HomeMy WebLinkAbout064609-CO5 - Construction-Related - Contract - McCarthy Building Companies, Inc.FORT WORTH®
City of Fort Worth
CSC No. 64609-CO5
Change Order Request
Project Name
Bomber Spur Trail Phase 1
City Sec # 64609
Client Project#(s)
104345
Project
Description
Construction of a shared use path from Calmont Ave. to US Route 377, including pedestrian crossings over Camp Bowie Blvd. and US Route 377
Contractor
McCarthy Building Companies, Inc.
Change Order # 5
Date 5/14/2026
City Project Mgr.
Blaise Grissom
City Inspector
Sergio Garcia Pedroza
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
PARD
Totals
Contract Time
(CD)
$4,901,279.77
$4,901,279.77
215
$14,116.52
$14,116.52
$2,058.48
$2,058.48
$4,913,337.81
$4,913,337.81
215
Amount of Proposed Change Order
$17,100.00
$17,100.00
0
Revised Contract Amount $4,930,437.81
Original Funds Available for Change Orders
Remaining Funds Available for this CO $0.00
Additional Funding (if necessary) $17,100.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%
$4,930,437.81
215
$0.00
$17,100.00
0.59%
$6,126,599.71
sere is an existing Drilled Shaft Wall that was not accounted for during design. The existing wall runs parallel along the eastern side of the new trail south of US 377 and is
conflict with the connecting sidewalk that will lead down to US 377 from the main trail. It is necessary to remove a section of this existing wall (from Station 1072 +75 to
ation 1073 +10) in order to construct the connecting sidewalk. This change order covers the labor, material and equipment to demo, remove and dispose of the conflicting
ction of existing wall and to repair the edges of the existing wall that will remain.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
offContractor's Company Name�l Contractor (Name)i
Contract Signature
Date
McCarthy Building Companies, Inc. Peter Siggerud
Ate` sq�"�
o 17, zozs 1 o:az:os cor
06/17/2026
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager W
Date
06/17/2026
06/17/2026
Program Manager
Date
Senior Capital Project Officer
Date
---, E
06/17/2026
Assistant Director (Dept)
Date
Director, Contracting Department (Dept) _
Date
'
TB✓Bsq Thomgsan
r1 2026 13,47 U CDr
Assistant City Attorney
Date
Assistant City Manager
Date
Q91111aao ii z, 2— s 1
06/23/2026
ozna Bur do Jun 24. 2026 17:14:04 CDT
06/24/2026
Council Action (if required)
ny
ATTEST: o f FORT �'padd CC
cc
(I per$
Jannette Goodall, City Secretary
°aaq>Px asap
M&C Number N/A M&C Date Approved NIA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Foxr Wox'ra City of Fort Worth
11v- - Change Order Additions
Project Name Bomber Spur Trail Phase 1 City Sec # 64609
Client Project # 104345
Contractor McCarthy Building Companies, Inc. PM Blaise Grissom Inspector
Change Order Submittal # 0 Date 5114/2026
ADDI I TUNS
�naw� � - • , S'J���" }SS911���nnu�rxyi�ClYJ�
�.ynar.re�rIfi� M, I ,
Change Order Additions Page 2 of 4
FORTWORTH City of Fort Worth
—— Change Order Deletions
Project Name Bomber Spur Trail Phase 1 City Sec # 64609
Client Project# 104345
Contracto McCarthy Building Companies, Inc. PIMJ Blaise Grissom Inspector®
Change Order Submittal # 0 Date 5I14I202fi
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub
Type of Service
Amount for this CO
N/A
Total
$0.00
Previous Change Orders
CO # DATE AMOUNT
Total $0.00
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: McCarthy Building Companies Inc.
Subject of the Agreement: Construction Services for Bomber Spur Trail Phase 1
M&C Approved by the Council? * Yes ❑ No M
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ 64609-CO5
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 104345
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.