HomeMy WebLinkAbout061158-A1 - Construction-Related - Contract - BGE, Inc.CSC No. 61158-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 61158
WHEREAS, the City of Fort Worth (CITY) and BGE, Inc., (ENGINEER) made
and entered into City Secretary Contract No. 61158, (the CONTRACT) which
was authorized by M&C 24-0069 on the 23rd day of January, 2024 in the
amount of $ 295,890.00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Sanitary Sewer Rehabilitation Contract 123, CPN 104975; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $18,665.00 (Sewer).
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $314,555.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Sanitary Sewer Rehabilitation Contract 123
Prof Services Agreement Amendment Template 104975
Revision Date: June 13, 2025
Page 1 of 2
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
i
Jesica McEachern
Assistant City Manager
DATE: 06/22/2026
of the date subscribed by the City's
pnn
onru°c
ATTEST:
0 �'g odG
?aIlIl nEXASabod
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
Christopher Hard (Jun 15, 2026 10:27:22 CDT)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
BGE, Inc.
dt4o
Carl J. Krogness, P.E.
Director Public Works
DATE: June 10, 2026
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Cla on M. Torrance, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (Jun 15, 2026 14:36:13 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: June 13, 2025
Page 2 of 2
M&C No.#: N/A
M&C Date: N/A OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Sanitary Sewer Rehabilitation Contract 123
104975
November 25, 2025
Tony Sholola, PE
Assistant Director, Water Department
City of Fort Worth
100 Fort Worth Trail
Fort Worth, Texas 76102
RE: Amendment No. 1— Design Services — Water Department
Design Services for Water and Sanitary Sewer Replacement Contract 123
City Project No. 104975
Dear Mr. Sholola:
As discussed in our meeting on August 1, 2025, and the coordination meeting on August 14, 2025, the
City has proposed that the following scope changes be made to the referenced project:
1. Addition of 780 linear feet of sanitary sewer line replacement along S Hughes from Ave J to Ave H
2. Addition of 100 linear feet of sanitary sewer line replacement along S Hughes at Ave N
The additional scope of work is summarized below.
M-191— Sanitary Sewer Reroute
It was determined that in -situ replacement of the M-191 sanitary sewer main posed too great a risk to the
existing 90-inch CMP storm drain. The current sanitary sewer line, according to as -built data, was
installed in the same trench as the existing storm drain with approximately one foot of separation. To
mitigate this risk, a reroute of the sewer line to S Hughes Ave is recommended.
The additional fee request includes project management, survey, design, Engineer's Opinion of Probable
Construction Cost, bid, and construction tasks. This proposed amendment increases the total contract
amount summarized below:
Original Contract amount $295,890
Amendment No. 1 - Sewer $ 18,665
Revised Contract Amount $314,555
Serving. Leading. Solving.-
BGE, Inc. • 777 Main Street, Suite 1900 • Fort Worth, Texas 76102 • 817-887-6130 • www.bgeinc.com
Amendment No. 1
Page 2
Please contact me at your earliest convenience to discuss our proposed amendment.
Sincerely,
Kara Britt, PE
Senior Project Manager
BGE, Inc.
TBPE Registration No. F-1046
Serving. Leading. Solving.'"
BGE, Inc. • 777 Main Street, Suite 1900 • Fort Worth, Texas 76102 • 817-887-6130 • www.bgeinc.com
IEIII�II
I�:=I
E t
UQr
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: BGE, Inc.
Subject of the Agreement: Sanitary Sewer Rehabilitation Contract 123
M&C Approved by the Council? * Yes ❑ No M
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ 61158-Al
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: 6/10/2026
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 104975
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.