HomeMy WebLinkAbout058683-CO10 - Construction-Related - Contract - Eagle Contracting, LLCDocusign Envelope ID: BA04FE54-9505-82FD-819C-7F96B46F6076
CSC No. 58683-CO10
F" tz-r WO R'1 E i City of Fort Worth
Change Order Request
Project Name: I Village Creek WRF Digester Mixing, Flare, Dome Improvements Phase 1 City Sec No.: 58683
Project No.(s): 56021/0700430/5740010/001780 M&C: � City Proj. No.: 102652
Project Description:
Digester mixing, flare, and dome improvements, new digester gas dryers, and new hydrogen sulfide scrubbers,
Contractor: I Eagle Contracting, LLC
Change Order # 10 Date: 1 5/13/2026
City Project Mgr.1 Suzy Abbe
City Inspector: Kevin Sideboitom
Phone Number: 1 817-392-8209
Phone Number: 817-991-0629
Dept. Sewer
Totals Contract Time
(Calendar days)
Original Contract Amount $39,773,000.00
$39,773,000.00 1,095
Extras to Date $2,062,100.00
$2,062,100.00 0465
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $41,835,100.00
$41,835,100.00 1,560
Amount of Proposed Change Order
$97,685.00
$97,685.00
068
Revised Contract Amount $41,932,785.00
$41,932,785.00
1,628
$318,184.00
Original Funds Available for Change Orders $318,184.00
Remaining Funds Available for this CO $0.00
$0.00
Additional Funding (if necessary) 1 $0.00 1
1
1 $0.00
1 5.43%
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST +25%)
1
$49,716,250.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No.10 provides for the following:
• Additional labor and materials to remove and replace 8 additional inches of annular seal depth in Digester 3 and 6.5 additional inches of
annular seal depth in Digester 4 due to field conditions differing from what was shown on the plans.
• Modifications of installed sample piping at Digester Nos.1 and 2 and the addition of inslulation over sample piping and 6-inch piping at
Digester Nos. 1 through 6 to protect the lines from freezing,
• 68 additional calendar days for the following events that affected the project's critical path:
o City installation of bypass pumping for Synagro dewatering operations,
o City stop work order due to issues with the higher ammonia loads from the dewatering effort and during the crude oil pipeline incident
o Digester Nos. 2 and 8 backfilling with sludge during and after dewatering operations.
o Additional days for lead abatement to account for the total time negotiations added to the critical path.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name
Contractor Name
Contractor Signature
I Date
Eagle Contracting, LLC
Andrew Howard
5/13/2026
d11
Inspector
Date
Project Manager "
Date
-
ii�fi SlL'v
Director Water Dept)
Date
Construction Supervisor Water Dept)
Date
Christopher garde✓
6/03/202
Senior Assistant City Attorney
Date
Assistant City Manager
Date
06/04/2026
,,g—
Council Action If Required)
M&C Number NA M&C Date Approved NA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Docusign Envelope ID: BA04FE54-9505-82FD-819C-7F96B46F6076
F,C-)PT WORTH City of Fort Worth
Change Order Additions
Project Name Village Creek WRF Digester Mixing, Flare, Dome Improvements Phase 1 1 City Sec No.: 58683
Project No.(s): 56021/0700430/5740010/001780 1 DOE No.O City Proj. No.: 102652
Project
Description
Digester mixing, flare, and dome improvements, new digester gas dryers, and new hydrogen sulfide scrubbers.
Contractor Eagle Contracting, LLC Change Order: 10 Date: 5/13/2026
CityProject Mgr. Suzy Abbe City Inspector FKevin Sidebottom
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
64 Digester 3 and 4 Annular Seal Sewer 1.00 LS $81,674.00 $81,674.00
65 Digester 1-6 Sample Piping on Mixing Pumps Sewer 1.00 LS $16,011.00 $16,011.00
Sewer $97,685.00
Additions Sub Total $97,685.00
Page 2 of 4
Docusign Envelope ID: BA04FE54-9505-82FD-819C-7F96B46F6076
FORT VV(�RT>E i City of Fort Worth
Change Order Deletions
Project Name Village Creek WRF Digester Mixing, Flare, Dome Improvements Phase 1
Project No.(s): 56021/0700430/5740010/001780 1 DOE No.
Project Description
City Sec No.: 58683
City Proj. No.: 102652
Digester mixing, flare, and dome improvements, new digester gas dryers, and new hydrogen sulfide scrubbers.
Contractor Eagle Contracting, LLC Change Order: Flo]Date 5/13/2026
City Project Mgr. Suzy Abbe City Inspector: Kevin Sidebottom
DELETIONS
ITEM IDESCRIPTION I DEPT I Qty JUnit I Unit Cost JTotal
1.72E-01
r
Page 3 of 4 (Deletions Sub Total
Docusign Envelope ID: BA04FE54-9505-82FD-819C-7F96B46F6076
MIWBE Breakdown for this Chanae Order
MWBE Sub I Type of Service I Amount for this CO
Total 1 $0.00
Page 4 of 4
5/17/2026
CPN 102652
Digester Mixing, Flare, Dome Improvements Phase 1
Change Order 10 Notes
Change Order No. 10 provides for the following:
• CMR 54A - Per RFI-122, the depth of the annular seals in Digester Nos. 3 and 4 was
discovered to be deeper than the 24-inches shown in the plans and included in the
original contract (32 inches in Digester 3 and 30.5 inches in Digester 4). This
change order provides for the additional labor and materials to remove and replace
the additional annular seal depth in Digester Nos. 3 and 4 (8 additional inches in
Digester 3 and 6.5 inches in Digester 2). A detailed check of the man hours needed
to remove the first 24 inches of annular seal in Digester Nos. 3 and 4 was performed
and used to check the contractor's proposed price for labor for the additional depth.
The contractors' proposed price for the additional work was found to be fair and
reasonable.
CM 55—This change order provides to modifications of installed sample piping at
Digester Nos. 1 and 2 to protect the lines from freezing. The changes will be carried
to the sample piping on Digester Nos. 3 through 6 at no additional cost because the
work has not been started yet. The changes include removal of the 2-inch sample
Line, relocation of the tap to the centerline of the pipe, relocation of the 2-inch ball
valve, and addition of a plug. This change order also provides for removable
insulation for exposed 2 and 6-inch piping and valves on Digesters 1 through 6. This
work was not fully included in the original scope and is required for freeze
protection. Please reference Field Order 19 for additional details. An independent
price check was performed by the consultant, and the proposed price was found to
be fair and reasonable.
• This change order also provides for an additional 68 calendar days to the contract
time for the following events that affected the project's critical path:
0 8 days for City to install bypass pumping for Synngro dewatering operations.
0 7 days due to City ordering Syangro to stop dewatering due to blowers being
down and issues with the higher ammonia loads from the dewatering effort.
o 4 days for Digester No. 2 backfilling with sludge during dewatering
operations. Contractor measured levels rising instead of falling during
dewatering.
o 30 additional days for lead abatement to account for the total time
negotiations added to the critical path.
o 18 days sludge backfilling in Digester No. 8 after digester had been emptied
and cleaned and concrete crack injection was being performed.
o 1 day when Synagro was asked to stop dewatering during the crude oil
pipeline incident that disrupted normal operations at Village Creek.
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Suzanne Abbe
Name of Employee
Senior Engineer, Capital Project Delivery
Title
F
ooaaonnn�
F ORS �YpO
o Oo°°
ATTEST: ova °Ro
o � � sd
d�Q �'EXASo4
dnnnoaao
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Eagle Contracting, LLC
Subject of the Agreement: Village Creek Water Reclamation Facility Digester Mixing, Flare,
Dome Improvements Phase 1
M&C Approved by the Council? * Yes 0 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ 58683-COl 0
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: N/A
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes 0 No ❑
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 102652
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.