Loading...
HomeMy WebLinkAbout025290 - Construction-Related - Contract - Dr. Puskoor KumarCOMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS S City Secretary COUNTY OF TARRANT S Contract No. ����- ��-� WHEREAS, Dr. Puskoor Kumar, hereinafter called "Developer", desires to make certain improvements to Elizabethtown Road, which will include water and services for an addition to the City of Fort Worth, Texas; WHEREAS, the said Developer has requested the City of Fort Worth, a Municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do Certain work in connection with said improvements; NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS: That said Developer, acting herein by and through Dr. Puskoor M. Kumar, its duly authorized Owner and the City, Acting herein by and through Mike Groomer, its duly authorized Assistant City Manager, for and in consideration of the covenant and agree as follows, to-wit: � u���COG�� G���uG°�D CB�( ���GG��Q�I �e � G���N�, �[��o s � %" SECTION ONE COMMUNITY FACILITIES AGREEMENT ' to install WATER AND SEWER SERVlCES � for ELIZABETH TOWN ROAD WATER AND SEWER IMPROVEMENTS 'r � �i A. The City agrees to permit the Developer to let a contract for, in accordance with its accepted practices, ordinances, regulations, and the provisions of � the City Charter, and subject to the requirements of the City's Charter, and subject to the requirements of the City's Policies and Regulations for Installation of Community Facilities, all as current at the time of installation: WATER FACILITIES serve the lots as shown on the attached Exhibit A, and SANITARY SEWER FACILITIES to serve the �ots as shown on the attached Exhibit A-1 all in accordance with plans and specifications to be prepared by private engineers employed � by the Developer and approved by the Water Department. B. The City agrees to allow the Developer to install, at his expense, at the time all other water mains in this addition are installed, a service line for each lot as shown on the attached Exhibit A. The estimated cost of these service lines is $ 0. The City agrees to record the location of each said service line in respect to the corner of the lot served, and to retain said records in its possession. C. The construction cost of the water facilities herein concerned, exclusive of service lines and engineering is estimated to be Ninety-Seven Thousand, Seven Hundred and Forty Seven Dollars ($97,747) . D. The City agrees to allow the Developer to install, at his expense, at the time all other sanitary sewer mains in this addition are installed, a service line for each lot as shown on the attached Exhibit A-1 . The estimated cost of these service lines is $ 0. The City agrees to record the location of each said service line in respect to the corner of the lot served, and to retain said records in its possession. E. The construction cost of the sanitary sewer facilities to be installed hereunder, exclusive of service lines and engineering, is estimated to be Twenty Thousand, One Hundred Twenty-Five Dollars ($20,125). '�, I-1 �' � � PROJECT NAME: ELIZABETH TOWN ROAD WATER AND SEWER F. Prior to allowance of the construction contract by Developer, the Developer agrees to provide acceptable financial guarantee to the city for 100 percent . of the construction of the construction costs along with payment of any Ordinance costs and fees that� are applicable. Prior to the award of the construction contract by the City or the commencing of any work by the City or its contractors, the Developer agrees to pay to the City: (1) (a) One Hundred percent (100%} of the Developer's cost of all water and sanitary sewer facilities within the development, exclusive of engineering and service costs, sized to provide water and sanitary sewer service within the development. (b)One hundred approach water and development sized to development. percent (100%) of the Developer's cost of all sanitary sewer facilities outside the limits of the provide water and sanitary sewer service to the (c) One hundred percent (100%) of the Developer's cost of any approach water main facility or water facility within the development that is 8-inches in size for non-industrial development and 12-inches in size for industrial development. (d}One hundred percent (100%) of the Developer's cost of any approach sanitary sewer main facility or sanitary sewer facility within the development that is 8-inches in size. (2) An additional ten percent (10%) of the total of the Developers cost of these water and sanitary sewer facilities, exclusive of cost of service lines, is required for design engineering if such engineering is performed by the City at the Developer's request. (3) One hundred percent (100%) of the Developer's cost of all service lines, estimated und r 1-B and 1-D above, in accordance with the provisions of the curr nt Fort Worth City Code. (4) A construction nspection Fee equal to two (2%) of the Developer's actual cost share of the construction cost (including all services) of the water and/or sanitary sewer facilities. G. The distribution of estimated construction cost between the City and the �, Developer, as per par�graph 1-F above, for all water and sanitary sewer , facilities to be constru �ted hereunder is estimated as follows: � I-2 + t. � �� PROJECT NAME: ELIZABETH TOWN ROAD WATER AND SEWER (1) WATER FACILITIES : Estimated ** Developer Estimated Total Cost City Cost Cost (a) Mains, Within ' � . Development $ -0- $ -0- $ -0- Approach $ 75,520.00 $22,227.00 $ 97,747.00 (b) Easements* $ -0- $ -0- $ -0- (c) Services � $ -0- (d)Park Participation $ -0- Sub-Totals, Water $ 75,520.00 (2) SANITARY SEWER FACILITIES: (a) Development $ 20,125.00 Approach $ -0- (b) Easements * $ -0- (c) Services ( 240 -4") $ -0- (d)Park Participation $ -0- Sub-Totals, Sewer $ 20,125.00 (3) TOTAL CONSTRUCTION COST: $ 95,645.00. (�) CONSTRUCTION INSPECTION FEE : $ 1,913.00 *•�o be dedicated by the developer. ** see Page 6 for City Cost $ -0- $ -0- $22,227.00 $ $ $ $ $ $ -0- -0- -0- � � � $22,227.00 $ 445.00 $ -0- $ -0- $ 97,747.00 $ 20,125.00 $ -0- $ -0- $ -0- $ -0- $ 20,125.00 $117,872.00 $ 2,358.00 I-3 i ` � PROJECT NAME: ELIZABETH TOWN ROAD WATER AND SEWER H. The above charges do not include any front foot charges for connection to existing or proposed water and/or sanitary sewer mains constructed or to be constructed under the pro�eisions of the "APPROACH MAIN OPTION" as described in Section III of the Policy for the "INSTALLATION OF COMMUNITY FACILITIES" adopted in September, 1992. These additional charges are as follows: 1. Applicable to this Contract in the amount of $ N/A. by Contract No. N/A Applicable CFA Name Date: NIA dated N/A N/A Number N/A I. When water facilities are installed by contract, installation of water services will be included as part of the contract. Installation of ineter boxes on those services may be done by the City, after completion of construction of all relative curb and gutter work on the water facilities project site, at a cost of $70/$135 per contract-installed charge to be due and payable prior to issuance of a Work Order on the water facilities installation contract. The above charges do not apply if the Developer elects to include meter�box installation as part of the contract. However, meter boxes must conform City standards. J. Within a reasonable time after completion of the above referenced facilities to be constructed by contract awarded by the Developer, provided all conditions for City participation have been met, the City agrees to pay the Developer the "Estimated City Cost" set out in 1-G above; provided, however, that said payment shall be calculated using the actual construction costs and actual service costs under the provisions of , � � I-4 �i ; i. PROJECT NAME ELIZABETH TOWN ROAD WATER AND SEWER � the current Fort Worth City Code, (said payment to be calculated as in 1- G above), based on actual quantities as reflected in the final estimate paid to the Contractor by the Developer and on the actual records of cost kept by the City as a part of its customary procedures. In the event the difference in the deposit� and� the actual costs exceeds $25, Developer agrees to pay to the City and underpayment which said adjustment might indicate as being due, and the City agrees to pay to Developer any overpayment. K. Work hereunder shall be completed within two (2) years from date hereof, and it is understood that any obligation on the part of the City to make any refunds with respect to water and/or sanitary sewer facilities shall cease upon the expiration of two (2) years from date hereof, except for refunds due from "front foot charges" on water and sanitary sewer mains, which refunds may continue to be made for a period of ten (10) years commencing on the date that approach mains are accepted by the Director. If less than 70% of the eligible collections due to the de�eloper has been collected, the Developer may request in writing an extension of up to an additional 10 years for collection of front charges. In the event water and/or sanitary sewer facilities work is not completed within the (2) year period, City may, at its election, complete such work at Developer's expense. � L. It is further agreed and understood that any additional payment required of Developer is to cover only such additional work and/or materials as may be made necessary by conditions encountered during construction, and shall not include any change in scope of the project. RECOMMENDED: . , Le . Bradley, Jr. Director Water Department r �/7 /�� � Date I-5 . �. , .,� ** CITY PARTICIPATION BREAK-DOWN FOR: ELIZABETH TOWN ROAD WATER AND SEWER OVERSIZED W,4TER MAJN (Developer pays up to 12" water fine; City pays the difference between 16"/12" water Irne, gate valve and fittirigs) Approach: � 16"/12" Water Line ($48-$29.60) 458 L. F. x$18.40 =$ 8,427.20 (developer-458L.F.x 29.60 = $ 13,556.80) 16"/12" Gate Valve ($8,000-$1,100) 2 Each x$ 6,900.00 = $ 13,800.00 (developer-2.x 1,100.00 = $ 2,200.00) Subtotal $ 22,227.00 TOTAL CITY PARTICIPATION FOR WATER DEPARTMENT _ $22,227.00 '�, I �� GENERAL REQUIFiEMENTS A. It is agreed and understood by the parties hereto that the developer shall employ a civil engineer, licensed to practice in the State of Texas, for the design and preparation of plans and specifications for the construction of ail facilities covered by this contract, subject to Paragraph B. B. For any project estimated to cost less than $10,000 or � for any project d.esigned to serve a single lot or tract, the develaper may at his option request the City to provide the design engineering, and if such request is granted, the developer shall pay to the City an amount equal to 10 percent of the final construction cost of such project for such engineering services. C. In the event the developer employs his own engineer to prepare plans and specifications for any or a11 facilities, the plans and specifications so prepared shall be subject to approval by the department having jurisdiction. One (1) reproducible set of plans with 15 prints and 35 specifications for each facility shall be furnished the department having jurisdiction. It is agreed and understood that in the event of any disagreement on the plans and specifications, the decision of the Transportation/Public Works Department Director, and/or Water Department Director will be final. D. It is further agreed and understood by the parties hereto that upon acceptance by the City, title to all facilities and improvements mentioned hereinabove shall be vested at all times in the City of Fort Worth, and developer hereby relinquishes any right, title, or interest in and to said facilities or any part hereof. E. Work hereunder shall be completed within two (2) years from date hereof, and it is understood that any obligation on the part of the City to make any obligation on the part of the City to make any refunds with respect to water N and/or sanitary sewer facilities shall cease upon the expiration of two (2) years firom date hereof, except for refunds due from "front foot charges" on water and sanitary sewer mains, which refunds may continue to be made for a period of ten (10) years commencing on the date that approach mains are accepted by the Director. If less than 70% of the eligible collections due to the devefoper has been collected, the Devefoper may request in writing an extension of up to an addit.ional 10 years for collection of front charges. If the construction under the Community Facilities Contract shall have started within the two-year period, the life of the Community Facilities Contract shall be extended for an additional one-year period. Community Facility Contracts not completed within the time periods stated above will require renewal of the contract with all updated agreements being in compliance with the policies in effect at the time of such renewal. Developers must recognize that City funds may not be available to pay all or a portion of the normal City share for renewal contracts. It must be understood by all parties to the Community Facilities Contract that any of the facilities or requirements included in the contract that are to be performed by the developer, but not performed by the developer within the time periods stated above, may be completed by the City at the developer's expense. The City of Fort Worth shall not be obligated to make any refunds due to the developer on any facilities constructed under this agreement until all provisions of the agreement are fulfilled. F. PERFORMANCE AND PAYMENT GUARANTEES 1. For Street. Storm Drain, Street Liaht and Street Name Sian Faci{ities on a Non-Assessment Basis: Performance and Payment bonds or cash deposits acceptable to the City are required to be furnished by the developer for the installation of streets, storm drains, street lights, and street name signs, on a non- assessment basis, and must be furnished to the City prior to execution of this contract. The performance and payment bonds shall be in the amount of one hundred percent (100%) of the developer's estimated share of the cost of the streets, storm drains, street lights, and street name signs. If the deposit is in the form of cash, the deposit shall be in the amount of one hundred twenty five percent (125%) of the developer's estimated cost of the streets, storm drains, street lights, street name signs, and change orders (during the course of the project?. 2. For Pavina Assessment: Performance and payment bonds or cash deposits, acceptable to the City ar� required to be furnished by the developer for one hundred percent (100%) of the developer's estimated cost resulting from the paving, drainage, lighting and name signage of border streets on an assessment paving basis. (Reference Section VI, Item 3, Development Procedures Manual.) Said performance and payment bonds or cash deposits must be furnished to the City prior to execution of this contract. 3. For Water and Sanitary Sewer Facilities: Performance and payment bonds, or cash deposits, acceptable to the City are required to be furnished by the developer for the installation of water and sanitary sewer facilities. a. Where the developer lets the construction contract for water and sanitary sewer facilities, performance and payment bonds shall be deposited, in the amount of one hundred percent (100%) of the estimated cost of construction, cash deposited shall be in the amount of one hundred twenty-five percent (125%), as stated in the construction contract, is required to be furnished simultaneous with execution of the construction contract. b. Where the City lets the contract, performance and payment bonds shall be deposited, in the amount of one hundred percent (100%) of the estimated cost of construction, as stated in the construction contract, is required prior to issuance of a work order by the City. 4. Tvpes of Guarantees: a. Performance and Pavment Bonds: Are required for the construction of streets, storm drains, street lights, and street name signs, the following terms and conditions shall apply: (1) The bonds will be standard performance and payment bonds provided by a licensed surety company on forms furnished by that surety company. (2) The bonds wi{I be subject to the review and approval by the City Attorney. . (3) The performance bond shall be payable to the City and shall guarantee performance of the street, storm drain, street light, and street name sign construction contemplated under this contract. (4) The Payment Bond shall guarantee payment for all labor, materials and equipment furnished in connection with the street, storm drain, street light, and street name sign construction contemplated under this contract. (5) In order for a surety company to be acceptable, the name of the surety shall be included on the current U.S. Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company. e b. Cash Deposits: A cash deposit shall be acceptable with verification that an attempt to secure a bond has been denied, such deposit shall be made in the Treasury of� the City of Fort Worth.� The City of Fort Worth will not pay interest on any such cash deposit. (1) At such time that the contract is bid for projects other than assessment projects, the cash deposit shall be adjusted to one hundred twenty five percent (125%) of the actual bid price. No contract shall be awarded and no work order shall be issued until such adjustment is made. (2} When a cash deposit is made, the additional twenty-five percent. (25%) beyond the one hundred percent (100%) of the estimated developer's share represents additional funds for change orders during the course of the project. This twenty five percent (25%) shall be considered the developer's change order fund. (3) If the developer makes a cash deposit with the City, the developer may make timely withdrawals from the cash funds in order to pay the contractor and/or subcontractor based on amount of construction work completed as approved and verified by the City Engineer or authorized representative. For projects whose actual total contract cost is 5400,000 or greater, such release of security shall equal the percentage of work completed for that period multiplied by ninety-five percent �95%). This percentage shall be applied to the actual current total contract cost to determine the amount that may be reduced upon request of developer. For projects whose actual total contract cost is less than 5400,000, such release of security shall equal the percentage of work completed for that period multiplied by 0 N G ninety percent (90%). This percentage shall then be applied to the actual current total contract cost to determine the amount of security that may be reduced upon request of developer. The remaining security, five percent (5%) for projects of $400,000 or greater and ten percent (10%) for projects less than 5400,000 together with the remaining funds from the ,Developer's Change Order Fund, if a�y, will be released to the developer after the project has been accepted by the City. Partial release of funds �shall be limited to once per month. There shall be no partial release of funds for projects of less than $25,000. Proof that the developer has paid the contractor shall be required for partial releases. 5. Purpose. Term and Renewal of Guarantees,: a. Performance and payment bonds, and cash deposits furnished hereunder shall be for the purposes of guaranteeing satisfactory compliance by the developer. with all requirements, terms and conditions of this agreement, including, but not limited to, the satisfactory completion of the improvements prescribed herein, and the making of payments to any person, firm, corporation or other entity with whom the developer has a direct contractual relationship for the performance of work hereunder. b. Developer shall keep said performance and payment bonds, and/or cash deposits in full force and effect until such time as developer has fully complied with the terms and conditions of this agreement, and failure to keep same in force and effect shalf constitute a default and breach of this agreement. G. The City shall assume its share of the cost of the improvements covered by this agreement along with the engineering fee only if funds are available for such participation. In the event that no funds are available fior City participation, the developer shall award the contract and deposit with the City a performance and payment bonds or cash for 100 percent of the estimated total construction cost of the improvements [plus ten percent (10%1 for engineering and miscellaneous costs if the City prepares the plans]. H. On all facilities included in this agreement fior which the developer awards its own construction contract, the developer agrees to follow the following procedures: 1. If the City participates in the cost of the facilities, the construction contract must be advertised, bid and awarded in accordance with State statutes prescribing the requirements for the letting of contracts for the construction of public work. This � includes advertising in a local 1 newspaper at least twice in one or mo're newspapers of general circulation in the county or counties in which the work is to be performed. The second publication must be on or before the tenth (10th) day before the first date. bids may be submitted. The bids must be opened by an officer or employee of the City at or in an office of the City. 2. To employ a construction contractor who is approved by the Director of the Department having jurisdiction over the facility to be so constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets. 3. To require the contractor to furnish to the City payment, performance and maintenance bonds in the names of the City and the developer for one hundred percent (100%) of the contract price of the facility, said bonds to be furnished before work is commence. Developer further shall require the contractor to provide public liability insurance in the amounts required by the City's specifications covering that particular work. 4. To give 48 hours notice to the department having jurisdiction of intent to commence construction of the facility so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install any sanitary sewer, storm drain, or water �ipe unless a responsible City inspector is present and gives his � consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. 5. To secure approval by the Director of the Department having jurisdiction of any and all partial and final payments to the contractor. Said approval shall be subject to and in accordance with requirements of this agreement, and is not to constitute approval of the quantities of which J 0 payment is based. 6. To delay connections of buildings to service lines of sewer and water mains constructed under this contract until said sewer and water• mains and 'service lines have been completed to the satisfaction of the Water Department. 7. � It is expressly understood by and between the developer and the City of Fort Worth, that in the event the developer elects to award one single construction contract for storm drainage and pavement, said contract shall be separated in the bidding and City participation, if any, shall be limited to the lowest possible combination of bids as if each of the above were awarded as separa�e contracts. f. Anything to the contrary herein notwithstanding, for and in consideration of the promises and the covenants herein made by the City, the developer covenants and agrees as follows: 1. The developer shall make separate elections with regard to water and/or sanitary sewer facilities, storm drainage, street improvements and street lights as to whether the work prescribed herein shall be performed by the City, or by its contractor, or by the developer, through its contractor. Each separate election shall be made in writing and deliuered to City no later than six (6) months priar to the expiration of this agreement. In the event any of such separate elections has not b�en made and delivered to City by such date, it shall be conclusively presurned that the developer has elected that such work be performed by the City in accordance with all of the terms of this agreement, and in particular Paragraph V-F hereof. , 2. lrrespective of any such election and whether the work is to be performed by the City, or by its contractor or by the developer through its contractor, the developer covenants and agrees to deliver to the City , a performance and payment guarantee in accordance with the provisions of Paragraph V-F of this agreement. � 3. ln addition to the guarantee required in the preceding paragraph, in the event developer elects that the work be performed by the City, or by the City's contractor, or such election is presumed as provided above, the developer covenants and agrees to pay to the City the developer's share of the estimated construction costs. The amount of such estimated payment shall be computed as set out in Sections l, 11, Ill, lV, and V hereof, based upan the lowest responsive bid for such work, as determined by City, or upon a cost estimated to be performed by City forces prepared by the City, as appropriate, and shall be subject to adjustment to actual costs upon final completion of the subject work. Such estimated pay,ment shall be made promptly upon demand by City, it being understood that such payrnent wil{ be made after the receipt of bids for work, but in every case prior to the award of any construction contract, unless otherwise specifically set out herein. 4. Developer further covenants and agrees to, and by these presents does hereby fully indemnify, hold harmless and defend the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, this agreement or the construction of the improvements or facilities described herein, whether or not causes, on whole or in part, by the negligence of officers, agents, employees, licensees, invitees, contractors or subcontractors of the City; and in addition the developer covenants to indemnify, hold harmless and defend the City, its officers, agents and empfoyees from and against all claims, suits, or causes or action or any nature whatsoever brought for, or on account of any injuries or damages to persons or property, incl'uding death, resulting from any failure to properly safeguard the work or an account of any � act, inte,ntional or otherwise, neglect or misconduct of the developer, its contractors, subcontractors, agents or employees, whether or not caused, on whole or in part, by the negligence of officers, agents, employees, licensees, invitees, contractors or subcontractors of the City. 5. Developer covenants and agrees that it discriminates against no individual involving employment as prohibited by the terms of Ordinance No. 7278 (as amended by Ordinance No. 7400), an ordinance prohibiting discrimination in employment practice because of race, creed, color, religion, national origin (except for illegal aliens), sex or age, unless sex or age is a bonafide occupational qualification, subcontractor or employment agency, either furnishing or referring applicants to such developer, nor any agent of developer is discriminating against any individual involving employment as prohibited by the terms of such Ordinance No. 7278 (as amended by Ordinance No. 7400). Individual involving employment as prohibited by the terms of such Ordinance No. 7278 (as amended by Ordinance No. 7400). J K The attached Exhibits Appendix "A", A and B, and Location Map are made a part hereof for all intents and purposes. Venue of any action brought hereunder shall be in Fort Worth, Tarrant County, Texas. L. The City's Policy for the Installation of Community Facilities, as adopted by the City Council on September 1992, is hereby incorporated herein by reference, and Developer covenants and agrees to comply with said Policy as a condition of this contract and as a condition to the platting of the subject property. IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said developer has executed this instrument in quadruplicate, at Fort Worth, Texas this the � , ��day of � ��a-/,� , 1 g � � : ATTEST: G oria Pearso City Secretary APPROVED AS TO FORM AND LEGALITY: � Gary J. S 'nberger Assistant City Attorney c - /'7�.�� Contract Authorization � " �-� -� �q Uate CITY OF FORT OR H EXAS 1 r By Mike Groomer Assistant City Manager DEVELOPER: Dr. Puskoor Kumar By: �,�j�,,,�� � Dr. Puskoor Kumar Owner ,, ,'. • . V 114 -� 35W V � / . / / / / �� � �SITE Elizabeth Cr�P.k . � /3 0 ,� s � �v v� N � �• -w� Elizabe#h ,Cemetary ELIZABETHTOWN ROAD IMPROVEMENTS LOCATION MAP , � � nvrrAwAY ��ocrA�s nvc � Englneerc • Landscaps Mchitects • Plannxs • Survey�xs ,aa uo��c aea� ainc ,ao raRr w�*N. mw r+a� niaxE (n» saa-»2� �na ta� as�rss r�x (n» s��sa� .. , / � . / � , /� / // / // � �/ � i �� � � / �� �ar°e , � �/ � / �� 0 / i� ,o FSMT /� � �q��S� � �/ � �o �.� � /��, � / � � b /� � � j ��� SO / � �/ i �.� / / / ��S°os i � / � / p• � �� / c� og¢� � � _,� � �/ � 9 / / / �� �/i / � / / � � 16" WATER / L(NE � / � � . � SCAI..E� 1'-100' �� o� o� q � � � INDEPENDANT HOL(NESS CHURCH 2751/26 R.P.R. Y-�d PUSHKAR M. KUMAR, M.D. AND ASH00 M. RAO, M.D. COUNTY CLERK FILE N0. 96R-0001982 � � � — " --�_ WATER EXHIBIT 'A' ELIZABETHTOWN ROAD DUNAWAY AS.SOCTA'iES INC Engineers • Landscape Architects • Planners • Surveyors 1501 MERRPAAC CRCLE. SUlE 100 fOFii YpRM 7E%ti5 76107 �xart (sn) s3s-ii2i Memo (ai� azo-z�ss Fw� �an> sss-�u� . Y +• ♦ � . � � � •. , , „ �• ' I I —x �;% 1 � I /'� � II � I � �'/,�� � I / . I � Fil � I r. i n i 8 S. S. � � I �' x'� � �� f. PUSHKAR M. KUMAR, M.D. � � I I�,'��'I AND ASH00 M. RAO, M.D. I I �'l COUNTY CLERK FILE N0. 96R-0001982 I I .r,: � 7 ,p � � � " lal �`��'��I STA 28+00 - 30" LINE �� SANITARY SEWER M.H. 15' SEWER � J I.•''� � RIM ELEV.= 597.34 EASEMENT x ` INVERT ELEV.= 578.23 (plans) _ � ��f:� � � i "�'�I � 1 I " �` �.{ � � I II � ` � � , � , 2o I I ��!°�I / i EXIST. UTIL f Ss EASEMENT \���P/ _ , / / � / / /30� / /� � / / � ` / / �' � I �r ;-•i ��; ,• , s�', ..,!,. I" ,�'I �'`���� r' `r � SEWER .EXHIBIT 'B' , ELIZABETHTOWN ROAD � DUNAWAY �4S.SOCIA'I'L.S INC � Englneers • londacape Architecta • Planners • Surveyon viwi (n��n�i�o'E( » sa�2+� uc n�i s��e-07i�,n City of Fort Worth, Texas n►�jAyar And Caunc�l C,ammun�cAt�an DATE REFERENCE NUMBER LOG NAME PAGE 2�23�99 **C-17284 20KOMAR 1 of 1 SUBJECT COMMUNITY FACILITIES A REEMENT WITH DR. PUSKAR M. kOMAR FOR THE INSTALLATION OF COMMUNITY FACILITIES FOR WATER AND SEWER SERVICES TO SERVE ELIZABETHTOWN ROAD RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a Community Facilities Agreement with Dr. Puskar M. Komar for the installation of community facilities for water and sewer services to serve Elizabethtown Road. DISCUSSION: Dr. Puskar M. Komar, has executed a proposed contract for community facilities to serve a single-family (six lots) development located in property south of Hwy. 114 and west of Elizabeth Cemetery Road. This development is located in COUNCIL DISTRICT 4. This Community Facilities Agreement is in compliance with standard City policy. ESTIMATED COSTS: Proiect Cost Water Sewer Construction Inspection Fee TOTAL Develoner $75,520.00 20125.00 1, 913.00 $95,645.00 � $22,227.00 -0- 445.00 $22,227.00 Total $ 97,747.00 20,125.00 2,358.00 $117,872.00 PLAN COMMISSION APPROVAL - On February 23, 1998, the Plan Commission approved application for Preliminary Plat (PP 98020), (AAR Phase II Addition). FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper-Water Fund. ►frCeA7 Submitted for City Manager's Oftice by: Mike Groomer Originating Department Head: Hugo Malanga Additional Information Contact: Hugo Malanga FUND I ACCOUNT � CENTER I AMOUNT (to) 6140 � � � 7801 I (from) FW77 7801 I 539140 060770154620 $22,227.00 CITY SECRETARY ���p�o�v�� �I?"� COUNCII ��6 23 ty99 �4�� I C�� �e�ry of ths 1 City of F�r► Worth,'fexas I