AMENDMENT NO. 2
CITY SECRETARY CONTRACT NO. �� �" / �'�
(No M&C Needed)
WHEREAS, the City of Fort Worth (City) and Black & Veatch,
L.L.P. (Engineer) made and entered into City Secretary Contract
No. 23684, (the Contract) which was authorized by the City Council
by M&C C-16649 on the 3rd day of March 1998; and subsequently
revised by one previous amendment; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Mains 19 and 258
Drainage Area Sanitary Sewer Rehabilitation and Improvements
(Group 5, Contract 1), Part 7.
WHEREAS, it has become necessary to execute Amendment No. 2
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated September 7, 1999, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services
to be performed by Engineer total $7,077.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $325,401.00.
G� �(�9C�O/�� �[�C�G� ��
CB� ������Q�
�o UU�%It`:UUU9 ��a
d
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the f� day of ,(��(�,(,Q/�,�
1999, in Fort Worth, Tarrant County, Texas.
ATT T:
�
loria Pea on, City Secretary
`�'Z.G i2t � �. ,��7JU � � ��
��ontract Authorizativn
L?ate
APPROVAL
e
,.�.�` :�-'�� t��. � �
A. Douglas Rademaker, P.E.
Director, Department of
Engineering
APPROVED:
� ��
Mike Groomer
Assistant City Manager
BLACK & VEATCH, L.L.P.
ENGINEER
By : �:�G ✓ /`-�_
_ /
Name: Randy G. McInt�re, P.E., P.O.A.
100 E. 15Tx Street, Suite 600
Fort Worth, TX 76102
APPROVED AS TO FORM AND LEGALITY:
Gary St ' erger
Assistant City Attorney
23684
-2-
►• _
�� �
BLACK & VEATCH
100 E. 15th Street
Suite 600
Fort Worth, Texas 76102 USA
City of Fort Worth, Texas
Mains 19 and 258, Drainage Area
Sanitary Sewer System Rehabilitation and Improvements
(Group 5, Contract 1), Part 13
DOE No. 2537, PS46-07046410250
Mr. John Boyer
City of Fort Worth
Department of Engineering
1000 Throckmorton Street
Fort Worth, Texas 76102
Black & Veatch Corporation
B&V Project 29597
B&V File G1.01
September 7, 1998
Subject: City Contract #23684, Amendment No. 2
Dear Mr. Boyer:
On June 21, 1999 we held a plan review meeting of M19 & M258 Part 13 at our
offices. In attendance were you, Peter Fu, Darryl Gadbury and Liam Conlon of the
Fort Worth Water Department. This review meeting-identified possible alternative
alignments that would reduce construction costs. It was also decided to divide the
construction projects to lessen schedule impacts from the large amount of property
rights that were being obtained for some sanitary sewers. This amendment is for
the surveying and engineering services necessary to design the relocated sanitary
sewers, and provides an additional set of plans and specifications for bidding and
construction.
The oriQinal M19 & M258. Part 13 qlans included three units:
Unit 1— Located in M19 near JPS Hospital and along Kentucky Street
(no land rights)
Unit 2— Located in M189 not an AO Basin (111 TROE & 2 TCE)
Unit 3— Located in M243 not an AO Basin (8 TROE)
The sanitary sewer lines near JPS Hospital, part of the previous Unit 1, were
recently advertised as M19 & M258, Part 13, with bid opening scheduled for
September 30, 1999. The remaining Unit 1 lines in Kentucky Street were
redesigned and are being constructed as change orders to current construction
contracts in the M19 Basin.
the imagine•build companyTM
, � �, +
City of Fort Worth, Texas
Mains 19 and 258, Drainage Area
B&V Project 29597
September 7, 1999
The surveys for sanitary sewer rehabilitation in Kentucky Street identified the
possibilities of abandoning significant portions of the sewers and rerouting sewers,
resulting in potential savings of $300,000 in construction. The City assisted in field
investigations that confirmed the potential for redesign. Gorrondona & Associates
provided additional surveying for the new alignments, see attached copy of
surveying invoice. We have designed and assisted in the coordination for
construction of the alignment improvements, through change orders on existing
construction contracts.
The oriainal Unit 2 and ll�it.3 sanitary sswer lines were sep�r�te� ir. � n.��N pro;sct.
and divided into three units. Final plans, specifications and �mylar cover sheet were
submitted on August 25, 1999.
Additional Surveying along Kentucky Street (+10%)
Additional Sets of Specifications (43 sets x$30 ea)
Additionai Bid and Additional Unit - Bidding Assistance,
Bid Tabulation, Pre Construction Meetings,
Change Order Construction Coordination
PM: 4 hrs x $100
PE: 8 hrs x$ 75
Secretarial: 4 hrs x$ 48
TOTAL
$ 4,595.00
$ 1,290.00
$ 400.00
$ 600.00
$ 192.00
$ 7,077.00
This $ 7,077.00 contract amendment includes additional surveying efforts
performed by our M/WBE subconsultant. The original contract amount was
$270,905.00, Amendment No. 1 added $47,419 and with approvaf of this Contract
Amendment No. 2, the revised contract amount will be $325,401.00:
If there are any questions, please do not hesitate to call.
Sincerely,
BLACK & VEATCH
`�[� " ,/"`, �
.
Randy Mclntyre, P.E.
Project Manager
Enclosure
cc: Mr. Peter Fu, Fort Worth Water Department
Mr. Tony Sholola, Fort Worth DOE
Mr. Dale Cherry, B&V
�.:
� �
8400 Ward Parkway
P.O. Box 8405
Kansas City, Missouri 64114 USA
Te1:�913)458-2000
BLACK & VEATCH
Black & Veatch Corporation
GENERAL POWER OF ATTORNEY
I, S. K. Sloan, of lawful age, and Vice President and Assistant
Secretary of Black & Veatch Corporation (the "Company"), in my capacity
as legal representative of same, declare as follows:
m
1. That the Company is a legally-constituted company
certified to operate in accordance with the laws of the
State of Delaware, United States of America;
2. That I am Vice President and Assistant Secretary of the
Company and, as such, am empowered to sign contracts and
issue powers of attorney on its behalf;
3. By the authority vested in me as Vice President
Assistant Secretary of the Company, I hereby issue
Randall G. McIntyre, of lawful age, a General Power
Attorney, to enter into and sign contracts, leases
invoices and other related documents for projects in
states of Texas, Ok1ahoma, and Arkansas on behalf of
Company; and
and
to
of
and
the
the
4. This GENERAL POWER OF ATTORNEY shall remain in force and
effect through and including 31 December 2001, or until
earlier terminated.
IN WITNESS WHEREOF, I affix my signature to this GENERAL POWER OF
ATT RNEY granted to Randall G. McIntyre at Overland Park. Kansas this
��f� day of May , 1999 .
'.��•�;!R�K� 4f�
.;o���r� �,.� �..
.
:��;� �' ,: �
� � _ .'i � � c��`•. � s
� C i � �
i i'• � .� !t �
y�; a:-;�
�`�•'••, ^►~,.� .�,,0
���..� �•��b
.,,.
Sea 1
I�
:
STATE OF KANSAS
COUNTY OF JOHNSON
AUTHORIZING OFFICER
S. K. Sloan
Vice President
Black & Veatch
)
) ss
)
and Assistant Secretary
Corporation
Swarn to and subscribed before me this � day of May, 1999.
�' �! �
o ry blic
��� A, ap�1Ll.
puAiic-5tate ot 4Cansss
��intsd tn !o►x�s� �t� � ,
the imagine•build compan� ��L �Q��es � -
S�fSt�v�
.�., . .... , .YO
� �..�.� .
� j �.' J/ � :, � ✓
�? rde'•. � �
4: ,� o-
�� pM ;��`'.
••;i� .
�-���;:. �:.i'°
. 4 y. _
10-01-99PO4:26 �CVD
FoT oTH
R R
� ._-
_. �_.
��-- � .
MEMORANDUM
TO:
FROM
A. Douglas Rademaker, Director DOE and
Mike Groomer, Assistant City Manager
Tony Sholola � ' S
DATE: September 21, 1999
RE: DESIGN FEE AMENDMENT NO. 2 TO MAINS 19 AND 258 DRAINAGE
AREA SANITARY SEWER SYSTEM REHABILITATION AND IM-
PROVEMENTS (GROUP 5, CONTRACT 2), PART 7, SEWER PROJECT
NO. PS46-070460410250, DOE NO. 1869
The proposed amendment will reimburse Black & Veatch, L.L.P., for the additional
services that were provided on the project as requested by the City.
The amendment is necessary to reimburse Black & Veatch for the additional survey and
design services that were provided on Part 13 of the project. In order to expedite con-
struction of the project, the project was divided into three units for construction purposes.
In addition, Black and Veatch provided additional design and survey services for the rea-
lignment of several sewer laterals located in the project area.
Black & Veatch, L.L.P., Inc., is requesting reimbursement in the amount of $7,077.00 for
the additional services thereby increasing the contract fee from $318,324.00 to
$325,401.00. I believe this fee is fair and reasonable for the additional services that were
provided.
Please authorize this additional fee by your signatures on the attached contract amend-
ment form.
Attachment
cc: Mike Domenech, Project Manager
Berdena Hamilton, Water Dept.
Dan Pepon, Water Dept
MEMO 2537
I,="���";1
���i�;
ENGINEERING DEPARTMENT
THE CITY OF FORT WORTH * IOOO THROCKMORTON STREET * FORT WORTH, TExns 76102-6311
(81'� 871-7941 * Fnx (81'� 871-7854
�� Printed on recycled paper