Loading...
HomeMy WebLinkAbout064609-CO4 - Construction-Related - Contract - McCarthy Building Companies, Inc.Fox_ 11 H City of Fort Worth CSC No. 64609-CO4 Change Order Request Project Name Bomber Spur Trail Phase 1 City Sec If 1 64609 Client Project ft(s)l 104345 Project Construction of a shared use path from Calmont Ave. to US Route 377, Including pedestrian crossings over Camp Bowe Blvd. and US Route 377 Description Contractorl McCarthy Building Companies, Inc. Change Order # 4 Date 5/4/2026 City Project Mgr. Blaise Grissom ICity Inspectorl Sergio Garcia Pedroza Dept. PARD Contract Time Totals I fCDI Original Contract Amount $4,901,279.77 $4,901,279.77 215 Extras to Date $14,116.52 $14,116.52 Credits to Date $2,058.48 $2,058.48 Pending Change Orders (in M&C Process) Contract Cost to Date $4.913.337.81 $4,913,337.81 219 Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 0.25% MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 1 $6,126,599,71 JUSTIFICATION (REASONS) FOR CHANGE ORDER 1 It has been deemed necessary by the Contractor and Project Engineer to modify the Traffic Control Plan for Calmonl Ave. The original plan did not provide adequate room for equipment to safely and correctly perform the necessary street work, located roughly between Station 1136+50 and Station 1138. This is a minor change order with zero added costs and zero additional contract time. Original plan sheet 016 will be replaced with revised sheets 016, 016A, 016B, and 016C. This is a TxDOT funded project, and as such TxDOT requires any and all changes to a Traffic Control Plan be processed as an official Change Order. It Is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Coritractors Company Name - - Contractor Name Contract Signature Date McCarthyBuilding Companies, Inc. Peter Si eruct Voter S1 eru , ,.-,-, ,E 1 05/06/2026 InspeclorAnspection Supervisor Date Project and Contract Compliance Manager Dale 05/06/2026 � �s, , 05/06/2026 Program Manager Date Senior Capital Project Officer Date A-- Assistant Director (Dept) Dale Director, Contract Department (Dept) Dale 7- Teresa Thomason 'Ma 8 2026 13 13 48 CD7 Assistant City Attorney Dale Assistant City Manager Dale - Council Action if required) 4 poRT4°a M&C Number N/A ATTEST: p 0' ........ Jannette Goodall, City Secretary p * eoo* aaaannEp6g4 b M&C Date Approved NIA OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FurtI- WUIII 'rI City of Fort Worth Change Order Additions Project Name Bomber Spur Trail Phase 1 City Sec # 64609 Client Project # 104345 C.ntract.1 McCarthy Building Companies, Inc. PM Blaise Grissom Inspector® Change Order Submittal # ® Date 3/1812026 Change Order Additions Page 2 of 4 FORT WORTH City of Fort Worth vl-- Change Order Deletions Project Name I Bomber Spur Trail Phase 1 City Sec # 64609 ClientProjecl# 1 104345 Contract« McCarthy Building Companies, Inc. PM1laise Grissom InspectorI Change Order Submittal # Date 311812026 Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO NIA Total $0.00 PHASE D STEP I Eno cin Hal CAW941 A� POJnQrm POSILD SPEED 35 IJPH .... PHASE D STEP I NOTES LEGEND 0 lAdl 21 PHASED STEP I MMUIT AVE POSTED—EE0 35 ��P� WA Nil: !1��, I - PHASED STEP I 140TES mI 11 PHASE D STEP 1 000 p g ♦: CAI-MONT AK POSTED SPUD 35 MPH j PH.{SE D STEP 2 " IJOTES LL W = rui v U F vlrm aw 1 na. Q n rns fi - CAU-UVI A%k'w_ PGSMG -35 Iwv�rgv-l.yl U �- SPEED MPH a.mc ncr � w»u�nrto •Im»I.w �] rrs_.. , s NN war PHASE D STEP 2 NOTES CAI MIT A\E A. 'NAM POSTED SPEED 35 :MIA ..L;7� PHASE D STEP 2 isms 05E 6W nd/ POSTED CALU014T A\f: SPEED 35 MPH mll>