HomeMy WebLinkAbout060142-A3 - Construction-Related - Contract - William Tharp Architects, PLLCAMENDMENT No . 3
TO CITY SECRETARY CONTRACT No.
WHEREAS, the City of Fort Worth (CITY) and William Tharp Architects,
PLLC (ARCHITECT) made and entered into City Secretary Contract No. 60142,
(the CONTRACT) which was authorized on 20th day of September, 2023 in the
amount of $94,500; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1
in the amount of $635,500.00 which was authorized by Mayor and Council
Communication (M&C) 24-0160 on 27th Day of February 2024; and Amendment 2
was authorized by M&C 24-0965 on 12thDay of November 2024 in the amount of
$187,092.00;
WHEREAS, the CONTRACT involves architectural services for the
following project:
2022 Bond Fire Station Community Center, CPN 104196; and
WHEREAS, it has become necessary to execute Amendment No. 3 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ARCHITECT, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
architectural services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by the Architect totals $76,400.00. (See Attached Funding
Breakdown Sheet, Page -3-) OFFICIAL RECORD
CITY SECRETARY
2. FT. WORTH, TX
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to the Architect for all work and services performed
under the Contract, as amended, so that the total fee paid by the City for
all work and services shall be an amount of $993,492.00.
City of Fort Worth, Texas Fire Station Community Center
Prof Services Agreement Amendment Template 104196
Revision Date: 12/08/2023
Page 1 of 3
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Valerie Washington (Jun 9, 2026 10:39:36 CDT)
Valerie Washington,
Assistant City Manager
DATE:
ATTEST:
'IInn
1140011111
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
ARCHITECT
William Tharp Architects, PLLC
Jim Tharp, AIA
Principal
DATE:
APPROVED AS TO FORM AND LEGALITY:
ZA-A�'
Stephen Hines (May 6, 26 12:13:05 CDT)
Steven M. Hines
Sr. Assistant City Attorney
M&C No.#: n/a
M&C Date: n/a
Marilyn Marvin
Director, Property Management Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Nikita N. Watts
Senior Capital Projects Officer
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 2 of 3
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Fire Station Community Center
104196
FUNDING BREAKDOWN SHEET
City Secretary No.
Amendment No. 3
Fund
Dept ID
Account
Project
ID
CF1-
Activity
CF2 -
Bond
Reference
Amount
34027
0800450
5330500
104196
9999
22020601
94,500.00
34027
0800450
5330500
104196
9999
22020601
635,500.00
34027
0800450
5330500
104196
9999
22020601
187,092.00
34027
0800450
5330500
104196
9999
22020601
76,400.00
Total:
$993,492
City of Fort Worth, Texas Fire Station Community Center
Prof Services Agreement Amendment Template 104196
Revision Date: 12/08/2023
Page 3 of 3
u i U L' a n s_ h n e p— cl r c 11:L U e c L s williamstharp.com
May 29, 2024
(Revised 0611812024)
(Revised 0710212024)
(Revised 0310912026)
Mrs. Niki Watts
Senior Capital Project Officer
Property Management Department
City of Fort Worth
100 Fort Worth Trail, Fort Worth, Texas 76102
Re: Phase 2 — Fire Station Community Center — Additional Services 2
Dear Niki,
The following proposal is for fees to provide additional scope of work related to the
design of the Fire Station Community Center.
01. SCOPE OF SERViCES
A.1 WTa's scope of additional services to include the following:
• All FF&E for the Community Center.
• Redesign of the South porch area of the building and adjacent playground,
hardscape and plantings to accommodate the existing 26" Pecan tree.
• Architecture, Civil and Landscape site plan revisions
• New Oncor easement dedication and coordination.
1114 East 15t Street 817.993.9844
Fort Worth, Texas 76102 itharp@wilhamstharp,com
D. ADDITIONIAL COIVIPEF!lSATIOI
Adcliiione)l compeansation f,�v Phase 2e $76,400
FF&E — $9,500
Design studies and drawings to save pecan tree — $15,000 (Arch, Structure, MEP)
Multiple alternate options, we've settled on three so far. - $5,000
Site Plan layout revisions - $39,500 (Arch, Civil & LA)
Oncor easement dedication and coordination - $7,500 (Civil)
Asbestos/Hazardous Materials Surveys
Environmental Surveys
A/V and Security
LEED Design
R %,, rnLiAYsyjbIi-,, E N paanses:
No additional expenses are anticipated.
Oyu iarship of Docurrucerkrs:
The Contract Documents and Specifications or reproduction of them in whole or
part shall not be used on any project without the prior written approval from
Williams Tharp Architects. WTA can provide digital files for the Owner's ongoing
management of the facility upon completion of the project.
Pa%u llar�'ir _u c'a'rii�3e
Invoicing will be monthly based on the percentage of work completed by the end of
the month. Payment is due within 30 days of the invoice statement date. Non-
payment within the 30 days may result in suspension of the work described above.
C.1 Summa j:
Niki, by signing below, you accept the general terms of this additional services
proposal. Please forward the City of Fort Worth's Standard Contract Amendment
for Professional Services for Phase 2 Additional Services 2.
Sincerely,
Jim Tharp, AIA NCARB
Principal
Williams Tharp Architects, PLLC.
Owner
Printed Name
Signature
Title
Date
The Texas Board of Architectural Examiners has jurisdiction over complaints regarding the
professional practices of persons registered as architects in Texas. TBAE, P.O. Box 12337, Austin,
Texas78711. 512-305-9000
tl) 9r 2I01 C, H, o1 1 L'un
The following are hourly billing rates for the professionals available to work on your
project. Additional staff may be added as the need arises. These rates are valid
through June 2026 and are subject to adjustment thereafter.
Principal
$275
Project Manager
$195
Architect 1
$145
Architect 2
$125
Architectural Technician
$115
Interior Design
$115
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: William Tharpe Architects
Subject of the Agreement: Add Services Amendment #3 for Fire Station Community Center Design
M&C Approved by the Council? * Yes ❑ No M
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ CSN 60142
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No ❑
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. PN 104196
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.