HomeMy WebLinkAbout065438 - Construction-Related - Contract - Federal Aviation Administration (FAA)CSC No. 65438
Agreement Number
AJW-FN-CSA-25-SW-007385
NON-FEDERAL REIMBURSABLE AGREEMENT
BETWEEN
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
AND
CITY OF FORT WORTH
FORT WORTH MEACHAM INTERNATIONAL AIRPORT
FORT WORTH, TEXAS
WHEREAS, the Federal Aviation Administration (FAA) can furnish directly or by
contract, material, supplies, equipment, and services which the City of Fort Worth
(Sponsor) requires, has funds available for, and has determined should be obtained from
the FAA;
WHEREAS, it has been determined that competition with the private sector for
provision of such material, supplies, equipment, and services is minimal; the proposed
activity will advance the FAA's mission; and the FAA has a unique capability that will
be of benefit to the Sponsor while helping to advance the FAA's mission;
WHEREAS, the FAA has determined that this project is construction or alteration at an
airport as to which notice is required under section 77.9 of title 14, Code Federal
Regulations.
NOW THEREFORE, the FAA and the Sponsor mutually agree as follows:
ARTICLE 1. Parties I OFFICIAL RECORD
The Parties to this Agreement are the FAA and the City of Fort Worth. CITY SECRETARY
FT. WORTH, TX
ARTICLE 2. Type of Agreement
This Agreement is an "other transaction" authorized under 49 U.S.C. § 106(1)(6). It is not
intended to be, nor will it be construed as, a partnership, corporation, joint venture or
other business organization.
ARTICLE 3. Scope
A. The purpose of this Agreement between the FAA and the Sponsor is to provide
support for the Sponsor's project to rehabilitate Runway 16-34 and make
improvements to the associated runway safety area (RSA) impacting FAA National
Airspace System facilities including Instrument Landing System (ILS), Medium
Intensity Approach Lighting System (MALS), MALS with Runway Alignment
Indicator Lights (MALSR), Runway Visual Range (RVR) components, Precision
Approach Path Indicator (PAPI), FAA cabling and infrastructure.
Non -Federal Reimbursable Agreement V98 Page 1 of 13
Agreement Number
AJW-FN-CSA-25-SW-007385
B. This Agreement provides funding for the FAA to perform site visit(s) and complete
design/engineering reviews required to maintain or establish these services. For
construction/installation support, the FAA and Sponsor will either amend this
agreement or enter into a new agreement to include any project support needed
from FAA. This Agreement is titled:
Fort Worth, TX (FT99 — Runway 16-34 Rehabilitation and Runway Safety
Area Improvements impacting FAA Navigational Aids (NAVAIDS), Cabling
and Infrastructure at Fort Worth Meacham International Airport.
FAA support may be affected by government shutdowns, pandemics, natural disasters
or other items outside of FAA control. No construction work shall be performed
involving FAA facilities, systems, and equipment until the design plans and
specifications have received final approval from the FAA.
C. The FAA will perform the following activities:
1. The FAA will perform Preliminary Design planning activities. This includes
technical consultation, site visits, feasibility assessments, project planning,
scope definition, development of cost estimate(s), and travel in support of the
reimbursable agreement program management.
2. Provide the Sponsor with any requirements and/or recommendations related to
FAA facilities impacted by the Sponsor's project.
3. Provide technical assistance necessary to ensure that the Sponsor's project
meets FAA rules, regulations, orders, requirements, and standards.
4. Provide standard design layout for new facilities to include footprint for
relocated or new equipment, grounding plates, cable trays, lighting fixtures,
and power raceways.
5. Provide FAA standard drawings, specifications, and directives for use by the
Sponsor in execution of the project.
6. Meet with the Sponsor as required to coordinate and discuss project planning
and engineering.
7. Coordinate with the Sponsor to ensure that National Environmental Policy Act
(NEPA) documentation for the project incorporates associated FAA actions.
Also ensure NEPA documentation meets FAA requirements and approvals.
8. Complete HazMat surveys for all applicable FAA facilities on the Airport and
provide information to the Airport Sponsor for use in preparing plans for
removal of the FAA facilities. This work will be conducted prior to demolition
of the applicable FAA facilities.
9. Complete environmental due diligence for FAA F&E facilities that are
associated with this project. .
10. Develop disposal plan for excessing FAA equipment impacted by Sponsor's
project. The specifics of the disposal plan will be included in a future
agreement.
11. Perform engineering design reviews of the Sponsor's design plans and
specifications in support of the Sponsor's construction project that affects FAA
Non -Federal Reimbursable Agreement V98 Page 2 of 13
Agreement Number
AJW-FN-CSA-25-SW-007385
systems or equipment.
12. The FAA will provide comments to the 60%, 90% and 100% design plans and
specifications packages, as provided for in D.11 and D.12 below. The
Sponsor's design plans and specifications are not final until the FAA has
notified the Sponsor that all the FAA's comments, suggestions, and/or
requirements have been incorporated into the design plans and specifications.
a) 60% and 100% design review comments will be provided within 21
calendar days of receipt of design plans and specifications package.
b) 90% design plans and specifications comments will be provided within
60 calendar days of receipt of design plans and specifications package.
13. With funds provided by the Sponsor the FAA will obtain equipment shelters for
Runway 16-34 NAVAIDS facilities with associated electronics equipment
installed.
14. The FAA shall make reasonable efforts to perform under this agreement in a cost-
effective manner, consistent with the estimated costs in this Article 7, Public Law
114-307, the FAA Financial Manual, and the FAA Acquisition Management
System, as applicable.
D. The Sponsor will perform the following activities:
1. Provide sufficient funding to cover costs associated with the applicable
phase of this agreement no later than 30 calendar days prior to
commencement or sufficient lead time to support contractingactivities,
whichever is greater.
2. Provide a full set of plans, including scaled electronic drawings, showing
the proposed work.
3. Provide a full schedule for the work to be accomplished, including
construction activities related to FAA facilities and equipment.
4. Incorporate requirements and recommendations made by the FAA into the
Plans and Specifications impacting FAA -owned systems.
5. Provide survey information and/or documentation to verify the clearance of
critical areas and obstruction surfaces relating to FAA facilities. Airspace cases
can be submitted online via hM?s:Hoeaaa.faa.gov.
6. Provide funding for fully outfitted shelters for the Runway 16-34 NAVAIDS
facilities electronic equipment.
7. Provide the FAA with access to the project site, including any airport -
specific security briefs or driving requirements, for the purposes of site
surveys, construction inspection, and other activities.
8. Support FAA Engineering Services availability by not seeking engineering
design review support before this Agreement is funded. Should the Sponsor
decide to accelerate the schedule ahead of agreed dates, Technical
Operations technicians and engineers may not be available to support.
Should the Sponsor proceed without FAA review and approval, the Sponsor
Non -Federal Reimbursable Agreement V98 Page 3 of 13
Agreement Number
AJW-FN-CSA-25-SW-007385
assumes the risk that could lead to the loss of one or more NAVAIDS.
9. Perform all appropriate surveys and engineering design for the Sponsor's
project impacting FAA facilities, equipment, and infrastructure.
10. Develop the design plans and specifications for the construction of the
Sponsor's project and required space for FAA equipment, with FAA's
participation and approval. The Sponsor shall coordinate any interruptions or
changes that may have an impact to FAA facilities, systems, and equipment
necessitated by the Sponsor's project. Scope of work includes but is not
limited to: siting of the facilities; all plot site preparation work (e.g., siting,
trenching, grading, filing, foundations, power) in establishing new facilities,
shelters and supporting infrastructure.
11. Provide the FAA copies of the proposed grading plan that the Sponsor and/or its
consultants and/or contractors have prepared that shows the contours and site -
grading profile information and all critical areas for communication, navigation,
surveillance, and weather systems, for use during facility siting evaluation.
Once the FAA has approved the siting of facilities in accordance with FAA
siting criteria and specifications, the Sponsor will provide the FAA with copies
of its finished grading plans 18 months prior to the expected return to service of
final locations.
12. Provide a schedule of engineering deliverables for 60%, 90%, and 100% design
plan and specifications submissions. No work may begin that affects FAA
facilities until the design plans and specifications have received final approval
from the FAA.
13. Provide to the FAA in hard -copy format four (2) sets of I V x 17", ('/2 size),
and two (2) full American National Standards Institute (ANSI) size "D" and
one (1) electronic copy using AutoCAD with all reference files of the complete
and finalized Plans and Specifications for the FAA's coordination and review
at the agreed -upon design phases. Within 21 calendar days of receipt of the
FAA's comments, or within such other period as the parties may agree, the
Sponsor will provide to the FAA NAVAIDs Engineering Center with a written
response to each of the FAA's comments, suggestions, and requirements. The
100% Plans and Specifications are not final until the FAA NAVAIDs
Engineering Center has notified the Sponsor that all of the FAA's comments,
suggestions, and requirements have been incorporated into the Plans and
Specifications.
14. Provide to the FAA final project Plans and Specifications that incorporates the
FAA's comments from the 100% engineering review no later than 21 calendar
days after FAA approval of the 100% Plans and Specifications. The
complete/finalized project Plans and Specifications shall be sent to the
Engineering Services address listed in this section.
15. Provide funding for any mandatory upgrades or modifications to any FAA
facility or equipment impacted by the Sponsor's project. An example of a
required modification is safety -related improvements when a facility is
"grandfathered" (i.e., allowed to operate under the original design but required
Non -Federal Reimbursable Agreement V98 Page 4 of 13
Agreement Number
AJ W-FN-C SA-25-S W-0073 85
to be compliant with current standards).
16. Coordinate the Sponsor's schedule and construction sequencing plan with the
FAA NAVAIDs Engineering Center before finalizing the plan to ensure that the
Sponsor and FAA are in agreement on the critical path, schedule, and
milestones. This should be done during the project design phase, before
construction contract award. In addition, provide a copy of the Sponsor's
schedule within 30 calendar days of the effective date of this Agreement, and
updated monthly (or as soon as changes occur), including the following tasks:
a. Construction bid
b. Construction award
c. Construction start
d. Construction complete
e. Overall construction schedule, to include FAA facilities
f. Dates when FAA assumes ownership for work on buried infrastructure
g. Each NAVAIDS shelter's Beneficial Occupancy Date (BOD) including
when electrical power will be available
h. Dates when flight checks of each FAA -owned NAVAIDS are required
i. Date when ILS critical areas and image forming areas will be graded to
within 3" of final grade.
17. Complete the contract, construction bid, and award process for the
construction phase of the project using approved FAA Plans and
Specifications for FAA impacted facilities. The project's scope of work will
include but not be limited to all plot site preparation work (e.g., trenching,
grading, filling, foundations, demolition) and the installation of all necessary
equipment and associated infrastructure. Sponsor will not bid the portion of
work that includes the FAA equipment and cabling until the FAA has agreed
that all of the Plans and Specifications are final.
18. No construction associated with this project that affect FAA facilities or
equipment may begin prior to receipt of the foregoing FAA design approval,
as described in paragraph C.13 above. Furthermore, the Sponsor shall advise
the FAA immediately of any proposed changes to the "approved" Plans and
Specifications before and during the project's construction. Before starting
any construction, provide four (4) full size sets of the construction package to:
FAA Navigation Engineering Center, AJW-2C14
ATTN: Richard Bellows, Engineering Manager
10101 Hillwood Parkway
Fort Worth, TX 76177
Phone: (817) 222-4085
Email: Richard.Bellows@faa.gov
19. Provide copies of any information that the Sponsor and/or its contractor and/or
Non -Federal Reimbursable Agreement V98 Page 5 of 13
Agreement Number
AJW-FN-CSA-25-SW-007385
consultants have prepared on hazardous materials or other environmental
conditions that may impact the FAA relocated facilities. This information
includes, but is not limited to, previous and current studies/reports conducted on
known or suspected areas of environmental contamination located on or adjacent
to airport property. The Sponsor agrees to remediate, at its sole cost, all
hazardous substance contamination found to impact the proposed FAA facility
sites prior to construction and modification to the land rights MOA. In the event
that contaminants are discovered on future FAA equipment areas during the
course of the FAA's environmental due diligence documentation process, the
FAA will require that those areas be remediated. Should this occur, the FAA
would coordinate further details with the Sponsor.
20. Complete the NEPA documentation, according to FAA Order 1050.1.(series) and
coordinate with the FAA for comments/guidance to ensure FAA facilities are
included.
21. Submit FAA Form 6000-26 Airport Sponsor Strategic Event Submission Form
(Outage Request Form) no -less -than 45 calendar days prior to the start of
construction that will impact NAS facilities, result in a full or partial runway
closure, or result in a significant taxiway closure. This form is available at
bZs:Hoeaaa.faa.gov under the Forms section on the left pane. This form may
also be used to notify the FAA of any changes to the project schedule.
22. Provide a copy of the submitted FAA Form 6000-26 to the NAVAIDS
Engineering Center.
23. Sponsor shall work with the FAA Airports Region/District Office and submit
non-rulemaking airport (NRA) or non-rulemaking (NR) airspace cases for
temporary and permanent locations of all buildings and equipment to be placed
on the airfield as well as required Airspace cases showing information
regarding construction vehicles and equipment during each phase of the project
to include all trenching operation locations, truck routes, contractor staging
areas, cranes, etc. Sponsor shall respond to all NRA case reviewer questions
and comply with all reviewer comments. A "determination letter" must be
received and reviewed by the FAA ADO before any construction can begin.
Airspace cases can be submitted online via hgps:Hoeaaa.faa.gov.
ARTICLE 4. Points of Contact
A. FAA:
The FAA Central Service Area, Planning and Requirements will provide
administrative oversight of this Agreement. David Hafer is the Lead Planner and
liaison with the Sponsor and can be reached at 817-222-4875 or via email at
David.W.Hafer@faa.gov. This liaison is not authorized to make any
commitment, or otherwise obligate the FAA, or authorize any changes which
affect the estimated cost, period of performance, or other terms and conditions of
this Agreement.
Non -Federal Reimbursable Agreement V98 Page 6 of 13
Agreement Number
AJW-FN-CSA-25-SW-007385
2. The FAA Central Service Area, NAVAIDs Engineering Center will perform the
scope of work included in this Agreement. Richard Bellows is the NAVAIDs
Engineering Center Manager and liaison with the Sponsor and can be reached at
817-222-4085 or via email at Richard.Bellows@faa.gov. This liaison is not
authorized to make any commitment, or otherwise obligate the FAA, or authorize
any changes which affect the estimated cost, period of performance, or other
terms and conditions of this Agreement.
3. The execution, amendment, and administration of this Agreement must be
authorized and accomplished by the FAA's Contracting Officer, Bradley K.
Logan who can be reached at 817-222-4395 or via email at Brad.Logan@faa.gov.
B. Sponsor:
City of Fort Worth
Attn: Valerie Washington
100 Fort Worth Trail
Fort Worth, TX 76102
817-392-6192
valerie.washington@fortworthtexas.gov
ARTICLE 5. Non -Interference with Operations
The Sponsor understands and hereby agrees that any relocation, replacement, or
modification of any existing or future FAA facility, system, and/or equipment covered by
this Agreement during its term or any renewal thereof made necessary by Sponsor
improvements, changes, or other actions which in the FAA's opinion interfere with the
technical and/or operations characteristics of an FAA facility, system, and/or piece of
equipment will be at the expense of the Sponsor, except when such improvements or
changes are made at the written request of the FAA. In the event such relocations,
replacements, or modifications are necessitated due to causes not attributable to either the
Sponsor or the FAA, the parties will determine funding responsibility.
ARTICLE 6. Property Transfer
A. To the extent that the Sponsor provides any material associated with the Project, and
to the extent that performance of the requirements of this Project results in the
creation of assets constructed, emplaced, or installed by the Sponsor, all such material
(buildings, equipment, systems, components, cable enclosures, etc.) and assets will be
transferred to and become the property of the FAA upon project completion. For
purposes of this Article 6, "project completion" means that FAA has inspected the
specific equipment or construction and has accepted it as substantially complete and
ready for use. The creation of an additional agreement will not be required, unless
such other agreement is required by the laws of the state in which the subject property
is located. The Sponsor and FAA acknowledge by execution of this agreement the
FAA will accept the fundamental responsibilities of ownership by assuming all
operations and maintenance requirements for all property transferred to the
FAA. The transfer of asset(s) will occur on the date the asset(s) is placed in
Non -Federal Reimbursable Agreement V98 Page 7 of 13
Agreement Number
AJW-FN-CSA-25-SW-007385
service. It has been determined the subject transfer(s) to FAA is in the best interest of
both the Sponsor and FAA.
B. In order to ensure that the assets and materials subject to this Article remain fully
accounted for and operational, the Sponsor will provide the FAA any additional
documents and publications that will enhance the FAA's ability to manage, maintain
and track the assets being transferred. Examples may include, but are not limited to,
operator manuals, maintenance publications, warranties, inspection reports, etc.
These documents will be considered required hand-off items upon Project
completion.
ARTICLE 7. Estimated Costs
The estimated FAA costs associated with this Agreement are as follows:
DESCRIPTION OF REIMBURSABLE ITEM
ESTIMATED COST
Labor
Engineering Support
$52,116.80
Environmental Support
$13,610.00
Labor Subtotal
$65,726.80
Labor Overhead
$13,066.49
Total Labor
$78,793.29
Non -Labor
Travel
$145.00
Environmental HAZMAT Surveys
and Testing
$30,000.00
NAVAIDS Equipment Shelters
3 ea.
$480,000.00
Non -Labor Subtotal
$510,145.00
Non -Labor Overhead
$40,811.60
Total Non -Labor
$550,956.60
TOTAL ESTIMATED COST
$629,749.89
Non -Federal Reimbursable Agreement V98 Page 8 of 13
Agreement Number
AJW-FN-CSA-25-SW-007385
ARTICLE 8. Period of Agreement and Effective Date
The effective date of this Agreement is the date of the last signature. This Agreement is
considered complete when the final invoice is provided to the Sponsor and a refund is
sent or payment is received as provided for in Article 9 of this Agreement. This
Agreement will not extend more than five years beyond its effective date.
ARTICLE 9. Reimbursement and Accounting Arrangements
A. The Sponsor agrees to prepay the entire estimated cost of the Agreement. The
Sponsor will send a copy of the executed Agreement and submit full advance
payment in the amount stated in Article 7 to the Reimbursable Receipts Team listed
in Section C of this Article. The advance payment will be held as a non -interest
bearing deposit. Such advance payment by the Sponsor must be received before the
FAA incurs any obligation to implement this Agreement. Upon completion of this
Agreement, the final costs will be netted against the advance payment and, as
appropriate, a refund or final bill will be sent to the sponsor, except as described in
section D of this Article. Per U.S. Treasury guidelines, refunds under $1.00 will not
be processed. Additionally, FAA will not bill the sponsor for amounts less than
$1.00.
B. The Sponsor certifies that arrangements for sufficient funding have been made to
cover the estimated costs of the Agreement.
C. The Reimbursable Receipts team is identified by the FAA as the billing office for this
Agreement. The preferred method of payment for this agreement is via Pay.Gov. The
sponsor can use a check or credit card to provide funding in this manner and receipt -
processing time is typically within 3 working days. Alternatively, the sponsor can
mail the payment to the address shown below. When submitting funding by mail, the
Sponsor must include a copy of the executed Agreement and the full advance
payment. All payments mailed to the FAA must include the Agreement number,
Agreement name, Sponsor name, and project location. Payments submitted by mail
are subject to receipt -processing delay of up to 10 working days.
FAA payment remittance address using USPS is:
DOT/FAA/ESC
P.O. Box 25770
AMK-322 — MPB 328
Oklahoma City, OK 73125
FAA payment remittance address using Fed Ex (overnight) is:
DOT/FAA/ESC
AMK-322 — MPB328
6500 S. MacArthur Blvd.
Oklahoma City, OK 73169
Non -Federal Reimbursable Agreement V98 Page 9 of 13
Agreement Number
AJW-FN-CSA-25-SW-007385
The Sponsor hereby identifies the office to which the FAA will render bills for the
project costs incurred as:
City of Fort Worth Aviation Department
Attn: Christy Medina
201 American Concourse, Suite 330
Fort Worth, TX 76106
aviaccounting_nfortworthtexas. gov
D. The FAA will accept payments under this Article from only one of two sources:
either (1) the Sponsor or (2) a Third Party on behalf of the Sponsor, and the same
source must make all required payments. If a Third Party makes the payments, then
any refund due from FAA upon completion of the Agreement will be returned to that
Third Party.
E. The FAA will provide the Sponsor a quarterly Statement of Account of costs incurred
against the advance payment.
F. The cost estimates contained in Article 7 are expected to be the maximum costs
associated with this Agreement but may be amended to recover the FAA's actual
costs. If during the course of this Agreement actual costs are expected to exceed the
estimated costs, the FAA will notify the Sponsor immediately. The FAA will also
provide the Sponsor an amendment to the Agreement which includes the FAA's
additional costs. The Sponsor agrees to prepay the entire estimated cost of the
amendment. The Sponsor will send a copy of the executed amendment to the
Agreement to the Reimbursable Receipts Team with the additional advance payment.
Work identified in the amendment cannot start until receipt of the additional advance
payment. In addition, in the event that a contractor performing work pursuant to the
scope of this Agreement brings a claim against the FAA and the FAA incurs
additional costs as a result of the claim, the Sponsor agrees to reimburse the FAA for
the additional costs incurred whether or not a final bill or a refund has been sent.
ARTICLE 10. Changes and Amendments
Changes and/or amendments to this Agreement will be formalized by a written
amendment that will outline in detail the exact nature of the change. Any amendment to
this Agreement will be executed in writing and signed by the authorized representative of
each party. The parties signing this Agreement and any subsequent amendment(s)
represent that each has the authority to execute the same on behalf of their respective
organizations. No oral statement by any person will be interpreted as amending or
otherwise affecting the terms of the Agreement. Any party to this Agreement may
request that it be amended, whereupon the parties will consult to consider such
amendments.
ARTICLE 11. Termination
In addition to any other termination rights provided by this Agreement, either parry may
terminate this Agreement at any time prior to its expiration date, with or without cause,
Non -Federal Reimbursable Agreement V98 Page 10 of 13
Agreement Number
AJW-FN-CSA-25-SW-007385
and without incurring any liability or obligation to the terminated party other than
payment of amounts due and owing and performance of obligations accrued, in each case
on or prior to the termination date, by giving the other party at least thirty (30) days prior
written notice of termination. Payment of amounts due and owing may include all costs
reimbursable under this Agreement, not previously paid, for the performance of this
Agreement before the effective date of the termination; the total cost of terminating and
settling contracts entered into by the FAA for the purpose of this Agreement; and any
other costs necessary to terminate this Agreement. Upon receipt of a notice of
termination, the receiving party will take immediate steps to stop the accrual of any
additional obligations which might require payment. All funds due after termination will
be netted against the advance payment and, as appropriate, a refund or bill will be issued.
ARTICLE 12. Order of Precedence
If attachments are included in this Agreement and in the event of any inconsistency
between the attachments and the terms of this Agreement, the inconsistency will be
resolved by giving preference in the following order:
A. This Agreement
B. The attachments
ARTICLE 13. Legal Authority
This Agreement is entered into under one or more of the following authorities: 49 U.S.C.
§ 106(1), 31 U.S.C. § 6505, Public Law 114-307, 130 Stat 1523, Dec. 16, 2016. Nothing
in this Agreement will be construed as incorporating by reference or implication any
provision of Federal acquisition law or regulation.
ARTICLE 14. Disputes
Where possible, disputes will be resolved by informal discussion between the parties. In
the event the parties are unable to resolve any dispute through good faith negotiations, the
dispute will be resolved by alternative dispute resolution using a method to be agreed
upon by the parties. The outcome of the alternative dispute resolution will be final unless
it is timely appealed to the Administrator, whose decision is not subject to further
administrative review and, to the extent permitted by law, is final and binding (see 49
U.S.C. § 46110).
ARTICLE 15. Warranties
The FAA makes no express or implied warranties as to any matter arising under this
Agreement, or as to the ownership, merchantability, or fitness for a particular purpose of
any property, including any equipment, device, or software that may be provided under
this Agreement.
Non -Federal Reimbursable Agreement V98 Page 11 of 13
Agreement Number
AJW-FN-CSA-25-SW-007385
ARTICLE 16. Insurance
The Sponsor will arrange by insurance or otherwise for the full protection of itself from
and against all liability to third parties arising out of, or related to, its performance of this
Agreement. The FAA assumes no liability under this Agreement for any losses arising
out of any action or inaction by the Sponsor, its employees, or contractors, or any third
party acting on its behalf.
ARTICLE 17. Limitation of Liability
To the extent permitted by law, the Sponsor agrees to indemnify and hold harmless the
FAA, its officers, agents and employees from all causes of action, suits or claims arising
out of the work performed under this Agreement. However, to the extent that such claim
is determined to have arisen from the act or omission by an officer, agent, or employee of
the FAA acting within the scope of his or her employment, this hold harmless obligation
will not apply and the provisions of the Federal Tort Claims Act, 28 U.S.C. § 2671, et
seq., will control. The FAA assumes no liability for any losses arising out of any action
or inaction by the Sponsor, its employees, or contractors, or any third party acting on its
behalf. In no event will the FAA be liable for claims for consequential, punitive, special
and incidental damages, claims for lost profits, or other indirect damages.
ARTICLE 18. Civil Rights Act
The Sponsor will comply with Title VI of the Civil Rights Act of 1964 relating to
nondiscrimination in federally assisted programs.
ARTICLE 19. Protection of Information
The parties agree that they will take appropriate measures to identify and protect
proprietary, privileged, or otherwise confidential information that may come into their
possession as a result of this Agreement.
ARTICLE 20. Security
In the event that the security office determines that the security requirements under FAA
Order 1600.1F applies to work under this Agreement, the FAA is responsible for
ensuring that security requirements, including compliance with AMS clause 3.14.2,
Contractor Personnel Suitability Requirements are met.
ARTICLE 21. Entire Agreement
This document is the entire Agreement of the parties, who accept the terms of this
Agreement as shown by their signatures below. In the event the parties duly execute any
amendment to this Agreement, the terms of such amendment will supersede the terms of
this Agreement to the extent of any inconsistency. Each party acknowledges
participation in the negotiations and drafting of this Agreement and any amendments
thereto, and, accordingly that this Agreement will not be construed more stringently
Non -Federal Reimbursable Agreement V98 Page 12 of 13
Agreement Number
AJ W-FN-CSA-25-SW-007385
against one party than against the other. If this Agreement is not executed by the Sponsor
within 120 calendar days after the FAA transmits it to the Sponsor, the terms contained
and set forth in this Agreement shall be null and void. Additionally, the FAA expects this
agreement to be funded within 120 days of execution, if funding is not received by that
date; the FAA may exercise the right to renegotiate estimated costs.
AGREED:
FEDERAL AVIATION
ADMINISTRATION
CITY OF FORT WORTH
SIGNATURE SIGNATURE Viderie Washington 24,202613:23:20CDT)
NAME Bradley K. Logan
TITLE Contracting Officer
DATE la y ao a
APPROVAL RECOMMENDED:
Roger M. Venables
Aviation Systems Director
NAME Valerie Washington
TITLE Assistant City Manager
DATE 06/24/2026
ATTEST: on
PoF Foni!y°a
a= pda
v°P�� ago
pvo 0=0
�p ApQ*e o*p
Jannette S. Goodall
City Secretary
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting requirements.
Tyler +Dale t�n24, 202610:20A4 CDT)
Tyler Dale
Capital Projects Manager
Approved as to Form and Legality OFFICIAL RECORD
Gwace TaAGraYa CITY SECRETARY
Candace Pagli�n 24, 20261324:07 CDT)
Candace Pagliara FT. WORTH, TX
Senior Assistant City Attorney
Non -Federal Reimbursable Agreement V98 Page 13 of 13
FORT WORTH,
MAYOR AND COUNCIL COM NICATION
7.5.2 55FTW RUNWAY 16-34 INSTRUMENT LANDING SYSTEM IMPROVEMENTS
REIMBURSABLE AGREEMENT
DATE: 06/23/26 M&C FILE NUMBER: M&C 26-0535
DEPARTMENT: AVIATION
SUBJECT
(CD 2) Authorize Execution of a Non -Federal Reimbursable Agreement with the Federal
Aviation Administration in the Amount Up to $629,750.00 for Improvements to the Runway 16-
34 Instrument Landing System at Fort Worth Meacham International Airport, Adopt
Appropriation Ordinances, and Amend the Fiscal Year 2026 Adopted Budget and Fiscal Years
2026-2030 Capital Improvement Program
RECOM NDATION
It is recommended that the City Council:
1. Authorize execution of a Non -Federal Reimbursable Agreement with the Federal
Aviation Administration in the amount up to $629,750.00 for improvements to the
Runway 16-34 Instrument Landing System at Fort Worth Meacham International Airport;
2. Adopt the attached appropriation ordinance increasing estimated receipts and
appropriations in the Municipal Airport Fund in an amount of $629,750.00, from
available net position, for the purpose of transferring to the Municipal Airport Capital
Projects Fund;
3. Adopt the attached appropriation ordinance increasing estimated receipts and
appropriations in the Municipal Airport Capital Projects Fund in an amount of
$629,750.00, transferred from the Municipal Airport Fund, for the purpose of funding the
Reimbursable Agreement with the Federal Aviation Administration for improvements to
the Runway 16-34 Instrument Landing System (City Project No. 106997) at Fort Worth
Meacham International Airport; and
4. Amend the Fiscal Year 2026 Adopted Budget and Fiscal Years 2026-2030 Capital
Improvement Program.
DISCUSSION
The purpose of this Mayor and Council Communication (M&C) is to authorize execution of a
Non -Federal Reimbursable Agreement (RA) in the amount up to $629,750.00 with the Federal
Aviation Administration (FAA) for improvements to the Runway 16-34 Instrument Landing
System (ILS) at Fort Worth Meacham International Airport (Airport).
1of11
FORT WORTH,
On May 30, 2025, the Aviation Department was informed by the Texas Department of
Transportation - Aviation Division (TxDOT) that funding is available for construction of
Runway 16-34 Rehabilitation and Runway Safety Area (RSA) improvements at the Airport. In
order to improve the RSA on the southwest side of the Airport, a new parallel Taxiway Tango
will be constructed. Due to the construction of this new taxiway, the existing glideslope
antenna and shelter for Runway 34 need to be relocated (see attached map).
On November 18, 2025, M&C 25-1083 authorized execution of an engineering services
agreement (City Secretary Contract (CSC) No. 64406) with Garver, LLC. (Garver), which
includes design and bidding support services for rehabilitation of Runway 16-34, RSA
improvements, construction of Taxiway Tango, and relocation of the ILS.
Since the ILS is FAA owned and maintained equipment, execution of an RA is necessary and
will consist of design and engineering review services from the FAA. It also includes the cost
of three (3) Navigational Aid (NAVAID) shelters due to the long lead time for procurement.
Even though the Project is only directly impacting a few components of the ILS, the FAA views
the closure of Runway 16-34 resulting from the Project as a Target of Opportunity to replace
and upgrade the entire ILS system. Not only is the current ILS system over twenty years old
and reaching the end of its service life, but replacing the entire system instead of just a few
components will ensure uniformity of the upgraded equipment. The FAA has agreed to
provide the new ILS equipment if the Aviation Department includes the installation and
construction of the equipment in the Project. The cost of the ILS equipment provided by the
FAA is estimated to be $2,100,000.00.
Funding is available in the net position of the Municipal Airport Fund for the Aviation
Department for the purpose of transferring to the Municipal Airport Capital Projects Fund for
the RA. Net Position beginning balance is $12,540,221.00 and the new balance will be
$11,910,471.00 after this M&C.
Funding for this RA was not included in the Fiscal Year (FY) 2026-2030 Capital Improvement
Program due to the amount of the RA being unknown. A meeting to discuss the RA with the
FAA was held in February of 2026; however, the final amount was not provided until May of
2026. The action in this M&C will amend the FY2026-2030 Capital Improvement Program as
approved in connection with Ordinance 27979-09-2025.
Fort Worth Meacham International Airport is located in COUNCIL DISTRICT 2.
This contract will be with a governmental entity, state agency or public institution of higher
education.
FISCAL INFORMATION/CERTIFICATION
The Director of Finance certifies that funds are currently available from net position within the
Municipal Airport Fund and upon approval of the above recommendations and adoption of
2of11
FORT WORTH,
the attached appropriation ordinances, funds will be available in the Municipal Airport
Capital Proj Fund for the FTW FAA RA-7385 16-34 RHB ILS project to support execution of the
agreement. Prior to an expenditure being incurred, the Aviation Department has the
responsibility of verifying the availability of funds.
SUBMITTED FOR CITY MANAGER'S OFFICE BY: Valerie R. Washington, # 6192
ORIGINATING BUSINESS UNIT HEAD: Roger Venables, # 5402
ADDITIONAL INFORMATION CONTACT: Tyler Dale, # 5416
ATTACHMENTS
1. 55 FTW Runway 16-34 ILS RA Map [7.5.2.1 -1 page]
2. ORD APP 55 55FTW Runway 16 34 Instrument Landing System Improvements Reimburs
(10) [7.5.2.2 - 2 pages]
3. ORD APP 55 55FTW Runway 16 34 Instrument Landing System Improvements Reimburs
(11) [7.5.2.4 - 2 pages]
4. CONFIDENTIAL - 55 FTW Runway 16-34 ILS RA - Funds Availability [7.5.2.5 - 2 pages]
5. CONFIDENTIAL - v255FTW Runway 16 34 ILS RA FID Table (1) [7.5.2.6 -1 page]
3of11
FORT WORTH
Routing and Transmittal Slip
Aviation
Department
DOCUMENT TITLE: FTW RWY 16-34 ILS Improvements Reimbursable Agreement
M&C 26-0535 CPN 106997 CSO # DOC#
DATE: 6/25/2026
INITIALS
DATE OUT
TO: 1. Roger Venables
Signed on
June 24, 2026
2. Candace Pa tiara
Signed on
June 24, 2026
3. Valerie Washington
Signed on
June 24, 2026
4. Jannette Goodall
Ja nette Goodall
06/25/2026
5.
6.
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and
take the next steps.
NEEDS TO BE NOTARIZED: ❑ Yes X❑ No
RUSH: ❑ Yes ❑X No SAME DAY: ❑ Yes ❑ No
ROUTING TO CSO: ❑X Yes ❑ No
Action Required:
❑ As Requested
❑ For Your Information
1 Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑ Yes ❑ No
❑ Attach Signature, Initial and Notary Tabs
Return to: Please call Tyler Dale at ext. 541 for pick up when completed. Thank you.
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Federal Aviation Administration (FAA)
Subject of the Agreement: A Reimbursable Agreement (RA) with the Federal Aviation Administration (FAA)
for improvements to the Runway 16-34 Instrument Landing System (ILS) at Meacham International Airport.
M&C Approved by the Council? * Yes 9 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 9 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No ® If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: 6/24/2026 Expiration Date: N/A
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes ❑ No W
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 106997
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be