WHEREAS, the City of Fort Worth (City) and Turner, Collie & Braden, Inc., (Engineer)
made and entered into City Secretary Contract No. 24373, (the Contract) which was
authorized by the City Council by M&C C-17058 on the 20"' day of October, 1998; and
WHEREAS, the Contract involves engineering services for the following project:
Engineering services for the improvements to Henderson Street Underpass at Union
Pacific Railroad and IH-30;
WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to
include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the additional engineering services
specified in a proposal letter dated October 12, 1999, a copy of which is attached hereto and
incorporated herein. The cost to City for the additionat design services to be performed by
Engineer total $10,620.00.
2.
Article II of the Contract is amended to provide for an increase in the maximum fee to
be paid to Engineer for all work and services performed under the Contract, as amended, so
that the total fee paid by the City for all work and services shall not exceed the sum of
$171,610.00
3.
All other provisions of the Contract that are not expressly amended herein shall
remain in full force and effect.
-Z-
���QC�B�� C����G�D
�8� ����G���ti
�a t�lU':'IlUllp �ISWo
EXECUTED on this the �
County, Texas.
ATTEST:
.���
Gloria Pearson ��
City Secretary
AP�ROV �
_ ��
�;; �-t��-
/
I
�
`
j���J G/ '�'`'u�
Mike Groomer
Assistant City Manager
APPRO L RECOMMENDED:
���,
Hugo A. Malanga, P.E., Director
Transportation and Public Works Department
Turner, Collie & Braden, Inc.
ENGINEER
By:
,, : ;��C-C - %�>v�/�
,F�obert C. 6�ach, P. E.
Vice President
APPROVED AS TO FORM AND LEGALITY:
�' '�
Gary Stein erger
Assistant City Attorney
ENG1.FRM(NO M&C)
L��: %11.f'-<'" �.L-;�'� l" l ks �
Contract Authorization
Date
day of �, 1999, in Fort Worth, Tarrant
-2-
.,�
,^
TurnerColli���Braden Inc.
Engineers • Planners • Project Managers
October 12, 1999
Mr. Mike Weiss, P.E.
City of Fort Worth
Transportation & Public Works Department
P.O. Box 870
Fort Worth, Texas 76101-0870
Re: Supplemental Authorization Request No. l
Henderson Street Improvements
TC&B Project No. 47-98680-720
Dear Mr. Weiss:
1200 Summit Avenue
Suite 600
Fort Worth, Texas 76102-4409
817 332-8977
Fax 817 332-8979
This letter is a request for supplemental authorization to provide for the following additional
engineering services requested by the City.
1) TC&B was requested to provide 6 alternative layouts for the Henderson Street — Rio
Grande intersection for the purpose of providing improved access to the GideonToal
building at the southeast corner of the intersection. This constitutes a design change
because a continuous, raised median along Henderson Street was requested by the City in
the 8/3/98 project scoping meeting.
After review of the alternatives by the City, TC&B was requested to revise the Henderson
Street construction plans to reflect the changes as shown on Alternative 6(attached). These
changes will require modifications to various plan sheets (roadway P&P, traffic control,
median details, illumination, signalization, signing, pavement marking, drainage, etc.) that
show the Henderson — Rio Grande intersection.
2) TC&B was requested to provide construction plans for the relocation of sanitary sewer L-
228-A*, the abandonment of portions of L-228 and L-229, and to investigate the
abandonment of the 6-inch and 4-inch waterlines in Henderson Street. This constitutes a
scope change because utility relocation plans were not included in the scope of services for
this project. It is our understanding that this work will include the preparation of
construction plans, quantity take-off, and construction cost estimate, but not Special
Contract Documents (specifications). We further understand that the plans will not be
advertised for bids, but will be constructed by the City's indefinite delivery utility
contractor.
Established in 1946
Engineering Excellence for Over One-Half Century
TEXAS AUSTIN / DALLAS / FORT WORTH / HOUSTON / RIO GRANDE VALLEY COLORADO DENVER FLORIDA MIAMI / WINTER PARK
• � Mr. Michael Weiss, P.E.
City of Fort Worth
Transportation & Public Works Dept.
Page 2
To accommodate this design change, additional meetings, engineering, and drafting work will
be required. A breakdown of individual tasks is provided on the attached sheet. The estimated
fee for this additional work is $10,620.
PROJECT FEE SUMMARY
Contract Item Descrintion Fee
Original Contract City Secretary Contract No. 24373 $160,990
Amendment No. 1 Intersection alt. & plan modifications $ 3,404
Utility relocations $ 7,216
TOTAL PROJECT $171,610
If you have any questions or need additional information concerning this request, please call me
at 332-8977.
Sincerely,
Stephen R. James, P.E.
Proj ect Manager
cc: File 2.1
N:�FTW�98680720_hrnderson�cortap\ftwWnend 1, 7.21.99.doc
lames Toal
Chairman
GideonToal
October 6, 1999
Mr. Dan Walsh
T/PW - Planning and Development
c�ty of rorc wotcn � �
1000 Throckrnorton � �
Fort Worth, TX 76102
Re: Gidcon Toal I3uilding / Henderson / El Paso intersection-
Related to I-30 [mprovements
Thanks for your cooperative approach to working with the owners of these two historlc
properties, the Old Dr. Pepper Plant (Gideon Toal) and the Public Market Bullding.
These two buildings create a gateway from Downtow to the Medical District. It is
important that we retain some reasonable access and�gress from our site in order to
protect the economic usefulness oE the property.
By way oE this letter, we are supporting the "Alternative G" solution with certain
adjustments and understandings that wc discussed at our last meeting. Pollowing, are
the understandings and condilions oE our support for.Alternative 6. Please see the
attached map with numerical reEerences related to the following points. .
1. Pull the median divider back nocthward to line up with the curtent south curb
line oE El Paso Street. �
2. Retain the protected leEt turn lane into our site as your drawing shows. This
allows 2 lanes oE southbound traffic to continue on Henderson Street, which is
good for traffic flow.
3. Close �he remaining short dead end segment oE El Paso Street and dedicate the
entire ROW (both sides of the centerline) to the owners oE the Dr. Pepper
building (Randy Gideon and James Toal - Island Services) at no cost to property
owners. This stretch of �1 Paso is no longer needed or functional as a public
street because the new west bound ramp from I-30 cuts off the stceet on our
east pro�erty line. There are no other private owners fronting on this street.
We're the only private property owner left east of Heriderson Street in this
whole area. We understand that some or all of the street will be needed for
utility easements. +
4. We'd like to work with you to find the best solution for the ADA ramps so as to
not compromise the historic entryway to our building.
5. With the instailation ot the median divider cutting oEf access to the El Paso
Street area, it is critical that we retain access to our parking lot at the southwest
corner oE our property (iust easc of ttle Henderson Street underpass structure).
Architecture • Engineering • Planning • Interiors • Landscape Architecture
1401 Henderson Street Fort Worth, Texas 76102 Phone 817.335.4991 Fax 817.877.1861
✓
► , ' 1
GideonToal
Dan Walsh
October 6, 1999
Page 3 �
Still, we are committed to staying at this location and preserving this historic building.
We are strong supporters of the central city, Downtown, and the Medical District.
Randy and I bought and rehabilitated this historic building and we did not request any
historic tax abatement or other special considerations from the City at that time, even
though it was e]igiUle. We felt we could afford to do what we needed to do and remain
tax payers. The previous owner felt that the reduced access would not be good for his
business. Our company provides over 50 very good jobs at this location.
Thanks again Eor you very cooperalive attitude, and we look forward to working with
you to make sure the whole Henderson / Lancaster corridor can attain its optimum
future.
Sincerely,
�
Ja e Toal
s
Attachment
/ �I/ '
� �•.
i
v
�
�
I
ri
�
�
�
L
0
�
)
:
r
r .
r
J
)
)
) '
�\
�'�.
t
,t
. i
, �
.�.... �
�
�
i!
i
'
0
. . .,�.��n�..
�'—$g"- x . ;. :
, .. . rnu� r -rr
{-� • 1 , ' \
� � �\
� �\
1 �
S S
tiaic.w+ � •
�� I
� 1 �
� ` , � � � '`
" � 't ::
� - ` f 1 � —•
► j ♦, i � ..
— � s: �s.�K � �:+ � �,,, � ,
wnoorw u
�C" - � -•.}o-•- • �[-� �; _1-----•---�-
r.»
"' ' _�..-1 ^ _ �t i_ � _
�
�+ �-► qi ••►
i 4 ~l � � l . R*i ,
� lli
i
. 1
0 \;
\` • . \
:� _,
� °.
:�
:�
:`
CON7INUOUS tEFT
TURN ONLY wITN MEDIAN
u�oa
�� � c+�etw .�.�
[�.�.�w•.cw.c�
Q � �.wr .w �w.�.
e ��w w
o .,�......
Q. � ..wx ww .,r •
Qr r �w� swr.
� u.s nR �
�ww Nt�
7.lmCoae(�i�radenfnG
.�.. �.......�.-..
_ •» I...... 1_,.
��"'f%.. �r.r.ri r�wwrrr
11hJ6�/tIFH IMTOI[�YNGL
fyAf » /-W I�ML.�1M MNtYI�
��rowtcrq� unut
r• �.r u .w�� x.
J --� -
_ -�-