HomeMy WebLinkAbout061360-CO4 - Construction-Related - Contract - Westwood Professional Services, D.R. Horton, and Acadia Services, LLCCSC No. 61360-CO4
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECT NAME:
ROCK CREEK RANCH LIFT STATION & FORCE MAIN PHASE 2
CHANGE
CONTRACT:
FORCE MAIN AND LIFT STATION IMPROVEMENTS
ORDER No:
CFA #
CFA24-0030 CITY PARTICIPATION: YES
CITY PROJECT #
105040
CITY SECRETARY CONTRACT #
61360
4
FID #
30114-0200431-105040-EO7685
X #
X-27916
FILE #
INSPECTOR: Omar Frias Phone No: (817)-647-2497
PROJECT MANAGER: Sandip Adhikari Phone No: (817)-392-8424
CONTRACT UNIT
FORCE MAIN
LIFT STATION
DRAINAGE
PAVING
STREET LIGHTS
CONTRACT
DAYS
Developer Cost
City Cost
Developer Cost
City Cost
Developer Cost
City Cost
Developer Cost
City Cost
Developer Cost
City Cost
ORIGINAL CONTRACT
$1,604,906.84
$4,339,192.56
$3,324,358.78
$3,324,358.77
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
275
EXTRAS TO DATE
$30,936.19
$83,642.28
($70,044.50)
($70,044.50)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0
CREDITS TO DATE
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0
CONTRACT TO DATE
$1,635,843.03
$4,422,834.84
$3,254,314.28
$3,254,314.27
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
275
AMOUNT OF PROP. CHANGE ORDER
$0.00
$0.00
$14,156.07
$14,156.07
$0.00
$0.00
1 $0.00
1
$0.00
$0.00
1 $0.00
65
REVISED CONTRACT AMOUNT
$1,635,843.03
$4,422,834.84
$3,268,470.35
$3,268,470.34
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
340
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
$6,058,677.87
$6,536,940.69
$0.00
$0.00
$0.00
REVISED COST SHARE
Dev. Cost:
$4,904,313.38
City Cost:
$7,691,305.18
TOTAL REVISED CONTRACT
$12,595,618.56
OFFICIAL RECORD
11 REVIEWED CITY SECRETARY
By Sandip Adhikari at 5:17 pm, Jun 08, 2026 FT. WORTH, TX
Revised: 12-17-2018 Page 1
Ynu are direrted to make the fnllnw nn hannes in the nnntmct dnnuments-
UNIT II: LIFT STATION IMPROVEMENTS
PAY ITEM #
CITY BID ITEM #
QUANTITY
UNIT
ITEM DESCRIPTION
UNIT PRICE
Developer Cost
City Cost
TOTAL
4
-1502
SF
Gravel
$10.00
($7,510.00)
($7,510.00)
($15,020.00)
7
-825
SF
Road/concrete asphalt paving
$17.00
($7,012.50)
($7,012.50)
($14,025.00)
58*
110
LF
4" Conduits
$165.00
$9,076.00
$9,075.00
$18,150.00
59*
110
LF
500 MC Feeders
$250.00
$13,760.00
$13,750.00
$27,500.00
60*
16
CY
Duct Bank - Concrete
$285.00
$2,280.00
$2,280.00
$4,560.00
61*
1
EA
3' Electrical Junction Box
$6,250.00
$2,625.00
$2,625.00
$5,250.00
62*
1
1 1
1 LS
Concrete Pad
$1,897.14
$948.57
$948.57
$1,897.14
TOTAL UNIT II: LIFT STATION IMPROVEMENTS
14 156.07
14 156.07
28 312.14
- -Asterisk indicates New Pay item
REASONS FOR CHANGE ORDER 1. Ductbank needed from existing SES to the new ATS location in response to RFI #3.
2. Reduce gravel quantity to only include necessary access road. Return road to existing conditions.
3. Remove concrete asphalt quantity.
RECOMMENDED:
Westwood Professio al Services
By:
Name: Ben Raef
Title:
APPROVAL RECOMMENDED:
CFW - Water Department
By. s�� ✓a pu..P.�
06/11 /2026
APPROVED:
D.R. Horton By:
T�
Name: Thomas Freed
Title: Vice President of Land Acquisition & Development
APPROVED:
CFW -Assistant City Manager
By:CAS�'_�06/25/2026
Name: Suby Varughese Name: Jesica McEachern
Title: Engineering Manager Title: Assistant
RECOMMENDED: ATTEST:
CFW - *Contract Compliance Manager
e 06/11/2026
By:
By:
Y
Name:
Sandip Adhikari Name:
Title:
Sr. Professional Engineer Title:
M&C Number:
N/A
M&C Date Approved:
N/A
OFFICIAL RECORD
CITY SECRETARY
Revised: 12-17-2018
FT. WORTH, TX
06/25/2026
AQf`poaT°qaa
Jannette S. Goodall
City Secretary �°�'°°�V� *d
acan.Ez oo
APPROVED:
Acadia6Sices, LLC -
By:
Name: Daniel Ja Bell
Title: _ Senior Project Manager
APPROVED AS TO FORM AND LEGALITY:
CFW - Assistant City Attorney
By:
Name: Richard McCracken
06/12/2026
Title: Sr. Assistant City Attorney
* Contract Compliance Manager (Project Manager):
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, include
ensuring all performance and reporting requirements.
❑ There are NO City Funds associated with this Contract
0 There are City Funds associated with this Contract
REVIEWED
By Sandip Adhikari at 5:17 pm, Jun 08, 2026
Page 2
r EXIGTING FENCE
ROADWAY
GEOTEXTILE
FILTER FABRIC
FINISH GRADE
I' GRAVEL SURFACING
/ TYP OF 2 GATE.
MEIER VAULTS
L� 3H�63.1—
PUMPBp4 ANp p5 Vr FO�
ACING I
I
r
NOORTH ODOR
TRGL I � VALVE VAULTS
SY6 EM
J PHME 111
EA SHP PUMP pS
LWJ WET WELL
T J E%I6TING
WFLUENT MANHOLE
O T�• � /*
®rPHASE V3 HE PUMP AS
FUTURC
EXISTNG -----� -- WETWELLA
METER A
I I
' \ FUTURE ODOR CONTROL
"FUTURE GES l\ TURF
---------------
Q\\ Q
o u \
PLAN
1"=10
FUNK£ METER VAULTA
PHASE IV 2
EA SHP PUMP rot AND.
FUTURE GATE
TO 90% RELATIVE
COMPACTION
DETAIL A - GRAVEL SURFACING
NTS
CRUSHED AGGREGATE
GRADATION TABLE
SIEVESRES
'-LAREOPENINGS)
PERCE—C.
W AGG GSIEVE
P1.I.IN
2
6•
EFFSD
25
2550
azs
0.]5^
0-tD
NOTE. AGGREGATE TO HAVE A MINIMUM
OF 3 FRACTURED FACES
PHASING SUMMARY
CAp Id
..—IServia
E.hWnw
Ph—
MGD (GPM)
0u (HP)t hdbp(HP)
A
G—
x0onahla
p— I (ExIrtIAEI
1.E D".)
1(100)- I DO 1
1200A
PM1au II
1l U.[)) a 1(100)
(350)-(350)
ROD
1EA-1000KW
Ph.. 111
ll.B (8,220)
2(350)+1(350)
3WOA
I ---
Ph.. IV
23.0(16,D00)
4(35G)r1(350)
3000A
2EA-3WOKW
PM1ase V(SafWOVcI
25.0(17,400)
5(350)+1(350)
3000A
2£A 1O00 KW'
NOTE: THE CONTRACTOR SHALL CONTACT THE FOLLOWING
B HOURS PRIORTO.EXCAVATING IN THIS AREA:
P0D3a0. l
ENERGYTRANSFER COMPANY 1B1]-28]-B213
SIEVE Gv
TXU ELECTRIC DELIVERY 1-000-]11-9112
CITY OF FORT WORTH392-123a
GONTRADT5H TO FIELD VERIFY AU- EXISTING 071
VERTICALLY AND HORIZONTALLY PRIOR TO CONSTRUCTION.
0 -0 20
LEGEND
REVIEWED
By Sandip Adhixarl at 4:19 pm, Jan OS, 2026
1, EQUIPMENTS ANOSTRUCTURES LABELED FUTURE ARE FOR
PHASE34AND 5 COND TION
2. PROVIDE B."ROA FOR SAFETY M_UAEG
3. RETURN TO EXISTING CONDITIONS.
1
:roll/
/ ROBBV DAN BRVANT
//lq104022,E
IT\A�;0 `ALEH�_
4Y29126
PAVING AN" FINAL SITE CONDITION REVISION -
A CORA
ROCK CREEK LIFT STATION - PHASE II
CIVIL
SITE PLAN
FORT WORTH, TARRANT COUNTY, TEXAS
WATERWORKS
ENGINEERS
BRAWN: DML DATE I PROJECTx SHEST
DESIGNED: DB A.PRIL DRIU-12 GIF.
REVIEWER ROB 2025
FROMTIIIIONCOR
I 00.XFMR-0O1
IA.MJ 3PH:4W, 32KAICAc
SE6
1200A.3P.4W, 421WC,
n _ N*4 3R(PEft LOCA_LIUTILITY)
I
Iw I
i
I I
c �IOGAT I, 51 3 BE
SStG k3a
EGJPO-j
I
I I
I I
I I
125OKW
46OYI2T7V
3P
GENERATOR
MANAGEMENT
1eaVn2m/
RELAY GE469
l6)
20PP;5
Q}:0T
1'C, CATO
❑ O )12PpAT
TORN
O) BPOAT
LPGEN
12MA ML0, 3P. 3W 42KAIC
HE MA 12 MCC
F--------------------------------------------------------------
I v I
oM i
PT �)� Jo)� 3P) JP) JP)soar JP)=;F ,)
i T U
ATS I RVSS1 I
12004. 3P, 3W.421WC.
NEMA3R _________ _—__ —_ —_ _____— —_—_—_—_—_—_—_—_-
a 19
I I �
jI n GKVA 0100
36XVA
I Y1TO Eq�FR=200 2M08Y/120V
I 480V To
1 I 20By"-
I
I I
I N I I
I I �
I I6
II
` --
I I LL
100 100 15
TO LIFT PUMP UFTPUMP A/C UNIT ODOR
MCC -A 101 201 CONTROL LIGHTING
I TO BLOWER PANEL
MCC -A
I
MCC -A ELECTRICAL LOAD SUMMARY
LOAD DESCRIPTION
KVA
1-2
HP
FLA@
460VAC
Iwl
HP
FLA@
460VAC
MOTOR LOADS:
LIFT PUMP NO.1
400
477
LIFT PUN NO, 2
400
4T!
LIFT PUMP NO. 3(FUTURE)
400
477
LFT PUN NO.4
400
—
400
477
LFT PUMP NO.5
400
0
400
47
LIFT PUN NO, 6(FUTUE)
400
0
EXISTMO MCC
T5
230
256
45
153
MPZ
30
36
36
SUBTOTAL:
105
IOW_j
769
1 2N5
2 4
25% LARGEST MOTOR(4T'/A)
25% OF CONTP810U5 LOAD
120
31.5
120
31.5
TOTAL LOAD 400V.
Sam;
2726.E
SERVICE ENTRANCE SUE (AMPS):
1200
3000
WIREWAV
12
WIREWAY
WIREWAY
A
WIREWAY
WIREWAV
7
SI SPO
B ..
P
FPRCI
AaOrn
SP
SpC e
t2
3
DOOR
CONTROL
BLOWER
00-XFM111.
Sp E�
Ilia Op
AN
METERING e
1 6laliona
o
O❑
SSSBPB 00 HP,
6latlon
O❑ o
SSSBV 100 HIA
51elIP
ADM a
SPACE UNIT
Slaliorve12
AEM
SPACE U T
Sduoaa
AAJt
Space
RR
A
slA al
wlREwar
2
wwnvav
mlREwnr
AA AB'c Y Y Ac,: �e AD'^AE..,
20W I20D 2OW 120D 2UW 12oD 201 20D 2UW 20C
600A 3Of1A 300A 300A 3VVA
I
NOTE: THECONTRACTORSH CONTACTTHEFOLLOWING
6HOUR PRtORTO.EXCAVATINGINTHISAREA:
ENERGY TRANSFER COMPANY 1 Bt]25]-82t3
sIENERGv
TXU ELECTRIC DELIVERY
CITY OF FORT WORTH B173921234
REVIEWED
By Sandip Adhik 1 t 4:19 pm, Jun 06, 2026
1. MODIFY MCC SECTION AS REQUIRED TO
ACCOMODATE THE NEW BODAMP CIRCUIT
BREAKER.
2. GENERATOR CIRCUIT BREAKER WILL BE SET
TO 20MA IN THE FUTURE WHEN IT IS
CONFIGURED TO FEED THE FUTURE
SWITCHBOARD.
ELECTRICAL CHANGES PER CO
—Ptg OFTEk �11
I BRIAN GEORGE YOUNG%
Ii .148577j
4I9I2026
ROCK CREEK LIFT STATION - PHASE II
ELECTRICAL
SITE POWER ONE -LINE DIAGRAM
FORT WORTH, TARRANT COUNTY, TEXAS
WATERWORKS
ENGINEERS
I
¢pPAL I —1.12 I IF—
a
K
LIEN MAIBREAKER
AUUXT
\\`\AIJELBOARO_ GENERATOR
IIH\
FUTRE RMH \ 1
LCP\ OWP�QeP
14 \
MCC -A `
CANOPY - --------
CONTROL MH NORTHOOOR
-_____-_- -1 ��/ CONTROL
SYSTEM
ll
�an c
I.
TI e
GONOFIT FORE. J
FUTURE
I I I
EXISTING METER
VAULTA
EXIBITNGRTU
CANOPY EXISTING MCC
POWER LIGHTING
PANELS
VALVEVAULTB
WET WELLS
II
EXISTING J
N UENT
MWHOLE
11-G WET
FILL A
—A -- NEW AT
L MTS
(PCSTING D PUURO%)
L- - - -- - - - - REM
(STING: EXISTING SES.
OVE CABLES.
- - - - - - - - _ - _ _ II , II TRANSEORMER Y
MAIN
MONITORING
UNIT FOR MAIN
LIFTPUMP4
PMP401
UFTPFll
PMP-501
LIFT PUMPS
PMP_OH
BPO
01STRIBUTION
TRANSFORMER
POWER
SUPPLY
ENET
30 20' 30' 30
MCC -A ELEVATION
NOTE: THE CONTRACTOR BHALL CONTACT THE FOLLOWING
AT LEABT 48 HOURB PRIOR TO EXCAVATING IN THIS AREA,
EXA5811 1-800.34 Gl
ENERGY MN5FER COMPANY
SENERGY
TFUELE'LHIC"
ELIVERY
CITY OF FORT WORTH 01T392-1-
0
8 e 16FEET
SCALE 1/8"=110"
REVIEWED
By Sandip Adhi 1,R 4:19 pm, Jun 08, M28
1. TYPE ALGHT FUTURE SHALL BE OUTDOOR LED
UNDER CANOPYCLIGHT,l 30K3 CK SIMILAR TO
LITHONIA
ELECTRICALCHANGES PER C-
A
PtE OF TEI \41
/ BRIAN GEORGE YOUNG/
/t 44.148577;�:
4/912026
ROCK CREEK LIFT STATION — PHASE II
OVERALL SITE PLAN
FORT WORTH, TARRANT COUNTY, TEXAS
WATERWORKS
Terns Registration #F-11683
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: D.R. Horton — Texas, LTD
Subject of the Agreement: Force Main and Lift Station Improvements - C04
M&C Approved by the Council? * Yes ❑ No M
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ 61360
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. CPN 105040
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.