HomeMy WebLinkAbout059214-A2 - Construction-Related - Contract - Kimley-Horn & Associates, Inc.AMENDMENT No . 02
TO CITY SECRETARY CONTRACT No. 59214
CSC No. 59214-A2
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 59214,
(the CONTRACT) which was authorized by M&C 23-0187 on the 28th day of
February, 2023 in the amount of $ 475,000.00; and
WHEREAS, the CONTRACT was subsequently revised by:Amendment Number 1
in the amount of $1,255,000.00 which was authorized by M&C # 24-0524 on
June 11, 2024,; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Gateway Park Phase 1 Design, CPN 104192; and
WHEREAS, it has become necessary to execute Amendment No. 02 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $96,900.00. (See Attached Funding Breakdown Sheet, Page
-4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the ont act as amended so that the total fee aid by the ity fo all
work and services shall be an amount of $1,826,900.00.
OFFICIAL RECORD
CITY SECRETARY
3. FT. WORTH, TX
City of Fort Worth, Texas Gateway Park Phase 1 Design
Prof Services Agreement Amendment Template 104192
Revision Date: June 13, 2025
Page 1 of 4
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
NA'Al 8LtAru!�J'f
Dana Burghdoff (Jun 1, 026 18:1 6 CDT)
Dana Burghdoff
Assistant City Manager
DATE: 06/01 /2026
ATTEST:
ony
�s
� dd
Pd�*ooa e
(�
Jannette Goodall
City Secretary
Cristian Chavez
Cristian Chavez (Jun 2, 2026 08:25:42 CDT)
APPROVAL RECOMMENDED:
Tevesa-1howaJm - s P Jy
Teresa Thomason (May 26, 2026 14:42:26 CDT) Jo M 71hany Sp Jy
ENGINEER
Kimley-Horn and Associates, Inc.
Bradley J: {-fill
Bradley J. Hill (Mar 6, 2026 15:26:23 CST)
Bradley J. Hill
Regional Contract Lead
DATE: 03/06/2026
Teresa Thomason
Deputy Director, Park & Recreation Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
A-Vlu�l 1`e O
Seth Henry
Landscape Architect
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: June 13, 2025
Page 2 of 4
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Gateway Park Phase 1 Design
104192
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (May 29, 2026 16:45:34 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: June 13, 2025
Page 3 of 4
M&C No.#: NA
M&C Date: NA
Gateway Park Phase 1 Design
104192
FUNDING BREAKDOWN SHEET
City Secretary No. 59214
Amendment No. 2
Fund
Dept ID
Account
Project
ID
CF1-
Activity
CF2 -
Bond
Reference
Amount
34027
0800450
5330500
104192
009110
22020201
$96,900.00
Total:
$96,900.00
City of Fort Worth, Texas Gateway Park Phase 1 Design
Prof Services Agreement Amendment Template 104192
Revision Date: June 13, 2025
Page 4 of 4
Exhibit A to Amendment Number 2,
dated December 17, 2025
ENGINEER shall perform the following Additional Services:
Task 1 — IPRC Review Fees
A. IPRC Review Fees : The ENGINEER will pay the fees to the City of Fort Worth on behalf
of the City of Fort Worth Parks Department for IPRC Pre -Submittal and Review Fees for
Gateway Park and the required Off -Site Public Utility Infrastructure improvements.
Task 2 — Oncor Power Easement Exhibits
A. Oncor Power Easement Exhibits: The ENGINEER will coordinate with Oncor Power
Delivery and prepare the required easement exhibits and staking for power poles and
easement limits.
Task 3 — Subsurface Utility Engineering (SUE)
A. Subsurface Utility Engineering (SUE) : The ENGINEER will utilize a subsurface utility
engineer to provide and perform SUE information regarding the park project area. The
scope includes Quality Level (QL) "B" SUE. Utilities to be designated including gas,
telecommunications, electric, traffic signals, storm, water, and sanitary sewer. Designated
marks using project control points will be provided. Any necessary Right -of -Entry (ROE)
permits will be provided prior to the start of field work. Work to be performed as required
for proposed utility lines to encroach at existing gas easements.
Task 4 — Public Infrastructure Plans (IPRC
A. Public Infrastructure Plans (IPRC). Project Manual, and Community Facilities Agreement
(CFA): The ENGINEER shall perform the following tasks related to preparation of plans
and CFA for the Gateway Park Off -Site Public Utility Infrastructure improvements.
Prepare and submit public infrastructure plans to serve the proposed project. The design
specifications will be in general accordance with published City guidelines. ENGINEER
will route the plans through the Infrastructure Plan Review Committee (IPRC) and
address up to two (2) sets of revisions based on City review comments. Public
infrastructure to serve the project consists of approximately 430 linear feet of public water
8-inch main, public domestic and irrigation taps in Beach Street, and one sanitary sewer
tap to an existing manhole within the park. The 8-inch water main will be shown in plan
view only. A profile will not be required.
2. Prepare a contract book and bid documents as required by the City for the purposes of a
CFA (as described below). This document will include standard city details and
specifications to construct the public improvements for this project. It will also include the
documentation on: Notice to Bidders, Special Instructions to Bidders, Proposal, General
Conditions, Special Conditions, City of Fort Worth Engineering Special Provisions,
Certificate of Insurance, Contractor Compliance with Worker's Compensation Law,
Performance Bond, Payment Bond, Maintenance Bond, and Standard Form Agreement.
This task also includes coordinating with the contractor for obtaining the documents
needed for the contract book. This task assumes a maximum of two rounds of revisions.
Rev. 7/18
3. Prepare exhibits and cost projections (based on unit costs provided by the Client or its
contractor) required by the City for a Community Facilities Agreement (CFA). This scope
includes preparation of a CFA application and supporting documents and submitting to
the City for review and processing for the public improvement plans. This task includes
coordination with the Client for obtaining the necessary documents required for the city to
execute the CFAs.
Task 5 —Additional Schematic Design
A. Additional Schematic Design: The ENGINEER shall provide additional schematic
design plans and OPCC for Gateway Park to include all areas located west of North
Beach Street, as illustrated in the approved Master Plan. The City will review the overall
schematic design plans and OPCC and select the final improvements to be included in
the Final Construction Documents.
Task 6 — Additional Final Design for Alternate Bid Items
A. Additional Final Design for Alternate Bid Items: Following City approval of the Schematic
Design Plan and selection of the final improvements to be included in the Final
Construction Documents, the ENGINEER shall provide the additional design for the
selected alternate bid items located in the expanded soccer field and paring areas that
exceed the $12M estimated construction budget. The additional design will include the
following scope, associated with the expanded field and parking areas:
1. Site Plans and Dimension Control Plans: The ENGINEER will provide the additional
paving layout and design for the additional soccer fields and the proposed parking lot
located south of the additional soccer fields. This task includes two (2) additional Site
Layout Plan Sheets and two (2) additional Dimension Control Plans for the expanded
park areas.
2. Storm Water Quality Plans: The ENGINEER will provide design for the required
Stormwater Quality BMPs associated with the expanded parking and soccer field areas.
Design includes associated fine grading for BMP drainage areas, drainage piping and
inlet design, and connection to the proposed site drainage improvements. This task
includes three (3) Additional Water Quality Plan Sheets and associated calculations.
3. Grading and Site Drainage Plans: The ENGINEER will provide design for the required site
grading, drainage and hydraulic analysis associated with the expanded parking and
soccer field areas. Design includes the grading, storm drainage, drainage area maps,
and hydraulic modeling for the expanded parking and soccer field areas. This task
includes two (2) Additional Grading Plan Sheets and associated drainage calculations.
4. Landscape and Irrigation Plans: The ENGINEER will provide design for the landscape
and irrigation associated with the expanded parking and soccer field areas. Design
includes the landscape planting plans and irrigation plans for the expanded parking and
soccer field areas. This task includes six (6) Additional Landscape Plan Sheets and six
(6) Additional Irrigation Plan Sheets.
Task 7 — Removal of Additional Services Scope
A. Removal of Additional Services Scope: This task will remove Task 14 (Additional
Services) in it's entirety from the approved scope of services included in Amendment #1.
Rev. 7/18
Kimley»>Horn
Attachment "B"
COMPENSATION
City of Fort Worth, TX- Gateway Park Phase I Design Amendment #2
Special Services
Task 1 IPRC Review Fees $7,200.00
Task 2 Oncor Power Easement Exhibits $7,500.00
Task 3 Subsurface Utility Engineering (SUE) $22,700.00
Task 4 Public Infrastructure Plans (IPRC) $27,500.00
Task 5 Additional Schematic Design $8,500.00
Task 6 Additional Design of Alternate Bid Items $48,500.00
Task 7 Removal of Additional Services Scope ($25,000.00)
Total Amendment Lump Sum Fee (Special Services) $96,900.00
Kimley»>Horn
Attachment "D"
PROJECT SCHEDULE
City of Fort Worth, TX- Gateway Park Phase I Design Amendment #2
Task
Duration
(Calendar Days)
Notice to Proceed
0
IPRC Review Fees
0
Oncor Power easement Exhibits
10
Subsurface Utility Engineering (SUE)
30
Public Infrastructure Design (IPRC)
60
Additional Schematic Design
15
Additional Final Design
30
TOTAL PROJECT DURATION (AMENDMENT #3)
145
Times for performance shall be extended as necessary for delays or suspensions due to circumstances
that the ENGINEER does not control.
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Kimley-Horn and Associates, Inc
Subject of the Agreement: Its an amendment to an existing contract for engineering design services. There were
additional tasks assigned following the design contract.
M&C Approved by the Council? * Yes ❑ No 8
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑ 59214-2
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes @ No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No ® If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No M
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 104192
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.