Loading...
HomeMy WebLinkAbout025293 - Construction-Related - Contract - Paragon Project Resource, Inc.AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO (���� C% � (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Paragon Project Resource, Inc., (Engineer) made and entered into City Secretary Contract No. 24572 (the Contract) which was authorized by the City Council by M&C C-17200 on the lst day of January, 1999; and WHEREAS, the Contract involves engineering services for the following project: Engineering Contract for the Pavement Reconstruction and Water and Sanitary Sewer Replacements on Curzon Ave. (Halloran to Faron) and Littlepage (Fletcher to Kilpatrick). WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: l. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 16, 1999, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $5,000.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $54,637.00. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. '�G��0��0�� °������ �'��� ���GG°3� ° �� ��� "� G'�b, �. , EXECUTED on this the � day of , 19�, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: �5.. - C �� C �>ti�, ,,�'.�y�:�n���,e�� . �.�.. � A. Douglas Rademaker, P.E. Director, Department of Engineering ENGINEER APPROVED: �` Mike Groomer Assistant City Manager AT ST: loria Pearso , City Secretary B : � �'�" Y '��� Name: William Carrea, P.E. President Yaragon Yro�ect ltesources, Inc. � `�2� l�1 y�'. ��1 � �2�� �:'ontract Authorization APPROVED AS TO FORM AND LEGALITY: Gary � erger Assistant City Attorney ; r_ �� ��������� II � September 16, 1999 Mr. Gopal Sahu, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Street Fort Worth, Texas 76102 1998 CAPITAL IMPROVEMENT PROGRAM PROJECTS . RECONSTRUCTION WITH NEW ASPHALT PAVEMENT OF 1) CURZON AVEivUE (HALLORAN TO FAROl� AND Z} LITTLEPAGE STREET (FLETCHER TO KII,PATRICI�. COUNCIL, DISTRICT 7, CONTRACT 17 (MAPSCO PAGE NO. 74M, R), DOE NO'S. 2280 AND.2281 Dear Mr. Sahu: Pursuant to our meeting today, please initiate a modification to our agreement for engineexing services in accordance with Standard Agreement Article V, Item K provisions. Based on additional scope requested by the City as identified below, we request modification of our design fee as fallows: SCOPE CHANGE #1: Revise pavement width established in concept phase design, from variable street width which matched existi.ng nrtersection curb returns per coordination with the City, to even 36-foot and 28-foot street widths after 90-percent design per coordination with the City. This desi� change affected 9 of the 16 project drawings (5 plan and profile sheets, 1 water plan sheet, 1 sanitary sewer plan and profile sheet, 2 cross section sheets) and required re-design of the 90-percent paving layout, �-ading, 25 driveways, 161eadwalks, water service layout and 40 cross sections already completed. FEE FOR SCOPE CHANGE #1 � Employee Classification Hours Rate/Hour Amount � Design Engineer 40 $65 $2,600 � Designer/CAD Operator 40 $60 $2,400 TOTAL $5,000 Mr. Gopal Sahu, P.E. August 26, 1999 Page 2 Original Contiact: This Niodification: Revised Desi� Fee Total $ 49,637 5,000 $ 54,637 No additional contract time is requested with this modification. Please do not hesitate to contact us if you have any questions regarding this matter. Daryl I% Schauer, P.E. Senior Project Manager