Loading...
HomeMy WebLinkAbout025295 - Construction-Related - Contract - Austin Commercial, Inc. (2)STATE OF TEXAS § COUNTY OF TEXAS § CITY SECRETARY CONTRACT NO. ��oG� %�' WHEREAS, the City of Fort Worth ("City") the City has entered into a contract with Austin Commercial, Inc. ("Project Manager") for project management services for the expansion and renovation of the Fort Worth Convention Center (City Secretary Contract #24692); and WHEREAS, the City desires to widen the scope of services to include selection of an Architect and payment of design services incurred within the scope of the contract; and WHEREAS, the City and Project Manger have mutually agreed to extend the contract term to accommodate this increase in scope; NOW, THEREFORE, City and Project Manager, acting herein by and through their duly authorized representatives, enter into the following agreement: 1. The first sentence of Article 3.2 is revised to read as follows: 3.2 The parties agree that the term of this contract shall extend for the duration of the design, construction and warranty period of the last phase of construction (Concept E Phase I). The total duration of services shall not exceed 5 years from the execution of this amendment, unless a further extension is mutually agreed to by both parties in writing. 2. Article 5.2.1 is revised to read as follows: 5.2.1 PREPARTION OF PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS 5.2.1.1 The Project Manager shall enter into a professional service agreement with the Architect ( references to "Design Professional" in City Secretary Contract #24692 shall be considered synonymous with "Architect") for the preparation of plans, specifications and contract documents. Services of the Project Manager are outlined in Article 16. �f����BC�� G'C���G�� ��� ������1G��( U Ua � Ci�U�p Il�a � 3. Article 5.2.4.1, Description of Phase 1B, is revised to read as follows: Phase 1B: Design/Preliminary Construction Management Services Phase: The Project Manager shall manage the services of the Architect to insure that each Phase is in compliance and consistent with the City's concept design and project plan. The Project Manager will insure that the construction costs are within the available funds as set by the City. 4. Article 8, Compensation and Payment, Paragraph 8.1 is revised to read as follows: 8.1 Compensation: The Project Manager shall be paid an amount not to exceed $3,445,403 for the following services (detailed breakdown for all services included as Attachment One) : 8.1.1 Phase lA: Project Planning and Conceptual Design Phase: For Project Management Services, hourly wages times a multiplier of 2.5 and for the services of the Phase 1 A Architect, hourly wages times a multiplier of 3.0. 8.1.2 Phase 1B: Design/Preliminary Construction Management Services Phase: A not to exceed amount of $2.947,903 (inclusive of $200,000 for Phase 1B in City Secretary Contract #24692) to include the Architectural Design fee of $2,284,528, Management Team consulting Fee of $176,000, Preliminary Construction Management fee of $434,375 and reimbursables of $53,000. �a 5. The follow section shall be added to Article 9 INDEMNITY AND INSURANCE: 9.7.13 Notwithstanding anything herein to the contrary, Project Manager's liability for claims, damage, causes of action, including attorneys fees and other costs arising or alleged to arise from the performance of professional services under this Agreement, shall be limited to the proceeds of professional liability insurance provided by the Architect and that of their consultants; provided, however, if Architect and/or its consultants do not maintain professional liability insurance or allow such insurance to lapse, then Project Manager's professional liability is limited to the amount described in section 9.5 of City Secretary Contract #24692. 6. Within Article 10 INDEMNITY PERTAINING TO HAZARDOUS MATERIAL, the words "and Architect" are to be added wherever there is reference to the Project Manager. 7. Article 16 is to be added as follows: Article 16 SERVICES OF THE PROJECT MANAGER WITH RESPECT TO DESIGN SERVICES 16.1 GENERAL: The Project Manager will contract with the project Architect as an independent contractor who will perform, within the professional standards normally accepted in the State of Texas, professional services in connection with the following general scope of work: 3 Design and preparation of construction documents and Construction phase services for the Renovation and Expansion of the Fort Worth Convention Center 16.2 CHARACTER OF PROJECT MANAGER'S SERVICES WITH RESPECT TO ARCHITECTURAL DESIGN 16.2.1 The Architect shall be a subcontractor to the Project Manager. 16.2.2 Project Manager shall consult with the City to clarify and define City's requirements relative to the assignments and review available data. 16.2.3 Project Manager agrees to commit the personnel to the assignment as necessary in order to complete the assignment in an expeditious manner. 16.2.4 The Project Manager shall pay for the printing of contract documents required for design submittals, presentations and other design phase products. Project Manager shall provide 5 sets of design drawings and specifications and one complete set of reproducibles for use in bidding and construction contracts. 16.2.5 Perform services as outlined in Attachment A, which is attached to and made a part of this Amendment. 16.3 FEES: The Project Manager's fees shall be allocated by an agreed schedule broken down by Phases. 16.3.1 Project Manager shall not be paid more than the following amounts based upon the stage of design: 16.3.1.1 Preliminary Concept Plan and Presentation 7% of total fee 16.3.1.2 For each Project Phase, percentage of Phase design costs. 16.3.1.3 Completion of Schematic Design 21% 16.3.1.4 Completion of Design Development and cost estimates 35% 16.3.1.5 Completion of Construction documents 75% 4 0 16.3.1.6 Action by City Council to accept bids 80% 16.3.1.7 Final acceptance of the Project Phase by the City 100% 16.3.2 The Project will be constructed in four Phases: 16.3.2.1 'Phase 1: Site Improvements and Utility Relocations 16.3.2.2 Phase 2: Building exterior and supporting rough interior 16.3.2.3 Phase 3: Interior Finish and Equipment 16.3.2.4 Phase 4: East Hall Modification 16.4 RESPONSIBILITY FOR CONSTRUCTION COSTS 16.4.1 The Construction Budget for this Project is $25,000,000 plus a construction contingency of $2,500,000, including all site work, utility relocation and utility connection fees. If the Construction Budget for any Phase of the Project is exceeded by the lowest bona fide bid, the City shall (1) award the contract, (2) abandon the project and terminate this agreement, or (3) cooperate in the reduction of the Project Scope and features as required to stay within the Construction Budget in order to rebid the Project. If the City decides to reduce the scope of the project phase and rebid, the Project Manager sha11, at its sole cost and expense, cause the Architect to modify the Drawings and Specifications as necessary to stay within the Construction Budget. In the event the City abandons the project after receiving bids, the City may terminate this Agreement, and the Project Manager shall be entitled to 80% of the total fee for any unawarded phases. 16.4.2 The Project Manager shall inform the City, in writing, of the probable construction cost at the submission of each design phase for each Project phase. The City shall either approve the adjustment of the Construction Budget or direct the Project Manager to adjust the Project design to stay within the previously approved Construction Budget. 5 16.5 PROCEDURES FOR PROVIDING DESIGN SERVICES 16.5.1 Design Phase: 16.5.2 City shall notify the Project Manager when it is appropriate to proceed with the services. 16.5.3 The Project Manager shall visit the site and make itself familiar with the scope of the assignment 16.5.4 The Project Manager shall inform the City of the need for services to survey, plat, prepare and vacate easements and any other property issues necessary to complete the design and secure a construction permit. 16.5.5 The design shall include all site work, design and coordination of utilities, landscaping and facility design required for a complete and functional project. 16.5.6 The Project Manager shall prepare presentation graphics using plans necessary for the design and attend twelve scheduled public meetings during the design of the project. Project Manager shall require the Architect to prepare "Elimination of Architectural Barriers Registration" and submit the applications to the Texas Department of Licensing and Regulation. All designs shall be in conformance with the Elimination of Barriers Act, State of Texas, City of Fort Worth Building Codes and the Texas Accessibility Standards (TAS). 16.5.7 The Project Manager shall reimburse the City for all damages incurred as a result of the failure of a facility to conform to all applicable State rules and regulations, Federal law, and municipal ordinances, including but not limited to the cost to modify the facility to conform to all applicable State rules and regulations, Federal law, and municipal ordinances. 16.5.8 The Project Manager shall include procedures for mitigating the design or installation of new hazardous material as part of the work, use of recycled building C� 0 materials, sustainable construction, and a building-commissionin� program in the design of the project. 16.5.9 The City shall acknowledge the design costs and scope in writing at each stage of design. The Project Manager shall submit the stages of design to�the City in eight copies along with its opinion of probable construction cost. 16.5.10 Upon written approval of the final design, the Proj�ect Manager shall make i whatever final changes are necessary and submit the d�awings and technical specifications to the City for use in bidding. 16.5.11 Project Manager shall prepare the design in phases' as follows: � 16.5.11.1 Preliminary Concept Plan and Presentation: Develpp a phased project plan I to meet the long-term development plan. Phased plan will� include utility and site preparation, facility construction and interior finish-out phase�. The three phases may be further broken out to control the size of individual contrac�s for each Project Phase: 16.5.11.2 Schematic Design: Preparation of alternative floor and site plans, architectural concepts and principal equipment and finish pla�hs and cost estimates. 16.5.11.3 Design Development: Preparation of detailed arcl�itectural floor plans and principal elevations, site plans, selection of principal equi:�ment and finishes, and detailed cost estimates 16.5.11.4 Construction Documents: Preparation of detailS, mechanical, electrical, and plumbing plans, finish schedules, detailed specifica�ions, and detailed cost estimates. � 16.5.11.5 Bidding: I 16.5.11.5.1 The Project Manager shall respond to $idders inquiries, prepare whatever addenda are necessary and assist the City at th� Prebid Conferences. � � 7 � 16.5.11.5.2 Following bidding the Project Manager shall make recommendations concerning award of the contract. , 16.5.11.6 Construction Services: 16.5.11.6.1 The Project Manager shall assist the City, upon request, in approving submittals, observing construction procedures and results, reviewing methods and costs associated with proposed change orders, and resolving construction problems. However, neither the professional activities of the Architect, nor the presence of the Architect or his or her employees and subconsultants at a construction site, sha11 relieve the General Contractor and any other entity of their obligations, duties and responsibilities including, but not limited to, construction means, methods, sequence, techniques or procedures necessary for performing, superintending or coordinating all portions of the Work of construction in accordance with the contract documents and any health or safety precautions required by any regulatory agencies. The Architect and his or her personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. The City agrees that the General Contractor is solely responsible for jobsite safety, and holds the Project I1rlanager responsible for making this intent evident in the Project Manager's preparation of bid and construction contract documents. 16.5.11.6.2 Project Manager shall attend periodic job site meetings. 16.5.11.6.3 At the completion of construction, the Project Manager shall assist the City conduct and document the final inspection and assist the Program/Construction Manager on the resolution of construction or design deficiencies. 16.5.11.6.4 Project Manager shall assist the City in the Commissioning Phase of the Project using the services of his mechanicaUelectrical consultants. 8 0 .� . 16.5.11.6.5 The Project Manager shall prepare "Record Drawings" on mylar medium based on inspection notes, Contractor's marked up field drawings and the Project Manager's observations. 16.5.11.7 All project information and designs shall become the property of the City and may be used by the City in any manner it wishes. The Project Manager shall not be liable for the use of such design information on other projects executed by the City. 16.6 CITY RESPONSIBILITIES 16.6.1 The Project Manager shall represent the City in the daily management of the design and construction activities. 16.6.2 Upon receipt of written approval from the City, the Project Manager will have the authority to direct changes in scope. 16.6.3 The Project Manager will make recommendations to the City concerning contractual cost changes (Design Agreement Amendments and possible alternative bid packages). 16.6.4 The Project Manager shall have the authority to accept project documents and construction on the behalf of the City. 16.6.5 The Project Manager shall review and approve all reports, recommendations and other documents and provide written decisions pertaining thereto within a reasonable time. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. E Executed on this the � day of �C��u✓ ATTEST: City Secretary � � APPROVED AS TO FORM Assistant ty Attorney ATTEST: ����� � Name: `iG�(E12 %v1�� Title: C�µ?�oc.-�- ��-� AUSTIN COMME CIAL, INC. 10 , 199�. CITY OF FO WO B. Assistant City Manager � - / r�� �� Contract Authorization �' a-�._ �/g vate AUSTIN COMMERCIAL, INC. . .� �� �l� Ton ck �ic Pr si ATTACHMENT ONE (to replace Attachment One of the 02/26/99 originai agreement; CS Contract #24692) RENOVATION AND EXPANSION FORT WORTH CONVENTION CENTER FEE STRUCTURE AUSTIN COMMERCIAL Phase lA- Project Planning and Conceptual Design Phase 1 B- Design/Preliminary Construction Management Services Design Management/Coordination $364,375 Bidding Phase $ 70,000 TOTAL Pha'se 1 B TOTAL AUSTIN COMMERCIAL $225,000 $434,375 $659,375 MANAGEMENT TEAM CONSULTING FEE (Phase 1B1 Architectural Services Inc. $ 75,000 Conventional Wisdom 66,000 environmental monitoring (TBD) 35,000 TOTAL $176,000 ARCHITECTURAL DESIGN FEE Carter Burgess $2,284,528 TOTAL ALL PROFESSIONAL SERVICES $3,119,903 (NOTE: Salary Costs include multipliers in amounts not to exceed 2.5 for Project Management Services and 3.0 for Architectural Services respectively.) REIMBURSABLES (Phases lA and 1B� Site and Utility Survey Geotechnical Investigation & Foundation Study Environmental Assessment Public Meetings (subconsultant) Temporary Office Space Temporary Services ' Office Equipment & Supplies Printing Phone Out of Town Travel Miscellaneous TOTAL REIMBURSABLES (all phases) GRAND TOTAL (Maximum Fee/Not To Exceed Amount) $ 50,000 30,000 50,000 35,000 22,500 10,000 10,000 60,000 13,000 35,000 10,000 $325,500 $3,445,403 11 GideonToal June 3, 1999 Ralph Cook Manager Design Build Austin Commercial 3535 Travis Street, Suite 300 Dallas, Texas 75221-2879 Re: Fort Worth Convention Center Gideon Toal Project No. 5817.00 Dear Ralph: Based on the City's "Prime Contract with Austin Comrnercial", Gideon Toal's overhead factor is 3.0. � In addition, the following salaries represents the compensation of the personnel we anticipate will be involved in this contract: Emnlovee Amatuli Crumpler Ibanez Grimland Wooten Hart Herr Gries Arevalo Richards O'Kelly Jones cc: File Hourlv Rate 29.72 23.77 , 38.47 24.76 33.36 18.51 15.87 12.60 12.02 35.00 45.10 30.75 Overhead Factor 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 � 3.0 3.0 3.0 3.0 Hourlv Fee 89.16 71.31 115.41 74.28 100.08 55.53 47.61 37.80 36.06 105.00 135.30 92.25 need additional information regarding this data. Architecture • Engineering • Planning • Interiors • Landscape Architecture 1401 Henderson Street Fort Worth, Texas 76102 Phone 817.335.4991 Fax 817.877.1861 � �Itf111 August 2, 1999 Mr. Paul Cain Transportation & Public Works Administration City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Austin Commercial An Austin Industries Company Austin Commercial, Inc. Construction ManageNGeneral Contractor P.O. Box 2879 Dallas, Texas 75221 3535 Travis Street, Suite 300 (75204) 214 443-5700 214 443-5791 (Fax) ATTACHMENT 3 Re: Fort Worth Convention Center Contract No. 24692 Dear Paul: Below is a list of Austin Commercial's actual hourly wages as required by Article 8.1.1.: Revised to include an additional employee and one wage increase. Ralph W. Cook Russell Harker Gil Holt Tom Neil Mary C. Sparks Elizabeth Stratton Elizabeth Stratton (Increase 7/19) Kelly Smith Kelly Williams Hourlv Wa�es 50.4808 48.0769 40.8654 28.8462 15.8654 15.8654 16.8269 19.7115 42.0808 Multinlier 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 Hourlv Fee 126.21 120.20 102.17 72.12 39.67 39.67 42.07 49.28 105.21 Please contact me if you have any questions. Sincerely, ,,,�% � ; �.� �`,� � Ralph W. Cook Manager Design Build City of Fort Wor�th, Texas �1✓�Ayar At1d Caunc�l ammun�cAt�an C DATE REFERENCE NUMBER LOG NAME PAGE 9�28099 C-17670 20FWCC 1 of 2 SUBJECT AMENDMENT TO PROFESSIONAL SERVICES AGRE_EMENT WITH �U�TIN COMMERCIAL, INC. FOR THE DESIGN PHASE OF THE FORT WORTH CONVENTION CENTER EXPANSION, AND AUTHORIZATION TO INITIATE NEGOTIATION OF CONSTRUCTION MANAGEMENT CONTRACT WITH AUSTI�J COMMERCIAL, INC. RECOMMENDATION: It is recommended that the City Council: 1. Approve an amendment to City Secretary Contract No. 24692 in the amount of $2,747,903 for additional project management services and preliminary construction management services during design of the Fort Worth Convention Center (FWCC) expansion; and 2. Authorize the City Manager to negotiate a construction management contract with Austin Commercial, Inc. for construction of the expansion. DISCUSSION: On January 19, 1999 (M&C C-17228), the City Council authorized the City Manager to execute a $697,500 program management contract with Austin Commercial, Inc. for management of project planning, conceptual design, and design of the FWCC expansion. Under terms of the original contract, the City was to enter into a separate contract with the selected architect. Austin Commercial, Inc. was to assist the City via monitoring of design plans and construction document preparation, etc. This amendment enables the City to utilize Austin Commercial, Inc.'s considerable expertise and experience to award and manage the architectural services contract, rather than assisting the City as the original contract provided. Under terms of this amendment, Austin Commercial, Inc. will subcontract with the selected architect(s) and ensure that each phase of the project is in compliance and consistent with the City's concept design. In addition, Austin Commercial, Inc. will provide preliminary construction management services and ensure that construction costs are within the City's available funding amount. The $2.75 million in additional funding will be allocated as follows: • Austin Commerical, Inc. (Design Management/Preliminary Construction Management) • Architectural Services, Inc. • Convent6onal Wisdom •(Firm to be determined for environmental monitoring) • Carter Burgess (architectural design fee) • Reimburseable expenses TOTAL THIS AMENDMENT $ 234,375 $ 75,000 $ 66,000 $ 35,000 $2,284,528 $ 53.000 $2,747,903 City o.f For�t Worth, Texas n►!1�' a��yar � And C,au.nc�l C,�mmun�cAt�an DATE REFERENCE NUMBER LOG NAME PAGE 9�28�99 C-17670 20FWCC 2 of 2 SUBJECT AMENDMENT TO PROFE SIONAL SERVICES AGREEMENT WITH AUSTIN COMMERCIAL, INC. FOR THE DESIGN PHASE OF THE FORT WORTH CONVENTION ' CENTER EXPANSION, AND AUTHORIZATION TO INITIATE NEGOTIATION OF CONSTRUCTION MANAGEMENT CONTRACT WITH AUSTIN COMMERCIAL, INC. Upon approval of this amendment, the total amount to be paid to Austin Commercial, Inc. for project management, project design, and preliminary construction management services (i.e., construction bid- ding phase) is $3,445,403 (i.e., $697,500 in original contract, plus costs included in this amendment.) Also, the term of the agreement is amended to "not to exceed" five years. This will enable the City to retain the services of Austin Commercial, Inc. for design of future phases, should the City wish to do so within the next five'years. The original contract term was nine months. It is staffs recommendation that Austin Commercial, Inc.'s construction expertise, experience, and familiarity with the FWCC project are justification to begin negotiation of �a project management contract. � . � Austin Commercial, Inc. is in compliance with the City's M/WBE Ordinance by committing to the original 26% M/WBE participation including this amendment. FISCAL INFORMATION/CERTIFICATION: � The Finance Director certifies that funds are available, as appropriated, in the current capital budget of the Public Events Fund. � . MG:k Submitted for City Manager's Office by: Mike Groomer Originatiug Department Head: Hugo Malanga Additional Information Contact: Hugo Malanga FUND I ACCOUNT I CENTER I AMOUNT (to) 6140 I 7801 I (from) I C192 �soi I, � 531200 020192067001 CITY SECRETARY � � APPROV�D . � �4TY �OUi�C�i. $2,747,903.00 � SEP �� ,��9� � I �� ����� 671Yg �cre�x.�! �� u�e� Ciiq Qf Fort �art'�,'�s:��*a