Loading...
HomeMy WebLinkAbout025306 - Construction-Related - Contract - Camp Dresser & McKee, Inc.STATE OF TEXAS AMENDMENT NO. 1 § CITY SECRETARY CONTRACT NO� 5�dCQ (No M&C Needed) COUNTY OF TAR1tANT § WHEREAS, the City of Fort Worth (City) and Camp Dresser & McKee, Inc. (Engineer) made and entered into City Secretary Contract No. 24423 (the Contract) which was authorized by the City Council by M&C C-17126 on the 17th day of November, 1998; and WHEREAS, the Contract involves engineering services for the following project: Engineering Contract for the Pavement Reconstruction and Water and Sanitary Sewer Replacements on Avenue H(Miller to Hughes) and Avenue G (Miller to Arch). WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated August 19, 1999, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $7,784.00. 2. Article II of the Contract is amended to provide for an increase in the m�imum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $76,763.00. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. �U��L��.6 N:���� �8�'' ���'�Q� ° ��i �, �����'�b, ��o t EXECUTED on this the � �� day of 19� in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: �,, .;��` � r � ��'� . I ^i ��r '� y' • � �. . 7i r +•� A.Douglas Rademaker, P.E. Director, Department of Engineering ENGINEER By: .t Name: Richard W. Sawev, P. . Vice-President � Camv Dresser & McKee, Inc. V ^-� Mike Groomer Assistant City Manager ATT ST: i • Gloria Pearson, Ciiy Secretary "l�l, (� �Vl �G R.�`(3� � ��D Contract Authorization Date APPROVED AS TO FORM AND LEGALITY: Gary Ste erger Assistant City Attomey . ..: • i- � /� / , C�� Camp Dresser & McKee Inc. ��u�9 801 Cherry Street, Suite 1440 �1Mee�9 Fort Worth, Texas 76102 `�D�' Tel: 817 332-8727 Fax: 817 332-6870 operaGons August 19, 1999 Mr. Gopal Sahu, P.E. Engineering Depaztment 1000 Throcl�morton Slreet Fort Worth, Texas 76102 RE: Additional Services Avenue G & II Reconstruction City Seeretary Confract #24423 Dear Mr. Sahu: A submittal review was conducted on Apri128, 1999, with the T&PW Department and yourself. After reviewing Avenue H right-of-way capacity calcutations, T&PW requested further analysis on street and right-of-way capacity. The original design included a 24feet wide roadway. CDM was asked to look at a 28-feet anci 30-feet wide roadway since a 24-feet wide roadway is not adequ�ate for a 5-year storm event. After the City's review of our new calculations, we were dire`cted to redesign the 28-feet wide roadway with 5451inear feet of new 24-inch storm��rain and two additional inlets. The following table summarizes our effort for these adc�tional services: ADDITIONAL SERVICE HO �S R.A.TE TOTAL Street/ROW capacity calculations 2� $62.96 $1,259.20 for wider street Storm Drai.n Inlet Calcuiations 30 Storm Drain Pipe Calculations 50 CAD Drafting 24 TOTAL 124 $62.96 $1,888.80 $62.96 $3,148.00 $62.00 $1.488.00 $7,784.00 If you have any questions or need additional information, piease do not hesitate to ca11. Sincerely, L�!��%�� Randal D. Romack, P.E. Proj ect Mana.ger