Change Order Request
Project Name Construction of the Airport Frontage Improvements Project at Meacham International Airport City Sec # F63670
Client Project #(s) 100602
Project Description This project consists of improvements to the Airport Frontage along N. Main Street including drainage improvements, curb, gutter, and sidewalk installation,
underground electrical infrastructure, and installation of street lighting, wayfaring signage, and gateway monument signs.
Contractor The Fain Group, LLC Change Order # 2 Date 6/3/2026
City Project Mgr. I Tyler Dale City Inspector Kevin Jackson
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Aviation
Totals
Contract Time
(CD)
$10,861,928.00
$10,861,928.00
400
$95,074.53
$95,074.53
60
$10,957,002.53
$10,957,002.53
460
Amount of Proposed Change Order
-$6,554.95
-$6,554.95
0
Revised Contract Amount $10,950,447.58
Original Funds Available for Change Orders
Remaining Funds Available for this CO $0.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
$10,950,447.58
460
$0.00
0.81 %
$13,577,410.00
JUSTIFICATION (REASONS) FOR CHANGE ORDE
Due to unknown existing utilities, several of the structures needed to be adjusted to match the existing grades. Two proposed drainage structures required the tops to be custom
cast -in -place to meet the required elevations. Some of the areas required the original structures to be returned and cast -in -place altogether, incurring a restocking fee from the
manufacturer.
Due to an existing waterline conflicting with the new infrastructure, the waterline needs to be relocated. This affects and existing fire hydrant and requires movement of the said
fire hydrant and portions of the waterline. A tap is required to install the new portion of the waterline to an existing 16" waterline.
The proposed grades were adjusted in some areas, and the retaining wall was no longer required. As a result, the retaining wall will be removed from the project scope,
generating a credit.
The project included a pay item for anticipated height adjustments to multiple existing structures to accommodate the proposed sidewalk and grading. Through field adjustments
to the sidewalk alignment and grading, the contractor was able to avoid some of these modifications, resulting in reduced usage of the pay item and a credit to the project.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
om an
The Fain Group, LLC Larry Frazier l`
Date
06/04/2026
Inspector/Inspection Supervisor
Date
Pro ect and Contract Com liance Manager
Date
'r1�tJ
06/05/2026
Program Manager
Date
Senior Capital Project Officer
Date
Assistant Director (Dept)
Date
Director, Contracting t
Date
06/05/2026
1 1 -
06/05/2026
Assistant City Attorney
Date
I Assistant Citv Manam
Date
`" '—i,.U—"
:andne Paghara(Jun 5. 202610:46:50 CDT)
06/05/2026
✓�
.-M, 7.z 60e:oe:27 CAr1
06/07/2026
Council Action
M&C Number NIA M&C Date Approved N/A
ATTEST: 1 ,;-- ,; ehoayc
a.8 o
Jannette Goodall, City Secretary a°$^nn�Xasb''
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
1'*"r Change Order Additions
Project Name Construction of the Airport Frontage Improvements Project at Meacham International Airport City Sec # 63670
Client Project # 100602
Contractorl The Fain Group, LLC PM1 Tyler Dale Inspector Kevin Jackson
Change Order Submittal # Date 61312026
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
Ste +Structure & Repour Inlet Top Adjustment
7-iation
3349.0001
AL-5 Cast In Place 4 X 4 Junction Box Sta 9+29 Restock
Aviation
1.00000000
EA
$625.05
3349.0001
BL-3 2608 4 X 4 Junction Box - Cast -In Place Restock
Aviation
1.00000000
EA
625.00
3349.5011
Al2 Cut Down for Grade Junction Box - Repour Top
Aviation
1.00000000
EA
3,809.00
241.1510
Fire Hydrant Relocation
Aviation
1.00000000
EA
$4,805.05
3305.0101
Fire Hydrant Stem Extension
Aviation
1.00000000
EA
$2,285.05
, 5.
241.1118
12" Water Valve & Plug Water Main Near Sta +30
Aviation
1.000 0000
EA
$3,660.00
241.1302
Relocate & Reuse 6" Fire Hydrant Gate Valve
Aviation
1.00000000
EA
$3,225.00
241. 015
Remove 2" DIP Water Line
Aviation
330.00000000
LF
38.00
3312.4112
Live Wet Tap 16" X 8" Fineline
Aviation
1.00000000
EA
16.8 44.75
3 12.4111
Live Wet Tap 1 " X 6"
Aviation
1.00000000
EA
6,675.00
3311.0141
6 Inch PVC for Fire Hydrant
Aviation
20.00000000
LF
$100.29
3311.0 441
8 Inch PV Fireline
Aviation
42.00000000
LF
T115.65
Aviation
$76,005.05
Sub Total Additions
76,005.05
Change Order Additions Page 2 of 3
FOR City of Fort Worth
Change Order Deletions
Project Name Construction of the Airport Frontage Improvements Project at Meacham International Airport City Sec # 63670
Client Project # 100602
Contractor The Fain Group, LLC PM Tyler Dale Inspector Kevin Jackson
Change Order Submittal # 02 Date 6/3/2026
DELETIONS
Change Order Deletions Page 3 of 3
FORT WORTH
Routing and Transmittal Slip
Aviation
Department
DOCUMENT TITLE: FTW Airport Frontage Improvements Change Order 2
M&C CPN 100602 CSO # 63670 DOC#
DATE: 6/3/2026
INITIALS
DATE OUT
TO:
06/05/2026
1. Aaron Barth
Aaron Barth
06/05/2026
2. Roger Venables
R g r Venables
GP
06/05/2026
3. Candace Pa liars
CP
06/07/2026
4. Valerie Washington
06/08/2026
5. Jannette Goodall
Ja nettfi e Goodall
6.
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑ Yes ❑X No
RUSH: ❑ Yes ❑X No SAME DAY: ❑ Yes ❑ No
ROUTING TO CSO: ❑x Yes ❑ No
Action Required:
❑ As Requested
❑ For Your Information
1 Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑ Yes ❑ No
❑ Attach Signature, Initial and Notary Tabs
Return to: Please call Tyler Dale at ext. 5416 for pick up when completed. Thank you.
FORTWORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: The Fain Group, LLC
Subject of the Agreement: Change Order II for construction of the Airport Frontage Improvements Project
at Fort Worth Meacham International Airport
M&C Approved by the Council? * Yes ❑ No 8
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes N No ❑ CSC 63670; Change Order 2
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes ® No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No N If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: Date of Execution
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes ❑ No 0
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 100602
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes IN No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.