Loading...
HomeMy WebLinkAbout060676-A1 - General - Contract - Federal Highway AdministrationCSC No. 60676-A1 AMENDMENT TO THE GRANT AGREEMENT 1. Federal Award No. 693JJ32440017 Amendment No. 0001 4. Award To City of Fort Worth 200 Texas Street Fort Worth, TX 76102 Unique Entity Id.: ENS6MKSIZL18 TIN No.: 756000528 6. Period of Performance 11/17/2023—11/17/2025 2. Effective Date 3. Assistance Listings No. See No. 16 Below 20.939 5. Sponsoring Office U.S. Department of Transportation Federal Highway Administration Office of Safety 1200 New Jersey Avenue, SE HSSA-1, Mail Drop E71-117 Washington, DC 20590 7. Total Amount Federal Share: $419,505.60 Recipient Share: $104,876.00 Other Federal Funds: $ 0.00 Other Funds: $ 0.00 Total: $524,381.60 8. Type of Agreement 9. Authority Grant Section 24112 of the Infrastructure Investment and Jobs Act (Pub. L. 117-58, November 15, 2021) 10. Procurement Request No. HSA260111 CL 12. Submit Payment Requests To See Article 5. 14. Description of the Amendment: 11. Federal Funds Obligated $419,505.60 13. Accounting and Appropriations Data 15XO 173 E5 0.0000.05 5 SR 10500.5592000000.41010.61006600 The purpose of this amendment is to administratively close out the Grant Agreement. As a result of this amendment, the total value of this agreement is shown in item No. 7 above. The Recipient hereby provides a Release of Claims and agrees to release and discharge the Government from any and all further obligations under this Grant Agreement. The Recipient and the Government represent and warrant that the Recipient has completed all performance obligations required under this grant: including but not limited to providing the Government with all required deliverables, reports, and/or any other information that may have been required. The Recipient acknowledges and agrees that it has received Federal funds in the amount of $419,505.60 for completing this Grant. This Amendment constitutes the entire agreement between the parties with respect to the closeout of this Grant Agreement. The Grant Agreement is now closed. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 1 of 2 RECIPIENT FEDERAL HIGHWAY ADMINISTRATION 15. Signature of Person Authorized to Sign 16. Signature of Agreement Officer Signature Name: Jesica McEachern Title: Assistant City Manager 06/08/2026 Date Signature Name: Veronica R. Jacobson n_�o�asa fORT��A'DPP ATTEST: Paa4n�os64d Jannette Goodall City Secretary APPROVRECOA FNDED: By: Lauren Prieur (Jun 3. 2026 07:54:22 CDT) Lauren Prieur, P.E. Director, Transportation and Public Works APPROVED AS TO FORM AND LEGALITY By: Douglas Black (Jun 2, 2026 16:18:22 CDT) Douglas W Black Sr. Assistant City Attorney Contract Compliance Manager: Title: Agreement Officer M&C No.: 23-0891 M&C Date: October 17, 2023 Date By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, in2 g q�uing all performance and reporting requirements. Cfielse St. L((ouis (May 26, 2026 13:11:05 CDT) Chelsea St. Louis, AICP Sr. Capital Projects Officer OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 2 of 2 City of Fort Worth, Texas Mayor and Council Communication DATE: 10/17/23 M&C FILE NUMBER: M&C 23-0891 LOG NAME: 20SS4A COMP SAFETY ACTION PLAN FEDERAL GRANT AGREEMENT SUBJECT (ALL) Ratify Application for and Authorize Acceptance of the Safe Streets and Roads for All Grant with the United Stales Department of Transportation and Federal Highway Administration in the Amount Up to $524,381.60 for the Citywide Safely Action Plan Project Which Includes City Participation in the Amount of $104,876.00, Adopt Appropriation Ordinances and Amend the Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Ratify application for federal funds and authorize execution of the Federal Grant Agreement with the Federal Highway Administration for the Safe Streets and Roads for All Discretionary Grant Program - SS4A Comp Safety Action Plan project (City Project No. 105099) in the amount of $524,381,60, with Federal participation in the amount of $419,505.60 and city participation in the amount of $104,876.00; 2. Adopt the attached appropriation ordinance Increasing estimated receipts and appropriations in the Grants Capital Projects Federal Fund, subject to the receipt of the grant, (1) in an amount up to $419,505.60 for Federal participation and (2) in the amount up to $104,876.00 for City participation, transferred from the General Capital Projects Fund, for the purpose of funding the SS4A Comp Safety �ction Plan project (City Project No.105099); 3. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the General Capital Projects Fund by increasing estimated receipts and appropriations in SS4A Comp Safely Action Plan project (City Project No.105099) in the amount of $104,876.00 and decreasing estimated receipts and appropriations in the Traffic System Maintenance programmable project (City Project No. P00021) by the same amount, for the purpose of transferring to the Grants Capital Projects Fund for the required local match; and 4. Amend the Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: The City of Fort Worth (City) Transportation and Public Works Department applied for and was awarded funds from the Federal Highway Administration (FHWA) to develop a citywide Comprehensive Safety Action Plan through the Safe Streets and Roads for All discretionary grant program. Development of the Comprehensive Safety Action Plan aligns with City Council Resolution No. 5149-11-2019, which affirms the City's support for development of a Vision Zero based strategy to eliminate traffic related fatalities and serious injuries. The Plan will build on High -Injury Network analysis completed In 2020, and will establish the City's Vision Zero commitment by recommending a portfolio of policies, programs, and projects to reduce crashes, injuries and fatalities for all modes. The creation of this plan will qualify the City to compete for implementation projects in future rounds of the Safe Streets and Roads for All program. The purpose of this Mayor and Council Communication (M&C) Is to ratify application for and authorize acceptance of the Safe Streets and Roads for All Grant with the Federal Highway Administration (FHWA), a division of the United States Department of Transportation. The agreement details the responsibilities of both the City and FHWA in the development of the Comprehensive Safely Action Plan. This M&C also adopts an appropriation ordinance to accept federal grant funds for the project. Appropriations for the SS4A Comp Safety Action Plan project are as depicted below: Fund Funding Amount Grants Capital Projects Federal Fund - Federal Participation $419,505.60 Grants Capital Projects Federal Fund - City Participation $104,876,00 Project Total $524,381.60 Funding for this project was not Included in the Fiscal Years 2024-2028 Capital Improvement Program because the project and funding sources were unknown at the time of its development. The action in this M&C will amend the Fiscal Years 2024-2028 Capital Improvement Program as approved in connection with Ordinance 26453-09-2023. Funding for the City participation for this grant is available In the Traffic System Maintenance programmable project. Fund IlProject Amount E1 90 IIP00021 Traffic System Maintenance II ($104,876.00)1 001 105099-SS4A Comp Safety Action Plan $104 876.00 Funding is budgeted in the TPW Dept Highway & Streets Department's Traffic System Maintenance programmable project within the General Capital Projects Fund for the purpose of funding the SS4A Comp Safely Action Plan project. Since no City salaries will be charged, indirect cost recovery does not apply. Transportation and Public Works staff are initiating the procurement of consultant services to create the Comprehensive Safety Action Plan. The project Is expected to start in the Winter of 2023 and be completed by the Fall of 2025. The SS4A Comp Safety Action Plan Project is located in ALL COUNCIL DISTRICTS. A Form 1295 is not required because: This contract will be with a governmental entity, state agency or public institution of higher education: Federal Highway Administration FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the current capital budget, as appropriated, in the Grants Capital Projects Federal Fund. The Transportation and Public Works Department (and Financial Management Services) will be responsible for the collection and deposit of funds due to the City. Prior to an expenditure being incurred, the Transportation and Public Works Department has the responsibllily to validate the availability of funds. This Is a reimbursement grant. Submitted for City Manager's Office by: William Johnson 5806 Originating Business Unit Head: Lauren Prieur 6035 Additional Information Contact: Martin Phillips 7861 Fort Worth City Urn"Ots EORTYO - RTH Comprehensive Safety Action Plan -1,- 1".. A, Jn ' �07 ... . ........ 4) Ad, PAIA.I..1 (123" 10 IUJ 00 ... ..... . ... J77 X W. LEGEND: CITY LIMIT - Gs'IfflounAp'll (Mona Kane), Esd Kow. Esd (ThollAnd). NGCC, ORDINANCE NO.26514-10-2023 AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE GRANTS CAPITAL PROJECTS FEDERAL FUND, SUBJECT TO RECEIPT OF TIIE GRANT, IN THE AMOUNT UP TO $419,505.60, FOR THE PURPOSE OF FUNDING SS4A COMP SAFETY ACTION PLAN PROJECT (CITY PROJECT NO. 105099); PROVIDING FOR A SEVERABILITY CLAUSE; MAKING TIIIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That in addition to those amounts allocated to the various City departments for Fiscal Year 2023-2024 in the Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the Grants Capital Projects Federal Fund, subject to the receipt of the grant, in the amount up to $419,505.60, for the purpose of funding SS4A Comp Safety Action Plan project (City Project No. 105099). SECTION 2. That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment sliall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions sliall be and remain in fill] force and effect. SECTION 3. That this ordinance shall be incorporated into the ordinance effecting the budget of the municipal government of the City of Fort Worth for the ensuing Fiscal Year beginning October 1, 2023, and ending September 30, 2024, and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4. This ordinance shall take effect upon adoption. APPROVED AS TO FORM AND LEGALITY: hfigi' I om..:t(a<in,eon I&AGcor) Assistant City Attorney ADOPTED AND EFFECTIVE: October 17, 2023 CITY SECRETARY Q�na h A , Jannette S. Goodall City Secretary -� .'%i O o®d 0 /,P,4 ° 1 0 "° °0 �° 0 ORDINANCE NO.26515-10-2023 AN ORDINANCE ADJUSTING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE GENERAL CAPITAL PROJECTS FUND, BY INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE SS4A COMP SAFETY ACTION PLAN PROJECT (CITY PROJECT NO. 105099) IN THE AMOUNT OF $104,876,00 AND DECREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE TRAFFIC SYSTEM MAINTENANCE PROGRAMMABLE PROJECT (CITY PROJECT NO. P00021) BY THE SAME AMOUNT; PROVIDING FOR A SEVERABILITY CLAUSE; MAILING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITII; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That in addition to those amounts allocated to the various City departments for Fiscal Year 2023-2024 in the Budget of the City Manager, there shall also be adjusted estimated receipts and appropriations in the General Capital Projects Fund, by increasing estimated receipts and appropriations in file SS4A Comp Safety Action Plan project (City Project No. 105099) in the amount of $104,876.00 and decreasing estimated receipts and appropriations in the Traffic System Maintenance programmable project (City Project No.P00021) by the same amount. SECTION 2. That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in frill force and effect. SECTION 3. That this ordinance shall be incorporated into the ordinance effecting the budget of the municipal government of the City of Fort Worth for the ensuing Fiscal Year beginning October 1, 2023, and ending September 30, 2024, and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4. This ordinance shall take effect upon adoption. APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney ADOPTED AND EFFECTIVE: October 17, 2023 CITY SECRETARY Jannette S. Goodall City Secretary 0 Was CSC No. 60676 1. Award No. 693JJ32440017 4. Award To City of Fort Worth, Texas 200 Texas Street Fort Worth, TX 76102 Unique Entity Id.: ENS6MKSIZL18 TIN No.: 756000528 6. Period of Performance Effective Date of Award through 24 Months 2. Effective Date See No. 17 Below 3. Assistance Listings No. 20.939 5. Sponsoring Office U.S. Department of Transportation Federal Highway Administration Office of Safety 1200 New Jersey Avenue, SE HSSA-1, Mail Drop E71-117 Washington, DC 20590 7. Total Amount Federal Share: $419,505.60 Recipient Share: $104,876.00 Other Federal Funds: $0 Other Funds: $0 Total: $524,381.60 8. Type of Agreement 9. Authority Grant Section 24112 of the Infrastructure Investment and Jobs Act (Pub. L. 117-58, November 15, 2021; also referred to as the "Bipartisan Infrastructure Law" or "BIL") 10. Procurement Request No. HSSP230386PR 12. Submit Payment Requests To See article 20. 11. Federal Funds Obligated $419,505.60 13. Payment Office See article 20. 14. Accounting and Appropriations Data 15XOI 73E50.0000.055SR10500.5592000000.41010.61006600 15. Description of Project Fort Worth Citywide Safety Action Plan RECIPIENT 16. Signature of Person Authorized to Sign L�L _ William ohnson (N v 14, 2023 07:iG CST) Signature Date Name: William Johnson Title: Assistant City Manager FEDERAL HIGHWAY ADMINISTRATION 17. Signature of Agreement Officer HECTOR RAMON Digitally signed byHECrOR RAMON SANTAMARIA SANTAMARIA Date: 2023.11.17 10:22:33 -05'00' Signature Date Name: HectorR. Santamaria Title: Agreement Officer 1 of 13 U.S. DEPARTMENT OF TRANSPORTATION GRANT AGREEMENT UNDER THE FISCAL YEAR 2022 SAFE STREETS AND ROADS FOR ALL GRANT PROGRAM This agreement is between the [United States Department of Transportation (the "USDOT")] [Federal Highway Administration (the "FHWA")] and the City of Fort Worth, TX (the "Recipient"). This agreement reflects the selection of the Recipient to receive a Safe Streets and Roads for All ("SS4A") Grant for the Fort Worth Citywide Safety Action Plan. The parties therefore agree to the following: ARTICLE 1 GENERAL TERMS AND CONDITIONS 1.1 General Terms and Conditions. (a) In this agreement, "General Terms and Conditions" means the content of the document titled "General Terms and Conditions Under the Fiscal Year 2022 Safe Streets and Roads for All Grant Program," dated February 8, 2023, which is available at hops://wNvNv.ti-anspoi-tation.goN,/grants/ss4a/grant-agreements. Articles 7-30 are in the General Terms and Conditions. The General Terms and Conditions are part of this agreement. (b) The Recipient states that it has knowledge of the General Terms and Conditions. Recipient also states that it is required to comply with all applicable Federal laws and regulations including, but not limited to, the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (2 CFR part 200); National Environmental Policy Act (NEPA) (42 U.S.C. § 4321 et seq.); and Build America, Buy America Act (BIL, div. G §§ 70901-27). (c) The Recipient acknowledges that the General Terms and Conditions impose obligations on the Recipient and that the Recipient's non-compliance with the General Terms and Conditions may result in remedial action, termination of the SS4A Grant, disallowing costs incurred for the Project, requiring the Recipient to refund to the FHWA the SS4A Grant, and reporting the non-compliance in the Federal -government -wide integrity and performance system. 2of13 ARTICLE 2 APPLICATION, PROJECT, AND AWARD 2.1 Application. Application Title: Conduct a citywide Safety Action Plan building on previous work with public involvement, collecting and analyzing detailed multimodal crash -data, and identifying projects that reduce serious crashes. Application Date: 9/15/2022 2.2 Award Amount. SS4A Grant Amount: $419,505.60 2.3 Award Dates. Period of Performance End Date: See section 6 on page 1 2.4 Budget Period. Budget Period End Date: See section 6 on page 1 2.5 Action Plan Giant or Implementation Giant Designation. Designation: Action Plan 2.6 Federal Award Identification Number. The Federal Award Identification Number is listed on page 1, line 1, ARTICLE 3 SUMMARY PROJECT INFORMATION 3.1 Summaiy of Project's Statement of Work. The award will be used by the City of Fort Worth to develop a comprehensive safety action plan. 3.2 Project's Estimated Schedule. 3of13 ACTION PLAN SCHEDULE Milestone Schedule Date Planned Draft Action Plan Completion Date: 14 months from Effective Date of Award Planned Action Plan Completion Date: 20 months from Effective Date of Award Planned Action Plan Adoption Date: 22 months from Effective Date of Award Planned SS4A Final Report Date: 24 months from Effective Date of Award 3.3 Project's Estimated Costs. (a) Eligible Project Costs Eligible Project Costs SS4A Grant Amount: $419,505.60 Other Federal Funds: $0.00 State Funds: $0.00 Local Funds: $104,876.00 In -Kind Match: $0.00 Other Funds: $0.00 Total Eligible Project Cost: $524,381,60 (b) Supplemental Estimated Budget Cost Element IF, Share Non -Federal Share Total Budget Amount Direct Labor $0.00 $0.00 $0.00 Fringe Benefits $0.00 $0.00 $0.00 Travel $0.00 $0.00 $0.00 Equipment $0.00 $0.00 $0.00 Supplies $0.00 $0.00 $0.00 Contractual/Consultant $419,505.60 $104,876.00 $524,381.60 Other $0.00 $0.00 $0.00 Indirect Costs $0.00 $0.00 $0.00 Total Budget $419,505.60 $104,876.00 $524,381.60 4of13 ARTICLE 4 RECIPIENT INFORMATION 4.1 Recipient's Unique Entity Identifier. ENS6MKS 1 ZL 18 4.2 Recipient Contact(s). Chelsea St. Louis Senior Capital Projects Officer City of Fort Worth, TX 5001 James Avenue, Fort Worth TX, 76115 (817) 392-7978 Clielsea.st.lotiis@fortwortlitexas.gov fortworthtexas.gov 4.3 Recipient ICey Pei-sonnel. Name Title or Position Namoo Han Professional Engineer Chelsea St. Louis Sr. Capital Projects Officer Mike Landvik Transportation Planning Manager Kelly Porter Assistant Public Works Director 4.4 USDOT Project Contact(s). Meg Miller Safe Streets and Roads for All Program Manager Federal Highway Administration Office of Safety HSSA-1, Mail Stop: E71-117 1200 New Jersey Avenue, S.E. Washington, DC 20590 202-366-8029 meg.miller@dot.gov 5of13 and Hector R. Santamaria Agreement Officer (AO) Federal Highway Administration Office of Acquisition and Grants Management HCFA-33, Mail Stop E62-310 1200 New Jersey Avenue, S.E. Washington, DC 20590 Hector.Santamaria@dot.gov and Mishel R. McCants Agreement Specialist (AS) Office of Acquisition and Grants Management HCFA-33, Mail Stop E62-204 1200 New Jersey Avenue, S.E. Washington, DC 20590 Mishel.McCants@dot.gov and Al Alonzi Agreement Officer's Representative (AOR Division Administrator FHWA-TX Division 308 W. 8"' Street, Room 826 512-536-5902 al.alonzi@dot.gov dot.gov and Lisa Larsen TX Division Office Point of Contact Special Programs Coordinator FHWA-TX Division 300 E. 8th Street, Rom 826 512-536-5965 lisa.larsen@dot.gov 6of13 ARTICLE 5 USDOT ADMINISTRATIVE INFORMATION 5.1 Office for Subaward and Contract Authorization. USDOT Office for Subaward and Contract Authorization: FHWA Office of Acquisition and Grants Management SUBAWARDS AND CONTRACTS APPROVAL Note: See 2 CFR § 200.331, Subrecipient and contractor determinations, for definitions of Subrecipient (who is awarded a subaward) versus contractor (who is awarded a contract). Note: Recipients with a procurement system deemed approved and accepted by the Government or by the AO are exempt from the requirements of this clause. See 2 CFR 200.317 through 200.327, Note: This clause is only applicable to Action Plan Grants. Unless described in the application and funded in the approved award, the Recipient must obtain prior written approval from the AO for the subaward, transfer, or contracting out of any work under this award above the Simplified Acquisition Threshold. This provision does not apply to the acquisition of supplies, material, equipment, or general support services. Approval of each subaward or contract is contingent upon the Recipient's submittal of a written fair and reasonable price determination, and approval by the AO for each proposed contractor/sub- recipient. Consent to enter into subawards or contracts will be issued through written notification from the AO or a formal amendment to the Agreement. The following subawards and contracts are currently approved under the Agreement by the AO. This list does not include supplies, material, equipment, or general support services which are exempt from the pre -approval requirements of this clause. (Fill in at award or by amendment) 5.2 Reimbursement Requests (a) The Recipient may request reimbursement of costs incurred in the performance of this agreement if those costs do not exceed the finds available under section 2.2 and are allowable under the applicable cost provisions of 2 C.F.R. Part 200, Subpart E. The Recipient shall not request reimbursement more frequently than monthly. (b) The Recipient shall use the DELPHI eInvoicing System to submit requests for reimbursement to the payment office. When requesting reimbursement of costs incurred or credit for cost share incurred, the Recipient shall electronically submit supporting cost detai I with the SF 271 (Outlay Report and Request for Reimbursement for Construction Programs) to clearly document all costs incurred. 7 of 13 (c) The Recipient's supporting cost detail shall include a detailed breakout of all costs incurred, including direct labor, indirect costs, other direct costs, travel, etc., and the Recipient shall identify the Federal share and the Recipient's share of costs. If the Recipient does not provide sufficient detail in a request for reimbursement, the AO may withhold processing that request until the Recipient provides sufficient detail. (d) The USDOT shall not reimburse costs unless the Agreement Officer's Representative '(the "AOR") reviews and approves the costs to ensure that progress on this agreement is sufficient to substantiate payment. (e) The USDOT may waive the requirement that the Recipient use the DELPHI eInvoicing System. The Recipient may obtain waiver request forms on the DELPHI eInvoicing website (httt)://www.dot.gov/cfo/delphi-einvoicing-system.html) or by contacting the AO. A Recipient who seeks a waiver shall explain why they are unable to use or access the Internet to register and enter payment requests and send a waiver request to Director of the Office of Financial Management US Department of Transportation, Office of Financial Management B-30, Roorn W93-431 1200 New Jersey Avenue SE Washington DC 20590-0001 91 DOTElectroiiicInvoicing@dot.gov. If the USDOT grants the Recipient a waiver, the Recipient shall submit SF 271 s directly to: DOT/FAA P.O. Box 268865 Oklahoma City, OK 73125-8865 Attn: Agreement Specialist (f) The requirements set forth in these terms and conditions supersede previous financial invoicing requirements for Recipients. ARTICLE 6 SPECIAL GRANT TERMS 6.1 SS4A funds must be expended within five years after the grant agreement is executed and DOT obligates the funds, which is the budget period end date in section 10.3 of the Terms and Conditions and section [wherever the date it is in this agreement]. 8of13 6.2 The Recipient acknowledges that the Action Plan will be made publicly available, and the Recipient agrees that it will publish the final Action Plan on a publicly available website. 6.3 The Recipient demonstrates compliance with civil rights obligations and nondiscrimination laws, including Titles VI of the Civil Rights Act of 1964, the Americans with Disabilities Act (ADA), and Section 504 of the Rehabilitation Act, and accompanying regulations. Recipients of Federal transportation funding will also be required to comply fully with regulations and guidance for the ADA, Title VI of the Civil Rights Act of 1964, Section 504 of the Rehabilitation Act of 1973, and all other civil rights requirements. 6.4 There are no other special grant requirements for this award. 9of13 ATTACHMENT A PERFORMANCE MEASUREMENT INFORMATION Study Area: City limits of Fort Worth Baseline Measurement Date: 09/01/2023 Baseline Report Date: 10/1 /2023 Table 1: Performance Measure Table Measure Category and Description Measurement Frequency Percent of Funds to Underserved Equity Communities: Funding amount (of total End of period of project amount) benefitting underserved performance communities, as defined by USDOT Project Costs: Quantification of the cost End of period of Costs of each eligible project carried out using performance the grant Lessons Learned and Recommendations: Lessons Learned and Description of lessons learned and any End of period of Recommendations recommendations relating to future performance projects of strategies to prevent death and serious injury on roads and streets. 10 of 13 ATTACHMENT B CHANGES FROM APPLICATION INSTRUCTIONS FOR COMPLETING ATTACHMENT B: Describe all material differences between the scope, schedule, and budget described in the application and the scope, schedule, and budget described in Article 3. The purpose of this attachment B is to document the differences clearly and accurately in scope, schedule, and budget to establish the parties' knowledge and acceptance of those differences. See section 10.1. Scope: N/A Schedule: N/A Budget: N/A The table below provides a summary comparison of the project budget. Fund Source Application $ % Section 3.3 $ % Previously Incurred Costs Non -Eligible Project Costs 1iI I ll;� ; �I ! . � :I ,,. I I '1 ' Federal Funds Non -Federal Funds Total Previously Incurred Costs Future Eligible Project Costs iij SS4AFunds Other Federal Funds Non -Federal Funds Total Future Eligible Project Costs Total Project Costs I 1 of 13 ATTACHMENT C RACIAL EQUITY AND BARRIERS TO OPPORTUNITY 1. Efforts to Improve Racial Equity and Reduce Barriers to Opportunity. The Recipient states that rows marked with "X" in the following table are accurate: A racial equity impact analysis has been completed for the Project. (Identil a report on thal analysis or, if 770 report was produced, describe the analysis and its results in the syl-?poi-flng narrative below. The Recipient or a project partner has adopted an equity and inclusion program/plan or has otherwise instituted equity -focused policies related to x project procurement, material sourcing, construction, inspection, hiring, or other activities designed to ensure racial equity in the overall delivery and implementation of the Project. (IdentijJ1 the relevant programs, plans, or policies in the supporting narrative below. The Project includes physical -barrier -mitigating land bridges, caps, lids, linear parks, and multimodal mobility investments that either redress past barriers to opportunity or that proactively create new connections and opportunities for underserved communities that are underserved by transportation. (Identi) the relevant investments in the su ortin narrative below. The Project includes new or improved walking, biking, and rolling access for individuals with disabilities, especially access that reverses the disproportional impacts of crashes on people of color and mitigates neighborhood bifurcation. (Identi l the nenv or improved access in the SUPP07-ting narrative below. The Project includes new or improved freight access to underserved communities to increase access to goods and job opportunities for those underserved communities. (Identify the neiv or improved access in the su orfin narrative beloiv. The Recipient has taken other actions related to the Project to improve racial equity and reduce barriers to opportunity, as described in the supporting narrative below. The Recipient has not yet taken actions related to the Project to improve racial x equity and reduce barriers to opportunity but, before beginning construction of the project, will take relevant actions described in the supporting narrative below The Recipient has not taken actions related to the Project to improve racial equity and reduce barriers to opportunity and will not take those actions under this award. 2. Supporting Narrative. The City of Fort Worth has a Diversity and Inclusion Department that maintains and implements our city MBE/WBE program. They set MBE/WBE goals prior to procurement and also review and approve MBE/WBE/DBE (whichever is applicable based on funding source) participation prior to contract execution. This department also 12 of 13 conducts extensive outreach to MBE/WBE/DBE firms to increase participation and improve the business equity program. Our previous high injury network document which the Action Plan will build on considered equity and the Action Plan work will as well in terms of data collection, outreach, project identification and recommendations. 13 of 13 ACCEPTED AND AGREED: City: By: Wiula n2,2024 11:58 CST) Name: William Johnson Title: Assistant City Manager Date: CITY OF FORT WORTH INTERNAL ROUTING PROCESS: Approval Recommended: A0. F. By: Lau Prieur(Dec 19, 202313:08 CST) Name: Lauren Prieur Title: Transportation and Public Works Director Approved as to Form and Legality: BY: DBlack(DecI9,202312:57CST) ter✓ Name: Doug W Black Title: Senior Assistant City Attorney Contract Authorization: M&C: M&C 23-0891 / October 17, 2023 Form 1295#: Not Applicable Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. /�LJ. P7 By: CheIc a S:. LO WSID?c 15, 202311:55 CST) Name: Chelsea St. Louis Title: Sr. Capital Projects Officer City Secretary: By: U Name: Jannette S. Goodall Title: City Secretary FORTWORTH. Routing and Transmittal Slip Transportation & Public Works DOCUMENT TITLE: Amendment to FHWA SS4A Agreement — Grant Closeout M&C: 23-0891 CPN: 105099 CSO: DOC#: Date: 5/26/2026 To: Name Department Initials Date Out 1. Chelsea St. Louis TPW - Signature Reis- St.Louis 2. Anna Benavides TPW - Initial 3. Martin Phillips TPW - Initial M 4. Doug Black CAO - Signature o 5. Lauren Prieur TPW - Signature 6. Jesica McEachern CMO - Signature 7. Katherine Cenicola CSO - Initial 8. Jannette Goodall CSO - Signature 9. Allison Tidwell CSO 10. Chelsea St. Louis TPW 11. 12. DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ❑No SAME DAY: ❑YES ❑No NEXT DAY: [-]YES ❑No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File Thank you! ❑ Attach Signature, Initial and Notary Tabs FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Federal Highway Administration Subject of the Agreement: Safe Streets and Roads for All Grant Agreement Amendment The purpose of the amendment is to administratively close out the grant. M&C Approved by the Council? * Yes 9 No ❑ If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 8 No ❑ 60676 Al If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes ❑ No 8 If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 9 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: 11/17/2023 If different from the approval date. Expiration Date: 11/17/2025 If applicable. Is a 1295 Form required? * Yes 8 No 0 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If'applicable. 105099 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.