HomeMy WebLinkAbout025356 - Construction-Related - Contract - J.B. Davies, Inc.AMENDMENT NO. 1
STATE OF TEXAS S CITY SECRETARY COI�?TRACT NO. ,� �j ,��j �
COUNTY OF TARRP,NT s
WHEREAS, the City of Fort Worth (City) and J.B. Davies, Inc.,
(Engineer) made and entered into City Secretary Contract No.
24351, (the Contract) which was authorized by the City Council by
M&C C-17042 on the lOth day of October 1998; and
WHEREAS, the Contract involves engineering services for the
following project:
Pavement Reconstruction and Water and Sanitary Sewer
Replacements on Lipscomb Street (Magnolia to Ingram);
Lipscomb Street (Hawthorne to Jessamine); West Cantey Street
(5�' to College); West Lowden Street(Adams to Hemphill) and
South Adams Street (West Jessasnine to Elizabeth).
WHEREAS, it
to said Contract
maximum fee;
has become necessary to execute Amendment No. 1
to include an increased scope of work and revised
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I, of the Contract is amended to include the
additional engineering services specified in M&C C-17706, adopted
by the City Council on the 19th day of October 1999, and further
amplified in a proposal letter dated August 18, 1999, copies of
which are both attached hereto and incorporated herein. The cost
to City for the additional services to be performed by Engineer
total $49,597.35.
��
Article II, of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
��
'�'I�I��'G���,� C_'��Vu���
� �� ������a�l
�a UU�:/U'1��0 ��Wa
total fee paid by the City for all work and services shall not
exceed the sum of $139,005.16.
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and e£fect.
EXECUTED on this the ,� ����-� day of ��� C���L�y2.��CE'%1��, 1 , Zggg �
in Fort Worth, Tarrant County, Texas.
AT��T : C - I �'�% �� .
�� Contract Authorization
�.�t2. . ._.P_?�,-�..�_ ( � _ p � pQ
�� � -I I -1
Gl�oria Pearsdn, City Secretary --
r;,;, t ,,
City Secretary
APPROVAL RECOI��NDED: APPROVED:
-,�.`�'�Ca � �.. '
A. Douglas Rademaker, P. E. ��' Mike Groo�iner
Director, Department of Assistant City Manager
Engineering
J.B. Davies, Inc.
Engineer
BY � !�"_2���� �
Name: Edward L. Green, P.E.
Vice President
1412 West Magnolia Avenue
Fort Worth, TX 76104-4249
APPROVED AS TO FORM AND LEGALITY:
Gary Steinberger
Assistant City Attorney
24351
City o�'Fort T�'orth, �'ezas
�✓�Ayar And C.a�nc�l C,ammun�cA��an
DATE
10/19/99
SU BJ ECT
REFERENCE NUMBER LOG NAME
PAGE
**C-�7706 30LIPS I 1 of 2
APPROPRIATION ORDINAf� CE AND AMENDMENT NO. 1 TO ENGINEERING
AGREEMENT WITH J.B. DAVIES, INC. FOR PA'✓EMENT RECONSTRUCTION AND
WATER AND SANITARY SEWER REPLACEMENTS ON LIPSCOMB STREET
(MAGNOLIA TO INGRAM); LIPSCOMB STREET (HAWTHORNE TO JESSAMINE);
WEST CANTEY STREET (5TH TO COLLEGE); WEST LOWDEN STREET (ADAMS TO
HEMPHILL) AND SOUTH ADAMS STREET (WEST JESSAMINE TO ELIZABETH)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer of $19,311.64 from the Water and Sewer Operating Fund to the Water Capital
Project Fund; and
2. Adopt the attached appropriation ordinance�increasing estimated receipts and appropriations in thP
Water Capital Project Fund in the amount of $19,311.64 from available funds; and
3. Authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 24351 with
J.B. Davies, Inc. in the amount of $49,597.35 to provide for additional survey and design services,
thereby increasing the contract amount to $139,005.16. ` .
DISCUSSION:
On October 13, 1998 (M&C C-17042), the City Council authorized the City Manager to execute an
engineering agreement with J.B. Davies, Inc. in the amount of $89,407.81 for the preparation of plans
and specifications for pavement reconstruction and water and sanitary sewer replacements on
Lipscomb Street (Magnolia to Ingram); Lipscomb Street (Magnolia to Jessamine); West Cantey Street
(5th to College); West Lowden Street (Adams to Hemphill) and South Adams Street (West Jessamine
to Elizabeth).
Community Development Block Grant (CDBG) Year XXI, Fairmont Street reconstruction funds, are
available for the reconstruction of Henderson Street (West Allen Street to West Arlington Street) and
College Avenue {West Allen Street to one-half block south of Jefferson Avenue). Since both streets are
in the same neighborhood as the streets being designed under City Secretary Contract No. 24351, and
to ensure that all seven streets are constructed under a single contract, staff recommends that the
contract with J.B. Davies, Inc. be amended to provide the necessary design services for both streets.
The deteriorated water lines on both Henderson Street and College Avenue will also be replaced.
In .addition to the• contract amount, $1,000.00 is - required for water project management by the
Department of Engineering.
•.. J.B. Davies, Inc. submitted a proposal in the amount of $49,597.35 for the additional services to be
,� provided. Staff considers the fee to be fair and reasonable for the additional services.
Cit,y of Fort Worth, Texas
�i✓IJ' A��r And �aunc�l C,ammun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
10/19/99 **C-17706 I 30LIPS I 2 of 2
SUBJECT APPROPRIATION ORDINANCE AND AMENDMENT NO. 1 TO ENGINEERING
AGREEMENT WITH J.B. DAVIES, INC. FOR PAVEMENT RECONSTRUCTION AND
WATER AND SANITARY SEWER REPLACEMENTS ON LIPSCOMB �STREET
(MAGNOLIA TO INGRAM); LIPSCOMB STREET (HAWTHORNE TO JESSAMINE);
WEST CANTEY STREET (5TH TO COLLEGE); WEST LOWDEN STREET (ADAMS TO
HEMPHILL) AND SOUTH ADAMS STREET (WEST JESSAMINE TO ELIZABETH)
J.B. Davies, Inc. is in compliance with the City's M/WBE Ordinance by committing to an additional 18%
M/WBE participation on this amendment.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that upon completion of recommendation 1 and the adoption of the
attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated,
of the Water Capital Project Fund and the Grants Fund.
MG:j
Submitted for City Manager's
Office by: ,
Mike Groomer
Originating Department Head:
A. Douglas Rademaker
Additional Information Contact:
A. Douglas Rademaker
I FUND
� (t�)
� 1&2) PW53
6140 I, 2) PW53
2) PW53
I
6157 � (from)
I1) PE45
3) PW53
, � 3) GR76
G157 �
ACCOUNT � CENTER � AMOUNT
472045 060530175330 I $19,311.64
541200 060530175330 $18,311.64
531350 030530175330 � $1,000.00
� I
538070 I 0609020 $19,311.64
541200 060530175330 $18,311.64
539120 I 005206101730 $31,285.71
CITY SECRETARY
ApPR�VED
CITY C013NCfL
OCT �g 1999
��.� ��
City Searetarp of tke
Cit� of Fort Wortn, Texas
Adopted Ordinance No, [;��
y
� �
�
August 18, 1999
J.B. DAVtES lNC., ENGlNEERS & SURVEYORS
Mrs. Dena Johnson, P.E.
�Department of Engineering
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas 76102
RE: Ammendment No.1, Design Fee for:
Street Design of Henderson Street from W. Allen Street to W. Arlington Street
and College Street f�om W. Allen Street to 1/2 block south of Jefferson Street and
Wateriine Design for 10" waterline replacement in Henerdson from W. Allen to W. Ariington
and 8" waterline replacement in College from W. Alien to W. Jefferson
Dear Dena,
We appreciate the opportunity to present this proposal and fee schedule for you consideration.
Attached please find construction cost estimates and exhibits depicting the additional
street and waterlines to be replaced. Attachment (1) contains a Construction Cost Estimate and
following is a breakdown of the proposed design fee:
1) STREETS
Henderson from W. Allen Street to W. Arlington Street $ 246,379.76
College from W. Allen Street to 1/2 block south of Jefferson $ 113,840.54
Subtotal Esfimated Construcfion Cost $ 360,220.30
Basic Engineering Design Services: (TSPE Curve for original contract: 8.25°/ax 0.85=7.01 %)
7.01 % x Total Estimated Construction Cost = Basic Design Fee
Engineering Basic Design
Surveying
Reproduction i
Additional Services
SUBTOTAL Street & Drainage Fee
10% of M/WBE Subcontracts
Total Fee for Street & Drainage
FWE98047
FEE:
$25,251.44 �
$4,034.10
$ 957.16
$ 480.00
$30,722.70
$563.00
$31,285.71 �
Page 1 amendment1 rev2.xls
1412 West Maqnolia Avenue / Fort Worth, Texas 761 04-4249 / 81 7-335-31 54 / Fax 817-870-1503
Amendment No. 1 98 CIP Contract 42
Leiter to Mrs. Dena Johnson, P.E.
August 18, 1999
Page 2
2) WATER LINES ,
10" Waterline in Henderson - W. Allen Street to W. Arlington Street . $ 117,498.70
8" Waterline in College from W. Ailen Street to W. Jefferson Street $ 44,006.60
Subtota! Estimated Construction Cost $ 161,505.30
Basic Engineering Design Services: (TSPE Curve for original contract: 10.25%x 0.85=8.71 %)
8.7i% x Total Estimated Construction Cost = Basic Design Fee
Engineering Basic Design
Surveying
Reproduction
Additional Services
SUBTOTAL Waterline Fee
i0% of M/V1/BE Subcontracts
Total Fee for Waterlines
70TAL NOT-TO-EXCEED AMENDMENT N0.1
We will be using Elder's Computerized Drafting Service for drafting and
Jim's Reproductions for printing construction plans and specifications. This will result in:
of the contract amendment that will be preformed by approved MIWBE firms.
If you have any questions or require additional information, please give me a call.
A summary of the total project fees are as follows
Contract
Original Contract
Amendment No. 1
Total Project
Description
Streets
$63,387.56
$31,285.71
$94,673.27
Water Sewer
$19,163.04 $6,857.21
$18,311.64 $0.00
$37,474.68 $6,857.21
$14,067.11 �
$2,892.50
$ 656.20
$ 360.00
$17,975.81
$335.83
$'18,319.64 �
$49,597.35
18%
Fee
Sincerely,
����s��
Edward L. Green, P.E. -
Vice President
FWE98047
$89,407.81
$49,597.35
$139,005.16
Page 2 amendmentl rev2.xls
Attachment (1) - COST ESTIMATE SUMMARY
AMENDMENT1
1998 Capitol Improvement Program Project Contract #12
DOE Nos.: 2168, 2169, 2171, 2172, & 2173
See attached detailed cost breakdown on Attachements (1A thru 1 D)
SUMMARY
STREET AND DRAINAGE
(1A) Henderson Street $
(1 B) College Street $
Subtota! Streets: $
WATER
(1 C) Henderson Street $
(1D) College Street $
Subtotal Water: $
246,379.76
113,840.54
360,220.30
117,498.70
44,006.60
161,505.30
Since ENGINEER has no control over lhe cost of Iabor, materials, equipment or services tumished by others, or over the Contractor(s)
methods of detertnining prices, or over competitive bidd(ng or market candi�ons, ENGINEER's opinions ot probable Total proJect Costs and
Construction Cost provided for herein are made on the basis ot ENGINEER's experience and Qualfications and represent ENGINEER's best
judgment as an experienced and qualified professional engineer, famllar with the consWction industry; but ENGINEER cannot and dces not
guarantee that propsals, bids or actual Total Project or Constructian Costs w11 not vary from opinions of probable cost prepared by
Engineer. I( prior to the bidding or Negotiating Phase OWNER wishes greater assurance to ConsWctfon Cost he shail employ an Independent
Cost estimator.
�
FWE98047
�
i`
!F
amendmenN rev2.xls
�
�
Attachment (1A)
APPROXIMATE
QUANTITY
2
1
575
2665
4850
9585
74
918
5482
4600
2665
9565
5876
775
11
4.1
1092
3
2
1
96
4
�
UNITS
EA
LS
LF
LF
SF
SF
TON
CY
SY
SY
LF
SF
SF
SF
EA
CY
SY
EA
EA
EA
LF
EA
DESGRIPTlON OF ITEM UNIT
PR10E
PROJEC7 DESIGNATION S1GNS $300.00
UTILITY ADJUSTMENTS $2,800.00
SAWCUT EXISTING CONCRETE DRIVEWAYS AND SIDEWALKS TO BE REMOVED $2.20
REMOVE EXISTING CURB AND GUTTER $2.40
REMOVE EXIST(NG CONCRETE DRIVEWAY $0.70
REMOVE EXISTING CO►JCRETE SIDEWALK, LFJ�IDWALK AND WHEELCHAIR RAMPS $0.65
CEMENT MATERIAL FOR STABILIZATION $110.00
UNCLASSIFIED STREET EXCAVATION $12.50
8" PULVERIAZATION WITH 5% CEMENT STABILIZATION $3.35
3" HMAC OVERLAY TYPE "D" MIX PAVEMENT $7.25
7" CURB AND GUTTER - g��,p�
PROP . STD. 4" RElNFORCED CONCRETE SIDEWALK, LEADWALK AND WHEELCHAIR RAM $3.50
PROP. STD. 6" REINFORCED CONCRETE DRIVEWAY APPROACH $3.75
PROP. STD. CONCRETE VALLEY GUTTER $4.40
WATERVALVE ADJUSTMENT $200.00
TOPSOIL $9.00
SOLID SOD RERPLACEMENT $9.00
REMOVE EXIST 5' INLET $500.00
REMOVE EXIST 5' INLET W/DRAINAGE GATE $600.00
REMOVE EXIST DRAINAGE GATE $450.00
PROP. 24" CLASS Ifl RCCP $75.00
PROP, STD 10' STORM DRAIN INl.ET $2,500.00
SUB TOTAL AMOUNT FOR HENDERSON STREET IMPROVEMENTS =
10°/. CONTINGENCY =
TOTAL AMOUNT FOR HEND�RSON STR��T IMPROVEMEN7S =
TOTAL
AMOUNT
$600.00
$2,800.00
$1,265.00
$6,396,00
$3,395.00
$6,217.25
$8,140.00
$11,475.00
$18,364.70
$33,350.00
$40,641.25
$33,477,:50
$22,035.00
$3,410.00
$2,200.00
$36.80
$9,828.00
$1,500.00
$1,200.00
$450.00
$7,200.00
$10,000.00
�223,981.60
a22,398.16
� �246,379.76
�
FWE98047 amendmentl rev2.xis
Attachment (16)
APPROXIMATE
QUANTITY
2
1
473
926
2267
6628
27
339
2031
1898
1016
6628
3335
1328
4
58
282
2
�
UNITS
EA
LS
LF
LF
SF
SF
TON
CY
SY
SY
LF
SF
SF
SF
EA
CY
SY
EA
DESCRIPTlON OF ITEM UNIT
PRICE
PROJECT DESIGNATION SIGNS $300.00
UTILITY ADJUSTMENTS $1,060.00
SAWCUT EXISTING CONCRETE DRIVEWAYS AND SIDEWALKS TO BE REMOVED $2.20
REMOVE EXISTING CURB AND GUTTER $2.40
REMOVE EXISTING CONCRETE DRIVEWAY $0.70
REMOVE EXISTING CONCRETE SlDEWALK, LEADWALK AND WHEELCHAIR RAMPS $0.65
CEMENT MATERIAI. FOR STABILIZATION $110.00
UNCLASSIFIED STREET EXCAVATION $12.50
8" PULVERIAZATION WITH 5% CEMENT STABILIZATION $3.35
3' HMAC OVERLAY TYPE "D" MIX PAVEMENT . $7.25
7" CURB AND GUTTER $15.25
PROP . S7D. 4" REINFORCED CONCRETE SIDEWALK, LEADWALK AND WHEELCHAIR RAM $3.50
PROP. STD. 6" REINFORCED CONCRETE DRIVEWAY APPROACH $3.75
PROP. STD. CONCRETE VALLEY GU7TER $4.40
WATERVALVE ADJUSTMENT $200.00
TOPSOIL $g.Qp
SOLID SOD RERPlACEMENT $9.00
REMOVE AND REPLACE EXISTING 10' INLET TOP $2,000.00
SUB TOTAL AMOUNT FOR COLLEGE STREET IMPROVEMENTS =
' 10% CONTINGENCY =
TOTAL AMOUNT FOR COLLEGE STREET tMPROVEMEHTS =
TOTAL
AMOUNT
$600.00
$1,060.00
� 1,040.60
$2,222.40
$1,586.90
$4,308.20
$2,970.00
$4,237.50
$6,803.85
$13,760.50
$15,494.00
$23,198.00
$12,506.25
$5,843.20
$800.00
$522.00
$2,538.00
$4,000.00
�103,491.40
510,349.14
�113,840.54�
FWE 98047 amendmentl rev2.xis
Attachment (1C)
APPROXIMATE
QUANTITY
129
1320
221
25
2
9
1.78
37
6i0 ,
35
2
37
2
2
1715
4
UNITS
LF
LF
LF
LF
EA
EA
TON
EA
., LF
EA
EA
EA
EA
EA
LF
— - LF
DESCRIPTION OF ITEM UNIT
PRICE
8" WATER LINE (including Removal and Abandoning of Existing) $28.00
10" WATER LINE (including Removai and Abandoning of Existing) $31.00
12" WATER LINE (including Removal and Abandoning of Existing) $33.00
6" DIP WATER L(NE $44.00
6" GATE VALVE WITH CAST IRON BOX AND LID $500.00
8" GATE VALVE WfTH CAST IRON BOX AND LID $640.00
CAST fRON AND DUCTfLE (RON FITTtNGS WITH CONRETE BLOCKING. $2,400.00
1" SERVICE TAP, SADDLE, STOP AND FI7TINGS $240.00
.._1" COPPER SERVICE LINE $16A0
FURNISH AND SET CLASS "A' (Sing(e Service) iVIE7ER BOX �� $85.00
FURNISH AND SET CLASS "C' (Dual Senrice) METER BOX - $100.00
RELOCATE METER BOX $160.00
REMOVE AND SALVAGE EXISTING FlRE HYDRANT $194.00
STANDARD FIRE HYDRANT 3'-6" BURY DEPTH $1,300.00
2" TEMPORARY ASPHALT PAVEMENT REPAIR PER FIG "A" $7.00
PERMANENT PA1lEMENT REPAIR PER FIG 4. $35.00
SUB TOTAL AMOUNT FOR WATER LINE REHABILITATION AND IMPROVEMENTS =
10% CONTINGENCY =
TOTAL AMOUNT FOR WATER L1NE REHABILITATION AND IMPROVEMENTS =
TOTAL
AMOUNT
$3,612.00
$40,920.00
$7,293.00
$1,1Q0.00
$1,OOO.QO
$5,760.00
$4,272.00
$8,88Q.00
$9,760.00
$2,975.00
$200.00
, , $5,920.00
$380.00
$2,600.00
$12,005.00
$140.00
$106,81T.00
�10,681.70
$117,498.70
FWE 98047 . amendment1 rev2.xls
Attachment (1 D)
APPROXIMATE
QUANTI7Y
612
7
1
3
0.27 .�
14
300
12
2
14
1
1
912
UNITS
LF
LF
EA
EA
TON �
EA
LF
EA
EA
EA
EA
EA
LF
DESCRIPTION OF ITEM UNIT
PRICE
8" WATER L(NE (including fZemoval and Abandoning of Existing) $28.00
6" DIP WATER LINE $44.00
6" GATE VAl.VE WITH CAS7 lRON BOX AND LID $500.00
8" GATE VALVE WITH CAST IRON BOX AND L1D $640.00
CAST lRON AND DUCTILE 1RON FlTT1NGS WITH CONRETE BLOCKING $2,400.00
9" SERVICE TAP, SADDLE, STOP AND FITTINGS $240.00
1" COPPER SERVICE LINE $16.00
FURNISH AND SE7 CLASS "A' (Single Service) METER BOX $85.00
FURNISH AND SET CLASS "C' (Dual Service) METER BOX $100.Q0
RELOCA7E METER BOX $160.00
REMOVE AND SALVAGE EX(STING FIRE HYDRANT $190.00
STANDARD FIRE HYDRANT 3'-6" BURY DEPTN $1,300.00
2" TEMPORARY ASPHALT PAVEMENT REPAIR PER FIG "A" $7.00
SlJB TOTAL AMOUNT FOR WATER LINE REHABILITATION AND IMPROVEMENTS =
90% CONTlNGENCY =
TOTAL AMOUNT FOR WATER LINE REHABIUTAT(ON AND IMPROVEMENTS =
TOTAL
AMOUNT
$17,136.00
$308.00
$500.00
$1,920.00
� $648.00
$3,360.00
$4,800.00 _
� � $1,020.00
$200.00
$2,240.00
$130.00
$1,300.00
$6,384.00
�40,006.00
�4,000.60
$44,006.60
FWE 98047 amendment9 rev2.xls
Attachment (2) - MIWBE SUMMARY
AMENDMENT1
1998 Capitol Improvement Program Project Contract #12
DOE Nos.: 2168, 2169, 2171, 2172, & 2173
DESIGN FEE COST SUMMARY
Unit Fee
I — Street and Drainage
il — Water
TOTAL
Proposed M/WBE Subconsultants
Elder's Computerized Drafting Service
Jim's Reproduction Service, Inc.
TOTAL
FWE98047
$31,285.71
$18,311.64
$49,597.35
Services
MWBE
Fees
Drafting Streets
Drafting Water
Printing Streets $
Printing Water $
%
$5,630.05 18.0%
$3,358.31 18.3%
$8,988.36 18.1 %
%
$4,672.89 9.4%
$2,702.11 5.4°/a
957.16 1.9%
656.20 1.3%
$8,988.36 18.1 %
amendmentl rev2.xls
Attachment (3) - SURVEY, CONSTRUCTION SERVICES and REPRODUCTIONS FEE
AMENDMENT4
1998 Capitol Improvement Program ProJect Contract #12
DOE Nos.: 2168, 2169, 2171, 2172, & 2773
STREETS & DRAINAGE
Special Seroi�es •
Design Survey (1,92i LF x$2.10/LFj $ 4,034.10
Construction Services
� Prebid Conference, Meetings/cursory inspection during construction (4 hrs. x S120.00) $ 480.00
Reproductions" .
i6 Sets of preliminary plans - review & util. clear. ($10.26 / set) $ 164,�g
� 40 Sets of Construction Plans ($10.26 / set) $ 410.40
�40 Sets of Specifications ($ 7.00 / ea.) $ 280.00
1 Sets of Mylars 1 set per part/unit ($102.60 / ea.j $ 102.60
Subtotai M8E printing $ 957.16
: 10% of MBE Printing Subcontractor $ 95.72
� TOTAL � $ 5,471,26 �
"Estimated using one plan set / two units per set with 9 sheets for Unit 1(54 SF / set of Unit 1)
WATER
Special Services �
Design Survey (2,314 LF x$1.25/LF) $ 2,892.50
Construction Services
Prebid Conference, Meetingslcursory inspection during construction (3 hrs. x$120.00} • $ 360.00 �
Reproductions"
16 Sets of preliminary plans - review & util, Gear. ($5.70 / set) $ 91.20
40 Sets of Construction Plans ($5.70 / set) $ 228.00
. 40 Sets of SpecificaGons ($ 7.00 / ea.) $ 280.00
1 Sets ot Mylars 1 set per part/unit ($57.00 / ea.) $ 57.00
Subtotal MBE printing $ 656.20
10% of MBE Printing SubconUactor $ 65.62
TOTAL � $ 3,908.70 �
'"Estimated using one plan set / two units per set with 5 sheets for Unit 2(30 SF / set of Unit 2)
�
�
�
FWE 98047
amendmenti rev2.xls
City of Fort Worth, Texas
n✓1�1Ayar And C,aunc�l L,ae»muni�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
10/19/99 **C-17706 I 30LIFS I 1 of 2
SUBJECT APPROPRIATION ORDINANCE AND AMENDMENT NO. 1 TO ENGINEERING
AGREEMENT WITH J.B. DAVIES, INC. FOR PAVEMENT RECONSTRUCTION AND
WATER AND SANITARY SEWER REPLACEMENTS ON LIPSCOMB STREET
(MAGNOLIA TO INGRAM); LIPSCOMB STREET {HAWTHORNE TO JESSAMINE);
WEST CANTEY STREET (5TH TO COLLEGE); WEST LOWDEN STREET (ADAMS TO
HEMPHILL) AND SOUTH ADAMS STREET (WEST JESSAMINE TO ELIZABETH)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer of $19,311.64 from the Water and Sewer Operating Fund to the Water Capital
Project Fund; and . ' ' �
2. Adopt the attached appropriation ordinance�increasing estimated receipts and appropriations in tF�e
Water Capital Project Fund in the amount of $19,311.64 from available funds; and
3. Authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 24351 with
J.B. Davies, Inc. in the amount of $49,597.35 to provide for additional survey and design services,
thereby�increasing the contract amount to $139,005.16. �
DISCUSSION:
On October 13, 1998 (M&C C-17042), the City Council authorized the City Manager to execute an
engineering agreement with J.B. Davies, Inc. in the amount of $89,407.81 for the preparation of plans
and specifications for pavement reconstruction and water and sanitary sewer replacements on
Lipscomb Street (Magnolia to Ingram); Lipscomb Street (Magnolia to Jessamine); West Cantey Street
(5th to College); West Lowden Street (Adams to Hemphill) and South Adams Street (West Jessam.ine
to Elizabeth).
Community Development Block Grant (CDBG) Year XXI, Fairmont Street reconstruction funds, are
available for the reconstruction of Henderson Street (West Allen Street to West Arlington Street) and
College' Avenue (West Allen Street to one-half block south of Jefferson Avenue). Since both streets are
in the same neighborhood as the streets being designed under City Secretary Contract No. 24351; and
to ensure that all seven streets are constructed under a single contract, staff recommends that the
contract with J.B. Davies, Inc. be amended to provide the necessary design services for both streets.
The deteriorated water lines on both Henderson Street and College Avenue will also be replaced.
.In addition to, the contract amount, $1,000.00 is required for water project management by the
Department of Engineering.
J.�. Davies, Inc. submitted a proposal in the amount of $49,597.35 for the additional services to be
provided. Staff considers the fee to be fair and reasonable for the additional services. _
� City of Fo�t Worth, Texas
� �✓�Ar�4r A11d �,c�unc�l C.ammun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
10/19/99 **C-17706 I 30LIPS 2 of 2
SUBJECT APPROPR1ATlON ORDINANCt AND AMENDMENT NO. 1 70 ENGINEERING
AGREEMENT WITH J.B. DAVIES, INC. FOR PAVEMENT RECONSTRUCTION AND
' WATER AND SANITARY SEWER REPLACEMENTS ON LIPSCOMB STREET
(MAGNOLIA TO INGRAM); LIPSCOMB STREET (HAWTHORNE TO JESSAMINE);
WEST CANTEY STREET (5TH TO COLLEGE); WEST LOWDEN STREET (ADAMS TO
HEMPHILL) RND SOUTH ADAMS STREET (WEST JESSAMINE TO ELIZABETH)
J.B. Davies, lnc. is in compliance with the City's M/WBE Ordinance by committing to an additional 18%
M/WBE participation on this amendment. � .
�ISCAL 1NFORMATION/CERTiFICATION:
The Finance Director certifies that upon completion of recommendation 1 and the adoption of the
attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated,
� of the Water Capital Project Fund and the Grants Fund.
MG:j
Submitted for City Manager's
Office by:
Mike Groomer
Originating Department Aead:
A. Douglas Rademaker
Additional Information Contact:
A. Douglas Rademaker
� FUND
� (to) �
� 1&2) PW53
6140 � 2) PW53
2) PW53
�
6157 � (from)
1) PE45
3) PW53
3) GR76
6157 �
� ACCOUNT � CENTER f AMOUNT
472045 060530175330 1 $19,311.64
541200 060530175330 $18,311.64
531350 030530175330 $1,000.00
538070 0609020 $19,311.64
541200 060530175330 $18,311.64
539120 005206101730 $31,285.71
CITY SECRETARY
���� ��
���Y ��������i�.
��T � � � ��9
�i,
�� �'���,�..�
�iCj +�i�:C?9Y"a: J 7f i°'c3
•'• 29
;,�i�q �t Fort srcr.n, -�x
�dupted Ordir�ance No, �;�-�