HomeMy WebLinkAboutContract 40653-CO3 F_ O -r Wc3RTH City of Fort Worth C=2rChange Order Request CCT Project Name: Hicks Industrial Park Sanitary Sewer Extension City Sec No.: 40653 Project No.(s): P275-707170036783 I DOE No. 5580 City Proj.No.: 00367 Project Description: Sanitary Sewer Extension to Serve Hicks Industrial Park Contractor: Wright Construction Co., Inc. Change Order# 0 Date: 1 4/11/2012 City Project Mgr.1 Liam Conlon City Inspector: Michael Collier Phone Number:1 817-392-6824 Phone Number: 817-223-2273 Dept. Sewer Totals Contract Time (Calendar da s) Original Contract Amount $1,063,674.60 _$1,063,674.60 180 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1.063.074. $1 fi74. 180 Amount of Proposed Change Order Revised Contract Amount 1; 34 •1 ' 180 Original Funds Available for Change Orders 132i, ds Available for this CO 44 0 d&Vn Fu ing(if necessary) v �' CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT ;* ' 4 0 N MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $169 � voc s Ca a ge order voids, supersedes and replaces Change Orders Nos. 1 and 2 in their entirety.Serbs t to the approval of Change Orders Nos. 1 and 2, it was determined that staff had inadvertently unit prices for trench safety (Pay Item 23) and dehole exploratory excavation study (Pay Itemo4���� 35) as $1.50 and $40.00 respectively, instead of $1.00 and $740.00. This change order rectifies thq errors. ,o'4'Q!o�O� �a OC The change order will provide for the following that were necessary to complete the project. •o °off d V o o°O FI • Increased pay item quantities of 8-inch sewer pipe, 4-foot dia and 3�-i, fr i d o°O'�� cover. o d Md b IrC. �►�ooppoo�� �a • Additional pay item quantity of ductile iron pipe services. lvfar�r. `J' The change order will also allow for the deletion of pay item quantities that are no longe needed on the o project. N It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. n Wright Construction Co., Inc. Kyle Marsh 1 Z A444 ig �y M&C Number I 1, M&C Date Approved A �ORT WORTH City of Fort Worth Change Order Additions Project Name Hicks Industrial Park Sanitary Sewer Extension City Sec No.: 40653 Project No.(s): P275-707170036783 DOE No. 5580 City Proj. No.: 00367 Project Sanitary Sewer Extension to Serve Hicks Industrial Park Description Contractor Wright Construction Co., Inc. Change Order: F—T] Date: 1 4/11/2012 City Project Mgr. Liam Conlon City Inspector F Michael Collier ADDITIONS oty Unk Cost Tom, 8 8-Inch Sanitary Sewer Pipe SEWER 182.00 LF $35.75 $6,506.50 13 Manhole STD 4-ft. Diameter SEWER 2.00 EA $1,435.00 $2,870.00 14 Manhole STD 4-ft. Diameter SEWER 2.00 LF $130.00 $260.00 20 Collar Manhole 32-Inch Frame and Cover Install SEWER 2.00 EA $930.00 $1,860.00 21 Manhole Vacuum Test Services SEWER 2.00 EA $110.00 $220.00 22 Inspection Post Construction Cleaning and TV Study SEWER 182.00 LF $1.50 $273.00 23 Trench Safety SEWER 182.00 LF $1.00 $182.00 36 Core Existing Manhole 6-Inch SEWER 1.00 EA $800.00 $800.00 37 DIP to Cross the Existing W/L ditch SEWER 7.00 EA $1,800.00 $12,600.00 Sewer $25,571.50 Page 2 of 4 Additions Sub Total $25,571.50 ` FO KT WORTH City of Fort Worth Change Order Deletions Project Name Hicks Industrial Park Sanitary Sewer Extension City Sec No.: 40653 Project No.(s): P275-707170036783 DOE No. 5580 City Proj. No.: 00367 Project Description Sanitary Sewer Extension to Serve Hicks Industrial Park Contractor Wright Construction Co., Inc. Change Order=] 4/11/2012 City Project Mgr. Liam Conlon City Inspector: Michael Collier DELETIONS DEPT Qty Unk Unit cost TOW 24 Concrete Type E Install SEWER 10.00 CY $85.00 $850.00 25 Driveways 6-Inch Exposed Aggerate Install SEWER $8,622.00 SF $1.40 $12,070.80 26 Drives 6-Inch Install SEWER 420.00 SF $8.00 $3,360.00 27 Pavement 2-inch HMAC on 2/27 Concrete Base Material SEWER 819.00 LF $65.00 $53,235.00 29 Rip Rap Grouted Than 18-inch Rock Install SEWER 42.00 CY $120.00 $5,040.00 33 6-Inch Top Soil Install SEWER 75.00 CY $8.00 $600.00 34 Filll Material SEWER 10.00 CY $20.00 $200.00 Sewer $75,355-80 Page 3 of 4 Deletions Sub Total $75,355.80 MIWBE Breakdown for this Change Order 1AM Seib 'Type of Service Amount for this CO Total Previous Change Orders TE NT Total $ Page 4 of 4 a� w 0 0 a� a� L Cl) 0 U a .o a c W U U O � O � U O tp (D M M O O U U J n ti co 0)C; O O d O Q to to 1*- 00 O O C O ~ tp d CO) M +� O O O m W r V V LU cc ER ER iA fA ER fA ER fA fH N J+ W a L C c6 M 3 U m r 0 7 m L a O V O ca M 0)C O 7 L cu Q C Q H r ti � � � Y r �p m tV CD ca 0 a m m � 6 U = a o U F— rn o v -m U Z' U c z O Q L Co W a L m L ° cn U 'E C - t: �_ v O - m cv O � c� ca c a a m O 0 ° o v E Q > Q ° — o m Q Q cn g O m L c o n Q O Z O zz E o U- .0 � z m o U a° o Q o a) a) o E C O W d W U m C_ 7 � N U C C O .> C E 7 !_ O - .'-.. O O O E m O m a m U U ° Q H U O U a a U a Q