FORT WORTH
Change Order Request
Project Namel Sanitary Sewer Rehabilitation, Contract 103, Part 1 City Sec No. 162807
Project No.(s) 060043010700430102004311CO2723 DOE No. N/A City Pro. No. CO2723
Project Replacement of cast iron water and deteriorated sanitary sewer mains
Descnption
Contractorl Woody Contractors, Inc. Change Order # 0 Date: 512812026
City Project Mgr.1 Dena Johnson, RE. J City Inspector I Richard Walden
Phone Number: 1 (817) 392-7866 Phone Number: (817)392-8306
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Unit 1- Water
Unit 2A -
Sanitary Sewer
Unit 2B -
Sanitary Sewer
Unit 3 - TPW
Totals
Contract Time
(Catandar Days)
$1.774,350.35
$2.732,677.55
$628,912.00
$439,388.25
$5,575,328.15
500
$63,221.40
$63,221.40
$1,774,350.35
$2,795,898.95
$628,912.00
$439,388.25
$5.638,549.55
500
Amount of Proposed Change Order
$0.00
$0.00
$O.OD
$0.00
$0.00
030
Revised Contract Amount $1,774,350.35 $2,795,898.95 $628,912.00 $439,388.25
Orig. Funds Available for Change Orders $88,718.00 $168,079.00 $43,939.00
Remaining Funds Available for this CO $88,718.00 $104,657.60 $43,939.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
$5,638.549.55
530
$300,736.00
$237,514.60
1.131
$6,969,160.19
ORDER
Change Order No. S provides for the following:
-Pavement stripping restoration on 4th Street subsequent to water main installation.
- Compensation for a road settlement bore test and analysis (conducted by a geotechnical consultant) as required by Union
Pacific Railroad in order to renew a railroad permit at a project sewer crossing of the railroad tracks.
MH Adj minor with concrete collar.
Staff concurs with the Contractor's request for additional calendar days for the change order,
that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents navment
in full (both time and money) for all costs arising out of, or incidental to. the above Change Order.
contractoescornpany Name
Con(raotoLName
Contractor Signature
Date -_
Woody Contractors, Inc.
Troy Woody
!n tAr
ro e t Manager
Aate
5/30/26
Director Water Dept)
Construction Su Dept)
Date
5/28/26
Senior Assistant City Attorney
Assistant Cit Manager
Date
06/17/2026
Council Action if required)
M&C Number F--N/A----1 M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FO RT V c) P,-F
City of Fort Worth
Change Order Additions
Project Name Sanitary Sewer Rehabilitation, Contract 103, Part 1
Project No,(s) 0600430/0700430/0200431/CO2723 DOE No. N/A
Project
Description
Replacement of cast iron water and deteriorated sanitary sewer mains
Contractor Woody Contractors, Inc.
City Project Mgr. Dena Johnson, P.E.
AUDI] IUN5
City Sec No. 62807
City Pro. No. CO2723
Change Order # F-5 -� Date: 5/28/2026
City Inspector Richard Walden
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
55
6" SLD MARKING HAS (Y)
Unit 1 - Water
240.00
LF
$23.00
$5,520.00
56
8" SLID PVMT MARKING HAS (W)
Unit 1 - Water
40.00
LF
$23.00
$520.00
57
PRE THERMO CONTRAST MARKING 24" CROSSSWALK
Unit 1 - Water
110.00
LF
$10.00
$1,100.00
58
PRE THERMO CONTRAST MARKING 24" STOP BAR
Unit 1 -Water
30.00
LF
$10.00
$300.00
59
4" REFLECTIVE TY II AA MARKER
Unit 1 - Water
6.01
EA
$194.00
$1,164.00
31
RAILROAD SETTLEMENT/BORE TEST AND ANALYSIS
Unit 28 - Sanitary Sewer
1.0
LS
$13,000.00
$13,000.00
21
MH ADJ MINOR W/ CONC COLLAR
Unit 3 - TPW
20.0
EA
$1,000.00
$20,000.05
Unit 1- Water
$9,004.00
Unit 2A - Sanitary Sewer
Unit 2B - Sanitary Sewer
$13,000.00
Unit 3 - TPW
$20,000.00
Additions Sub Total
$42,004.00
Page 1 of 1
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Sanitary Sewer Rehabilitation, Contract 103, Pad 1
Project No.(s) 060043010700430/02004311CO2723 DOE No. N/A
Project Description I Replacement of cast iron water and deteriorated sanitary sewer mains
City Sec No.
City Pro. No.
Contractor Woody Contractors, Inc. Change Order#= Date 5128/2026
City Project Mgr, Dena Johnson, P.E, City Inspector Richard Walden
11171 FTIMIC
62807
CO2723
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
54
30
26
Water Construction Allowance
Sanitary Sewer Construction Allowance
Paving Construction Allowance
Unit 1 -Water
Unit 2B - Sanitary Sewer
Unit 3 - TPW
0.09004
0.43333
0.25
LS
LS
LS
$100,000.00
$30,000.00
$80,000.00
$9,004.00
$13,000.00
$20,000.00
Unit 1 - Water
$9,004.00
Unit 2A - Sanitary Sewer
Unit 2B - Sanitary Sewer
$13,000.00
Unit 3 - TPW
$20,000.00
Deletions Sub Total
$42,004.00
Page 1 of 1
5/28/2026
Sanitary Sewer Rehabilitation, Contract 103 Part 1
CSC: 62807
CPN:CO2723
Change Order 5 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all perfonnance and reporting requirements.
Signature
Dena Johnson
Name of Employee
Project Manager
Title
Qoovoapnn
P C, FORTad
ATTEST:o
v `�9•i°o
Y 4Y
� i� � dttan °E4 g4ob
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Woody Contractors, Inc.
Subject of the Agreement: Sanitary Sewer Rehabilitation Contract 103, Part 1
M&C Approved by the Council? * Yes ❑ No 0
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ 62807
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: N/A
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes ❑ No 0
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. CO2723
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.