HomeMy WebLinkAbout025355 - Construction-Related - Contract - Wendy Lopez & Associates, Inc.�
AMENDMENT NO. 1
STATE OF TEXAS b CITY SECRETARY CONTRACT NO.
,�.5 35.�
COUNTY OF TARRANT b
WHEREAS, the City of Fort Worth (City) and Wendy Lopez &
Associates, Inc., (Engineer) made and entered into City Secretary
Contract No. 24775, (the Contract) which was authorized by the
City Council by M&C C-17350 on the 30th day of March 1999; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Main 21 Drainage Area
Sanitary Sewer System Rehabilitation and Improvements (Group
7, Contract 3), Part 3.
WHEREAS, it has become necessary to execute Amendment No. 2
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a M&C C-17648 adopted
by the City Council on 21St day of September 1999, and further
amplified in a proposal letter dated August 2, 1999, copies of
which are both attached hereto and incorporated herein. The cost
to City for the additional design services to be performed by
Engineer total $24,000.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $93,632.77.
u��OCB/�� ��C�C�Q�
�D�i ���cG��G?�l
�o ��r'�a9 ��. ,
,
��
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the ;��r'�� day of f/(��T�>.y^�-f:I�F'�
�
1999, in Fort Worth, Tarrant County, Texas.
/ �
AT �iT : ' —�
-:��� � �
Gloria Pearsdn City Secretary
APPROVAL RECONlD�NDED :
� •'�Ulil� �cZ Y�Yd.�'
A. Douglas Rademaker, P.E.
Director, Department of
Engineering
�— I��e�g
Contract Au�horization
�'�►— �9
'•;ate
APPROVED:
O
Mike Groomer � �
Assistant City Manager
WENDY LOPEZ & ASSOCIATES, INC.
ENGINEER
�
By . /f'�, � /
Name: Wendy Lopez, P.E.
President
3800 Sandshell Dr., Suite 175
Fort Worth, TX 76137
APPROVED AS TO FORM AND LEGALITY:
Gary Stei erger
Assistant City Attorney
24775-1
-2-
City of Fo�t Worth, Texas
��A��� At�� C�unc�l �',,a�r»mun�c���an
DATE REFERENCE NUMBER LOG NAME PAGE
9�21�99 • '�'�C-17648 I 30WENDY I 1 of 1
SUBJECT AMENDMENT NO. 1 TO ENGINEERING AGRE�MENT WITH WENDY LOPEZ &
ASSOCIATES, INC. FOR MAIN 21 DRAINAGE AREA SANITARY SEWER SYSTEM
REHABILITATION AND IMPROVEMENTS (GROUP 7, CONTRACT 3) PART 3
RECOMMENDATION:
It is recommended that the City Council �authorize the City Manager to execute Amendment No. 1 to
City Secretary Contract No. 24775 with Wendy Lopez & Associates, Inc. in the amount of $24,000.00 to
provide for additional design and survey services, thereby increasing the contract amount to
$93,632.77.
DISCUSSION:
On March 30, 1999 (M&C C-17350), the City Councl
engineering agreement with Wendy Lopez & Associa
preparations of plans and specifications for Main
Rehabilitation and (mprovements (Group 7, Contract 3)
north by Irma Street, on the south by Richmond Street,
by the Un9on Pacific Railroad.
authorized the City Manager to execute an
es, Inc. in the amount of $69,632.77 for the
21 Drainage Area Sanitary Sewer System
Part 3. The project is generally bound on the
on the east by Belzise Street and on the west
It has been determined that an additional 1,400 linear feet of severely deteriorated sanitary sewer lines
located within the project area must be replaced. The poor condition of the identified sewer lines was
not known at the time the original engineering agreement was a�proved by the City Council. The
recommended amendment will allow Wendy Lopez & Associates, Inc. to perform the necessary survey
and design work for the additional sewer lines. Staff considers th� proposed fee of $24,000.00 to be
fair and reasonable for the additional work to be performed.
Wendy Lopez & Associates, Inc. is in compliance with the City's M/WBE Ordinance by committing to an
additional 7% M/WBE participation on this amendment.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the Commercial Paper-Sewer Fund.
MG:j
Submitted for City Manager's
Office by:
Mike Groomer
Originating Department Head:
A. Douglas Rademaker
Additional Information Contact:
A. Douglas Rademaker
� FUND � ACCOUNT
I (to)
6140 I
�
6157 � (from)
I PS46 531200
i
G157 I
CENTER I AMOiJNT
070460410310 � $24,000.00
CITY SECRETARY
APPROIiED
C1T� COUNCft
S � p 21 1999
�ju.. ��tr e,�.�-1J
C[tg Socrs4�ry ot' the
Citp at Fost w°dcrth,'S�x:�::
.`
�
Wendy Lopez & Associates, Inc.
engineerrng • environmental • surveying • construction services
August 2, 1999
Mr. Rakesh Chaubey, P. E.
Department of Engineering
City of Fort Worth
811 Lamar Street Suite 310
Fort Worth, TX 76102
RE: Engineering Contract Amendment No. 1 for Project No. PS46-070460460310
D.O.E. No. 2488; WLA Project No. 99008.00
Sanitary Sewer Main 21 Drainage Area Rehabilitation and Improvement
(Group 7, Contract 3) Part 3
Dear Mr. Chaubey:
This letter outlines our request for revised authorization '�and contract amendment for
engineering and surveying fees. and specifications for the rehabilitation/replacement of sanitary
sewer lines. The additional scope of work was reviewed with you and Mr. Tony Sholola, P.E.
in our meeting on July 13, 1999, and our approach to this additional design work for
approximately 1,400 LF line was summarized in a letter to you dat�d July,l3, 1999.
The total engineering and surveying fee for the services is $24,000. A detailed breakdown of
the fee estimate is attached.
� Contract (
�Ori�inal �
Amend No �
� �
I Totals�
Contract Amendrnent No. 1 Design Fee Brea�Cdown
Date � Basic 1 Special � Construction �Reproductio �
3/29/99 $38,708.22 $24.331.95� $3,647.60 $2,945.00
7/27/99 $17,000.00 $4,600.00 $2,155.00 $245.00
� $57,365.93� $28,931.95� $5,833.60 $3,190.00�
Total
$69, 632.77
$24,000.00
$93,632.77I
This additional work will increase the work required of our M/WBE subconsultants. We
intend to utilize ANA Consultants, L.L.C. in an expanded role to provide assistance in
preparing the drawings. There will be additional reproduction work which will be provided by
Arlington Blueline. Both these firms were a part of our original design team and both are
certified M/WBE entities. The following is a summary of the anticipated M/WBE
participation.
3800 Sandshell Drive • Suite 175 • Fort Worth, Texas 76137 •(817) 232-0244 • FAX (817) 232-4638
.`
Mr. Rakesh Chaubey, P.E.
Department of Engineering _
City of Fort Worth
August 2, 1999 �
Page Two
� � Contract � ANA Consultants � Arlington Blueline �
� � Original � $69, 632.77 � $11, 660: 00 � $2, 610.00 �
� Amendment No. 1 24,000.00 � 1,540ti,00 � . 245.00 �
� TOTAL $93,632.77 � I $13,200;'00 � $2,855.00 �
Total estimated M/WBE participation amounts to $16,055, or 17.15 percent of the total
contract amount, which exceeds the goal of 17 percent.
If you have any questions or comments, please do riot hesitate to call me.
Sincerely,
WENDY LOPEZ & ASSOCIATES, INC.
Paul R. Holmes, P.E.
Manager, Fort Worth Office
I' � *�
Enclosures
K:\Projects\99008 Main 21\Conespondence\Chaubey, Revised Contract Amendment No. I.doc
�
City of Fort Worth, Texas
�1✓1'Ayar And C,aunc�l Cammun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
9�21�99 **C-17648 30WENDY I 1 of 1
SUBJECT AMENDMENT NO. 1 TO ENGINEERING AGREEMENT WITH WENDY LOPEZ &
ASSOCIATES, INC. FOR MAIN 21 DRAINAGE AREA SANITARY SEWER SYSTEM
REHABILITATION AND IMPROVEMENTS (GROUP 7, CONTRACT 3) PART 3
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to
City Secretary Contract No. 24775 with Wendy Lopez & Associates, Inc. in the amount of $24,000.00 to
provide for additional design and survey services, thereby increasing the contract amount to
$93,632.77.
DISCUSSION:
On March 30, 1999 (M&C C-17350), the City Council authorized the City Manager to execute an
engineering agreement with Wendy Lopez & Associates, Inc. in the amount of $69,632.77 for the
preparations of plans and specifications for Main 21 Drainage Area Sanitary Sewer System
Rehabilitation and Improvements (Group 7, Contract 3) Part 3. The project is generally bound on the
north by Irma Street, on the south by Richmond Street, on the east by Belzise Street and on the west
by the Union Pacific Railroad.
It has been determined that an additional 1,400 linear feet of severely deteriorated sanitary sewer lines
located within the project area must be replaced. The poor condition of the identified sewer lines was
not known at the time the original engineering agreement was approved by the City Council. The
recommended amendment will allow Wendy Lopez & Associates, Inc. to perform the necessary survey
and design work for the additional sewer lines. Staff considers the proposed fee of $24,000.00 to be
fair and reasonable for the additional work to be performed.
Wendy Lopez & Associates, Inc. is in compliance with the City's M/WBE Ordinance by committing to an
additional 7% M/WBE participation on this amendment.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the Commercial Paper-Sewer Fund.
MG:j
Submitted for City Manager's
Office by:
Mike Groomer
Origiaating Department Head:
A. Douglas Rademaker
Additional Information Contact:
A. Douglas Rademaker
FUND I ACCOUNT I CENTER I AMOUNT
(to)
6140 I
�
6157 � (from)
IPS46 531200
�
6157 I
070460410310 $24,000.00
CITY SECRETARY
���oW��
C�?Y COUNCiL
�' r p 21 1999
�.�i�f4 \P(4.�[a�
�iE'� �a+.:..�eYr�, ;. .,� r�,i:,
i.:[? i' iJ4 ;',�r;. <F:; . .;1e,'T`=:. __