HomeMy WebLinkAbout053889-A1 - Construction-Related - Contract - Texas Department of Transportation (TxDOT)Docusign Envelope ID: 3FOF3321-C3EF-8B38-813B-185BBE9771OF
TxDOT:
Federal Highway Administration:
CCSJ # 0902-00-235 1 AFA ID I Z00001616
AFA CSJs 0902-00-235, 0902-00-395
District # 02 1 Code Chart 64# 1 15000
Project Name VA: Various locations Centreport TO
#2
THE STATE OF TEXAS §
THE COUNTY OF TRAVIS §
CFDA No. 1 20.205
CFDA Title I Highway Planning and Construction
AFA Not Used For Research & Development
ADVANCE FUNDING AGREEMENT CSC NO. 53889-Al
For
CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT
Off -System
AMENDMENT #1
THIS AMENDMENT is made by and between the State of Texas, acting through the Texas Department of
Transportation, called the "State", and the City of Fort Worth, acting by and through its duly authorized
officials, called the "Local Government". The State and Local Government shall be collectively referred to
as "the parties" hereinafter.
WITNESSETH
WHEREAS, the parties executed a contract on 03/12/2020 to effectuate their agreement of the final
environmental assessment, final engineering design and the construction of the Fort Worth to Dallas
Regional Veloweb Shared -used trail from THE CentrePort Station to Fort Worth and Grand Prairie city limits;
and,
WHEREAS, it has become necessary to amend that contract in order to revise the project budget and
resolution due to increasing Federal funds of the engineering, right-of-way, and construction phases due to
the need of additional surveys and ongoing negotiations with adjacent property owners and the addition
CSJ 0902-00-395;
NOW THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the
parties, the parties do agree as follows:
AGREEMENT
1. Attachment A, Resolution, Ordinance, or Commissioners Court Order is supplemented by
adding Attachment A-1 Resolution, Ordinance, or Commissioners Court Order. The new
resolution includes the increased funds since the previous resolution did not include such
information.
2. Attachment B, Location Map Showing Project, is deleted in its entirety and replaced with
Attachment B-1, Location Map Showing Project, which is attached to and made part of this
Amendment. Project location map is being updated to provide a better -quality map than what
was used in the Prime.
3. Attachment C, Project Budget, is deleted in its entirety and replaced with Attachment G1,
Project Budget, which is attached to and made a part of this Amendment. The total estimated
AFA Amend Page 1 of 2 OFFICIAL RECORD Rev. 10/03/2024
CITY SECRETARY
FT. WORTH, TX
Docusign Envelope ID: 3FOF3321-C3EF-8B38-813B-185BBE9771OF
TxDOT:
CCSJ # 0902-00-235 1 AFA ID I Z00001616
AFA CSJs 0902-00-235, 0902-00-395
District # 02 Code Chart 64# 15000
Project Name VA: Various locations Centreport TO
#2
Federal Highway Administration:
CFDA No. 20.205
CFDA Title Highway Planning and Construction
AFA Not Used For Research & Development
cost of the Project increased by $ 10,240,673.00, from $ 5,644,923.00 to $ 15,885,596.00,
due to increasing Federal funds of the engineering, right-of-way, and construction phases due
to the need of additional surveys, ongoing negotiations with adjacent property owners.
All other provisions of the original contract are unchanged and remain in full force and effect.
Signatory Warranty
Each signatory warrants that the signatory has necessary authority to execute this agreement on behalf of
the entity represented.
Each party is signing this Agreement on the date stated under that party's signature.
THE STATE OF TEXAS THE LOCAL GOVERNMENT
FD—Sign,d by: by:
Sitwmf CSI,,,d
aan.a. i w �ff
Ig
,cD T 6ec468.. °Igna ur2
na�ure
Kenneth Stewart
Typed or Printed Name
Director, Contract Services
Typed or Printed Title
6/9/2026
Date
AFA Amend
Page 2 of 2
Dana Burghdoff
Typed or Printed Name
Assistant City Manager
Typed or Printed Title
6/9/2026
Date
Rev. 10/03/2024
Docusign Envelope ID: 3FOF3321-C3EF-8B38-813B-185BBE9771OF
TxDOT:
CCSJ # 0902-00-235 AFA ID Z00001616
AFA CSJs 0902-00-235, 0902-00-395
District # 02 Code Chart 64# 15000
Project Name VA: Various locations Centreport Trl
#2
Federal Highway Administration:
I CFDA No. 1 20.205
CFDA Title I Highway Planning and Construction
AFA Not Used For Research & Development
ATTACHMENT A-1
RESOLUTION, ORDINANCE, OR COMMISSIONERS COURT ORDER
A Resolution
NO, 6246-01-2026
A RESOLUTION AUTHORIZING EXECUTION OF AMENDMENT NO. 1 TO
AN ADVANCE FUNDING AGREEMENT WITH THE TEXAS DEPARTMENT
OF TRANSPORTATION (TxDOT) TO INCREASE THE AMOUNT TO
S15,885,596.00, WITH FEDERAL COSTS IN THE AMOUNT OF
S14,347,075.00, STATE COSTS IN THE AMOUNT OF $35,596.00 AND CITY
COSTS IN THE AMOUNT OF $1,502,925.00, DUE TO INCREASED
CONSTRUCTION COSTS OF THE C'ENTREPORT TRAIL PHASE 11
PROJECT.
WHEREAS, the Congestion Mitigation and Air Quality Improvement (CMAQ) Program Off
System, administered by the Texas Department of Transportation (TxDOT), provides funding for surface
transportation projects and other related efforts that contribute air quality improvements and provide
congestion relief, and
WHEREAS, the City of Fort Worth and the Texas Department of Transportation ("TxDOT")
entered into a Local Project Advance Funding Agreement (City Secretary No. 53889, CSJ# 0902-00-235)
("Agreement') in the amount up to $5,644,923.00 for the division of costs and responsibilities associated
with the design and construction of the Project, and
WHEREAS, the TxDOT and the City of Fort Worth desire to amend the Agreement to add
funding (CSJ# 0902-00-395) due to unforeseen site conditions and construction inflation.
WHEREAS, the City of Fort Worth desires to contribute an amount up to $1,502.925.00 as City
participation, and increase the total funding agreement amount up to $15,885,596.00. including
$15,850,000.00 project budget and $35,596.00 Indirect State Costs; and
WHEREAS, additional City Participation in the amount up to 1,667,075 will be contributed
through available Transportation Development Credits; and
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF FORT WORTH, TEXAS, THAT:
The City Council authorizes the City Manager or their designee to execute Amendment No.1 to
the Agreement increasing the funding amount up to $15,885,596.00, with an increase of the City's
participation in the amount up to $1,502,925.00 for the CentrePort Trail Phase II project_ Additional City
Participation in the amount up to 1,667,075 will be contributed through available Transportation
Development Credits. The City of Fort Worth will be responsible for all overruns.
Page 1 of 2
AFA LongGen Attachment A-1
Docusign Envelope ID: 3FOF3321-C3EF-8B38-813B-185BBE9771OF
TxDOT:
CCSJ # 0902-00-235 1 AFA ID I Z00001616
AFA CSJs 0902-00-235, 0902-00-395
District # 02 Code Chart 64# 15000
Project Name VA: Various locations Centreport Trl
#2
Adopted this 2r of January 2026.
ATTEST
1annette Goodall, City,' Secretary
Federal Highway Administration:
CFDA No. 20.205
CFDA Title Highway Planning and Construction
AFA Not Used For Research & Development
Page 2 of 2
AFA LongGen Attachment A-1
Docusign Envelope ID: 3FOF3321-C3EF-8B38-813B-185BBE9771OF
TxDOT:
CCSJ # 0902-00-235 1 AFA ID I Z00001616
AFA CSJs 0902-00-235, 0902-00-395
District # 02 Code Chart 64# 15000
Project Name VA: Various locations Centreport Trl
#2
Federal Highway Administration:
CFDA No. 20.205
CFDA Title Highway Planning and Construction
AFA Not Used For Research & Development
ATTACHMENT B-1
LOCATION MAP SHOWING PROJECT
I
I
I
s lkly
I
I
I
I
Ge ntmaort DFW
Airport StAbu n
� d
I
1
I
ROJECT START:
Centetpro,® DFW
r.I cart ,tl i1mTraiI
I
1
V
I
,
ry Gh
"B
F R JECT ENDS: c
Corner of High z
River Rd, & Trinity
Blvd. l
I
I
Esn Cam unity Wps Contributwta. City of A lingtan TX, City of FoA
Worth Teams Parks & Wildlife, Evi. Toi iTom, 6armirk SafeGrapq
Ge,aT-K sno4*&. Inc. M€ INASA, US" EPA, NIPS US Census 9ytea4
USD.q YKF1n+u`
� I
C'SJ: 0902-00-235 & 0902-00-395
PROJE, CT NAME: CE NTE RPORT TRAIL PI 1. 2 4,
PROJECT LIMIT: CENERPOR'T DFW AIRPORT
STATION TRAIL. TO HIGH
RIVER RD.
Page 1 of 1
AFA LongGen Attachment B-1
Docusign Envelope ID: 3FOF3321-C3EF-8B38-813B-185BBE9771OF
TxDOT:
CCSJ # 0902-00-235 1 AFA ID I Z00001616
AFA CSJs 0902-00-235, 0902-00-395
District # 02 Code Chart 64# 15000
Project Name VA: Various locations Centreport TO #2
Federal Highway Administration:
CFDA No. 20.205
CFDA Title Highway Planning and Construction
AFA Not Used For Research & Development
ATTACHMENT C-1
PROJECT BUDGET
Costs will be allocated based on 100% Federal funding and 0% Local Government funding until
the federal funding reaches the maximum obligated amount. The Local Government will then
be responsible for 100% of cost overruns.
Description
Total
Federal Participation
State Participation
Local Participation
Estimated
%
Cost
%
Cost
%
Cost
CSJ 0902-00-235
Cost
Environmental (by Local
$46,075
100%
$46,075
0%
$0
0%
TDC 9,215
Government
Right of Way (by Local
$827,450
1000
$827,450
0%
$0
00
TDC 165,490
Government
Engineering (by Local
$463,125
100%
$463,125
0%
$0
0%
TDC 92,625
Government
Utilities (by Local
$18,430
100%
$18,430
0%
$0
01
TDC 3,686
Government)
Construction (by Local
$6,634,843
100%
$6,634,843
0%
$0
0%
TDC 1,326,969
Government)
Subtotal
$7,989,923
$7,989,923
$0
TDC 1,597,985
Environmental Direct
$2,425
100%
$2,425
0%
$0
0%
TDC 485
State Costs
Right of Way Direct
$43,550
100%
$43,550
0%
$0
0%
TDC 8,710
State Costs
Engineering Direct State
$24,375
1001
$24,375
0%
$0
0%
TDC 4,875
Costs
Utility Direct State Costs
$970
100%
$970
01
$0
0%
TDC 194
Construction Direct State
$274,132
100%
$274,132
0%
$0
00
TDC 54,826
Costs
Subtotal
$345,452
$345,452
$0
TDC 69,090
Indirect State Costs
$19,034
01
$0
100%
$19,034
0%
$0
(5.51 %)
CSJ TOTAL
$8,354,409
$8,335,375
$19,034
IL
TDC 1,667,075
Transportation Development Credits (TDCs) in the amount of 1,667,075 will be used for the Local
Government's 20% match contribution.
Total Federal Reimbursable Costs = $ 8,335,375.00
Total Federal Reimbursable Costs to the Local Government = $ 7,989,923.00
Payment by the Local Government to the State upon execution of this agreement: $ 0 .
This is an estimate. The final amount of Local Government participation will be based on actual costs.
Page 1 of 2
AFA LongGen Attachment C-1
Docusign Envelope ID: 3FOF3321-C3EF-8B38-813B-185BBE9771OF
TxDOT:
CCSJ # 0902-00-235 1 AFA ID I Z00001616
AFA CSJs 0902-00-235, 0902-00-395
District # 02 Code Chart 64# 15000
Project Name VA: Various locations Centreport TO #2
Federal Highway Administration:
CFDA No. 20.205
CFDA Title Highway Planning and Construction
AFA Not Used For Research & Development
Costs will be allocated based on 80% Federal funding and 20% Local Government
funding until the Federal funding reaches the maximum obligated amount. The Local
Government will then be responsible for 100% of cost overruns.
Description
Total
Federal
State
Local Participation
Estimated
Participation
Participation
CSJ 0902-00-395
Cost
%
Cost
%
Cost
%
Cost
Construction (by Local
$7,214,040
80%
$5,771,232
0%
$0
20%
$1,442,808
Government
Subtotal
$7,214,040
$5,771,232
$0
$1,442,808
Environmental Direct
$1
0%
$0
0%
$0
100%
$1
State Costs
Engineering Direct
$1
0%
$0
0%
$0
100%
$1
State Costs
Right of Way Direct
$1
0%
$0
0%
$0
1001
$1
State Costs
Utility Direct State
$1
0%
$0
0%
$0
100%
$1
Costs
Construction Direct
$300,581
801
$240,468
0%
$0
20%
$60,113
State Costs
Subtotal
$300,585
$240,468
$0
$60,117
Indirect State Costs
$16,562
0%
$0
1000
$16,562
0%
$0
(5.51 %)
CSJ Total
$7,531,187
$6,011,700
$16,562
$1,502,925
PROJECT TOTAL
$15,885,596
$14,347,07
$35,596
$1,502,925
TDC 1,667,075
Initial payment by the Local Government to the State: $_4.00 .
Payment by the Local Government to the State before construction: $ 60,113.00 .
Estimated total payment by the Local Government to the State $ 60,117.00 .
This is an estimate. The final amount of Local Government participation will be based on actual
costs.
Page 2 of 2
AFA LongGen Attachment C-1
ADDITIONAL ROUTING SIGNATURES
CITY OF FORT WORTH
ADVANCE FUNDING AGREEMENT CSJ: 0902-00-235, 0902-00-395
PROJECT NAME: 102130 Centerport Trail Ph 2
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
F
Carlos M. Gonzalez / �cz���' )t� (r(Name of Employee/Signature
Title: Park Planner
Email: carlos.gonzalez@fortworthtexas.gov
APPROVAL RECOMMENDED:
nry wfVH4tA4-(�
BY: Teresa Thomason (Jun 12, 2026 14:57:32 CDT) jowl MoElhany 8� Jy
Teresa Thomason, Deputy Director
Park & Recreation Department
Email: teresa.thomason@fortworthtexas.gov
CONTRACT AUTHORIZATION
M&C: 26-0073
Date Approved:01/27/2026
Form 1295: N/A
APPROVED AS TO FORM AND LEGALITY:
�
BY; Douglas Black (Jun 15, 2026 14:33:50 CDT)
Douglas W. Black
Senior Assistant City Attorney
Email: douglas.black@fortworthtexas.gov
ATTEST AS TO CITY MANAGER SIGNATURE:
fill OFFORT�Oad
>a oa
BY: cc ago o9�Ad
PV= o=p
Jannette S. Goodall °op000 00 «�
City Secretary a°aa nez bsap
Email: Jannette.Goodall@fortworthtexas.gov
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 01/27/26 M&C FILE NUMBER: M&C 26-0073
LOG NAME: 80CENTREPORT TRAIL PH.2 AFA AMEND1 W/TXDOT
SUBJECT
(CD 5) Adopt Resolution Authorizing Execution of Amendment No. 1 to an Advance Funding Agreement with the Texas Department of Transportation for the CentrePort Trail Phase II Project to Increase Contract Amount
Up to $15,885,596.00 Including $1,502,925.00 City Participation, from Original Contract Amount of $5,644,923.00; Authorize Acceptance of Additional Federal Funds and Non -Spendable Transportation Development
Credits; Adopt Appropriation Ordinances; and Amend the Fiscal Years 2026-2030 Capital Improvement Program
RECOMMENDATION;
It is recommended that the City Council:
Adopt the attached Resolution authorizing execution of Amendment No. 1 to the Advance Funding Agreement with the Texas Department of Transportation (City Secretary Contract No. 53889; CSJ# 0902-00-235
and 0902-00-395) for the CentrePort Trail Phase II project (City Project No.102130) to increase the contract amount up to $15,885,596.00 including $1,502,925.00 city participation, from original contract amount of
$5,644,923.00;
Authorize acceptance of $8,934,964.00 in federal funds contributing to CentrePort Trail Phase II project (City Project No. 102130) through the Texas Department of Transportation;
Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the the General Fund for the Park & Recreation Department, in the amount of $1,502,925.00, from Fiscal Year
2024 General Fund -Fund Balance, for the purpose of transferring to the Grants Capital Project Federal Fund;
Authorize acceptance of 1,667,075 non -spendable Transportation Development Credits towards additional city in -kind match;
Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Grants Capital Projects Federal Fund, in the amount up to $10,437,889.00, (1) subject to the receipt of
the $8,934,964.00 grant, and (2) $1,502,925.00 as a transfer from the General Fund -Fund Balance Fund to meet City's local match requirement, for the purpose of funding CentrePort Trail Phase II project (City
Project No. 102130);
Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Grants Capital Projects Other Fund, in the amount up to 1,667,075, subject to the receipt of the grant, for the
purpose of funding CentrePort Trail Phase II project (City Project No. 102130); and
Amend the Fiscal Years 2026-2030 Capital Improvement Program.
DISCUSSION:
The purpose of this Mayor and Council Communication (M&C) is to adopt a resolution authorizing execution of Amendment No. 1 to the Advance Funding Agreement (AFA) with the Texas Department of Transportation
(TxDOT) (City Secretary Contract No. 53889; CSJ# 0902-00-235 and 0902-00-395) due to increased project construction costs.
The City Council approved an AFA with TxDOT in the amount of $5,644,923.00 on February 18, 2020 (M&C 20-0104) for CentrePort Trail Project Phase II which includes the design and construction of a multi -use trail from
the Trinity Railway Express (TRE) CentrePort Station to the Grand Prairie city limits at Trinity Boulevard. This project is a part of the Veloweb Trail Network of the North Central Texas Council of Governments. The original
AFA includes a 1,030,141 non -spendable Transportation Development Credits (TDC) used for city in -kind match. This TDC was not appropriated in M&C 20-0104.
Amendment No. 1 is based on an increased project construction cost estimate for 95% engineering design. The project site includes many challenging conditions such as steep slopes, existing utility lines, and close
vicinity to a major drainage channel, TRE railroad infrastructure and Trinity Boulevard. As a result, a pedestrian bridge, security fencing, retaining walls, construction labor security training, traffic control and utility relocations
are added into construction cost. An additional TDC in the amount of 636,934 will be used for city in -kind match in addition to the $1,502,925.00 General Fund -Fund Balance Fund.
The total project budget is summarized below.
Participation
Fund
Authority
Original
Budget Change
Revised Budget
Budget
(Increase/Decrease)
Grants Cap
M&C 20-
Federal
Projects
0104; This
$5,412,111.00
$8,934,964.00
$14,347,075.00
Federal Fund
M&C
General Fund -
Local
Fund Ba once
This M&C
$0.00
$1,502,925.00
$1,502,925.00
Fund
Indirect State Costs
State
M&C 20-
$232,812.00
($197,216.00)
$35,596.00
0104
Total AFA Contract
Amount
��
$5,644,923.00
$10,437,889.00
$15,885,596.00
TDC (not included in
Grants Cap
Total AFA Contract
Projects Other
This MC]Fl,030,141
E636,934
1,667,075
Amount)
Fund
The AFA includes $35,596.00 Indirect State Costs. City does not budget Indirect State Costs in grants/projects. The Park & Recreation Department (PARD) project manager, city inspector, city material testing lab will
charge salaries to this grant project as incurred. There is no grant application repository number, as the PARD did not apply for this grant.
As part of the Fiscal Year (FY) 2024 year-end process, city council authorized the assignment of $56,507,497.00 from the FY 2024 fund balance to address future capital project shortfalls (M&C 25-0003). This assigned
amount exceeds the General Fund reserve requirements and is composed of the following sources: $9,472,519.00 from the sale of library property residuals, $14,627,444.00 from capital project shortfalls funded by the
remaining assigned fund balance from FY2023, $7,690,534.00 from FY2024 budgetary savings, and $24,717,000.00 from one-time interest earnings.
This M&C will amend the Fiscal Year 2026 Adopted Budget, as approved in connection with Ordinance 27979-09-2025. Funding for these projects was not included in the FY2026-2030 Capital Improvement Program due
to cost overruns resulting from inflation and rising construction expenses.
Approval of this M&C will reduce the Assigned Fund Balance for capital projects as follows:
FY2024
Assigned
2020
121SF 4550
VILLAGE
80CIQUIO
VASQUEZ PARK
80SYCAMORE
PARK PHASE II
21DOWNTOWN
LIBRARY
60CAMP BOWIE
20GFFB
APPROPRIATION
Revised
Authority
Fund Balance
M&C 25-0003
APPROPRIATE
FY24 GFFB
CREEK
SETTLEMENT
PHASE I
CONSTRUCTION
CONSTRUCTION
DESIGN BUILD
IMPROVEMENTS
COA
MCCART-
THIS M&C
Assigned
Fund Balance
#or Capital
M&C
CONTRACT
BAILEY-HORNE
M&C
M&C
Fund Balance Set
Aside for Capital
$47,034,978.00
($2,000,000.00)
($3,450,000.00)
($1,500,000.00)
($1,000,000.00
($285,500.00)
($14,145,000.00)
($1,502,925.00)
$23,151,553.00
Project Shortfalls
Fund Balance Set
Aside for Library
$9,472,519.00
($9,472,519.00)
$0.00
Capital Projects
Fund Balance Set
Aside for
$2,939,440.00
($2,939,440.00)
$0.00
Ambulance/MedStar
Transition
Fund Balance Set
Aside for Risk/Fund
Deficit
$5,000,000.00
$5,000,000.00
( )���
$0.00
�
Total Assigned
-]=,F--
Fund Balance for
$64,446,937.00
�=E:]�3,1151,553.00
Capital
This project is located in COUNCIL DISTRICT 5.
A Form 1295 is not required because: This contract will be with a governmental entity, state agency or public institution of higher education: Texas Department of Transportation
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Grants
Cap Projects Federal Fund and Grants Capital Projects Other Fund. The Park & Recreation Department (and Financial Management Services) will be responsible for the collection and deposit of funds due to the City.
Prior to an expenditure being incurred, the Park & Recreation Department has the responsibility to validate the availability of funds. This is a State Advance Funding Agreement.
Submitted for City Manager's Office bk Dana Burghdoff 8018
Originating Business Unit Head: Dave Lewis 5717
Additional Information Contact: Joel McElhany 5745
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: TxDot Advance Funding Agreement Grant Contract (CSJ 0902-00-235, 0902-00-395)
Subject of the Agreement: Resolution Authorizing Execution of an Advanced Funding Agreement
Amendment No. 1 with Texas Department of Transportation
M&C Approved by the Council? * Yes 0 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ CSC No. 53889
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 102130
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be