HomeMy WebLinkAbout025328 - Construction-Related - Contract - Orval Hall Excavating Company0
'
�
�
�
�
1
�
�
�
�
�
�
�
�
�
�
�
�
�
ciTv sECR��RY� �
D.t�.E. Fi�.E � � �
��iVT��`�L'��'S BC?�t��"s�� � ��.
CC3�I�TR�1�TtC)�'S ���'� SPECIFICATIONS
G�.1��1T DEP�►R�'11��P�' AND
0
�
CITY SECRETARY 5 �
�C�NTRACT NO . �� - � �
CONTRACT DOCUMENTS
FOR
CONSTRUCTION OF BASSWOOD BOULEVARD
FROM
EAST OF INTERSTATE HIGHWAY 35W
TO
EXISTING BASSWOOD BOULEVARD
D.O.E. NO. 0329
T/PW PROJECT NO. C115-020115023220
IN THE
CITY OF FORT WORTH, TEXAS
Hugo Malanga, P.E. A. Douglas Rademaker, P.E
Director Director
T/PW Department Department of Engineering
PREPARED BY
�
DUNAWAY ASSOCIATES, I�1C.
ENGINEERS • PLANNERS • SURVEYORS
1501 Merrimac Circle, Suite 100
Fort Worth, Texas 76107
Phone 817.335.1121 Fax 817.335.7437
AUGUST, 1999
DAI No. 9811000
L.C. Bradley, Jr., P.E.
Director
Water Department
aA� .��
r-`'s .`^,j� f �
`� l, ��
�'' �: -^�e^rnoeeos�sors�»(
:t T �::<
� .'E�E POJ;4ry'��
r^.'1 '�VO/"�� V
`:� � :�� ��r?:
s;.. �
6..'�: -,� .4: J �, .` >' ;� c
� �,,,, o
,,�,
�: ��a. ,,
'c�� ,�:;1 1�a��.��.
Y/�L`"�.�4 �
�
G���6C�9Q� G'���J),�'�7
CB�I ��r�G� �� ��`v�
V'U �" ��;
� �U:��10 1��::-�:o
�
.�
� ' e �
�
� .
�
�
�
�
�
l�J
�
[I
CI
�
n
CITY OF FORT WORTH, TEXAS
DEPARTMENT OF ENGlNEERING
A�DENDUM NO. 1
TO THE SPECIFICATIONS AND CONTRACT DOCUMENTS
FOR
CONSTRUCTION OF BASSWOOD BOULEVARD
FROM
EAST OF INTERSTATE HIGHWAY 35W
TO
EXISTING BASSWOOD BOULEVARD
D.O.E. Project No. 0329
T/PW Project No. C115-020115023220
Addendum Issued: August 26, 1999
Bids Received Until: September 2, 1999, 1:30 p.m.
The Contract Documents for the subject project are hereby revised or amended as follows:
I. SPECIFICATIONS
A. Table of Contents
• Added Part 18 — Geotechnical Engineering Study.
(See attached Page i)
B. Part 5 — Proposal
! • Changed Pay Item No. 44 to "469 LF" in lieu of "247 LF".
(See attached Page 5-5)
• Changed Pay Item No. 51 to indicate intersections.
(See attached Page 5-5)
• Added Pay Item Nos. 63 through 70 in their entirety and renumbered
subsequent pages.
(See attached Pages 5-6 fhrough 5-8)
• Note: 16-in. water line shall be tested as per City of Fort Worth standards.
C. Part 18 — Geotechnical Enqineerinq Studv
• Added part in its entirety.
• Note: Fill material shall be placed and tested as specified in Rone Engineers'
Geotechnical Engineering Study (Pages 9 and 10).
II. DRAWINGS
A. Cover Sheet
• Changed title to "Plans for the construction of Basswood Boulevard from East
� of IH-35 to Existing Basswood Boulevard".
• Changed sheet index as shown on the attached.
u
p
� 9811000_AddlNarr_082699 DO.doc
\
� • � r
�
�
�
�
�
�
�
� III.
�
�
L!I
C
CITY OF FORT WORTH, TEXAS
DEPARTMENT OF ENGINEERING
ADDENDUM NO. 1
B. Paqe 2 of 6
• Attached Page 2 through 6 to show water line crossings to be executed as part
of this project.
C. Paae 19 — Storm Drain Plan Profile Sta. 20+00 to 30+00
• Changed page to show the 27-in. sanitary sewer crossing to be executed as
part of this project.
D. Paae 31
• Changed the overall dimension on "2-Typical Half Section (8-10x10)" to "74-
115/" in lieu of "80-115/e".
E. Paqe 41
� Changed text to "2" Schedule 40 PVC (Typ) Conduit" in lieu of "1'/4' Schedule
40 PVC Conduit (Typ)"
ENGINEER'S COST ESTIMATE
• Changed totai to reflect new total of "$2,961,165.60" in lieu of the previous
"$2,905,033.60" to reflect the changes made in the Proposal section of the
specifications. ,
BIDDER SHALL ATTACH THE REPLACEMENT PAGES TO ORIGINAL DOCUMENTS
This Addendum forms a part of the Contract Documents referenced above and modifies the original
Contract Documents and plans. Acknowledge receipt of this Addendum on the space provided below
and on Page "6 (30)" of your Bid Proposal and note on the outer envelope of your bid. Failure to
acknowledge receipt of this Addendum could subject bidder to disqualification.
RECEIPT ACKNOWLEDGED:
'� �, /� �
By: . �:.�i�'" By: �
� �" �ick Trice, P.E. and Manager
Title: I-YQSiG�PI��" Consultant Services (DOE)
Address: 2U 1 N� 2� h S+r��-� 1CG�'-1- I�IU�I�, ��(� p(,�
aTelephone: tg��- (02�- ��3-07
�
�
a9811000 AddlNarr 062699 DO.doc
�
�
�
�
�
�
a
�
�
�
�
a
�
�
�
�
�
a
a
TABLE OF CONTENTS
1. NOTICE TO BIDDERS
2. COMPREHENSIVE NOTICE TO BIDDERS
3. SPECIAL INSTRUCTIONS TO BIDDERS
4. MINORITY AND WOMEN BUSINESS ENTERPRISES SPECIFICATIONS
5. PROPOSAL
6. SPECIAL PROVISIONS
7. SILICONE JOINT SEALING SPECIFICATIONS
8. PROJECT DESIGNATION SIGN
9. VENDOR COMPLIANCE TO STATE LAW
10. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
11. EQUIPMENT SCHEDULE
12. EXPERIENCE RECORD
13. CERTIFICATE OF INSURANCE
14. PERFORMANCE BOND
15. PAYMENT BOND
16. MAINTENANCE BOND
17. CITY CONTRACT
18. GEOTECHNICAL ENGINEERING STUDY
9811000 Specs_0899_DO.doc
i Addendum No. 9- Augusf 26, 9999
�
�
�
�
�
O
�
I
�
�
I
1
I
I
I
I
R
I
�
18.
GEOTECHNICAL ENGINEERING STUDY
Basswood Bouievard Channel Near Old Denton
Road, Fort Worth, Texas
By Rone Engineers
9811000_Specs OB99 DO.doc
Addendum No. 9- August 26, 1999
D
D
D
D
D
D
D
D
�
�
D
D
D
�
�
�
�
�
�
TABLE OF CONTENTS
1. NOTICE TO BIDDERS
2. COMPREHENSIVE NOTICE TO BIDDERS
3. SPECIAL INSTRUCTIONS TO BIDDERS
4. MINORITY AND WOMEN BUSINESS ENTERPRISES SPECIFlCATIONS
5. PROPOSAL
6. � SPECIAL PROVISIONS ' '
7. SILICONE JOINT SEALING SPECIFICATIONS �
8. PROJECT DESIGNATION SIGN
9. VENDOR COMPLIANCE TO STATE LAW
10. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
11. EQUIPMENT SCHEDULE
1-2. EXPERIENCE RECORD
13. CERTIFICATE OF INSURANCE
,
14. � PERFORMANCE BOND .
15. PAYMENT BOND
16. MAINTENANCE BOND
17. CITY CONTRACT
9817000 Specs 0899_DO.doc �
�
�'
1. NOTICE TO BIDDERS
Sealed Proposals for the following:
FOR: Construction of Basswood Boulevard
D Rehabilitation and Sewer System Improvements
T/PW Project No. C115-020115023220
D.O.E. No. 0329
�
�
i
�
J
J
J
�
■1
�
�
�
�
�
J
�
Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, wiil be received at
the Purchasing Office until 1:30 p.m., September 2, 1999, and then publicly opened and read
aloud at 2:00 p.m., in the Council Chambers.
Plans, Specifications, and Contract Documents for this project may be obtained at the office of
the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort
Worth, Texas. One set of plans and documents will be provided for a deposit of fifty dollars
($50.00). A Pre-Bid Conference will be held on August.23, 1999, at 2:00 p.m. in Room 255A of
the Department of Engineering offices. All bidders�are encouraged to attend.
The major work on the above-referenced project shall consist of the following:
Approximately 2,370 LF 4-lane divided road with reinforced concrete pavement
Approximately 139 LF 10-ft. x 10-ft. reinforced concrete box culvert
Approximately 120 LF 9-ft. x 6-ft. MBC reinforced concrete box culvert
Approximately 2,654 LF Storm drain
The Affidavit statement of the City of Fort Worth Minority and Women Business Enterprises
Specifications must be submitted with the bid at the time of bid opening. Failure to submit the
Affidavit statement with the bid shall result in the rejection of the bid as non-responsive.
For additional information, please contact Mr. Jim DeOtte, P.E. at (817) 335-1121, or Mr. Dan
Walsh, P.E. at (817) 871-8702.
Advertising Dates:
Auqust 5, 1999
Auqust 12, 1999
9811000 Specs 0899 DO.doc �—�
�
i�
J�
D
2. COMPREHENSiVE NOTICE TO BIDDERS
Sealed Proposals for the following:
FOR: Construction of Basswood Boulevard
� from East of I-35W to Existing Basswood Boulevard
T/PW Project No. C115-020115023220
D.O.E. No. 0329
�
�
D
J
J
�
�
�
■1
�
J
`J
1�'
�
�
Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at
the Purchasing Office until 1:30 p.m., September 2, 1999, and then publicly opened and read
aloud at 2:00 p.m. in the Council Chambers. Plans, Specifications, and Contract Documents for
this project may be obtained at the office of the Department of Engineering, Municipal Office
Building, 1000 Throckmorton Street, Fort Worth, Texas. A fifty dollar ($50.00) deposit is required
for the first set of documents and additional sets may be purchased on a non-refundable basis
for fif .ty dollars ($50.00) per set. These documents contain additional information for prospective
bidders. , � .
A Pre-Bid Conference will be held on August 23, 1999 at 2:00 p.m. in Room 255A of the
Department of Engineering offices. All bidders are encouraged to attend.
All bidders will be required to comply with Provision 5159a of "Vernon's Annotated Civil
Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City
Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City Code Sections
13-A-21 through 13-A-29), prohibiting discrimination in employment practices.
Bid security is required in accordance with Paragraph 1 of the Special Instructions to Bidders.
The major work on the above-referenced project shall consist of the following:
Approximately
Approximately
Approximately
Approximately
2,370 LF
139 LF
120 LF
2,654 LF
4-lane divided road with reinforced concrete pavement
10-ft. x 10-ft. reinforced concrete box culvert
9-ft. x 6-ft. MBC reinforced concrete box culvert
Storm drain
Included in the above will be all other miscellaneous items of construction as outlined in the
Plans and Specifications.
The City reserves the right to reject any and/or all bids and waive any and/or all irregularities.
No bid may be withdrawn until the expiration of forty-nine (49) days from the date the M/WBE
UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM
("Documentation") as appropriate is received by the City. The award of contract, if made, will be
within forty-nine (49) days after this documentation is received, but in no case will the award be
made until all the responsibility of the bidder to whom it is proposed to award the contract has
been verified.
SUBMISSION OF BIDS: The Proposal sections of the special contract document are arranged
to allow the contractor to submit a bid on each individual proposal. This document is designed
as two sep�rate contract documents and proposals and shall not be constructed as being a
package. The total low bid of each proposal is the apparent successful bidder. If the contractor
only submits a bid on one proposal and is the lowest proposed bidder for this individual
proposal.
Bidders are responsible for obtaining all addenda to the contract documents prior to the bid
receipt time and acknowledging them at the time of bid receipt. Information regarding the status
9811000 Specs 0899 DO.doc 2-�
�
�
�
���
��
��
I�
•l
D
�
�
D
���
�
_J
�
�
�
�
J
�
of addenda may be obtained by contacting the Department of Engineering at (817) 871-7910.
Bids that do not acknowledge all applicable addenda may be rejected as non-responsive.
In accord with the City of Fort Worth Ordinance No. 11923, the City of Fort Worth has goals for
the participation of minority business enterprises and women business enterprises in City
contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. In
order for a bid to be considered responsive, the AFFIDAVIT STATEMENT included with the bid
documents must be completed and submitted with the bid. Failure to submit the completed
AFFIDAVIT STATEMENT shall render the bid non-responsive. In addition, the M/WBE
UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH
EFFORT FORM ("Documentation") as appropriate. The documentation must be received no
later than 5:00 p.m., within five (5) City business days after bid opening date. The bidder shall
obtain a receipt from the appropriate employee of the managing department to whom delivery
was made. Such receipt shall be evidence that the Documentation was received by the City.
Failure to comply shall render the bid non-responsive.
The.Managing Department for this project�is the Departmenfof Engineering.
For additional information concerning this project, please contact Mr. Jim DeOtte at (817) 335-
1121, or Mr. Dan Walsh, P.E., at (817) 871-8702.
BOB TERRELL
CITY MANAGER
ADVERTISING DATES:
Auaust 5. 1999
Auqust 12, 1999
GLORIA PEARSON
CITY SECRETARY
A. DOUGLAS RADEMAKER, P.E.
DIRECTOR
DEPARTMENT OF ENGINEERING
�
Rick Trice, P.E.
Manager, Consulting Services
9811000 Specs_0899 DO.doc 2-2
�
�
3. SPECIAL INSTRUCTIONS TO BIDDERS
D
D
�
�
�� �
�, -
�l
�
J
�
J
�
�
J
�
�
BID SECURITY: Cashier's check or an acceptable bidder's bond payable to th� City of
Fort Worth, in an amount of not less than five percent (5°/a) of the total of the bid
submitted must accompany the bid, and is subject to forfeit in the event the successful
bidder fails to execute the �ontract documents withih ten (10) days� after the contract has-
been awarded.
To be an acceptable surety on the bond, (1) the name of the surety shall be included on
the current U.S. Treasury, or (2) the surety must have capital and surplus equal to ten
(10)�times the limit.of the bond. The surety must be licensed to do business in the State
of Texas. The amount of the bond shall not exceed the amount shown ,on the treasury
list or one-tenth (1/10) the total capital and sur,plus.
2. PAYMENT BOND AND PERFORMANCE BOND: The successful bidder entering into a
contract for the work will be required to give the City surety in a sum equal ta the amount
of the contract awarded. In this connection, the successful bidder shall� be req�ired to
furnish a perFormance bond, as well as a payment bond, both in a sum equal to the
amount of the contract awarded. The forr� of the bond shall be as herein provided and
the surety shall be ac�eptable to the City. All bonds furnished hereunder shall meet the
requirements of Article 5160 of the Revised Civil Statutes of Texas, as amended.
In order for a surety to be acceptable to the City, (1) the name of the surety shall� be
included on the current U.S. Treasury List of Acceptable Sureties (Circular 870), or (2)
the surety must have capital and surplus equal to ten (10) tirr•jes the amount of the bond.
The surety must be licensed to do business in the State of Texas. The amount of the
bond shall not exceed the amount shown on the Treasury List or one-tenth (1/10) of the
total capital°and surplus. If reinsurance is required, the company writing the reinsurance
must be authorized, accredited, or trusted to do business in Texas.
No sureties will be accepted by the City which are at the time in default or delinquent on
any bonds or which are interested in any litigation against the City. Should any surety
on the contract be determined unsatisfactory at any time by the City, notice will be given
to the contractor to that effect and the contractor shall immediately provide a new surety
satisfactory to the City. . "
If the contract amount is in excess of $25,000, a Payment Bond shall be executed, in the
amo.unt of the contract, solely for the protection of all claimants supplying labor and
materials in the prosecutibn of the work. .
If the contract amount is in� excess of $100,000, a Performance Bond shall be executed,
in the amount of the contract conditioned on the faithful performance of the work in
accordance with the plans, specifications, and contract documents. Said bond shall
solely be for the protection of the City of Fort Worth.
3". LIQUIDATED DAMAGES: The Contractor's attention is called in Part 1, Item 8',
Paragraph 8.6, of the "General Provisions" of the Standard Specifications for
Construction of the City of Fort Worth, Texas, concerning liquidated damages for late
completion of projects.
4. AMBIGUITY: In case of ambiguity or lack of 'clearness in stating prices in the proposal,
the City reserves the right to adopt the most advantageous construction thereof to the
City or to reject the proposal.
9811000 Specs 0899 DO.doc 3'�
� .
D
�
�
�J
'�
�l
D
D
�
�
�I
5. EMPLOYMENT: All bidders will be required to comply with.City Ordinance No. 7278 as
� amended by City Ordinance No. 7400 (Fort Wo�th City Code Section 13-A-21 through
13 f1-29) prohibiting discrimination in employment practices.
6. WAGE RATES: All bidders will be required to comply with Provision 5159a of "Vernon's
Annotated Civil Statutes" of the State of Texas wit� respect to the payment of prevailing
wage rates as established by the City of Fort Worth, Texas, and set fo�th in Contract
Documents for this project.
7.• FINANCIAL STATEMENT: A current certified financial statement may be required by
the Department of Engineering if required for use by the CITY OF FORT WORTH in
determining the successful bidder. This statement, if required, is to be prepared by an
independent Public Accountant holding a valid permit issued by an appropriate State
Licensing Agency. � ^
$. INSURANCE: Within ten (10) days of receipt of notice of award o,f contract, the
,. .�•Contractor- must provide, along. with executed. contract ,documents and appropriat�
- bond�, proof °of insurance for Worker's Compensation and` Comprehen�ive Gener`al
Liability (Bodily Injury -$250,000 each person, $500,00 each occurrence; Property
. Damage -$300,000 each occurrence). The City reserves the right to request any other
insurance coverages as may be.required by each individual project. �
9. NONRESID�ENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statutes, the�
City of Fort Worth will not award this contract to a nonresident bidder unless the
nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident
bidder by the same amount that a Texas resident bidder would be required to underbid a
nonresident bidder to obtain a comparable contract in the state in which the
nonresidenYs principal place of business is located.
"Nonresident bidder" means a bidder whose principal place of business is
not in this state, but excludes a contractor whose ultimate parent
company or majority owner has its principal place of business in this
state.
D "Texas resident bidder" means a bidder whose principal place of business
is in this state, and includes a contractor whose ultimate parent company
or majority owner has its principal place of business in this state.
This provision does not apply if this contract involves federal funds.
�
�
�
�
�
The appropri�te blanks of the Proposal must be filled out by all nonresident bidders in
order for its bid to meet specifications. The failure of a nonresident contractor to do so
:will automatically disqualify that bidder.
10. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accord with the City of Fort
�/Vorth Ordinance No. 11923, the City of Fort Worth has goals for the participation of
minority business enterprises and women business enterprises in City contracts. A copy
of the Ordinance can be obtained from the office of the City Secretary. In order for a bid
to be considered responsive, the AFFIDAVIT STATEMENT included within these bid
documents must be completed and submitted with the bid. Failure to submit the
completed AFFIDAVIT STATEMENT shall render the bid non-responsive. In addition,
the bidder shall submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR
WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation") as
appropriate. The Documentation must be received no fater than 5:00 p.m., five (5) City
business days after the bid opening date. The bidder shall obtain a receipt from the
appropriate employee of the managing department to whom delivery was made. Such
� 9811000 Specs_0899_DO.doc 3'2
�
�
�
��
�
�
� � , �.
�
J
J
J
�
receipt shall be evidence that the Documentation was received by the City. Failure to
comply shall render the bid non- responsive. �
Upon request, Contractor�agrees to provide to Owner complete and accurate information
regarding actual work performed by a Minority Business Enterprise (MBE) on the
contract and payment therefore. Contractor further agrees to permit an audit and/or
examination of any books, record�s, or files in its possession that will substitute the actual
work performed by an IV1BE and/or WBE. The misrepresentation of facts (other than a
negligent, misrepresentation) and/or the commission of fraud by the Contractor will� be
grounds for termination of the contract and/or initiating action under appropriate federaf,
state; or local laws or ordinances relating to false statements; further, any such
misrepresentation (other than a negligent misrepresentation) and/or commission of fraud
will result in the Contractor being determined to be irresponsible and barred from
participating in City work for a period of time of not less than three (3) years.
11. AWARD OF CONTRACT: Contract will be awarded to the lowest responsive bidder.
� The `City �res�rves the nght fto � rejecf' any and/or all bids� and waive a�y and/or all�
form�lities. No bid may be withdrawn until the expiration of forty-nine (49) days from the
date bids are opened. The award of contract, if made, will be within forty-nine (49) days
after the opening of bids, but in no case will the award, be made until all the necessary
investigations are made as to the responsibility of the bidder to whom it is proposed to
award the contract. .
12. PAYMENT: The Contractor will receive full payment (minus 5%_ retainage) from the City
for all wo'rk for each pay period. Payment of the remaining amount shall be made with
the final payment, and upon acceptance of the project.
13. ADDENDA: Bidders are responsible for obtaining all �ddenda to the contract
documents prior to the bid receipt time and acknowledging them at the time of bid
receipt. Information regarding the status of addenda may be obtained by contacting the
Department of Engineering Construction Division at (817) 871-7910. Bids that do not
acknowledge all applicable addenda may be rejected as non-responsive.
14. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW:
a. Workers Compensation Insurance Coverage:
�
�
�
�J
•l
1.
Definitions:
Certification of coverage ("certificate"). A copy of a certificate of
insurance, a certificate of authority to self-insure issued by the
commission, or a coverage agreement (TWCC-81', TWCC-82, TWCC-83,
or TWCC-84), showing statutory vuorl�ers' compensation insurance
coverage for the person's or entity's employees pr.oviding services on a
project, for the duration of the project.
Duration of the project includes the time from the begirining of the work
on the project until the contractor's/person's work on the project has been
completed and accepted by the governmental entity.
Persons providing services on the project ("subcontractor" in §406.096)
includes all persons or entities perForming all or part of the services the
contractor has undertaken to perform on the project, regardless of
whether that person contracted directly with the contractor and regardless
of whether that person has employees. This includes, without limitation,
independent contractors, subcontractors, leasing companies, motor
981100D Specs 0899 DO.doc 3'3
�
�
� carriers, owner-operators, employees of any such entity, or employees of
� any ,entity which furnishes persons to provide seniices on the project.
"Services"� include, withoat limitation, providing, �hauling, or delivering
equipment or materials, or providing labor,. transportation, or other
services related to a project. "Services" does not include activities
Dunrelated to the project, such as food/beverage vendors, office supply
deliveries, and delivery of portable toilets.
D 2. The contractor shall provide coverage, based on proper repo�ting of
classification codes and payroll amounts and filing of any coverage
agreements, which meets the statutory requirements of Texas Labor
� Code, Section 401.011(44) or all employees of the contractor providing
services on the project, for the duration of the project.
�
3. The Contractor must provide a certificate of coverage to the governmental
entity prior to being awarded the contract.
�•� � • 4. If the cover'age period shown on the cont�actbr's current certificate of
E'j coverage ends during the duration of the project, the contractor must,
,,,,� prior to the end of the coverage� period, file a new certificate of coverage
� with the, governmental entity showing. that coverage has been extended.
�
5.
The contractor shall obtain from each person providing services on a
project, and provide to the governmental entity:
J
�
■J
�
�
eJ
�
�
�
�
C:�
a) a certificate of coverage, prior to that person beginning work on
the project, so the governmental entity will have on file certifcates
of coverage showing coverage for all persons providing services
on the project; and
b) no later than seven (7) days after receipt by the contractor, a new
certific�te of coverage showing extension of coverage, if the
coverage period shown on the current certificate of coverage ends
during the duration of the project.
The contractor shall retain all required certificates of coverage for the
d'uration of the project and for one year thereaft�.r.
7. The contractor shall notify the governmental entity in writing by certified
mail or personal delivery, within ten (10) �ays after the contractor knew or
should have known, of any .change that "materially affecCs the provision of
coverage of any person providing services on the project.
8. The contractor shall post on each project site a notice, in the text, form,
and manner prescribed by the Texas Worker's Compensation
Commission, informing all persons providing services on the project that
they are required to be covered, and stating how a person may verify
coverage and report lack of coverage.
�
The contractor shall contractually require each person with whom it
contracts to provide services on a project, to:
a) provide coverage, based on proper reporting on classification
codes and payroll amounts and filing of any coverage
agreements, wf�ich meets the statutory requirements of Texas
9811000 Specs_0899 DO.doc 3-4
� -
J
�
�
D
•l
� - ..
�
D
D
D
D
`I
�
J
J
�
�
!J
Labor Code, Section 401.0� 1(44) for all of its employees providing
services on the project, for the duration of the project;
b) prbvide to the contractor, prior to that person beginning work on
the project, aH certificate of coverage showing that coverage is
being provided for all employees of the person providing services
on the project, for the duration of the project;
c) provide the cont�actor, prior to the end'of the coverage period, a
new certificate of coverage showing extension of coverage, if the
coverage period shown on the current certificate of coverage ends
during the duration of the project;
d) obtain from each other person with whom it contracts, and provide
to the contractor: �
(1.) a�ertificate of coverage;. prior .to the, other< person ,. •
� I��ginning work an the project; and - �
(2) a new certificate of coverage showing extension of
coverage, prior to the end of the coverage period, if the
coverage period shown on the current certificate. of
coverage ends during the duration of the project;
e) retain all required certif'icates of coverage on"file for the duration of
the �roject and for one year thereafter.
fl notify the governmental entity in writing by certified mail or
personal delivery, within ten (10) days after the person knew or
should have known, of any change that materially affects the
provision of coverage of any person providing services on the
pr.oject; and 1, �
g) contracfually require each person with whom it contracts, to
perform as required by paragraphs (1) -(7), with the certificates of
coverage to be provided to the person for whom they are
providing services.
10. By signing this contract or providing or causing to be provided a certificate
of coverage, the contractor is representing to the governmental entity that
all employees of the contr.actor• who will provide services on the project
will be covered by worker's compensation coverage for the duration of the
project, that the• coverage will be based on proper reporting of
classification codes and payroll amounts, and that all coverage
agreements will be filed with the appropriate insurance carrier or, in the
case of a self-insured, with the commission's Division of Self-Insurance
Regulation. Providing false or misleading information may subject the
� contractor to administrative; c�iminal, civil penalties, or other civil actions.
11. The contractor's failure to comply with any of these provisions is a breach
of contract by the contractor which entitles the governmental entity to
declare the contract void if the contractor does not remedy the breach
within ten days after receipt of notice of breach from the governmental
entity.
9811000 Specs_0899 DO.doc 3—�J
�
��
�
D
�
�
�
�
J
b. The contractor shall post a notice on each project site informing all persons
providing services on the project that they are required to be covered, and stating
how a person may verify current coverage and report failure to provide coverage.
This notice �does not satisfy other posting requirements imposed by the Texas
Worker's Compensation Act or other Texas �Worker's Compensation Commission
rules. This notice must be printed with a title in at least 30 point bold type and
text in at least 19 point normal type, and shall be in both English and Spanish
and any other language common to the worker population. The text for the
notices shall be the following text, without any additional words or changes:
"REQUIRED WORKER'S COMPENSATION COVERAGE"
"The law requires that each person working on this site or providing services
related to this construction project must be covered by workers' compensation
insurance. This includes persons providing, hauling, or delivering equipment or
materials, or providing labor or transportation or other service related to the
project, regardless of.the identity of their employer or status as�an employee."
"Call the Texas Worker's Compensation Commission at (512) 44"0-3789" to
receive information on th�e. legal requirement for coverage, to verify whether your
employer has provided the required coverage, or to report an employer's failure
to provide coverage."
� 15. NON DISCRIMINATION: The Contractor shall not discriminate against any person or
persons because of sex, race, religion, color, or national origin and shall comply with the
provisions of City Ordinance 72�8, as amended by City Ordinance 7400 (Fort Worth City
� Code Sections 13A-21 throu�h 13A-29), prohibiting discrimination in employment
practices.
�
�
�
�
D
U
D
D
16. AGE DlSCR1MINA�'ION: In ccordance with the policy ("Policy") of the Executive
Branch of the federal govern ent, Contractor covenants t�iat neither it nor any of its
officers, members, agents, or mployees, will engage in performing this contract, shall,
in connection with the employment, advancement, or discharge of employees or in
connection with the terms, conditions, or privileges of their employment, discriminate
against persons because of th�ir age except on the basis of a bona fide occupational
qualification, retirement plan, or� statutory requirement.
Cantractor further covenants that neither it nor itsr officers, members, agents, or
employees, or persons acting on their behalf, s�all specify, in solicitatidns or
advertisements for employees to work on this Contra�t, a maximum age limit for such
employment unless the specified maximum age limit is based upon a bona fide
occupational qualification, retirement plan, or statutory requirement.
Contractor warrants it will fully comply with the Policy and will defend, indemnify, and
hold City harmless against any and all claims or allegations asserted by third parties
against City arising out of Contractor's alleged failure to comply with the above
referenced Policy concerning age discrimination in the performance of this Contract.
17. DISCRIMINATION DUE TO DISABILITY: In accordance with the provisions of the
Americans with Disabilities Act of 1990 ("ADA"), Contractor warrants that it will not
unlawfully discriminate on the basis of disabilit.y in �the provision of services to the
general public, nor in the availability, terms, and/or conditions of employment for
applicants for employment with, or current employees of Contractor. Contractor
warrants it will fully comply with ADA's provisions and any other applicable federal, state,
9811000 Specs_0899 DO.dac 3-6
D
�
D
D
�
�
�� ,
�
�
D
Q
D
D
�.
�
0
D
�
D
�
and local laws concerning disability and will defend, indemnify, and hold City harmless
.against any claims or allegations asserted by third pa�ties against City arising out of
Contractor's alleged failure to comply with the above-referenced laws concerning
disability discrimination in the perFormance of this Contract.
Revised March 15, 1996
�
9811000_Specs 0899_DO.doc
3-7
I.�
MINORITY AND WOMEN BUSINESS
ENTERPRISES SPECIFICAiIONS
e
9811000 Specs 0899_DO.doc
I�I
CITY OF FORT WORTH
� MINORtTY AND WOMEN BUSINESS ENTERPRISES SPEClFICATIONS
' MBE/WBE UTILIZATION � � �°T d �
�'td�IN���I�d�/C F4`J
� (`'�r�al �uli �Scccwa-h',�.q � • �'��r�L(' ���g('��1 S �sb
Prime Company Name �� Bid Date
�/�S-�/�CL�Dl� c.� �BQSSGt� �Ol,t-�GVLr/'c:C. T�.O. �. �D • �.3 ZGT
� Project Name Project Number
�
�'l
�
ATTACHMENTIA
PaQe 1 of 2
Revised 06/02/98
ICITY'S M/WBE PROJECT GOAL: 2��p � IMIWBE PERCENTAGE ACHIEVED: �Gf, �� �% �
•Failure to complete this form,. in its entirety with supporting documentation�,and. receive�-6x the Managing Department on
'-or before 5:00 p.m., five (5)� City� business days after �bid opening, exclusive of bid� opening date, wii4 result, in the bid being .
�considered non-responsive�to tiid specifications. _, . . � . ,, , ` , , • � �
. . � . . . . . . , .,. . . . .. . . . .. . . ., .. . . . � . , , , ,
The undersigned bidder agrees to enter into a format agreement with the MBE andlor WBE ft�ms for work listed.in this
n�schedule, conditioned upon execution of a contract wlth� the City of Fort Worth. The wiilful" misrepresentation oifacts is �
�•�� groundsforconsideratiorr�of`disqualificationandyriU.resultin„the�•bid.beingconsidered;non-responsive�ta"specifications. '
�
�
�
�
�
�
�
�
� Company Name,,.Cantact Name,.. � � �Certified�
_ . Address, and Telephona No., ' � ,
. .. . ; .;...`��ao
, . , . 4 w�
.. , �
� �en Tu S�ed�r' j
�l Z � U[G U/"
FrX+ lnlor-N�,?7� �T (ollo�
�Sn- zy�- C�z4
C�a..L-�I�
Marock, Tn� .
�0. �»u ?_�(o"�Z.
�a►(as, T�- `75zzg �
!'i �l!)- 7cl'a - R �7.,0
LA�r�I
-�i��-t- ���►--�,,,-r�r `�co�B �
� -yns�
-�����Q �
�y
Specify AiFContracting, " �rSpecify���tilT�l%riis�toy- " : �, ..
Scope of Work {") , be Supplied�:{*j� ... � ,
, ` . .z'�
. ,. , . � . ..' .. t a`� ;
. • . . . . �.., ' .. � . . , ° (A: }
�rosian
j� C.��-n 1
�
�Dck -�'o �
�,p.L h�ddf�
Na.u.1 eonu'c.� p,pe.
�( l�aul rna�crta�5
-4�v� ccx�. 4 � p.�-
a� co�- P���g
Dolfar.Amount
5-�
� � �J3, �zo�vo
S� ,
I �gg�a8 ,os `
� ��,��, . c�i
( , M/WBEs must be located in the 9(nine) county marketplace or currently doing business in�the marketplace at time of bid.
'('� Specify all areas in which MlWBEs are to be utilized and/or items to be supplied:: ,• � .•' •.�, , ,�
, ('j '/lcomplete.•listing�of items.to 6e supplied�is required imorder to receive cradit toward"the M/WB�goaC ,� : ' ,, , . ' . :. .°4 :'. ;
("} Identify Each Tier LeveG Tier: Means the tevel of subcontracting below the ptime contractorlconsultant, i.e., a direct payment from'
the prime contractor to a subcontractor is considered 1st�tie,r,.a•�payment by a'subcontcactor tcs its� •-
. supplier is considered 2ndtier. . � •, ' .;�. " . 'ti;; ° . . ` . . . , ` �
THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT 8Y 5:00 p.m., FlVE (5) ClTY BUSINESS DAYS AFTER BID OPENING,
EXCLUSIVE OF THE BID OPENING DATE .
�i . ,
' Pages 1 and 2 of Attachment 1Q must be received by the Managing Department •"'
�L. • •
4-2
�
� �.. •
CITY OF FORT WORTH
MINORfTY AND WOMEN BUSiNESS ENTERPRISES SPECIFICATIONS
MBEIWBE UTILIZATION
�t 1r�al �-i�all �1cca�r�-�'� �• SE�o��rnb�er Z, 1°>g�7
Prime Company Name Bid Date
�ai15i��'LtC�i0�1 0� � -SSu�oor,l �Du.lP,uar�(. � 1�0 D�Z�j
4-'roject Name Project Number
.,, .,,... ��.,�.. � ,.,
Paye 1 of 2
Revised 06/02/98
�jITY'S M/WBE PROJECT GOAL: �i��'ln � �MNVBE PERCENTAGE ACHIEVED: �CJ�g��,�
�.� .
Faiture to compfeCs this form, in its entirety with suppocting documentation,,,a�d='receivec�' 6y the-Managing Department on
�r before S:OU p.m., five E5)� City, business days after 6id opening, exclusive. o�bid' opening date, will result in the bid being
onsidered non-responsive to bid�specifications. � � � �,. ,, , : , - �
�he undersigned 6icCder agrees to enter inta a formaf�agreement�witl� the MBE'and/"or WBEfirms for wor,k Iistec�im tfiis
chedule, conditioned' uport execution of a contract with� the� City of Fort.Utforth. The� willfu� rriisrepresentatlort� o� facts is�
grounds for. consideKation�of�disq,ualification anc� will resutt ic�,the-6id.being consictered�no�t: cesponsi�ts ta'speciftcations.
�
�Comp�any Name,, Contact Name,� �
AdcJress, anci %lephone No.
� • .. . .. . ._.
� . . _ ..n. ,. . �,. . . , . , ... ., . .
�-»�bD ��rt�:Fi� .T �
� , o. C3o�� "73 i �'�
'—��r,fr� : TX �7�
x- n� 3�
� ;,�
,_..
Ce�tiftect ; Specify alI Contracting,
� Scopa of Work (•j
fpa
� �
~ ... y '
��, rra.r�1.�
� �yc_ (v.�.�-L-f�-�
�►P� ���� ��
P �
� �'�'P'�
r -spec�t�-a�ra�Yerris.ta
� 6e�Supplied�"(*��
�
_ ,
� ' � Dol(arAmount
. �,
e• �' `
��* ; .
� �v � .
;� �
� � �'�,U�.�
�5+
Su�s,a�
/' �' �i 1'S �A.u-� t� ��s S
�i� � j-- � �.�-,�-e►-r� �-a.�-�
.,.�LPL� ss, � �7 r > '�C. L�a�-Q,- � � 2, �DD . 0(5
' - � , � ;�� 71 ��Qr�
�,., .,e�ea-�a�-iar�
MNVBEs must be located in the 9(nine} county marketpiace or currently doing business irr the, marketplace at time of bid: �
�j Specify aif areas irr wf�ich MNVBEs are to� be utilized andlor items ta be. supplied: � ..
�.�(t} '�complete listing of items ta be supplied� is requirect tnrocdec to receive credit tovKaid`the IfA/WBEgoaF. •, - .� •' �
� �
� Identify Each Tier Level: Tier. M`eans the levet. of subcontractingpelovirthe priine contractorlconsulYant, i:e., a direct payment from
thepnmg�contractorto��subcontractoriscons�dere�l'st�tterf�paymentbr�subcontractocta�ts� -
supplier ts considered�Zrtdtier. • . •'��" . �� . :.{:_ r:;,. . � • ... �
JTHIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FNE (5) CITY BUSINESS DAYS AFTER BID OPENING,
EXCLUSiVE OF THE BID OPENING DATE
aPages 1 and 2 of Attachment 1A must be received by the Managing Department
98710� Sp� 0899_DO PaR4.doc 4-2
Page 2 of 2
� Revised-06/02/98
CITY OF FORT WORTH
MINORITY AND WOMEN BUSINESS ENTERPRISES SPECIFICATIONS
��
�
��
�
' r�l
Company Name, Contact Name,
Address, and Telephone No.
. ,� r, ' ,
- KP,bLt!' �iU't�i(.�� Co
pQ,��� �to�8��
" �r+ l�.lor�-h, -1Y '7LolUD ..
81'l - �?� - �IcJ 50
1'�L.!'
r . �
�� � � ��-{/
1�_,�u 7si,u ,
�,n� - 3g�-��ir
MBE and WBE UTILIZATION FORM
Certified Specify All Contracting Specify All Items to
- Scope of.Work ("} be•Supplied (*)
00
. � �
1=
_ ,
Sr,�Ply r�a-r
� �o� cvnc, Pu,v��
� ���y /t1�a.r
-�o� h� Cu1►fe1-�'
� � ua.�dra�,�.
`m
F=
`�' �
m
�
N
Dollar Amount
z!� lStISD��fS'
�5-� �, �. �z.
z � g, t�la. av
"�'� I-�?C� `I�n.c�k;�u1,Tn� 1� Cu$tv'nn
-��! Ucnai � �P ...� �.-
�-�i,r+ l�IoFi-h,TX `�(olli �( ��►.rn d�un )5� �Zlo, D�g.00
�. 8n-B�I-��s, �� �
�PM j wa-Fe,- # seu.�- �^� � 3, q 3(0 � o�
� V �
� The bidder further agrees to provide, directiy to the City upon request, complete and accurate information
regarding actual work performed by all subcontractors, including MBE(s) andlor WBE(s) arrangements submitted
with this bid. The bidder also agrees to allow an audit andlor examination of any books, records, and �les heid
a� by their company that will substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract,
" by an authorized o�cer or employee of the City. Any intentional and/or knowing misrepresentation of facts will
be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years
;, and for initiating action under Federal, State, or Local laws concerning false statements. Any failure to compiy
I with this ordinance and creates a material breach of contract may result in a determinatio� of an irresponsibie
� offeror and barred from participating in City work for a period of time not less than one (1) year.
�; j, - ALL MBE(s) and WBE(s) MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD
� • �!� ��` ��:.e� 1�i . F- !-�a 1 �
� �' Authorized Signature Printing Signature
' � . �,�es;dent
��;+' Title , ` Contact Name and Title (if different) •
� ��. O�� �-lar � �ca.��h� Co . ... 8�7 �z�-�- 7� � . .. . ..
,._ Company Name _ _ . � Telephone Number(s)
� � �.. . �Ol A1 C— 2�'w' �: Rl7- (o�- Z�� � . . ..
r- Address . Fax Number
�� �' ��-� J�D.� � �L �ivlDCo . g :�'�`�
City/State2ip Code � Date
� ��
I' Ir
THIS FORM MUST BE RECENED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FNE (5) CITY BUSINESS DAYS AFTER BID OPENING,
EXCLUSIVE OF THE BID OPENiNG DATE
Pages 1 and 2 of Attachment 1A must be received by the Managing Department
'F. ^ : � � ... . _
9811000 Specs_o899_DO Part4.doc 4-3 �
� 5. PROPOSAL
� TO: Mr. Bob Terrell
City Manager
Fort Worth, Texas
� FOR: Construction of Basswood Boulevard
from East of I-35W to Existing Basswood Boulevard
aT/PW Project No. C115-020115023220
�
D.O.E. No. 0329
� Pursuant to the foregoing "NOTICE TO BIDDERS", the undersigned has thoroughly examined
the plans, specifications and the site, understands the amount of work to be done, and hereby
proposes to do all the work and furnish all labor, equipment and materials necessary to fully
Dcomplete all the work as provided in the plans and specifications and subject to the inspection
and approval of the Director, Department of Engineering of the City of Fort Worth. The
� Contractor must be pre-qualified in accordance with the Water Department of the City of Fort
Worth requirements.
� Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract
and furnish Performance, Maintenance Bond, and Payment Bond approved by the City of Fort
� Worth for performing and completing the construction work within the time stated and for the
following sum, to-wit:
D
�
�
�
�
D
�
a
9911000 Specs_0899 DO.doc 5—�
I
�
�'
_�
'!J
Q
I�
�J
J
�
'
�,�
D
D
�
J
�
D
J
�
I�
Furnish and install, including all appurtenant work, complete in place, the following items:
PAY APPROX. DESCRIPTION OF ITEMS UNIT TOTAL
ITEM QUANTITY WITH BID PRICES WRITTEN IN WORDS VALUE VALUE
1. 1 LS Mobilization
��u��Lli2lq:th{•vne�{IwltsartJseVcn ht�rtd(ee�ollars
and �� Cents per LS $���, 7DG� $ lg�, %D�4•OL'
2. 1 LS Utility adjustment
� ' 'J
�l.UD Y�l(Tl1S�/!� Doliars
and /'�U Cents ner LS $�, DD�� DU $ a, ODU. OC�
3. 2 EA Project designation sign
�/� hun���d �ivQirfzi • �ve- Dollars
J /1
and � Cents per EA $ "� ��•� $ �`"J�. �
4, 22,000 CY Unclassified street excavation
� �(,�TO Dollars
and h� _ _ _ Cents per CY $ �' � $ �`�+, �' �
5. 13,300 CY Borrow
�
7
8.
9.
�
11
12.
13.
�re� Doliars
and nv Cents per CY $ �� DD
1,300 CY Disposal of unclassified excavation (see Geotech Study)
/ Gl�D Dollars
and n� Cents per CY $�•DD
270 TN Lime (27 Ibs/SY)
��%/• '�ZC� Dollars
and ��i�I Cents qer TN $�a� a�
19,325 SY 6-in. lime stabilized subgra�
�/1� Dollars
and ��1�� Cents per SY $ /' �,�
18,615 SY 7-in. reinforced con rete pavement, complete in place
G.iG�rTr��/' J Dollars
and ' T/ �'"TN Cents per SY $�O' SD
- --- . ._._—.. _._. _...
5,132 LF 7-in. concrete curb ,
J�0 Dollars
and Y����� __ __� Cents per LF $�'� �
..
5,682 LF 6-in. concrete median curb
�/�-f� Doilars
and �C%� Cents per LF $ a�•4�
2,660 LF Barbed wir�fence removal (Old Denton Road)
NL� Dollars
and �a T'rL/ Cents per LF $ Q� SD
21,000 LF Silicon joint sealing j
�a Dollars
and �/lC�/ ' 7f7i/� _. ,_ Cents per LF $ �• �O J�
9811000_Spe� 0899_DO.doc
5-2
$ •�clr 4%DD.l,�i
$ � �oa .ov
$ �, �9y.c��
$ '�, 9aG.GY:
$ 3�y, 3��Sv
$ IC? q3/.i(�
$ ��, �, � Sl�
$ /33�•00
$. !3, ���
�
i�
�
_�J
!J
,l
J
•f
�
�
�
�
�
�
�
�
,I
J
�
�
PAY APPROX. DESCRIPTION OF ITEMS UNI7 TOTAL
ITEM QUANTITY WITH BID PRICES WRITTEN IN WORDS VALUE VALUE
14. 55 LF SawcuUconnection to existing concrete pavement
15. 1
16. 2,862
17
18.
19.
20.
21
22.
23
24.
25.
�
�I,LA'"� Dollars
and ha Cents per �F $�•�� $��li.DC)
LS Roadway markings
L�iqlif �l7DL(Sltrd �Dui'�iW-tGllPd �� Dollars
and �'10 ___,. ___ . _._._ __ Cents per LS $ p ��� ��� $ 0, ysv`00
LF Trench safety
Tn Dollars
and �d Cents per LF $ ��. �D $�; �v��
3 EA Construct 4-ft. square storm drain manhole
�O b�'rutlSCc/Id —T�� �un�(/��� Dollars
and � �D Cents per EA $��D•OD '$�p,�POD• OG
1 EA Construct 5-ft. square storm drain manhole
�Gt��1Dl/Sk/V� /'li�c��uncl�Pd �i��_Dollars
and h� CentsperEA $�LlSD•(.�O $ �,��•�D
1 EA Five-sided, Type 6 storm drain manhole
1�Ii��cl�tor.�sand �'Uurhunct��d iv7-tz1 Dollars
J
and h� CentsperEA $`7�S��.UCS $���SD�OG
. --- --- - - - - --.. .
6 EA 10-ft. recessed curb inlet
�ua/� �vus�nd Do��ars
and _ h� _ __ Cents ner EA � o� �.OG $ ��, GL2'�• �L' �
5 EA 15-ft. recessed curb inlet
l/tah��OX�/►� Er'o� %�v�drQd -��i� Dollars
. � ,/
and h� Cents per EA $c�%��,0�3 $�5� �D•OG�
2 EA 20-ft. recessed curb inlet
h g�i b r/t( `i�i'P� /7U/tG�/'Qo� Dollars
and /iD Cents per EA $J, 3L�-D� $(D(oUd•l.7�
2 EA 6-ft. x 6-ft. drop inlet �
�s'(I� ��l�'�t/t�[ �dlu-�u/[�r¢� Dollars �
and /�� Cents oer EA $.3��• � $ l� �DU. OD
581 LF 72-in. Class III RCP
��� / � �" �
,%l,[XJ /7ft/Y{�P.sa� -f'Cl1 Doilars
and I7� Cents per LF $�5�� �OL7 $/o�,�j/D�L O
140 LF 66-in. Class III RCP
D/14� �ll�i��� ��✓��1/��I • ,Si� Dollars
and !�� Cents �er LF $ ��.OD $�� �Slp,L'b1
428 LF 48-in. Class III RCP
/%/�2 {'/�L�[G�/NA �f�1i/'�p�r1 Dollars
and ._- I?D --. - - . . _ _ Cents Per LF $ �/,3.� $ ���lo�%Od
9811000 Spe� 0899 DO.doc 5-3
�
�'
�J
'1
�
��
'1
�
�
i..i
I
J
,I
�
�
�
�
�1
�
�
�
�
PAY APPROX. DESCRIPTION OF ITEMS UNIT TOTAL
ITEM QUANTITY WITH BID PRICES WRITTEN IN WORDS VALUE VALUE
27. 801 LF 42-in. Class III RCP
e �v/ Dollars
and _. `Jl�.. __ ____ _ _ Cents per LF $ �J %•OD $ �, bG17•O�
28. 287 LF 36-in. Class III RCP
�/C/i�� • /7/?°�..� Dollars
� � �/. �o �3 ay�.�
and i?4 Cents per LF $ $ �
29. 45 LF 30-in. Class III RCP
SL��ZI' /'1//►L• Dollars
r /,.�
and ii4 Cents per LF $ "' '•�d $�, � ds,�
� -- --- ---. .. _. . .. _
30. 124 LF 24-in. Class III RCP
� �� � S�f/,P�9 Dollars .
- . � . -
and /10 Cents oer LF $�� 0O $% ��g. �
31. 426 LF 21-in. Class III RCP
1'—(7'� ' t'i�/� Dollars
i
and !'1 � Cents per LF $ s�� d6 $�3 L�/-�j� (�/�
32. 139 LF Eight 10-ft. x 10-ft. multiple box culvert including wingwails
� �OSy1D!lSQn� �l,UD unc�rid !/'�z/ Dollars
and �'1 b Cents per LF $�, �7�> � $���-�lD�.�%d
---_ ----- -. _ . _.... _
33. 1 EA 30-in. diameter plug
�%/�Z, • �� l/�l'1 Dollars
i
and �U _ Cents oer EA $�7 �� $..3% DD
34. 1 EA 66-in. diameter plug
( //%� �l(.1/2C�/d� ��/7 Dollars
and /1 � Cents qer EA $//Q• d� $//D�DD
35. 120 LF Four 9-ft. x 6-ft. multiple box culvert including wingwalls
�,�7o!!S!!/lcf �� %7u��P� 2i9�f �1�e- Dollars
and � , ' � Cents per LF $�,�1�� UD � /�o �L?J,UCJ
36. 1,050 SY 6-in. concrete riprap
. //Ji%`{�j -7/'('�� Dollars
and I'�o Cents per CY $�� $.� �50 L�
37. 1,425 SY 18-in. rock riprap
//7i�� � Dollars
and • h� Cents per SY $.9�a.Od $ y�, IoDO�OL'
38. 62,000 CY Unclassifeci c an�nel excavation (see Geotech Study)
T u/' Dollars
and �h�r ___..__.._ Cents per CY $ `� 30 $ �i ��•�
39. 2,800 SY Remove existing asphalt pavement
LJi'IG� Dollars
and =----=�7_7'�71 _ _ _ Cents per SY $ � � $ �% o�D000
�.
. ... ' �
9811000 Specs_0899_DO.doc 5-4'
�
Li
�
D
�
�
�
�
�
O
a
�
�
�
�
O
a
�
�
D
�
PAY APPROX. DESCRIPTION OF ITEMS . UNIT
ITEM QUANTITY WITH BID PRICES WRITTEN IN WORDS VALUE
40. 1� LS Remove existing bridge ,
TOTAL
VALUE
I-1Ve `i�1011SGlnGt- Dollars
and /11J Cents per LS $`J,ODD.DD g�ODD.Ol�
41. 120 LF Remove end-of-roed barricade
I%�� / (/� Dollars
and 77�� Cents per LF $ ��. Sd
42. 240 LF End-of-road barri ade
'�71T�/ ' '7�v� Dollars
and ' ha Cents per LF $ yS.Ol�
43. 12 LF Remove 48-in. RCP
�A� Dollars
i o
� and /l0 Cents per LF $ �• ��
44. 469 LF Combination rail (Type C4)
/�?l/'i�l ' ��/►� Dollars
and �� Cents per LF $•�9• ��
45. 200 LF Steel beam guardrail including terminal anchor system
�w�n� ' �V� Dollars
and , �� Cents per LF $ �D�
46. 1 LS Pollution Prevention Plan, including silt fence, hay bale dike,
sandbag berm, and inlet protection
$ /, �'"do.OG
$ /4, 8D0-QU
$ q(o.oa
$ /8 �9/. o��
$ J, OU4. DO
P-i�Tf��/I �Ou.SLt-/!�! Dollars
and /)o Cents per LS $��GY��-04 $ ��DD4•DO
47. 5,000 CY Topsoil
48.
49.
50
51
��� Dollars
and . /�O Cents per CY $� QD $�2(j,000.l�
15 EA Type 5 drilled-shaft foundation for street lights, compiete in �
place
�j� �/L!/'�i/"ps( �{�li/�j Dollars
and %2� Cents per EA $ ap3O�OL5 $/ L%$?. DU
15 EA Street light pole assembly with double arm, D40-9T, 1 OOW,
HPS lamp, IES Type M-C-II, complete in place
/LUD y� �dl(S�/lcl �l[i""/l�/'QdP Dollars
and �� Cents per EA $at�DD,Ol� ��v, ���•�'
3,500 LF 2-in. Schedule 40 PVC conduit and wiring, complete in
place
�)S� Doliars
and ��� • 771/�. Cents 4er LF $�•�s $�� ��.�
_ _. . -
1 LS Inductive loop d tectors, including conduit and wiring for
both intersections with Old Denton Road and Sandshell
Boulevard
���.`�t� �USlv+d �UQ /7[//�li QooDol�ars
and l7O Cents aer LS �3 �SL10.Ob $� 5GY�• ���
9811000 Specs 0899 DO.doc
5-5 Addendum No. 9- August 26, 9999
� ' .
� PAY
ITEM
52.
a � �
C
C
LJI
l�J
L�
L•J
�
u
�
�
l�
�
l�J
�
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
l�
APPROX. I DESCRIPTION OF ITEMS UN1T TOTAL
QUANTITY I WITH BID PRICES WRITTEN IN WORDS VALUE VALUE
60 LF 18-in. sanitary sewer
�/� �Ju�cfr�d n;,,e�� • �v� Dollars
and /7D Cents per LF $�9s DO $ fl� %DG�� 40
1 EA Remove existing SSMH
�lr� �(D uSa�d -�DUr /7U��'e�1 Dollars
and /10 _ Cents perEA $��%GYJ.CX% $ 0?�/40,��
1 EA Standard 4-ft. diameter SSMH
_��lfsQ/iG� '77�[.�/lG�/C�O� Dollars
and �'(D Cents per EA $� SDD�DD $�sDD,OD
8 VF 4-ft. diameter extra depth SSMH
/�� /lU�/P� Dollars
and _ /10 Cents per VF $ ��d•0� $ �,��•�D
1 EA Stainless steel watertight manhole insert
r?c� �iT7�ij Dollars
J
and %D Cents per EA � 0�75 d, 0� $ o�SD.OD
1 EA Concrete collar for SSMH
���e /7lt/Lq/Q!� �S'�l�i - �'l�e- Dollars
. �
and _� D�_ Cents per EA $`-���U $�7�-vp
50 CY Class E(1500#) concrete for misc. placement and
encasement, furnish and install complete in place
�/%i� f lUi1/.���L� Si�GT� Dollars
/ �!
and %i� Cents per CY $��o�•�D $ p,pDQ.OD
50 CY Class B(2500#) concrete for misc. placement and �
encasement, furnish and install complete in place
l�l� �Ll/�Gl/�e� S�� Dollars
and ..----- ....-- %�U --- Cents per CY $ �loD. OD $ �OpO, G�
50 CY Crushed limestone as directed by Engineer
— --
/Ll7irr�i/ Doliars
✓
and /? O Cents per CY $�d-�� $/ �OU, d0
50 CY Ballast stone as directed by Engineer
1��7N Dollars
J
and �1 D Cents per CY $ c� �d $/, DIID. OD
— - ------- -- -
60 LF Television inspection of new sanitary sewer lines
�rP� Dollars
and . . _.___. /1D _. _.___. _ Cents per LF $ �• �� $ /pD� DO
124 LF 8-in. water pipe (including blocking)
�9�. • Tl1/Q Dollars
l
and h� Cents perLF $ �S•db � /�Sl,�O�pG
990 LF 16-in. DIP water pipe (including blocking)
(• Jl�.° %IU��P� ,La��� Dollars
and Yl0 Cents per LF $��?O.OD $aa, vcav � 0
� 9811000_Specs_0899_DO.doc 5-6 Addendum No. 1— August 26, 1999
a
a
a
a
0
D
�
�
�
a
D
0
0
0
0
a
D
a
D
PAY APPROX. DESCRIPTION OF ITEMS UNIT TOTAL
ITEM QUANTITY WITH BID PRICES WRITTEN IN WORDS VALUE VALUE
65. 150 LF 27-in. DIP sewer, open cut
_, LU/7 NLEyt/�✓QO 7Qf? DoUars
and �/1!� � Cents per LF $�` �D .DD $��j 500•OG
66. 0.2 TN Cast iron fitbngs
�ili?f `T11U1(SQ/1l,� '17�/e Fl/�[�'U.1/eGQ Dollars
�
and /� Cents per TN a�SDD� DD a l, �%(�"D, DU
67. 637 LF Trench safety system (less than 5-ft. depth)
/ �'(�P� � � Dollars
and i�� � Cents perLF $ �•DD $ l��///, p0
68. 1 CY C/ass 'E' (1500#) concrete for misc. placemenf and
encasement
l�//12 �'/l�/(G(1�( S'/1!7(/ Dollars
I
and � 8 Cents per CY $��' �� a ���• OD
69. 1 CY Class `B' (2500#) concrete for misc. placement and
encasement
�/12 i'! Lli'tGC1 � J�/X"�/ Dollars
and i'�D Cents per CY $/1P0.lJU $/�, p. DD
70. 1 CY Crushed limestone as directed by Engineer
/L{,�/1-�Z/ Dollars
�
and /'JD Cents per CY $ �.00 $ o�. DD
TOTAL AMOUNT BID
9811000 Specs_0899 DO.doc
5-7
$���31P, 3B� �
Addendum No. 1- August 26, 1999
L�J
� Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract
and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents,
for the faithful performance of the Contract. The attached bid security in the amount of 5°/o is to become
o the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not
executed and delivered within the time above set forth, as liquidated damages for the delay and additional
work caused thereby.
C
C
�I
The undersigned bidder certifies that he has been furnished at least one set of the General Contract
Documents and General Specifications for Water Department Project dated January 1, 1978, and the he
has read and thoroughly understands all the requirements and conditions of those General Documents
and the specific Contract Documents and appurtenant plans.
This contract is issued by an organization which qualifies for exemption pursuant to the provisions of
Article 20.04(F) of the Texas Limited Sales, Excise and Use Tax Act.
Taxes. All equipment and materiais not consumed by or incorporated into the project construction are
subject to State sales tax under House Bill 11, enacted August 15, 1991.
The successful bidder shall be required to complete the attached Statement of Materials and Other
Charge§ Contractor at the time of executing the contract.
� The undersigned assures that its employees and applicants for employment and those of any labor
organization, subcontractors, or employment agency in either furnishing or referring employee applicants
to the undersigned are not discriminated against as prohibited by terms of City Ordinance No. 7278 as
amended by City Ordinance No. 7400.
�I
C'
��
�
The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to
complete the contract within 120 working days after beginning construction as set forth in the written work
order to be furnished by the Owner.
(Complete A or B below, as applicable:)
[] A. The principal place of business of our company is in the State of
Nonresident bidders in the State of , our principal place of business,
are required to be percent lower than resident bidders by state law. A copy of the
stature is attached.
Nonresident bidders in the State of , our principal place of business,
are not required to under6id resident bidders.
a �B
C
L
C��
G
C
The principal place of business of our company or our parent company or majority owner
is in the State of Texas.
Receipt is acknowledged of the following addenda:
Addendum No. 1 � ����'% %�� Y
Addendum No. 2 Respectfully submitted,
Addendum No. 3
�rva l l�a !l �Ir c�L�itr�'rLG �D .
���%
(SEAL) If bidder is Corporation By: . '� a��--N"
Name
Title:
�.r Nu��
f���5�rfe�1-f
Address: �� N� Z�i .��PP�
�r� l�lo�.�ti , 7-�l +7� �v l�
Phone:
��-�Zy-���
� 9811000 Specs_0899_DO.doc rJ—$ Addendum No. 9- August 26, 1999
J
J
TRANSPORTATION 8� PUBLIC WORKS DEPARTMENT
D TO: Mr. Bob Terrell
City Manager
Fort Worth, Texas
� FOR: Construction of Basswood Boulevard
from East of I-35W to Existing Basswood Boulevard
� T/PW Project No. C115-020115023220
D.O.E. No. 0329
� 1. SCOPE OF WORK: This work shall include all materials, labor, equipment, tools and
incidentals n�cessary � to construct the proposed paving improvements and other
appurtenances in accordance with the plans and specifications.
�
6. SPECIAL PROVISIONS
Award of Contract and Working Days:
a. Award of Contract: The City reserves the right to abandon, without obligation to
D the Contractor, any part of the project, or the entire project, at any time before the
Contractor begins any construction work authorized by the City. Award, if made,
shall be to the responsive low bidder.
`J
�
,�
J
�
�
b. Workina Days: The number shall be 120 working days.
The Contractor agrees to complete the Contract within the allotted number of working
days. If the Contractor fails to complete the work within the number of working days
specified, liquidated damages shall be charged, as outlined in Part 1, Item 8, Paragraph
8.6 of the "Generai Provisions" of the Standard Specification for Construction of the City
of Fo�t Worth, Texas.
2. INCREASE OR DECREASE IN QUANTITIES: The quantities shown in the Proposal
are approximate. It is the Contractor's sole responsibility to verify all the minor pay item
quantities prior to submitting a bid.
When the quantity of the work to be done or materials to be furnished under any major
pay item of the Contract is more than 125°/o of the quantity stated in the Contract,
whether stated by Owner or by Contractor, then either party to the Contract, upon
demand, shall be entitled to negotiate for revised consideration on the portion of work
above 125% of the quantity stated in the Contract.
When the quantity of the work to be done or materials to be furnished under any major
D pay item of the Contract is less than 75% of the quantity stated in the Contract, whether
stated by Owner or by Contractor, then either party to the Contract, upon demand, shall
be entitled to negotiate for revised consideration on the portion of work below 75% of the
D quantity stated in the Contract. This paragraph shall not apply in the event Owner
deletes a pay item in its entirety from this Contract.
�
A major pay item is defined as any individual bid item included in the proposal that has a
total cost equal to or greater than five (5%) percent of the original contract.
�
9811000 Specs 0899 DO.doc
6-1
�
L+�J
�
�
��I
'�
�J
'�
��
J
_�J
��
�
J
��
.�
�
�
D
il
A minor pay item is defined as any individual bid item included in the proposal that has a
total cost less than five (5%) percent of the original contract.
in the event Owner and Contractor are unable to agree on a negotiated price, Owner
and Contractor agree that the consideration will be the actual field cost of the work plus
fifteen (15%) percent as described herein below, agreed upon in writing by the
Contractor and Director, Department of Engineering and approved by the City Council
after said work is completed, subject to all other conditions of the Contract. As used,
herein, field cost of the work will include the cost of all workmen, foremen, time keepers,
mechanics and laborers; all materials, supplies, trucks, equipment rental for such time
as actually used on such work only, plus all power, fuel, lubricants, water and similar
operating expenses; and a ratable portion of premiums on performance and payment
bonds, public liability, Workers Compensation and all other insurance required by law or
by ordinance. The Director, Department of Engineering will direct the form in which the
accounts of actual field cost will be kept and will recommend in writing the method of
doing the work and the type and kind of equipment to be used, but such work will be
perfiormed by the Contractor as an independent Contractor and nof as an . agent or
employee of the City. The fifteen (15%) percent of the actual field cost to be paid to the
Contractor shall cover and compensate him for profit, overhead, general supervision and
field office expense, and all other elements of cost and expense not embraced within the
actual field cost as herein specified. Upon request, the Contractor shall provide the
Director, Department of Engineering access to all accounts, bills and vouchers relating
thereto.
3. The City reserves the right to abandon, without obligation to.the Contractor, any part of
the project, or the entire project, at any time before the Contractor begins any
construction work authorized by the City.
4. This Contract and project are governed by the two following published specifications,
except as modified by these Special Provisions: STANDARD SPECIFICATIONS FOR
STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH;
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH
CENTRAL TEXAS. A copy of either of these specifications may be purchased at the
office of the Transportation and Public Works Director, 1000 Throckmorton Street, 2nd
Floor, Municipal Building, Fort Worth, Texas 76102. The specifications applicable to
each pay item are indicated in the call-out for the pay item by the designer. If not shown,
then applicable published specifications in either of these documents may be followed at
the discretion of the Contractor. General Provisions shall be those of the Fort Worth
document rather than Division 1 of the North Central Texas document.
5. Bidders shall not separate, detach or remove any portion, segment or sheets from the
contract documents at any time. Failure to bid or fully execute contract without retaining
contract documents intact may be ground for designating bids as "non-responsive" and
rejecting bids or voiding contract as appropriate and as determined by the City Engineer.
6. The Contractor shall be responsible for defects in this project due to faulty materials and
workmanship, or both, for a period of one (1) year from date of final acceptance of this
project by the City Council of the City of Fort Worth and will be required to replace at this
expense any part or all of the project which becomes defective due to these causes.
Construction stakes for line and grade will be provided by the City as outlined on P-17,
Standard Specifications for Construction, City of Fort Worth.
8. TRAFFIC CONTROL: The Contractor shall be responsible for providing traffic control
during the construction of this project consistent with the provisions set forth in the "1980
9871000 Specs 0899 DO.doc 6-2
J
i
�
Texas Manual on Uniform Traffic Control Devices� for Streets and Highways" issued
under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways",
codified as Articfe 6701 d Vernon's Civil Statutes, pertinent sections being Section Nos.
27, 29, 30 and 31.
D The Contractor will not remove any regulatory sign, instructional sign, street name sign,
or other sign which has been erected by the City. if it is determined that a sign must be
removed to permit required construction, the Contractor shall contact the Transportation
� and Public Works Department, Signs and Markings Division (telephone number 817-
870-8075) to remove the sign. In the case of regulatory signs, the Contractor must
replace the permanent sign with a temporary sign meeting the requirements of the
above referenced manual and such temporary sign must be installed prior to the removal
D of the permanent sign. If the temporary sign is not installed correctly or if it does not
meet the required specifications, the permanent sign shall be left in place until the
temporary sign requirements are met. When construction work is completed to the
D. extent that the permanent sign can be reinstalled, the Contractor shall again contact the
. Signs and Markings Division to reinstall the. permanent sign �and shall leave his
temporary sign in place until such reinstallation is completed.
� 9. PAYMENT: The Contractor will receive full payment from the City for all work.
�
�
�
.J
�J
i
�
�
-,
'
J
�I
�
J
�
J
10. DELAYS: The Contractor shall receive no compensation for delays or hindrances to the
work, except when direct and unavoidable extra cost to the Contractor is caused by the
failure of the City to provide information or material, if any, which is to be furnished by
the City. When such extra compensation is claimed a written statement thereof shall be
presented by the Contractor to the Engineer and, if by him found correct, shall be
approved and referred by him to the Council for final approval or disapproval; and the
action thereon by the Council shall be final and binding. If delay is caused by specific
orders given by the Engineers to stop work, or by the performance of extra work, or by
the failure of the City to provide material or necessary instructions for carrying on the
work, then such delay will entitle the Contractor to an equivalent extension of time, his
application for which shall, however, be subject to the approval of the City Council; and
no such extension of time shall release the Contractor or the surety on his pe►fiormance
bond from all his obligations hereunder which shall remain in full force until the discharge
of the contract.
11. DETOURS: The Contractor shall prosecute his work in such a manner as to create a
minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and
pedestrian traffic within the project area.
Barricades, warning and detour signs shall conform to the Standard Specifications
"Barriers and Warning and/or Detour Signs", Item 524, and/or as shown on the plans.
Construction signing and barricades shall conform with "1980 Texas manual on Uniform
Traffic Control Devices, Vol. No. 1".
12. During the construction of this project, it will be required that all parkways be excavated
and shaped at the same time the roadway is excavated. Excess excavation will be
disposed of at locations approved by the Engineer.
13. DISPOSAL OF SPOIL/F1LL MATERIAL: Prior to the disposing of any spoil/fill material,
the Contractor shall advise the Director of Depa�tment of Engineering, acting as the City
of Fort Worth's Flood Plain Administrator ("Administrator"), of the location of all sites
where the Contractor intends to�dispose of such material. Contractor shall not dispose
of such material until the propo�ed sites have been determined by the Administrator to
9811000_Specs 0899 DO.doc
6-3
�
�
�
�
J
�
��
�
�
meet the requirements of the Flood Plain Ordinance of the City of Fort Worth (Ordinance
No. 10056). All disposal sites must be approved by the Administrator to ensure the
filling is not occurring within a flood plain without a permit. A flood plain permit can be
issued upon approval of necessary engineering studies. No fill permit is required if
disposal sites are not in a flood plain. Approval of the Contractor's disposal sites shall
be evidenced by a letter signed by the Administrator stating that the site is not in a
known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain.
Any expenses associates with obtaining the fill permit, including any necessary
engineering studies, shall be at Contractor's expense. In the event that the Contractor
disposes of spoil/fill material at a site without a fill permit or a letter from the
Administrator approving the disposal site, upon notification by the Director of
Transportation and Public Works, Contractor shall remove the spoil/fill material at its
expense and dispose of such materials in accordance with the Ordinance of the City and
this section.
14. During the construction of this project, the Contractor shall comply with present zoning
'requirements of. the City. of Fort Worth in the. use of �vacant property for storage
purposes.
15. All objectionable matter required to be removed within the right-of-way and not
particularly described under these specifications shall be covered by Item No. 102,
"Clearing and Grubbing" and shall be subsidiary to the other items of the contract.
16. Final cleanup work shall be done for this project as soon as paving and curb and gutter
have been constructed. No more than seven (7) days shall elapse after completion of
construction before the roadway and right-of-way is cleaned up to the satisfaction of the
Engineer.
17. PROPERTY ACCESS: Access to adjacent property shall be maintained at all times
� unless otherwise directed by the Engineer.
18. CONSTRUCTION SCHEDULE: It shall be the responsibility of the Contractor to furnish
D the Construction Engineer, prior to construction, a schedule outlining the anticipated time
each phase of construction will begin and be completed, including sufficient time being
allowed for cleanup.
� 19. SAFETY RESTRICTION WORK NEAR HIGH VOLTAGE LINES: The following
procedures will be followed regarding the subject item on this contract:
�,
J
�
�
�
J
a. A warning sign not less than five inches by seven inches (5" x 7"), painted yellow
� with black letters that are legible at twelve (12') feet shall be placed inside and
outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drive,
hoisting equipment or similar apparatus. The warning sign shall read as follows:
"WARNING - UNLAWFUL TO OPERATE THIS EQUIPMENT
WITHIN SIX FEET OF HIGH VOLTAGE LINES"
b. Equipment that may be operated within ten (10') feet of high voltage lines shall
have an insulating cage type or guard about the boom or arm, except backhoes
or dippers, and insulator links on the lift hook connections.
c. When necessary to work within six (6') feet of high voltage electric lines,
notification shall be given the power company (T.U. Electric Service Co.) who will
erect temporary mechanical barriers, de-energize the line, or raise or lower the
line. The work done by the power company shall not be at the expense of the
9811000_Specs 0899 OO.doc
�. •.
^J
��
J
!J
�
■J
City of Fort Worth. The notifying department shall maintain an accurate log of all
such calis to T.U. Electric Service Company and shall record action taken in each
case. �
d. The Contractor is required to make arrangements with the TU Electric Service
Company for the temporary relocation or raising of high voltage lines at the
Contractor's sole cost and expense.
e. No person shall work within six (6') feet of a high voltage line without protection
having been taken as outlined in Paragraph (3).
20. Any Contractor performing any work on Fort Worth water or sanitary sewer facilities
D must be pre-qualified with the Water Department to perform such work in accordance
with procedures described in the current Fort Worth Water Department General
Specifications, which general specifications shall govern performance of all such work.
�J
�
�
D
�
�
J
�
�
�
J
�
�
�
21. . RIGHT TO AUDIT:
a. Contractor agrees that the City shall, until the expiration of three (3) years after
final payment under this contract, have access to and the right to examine and
photocopy any directly pertinent books, documents, papers, and records of the
Contractor involving transactions relating to this contract. Contractor agrees that
the City shall have access during normal working hours to all necessary
Contractor facilities and shall be provided adequate and appropriate work space
in order to conduct audits in compliance with provisions of this section. The City
shall give Contractor reasonable advance notice of intended audits.
b. Contractor further agrees to include in all its subcontracts hereunder a provision
to the effect that the subcontractor agrees that the City shall, until the expiration
of three (3) years after final payment under the subcontract, have access to and
the right to examine and photocopy any directly pertinent books, documents,
papers, and records of such subcontractor, involving transactions to the
subcontract, and further, that the City shall have access during normal working
hours to all subcoritractor facilities, and shall be provided adequate and
appropriate work space, in order to conduct audits in compliance with the
provisions of this article. City shall give subcontractor reasonable advance notice
of intended audits.
c. Contractor and subcontractor agree to photocopy such documents as may be
requested by the City. The City agrees to reimburse contractor for the cost of
copies as follows:
1. 50 copies and under - 10 cents per page
2. More than 50 copies - 85 center for the first page plus fifteen cents for
each page thereafter
22. OBSTRUCTION OF ACCESS TO DRIVES: The Contractor shall conduct his activities
to minimize obstruction of access to drives and property during the progress of
construction. Notification should be made to an owner prior to his driveway being rebuilt.
23. TEMPORARY EROSION, SEDIMENT AND WATER POLLUTION CONTROL:
a. Descriqtion: This item shall consist of temporary soil erosion, sediment and
water pollution control measures deemed necessary by the Engineer for the
duration of the contract. These control measures shall at no time be used as a
9811000_Specs 0899 DO.doc 6-5
�J
�
�
�
�
�
�
J
J
�
�
�
�
'
J
substitute for the permanent control measures unless otherwise directed by the
Engineer and they shali not include measures taken by the CONTRACTOR to
control conditions created by this construction operations. The temporary
measure shali include dikes, dams, berms, sediment basins, fiber mats, jut
netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubbie
liners, baled-hay retards, diked, slope drains and other devices.
b. Construction Requirements: The Engineer has the authority to define erodible
earth and the authority to limit the surface area of erodible-earth material
exposed by excavation, borrow and to direct the CONTRACTOR to provide
temporary pollution control measures to prevent contamination of adjacent
streams, other water courses, lakes, ponds or other areas of water
impoundment. Such work may involve the construction of temporary berms,
dikes, dams, sediment basins, slope drains and use of temporary mulches, mats,
seeding or other control devices or methods directed by the Engineer as
necessary to control soil erosion. Temporary pollution control measures shall be
. used to prevent or correct erosion�that may develop during construction prior to
installation of permanent pollution control features, but are not associated with
permanent control features on the project.
The Engineer will limit the area of preparing the right-of-way, clearing and
grubbing, excavation and borrow to be proportional to the CONTRACTOR'S
capability and progress in keeping the finish grading, mulching, seeding and
other such permanent pollution control measures current in accordance with the
accepted schedule. Should seasonal conditions make such limitations unrealistic,
temporary soil erosion control measures shall be performed as directed by the
Engineer.
The contractor shall also conform to the following practices and controls. All
labor, tools, equipment and incidentals to complete the work will not be paid for
directly, but shall be considered as subsidiary work to the various items included
in the contract. . -
Waste or disposal areas and construction roads shall be located and constructed
in a manner that will minimize the amount of sediment entering streams.
When work areas or material sources are located in or adjacent to live streams,
such areas shall be separated from the stream by a dike or other barrier to keep
sediment from entering a flowing stream. Care shall be taken during the
construction and removaf of such barriers to minimize the muddying of a stream.
All waterways shall be cleared as soon as practicable of falsework, piling, debris
or other obstructions placed during construction operations that are not part of
the finished work.
� The CONTRACTOR shall take sufficient precautions to prevent pollution of
streams, lakes and reservoirs with fuels, oils, bituments, calcium chloride or other
harmful materials. He shall conduct and schedufe his operations so as to avoid or
� minimize siltation of streams, lakes and reservoirs and to avoid interference with
movement of migratory fish.
J
c. Measurement and Pavment: All work, materials and equipment necessary to
provide temporary erosion control shall be considered subsidiary to the contract
and not extra pay will be given for this work.
J
9811000 Specs 0899 DO.doc
..
�
�!
I
�
�I��
�
�
��
i
.�
J
24. EXAMINATION OF SITE: It shali be the responsibility of the prospective bidder to visit
the project site and make such examination and explorations as may be necessary to
determine all conditions which may affect construction of this project. Particular attention
should be given to methods of providing ingress and egress to adjacent private and
public properties, procedures for protecting existing improvements and disposition of all
materials to be removed. Proper consideration should be given to these details during
the preparation of the Proposai and all unusual conditions which may give rise to later
contingencies should be brought to the attention of the Owner prior to the submission of
the Proposal.
25. WATER FOR CONSTRUCTION: Water for construction will be furnished by the
Contractor at his own expense.
26. PROTECTION OF EXISTING UTILITIES AND IMPROVEMENTS: The Contractor shall
take adequate measures to protect all existing structures, improvements and utilities
which may be encountered. .
Any and all permanent structures such as parking lot surface, fencing and like structures
shall be replaced at no cost to the City by material of equal value and quality as that
damaged.
The utility lines and conduits shown on the plans are for information only and are not
�j guaranteed by the City or the Engineer to be accurate as to extent, location and depth;
J they are shown on the plans as the best information available at the time of design from
the owners of the utilities involved and from evidences found on the ground.
J
�
J
�
�
�
�
27. CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: The Contractor
covenants and agrees to indemnify, hold harmless and defend the City and their officers,
agents, servants or employees, and/or owners of the units and lots abutting the units in
this contract from and against any and all claims for damages or injuries, including
death, to any and all persons or property, of whatsoever kind of character, whether real
or asserted, arising out of or incident to the services relating to the project to be
performed by said Contractor, its officers, agents, servants or employees, under the
terms and conditions of this Contract, whether or not caused by negligence on the part
of the City, or their officers, agents, servants or employees; and said Contractor does
hereby covenant and agree to assume all liability and responsibility of City for injuries,
claims or suits for damages to any and all persons or property, of whatsoever kind or
character, occurring during the term of this agreerr�ent and arising out or by reason of
service, covenants or agreements performed by said Contractor, its officers, agents,
servants or employees. Contractor likewise covenants and agrees to, and does hereby�
indemnify and hold harmless the City from and against any and all injuries or damages
to property of City during the performance of any of the terms and conditions of this
Contract, whether arising out of or in connection with or resulting from any and all acts or
omissions of the City, their of,ficers, agents, servants or employees, or caused by
negligence on the part of City of their officers, agents, servants, employees and/or
owners of the units and lots abutting the units in this Contract.
In the event a written claim for damages against the Contractor remains unsettled at the
^'� time all work on the project has been completed to the satisfaction of the Director,
,J Department of Engineering, as evidenced by a final inspection, final payment to the
Contractor shall not be recommended by the Director, Department of Engineering for a
�period of 30 days after the date of such final inspection, unless the Contractor shall
� submit written evidence satisfactory to the Director that the claim has been settled and a
release has been obtained from the claimant involved.
J
9811000 Specs_0899_DO.doc
6-7
�
�
J
�
�
�
�
Although the ciaim concerned remains unsettled as of the expiration of the above 30-day
period, the Contractor may be deemed to be entitled to a semi-final payment for work
completed, such semi-finai payment to be in an amount equal to the total dollar amount
due less the dollar value of any written claims pending against the Contractor arising out
of the performance of such work, and semi-final payment may then be recommended by
the Director.
The Director shall not recommend final payment to a Contractor against whom such a
claim for damages is outstanding for a period of six months following the date of the
acceptance for the work performed unless the Contractor submits evidence in writing
satisfactory to the Director that:
a.
L•'!
The claim has been settled and a release has been obtained from the claimant
involved, or
Good faith efforts have been made to settle such outstanding claims, and such
good faith efforts have failed.
If condition (a) above is met at any time within the six-month period, the Director shall
�recommend that the final payment to the Contractor be made. If condition (b) above is
' met at any time within the six-month period, the Director may recommend that the final
payment to the Contractor be made. At the expiration of the six-month period, the
� Director may recommend that final payment be made if all other work has been
performed and all other obligation of the Contractor have been met to the satisfaction of
the Director.
�
�
�
■J
�
�
!1
'
J
■l
The Director may, if he deems it appropriate, refuse to accept bids on other Department
of Engineering contract work from a Contractor against whom a claim for damages is
outstanding as a result of work performed under a City contract or under a developer-let
contract for City of Fort Worth street and/or storm drainage facilities.
28. TEST BORINGS: It shall be the responsibility of the bidder to make subsurface
investigations as he deems necessary to determine the nature of material to be
excavated. This item shall be considered as subsidiary to the other items of the contract.
29. QUALITY CONTROL TESTING:
a. The Contractor shall furnish, at its own expense, certifications by a private
laboratory for all materials proposed to be used on the project, including a mix
design for any asphaltic and/or . Portland cement. concrete to be used, and
gradation analysis for sand and crushed stone to be used along with the name of
the pit from which the material was taken. The Contractor shall provide
manufacturer's certifications for all manufactured items to be used in the project
and will bear any expense related thereto.
b. Tests of the design concrete mix shall be made by the Contractor's laboratory at
least nine days prior to the placing of concrete using the same aggregate,
cement and mortar which are to be used later in the concrete. The Contractor
shall provide a certified copy of the test results to the City.
c. Quality control testing of an in-place material on this project will be performed by
the City at its own expense. Any retesting required as a result of failure of the
material to meet project specifications will be at the expense of the Contractor
and will be billed at commercial rates as determined by the City. The failure of
the City to make any tests of materials shall in no way relieve the Contractor of
9811000 Specs 0899_DO.doc
.:
J
f��
�
�
�
� 30
�
its �esponsibility to furni�h materials and equipment conforming to the
requirements of the Contract.
d. Not less than 24 haurs notice shall be provided to the City by the Contractor for
operations requiring testing. The Contractor shall provide access and trench
safety system (if required) for the site to be tested, and any work effort involved is
deemed to be included in the unit price for the item being tested.
e. The Contractor shall provide a copy of the trip ticket for each Ioad of fill material
delivered to the jobsite. The ticket shall specify the name of the pit supply the fill
material.
FINlSHlNG EQUlPMENT FOR CONCRETE PAVEMENT: Shall be governed by
Specification ltem No. 314.3(8) and 314.5(8) with the modifications:
equipment. .
S1ip Form Construction: At the option of the Contractor and with the approval of the
Owner, concrete pavement may be constructed by the. use of slip form paving
� Slip form paving equipment shall be provided with traveling side forms of sufficient
dimensions, shape and strength so as to support the concrete laterally for a sufficient
length of time during placement to produce pavement of the require cross section. The
� equipment shall spread, consolidate, screed and float-finish the freshly placed concrete
in such a manner as to provide a dense and homogeneous pavement.
�
�
�
�
�
�
31.
The concrete for the full paving width shall be effectively consolidated by internaf
vibration with transverse vibrating units; or with a series of longitudinal vibrating units
loaded with the specified thickness of pavement secfton and a minimum distance ahead
of the screed equal to the pavement thickness.
When concrete is being placed adjacent to an existing pavement, that part of the
equipment which is supported on existing pavement shall be equipped with protective
pads on crawler tracks or rubber-tired wheels offset to run a sufficient distance from the
edge of the pavement to avoid breaking or cracking the pavement edge.
Final finishing for slip form pavement construction shall be to the tolerance as specified
in Section 314.5(8).
CUTTING OF CONCRETE: When existing concrete is cut, such cut shall be made with
a concrete saw. All sawing shall be subsidiary to the unit cost of the respective item.
32. SANITARY FACILITIES FOR WORKMEN: The Contractor shall provide all necessary
sanitary conveniences for the use of workmen at the project site. Specific attention is
directed to this requirement.
�
�
�
�
33. SUBSIDIARY WORK: Any and all work specifically governed by documentary
requirements for the project such as conditions imposed by the Plans, the General
Contract Documents or these Special Contract Documents, in which no specified item
for bid has been provided in the Proposal, shall be considered as a subsidiary item of
work, the cost of which shall be inc(uded in the price in the Proposal for each bid item.
Surface restoration, cleanup and relocation of mailboxes are general items of work
which fall in the category of subsidiary work.
34. LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor's
particular attention is directed to the requirements of Item 7, "Legal Relations and
Responsibilities to the Public" of the Standard Specifications.
9811000_Specs_0899_DO.doc 6-9
J
D35. CONSTRUCTION:
� a. NON-PAY ITEM NO. 1- CLEARING AND GRUBBING: All objectionable items
within the limits of this project and not otherwise provided for shall be removed
under this item in accordance with Standard Specification Item 102, "Clearing
� and Grubbing". However, no direct payment will be made for this item and it
shall be considered incidental to this contract.
b. NON-PAY ITEM NO. 2- SPRINKLING FOR DUST CONTROL: All applicable
� provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall
apply. However, no direct payment will be made for this item and it shall be
considered incidental to this contract.
�J
L�J
c. NON-PAY ITEM NO. 3- BARRICADES AND TRAFFIC CONTROL: Contractor
shall be responsible for providing barricades and traffic control as set forth in the
"1980 Texas Manual on Uniform Traffic Control Devices for Streets and
Highways" and per Standard Specification Item No. 524, "Barrier and Warning
an�t/or Detour Signs", Fort Worth Public 1Norks.
Q Payment for traffic control and traffic control devices shall be considered
subsidiary to work performed as stated in Standard Specification Item No. 524,
City of Fort Worth and no additional compensation will be allocated.
�
�
�
D
�
�
�
�
I�'
�
�
d. NON-PAY ITEM NO. 4- PROTECTION OF TREES. PLANTS. AND SOILS: All
property along and adjacent to the Contractor's operations including lawns,
yards, shrubs, trees, etc. shall be preserved or restored after completion of the
work to a condition equal or better than existed prior to start of work.
By ordinance, the contractor must obtain a permit from the City Forester before
any work (trimming, removal or root pruning) can be done on trees or shrubs
growing on public property including street rights-of-way and designated alleys.
This permit can be obtained by calling the Forestry Office at 871-5738. All tree
work shall be in compliance with pruning standards for Class II Pruning as
described by the National Arborist Association. A copy of these standards can
be provided by calling the above number. Any damage to public trees due to
negligence by the Contractor shall be assessed using the current formula for
Shade Tree Evaluation as defined by the International Society of Arboriculture.
Payment for negligent damage to public trees shall be made to the City of Fort
Worth and may be withheld from funds due to the Contractor by the City.
To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red
Oak trees shall be immediately sealed using a commercial pruning paint. This is
the only instance when pruning paint is recommended.
e. NON-PAY ITEM NO. 5- CONCRETE COLORED SURFACE: Concrete
wheelchair ramp surfaces, excluding the side slopes and curb, shall be colored
with LITHOCHROME color hardener or equal. A brick red color, a dry-shake
hardener manufactured by L.M. Scofield Company or equal, shall be used in
accordance with manufacturers instructions. Contractor shall provide a sample
concrete panel of one foot by one foot by three inches dimension, or other
dimension approved by the Engineer, meeting the aforementioned specifications.
The sample, upon approval of the Engineer, shall be the acceptable standard to
be applied for all construction covered in the scope of this Non-Pay Item. No
direct payment will be made for this item and it shall be considered incidental to
this contract.
9811000_Specs 0899_DO.doc
6-10
�
I
u
I�
�
J
�
�I
�
�
�
■1
The method of application shall be by screen, sifter, sieve, or other means in
order to provide for a uniform color distribution.
NON-PAY ITEM NO. 6- PROJECT CLEAN-UP: The Contractor shall be aware
that keeping the project site in a neat and orderly condition is considered an
integral part of the contracted work and as such shall be considered subsidiary to
the appropriate bid items. Clean up work shall be done as directed by the
Engineer as the work progresses or as needed. If, in the opinion of the Engineer
it is necessary, clean-up shall be done on a daily basis. Clean up work shall
incfude, but not be limited to:
Sweeping the street clean of dirt or debris
2.
3
Storing excess material in appropriate and organized manner
Keeping trash of any kind off of residents' property
I# the Engineer does not fee( that the jobsite has been kept in an or.derly
condition, on the next estimate payment (and all subsequent payments until
completed) of the appropriate bid item(s) will be reduced by 25%.
� Final cleanup work shall be done for this project as soon as the paving and curb
D and gutter has been constructed. No more than seven days shall elapse after
completion of construction before the roadway and right-of-way is cleaned up to
the satisfaction of the Engineer.
�
�
�
■J
��
�
�
�
�
�
g. NON-PAY ITEM NO. 7- PROJECT SCHEDULE: Contractor shall be
responsible for producing a project schedule at the pre-construction conference.
This schedule shall detail all phases of construction, including project clean up,
and allow the contractor to complete the work in the allotted time. Contractor will
not move on to the jobsite nor will work begin until said schedule has been
received and approval secured from the Construction Engineer. However,
contract time will start even if the project schedule has not been turned in.
Project schedule will be updated and resubmitted at the end of every estimating
period. All costs involved with producing and maintaining the project schedule
shall be considered subsidiary to this contract.
h. PAY ITEM NO. 1- MOBILIZATION: This item is to include all costs associates
with moving equipment, personnel, and material to the job site in order to
commence construction.
PAY ITEM NO. 2- UTILITY ADJUSTMENT: This item is included for the basic
purpose of establishing a contract price which will be comparable to the final cost
of making necessary adjustments required due to street improvements to water,
sanitary sewer and natural gas service lines and appurtenances where such
service lines and appurtenances are the property owner's responsibility to
maintain. An arbitrary figure has been placed in the PROPOSAL; however, this
does not guarantee any payment for utility adjustments, neither does it confine
utility adjustments to the amount shown in the PROPOSAL. It shall be the
Contractor's responsibility to provide the services of a licensed plumber to make
the utility adjustments determined necessary by the Engineer. No payment will
be made for utility adjustments except those adjustments determined necessary
by the Engineer. Should the Contractor damage service lines due to his
negligence, where such lines would not have required adjustment or repair other-
wise, the lines shall be repaired and adjusted by the Contractor at the
Contractor's expense. The payment to the Contractor for utility adjustments shall
9811000_Specs 0899 DO.doc
6-11
�
�
■1
sl
�
�
■f
J
J
�
�
'I
�
sJ
�
�
�
�
be the actual cost of the adjustments plus ten percent (10%) to cover the cost of
bond and overhead incurred by the Contractor in handling the utility adjustments.
PAY ITEM NO. 3- PROJECT DESIGNATION SIGN: The Contractor shall
construct and install one (1) Project Designation Sign for 8asswood Blvd. and it
will be the responsibility of the Contractor to maintain the sign in a presentable
condition at all times on each project under construction. Maintenance will
include painting and repairs as directed by the Engineer.
It will be the responsibility of the Contractor to have the individual project signs
lettered and painted in accordance with the enclosed detail.
The quality of the paint, painting, and lettering on the signs shall be approved by
the Engineer.
The height and arrangement of the lettering shall be in accordance with the
enclosed detail. .
The sign shall be constructed of 3/4" fir plywood, Grade A-C (exterior) or better.
These signs shall be installed on barricades or as directed by the Engineer.
The unit price bid per each will be full payment for materials including all labor,
equipment, tools, and incidentals necessary to complete and install the work.
k. PAY ITEM NO. 4- UNCLASSIFIED STREET EXCAVATION: This item shall
consist of all the required excavation within the limits of the right-of-way, the
street excavation will be made to the subgrade of the roadway and finished grade
of the parkway, without regard to materials encountered. The removal of existing
penetration or asphalt materials encountered. The removal of existing
penetration or asphalt pavement shall also be included under this item. This item
is governed by Fort Worth Standard Specification Item No. 106, "Unclassified
Street Excavation".
PAY ITEM NOS. 11 & 12 - 6" & 7" CONCRETE CURB: The Contractor may, at
his option, construct either integral or superimposed curb.
Standard Specification Item 502 shall apply except as herein modified.
Inteqral Curb - Integral curb shall be constructed along the edge of the
pavement as an integral part of the slab and of the same concrete as the
slab. The concrete for the curb shall be deposited not more than thirty
(30) minutes after the concrete in the slab.
2. Superimposed Curb - Concrete shall have a minimum compressive
strength of three thousand (3,000) pounds per square inch at twenty eight
(28} days. The quantity of mixing water shall not exceed seven (7) U.S.
gallons per sack (94 Ibs.) of Portland Cement. The s►ump of the concrete
shall not exceed three (3) inches. A minimum cement content of five (5)
sac4cs of cement per cubic yard of concrete is required.
m. PAY ITEM NO. 17 - TRENCH SAFETY:
�
9811000 Specs 0899 DO.doc
General: This specification covers the trench safety requirements for all
trench excavations exceeding a depth of five (5) feet in order to protect
workers from cave-ins. The requirements of this item govern all trenches
for mains, manholes, vaults, service lines and all other appurtenances.
6-12
-J
�
�
�
2. Standards: The latest version of the U.S. Department of Labor,
Occupational Safety and Heaith Administration Standards (OSHA), 29
CFR Part 1926, Subpart P-Excavations, are hereby made a part of this
specification and shall be the minimum governing requirements for trench
safety.
3. Definitions:
a) Trenches: A trench is referred to as a narrow excavation made
� below the surface of the ground in which the depth is greater than
the width, where the width measured at the bottom is not greater
than fifteen (15) feet.
�
�
J
I�
�J
J
,I
�
,I
�
�
b)
c)
Benching System: Benching means excavating the sides of a
trench to form one or a series of horizontal levels or steps, usually
with vertical or near-vertical surfaces between levels.
Sloping System: Sloping means excavating to form sides of a
trench that are inclined away from the excavation.
d) Shield System: Shields used in trenches are generally referred to
as "trench boxes" or "trench shields". Shield means a structure
that is able to withstand the forces imposed on it by a cave-in and
protect workers within the structure. Shields can be permanent
structures or can be designed to be portable and move along as
the work progresses. Shields can be either pre-manufactured or
job-built in accordance with OSHA standards.
e) Shoring System: Shoring means a structure such as a metal
hydraulic, mechanical or timber shoring system that supports the
sides of a trench and which is designed to prevent cave-ins.
Shoring system generally comprised of cross-branches, vertical
rails (uprights), horizontal rails (wales) and/or sheeting.
4. Measurement: Trench depth is the vertical measurement from the top of
the existing ground to the bottom of the pipe or structures. The quantity of
trench safety systems shall be based on the linear foot amount of trench
depth greater than five (5) feet.
5. Pavment: Payment shall be full compensation for safety system design,
labor, tools, materials, equipment and incidentals necessary for the
installation and removal of trench safety systems.
n. PAY ITEMS NO. 18 THROUGH 24 - INLETS OR MANHOLES: An alternate
method of construction for these items will be "Pre-cast" manholes or inlets. If the
Contractor desires to use this method, he must submit details for the construction
to the Public Works Department for review and approval.
The pre-cast construction must be equal to or superior in strength requirements
� for this item as set out in Item 444, "Manholes and Inlets", and said construction
shall be in compliance with all other requirements of Item 444 where applicable.
o. PAY ITEMS NO. 25 THROUGH 32 - R.C. - PIPE: This item shall be governed by
� Standard Specification Item No. 440, "Reinforced Concrete Culvert Pipe", with
the exception that it will not be acceptable to use a backhoe shovel to push the
�
9811000 Specs 0899 OO.doc
6-13
�
J
�
i
�
�
�
�
I
�
��
J
�
�
�
,I
■1
�
�
il
�
36.
�
After completion of construction and prior to final inspection, it shall be the
Contractor's responsibility to remove all debris from the storm drain system to
facilitate final inspection.
pipe home when making the joints on pipes 30" in diameter or larger. The pipe
shall be Class III, conforming to A.S.T.M. Designation C-76.
Reinforced concrete collars (per Detail S-SD16) shall be constructed at all
changes of pipe size, as indicated on the plans. This work shall be considered
subsidiary to the pipe items and no additional payment will be allocated.
PAY ITEM NO. 38 - ROCK RIPRAP: This pay item is for erosion control, riprap
shall be installed at locations indicated on the plans.
q. PAY ITEM NO. 48 - TOPSOIL: This item shall be governed by Item 116 of the
City of Fort Worth Standard Specifications for Construction. Locations of the top
soil shall be directed by the Engineer.
SAMPLES AND QUALITY CONTROL TESTING:
a. The Contractor shall furnish, at its own expense, certifications by a private
laboratory for all materials proposed to be used on the project, including a mix
design for any asphaltic and/or Portland cement concrete to be used, and
gradation analysis for sand and crushed stone to be used along with the name of
the pit from which the material was taken. The Contractor shall provide
manufacturer's certifications for all manufactured items to be used in the project
and will bear any expense related thereto.
b. Tests of the design concrete mix shall be made by the Contractor's laboratory at
least nine (9) days prior to the placing of concrete using the same aggregate,
cement and mortar which are to be used later in the concrete. The Contractor
shall provide a certified copy of the test results to the City.
c. Quality control testing of in-place material on this project will be performed by the
City at its own expense. Any retesting required as a result of failure of the
material to meet project specifications will be at the expense of the Contractor
and will be billed at commercial rates as determined by the City. The failure of
the City to make any tests of materials shall in no way relieve the Contractor of
its responsibility to furnish materials and equipment conforming to the
requirements of the contract. ,
d. Not less than 24 hours notice shall be provided to the City by the Contractor for
operations requiring testing. The Contractor shall provide access and trench
safety system (if required) for the site to be tested, and any work effort involved is
deemed to be included in the unit price for the item being tested.
e. The Contractor shall provide a copy of the trip ticket for each load of fill material
delivered to the job site. The ticket shall specify the name of the pit supplying the
fill material.
9811000 Specs_0899_DO.doc
6-14
�
� 7. SILlCONE JOlNT SEALING SPECIFICATIONS
�
D
Q 1.
�
D
2.
�
D3
�
�
D
D
CITY OF FORT WORTH
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
(Revision 1 - October 18, 1989)
(Revision 2 - May 12, 1994)
SCOPE
This specification for silicone joint sealing Portiand Cement Concrete pavement and
curbs shall supersede Item 314.2. (11) "Joint Sealing Materials" of STANDARD
SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF
FORT WORTH, and Item 2.2.10 "Joint Sealing" of STANDARD SPECIFICATIONS FOR
PUBLIC WORKS CONSTRUCTION - NORTH CENTRAL TEXAS COUNCIL OF
GOVERNMENTS. � �
DESCRIPTION
This specification for siticone joint sealing shall apply to, but shall not be limited to, all
Portland Cement Concrete street pavement and curbs.
MATERIALS
3.1 The silicone joint sealant shall meet Federal Specifications TT-S-001543A for
Class A sealants except as modified by the test requirements for the Class I,
Class II and Class III silicone joint sealants of this specification. Before the
installation of the joint sealants, the Contractor shall furnish the Engineer
certification by an independent testing laboratory that the silicone joint sealants
meet these requirements.
3.2 The manufacturer of the silicone joint sealant shall have a minimum two-year
demonstrated, documented successful field performance with Portland Cement
Concrete pavement silicone joint sealant systems. Verifiable documentation
shall be submitted to the Engineer. Acetic acid cure sealants shall not be
accepted. The silicone sealant shall be cold applied.
3.3 Self-Levelina Silicone Joint Sealant
D The joint sealant shall be Dow Corning 890-SL self-leveling silicone joint sealant
for asphalt as manufactured by Dow Corning Corporation, Midland, MI 48686-
0994, or an approved equal.
�
�
J
��
�
�
9B11000 5pecs_0899_DO.doc
7-,
'1
�
D
D
�.1
�
� , .
�
�
D
4
�
D
D
�
�
5.
�
J
��
Self-Leveling Silicone Joint Sealant for Asphait
Test Method As Supplied Test Requirement
... Non Volatile Content, % min. 96 to 99
MIL-S-8802
ASTM D 1475
..
..
..
Extrusion Rate, grams/minute
Specific Gravity
Skin-Over Time, minutes mad
Cure Time, days
Full Adhesion, days
227 to 550
1.260 to 1.340
60
14 to 21
14 to 21
1400
No Failure
600
As Cured - After 21 Days at 25°C (77°F) and 50% RH
ASTM D 412, Die C
ASTM C 719
ASTM D 3583..
(Sect. 14 Mod.)
Mod. Elongation, % min.
Movement, 10 cycles
@ + 100/-50%
Adhesion to Concrete,
% Elonqation min.
3.4 The joint filler stop shall be of a closed cell expanded polyethylene foam backer
rod and polyethylene bond breaker tape of sufficient size to provide a tight seal.
The back rod and breaker tape shall be installed in the saw cut joint to prevent
the joint sealant from flowing to the bottom of the joint. The backer rod and
breaker tape shall be compatible with the silicone joint sealant and no bond or
reaction shall occur between them. Reference is made to the "Construction
Detail" sheet for the various joint details with their respective dimensions.
TIME OF APPLICATION
On newly constructed Portland Cement Concrete pavement, the joints shall be initially
saw cut to the required depth with the proper joint spacing as shown on the
"Construction Detail" sheet or as directed by the Engineer within 12 hours of the
pavement placement. (Note that for the "dummy" joints, the initial 1/4 inch width "green"
saw cut and the "reservoir" saw cut are identical and should be part of the same saw
cutting operation. Immediately after the saw cutting pressure water washing shall be
applied to flush the concrete slurry from the freshly saw cut joints.) The pavement shall
be allowed to cure to a minimum of 7 days. Then the saw cuts for the joint sealant
reservoir shall be made, the joint cleaned, and the joint sealant installed. During the
application of the joint sealant, the weather shall not be inclement and the temperature
shall be 40°F (4°C) and rising. �
EQUIPMENT
5.1 All necessary equipment shall be furnished by the Contractor. The Contractor
shall keep his equipment in a satisfactory working condition and shall be
inspected by the Engineer prior to the beginning of the work. The minimum
requirements for construction equipment shall be as follows:
5.2 Concrete Saw: The sawing equipment shall be adequate in size and power to
complete the joint sawing to the required dimensions.
� 5.3 Hiqh Pressure Water Pump: The high pressure cold water pumping system shall
be capable of delivering a sufficient pressure and volume of water to thoroughly
flush the concrete slurry from the saw cut joint.
� 9811400 Specs 0899 DO.dac
7-2
�
�
�
D
�
D
�
6
D
D
D
a
D
D
�
D
D
�
LJ �
When the Contractor elects to saw the joint by the dry method, flushing the joint
with high pressure water may be deleted. The dust resulting from the sawing
shall be removed from the joint by using compressed air. (Paragraph Rev. 1-
October 18, 1989)
After complete drying, the joints shall be sandblasted. The nozzle shall be
attached to a mechanical aiming device so that the sand blast will be directed at
an angle of 45 degrees and at a distance of one to two inches from the face of
the joint. Both joint faces shall be sandblasted in separate, one directional
passes.
Upon the termination of the sandblasting, the joints shall be blown-out using
compressed air. The blow tube shall fit into the joints.
The blown joint shall be checked for residual dust or other contamination. If any
dust or contamination is found, the sandblasting and blowing shall be repeated
until the joint is cleaned. Solvents will not be permitted to remove stains and
contamination.
Immediately upon cleaning, the bond breaker and sealant shall be placed in the
joint. Open, cleaned joints shall not be left unsealed overnight.
D
9811000 Specs 0899_DO.doc
5.4 Air Compressors: The delivered compressed air shall have a pressure in excess
of 90 PSI and 120 CFM. There shaii be suitable traps for the removal of all free
water and oil from the compressed air. The blow tube shall fit into the saw cut
joint.
5.5
5.6
5.7
Extrusion Pump: The output shall be capable of supplying a sufficient volume of
sealant to the joint.
Iniection Tool: This mechanical device shall apply the sealant uniformly into the
joint.
Sandblaster: The design shall be for commercial use with air compressars as
specified in Paragraph 5.4.
5.8 Backer Rod Roller and Toolina Instrument: These devices shall be clean and
free of contamination. They shall be compatible with the joint depth and width
. requirements.
CONSTRUCTION METHODS
6.1 General: The joint reservoir saw cutting, cleaning, bond breaker installation, and
joint sealant placement shall be performed in a continuous sequence of
operations.
6.2 Sawinq Joints: The joints shall be saw cut to the width and depth as shown on
the "Construction Detail" sheet. The faces of the joints shall be uniform in width
and depth along the full length of the joint.
6.3 Cleaninq Joints: Immediately after sawing, the resulting concrete slurry shall be
completely removed from the joint and adjacent area by flushing with high
pressure water. The water flushing shall be done in one direction to prevent joint
contamination.
7-3
J
� 6.4 Bond Breaker Rod and Tape: The bond breaker rod and tape shali be installed
in the cleaned joint prior to the application of the joint sealant in a manner that
� will produce the required dimensions.
�.�
6.5 Joint Sealant: Upon placement of the bond breaker rod and tape, the joint
�sealant shall be applied using the mechanical injection tool. The joint sealant
j application shall not be permitted when the air and pavement temper�ture is less
than 40°F (4°C). Joints shall not be sealed unless they are clean and dry.
�Unsatisfactorily sealed joints shall be refilled. Excess sealant left on the
' pavement surface shall be removed and discarded and shall not be used to seal
the joints. The pavement surface shall present a clean final condition.
� Traffic shall not be allowed on the fresh sealant until it becomes tack free.
6.6 Approval of Joints: A representative of the sealant manufacturer shall be present
� at the job site at the beginning of the final cleaning and sealing of the joints. He
shall demonstrate to the Contractor and the Engineer the acceptable method for
sealant installation. The manufacturer's representative shall approve the clean,
� dry joints before the sealing operation commences.
7. WARRANTY
ii
�
� 8.
The Contractor shall provide the Engineer a manufacturer's written guarantee on all joint
sealing materials. The manufacturer shall agree to provide any replacement material
free of charge to the City. Also, the Contractor shall provide the Engineer a written
warranty on all sealed joints. The contractor shall agree to replace any failed joints at no
cost to the City. Both warranties shall be for one year after final acceptance of the
completed work by the Engineer.
BASIS OF PAYMENT
� Payment will be made at the Contract Bid Item unit price per linear foot (LF) as provided
in "MEASUREMENT" for "SILICONE JOINT SEALING", which price of shall be full
compensation for furnishing all materials and for all preparation, delivery, and application
of those sealing materials and for all labor, equipment, tools, and incidentals necessary
� to complete the silicone joint sealing in conformity with the plans and these
specifications.
�
�
�
��
�
� 9811000 Spea_0899_DO.doC 7-4
�
�
�
�
�
J
�
��
�I
�
�
�
�
�I
J
�
J
J
�
9811000_Specs 0899 DO.doc
i
PROJECT DESIGNATION SiGN
(Transportation & Public Works Department)
�
_ - U f_.__] U Cw.7 [�] � L---� �---� L---� L--� �---1 C"`] C.,._J U L--� U
[._j [: __) U
W
�
0
�
HOiC: AN4LE OF !l[lOSE lHALL �E COHITRUCTED
� FROII TH[ �OTT01r OK TNi 7!1SNCH.
a
a. '
� HOTC: THC �AFtCNCE Of tROUNDMfATCit 11COUIRES
d
a �PECtAt T11EAiltCHT.
G `
a
w •
aROUkD liN£ /
�� `�— %%% `�/�! =
1 . .
~ I ��
�
� [XCAYA71ON 0 ��cKr��� '
�
� r' I Tf�ENCN IAFETY fY�TC4+ �
j �` � rAY IT[►t
Y =
F' I '1
► .
u
Y 1lii0L[ Orr R[tOfi IILOUIR[D dY 7HE
V
Z tIPE CITY O► �ORT RORTH �tOTN ftDtfl.
u
.c ANY DLYIATIOM 11[tUL71t1� Ik A 1TC[tLR
r-
SLO�F YUST �C iU�MITTCO QY A
REOI1TCRi0 �fiOFEtf10MAL LN91M[iR,
���L� o� ���os� ��-��oo
���uR� x
�
�
�
D
Q
�
�
�
�
"�y
�
�
�
�
�
��
�
�
�r
�
1
�L5 • �
�'���o� 8�
. I 5� ► � !� �
Ye�s't�;�9e�s �
� /
v �
� �
� ,/
� •l
a
i
�
Sheet Ptliagn (Lpr:gh:s)
NOrc: AnyL�rial� in JiZin9o�lJ�c:�x,
ojmernbe�s f�om Iho,re /is�ed t�/ow m.�c/
be des�gntd o�submitlet� by a Regisl�^�:'
P/'OfCJS%O/7Q/ �inecr.
� / ���7rJ
s.,. ,� w:.� j r �.�
uo.<^�, su.�,., ' cleai ascn �
Oeatrd Ra�artavl.�an�lu.tn �__���_—_ ^.._��__� —���_�_����_���'�__ W+.w�uc�t
�n.r.r , Nam d u.ncn
Wr.vn Yr..�e.. W.�vw w..ns�+ �_�".__��_�����' _�__
�wrn faaR. �r. �rc.�
llorl l�.i c»S 1e11 37b:S 4nca ��r.a+u
MA IMt Iwt 1wt �t
fw�t irtr hrl MO�e� iwt r+c1�n rcht ►�Cfe MC�r� YW� f�el !rr
C1s�
Sb20 Nfi�torcanAtaa...... 7i� w.��y, 1�57 � ��17i�A le7 �.ID 10�10 � i
TRENCH SHORIN�,SHEE i ING, aND BRAC lNG METHO�
FlGURE Z
Addendun 3 34Gc
�, �s
b �4�im`�� 4�r�
' 5���,G
���y�t�kats �
8-2
[.:r.] [:�:] U �i � L� �! Q i� G�3 � � C! C� C� G� C� C� �3
W
.�
�
>
�
a
�o
0
a
c
a
w
�
W
l� i7�-6�� -- ----�-- �L-�--------
�
I, _ i2�-6�� ^ � ^ /7�-6�� _ i-9��
�
I _ � � — I .- - ±� �� - � ,a. � --- ��� � -`,
- _� -„�----
- ��._, -- l�'�
� I � + �� � � � ------�-� , , ,
� _i___--. � ',
�--c�--� � � _ .. _ ._ .. -- - — - --
I I
�— — • �nn ��_
�' � Wooden Pos/ --S ~
�
� �
N0� /O SCa/0
NOTE Tnls ro+�e A�ar�ng os C- 2J/6
RFV 10-?.0- 87
- - — -- h -- - -- � ��
,� , I � Nboden Pos�
�,-n•�- - -Tr�-
-- �av�r--
f T•, 1 A(.n Om �
�, 1 �
�Q I� One 5/B��Boli �
� _ b, . s�'� s�a" o 0
�) � wt7sner - Ue"♦
� �' �� Nole in POsl (M�n J
�b
� .m I I
h i , I I ,
c � � � ..,�.
LI " i 1
d �_c�
. ' d �' i
� � NOT£' End Pos! sAolJ be 8�� O�a
i
I__� /n��rmed�o�t Pnsl o�e 7��D+o
Posr sFcr�oN
STEEL GUAR� RA/L
I CITY OF FORT WORTH, TEXAS-CONSTRUC7ION STANDARO
IO�o+�nq No S-MS I[1n�e Jon 1969
A --1
i
L
S� T1► �,
--�1
t2' • 6��RYF) i 3� X 3" X�/4" EARS
�• E. � wEL0E0 EEFORE
� AT E04R0 JOINTS /
�������� ��•'�, �a� �
�2�XQ��E0�11D5 TYPICALREF.
�EFLECTrvE aED S REF�ECTIVE WMITE
3'M NIGH IMTENSITY AEFLECT�VC
SHEETING OR �CV110VED EOU�L. —
REF, ,
� ' I � '
I• I• �//
`�tr,..� 1� .�.,�u�... ,�� � ��q�.�.._�.� , ..y�,Jl,y�Mi �,,�;,,W;•"/
' Y 1
i � � �
� � I �
�J �_I
A
�A �
~�SCA7tF �1 45�
,��/S�CaL���1�Z[D CA1IRI�GE �OLT TYP.
��7� x y X V<' �kGIE
I
20��TYP,
� y I—
�
IS��
�SAIAE �
/ 6'� MiN.
l
.
i �
i i
t I
I �
i �
i �
t. . J
NOTE� I. SaR111CADE SMA�L
CONFORY TO TEXA$ YUTCD.
2.STEEI GU�RD RA�L SN.4LL
cONFO�� 70 STD. OwC. S•w�.
J.LEMGTH SHALL CE GivEN
ON PL�MS, EVT ONL� •S
wu�Ti►�E 0: 12'-6;P£R NO'TE S
4.YERTICAL SUPAORT� MAY �£
OF �pUAI AlTER11ATE DES16H
AVPROVED s7THE EM61N'fER.
S.LEnGTN $HA�� BE �T LE�.ST
H.AIP Of iTREE7 •WIDTN ANG
HOT YGRE TNaN THE MULTtPLE
Cf 12'-6 "REOUIREO TO CENTER
BARRICADE QfJ STREE T �.
SECTION A-A DEAD END BARRICADE
CITY of FORT WORTH,TEXIS-CONSTRUCTION STANDARD
iritu REViSEf: 9/t7.�H7 r.a.n./w.R.�. ' DRAWITJG N0. S-M12 I DATE� MARC!1 1983
354e Addendua 3
8-4
U U U U U U U U U U U U L� U U U U L� LJ'
- .� -, .. ._..._ .. _.-.. ,....-,-...� ,...-...-,... , -.....:_-. _..,...s�� . . � .� . . - -�----
�
��
� �O �
NO SCA�E
�
cn
>
0.
0.
�
5
a
�
�
u
m
m
�F APPAOVEO BY ENGtNEER
SLiPFORM CURS 9 GUTTER
MAY RfPLACE TNE�E 8 TNE
FONNS �OR REiNiOpCED
CCNCRETE PAVE�IENT,1viTH
ADDITIOHAL r4X36�AT24��
OC, ACROS$ COHSTRUCT�ON
JOIHT.
�
�
�
I �/<.• � 6.• 6••
,.-
�1/B� SIOPE I �1/z" R -
� 2 � 7 ��.d.: ' —_ /�^
r-THIS 14R MUST BEiA��CEO AT TME TILIE
';� :�"� THE WVING SE .�10N $L48 15 POUREO
T" 3..R .:. � F� � • /�
�' COLD �
�� '• ►. �.! JOINT m =
, � _ '!:'}.� : . �y '� �2,. PAY LIi�T \
//�
• � /'/ .
�
L
�a
NO. � 84R5 4T 2�'0� C-C �
Z 1'2\��
� L'T— -
- SiaBiUZEO Su8GHq0E ��
,�_�N �`�': ;�i
=u � � � �., �,'.,, �,
SUPERIMPOSED CURB
I �/4" _5•' 6 �.
1/B�� SIOPE� ,-� t/2� R I
T___ _ ���
1 .-: ., :....� � _;,
� ��► • ��� - �,
�" 3..q ::.; ' �� -
! PAY . —
�;'IIMI ►. c /"
��"'{•,%; � �
__. __ ��� `
� ,,,%
N0, 3 BARS AT Z'- p C-� � �2 VZ' �
•` n �--- // I
.e. � -
`s `�� STqBILIZED 9U8GRq0Ep.p- � _ {I�!�
`' I LL�
�1�1�r�� ���
MONOLITHIC CURB
ATTACHED CUf�DS
CITY Of FORT WORTH,TEXAS-CONSTRUCTION STANDAR�
ORAWING N0. 5-S 12 . I U4TE � OCT. 1972
� r.� o� o 0 0 0 0 0 0 0 0 0� o o c� o
W
V
W
A
� C.t. COVER
�Ix� a tov[11 To r—�������^"'� �""�—� '�
t[ COM�TlIUCT(0 � �' _��__�_^^_�___ ; __�..�..����^�_�_ _�
OV[�t OVTL[T � � i ; I
r -_-.___--_ - �►._._. r
+� ---------- --L-Y-------- -- --- --~i
.� ...___�_^_____��___�__.._�__..�__�_.._..__�_. .
i ---5 IA" DEPRESSEO +¢
�' �S A "�/
PLAN
(, a'-o" zo'-e"
_ �_ j i .�
�
, 1—�----r � � i
..
•z
�
.l
5�—O" �+
� �
T� 6�'� �
SP£C/.IL ' NOTF
IE" A
ONE DOUtiLE 10� INLET SHALL CONSIST �-FACE CURB ��
'- �'•� � �' NO SCAL F
OF Tw0 $TANDARD 10� REINFORCED CONC. '.::',',•',•. ., . �r•
IN�CTS COHSTRUCTEO TOGETHER AS A .:�.: '-:I
S�HGLE UNlT WITF{ T►iE AOJACENT ENDS= �� � a"� ' �
pF THE Tw0 1NLET5 REAIOVED ANp �o+ .°��.��_ �
JOINED TOGETHER SO AS TO FOR1A A , µ s �AR� �t •' c-c •
� .
G�NTINOUS OOX IH(.ET iiAVINCi A ZO�'-8�� '�.' �_; M� �A1tt Af �' C-C ( IN C[NTC11 YALI O� DOfl�l[ 10� INLQi OMLY )
LENGTII OPENING. PROVtDE AN 8�� :
CEHTER WALL AS SNOWN IN SECTIOH '�� , Z._O.�.b. • TN�tK r�LL Ai t[MiiA 0► oou�li lo' iML[i
A- A. S££ ORAIY/NG ND. S— SO 7 fOR v,,.---;--�:
FlNrSHfO tNLfT U£TA/LS •` Q'�" "4�• ��'� .
SECTION A--A; .
0�►AENSION ��A� SHALL MATCN THE GUTTER
DIIdENS�ON IN USE ON THE PROJEC7 � qN0
WILL OE EITHER 1 S� OR 2.0�
, F , -. �. � . . �, , � � . I r I
a
RECESSED DOUBLE i�' INLET
�C17Y of FORT WORTH�TEXAS-CONSTRUCTION STANDARD
DRAWING N�. 5—SD 4 I OATE= JArt. �969
1tLYISCD JN( �tl�
r � � � � � ~ I � ' � I
� ' .
0
w- •-- --�
C� [=7 � C� O 0 �3 � O O O 0 0 O 0 C� � � �
___,_, _-._ _...�_ ___._� . _..__ ,�..._.._. . --_ _ , _ - -- - � - . ..
�
� _ w�zr
a'- o" r_ I_ w ` r , 4'— o" _
� I �/Toolsd Edyis
4 � , ,:: ..:::;; .b
�� -k--� ..... . ' � . _J'
b# , �3•• Fi!/er in 'Oy�nin�
�
�
>
a
a
ry
n
a
C
p
w
w
�
A
3�-O" '#4 Bors /B'�c-i
4-
w t zr I
T W - Openin9 _ I �
I l >. J�I
�' ~ .� � �k�l
��/ A ��
�-irowe/ finish ��_ �t �,
�'ontfiucli0n ✓Oinl
a/ Coinars
SEC710N A—A
� o/ IB c-c -x�=.c -.
eo�n Worr ti �
A + o
3 �
- -3 -
I
'~i
rnoleJ Fdyes `
C./. Corir
� 4 8ors o� 6�� t- t EatA Way
GENERAL NOTES � � .
/ Mo/srio/ pnd Wor,tmonJhip SAoI/ Con/oim Wi/A
TAs Rsqviremsnlf 01 Fp// fYoilA Slandaid 1 N L E T JC � Z E T W
Specrlrco�rons (o� Srondord Cancre�e MonAol�s.
2. Loysrs ol Rein/o�cod S�isJ Nrores� fAe /n�irioi 2� SOUARE 7�� 2�-O��
anA E.�/eiioi Sui/otes Sho// Nove A Covar ol 4' SOUARE 7" 4'- O��
2�� �o rAi Csn�sr of Bors, Unless OrAe�w,s� —•
No�ed. 5' SOUARE 8�� 5�- 0��
J E.�coro/ion /o� MonAo/a /o Ga /nc/udes in �ha 6� SOUARE 9�� 6�- O�
Uni� P�;te B�d �far Manhola. 7� SOUARE 9�� T�-O��
* Fvr Da�oi/s o/ Rsinloicing ol Lowsi Por/ions a/ 8' SQUARE 9� 8�-O�
/n/s1 See AppioD��O/e Squore Monho/e �e/oi/s �
.5. OiD�A o/ Orop /n/eI from FinisheJ Giade /o For L ow�r Poi/ion o/ ?� Spuois Orop
F/o� Lins o/ /n/sI is Voriab/s. Apy�or�mo�e lnle� Uss Aein/ S�ee! Deroils oI 4� Spuors
D�p;A Wil/ Ba Shown on P/ans o� Loco��on MonAo/e ond E/�m.no�e /n/ei Riny ond
o/ In/e�. Cove�. �
6 A!! S�nndord Drop /n/a�s SAo/J Nova Dne
Openinp o� £o�n s;da ���sss s�o�� o� P�o�s STANDARD DROP INLET
7 OecA .tby Be Rsin/oiced Some As 4� Sv�i� �/aMok /See
Lk/ai/No. S-SD �) � CITY of FORT WOR7H, TEXAS-CONSTRUCTION STANDARD
8. // OEPTN Orir ��-O�� A1 MonAa/e, S/tp� .�o/I �e
Con:lrucl�d Pr� OMp. No. S-SO T. DRawiNG NO 5-SD 5 I DaTE� DEC i969
REV/SED 9/28/B7 J.A,N./W.R.M. Rtv�seo �uNc �979
U [.� CJ �7 C7 0 C7 C] C3 C3 0 � O C) C� C� � 0 0
- _ - - • � ,._.:.�.�... . :_....�. . -ti ...-_-- , . . __. _ . _ .. _ . _ -- ._.
. . . �
.--.-�_i
�-0�
�' �
!� � J
jd �;�
i
_ �
�o f�
' � 4� �
• +
..
••
f a�f �
'� �W li ��LICM YY�
��OdcCO [�CM [YO
PLAH
• �•� t0•1 00�[il �AOUwO ��
To ww �c. ro to. ��u
CIT1 �itMOMOI�YK �1q CO'/(11 ►Iy�W R/1/Kf �
1:/ YWRM--�
p/ W Yd1[ CR/�K! I �
t 1ti va�uKo r��ca
)' pa We� / �� �iq
♦1 �' l� rat
....,.�..,..,.� �_� �,.T,: Jl
C1.�Y1 MM ���CK Y�}
.... �
.....,.,: �.��...
NOM[D (�CN (h0
..,, � � �, , , :.�, �
+� ���� �1 n' • W�� �t Y
OUT]�0! I�Ct 1�40( f�Cf
4Uti O !� �
• � ���� �T 1�� •4{�11��i 1!�
ourua ncc - uou r.c[
,..- _�_--`.T I t
I
NOTE• OEPTN ��D �� SNALL BE SHOwN I""—
_ _ _�
ON STOR.N DHA1N PLAN ond —
PROF/GE SN£ETS
L'�I�i'+r :.� iii vxm I ��/ ��i""" 3
�a a .,.. �' � �i :
.p �. ,i� .
�� . ;. .
� Y� —_ _'_ Kort�roWrxi
T �Tttl wt�
� � �� IM�M
� ` / •�
d I 7� ■[� � / L
a
� '---f= • se�a •1 i�. e CACH YrAY
tl
W SECTION B-8
Q� Y � -��llf �T � C-C
W ta l�[� oi KS�rur
O� REVISCO 9/j0/aT J.A.N./W.R.M.
NOl /0 .it0/I
�
�� ���1 �i � [ACM ��l
: 1� �
� r-o SECTION A-A
- ��� � �i
� '
TYPICAL CORNER � I �
pETA1L -
PLAN VIEW :��� ��
r � j ��TTPICAL
_f._—_.. =^�
� - --
_I
=-�r--- - —'—�
•. oo+cu �r u•.«
i' 1 Y{pM0 [RC[R MI
'—"� raY OI hK.
MOiC'�laL IFY[�t d
Y/MMOI� �/ MiO�C�T[O
O� �l�M-MWII[ NK[T
STANDARD 4' S�JUARE MANHOLE
CITY of FORT WORTH,TEXAS-CONSTRUCTION STAf�10ApD
DRAWING NU. S— SD 7 I DAT E� DEC• 1969
11[V1�[D �AM.1f�3
U U G� �7 [� 0 Cl �] CI C� �] C. -1 L� L� �7 O � G� �1
�•
W
�
�
—r�-
� �
� I _
a
�
� —' � "_
i1. _. .
G i �n �
w ,\
'o �
�
i
1
�
'�=•= . ---
i - o-
� � �
�
�a�f f
—� � a.es �i �' ncw .�r
�oo+(o (.cM cwo
M�] I
�„ ��wf �1 �' / �CM ���
� 00w[D L�CH lw0 "__ �
�\R� C // =1111 C
•s ���f �f ��'Y • 4�i �T N�
OUI�ID[ /�Cf IM7�DL /�CC
�..� o f -
. •.ei 1t u• u�f �
OUi�lp( /�C(.� ��Y�1 �1 f
tMfqe /�C[
�`•- ' � _ -- '_ -_=✓
_ i ::�:_:.__ v
i I
NOT£� O£PTH ��D �� SNALL BE • f �__j -_ �
SNOWN ON STORM ORA/N = .;_}=' �. � _' - _ - "- •-�
PG AN ond PROF/L E SNE£TS •� -
!• ti0:� OO�CI] �1101NW II�MO
t0 0 M�C� 101V 1L�� �
C�Ti fiwo�ro nuK �M [ov[• � � ��r�na a��r�CC ' 7
i e rui.� - �
OM[ W YM( COu��[f
j {y v1S111I1CD M�C•
[t pA .
�uf t!'l���7
� �( � i �CM M�I
4��t I �� ��M �f � •aM C �� ���7 �T r
� R[bI. K�fiK
t�Mu..�p� c srtn vt�nc�� ��wf
♦� �i'il� •rw[•o v7fOf Y�i K �tY�s �r �
lf�yo[�[D ' M
t01 p I�K�_'_ ��Y����
u• �� I ��i i
�� f ' �w� 'Q
^� � �101(� i0 W�1M • `
� .'��'-"--- !iL[t T�Ow[l y
1 � � [[1 -- \ /IM��M / �
� jI.
� ' _._ .._
-�1-�
•f �us at i e. EACM MAY
3ECTION 8-8
011 � 1 �aRt AT �' C-C M LNU
a atr...r
ItiVIfCD 10/01/O7 J.A.N./W.R.I.f.
�;�i. .. .• . .� . . �
�! �111! �T � [K+� ���� i " � � DO��t7 �f N�1ll
� �� SECTION A-A i-= -i �;°"'0 """'"
a rv[
� -o wor� ��wt ..yteT a
Y�Mnq[ �� IFO�C�I(0
.. - - Ow Ku-MqIKt M[i.
� �� •.�5. _—_ ��.
TYPICAL COF� I
OETAIL �.
PLAN VIE1Y �' � ��
— �-- 2'/t TYPICAL
NO/ /O SCO/I
STANDARD 5' SQUARE MANNOLE �
I CITY of FORT WORTN, TEXAS -CONSTRUCTION STANOARO ;
� DRAWIHO NO S-SD 9` I 0/+TE� JAN. 1969
ncrl�[o� ��e. i���
� PLAN
0 0 � � � o � � �
w
J
tp
S
c
9
L:
�
O
�
�"' ' _
N�NMOtI .TCH
IN In�1 r ll
_ PLAN . : .
� MANHOLE TYPE
; I 2 . 3 4 5 6 7
PIPE DIA. 18'to24�� 27'1033��36"to42` 48"to54' 60�1066" 72�Io79' 8��10�6�
A 4'-5�/2 A'-II�'8�� 5�-55/g�.6�-13/q i 6�-97/g 7=6" 8�-6�/g
B 3�-3�/�g � 3�-93/8 ���-3�16 4'-�i�/2 5�-75/g 6'-33I4 7�_'g��8
C2�-5"'i 2�-8� 2�-I1" � 3�-3' 3'-7' 3�-I1� 4'-S�/g
[� i� E� �3 �1 o O o o�!
Q µ --{I
_ . .� I
� ^ _ (
__.-1 ]lCri TO �—_______��
. o�.��.
r---' - d
�C � I W p
i n.c
O W
- 4
--Y— � —a — l
��f-�9 �u] Nf
o[M�MO �! S O�M
CIT♦ �iu�pa�0 M�MWI[
l��Y( r0 CMf11
�—I141tr�[D lTKtf 7��Q
��y( 2 a� rW[ CRw][f /YdRall COVC■
-- _ _pi� 1�S V�I��/I(D MiCR
? � !-��k0�•� W��
— ' ` . . � ^ . ., . �110IM0 11�MY t0
�� �w0 s�KM �o to►
K Sl��
�! •\��! •�t •�� C _ L �• y
l.C� r�f � 2/2 � �
' �� TYPICAL � c�.+..�a� �nn
� i2' 4c
7 ouaona��� �an7 � �I��wt0�2'C•C
o.�� �,.�,.�.��..« � L���.. �.s�K S.E�
X 1T !F USFO1
�^ �� /
� � M�MO�C�NY TtnC�a
� I \ ��� w.«a:
wj /. . \ c=n •� u�` .r �i ve�r
.r, ,+, I c a w .•
' � j !� u�� �� a woe�t-
� 3 j ' �.�M ...
�jt
:
A �F w�� .c�cNr �s
� � � ~OVEM 6+ USE ST([l
y � At(` RE6aR 5►�CEpi
^ '� ��q 1
� m i
fTa� siw[ i
--- \( S� � rno+tt — � ,� •
.' � \ \ `�/
- ' � — —' ---�-
.�_ �-:. �, --�
y 'e e�+s �i �i t-t�%'' la'r�e�rw
� (.cH ...
SEC1`ION A—A
0� �► ���RS ♦T � C-C M L�CU Oi KCT11�T
NO'f£� THE 2�-9� d►tEN�lOfl SHALL tH f.LL
CA3ES BE THE CONTROI OtwtE►iS�ON
AND AHY DEVIATIOH IN OTHER DIMEN-
S10H] ENGOUHTER'EO IN THE F�EID
SNALL BE AOJUSTEO 8Y THE EN-
G� NEE R. �
MANHOLE DETAIL TYPES I thru 7
D 3�-O" � 3�-10�/2 . 4�- 9� �S�-I I� 7'- I� 8'- 3' IO'-0` '
� CITY o( FORi WORTH, TEXAS-CONSTRUC710N STANOARD
E 4� - 2 � 5� - I� , 5�-I I�/q , 7�- I�/y� 8�- 3�/� 9�-5�/q' I1�-2�/4 OR�wiNG u0 5- SO i0- -----r OAiE --- t+6v t9G9 ^- ----
RF.vISEO �0/i/ti7 JnN/w.R.M. Hcv�sro. �an. isse
�
�
D�
D
�
�
��
D ��
a.
D ��
D
�
.�
D'
�
� '
�
.�
D�
�
r
D�
D �"
�
4
1
1
U
D
�
� '
� 9 _I 9 `3�
GONCRETE SHALL BE CLASS A
� PER SPECIFiCAT10NS ITEM 406 �3 BARS �
CONCRETE FOR STRUCTURES �8 ac80TH WAYS
SYM.
o �
� � CONCRETE
W W (5-SACK)
� N �
i
�
�
43 84R
3 3 RiPRAP TQ 8E FQRMED ON
I a UNDISTUR8E0 SOIL CUT TO GRADE.
IF 70 BE PLACEO ON FtLL, 1�L
FILL SHALL 8E PLACED ON
L, BENCHES CU7 1N UNDIS7UR8ED
SOIL ANO FII.LED IN 8' LOOSE
� LIFTS, EACH COMPAGTED TO 95%
¢ STD. PROCTOR DENSITY. THE FILL
. CONSTRUCTION ,. 3 L@AR Q . SO COMPACTED SHAL� THEN BE
18�o-c CUT TO GRADE.
JO�NT
I TYPICAL TRANSVERSE SECTION
( SEE 80TH FOR COMPLETE DETAIL)
TRANSVERSE EXPANSION JDINTS ARE REQUIRED 100� ON CENTERS OR
LESS; SA�IE SHALL INCLUOE 3/4�� REDWOOD COA4PLETELY COYERIlIG
TNE JOIN7 FACES (EXCEPT 3/4�� EDGE RELIEF FOR SEALING COMPOUNO)
AND 24" k8 STAOOTH DO`lVELS ON 18�� CENTERS COATED 16�� AND CAPPED
WITH I—V4" MiN. CLEARANCE ON ONE ENfl AND WfTH 12�� SPAN DOWEL
SUPPORT ANO HOT POURED RU88ER TYPE SEALt�I� COlAPOUlJD 3!4" THICiC
��
,�.
,
� � 20 c-c 2" SCH 40 SI.OPE UNLESS � '�/'a
.
SYM. PV.C. CUT FI.USN � OTHERWISE �
AS SHOWN 2 �(i\11�1U✓/11���,�����
� 1 ` I �r�r /'
i����� fi� MINIMUM
�
.25
��
� 4
.25%FT
...__ ,
fi �MIN �
�
�I BOTTOM WIOTH
AS SPECIFIED
2 �ii f
CUTOFF .PROJECTtON n'`�r�y�
, ,� .
t AS REOUfRED FOR i SQ FT.
f' ' �_� T_ �� ( I CU. FT. PER FT. ,CONTINUOUS)
�n4 f �2" FOR 2:I SIDE S�QPE )
- - �I((l�f,.li( / ��`\
����«� ��r���r' ! WASHED RocK
�2, S! CU. FT. PER FT. )
W4SHED ROCK TO BE COVERED W4TH STAKEO BURtAP
OR OTHER SUITABLE MEANS,APPROvED BY THE
ENGtNEER, TQ HOIQ lN PLACE WHiLE CONGRE7E !S
I BEING PI.ACEO
TYPICAL TRANSVERSE SECTION
(SEE BOTH FOR COMPLETE DE7AIL )
REiNFORCED CONCRETE RIPRAP
sca�� i�2" : i' � CITY OF FORT WORTH CONSTRUCTION STA'NDARD
W.RH. REVISEO 2-81
w.R.M � DRAWING N0. S-SD 20 � DATE � II— 80
Addendura 1 389e
8-� 1
U [.� � [..+J L.=�i [� � L� C7 � 0 t� .,�� C-3 �] G� C� C.�.J f�
�'
.
White Stripe 1/2�� From Outsfde Edqe
AU The Woy Around Trionqle(5hipe V4�Vfidt)
(Red Bockpround With Whi1e Letttrs) —�y�
5��
, �, - --- - � UNIT I�
�
� ,�, $ 310,383.37
� �
-� , A ��-o�� _ ��-o�
! : � �ALES T X � -
°�� h��� AN D �
,,
N �N� ����— BOND FUNDS
��
, .� EN �-� R-
� � � //
�; (Blue Bockprand Vlth Whi1e Letters) � /
� � I /
�� .
"T • .
� - -
0
� . p � , (Wh�te 8ackqrounC With
-- 81ue Lettersl
-f • • ' J
r `
i ',--�- ,- _
=�� �N �;iTY OF FORT �1l��RTH
; •�
i �+ .
I —5`�
� _ Q,_o.,
�
N
�� �
� ��
� � - �
� -� '
� x ,
�c �
I�-0�� I �c• I
, �
PUBL1 C �- '
W�RK� `N i
o:
,;
"a�
. �
?� �
�
�
(B�e Bockprou�d With
White Leitars)
� CONTRACTOR--�-
PHONE NUMBER-�
�
�
Type `A�
DETAILS 4� PROJECT DESIGNATION SIGN
CITY OF (=ORT WORTH, TEXAS
LYawn �y�C.F.S. Dota�10•18-6£3 PREPAREO BY: PUBUC WORKS DEPAR7MENT FILF=C-2�1p7 c
�
I�J
�
�
D
�
�
��
�
�
�
�
�
�J
�
�
��
�M
�
Q--�r � �` _--- 5..
� :� �_�o_�`_ e��� __ � ___ -1
� —g---� �; �+ ~
2�z 2�� x V4�� Anat� lron Cmtirx�a,s V2�� Carriade Eolts �
3� -0"
I ,
� • SEE ATTACHED SHEET FOR GETAILS
'� OF LETTERING
�/8�� x 3�� Slots Top md Bdtom Mqlas
__. _ ... ,.�..__ �..�,.._.�.�..��.
_T � ______ - . . ___J ,
�2�x2��zi/4��Anpk Iro� Contirwous---
. � 2„ . A -+�: . Z:J �.
� e'-o" _
ELEVATION 8'x4� SIGN
� iCA�E V2��!'-O'
� �.
�
�
' v2" aa�ts `/ 2'z2��: �f�; anQ�e
� � '7- Iron� 3 �c+�p
` � ~ =L V
� I'-6�� � �\
-o � � ' Y
-�, SEE ATTACHED S�iEET FOR V 1
dETA�LS Of LETTERING �,
V '
1 a' _�„ j ,U .
. �� /
v
• ELEVATION 4� x 2� SIGN 3/a" PtYw000s V
supporis by o"�ers
s�� ��Z-.r-o- N
i/z" sons _
��
� � - ,.
N
� V"
SECTION A-A
3ULE 3 •��•0�
DETAILS OF PROJECT DESIGNATION SIGN
CITY OF FORT WORTH TEXAS
Drnwn By � C.F.S. Dote� 10-18-6A PREPARED BY•PU�LIC WORKS DEPARTMENT FILE� C-2487a
404
8-13
�
D
D �� �
�
D .�
�
�
i
D �� �
. ,
U � �
� '
D t ��
;
: ,
D�
i •
U r
�
L! �
� ;
�.J .
�
D`
;
:�
D�
� �.
�,
�-
� ,
� 1
PROJECT DESIGNATI(kl-SIGNS
1. The size of the larger rectangular signs shall be 4' - 0" x 8' - 0".
The base length of the triangular naxieplate €or the-3arge�r signs shall
be 3' - 0" with a height of 2' - 0".
The size of the smaller rectangular s�igns shall be 2' - 0" x 4' - 0".
The base length of the triangular nameplate for the-smaller•signs
shall be 1` - 6" with a height of 1' - 0".
2. The approximate height of the lettering on the rectangular signs
shall be as follcws: �
4' - 0" x 8' • 0" Signs: OUR - 7 1/2"
SALES TAX ANO BOND FUNDS IN - 2 3/4"
ACTION - 10 1/2"
CITY OF FORT WORTN - 2 1/4"
PUBLIC 410R1(S - 2 3/4"
CONTRAC70R-PHONE NUMSER -•1 1/2"
2' - 0" x 4' - 0" Signs: OUR - 3"
SALES TAX AND BOND FUNDS IN - 2"
acriox - s°
CITY OF FORT WORTN - 1 3/4"
PUBLIC NORKS - 1 3/4"
CONiRACTOR - PHONE•NUMBER•-•1 1/4"
3. The approximate height of the lettering•on the•triangular sign
attachments shall be as follows:
3' - 0" base - 2' - 0" height: LONG AYE. UNIT 12 - 2�3/4"
Signs $310,383.37 - 1 lj2"
1' - 6" base - 1' - 0" height: LONG AYE. UNIT 12 - 1 3/4"
Signs S310,383.37 - 1 1/4"
Addendum I 405
8-14
�
J
�
J
�
iJ
D
9. VENDOR COMPLIANCE TO STATE LAW
The 1985 Session of the Texas Legisiature passed House Biii 620 relative to the award of
contracts to non-resident bidders. The law that, in order to be awarded a contract as low bidder,
non-resident bidders (out-of-state contractors whose corporate offices or principal place of
business are outside of the state of Texas) bid projects for construction, improvements, supplies
or services in Texas at an mount lower than the lowest Texas resident bidder by the same
amount that a Texas resident bidder would be required to underbid a non-resident bidder in
order to obtain a comparable contract in the state in which the non-resident's principle place of
business is located. The appropriate blanks in Section A must be filled out by all out-of-state or
non-resident bidders in order for your bid to meet specifications. The failure of out-of-state or
non-resident contractors to do so will automatically disqualify that bidder. Resident bidders
must check the box in Section B.
A. Non-resident vendors in (give state), our principal place of business, are
required to be � percent lower than resident bidders by state law. A
copy of the statute is attached.
DB
Non resident vendors in (give state), or principal place of business, are
not required to underbid resident bidders.
Our principal place of business or corporate offices are in the State of Texas. �
� BIDDER:
J
D
�val � (1 �!-cc�.va-t�nc�
Company
20 ► �� Z�" �-ree.-�-
i�p . gy; ��. � 1 �c�l I
(please print)
�°- ��
Signature:
� -�"or� l�lor-►-h �l �(�ID(� Title: �reSid e►�I�
City State Zip (please print)
U THIS FORM MUST BE RETURNED WITH YOUR QUOTATION
�
�
�
�
�
9811000_Specs_0899 DO.doc
�
�
�
D11. EQUIPMENT SCHEDULE
DList of Equipment owned by Bidder that is in serviceable condition and available for use:
� E� G�+�-ac1� e d�
D
�
�
��
���
D
�,
D Portions of work Bidder proposes to sublet in case of Award of Contract including amount and
type:
�
D.�n 1�-l� �,�+'P� � l 3U. DvU . oD
�aUr'lt.� � �.+Yn� �Od� ODa , a C�
� �i I✓W g, ODo - Od
A
n �r,���c.r'% � �,rr; c.��..s (7, �oU , D b
�.f . .
�l.ec�ri �-a.f' �1�� oo� •oD
� 1,()�e� � Se�u.� /vD, o00 • o n
�
■J
J
�
9811000_Specs_0899_DO.doc 1 1 -1
�
.Hall� �Excavating Co . Equipment List��x� • '� � .
gn: T:\TSGOLD\REPORT\EQ ID LIST.RPT �
«�i -
�" Eq ID Equip Description
�r
�," L-1
S L-2
L-9
�+r L-5
�, L- 6
' y�, ` L- 7
L-18
f . L-20
�*` L-21
, L-22
�.:
P-1
P-2
P-3
P-4
P-5
D-9
D-5
D-6
D-7
MG-1
MG-2
MG-3
MG-4
MG-6
MG-11
BH-1
BH-4
BH-5
BH-6
BH-7
BH-8
BH-9
BH-10
HR-1
BH-11
R-3
R-5
R-7
R-11
R-12
R-18
R-19
R-20
T-1
T-2
T-6
T-7
T-9
MT-11
MT-12
T-17
T-18
AT-1
AT-2
101 963 Loader
102 963 Loader
104 963 Loader
105 963 Loader
106 9638 Loader
107 763B Loader
118 980G RUBBER TIRED LOADER
120 928G Rubber Tired Loader
121 938G Rubber Tired Loader
122 926E Loader
195 L-3 STOCK ENGINE
201 623 Scraper
202 623 Scraper
203 623E Scraper
204 623E Scraper
205 623F Scraper
304 D4H Dozer
305 D4H Dozer
306 D6H Dozer
307 D6H Dozer
401 140G Motor Grader
402 140G Motor Grader
403 160H Motor Grader
404 140G Motor Grader
406 140G Motor Grader
411 140G Motor Grader
501 225 Backhoe
504 300 Hitachi
505 220 Backhoe
506 300 Backhoe
507 416 Backhoe
508 426B Backhoe
509 EX450LC-5 Track Backhoe
510 310C Backhoe
511 Hoe Ram
512 330 Backhoe
603 Steel Wheel Roller
605 SP1130 Pneumatiic Roller
607 CP433 Vibrator Compactor
611 630 Compactor
612 530A Pneumatic Roller
618 815 Compactor
619 815 Compactor
620 815B Compactor
701 Dump Truck
702 Dump Truck
706 DumpTruck
707 Dump Truck
709 Dump Truck
711 Concrete Mixer Truck
712 Concrete Mixer Truck
717 Dump Truck
718 Dump Truck
751 Articulating Truck
752 Articulating Truck
Make Model Ye
CAT 963 19y
CAT 963 19�
CAT 963 19�
CAT 963 19!
CAT 963B 19!
Bobcat 763B 19�
Cat 980G 19�
CAT 928G 19'
Cat 938G
CAT 926E 19
CAT 623 19
CAT 623 19
CAT 623E 19
CAT 623E 19
Caterpillr 623F 19
CAT D4H 19
CAT D4H 19
CAT D6H 19
CAT D6H 19
CAT 140G 1�
CAT 140G 1�
CAT 160H 1�
CAT 140G 1�
CAT 14 0 G 1�
CAT 140G 1�
CAT 225 1!
Hitachi EX300LC II 1!
Komatsu PC220 1!
Hitachi EX300 1'
CAT 416 1'
CAT 426B 1
Hitachi EX450LC-5 1
John Deere 310C 1
Hoe Ram
HITACHI EX330LC-5 1
Gallion Steel Whl 1
Ferguson SP1130 1
CAT CP933 T
CAT 630 1
Hyster 530A 1
CAT 815 1
CAT 815 1
CAT 815B 1
Mack Dump Truck ]
Mack Dump Truck ]
Mack Dump Truck ]
Mack Dump Truck ?
Mack Dump Truck :
Mack Mixer Trck :
Mack Mixer Trck :
Mack Dump Truck .`
Mack Dump Truck '
Volvo A25C
Volvo A25C
•h T:�\TSGOLD\REPORT\EQ ID LIST. RPT• ;
�,+' .
i'�ID Equip Description •
6
1
2
6
7
10
�11
�17
�30
�31
•29
�33
•37
•3
•4
•3
•1
•2
•5
.2
•12
-1
-9
•rr-6
TP-7
HT-4
CT-5
CT-8
TP-10
HT-3
�
7
756 Articulatinq Truck
775 Truck Tractor
776 Truck Tractor
806 Water Truck
807 Water Truck
810 Water Truck
811 Water Truck
817 F-350/Flatbed
820 Grease Truck
821 Mechanic Truck/Alton Jr. '
829 D3500 Mechnic Trck - Altn
833 Service Truck/Jose
837 Service Truck/Chuck
842 Flowboy Trailer
893 Flowboy Trailer
845 Trash Trailer
847 Dump Trailer
848 Dump Trailer
849 Pup Trailer
850 Pup Trailer
851 Pup Trailer
852 Pup Trailer
853 Pup Trailer
854 Pup Trailer
855 Pup Trailer
857 1999 MACK HAUL TRUCK
858 Truck Tractor
860 Truck Tractor
861 Pup Trailer
863 Haul Truck
� * Out of Service
�
���
�
u
L
�
0
_z__c....�..� ..r....�
Make
Volvo
MACK
MACK
Internatnl
Internatnl
Mack
Mack
Ford
Eord
Dodge
Dodge
Mack
Mack
Flowboy
Flowboy
Cherokee
Cherokee
Cherokee
Aztec
Aztec
Aztec
Aztec
Aztec
Clements
Clements
MACK
Mack
Mack
Cherokee
Kenworth
Model
A25C
RD688S
RD688S
Water Trck
Water Trck
Water Trck
Water Trck
F-350
Greas Trck
3500
D3500
Servc Trck
Servc Trck
Trailer
Trailer
Trash Trlr
Dump Trler
Dump Trler
Pup Trailr
Pup Trailr
Pup Trailr
Pup Trailr
Pup Trailr
Pup Trailr
Pup Trailr
TRACTOR
Pup Trailr
s
Year ,
1999
1998
1998
1978
1979
1977
1981
1992
1980
1998
1998
1984
1984
1998
1998
1985
1984
1984
1988
1988
1988
1988
1988
1992
1992
1999
1982
1984
1987
1990
7,
11
1�C
C]
D�
1P
21
F:
3]
3]
11
11
11
11
1�
1�
1+
1,
1.
1.
1.
1.
1
1
1
1
1
1
1
�
�
�
�
��''
�
�
�
�
�
��
�
�
�
�
�
�
�
�
i
f
[
�
I
12. EXPERfENCE RECORD — �j(,JQ_ ��hp�L
List of Projects your Organization has successfully compieted: .
AMOUNT OF CONTRACT TYPE OF WORK DATE ACCEPTED
AWARD
NAME AND ADDRESS
OF OWNER
List of Projects your Organization is now engaged in completing:
AMOUNT OF CONTRACT ANTICIPATED DATE OF NAME AND ADDRESS
AWARD TYPE OF WORK COMPLETION OF OWNER
List Surety Bonds in force on above incomplete work:
DATE OF CONTRACT �PE OF WORK BONp AMOUNT OF BOND
AWARD
9811000_Specs 0899_DO.doc
12-1
NAME AND ADDRESS
OF SURETY
�• _.,'�iE
COMPLETED PROJECTS
August 1999
�
aPROJECT OWNER/CONTRACTOR
� White Settlement Road City of White Settlement
Roadway Services Service Development Corporation
a Redbird Airport Cit of Dallas
Y
� Henrietta Creek Hillwood Construction
� Remedial Construction Hillwood Construction
CR 234, Wise County State of Texas
� Bryant Irvin Road City of Fort Worth
� SH 10, Tarrant County State of Texas
aIH 30, Dallas County State of Texas
Maplewood Avenue City of North Richland Hills
� Great Southwest Parkway City of Grand Prairie
n Page Avjet Hangar City of Fort Worth
U
� Distribution Center Food Lion, Inc.
Centerville Road City of Garland
aMeadowbrook Substation TU Electric
QArlington Municipal Airport City of Arlington
Runaway Bay . NACO Resort Club
� Tarrant Co. Parkin Gara e Thos. S. B rnes
g 9 Y
� 40 Oaks Detention Basin City of Fort Worth
� FM 3479 State of Texas
FM 1938, Tarrant County State of Texas
� Page 1 of 4
CONTRACT
AMOUNT
$582,673.90
$361,960.00
$755,772.50
$69, 541.35
$111,500.00
$186,996.49
$47,711.00
$668,000.00
$266,252.08
$699,497.40
$123,861.00
$1,986,851.35
$2,497,328.00
$475,704.26
$188,990.00
$607,732.53
$52,200.00
$186,694.28
$1,108,803.95
$1,402,862.78
$4, 302, 074.36
YEAR WITH OWN
COMPLETED FORCES �
1991 85%
1991 100%
1991 100%
1991 100%
1991 100%
1991 92%
1991 100%
1991 100%
1991 100%
1991 70%
1991 100%
1991 30%
1991 100%
1991 100%
1991 100%
1991 75%
1992 100%
1992 100%
1992 53%
1993 52%
1993 55%
` '�
�
�
aPROJECT
FM 731, Tarrant County
� Centerville Road Bridge
pGainesville Airport
� MH, Tarrant County
Distribution Center #3
� Green Oaks Blvd.
aDenton Regional Medical
� SH 114, Denton County
SH 114, Denton County
� Calloway Branch
� CR, Tarrant County
Little Bear Creek
pStadium Drive Parking
� Tension Connection
aChico Pit
Hobson Industrial Park
� Sundance Canal Bridge
pSH 360, Tarrant County
� Browning Drive
Hemphill Bridge Repair
� Clear Creek Estates
� Harley Avenue
COMPLETED PROJECTS
August 1999 �
CONTRACT YEAR WITH OWN
OWNER/CONTRACTOR AMOUNT COMPLETED FORCES 1
State of Texas $1,007,484.05 1993 100%
CityofGarland $721,226.20 1993 94%
City of Gainesville $1,003,759.06 1993 52%
State of Texas $1,885,131.29 1993 51 %
Venture Stores, Inc. $1,019,663.00 1993 88%
APAC-Texas, Inc. $424,665.00 1993 88%
Austin Commercial $488,471.00 1993 100%
State of Texas $15,943,710.00 1994 56%
State of Texas(Sub from Sunmount C $535,603.77 1994 100%
City of North Richland Hills $1,633,557.55 1994 58%
State of Texas $383,037.57 1994 91 %
Trinity River Authority $88,581.00 1994 100%
City of Arlington $213,321.88 1994 100%
Atchison, Topeka & Santa Fe Railwa� $1,518,837.09 1994 72%
Chico Crushed Stone $589,032.97 1994 100%
City of Weathertord $334,139.62 1994 30%
Barry, Bette & Led Duke $592,700.00 1994 87%
State of Texas $14,949,976.47 1994 40%
City of North Richland Hills $665,179.58 1994 75%
City of Fort Worth $77,000.00 1994 100%
Clear Creek Estates, Inc. $34,505.10 1995 100%
City of Fort Worth $1,067,596.11 1995 35%
Page 2 of 4
a` •�iL . .
COMPLETED PROJECTS
August 1999
�
� PROJECT OWNER/CONTRACTOR
aKeene Maintenance Facility State of Texas
Denton Regional Airport State of Texas
� SH 174 State of Texas
� CS, Tarrant County State of Texas
� Harry Hines Blvd. State of Texas
SH 31, Navarro County State of Texas
� Pedestrian Bridge J.L. Bertram Construction
aMH, Tarrant County State of Texas
� New York Avenue City of Arlington
Randol Mill Road City of Arlington
� IH 20, Tarrant County State of Texas
n St. John Catholic Church Cathokic Diocese of Fort Worth
IJ
� Fort Worth Star Telegram Hunt Petroleum
Parking Lot National Pride of Texas
aJohnson Creek Hike & Bike Tra City of Arlington
� Meacham Field City of Fort Worth
Rehab of Lake Worth Dam City of Fort Worth
0 US 287, Tarrant County State of Texas
� Oak Valley Estates, Phase IV Burleson Development
� Eastland Quarry Vulcan Materials Company
FM 2281, Sanitary Sewer City of Lewisville
� Page 3 of 4
CONTRACT YEAR WITH OWN
AMOUNT COMPLETED FORCES �
$494,879.67 1995 68%
$226,028.00 1995 100%
$4,046,672.12 1995 65%
$1,819,304.54 1995 70%
$1,012,511.70 1995 100%
$3,242,837.47 1995 65%
$46,500.00 1996 100%
$3,407,007.58 1996 38%
$474,274.60 1996 90%
$3,701,641.05 1996 79%
$1,464,721.26 1996 60%
$352,265.84 1996 89%
$101,441.80 1996 89%
$87,700.00 1996 100%
$50,639.40 1996 92%
$47,495.25 1996 100%
$556,050.43 1996 85%
$219,518.53 1996 93%
$100,200.00 1996 100%
$80,000.00 1996 100%
$43,000.00 1997 100%
�� . . �
COMPLETED PROJECTS
August 1999
�
� CONTRACT YEAR WITH OWN
PROJECT OWNER/CONTRACTOR AMOUNT COMPLETED FORCES �
Winn Dixie Site Work Forest Hill-WD, LTD $862,498.00 1997 26%
� Weaver Channel Forest Hill Joint Venture $241,488.50 1997 91 %
� Forest Hill Channel Stonewood Investments $773,916.94 1997 97°/a
� SH 174, Johnson County State of Texas $4,028,130.58 1997 75%
135W, Tarrant County State of Texas $7,929,296.79 1997 45%
aSouthwest Addition Box Culvert City of Fort Worth $894,746.00 1998 100%
QWilliamsburg Village Nursing York Healthcare & Scotland Healthca $280,000.00 1998 100%
Center
� FM 3029, Tarrant County State of Texas $7,136,753.12 1998 45%
� Tony's Creek City of Fort Worth $1,012,411.25 1998 100%
Stonebriar Mall GGp/Homart, Inc.-John Burns Constr $344,850.25 1998 100%
� Chico Overburden Pioneer Aggregates $210,000.00 1998 100°/a
a
a
0
0
a
0
0
� Page4of4
PROJECTS UNDER CONSTRUCTION
August1999
PROJECT
FM 2281, Denton County
IH 35W, Tarrant County
DFW-RAC
Johnson County
Center Street
SH 360 at Trinity River
OWNER/CONTRACTOR
Texas Department of Transportation
Texas Department of Transportation
DFW Airport - Thos. S. Byrnes
TxDOT
City of Arlington
Texas Department of Transportation
CONTRACT PERCENT
AMOUNT COMPLETE DESCRIPTION
$7,340,002.40 98% Grading, Drainage, Bridge & Pvmt
$1,979,380.32 98% Grading, Drainage, Bridge & Pvmt
$17,275,374.00 84% Grading, Drainage & Bridge
$875,359.15 93% Excavation & Bridge
$14,366,815.80 54% Excavation, Bridge & Drainage�
$1,021,459.50 0% Erosion Control
TOTAL
$42,858,391.17
0 0 0 0 0 0 0 0 o P�+ °f � o 0 0 0 0 0 0 0
0 0 0 0 0 0 � 0 0 0 0 0 0 0 0 0 � 0 �
Bond Schedule
Date of Contract Award Type of Work Bond
09/20/96 Grading, Drainage, Bridge & pvmt
03/12/98 Grading, Drainage, Bridge & pvmt
04/14/98 Grading, Drainage & Bridge
11/02/98 Excavation & Bridge
10/27I98 Excavation, Bridge & Drainage
Amount of Bond Name and Address of Surety
$7,585,307.02 Fireman's Fund
$1,953,587.89 Fireman's Fund
$16,518,041.00 Fireman's Fund
$969,829.15 Fireman's Fund
$14,366,815.80 Fireman's Fund
�
��l
L'
�
�
�
�
CERTIFICATE OF INSURANCE
TO: CITY OF FORT WORTH
1000 Throckmorton St.
Fort Worth, Texas 76102
DATE: October 14, 1999
NAME OF PROJECT: Construction of Basswood Boulevard
PROJECT NLJMBER: D.O.E. No. 0329; T/PW Proiect No. C115-020115023220
THIS IS TO CERTIFY THAT Orval Hall Excavatine Co., 201 Northeast 29`�'. Street, Fort Worth, TX
76006 .
is at the date of this certificate, insured by this Company with respect to the business operations hereinafter
described, for the type of insurance and in accordance with the provisions of the standard policies used by
this Company, and further hereinafter described. Exceptions to standard policy noted on reverse side
hereof.
TYPE OF INSURANCE
Policy No. Effective
WVK 9101062 10/O1/99
KK09100974 10/O1/99
KK09100974 10/O 1/99
KK09100974 10/O 1 /99
KK09100974 10/O1/99
KK09100974-1 10/O 1 /99
KK09100974 10/O1/99
BE7018060 10/O1/99
Expires Limit of Liability
10/O1/00 $500/500/500
10/O1/00 $2,000,000 Gen. Agg.
$1,000,000 Each Occ.
� Workers' Compensation
Commercial General
Liability Insurance
D (Public Liability)
Blasting
Collapse of Buildings
a or structures adjacent
to excavations
Damage to Underground
Utilities
n Builder's Risk
�"� Automobile
Liability
Q Contractual Liability
Excess Liablity
C
�
L�J
C
�''
10/01/00 $1,000,000 Each Occ.
10/O1/00 $1,000,000 Each Occ.
10/O1/00 $1,000,000 Each Occ.
10/O1/00 $1,000,000 Each Occ.
10/O1/00 $1,000,000 Each Occ.
10/O1/00 $15,000,000 Ea. Occ.
Locations Covered: All onerations for the Citv of Fort Worth
Description of Operations Covered: Construction of Basswood Boulevard from East of Interstate Hwv
35W to Existine Basswood Boulevard.
The above policies either in the body thereof or by appropriate endorsement provide that they may not be
changed or cancelled by the insurer in less than five (5) days after the insured has received written notice of
such change or cancellation.
Where applicable, local laws or regulations require more than five days actual notice of change or
cancellation to be assured, the above policies contain such special requirements, either in the body or by
appropriate endorsement thereto attached.
Agency: Aon Risk Services of Texas. Inc.
Agent: Jem P. Rose
Address: 2711 N. Haskell. Dallas, T'X 75204
�By:
i
Title: xecutive Vice President
[j
'
1
�
1
�
�
�
�
�
I
'
I
�
�
�
�
�
�
II�
CONTRACTOR COMPLIANCE WITH
WORKERS' COMPENSATION LAW
Pursuant to V.T.C.A Labor Code Section 406.096, Contractor certifes that it provides workers'
compensation insurance coverage for all its employees employed on city of Fort Worth Project Number C115-
020115023220.
ORVAL HALL EXCAVATING CO.
� CONTRACTOR
' ����G�
By: �
� �.�5/G�+�
i Title
/Q /�-��
� Date
i
STATE OF TEXAS
COUNTY OF TARRANT
�
0
BEFORE ME, the undersigned authority, on this day personally appeared rn_�� ��� ,
known to me be the person whose name is subscribed to the foregoing ins}rument, and acknowledged to me that he
executed the same as the act and deed of(��re�c�-� �� ��� �Y,ca�c�.�-i,,. C for the purpose and consideration
therein expressed and in the capacity therein stated. �
GIVEN lJNDER MY HAND AND SEAL OF OFFICE �his ��l day of
i� ���-� . 19 �'l � .
� ���- �
Notary Public in and for
th;e State of Texas
o� '� EI.�ZA�&TH MCAFEE
*��� N�7AFiY PUBLIC
"� .� �t�lt� af i"Ex�g
�Of �� �bftitll. �xp, tl�4-�5-2001
,,
I
�
l�J
�
PERFORMANCE BOND
THE STATE OF TEXAS �
u
L�J
L�
II�
COUNTY OF TARRANT §
Bond No. 11127418447
KNO W ALL MEN BY THESE PRESENTS: That we (1) ORVAL HALL EXCAVATING COMPANY a
(2) CORPORATION of TEXAS, hereinafter call Principal, and (3)�sPri ran A,tomobi 1_ 7nsii anra �ompany
corporation organized and existing under the laws of the State and fully authorized to transact business in the State
of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation organized and
existing under the laws of the State of Texas, hereinafter called Owner, in the penal sum of:
TWO MILLION TWO HUNDRED THIRTY-SIX THOUSAND THREE HUNDRED EIGHTY-SEVEN AND,
22/100 ...... ..............................................................................................................................
� ($2.236.387.221 Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for
the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators
and successors, jointly and severa(ly, firmly by these presents.
I,'�
J
THE CONDITION OF THIS of: OBLIGATION is such that Whereas, the Principal entered into a certain
contract with the City of Fort Worth, the Owner, dated the 12T" of October, 1999 a copy of which is hereto
attached and made a part hereof, for the construction of:
CONSTRUCTION OF BASSWOOD BOULEVARD FROM WEST OF 1VORTH RIVERSIDE DRIVE TO
IH-35W
� designated as Project No. (s) C115-020115023220, a copy of which contract is hereby attached, referred to, and
made a part hereof as fully and to the same extent as if copied at length herein, such project and construction being
hereinafter referred to as the "work".
O
NOW THEREFORE, if the Principal shall well, truly, and faithfully perform the work in accordance with
a the plans, specifications, and contract documents during the original term thereof, and any extensions thereof which
may be granted by the Owner, with or without notice to the Surety, and if he shall satisfy all claims and demands
incurred under such contract, and shall fully indemnify and save harmless the Owner from all costs and damages
which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense
� which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in
full force and effect.
L!
�
�I
���'
� F1
�
L
�
�.,
�
�
�
e
�
i�
�
�
�
�
�
PROVIDED FURTHER, that if any legal action filed upon this bond, venue shall lie in Tarrant County,
State of Texas.
AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no
change, extension of time, alteration or addition to the terms of the contract or to the work to be performed
thereunder or the specifications accompanying the same shall in any wise affect its obligations on this bond, and it
does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or
to the work or to the specifications.
IN WITNESS WHEREOF, this instrument is executed in 8 counterparts each one of which shall be deemed
an original, this the 12T" of October, 1999.
ATTEST:
� -� -
� . � � �,; _��„z �,,�y � � .� ORVAL HALL EXCAVATION CO.
� _...
��ncipal) Secretary PRINC[PAL (4) ��
�
(SEAL)
�,�%) /
i i JL�C t1 C i i
Witness as to Principal
'G'% /UL� z'�l�l, ��, �..�4�h_, �ti-�ztl� �f� �7/�l�'�/
Address
ATT
� ��,.��. ��
(Surety) Secretary
(SEAL)
W itness as to Surety
2711 N. Haskell Avenue 4�800
(Address)
Dallas, TX 75204
L� . ��%2�Z����
�� � �
F2
BY: � • ` C'' /
Title: /�"�sicl..�"� -
201 IVE 29T" STREET
FORT WORTH, TX 76106
(Address)
American Automobile Insurance Company
Surety
'-n
/ ,�,_ , } � ,�; '� �
BY: i ':�'ti � _ `��. �� � � �
(Atto�`ey-in-fact) (5) Lisa M. Bonnot
2711 N. Haskell Avenue ��800
Dallas, TX 75204
(Address)
NOTE: Date of Bond must not be
prior to date of Contract
(1) Correct Name of Contractor
(2) A Corporation, a Partnership or an
Individual, as case mav be
(3) Correct name of Surety
(4) If contractor is Parmership all
Partners should execute Bond
(5) A true copy of Power of Attorney
shall be attached to Bond by
Attorney-in-Fact..
i j�
�'I
�
�
�
C�
L�J
�
I!1
�
�
'�
I�
�
C
C
I!
I�l
�
Bond No. 11127418447
THE STATE OF TEXAS
COUNTY OFTARRANT
PAYMENT BOND
�7
0
KNOW ALL MEN BY THESE PRESENTS: That we (I) ORVAL HALL EXCAVATION COMPANY
a(2) Corporation of Texas, hereinafter call Principal, and (3) American Automobile tnsurance�
corporation organized and existing under the (aws of the State and fully authorized to transact business in the State
of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation organized and
existing under the laws of the State of Texas, hereinafter called Owner, and unto all person, firms, and corporations
who may furnish materials, for or perform labor upon the building or improvements hereinafter referred to in the
penal sum of :
TWO MILLION TWO HUNDRED THIRTY-SIX THOUSAND THREE HUNDRED EIGHTY-SEVEN AND
22/100 ............ ... ... ... ... ............ ... ... ... ... ... ..... . ... ... ...... ... ...... ... ... ... ... ... .................. ... ... ... ...... ......
($2.236.387.22) Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for
the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators
and successors, jointly and severally, firmly to these presents.
THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain
contract with the City of Fort Worth, the Owner, dated the 12T" day of October A.D. , 1999, a copy of which is
hereto attached and made a part thereof, for the construction of::
COtYSTRUCTIOIV OF BASSWOOD BOULEVARD FROM WEST OF NORTH RIVERSIDE DRIVE TO
IH-35 W
Project No. (s) C115-020115023220 a copy of which is hereto attached, referred to and made a part hereof
as fully and to the same extent as if copied at length herein, such project and construction being hereinafter referred
to as the "work".
NOW THEREFORE, the condition of this obligation is such that, if the Principal shall promptly make
payment to all claimants as defined in Article 5160, Revised Civil Statutes of Texas, supplying labor and materials
in the prosecution of the work provided for in said Contract, then this obligation shall be null and void, otherwise it
shall remain in full force and effect.
F10
Company
L�J
L�l
�
J
u
�i
I�I
�
�
I�
,II
J
THE BOND IS MADE AND ENTERED into solely for the protection of all� claimants supplying labor and
material in the prosecution of the work provided for in said Contract, as claimants are defined in said Article 5160,
and all such claimants shall have a direct right of action under the bond as provided in Article 5160 of the Revised
Civil Statutes.
PROVIDED FURTHER, that if any legal action be filed upon this bond, venue shall lie in Tarrant County,
State of Texas, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of
time, alteration of addition to the terms of the contract or to the work to be performed thereunder or the specification
s accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any
such change, extension of time, alteration or addition to the terms of the contract or to the work to the specifications.
PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the
right of any benefciary hereunder whose claim may be unsatisfied.
IN WITNESS WHEREOF, this instrument is executed in 8 counterparts each one of which shall be deemed
an original, this tha 12T" day of October A.D., 1999.
• �I�t� 'L� _' ���_ �L �/L �r
�
ORVAL HALL EXCAVATION COMPANY
PRINC A
BY: . • ��
Title: ��5��-�
(Principal) Secretary
0 ��� ����
Wimess as tb Princi al
�� Jl/� �?�=/2 �-i�-
� �-�� Gc-�v�..lc. . �`!� h�O/Dl�
Address
�
'I
II'
�
ATT�':
�I�.GC
(Surety) Secretary
(SEAL)
� �,
���
��I
Witness as to Surery
2711 N. Haskell Avenue 4�800
Dallas, TX 75204
(Address)
201 NE 29T" STREET
FORT WORTH. TX 76106 (SEAL)
(Address)
American Automobile Insurance Company
Surety
BY: /J
(A�t rney-in-fact) (5)
Lisa M. Bonnot
(Address)
2711 N. Haskell Avenue 9�800
Dallas, TX 75204
(Address)
NOTE: Date of Bond must not be prior to date
of contract
(1) Correct Name of Contractor
(2) A Corporation, a Partnership or an
Individual, as case may be
(3) Correct name of Surety
(4) If contractor is Partnership all
Partners should execute Bond
(5) A true copy of Power of Attorney
shall be attached to Bond by
Attorney-in-Fact..
L'
LJ
MAINTENANCE BOND
Bond no. 11127418447
� THE STATE OF TEXAS �
COUNTY OF TARRANT �
KNOW ALL MEN BY THESE PRESENTS: That (1) ORVAL HALL EXCAVATING COMPANY as
a Principa(, acting herein by and, through (2) its duly authorized
and (3) �erican Automo�ile lnsurance ��u���ation organized under the
laws of the State of Missour� surety, do hereby acknowledge themselves to be held and bound to pay unto the
� City of Fort Worth, A Municipal Corporation, chartered by virtue of Constitution and laws of the State of Texas, at
Fort Worth, in Tarrant County, Texas the sum of
� TWO MILLION TWO HUNDRED THIRTY-SIX THOUSAND THREE HUNDRED EIGHTY-SEVEN AND
22/100 ... ... ......... ... ............ ... ... ... ... ... ...... ... ... ... ...... ...... ......... ... ... ... ... ......... ... ... ... ... ......... ... ... ...
($2,236,387.221 in lawful money of the United States, for the payment of which sum well and truly be made unto
� said City of Fort Worth and its successors, said Contractor and surety do hereby bind themselves, their heirs,
executors, administxators, assigns and successors, jointly and severally.
� This obligation is conditioned, however; that,
a WHEREAS, the Principal has entered into a certain contract with the City of Fort Worth, October 12.
1999, the performance of the following described public work and the construction of the following described
public improvements:
� CONSTRUCTION OF BASSWOOD BOULEVARD FROM WEST OF NORTH RIVERSIDE DRIVE TO
IH-35W
� of same being referred to herein and in said contract as the Work and being designated as project C115-
020115023220 and said contract, including all of the specifications, conditions and written instruments referred to
therein as contract documents being hereby incorporated herein by reference for all purposes and made a part
hereof, the same as if set out verbatim herein; and ,
a
WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work that
� it will remain in good repair and condition for and during the period One (1) Year after the date of the final
acceptance of the work by the City; and
a WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of
One (1) Year; and,
� WHEREAS, said Contractor binds itself to repair or reconstruct the Work in whole or in part at any time
within said period, if in the opinion of the Director of the Water Department of the City of Fort Worth, it be
anecessary; and,
I�I
�
�
�
�
w,
.,
�..
�
L.
�
a
WHEREAS, said Contractor binds itself, upon receiving notice of the need therefor to repair or reconstruct
said work as herein provided.
NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or
reconstruct said work in accordance with all the terms and conditions of said Contract, these presents shall be null
and void, and have no force or effect. Otherwise this Bond shall be and remain in full force and effect, and said
City shall have and recover from the said Contractor and its surety damages in the premises prescribed by said
Contract. This obligation shall be continuing one and successive recoveries may be had hereon for successive
breaches until the full amount hereof is exhausted.
WHEREAS, all parties covenant and agree that if any legal action be filed upon this bond, venue shall lie
in Tarrant County, Texas; and,
IN W['I'NESS WHEREOF, this instrument is executed in 8 counterparts, each one of which shall be
deemed an original, dated October 12, 1999.
ATTEST:
� i� ��-%� ��u�T _Q�1-Z�1—�_ _
� � (Princ�pal) Secre�ary
�
�- _
r
�
�
�
�
�
�
�
i..,o
(Seal) ORVAL HALL EXCAVATING COMPANY
PRINCIPAL (4)
BY: . (! Yu�Cl/ '
Title: /"�- tS%��'r►�
�,11: ,��/ .�� L�L%�"�
Witness as to Princi�a�
�L`� l /�/�- ��i �t'1t �•.�f .
'�_ j"(i L�, 6 � (_ �'U � _ �. /� , 7` X
(Address)
ATTEST:
����i_" ��.��/�,��
(Surety) Secretary
(SEAL)
201 NE 29T" STREET
FORT WORTH, TX 76106
(Address)
American Automobile Insurance Company
������JC-%�j, � Sure�/ � � ,
�.- /
BY: '' '�',�,., �'� j������ ; ��r�',,.'`���u
� � �(Attorney-i��-fact) (5) Lisa M. B:�nnot
2711 N. Haskell�`Avenue ��800, Dallas, TR
(Address) 75 204
NOTE: Date of Bond must not be prior to
date of Contract
� �i�� �'
Witness as to Surety
(1) Conect Name of Contractor
(2) A Corporation, a partnership or an
Individual, as case may be
(3) Correct name of Surety
(4) If Contractor is Partnership all
Partners should execute Bond
(5) A true copy of Power of Attorney
shall be attached to Bond by
Attorney-in-Fact.
� F6
�J
�
t�
L�J
fJ
�
�J
I�
��
FIREMAN'S FUND INSURANCE COMPANY
NATIONAL SURETY CORPORATION . ASSOCIATED INDEMNITY CORPORATION
THE AMERICAN INSURANCE COMPANY AMERICAN AUTObiOBILE INSURANCE COMPANY
GENERAL POWER OF ATTORNEY
KNOW ALL MEN BY 7'HESE PRESEMS: 'Ihat FIREMAN'S FUND INSURANCE COMPANY, a Califomia corporarion, NA'I'IONAL SURETY CORPORATION,
an Illinois corporation, THE AMERICAN INSURANCE COMPANY, a New Jersey corporation redomesticated in Nebraska, AS.SOCIATED INDEMNITY
CORPORATTON, a California corporation, and AMERICAN A[]TOMOBII.E WSURAI�CE COMPANY, a Missouri corporation, (herein colloctively caUed "the
Companies")doeseachherebyappoint Jerry P. Rose, DOri E. Cornell, Robbi Morales, Lisa i�I.
Bonnot and James W. Baughman of Dallas, T�.
their we and lawful Attomey(s)-in-Fact, with full power of authority hereby conferred in their name, placo and stead, to execute, seal, acknowledge and deliver any and ali
bonds, undenakings, recognizances or other wric[en obligations in th� nature [hereof _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
and to bind the Companies thereby as fully and to the same extent u if such bonds were signed by the President, sealed with the corporate seals of the Companies and duly
attested by the Companies' Secretary, hereby ratifying and confirtning all that the said Attorncy(s)-in-Fact may do in the premises.
This power of attomey is granced under and by the authority of Article VII of the Bv-laws of FIREMAN'S fl1ND INSURANCE COMPANY, NATIONAL SURETY
CORPORATION. THE AMERICAN INSURANCE COMP,�NY. ASSOCIATED INDEMNITY CORPORA7'ION and AMERICAN AUTOMOBILE 1NSURANCE
COMPANY which provisions are now in full force and effect. •
'fhis pow•er of a�tomey is signed and sealed under the authority of the following Resolution adopted by the Board of Directors of FIREMAN'S FUND 1NSURANCE
COMPAKY, NATIONAL SURETY CORPORATION. 7'HE AMERICAN INSURANCE COMPANY, ASSOCIA'1'ED INDEAINI7'Y CORPORATION and AMERICAN
AUTOMOBILE IhSURANCE COMPANY a[ a meeting duly called and held. or by written consent. on the 19th day of 1�9arch. 1995, and said Resotution has not been
amended or repealed:
"RESOLVED, that the signature of any Vice-President. Assistant Secretary. and Resident Assistant Secretary of the Companies, and the seal of
Companies may be a�xed or printed on an}• pou•er of ateorney, on any re�•ocation of any power of attorney, or on any cettificate relating thereto.
facsimile. and any power of attorney, any revocation of any power of attorney. or cenificate bearing such facsimile signacure or facsimile seal shall
valid and binding upon the Companies:' •
ITv WITN S�S WHEREOF, the Companies ha��e caused tbe e,,presencs to be signed by their Yce-President, and their corporate seals to be het�nto a�xed
this � y day of AUCTUs t , 1� y 9 . /
� ��Y ,�M1`ull�'tp4i p�AN'S AYER/ h oa �ni
J avoq O ro��o�,�r,,, r �•y `pE��FG� �r� oaro��feH i� �o`'�pB1lE�hyf� 4
J �C 9,�� g^o�. .;4 �k£ : rr, f � ,.i O 4 r'` �0,;_ �'� ; ��c
q O �) 1 ? _ ^ , f •4� :?,/ • "s
Z SEOT�q70 ; �•' ,•e•s � !�, i�:6EAL;b'=
�' Y"s,.� t; 4 � a , ✓ � . ' �
Q�C <ciNO�s �`/ 'zk �•; ,,�,.•'�i r G,p •� t � ,�.^`Qe sG �t •, s`''• : •'y``F
� bti C�� 4,� ••;,����,•cF 4,yCE�G�t� �3,4 f�.......��"`
�•o�nuwna��N•.
R�N�E'��,� ''�yu�OUiuoxe ••
STATE OF CALIFORNIA
� ss.
COUNTY OF MARIN
' FIREMAN'S FUND INSURA
NA'f10NAt SURE7'Y
"'HE AMERICAN INSUR
�SOCIATED INDEMNI'f
A ERICA.' AUTOMOBILE IN3U
By . u �,
v«.e��:�a���
COMPANY
PORATION
COMPANY
COMPANY
On this � 9 day of AUC�USt 19 9 9 ,�fore me personally came Harold N. Marsh to me known.
� w�ho, being b� me duly swom, did depose and say: that he is a Vice•President of each company, described in and which executed the above inswment; that he knows the
seals of the said Companies: that the seals affixed to the said inswment aze such company seals; that they were so affixed by order of the Board of Dircctors of said companies.
and that he signed his name thereto by like order.
�
�
�
IN WITNESS WHEREOF, I have ereunto set my hand and affixed mv official seal, the day and yeaz herein firs[ above written.
L. OCA.M"r0
�� Commiss�on # 1 163726
`z : =�s�► Notary Pu�tic - CaI�`ornia �
z p r ,
Mcrin Co�rty
��'� My Comm. Exai�es N��jC'�" !' � / ���n wbu�
L ■ I
STA'rE OF CALiFORNIA
COUNTY OF MARIN
J SS.
I, the undersigned, Residcnt Assistant Secretary of each company, DO HEREBY CERTIFY that the foregoing and attached POWER OF ATTORNEY remains in full force
and has not been revoked; and furthermore tha[ Article Vll of the By-laws of each company, and the Resolution of the Board of Directors; set forth in the Power ofAnorney,
are now in force. •
�12th October.
Signed and soaled at the County of Marin. Dated the day of
��„�,µ,,, ��, ,,,,,.���,,,,,,,,
Q,ETYC a�" .eMii au ,�N,�K'S �. E AYo�R� y �,a
J ao � r��i, �C ¢ .4',"r;�`•G ��ca� �F�y �� �.o�r�6tlE IqfG .�
aQ �'� p,ro � ; {'~� ,'e`�C f�•�, � �Oi • r:• ♦'r ' 3`O'—.... `4+� s
� SEFf 7.A:0 � _:•I ' S :7. , i . 6 E A L';� i"
5 `y �i�i ,�' ��� G�� � {� ?� '��' .� f
�tb�4�Na -c� �L.��••�L. • �e° R;`..:....o''�Q °o � �`'�i�'''' •'�'��
:ti rr -y 4ry�Ux����M��A� �'CE C�� '��M�E�C��� ��4r�l0UISr�,or
� 360791-11•98
1999
V
Resident Assisunt Seaetary
�
I�I
i�
0
�
u
�
u
�
�
�
�
CITY OF FORT WORTH, TEXAS
CONTRACT
THE STATE OF TEXAS
COUNTY OF TARRANT
KNOW ALL MEN BY THESE PRESENTS
This agreement made and entered into this the 12TH day of October A.D., 1999, by and
between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas,
organized and existing under and by virtue of a special charter adopted by the qualified voters
within said City on the l lth day of December, A.D. 1924, under the authority (vested in said
voters by the "Home Rule" provision) of the Constitution of Texas, and in accordance with a
resolution duly passed at a regular meeting of the City Council of said city , and the City of Fort
Worth being hereinafter termed Owner, ORVAL HALL EXCAVATING COMPANY,
HEREINAFTER CALLED Contractor.
WITNESSETH: That said parties have agreed as follows:
1.
That for and in consideration of the payments and agreements hereinafter mentioned to
be made and performed by the Owner, and under the conditions expressed in the bond bearing
even date herewith, the said Contractor hereby agrees with the said Owner to commence and
complete the construction of certain improvements described as follows:
CONSTRUCTION OF BASSWOOD BOULEVARD FROM WEST OF NORTH
RIVERSIDE DRIVE TO IH-35W
2.
That the work herein contemplated shall consist of furnishing as an indenendent
� contractor all labor, tools, appliances and materials necessary for the construction and completion
of said project in accordance with the Plans and Specifications and Contract Documents prepared
by the Department of Engineering for the Transportation and Public Works Department of the
� City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and
Specifications and Contract Documents are hereto attached and made a part of this contract the
same as if written herein.
�
3.
a The Contractor hereby agrees and binds himself to commence the construction of said
work within ten (10) days after being notified in writing to do so by the Department of
Engineering of the City of Fort Worth.
L+�l
�
4.
The Contractor hereby agrees to prosecute said work with reasonable diligence after the
commencement thereof and to fully complete and finish the same ready for the inspection and
�
LJ
LJ
u
L�J
�
approval of the Deparhnent of Engineering of the City of Fort Worth and the City Council of the
City of Fort Worth within a period of 120 workin� days.
If the Contractor should fail to complete the work as set forth in the Plans and Specifications and
Contract Documents within the time so stipulated, plus any additional time allowed as provided
in the General Conditions, there shall be deducted from any monies due or which may thereafter
become due him, the sum of $630.00 Per working day, not as a penalty but as liquidated
damages, the Contractor and his Surety shall be liable to the Owner for such deficiency.
5.
Should the Contractor fail to begin the work herein provided for within the time herein
Q fixed or to carry on and complete the same according to the true meaning of the intent and terms
of said Plans, Specifications and Contract Documents, then the Owner shall have the right to
either demand the surety to take over the work and complete same in accordance with the
a Contract Documents or to take charge of and complete the work in such a manner as it may deem
proper, and if in the completion thereof, the cost to the said City shall exceed the contract price or
prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its
� Surety shall pay said City on demand in writing, setting forth and specifying an itemized
statement of the total cost thereof, said excess cost.
�
�
�
�
�
�
�
�
�
�
0
Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel
at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees
to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and
employees, from and against any and all claims or suits for property loss, property damage,
personal injury, including death, arising out of, or alleged to arise out of, the work and services to
be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees
or invitees, whether or not anv such iniurv, damage or death is caused, in whole or in
part, bv the negli�ence or alleged nesligence of Owner, its officers, servants. or
emplovees. Contractor likewise covenants and agrees to indemnify and hold harmless the
Owner from and against any and all injuries to Owner's officers, servants and employees and any
damage, loss or destruction to property of the Owner arising from the performance of any of the
terms and conditions of this Contract, whether or not anv such iniury or dama�e is caused
in whole or in vart bv the ne�li�ence or alle�ed ne�li�ence of Owner, its officers.
servants or emvlovees..
In the event Owner receives a written claim for damages against the Contractor or its
subcontractors prior to final payment, final payment shall not be made until Contractor either (a)
submits to Owner satisfactory evidence that the claim has been settled and/or a release from the
claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance
carrier that the claim has been referred to the insurance carrier.
The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth
public work from a Contractor against whom a claim for damages is outstanding as a result of
work performed under a City Contract.
7.
�
L�
L� 1
�
�
�
�
M
u
The Contractor agrees, on the execution of this Contract, and before beginning work, to
make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the
faithful performance of the terms and stipulations of the Contract and for the payment to all
claimants for labor and/or materials furnished in the prosecution of the work, such bonds being as
provided and required in Article 5160 of the Revised Civil Statutes of Texas, as amended, in the
form included in the Contract Documents, and such bonds shall be for 100 percent of the total
contract price, and said surety shall be a surety company duly and legally authorized to do
business in the State of Texas, and acceptable to the City Council of the City of Fort Worth.
8.
Said City agrees and binds itself to pay, and the said Contractor agrees to receive, for all
of the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on
the Proposal submitted by the successful bidder hereto attached and made a part hereo£ Payment
will be made in monthly installments upon actual work completed by contractor and accepted by
the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount
(including/excluding) alternates n/a, shall be TWO MILLION TWO HUNDRED THIRTY-
SIX THOUSAND THREE HUNDRED EIGHTY-SEVEN AND 22/100Dollars,
($2,236,387.22).
�
�-
u
L�1
�
�
L!
�
L�J
�
�
'�
It is further agreed that the performance of this Contract, either in whole or in part, shall
not be sublet or assigned to anyone else by said Contractor without the written consent of the
Director of the Department of Engineering.
10.
The Contractor agrees to pay at least the minimum wage per hour for all labor as the
same is classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is
attached hereto and made a part hereof the same as if it were copied verbatim herein.
11.
It is mutually agreed and understood that this agreement is made and entered into by the
parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth
and the laws of the State of Texas with references to and governing all matters affecting this
Contract, and the Contractor agrees to fully comply with all the provisions of the same.
IN WITNESS THEREOF, the City of Fort Worth has caused this instrument to be signed in ____
counterparts in its name and on its behalf by the City Manager and attested by its Secretary,
with the corporate seal of the City of Fort Worth attached. The Contractor has executed this
instrument through its duly authorized officers in 8 counterparts with its corporate seal attached.
Done in Fort Worth, Texas, this the 12TH day of October , A.D., 1999.
RECOMMENDED: ITY OF FORT W RTH
.
�- —""��� BY:
DIRECTOR, DEPARTMENT OF � CITY MANAGER
S
u
�
I
�,��i�1t3I'I�ERI`�i�' ::'"' .., . _.... ��,�,,�
'�er.�ti H
# •� `, �
� E� D: �i� t
�
�, •�
�"�' �
3� r'°�RANSPORTA.T'�O � �'
� ��.�:.��.�Q�,�:�,���� r
" I7IT�ECTOI� __.._
ATTEST:
..,
�
'
ORVAL HALL EXCAVATING COMPANY
201 NE 29TH STREET
FORT WORTH, TX 76106
CONTRACTOR
BY: • ' �' /�
%^�si�i�
TITLE
... 2c�/ •v cE ��.�Sz!
WI �� C��t� /�-fS ��/t��
ADDRESS
'
'
�
'
'
'
November 1960
Revised May 1986
Revised September 1992
�
�; CIT��ECRETARY
(SEAL)
APPROVED AS TO FORM AND
LEGALITY:
� "�� �
ITY���'£�RNEY
� � �����
c�c�ni::ract Authorization
� f � � �i`-' ✓ l...�
U���
'
City of Fort Worth, Texas
�1►�Ayar And C,aunc�t ar»mun�cAt�an
C
DATE REFERENGE NUMBER LOG NAME PAGE
10/12/99 **C-17683 I 200RVAL
SUBJECT AUTHORlZE ACCEPTANCE OF SPEClAL COMMISSION R'S AWARD
141-179155-99) AND AWARD OF CONTRACT TO ORVAL HALL
COMPANY FOR THE CONSTRUCTION OF BASSWOOD BOULEVARD
OF NORTH RIVERSIDE DRIVE TO 1H-35W
RECOMMENDATION:
It is recommended that the City Council:
1 of 3
(CAUSE NO.
EXCAVATING
FROM WEST
1. Authorize acceptance of a Special Commissioner's award (Cause No. 141-179155-99) in the
amount of $155,700.00 as final settlement for right-of-way taken for construction of the Basswood
Boulevard extension; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations by
$128,895.00 in the Special Assessments Fund and the Street Improvements Fund from available
funds; and
3. Approve a$128,895.00 funds transfer for the property owner's share of construction costs from the
Special Assessments Fund to the Street Improvements Fund; and
4. Authorize the City Manager to execute a contract with Onial Hall Excavating Company in the amount of
$2,236,387.22 for construction of an extension of Basswood Boulevard from west of North Riverside
Drive to IH-35W.
DISCUSSION:
On June 22, 1999 (M&C L-12539), following unsuccessful negotiations to obtain the necessary right-of-
way for construction of the extension to Basswood Boulevard (west of North Riverside Drive to IH-35W),
the City Council authorized the City Attorney to initiate condemnation proceedings.
Condemnation proceedings (Cause No. 141-179155-99) were filed against Dennison A. Royal to obtain
2.903 acres of land for the Basswood Boulevard right-of-way. After hearing expert testimony from the
City and Mr. Royal, the court-appointed Special Commissioners set the award amount at $155,700.00.
Neither Mr. Royal nor the City chose to contest the award of the Special Commissioners. Staff believes
the award to be fair and recommends its acceptance.
The 1998 Capital Improvement Program included funding for the extension of Basswood Boulevard
from west of. North Riverside Drive to IH-35W. This project will construct a 4-lane divided boulevard
within a 120-foot right-of-way and connect to the improvements that are under construction by the Texas
Department of Transportation on IH-35W from Western Center Boulevard to Basswood Boulevard. The
project is needed to serve rapidly growing development in the northeast portion of the City and to relieve
traffic congestion on Westem Center Boulevard. The City expects this project to be completed in May 2000.
On August 24, 1999 (M&C BH-0192j, the City Council held a benefit hearing and levied assessments
for Basswood Boulevard.
City of Fort Wo�th, Texas
�1�A�ar And �aunc�[ (�ammun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
10/12/99 **C-17683 I � 200RVAL 2 af 3
SUBJECT AUTHORIZE ACCEPTANCE OF SPEClAL COMMISS{ONER'S AWARD (CAUSE, NO.
141-179155-99) AND AWARD OF CONTRACT TO ORVAL HALL EXCAVATING
COMPANY FOR THE CONSTRUCTION OF BASSWOOD BOULEVARD FROM WEST
OF NORTH RIVERSIDE DRIVE TO IH-35W
The project was advertised for bid on August 5 and 12, 1999. The following bids were received on
September 2, 1999: .
BIDDER
Orval Hall Excavatina Comoan�
Wright Construction Company
Ed Bell Construction Company
Gilco Contracting, Inc.
Ed A. Wilson, Inc.
Walt Williams Construction, Inc.
McMahon Contracting, inc.
Architectural Utilities, Inc.
Jackson Construction, Inc.
Site Concrete, Inc.
S. J. Louis Construction, Inc.
�4MOUNT
$2.236.387.22
$2,244,138.85
$2,247,162.35
$2,312,228.55
$2,429,718.00
$2,542,145.12
$2,552,547.05
$2,553,728.40
$2, 721, 743.25
$2,768,543.65
$2,894,650.74,
The contingency amount required for possible change orders is $67,092.00.
TIME OF COMPLETION
120 Working Days
Orval Hall Excavating Company is in compliance with the City's M/WBE Ordinance by committing to
30% M/WBE participation. The City's goal on this project is 29%.
This project is located in COUNCIL DISTRICT 4, Mapsco 35Q.
,1
'�. , �,:'?: �` . .
w�.`�'�'i; ..
� _�� i fM '��. .
A,�
- -n
+ �i
. �
.LL�.
`�";
,.,+j4
� 'ry�:a
a
. �,,. .
City of Fo�t Wo�th, Texas
n►�Ayar And C.aunc�( Cammun�ca�t�an
DATE REFERENCE NUMBER LOG NAME PAGE �
10/12/99 �**C-17683 200RVAL 3 of 3
SUBJECT AUTHORIZE ACCEPTANCE OF SPECIAL COMMISSION R'S AWARD (CAUSE NO.
141-179155-99) AND AWARD OF CONTRACT� TO ORVAL HALL EXCAVATING
COMPANY FOR THE CONSTRUCTION OF BASSWOOD BOULEVARD FROM WEST
OF NORTH RIVERSIDE DRIVE TO IH-35W
FISCAL INFORMATION/CERTIFICATION:
,t
The Finance Director certifies that upon adoption of the attached appropriation ordinance and '
completion of the above recommendations, funds will be available in the current capital budget,, as .
appropriated, of the Street Improvements Fund. "
..-- ,
MG:k
Submitted for City Manager's
Office by:
Mike Groomer
Originating Department Head:
Hugo Malanga
Additional Information Contact:
Hugo Malanga
� FUND
(to)
1) C115
6140 2) GS94
2) GS94
I 2) C115
� 2&3) C115
7801 I (from)
I3) GS94
4) GS21
� 4) C115
7801 �
I ACCOUNT I
541100
488032
538070
488093
541200
538070
541200
541200
CENTER
�
030115023?27
0209400990'50
0209400990�50
020115023�27
020111023 27
I
�
020940099 50
020210367� 0
020115023$�27
I AMOUNT
$ 155,700.00
$ 128,895.00
$ 128,895.00
$ 128,895.00
$ 128,895.00
$ 128,895.00
$ 31,644.00
$2,204,743.22
CITY SECRETARY
� A�ROVED
CITY COUNCIL
0 CT - 12 "�999 � " �
�d.�.. l�"t e,u•.J
Ctt� S�cn�ry d thp,
Ciqr oI Fprt Wortn, 7exaa
Adopted Ordinance �fo. � (