Loading...
HomeMy WebLinkAbout061360-CO4 - Construction-Related - Contract - Westwood Professional Services, D.R. Horton, and Acadia Services, LLCCSC No. 61360-CO4 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: ROCK CREEK RANCH LIFT STATION & FORCE MAIN PHASE 2 CHANGE CONTRACT: FORCE MAIN AND LIFT STATION IMPROVEMENTS ORDER No: CFA # CFA24-0030 CITY PARTICIPATION: YES CITY PROJECT # 105040 CITY SECRETARY CONTRACT # 61360 4 FID # 30114-0200431-105040-EO7685 X # X-27916 FILE # INSPECTOR: Omar Frias Phone No: (817)-647-2497 PROJECT MANAGER: Sandip Adhikari Phone No: (817)-392-8424 CONTRACT UNIT FORCE MAIN LIFT STATION DRAINAGE PAVING STREET LIGHTS CONTRACT DAYS Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost ORIGINAL CONTRACT $1,604,906.84 $4,339,192.56 $3,324,358.78 $3,324,358.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 275 EXTRAS TO DATE $30,936.19 $83,642.28 ($70,044.50) ($70,044.50) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 CREDITS TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 CONTRACT TO DATE $1,635,843.03 $4,422,834.84 $3,254,314.28 $3,254,314.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 275 AMOUNT OF PROP. CHANGE ORDER $0.00 $0.00 $14,156.07 $14,156.07 $0.00 $0.00 1 $0.00 1 $0.00 $0.00 1 $0.00 65 REVISED CONTRACT AMOUNT $1,635,843.03 $4,422,834.84 $3,268,470.35 $3,268,470.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 340 TOTAL REVISED CONTRACT AMOUNT PER UNIT $6,058,677.87 $6,536,940.69 $0.00 $0.00 $0.00 REVISED COST SHARE Dev. Cost: $4,904,313.38 City Cost: $7,691,305.18 TOTAL REVISED CONTRACT $12,595,618.56 OFFICIAL RECORD 11 REVIEWED CITY SECRETARY By Sandip Adhikari at 5:17 pm, Jun 08, 2026 FT. WORTH, TX Revised: 12-17-2018 Page 1 Ynu are direrted to make the fnllnw nn hannes in the nnntmct dnnuments- UNIT II: LIFT STATION IMPROVEMENTS PAY ITEM # CITY BID ITEM # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE Developer Cost City Cost TOTAL 4 -1502 SF Gravel $10.00 ($7,510.00) ($7,510.00) ($15,020.00) 7 -825 SF Road/concrete asphalt paving $17.00 ($7,012.50) ($7,012.50) ($14,025.00) 58* 110 LF 4" Conduits $165.00 $9,076.00 $9,075.00 $18,150.00 59* 110 LF 500 MC Feeders $250.00 $13,760.00 $13,750.00 $27,500.00 60* 16 CY Duct Bank - Concrete $285.00 $2,280.00 $2,280.00 $4,560.00 61* 1 EA 3' Electrical Junction Box $6,250.00 $2,625.00 $2,625.00 $5,250.00 62* 1 1 1 1 LS Concrete Pad $1,897.14 $948.57 $948.57 $1,897.14 TOTAL UNIT II: LIFT STATION IMPROVEMENTS 14 156.07 14 156.07 28 312.14 - -Asterisk indicates New Pay item REASONS FOR CHANGE ORDER 1. Ductbank needed from existing SES to the new ATS location in response to RFI #3. 2. Reduce gravel quantity to only include necessary access road. Return road to existing conditions. 3. Remove concrete asphalt quantity. RECOMMENDED: Westwood Professio al Services By: Name: Ben Raef Title: APPROVAL RECOMMENDED: CFW - Water Department By. s�� ✓a pu..P.� 06/11 /2026 APPROVED: D.R. Horton By: T� Name: Thomas Freed Title: Vice President of Land Acquisition & Development APPROVED: CFW -Assistant City Manager By:CAS�'_�06/25/2026 Name: Suby Varughese Name: Jesica McEachern Title: Engineering Manager Title: Assistant RECOMMENDED: ATTEST: CFW - *Contract Compliance Manager e 06/11/2026 By: By: Y Name: Sandip Adhikari Name: Title: Sr. Professional Engineer Title: M&C Number: N/A M&C Date Approved: N/A OFFICIAL RECORD CITY SECRETARY Revised: 12-17-2018 FT. WORTH, TX 06/25/2026 AQf`poaT°qaa Jannette S. Goodall City Secretary �°�'°°�V� *d acan.Ez oo APPROVED: Acadia6Sices, LLC - By: Name: Daniel Ja Bell Title: _ Senior Project Manager APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney By: Name: Richard McCracken 06/12/2026 Title: Sr. Assistant City Attorney * Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. ❑ There are NO City Funds associated with this Contract 0 There are City Funds associated with this Contract REVIEWED By Sandip Adhikari at 5:17 pm, Jun 08, 2026 Page 2 r EXIGTING FENCE ROADWAY GEOTEXTILE FILTER FABRIC FINISH GRADE I' GRAVEL SURFACING / TYP OF 2 GATE. MEIER VAULTS L� 3H�63.1— PUMPBp4 ANp p5 Vr FO� ACING I I r NOORTH ODOR TRGL I � VALVE VAULTS SY6 EM J PHME 111 EA SHP PUMP pS LWJ WET WELL T J E%I6TING WFLUENT MANHOLE O T�• � /* ®rPHASE V3 HE PUMP AS FUTURC EXISTNG -----� -- WETWELLA METER A I I ' \ FUTURE ODOR CONTROL "FUTURE GES l\ TURF --------------- Q\\ Q o u \ PLAN 1"=10 FUNK£ METER VAULTA PHASE IV 2 EA SHP PUMP rot AND. FUTURE GATE TO 90% RELATIVE COMPACTION DETAIL A - GRAVEL SURFACING NTS CRUSHED AGGREGATE GRADATION TABLE SIEVESRES '-LAREOPENINGS) PERCE—C. W AGG GSIEVE P1.I.IN 2 6• EFFSD 25 2550 azs 0.]5^ 0-tD NOTE. AGGREGATE TO HAVE A MINIMUM OF 3 FRACTURED FACES PHASING SUMMARY CAp Id ..—IServia E.hWnw Ph— MGD (GPM) 0u (HP)t hdbp(HP) A G— x0onahla p— I (ExIrtIAEI 1.E D".) 1(100)- I DO 1 1200A PM1au II 1l U.[)) a 1(100) (350)-(350) ROD 1EA-1000KW Ph.. 111 ll.B (8,220) 2(350)+1(350) 3WOA I --- Ph.. IV 23.0(16,D00) 4(35G)r1(350) 3000A 2EA-3WOKW PM1ase V(SafWOVcI 25.0(17,400) 5(350)+1(350) 3000A 2£A 1O00 KW' NOTE: THE CONTRACTOR SHALL CONTACT THE FOLLOWING B HOURS PRIORTO.EXCAVATING IN THIS AREA: P0D3a0. l ENERGYTRANSFER COMPANY 1B1]-28]-B213 SIEVE Gv TXU ELECTRIC DELIVERY 1-000-]11-9112 CITY OF FORT WORTH392-123a GONTRADT5H TO FIELD VERIFY AU- EXISTING 071 VERTICALLY AND HORIZONTALLY PRIOR TO CONSTRUCTION. 0 -0 20 LEGEND REVIEWED By Sandip Adhixarl at 4:19 pm, Jan OS, 2026 1, EQUIPMENTS ANOSTRUCTURES LABELED FUTURE ARE FOR PHASE34AND 5 COND TION 2. PROVIDE B."ROA FOR SAFETY M_UAEG 3. RETURN TO EXISTING CONDITIONS. 1 :roll/ / ROBBV DAN BRVANT //lq104022,E IT\A�;0 `ALEH�_ 4Y29126 PAVING AN" FINAL SITE CONDITION REVISION - A CORA ROCK CREEK LIFT STATION - PHASE II CIVIL SITE PLAN FORT WORTH, TARRANT COUNTY, TEXAS WATERWORKS ENGINEERS BRAWN: DML DATE I PROJECTx SHEST DESIGNED: DB A.PRIL DRIU-12 GIF. REVIEWER ROB 2025 FROMTIIIIONCOR I 00.XFMR-0O1 IA.MJ 3PH:4W, 32KAICAc SE6 1200A.3P.4W, 421WC, n _ N*4 3R(PEft LOCA_LIUTILITY) I Iw I i I I c �IOGAT I, 51 3 BE SStG k3a EGJPO-j I I I I I I I 125OKW 46OYI2T7V 3P GENERATOR MANAGEMENT 1eaVn2m/ RELAY GE469 l6) 20PP;5 Q}:0T 1'C, CATO ❑ O )12PpAT TORN O) BPOAT LPGEN 12MA ML0, 3P. 3W 42KAIC HE MA 12 MCC F-------------------------------------------------------------- I v I oM i PT �)� Jo)� 3P) JP) JP)soar JP)=;F ,) i T U ATS I RVSS1 I 12004. 3P, 3W.421WC. NEMA3R _________ _—__ —_ —_ _____— —_—_—_—_—_—_—_—_- a 19 I I � jI n GKVA 0100 36XVA I Y1TO Eq�FR=200 2M08Y/120V I 480V To 1 I 20By"- I I I I N I I I I � I I6 II ` -- I I LL 100 100 15 TO LIFT PUMP UFTPUMP A/C UNIT ODOR MCC -A 101 201 CONTROL LIGHTING I TO BLOWER PANEL MCC -A I MCC -A ELECTRICAL LOAD SUMMARY LOAD DESCRIPTION KVA 1-2 HP FLA@ 460VAC Iwl HP FLA@ 460VAC MOTOR LOADS: LIFT PUMP NO.1 400 477 LIFT PUN NO, 2 400 4T! LIFT PUMP NO. 3(FUTURE) 400 477 LFT PUN NO.4 400 — 400 477 LFT PUMP NO.5 400 0 400 47 LIFT PUN NO, 6(FUTUE) 400 0 EXISTMO MCC T5 230 256 45 153 MPZ 30 36 36 SUBTOTAL: 105 IOW_j 769 1 2N5 2 4 25% LARGEST MOTOR(4T'/A) 25% OF CONTP810U5 LOAD 120 31.5 120 31.5 TOTAL LOAD 400V. Sam; 2726.E SERVICE ENTRANCE SUE (AMPS): 1200 3000 WIREWAV 12 WIREWAY WIREWAY A WIREWAY WIREWAV 7 SI SPO B .. P FPRCI AaOrn SP SpC e t2 3 DOOR CONTROL BLOWER 00-XFM111. Sp E� Ilia Op AN METERING e 1 6laliona o O❑ SSSBPB 00 HP, 6latlon O❑ o SSSBV 100 HIA 51elIP ADM a SPACE UNIT Slaliorve12 AEM SPACE U T Sduoaa AAJt Space RR A slA al wlREwar 2 wwnvav mlREwnr AA AB'c Y Y Ac,: �e AD'^AE.., 20W I20D 2OW 120D 2UW 12oD 201 20D 2UW 20C 600A 3Of1A 300A 300A 3VVA I NOTE: THECONTRACTORSH CONTACTTHEFOLLOWING 6HOUR PRtORTO.EXCAVATINGINTHISAREA: ENERGY TRANSFER COMPANY 1 Bt]25]-82t3 sIENERGv TXU ELECTRIC DELIVERY CITY OF FORT WORTH B173921234 REVIEWED By Sandip Adhik 1 t 4:19 pm, Jun 06, 2026 1. MODIFY MCC SECTION AS REQUIRED TO ACCOMODATE THE NEW BODAMP CIRCUIT BREAKER. 2. GENERATOR CIRCUIT BREAKER WILL BE SET TO 20MA IN THE FUTURE WHEN IT IS CONFIGURED TO FEED THE FUTURE SWITCHBOARD. ELECTRICAL CHANGES PER CO —Ptg OFTEk �11 I BRIAN GEORGE YOUNG% Ii .148577j 4I9I2026 ROCK CREEK LIFT STATION - PHASE II ELECTRICAL SITE POWER ONE -LINE DIAGRAM FORT WORTH, TARRANT COUNTY, TEXAS WATERWORKS ENGINEERS I ¢pPAL I —1.12 I IF— a K LIEN MAIBREAKER AUUXT \\`\AIJELBOARO_ GENERATOR IIH\ FUTRE RMH \ 1 LCP\ OWP�QeP 14 \ MCC -A ` CANOPY - -------- CONTROL MH NORTHOOOR -_____-_- -1 ��/ CONTROL SYSTEM ll �an c I. TI e GONOFIT FORE. J FUTURE I I I EXISTING METER VAULTA EXIBITNGRTU CANOPY EXISTING MCC POWER LIGHTING PANELS VALVEVAULTB WET WELLS II EXISTING J N UENT MWHOLE 11-G WET FILL A —A -- NEW AT L MTS (PCSTING D PUURO%) L- - - -- - - - - REM (STING: EXISTING SES. OVE CABLES. - - - - - - - - _ - _ _ II , II TRANSEORMER Y MAIN MONITORING UNIT FOR MAIN LIFTPUMP4 PMP401 UFTPFll PMP-501 LIFT PUMPS PMP_OH BPO 01STRIBUTION TRANSFORMER POWER SUPPLY ENET 30 20' 30' 30 MCC -A ELEVATION NOTE: THE CONTRACTOR BHALL CONTACT THE FOLLOWING AT LEABT 48 HOURB PRIOR TO EXCAVATING IN THIS AREA, EXA5811 1-800.34 Gl ENERGY MN5FER COMPANY SENERGY TFUELE'LHIC" ELIVERY CITY OF FORT WORTH 01T392-1- 0 8 e 16FEET SCALE 1/8"=110" REVIEWED By Sandip Adhi 1,R 4:19 pm, Jun 08, M28 1. TYPE ALGHT FUTURE SHALL BE OUTDOOR LED UNDER CANOPYCLIGHT,l 30K3 CK SIMILAR TO LITHONIA ELECTRICALCHANGES PER C- A PtE OF TEI \41 / BRIAN GEORGE YOUNG/ /t 44.148577;�: 4/912026 ROCK CREEK LIFT STATION — PHASE II OVERALL SITE PLAN FORT WORTH, TARRANT COUNTY, TEXAS WATERWORKS Terns Registration #F-11683 FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: D.R. Horton — Texas, LTD Subject of the Agreement: Force Main and Lift Station Improvements - C04 M&C Approved by the Council? * Yes ❑ No M If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 0 No ❑ 61360 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see backpage for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes ❑ No 21 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. CPN 105040 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 0 No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.