Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
065439 - Construction-Related - Contract - Rebcon, LLC
CSC No. 65439 FORT WORTH, CONTRACT FOR THE CONSTRUCTION OF N Tarrant Parkway and N Beach Street Intersection Improvements Paving and Traffic Signal Improvements City Project No. 103309 Mattie Parker Jesus "Jay" Chapa Mayor City Manager Lauren Prieur, P.E., PMP, CCM Director, Transportation and Public Works Department Prepared for The City of Fort Worth Transportation and Public Works Department October 2025 DOCUMENTS ISSUED FOR CONSTRUCTION These "Issued for Construction" Contract Documents have been prepared by revising the Bidding Documents to record references to addenda, field orders or change orders issued. The Bidding Documents may have been revised to incorporate these revisions directly into the "Issued for Construction" Contract Documents. Contractor is responsible for determining that these documents are consistent with their understanding of the Bidding Documents as modified per the appropriate provisions of the Contract Documents. The Bidding Documents, as modified per the appropriate provisions of the Contract Documents, take precedence over these "Issued for Construction" documents. FREESE Irmill:N,CHOLS Freese and Nichols, Inc. 801 Cherry Street, Suite 2800 Fort Worth, Texas 76102 817-735-7300 Texas Registered Engineering Firm F-2144 FNI Project No. FT122711 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORTWORTH. 41,41 City of Fort Worth Standard Construction Specification Documents Adopted September 2011 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 6 SECTION 00 00 00 TABLE OF CONTENTS Division 00 - General Conditions Last Revised 0005 10 Mayor and Council Communication 07/01/2011 0005 15 Addenda 07/01/2011 0011 13 Invitation to Bidders 02/08/2024 0021 13 Instructions to Bidders 09/01/2025 0035 13 Conflict of Interest Statement 02/24/2020 00 41 00 Bid Form 09/19/2025 00 42 43 Proposal Form Unit Price 09/30/2021 0043 13 Bid Bond 09/30/2021 00 43 37 Vendor Compliance to State Law Nonresident Bidder 09/30/2021 0045 11 Bidders Prequalifications 08/13/2021 00 45 12 Pre uglification Statement 09/30/2021 0045 r3 Preqtta4ifieation Appheation 06 t i 3 t2 m 5 00 45 26 Contractor Compliance with Workers' Compensation Law 07/01/2011 00 45 41 Small Business Goal 9/01/2025 00 52 43 Agreement 9/19/2025 0061 13 Performance Bond 12/08/2023 0061 14 Payment Bond 12/08/2023 0061 19 Maintenance Bond 9/19/2025 00 61 25 Certificate of Insurance 07/01/2011 00 72 00 General Conditions 09/01/2025 00 73 00 Supplementary Conditions 9/19/2025 Division 01 - General Requirements Last Revised 01 11 00 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 07/01/2011 01 29 75 Materials On Hand 9/19/2025 01 31 19 Preconstruction Meeting 09/01/2025 01 3120 Project Meetings 07/01/2011 01 32 16 Construction Schedule 10/06/2023 01 3233 Preconstruction Video 07/01/2011 013300 Submittals 12/20/2012 01 35 13 Special Project Procedures 03/11/2022 01 45 23 Testing and Inspection Services 03/09/2020 01 50 00 Temporary Facilities and Controls 09/19/2025 01 5526 Street Use Permit and Modifications to Traffic Control 03/22/2021 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 0158 13 Temporary Project Signagc 07/01/2011 01 60 00 Product Requirements 03/09/2020 01 66 00 Product Storage and Handling Requirements 07/01/2011 01 70 00 Mobilization and Remobilization 11/22/2016 01 71 23 Construction Staking and Survey 02/14/2018 01 74 23 Cleaning 07/01/2011 01 77 19 Closeout Requirements 03/22/2021 01 78 23 Operation and Maintenance Data 12/20/2012 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 6 01 78 39 1 Project Record Documents 07/01/2011 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: http://fortworthtexas.gov/tpw/contractors/ or https:Happs.fortworthtexas.gov/Proi ectResources/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 03/11/2022 0241 14 Utility Removal/Abandonment 12/20/2012 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 0334 13 Controlled Low Strength Material CLSM 03/07/2025 n� 3 1 � 1 � /20/201 v�-�rry r�-�,vnvrt 0390--08 424z Division 26 - Electrical 26 05 00 Common Work Results for Electrical 03/11/2022 g Deffl0litiOR f0F QeOtfi6a4 SyStefffS 11 /�12 26 05 33 Raceways and Boxes for Electrical Systems 12/20/2012 2ti�? n�/no 1 2605 cnGoffm/��hn1ti Division 31- Earthwork 31 00 00 Site Clearing 03/22/2021 3123 16 Unclassified Excavation 01/28/2013 31 23 23 Borrow 01/28/2013 31 24 00 Embankments 01/28/2013 31 25 00 Erosion and Sediment Control 04/29/2021 34-36-00 dons 12 /�12 34-37-4DO Ripfap 11 7 /7rtr-cv,/20 12 Division 32 - Exterior Improvements 3' 12/20/20 gTeinpofar-y1 / 32 n1 7o /;2n2,c 3244-2-3 Flexible Rase r'',,uFses- 17M 32 11 29 Lime Treated Base Courses 12/20/2012 3244--3-3 Cement Treated Base r,.ufses n�/10 n�z 2 14 �� �-r 401 c vnrn/21�/2z� 32 12 16 Asphalt Paving 6/07/2024 2 1 7 7- ��r�r� - 12A20,12012 32 13 13 Concrete Paving 06/13/2025 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 12/09/2022 2 1 3-7- 1- /20 /N 4 2 1 /�1- 2 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 6 2a-ad12/09/2022 32 1723 Pavement Markings 06/10/2022 2 q 2- �� „ in4404- rn-v-rr�vz� 2 3 , 3 �� !'haif. Feftees ,.,a Gatos- , �i201/20 � zz-rsvrLvzz 32 3 26 Wire Few es and Gates , 2420/2n, 2 32-34-29 Woo F-eftees aa races- 12 0/2 3232 13 Cast -in -Place Concrete Retaining Walls 06/05/2018 3291 19 Topsoil Placement and Finishing of Roadway Right-of-ways 03/11/2022 3292 13 Sodding 05/13/2021 329 4 nci,�21 32o2 , c N-atye See4 ag , n/06,12 r,z 32-93-43. Trees and Sh 4 , � i�I Division 33 - Utilities 334t-3-0 nn in�l-9 3 n, z, �--v-r�r 0314 /202 vim,-z-�,-zv� 3 n, 27 �--v-r�z ,1inQi2m3 rtrvvrav�.� 33-0440 Joint Banding and Eleetfiea4 isolation- 12/20/201-2 33 04 12 Magnesium Anode Cathodic Protection System 12/20/2012 33 04 40 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 04 50 Cleaning of Pipes 03/11/2022 3305 10 Utility Trench Excavation, Embedment, and Backfill 06/13/2025 3 05 ,� T✓--v�-Tz ,2i2'ni;n,2 r�-avravzz 33-054-3 Ffame, 091LO91/2 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 03/11/2022 33 -0546 r,,mf-ota AT-Atef vatAts , 2 i�1 3305 17 Concrete Collars 03/11/2022 334 5-2g , 2 � -r Tunnel LineFT4ate 12T2012412 33--05-2z r1-20r2012- 3 nc 2� T✓--v�-z� ,�124/2012 rtr-avravzz 3 05 2nInstal4afieffpe ,2i09i2022 33 05 26 Utility Markers/Locators 12/20/2012 33 05 30 Location of Existing Utilities 12/20/2012 33344-0- Bel ,. t a a c�� , /�tz 33 11 10 Ductile Iron Pie 12/09/2022 33 11 11 Ductile Iron Fittings 09/20/2017 33444-2 nn ins 33 11 14 Buried Steel Pipe and Fittings 12/20/2012 33 12 10 Water Services 1-inch to 2-inch 02/14/2017 3_T=af,2/�Q 22�o Resilient Seated GAtp 11.,Iye nyn -5 33-�BtAtefflyAWyesnn ter° 33 1225 Connection to Existing Water Mains 02/06/2013 334-2-8 4-� CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 6 Division 34 - Transnortation 3441 10 Traffic Signals 03/11/2022 3441 10.01 Attachment A — Controller Cabinet 12/18/2015 3441 10.02 Attachment B — Controller Specification 02/2012 3441 10.03 Attachment C — Software Specification 01/2012 3441 11 Temporary Traffic Signals 11/22/2013 3441 13 Removing Traffic Signals 03/11/2022 34 41 20 Roadway Illumination Assemblies 12/20/2012 34 41 20.01 Arterial LED Roadway Luminaires 06/15/2015 444oz 4 n�4-5 34n, 20 03 Residei#ial LED Roadway Ltiminaffes 34 41 30 Aluminum Signs 11/12/2013 � neonFiber-02 io n 3471 13 Traffic Control 03/22/2021 Division 99 — Special Specifications 99 99 99 Special Specifications CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 6 Appendix GC-4.01 Availability of Lands GC-4.02 Subsurface and Physical Conditions GC-4.04 Underground Facilities GG 4.06 14a"a.dotts En-,ir-e neat i G Haiti,.„ at Site GC-6.06.1) Small Business Utilization Form GC-6.07 Wage Rates GC 6.09 Pemiits and Utilities GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 5/20/26, 4:01 PM CITY COUNCIL AGENDA Create New From This M&C M&C Review Official site of the City of Fort Worth, Texas FORT WORTH REFERENCE **M&C 26- 20NORTH TARRANT PARKWAY DATE: 5/12/2026 NO.: 0375 LOG NAME: AND NORTH BEACH STREET CONSTRUCTION CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: (CD 4) Authorize Execution of a Contract with Rebcon, LLC, in the Amount of $4,504,400.00 for the North Tarrant Parkway and North Beach Street Intersection Improvements Project, Adopt Appropriation Ordinance and Amend the Fiscal Years 2026- 2030 Capital Improvement Program (2022 Bond Program) RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of a contract with Rebcon, LLC, in the amount of $4,504,400.00, for the North Tarrant Parkway and North Beach Street Intersection Improvements project (City Project No. 103309); 2. Adopt the attached appropriation ordinance adjusting appropriations in the 2022 Bond Program Fund by increasing appropriations in the North Tarrant Parkway and North Beach Street Intersection Improvements project (City Project No. 103309) in the amount of $1,220,000.00, and decreasing appropriations in the South Hulen Street at West Risinger Road project (City Project No. 103312) by the same amount; and 3. Amend the Fiscal Years 2026-2030 Capital Improvement Program. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize execution of a construction contract with Rebcon, LLC, in the amount of $4,504,400.00 for construction of the North Tarrant Parkway and North Beach Street Intersection Improvements project (City Project No. 103309). This M&C will also appropriate funding for the North Tarrant Parkway and North Beach Street Intersection Improvements project. This project is part of the 2022 Bond Program. The project scope includes new traffic signals, updated signs and striping, construction of additional eastbound and westbound left -turn lanes, an additional northbound left -turn lane, additional southbound and westbound right -turn lanes, ADA-accessible ramps, and sidewalks at the intersection of North Tarrant Parkway and North Beach Street. This project was advertised for bid on November 19, 2025, and November 26, 2025, in the Fort Worth Star -Telegram. On February 5, 2026, the following bids were received: Bidder Amount Rebcon, LLC $4,504,400.00 Stabile & Winn, Inc. $4,595,908.50 DDM Construction Corp. $4,743,999.65 Ed Bell Construction Company $5,111,432.15 Construction for this project is expected to start in the Fall of 2026, with a construction duration of 13 months. SMALL BUSINESS (SB) GOAL — Rebcon, LLC, is in compliance with the City's Small Business goal. The following table summarizes the funding for the North Tarrant Parkway and North Beach Street Intersection Improvements project: apps.cfwnet.org/council_packet/mc_review.asp? ID=34418&cou nci Idate=5/12/2026 1 /3 5/20/26, 4:01 PM M&C Review Fund 30100-General Capital Projects 30108- Transportation Impact Fee 34027-2022 Bond Program Existing Funding $4,000,000.00 Additional Funding Project Total $0.00 $4,000,000.00 $0.00 $800,000.00 $0.00 $1,220,000.00 $1,220,000.00 Project Total $4,800,000.00 $1,220,000.00 $6,020,000.00 This project is included in the 2022 Bond Program. The City's Extendable Commercial Paper (ECP) (M&C 22-0607; Ordinance 25675-08-2022) provides liquidity to support the appropriation. Available resources will be used to actually make any interim progress payments until the debt is issued. Once debt associated with a project is sold, debt proceeds will reimburse the interim financing source in accordance with the statement expressing official intent to reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance 25515-05-2022). Funding is budgeted in the 2022 Bond Program Fund, Transportation Impact Fee Cap Fund and the General Capital Projects Fund for the Transportation & Public Works Department for the purpose of funding the North Tarrant Parkway at North Beach Street project. This project is located in COUNCIL DISTRICT 4. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are currently available in the S Hulen St at W Risinger Rd project within the 2022 Bond Program Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the 2022 Bond Program Fund for the N Tarrant Pkwy at N Beach St project to support the execution of the contract. Prior to an expenditure being incurred, the Transportation and Public Works Department has the responsibility to validate the availability of funds. TO Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project ID ID Submitted for City Manager's Office by_ Originating Department Head: Additional Information Contact: ATTACHMENTS Program Activity Budget Reference # Year (Chartfield 2) Jesica McEachern (5804) Lauren Prieur (6035) Monty Hall (8662) Amount 2022 Bond by Proposition - Report.pdf (CFW Internal) 20NORTH TARRANT PARKWAY AND NORTH BEACH STREET CONSTRUCTION funds avail.docx (CFW Internal) CPN 103309 FID Table.xlsx (CFW Internal) apps.cfwnet.org/council_packet/mc_review.asp?ID=34418&councildate=5/12/2026 2/3 5/20/26, 4:01 PM M&C Review Form 1295 Fort Worth - N Tarrant Parkway and N Beach St.pdf (CFW Internal) GL0019-07 - Project Budget Summary 103309.pdf (CFW Internal) GL0019-07 - Project Budget Summary 103312.pdf (CFW Internal) M&C Map CPN103309 Intersection NTarrantPkwy NBeachSt.pdf (Public) ORD.APP 20NORTH TARRANT PARKWAY AND NORTH BEACH STREET CONSTRUCTION 34027 AO26(R2).docx (Public) SAM Search Report Rebcon LLC.pdf (CFW Internal) apps.cfwnet.org/council_packet/mc_review.asp?ID=34418&councildate=5/12/2026 3/3 0005 15- 1 ADDENDA Pagel of 5 I SECTION 00 05 15 2 ADDENDUM NO. 1 3 4 N Tarrant Parkway and N Beach Street Intersection Improvements 5 City Project No. 103309 6 7 Issue Date: November 25, 2025 8 Bid Receipt Date: December 4, 2025 9 10 This addendum forms part of the Contract Documents referenced above and modifies the 1 I original Contract Documents. Failure to acknowledge receipt of this addendum by 12 completing the requested information at the following locations shall be grounds for 13 rendering the bid non -response. 14 1. In the space provided in Section 00 41 00 — Bid Form of the Bid Proposal 15 2. Execute the acknowledgment below and submit a signed copy with your 16 proposal at the time of the bid submittal. 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 1) The following modifications to the Project Manual have been made: a) Delete section 00 11 13 — Invitation to Bidders of the Project Manual and replace it with the attached revised section 00 11 13 — Invitation to Bidders. The deadline for bid submissions has been updated from December 41h, 2025 to January 81h 2026. b) Delete section 00 41 00 - Bid Form of the Project Manual and replace it with the attached revised section 00 41 00 - Bid Form. The following bid items have been updated: • Bid Items V-7 and V-8 updated. • Bid Items III-19 added. • Bid Item IV-14 removed. 2) The following modifications to the Project Plans have been made: a) Add sheet 83A: D007 — PIPE ABANDONMENT PLUG. b) Updated sheet 88: UTILITY ADJUSTMENT PLAN 3) Prebid conference presentation and attendee list is attached to this addendum. 4) Summarized below are the response to the questions asked during the prebid conference and submitted online via Bonfire: a) Q: Is an estimated cost available? A: The engineer's estimate is for internal use only and will not be shared. We appreciate your understanding and encourage you to prepare your proposal based on your own cost analysis and -project review. CITY OF FORT WORTH N Tarrant Parkway and N Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 103309 Revised December 20, 2017 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 000515-2 ADDENDA Page 2 of 5 b) Q: How will electric power and service be provided to the existing, temporary, and permanent traffic signal? A: See Sheet 104, which shows the existing and proposed power source locations. The Contractor must plan for and coordinate with Oncor Electric regarding the removal of the existing power source and the installation of the permanent power source. The Contractor must consider the power source for the temporary traffic signal when planning the construction of the southbound right turn lane (in conflict with the location of the existing power source). c) Q: Do any property easement have restrictions during construction? A: Yes. As shown on Sheet 12, Parcel 2 (northwest corner of the intersection) allows for the temporary loss of up to 8 parking spaces for a period not to exceed 3 months. The Contractor must notify the property owner at least 30 calendar days prior to the start of the temporary parking space closure. d) Q: Who pays for construction water usage? A: See Section 01 50 00 — construction water is considered subsidiary to the various bid items. The contractor is responsible. e) Q: Who pays for construction materials testing? A: Please refer to section 01 45 23 - a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. City is responsible for perfonning and payment for first set of Quality Assurance testing. If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. f) Q: Does the City allow for a vibratory truss screed for street paving in lieu of a slip form paving machine? A: No. The concrete paving spec considers vibratory truss screed paving same as hand placed paving and can't be used in lieu of slip form paving. g) Q: Does this require pre -qualification? A. Yes, please refer to section 00 21 13 instructions to bidder. Bidders or their designated subcontractors are required to be prequalified for the work types requiring prequalification as per Sections 00 45 11 BIDDERS PREQUALIFICATIONS and 00 45 12 PREQUALIFICATION STATEMENT. h) Q: What is the anticipated start date for this project? A: Anticipated start is in Spring of 2026. CITY OF FORT WORTH N Tarrant Parkway and N Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 103309 Revised December 20, 2017 000515-3 ADDENDA Page 3 of 5 I i) Q: Have any and all franchise utility conflicts been relocated? 2 A: Please refer to section 00 73 00 - Utilities or obstructions to be removed, 3 adjusted, and/or relocated The following is list of utilities and/or obstructions that 4 have not been removed, adjusted, and/or relocated as of October, 2025: 5 EXPECTED OWNER UTILITY AND LOCATION TARGET DATE OF 6 ADJUSTMENT 1. Oncor Electric N. Tarrant Pkwy and N. Beach St. Intersection 7 October 2025 2. Spectrum N. Tarrant Pkwy and N. Beach St. Intersection 8 December 2025. The Contractor understands and agrees that the dates listed 9 above are estimates only, are not guaranteed, and do not bind the City. Refer to 10 Question 4.b and its corresponding response in this addendum for additional 11 details. 12 j) Q: Can a list be provided of current prequalified contractors for scopes 13 indicated in the Specifications? 14 A: Please see the hyperlink for the list. https://app-us3.e- 15 builder.net/public/publicLanding.aspx?QS=03e5c5ababab43d5aec1020d9481182 16 7 17 k) Q: Can you please post the grading plans or the x-sec for Tarrant CL Sta 18 14+00 to 14+50? 19 A: No, additional grading plans or cross sections will not be provided. Please bid 20 the project based on the plans that have been issued. 21 1) Q: Thank you for sending us the pre -qualified contractors list. We were 22 unable to find a contractor in that list with Cathodic Protection pre 23 qualification as required in your bid documents, please advise. 24 A: Contractors prequalified for "Water Transmission, Urban/Renewal, 24 inches 25 and smaller" will automatically be considered prequalified for "Cathodic 26 Protection" work. 27 m) Q: Is there any additional information on the existing 16" concrete water line 28 shown on Sheet 88? 29 A: Yes, please seethe record drawings for the X-16542 project that are attached 30 to this addendum. 31 n) Q: Please provide detail for storm drain abandonment plugs 32 A: Yes, see Sheet 83A: D007 — PIPE ABANDONMENT PLUG attached to this 33 addendum. 34 o) Q: Please advise where the remainder of the "curb at back of sidewalk", Bid 35 Item #40 is located besides the 1 call out on page 29. 36 A: Yes, 35 LF of the I11-14: 3213.0322 Conc Curb at Back of Sidewalk bid item 37 is shown on Sheet 29. The remaining quantity is intended as contingency and 38 may be used as directed by the City inspector in the field. 39 p) Q: Please add a Bid Item for the P-1 Ramps 40 A: Bid item 1II-19 will be added and will be for 3213.0506 Barrier Free Ramp, 41 Type P-1. Please see the updated section 00 41 00 - Bid Form attached to this 42 addendum. CITY OF FORT WORTH N Tarrant Parkway and N Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 103309 Revised December 20, 2017 000515-4 ADDENDA Page 4 of 5 I q) Q: Bid Items #44 & #2-11 the same? 2 A: Bid item IV-1 will be removed. Please see the updated section 00 41 00 - Bid 3 Form attached to this addendum. 4 Q: Can the topsoil onsite be salvaged and respread? 5 A: No, topsoil onsite cannot be salvaged and respread. 6 r) Q: Bid Item Description #5-8 states 12" DIP water, plans and profiles show 7 8" DIP water, please clarify. 8 A: Bid item V-7 and V-8 will be updated to V-7: 3311.0251 8" DIP Water (Class 9 350) and V-8: 3311.0254 8" DIP Water (Class 350), CLSM Backfill. Please see 10 the updated section 00 41 00 - Bid Form attached to this addendum. 11 s) Q: Can you post the pre -bid meeting agenda? 12 A: Yes, pre -bid meeting material will be provided with this addendum. 13 t) Q: Concrete Curb at Sidewalk - Bid Item #3-10 please clarify how this bid 14 item is paid, is the sidewalk subsidiary? 15 A: Bid item I11-10: 3213.0322 Cone Curb at Back of Sidewalk includes payment 16 for the curb only. The adjacent concrete sidewalk is not subsidiary and will be 17 paid separately under Bid Item III-7: 3213.0301 4" Cone Sidewalk. 18 u) Q: Partial Bid Acceptance - I am writing regarding the bid solicitation and 19 would like to clarify if partial bids are acceptable. 20 A: No, partial bids are not acceptable. 21 v) Q: Please provide detail for C-3 Ramps. 22 A: The C-3 curb ramp detail is shown on Sheet 60. 23 w) Q: Earthwork Calculation - Please clarify how the earthwork quantities were 24 calculated. 25 A: Earthwork was calculated using the Average End Area method of the cross- 26 sections shown in the plans. 27 x) Q: While evaluating the landscape plans we noticed that undisturbed work 28 areas are to be topsoiled and sodded. Is it the intent the contractor strip out 29 existing and place new topsoil and sod in those areas? 30 A: Yes. All disturbed areas are required to receive new topsoil and new sod. The 31 limits of disturbance will be verified in the field by City inspection staff based on 32 actual construction activities. 33 y) Q: Exploratory - Please clarify this bid item, is it the intent to explore to find 34 the unfound utilities per page 14? 35 A: Bid item I-7: 3305.0103 Exploratory Excavation of Existing Utilities is a 36 contingency item intended to verify the location and depth of existing utilities that 37 are not fully defined. Use of this item must be coordinated with and approved by 38 the City prior to performing any exploratory excavation. 39 CITY OF FORT WORTH N Tarrant Parkway and N Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 103309 Revised December 20. 2017 0005 15 -5 ADDENDA Page 5 of 5 I z) Q: Water Line Pay Items - The plans call for an 8" Water Line but the bid 2 items are for 12" DIP. Please clarify which is correct and make the 3 necessary corrections in either the plans or the bid items. 4 A: Please refer to Question 4.r and its corresponding response in this addendum 5 for additional details. 6 aa) Q: Temporary Water Service - There are 2 water services shown on plan 7 sheet 86 to be replaced. We will need to install temporary water services for 8 these 2 locations to keep them in service will the water line lowering is 9 completed. Typically there is a pay item for Temporary Water Service. 10 Please add a pay item for this work. 11 A: As shown on Sheet 86, the existing water line will be shut off while Water 12 Line A improvements are constructed. The work is expected to be performed 13 during non -operating hours for the affected property owners, so a temporary water 1.4 service pay item is not required. 15 bb) Q: Cathodic Protection- Plan sheet 88 calls for a Major Manhole Adjustment 16 and Cathodic Protection Test Station adjustment on the 16" Water Line. 17 The prequalification statement has a item for a prequalified cathodic 18 protection contractor. The prequalification listing for the water department 19 does not have any cathodic protection contractors listed. Is this an item of 20 work requiring a prequalified contractor and if so, does the water 21 department have a listing of prequalified cathodic protection contractors 22 that is not in the project resources section on E-Builder? If there is a listing 23 we need it to be provided. 24 A: Please refer to Question 4.1 and its corresponding response in this addendum 25 for additional details. 26 27 RECEIPT ACKNOWLEDGED TRANSPORTATION & PUBLIC WORKS 28 DEPARTMENT 29 30 31 32 33 B 34 Chad Allen, P.E., CFM 35 Company: LC Engineering Manager 36 ......� 37 38 :.*.: ............ 39 TODD C. RUCKING HAM i ' ...................... �00p -• 115530 ;' 41 �1/25/2025 42 Freese and Nichols, Inc. Texas Registered Engineering Finn F-2144 43 END OF SECTION CITY OF FORT WORTH N Tarrant Parkway and N Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 103309 Revised December 20. 2017 0005 15-1 ADDENDA Pagel of3 1 SECTION 00 05 15 2 ADDENDUM NO.2 3 4 N Tarrant Parkway and N Beach Street Intersection Improvements 5 City Project No. 103309 6 7 Issue Date: December 15, 2025 8 Bid Receipt Date: January 15, 2026 9 10 This addendum forms part of the Contract Documents referenced above and modifies the 11 original Contract Documents. Failure to acknowledge receipt of this addendum by 12 completing the requested information at the following locations shall be grounds for 13 rendering the bid non -response. 14 1. In the space provided in Section 00 4100 — Bid Form of the Bid Proposal 15 2. Execute the acknowledgment below and submit a signed copy with your 16 proposal at the time of the bid submittal. 17 18 1) The following modifications to the Project Manual have been made: 19 a) Delete section 00 11 13 — Invitation to Bidders of the Project Manual and replace 20 it with the attached revised section 00 11 13 — Invitation to Bidders. The deadline 21 for bid submissions has been updated from January 81h, 2026 to January 15`h, 2026. 22 b) Delete section 00 42 43 - Bid Form of the Project Manual and replace it with the 23 attached revised section 00 42 43 - Bid Form. The following bid items have been 24 updated: 25 . Bid Items 1- 11 and 1- 13 updated. 26 . Bid Items V-18, V-19, and V-20 added. 27 c) Delete section 99 99 99 — Special Specifications of the Project Manual and replace 28 it with the attached revised section 99 99 99 — Special Specifications. The 29 description of the 9999.GN01 - Landscape & Irrigation Adjustment Allowance 30 has been updated. 31 32 2) The following modifications to the Project Plans have been made: 33 a) Add sheet 95A: D133 —TEMPORARY SERVICE CONNECTION 34 b) Updated sheet 86: WATER LINE A PLAN AND PROFILE. 35 36 37 CITY OF FORT WORTH N Tarrant Parkway and N Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 103309 Revised December 20, 2017 000515-2 ADDENDA Page 2 of 3 1 3) Summarized below are the response to the questions submitted online via Bonfire: 2 a) Q: Temporary Traffic Signals - Plan sheet 18 states the contractor is 3 responsible for the design and installation of the temporary traffic signal. 4 The design of the temporary traffic signal should be the responsibility of the 5 engineer of record. I have spoken with a couple of traffic signal contractors 6 and they said they would have to hire a licensed engineer to design the 7 temporary signals. It will be very difficult for us to get an engineer to quote 8 a price for designing this. Shouldn't the plan be designed either by the city 9 or design engineer and the contractor provide a price for the installation. 10 A: Addendum No. 3 will include a temporary traffic signal design and a traffic 11 control plan. 12 b) Q: HES - During Phase 2B will an extended closure be permitted while 13 paving the travel lane over the storm extensions and curing is in progress? 14 A: Addendum No. 3 will provide additional information regarding high early 15 strength concrete. 16 c) Q: Bid Item I-11 - Costs of adjustments of irrigation and landscape are not 17 possible to determine until the existence and location of private systems is 18 known, which won't happen until construction takes place. Can you set up a 19 pre -bid allowance for this and only reimburse the contractor actual 20 expenses? 21 A: Bid Item I -I I will be revised to an allowance item under this addendum, with 22 reimbursement based on actual costs incurred. 23 Q: Contraction Joints - It is necessary for transverse sawed joints to match 24 transverse joints in existing paving when adding turn lanes. Doweled 25 contractions joints may or may not be in the existing paving. With this 26 known, are the paving details on sheet 44 and sheet 49 applicable to this 27 project? 28 A: Proposed pavement joints shall match the existing pavement jointing. The 29 paving details on sheets 44 and 49 are applicable to this project. 30 d) Q: There is no bid item for temporary water. for the water services on the 31 north east side and also the south east side. South east side is a single feed no 32 back feed? 33 A: Please refer to updated Sheet 86 and the added bid item included with this 34 addendum for isolation of Water Line A and temporary water service to the 8500 35 N Beach Street property. 36 CITY OF FORT WORTH N Tarrant Parkway and N Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Prqiect No. 103309 Revised December 20, 2017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 000515-3 ADDENDA Page 3 of 3 e) Q: Landscape & Irrigation Adjustment - Bid Item I-11 is for Landscape & Irrigation Adjustment with a unit if 1 lump sum. This is typically a pre -bid allowance amount since there are no irrigation plans and at this time we have no way of knowing what will have to be relocated and/or adjusted. A: Bid Item I-11 will be revised to an allowance item under this addendum, with reimbursement based on actual costs incurred. RECEIPT ACKNOWLEDGED TRANSPORTATION & PUBLIC WORKS DEPARTMENT Chad Allen, P.E., CFM Company: eb C Engineering Manager .t.. of Ftt ''.i •TOUD C. BUCKINGHAM i 115530u�,� II / Freese and Nlchds, Inc. 12/12l2025 Texas Registered Engineering Firm F-2144 END OF SECTION CITY OF FORT WORTH N Tarrant Parkwa} and N Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 103309 Revised December 20, 2017 0005 15- 1 ADDENDA Page 1 of l 1 SECTION 00 05 15 2 ADDENDUM NO.3 3 4 N Tarrant Parkway and N Beach Street Intersection Improvements 5 City Project No. 103309 6 7 Issue Date: January 12, 2026 8 Bid Receipt Date: February 5, 2026 9 10 This addendum forms part of the Contract Documents referenced above and modifies the I 1 original Contract Documents. Failure to acknowledge receipt of this addendum by 12 completing the requested information at the following locations shall be grounds for 13 rendering the bid non -response. 14 1. In the space provided in Section 00 4100 — Bid Form of the Bid Proposal 15 2. Execute the acknowledgment below and submit a signed copy with your 16 proposal at the time of the bid submittal. 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 1) The following modifications to the Project Manual have been made: a) Delete section 00 11 13 — Invitation to Bidders of the Project Manual and replace it with the attached revised section 00 11 13 — Invitation to Bidders. The deadline for bid submissions has been updated from January 151h, 2026 to February 5111, 2026. RECEIPT ACKNOWLEDGED TRANSPORTATION & PUBLIC WORKS DEPARTMENT $ Chad Allen, P.E., CFM Company: e LLC Engineering Manager /•T000 O. BUOKINGHAM i ��p •, 115530oo ,.•:CEN Freese and Nichols. Inc. 1/10/2026 Texas Registered Engineering Firm F-2144 END OF SECTION CITY OF FORT WORTH N Tarrant Parkway and N Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 103309 Revised December 20, 2017 0005 15- 1 ADDENDA Page 1 of 2 1 SECTION 00 05 15 2 ADDENDUM NO.4 3 4 N Tarrant Parkway and N Beach Street Intersection Improvements 5 City Project No. 103309 6 7 Issue Date: January 27, 2025 8 Bid Receipt Date: February 5, 2026 9 10 This addendum forms part of the Contract Documents referenced above and modifies the 11 original Contract Documents. Failure to acknowledge receipt of this addendum by 12 completing the requested information at the following locations shall be grounds for 13 rendering the bid non -response. 14 1. In the space provided in Section 00 41 00 — Bid Form of the Bid Proposal 15 2. Execute the acknowledgment below and submit a signed copy with your 16 proposal at the time of the bid submittal. 17 18 1) The following modifications to the Project Manual have been made: 19 a) Delete section 00 00 00 — Table of Contents of the Project Manual and replace it 20 with the attached revised section 00 00 00 — Table of Contents. The strikethrough 21 of 34 41 11 — Temporary Traffic Signals and the 3123 23 — Borrow row has been 22 removed. 23 b) Delete section 00 4100 - Bid Form of the Project Manual and replace it with the 24 attached revised section 00 41 00 - Bid Form. The following bid items have been 25 updated: 26 • Bid Items III-1 to III-2 and III-6 updated. 27 • Bid Items 1-14 removed. 28 0 Bid Items 1- 15 to I-34 and III-20 to III-21 added. 29 c) Delete section 99 99 99 — Special Specifications of the Project Manual and 30 replace it with the attached revised section 99 99 99 — Special Specifications. The 31 description of the 9999.GN04 - Furnish, Install, and Remove Temporary Traffic 32 Signal has been removed. 33 34 2) The following modifications to the Project Plans have been made: 35 a) Add sheet 18A-18G: TRAFFIC CONTROL PLAN 36 b) Add sheet 1814-18N: TEMPORARY SIGNAL LAYOUT 37 c) Add sheet 27A: D677 - SPAN WIRE MOUNTED SIGNALS - 38 CONSTRUCTION DETAILS 39 d) Add sheet 2713: D678 - SPAN WIRE MOUNTED SIGNALS - 40 CONSTRUCTION DETAILS CITY OF FORT WORTH N Tarrant Parkway and N Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 103309 Revised December 20, 2017 000515-2 ADDENDA Page 2 of 2 1 e) Update sheet 18: CONSTRUCTION PHASING PLAN 2 f) Update sheet 10: TYPICAL SECTIONS 3 g) Update sheet 29-30: N. TARRANT PARKWAY PAVING PLAN 4 5 3) Summarized below are the response to the questions submitted online via Bonfire: 6 a) Q: Excavation/Embankment — The bid quantity for Unclassified Excavation 7 is 700 CY and the quantity for Embankment is 1,800 CY. Is it the intent for 8 all the embankment to come from cut on the site or will import be required? 9 Since these are plans quantity measurements for pay can you provide the 10 total amount of cut you are calculating? From the provided quantities it 11 would seem to indicate there is a total of 2,500 CY of Cut (Excavation). Due 12 to the multiple phases I am not sure you will have the cut material available 13 to make the required fills. 14 A: The unclassified excavation and embankment quantities have been re- 15 evaluated, and the bid item quantities have been updated with this addendum. The 16 intent is not for all embankment to be constructed solely from on -site cut. Due to 17 the phasing constraints and limited ability to balance earthwork between phases, 18 imported material will be required for Phase IA; therefore, a borrow bid item has 19 been added with this addendum. 20 21 b) Q: Excavation/Embankment — Has the excavation and embankment work 22 been evaluated based on the proposed phasing. There will not be enough 23 space on site to stockpile excavated material on site to use between phasing. 24 Will you consider adding a borrow item for imported material that may be 25 required due to phasing? 26 A: Please see the response to Question 3.a. 27 28 RECEIPT ACKNOWLEDGED TRANSPORTATION & PUBLIC WORKS 29 DEPARTMENT 30 31 32 33 34 Bv: 35 Chad Allen, P.E., CFM 36 Company: �ebco,�i 1. L-C Engineering Manager 37 38 ....... Ekq 1, 39 *l ... TODD D. 6UCKINGHAM i ....................... p; ��p ; 1155315530 41 42 Freese and Nichols. Inc. 1/23l2026 Texas Registered Engineeering Firm F-2144 43 END OF SECTION CITY OF FORT WORTH N Tarrant Parkway and N Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 103309 Revised December 20, 2017 Welcome to CPN 103309 Prebid Conference Meeting will start shortly, in the meantime, please help with the following: 1. Mute microphone 2. Add the following information to the chat: 0 Contact Name o Contractor/company Name o Company Address 0 Phone Number 0 E-mail Address FORS , I Transportation and Public Works Department 2 s O VIA M M O z a v A d a II E 400 0 O .IMON MEMIN _ a _ O O N _ a am O ow i O U. c.i Lo N N NOW E O Z rso, v U - n m D^,®a!^r"�+ Z oY a K m S mithfield Rd Pli PIM141XIuS o N ell z 4 p 4 c E U /0 i a N ® o � JaG m 'p Mnug eyna Y rc 'Moo Ln U z Crosstimbers S Rute Snow Or rQ Mqug eln>j Rofe u m w m Willis Ln m of w P21 AoII1VM m 4 m id 35-u!•W $ - .:�_-` _ -' Db AaIIIVM = Q U P2f A-1114M m e Y a Q m a o • ILPalkwWd H!n Rl O 'o Y 4 _ Y 1 m Nuddllon St— oa •� o # • `e Elmo Pa • y 4 C a a' • - m Y $ 04o az e ¢ e n J O ` x S 4o0¢8 N = 16 4ova8 N m 1S Woos R Z Or _- m v m m< LL Bullortl 13 O m a a p �� ono/a�en�,2C N U � •O F 'Cl aplsl*-EN N Rivarslde or v, y ID It' ID ID ID Rd <L E ordomen ¢ ul slultlilA ,�, c z 0 0 _ c a� aIIVM � 4 81uo Mound Rd � o a m \o O _ W - a0 do A - 0.0 a O to o a _ V V .� •� y N a a. :ii cii •— Q m a i O V V V '� V a- i L (LI-) E "0 Q 00 z w CV M Project Purpose The purpose of this project is to enhance safety, mobility, and operational efficiency at the North Tarrant Parkway and North Beach Street intersection by improving capacity and multimodal accommodations for vehicles, pedestrians, and bicyclists. FOR_ TTWFO� ,, I Transportation and Public Works Department 2 N O I W �1 L O i v Q V .Q }� O \� L > y V Q c c V � • V W V+ N4-0 I o O^ C •� 4) d' E u N o �CL v (� c U 0 a ; _ V V Q Q Q Cl) •— a (fi Q O 4.0 a 04 1nOAV'1 1D3(Obd 133b1S HDV38 N "J AVMNUVd 1NV'dVVl N - S1N3W3AObdW NO1ID3Sb31Nl �N . -_ •_uwr. erne ,o _.. h Qi •,+« ► �a- ...----------- . . h l,J h` - N BEACH ST— POSTED SPEED: 40 MPH: • aann RI K POSTED SPEED! 40 MPH 8600 BLK F CG F PC w SO v O L a w N i 0 Cr 3 d a 0 O Al A w N 0 a c 'a L 0 0 A ra V �� • w RNI se O ,Oro 'A 0 a E N •0 E L O E E O iG Z C G m G w u°El u c m � n E u W a O U 3 Z i Em L N m Q O c Z U Q a m e W 2 z f 4 f 6 u m 0 aaw w$ mO�°oa. �oOQ ao �i K=s 3m m m V n U a d m O Ulu w N i a 0 C O :- 4-0 Or .E cn 0 O . L / CN N N M w Questions We will try to answer your questions as well as we can at this time. We may not be able to answer all of your questions, but we will record them. Any response or question that requires a change from the Contract Documents can only be documented by Addendum (via Bonfire). Verbal responses made at this conference have no meaning unless they are documented by the Addendum that will be issued after this conference. Unless you see a clarification or change made in that addendum you are advised to bid according to the Contract Documents. When asking questions, please state your name and company. Meeting notes and sign -in sheet from this non -mandatory pre -bid meeting will be issued via Addendum No. 1 and uploaded through Bonfire. FOR144 :, 1 Transportation and Public Works Department 2 N N, N M CD M 6m E I W w 0011 13 INVITATION TO BIDDERS Page 1 of 2 SECTION 00 1113 INVITATION TO BIDDERS RECEIPT OF BIDS Electronic bids for the construction of CPN 103309 — North Tarrant Parkway and North Beach Street Intersection Improvements ("Project") will be received by the City of Fort Worth via the Procurement Portal https:Hfortworthtexas.bonfirehub.com/portal/?tab=openOpportunities, under the respective Project until 2:00 PM CST, Thursday, February 51b, 2026. Bids will then be opened publicly and read aloud beginning at 2:00 PM CST in the City Council Chambers. Your submissions must be uploaded, finalized and submitted prior to the Project's posted due date. The City strongly recommends allowing sufficient time to complete this process (ideally a week prior to the deadline) to begin the uploading process and to finalize your submission. Uploading large documents may take time, depending on the size of the file(s) and your Internet connection speed. The Bonfire portal can be accessed using Microsoft Edge, Google Chrome, or Mozilla Firefox. Javascript must be enabled. Browser cookies must be enabled. Electronic submission is subject to electronic interface latency, which can result in transmission delays. All bidders or proposers assume the risk of late transmission/ submission. The City shall not be held liable if an interested bidder or proposer is unable to submit a complete bid/response before the published deadline due to transmission delays or any other technical issues or obstructions. The City strongly recommends allowing sufficient time to complete the submission process (ideally a week before the deadline) to begin the uploading process and to finalize your submission to give adequate time in the event an issue arises. All submissions must be submitted electronically prior to the close date and time under the respective Project via the Procurement Portal: https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities Failure to submit all completed required information listed in the respective Solicitation will be grounds for rejection of a bid as non -responsive. No late bids/proposals shall be accepted. Bids delivered in any other manner than using the Bonfire Platform (Procurement Portal) will not be accepted or considered. If, upon being opened, a submission is unreadable to the degree that material conformance to the requirements of the procurement specifications cannot be ascertained, such submission will be rejected without liability to the City, unless such bidder provides clear and convincing evidence (a) of the content of the submission as originally submitted and (b) that the unreadable condition of the Electronic Bid was caused solely by error or malfunction of the Bonfire Platform (Procurement Portal). Failure to scan a clear or readable copy of a bid into the system does not constitute and shall not be considered an error or malfunction of the Bonfire Platform (Procurement Portal). Bidders are encouraged to fully review each page of every document within their submission prior to submitting to ensure all documents are clear, legible, and complete. SUPPORT For technical questions, visit Bonfire's help forum at https://vendorsupport.gobonfire.com/hc/en- us CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103309 Revised 2J08/24 0011 13 INVITATION TO BIDDERS Page 2 of 2 Contact the Bonfire support team at Support@GoBonfire.com or by calling 1-800-354-8010. To get started with Bonfire, watch this five-minute training video: Vendor Registration and Submission [VIDEO] — Bonfire Vendor Support (gobonfire.com) GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: Pavement and traffic signal improvements at the intersection of North Tarrant Parkway and North Beach Street Intersection Improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. PREQUALIFICATION Certain improvements included in this project must be performed by a contractor or designated subcontractor who is pre -qualified by the City at the time of bid opening. The procedures for qualification and pre -qualification are outlined in the Section 3 of 00 21 13 — INSTRUCTIONS TO BIDDERS. DOCUMENT EXAMINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or obtained via the Procurement Portal https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities, under the respective Project. Contract Documents may be downloaded, viewed, and printed by interested contractors and/or suppliers. EXPRESSION OF INTEREST To ensure potential bidders are kept up to date of any new information pertinent to this project, all interested parties should indicate their intent to bid in the Procurement Portal by selecting "yes" under the Intent to Bid section. All Addenda will be posted in the Procurement Portal https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities, under the respective Project. PREBID CONFERENCE — Web Conference A prebid conference will be held as discussed in Section 00 21 13 - INSTRUCTIONS TO BIDDERS at the following date, and time via a web conferencing application: DATE: Monday, November 1 Oth, 2025 TIME: 10:00 AM, CST Invitations with links to the web conferencing application will be distributed directly to those who have submitted an Expression of Interest. CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject any or all bids. AWARD City will award a contract to the Bidder presenting the lowest price, qualifications and competencies considered. ADVERTISEMENT DATES First Date: October 29th, 2025 Second Date: November 51h, 2025 END OF SECTION CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103309 Revised 2/08/24 0021 13 INSTRUCTIONS TO BIDDERS SECTION 00 2113 INSTRUCTIONS TO BIDDERS 1. Defined Terms Page 1 of 9 1.1. Capitalized terms used in these INSTRUCTIONS TO BIDDERS are defined in Section 00 72 00 - GENERAL CONDITIONS. 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the meanings indicated below which are applicable to both the singular and plural thereof. 1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents. 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents whose principal place of business is not in the State of Texas. 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City (on the basis of City's evaluation as hereinafter provided) makes an award. 2. Copies of Bidding Documents 2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations resulting from the Bidders use of incomplete sets of Bidding Documents. 2.2. City and Engineer in making electronic Bidding Documents available do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license or grant for any other use. 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 3.1. Bidders or their designated subcontractors are required to be prequalified for the work types requiring prequalification as per Sections 00 45 11 BIDDERS PREQUALIFICATIONS and 00 45 12 PREQUALIFICATION STATEMENT. Firms seeking pre -qualification, must submit the documentation identified in Section 00 45 11 on Section 00 45 13 PREQUALIFICATION APPLICATION at least seven (7) calendar days prior to Bid opening for review and, if qualified, acceptance. The subcontractors listed by a Bidder on 00 45 12 must be prequalified for the appropriate work types. Subcontractors must follow the same timelines as Bidders for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at the time bids are opened and reviewed may cause the bid to be rejected. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103309 Revised/Updated September 1, 2025 0021 13 INSTRUCTIONS TO BIDDERS Page 2 of 9 Prequalification requirement work types and documentation are available by accessing all required files through the City's website at: https://www.fortworthtexas. og v/departments/tpw/development/cfw-departments-ipw- contractors under Division 00 - General Conditions and as follows: 3.1.1. Paving — Requirements document located at: https://Up-us3.e- builder.net/public/`PublicLanding.aspx?QS=4d008O4b I33b408a85a69323548dda25 .1.2. Roadway and Pedestrian Lighting — Requirements document located at: https://ap -up s3.e- builder.net/public/publicLanding.aspx?QS=e43c4239775f4b2583552cO29c6al ed2 3.1.3. Water and Sanitary Sewer — Requirements document located at: https://apy-us3.e- builder.net/public/publicLanding.aspx?QS=4fc66ff8c3 6c4cO29d542d4e55114e8d 3.2. Each Bidder, unless currently prequalified, must submit to City at least seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 45 11, BIDDERS PREQUALIFICATIONS. 3.2.1. Submission of and/or questions related to prequalification should be addressed to the City contact as provided in Paragraph 6.1. 3.3. The City reserves the right to require any pre -qualified contractor who is the apparent low bidder for a project to submit such additional information as the City, in its sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule to assist the City in evaluating and assessing the ability of the apparent low bidder to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information, if requested, may be grounds for rejecting the apparent low bidder as non -responsive. Affected contractors will be notified in writing of a recommendation to the City Council. 3.4. In addition to prequalification, additional requirements for qualification may be required within various sections of the Contract Documents. 3.5. OMITTED 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 4.1. Before submitting a Bid, each Bidder: CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103309 Revised/Updated September 1, 2025 0021 13 INSTRUCTIONS TO BIDDERS Page 3 of 9 4.1.1. Shall examine and carefully study the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to in Paragraph 4.2. below). No information given by City or any representative of the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.2. Should visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work. 4.1.3. Shall consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work. 4.1.4. OMITTED 4.1.5. Shall study all: (i) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in the Contract Documents as containing reliable "technical data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in the Contract Documents as containing reliable "technical data." 4.1.6. Is advised that the Contract Documents on file with the City shall constitute all of the information which the City will furnish. All additional information and data which the City will supply after promulgation of the formal Contract Documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. No information given by the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.7. Should perform independent research, investigations, tests, borings, and such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project. For projects with restricted access, upon request, City may provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies. 4.1.8. Shall determine the difficulties of the Work and all attending circumstances affecting the cost of doing the Work, time required for its completion, and obtain all information required to make a proposal. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is understood that the submission of a proposal or bid is prima -facie evidence that the Bidder has made the investigations, examinations and tests herein required. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103309 Revised/Updated September 1, 2025 0021 13 INSTRUCTIONS TO BIDDERS Page 4 of 9 4.1.9. Shall promptly notify City of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related documents. The Contractor shall not take advantage of any gross error or omission in the Contract Documents, and the City shall be permitted to make such corrections or interpretations as may be deemed necessary for fulfillment of the intent of the Contract Documents. 4.1.10. Indicate their intent to bid by selecting "yes" in the Procurement Portal under the Intent to Bid section. You must indicate your intent to bid to be able to submit a bid to the City. 4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of: 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by City in preparation of the Contract Documents. The logs of Soil Borings, if any, on the plans are for general information only. Neither the City nor the Engineer guarantee that the data shown is representative of conditions which actually exist. 4.2.2. those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by City in preparation of the Contract Documents. 4.2.3. copies of such reports and drawings will be made available by City to any Bidder on request. Those reports and drawings may not be part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02. of the General Conditions has been identified and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any "technical data" or any other data, interpretations, opinions or information. 4.2.4. Standard insurance requirements, coverages and limits. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder: (i) that Bidder has complied with every requirement of this Paragraph 4, (ii) that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, (iii) that Bidder has given City written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolutions thereof by City are acceptable to Bidder, and when said conflicts, etc., have not been resolved through the interpretations by City as described in Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103309 Revised/Updated September 1, 2025 0021 13 INSTRUCTIONS TO BIDDERS Page 5 of 9 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract Documents. 5. Availability of Lands for Work, Etc. 5.1. The lands upon which the Work is to be performed, rights -of -way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by City unless otherwise provided in the Contract Documents. 5.2. Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right-of-way, easements, and/or permits are not obtained, the City reserves the right to cancel the award of contract at any time before the Bidder begins any construction work on the project. 5.3. The Bidder shall be prepared to commence construction without all executed right- of-way, easements, and/or permits, and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require permits and/or easements. 6. Interpretations and Addenda 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to City electrically through the Vendor Discussions section under the respective Project via the Procurement Portal https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities on or before 2 p.m., the FRIDAY prior to the Bid opening. Questions received after this day may not be responded to. Interpretations or clarifications considered necessary by City in response to such questions will be issued by Addenda. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by City. 6.3. Addenda or clarifications shall be posted under the respective Project via the Procurement Portal https://fortworthtexas.bonfirehub.com/portal/?tab=opcnOpportunities 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or INVITATION TO BIDDERS. Representatives of City will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. City will transmit to all prospective Bidders of record such Addenda as City considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103309 Revised/Updated September 1, 2025 0021 13 INSTRUCTIONS TO BIDDERS Page 6 of 9 7. Bid Security 7.1. Each Bid must be accompanied by a Bid Bond made payable to City in an amount of five (5) percent of Bidder's maximum Bid price, on the form attached or equivalent, issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. 7.2. The Bid Bonds provided by a Bidder will be retained until the conditions of the Notice of Award have been satisfied. If the Successful Bidder fails to execute and return the Contract Documents within 14 days after the Notice of Award conveying same, City may consider Bidder to be in default, rescind the Notice of Award and act on the Bid Bond. Such action shall be City's exclusive remedy in the event Bidder is deemed to have defaulted. 8. Contract Times The number of days within which, or the dates by which, Milestones are to be achieved in accordance with the General Requirements and the Work is to be completed and ready for Final Acceptance is set forth in the Agreement or incorporated therein by reference to the attached Bid Form. 9. Liquidated Damages Provisions for liquidated damages are set forth in the Agreement. 10. Substitute and "Or -Equal" Items The Contract, if awarded, will be on the basis of materials and equipment described in the Bidding Documents without consideration of possible substitute or "or -equal" items. Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or - equal" item of material or equipment may be furnished or used by Contractor if acceptable to City, application for such acceptance will not be considered by City until after the Effective Date of the Agreement. The procedure for submission of any such application by Contractor and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General Conditions and is supplemented in Section 0125 00 of the General Requirements. 11. Subcontractors, Suppliers and Others 11.1. In accordance with the City's Small Business Ordinance No. 27832-08-25, the City has established a goal for the participation of small businesses for City contracts $100,000 or greater. See Section 00 45 41 for the Project Goal and additional requirements. Failure to comply may render the Bidder non- responsive. 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Contractor or City has reasonable objection. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103309 Revised/Updated September 1, 2025 0021 13 INSTRUCTIONS TO BIDDERS Page 7 of 9 12. Bid Form 12.1. The Bid Form is included with the Bidding Documents. 12.2. All blanks on the Bid Form must be completed and the Bid Form signed electronically or signed in ink and scan. A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein. In the case of optional alternatives, the words "No Bid," "No Change," or "Not Applicable" may be entered. Bidder shall state the prices for which the Bidder proposes to do the work contemplated or furnish materials required. 12.3. Bids by corporations shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the signature. 12.4. Bids by partnerships shall be executed in the partnership name and signed by a partner, whose title must appear under the signature accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 12.5. Bids by limited liability companies shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown. 12.6. Bids by individuals shall show the Bidder's name and official address. 12.7. Bids by joint ventures shall be executed by each joint venture in the manner indicated on the Bid Form. The official address of the joint venture shall be shown. 12.8. All names shall be typed or printed in ink below the signature. 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. 12.10. Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown. 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of Texas shall be provided in accordance with Section 00 43 37 —Vendor Compliance to State Law Non Resident Bidder. 13. Submission of Bids Bids shall be submitted electronically in the Procurement Portal on the prescribed Bid Form, provided with the Bidding Documents, prior to the time indicated in the Advertisement or INVITATION TO BIDDERS. 14. Withdrawal of Bids CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103309 Revised/Updated September 1, 2025 0021 13 INSTRUCTIONS TO BIDDERS Page 8 of 9 14.1. Bids submitted electronically may be withdrawn prior to the time set for bid opening via the Procurement Portal https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities. 15. Opening of Bids Bids will be opened and read aloud publicly. An abstract of the amounts of the base Bids and major alternates (if any) will be made available to Bidders after the opening of Bids. 16. Bids to Remain Subject to Acceptance All Bids will remain subject to acceptance for a minimum of 90 days or the time period specified for Notice of Award and execution and delivery of a complete Agreement by Successful Bidder. City may, at City's sole discretion, release any Bid and nullify the Bid security prior to that date. 17. Evaluation of Bids and Award of Contract 17.1. City reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if City believes that it would not be in the best interest of the Project to make an award to that Bidder. City reserves the right to waive informalities not involving price, contract time or changes in the Work and award a contract to such Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists among the Bidders, Bidder is an interested party to any litigation against City, City or Bidder may have a claim against the other or be engaged in litigation, Bidder is in arrears on any existing contract or has defaulted on a previous contract, Bidder has performed a prior contract in an unsatisfactory manner, or Bidder has uncompleted work which in the judgment of the City will prevent or hinder the prompt completion of additional work if awarded. 17.2. In addition to Bidder's relevant prequalification requirements, City may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work where the identity of such Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Contract Documents or upon the request of the City. City also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.3. City may conduct such investigations as City deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to City's satisfaction within the prescribed time. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103309 Revised/Updated September 1, 2025 0021 13 INSTRUCTIONS TO BIDDERS Page 9 of 9 17.4. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and responsive Bidder whose evaluation by City indicates that the award will be in the best interests of the City. 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. 17.7. A contract is not awarded until formal City Council authorization. If the Contract is to be awarded, City will award the Contract within 90 days after the day of the Bid opening unless extended in writing. No other act of City or others will constitute acceptance of a Bid. Upon the contract award, a Notice of Award will be issued by the City. 17.7.1. The contractor is required to fill out and sign the Certificate of Interested Parties Form 1295 and the form must be submitted to the Project Manager before the contract will be presented to the City Council. The form can be obtained at httys://www.ethics.state.tx.us/data/forms/1295/1295.i)df 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 18. Signing of Agreement 18.1. When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Project Manual. Within 14 days thereafter, Contractor shall sign and deliver the required number of counterparts of the Project Manual to City with the required Bonds, Certificates of Insurance, and all other required documentation. 18.2. City shall thereafter deliver one fully signed counterpart to Contractor. IWDIX11UMX4I11130 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103309 Revised/Updated September 1, 2025 00 35 13 CONFLICT OF INTEREST STATEMENT Page 1 of 1 SECTION 00 35 13 CONFLICT OF INTEREST STATEMENT Each bidder, offeror or respondent to a City of Fort Worth procurement is required to complete a Conflict of Interest Questionnaire or certify that one is current and on file with the City Secretary's Office pursuant to state law. If a member of the Fort Worth City Council, any one or more of the City Manager or Assistant City Managers, or an agent of the City who exercise discretion in the planning, recommending, selecting or contracting with a bidder, offeror or respondent is affiliated with your company, then a Local Government Officer Conflicts Disclosure Statement (CIS) may be required. You are urged to consult with counsel regarding the applicability of these forms and Local Government Code Chapter 176 to your company. The referenced forms may be downloaded from the links provided below. Form CIQ (Conflict of Interest Questionnaire) (state.tx.us) https://www.ethics.state.tx.us/data/forms/conflict/CIS.pd ❑ CIQ Form does not apply CIQ Form is on file with City Secretary ❑ CIQ Form is being provided to the City Secretary d CIS Form does not apply ❑ CIS Form is on File with City Secretary ❑ CIS Form is being provided to the City Secretary BIDDER: Re.bcort, LLC END OF SECTION By: UghnK Signature: / , Title: Pre CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised February 24, 2020 SECTION 00 41 00 BID FORM TO: The Purchasing Manager c/o: The Purchasing Division 200 Texas Street City of Fort Worth, Texas 76102 FOR: CPN 103309 - North Tarrant Parkway and North Beach Street Intersection Improvements City Project No.: 103309 Units/Sections: UNIT I - GENERAL, UNIT II - REMOVAL UNIT III - PAVING, UNIT IV - DRAINAGE UNIT V - WATER, UNIT VI - TRAFFIC SIGNAL UNIT VII - PAVEMENT MARKING AND SIGNAGE, UNIT VIII - ILLUMINATION 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or -- withouttheknowledge of Ci purpose of which iS to establish Bid rices at arfiflcial, n n- 9 �Y,a - P p p competitive levels. d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Concrete Paving Construction/Reconstruction (LESS THAN 15,000 square yards) b. Roadway and pedestrian lighting c. Water Distribution, Urban and Renewal, 8-inch diameter and smaller d. Water Transmission, Urban/Renewal, 24-inches and smaller e. Cathodic Protection f. - M h. - 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 390 calen days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones) within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. Small Business Forms (required at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 I necessary,,-CIQ or -CIS forms -are -to -beprovided direcflyto-city Secretary - h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. Total Bid 7. Bid Submittal This Bid is submitted on Respectfully submitted, By: Title: President (Sigr)6ture) February, 5th 2026 Danny Krieq (Printed Name) Company: Rebcon, LLC Address: 400 109th Street Arlington, Texas 76011 State of Incorporation: Texas Email: estimating(cDrebcon.com Phone: (972) 444-8230 END OF SECTION $4, 504,400.00 by the entity named below. Receipt is acknowledged of the Initial following Addenda: Addendum No. 1: Addendum No. 2: Addendum No. 3: Addendum No. 4: Corporate Seal: :J 1;% SEAL = �,'�qTF OV SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID This form is provided for reference only. Bidder's Application Please enter bid prices in the Bonfire bidtable. Project item Information I Bidder's Proposal BASE BW Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Rice Bid Value UNIT I - GENERAL 41 0170.0100 Mobilization (5%) 01 70 00 LS 1 $225,000.00 $ 225,000.00 I-2 0171.0101 Construction Staking For All Except Water 01 71 23 LS 1 $55,000.00 $ 55,000.00 I-3 0171.0102 As -Built Survey (For All Except Water) 01 71 23 LS 1 $3,500.00 $ 3,500.00 I-4 3125.0101 SWPPP >_ 1 acre 312500 LS 1 $30,751.00 $ 30,751.00 I-5 3291.0100 Topsoil 3291 19 CY 1,200 $63.00 $ 75,600.00 I-6 3292.0100 Block Sod Placement 3292 13 SY 6,900 $8.00 $ 55,200.00 I-7 13305.0103 Exploratory Excavation of Existing Utilities 33 05 30 EA 10 $3,300.00 $ 33,000.00 I-8 3471.0001 Traffic Control 3471 13 MO 13 $10,000.00 $ 130,000.00 I-9 3471.0002 Portable Message Sign 3471 13 WK 72 $400.00 $ 28,800.00 I-10 3471.0003 Traffic Control Details 3471 13 EA 1 $1,000.00 $ 1,000.00 I-11 9999.GN01 Landscape & Irrigation Adjustment Allowance 99 99 99 LS 1 $25,000.00 $ 25,000.00 I-12 9999.GN02 Tree Protection 99 99 99 EA 4 $750.00 $ 3,000.00 I-13 9999.GN03 Contingency Allowance - Miscellaneous Construction 99 99 99 LS 1 $350,000.00 $ 350,000.00 I-14 REMOVED I-15 2605.3014 2" CONDT RM (Riser) (Temporary Si mal) 26 05 33 LF 350 $25.00 $ 8,750.00 1-16 2605.3024 3" CONDT RM (Riser) (Temporary Si mal) 26 05 33 LF 250 $27.00 $ 6,750.00 1-17 2605.3025 3" CONDT PVC SCH 80 (T) (Temporary Signal) 26 05 33 LF 20 $38.00 $ 760.00 1-18 3441.1001 Fumish/Install 3-Sect Signal Head Assembly (Temporary Signal) 3441 10 EA 11 $935.00 $ 10,285.00 1-19 3441.1002 Fumish/Install 4-Sect Signal Head Assembly (Temporary Signal) 3441 10 EA 8 $935.00 $ 7,480.00 I-20 3441.1012 Relocate Existing Ped Signal Head Assmbl (Temporary Signal) 3441 10 EA 10 $451.00 $ 4,510.00 1-21 3441.1031 Relocate Existing Audible Pedestrian Pushbutton Station (Temporary Signal) 3441 10 EA 10 $127.00 $ 1,270,00 I-22 3441.1250 Relocate Existing PTZ Camera(Temporary Signal) 344110 EA 1 $1,100.00 $ 1,100.00 I-23 3441.1217 Fumish/Install Fish -Eye Detection System (Temporary Signal) 3441 10 EA 2 $33,000.00 $ 66,000.00 1-24 3441.1220 Fumish/Install Model 711 Preemption Detector (Temporary Si al) 3441 10 EA 4 $1,210.00 $ 4,840.00 1-25 3441.1224 Furnish/Install Preemption Cable (Temporary Signal) 3441 10 LF 1,055 $4.00 $ 4,220.00 1-26 3441.1260 Fumish/Install CAT5 Ethernet Cable (Temporary Signal) 3441 10 LF 485 $4.00 $ 1,940.00 I-27 3441.1311 51C 14 AWG Multi -Conductor Cable (Tempo ry Signal) 3441 10 LF 1 1,780 $5.50 $ 9,790.00 1-28 3441.1312 7/C 14 AWG Multi -Conductor Cable (Temporary Signal) 3441 10 LF 1,130 $5.50 $ 6,215.00 1-29 3441.1322 31C 14 AWG Multi -Conductor Cable (Temporary Sigmal) 3441 10 LF 1,780 $4.40 $ 7,832.00 I-30 3441.1414 NO 8 Bare Elec Condr (Temporary Signal) 3441 10 LF 870 $4.40 $ 3,828.00 I-31 3441.3014 Span Wire 3/8" (Temporary Signal) 3441 10 LF 5,100 $7.70 $ 39,270.00 1-32 3441.3331 30' Timber Pole CL 2 (Temporary Signal) 3441 10 EA 6 $2,640.00 $ 15,840.00 1-33 13441.3333 40' Timber Pole CL 2 (Temporary Signal) 3441 10 EA 7 $3,135.00 $ 21,945.00 1-34 3441.4005 Install Alum Si Mast Arm Mount (TemporarySignal) 3441 10 EA 12 $330.00 $ 3,960.00 UNIT H - REMOVAL 11-1 0241.0100 Remove Sidewalk 0241 13 SF 4,386 $3.50 $ 15,351.00 II-2 0241.0300 Remove ADA Ramp 0241 13 EA 16 $200.00 $ 3,200.00 11-3 0241.0401 Remove Concrete Drive 0241 15 SF 2,650 $4.50 $ 11,925.00 H-4 0241.0800 Remove Rip Rap 0241 13 SF 730 $5.00 $ 3,650.00 11-5 0241.1000 Remove Conc Pvmt 0241 15 SY 1,442 $50.00 $ 72,100.00 I1-6 0241.1013 Remove 8" Water Line 0241 14 LF140 $55.00 $ 4,125.00 Q-7 0241.1100 Remove Asphalt Pvmt 0241 15 SY $83.00 $ 27,390.00 11-8 0241.1300 Remove Conc Curb&Gutter 0241 15 LF $21.00 $ 17,955.00 U-9 0241.3011 Remove 15" Storm Line 0241 14 LF $l 10.00 $ 6,380.00 11-10 0241.3017 Remove 30" Storm Line 0241 14 LF $ l 10.00 $ 3,300.00 II-11 0241.3019 Remove 36" Storm Line 0241 14 LF $ l 10.00 $ 4,400.00 11-12 0241.3103 21" Storm Abandonment Plug 0241 14 EA 1 $3,300.00 $ 3,300.00 11-13 0241.3106 30" Storm Abandonment Plug 0241 14 EA 1 $3,300.00 $ 3,300.00 U-14 0241.4001 Remove 10' Curb Inlet 0241 14 EA 2 $3,300.00 $ 6,600.00 11-15 0241.4003 Remove 20' Curb Inlet 0241 14 EA 2 $4,950.00 $ 9,900.00 II-16 0241.4201 Remove 4'Drop Inlet 0241 14 EA 1 $3,300.00 $ 3,300.00 U-17 31 I0,0101 Site Clearing 31 1000 LS 1 $50,000.00 $ 50,000.00 II-18 3217.4301 Remove 4" Pvmt Marking 32 1723 LF 770 $1.00 $ 770.00 U-19 3217.4302 Remove 6" Pvmt Marking 32 1723 LF 180 $1.00 $ 180.00 II-20 3217.4303 Remove 8" Pvmt Marking 32 1723 1 LF 1,100 $1.00 $ 1,100.00 H-21 3217.4306 Remove 24" Pvmt Marking 32 1723 LF 840 $4.00 $ 3,360.00 II-22 3217.4307 Remove Raised Marker 32 1723 EA 2,230 $1.50 $ 3,345.00 11-23 3217.4402 Remove Lane Legend Arrow 32 1723 EA 4 $61.00 $ 244.00 U-24 3217.4404 Remove Lane Legend Only 3217 23 EA 4 $61.00 $ 244.00 U-25 3441.2001 Dis oselsalva a Full Traffic Signal 3441 13 EA l $4,631.00 $ 4,631.00 II-26 34413501 Salvage Street Light Pole 34 41 20 EA 4 $715.00 $ 2,860.00 11-27 3441:4108 Remove Sign Panel and Post 1 34 41 30 EA 61 $300.00 $ 11800.00 UNIT III - PAVING 111-1 3123.0101 Unclassified Excavation by Plan 31 23 16 CY 1,700 $35.00 $ 59,500.00 11I-2 3124.0101 Embankment by Plan 31 24 00 CY 700 $25.00 $ 17,500.00 III-3 3211.0400 Hydrated Lime 32 11 29 TN 120 $350.00 $ 42,000.00 M 4 3211.0502 8" Lime Treatment 32 1129 SY 5,070 $11.00 $ 55,770.00 HI-5 3212.0401 HMAC Transition 32 1216 TN 150 $600.00 $ 90,000.00 III-6 3213.0105 10" Cone Pvmt 32 13 13 SY 4,540 $163.00 $ 740,020.00 111-7 13213.0301 4" Cone Sidewalk 32 1320 SF 4,578 $12.00 $ 54,936.00 III-8 3213.0311 4" Cone Sidewalk, Adjacent to Curb 32 1320 SF 152 $20.00 $ 3,040.00 11I-9 3213,0321 Cone Sidewalk, Adjacent to Ret Wall 32 1320 SF 1,346 $12.00 $ 16,152.00 IH-10 3213.0322 Cone Curb at Back of Sidewalk 32 1320 LF 69 $5.00 $ 345.00 III-11 3213.0504 Barrier Free Ramp, Type M-2 32 1320 EA 2 $4,000.00 $ 8,000.00 III-12 3213.0505 Barrier Free Ramp, Type M-3 32 1320 EA 2 $3,000.00 $ 6,000.00 III-13 3213.0510 Barrier Free Ramp, Type C-3 32 1320 EA 4 $9,000.00 $ 36,000.00 111-14 3232.0100 Cone Ret Wall Adjacent to Sidewalk 3232 13 SF 197 $185.00 $ 36,445.00 III-15 9999.PV01 4" Cone Sidewalk, Stamped and Integral Color 99 99 99 SF 5,985 $25.00 $ 149,625.00 HI-16 9999.PV02 Pedestrian Handrail, Type D 99 99 99 LF 60 $200.00 $ 12,000.00 111-17 9999.PV03 13" Cone Pvmt Stamped and Inte al Color 99 99 99 SF 300 $40.00 $ 12,000.00 IH-18 9999.PV04 3" Concrete Mountable Curb 99 99 99 LF 71 $25.00 $ 1,775.00 III-19 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 1 EA 2 $1,750.00 3,500.00 I11-20 13213.0205 10" Conc Pvmt HES 32 13 13 1 SY 1 1,0101 $225.00 _S $ 22T250.00 11I-21 13123.0103 Borrow by Plan 31 23 23 1 CY 1 200 $55.00 $ 11,000.00 UNIT IV - DRAINAGE IV-1 REMOVED - IV-2 3301.0012 Post -CCTV Inspection of Storm Drain 33 01 32 LF 122 $11.00 $ 1,342.00 IV-3 3305.0107 Manhole Adjustment, Minor (Storm Drain) 3305 10 EA 1 $2,000.00 $ 2,000.00 IV-4 3305.0109 Trench Safety 3305 10 LF 122 $11.00 $ 1,342.00 IV-5 3305.0112 Concrete Collar for Manhole (Storm Drain) 3305 17 EA 1 $7,700.00 $ 7,700.00 IV-6 3341.0201 2 1 " RCP, Class III 3341 10 LF 10 $830.00 $ 8,300.00 IV-7 13341.0205 24" RCP, Class IH 3341 10 LF 12 $847.00 $ 10,164.00 IV-8 3341.0206 24" RCP, Class IV 3341 10 LF 32 $858.00 $ 27,456.00 IV-9 3341.0302 30" RCP, Class HI 3341 10 LF 16 $880.00 $ 14,080.00 IV-10 3341.0303 30" RCP, Class IV 3341 10 LF 52 $891.00 $ 46,332.00 IV-1 I 3349.0002 5' Storm Junction Box 33 49 10 EA 1 $14,300.00 $ 14,300.00 IV-12 3349.6001 10' Recessed Inlet 33 49 20 EA 1 $11,000,00 $ 11,000.00 IV-13 3349.6003 20' Recessed Inlet 33 49 20 EA 2 $17,050.00 $ 34,100.00 IV-14 3349.7001 4' Drop Inlet 33 49 20 EA 1 $18,260.00 $ 18,260.00 IV-15 9999.DR01 Concrete Pilot Channel 5") 99 99 99 SF 624 $66.00 $ 41,184.00 IV-16 9999.DR02 Concrete Flume 5" 99 99 99 SF 80 $66.00 $ 5,280.00 IV-17 9999.DR03 20' Recessed Inlet (Open Back) 99 99 99 EA 1 $17,875.00 $ 17,875.00 UNIT V - WATER V-1 0171.0101 Construction Staking (For Water) 01 71 23 LS 1 $10,000.00 $ 10,000.00 V-2 0171.0102 As -Built Survey (For Water) 01 71 23 LS 1 $1,500.00 $ 1,500.00 V-3 3305.0102 Cathodic Protection Test Station Adjustment 3305 14 EA 1 $5,500.00 $ 5,500.00 V4 3305.0106 Manhole Adjustment,Major (Water) 330514 EA 1 $11,440.00 $ 11,440.00 V-5 3305.0110 Utility Markers (Buried) 33 05 26 LS 1 $1,650.00 $ 1,650.00 V-6 3305.0111 Valve Box Adjustment 3305 14 EA 6 $1,200.00 $ 7,200.00 V-7 3311.0251 8" DIP Water Class 350) 33 11 10 LF 70 $612.00 $ 42,840.00 V-8 3311.0254 8" DIP Water Class 350), CLSM Backfill 33 11 10 LF 32 S857.001 $ 27,424.00 V-9 3305.0109 Trench Safety 3305 10 LF 102 $11.00 $ 1,122.00 V-10 3311.0001 Ductile Iron Water Fittings w/ Restraint 33 11 11 TON 1 $16,500.00 $ 16,500.00 V-11 3312.0117 Connection to Existing 4"-12" Water Main 33 1225 EA 1 $18,700.00 $ 18,700.00 V-12 3312.2101 1 1/2" Water Service, Meter Reconnection 33 12 10 EA 1 $3,850.00 $ 3,850.00 V-13 3312.2103 1 1/2" Water Service 33 12 10 EA 1 $7,150.00 $ 7,150.00 V-14 3312.2104 1 1/2" Private Water Service 33 12 10 LF 13 $220.00 $ 2,860.00 V-15 3312.2201 2" Water Service, Meter Reconnection 33 12 10 EA 1 $3,960.00 $ 3,960.00 V-16 3312.2203 2" Water Service 33 1210 EA 1 $7,370.00 $ 7,370.00 V-17 3312.2204 2" Private Water Service 33 12 10 LF 11 $237.00 $ 2,607.00 V-18 3312.3103 8" Cut -in Gate Valve 33 1210 EA 1 $29,260.00 $ 29,260.00 V-19 13304.0101 Temporary Water Services 33 04 30 LS 1 $36,300.00 $ 36,300.00 V-20 13305.0117 Concrete Collar for Valve (Water) 3305 17 EA 1 S500.00 $ 500.00 UNIT VI - TRAFFIC SIGNAL VI-1 2605.0111 Fumish/Install Elec Sery Pedestal 26 05 00 EA 1 $11,770.00 $ 11,770.00 VI-2 2605.3015 2" CONDT PVC SCH 80 T 26 05 33 LF 220 $35.00 $ 7,700.00 VI-3 2605.3016 2" CONDT PVC SCH 80 B) 26 05 33 LF 250 $71,00 $ 17,750.00 VI-4 2605.3025 3" CONDT PVC SCH 80 T 26 05 33 LF 140 $38.00 $ 5,320.00 VI-5 2605.3026 3" CONDT PVC SCH 80 (B) 26 05 33 LF 165 $76.00 $ 12,540.00 VI-6 2605.3033 4" CONDT PVC SCH 80 (T) 26 05 33 LF 130 $41.00 $ 5,330.00 VI-7 2605.3034 4" CONDT PVC SCH 80 B 26 05 33 LF 630 $80.00 $ 50,400.00 VI-8 3441.1001 Furnish/Install 3-Sect Signal Head Assembly 3441 10 EA 18 $2,750.00 $ 49,500.00 VI-9 3441.1012 Furnish/Install Ped Signal Head Assmbly 3441 10 EA 8 $1,496.00 $ 11,968.00 VI-10 3441.1031 Furnish/Install Audible Pedestrian Pushbutton Station 3441 10 EA 8 $1,650.00 $ 13,200.00 VI-11 3441.1209 Fumish/Install BBU System EXT Mounted 3441 10 EA 1 $10,780.00 $ 10,780.00 VI -12 3441.1215 Furnish/Install Hybrid Detection Device 3441 10 1 APR 4 $11,627.00 $ 46,508.00 VI-13 13441.1220 Furnish/Install Model 711 Preemption Detector 1 3441 10 1 EA 4 $3,465.00 $ 13,860.00 VI-14 3441.1224 Furnish/Install Preemption Cable 3441 10 LF 1,080 $5.00 $ 5,400.00 VI-15 3441.1250 Furnish/Install PTZ Camera 3441 10 EA 1 $9,680.00 $ 9,680.00 VI-16 3441.1255 Fumish/Install Communication Modem 3441 10 EA I $5,610.00 $ 5,610.00 VI-17 3441.1260 Furnish/Install CAT5 Ethernet Cable 3441 10 LF 1,245 $6.00 $ 7,470.00 VI-18 3441.1311 51C 14 AWG Multi -Conductor Cable 3441 10 LF 1,865 $4.00 $ 7,460.00 VI-19 3441.1312 7/C 14 AWG Multi -Conductor Cable 3441 10 LF 575 $5.00 $ 2,875.00 VI-20 13441.1315 20/C 14 AWG Multi -Conductor Cable 3441 10 LF 900 $10.00 $ 9,000.00 VI-21 3441.1322 3/C 14 AWG Multi -Conductor Cable 3441 10 LF 1,967 $3.00 $ 5,901.00 VI-22 3441.1413 NO 6 Bare Elec Condr SLD 3441 10 LF 20 $4.00 $ 80.00 VI-23 3441.1414 NO 8 Bare Elec Condr 3441 10 LF 1,580 $3.00 $ 4,740.00 VI-24 3441.1415 NO 10 Bare Elec Condr 3441 10 LF 425 $2.00 $ 850.00 VI-25 3441.1502 Fumish/Install Ground Box Type B, w/A ron 3441 10 EA 1 $2,310.00 $ 2,310.00 VI-26 3441.1503 Fumish/Install Ground Box Type D, w/A ron 3441 10 EA 1 $2,640.00 $ 2,640.00 VI-27 3441.1506 Fumish/Install Ground Box Type D 3441 10 EA 5 $1,980.00 $ 9,900.00 VI-28 3441,1603 Furnish/Install 10'- 14' Ped Pole Assmbly 3441 10 EA 5 $2,970.00 $ 14,850.00 VI-29 3441.1613 Fumish/Install Type 43 Signal Pole 3441 10 EA 1 $14,630.00 $ 14,630.00 VI-30 3441.1615 Furnish/Install Type 45 ignal Pole 3441 10 EA 1 $15,290.00 $ 15,290.00 VI-31 3441.1624 Furnish/Install Mast Arm 40' - 48' 3441 10 EA 1 $7,700.00 $ 7,700.00 VI-32 3441.1625 Fumish/Install Mast Arm 52' - 60' 3441 10 EA 1 $14,410.00 $ 14,410.00 VI-33 3441.1701 TY 1 Si oral Foundation 3441 10 EA 6 $2,970.00 $ 17,820.00 VI-34 3441.1704 TY 4 Signal Foundation 3441 10 EA 1 $9,570.00 $ 9,570.00 VI-35 3441.1705 TY5Signal Foundation 344110 EA I $tO,120.00 $ 10,120.00 VI-36 3441.1715 Signal Cabinet Foundation - 352i & BBU 3441 10 EA 1 $6,600.00 $ 6,600.00 VI-37 3441.1725 Furnish/Install ATC Signal Controller 3441 10 EA 1 $8,250.00 $ 8,250.00 VI-38 3441.1741 Furnish/Install 352i Controller Cabinet Assembly 3441 10 EA 1 $44,000.00 $ 44,000.00 VI-39 13441.4001 Furnish/Install Alum Sign Mast Arm Mount 34 41 30 EA 8 $660.00 $ 5,280.00 VI-40 19999.TSOI INS TRF SIG PLAM(S)I ARM(65') 1 999 99 1 EA 2 $49,500.00 $ 99,000.00 VI-41 19999.TS02 DRILL. SHAFT (TRF SIG POLE) (48 IN) 99 99 99 LF 44 $885.00 $ 38,940.00 UNIT VII - PAVEMENT MARKING AND SIGNAGE VII-1 3217.0101 6" SLD Pvmt Markin HAS W) 32 1723 LF 1,640 $1.00 $ 1,640.00 VII-2 3217.0101A 6" SLD Pvmt Markin HAS (B) 32 17 23 LF 1,700 $2.00 $ 3,400.00 VII-3 3217.0103 6" BRK Pvmt Markin HAS (W) 32 1723 LF 1,040 $1.00 $ 1,040.00 VII-4 3217.0103 6" SLD Pvmt Marking HAS (Y) 32 1723 LF 1,390 $1.00 $ 1,390.00 VII-5 3217.0104 6" DOT Pvmt MarkingHAS (W) 32 1723 LF 162 $2.50 $ 405.00 VII-6 3217.0201 8" SLD Pvmt Marking HAS (W) 32 1723 LF 3,070 $2.00 $ 6,140.00 VII-7 3217.0301 12" SLD Pvmt Marking HAE (W) 32 1723 LF 48 $5.50 $ 264.00 VII-8 3217.0401 18" SLD Pvmt MarkingHAE(W) 32 1723 LF 395 $6.60 $ 2,607.00 VII-9 3217.0501 24" SLD Pvmt Marking HAE W) 32 1723 LF 1,368 $8.50 $ 11,628.00 VII-10 3217.1002 Lane Legend Arrow 32 1723 EA 35 $215.00 $ 7,525.00 V11-11 3217.1004 Lane Legend Only 32 1723 EA 34 $247.50 $ 8,415.00 VQ-12 3217.1004A Lane Legend Yield Symbol 32 1723 EA 28 $36.00 $ 1,008.00 VII-13 13217.2104 REFL Raised Marker TY II-C-R 32 17 23 EA 238 15.00 $ 1,190.00 VB-14 3441.4003 Fumish/Install Alum Sign Ground Mount CityStd. 34 41 30 EA 321 $544.50 $ 17,424.00 VII-I S 19999.PMOI 6" Round Reflective Round Marker W 99 99 99 1 EA 390 1 $4.00 $ 1,560.00 UNIT VIII - ILLUMINATION VID-1 2605.3014 2" CONDT RM (Riser) 26 05 33 LF 400 $24.00 $ 9,600.00 VIII-2 2605.3015 2" CONDT PVC SCH 80 (T) 26 05 33 LF 1,170 $22.00 $ 25,740.00 VIII-3 2605.3016 2" CONDT PVC SCH 80 (B) 26 05 33 LF 940 $45.00 $ 42,300.00 V1114 3441.1401 NO 4 Triplex OH insulated Elec Condr 3441 10 LF 160 $7.00 $ 1,120.00 VIII-5 3441.1405 NO 2 Insulated Elec Condr 3441 10 LF 6,330 $4.00 $ 25,320.00 VIB-6 3441.1502 Furnish/Install Ground Box Type B, w/Apron 3441 10 EA 21 $2,310.00 $ 48,510.00 VIII-7 3441.3003 Rdwy Illum Assmbly TY 18 34 41 20 EA 4 $6,050.00 $ 24,200.00 VIII-8 3441.3050 Furnish/Install LED Li h ing Fixture 70 watt ATBO Cobra Head) 34 41 20 EA 8 $1,045.00 $ 8,360.00 VIII-9 3441.3302 Rdwy Ilium Foundation TY 3,5,6, and 8 34 41 20 EA 4 $3,850.00 $ 15,400.00 VM-10 3441.3321 Fumish/Install 40' Wood Light Pole 3441 20 EA 1 $4,400.00 $ 4,400.00 VHI-11 3441.3323 Furnish/Install 8' Wood Light Pole Arm 34 41 20 EA 8 $1,045.001 $ 81360.00 AL = Base Bid UNIT I - GENERAL $ 1,242,436.00 UNIT 11- REMOVAL $ 264,710.00 UNIT III-- PAVING $ 1,582,,858.00- UNIT IV - DRAINAGE $ 260,715.00 UNIT V - WATER S 237,733.00 UNIT VI - TRAFFIC SIGNAL $ 637,002.00 UNIT VII - PAVEMENT MARKING AND SIGNAGE $ 65,636.00 END OF SECTION SECTION 00 43 13 BID BOND KNOW ALL BY THESE PRESENTS: 00 43 13 BID BOND Page 1 of 2 That we, Rebcon, LLC , known as "Bidder" herein and Colonial American Casualty and Surety Company, Fidelity and Deposit Company of Maryland a corporate surety duly authorized to do business in the State of Texas, known as "Surety" herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal sum of five percent (5%) of Bidder's maximum bid price, in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid or proposal to perform Work for the following project designated as CPN 103309 - North Tarrant Parkway and North Beach Street Intersection Improvements NOW, THEREFORE, the condition of this obligation is such that if the City shall award the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with the City in accordance with the terms of such same, then this obligation shall be and become null and void. If, however, the Principal fails to execute such Contract in accordance with the terms of same or fails to satisfy all requirements and conditions required for the execution of the Contract, this bond shall become the property of the City, without recourse of the Principal and/or Surety, not to exceed the penalty hereof, and shall be used to compensate City for the difference between Principal's total bid amount and the next selected bidder's total bid amount. PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 5th day of February , 2026. ATTEST: Witness as to Principal 01(v-�ACi CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 PRINCIPAL: Rebcon. LLC BY: Signature �annu Kriea �" Pfes�cien% Nameldnd Title North Tarrant Parkway and North Beach Street Intersection Improvements CPN 103309 A� I/ Witness as to Sure Attach Power of Attorney (Surety) for Attorney -in -Fact 00 43 13 BID BOND Page 2 of 2 Address: 400 109th Street Arlington, TX 76011 SURETY: Colonial American Casualty and Surety Company _ Fidelity anj4,eposit Company of Maryland Q BY: )( ignature Andrea Rose Crawford, Attorney -in -Fact Name and Title Address: 1299 Zurich Way, 5th Floor Schaumburg, IL 60196 Telephone Number: 800-382-2150 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised 9/30/2021 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint to o John R.WARD, Monica Ruby VEAZEY, John William NEWBY, Thomas Douglas MOORS ,Sandra Lee RONEY, Debra Lee MOON, Andrea Rose CRA WFORD, Troy Russell KEY, Emily Allison MIKESKA, Allyson W .DEAN, Colin E. CONLY, Andrew Gareth ADDISON, Patrick Thomas COYLE, Michael Donald HENDERICKSON, Bryan Kelly MOORE, Elizabeth ORTIZ Ana OWENS, Betty J. REEH, Andrew CLARK, Faith Ann HILTY of Addison, Texas, its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. f The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 31 st day of January, A.D. 2024. W ",bQ4 •+`�Cy5U2I�11y 4 `` ��' •'•i V t: PP '•',,,�y a `. �cp.....,,.N.a,�,e �'. •,`,aQp9� Corr)'Gg OSEALmi IoSEALmI6get°SEALm1 ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND By: Robert D. Murray Vice President By: Dawn E. Brown Secretary State of Maryland County of Baltimore On this 31st day of January, A.D. 2024, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D. Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly swom, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. Genevieve M. Maison Authenticity of this bond can be confirmed at bondvalidator.zurichna.com or 410-559-8790 E M..Riy'; GENEVIEVE M. MAISON =�tm PU80r' jZ= NOTARY PUBLIC ovY?t: BALTIMORE COUNTY, MD . , `'. 'RE N Commission Expics JANUARY 47, 2025 COU`` �.II..,,,,.`,` EXTRACT FROM BY-LAWS OF THE COMPANIES "Article V, Section 8, Attorneys -in -Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President may, by written instrument under the attested corporate seal, appoint attomeys-in-fact with authority to execute bonds, policies, recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such attorney -in -fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any time. CERTIFICATE I, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of the By -Laws of the Companies is still in force. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998. RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary and the Seal of the Company may be affixed by facsimile on any Power of Attorney ... Any such Power or any certificate thereof bearing such facsimile signature and seal shall be valid and binding on the Company." This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the I Oth day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies, this 5 day of February , 2026 . Gg UUY 4, '., `GPW N30 ,,, osa co,gp , .�c etF^Qq` �P^'sg•`QpQ/j'- ``oo "Qi SEAL € -_' ;K' '-=°ivSEAL `"i�= SEAL a:C3 u Thomas 0. McClellan Vice President TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT INFORMATION TO: - - Zurich Surety Claims Authenticity of this bond can be confirmed at bondvalidator.zurichna.coim or 410-559-8790 Texas Important Notice IMPORTANT NOTICE To obtain information or make a complaint: You may call Zurich North America's toll -free telephone number for information or to make a complaint at: 1-800-382-2150 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights, or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Web: www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. 19 ZURICH AVISO IMPORTANTE Para obtener informacion o para presentar una queja: Usted puede Ilamar al numero de telefono gratuito de Zurich North America's para obtener informacion o para presentar una queja al: 1-800-382-2150 Usted puede comunicarse con el Departamento de Se- guros de Texas para obtener informacion sobre com- pahias, coberturas, derechos, o quejas al: 1-800-252-3439 Usted puede escribir al Departamento de Seguros de Texas a: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Sitio web: www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov DISPUTAS POR PRIMAS DE SEGUROS O RECLAMACIONES: Si tiene una disputa relacionada con su prima de seguro o con una reclamacion, usted debe comunicarse con la compania primero. Si la disputa no es resuelta, usted puede comunicarse con el Departamento de Seguros de Texas. ADJUNTE ESTE AVISO A SU POLIZA: Este aviso es solamente para propositos informativos y no se con- vierte en parte o en condicion del documento adjunto. U-GU-296-E (06/15) Page 1 of 1 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page 1 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of are not required to underbid resident bidders. , our principal place of business, B. The principal place of business of ur company or our parent company or majority owner is in the State of Texas. BIDDER: END OF SECTION By: I4�1n� Krie3 Title: Pre s i d En} Date: Qa-OS 9_OZ4 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised 9/30/2021 004511-1 BIDDERS PREQUALIFICATIONS Pagel of 3 SECTION 00 45 11 BIDDERS PREQUALIFICATIONS 4 1. Summary. A Bidder or their designated subcontractors are required to be prequalified or 5 have applied for prequalification by the City for the work types requiring prequalification 6 prior to submitting bids. To be considered for award of contract the Bidder must submit 7 Section 00 45 12, PREQUALIFICATION STATEMENT for the work type(s) listed with 8 their Bid. Any contractor or subcontractor who is not prequalified for the work type(s) listed 9 must submit Section 00 45 13, PREQUALIFICATION APPLICATION in accordance with 10 the requirements below. The information must be submitted seven (7) days prior to the 11 date of the opening of bids. Subcontractors must follow the same timelines as contractors 12 for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at 13 the time bids are opened and reviewed may cause the bid to be rejected. 14 15 16 The prequalification process will establish a bid limit based on a technical evaluation and 17 financial analysis of the contractor. For example, a contractor wishing to submit bids on 18 projects to be opened on the 7th of April must file the information by the 31 st day of March 19 in order to eligible to work on these projects. In order to facilitate the approval of a Bidder's 20 Prequalification Application, the following must accompany the submission. 21 a. A complete set of audited or reviewed financial statements. 22 (1) Classified Balance Sheet 23 (2) Income Statement 24 (3) Statement of Cash Flows 25 (4) Statement of Retained Earnings 26 (5) Notes to the Financial Statements, if any 27 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles 28 of Incorporation, Articles of Organization, Certificate of Formation, LLC 29 Regulations, and Certificate of Limited Partnership Agreement). 30 c. A completed Bidder Prequalification Application. 31 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 32 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 33 number visit the Texas Comptroller of Public Accounts online at the 34 following web address www.window.state.tx.us/taxpermit/ and fill out the 35 application to apply for your Texas tax ID. 36 (2) The firm's e-mail address and fax number. 37 (3) The firxn's DUNS number as issued by Dun & Bradstreet. This number 38 is used by the City for required reporting on Federal Aid projects. The DUNS 39 number may be obtained at www.dnb.com. 40 d. Resumes reflecting the construction experience of the principles of the firm for firms 41 submitting their initial prequalification. These resumes should include the size and 42 scope of the work performed. 43 e. Other information as requested by the City. 44 45 2. Prequalification Requirements 46 a. Financial Statements. Financial statement submission must be provided in 47 accordance with the following: 48 (1) The City requires that the original Financial Statement or a certified copy 49 be submitted for consideration. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 0045 11 - 2 BIDDERS PREQUALIFICATIONS Page 2 of 3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1) express an unqualified opinion, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital = current assets — current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Prequalification Application. A Bidder Prequalification Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None" or "N/A" should be inserted. 38 (2) A minimum of five (5) references of related work must be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility for Award of Contract 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance. 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 004511-3 BIDDERS PREQUALIFICATIONS Page 3 of 3 1 d. If a contractor has a valid prequalification letter, the contractor will be eligible to 2 perform the prequalified work types until the expiration date stated in the letter. 3 8 END OF SECTION CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 2 3 4 5 A 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0045 12- 1 PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 45 12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Contractor/Subcontractor Company Prequalification Name Expiration Date Concrete Paving Construction/Reconstruction �20�OnIl'l'C (LESS THAN 15,000 square OS Z 2�2 yards) Roadway and pedestrian lighting 1' Juccw�c Spec.%�•l4ies , lnc, p / 19 /20 2� Water Distribution, Urban and Renewal, 8-inch diameter and /� ZnC . 0 H / 30 / 20 TG smaller Water Transmission, Urban/Renewal, 24-inches and �ood Con�na G}ors, �n�. 0,4 / a0 / 20 2G smaller y Cathodic Protection W (� CSOc�� (,o,n Mo-c lard , Zn C . 0 y / 30 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: ebc-)VN, L'LC By: binnu Krie Company (Please Print y 00 10 9 T" S4-ree-t Signature - Address Flr1;n ib n l Tcxas � ��e01� Title: PrPsid�n City/State/Zip (Please Print) Date: 02-05 - 202& 24 END OF SECTION CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103309 Revised September 30, 2021 00 45 26 - I CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 i SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. 103309. Contractor further certifies that, pursuant to Texas Labor Code, Section 6 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. 8 9 CONTRACTOR: HE 11 kedproV1I LLC By: ()Cwnvlu Krieg 12 Company (PI 13 14 1400 109" She,} Signature- 15 Address I 16 , 17 tKa-C. Title: Pre-AIAP-A�e 18 City/State/Zip (Please Print) 19 20 21 THE STATE OF TEXAS 22 23 COUNTY OF TARRANT § 24 25 BEFORE ME, the undersigned authority, on this day personally appeared 26 Y\% p Y 1 f � , known to me to be the person whose name is 27 subscribed to the foregoi g instrument, and acknowledged to me that he/she executed the same as 28 the act and deed of 7--PP(W LLe- for the purposes and 29 consideration therein expressed and in the capacity therein stated. 30 31 32 33 34 GIVEN UNDER MY HAND AND SEAL OF OFFICE this 1 t day of y, 202M 35 36 \��q\Ill 11 lllllttt��i 37 : D� SPRY PVB' •9�Q �'� 38 39 % �rF OF F ..36529l.• /Ie11/i�ijOt08i25,1���`��� 40 yW Notary Public in and for the State of Texas END OF SECTION CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July I, 2011 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 004541-1 SMALL BUSINESS ENTERPRISE GOAL Page 1 of 1 SECTION 00 45 41 SMALL BUSINESS GOAL APPLICATION OF POLICY If the total dollar value of the contract is $100,000 or more, the Small Business goal is applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to foster competition, expand the supplier base, and promote and encourage the participation of small business firms in the City's contracting opportunities. SMALL BUSINESS GOAL The City's Small Business goal is 30% of the amount bid (if bid alternates are requested, the goal shall be applied to the total bid amount inclusive of any selected alternates). COMPLIANCE Bidders shall comply with the Small Business Goal by meeting or exceeding the small business goal through self -performance and/or Small Business subcontracting participation. Small businesses are based on SBA definitions and must be located within the five Fort Worth counties: Tarrant, Denton, Wise, Parker and Johnson. Small businesses shall be certified via one of the following certifying agencies: • North Central Texas Regional Certifying Agency (NCTRCA) • Dallas/Fort Worth Minority Supplier Development Council (DFW MSDC) • Women's Business Council — Southwest (WBCS) • Texas Department of Transportation (TxDOT) SUBMITTAL OF REQUIRED DOCUMENTATION The following documents must be submitted with the bid documents at the time of bidding: • Completed Small Business Utilization form • Certificates identifying themselves or subcontractors as Small Businesses FAILURE TO COMPLY WITH THE CITY'S SMALL BUSINESS ORDINANCE WILL RESULT IN THE BID BEING CONSIDERED NON -RESPONSIVE. 38 END OF SECTION CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 1, 2025 +_ 0 0 \ U N o M O � W m � O O a G� cn = A o co� o E co W Z V) U W !n _ t cc Q� Q cn c co •� co m ED Cl) m w U z A E ❑X �; oOL O a cc E 3: c oco_ U co cn Cc)cn v1 a o co oa)z M � °' o i M O oc z cis F z O W W Lli co w LL a Z I Q E Co .0 VU. o 0>. �Z~ Z z ui A a 0 w a w w Q Y w m 41 aD o 0 O O X E amUa a m U0a`m U U U A N J o y O .3 Qa G bn � 3 C� � Cd o 4 r� to O ++ +• C'C �0 o C� ° "O L S. 4- 0 a 4-4 un �U ^�a�d w F E o c �° U v U Q _U d z z A ❑ A O O a � a � o � Pa• � o a � c O O\ p N 00 .C. •CL M � r M C/� � O U N GoN U enWD i F� CL H' z FC7 CL z a �' O r, W O o x O O b M O O L %- a ooc O r O 14, W6 O U !' O o O U aii M N O ° o w � o a 3 u°n U •O •O Q� 'C O � O d 'O O � O z as �U � a w U z a QU ,� a w U r o n � L L CC cr CC 1 U_ U_ U_ d d d z z z L _ o E ° 4 a a Y 0 Z O 0 Z Cc y o 0 2 O C Cy? d N C, y, N Op %� O. C N to C. = M O C. p 00 W R �v "" N W G O N rW` rvr V] v N 6R U ""� Gn V u M bl9 ri1 c C� c F" cc c F; rj U o F O U O U O = (1) U w u o O w o O m L p O as cd Z ds F CZ FW Z Go!l F C/� F Rr Z 60) 0 N a a tn A i R f7r v a PC _cq ow c x �F = " 0 ON N d y O P4 O O G7r C/1 M O j �i. L Vi "C rl 01 L L p 7 cn •aL.r V i' L r (AA a Q a V� U O p4 N F ..i u U Vi ai M N A ti -I CC W W � x a w(A L C c C O 'O ^O O � z m dU a W U z Im dU a W U Z 0. dU a w U a cr v 4 40 U U U z z z A ® A ❑ A ❑ cn O O O co •Ei � w cl w w � a c a a O z o o z z CO) en VI) = U = 1aj _U •� w V � V � on O � w O � 0 O O `�' W U W V U Z Z F Z uq us cn Fes' sdn- M W W W M aa. � E a a cc y o E F Ucd aF F U 3 z = z O O u W 0 s- = 00 U 00 O O � c a a, v w w � :g a a � A A Q A = Z ci = z Q z d WD o; .. .. V C •L b Ccd o d e ° E -0 o 8 0 z co d U 96 W U z A d U a, W U z U 0. W U uO 0 O N F.e O el con O .� v O OR O bA cz O 3 o � a � O O L coo w O � � p ^C7 O � ci C C> h � C v) U cn Z O O O O a Q Q Q H C 0 E w i N N c i ca N El L " N co cV E Z Co O t E IL 0 4N d Q O E w (V o Ln G Iq 0 N u0 a O O �+ c � N L 0 Q cc 1 ii� �a) C O 0 m Q V O a) 0)(D O 0 d Q r O O n X N 0 Q d 'O U Q N N O U cc c 0 A L u+ ✓, W V 2 C � O J y V Small Business Enterprise (SBE) NOT R ' C. Green Scaping, LP C. Green Scaping, LP has filed with the Agency an Affidavit as defined by NCTRCA Small Business Enterprise (SBE) Policies & Procedures and is hereby certified to provide service(s) in the following areas: NAICS 236220: COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION This Certification commences February 4, 2026 and supersedes any registration or listing previously issued. This certification must be updated every two years by submission of an Annual Update Affidavit. At any time there is a change in ownership, control of the firm or operation, notification must be made immediately to the North Central Texas Regional Certification Agency for eligibility evaluation. Certification Expiration: February 4, 2028 Issued Date: February 4, 2026 CERTIFICATION NO. HFSB07457NO228 Certification Administrator 005243-1 Agreement Page 1 of 10 SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on May 12, 2026, is made by and between the City of Fort Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, ("City"), and Rebcon, LLC, authorized to do business in Texas, acting by and through its duly authorized representative, ("Contractor"). City and Contractor may jointly be referred to as Parties. City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: N. Tarrant Parkway and N. Beach Street Intersection Improvements City Project Number 103309 Article 3. CONTRACT PRICE City agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount, in current funds, of Four Million Five Hundred Four Thousand Four Hundred and 00/100 Dollars ($4,504,400.00). Contract price may be adjusted by change orders duly authorized by the Parties. OFFICIAL RECORD Article 4. CONTRACT TIME CITY SECRETARY 4.1 Final Acceptance. FT. WORTH, TX The Work shall be complete for Final Acceptance within 390 calendar days after the date when the Contract Time commences to run, as provided in Paragraph 2.02 of the General Conditions, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 (effective September 1, 2025) 005243-2 Agreement Page 2 of 10 4.2 Liquidated Damages Contractor recognizes that time is of the essence for completion of Milestones, if any, and to achieve Final Acceptance of the Work and City and the public will suffer from loss of use if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding, the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay City One Thousand Two Hundred Fifty and 00/100 Dollars ($1,250.00) for each day that expires after the time specified in Paragraph 4.1 for Final Acceptance until the City issues the Final Letter of Acceptance. Article S. CONTRACT DOCUMENTS 5.1 CONTENTS: A.The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form 1) Proposal Form 2) Vendor Compliance to State Law Non -Resident Bidder 3) Prequalification Statement 4) State and Federal documents (project specific) b. Current Prevailing Wage Rate Table c. Insurance Certification Form (ACORD or equivalent) d. Payment Bond e. Performance Bond f. Maintenance Bond g. Power of Attorney for the Bonds CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 (effective September 1, 2025) 005243-3 Agreement Page 3 of 10 h. Worker's Compensation Affidavit i. Small Business Utilization Form 3. General Conditions. 4. Supplementary Conditions. 5. Specifications specifically made apart of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in part, by any act, omission or negligence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 (effective September 1, 2025) 005243-4 Agreement Page 4 of 10 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in part, by any act, omission or negligence of the city. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the City. 7.3 Successors and Assigns. City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability/Non-Waiver of Claims. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor. The failure of City or Contractor to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of City's or Contractor's respective right to insist upon appropriate performance or to assert any such right on any future occasion. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 (effective September 1, 2025) 005243-5 Agreement Page 5 of 10 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement if signed by someone other than the duly authorized signatory of the Contractor. 7.7 Non -appropriation of Funds. In the event no funds or insufficient funds are appropriated by City in any fiscal period for any payments due hereunder, City will notify Vendor of such occurrence and this Agreement shall terminate on the last day of the fiscal period for which appropriations were received without penalty or expense to City of any kind whatsoever, except as to the portions of the payments herein agreed upon for which funds have been appropriated. 7.8 Prohibition On Contracts With Companies Boycotting Israel. Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if Contractor has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Contractor certifies that Contractor's signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. 7.9 Prohibition on Boycotting Energy Companies. Contractor acknowledges that in accordance with Chapter 2276 of the Texas Government Code, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 (effective September 1, 2025) 005243-6 Agreement Page 6 of 10 company" and "company" have the meaning ascribed to those terms by Chapter 2276 of the Texas Government Code. To the extent that Chapter 2276 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries. Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 (effective September 1, 2025) 005243-7 Agreement Page 7 of 10 7.11 Immigration Nationality Act. Contractor shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by City, Contractor shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Contractor shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Contractor employee who is not legally eligible to perform such services. CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right to immediately terminate this Agreement for violations of this provision by Contractor. 7.12 No Third -Party Beneficiaries. This Agreement gives no rights or benefits to anyone other than the City and the Contractor and there are no third -party beneficiaries. 7.13 No Cause of Action Against Engineer. Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their sureties, shall maintain no direct action against the Engineer, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the City will be the beneficiary of any undertaking by the Engineer. The presence or duties of the Engineer's personnel at a construction site, whether as on -site representatives or otherwise, do not make the Engineer or its personnel in any way responsible for those duties that belong to the City and/or the City's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The Engineer and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 (effective September 1, 2025) 005243-8 Agreement Page 8 of 10 7.14 Small Business Utilization. Contractor shall not make any unjustified changes to its small business utilization as presented on the Small Business Utilization Form. Contractor's failure to abide by the commitments presented on the form or intentional and/or knowing misrepresentation of material facts regarding small business utilization shall be disallowed from bidding on future City of Fort Worth public works contracts for a period of time of not less than one year. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 (effective September 1, 2025) 005243-9 Agreement Page 9 of 10 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective as of the date subscribed by the City's designated Assistant City Manager ("Effective Date"). Contractor: Rebcon, LLC By: Signature U Danny Krieg (Printed Name) President Title 400 1091'' Street Address Arlington, Texas 76011 City/State/Zip 05/27/2026 Date City of Fort Worth By: Jesica McEachern Assistant City Manager 06/18/2026 Date �qn P O�pORT�J ad Fo Attest: opt* o, oe*�d Jannette Goodall, City Secretary (Seal) M&C: 26-0375 Date: 05/12/2026 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 (effective September 1, 2025) 005243-10 Agreement Page 10 of 10 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Chad Allen Transportation and Public Works Department Approved as to Form and Legality: Douglas Black (Jun 8, 2026 15:12:04 CDT) Douglas W. Black Sr. Assistant City Attorney APPROVAL RECOMMENDED: Lauren Prieur (Jun 7, 2026 14:44:46 CDT) Lauren Prieur, PE Director, Transportation and Public Works Department CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 (effective September 1, 2025) Bond No. 9453940 006113-1 PERFORMANCE BOND Page 1 of 2 1 SECTION 00 6113 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Rebcon, LLC, known as "Principal' herein and Colonial American Casualty and 8 Surety Company, Fidelity and Deposit Company of Maryland, a corporate surety (sureties, if more 9 than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether 10 one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation 11 created pursuant to the laws of Texas, known as "City" herein, in the penal sum of, Four Million 12 Five Hundred Four Thousand Four Hundred and 00/100 Dollars ($4,504,400.00), lawful money of 13 the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum 14 well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and 15 assigns, jointly and severally, firmly by these presents. 16 WHEREAS, the Principal has entered into a certain written contract with the City awarded 17 the 121h day of May, 2026, which Contract is hereby referred to and made a part hereof for all 18 purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories 19 defined by law, in the prosecution of the Work, including any Change Orders, as provided for in 20 said Contract designated as N. Tarrant Parkway and N. Beach Street Intersection Improvements, 21 City Project Number 103309. 22 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 23 shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully 24 perform the Work, including Change Orders, under the Contract, according to the plans, 25 specifications, and contract documents therein referred to, and as well during any period of 26 extension of the Contract that may be granted on the part of the City, then this obligation shall be 27 and become null and void, otherwise to remain in full force and effect. 28 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 29 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 30 Worth Division. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN103309 Revised December 8, 2023 0061 13 - 2 PERFORMANCE BOND Page 2 of 2 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this 5 instrument by duly authorized agents and officers on this the 28 day of MaY , 2026. sD O i ge 6 PRINCIPAL: ���� •, 7 .c . 8 Rebcon LLC SEAL ; 9 _- 11 B 12 Sign 13 ATTEST: 14 15 Danny Krieg, President 16 (Pr al) Secretary Name and Title 17 18 Address: 400 109' Street 19 Arlington, Texas 76011 20 21 'me 22 Witness as to Principal 23 SURETY: 24 Colonial American Casualty and Surety 25 Company, 26 Fidelity and Deposit Company of M!Tylajjd 27 28 BY: Ilk J, 29 Signat re 30 31 Andrea Rose Crawford, Attorney -in -Fact 32 Name and Title 33 34 Address: 1299 Zurich Way, 5' Floor 35 Schaumburg, Illinois, 60196 36 37 Witn ss as t Surety Telephone Number: 800-382-2150 38 39 Email Address: acrawford@acrisure.com 40 41 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 42 from the by-laws showing that this person has authority to sign such obligation. If 43 Surety's physical address is different from its mailing address, both must be provided. 44 The date of the bond shall not be prior to the date the Contract is awarded. I CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 8, 2023 Bond No. 9453940 0061 14 - 1 PAYMENT BOND Pagel of 3 1 SECTION 00 6114 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Rebcon, LLC, known as "Principal" herein, and Colonial American 8 Casualty and Surety Company, Fidelity and Deposit Company of Maryland, a corporate 9 surety (sureties), duly authorized to do business in the State of Texas, known as "Surety" 10 herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a 11 municipal corporation created pursuant to the laws of the State of Texas, known as "City" 12 herein, in the penal sum of Four Million Five Hundred Four Thousand Four Hundred and 13 00/100 Dollars ($4,504,400.00), lawful money of the United States, to be paid in Fort 14 Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we 15 bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and 16 severally, firmly by these presents: 17 WHEREAS, Principal has entered into a certain written Contract with City, 18 awarded the 12th day of May, 2026, which Contract is hereby referred to and made a part 19 hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor 20 and other accessories as defined by law, in the prosecution of the Work as provided for in 21 said Contract and designated as N. Tarrant Parkway and N. Beach Street Intersection 22 Improvements, City Project Number 103309. 23 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 24 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined 25 in Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the 26 Work under the Contract, then this obligation shall be and become null and void; otherwise 27 to remain in full force and effect. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 8, 2023 0061 14 - 2 PAYMENT BOND Page 2 of 3 1 This bond is made and executed in compliance with the provisions of Chapter 2253 2 of the Texas Government Code, as amended, and all liabilities on this bond shall be 3 determined in accordance with the provisions of said statute. 4 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 8, 2023 0061 14 - 3 PAYMENT BOND Page 3 of 3 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 28 3 day of May , 2026. 5 6 7 9 10 11 ATTEST: 12 13 14 (Princ' ) Secretary 15 16 17 18 19 �1921l Gig n� S 20 Witness as to Principal 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Witn ss as t4 Surety 36 37 PRINCIPAL: Danny Krieg, President Name and Title Address: 400 109t1 Street _ Arlington, Texas 76011 SURETY: Colonial American Casualty and Surety Company, Fidelity and Deposit Company of Maryland ��.�.�.�1rL1.11ILTl�L► Andrea Rose Crawford, Attorney -in -Fact Name and Title Address: 1299 Zurich Way, 5`1 Floor Schaumburg, Illinois, 60196 Telephone Number: 800-382-2150 Email Address: acrawford@acrisure.com 38 39 Note: If signed by an officer of the Surety, there must be on file a certified extract from 40 the bylaws showing that this person has authority to sign such obligation. If Surety's 41 physical address is different from its mailing address, both must be provided. 42 The date of the bond shall not be prior to the date the Contract is awarded. 43 END OF SECTION CITY OF FORT WORTH North Tarrant Parkwav and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 8, 2023 Bond No. 9453940 0061 19 - 1 MAINTENANCE BOND Page 1 of 3 1 SECTION 00 6119 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Rebcon, LLC, known as "Principal" herein and Colonial American Casualty and 9 Surety Company, Fidelity and Deposit Company of Maryland, a corporate surety (sureties, if more 10 than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether 11 one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation 12 created pursuant to the laws of the State of Texas, known as "City" herein, in the sum of Four 13 Million Five Hundred Four Thousand Four Hundred and 00/100 Dollars ($4,504,400.00), lawful 14 money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which 15 sum well and truly be made unto the City and its successors, we bind ourselves, our heirs, executors, 16 administrators, successors and assigns, jointly and severally, firmly by these presents. 17 18 WHEREAS, the Principal has entered into a certain written contract with the City awarded 19 the 12t' day of May, 2026, which Contract is hereby referred to and a made part hereof for all 20 purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories 21 as defined by law, in the prosecution of the Work, including any Work resulting from a duly 22 authorized Change Order (collectively herein, the "Work") as provided for in said contract and 23 designated as N. Tarrant Parkway and N. Beach Street Intersection Improvements, City Project 24 Number 103309; and 25 26 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 27 accordance with the plans, specifications and Contract Documents that the Work is and will remain 28 free from defects in materials or workmanship for and during the period of two (2) years after the 29 date of Final Acceptance of the Work by the City ("Maintenance Period"); and 30 31 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon 32 receiving notice from the City of the need therefor at any time within the Maintenance Period. 33 NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy 34 any defective Work, for which timely notice was provided by City, to a completion satisfactory to 35 the City, then this obligation shall become null and void; otherwise to remain in full force and 36 effect. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 8, 2023 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 006119-2 MAINTENANCE BOND Page 2 of 3 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTH North. Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CAN 103309 Revised December 8, 2023 3 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 006119-3 MAINTENANCE BOND Page 3 of 3 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 28 day of May 2026. ,••��CON PRINCIPAL: ,••� \:��o Lige�����',', Rebcon SEAL LLC - ' ��SrgcOMPPNy 'PSG;' B OF Signature ATTEST: Danny Krieg, President (P n # al) Secre Name and Title Address: 400 109t1i Street _ Arlington, Texas 76011 Witness as to Principal Wi ess as to Surety SURETY: Colonial American Casualty and Surety Company, Fidelity and Deposit Companv of Marvland Andrea Rose Crawford, Attorney -in -Fact Name and Title Address: 1299 Zurich Way, 5` Floor Schaumburg, Illinois, 60196 Telephone Number: 800-382-2150 Email Address: acrawford@acrisure.com 40 *Note: If signed by an officer of the Surety Company, there must be on file a certified 41 extract from the by-laws showing that this person has authority to sign such 42 obligation. If Surety's physical address is different from its mailing address, both 43 must be provided. The date of the bond shall not be prior to the date the Contract 44 is awarded. 45 CITY OF FORT WORTH North Tarrant Parkwav and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 8, 2023 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint to o John R.WARD, Monica Ruby VEAZEY, John William NEWBY, Thomas Douglas MOORE ,Sandra Lee RONEY, Debra Lee MOON, Andrea Rose CRAWFORD, Troy Russell KEY, Emily Allison MIKESKA, Allyson W .DEAN, Colin E. CONLY, Andrew Gareth ADDISON, Patrick Thomas COYLE, Michael Donald HENDERICKSON, Bryan Kelly MOORE, Elizabeth ORTIZ Ana OWENS, Betty J. REEH, Andrew CLARK, Faith Ann HILTY of Addison, Texas, its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. f The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 31st day of January, A.D. 2024. ,";a,uungrrrn rrranrur x CaSUB(fyyy9 4jr .,a,r r, , ,riirrr rN cT°.+ POgga+fiG, �GMy.N...... 7•Up!`UPPO�rtV ,a{pPPOg9'`•o1. m SEALo{vuEALm = r!'SEAL i= fa c C= "`+rmr„ rw"+` `'m"uiw",ma"` urnnima ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND By: Robert D. Murray Vice President By: Dawn E. Brown Secretary State of Maryland County of Baltimore On this 31st day of January, A.D. 2024, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D. Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. Genevieve M. Maison Authenticity of this bond can be confirmed at bondvalidator.zurichna.com or 410-559-8790 GENEVIEVE M. MAISON ' PuBLtG Lc NOTARY PUBUC BALTIMORE COUNTY, MD01/Y1'• �'' R�COIt" Commisslon IsM Expirse JANUARY 27, 2025 It" EXTRACT EXTRACT FROM BY-LAWS OF THE COMPANIES "Article V, Section 8, Attorneys -in -Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President may, by written instrument under the attested corporate seal, appoint attorneys -in -fact with authority to execute bonds, policies, recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such attomey-in-fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any time." CERTIFICATE I, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of the By -Laws of the Companies is still in force. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998. RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary and the Seal of the Company may be affixed by facsimile on any Power of Attorney... Any such Power or any certificate thereof bearing such facsimile signature and seal shall be valid and binding on the Company." This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 1 Oth day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies, this 28 day of May > 2026 . vouawltyfq�e4�,,, `'opttp..a,PtrNuQSufU "rq� : ``C�7t�JfttQs\.tPON Qa++�➢•PFOOi Os f SEAL`"tg 5t SEAL" 0 - ;4 °SEAL`Rtc �JS It 'f�Je++rtrrrnHtt�1"" F��+yEW ��aK"40 ,,��•• Ir1lli"4 !' $ Thomas 0. McClellan Vice President TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT INFORMATION TO: Zurich Surety Claims Authenticity of this bond can be confirmed at bondvalidator.zurichna.com or 410-559-8790 Texas Important Notice IMPORTANT NOTICE To obtain information or make a complaint: You may call Zurich North America's toll -free telephone number for information or to make a complaint at: 1-800-382-2150 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights, or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Web: www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. ZURICH� AVISO IMPORTANTE Para obtener informacion o para presentar una queja: Usted puede Ilamar al numero de telefono gratuito de Zurich North America's para obtener informacion o para presentar una queja al: 1-800-382-2150 Usted puede comunicarse con el Departamento de Se- guros de Texas para obtener informacion sobre com- panias, coberturas, derechos, o quejas al: 1-800-252-3439 Usted puede escribir al Departamento de Seguros de Texas a: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Sitio web: www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov DISPUTAS POR PRIMAS DE SEGUROS O RECLAMACIONES: Si tiene una disputa relacionada con su prima de seguro o con una reclamacion, usted debe comunicarse con la compania primero. Si la disputa no es resuelta, usted puede comunicarse con el Departamento de Seguros de Texas. ADJUNTE ESTE AVISO A SU POLIZA: Este aviso es solamente para propositos informativos y no se con- vierte en parte o en condicion del documento adjunto. U-GU-296-E (06/15) Page 1 of 1 SECTION 00 43 13 BID BOND KNOW ALL BY THESE PRESENTS: 00 43 13 BID BOND Page 1 of 2 That we, Rebcon, LLC , known as "Bidder" herein and Colonial American Casualty and Surety Company, Fidelity and Deposit Company of Maryland a corporate surety duly authorized to do business in the State of Texas, known as "Surety" herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal sum of five percent (5%) of Bidder's maximum bid price, in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid or proposal to perform Work for the following project designated as CPN 103309 - North Tarrant Parkway and North Beach Street Intersection Improvements NOW, THEREFORE, the condition of this obligation is such that if the City shall award the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with the City in accordance with the terms of such same, then this obligation shall be and become null and void. If, however, the Principal fails to execute such Contract in accordance with the terms of same or fails to satisfy all requirements and conditions required for the execution of the Contract, this bond shall become the property of the City, without recourse of the Principal and/or Surety, not to exceed the penalty hereof, and shall be used to compensate City for the difference between Principal's total bid amount and the next selected bidder's total bid amount. PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 5th day of February , 2026. ATTEST: Witness as to Principal CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9130/2021 PRINCIPAL: Rebcon. LLC BY: Signatures i �annu Kriea �' Pfes�cien% Nameldnd Title North Tarrant Parkway and North Beach Street Intersection Improvements CPN 103309 Witness as to Surete Attach Power of Attorney (Surety) for Attorney -in -Fact 004313 BID BOND Page 2 of 2 Address: 400 109th Street Arlington, TX 76011 SURETY: Colonial American Casualty and Surety Comte _ Fidelity anoXeposit Company of Maryland BY:(-'2VJQ)94 —Signature Andrea Rose Crawford, Attorney -in -Fact Name and Title Address: 1299 Zurich Way, 5th Floor Schaumburg, IL 60196 Telephone Number: 800-382-2150 'Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised 9/30/2021 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint to o John R.WARD, Monica Ruby VEAZEY, John William NEWBY, Thomas Douglas MOORE ,Sandra Lee RONEY, Debra Lee MOON, Andrea Rose CRAWFORD, Troy Russell KEY, Emily Allison MIKESKA, Allyson W .DEAN, Colin E. CONLY, Andrew Gareth ADDISON, Patrick Thomas COYLE, Michael Donald HENDERICKSON, Bryan Kelly MOORE, Elizabeth ORTIZ Ana OWENS, Betty J. REEH, Andrew CLARK, Faith Ann HILTY of Addison, Texas, its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bands and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 31 st day of January, A.D. 2024. \`pplanrrrn,, 1�'SEAt m � 1 SEAL gib -ik SEALfi �todt.., ✓'"�a�� `7r, r f°`-` wig? �� c MU006`";,rlle„1,11. ` ATTEST• ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND By: Robert D. Murray r Vice President By: Dawn E. Brown Secretary State of Maryland County of Baltimore On this 31 st day of January, A.D. 2024, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D. Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. Genevieve M. Maison Authenticity of this bond can be confirmed at bondvalidator.zurichna.com or 410-559-8790 GENEVIEVE M. MAISON NOTARY PUSUC 6Ai.TTMdK2ECWNTY,MD , �'••.,., �w �i;�• ''.; NECOU` K4CommiWonExpkosJANUARY27,2025 EXTRACT FROM BY-LAWS OF THE COMPANIES "Article V, Section 8, Attorneys -in -Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President may, by written instrument under the attested corporate seal, appoint attomeys-in-fact with authority to execute bonds, policies, recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such attorney -in -fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any time." CERTIFICATE I, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of the By -Laws of the Companies is still in force. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998. RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary and the Seal of the Company may be affixed by facsimile on any Power of Attorney ... Any such Power or any certificate thereof bearing such facsimile signature and seal shall be valid and binding on the Company." This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the I0th day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies, this 5 day of February , 2026 . vvfNvµnl It,,, `Uut IIi1114J� "10 ULLI/#',, �'A'508Ity, 1" wv Pp11N3Uq ��i� �0% ,L Ca 1", �Zro�pOp`yr� ns� OZS�Ck+'o t USEALo _ _ ygUSEALm 1�'SEAL`"� ° �•'ti3. ''�� .,,797j..: vlvv511011� 'gy�iOPv`P,`w '''���i�14ntHOdXa• ydE $ �yv' c 1 �rir* • 9 Thomas O. McClellan Vice President TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT INFORMATION TO: Zurich Surety Claims Authenticity of this bond can be confirmed at bondvalidator.zurichna.com or 410-559-8790 Texas Important Notice IMPORTANT NOTICE To obtain information or make a complaint: You may call Zurich North America's toll -free telephone number for information or to make a complaint at: 1-800-382-2150 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights, or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Web: www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. ZURICH AVISO IMPORTANTE Para obtener informacion o para presentar una queja: Usted puede Ilamar al numero de telefono gratuito de Zurich North America's para obtener informaci6n o para presentar una queja al: 1-800-382-2150 Usted puede comunicarse con el Departamento de Se- guros de Texas para obtener informacion sobre com- panias, coberturas, derechos, o quejas al: 1-800-252-3439 Usted puede escribir al Departamento de Seguros de Texas a: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Sitio web: www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov DISPUTAS POR PRIMAS DE SEGUROS O RECLAMACIONES: Si tiene una disputa relacionada con su prima de seguro o con una reclamaci6n, usted debe comunicarse con la compania primero. Si la disputa no es resuelta, usted puede comunicarse con el Departamento de Seguros de Texas. ADJUNTE ESTE AVISO A SU POLIZA: Este aviso es solamente para prop6sitos informativos y no se con- vierte en parte o en condici6n del documento adjunto. U-GU-296-E (06/15) Page 1 of 1 Rebcon, LLC GL21112200705 2-18-2026 - 2.18.2027 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION, NONRENEWAL OR MATERIAL CHANGE -THIRD PARTY This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM BUSINESSAUTO PHYSICAL DAMAGE COVERAGE FORM COMMERCIAL GENERAL LIABILITY COVERAGE FORM COMMERCIAL UMBRELLA LIABILITY COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIER COVERAGE FORM PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE FORM TRUCKERS COVERAGE FORM Subject to the cancellation provisions of the Coverage Form to which this endorsement is attached, we will not: 1. Cancel; 2. Nonrenew; or, 3. Materially change (reduce or restrict) this Coverage Form, except for nonpayment of premium, until we provide at least 3 o days written notice of such cancellation, nonrenewal or material change. Written notice will be to the person or organization named in the Schedule. Such notice will be by certified mail with return receipt requested. This notification of cancellation, nonrenewal or material change to the person or organization named in the Schedule is intended as a courtesy only. Our failure to provide such notification will not: 1. Extend any Coverage Form cancellation date; 2. Negate the cancellation as to any insured or any certificate holder; 3. Provide any additional insurance that would not have been provided in the absence of this endorsement; or 4. Impose liability of any kind upon us. This endorsement does not entitle the person or organization named in the Schedule to any benefits, rights or protection under this Coverage Form. SCHEDULE Name Of Person Or Organization Mailing Address Any person or organization holding a certificate of insurance issued The address shown for that person or organization in for you, provided the certificate: that certificate of insurance 1. Refers to this policy; 2. States that notice of: a. Cancellation; b. Nonrenewal; or c. Material change reducing or restricting coverage; will be provided to that person or organization; 3. Is in effect at the time of the: a. Cancellation; b. Nonrenewal; or c. Material change reducing or restricting coverage; and 4. Is on file at your agent or broker's office for this policy IL70660714 Forms and Endorsements Schedule Policy Number: GL21112200705 Effective Date: 02/18/2026 Named Insured: Rebcon, LLC Form Number Description A 40 10 02 10 TEXAS IMPORTANT NOTICE AN 12 90 04 17 NOTICE TO POLICYHOLDERS 2017 REVISION CONTRACTOR'S GENERAL LIABILITY EXTENSION IL 00 17 11 98 COMMON POLICY CONDITIONS IL 00 21 09 08 NUCLEAR ENERGY LIABILITY EXCLUSION IL 01 68 03 12 TEXAS CHANGES - DUTIES IL 02 75 11 13 TEXAS CHANGES - CANCELLATION AND NONRENEWAL PROVISION FOR CASUALTY LINES AND CPP IL 70 66 07 14 NOTICE OF CANCELLATION, NONRENEWAL OR MATERIAL CHANGE - THIRD PARTY IL 70 66 07 14-BLK(BLANKET)NOTICE OF CANCELLATION, NONRENEWAL OR MATERIAL CHANGE - THIRD PARTY M 10 85 01 15 AMIC SIGNATURE PAGE CG 00 01 04 13 COMMERCIAL GENERAL LIABILITY COVERAGE FORM CG 01 03 06 06 TEXAS CHANGES CG 03 00 01 96 DEDUCTIBLE LIABILITY INSURANCE CG 20 10 07 04 ADD'L INSURED - OWNERS, LESSEES OR CONTRACTORS/SCHEDULED PERSON OR ORGANIZATION CG 20 37 07 04 ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS CG 21 06 05 14 EXCL-ACCESS OR DISCL OF CONFIDENTIAL OR PERSONAL INFO -DATA -RELATED LIAB-W/L-BI CG 21 47 12 07 EMPLOYMENT -RELATED PRACTICES EXCLUSION CG 21 60 09 98 EXCLUSION - YEAR 2000 COMPUTER -RELATED AND OTHER ELECTRONIC PROBLEMS CG 21 67 12 04 FUNGI OR BACTERIA EXCLUSION CG 21 73 01 15 EXCLUSION OF CERTIFIED ACTS OF TERRORISM CG 22 34 04 13 EXCLUSION - CONSTRUCTION MANAGEMENT ERRORS AND OMISSIONS CG 22 79 04 13 EXCLUSION - CONTRACTORS - PROFESSIONAL LIABILITY CG 26 39 12 07 TEXAS CHANGES - EMPLOYMENT -RELATED PRACTICES EXCLUSION CG 70 42 04 03 ASBESTOS EXCLUSION ENDORSEMENT CG 70 45 11 09 TEXAS REPAIR AND REWORK COV: EXP INDEM FOR REPAIR OF YOUR PRODUCT OR YOUR WORK CG 70 63 04 17 TEXAS CONTRACTORS GENERAL LIABILITY EXTENSION ENDT CG 70 85 10 15 TEXAS CONTRACTOR'S BLANKET ADDITIONAL INSURED ENDORSEMENT - FORM A CG 71 52 08 13 EXCLUSION -CONTROLLED INSURANCE PROGRAM WITH RESIDUAL COVERAGE EXCEPTION CG 71 55 02 14 ELECTRONIC DATA LIABILITY CG 71 66 08 11 TOTAL POLLUTION EXCLUSION WITH EXCEPTIONS FOR BUILDING HEAT, COOLING AND DEHUMD IL DS 71 01 09 06 Page 1 of 1 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS CONTRACTOR'S BLANKET ADDITIONAL INSURED ENDORSEMENT - FORM A This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART Policy Number GL21112200705 Agency Number 0775315 Policy Effective Date 2/18/2026 Policy Expiration Date Date Account Number 2/18/2027 2/12/26 20003470 Named Insured Agency Issuing Company Rebcon, LLC MULLIS NEWBY HURST AMERISURE MUTUAL INSURANCE COMPANY 1. a. SECTION If -WHO IS AN INSURED is amended to add as an additional insured any person or organization whom you are required to add as an additional insured on this policy under a written contract or written agreement relating to your business. b. The written contractor written agreement must: (1) Require additional insured status for a time period during the term of this policy; and (2) Be executed prior to the "bodily injury", "property damage", or "personal and advertising injury" leading to a claim under this policy. c. If, however: (1) "Your work" began under a letter of intent or work order; and (2) The letter of intent or work order led to a written contract or written agreement within 30 days of beginning such work; and (3) Your customer's customary contracts require persons or organizations to be named as additional insureds; we will provide additional insured status as specified in this endorsement. 2. The insurance provided under this endorsement is limited as follows: a. That person or organization is an additional insured only with respect to liability caused, in whole or in part, by: (1) Premises you: (a) Own; (b) Rent; (c) Lease; or (d) Occupy; (2) Ongoing operations performed by you or on your behalf. Ongoing operations does not apply to "bodily injury" or "property damage" occurring after: (a) All work to be performed by you or on your behalf for the additional insured(s) at the site of the covered operations is complete, including related materials, parts or equipment (other than service, maintenance or repairs); or (b) That portion of "your work" out of which the injury or damage arises is put to its intended use by any person or organization other than another contractor working for a principal as a part of the same project. Includes copyrighted material of Insurance Services Office, Inc. CG 70 851015 Pages 1 of 3 (3) Completed operations coverage, but only if: (a) The written contract or written agreement requires completed operations coverage or "your work" coverage; and (b) This coverage part provides coverage for "bodily injury" or "property damage" included within the "products -completed operations hazard". However, the insurance afforded to such additional insured only applies to the extent permitted by law. b. If the written contract or written agreement: (1) Requires "arising out of language; or (2) Requires you to provide additional insured coverage to that person or organization by the use of either or both of the following: (a) Additional Insured —Owners, Lessees or Contractors— Scheduled Person Or Organization endorsement CG 20 10 10 01; or (b) Additional Insured —Owners, Lessees or Contractors— Completed Operations endorsement CG 20 37 10 01; then the phrase "caused, in whole or in part, by" in paragraph 2.a. above is replaced by "arising out of'. c. If the written contract or written agreement requires you to provide additional insured coverage to that person or organization by the use of: (1) Additional Insured —Owners, Lessees or Contractors — Scheduled Person Or Organization endorsement CG 20 10 07 04 or CG 20 10 04 13; or (2) Additional Insured — Owners, Lessees or Contractors — Completed Operations endorsement CG 20 37 07 04 or CG 20 37 04 13; or (3) Both those endorsements with either of those edition dates; or (4) Either or both of the following: (a) Additional Insured —Owners, Lessees or Contractors — Scheduled Person Or Organization endorsement CG 20 10 without an edition date specified; or (b) Additional Insured —Owners, Lessees or Contractors— Completed Operations endorsement CG 20 37 without an edition date specified; then paragraph 2.a. above applies. d. Premises, as respects paragraph 2.a.(1) above, include common or public areas about such premises if so required in the written contractor written agreement. e. Additional insured status provided under paragraphs 2.a.(1)(b) or 2.a.(1)(c) above does not extend beyond the end of a premises lease or rental agreement. f. The limits of insurance that apply to the additional insured are the least of those specified in the: (1) Written contract; (2) Written agreement; or (3) Declarations of this policy. The limits of insurance are inclusive of and not in addition to the limits of insurance shown in the Declarations. g. The insurance provided to the additional insured does not apply to "bodily injury", "property damage", or "personal and advertising injury" arising out of an architect's, engineer's, or surveyor's rendering of, or failure to render, any professional services, including but not limited to: (1) The preparing, approving, or failing to prepare or approve: (a) Maps; (b) Drawings; (c) Opinions; Includes copyrighted material of Insurance Services Office, Inc. Page 2 of 3 CG 70 85 10 15 (d) Reports; (e) Surveys; (f) Change orders; (g) Design specifications; and (2) Supervisory, inspection, or engineering services. h. SECTION IV— COMMERCIAL GENERAL LIABILITY CONDITIONS, paragraph 4.Other Insurance is deleted and replaced with the following: 4. Other Insurance. Coverage provided by this endorsement is excess over any other valid and collectible insurance available to the additional insured whether: a. Primary,- b. Excess; c. Contingent; or d. On any other basis; but if the written contract or written agreement requires primary and non-contributory coverage, this insurance will be primary and non-contributory relative to other insurance available to the additional insured which covers that person or organization as a Named Insured, and we will not share with that other insurance. i. If the written contract or written agreement as outlined above requires additional insured status by use of CG 20 10 11 85, then the coverage provided under this CG 70 85 endorsement does not apply except for paragraph 2.h. Other Insurance. Additional insured status is limited to that provided by CG 20 10 11 85 shown below and paragraph 2.h. Other Insurance shown above. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS (FORM B) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART. SCHEDULE Name of Person or Organization: Blanket where required by written contract or written agreement that the terms of CG 20 10 11 85 apply. (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.) WHO IS AN INSURED (Section II) is amended to include as an insured the person or organization shown in the Schedule, but only with respect to liability arising out of "your work" for that insured by or for you. CG 20 10 1185 Copyright, Insurance Services Office, Inc., 1984 The insurance provided by this endorsement does not apply to any premises or work for which the person or organization is specifically listed as an additional insured on another endorsement attached to this policy. Includes copyrighted material of Insurance Services Office, Inc. CG 70 85 10 15 Pages 3 of 3 Rebcon, LLC GL21112200705 2/18/2026 - 2/18/2027 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS CONTRACTOR'S GENERAL LIABILITY EXTENSION ENDORSEMENT TABLE OF CONTENTS Page 1. Additional Definitions 9 2. Aggregate Limits Per Location 7 3. Aggregate Limits Per Project 6 4. Blanket Contractual Liability — Railroads 3 5. Broadened Bodily Injury Coverage 10 6. Broadened Knowledge Of Occurrence 8 7. Broadened Legal Liability Coverage For Landlord's Business Personal Property 7 8. Broadened Liability Coverage For Damage To Your Product And Your Work 10 9. Broadened Who Is An Insured 3 10. Co -Employee Bodily Injury Coverage for Managers, Supervisors, Directors or Officers [see provision 9, Broadened Who Is An Insured, paragraph 2.a.(1)] 4 11. Contractual Liability — Personal And Advertising Injury 3 12. Damage To Premises Rented To You — Specific Perils and Increased Limit 7 13. Designated Completed Projects —Amended Limits of Insurance 11 14. Extended Notice Of Cancellation And Nonrenewal 8 15. Incidental Malpractice Liability 6 16. Increased Medical Payments Limit 7 17. Mobile Equipment Redefined 9 18. Nonowned Watercraft 3 19. Product Recall Expense 2 20. Property Damage Liability — Alienated Premises 2 21. Property Damage Liability — Elevators And Sidetrack Agreements 2 22. Property Damage Liability — Property Loaned To The Insured Or Personal Property In The Care, Custody And Control Of The Insured 2 23. Reasonable Force — Bodily Injury or Property Damage 10 24. Supplementary Payments 3 25. Transfer Of Rights Blanket Waiver Of Subrogation) 8 26. Unintentional Failure To Disclose Hazards 8 Includes copyrighted material of Insurance Services Office, Inc. CG 70 63 0417 Page 1 of 11 This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM Under SECTION I — COVERAGE A. BODILY INJURY AND PROPERTY DAMAGE LIABILITY, paragraph 2. EXCLUSIONS, provisions 1. through 6. of this endorsement are excess over any valid and collectible insurance (including any deductible) available to the insured, whether primary, excess or contingent (SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS, paragraph 4. Other Insurance is changed accordingly). Provisions 1. through 6. of this endorsement amend the policy as follows: PROPERTY DAMAGE LIABILITY —ALIENATED PREMISES A. Exclusion j. Damage to Property, subparagraph (2) is deleted. B. The following paragraph is deleted from Exclusion j. Damage to Property; Paragraph (2) of this exclusion does not apply if the premises are "your work" and were never occupied, rented or held for rental by you. 2. PROPERTY DAMAGE LIABILITY— ELEVATORS AND SIDETRACK AGREEMENTS A. Exclusion j. Damage to Property, paragraphs (3), (4), and (6) do not apply to the use of elevators. B. Exclusion k. Damage to Your Product does not apply to: The use of elevators; or 2. Liability assumed under a sidetrack agreement. 3. PROPERTY DAMAGE LIABILITY— PROPERTY LOANED TO THE INSURED OR PERSONAL PROPERTY IN THE CARE, CUSTODY AND CONTROL OF THE INSURED A. Exclusion j. Damage to Property, paragraphs (3) and (4) are deleted.. B. Coverage under this provision 3. does not apply to "property damage" that exceeds $25,000 per occurrence or $25,000 annual aggregate. 4. PRODUCT RECALL EXPENSE A. Exclusion n. Recall of Products, Work or Impaired Property does not apply to "product recall expenses" that you incur for the "covered recall' of "your product'. This exception to the exclusion does not apply to "product recall expenses" resulting from: 1. Failure of any products to accomplish their intended purpose; 2. Breach of warranties of fitness, quality, durability or performance; 3. Loss of customer approval or any cost incurred to regain customer approval; 4. Redistribution or replacement of "your product', which has been recalled, by like products or substitutes; 5. Caprice or whim of the insured; 6. A condition likely to cause loss, about which any insured knew or had reason to know at the inception of this insurance; 7. Asbestos, including loss, damage or clean up resulting from asbestos or asbestos containing materials; 8. Recall of "your product(s)" that have no known or suspected defect solely because a known or suspected defect in another of "your product(s)" has been found. B. Under SECTION III — LIMITS OF INSURANCE, paragraph 3. is replaced in its entirety as follows and paragraph 8. is added: 3. The Products -Completed Operations Aggregate Limit is the most we will pay for the sum of: Includes copyrighted material of Insurance Services Office, Inc. Page 2 of 11 CG 70 63 0417 a. Damages under COVERAGE A BODILY INJURY AND PROPERTY DAMAGE LIABILITY because of "bodily injury" and "property damage" included in the "products -completed operations hazard" and b. "Product recall expenses". 8. Subject to paragraph 5. above [of the CGL Coverage Form], $25,000 is the most we will pay for all "product recall expenses" arising out of the same defect or deficiency. 5. NONOWNED WATERCRAFT Exclusion g. Aircraft, Auto or Watercraft, paragraph (2) is deleted and replaced with the following: [This exclusion does not apply to:] (2) A watercraft you do not own that is: (a) Less than 75 feet long; and (b) Not being used to carry any person or property for a charge; 6. BLANKET CONTRACTUAL LIABILITY— RAILROADS Under SECTION V — DEFINITIONS, paragraph c. of "Insured Contract' is deleted and replaced by the following: c. Any easement or license agreement; Under SECTION V — DEFINITIONS, paragraph f.(1) of "Insured Contract' is deleted. 7. CONTRACTUAL LIABILITY— PERSONAL AND ADVERTISING INJURY Under SECTION I — COVERAGE B., paragraph 2. Exclusions, paragraph e. Contractual Liability is deleted. 8. SUPPLEMENTARY PAYMENTS Under SECTION I — SUPPLEMENTARY PAYMENTS — COVERAGES A AND B, paragraph 1.b. is deleted and replaced with the following: 1. b. Up to $5,000 for cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which the Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. 9. BROADENED WHO IS AN INSURED SECTION II — WHO IS AN INSURED is deleted and replaced with the following: 1. If you are designated in the Declarations as: a. An individual, you and your spouse are insureds, but only with respect to the conduct of a business of which you are the sole owner. b. A partnership or joint venture, you are an insured. Your members, your partners, and their spouses are also insureds, but only with respect to the conduct of your business. c. A limited liability company, you are an insured. Your members are also insureds, but only with respect to the conduct of your business. Your managers are insureds, but only with respect to their duties as your managers. d. An organization other than a partnership, joint venture or limited liability company, you are an insured. Your "executive officers" and directors are insureds, but only with respect to their duties as your officers or directors. Your stockholders are also insureds, but only with respect to their liability as stockholders. Includes copyrighted material of Insurance Services Office, Inc. CG 70 63 0417 Page 3 of 11 2. Each of the following is also an insured: a. Your "volunteer workers" only while performing duties related to the conduct of your business, or your "employees," other than either your "executive officers," (if you are an organization other than a partnership, joint venture or limited liability company) or your managers (if you are a limited liability company), but only for acts within the scope of their employment by you or while performing duties related to the conduct of your business. However, none of these "employees" or "volunteer workers" are insured for: (1) "Bodily injury" or "personal and advertising injury": (a) To you, to your partners or members (if you are a partnership or joint venture), to your members (if you are a limited liability company), to a co -"employee" while in the course of his or her employment or performing duties related to the conduct of your business, or to your other "volunteer workers" while performing duties related to the conduct of your business; (b) To the spouse, child, parent, brother or sister of that co -"employee" or volunteer worker as a consequence of paragraph (1)(a) above; (c) For which there is any obligation to share damages with or repay someone else who must pay damages because of the injury described in paragraphs (1)(a) or (b) above; or (d) Arising out of his or her providing or failing to provide professional health care services except as provided in Provision 10. of this endorsement. Paragraphs (1)(a), (1)(b) and (1)(c) above do not apply to your "employees" who are: (i) Managers; (ii) Supervisors; (iii) Directors; or (iv) Officers; with respect to "bodily injury" to a co -"employee". (2) 'Property damage" to property: (a) Owned, occupied or used by; (b) Rented to, in the care, custody or control of, or over which physical control is being exercised for any purpose by you, any of your "employees," "volunteer workers", any partner or member (if you are a partnership or joint venture), or any member (if you are a limited liability company). b. Any person (other than your "employee" or "volunteer worker"), or any organization while acting as your real estate manager. c. Any person or organization having proper temporary custody of your property if you die, but only; (1) With respect to liability arising out of the maintenance or use of that property; and (2) Until your legal representative has been appointed. d. Your legal representative if you die, but only with respect to duties as such. That representative will have all your rights and duties under this Coverage Form. e. Your subsidiaries if: (1) They are legally incorporated entities; and (2) You own more than 50% of the voting stock in such subsidiaries as of the effective date of this policy. If such subsidiaries are not shown in the Declarations, you must report them to us within 180 days of the inception of your original policy. Includes copyrighted material of Insurance Services Office, Inc. Page 4 of 11 CG 70 63 0417 f. Any person or organization, including any manager, owner, lessor, mortgagee, assignee or receiver of premises, to whom you are obligated under a written contract to provide insurance such as is afforded by this policy, but only with respect to liability arising out of the ownership, maintenance or use of that part of any premises or land leased to you, including common or public areas about such premises or land if so required in the contract. However, no such person or organization is an insured with respect to: (1) Any 'occurrence" that takes place after you cease to occupy or lease that premises or land; or (2) Structural alterations, new construction or demolition operations performed by or on behalf of such person or organization. g. Any state or political subdivision but only as respects legal liability incurred by the state or political subdivision solely because it has issued a permit with respect to operations performed by you or on your behalf. However, no state or political subdivision is an insured with respect to: (1) "Bodily injury", "property damage", "personal and advertising injury" arising out of operations performed for the state or municipality; or (2) 'Bodily injury" or "property damage" included within the "products -completed operations hazard." Any person or organization who is the lessor of equipment leased to you, to whom you are obligated under a written contract to provide insurance such as is afforded by this policy, but only with respect to their liability arising out of the maintenance, operation or use of such equipment by you or a subcontractor on your behalf with your permission and under your supervision. However, if you have entered into a construction contract subject to Subchapter C of Chapter 151 of Subtitle C of Title 2 of the Texas Insurance Code with the additional insured, the insurance afforded to such person(s) or organization(s) only applies to the extent permitted by Subchapter C of Chapter 151 of Subtitle C of Title 2 of the Texas Insurance Code. No such person or organization, however, is an insured with respect to any 'occurrence" that takes place after the equipment lease expires. L Any architect, engineer, or surveyor engaged by you under a written contract but only with respect to liability arising out of your premises or "your work." However, if you have entered into a construction contract subject to Subchapter C of Chapter 151 of Subtitle C of Title 2 of the Texas Insurance Code with the additional insured, the insurance afforded to such person only applies to the extent permitted by Subchapter C of the Chapter 151 of Subtitle C of Title 2 of the Texas Insurance Code. No architect, engineer, or surveyor, however, is an insured with respect to "bodily injury," "property damage," or "personal and advertising injury" arising out of the rendering of or the failure to render any professional services by or for you, including: (1) The preparing, approving, or failing to prepare or approve maps, drawings, opinions, reports, surveys, change orders, designs or specifications; or (2) Supervisory, inspection, or engineering services. This paragraph L does not apply if a separate Additional Insured endorsement providing liability coverage for architects, engineers, or surveyors engaged by you is attached to the policy. If the written contract or written agreement requires primary and non-contributory coverage, the insurance provided by paragraphs f. through L above will be primary and non-contributory relative to other insurance available to the additional insured which covers that person or organization as a Named Insured, and we will not share with that other insurance. 3. Any organization you newly acquire or form, other than a partnership, joint venture or limited liability company and over which you maintain ownership or majority interest, will qualify as a Named Insured if there is no other similar insurance available to that organization. However: a. Coverage under this provision is afforded only until the end of the policy period; b. Coverage A does not apply to "bodily injury" or "property damage" that occurred before you acquired or formed the organization; Includes copyrighted material of Insurance Services Office, Inc. CG 70 63 0417 Page 5 of 11 c. Coverage B does not apply to "personal and advertising injury" arising out of an offense committed before you acquired or formed the organization. d. Coverage A does not apply to "product recall expense" arising out of any withdrawal or recall that occurred before you acquired or formed the organization. 4. Any person or organization (referred to below as vendor) with whom you agreed under a written contract to provide insurance is an insured, but only with respect to "bodily injury" or "property damage" arising out of "your products" that are distributed or sold in the regular course of the vendor's business. However, no such person or organization is an insured with respect to: a. "Bodily injury" or "property damage" for which the vendor is obligated to pay damages by reason of the assumption of liability in a contract or agreement. This exclusion does not apply to liability for damages that the vendor would have in the absence of the contract or agreement. b. Any express warranty unauthorized by you; c. Any physical or chemical change in "your product" made intentionally by the vendor; d. Repackaging, except when unpacked solely for the purpose of inspection, demonstration, testing, or the substitution of parts under instructions from the manufacturer, and then repackaged in the original container; e. Any failure to make such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of "your products"; f. Demonstration, installation, servicing or repair operations, except such operations performed at the vendor's premises in connection with the sale of the "your product"; g. "Your products" which, after distribution or sale by you, have been labeled or relabeled or used as a container, part or ingredient of any other thing or substance by or for the vendor. h. "Bodily injury" or "property damage" arising out of the sole negligence of the vendor for its own acts or omissions or those of its employees or anyone else acting on its behalf. However, this exclusion does not apply to: (1) The exceptions contained in subparagraphs d. or f.; or (2) Such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products. This paragraph 4. does not apply to any insured person or organization from which you have acquired "your products", or any ingredient, part, or container, entering into, accompanying or containing "your products". This paragraph 4. also does not apply if a separate Additional Insured endorsement, providing liability coverage for "bodily injury" or "property damage" arising out of "your product" that is distributed or sold in the regular course of a vendor's business, is attached to the policy. No person or organization is an insured with respect to the conduct of any current or past partnership, joint venture or limited liability company that is not shown as a Named Insured in the Declarations. 10. INCIDENTAL MALPRACTICE LIABILITY As respects provision 9., SECTION II — WHO IS AN INSURED, paragraph 2.a.(1)(d) does not apply to any nurse, emergency medical technician or paramedic employed by you to provide medical or paramedical services, provided that you are not engaged in the business or occupation of providing such services, and your "employee" does not have any other insurance that would also cover claims arising under this provision, whether the other insurance is primary, excess, contingent or on any other basis. Under SECTION III — LIMITS OF INSURANCE, provisions 11. through 14. of this endorsement amend the policy as follows: 11. AGGREGATE LIMITS PER PROJECT The General Aggregate Limit applies separately to each of your construction projects away from premises owned by or rented to you. Includes copyrighted material of Insurance Services Office, Inc. Page 6 of 11 CG 70 63 0417 12. AGGREGATE LIMITS PER LOCATION The General Aggregate Limit applies separately to each of your locations, but only when required by written contract or written agreement. As respects this provision 12., your locations are premises you own, rent or use involving the same or connecting lots or premises whose connection is interrupted only by a street, roadway, waterway or right-of-way of a railroad. However, your locations do not include any premises where you, or others acting on your behalf, are performing construction operations. 13. INCREASED MEDICAL PAYMENTS LIMITS A. SECTION III — LIMITS OF INSURANCE, paragraph 7., the Medical Expense Limit, is subject to all the terms of SECTION III — LIMITS OF INSURANCE and is the greater of: $10,000; or 2. The amount shown in the Declarations for Medical Expense Limit. B. This provision 13. does not apply if COVERAGE C MEDICAL PAYMENTS is excluded either by the provisions of the Coverage Form or by endorsement. 14. DAMAGE TO PREMISES RENTED TO YOU — SPECIFIC PERILS AND INCREASED LIMIT A. The word fire is changed to "specific perils" where it appears in: 1. The last paragraph of SECTION I — COVERAGE A, paragraph 2. Exclusions; 2. SECTION IV, paragraph 4.b. Excess Insurance. B. The Limits of Insurance shown in the Declarations will apply to all damage proximately caused by the same event, whether such damage results from a "specific peril" or any combination of "specific perils." C. The Damage To Premises Rented To You Limit described in SECTION III -- LIMITS OF INSURANCE, paragraph 6., is replaced by a new limit, which is the greater of: 1. $1,000,000; or 2. The amount shown in the Declarations for Damage To Premises Rented To You Limit. D. This provision 14. does not apply if the Damage To Premises Rented To You Limit of SECTION I — COVERAGE A is excluded either by the provisions of the Coverage Form or by endorsement. E. "Specific Perils" means fire; lightning; explosion; windstorm or hail; smoke; aircraft or vehicles; riot or civil commotion; vandalism; leakage from fire extinguishing equipment; weight of snow, ice or sleet; or "water damage". "Water damage" means accidental discharge or leakage of water or steam as the direct result of the breaking or cracking of any part of a system or appliance containing water or steam. 15. BROADENED LEGAL LIABILITY COVERAGE FOR LANDLORD'S BUSINESS PERSONAL PROPERTY Under SECTION I — COVERAGE A BODILY INJURY AND PROPERTY DAMAGE LIABILITY, 2. Exclusions, j. Damage to Property, the first paragraph following paragraph (6) is deleted and replaced with the following: Paragraphs (1), (3) and (4) of this exclusion do not apply to "property damage" (other than damage by fire) to a landlord's business personal property that is subject to, or part of, a premises lease or rental agreement with that landlord. The most we will pay for damages under this provision 15. is $10,000. A $250 deductible applies. Under SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS, provisions 16. through 18. of this endorsement amend the policy as follows: Includes copyrighted material of Insurance Services Office, Inc. CG 70 63 0417 Page 7 of 11 16. BROADENED KNOWLEDGE OF OCCURRENCE Under 2. Duties In The Event Of Occurrence, Offense, Claim, Or Suit, paragraph a. is deleted and replaced and paragraphs e. and f. are added as follows: a. You must see to it that we are notified as soon as practicable of an 'occurrence" or an offense, regardless of the amount, which may result in a claim. Knowledge of an 'occurrence" or an offense by your "employee(s)" shall not, in itself, constitute knowledge to you unless one of your partners, members, "executive officers," directors, or managers has knowledge of the 'occurrence" or offense. To the extent possible, notice should include: (1) How, when and where the "occurrence" or offense took place; (2) The names and addresses of any injured persons and witnesses; and (3) The nature and location of any injury or damage arising out of the 'occurrence" or offense. e. If you report an 'occurrence" to your workers compensation carrier that develops into a liability claim for which coverage is provided by this Coverage Form, failure to report such an `occurrence" to us at the time of the "occurrence" shall not be deemed a violation of paragraphs a., b., and c. above. However, you shall give written notice of this 'occurrence" to us as soon you become aware that this "occurrence' may be a liability claim rather than a workers compensation claim. f. You must see to it that the following are done in the event of an actual or anticipated "covered recall' that may result in "product recall expense": (1) Give us prompt notice of any discovery or notification that "your product' must be withdrawn or recalled. Include a description of "your product' and the reason for the withdrawal or recall; (2) Cease any further release, shipment, consignment or any other method of distribution of like or similar products until it has been determined that all such products are free from defects that could be a cause of loss under the insurance. 17. UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS Paragraph 6. Representations is deleted and replaced with the following: 6. Representations By accepting this policy, you agree: a. The statements in the Declarations are accurate and complete; b. Those statements are based upon representations you made to us; and c. We have issued this policy in reliance upon your representations. We will not deny coverage under this Coverage Form if you unintentionally fail to disclose all hazards existing as of the inception date of this policy. You must report to us any knowledge of an error or omission in the description of any premises or operations intended to be covered by this Coverage Form as soon as practicable after its discovery. However, this provision does not affect our right to collect additional premium or exercise our right of cancellation or nonrenewal. 18. TRANSFER OF RIGHTS (BLANKET WAIVER OF SUBROGATION) Paragraph 8. Transfer of Rights Of Recovery Against Others To Us is deleted and replaced with the following: 8. If the insured has rights to recover all or part of any payment we have made under this Coverage Form, those rights are transferred to us. The insured must do nothing after loss to impair them. At our request, the insured will bring "suit' or transfer those rights to us and help us enforce them. However, if the insured has waived rights to recover through a written contract, or if "your work" was commenced under a letter of intent or work order, subject to a subsequent reduction to writing with customers whose customary contracts require a waiver, we waive any right of recovery we may have under this Coverage Form. 19. EXTENDED NOTICE OF CANCELLATION AND NONRENEWAL Includes copyrighted material of Insurance Services Office, Inc. Page 8 of 11 CG 70 63 0417 Paragraph 2.b. of A. Cancellation of the COMMON POLICY CONDITIONS is deleted and replaced with the following: b. 60 days before the effective date of the cancellation if we cancel for any other reason. Under SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS, Paragraph 9. When We Do Not Renew is deleted and replaced with the following: 9. When We Do Not Renew a. We may elect not to renew this policy except, that under the provisions of the Texas Insurance Code, we may not refuse to renew this policy solely because the policyholder is an elected official. b. If we elect not to renew this policy, we may do so by mailing or delivering to the first Named Insured, at the last mailing address known to us, written notice of nonrenewal, stating the reason for nonrenewal, at least 60 days before the expiration date. If notice is mailed or delivered less than 60 days before the expiration date, this policy will remain in effect until the 61 st day after the date on which the notice is mailed or delivered. Earned premium for any period of coverage that extends beyond the expiration date will be computed pro rata based on the previous year's premium. c. If notice is mailed, proof of mailing will be sufficient proof of notice. d. The transfer of a policyholder between admitted companies within the same insurance group is not considered a refusal to renew. 20. MOBILE EQUIPMENT REDEFINED Under SECTION V— DEFINITIONS, paragraph 12. "Mobile equipment", paragraph f. (1) does not apply to self-propelled vehicles of less than 1,000 pounds gross vehicle weight that are not designed for highway use. 21. ADDITIONAL DEFINITIONS 1. SECTION V — DEFINITIONS, paragraph 4. "Coverage territory" is replaced by the following definition: "Coverage territory" means anywhere in the world with respect to liability arising out of "bodily injury," "property damage," or "personal and advertising injury," including "personal and advertising injury" offenses that take place through the Internet or similar electronic means of communication provided the insured's responsibility to pay damages is determined in a settlement to which we agree or in a "suit" on the merits, in the United States of America (including its territories and possessions), Puerto Rico and Canada. 2. SECTION V— DEFINITIONS is amended by the addition of the following definitions: "Covered recall" means a recall made necessary because you or a government body has determined that a known or suspected defect, deficiency, inadequacy, or dangerous condition in "your product" has resulted or will result in "bodily injury" or "property damage". "Product Recall expenses" mean only reasonable and necessary extra costs, which result from or are related to the recall or withdrawal of "your product" for: a. Telephone and telegraphic communication, radio or television announcements, computer time and newspaper advertising; b. Stationery, envelopes, production of announcements and postage or facsimiles; c. Remuneration paid to regular employees for necessary overtime or authorized travel expense; d. Temporary hiring by you or by agents designated by you of persons, other than your regular employees, to perform necessary tasks; e. Rental of necessary additional warehouse or storage space; f. Packaging of or transportation or shipping of defective products to the location you designate; and g. Disposal of "your products" that cannot be reused. Disposal expenses do not include: (1) Expenses that exceed the original cost of the materials incurred to manufacture or process such product; and Includes copyrighted material of Insurance Services Office, Inc. CG 70 63 0417 Page 9 of 11 (2) Expenses that exceed the cost of normal trash discarding or disposal, except as are necessary to avoid "bodily injury" or "property damage". 22. REASONABLE FORCE — BODILY INJURY OR PROPERTY DAMAGE Under SECTION I — COVERAGE A., paragraph 2. Exclusions, subparagraph a. Expected Or Intended Injury is deleted and replaced with the following: [This insurance does not apply to:] a. Expected Or Intended Injury "Bodily injury" or "property damage" expected or intended from the standpoint of the insured. This exclusion does not apply to "bodily injury" or "property damage" resulting from the use of reasonable force to protect persons or property. 23. BROADENED LIABILITY COVERAGE FOR DAMAGE TO YOUR PRODUCT AND YOUR WORK A. Under SECTION I —COVERAGE A., paragraph 2. Exclusions, exclusion k. Damage to Your Product and exclusion I. Damage to Your Work are deleted and replaced with the following: [This insurance does not apply to:] k. Damage to Your Product "Property damage" to "your product' arising out of it or any part of it, except when caused by or resulting from: (1) Fire; (2) Smoke; (3) "Collapse"; or (4) Explosion. For purposes of exclusion k. above, 'collapse" means an abrupt falling down or caving in of a building or any part of a building with the result that the building or part of the building cannot be occupied for its intended purpose. I. Damage to Your Work "Property damage" to "your work" arising out of it or any part of it and included in the "products -completed operations hazard". This exclusion does not apply: (1) If the damaged work or the work out of which the damage arises was performed on your behalf by a subcontractor; or (2) If the cause of loss to the damaged work arises as a result of: (a) Fire; (b) Smoke; (c) "Collapse"; or (d) Explosion. For purposes of exclusion I. above, "collapse" means an abrupt falling down or caving in of a building or any part of a building with the result that the building or part of the building cannot be occupied for its intended purpose. B. The following paragraph is added to SECTION III — LIMITS OF INSURANCE: Includes copyrighted material of Insurance Services Office, Inc. Page 10 of 11 CG 70 63 0417 Subject to 5. above [of the CGL Coverage Form], $100,000 is the most we will pay under Coverage A for the sum of damages arising out of any one "occurrence" because of "property damage" to "your product" and "your work" that is caused by fire, smoke, collapse or explosion and is included within the "product -completed operations hazard". This sublimit does not apply to "property damage" to "your work" if the damaged work, or the work out of which the damage arises, was performed on your behalf by a subcontractor. 24. BROADENED BODILY INJURY COVERAGE Under SECTION V — DEFINITIONS, the definition of "bodily injury" is deleted and replaced with the following: 3. 'Bodily injury" Means physical: (1) Injury; (2) Disability; (3) Sickness; or (4) Disease; sustained by a person, including death resulting from any of these at any time. b. Includes mental: (5) Anguish; (6) Injury; (7) Humiliation; (8) Fright; or (9) Shock; directly resulting from any "bodily injury" described in paragraph 3.a. c. All "bodily injury" described in paragraph 3.b. shall be deemed to have occurred at the time the "bodily injury" described in paragraph 3.a. occurred. 25. DESIGNATED COMPLETED PROJECTS — AMENDED LIMITS OF INSURANCE When a written contract or written agreement between you and another party requires project -specific limits of insurance exceeding the limits of this policy; A. for "bodily injury" or "property damage" that occurs within any policy period for which we provided coverage; and B. for "your work" performed within the "products -completed operation hazard"; and C. for which we previously issued Amendment Of Limits Of Insurance (Designated Project Or Premises) CG 71 94 either during this policy term or a prior policy term; and D. that designated project is now complete; the limits of insurance shown in the CG 71 94 schedule will replace the limits of insurance of this policy for the designated project and will continue to apply for the amount of time the written contract or written agreement requires, subject to the state statute of repose of the project location. These limits are inclusive of and not in addition to the replaced limits. Includes copyrighted material of Insurance Services Office, Inc. CG 70 63 0417 Page 11 of 11 Rebcon, LLC WC21226510301 02/18/2026 - 02/18/2027 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. EARLIER NOTICE OF CANCELLATION PROVIDED BY US Number of Days Notice 30 For any statutorily permitted reason other than nonpayment of premium, the number of days required for notice of cancellation is increased to the number of days shown in the Schedule above. If this policy is cancelled by us we will send the Named Insured and any party listed in the following schedule notice of cancellation based on the number of days notice shown above. SCHEDULE Name of Person or Organization The Name of Person or Organization is any person or organization holding a certificate of insurance issued for you, provided the certificate: 1. Refers to this policy; 2. States that notice of: a. Cancellation; b. Nonrenewal; or c. Material change reducing or restricting coverage; will be provided to that person or organization; 3. Is in effect at the time of the: a. Cancellation; b. Nonrenewal; or c. Material change reducing or restricting coverage; and 4. Is on file at your agent or broker's office for this policy. Mailing Address The Mailing Address is the address shown for that person or organization in that certificate of insurance. IL70450507 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 42 03 04 B (Ed. 6-1 TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ( ) Specific Waiver Name of person or organization (X) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: 3. Premium: The premium charge for this endorsement shall be 0.020 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: $1,860 This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective 2/18/2026 Policy No.wC21226510301 Endorsement No. Insured Rebcon, LLC. Premium $ Insurance Company Countersigned by WC 42 03 04 B (Ed. 6-14) © Copyright 2014 National Council on Compensation Insurance, Inc. All Rights Reserved. Rebcon, LLC CA211121800701 2/18/2026 - 2/18/2027 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION, NONRENEWAL OR MATERIAL CHANGE -THIRD PARTY This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESSAUTO COVERAGE FORM BUSINESS AUTO PHYSICAL DAMAGE COVERAGE FORM COMMERCIAL GENERAL LIABILITY COVERAGE FORM COMMERCIAL UMBRELLA LIABILITY COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIER COVERAGE FORM PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE FORM TRUCKERS COVERAGE FORM Subject to the cancellation provisions of the Coverage Form to which this endorsement is attached, we will not: 1. Cancel; 2. Nonrenew; or, 3. Materially change (reduce or restrict) this Coverage Form, except for nonpayment of premium, until we provide at least 30 days written notice of such cancellation, nonrenewal or material change. Written notice will be to the person or organization named in the Schedule. Such notice will be by certified mail with return receipt requested. This notification of cancellation, nonrenewal or material change to the person or organization named in the Schedule is intended as a courtesy only. Our failure to provide such notification will not: 1. Extend any Coverage Form cancellation date; 2. Negate the cancellation as to any insured or any certificate holder; 3. Provide any additional insurance that would not have been provided in the absence of this endorsement; or 4. Impose liability of any kind upon us. This endorsement does not entitle the person or organization named in the Schedule to any benefits, rights or protection under this Coverage Form. SCHEDULE Name Of Person Or Organization Mailing Address Any person or organization holding a certificate of insurance issued The address shown for that person or organization in for you, provided the certificate: that certificate of insurance 1. Refers to this policy; 2. States that notice of: a. Cancellation; b. Nonrenewal; or c. Material change reducing or restricting coverage; will be provided to that person or organization; 3. Is in effect at the time of the: a. Cancellation; b. Nonrenewal; or c. Material change reducing or restricting coverage; and 4. Is on file at your agent or broker's office for this policy IL70660714 POLICY NUMBER: CA21112180701 COMMERCIAL AUTO CA 7165 0911 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED - PRIMARY NON-CONTRIBUTORY COVERAGE WHEN REQUIRED BY INSURED CONTRACT OR CERTIFICATE This endorsement modifies insurance provided under the BUSINESSAUTO COVERAGE FORM The provisions of the Coverage Form apply unless changed by this endorsement. This endorsement identifies person(s) or organization(s) who are "insured" under the Who Is An Insured Provision of the Coverage Form. This endorsement changes the policy on the inception date of the policy, unless another date is shown below. Endorsement Effective: 2 / 1 s /2 02 5 Countersigned By: Named Insured: Rebcon, LLC (Authorized Representative) (No entry may appear above. If so, information to complete this endorsement is in the Declarations.) 1. Section 11— Liability Coverage, A. Coverage, 1. Who Is An Insured is amended to add: Any person or organization with whom you have an "insured contract" which requires: L that person or organization to be added as an "insured" under this policy or on a certificate of insurance; and ii. this policy to be primary and non-contributory to any like insurance available to the person or organization. Each such person or organization is an "insured" for Liability Coverage. They are an "insured" only if that person or organization is an "insured" under in SECTION If of the Coverage Form. The contract between the Named Insured and the person or organization is an "insured contract'. 2. Section IV —Business Auto Conditions, B. General Conditions, 5. Other Insurance, paragraph d. is deleted and replaced by the following for the purpose of this endorsement only: d. When coverage provided under this Coverage Form is also provided under another Coverage Form or policy, we will provide coverage on a primary, non-contributory basis. Includes copyrighted material of Insurance Services Office, Inc. with its permission. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS ADVANTAGE COMMERCIAL AUTOMOBILE BROAD FORM ENDORSEMENT This endorsement modifies insurance provided under the BUSINESS AUTO COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. The premium for this endorsement is $ $250 .00 BROAD FORM INSURED SECTION II - LIABILITY COVERAGE, A.1. Who Is An Insured is amended by the addition of the following: d. Any organization you newly acquire or form, other than a partnership, joint venture or limited liability company, and over which you maintain ownership or a majority interest, will qualify as a Named Insured. However, (1) Coverage under this provision is afforded only until the end of the policy period; (2) Coverage does not apply to "accidents" or "loss" that occurred before you acquired or formed the organization; and (3) Coverage does not apply to an organization that is an "insured" under any other policy or would bean "insured" but for its termination or the exhausting of its limit of insurance. e. Any "employee" of yours using: (1) A covered "auto" you do not own, hire or borrow, or a covered "auto" not owned by the "employee" or a member of his or her household, while performing duties related to the conduct of your business or your personal affairs; or (2) An "auto" hired or rented under a contract or agreement in that "employee's" name, with your permission, while performing duties related to the conduct of your business. However, your "employee" does not qualify as an insured under this paragraph (2) while using a covered "auto" rented from you or from any member of the "employee's" household. f. Your members, if you are a limited liability company, while using a covered "auto" you do not own, hire or borrow and while performing duties related to the conduct of your business or your personal affairs. g. Any person or organization with whom you agree in a written contract, written agreement or permit, to provide insurance such as is afforded under this policy, but only with respect to your covered "autos". This provision does not apply: (1) Unless the written contractor agreement is executed or the permit is issued prior to the "bodily injury" or "property damage"; (2) To any person or organization included as an insured by an endorsement or in the Declarations; or (3) To any lessor of "autos" unless: (a) The lease agreement requires you to provide direct primary insurance for the lessor; (b) The "auto" is leased without a driver; and Includes copyrighted material of Insurance Services Office, Inc. CA 71 1811 09 Page 1 of 5 (c) The lease had not expired. Leased "autos" covered under this provision will be considered covered "autos" you own and not covered "autos" you hire. h. Any legally incorporated organization or subsidiary in which you own more than 50% of the voting stock on the effective date of this endorsement. This provision does not apply to "bodily injury" or "property damage" for which an "insured" is also an insured under any other automobile policy or would be an insured under such a policy, but for its termination or the exhaustion of its limits of insurance, unless such policy was written to apply specifically in excess of this policy. 2. COVERAGE EXTENSIONS -SUPPLEMENTARY PAYMENTS Under Section II - LIABILITY COVERAGE, A.2.a. Supplementary Payments, paragraphs (2) and (4) are deleted and replaced as follows: (2) Up to $2,500 for the cost of bail bonds (including bonds for related traffic law violations) required because of an "accident" we cover. We do not have to furnish these bonds. (4) All reasonable expenses incurred by the "insured" at our request, including actual loss of earnings up to $500 a day because of time off from work. 3. AMENDED FELLOW EMPLOYEE EXCLUSION Under SECTION II - LIABILITY COVERAGE, B. EXCLUSIONS, paragraph 5. Fellow Employee is deleted and replaced by the following: 5. Fellow Employee "Bodily injury" to: a. Any fellow "employee" of the "insured" arising out of and in the course of the fellow "employee's" employment or while performing duties related to the conduct of your business. However, this exclusion does not apply to your "employees" that are officers, managers, supervisors or above. Coverage is excess over any other collectible insurance. b. The spouse, child, parent, brother or sister of that fellow "employee" as a consequence of paragraph a. above. 4. HIRED AUTO PHYSICAL DAMAGE COVERAGE AND LOSS OF USE EXPENSE A. Under SECTION III -PHYSICAL DAMAGE COVERAGE, A. COVERAGE, the following is added: If any of your owned covered "autos" are covered for Physical Damage, we will provide Physical Damage coverage to "autos" that you or your "employees" hire or borrow, under your name or the "employee's" name, for the purpose of doing your work. We will provide coverage equal to the broadest physical damage coverage applicable to any covered "auto" shown in the Declarations, Item Three, Schedule of Covered Autos You Own, or on any endorsements amending this schedule. B. Under SECTION III -PHYSICAL DAMAGE COVERAGE, A.4. Coverage Extensions. paragraph b. Loss Of Use Expenses is deleted and replaced with the following: b. Loss Of Use Expenses For Hired Auto Physical Damage, we will pay expenses for which an "insured" becomes legally responsible to pay for loss of use of a vehicle rented or hired without a driver, under a written rental contract or agreement. We will pay for loss of use expenses if caused by: (1) Other than collision, only if the Declarations indicate that Comprehensive Coverage is provided for any covered "auto"; Includes copyrighted material of Insurance Services Office, Inc. Page 2 of 5 CA 71 1811 09 (2) Specified Causes of Loss, only if the Declarations indicate that Specified Causes Of Loss Coverage is provided for any covered "auto"; or (3) Collision, only if the Declarations indicate that Collision Coverage is provided for any covered "auto". However, the most we will pay for any expenses for loss of use is $30 per day, to a maximum of $2,000. C. Under SECTION IV —BUSINESS AUTO CONDITIONS, B. General Conditions, 5. Other Insurance, paragraph b. is replaced by the following: b. For Hired Auto Physical Damage, the following are deemed to be covered "autos" you own: 1. Any covered "auto" you lease, hire, rent or borrow; and 2. Any covered "auto" hired or rented by your "employees" under a contract in that individual "employee's" name, with your permission, while performing duties related to the conduct of your business. However, any "auto" that is leased, hired, rented or borrowed with a driver is not a covered "auto", nor is any "auto" you hire from any of your "employees", partners (if you are a partnership), members (if you are a limited liability company), or members of their households. 5. LOAN OR LEASE GAP COVERAGE Under SECTION III — PHYSICAL DAMAGE COVERAGE, A. COVERAGE, the following is added: If a covered "auto" is owned or leased and if we provide Physical Damage Coverage on it, we will pay, in the event of a covered total "loss", any unpaid amount due on the lease or loan for a covered "auto", less: (a) The amount paid under the Physical Damage Section of the policy; and: (b) Any: (1) Overdue lease or loan payments including penalties, interest or other charges resulting from overdue payments at the time of the "loss"; (2) Financial penalties imposed under a lease for excessive use, abnormal wear and tear or high mileage; (3) Costs for extended warranties, Credit Life Insurance, Health, Accident or Disability Insurance purchased with the loan or lease; (4) Security deposits not refunded by a lessor; and (5) Carry-over balances from previous loans or leases. 6. RENTAL REIMBURSEMENT Under SECTION III - PHYSICAL DAMAGE COVERAGE, AA. Coverage Extensions, paragraph a. Transportation Expenses is deleted and replaced by the following: a. Transportation Expenses (1) We will pay up to $75 per day to a maximum of $2,000 for transportation expense incurred by you because of covered "loss". We will pay only for those covered "autos" for which you carry Collision Coverage or either Comprehensive Coverage or Specified Causes of Loss Coverage. We will pay for transportation expenses incurred during the period beginning 24 hours after the covered "loss" and ending, regardless of the policy's expiration, when the covered "auto" is returned to use or we pay for its "loss". This coverage is in addition to the otherwise applicable coverage you have on a covered "auto". No deductibles apply to this coverage. Includes copyrighted material of Insurance Services Office, Inc. CA 71 1811 09 Page 3 of 5 (2) This coverage does not apply while there is a spare or reserve "auto" available to you for your operation. 7. AIRBAG COVERAGE Under SECTION III - PHYSICAL DAMAGE, B. EXCLUSIONS, paragraph 3. is deleted and replaced by the following: 3. We will not pay for "loss" caused by or resulting from any of the following unless caused by other "loss" that is covered by this insurance: (1) Wear and tear, freezing, mechanical or electrical breakdown. However, this exclusion does not include the discharge of an airbag. (2) Blowouts, punctures or other road damage to tires. 8. GLASS REPAIR— WAIVER OF DEDUCTIBLE Section III — PHYSICAL DAMAGE COVERAGE, D. Deductible is amended to add the following: No deductible applies to glass damage if the glass is repaired rather than replaced. 9. COLLISION COVERAGE— WAIVER OF DEDUCTIBLE Under Section III - PHYSICAL DAMAGE COVERAGE, D. Deductible is amended to add the following: When there is a loss to your covered "auto" insured for Collision Coverage, no deductible will apply if the loss was caused by a collision with another "auto" insured by us. 10. KNOWLEDGE OF ACCIDENT Under SECTION IV - BUSINESS AUTO CONDITIONS, A. Loss Conditions, 2. Duties In The Event Of Accident, Claim, Suit Or Loss, paragraph a. is deleted and replaced by the following: a. You must see to it that we are notified as soon as practicable of an "accident", claim, "suit" or "loss". Knowledge of an "accident", claim, "suit" or "loss" by your "employees" shall not, in itself, constitute knowledge to you unless one of your partners, executive officers, directors, managers, or members (if you are a limited liability company) has knowledge of the "accident", claim, "suit" or "loss". Notice should include: (1) How, when and where the "accident" or "loss" occurred; (2) The "insured's" name and address; and (3) To the extent possible, the names and addresses of any injured persons and witnesses. 11. TRANSFER OF RIGHTS (BLANKET WAIVER OF SUBROGATION) Under SECTION IV - BUSINESS AUTO CONDITIONS, A. Loss Conditions paragraph 5. Transfer Of Rights Of Recovery Against Others To Us is deleted and replaced by the following: 5. Transfer Of Rights Of Recovery Against Others To Us If any person or organization to or for whom we make payment under this Coverage Form has rights to recover damages from another, those rights are transferred to us. That person or organization must do everything necessary to secure our rights and must do nothing after "accident" or "loss" to impair them. However, if the "insured" has waived rights to recover through a written contract, or if your work was commenced under a letter of intent or work order, subject to a subsequent reduction in writing with customers whose customary contracts require a waiver, we waive any right of recovery we may have under this Coverage Form. Includes copyrighted material of Insurance Services Office, Inc. Page 4 of 5 CA 71 1811 09 12. UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS Under SECTION IV - BUSINESS AUTO CONDITIONS, B. General Conditions, paragraph 2. Concealment, Misrepresentation Or Fraud is amended by the addition of the following: We will not deny coverage under this Coverage Form if you unintentionally fail to disclose all hazards existing as of the inception date of this policy. You must report to us any knowledge of an error or omission in your representations as soon as practicable after its discovery. This provision does not affect our right to collect additional premium or exercise our right of cancellation or non -renewal. 13. BLANKET COVERAGE FOR CERTAIN OPERATIONS IN CONNECTION WITH RAILROADS When required by written contract or written agreement, the definition of "insured contract' is amended as follows: The exception contained in paragraph H.3. relating to construction or demolition operations on or within 50 feet of a railroad; and Paragraph H.a. are deleted with respect to the use of a covered "auto" in operations for, or affecting, a railroad. Includes copyrighted material of Insurance Services Office, Inc. CA 71 1811 09 Page 5 of 5 Flores, Sophia From: Andrea Crawford <acrawford@acrisure.com> Sent: Friday, May 29, 2026 5:49 PM To: Flores, Sophia Cc: Trinh, Philip Subject: RE: Verification of Bond# 9453940 This email is from an unknown sender This is the first time you are receiving an email from this sender. Hi Sophia, Report Suspicious Yes, I can confirm we executed these bonds for Rebcon, and they have been filed with the sureties. Please let me know if you have any questions. Thanks! Andrea Crawford Surety Account Executive South Division 5057 Keller Springs Road, Suite 200 Addison, TX 75001 Acrawford@Acrisure.com Direct: (972) 201-0100 Cell: (214) 448-3949 /&ACRISURE" The Coverage may not be issued, bound, changed modified, altered, canceled or terminated without receiving written confirmation thereof from an authorized representative with any questions. From: Flores, Sophia <Sophia.Flores2@fortworthtexas.gov> Sent: Friday, May 29, 2026 5:26 PM To: Andrea Crawford <acrawford@acrisure.com> Cc: Trinh, Philip <Philip.Trinh@fortworthtexas.gov> Subject: Verification of Bond# 9453940 You don't often get email from sophia.flores2@fortworthtexas.gov. Learn why this is important Hello, The City of Fort Worth requires bond verification before a contract can be executed. We have received the following bonds from Rebcon, LLC: Bond # 9453940, in the amount of $4,504,400.00, issued by Colonial American Casualty and Surety Company, Fidelity and Deposit Company for City Project #103309, N. Tarrant Parkway and N. Beach Street Intersection Improvements. Please confirm that the bonds and corresponding amounts are valid so we can proceed with awarding the contract to Rebcon, LLC. If this is not the right bond verification address, please provide for Colonial American Casualty and Surety Company, Fidelity and Deposit Company. Thank you, FORT WORTH. IMPORTANT NOTICE: Sophia Flores Contract Compliance Specialist Transportation & Public Works Office 817-392-2026 100 Fort Worth Trail, Fort Worth, TX 76102 CONNECT WITH US. O ® o O This email, including any attachments or subsequent replies or forwards, (a) may include confidential, proprietary or other protected information; (b) is sent based upon a reasonable expectation of privacy; and (c) is not intended for unauthorized persons. If you are not the intended recipient, then you must not use, disclose or disseminate the information. In addition, please immediately notify the sender and then permanently delete the message and any attachments, replies or forwards, including any copies or portions thereof. Any unauthorized review, use, disclosure or distribution of this email is prohibited and may be a violation of law or regulation. It is the responsibility of the recipient to take steps to protect against viruses and ensure that this email (and any attachments hereto) does not adversely affect any computer system into which it is received or opened. STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: SepWinber1,2025 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Article 1 — Definitions and Terminology ........ 1.01 Defined Terms ............................. 1.02 Terminology ................................ Article 2 — Preliminary Matters........................................................ 2.01 Copies of Documents ................................................... 2.02 Commencement of Contract Time; Notice to Proceed 2.03 Starting the Work ......................................................... 2.04 Before Starting Construction ....................................... 2.05 Preconstruction Conference ......................................... 2.06 Public Meeting............................................................. 2.07 Initial Acceptance of Schedules ................................... Page .................................1 .................................1 ................................. 6 .............................................................. 7 .............................................................. 7 .............................................................. 7 .............................................................. 8 .............................................................. 8 .............................................................. 8 .............................................................. 8 .............................................................. 8 Article 3 — Contract Documents: Intent, Amending, Reuse............................................................................ 8 3.01 Intent.............................................................................................................................................. 8 3.02 Reference Standards...................................................................................................................... 9 3.03 Reporting and Resolving Discrepancies....................................................................................... 9 3.04 Amending and Supplementing Contract Documents.................................................................10 3.05 Reuse of Documents...................................................................................................................10 3.06 Electronic Data............................................................................................................................ I I Article 4 — Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions; Reference Points...........................................................................................................11 4.01 Availability of Lands..................................................................................................................11 4.02 Subsurface and Physical Conditions..........................................................................................12 4.03 Differing Subsurface or Physical Conditions.............................................................................12 4.04 Underground Facilities...............................................................................................................13 4.05 Reference Points.........................................................................................................................14 4.06 Hazardous Environmental Condition at Site..............................................................................14 Article 5 — Bonds and Insurance.....................................................................................................................16 5.01 Licensed Sureties and Insurers...................................................................................................16 5.02 Performance, Payment, and Maintenance Bonds.......................................................................16 5.03 Certificates of Insurance.............................................................................................................16 5.04 Contractor's Insurance................................................................................................................18 5.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................19 Article 6 — Contractor's Responsibilities........................................................................................................19 6.01 Supervision and Superintendence...............................................................................................19 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: Septenil)er 1,2025 6.02 Labor; Working Hours................................................................................................................20 6.03 Services, Materials, and Equipment...........................................................................................20 6.04 Project Schedule..........................................................................................................................21 6.05 Substitutes and "Or-Equals"....................................................................................................... 21 6.06 Concerning Subcontractors, Suppliers, and Others....................................................................24 6.07 Wage Rates..................................................................................................................................25 6.08 Patent Fees and Royalties........................................................................................................... 26 6.09 Permits and Utilities.................................................................................................................... 27 6.10 Laws and Regulations................................................................................................................. 27 6.11 Taxes...........................................................................................................................................28 6.12 Use of Site and Other Areas....................................................................................................... 28 6.13 Record Documents......................................................................................................................29 6.14 Safety and Protection..................................................................................................................29 6.15 Safety Representative..................................................................................................................30 6.16 Hazard Communication Programs............................................................................................. 30 6.17 Emergencies and/or Rectification............................................................................................... 30 6.18 Submittals....................................................................................................................................31 6.19 Continuing the Work................................................................................................................... 32 6.20 Contractor's General Warranty and Guarantee..........................................................................32 6.21 Indemnification......................................................................................................................... 33 6.22 Delegation of Professional Design Services..............................................................................34 6.23 Right to Audit.............................................................................................................................. 34 6.24 Nondiscrimination.......................................................................................................................35 Article 7 - Other Work at the Site................................................................................................................... 35 7.01 Related Work at Site................................................................................................................... 35 7.02 Coordination................................................................................................................................36 Article 8 - City's Responsibilities..................................................................... 8.01 Communications to Contractor..................................................... 8.02 Furnish Data.................................................................................. 8.03 Pay When Due.............................................................................. 8.04 Lands and Easements; Reports and Tests ..................................... 8.05 Change Orders............................................................................... 8.06 Inspections, Tests, and Approvals ................................................ 8.07 Limitations on City's Responsibilities ......................................... 8.08 Undisclosed Hazardous Environmental Condition ...................... 8.09 Compliance with Safety Program ................................................. .......................................... 36 .......................................... 36 .......................................... 36 .......................................... 36 .......................................... 36 .......................................... 36 .......................................... 36 .......................................... 37 .......................................... 37 .......................................... 37 Article 9 - City's Observation Status During Construction........................................................................... 37 9.01 City's Project Manager............................................................................................................37 9.02 Visits to Site................................................................................................................................ 37 9.03 Authorized Variations in Work.................................................................................................. 38 9.04 Rejecting Defective Work..........................................................................................................38 9.05 Determinations for Work Performed.......................................................................................... 38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work.....................38 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: SepleM)er 1, 2025 Article 10 - Changes in the Work; Claims; Extra Work........... 10.01 Authorized Changes in the Work .......................... 10.02 Unauthorized Changes in the Work ...................... 10.03 Execution of Change Orders .................................. 10.04 Extra Work............................................................. 10 05 Notification to Suret ........................................................... 38 ........................................................... 38 ........................................................... 39 ........................................................... 39 ........................................................... 39 y.................................................................................................................. 39 10.06 Contract Claims Process............................................................................................................. 40 Article 11 - Cost of the Work; Allowances; Unit Price Work; Plans Quantity Measurement ...................... 41 11.01 Cost of the Work......................................................................................................................... 41 11.02 Allowances..................................................................................................................................43 11.03 Unit Price Work.......................................................................................................................... 44 11.04 Plans Quantity Measurement......................................................................................................45 Article 12 - Change of Contract Price; Change of Contract Time................................................................. 46 12.01 Change of Contract Price............................................................................................................46 12.02 Change of Contract Time............................................................................................................47 12.03 Delays..........................................................................................................................................47 Article 13 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 48 13.01 Notice of Defects........................................................................................................................ 48 13.02 Access to Work........................................................................................................................... 48 13.03 Tests and Inspections.................................................................................................................. 48 13.04 Uncovering Work........................................................................................................................49 13.05 City May Stop the Work............................................................................................................. 49 13.06 Correction or Removal of Defective Work................................................................................50 13.07 Correction Period........................................................................................................................ 50 13.08 Acceptance of Defective Work................................................................................................... 51 13.09 City May Correct Defective Work............................................................................................. 51 Article 14 - Payments to Contractor and Completion.................................................................................... 52 14.01 Schedule of Values......................................................................................................................52 14.02 Progress Payments...................................................................................................................... 52 14.03 Contractor's Warranty of Title................................................................................................... 54 14.04 Partial Utilization........................................................................................................................55 14.05 Final Inspection...........................................................................................................................55 14.06 Final Acceptance......................................................................................................................... 55 14.07 Final Payment..............................................................................................................................56 14.08 Final Completion Delayed and Partial Retainage Release........................................................ 56 14.09 Waiver of Claims........................................................................................................................ 57 Article 15 - Suspension of Work and Termination........................................................................................ 57 15.01 City May Suspend Work............................................................................................................. 57 15.02 City May Terminate for Cause................................................................................................... 58 15.03 City May Terminate For Convenience.......................................................................................60 Article 16 - Dispute Resolution...................................................................................................................... 61 16.01 Methods and Procedures.............................................................................................................61 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: Septenl)er 1, 2025 Article 17 —Miscellaneous ............................................................................................. 17.01 Giving Notice............................................................................................. 17.02 Computation of Times............................................................................... 17.03 Cumulative Remedies................................................................................ 17.04 Survival of Obligations.............................................................................. 17.05 Headings..................................................................................................... CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Pagel of 63 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement —The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment —The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award — Authorization by the City Council for the City to enter into an Agreement. 6. Bid —The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder —The individual or entity who submits a Bid directly to City. 8. Bidding Documents —The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 2 of 63 12. Change Order —A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 13. City— The City of Fort Worth, Texas, a home -rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 14. City Attorney — The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 15. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 16. City Manager — The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 17. Contract Claim —A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 18. Contract —The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, or agreements, whether written or oral. 19. Contract Documents Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 20. Contract Price —The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 21. Contract Time —The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance. 22. Contractor —The individual or entity with whom City has entered into the Agreement. 23. Cost of the Work —See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 3 of 63 24. Damage Claims — A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 25. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 26. Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 27. Director of Parks and Community Services — The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Planning and Development — The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Transportation Public Works — The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30. Director of Water Department — The officially appointed Director of the Water Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 32. Effective Date of the Agreement —The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 33. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 34. Extra Work — Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 35. Field Order A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 36. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 4 of 63 37. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 38. General Requirements —Sections of Division 1 of the Contract Documents. 39. Hazardous Environmental Condition The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 40. Hazardous Waste Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 41. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 42. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 43. Major Item — An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or $25,000 whichever is less. 44. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 45. Notice of Award —The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 46. Notice to Proceed —A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 47. PCBs Polychlorinated biphenyls. 48. Petroleum —Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non -Hazardous Waste and crude oils. 49. Plans — See definition of Drawings. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 5 of 63 50. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 51. Project —The Work to be performed under the Contract Documents. 52. Project Manager —The authorized representative of the City who will be assigned to the Site. 53. Public Meeting — An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 54. Radioactive Material —Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 55. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 56. Samples —Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 57. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 58. Schedule of Values —A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 59. Site —Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 60. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 61. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 6 of 63 62. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 63. Substantial Completion — The stage in the progress of the Project when the Work is sufficiently complete in accordance with the Contract Documents for Final Inspection. 64. Successful Bidder —The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions —That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 69 Unit Price Work —See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours — Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain Terms or Adjectives: CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 — PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time; Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given no earlier than 14 days after the Effective Date of the Agreement, unless agreed to by both parties in writing. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to the Public Meeting if scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3 — CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: September 1,2025 North Tarrant Parkway and North Beach Street Intersection Improvements CPN 103309 00 72 00 - 1 GENERAL CONDITIONS Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation, (b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subject to the provisions of Paragraph 6.18.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 11 of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's on-line electronic document management and collaboration system site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving parry. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4 — AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if- 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated: 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (11) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 16 of 63 ARTICLE 5 — BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (other evidence of insurance requested by City or any other additional insured) in at least the minimum amount as specified in the Supplementary Conditions which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6 — CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid, unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 01 32 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. "Or -Equal " Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.13. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions: No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Small Business Goal Compliance: It is City policy to foster competition, expand the supplier base, and promote and encourage the participation of small business firms in the City's contracting opportunities. If the Contract Documents provide for a small business goal, Contractor shall comply with the City's Small Business Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a contracted small business and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted small businesses without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by the small business(es). Material misrepresentation of any nature may be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for the disqualification of the Contractor to bid on future contracts with the City for a period of not less than one year. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 25 of 63 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 Ith day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a parry in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Affadavit. Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 225 8, Texas Government Code related to paying prevailing wage rates on completion of the project. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 27 of 63 the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.13. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: htWs://comptroller.texas.gov/taxes/permit/ 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: September 1,2025 North Tarrant Parkway and North Beach Street Intersection Improvements CPN 103309 00 72 00 - 1 GENERAL CONDITIONS Page 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.13. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN PART, BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 34 of 63 SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN PART, BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title V1, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7 — OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a parry to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8 — CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements; Reports and Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: September 1,2025 North Tarrant Parkway and North Beach Street Intersection Improvements CPN 103309 00 72 00 - 1 GENERAL CONDITIONS Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Project Manager City will provide one or more Project Manager(s) during the construction period. The duties and responsibilities and the limitations of authority of City's Project Manager during construction are set forth in the Contract Documents. The City's Project Manager for this Contract is identified in the Supplementary Conditions. 9.02 Visits to Site A. City's Project Manager will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Manager will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Manager will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Manager's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Manager's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: September 1,2025 North Tarrant Parkway and North Beach Street Intersection Improvements CPN 103309 00 72 00 - 1 GENERAL CONDITIONS Page 38 of 63 9.03 Authorized Variations in Work City's Project Manager may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Manager believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Manager will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: September 1,2025 North Tarrant Parkway and North Beach Street Intersection Improvements CPN 103309 00 72 00 - 1 GENERAL CONDITIONS Page 39 of 63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11— COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Costs Included: The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.0LB, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.0l.B, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55% markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.0I.A.1 or specifically covered by Paragraph 11.01.AA, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.01.A and 11.01.13, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre -bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 44 of 63 a. the pre -bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre -bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 i£ 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. 1. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outlined under "Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 46 of 63 E. For callout work or non -site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TEME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.0l.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.0l.B.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit (determined as provided in Paragraph 12.01.Q. C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.0l.A.1, 11.0l.A.2. and 11.0l.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 11.01.A.4 and 11.0l .A.5, the Contractor's fee shall be five percent (5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.0l.C.2.a and 12.0l.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.0l.A.1 and 11.0l.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; no fee shall be payable on the basis of costs itemized under Paragraphs 11.0l.A.6, and 11.0l.B; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 48 of 63 ARTICLE 13 — TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work maybe rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: September 1,2025 North Tarrant Parkway and North Beach Street Intersection Improvements CPN 103309 00 72 00 - 1 GENERAL CONDITIONS Page 49 of 63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 50 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as described in subsection C. unless otherwise stipulated in the Contract Documents. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 53 of 63 B. Review of Applications: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules, that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor; or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective or completed Work has been damaged by the Contractor or subcontractors requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement will be assessed against the monies due the Contractor, not as a penalty, but as damages suffered by the City. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment: 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any part of the Work which has specifically been identified in the Contract Documents, or which City determines constitutes a separately functioning and usable part of the Work that can be used for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Finallnspection A. Upon written notice from Contractor that the entire Work is Substantially Complete in accordance with the Contract Documents: 1. Within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective ("Punch List Items"). Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification to the City of Substantial Completion and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 2. Should the City concur that Substantial Completion has been achieved with the exception of any Punch List Items, Contract Time will resume for the duration it takes for Contractor to achieve Final Acceptance. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 56 of 63 14.07 Final Payment A. Application for Payment: 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any, to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments for employees, subcontractors, and suppliers; and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15 — SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 58 of 63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-2011established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature, the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily; or 8. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.02.13, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 60 of 63 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16 — DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.1) shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 62 of 63 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other parry to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17 — MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 72 00 - 1 GENERAL CONDITIONS Page 63 of 63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revision: September 1,2025 00 73 00 SUPPLEMENTARY CONDITIONS SECTION 00 73 00 SUPPLEMENTARY CONDITIONS TO GENERAL CONDITIONS Supplementary Conditions Page 1 of 6 These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are modified or supplemented remain in full force and effect as so modified or supplemented. All provisions of the General Conditions which are not so modified or supplemented remain in full force and effect. Defined Terms The terms used in these Supplementary Conditions which are defined in the General Conditions have the meaning assigned to them in the General Conditions, unless specifically noted herein. Modifications and Supplements The following are instructions that modify or supplement specific paragraphs in the General Conditions and other Contract Documents. SC-3.03B.2, "Resolving Discrepancies" Plans govern over Specifications. SC-4.01 A Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the Contract Drawings. SC-4.01A.1., "Availability of Lands" The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of October, 2025: Outstanding Right -Of -Way, and/or Easements to Be Acquired PARCEL OWNER TARGET DATE NUMBER OF POSSESSION None The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. If Contractor considers the final easements provided to differ materially from the representations on the Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, notify City in writing associated with the differing easement line locations. SC-4.01A.2, "Availability of Lands" CITY OF FORT WORTH North Tan -ant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 00 73 00 SUPPLEMENTARY CONDITIONS Page 2 of 6 Utilities or obstructions to be removed, adjusted, and/or relocated The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated as of October, 2025: EXPECTED UTILITY AND LOCATION TARGET DATE OF OWNER ADJUSTMENT Oncor Electric N. Tarrant Pkwy and N. Beach St. Intersection October 2025 ....... ..... ............_... _....... ......._................N.....arra............_................................... .......... ......... ... ..... .... .. _............ ..._.._......__.._ .�.____...._.._....._.._.._.................._......_.._......................__...._.. Spectrum N. Tarrant Pkwy d N. Beach St. Intersection December 2025 The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. SC-4.02A., "Subsurface and Physical Conditions" The following are reports of explorations and tests of subsurface conditions at the site of the Work: A geotechnical memorandum, dated 6/14/2023, prepared by Freese and Nichols, a consultant of the City, providing additional information on the existing geotechnical conditions of the intersection of North Tarrant Parkway and North Beach Street. The following are drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site of the Work: None SC-4.06A., "Hazardous Environmental Conditions at Site" The following are reports and drawings of existing hazardous environmental conditions known to the City: None SC-5.02 Performance Payment, Bonds Delete 5.02 B SC-5.03A., "Certificates of Insurance" The entities listed below are "additional insureds as their interest may appear" including their respective officers, directors, agents and employees. (1) City (2) Consultant: Freese and Nichols, Inc. (3) Other: None CITY OF FORT WORTH North Tan -ant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 00 73 00 SUPPLEMENTARY CONDITIONS Page 3 of 6 SC-5.04A., "Contractor's Insurance" The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following coverages for not less than the following amounts or greater where required by laws and regulations: 5.04A. Workers' Compensation, under Paragraph GC-5.04A. Statutory limits Employer's liability $100,000 each accident/occurrence $100,000 Disease - each employee $500,000 Disease - policy limit SC-5.04B., "Contractor's Insurance" 5.04B. Commercial General Liability, under Paragraph GC-5.04B. Contractor's Liability Insurance under Paragraph GC-5.04B., which shall be on a per project basis covering the Contractor with minimum limits of: $1,000,000 each occurrence $2,000,000 aggregate limit The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. SC 5.04C., "Contractor's Insurance" 5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor's Liability Insurance under Paragraph GC-5.04C., which shall be in an amount not less than the following amounts: (1) Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: $250,000 Bodily Injury per person / $500,000 Bodily Injury per accident / $100,000 Property Damage SC-5.04D., "Contractor's Insurance" The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks None CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 00 73 00 SUPPLEMENTARY CONDITIONS Page 4 of 6 The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: (1) General Aggregate: N/A (2) Each Occurrence: N/A Required for this Contract X Not required for this Contract With respect to the above outlined insurance requirements, the following shall govern: 1. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. 2. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of -way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. 3. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. 4. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. SC-6.04., "Project Schedule" Project schedule shall be tier 3 for the project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 00 73 00 SUPPLEMENTARY CONDITIONS Page 5 of 6 SC-6.07 A.., "Duty to pay Prevailing Wage Rates" The following is the prevailing wage rate table(s) applicable to this project and is provided in the Appendixes: Heavy and Highway Construction Projects A copy of the table is also available by accessing the City's website at: https:Happs.fortworthtexas.Eov/Pro* ectResources/ You can access the file by following the directory path: 02-Construction Documents/Specifications/Div00 — General Conditions SC-6.09., "Permits and Utilities" SC-6.09A., "Contractor obtained permits and licenses" 1. The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: SWPPP — TCEQ/TPDES General Permit TXR150000 SC-6.09B. "City obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the City: None SC-6.09C. "Outstanding permits and licenses" The following is a list of known outstanding permits and/or licenses to be acquired, if any as of October, 2025 Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION None SC-7.02., "Coordination" The individuals or entities listed below have contracts with the City for the performance of other work at the Site: Vendor Scope of Work Coordination Authority None SC-8.01, "Communications to Contractor" None SC-9.01., "City's Project Manager" The City's Project Manager for this Contract is Iskal Shrestha, or his/her successor pursuant to written notification from the Director of Transportation and Public Works. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 00 73 00 SUPPLEMENTARY CONDITIONS SC-13.03C., "Tests and Inspections" None Page 6 of 6 SC-16.01C.1, "Methods and Procedures" None END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1/22/2016 F. Griffin SC-9.01., "City's Project Representative" wording changed to City's Project Manager. 3/9/2020 D.V. Magana SC-6.07, Updated the link such that files can be accessed via the City's website. 10/06/23 Michael Owen SC-6.07, Allow affidavit regarding paying prevailing wages to be submitted on completion of job, as opposed to with each progress report 3/08/24 Michael Owen Removed revisions related to affidavit, as those changes have been made in General Conditions SC-5.02 Added notes to reviewer to delete Maintenance Bond if using T specifications 9/19/25 Michael OwenxDOT SC 6.20 Revised Contractors General Warranty and Guarantee language if using TxDOT specifications CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 19, 2025 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 01 11 00 SUMMARY OF WORK 011100-1 SUMMARY OF WORK Pagel of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection bnprovements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 011100-2 SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission, neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection bnprovements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 011100-3 SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED[ 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection bnprovements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 01 25 00 - 1 SUBSTITUTION PROCEDURES Page 1 of 4 1 SECTION 0125 00 2 SUBSTITUTION PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specified by descriptive or performance criteria or 8 defined by reference to 1 or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor 11 c. Trade name 12 d. Catalog number 13 2. Substitutions are not "or -equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include, but are not necessarily limited to: 17 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 18 2. Division 1 — General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. 22 No separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A. Request for Substitution - General 26 1. Within 30 days after award of Contract (unless noted otherwise), the City will 27 consider formal requests from Contractor for substitution of products in place of 28 those specified. 29 2. Certain types of equipment and kinds of material are described in Specifications by 30 means of references to names of manufacturers and vendors, trade names, or 31 catalog numbers. 32 a. When this method of specifying is used, it is not intended to exclude from 33 consideration other products bearing other manufacturer's or vendor's names, 34 trade names, or catalog numbers, provided said products are "or -equals," as 35 determined by City. 36 3. Other types of equipment and kinds of material may be acceptable substitutions 37 under the following conditions: 38 a. Or -equals are unavailable due to strike, discontinued production of products 39 meeting specified requirements, or other factors beyond control of Contractor; 40 or, CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 012500-2 SUBSTITUTION PROCEDURES Page 2 of 4 1 b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 2. Submit 3 copies of each written request for substitution, including: 9 a. Documentation 10 1) Complete data substantiating compliance of proposed substitution with 11 Contract Documents 12 2) Data relating to changes in construction schedule, when a reduction is 13 proposed 14 3) Data relating to changes in cost 15 b. For products 16 1) Product identification 17 a) Manufacturer's name 18 b) Telephone number and representative contact name 19 c) Specification Section or Drawing reference of originally specified 20 product, including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2) Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3) Itemized comparison of original and proposed product addressing product 25 characteristics including, but not necessarily limited to: 26 a) Size 27 b) Composition or materials of construction 28 c) Weight 29 d) Electrical or mechanical requirements 30 4) Product experience 31 a) Location of past projects utilizing product 32 b) Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c) Available field data and reports associated with proposed product 35 5) Samples 36 a) Provide at request of City. 37 b) Samples become the property of the City. 38 c. For construction methods: 39 1) Detailed description of proposed method 40 2) Illustration drawings 41 C. Approval or Rejection 42 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved, the resulting cost and/or time reduction 46 will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 012500-3 SUBSTITUTION PROCEDURES Page 3 of 4 1 4. No additional contract time will be given for substitution. 2 5. Substitution will be rejected if- 3 a. Submittal is not through the Contractor with his stamp of approval 4 b. Request is not made in accordance with this Specification Section 5 c. In the City's opinion, acceptance will require substantial revision of the original 6 design 7 d. In the City's opinion, substitution will not perform adequately the function 8 consistent with the design intent 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE 13 A. In making request for substitution or in using an approved product, the Contractor 14 represents that the Contractor: 15 1. Has investigated proposed product, and has determined that it is adequate or 16 superior in all respects to that specified, and that it will perform function for which 17 it is intended 18 2. Will provide same guarantee for substitute item as for product specified 19 3. Will coordinate installation of accepted substitution into Work, to include building 20 modifications if necessary, making such changes as may be required for Work to be 21 complete in all respects 22 4. Waives all claims for additional costs related to substitution which subsequently 23 arise 24 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 25 1.11 FIELD [SITE] CONDITIONS [NOT USED] 26 1.12 WARRANTY [NOT USED] 27 PART 2 - PRODUCTS [NOT USED] 28 PART 3 - EXECUTION [NOT USED] 29 30 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 01 25 00 - 4 SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Firm Address Date Telephone For Use by City: Approved City Recommended _ Recommended _ Not recommended Received late By Date Remarks Date Rejected CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 013119 PRECONSTRUCTION MEETING 013119-1 PRECONSTRUCTION MEETING Page 1 of 3 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Coordination 20 1. Attend preconstruction meeting. 21 2. Representatives of Contractor, subcontractors and suppliers attending meetings 22 shall be qualified and authorized to act on behalf of the entity each represents. 23 3. Meeting administered by City may be tape recorded. 24 a. If recorded, tapes will be used to prepare minutes and retained by City for 25 future reference. 26 B. Preconstruction Meeting 27 1. A preconstruction meeting will be held within 14 days after the execution of the 28 Agreement and before Work is started. 29 a. The meeting will be scheduled and administered by the City. 30 2. The Project Representative will preside at the meeting, prepare the notes of the 31 meeting and distribute copies of same to all participants who so request by fully 32 completing the attendance form to be circulated at the beginning of the meeting. 33 3. Attendance shall include: 34 a. Project Representative 35 b. Contractor's project manager 36 c. Contractor's superintendent 37 d. Any subcontractor or supplier representatives whom the Contractor may desire 38 to invite or the City may request CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 1, 2025 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 0131 19 - 2 PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f Others as appropriate 4. Construction Schedule a. Prepare baseline construction schedule in accordance with Section 0132 16 and provide at Preconstruction Meeting. b. City will notify Contractor of any schedule changes upon Notice of Preconstruction Meeting. 5. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals in. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing cc. Record Drawings ff. Temporary construction facilities gg. Final Acceptance hh. Final Payment ii. Questions or Comments CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 1, 2025 0131 19 - 3 PRECONSTRUCTION MEETING Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 9/1/2025 M Owen Deleted Section 1.4 B.5..hh, due to new Small Business Ordinance CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 1, 2025 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 013120 PROJECT MEETINGS 013120-1 PROJECT MEETINGS Page I of 3 5 A. Section Includes: 6 1. Provisions for project meetings throughout the construction period to enable orderly 7 review of the progress of the Work and to provide for systematic discussion of 8 potential problems 9 B. Deviations this City of Fort Worth Standard Specification 10 1. None. 11 C. Related Specification Sections include, but are not necessarily limited to: 12 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 13 2. Division 1— General Requirements 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Coordination 21 1. Schedule, attend and administer as specified, periodic progress meetings, and 22 specially called meetings throughout progress of the Work. 23 2. Representatives of Contractor, subcontractors and suppliers attending meetings 24 shall be qualified and authorized to act on behalf of the entity each represents. 25 3. Meetings administered by City may be tape recorded. 26 a. If recorded, tapes will be used to prepare minutes and retained by City for 27 future reference. 28 4. Meetings, in addition to those specified in this Section, may be held when requested 29 by the City, Engineer or Contractor. 30 B. Pre -Construction Neighborhood Meeting 31 1. After the execution of the Agreement, but before construction is allowed to begin, 32 attend 1 Public Meeting with affected residents to: 33 a. Present projected schedule, including construction start date 34 b. Answer any construction related questions 35 2. Meeting Location 36 a. Location of meeting to be determined by the City. 37 3. Attendees 38 a. Contractor CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 31 20 - 2 PROJECT MEETINGS Page 2 of 3 1 b. Project Representative 2 c. Other City representatives 3 4. Meeting Schedule 4 a. In general, the neighborhood meeting will occur within the 2 weeks following 5 the pre -construction conference. 6 b. In no case will construction be allowed to begin until this meeting is held. 7 C. Progress Meetings 8 1. Formal project coordination meetings will be held periodically. Meetings will be 9 scheduled and administered by Project Representative. 10 2. Additional progress meetings to discuss specific topics will be conducted on an as - II needed basis. Such additional meetings shall include, but not be limited to: 12 a. Coordinating shutdowns 13 b. Installation of piping and equipment 14 c. Coordination between other construction projects 15 d. Resolution of construction issues 16 e. Equipment approval 17 3. The Project Representative will preside at progress meetings, prepare the notes of 18 the meeting and distribute copies of the same to all participants who so request by 19 fully completing the attendance form to be circulated at the beginning of each 20 meeting. 21 4. Attendance shall include: 22 a. Contractor's project manager 23 b. Contractor's superintendent 24 c. Any subcontractor or supplier representatives whom the Contractor may desire 25 to invite or the City may request 26 d. Engineer's representatives 27 e. City's representatives 28 f. Others, as requested by the Project Representative 29 5. Preliminary Agenda may include: 30 a. Review of Work progress since previous meeting 31 b. Field observations, problems, conflicts 32 c. Items which impede construction schedule 33 d. Review of off -site fabrication, delivery schedules 34 e. Review of construction interfacing and sequencing requirements with other 35 construction contracts 36 f. Corrective measures and procedures to regain projected schedule 37 g. Revisions to construction schedule 38 h. Progress, schedule, during succeeding Work period 39 i. Coordination of schedules 40 j. Review submittal schedules 41 k. Maintenance of quality standards 42 1. Pending changes and substitutions 43 m. Review proposed changes for: 44 1) Effect on construction schedule and on completion date 45 2) Effect on other contracts of the Project 46 n. Review Record Documents 47 o. Review monthly pay request 48 p. Review status of Requests for Information CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 31 20 - 3 PROJECT MEETINGS Page 3 of 3 1 6. Meeting Schedule 2 a. Progress meetings will be held periodically as determined by the Project 3 Representative. 4 1) Additional meetings may be held at the request of the: 5 a) City 6 b) Engineer 7 c) Contractor 8 7. Meeting Location 9 a. The City will establish a meeting location. 10 1) To the extent practicable, meetings will be held at the Site. 11 1.5 SUBMITTALS [NOT USED] 12 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 13 1.7 CLOSEOUT SUBMITTALS [NOT USED] 14 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 15 1.9 QUALITY ASSURANCE [NOT USED] 16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 17 1.11 FIELD [SITE] CONDITIONS [NOT USED] 18 1.12 WARRANTY [NOT USED] 19 PART 2 - PRODUCTS [NOT USED] 20 PART 3 - EXECUTION [NOT USED] 21 22 23 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 32 16 - 1 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 10 1 SECTION 0132 16 2 CONSTRUCTION SCHEDULE 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General requirements for the preparation, submittal, updating, status reporting and 7 management of the Construction Progress Schedule 8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance 9 Document 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 — General Requirements 15 D. Purpose 16 The City of Fort Worth (City) is committed to delivering quality, cost-effective 17 infrastructure to its citizens in a timely manner. A key tool to achieve this purpose is a 18 properly structured schedule with accurate updates. This supports effective monitoring 19 of progress and is input to critical decision making by the project manager throughout 20 the life of the project. Data from the updated project schedule is utilized in status 21 reporting to various levels of the City organization and the citizenry. 22 23 This Document complements the City's Standard Agreement to guide the construction 24 contractor (Contractor) in preparing and submitting acceptable schedules for use by the 25 City in project delivery. The expectation is the performance of the work follows the 26 accepted schedule and adhere to the contractual timeline. 27 28 The Contractor will designate a qualified representative (Project Scheduler) responsible 29 for developing and updating the schedule and preparing status reporting as required by 30 the City. 31 1.2 PRICE AND PAYMENT PROCEDURES 32 A. Measurement and Payment 33 1. Work associated with this Item is considered subsidiary to the various items bid. 34 No separate payment will be allowed for this Item. 35 2. Non-compliance with this specification is grounds for City to withhold payment of 36 the Contractor's invoices until Contractor achieves said compliance. 37 1.3 REFERENCES 38 A. Project Schedules CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 013216-2 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 10 1 Each project is represented by City's master project schedule that encompasses the 2 entire scope of activities envisioned by the City to properly deliver the work. When the 3 City contracts with a Contractor to perform construction of the Work, the Contractor 4 will develop and maintain a schedule for their scope of work in alignment with the 5 City's standard schedule requirements as defined herein. The data and information of 6 each such schedule will be leveraged and become integral in the master project 7 schedule as deemed appropriate by the City's Project Control Specialist and approved 8 by the City's Project Manager. 9 10 1. Master Project Schedule 11 The master project schedule is a holistic representation of the scheduled activities 12 and milestones for the total project and be Critical Path Method (CPM) based. The 13 City's Project Manager is accountable for oversight of the development and 14 maintaining a master project schedule for each project. When the City contracts for 15 the design and/or construction of the project, the master project schedule will 16 incorporate elements of the Design and Construction schedules as deemed 17 appropriate by the City's Project Control Specialist. The assigned City Project 18 Control Specialist creates and maintains the master project schedule in P6 (City's 19 scheduling software). 20 21 2. Construction Schedule 22 The Contractor is responsible for developing and maintaining a schedule for the 23 scope of the Contractor's contractual requirements. The Contractor will issue an 24 initial schedule for review and acceptance by the City's Project Control Specialist 25 and the City's Project Manager as a baseline schedule for Contractor's scope of 26 work. Contractor will issue current, accurate updates of their schedule (Progress 27 Schedule) to the City at the end of each month throughout the life of their work. 28 B. Schedule Tiers 29 The City has a portfolio of projects that vary widely in size, complexity and content 30 requiring different scheduling to effectively deliver each project. The City uses a 31 "tiered" approach to align the proper schedule with the criteria for each project. The 32 City's Project Manager determines the appropriate schedule tier for each project, and 33 includes that designation and the associated requirements in the Contractor's scope of 34 work. The following is a summary of the "tiers". 35 36 1. Tier 1: Small Size and Short Duration Project (design not required) 37 The City develops and maintains a Master Project Schedule for the project. No 38 schedule submittal is required from Contractor. City's Project Control Specialist 39 acquires any necessary schedule status data or information through discussions with 40 the respective party on an as -needed basis. 41 42 2. Tier 2: Small Size and Short to Medium Duration Project 43 The City develops and maintains a Master Project Schedule for the project. The 44 Contractor identifies "start" and "finish" milestone dates on key elements of their 45 work as agreed with the City's Project Manager at the kickoff of their work effort. 46 The Contractor issues to the City, updates to the "start" and "finish" dates for such 47 milestones at the end of each month throughout the life of their work on the project. 48 49 3. Tier 3: Medium and Large Size and/or Complex Projects Regardless of Duration CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 01 32 16 - 3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 10 1 The City develops and maintains a Master Project Schedule for the project. The 2 Contractor develops a Baseline Schedule and maintains the schedule of their 3 respective scope of work on the project at a level of detail (generally Level 3) and in 4 alignment with the WBS structure in Section 1.4.H as agreed by the Project 5 Manager. The Contractor issues to the City, updates of their respective schedule 6 (Progress Schedule) at the end of each month throughout the life of their work on the 7 project. 8 C. Schedule Types 9 Project delivery for the City utilizes two types of schedules as noted below. The City 10 develops and maintains a Master Project Schedule as a "baseline" schedule and issue 11 monthly updates to the City Project Manager (end of each month) as a "progress" 12 schedule. The Contractor prepares and submits each schedule type to fulfill their 13 contractual requirements. 14 15 1. Baseline Schedule 16 The Contractor develops and submits to the City, an initial schedule for their scope 17 of work in alignment with this specification. Once reviewed and accepted by the 18 City, it becomes the "Baseline" schedule and is the basis against which all progress 19 is measured. The baseline schedule will be updated when there is a change or 20 addition to the scope of work impacting the duration of the work, and only after 21 receipt of a duly authorized change order issued by the City. In the event progress is 22 significantly behind schedule, the City's Project Manager may authorize an update 23 to the baseline schedule to facilitate a more practical evaluation of progress. An 24 example of a Baseline Schedule is provided in Specification 01 32 16.1 25 Construction Project Schedule Baseline Example. 26 27 2. Progress Schedule 28 The Contractor updates their schedule at the end of each month to represent the 29 progress achieved in the work which includes any impact from authorized changes 30 in the work. The updated schedule must accurately reflect the current status of the 31 work at that point in time and is referred to as the "Progress Schedule". The City's 32 Project Manager and Project Control Specialist reviews and accepts each progress 33 schedule. In the event a progress schedule is deemed not acceptable, the 34 unacceptable issues are identified by the City within 5 working days and the 35 Contractor must provide an acceptable progress schedule within 5 working days 36 after receipt of non -acceptance notification. An example of a Progress Schedule is 37 provided in Specification 0132 16.2 Construction Project Schedule Progress 38 Example. 39 D. City Standard Schedule requirements 40 The following is an overview of the methodology for developing and maintaining a 41 schedule for delivery of a project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 01 32 16 - 4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 10 1. Schedule Framework - The schedule will be based on the defined scope of work and follow the (Critical Path Methodology) CPM method. The Contractor's schedule will align with the requirements of this specification and will be cost loaded to reflect their plan for execution. Compliance with cost loading can be provided with traditional cost loading of line items OR a projected cost per month for the project when the initial schedule is submitted, updated on a quarterly basis is significant change is anticipated. Overall schedule duration will align with the contractual requirements for the respective scope of work and be reflected in City's Master Project Schedule. The Project Number and Name of the Project is required on each schedule and must match the City's project data. E. Schedule File Name All schedules submitted to the City for a project will have a file name that begins with the City's project number followed by the name of the project followed by baseline (if a baseline schedule) or the year and month (if a progress schedule), as shown below. • Baseline Schedule File Name Format: City Project Number Project Name _Baseline Example: 101376 North Montgomery Street HMAC_Baseline • Progress Schedule File Name Format: City Project Number Project Name _YYYY-MM Example: 101376 North Montgomery Street HMAC 2018_01 • Project Schedule Progress Narrative File Name Format: City Project Number Project Name PN_YYYY-MM Example: 101376 North Montgomery Street HMAC PN 2018_01 F. Schedule Templates The Contractor will utilize the relevant sections from the City's templates provided in the City's document management system as the basis for creating their respective project schedule. Specifically, the Contractor's schedule will align with the layout of the Construction section. The templates are identified by type of project as noted below. • Arterials • Aviation • Neighborhood Streets • Sidewalks (later) • Quiet Zones (later) • Street Lights (later) • Intersection Improvements (later) • Parks • Storm water • Street Maintenance • Traffic • Water 48 G. Schedule Calendar CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 01 32 16 - 5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 10 1 The City's standard calendar for schedule development purposes is based on a 5-day 2 workweek and accounts for the City's eight standard holidays (New Years, Martin 3 Luther King, Memorial, Independence, Labor, Thanksgiving, day after Thanksgiving, 4 Christmas). The Contractor will establish a schedule calendar as part of the schedule 5 development process and provide to the Project Control Specialist as part of the basis 6 for their schedule. Variations between the City's calendar and the Contractor's 7 calendar must be resolved prior to the City's acceptance of their Baseline project 8 schedule. 10 H. WBS & Milestone Standards for Schedule Development 11 The scope of work to be accomplished by the Contractor is represented in the schedule 12 in the form of a Work Breakdown Structure (WBS). The WBS is the basis for the 13 development of the schedule activities and shall be imbedded and depicted in the 14 schedule. 15 16 The following is a summary of the standards to be followed in preparing and 17 maintaining a schedule for project delivery. 18 19 1. Contractor is required to utilize the City's WBS structure and respective 20 project type template for "Construction" as shown in Section 1.4.H below. 21 Additional activities may be added to Levels 1 - 4 to accommodate the needs 22 of the organization executing the work. Specifically the Contractor will add 23 activities under WBS XXXXXX.80.83 "Construction Execution" that 24 delineates the activities associated with the various components of the work. 25 26 2. Contractor is required to adhere to the City's Standard Milestones as shown 27 in Section 1.4.I below. Contractor will include additional milestones 28 representing intermediate deliverables as required to accurately reflect their 29 scope of work. 30 31 I. Schedule Activities 32 Activities are the discrete elements of work that make up the schedule. They will be 33 organized under the umbrella of the WBS. Activity descriptions should adequately 34 describe the activity, and in some cases the extent of the activity. All activities are 35 logically tied with a predecessor and a successor. The only exception to this rule is for 36 "project start" and "project finish" milestones. 37 38 The activity duration is based on the physical amount of work to be performed for the 39 stated activity, with a maximum duration of 20 working days OR a continuous activity 40 in one location. If the work for any one activity exceeds 20 days, break that activity 41 down incrementally to achieve this duration constraint. Any exception to this requires 42 review and acceptance by the City's Project Control Specialist. 43 44 J. Change Orders 45 When a Change Order is issued by the City, the impact is incorporated into the 46 previously accepted baseline schedule as an update, to clearly show impact to the 47 project timeline. The Contractor submits this updated baseline schedule to the City for CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 01 32 16 - 6 CONSTRUCTION PROGRESS SCHEDULE Page 6 of 10 review and acceptance as described in Section 1.5 below. Updated baseline schedules adhere to the following: 1. Time extensions associated with approved contract modifications are limited to the actual amount of time the project activities are anticipated to be delayed, unless otherwise approved by the Program Manager. 2. The re-baselined schedule is submitted by the Contractor within ten workdays after the date of receipt of the approved Change Order. 3. The changes in logic or durations approved by the City are used to analyze the impact of the change and is included in the Change Order. The coding for a new activity(s) added to the schedule for the Change Order includes the Change Order number in the Activity ID. Use as many activities as needed to accurately show the work of the Change Order. Revisions to the baseline schedule are not effective until accepted by the City. K. City's Work Breakdown Structure WBS Code WBS Name XXXXXX Project Name XXXXXX.30 Design XXXXXX.30.10 Design Contractor Agreement XXXX0X.30.20 Conceptual Design (30%) XXXXXX.30.30 Preliminary Design (60%) XXXXXX.30.40 Final Design XXXXXX.30.50 Environmental XXXXXX.30.60 Permits XXXXXX.30.60.10 Permits - Identification XXXXXX.30.60.20 Permits - Review/Approve XXXXXX.40 ROW & Easements XXXXY—X.40.10 ROW Negotiations XXXXXX.40.20 Condemnation XXXXXX.70 Utility Relocation XXXXY—X.70.10 Utility Relocation Co-ordination XXXXXX.80 Construction XXXXXX.80.81 Bid and Award XXXXXX.80.83 Construction Execution XXXXXX.80.85 Inspection XXXXXX.80.86 Landscaping XXXXXX.90 Closeout XXXXXX.90.10 Construction Contract Close-out XXXXXX.90.40 Design Contract Closure L. City's Standard Milestones The following milestone activities (i.e., important events on a project that mark critical points in time) are of particular interest to the City and must be reflected in the project schedule for all phases of work. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 01 32 16 - 7 CONSTRUCTION PROGRESS SCHEDULE Page 7 of 10 1 Activity ID Activity Name 2 Design 3 3020 Award Design Agreement 4 3040 Issue Notice to Proceed - Design Engineer 5 3100 Design Kick-off Meeting 6 3120 Submit Conceptual Plans to Utilities, ROW, Traffic, Parks, Storm Water, 7 Water & Sewer 8 3150 Peer Review Meeting/Design Review meeting (technical) 9 3160 Conduct Design Public Meeting #I (required) 10 3170 Conceptual Design Complete 11 3220 Submit Preliminary Plans and Specifications to Utilities, ROW, Traffic, 12 Parks, Storm Water, Water & Sewer 13 3250 Conduct Design Public Meeting #2 (required) 14 3260 Preliminary Design Complete 15 3310 Submit Final Design to Utilities, ROW, Traffic, Parks, Storm Water, 16 Water & Sewer 17 3330 Conduct Design Public Meeting #3 (if required) 18 3360 Final Design Complete 19 ROW & Easements 20 4000 Right of Way Start 21 4230 Right of Way Complete 22 Utility Relocation 23 7000 Utilities Start 24 7120 Utilities Cleared/Complete 25 Construction 26 Bid and Award 27 8110 Start Advertisement 28 8150 Conduct Bid Opening 29 8240 Award Construction Contract 30 Construction Execution 31 8330 Conduct Construction Public Meeting #4 Pre -Construction 32 8350 Construction Start 33 8370 Substantial Completion 34 8540 Construction Completion 35 9130 Notice of Completion/Green Sheet 36 9150 Construction Contract Closed 37 9420 Design Contract Closed 38 39 1.4 SUBMITTALS 40 A. Schedule Submittal & Review 41 The City's Project Manager is responsible for reviews and acceptance of the Contractor's 42 schedule. The City's Project Control Specialist is responsible for ensuring alignment of 43 the Contractor's baseline and progress schedules with the Master Project Schedule as 44 support to the City's Project Manager. The City reviews and accepts or rejects the 45 schedule within ten workdays of Contractor's submittal. 46 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 01 32 16 - 8 CONSTRUCTION PROGRESS SCHEDULE Page 8 of 10 Schedule Format The Contractor will submit each schedule in two electronic forms, one in native file format (.xer, .xml, .mpx) and the second in a pdf format, in the City's document management system in the location dedicated for this purpose and identified by the Project Manager. In the event the Contractor does not use Primavera P6 or MS Project for scheduling purposes, the schedule information must be submitted in.xls or .xlsx format in compliance with the sample layout (See Specification 0132 16.1 Construction Project Schedule Baseline Example), including activity predecessors, successors and total float. 2. Initial & Baseline Schedule The Contractor will develop their schedule for their scope of work and submit their initial schedule in electronic form (in the file formats noted above), in the City's document management system in the location dedicated for this purpose at least 5 working days prior to Pre Construction Meeting. The City's Project Manager and Project Control Specialist review this initial schedule to determine alignment with the City's Master Project Schedule, including format & WBS structure. Following the City's review, feedback is provided to the Contractor for their use in finalizing their initial schedule and issuing (within five workdays) their Baseline Schedule for final review and acceptance by the City. 3. Progress Schedule The Contractor will update and issue their project schedule (Progress Schedule) by the last day of each month throughout the life of their work on the project. The Progress Schedule is submitted in electronic form as noted above, in the City's document management system in the location dedicated for this purpose. The City's Project Control team reviews each Progress Schedule for data and information that support the assessment of the update to the schedule. In the event data or information is missing or incomplete, the Project Controls Specialist communicates directly with the Contractor's scheduler for providing same. The Contractor re -submits the corrected Progress Schedule within 5 workdays, following the submittal process noted above. The City's Project Manager and Project Control Specialist review the Contractor's progress schedule for acceptance and to monitor performance and progress. The following list of items are required to ensure proper status information is contained in the Progress Schedule. • Baseline Start date • Baseline Finish Date • % Complete • Float • Activity Logic (dependencies) • Critical Path • Activities added or deleted • Expected Baseline Finish date • Variance to the Baseline Finish Date CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 013216-9 CONSTRUCTION PROGRESS SCHEDULE Page 9 of 10 1 B. Monthly Construction Status Report 2 The Contractor submits a written status report (referred to as a progress narrative) at the 3 monthly progress meeting (if monthly meetings are held) or at the end of each month to 4 accompany the Progress Schedule submittal, using the standard format provided in 5 Specification 0132 16.3 Construction Project Schedule Progress Narrative. The content 6 of the Construction Project Schedule Progress Narrative should be concise and complete 7 to include only changes, delays, and anticipated problems. 8 9 C. Submittal Process 10 • Schedules and Monthly Construction Status Reports are submitted in in the City's 11 document management system in the location dedicated for this purpose. 12 • Once the project has been completed and Final Acceptance has been issued by the 13 City, no further progress schedules or construction status reports are required from 14 the Contractor. 15 1. 16 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 17 1.6 CLOSEOUT SUBMITTALS [NOT USED] 18 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 19 1.8 QUALITY ASSURANCE 20 A. The person preparing and revising the construction Progress Schedule shall be 21 experienced in the preparation of schedules of similar complexity. 22 B. Schedule and supporting documents addressed in this Specification shall be prepared, 23 updated and revised to accurately reflect the performance of the construction. 24 C. Contractor is responsible for the quality of all submittals in this section meeting the 25 standard of care for the construction industry for similar projects. 26 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 27 1.10 FIELD [SITE] CONDITIONS [NOT USED] 28 1.11 WARRANTY [NOT USED] 29 1.12 ATTACHMENTS 30 Spec 0132 16.1 Construction Project Schedule Baseline Example 31 Spec 0132 16.2 Construction Project Schedule Progress Example 32 Spec 0132 16.3 Construction Project Schedule Progress Narrative 33 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 0132 16 - 10 CONSTRUCTION PROGRESS SCHEDULE Page 10 of 10 2 PART 2 - PRODUCTS [NOT USED] 3 PART 3 - EXECUTION [NOT USED] 4 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/13/2021 Michael Owen Revised to update specification requirements and eliminate duplicate schedule specifications. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 0132 16.1 CONSTRUCTION PROGRESS SCHEDULE —BASELINE EXAMPLE Pagel of 5 1 SECTION 0132 16.1 2 CONSTRUCTION SCHEDULE - BASELINE EXAMPLE 3 PART1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 The following is an example of a Contractor's project schedule that illustrates the data and expectation for schedule content depicting the baseline for the project. This version of the schedule is referred to as a "baseline" schedule. This example is intended to provide guidance for the Contractor when developing and submitting a baseline schedule. See CFW Specification 0132 16 Construction Schedule for details and requirements regarding the Contractor's project schedule. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 0132 16.1 CONSTRUCTION PROGRESS SCHEDULE —BASELINE EXAMPLE Page 2 of 5 00 o 1 --------- ----------- - - - ----- --- } E� O (0 --------------- ----;--------- ' - 7+' p W Qr ------ T ---- O O U Fir ¢ O � 1 co O] ,O o 0 0 tv N a o 0 0 0 0 b o iv ry N N p" N d o o 76 N {y.0 C J•L s O � fn � � d V rC V U m o IL o � +�-• (6 E a b V 5 s t?� a � Y-a W � � � 3 `� c � �. a U •5 Tao ,� � � 0 = � z a d a •1. rn Cm a H u N c m c fu mmmm m m m m m m m m m m m 2 81 a U 0 z CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 0132 16.1 CONSTRUCTION PROGRESS SCHEDULE —BASELINE EXAMPLE Page 3 of 5 00 r m O C) m 0 m r) W ;= 0) a) 1 G T 1 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 0132 16.1 CONSTRUCTION PROGRESS SCHEDULE —BASELINE EXAMPLE Page 4 of 5 00 t~ CC o z L o O m LL 0 0 6� 0 O 0 4 O z✓1 .'y F/�wI1� a m a� rn m U �' - 0 0❑❑ ry� 4� n� Z � r 1 ��h co ' Z O .0 J m E V 0 {yam/ Z W C O 8 V s U U d � a ILji V lL G iU o ll G c N K 0)� 19 0 yg � �� c� U � ¢ Y i� �n iL U '� O N r1\ 7 d o Q 0' U LL C) III I CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 0132 16.1 CONSTRUCTION PROGRESS SCHEDULE —BASELINE EXAMPLE Page 5 of 5 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 M. Jarrell Initial Issue May 7, 2021 M Owen Revised name due to revising the schedule specification CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 0132 16.2 CONSTRUCTION PROGRESS SCHEDULE —PROGRESS EXAMPLE Page 1 of 5 1 SECTION 0132 16.2 2 CONSTRUCTION SCHEDULE — PROGRESS EXAMPLE 3 PART1- GENERAL 4 The following is an example of a Contractor's project schedule that illustrates the data and 5 expectation for schedule content depicting the progress for the project. This version of the 6 schedule is referred to as a "progress" schedule. This example is intended to provide 7 guidance for the Contractor when developing and submitting a progress schedule. See 8 CFW Specification 01 32 16 Construction Schedule for details and requirements regarding 9 the Contractor's project schedule. 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 0132 16.2 CONSTRUCTION PROGRESS SCHEDULE —PROGRESS EXAMPLE Page 2 of 5 00 CC Q i I CO a--� ¢ ___________________ v� y 6 b� bi b d c, h di bi d b. Yi f'i le�yy N•n O Q 4 G G S N? Ifi ¢¢ N (% 0 Ui ¢¢¢¢ ff O O O F„ U w x w < < w . 3. i. .. 3. 3. . . . b •Q% GJJ . � � � �G � � 9 a< a < 0 Z O 0:F o 0PLO a 9 �+ ro ¢ ¢ Q a n m w w ro w ro m m w m m w w �, r d bx ch b d b di Yn bi n rn ¢ ¢' U o = o o d N m d E a a a a o d ry a r ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ S ¢ ¢4 O 0 O d `b N o ry �' N cb o N LX o A nj m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 o C J O C C {y.0(/ J•L Q � C � O � � `ry ] V d EC d U U o fD (6 a __ 0 6. m Q o Q¢ a1. Uri U Z d r1 2 U Ga E E ro= E E E m U Y E � ob 47 C E 2 ,t+ / V U z° — CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 0132 16.2 CONSTRUCTION PROGRESS SCHEDULE —PROGRESS EXAMPLE Page 3 of 5 00 Q i i _______________- I CC CO IT ---------------------- m v0 Qc� tv N c� ry N N ry +ti ry CV r� N N ry c� N cv iti cv [� [� N m W W m m Y U' ..�� c, d b m Z❑ O 1p - Z Z❑❑❑ N¢❑ [f ❑ O O Z O❑ O 7 0 U O O A d d M ry cv c i m cv o N N o O G 3 m a Ti G i" d G Ti 3 ro m: rn O O Z V.� 0 00 4❑ V.� n'2 , d4i N r O - OI m ca m w m ca m m m ro a� m m M m a. w m m d Z N Z 8 8 ¢ Z 8 3¢ G rn m m fJ f� CI O O 19 (0 O O d d m b S o Q 9 4 N 7 7 o N 9 m 4 ry o 4 S 7 A o b 9 ry m o r w a; o� 01 rn m m � S¢ Q d� r > fd O o 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 o O O o o C J C co N N C {Vcj� C L O � � d V 2 2 _ V V m E m m U oml H E IL (v E c E o �' o o Ti a o Q� 0 C. Cf iy. 75 L2 LL U I I I I z r 1 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 0132 16.2 CONSTRUCTION PROGRESS SCHEDULE —PROGRESS EXAMPLE Page 4 of 5 x 00 , Q a ,F ti o rrTT 1�1 cu ❑ N N N C I N rJ N N N N N N N N i� co - o 0 0 0-- o o �- o o- �- _— _ O Z Z O E - ❑ ❑ ❑ ❑ [n 1�1 1�I Q G w g� L] LJ L] LJ ❑ Z Z 3 ~y ILI f�fh� ,01 7 w' W rr�1 o oS 6 0 0 o 0 0 0� z a m W 1 T E o 0 0 E J 0 C F N V 0 V U 21 ❑ V o U i°- � _0 m U i� E '�' o a I- U H z a � � O m � C: 3 O O C b m rn m m a� rn � m t1 LL G1 0�� I CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 0132 16.2 CONSTRUCTION PROGRESS SCHEDULE —PROGRESS EXAMPLE Page 5 of 5 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 M. Jarrell Initial Issue May 7, 2021 M Owen Revised name due to revising the schedule specification CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised August 13, 2021 01 32 16.3 — PROGRESS NARRATIVE Page 1 of 1 SECTION 0132 16.3 CONSTRUCTION PROJECT SCHEDULE PROGRESS NARRATIVE Reporting Period: Date Issued: Project Name: Contractor Company Name: City Project No: Contractor Schedule Contact: City Project Manager: A. List of activities cnangea in the reporting perioa. 1. (insert text here) 2. (insert text here) 3. (insert text here) 4. (insert text here) 5. (insert text here) 6. (insert text here) 3. List any potential delays and provide mitigation actions 1. (insert text here) 2. (insert text here) 3. (insert text here) List any actual delays and provide recovery actions 1. (insert text here) 2. (insert text here) 3. (insert text here) City of Fort Worth, Texas Construction Project Schedule Narrative Report for CFW Projects North Tarrant Parkway and North Beach Street Intersection Improvements Revised August 13, 2021 CPN 103309 Page 1 of 1 01 32 33 - 1 PRECONSTRUCTION VIDEO Page I of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 32 33 - 2 PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 SECTION 0133 00 SUBMITTALS PART1- GENERAL 1.1 SUMMARY 013300-1 SUBMITTALS Pagel of 8 A. Section Includes: 1. General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 01 33 00 - 2 SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 % inches x 11 inches to 8 '/z inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 01 33 00 - 3 SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 01 33 00 - 4 SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples 1. As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 01 33 00 - 5 SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review l . The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 01 33 00 - 6 SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 01 33 00 - 7 SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Use the Request for Information (RFI) form provided by the City. 3. Numbering of RFI a. Prefix with "RFI" followed by series number, "-xxx", beginning with "01" and increasing sequentially with each additional transmittal. 4. Sufficient information shall be attached to permit a written response without further information. 5. The City will log each request and will review the request. a. If review of the project information request indicates that a change to the Contract Documents is required, the City will issue a Field Order or Change Order, as appropriate. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 013300-8 SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] L13MIIXIMLIX/M11011 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 0135 13- 1 SPECIAL PROJECT PROCEDURES Page 1 of 8 I SECTION 0135 13 2 SPECIAL PROJECT PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Use of Explosives, Drop Weight, Etc. 11 e. Water Department Notification 12 f. Public Notification Prior to Beginning Construction 13 g. Coordination with United States Army Corps of Engineers 14 h. Coordination within Railroad permits areas 15 i. Dust Control 16 j. Employee Parking 17 B. Deviations from this City of Fort Worth Standard Specification 18 1. None. 19 C. Related Specification Sections include, but are not necessarily limited to: 20 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 21 2. Division 1 — General Requirements 22 3. Section 33 12 25 — Connection to Existing Water Mains 23 1.2 PRICE AND PAYMENT PROCEDURES 24 A. Measurement and Payment 25 1. Coordination within Railroad permit areas 26 a. Measurement 27 1) Measurement for this Item will be by lump sum. 28 b. Payment 29 1) The work performed and materials furnished in accordance with this Item 30 will be paid for at the lump sum price bid for Railroad Coordination. 31 c. The price bid shall include: 32 1) Mobilization 33 2) Inspection 34 3) Safety training 35 4) Additional Insurance 36 5) Insurance Certificates 37 6) Other requirements associated with general coordination with Railroad, 38 including additional employees required to protect the right-of-way and 39 property of the Railroad from damage arising out of and/or from the 40 construction of the Project. 41 2. Railroad Flagmen 42 a. Measurement CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 11, 2022 0135 13 - 2 SPECIAL PROJECT PROCEDURES Page 2 of 8 1 1) Measurement for this Item will be per working day. 2 b. Payment 3 1) The work performed and materials furnished in accordance with this Item 4 will be paid for each working day that Railroad Flagmen are present at the 5 Site. 6 c. The price bid shall include: 7 1) Coordination for scheduling flagmen 8 2) Flagmen 9 3) Other requirements associated with Railroad 10 3. All other items 11 a. Work associated with these Items is considered subsidiary to the various Items 12 bid. No separate payment will be allowed for this Item. 13 1.3 REFERENCES 14 A. Reference Standards 15 1. Reference standards cited in this Specification refer to the current reference 16 standard published at the time of the latest revision date logged at the end of this 17 Specification, unless a date is specifically cited. 18 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 19 High Voltage Overhead Lines. 20 1.4 ADMINISTRATIVE REQUIREMENTS 21 A. Coordination with the Texas Department of Transportation 22 1. When work in the right-of-way which is under the jurisdiction of the Texas 23 Department of Transportation (TxDOT): 24 a. Notify the Texas Department of Transportation prior to commencing any work 25 therein in accordance with the provisions of the permit 26 b. All work performed in the TxDOT right-of-way shall be performed in 27 compliance with and subject to approval from the Texas Department of 28 Transportation 29 B. Work near High Voltage Lines 30 1. Regulatory Requirements 31 a. All Work near High Voltage Lines (more than 600 volts measured between 32 conductors or between a conductor and the ground) shall be in accordance with 33 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 34 2. Warning sign 35 a. Provide sign of sufficient size meeting all OSHA requirements. 36 3. Equipment operating within 10 feet of high voltage lines will require the following 37 safety features 38 a. Insulating cage -type of guard about the boom or arm 39 b. Insulator links on the lift hook connections for back hoes or dippers 40 c. Equipment must meet the safety requirements as set forth by OSHA and the 41 safety requirements of the owner of the high voltage lines 42 4. Work within 6 feet of high voltage electric lines 43 a. Notification shall be given to: 44 1) The power company (example: ONCOR) CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 11, 2022 0135 13-3 SPECIAL PROJECT PROCEDURES Page 3 of 8 1 a) Maintain an accurate log of all such calls to power company and record 2 action taken in each case. 3 b. Coordination with power company 4 1) After notification coordinate with the power company to: 5 a) Erect temporary mechanical barriers, de -energize the lines, or raise or 6 lower the lines 7 c. No personnel may work within 6 feet of a high voltage line before the above 8 requirements have been met. 9 C. Confined Space Entry Program 10 1. Provide and follow approved Confined Space Entry Program in accordance with 11 OSHA requirements. 12 2. Confined Spaces include: 13 a. Manholes 14 b. All other confined spaces in accordance with OSHA's Permit Required for 15 Confined Spaces 16 https://www.tceq.texas.gov/assets/public/permitting/air/factsheets/permit-factsheet.pdf 17 D. TCEQ Air Permit 18 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. 19 E. Use of Explosives, Drop Weight, Etc. 20 1. When Contract Documents permit on the project the following will apply: 21 a. Public Notification 22 1) Submit notice to City and proof of adequate insurance coverage, 24 hours 23 prior to commencing. 24 2) Minimum 24 hour public notification in accordance with Section 0131 13 25 F. Water Department Coordination 26 1. During the construction of this project, it will be necessary to deactivate, for a 27 period of time, existing lines. The Contractor shall be required to coordinate with 28 the Water Department to determine the best times for deactivating and activating 29 those lines. 30 2. Coordinate any event that will require connecting to or the operation of an existing 31 City water line system with the City's representative. 32 a. Coordination shall be in accordance with Section 33 12 25. 33 b. If needed, obtain a hydrant water meter from the Water Department for use 34 during the life of named project. 35 c. In the event that a water valve on an existing live system be turned off and on 36 to accommodate the construction of the project is required, coordinate this 37 activity through the appropriate City representative. 38 1) Do not operate water line valves of existing water system. 39 a) Failure to comply will render the Contractor in violation of Texas Penal 40 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 41 will be prosecuted to the full extent of the law. 42 b) In addition, the Contractor will assume all liabilities and 43 responsibilities as a result of these actions. 44 G. Public Notification Prior to Beginning Construction CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 11, 2022 0135 13 - 4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1 1. Prior to beginning construction on any block in the project, on a block by block 2 basis, prepare and deliver a notice or flyer of the pending construction to the front 3 door of each residence or business that will be impacted by construction. The notice 4 shall be prepared as follows: 5 a. Post notice or flyer and City of Fort Worth Door Hangers, 7 days prior to 6 beginning any construction activity on each block in the project area. 7 1) Prepare flyer on the Contractor's letterhead and include the following 8 information: 9 a) Name of Project 10 b) City Project No (CPN) 11 c) Scope of Project (i.e. type of construction activity) 12 d) Actual construction duration within the block 13 e) Name of the contractor's foreman and phone number 14 f) Name of the City's inspector and phone number 15 g) City's after-hours phone number 16 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 17 A. 18 3) City of Fort Worth Door Hangers will be provided to the Contractor for 19 distribution with their notice. 20 4) Submit schedule showing the construction start and finish time for each 21 block of the project to the inspector. 22 5) Deliver flyer to the City Inspector for review prior to distribution. 23 b. No construction will be allowed to begin on any block until the flyer and door 24 hangers are delivered to all residents of the block. 25 H. Public Notification of Temporary Water Service Interruption during Construction 26 1. In the event it becomes necessary to temporarily shut down water service to 27 residents or businesses during construction, prepare and deliver a notice or flyer of 28 the pending interruption to the front door of each affected resident. 29 2. Prepared notice as follows: 30 a. The notification or flyer shall be posted 24 hours prior to the temporary 31 interruption. 32 b. Prepare flyer on the contractor's letterhead and include the following 33 information: 34 1) Name of the project 35 2) City Project Number 36 3) Date of the interruption of service 37 4) Period the interruption will take place 38 5) Name of the contractor's foreman and phone number 39 6) Name of the City's inspector and phone number 40 c. A sample of the temporary water service interruption notification is attached as 41 Exhibit B. 42 d. Deliver a copy of the temporary interruption notification to the City inspector 43 for review prior to being distributed. 44 e. No interruption of water service can occur until the flyer has been delivered to 45 all affected residents and businesses. 46 i Electronic versions of the sample flyers can be obtained from the Project 47 Construction Inspector. 48 I. Coordination with United States Army Corps of Engineers (USAGE) CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 11, 2022 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 0135 13 - 5 SPECIAL PROJECT PROCEDURES Page 5 of 8 1. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. J. Coordination within Railroad Permit Areas 1. At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance c. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed to comply with the railroad's requirements. 3. Railroad Flagmen a. Submit receipts to City for verification of working days that railroad flagmen were present on Site. K. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. L. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 11, 2022 013513-6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED[ 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.4.13 — Added requirement of compliance with Health and Safety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 1.4.E — Added Contractor responsibility for obtaining a TCEQ Air Permit Remove references to Air Pollution watch Days and NCTCOG Clean construction 3/11/2022 M Owen Specification requirements. Clarify need for Door Hangers under in addition to contractor notification of public. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 11, 2022 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 we 01 35 13-7 SPECIAL PROJECT PROCEDURES Page 7 of 8 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH North Tarrant Parkway and North Beach Street hatersectiora Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 11, 2022 0 2 3 4 013513-8 SPECIAL PROJECT PROCEDURES Page 8 of 8 EXHIBIT B FoRT WORTH. DOE NO. XSXX Project !lame: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. (CITY INSPECTOR) AT (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, CONTRACTOR CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 11, 2022 01 45 23 TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to City's document management system, or another external FTP site approved by the City. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 9, 2020 01 45 23 TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 3/9/2020 D.V Magana Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 9, 2020 01 50 00 - 1 TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 50 00 - 2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing 1. Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 50 00 - 3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 50 00 - 4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 55 26 - 1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 SECTION 0155 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Imo\ .71 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division I — General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A.Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. Contractor shall minimize lane closures and impact to vehicular/pedestrian traffic. b. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. c. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 22, 2021 015526-2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 2) A traffic control "Typical" published by City of Fort Worth, the Texas Manual Unified Traffic Control Devices (TMUTCD) or Texas Department of Transportation (TxDOT) can be used as an alternative to preparing project/site specific traffic control plan if the typical is applicable to the specific project/site. B. Street Use Permit Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. 1) Allow a minimum of 5 working days for permit review. 2) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's website. 1.5 SUBMITTALS [NOT USED] A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 22, 2021 01 55 26 - 3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.4 A. Added language to emphasize minimizing of lane closures and impact to traffic. 1.4 A. 1. c. Added language to allow for use of published traffic control "Typicals" i 3/22/2021 M Owen applicable to specific project/site. 1.4 F. 1) Removed reference to Buzzsaw 1.5 Added language re: submittal of permit CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 22, 2021 0157 13- 1 STORM WATER POLLUTION PREVENTION Page 1 of 3 SECTION 0157 13 STORM WATER POLLUTION PREVENTION PART 1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 3125 00 — Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 015713-2 STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR 150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS I�,yt,S . . Submit in accordance with Section 01 33 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 0157 13 - 3 STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 SECTION 0158 13 TEMPORARY PROJECT SIGNAGE PART1- GENERAL numli1Ju/ 10 015813-1 TEMPORARY PROJECT SIGNAGE Page 1 of 3 A. Section Includes: 1. Temporary Project Signage Requirements B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Design Criteria 1. Provide free standing Project Designation Sign in accordance with City's Standard Details for project signs. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July I, 2011 015813-2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 B. Materials 1. Sign a. Constructed of 3/4-inch fir plywood, grade A-C (exterior) or better 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Provide vertical installation at extents of project. 2. Relocate sign as needed, upon request of the City. B. Mounting options a. Skids b. Posts c. Barricade 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE A. General 1. Maintenance will include painting and repairs as needed or directed by the City. 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 015813-3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0160 00 PRODUCT REQUIREMENTS 01 60 00 - 1 PRODUCT REQUIREMENTS Pagel of 2 5 A. Section Includes: 6 1. References for Product Requirements and City Standard Products List 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES [NOT USED] 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 A. A list of City approved products for use is available through the City's website at: 16 https:Happs.fortworthtexas.gov/ProjectResources/ and following the directory path: 17 02 - Construction Documents\Standard Products List 18 B. Only products specifically included on City's Standard Product List in these Contract 19 Documents shall be allowed for use on the Project. 20 1. Any subsequently approved products will only be allowed for use upon specific 21 approval by the City. 22 C. Any specific product requirements in the Contract Documents supersede similar 23 products included on the City's Standard Product List. 24 1. The City reserves the right to not allow products to be used for certain projects even 25 though the product is listed on the City's Standard Product List. 26 D. Although a specific product is included on City's Standard Product List, not all 27 products from that manufacturer are approved for use, including but not limited to, that 28 manufacturer's standard product. 29 E. See Section 0133 00 for submittal requirements of Product Data included on City's 30 Standard Product List. 31 1.5 SUBMITTALS [NOT USED] 32 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 33 1.7 CLOSEOUT SUBMITTALS [NOT USED] 34 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 35 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 9, 2020 016000-2 PRODUCT REQUIREMENTS Page 2 of 2 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 3/9/2020 D.V. Magana Removed reference to Buzzsaw and noted that the City approved product is accessible through the City's website. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 9, 2020 01 66 00 - 1 PRODUCT STORAGE AND HANDLING REQUIREMENTS Pagel of 4 ki 000 Y [�7�[17� GLTIIO PRODUCT STORAGE AND HANDLING REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 66 00 - 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control ofpremises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 66 00 - 3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 66 00 - 4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 North Tarrant Parkway and North Beach Street Intersection Improvements CPN 103309 01 70 00 - 1 MOBILIZATION AND REMOBILIZATION Page 1 of 5 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1.1 SUMMARY A. Section Includes: 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection: Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised November 22, 2016 017000-2 MOBILIZATION AND REMOBILIZATION Page 2 of 5 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel, equipment, and operating 4 supplies to the Site for the issued Work Order. 5 b) Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for: 8 a) Transportation of Contractor's personnel, equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order 11 b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include, but are not necessarily limited to: 22 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1 — General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment [Consult City Department/Division for direction on if 26 Mobilization pay item to be included or the item should be subsidiary. Include the 27 appropriate Section 1.2 A. 1.] 28 1. Mobilization and Demobilization 29 a. Measure 30 1) This Item will be measured by the lump sum or each as the work 31 progresses. Mobilization is calculated on the base bid only and will not be 32 paid for separately on any additive alternate items added to the Contract. 33 2) Demobilization shall be considered subsidiary to the various bid items. 34 b. Payment 35 1) For this Item, the adjusted Contract amount will be calculated as the total 36 Contract amount less the lump sum for mobilization. Mobilization shall be 37 made in partial payments as follows: 38 a) When 1% of the adjusted Contract amount for construction Items is 39 earned, 50% of the mobilization lump sum bid or 2.5% of the total Contract 40 amount, whichever is less, will be paid. 41 b) When 5% of the adjusted Contract amount for construction Items is 42 earned, 75% of the mobilization lump sum bid or 5% of the total Contract 43 amount, whichever is less, will be paid. Previous payments under the Item 44 will be deducted from this amount. 45 c) When 10% of the adjusted Contract amount for construction Items is 46 earned, 100% of the mobilization lump sum bid or 5% of the total Contract CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection: Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised November 22, 2016 017000-3 MOBILIZATION AND REMOBILIZATION Page 3 of 5 1 amount, whichever is less, will be paid. Previous payments under the Item 2 will be deducted from this amount. 3 d) A bid containing a total for "Mobilization" in excess of 5% of total 4 contract shall be considered unbalanced and a cause for consideration 5 of rejection. 6 e) The Lump Sum bid for "Mobilization — Paving/Drainage" shall NOT 7 include any cost or sum for mobilization items associated with 8 water/sewer items. Those costs shall be included in the various 9 water/sewer bid Items. Otherwise the bid Items shall be considered 10 unbalanced and a cause for consideration of rejection. 11 f) The Lump Sum bid for "Mobilization — Paving" shall NOT include 12 any cost or sum for mobilization items associated with drainage items. 13 Those costs shall be included in the "Mobilization — Drainage" Lump 14 Sum bid Item. Otherwise the bid Items shall be considered unbalanced 15 and a cause for consideration of rejection. 16 g) The Lump Sum bid for "Mobilization — Drainage" shall NOT 17 include any cost or sum for mobilization items associated with paving 18 items. Those costs shall be included in the "Mobilization — Paving" 19 Lump Sum bid Item. Otherwise the bid Items shall be considered 20 unbalanced and a cause for consideration of rejection. 21 2) The work performed and materials furnished for demobilization in 22 accordance with this Item are subsidiary to the various Items bid and no other 23 compensation will be allowed. 24 2. Remobilization for suspension of Work as specifically required in the Contract 25 Documents 26 a. Measurement 27 1) Measurement for this Item shall be per each remobilization performed. 28 b. Payment 29 1) The work performed and materials furnished in accordance with this Item 30 and measured as provided under "Measurement" will be paid for at the unit 31 price per each "Specified Remobilization" in accordance with Contract 32 Documents. 33 c. The price shall include: 34 1) Demobilization as described in Section 1.1.A.2.a.1) 35 2) Remobilization as described in Section 1.1.A.2.a.2) 36 d. No payments will be made for standby, idle time, or lost profits associated this 37 Item. 38 3. Remobilization for suspension of Work as required by City 39 a. Measurement and Payment 40 1) This shall be submitted as a Contract Claim in accordance with Article 10 41 of Section 00 72 00. 42 2) No payments will be made for standby, idle time, or lost profits associated 43 with this Item. 44 4. Mobilizations and Demobilizations for Miscellaneous Projects 45 a. Measurement 46 1) Measurement for this Item shall be for each Mobilization and 47 Demobilization required by the Contract Documents 48 b. Payment 49 1) The Work performed and materials furnished in accordance with this Item 50 and measured as provided under "Measurement" will be paid for at the unit CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection: Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised November 22, 2016 017000-4 MOBILIZATION AND REMOBILIZATION Page 4 of 5 1 price per each "Work Order Mobilization" in accordance with Contract 2 Documents. Demobilization shall be considered subsidiary to mobilization 3 and shall not be paid for separately. 4 c. The price shall include: 5 1) Mobilization as described in Section 1.I.A.3.a.1) 6 2) Demobilization as described in Section 1.1.A.3.a.2) 7 d. No payments will be made for standby, idle time, or lost profits associated this 8 Item. 9 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 10 a. Measurement 11 1) Measurement for this Item shall be for each Mobilization and 12 Demobilization required by the Contract Documents 13 b. Payment 14 1) The Work performed and materials furnished in accordance with this Item 15 and measured as provided under "Measurement" will be paid for at the unit 16 price per each "Work Order Emergency Mobilization" in accordance with 17 Contract Documents. Demobilization shall be considered subsidiary to 18 mobilization and shall not be paid for separately. 19 c. The price shall include 20 1) Mobilization as described in Section 1.1.A.4.a) 21 2) Demobilization as described in Section 1.1.A.3.a.2) 22 d. No payments will be made for standby, idle time, or lost profits associated this 23 Item. 24 1.3 REFERENCES [NOT USED] 25 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 26 1.5 SUBMITTALS [NOT USED] 27 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] 34 PART 2 - PRODUCTS [NOT USED] 35 PART 3 - EXECUTION [NOT USED] 36 END OF SECTION CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection: Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised November 22, 2016 017000-5 MOBILIZATION AND REMOBILIZATION Page 5 of 5 Revision Log DATE NAME SUMMARY OF CHANGE 11/22/16 Michael Owen 1.2 Price and Payment Procedures - Revised specification, including blue text, to make specification flexible for either subsidiary or paid bid item for Mobilization. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised November 22, 2016 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 8 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Staking a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "Construction Staking". 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following: 1) Verification of control data provided by City. 2) Placement, maintenance and replacement of required stakes and markings in the field. 3) Preparation and submittal of construction staking documentation in the form of "cut sheets" using the City's standard template. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "As -Built Survey CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised February 14, 2018 01 71 23 - 2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following: 1) Field measurements and survey shots to identify location of completed facilities. 2) Documentation and submittal of as -built survey data onto contractor redline plans and digital survey files. 1.3 REFERENCES A. Definitions 1. Construction Survey - The survey measurements made prior to or while construction is in progress to control elevation, horizontal position, dimensions and configuration of structures/improvements included in the Project Drawings. 2. As -built Survey —The measurements made after the construction of the improvement features are complete to provide position coordinates for the features of a project. 3. Construction Staking — The placement of stakes and markings to provide offsets and elevations to cut and fill in order to locate on the ground the designed structures/improvements included in the Project Drawings. Construction staking shall include staking easements and/or right of way if indicated on the plans. 4. Survey "Field Checks" — Measurements made after construction staking is completed and before construction work begins to ensure that structures marked on the ground are accurately located per Project Drawings. B. Technical References 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) — 01 71 23.16.01— Attachment A —Survey Staking Standards 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available on City's Buzzsaw website). 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land Surveying in the State of Texas, Category 5 1.4 ADMINISTRATIVE REQUIREMENTS A. The Contractor's selection of a surveyor must comply with Texas Government Code 2254 (qualifications based selection) for this project. 1.5 SUBMITTALS A. Submittals, if required, shall be in accordance with Section 0133 00. B. All submittals shall be received and reviewed by the City prior to delivery of work. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Field Quality Control Submittals CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised February 14, 2018 01 71 23 - 3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1. Documentation verifying accuracy of field engineering work, including coordinate conversions if plans do not indicate grid or ground coordinates. 2. Submit "Cut -Sheets" conforming to the standard template provided by the City (refer to 01 71 23.16.01— Attachment A — Survey Staking Standards). 1.7 CLOSEOUT SUBMITTALS B. As -built Redline Drawing Submittal 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of constructed improvements signed and sealed by Registered Professional Land Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards) . 2. Contractor shall submit the proposed as -built and completed redline drawing submittal one (1) week prior to scheduling the project final inspection for City review and comment. Revisions, if necessary, shall be made to the as -built redline drawings and resubmitted to the City prior to scheduling the construction final inspection. 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Construction Staking 1. Construction staking will be performed by the Contractor. 2. Coordination a. Contact City's Project Representative at least one week in advance notifying the City of when Construction Staking is scheduled. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes. If City surveyors are required to re -stake for any reason, the Contractor will be responsible for costs to perform staking. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed disturbed or omitted that the contracted Work cannot take place then the Contractor will be required to stake or re -stake the deficient areas. B. Construction Survey 1. Construction Survey will be performed by the Contractor. 2. Coordination a. Contractor to verify that horizontal and vertical control data established in the design survey and required for construction survey is available and in place. 3. General a. Construction survey will be performed in order to construct the work shown on the Construction Drawings and specified in the Contract Documents. b. For construction methods other than open cut, the Contractor shall perform construction survey and verify control data including, but not limited to, the following: 1) Verification that established benchmarks and control are accurate. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised February 14, 2018 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 2) Use of Benchmarks to furnish and maintain all reference lines and grades for tunneling. 3) Use of line and grades to establish the location of the pipe. 4) Submit to the City copies of field notesused to establish all lines and grades, if requested, and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City, if requested, to verify the guidance system and the line and grade of the carrier pipe. 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 250 linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised February 14, 2018 01 71 23 - 5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) d) Fire hydrants e) Valves (gate, butterfly, etc.) f) Air Release valves (Manhole rim and vent pipe) g) Blow off valves (Manhole rim and valve lid) h) Pressure plane valves i) Underground Vaults (1) Rim and flowline elevations and coordinates for each Underground Vault. 3) Sanitary Sewer a) Cleanouts (1) Rim and flowline elevations and coordinates for each b) Manholes and Junction Structures (1) Rim and flowline elevations and coordinates for each manhole and junction structure. 4) Stormwater — Not Applicable 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY PART 2- PRODUCTS A. A construction survey will produce, but will not be limited to: 1. Recovery of relevant control points, points of curvature and points of intersection. 2. Establish temporary horizontal and vertical control elevations (benchmarks) sufficiently permanent and located in a manner to be used throughout construction. 3. The location of planned facilities, easements and improvements. a. Establishing final line and grade stakes for piers, floors, grade beams, parking areas, utilities, streets, highways, tunnels, and other construction. b. A record of revisions or corrections noted in an orderly manner for reference. c. A drawing, when required by the client, indicating the horizontal and vertical location of facilities, easements and improvements, as built. 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all construction staking projects. These cut sheets shall be on the standard city template which can be obtained from the Survey Superintendent (817-392-7925). 5. Digital survey files in the following formats shall be acceptable: a. AutoCAD (.dwg) b. ESRI Shapefile (.shp) CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use standard templates, if available) 6. Survey files shall include vertical and horizontal data tied to original project control and benchmarks, and shall include feature descriptions PART 3 - EXECUTION 3.1 INSTALLERS A. Tolerances: The staked location of any improvement or facility should be as accurate as practical and necessary. The degree of precision required is dependent on many factors all of which must remain judgmental. The tolerances listed hereafter are based on generalities and, under certain circumstances, shall yield to specific requirements. The surveyor shall assess any situation by review of the overall plans and through consultation with responsible parties as to the need for specific tolerances. a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical tolerance. Horizontal alignment for earthwork and rough cut should not exceed 1.0 ft. tolerance. b. Horizontal alignment on a structure shall be within .0.lft tolerance. c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and walkways shall be located within the confines of the site boundaries and, occasionally, along a boundary or any other restrictive line. Away from any restrictive line, these facilities should be staked with an accuracy producing no more than 0.05ft. tolerance from their specified locations. d. Underground and overhead utilities, such as sewers, gas, water, telephone and electric lines, shall be located horizontally within their prescribed areas or easements. Within assigned areas, these utilities should be staked with an accuracy producing no more than 0.1 ft tolerance from a specified location. e. The accuracy required for the vertical location of utilities varies widely. Many underground utilities require only a minimum cover and a tolerance of 0.1 ft. should be maintained. Underground and overhead utilities on planned profile, but not depending on gravity flow for performance, should not exceed 0.1 ft. tolerance. B. Surveying instruments shall be kept in close adjustment according to manufacturer's specifications or in compliance to standards. The City reserves the right to request a calibration report at any time and recommends regular maintenance schedule be performed by a certified technician every 6 months. 1. Field measurements of angles and distances shall be done in such fashion as to satisfy the closures and tolerances expressed in Part 3. LA. 2. Vertical locations shall be established from a pre -established benchmark and checked by closing to a different bench mark on the same datum. 3. Construction survey field work shall correspond to the client's plans. Irregularities or conflicts found shall be reported promptly to the City. 4. Revisions, corrections and other pertinent data shall be logged for future reference. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised February 14, 2018 01 71 23 - 7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION 3.5 REPAIR / RESTORATION A. If the Contractor's work damages or destroys one or more of the control monuments/points set by the City, the monuments shall be adequately referenced for expedient restoration. 1. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. a. Contractor shall perform replacements and/or restorations. b. The City may require at any time a survey "Field Check" of any monument or benchmarks that are set be verified by the City surveyors before further associated work can move forward. 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. It is the Contractor's responsibility to maintain all stakes and control data placed by the City in accordance with this Specification. This includes easements and right of way, if noted on the plans. B. Do not change or relocate stakes or control data without approval from the City. 3.8 SYSTEM STARTUP A. Survey Checks 1. The City reserves the right to perform a Survey Check at any time deemed necessary. 2. Checks by City personnel or 3' party contracted surveyor are not intended to relieve the contractor of his/her responsibility for accuracy. 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised February 14, 2018 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text"; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised February 14, 2018 FORTWORTH, Section 01 71 23.01- Attachment A Survey Staking Standards February 2017 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 1 of 22 CITY OF FORT WORTH North Tarrant Par",ay and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 These procedures are intended to provide a standard method for construction staking services associated with the City of Fort Worth projects. These are not to be considered all inclusive, but only as a general guideline. For projects on TXDOT right-of-way or through joint TXDOT participation, adherence to the TXDOT Survey Manual shall be followed and if a discrepancy arises, the TXDOT manual shall prevail. (http://onlinemanuals.txdot.gov/txdotmanuals/ess/ess.pdf) If you have a unique circumstance, please consult with the project manager, inspector, or survey department at 817-392-7925. Table of Contents I. City of Fort Worth Contact Information II. Construction Colors III. Standard Staking Supplies IV. Survey Equipment, Control, and Datum Standards V. Water Staking VI. Sanitary Sewer Staking VII. Storm Staking VIII. Curb and Gutter Staking IX. Cut Sheets X. As -built Survey O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 2 of 22 CITY OF FORT WORTH North TarrantPar",ay and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 I. Survey Department Contact Information Physical and mailing address: 8851 Camp Bowie West Boulevard Suite 300 Fort Worth, Texas 76116 Office: (817) 392-7925 Survey Superintendent, direct line: (817) 392-8971 II. Construction Colors The following colors shall be used for staking or identifying features in the field. This includes flagging, paint of laths/stakes, paint of hubs, and any identification such as pin flags if necessary. Utility Color PROPOSED EXCAVATION WHITE ALL ELECTRIC AND CONDUITS POTABLE WATER GAS OR OIL YELLOW TELEPHONE/FIBER OPTIC ORANGE SURVEY CONTROL POINTS, BENCHMARKS, PROPERTY CORNERS, RIGHT-OF-WAYS, AND ALL PAVING INCLUDING CURB, SIDEWALK, BUILDING CORNERS PINK SANITARY SEWER IRRIGATION AND RECLAIMED WATER III. Standard Staking Supplies Item Minimum size Lath/Stake 36" tall Wooden Hub (2"x2" min. square preferred) 6" tall Pin Flags (2.5" x 3.5" preferred) 21" long Guard Stakes Not required PK or Mag nails 1" long Iron Rods (1/2" or greater diameter) 18" long Survey Marking Paint Water -based Flagging 1" wide Marking Whiskers (feathers) 6" long Tacks (for marking hubs) 3/4" long 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 3 of 22 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 IV. Survey Equipment, Control, and Datum Standards A. City Benchmarks All city benchmarks can be found here: http://fortworthtexas.gov/itsolutions/GIS/ Look for 'Zoning Maps'. Under 'Layers' , expand 'Basemap Layers', and check on 'Benchmarks'. B. Conventional or Robotic Total Station Equipment I. A minimum of a 10 arc -second instrument is required. II. A copy of the latest calibration report may be requested by the City at any time. It is recommended that an instrument be calibrated by certified technician at least 1 occurrence every 6 months. C. Network/V.R.S. and static GPS Equipment I. It is critical that the surveyor verify the correct horizontal and vertical datum prior commencing work. A site calibration may be required and shall consist of at least 4 control points spaced evenly apart and in varying quadrants. Additional field checks of the horizontal and vertical accuracies shall be completed and the City may ask for a copy of the calibration report at any time. Network GPS such as the Western Data Systems or SmartNet systems may be used for staking of property/R.O.W, forced -main water lines, and rough -grade only. No GPS staking for concrete, sanitary sewer, storm drain, final grade, or anything that needs vertical grading with a tolerance of 0.25' or less is allowed. D. Control Points Set All control points set shall be accompanied by a lath with the appropriate Northing, Easting, and Elevation (if applicable) of the point set. Control points can be set rebar, 'X' in concrete, or any other appropriate item with a stable base and of a semi -permanent nature. A rebar cap is optional, but preferred if the cap is marked 'control point' or similar wording. Datasheets are required for all control points set. Datasheet should include: A. Horizontal and Vertical Datum used, Example: N.A.D.83, North Central Zone 4202, NAVD 88 Elevations B. Grid or ground distance. — If ground, provide scale factor used and base point coordinate, Example: C.S.F.=0.999125, Base point=North: 0, East=O C. Geoid model used, Example: GEOID12A 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01—Attachment A —Survey Staking Standards.docx Page 4 of 22 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 E. Preferred Grid Datum Although many plan sets can be in surface coordinates, the City's preferred grid datum is listed below. Careful consideration must be taken to verify what datum each project is in prior to beginning work. It is essential the surveyor be familiar with coordinate transformations and how a grid/surface/assumed coordinate system affect a project. Projected Coordinate System: NAD_1983_StatePlane_Texas_North_Central_FIPS_4202_Feet Projection: Lambert_ Conformal_ Conic Fa Ise_Easti ng: 1968500.00000000 False —Northing: 6561666.66666667 Central Meridian:-98.50000000 Standard—Parallel-1: 32.13333333 Standard Parallel 2: 33.96666667 Latitude —Of —Origin: 31.66666667 Linear Unit: Foot US Geographic Coordinate System: GCS_North_American_1983 Datum: D North American 1983 Prime Meridian: Greenwich Angular Unit: Degree Note: Regardless of what datum each particular project is in, deliverables to the City must be converted/translated into this preferred grid datum. 1 copy of the deliverable should be in the project datum (whatever it may be) and 1 copy should be in the NAD83, TX North Central 4202 zone. See Preferred File Namina Convention below F. Preferred Deliverable Format txt csv dwg .job G. Preferred Data Format P, N, E,Z, D, N Point Number, Northing, Easting, Elevation, Description, Notes (if applicable) H. Preferred File Naming Convention This is the preferred format: City Project Number_Description_Datum.csv Example for a project that has surface coordinates which must be translated: File 1: C1234 As -built of Water on Main Street Grid NAD83 TXSP 4202.csv 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 5 of 22 CITY OF FORT WORTH North Tarrant Par",ay and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 File 2: C1234_As-built of Water on Main Street —Project Specific Datum.csv Example Control Stakes 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 6 of 22 CITY OF FORT WORTH North Tarrant Par"vy and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 = Cr w CIO m <I 7 CD z w � Cn r w C W 1016 EL.= 100,Oa' i x J < W 0 � — Z -} C17 C� _W J d W V) W 0 W LL- W Cy J u m [ R < ry El U ElC1= w Cr 0 V. Water Staking Standards 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 7 of 22 CITY OF FORT WORTH North Tarrant Par",ay and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 A. Centerline Staking —Straight Line Tangents I. Offset lath/stakes every 200' on even stations II. Painted blue lath/stake only, no hub is required III. Grade is to top of pipe (T/P) for 12" diameter pipes or smaller IV. Grade to flow line (F/L) for 16" and larger diameter pipes V. Grade should be 3.50' below the proposed top of curb line for 10" and smaller diameter pipes VI. Grade should be 4.00' below the proposed top of curb line for 12" and larger diameter pipes VII. Cut Sheets are required on all staking and a copy can be received from the survey superintendent Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking - Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Same grading guidelines as above III. Staking of radius points of greater than 100' may be omitted C. Water Meter Boxes I. 7.0' perpendicular offset is preferred to the center of the box II. Center of the meter should be 3.0' behind the proposed face of curb III. Meter should be staked a minimum of 4.5' away from the edge of a driveway IV. Grade is to top of box and should be +0.06' higher than the proposed top of curb unless shown otherwise on the plans D. Fire Hydrants I. Center of Hydrant should be 3.0' behind proposed face of curb II. Survey offset stake should be 7.0' from the center and perpendicular to the curb line or water main III. Grade of hydrants should be +0.30 higher than the adjacent top of curb E. Water Valves & Vaults I. Offsets should be perpendicular to the proposed water main II. RIM grades should only be provided if on plans Example Water Stakes 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 8 of 22 CITY OF FORT WORTH North Tarrant Par",ay and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 C \\ \±. SJ . g G \ In (7�j %j \\ 2 0 < 3 0/ f W/L \ zg \ � � S \� : U- \ \zUr / ;\\\ \ Q z � 0< 11 3 ohs £ w d S9w+ , \C-, \ — 2 \S / 7 �a 2 _ E- m: \ $/ / \ e \ \ \ \ =0 . 2z \ \ \\ / LLJ _§ bi \ / 0 \ % u 1 \ M) k u ^ \\ § E ]+ \ ) .§§ § z z \ � » 2 o « G M= ® § G � U / �§ 2 2 ; , <CL7 10M cow P- j § /\ a / y u» 2 VE Sanl aC Sewer Staking »%pc aA Governance Pmc a\Tempoowspec ge\Ca@bIDeIvR\CapDelivery Div01\0171 2 aEo1 Attachment ASurp Stakingaandaesdoa Page g&ZZ CITY OF FORT *oz N+ Tarrant Parkway adNm Beach Street Intersection + w_m STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS c &103309 A. Centerline Staking — Straight Line Tangents I. Inverts shall be field verified and compared against the plans before staking II. Painted green lath/stake WITH hub and tack or marker dot, no flagging required III. 1 offset stake between manholes if manholes are 400' or less apart IV. Offset stakes should be located at even distances and perpendicular to the centerline V. Grades will be per plan and the date of the plans used should be noted VI. If multiple lines are at one manhole, each line shall have a cut/fill and direction noted VII. Stakes at every grade break VIII. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Staking of radius points of greater than 100' may be omitted C. Sanitary Sewer Manholes I. 2 offset stakes per manhole for the purpose of providing alignment to the contractor II. Flowline grade should be on the lath/stake for each flowline and direction noted III. RIM grade should only be on the stake when provided in the plans 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 10 of 22 CITY OF FORT WORTH North Tarrant Par"vy and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Example Sanitary Sewer Stakes w �7 C x LL � 0 �77'' /S (L SS sra=s+ c-ate � c-sue -ZLL- a-o� w - 'w L� w o ` 9 m £} H p fC 1P {F �• T fy❑ Lbw 447-' w 12 O f 5 SS11:2 aA-3+71M ua C-3� C-3� 01Z W r O � wzd 2 w � w ~ w + 'd a d w V1 W w x Q < 7C/S SS O {Sw Z� w N p U} 2 o/s � ss Li d W � LLJ z ww n Cn Z f}0- N + WIL w r F F F FE: 4 r• rz � A0 1 ,y cT ,y 4 �4 4y � +ML w IL a y ti G LLJ w w � �!j 1W Orn zy!77 d U, + 0 q) + W d w w U: I-L m iF- FF 2 w ` m j- 5 FELM ail' & m1 J� W:f-, Q G a w w a171 z z F 4 aW$ 4 m J J _ m 2 'i w -a+a c-sues c-o�' v,w �m CD Zn `wy E� rLL �r d z LOLL m3 � C c3 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.O1_Attachment A_Survey Staking Standards.docx Page 11 of 22 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 VII. Storm Sewer & Inlet Staking A. Centerline Staking — Straight Line Tangents I. 1 offset stake every 200' on even stations II. Grades are to flowline of pipe unless otherwise shown on plans III. Stakes at every grade break IV. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Staking of radius points of greater than 100' may be omitted C. Storm Drain Inlets I. Staking distances should be measured from end of wing II. Standard 10' Inlet = 16.00' total length III. Recessed 10' Inlet = 20.00' total length IV. Standard double 10' inlet = 26.67' total length V. Recessed double 10' inlet = 30.67' total length D. Storm Drain Manholes I. 2 offset stakes per manhole for the purpose of providing alignment to the contractor ll. Flowline grade should be on the lath/stake for each flowline and direction noted III. RIM grade should only be on the stake when provided in the plans 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 12 of 22 CITY OF FORT WORTH North Tarrant Pur",ay and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Example Storm Inlet Stakes FRONT (SIDE FACING BACK C30E FAahr- R.ELW.) POINT # i HLe ELEvan[Fa HUB YATI1 TACK SACK CF CLIRB FLOYLINE — — EDGE OF PAVEMENT n m m 0 m m 1 z { IDENTIFIES ti1HlLFI 1t ENE, OF THE 411NG BEING STAKED II INLET STATION } (IF NOTED ON P IDENTIFIES GRADE (T1 1 TO TOP OF CURB 0 G j IDENTIFIES GRADE TO FLOVLINE c7 I NOFL �_I IhII FEEOUIREEI It -I LIEU OF PINk R;-'OJTF-C LAII-I LAN S] BACK {SUE FAI3NG R.QW_) PCINT F IQ s� Hue ELEV,4nm c FRONT (SIDE FACING 0 n r f rn IDENTIFIES WHICH END OF THE YdNG f BEING STAKED �p 1 T r TJC a ITL c7 I DISTANCES FOR INLETS STANDARD 10' — 16' RECESSED 1CY' — 20' STANDARD DUJBLE 10' — PB.e7 RECESSED IMBLE 10] =3,_67 — — — — — — — — — — I I GAG} OF INLET H I w CII bI flh{ I FACE OF INLET FA?:E OF INLET EDGE OF PA,44AENT EDCE OF PAVEMENT 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 13 of 22 BACK OF CURS i FLOWLINE --- EDGE OF PAVEMENT CITY OF FORT WORTH North Tarrant Pcarkwcq and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 VIII. Curb and Gutter Staking A. Centerline Staking — Straight Line Tangents V. 1 offset stake every 50' on even stations VI. Grades are to top of curb unless otherwise shown on plans VII. Stakes at every grade break VIII. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves III. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval IV. Staking of radius points of greater than 100' may be omitted 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 14 of 22 CITY OF FORT WORTH North Tarrant Parkmzry and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Example Curb & Gutter Stakes FRONT (SIDE FACING (�) 0 FRONT 16ENnRE5 ENE) FRONT {SIDE FACING �} POINT OF elo FRONT Tr+GENT (SIDE FACING ) IDENTIFIES STAR.T PC S1 (lE FACING J/ PONT OF CURVATURE ( }/ N w 9 m 4 A LA C IIPT7 IDENTIFIE4 OFFSET 13 TO O Tom. . (SIDE FACING R.C.W.) FOLK CF C Ck F,JC TJC O O PrT� R7FORF✓,OE OFF CCUMNT fs� $ + a�C III ` O r u III m II N„FIES GRADE IS b p TO TOP OF 0UF7H NO DRADE ON 0 I 4 HUB ELEVATION + RAPIUS POINTJ -� 1 0 i p+ I y IN LIEU OF F'INk RAINTEG D47H TOP OF CURB �r PACK OF CURB _r rr FACE OF CURB L FL0WUNE EDGE OF PAVEMENT Example Curb & Gutter Stakes at Intersection O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 15 of 22 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 P � E3 La , ° z /, 0-amd \ g@s a= m[} Ro ] � / / � w pc 01 Ld F- 3C5NYi910 ». a \ / n=am \\/ (&�® la 21 z m »n a _/ wo 6® §G { ( ` _ � y ® u3 ®. ) _ > \_ ) 2 ya Q3 \ \ /6 »%pc aA Governance Pmc a\Tempoowspec ge\Ca@bIDeIvR\CapDelivery Div01\0171 2 aE01 Attachment A S rp Stakingaandaesdoa g 16 of 22 CITY OF FORT WORTH Aro, Tarrant Par"m and N GBH Street Inte Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS c «lg+9 IX. Cut Sheets A. Date of field work B. Staking Method (GPS, total station) C. Project Name D. City Project Number (Example: C01234) E. Location (Address, cross streets, GPS coordinate) F. Survey company name G. Crew chief name H. A blank template can be obtained from the survey superintendent (see item I above) Standard City Cut Sheet Date: ❑ TOTAL Staking Method: ❑ GPS STATION LOCATION: CONSULTANT/CONTRACTOR SURVEY CREW INITIALS City Project Number: Project Name: INEX01OWN ALL GRADES ARE TO FLOWLINE OR TOP OF CURB UNLESS OTHERWISE NOTED. PT # STATION OFFSET -LT/+RT DESCRIPTION PROP. GRADE STAKED ELEV. - CUT + FILL 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 17 of 22 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 X. As -built Survey A. Definition and Purpose The purpose of an as -built survey is to verify the asset was installed in the proper location and grade. Furthermore, the information gathered will be used to supplement the City's GIS data and must be in the proper format when submitted. See section IV. As -built survey should include the following (additional items may be requested): Manholes Top of pipe elevations every 250 feet Horizontal and vertical points of inflection, curvature, etc. (All Fittings) Cathodic protection test stations Sampling stations Meter boxes/vaults (All sizes) Fire lines Fire hydrants Gate valves (rim and top of nut) Plugs, stub -outs, dead-end lines Air Release valves (Manhole rim and vent pipe) Blow off valves (Manhole rim and valve lid) Pressure plane valves Cleaning wyes Clean outs Casing pipe (each end) Inverts of pipes Turbo Meters 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 18 of 22 CITY OF FORT WORTH North Tarrant Par"vy and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 B. Example Deliverable A hand written red line by the field surveyor is acceptable in most cases. This should be a copy of the plans with the point number noted by each asset. If the asset is missing, then the surveyor should write "NOT FOUND" to notify the City. 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 19 of 22 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 20 of 22 CITY OF FORT WORTH North Tarrant Par",ay and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 00010 —OWL N' CL 077W RM SrA 0.5.00 — 12'WL LFLOYD DR! STA . STA pwxv — l2WL (FtLYD IM RE"E R SAYAGE EXIST. SEGYN pnop,.12'WATER GATE VALVE & REDVMR iro LLI4NFCT TO EXIST WATER 1-i2X 12rEE BEND PIN P 2- /(.r� IA15TAt.1: FATSOLID SLEtyE sTAD'2@W— I2'WL h 12' X 9 REDUCER h12 OWE VXVE ��7 ��� � h�Y•VFRI. BEND STA Oam — rWL I -le ,N d5471l0663! �� �/ N-694J09sd9H1 ( f N�5945C7815f2- VMSTAL, Jr E.pa 53791fo.,2 E•22DO371794 Ev^2515317_WG HEX PMGEYi TEr I-eaer VALVE-V F FtRE !0' m y 1 I1 LF 6 IIYLYIw I,FxUJ a. Ra. �' I.✓ ti 0'�4 / ,r=�.rwmnifv H` 7/ h 0 GATE VAWE Mb947u30n?69 7; �9 � � sxtucm�w �'J �*' �e � CP. •r3 k' Ra w.Fai wnm '14 7;"(,ITT adsr.N'n R fluA fiV.9 h'�947ri396gGO ��. A I]LJ1 & LOT 2 xcw wad+ w,v�r vwm t'�i NJt�lmm fh N� !Ad h9.• • !d'Nfhrry y /2 WATER # �T 5P" \�` �\ b cP. 114 �55 i� ww MTam f 1 -2 x. r2 ors E[EV. i" d142 �. � f2WATER y. - L-37Tf EX. J � r TBM •i/ % !,I4W saA � PROPOSED SANITARY S CAM M� SEE SHEET EEX� SrA o-D - t2 w 1ASAII, LDT A h-OfXVERT.BEND 0—ft5+xfc —M �y M-&WO77,094 cMr b.*rs US / SrA. 0'017117 — I2'WL (FILTM D.RI STA O.57M — 0 STA 015W — 12'w 1 INSTAL!, OKFAUf AYSTAU,r h I2A1. SWD SLEEVE h rl VER7: BEMO I.0 AS•VERt BEND S' LF A OWATER PIPE M 94T0555947 M459fF05z_ 657' C NN= TO EXisr. 0WATER E-229MMB13 &2296301B370 N�34Tf�E53279 E-2�J09dT36 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 21 of 22 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 23.16.01_Attachment A_Survey Staking Standards.docx Page 22 of 22 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 0:\S 23.16.01_Attachment A_Survey Staking Standards.docx Page 23 of 23 1\01 71 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Obviously the .csv or Axt file cannot be signed/sealed by a surveyor in the format requested. This is just an example and all this information should be noted when delivered to the City so it is clear to what coordinate system the data is in. POINT NO. NORTHING FASTING ELEV. DESCRIPTION 1 6946257.189 2296079.165 726.09 SSMH RIM 2 6946260.893 2296062.141 725.668 GV RIM�� 3 6946307.399 2296038.306 726.85 GV RIM CoLk-D/&r ftj s 4 6946220.582 2296011.025 723.358 SSMH RIM 5 6946195.23 2296015.116 722.123 GV RIM r 6 6946190.528 2296022-721 722,325 FH 7 6946136.012 2295992.115 719.448 WM RIM 8 6946002.267 2295919.133 713.331 WM RIM �P�Cd1 9 6946003.056 2295933.418 713.652 CO RIM z-r�c-_ Ct lf-lz 10 6945984.677 2295880.52 711.662 SSMH RIM 11 6945986.473 2295869.892 710.046 WM RIM 12 6945895.077 2295860.962 707.72 WM RIM 13 6945896.591 2295962.188 708.205 WM RIM Uef-7,NC t4 L 14 6945934.286 2295941.925 709.467 WM RIM 15 6945936.727 2295930.441 710.084 CO RIM CG6( -I) n. { 16 6945835.678 2295799.707 707.774 SSMH RIM r 17 6945817.488 2295827.011 708.392 SSMH RIM 18 6945759.776 2295758.643 711.218 SSMH RIM 19 6945758.563 2295778.424 710.086 GV RIM 20 6945743.318 229S788.392 710.631 GV RIM 21 6945723.219 2295754.394 712.849 GV RIM 22 6945682.21 2295744.22 716.586 WM RIM r 23 6945621.902 2295669.471 723.76 WM RIM 24 6945643.407 2295736.03 719.737 CO RIM C 25 6945571.059 2295655.195 727.514 SSMH RIM �Ari.l 26 6945539.498 2295667.803 729.123 WM RIM 7U 27 6945519.834 2295619A9 732.689 WM RIM C p ��t �I�S t-- JT-S 28 6945417.879 2295580.27 740.521 WM R9M I Sfi I 29 6945456.557 2295643.145 736.451 CO RIM 30 6945387.356 2295597.101 740.756 GV RIM 31 6945370.688 2295606.793 740.976 GV RIM 32 6945383.53 2295610.559 740.408 FH 33 6945321.228 2295551.105 746.34 WM RIM 34 6945319.365 2295539.728 746,777 CO RIM 35 6945242.289 2295570.715 749.454 WM RIM 36 6945233.624 2295544.626 749.59 SSMH RIM n 37 6945206.483 2295529.305 751.058 WM RIM , i- •� 38 6945142.015 2295557.666 750.853 WM RIM �-(Amp 39 6945113.445 2295520.335 751.871 WM RIM 40 6945049.02 2295527.345 75L257 SSMH RIM E f7- 41 6945041.024 2295552.675 751.79 WM RIM 42 43 6945038.878 6945006.397 2295552.147 2295518.135 751.98 WM RIM 752.615 WM RIM{i � y. 44 6944944.782 2295520.635 752.801 WM RIM 45 6944943.432 2295556.479 752.156 WM RIM 46 6944860.416 2295534.397 752.986 SSMH RIM 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 24 of 24 CITY OF FORT WORTH North Tarrant Par"vy and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 C. Other preferred as -built deliverable Some vendors have indicated that it is easier to deliver this information in a different format. Below is an example spreadsheet that is also acceptable and can be obtained by request from the survey superintendent. 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 25 of 25 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 alo _ - - r ---- ------ -- ----- - ------ ------ ----- ------ ------ ------ ------ -- ------ ------ m a _E $ a _ E i E iLL _ m s a 6a — E � - - ---- ---- - --- - Ihl,. E C 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 26 of 26 CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 SECTION 0174 23 CLEANING PART 1- GENERAL 1.1 SUMMARY 01 74 23 - 1 CLEANING Page 1 of 4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 017423-2 CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 017423-3 CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Interior Final Cleaning 1. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and other foreign materials from sight -exposed surfaces. 2. Wipe all lighting fixture reflectors, lenses, lamps and trims clean. 3. Wash and shine glazing and mirrors. 4. Polish glossy surfaces to a clear shine. 5. Ventilating systems a. Clean permanent filters and replace disposable filters if units were operated during construction. b. Clean ducts, blowers and coils if units were operated without filters during construction. 6. Replace all burned out lamps. 7. Broom clean process area floors. 8. Mop office and control room floors. D. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 74 23 - 4 CLEANING Page 4 of 4 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 77 19 - 1 CLOSEOUT REQUIREMENTS Pagel of 3 SECTION 0177 19 CLOSEOUT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative, 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 22, 2021 017719-2 CLOSEOUT REQUIREMENTS Page 2 of 3 PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. The Right-of-way shall be cleared of all construction materials, barricades, and temporary signage. 4. Upon completion of Work associated with the items listed in the City's written notice, inform the City that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 5. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 22, 2021 01 77 19 - 3 CLOSEOUT REQUIREMENTS Page 3 of 3 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 3/22/2021 M Owen 3.4 C. Added language to clarify and emphasize requirement to "Clearing ROW" CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised March 22, 2021 01 78 23 - 1 OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART 1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00 . All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 '/2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 01 78 23 - 2 OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 017823-3 OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 01 78 23 - 4 OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 01 78 23 - 5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A. 1 —title of section removed CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised December 20, 2012 SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 78 39 - 1 PROJECT RECORD DOCUMENTS Page 1 of 4 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 017839-2 PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [oR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 017839-3 PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum, in accordance with the intervals set forth in Section 01 71 23, clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch., the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 01 78 39 - 4 PROJECT RECORD DOCUMENTS Page 4 of 4 c. Call attention to each entry by drawing a "cloud" around the area or areas affected. d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised July 1, 2011 99 99 99 - 1 SPECIAL SPECIFICATIONS 4 Page 1 of 3 SECTION 99 99 99 SPECIAL SPECIFICATIONS 9999.GN01 Landscape & Irrigation Adjustment Allowance Contractor shall adjust landscape and irrigation to match the existing landscape conditions and existing irrigation coverage. Perform irrigation system work under the supervision of a person possessing an irrigator's license issued by the TCEQ. Provide documentation of this license. Follow the codes of the controlling utility authority for water and electrical connection and service. Coordinate irrigation system installation with plant installation, when plant installation is specified, to ensure that watering requirements are met. Prevent damage to vegetation, slopes, utilities, structures, and other amenities. Repair any damage within the right of way caused by the Contractor. Irrigation Pipe. Use polyvinyl chloride (PVC) pipe meeting ASTMD2241, SDR 13.5, SDR 17, SDR 21; or ASTMDI785, Schedule 40. Fittings. Furnish fittings as shown on the plans. PVC fittings must meet ASTMD2466. Excavation and Trenching. Excavate and trench to a sufficient depth to provide for a minimum of 12-in. soil cover for all lines or as shown on the plans. Use common trenches for irrigation lines and wire runs where feasible. Pipe and Valve Assembly. Assemble pipe and fittings as recommended by the manufacturers. Clean pipe and fittings of dust, dirt, and moisture before assembly. Make connections between plastic pipe and metal valves with threaded fittings and plastic adapters. Install backflow preventers as required by ordinances of the controlling water utility authority. Install pipe, valves, and valve boxes a minimum of 12 in. from sidewalks, buildings, walls, and other objects, or as directed. Sprinkler Heads and Drip Tubing. Install sprinkler heads and drip tubing in accordance with the manufacturer's recommendations or as directed. Low -Voltage Wire. Install wire in trenches below thepipe or in a minimum 1-in. PVCpipe with at least 12 in. of cover over its entire run. Install wire in continuous lengths. Splice wire, if required, in valve boxes using waterproof materials. Closing and Flushing of PVC Pipe. Cap or plug pipe after installation to prevent entry of foreign materials that would obstruct the flow of water. Leave caps or plugs in place until removal is necessary for completion of the installation. Thoroughly flush all water lines. Hydrostatic Tests. Notify the Engineer in writing at least 48 hr. before testing. Center load all pipe with enough backfill to prevent arching or slipping while underpressure. After all welded joints have cured for at least 24 hr., test the main lines from the meter to the valves, with all valves closed, for at least 2 consecutive hours by applying a continuous and static minimum 80 psi water pressure. Repair leaks if necessary and retest. Maintain the lines under static pressure for 24 hr. without leaks before final approval. Backfill and Compaction. Backfill trenches and other excavations with soil free of objectionable material after the irrigation system is fully operational, all tests and inspections have been performed, and the results are approved. Backfill and compact in 8-in. layers. Smooth and shape disturbed soil to final grade or as directed. Items bid as allowances shall consist of landscape and irrigation adjustments requested by the Owner. The payment to the Contractor for miscellaneous construction work shall be the actual cost of the work plus ten percent (1091o) to cover the cost of bond and overhead incurred by the Contractor in handling the landscape and irrigation adjustments. Should the Contractor damage existing features or utility lines due to his negligence, where required repairs or adjustments were not specified in the plans and specifications, the features shall be repaired and adjusted by the Contractor at the Contractor's expense. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 999999-2 SPECIAL SPECIFICATIONS Page 2 of 3 9999.GN02 Tree Protection Contractor shall install and remove tree protection to the limits shown on the plans and in accordance with the details and notes provided on the plans. Payment will be made at the unit price bid per each (EA) and shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to install. 9999.GN03 Contingency Allowance - Miscellaneous Construction Items bid as allowances shall consist of miscellaneous construction adjustments and other non -subsidiary items requested for construction by the Owner. The payment to the Contractor for miscellaneous construction work shall be the actual cost of the work plus ten percent (10%) to cover the cost of bond and overhead incurred by the Contractor in handling the miscellaneous construction. Should the Contractor damage existing features or utility lines due to his negligence, where required repairs or adjustments were not specified in the plans and specifications, the features shall be repaired and adjusted by the Contractor at the Contractor's expense. REMOVED 9999.PV01 4" Conc Sidewalk, Stamped and Integral Color Contractor shall install to the limits shown on the plans and in accordance with the details and notes provided on the plans. Payment will be made at the unit price bid per square foot (SF) and shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to install. 9999.PV02 Pedestrian Handrail, Type D Contractor shall install to the limits shown on the plans and in accordance with the details and notes provided on the plans and TxDOT Item 450. Payment will be made at the unit price bid per linear foot (LF) and shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to install. 9999.PV03 13" Cone Pvmt, Stamped and Integral Color Contractor shall install to the limits shown on the plans and in accordance with the details and notes provided on the plans. Payment will be made at the unit price bid per linear foot (SF) and shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to install. 9999.PV04 3" Concrete Mountable Curb Contractor shall install to the limits shown on the plans and in accordance with the details and notes provided on the plans. Payment will be made at the unit price bid per linear foot (LF) and shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to install. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 999999-3 SPECIAL SPECIFICATIONS Page 3 of 3 9999.DR01 Concrete Pilot Channel (511) Contractor shall install to the limits shown on the plans and in accordance with the details and notes provided on the plans. Payment will be made at the unit price bid per square foot (SF) and shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to install. 9999.DR02 Concrete Flume (5') Contractor shall install to the limits shown on the plans and in accordance with the details and notes provided on the plans. Payment will be made at the unit price bid per square foot (SF) and shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to install. 9999.DR03 20' Recessed Inlet (Open Back) Contractor shall install to the limits shown on the plans and in accordance with the details and notes provided on the plans. Payment will be made at the unit price bid per each (EA) and shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to install. 9999.TS01 INS TRF SIG PL AM(S)1 ARM(65') Contractor shall install to the limits shown on the plans and in accordance with the details and notes provided on the plans and TxDOT Item 686. Payment will be made at the unit price bid per each (EA) and shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to install. 9999.TS02 DRILL SHAFT (TRF SIG POLE) (48 IN) Contractor shall install to the limits shown on the plans and in accordance with the details and notes provided on the plans and TxDOT Item 416. Payment will be made at the unit price bid per linear foot (LF) and shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to install. 9999.PM01 6" Round Reflective Round Marker (W) Contractor shall install to the limits shown on the plans and in accordance with the details and notes provided on the plans. Payment will be made at the unit price bid per each (EA) and shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to install. END SECTION CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 APPENDIX GC-4.01 Availability of Lands ■ Right -of -Way and Easement Documents GC-4.02 Subsurface and Physical Conditions ■ Geotechnical Boring Logs and Laboratory Results GC-4.04 Underground Facilities ■ Table of Level A SUE Results GC-4.06 Hazardous Environmental Condition at Site ■ None GC-6.06.1) Small Business Compliance ■ Small Business Utilization Form GC-6.07 Wage Rates ■ 2013 Prevailing Wage Rates — Heavy and Highway Construction Projects GC-6.09 Permits and Utilities ■ None GC-6.24 Nondiscrimination �,Tfi3jm- GR-01 60 00 Product Requirements ■ City of Fort Worth Water Department Standard Product List CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 1, 2025 GC-4.01 Availability of Lands THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH North Tarrant Partway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 1, 2025 EXHIBIT "A" City Project No.: 103309 City Project Name: N. Tarrant Pkwy. At N. Beach St. Parcel 01 4464 North Tarrant Parkway Lot 1, Block A, Benderson Addition Being a 271 square foot (0.0062 acre) tract of land situated in the Charles C. Whyte Survey, Abstract No. 1611, City of Fort Worth, Tarrant County, Texas, and being a portion of Lot 1, Block A of Benderson Addition, an addition to the City of Fort Worth, Tarrant County, Texas as recorded in Cabinet A, Slide 8484 of the Plat Records of Tarrant County, Texas, said Lot 1 being described in the deed to Ronald Benderson, Randall Benderson and David H. Baldauf as Trustees under a Trust Agreement dated October 14, 1985 known as The Benderson 85-1 Trust recorded in Instrument No. D206124738 of the Official Public Records of Tarrant County, Texas, said 271 square foot (0.0062 acre) tract of land being more particularly described by metes and bounds as follows: COMMENCING at a Mag Nail found for the northwest corner of said Lot 1 and the northeast corner of Lot 5, Block A of North Beach -Thompson Addition, an addition to the City of Fort Worth, Tarrant County, Texas as recorded in Cabinet A, Slide 11315 of said Plat Records of Tarrant County, Texas, said Mag Nail also being in the existing southwesterly right-of-way line of North Tarrant Parkway (a 200' right-of-way); THENCE South 69 degrees 07 minutes 32 seconds East, with the existing southwesterly right-of-way line of said North Tarrant Parkway and with the northeasterly line of said Lot 1, a distance of 181.15 feet to a 1/2 inch iron rod with cap stamped "Yellow Rose 6574" set for the POINT OF BEGINNING of the herein described tract of land, said 1/2 inch iron rod with cap stamped "Yellow Rose 6574" also being the intersection of the existing southwesterly right-of-way line of said North Tarrant Parkway and the northeasterly line of said Lot 1 with the proposed southwesterly right-of-way line of said North Tarrant Parkway; THENCE South 69 degrees 07 minutes 32 seconds East, with the existing southwesterly right-of-way line of said North Tarrant Parkway and with the northeasterly line of said Lot 1, a distance of 30.42 feet to an "X" cut found for the northeast corner of said Lot 1, said "X cut also being the intersection of the existing southwesterly right-of-way line of said North Tarrant Parkway with the existing west right-of-way line of North Beach Street (a variable width right-of-way); THENCE South 01 degree 32 minutes 35 seconds East, with the existing west right-of-way line of said North Beach Street and with the east line of said Lot 1, a distance of 39.93 feet to a 1/2 inch iron rod with cap stamped "Yellow Rose 6574" set for the intersection of the existing west right-of-way line of said North Beach Street and the east line of said Lot 1 with the proposed southwesterly right-of-way line of said North Tarrant Parkway; THENCE North 01 degree 44 minutes 45 seconds West, with the proposed southwesterly right-of- way line of said North Tarrant Parkway, a distance of 5.66 feet to a 1/2 inch iron rod with cap stamped "Yellow Rose 6574" set for the beginning of a non -tangent curve to the left having a radius of 43.50 feet, a central angle of 44 degrees 59 minutes 25 seconds, and a chord that bears North 24 degrees 13 minutes 57 seconds West, a chord length of 33.29 feet; Exhibit "A" Page 1 of 2 Yellow Rose Mapping LLC 2011 Woodland Hills Lane Weatherford, Texas 76087 817-703-6578 THENCE Northwesterly, with the proposed southwesterly right-of-way line of said North Tarrant Parkway and with said non -tangent curve to the left, an arc length of 34.16 feet to a 1/2 inch iron rod with cap stamped "Yellow Rose 6574" set for corner; THENCE North 46 degrees 43 minutes 40 seconds West, with the proposed southwesterly right-of- way line of said North Tarrant Parkway, a distance of 21.51 feet to the POINT OF BEGINNING and containing 271 square feet or 0.0062 acres of land. Notes: 1. A parcel plat of same date accompanies this legal description. 2. Bearings are based on the Texas Coordinate System of 1983 (NAD83) (NA2011), North Central Zone (4202). Distances and areas are surface values using the grid to surface adjustment factor of 1.00012. 3. This survey was performed without the benefit of a title report. There may be easements and/or covenants affecting this property not shown hereon. * SURVEYOR CERTIFICATE * TO ALL PARTIES INTERESTED IN TITLE TO THE PREMISES SURVEYED, I DO HEREBY STATE THAT THE ABOVE LEGAL DESCRIPTION WAS PREPARED FROM PUBLIC RECORDS AND FROM AN ACTUAL AND ACCURATE SURVEY UPON THE GROUND AND THAT SAME IS TRUE AND CORRECT. Company Name: Yellow Rose Mapping LLC ST By: GHARLES S. RUBY Sury yor's Name: Charles S. 6574 Registered Professional LandKurveyor y?'PPPs`o�a?y0 Texas No. 6574 O .. U R4�' Date of Survey: June 25, 2023 ao Texas Firm No. 10194700 Exhibit "A" Page 2 of 2 Yellow Rose Mapping LLC 2011 Woodland Hills Lane Weatherford, Texas 76087 817-703-6578 LINE TABLE LINE BEARING DISTANCE L1 S 69'07'32" E 30.42' L2 S 01'32'35" E 39.93' L3 N 01'44'45" W 5.66' L4 N 4643'40" W 21.51' LOT 5, BLOCK A NORTH BEACH-THOMPSON ADDITION CABINET A, SLIDE 11315 P.R.T.C.T. i EXHIBIT "B " PARCEL N0. 01IL P. 0 oC. N RTN TqR RIGHT—OF—WAY % 2p0 Rl�q oTgRKtt,,,,,, �K'AY) vV'9 Y \ S g9.0j32.. � �F I8j P.O.B. � 20' BUILDING LINE CABINET A, SLIDE 8484 \ P.R.T.C.T. RONALD BENDERSON, RANDALL BENDERSON AND DAVID H BALDAUF AS TRUSTEES PROPOSED — RIGHT -OF -WAY ACQUISITION AREA 271 SQUARE FEET OR 0.0062 ACRES GJ �::... FOUND .... .... .,X„CUT / UNDER A TRUST AGREEMENT RIGHT—OF—WAY DATED 0 NOWNRAS14, 1985 / THE BENDERSON 85-1 TRUST / INSTRUMENT N0. D206124738 / O.P.R.T.C.T. / I LOT 1, BLOCK A BENDERSON ADDITION CABINET A, SLIDE 8484 P.R.T.C.T. L —I CHARLES C. WHYTE SURVEY / ABSTRACT NO. 1 61 1 ACQUISITION LOCATION 30' 15' 0 30' a I SUBJECT TRACT & SCALE IN FEET LOCATION OF ACQUISITION CURVE TABLE CURVE RADIUS I DELTA ANGLE CHORD BEARING CHORD LENGTH ARC LENGTH Cl 43.50' 44'59'25" N 24'13'57" W 33.29' 1 34.16' NOTES: 1. A LEGAL DESCRIPTION OF SAME DATE ACCOMPANIES THIS PARCEL PLAT. 2. BEARINGS ARE BASED ON THE TEXAS COORDINATE SYSTEM OF 1983 (NAD83) (NA2011), NORTH CENTRAL ZONE (4202). DISTANCES AND AREAS ARE SURFACE VALUES USING THE GRID TO SURFACE ADJUSTMENT FACTOR OF 1.00012. 3. THIS SURVEY WAS PERFORMED WITHOUT THE BENEFIT OF A TITLE REPORT. THERE MAY BE EASEMENTS AND/OR COVENANTS AFFECTING THIS PROPERTY NOT SHOWN HEREON. 20'x20'PUBLIC OPEN SPACE EASEMENT CABINET A, SLIDE 8484 P.R.T.C.T. EXISTING RIGHT—OF—WAYLU w} 0 UCD Q[If W J EO In = Q z LEGEND SET 1/2" IRON ROD WITH CAP � STAMPED 'YELLOW ROSE 6574" (OR NOTED OTHERWISE) Q CALCULATED POINT --- PROPERTY LINE PROPOSED RIGHT—OF—WAY LINE — — — — — — EASEMENT LINE O.P.R.T.C.T. OFFICIAL PUBLIC RECORDS TARRANT COUNTY, TEXAS P.R.T.C.T. PLAT RECORDS TARRANT COUNTY, TEXAS ORTWORTH CITY OF FORT WORTH N. TARRANT PKWY. AT N. BEACH ST. srE� F-�� ...................................................... CHARLES S. RUBY '""""""""""""""""""'"""" PARCEL N0. 01 CITY PROJ. N0. 103309 RIGHT-OF-WAY ACQUISITION OWNER: RONALD BENDERSON, RANDALL BENDERSON AND DAVID H. BALDAUF, TRUSTEES SURVEY: CHARLES C. WHYTE SURVEY, ABSTRACT N0. EXHIBIT "A" City Project No.: 103309 City Project Name: N. Tarrant Pkwy. At N. Beach St. Parcel 01 TE 4464 North Tarrant Parkway Lot 1, Block A, Benderson Addition Being a 457 square foot (0.0105 acre) tract of land situated in the Charles C. Whyte Survey, Abstract No. 1611, City of Fort Worth, Tarrant County, Texas, and being a portion of Lot 1, Block A of Benderson Addition, an addition to the City of Fort Worth, Tarrant County, Texas as recorded in Cabinet A, Slide 8484 of the Plat Records of Tarrant County, Texas, said Lot 1 being described in the deed to Ronald Benderson, Randall Benderson and David H. Baldauf as Trustees under a Trust Agreement dated October 14, 1985 known as The Benderson 85-1 Trust recorded in Instrument No. D206124738 of the Official Public Records of Tarrant County, Texas, said 457 square foot (0.0105 acre) tract of land being more particularly described by metes and bounds as follows: COMMENCING at a Mag Nail found for the northwest corner of said Lot 1 and the northeast corner of Lot 5, Block A of North Beach -Thompson Addition, an addition to the City of Fort Worth, Tarrant County, Texas as recorded in Cabinet A, Slide 11315 of said Plat Records of Tarrant County, Texas, said Mag Nail also being in the existing southwesterly right-of-way line of North Tarrant Parkway (a 200' right-of-way); THENCE South 69 degrees 07 minutes 32 seconds East, with the existing southwesterly right-of-way line of said North Tarrant Parkway and with the northeasterly line of said Lot 1, a distance of 172.18 feet to the POINT OF BEGINNING of the herein described tract of land; THENCE South 69 degrees 07 minutes 32 seconds East, with the existing southwesterly right-of-way line of said North Tarrant Parkway and with the northeasterly line of said Lot 1, a distance of 8.97 feet to a 1/2 inch iron rod with cap stamped "Yellow Rose 6574" set for the intersection of the existing southwesterly right-of-way line of said North Tarrant Parkway and the northeasterly line of said Lot 1 with the proposed southwesterly right-of-way line of said North Tarrant Parkway, from which an "X" cut found for the northeast corner of said Lot 1 bears South 69 degrees 07 minutes 32 seconds East, a distance of 30.42 feet, said "X" cut also being the intersection of the existing southwesterly right-of-way line of said North Tarrant Parkway with the existing west right-of-way line of North Beach Street (a variable width right-of-way); THENCE South 46 degrees 43 minutes 40 seconds East, with the proposed southwesterly right-of- way line of said North Tarrant Parkway, a distance of 21.51 feet to a 1/2 inch iron rod with cap stamped "Yellow Rose 6574" set for the beginning of a curve to the right having a radius of 43.50 feet, a central angle of 44 degrees 59 minutes 25 seconds, and a chord that bears South 24 degrees 13 minutes 57 seconds East, a chord length of 33.29 feet; THENCE Southeasterly, with the proposed southwesterly right-of-way line of said North Tarrant Parkway and with said curve to the right, an arc length of 34.16 feet to a 1/2 inch iron rod with cap stamped "Yellow Rose 6574" set for corner; Exhibit "A" Page I of 3 Yellow Rose Mapping LLC 2011 Woodland Hills Lane Weatherford; Texas 76087 817-703-6578 THENCE South 01 degree 44 minutes 45 seconds East, with the proposed southwesterly right-of- way line of said North Tarrant Parkway, a distance of 5.66 feet to a 1/2 inch iron rod with cap stamped "Yellow Rose 6574" set for the intersection of the proposed southwesterly right-of-way line of said North Tarrant Parkway with the existing west right-of-way line of said North Beach Street and the east line of said Lot 1; THENCE South 01 degree 32 minutes 35 seconds East, with the existing west right-of-way line of said North Beach Street and with the east line of said Lot 1, a distance of 10.00 feet to a point for corner; THENCE South 88 degrees 15 minutes 45 seconds West, a distance of 4.85 feet to a calculated point for corner; THENCE North 01 degree 30 minutes 50 seconds West, a distance of 33.54 feet to a calculated point for corner; THENCE South 84 degrees 16 minutes 16 seconds West, a distance of 17.3 8 feet to a calculated point for the beginning of a non -tangent curve to the right having a radius of 1.77 feet, a central angle of 129 degrees 16 minutes 00 seconds, and a chord that bears North 40 degrees 13 minutes 25 seconds West, a chord length of 3.19 feet; THENCE Northwesterly, with said non -tangent curve to the right, an arc length of 3.99 feet to a calculated point for corner; THENCE North 21 degrees 01 minute 24 seconds East, a distance of 16.76 feet to a calculated point for corner; THENCE North 69 degrees 01 minute 07 seconds West, a distance of 22.89 feet to a calculated point for corner; THENCE North 20 degrees 52 minutes 28 seconds East, a distance of 6.44 feet to the POINT OF BEGINNING and containing 457 square feet or 0.0105 acres of land. Exhibit "A" Page 2 of 3 Yellow Rose Mapping LLC 2011 Woodland Hills Lane Weatherford, Texas 76087 817-703-6578 Notes: 1. A parcel plat of same date accompanies this legal description. 2. Bearings are based on the Texas Coordinate System of 1983 (NAD83) (NA2011), North Central Zone (4202). Distances and areas are surface values using the grid to surface adjustment factor of 1.00012. 3. This survey was performed without the benefit of a title report. There may be easements and/or covenants affecting this property not shown hereon. * SURVEYOR CERTIFICATE * TO ALL PARTIES INTERESTED IN TITLE TO THE PREMISES SURVEYED, I DO HEREBY STATE THAT THE ABOVE LEGAL DESCRIPTION WAS PREPARED FROM PUBLIC RECORDS AND FROM AN ACTUAL AND ACCURATE SURVEY UPON THE GROUND AND THAT SAME IS TRUE AND CORRECT. Company Name: Yellow Rose Mapping LLC OF 01 By;Amr Su or's Name: Charle S. CHARLES�S. RUBY Registered Professional LanjOrurveyor r ' 0 6574 Texas No. 6574 �'� 'Fess��,o Date of Survey: June 25, 2023 S U R Texas Firm No. 10194700 Exhibit "A" Page 3 of 3 Yellow Rose Mapping LLC 2011 Woodland Hills Lane Weatherford, Texas 76087 817-703-6578 LINE TABLE LINE I BEARING DISTANCE L1 5 69'07'32" E 8.97' L2 S 46'43'40" E 21.51' L3 S 01'44'45" E 5.66' L4 S 01'32'35" E 10.00' L5 S 88' 15'45" W 4.85' L6 N 01'30'50" W 33.54' L7 S 84' 1 6' 16" W 17.38' LS N 2I'D 1'24" E 16.76' L9 N 69'01'07" W 22.89' L10 N 20'52'28" E 6.44' EXHIBIT 99B 99 PARCEL NO. 01 TE P. OUND 0. C. No) T F MAG NAIL �q zagAAq o R��tir oT pggk�N \ -IS es•o�. 32..e P.O.B. LOT 5, BLOCK A 20' BUILDING LINE 78 NORTH BEACH-THOMPSON V� CABINET A, SLIDE 8484 ADDITION ���- P.R.T.C.T. 0 41 S 6 CABINET A, SLIDE 11315 3 O, 3z P.R.T.C.T. �' l;4?' F 49 TEMPORARY CONSTRUCTION EASEMENT AREA 457 SQUARE FEET OR 0.0105 ACRES FOUND "X"CUT RONALD BENDERSON, RANDALL BENDERSON �I._ OPEN SPACE EASEMENT AND DAVID H. BALDAUF AS TRUSTEES �/ .`::.... n CABINET A, SLIDE 8484 UNDER A TRUST AGREEMENT P.R.T.C.T. DATED OCTOBER 14, 1985 KNOWN AS / I THE BENDERSON 85-1 TRUST INSTRUMENT NO. D206124738 O.P.R.T.C.T. LOT 1, BLOCK A BENDERSON ADDITION CABINET A, SLIDE 8484 P.R.T.C.T. L5 Z_ CHARLES C. WHYTE SURVEY ABSTRACT NO. 1611 EASEMENT LOCATION 30' 15' 0 30' TRACT & SCALE IN FEET LOCATIONCOF EASEMENT CURVE TABLE CURVE I RADIUS I DELTA ANGLE CHORD BEARING CHORD LENGTH ARC LENGTH Cl 43.50' 44'59'25" S 24'13'57" E 33.29' 34.16' C2 1 .77' 129' 16'00" N 40" 13'25" W 3.19' 3.99' NOTES: 1. A LEGAL DESCRIPTION OF SAME DATE ACCOMPANIES THIS PARCEL PLAT. 2. BEARINGS ARE BASED ON THE TEXAS COORDINATE SYSTEM OF 1983 (NAD83) (NA2011), NORTH CENTRAL ZONE (4202). DISTANCES AND AREAS ARE SURFACE VALUES USING THE GRID TO SURFACE ADJUSTMENT FACTOR OF 1.00012. 3. THIS SURVEY WAS PERFORMED WITHOUT THE BENEFIT OF A TITLE REPORT. THERE MAY BE EASEMENTS AND/OR COVENANTS AFFECTING THIS PROPERTY NOT SHOWN HEREON. a& I J ti "F U / I- LLI LLI 3 � I Uj o U � Q� LU w CC) m = a 0 z LEGEND SET 1/2" IRON ROD WITH CAP ® STAMPED 'YELLOW ROSE 6574" (OR NOTED OTHERWISE) 0 CALCULATED POINT — - - — PROPERTY LINE PROPOSED RIGHT-OF-WAY LINE EASEMENT LINE O.P.R.T.C.T. OFFICIAL PUBLIC RECORDS TARRANT COUNTY, TEXAS P.R.T.C.T. PLAT RECORDS TARRANT COUNTY, TEXAS ORTWORTH CITY OF FOR T WOR TH N. TARRANT PKWY. AT N. BEACH ST. of � . ..•........ T� \Q:. p .ST4'-`- co:: u �''•. P .............................................. CHARLES S. RUBY """""""""""""""""""".....! " ':�� 6574 y • . F SS\p?.• O S U PARCEL NO. 01 TE ICITY PROJ. NO. 103309 TEMPORARY CONSTRUCTION EASEMENT OWNER: RONALD BENDERSON, RANDALL BENDERSON AND DAVID H. BALDAUF, TRUSTEES SURVEY: CHARLES C. WHYTE SURVEY, ABSTRACT NO. 1611 LOCATION: CITY OF FORT WORTH, TARRANT COUNTY, TEXAS ACQUISITION AREA: 457 SQUARE FEET OR 0.0105 ACRES WHOLE PROPERTY ACREAGE: 2.748 ACRES LES S. RUB REGISTERED PROFESSIONAL D SURVEYOR NO. 6574 TEXAS FI No. 10194700 JOB NO, FNI2204_82 DRAWN BY: MP CAD FILE: PARCEL 01 TE.DWG DATE: JUNE 25, 2023 EXHIBIT B PAGE 1 OF 1 SCALE: 1" = 30' YELLOW ROSE MAPPING LLC 2011 WOODLAND HILLS LANE WEATHERFORD, TX 76087 817-703-6578 D224159140 09/06/2024 08:02 AM Page: 1 of 8 Fee: $48.00 Submitter: City of Fort Worth, TX Electronically Recorded by Tarrant County Clerk in Official Public Records MARY LOUISE NICHOLSON COUNTY CLERK NOTICE OF CONFIDENTIALITY RIGHTS: IF YOU ARE A NATURAL PERSON, YOU MAY REMOVE OR STRIKE ANY OR ALL OF THE FOLLOWING INFORMATION FROM THIS INSTRUMENT BEFORE IT IS FILED FOR RECORD IN THE PUBLIC RECORDS: YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. CPN 103309 N. Tarrant at N. Beach Street Parcel No. 2 TICE 4425 North Tarrant Pkwy, Fort Worth, TX 76244 BEACH -NORTH TARRANT ADDITION Block A Lot 1 STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL MEN BY THESE PRESENTS CITY OF FORT WORTH TEMPORARY CONSTRUCTION EASEMENT DATE: `, / )- q GRANTOR: KINGSPORT LLC GRANTOR'S MAILING ADDRESS (including County): 3507 CROSS CREEK LANE MALIBU, LOS ANGELES COUNTY, CA 90265 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 200 TEXAS STREET FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. EASEMENT PROPERTY: BEING a tract of land more particularly described in the attached Exhibit A and Exhibit B. Grantor, for the Consideration paid to Grantor, hereby temporarily grants, sells, and conveys to Grantee, its successors and assigns, the temporary use and passage in, over, and across, below and along the Easement Property situated in TARRANT County, Texas, as described and depicted in accordance with Exhibit A and Exhibit B, attached hereto and made a part hereof, and ingress and egress over Grantor's property to the Easement Property. TEMPORARY CONSTRUCTION EASEMENT FORT IVORT11 Rev. 20231013 -Ir-- D224159140 Page 2 of 8 It is further agreed and understood that Grantee will be permitted the temporary use of said Easement Property for the purpose of facilitating the construction of traffic signal lights and sidewalk and improvements ("Improvements"). For the purposes of clarification, the Improvements shall not be located within the Easement Property, and the Easement Property shall only be used as a staging area for the general contractor for such work. The use of the Easement Property shall result in the temporary loss of use of no more than eight (8) parking spaces (as more particularly shown on Exhibit "B" attached hereto) for a period of time not to exceed three (3) months. Grantee shall notify Grantor of the specific date of commencement no later than thirty (30) days in advance. Prior to delivering the Easement Property back to Grantor, Grantee shall, at its sole cost and expense, promptly replace and/or repair any damage to the Easement Property and restore the Easement Property to the condition it was in prior to the date of this Temporary Construction Easement, Including, but not limited to, repaving or restriping damaged portions or replacing any disturbed or damaged landscaping. It is understood by the parties that, in addition to the above, Grantee will make any and all repairs to the sprinkler system, replace all landscaping and construct a new sidewalk to extent damages or altered due to Grantee's use of the Easement Property. Notwithstanding anything herein to the contrary, Grantee or its contractors shall not block any accessways to entrances to Grantor's property in its utilization of the Easement Property. Upon completion of Improvements and its acceptance by Grantee, all rights granted within the described Temporary Construction Easement shall cease. The person signing this document on behalf of the Grantor warrants that he or she has the legal authority to execute this temporary easement for the purposes and consideration therein expressed, and in the capacity therein stated, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the Grantor. Grantee is fully entitled to rely on Grantor's warranty and representation in accepting this temporary easement. TO HAVE AND TO HOLD the above -described temporary easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, its successors and assigns, until the cessation or expiration of the rights granted hereunder. Grantor does hereby bind itself, its heirs, successors and assigns, to warrant and forever defend, all and singular, the said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof. This document may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. When the context requires, singular nouns and pronouns include the plural. Grantee may execute this document by electronic signature, which will be considered as an original signature for all purposes and have the same force and effect as an original signature. For these purposes, "electronic signature" means electronically scanned and transmitted versions (e.g. via pdf file or facsimile transmission) of an original signature, or signatures electronically inserted via software such as Adobe Sign. [signature pages follow] TEMPORARY CONSTRUCTION EASEMENT Rev. 20231013 FORT WORTH. D224159140 Page 3 of 8 GRANTOR: KINGSPORT LLC By: (Print Name) ' -D&v L) I - (Title) STATE OF CALIFORNIA COUNTY OF LOS AN ELES BEFORE ME, the di York, on this day personally Iv1 OA Y jV l ACKNOWLEDGMENT rsigned authority, a Notary Public in and for the State of New neared of KINGSPORT LLC, known to me to be the same person whose name is subscribe to the foregoing instrument, and acknowledged to me that the same was the act of KINGSPO LLC and that they executed the same as the act of said limited liability company for the pur ses and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of [SEAL] Notary Public, State of California TEMPORARY CONSTRUCTION EASEMENT R)R�TH Rev.20231013 t D224159140 Page 4 of 8 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of Califomia Los Angeles County of 9 On. —A UM Vit YL I before me, Anthony Ruiz, Notary Public (insert name and title of the officer) personally appeared bov jot� M who proved to me on the basis of satisfaktory evidence to be the person(s) whose names) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in hislherltheir authorized capacity(ies), and that by his/her/their signature(i) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (Seal) Arrxorn W Notary Publk • CadNomia I.as Mget�s Cau�ty Commisdw N 2489613 Aty Comm. Expires May 7, 2028 D224159140 Page 5 of 8 ACCEPTED BY: GRANTEE: City of Fort Worth If APPROVED AS TO FORM AND LEGALITY ✓ elk., � t By: (Name) Matthew Murray (Title) Assistant City Attorney ACKNOWLEDGMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a NotW Public in 4Vd for the State of Texas, 01i this c1-y personally appeared �� cty rci cif f , ► ( [ 1Gx-6i a If -c 'v of the City f Fort Worth, a Texas home rule municipal corporfation, known t me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the some was the act of the City of Fort Worth and that they executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of Au . 3, ISM] =(&L1Cda. HiMinyer ssionExpires /2026 arIyy ID 44746 TEMPORARY CONSTRUCTION EASEMENT Rev. 20231013 . L1 N Public, State of Texas Foe_ T�ORrH. D224159140 Page 6 of 8 EXHIBIT "A" City Project No.: 103309 City Project Name: N. Tarrant Pkwy. At N. Beach St. Parcel 02 TE 4425 North Tarrant Parkway Lot 1, Block A, Beach -North Tarrant Addition Being a 788 square foot (0.0181 acre) tract of land situated in the Charles C. Whyte Survey, Abstract No. 1611, City of Fort Worth, Tarrant County, Texas, and being a portion of Lot 1, Bloch A of Beach -North Tarrant Addition, an addition to the City of Fort Worth, Tarrant County, Texas as recorded in Cabinet A, Slide 9582 of the Plat Records of Tarrant County, Texas, said Lot 1 being described as Tract 1 in the deed to Kingsport LLC as recorded in Instrument No. D215237135 of the Official Public Records of Tarrant County, Texas, said 788 square foot (0.0181 acre) tract of land being more particularly described by metes and bounds as follows: COMMONCING at an "X" cut found for the northeast corner of said Lot 1 and southeast comer of Lot 5, Block A of said Beach -North Tarrant Addition, said "X" cut also being in the existing west right-of-way line of North Beach Street (a variable width right-of-way); THENCE South 00 degrees 32 minutes 42 seconds East, with the existing west right-of-way line of said North Beach Street and with the east line of said Lot 1, a distance of 54.45 feet to the POINT OF BEGINNING of the herein described tract of land; THENCE South 00 degrees 32 minutes 42 seconds East, with the existing west right-of-way line of said North Beach Street and with the east line of said Lot 1, a distance of 73.55 feet to an "X" cut found for the beginning of a curve to the right having a radius of 90.00 feet, a central angle of 24 degrees 20 minutes 26 seconds, and a chord that bears South 11 degrees 37 minutes 31 seconds West, a chord length of 37.95 feet; THENCE Southwesterly, with the existing west right-of-way line of said North Beach Street, with the east line of said Lot 1 and with said curve to the right, an arc length of 38.23 feet to a calculated point for comer; THENCE North 00 degrees 32 minutes 42 seconds West, a distance of 110.64 feet to a calculated point for corner; THENCE North 89 degrees 25 minutes 31 seconds East, a distance of 8.00 feet to the POINT OF BEGINNING and containing 788 square feet or 0.0181 acres of land. Exhibit "A" Page 1 of 2 Yellow Rose Mapping LLC 2011 Woodland Hills Lane Weatherford, Texas 76097 817-703-6578 D224159140 Page 7 of 8 Notes: 1. A parcel plat of same date accompanies this legal description. 2. Bearings are based on the Texas Coordinate System of 1983 (NAD83) (NA2011), North Central Zone (4202). Distances and areas are surface values using the grid to surface adjustment factor of 1.00012. 3. This survey was performed without the benefit of a title report. There may be easements and/or covenants affecting this property not shown hereon. * SURVEYOR CERTIFICATE * TO ALL PARTIES INTERESTED IN TITLE TO THE PREMISES SURVEYED, I DO HEREBY STATE THAT THE ABOVE LEGAL DESCRIPTION WAS PREPARED FROM PUBLIC RECORDS AND FROM AN ACTUAL AND ACCURATE SURVEY UPON THE GROUND AND THAT SAME IS TRUE AND CORRECT. Company Name: Yellow Rose Mapping LLC By: Re€ Tea Dal Texas 1~irm No. 1U194/UU Exhibit "A" Page 2 of 2 Yellow Rose Mapping LLC 2011 Woodland Hills Lane Weatherford, Texas 76087 817-703-6578 D224159140 Page 8 of 8 LOT 2, BLOCK A EXHIBIT "B 97 BEACH -NORTH TARRANT ADDITION CABINET A, SLIDE 9582 PARCEL NO. 02 TE P.R.T.C.T. C. T. _ — P. 0. C. FOUND I "X" CUT I � CHARLES C. WHYTE SURVEY I EASEMENT ABSTRACT NO. 1611 WC4 LOCATON I 20' BUILDING LINE I I ® SUBJECT TRACT & CABINET A. SLIDE 9582 I LOCATION OF EASEMENT P.R.T.C.T. I L1 TEMPORARY CONSTRUCTION I <: EASEMENT AREA 788 SQUARE FEET OR 0.0181 ACRES P :C::::: w LOT f, BLOCK A BEACH —NORTH TARRANT ADDITION 3 b + ::.... 0 CABINET A, SLIDE 9582 P.R. T. C. T. NE b TRACT 1 KINGSPORT LLC FOUND INSTRUMENT NO. D215237135 ' '' "x"cuT O.P.R.T.C.T. v LINE TABLE LINE DEARINO 1 DISTANCE L7 N 8W25.31" E 1 8.00- CURVE TAB CURVE IUS DE TA ANGLE CHORD BEARING CHORD LENGTH ARC LENGTH C1 90.00 24'20 26 5 11-37 31 W 37.95' 35.23 NOTES: 1. A LEGAL DESCRIPTION OF SAME DATE ACCOMPANIES THIS PARCEL PLAT. 2. BEARINGS ARE BASED ON THE TEXAS COORDINATE SYSTEM OF 1083 (NAD83) (NA2011), NORTH CENTRAL ZONE (4202). DISTANCES AND AREAS ARE SURFACE VALUES USING THE GRID TO SURFACE ADJUSTMENT FACTOR OF 1.00012. 3. THIS SURVEY WAS PERFORMED WITHOUT THE BENEFIT OF A TITLE REPORT. THERE MAY BE EASEMENTS AND/OR COVENANTS AFFECTING THIS PROPERTY NOT SHOWN HEREON. 30' 15' 0 30' SCALE IN FEET LEGEND SET 1/2" IRON ROD WITH CAP STAMPED "YELLOW ROSE 6574" (OR NOTED OTHERWISE) 0 CALCULATED POINT PROPERTY LINE PROPOSED RIGHT-OF-WAY LINE - - - - - - EASEMENT LINE O.P.R.T.C.T. OFFICIAL PUBLIC RECORDS TARRANT COUNTY, TEXAS P.R.T.C.T. PLAT RECORDS TARRANT COUNTY, TEXAS o WORT CITY OF FOR T WOR TH N. TARRANT PKWY. AT N. BEACH ST. PARCEL NO. 02 TE CITY PROJ. NO. 103309 TEMPORARY CONSTRUCTION EASEMENT OWNER: KINGSPORT LLC SURVEY: CHARLES C. WHYTE SURVEY ABSTRACT NO. 1611 LOCATION: CITY OF FORT WORTH, TARRANT COUNTY, TEXAS ACQUISITION AREA: 788 SQUARE FEET OR 0.0181 ACRES WHOLE PROPERTY ACREAGE: 1.273 ACRES )u4T .......CHARLES S. --- 6v74 Opp C LES S. RUB REGISTERED PROFESSIO D SURVEYOR D224030876 02/23/2024 01:05 PM Page: 1 of 8 Fee: $48.00 Submitter: City of Fort Worth, TX Electronically Recorded by Tarrant County Clerk in Official Public Records MARY LOUISE NICHOLSON COUNTY CLERK NOTICE OF CONFIDENTIALITY RIGHTS: IF YOU AREA NATURAL PERSON, YOU MAY REMOVE OR STRIKE ANY OR ALL OF THE FOLLOWING INFORMATION FROM THIS INSTRUMENT BEFORE /T IS FILED FOR RECORD IN THE PUBLIC RECORDS: YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. CPN 103309 N. Tarrant at N. Beach Street Parcel No. 3 TCE 8412 North Tarrant Pkwy, Fort Worth, TX 76244 WALGREENS-N TARRANT PKWY Block 1 Lot 1 STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL MEN BY THESE PRESENTS CITY OF FORT WORTH TEMPORARY CONSTRUCTION EASEMENT DATE: 2 D(D,23 GRANTOR: TARRANT BEACH PARTNERSHIP L.P. GRANTOR'S MAILING ADDRESS (including County): 22508 REDCLIFF COURT MOUNTAIN VIEW, SANTA CLARA COUNTY, CA 94040 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 200 TEXAS STREET FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. EASEMENT PROPERTY: BEING a tract of land more particularly described in the attached Exhibit A and Exhibit B. Grantor, for the Consideration paid to Grantor, hereby grants, sells, and conveys to Grantee, its successors and assigns, the use and passage in, over, and across, below and along the Easement Property situated in TARRANT County, Texas, as described and depicted in accordance with Exhibit A and Exhibit B, attached hereto and made a part hereof, and ingress and egress over Grantor's property to the Easement Property. TEMPORARY CONSTRUCTION EASEMENT FORTWORTH. TWORTH., Rev. 20231013 `'+�� D224030876 Page 2 of 8 It is further agreed and understood that Grantee will be permitted the use of said Easement Property for the purpose of constructing traffic signal lights and sidewalk and improvements. Upon completion of improvements and its acceptance by Grantee, all rights granted within the described Temporary Construction Easement shall cease. The person signing this document on behalf of the Grantor warrants that he or she has the legal authority to execute this temporary easement for the purposes and consideration therein expressed, and in the capacity therein stated, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the Grantor. Grantee is fully entitled to rely on Grantor's warranty and representation in accepting this temporary easement. TO HAVE AND TO HOLD the above -described temporary easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, its successors and assigns, until the cessation or expiration of the rights granted hereunder. Grantor does hereby bind itself, its heirs, successors and assigns, to warrant and forever defend, all and singular, the said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof. This document may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. When the context requires, singular nouns and pronouns include the plural. Grantee may execute this document by electronic signature, which will be considered as an original signature for all purposes and have the same force and effect as an original signature. For these purposes, "electronic signature" means electronically scanned and transmitted versions (e.g. via pdf file or facsimile transmission) of an original signature, or signatures electronically inserted via software such as Adobe Sign. [signature pages follow] TEMPORARY CONSTRUCTION EASEMENT Rev. 20231013 FORT WORTH, D224030876 Page 3 of 8 GRANTOR: TARRANT BEACH PARTNERSHIP L.P., P By: _—Itjlll� (Print Nam�/e)� �t"�i� iZ� � /'L�APj ! � (Title) / �lyt/.�i 6lhV4 �'/4 ja67R ACKNOWLEDGMENT STATE OF CALIFORNIA § COUNTY OF S CLARA § BEFORE ME, the undersi authority, a Notary Public in and for the State of New York, on this day personally appeared of TARRANT BEACH PARTNERSHIP L.P., known to me to-6 same person whose name is subscribed to the foregoing instrument, and acknowledged to me the same was the act of TARRANT BEACH PARTNERSHIP L.P. and that they executed the sam s the act of said ENTITY for the purposes and consideration therein expressed and in the capa . therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of [SEAL] ACCEPTED BY: SEE CA NOTARY ATTACHMENT Notary Public, State of California TEMPORARY CONSTRUCTION EASEMENT Rev. 20231013 FORTWORTH. i D224030876 Page 4 of 8 CALIFORNIA ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California 1 County of �Xm-yo,Coro, J} On 12 I f2I U 23 before me, E--7 1 � i N6t0.M �U�O�1L Date 14ere Insert Name and Title of t e Officer personally appeared of who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. (%MYN.try ANGELICA E. ROMAN aPublic - California 72 Santa Clara County Commission # 24399�Zj Comm. Expires Mar 1, Place Notary Seal and/or Stamp Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand a official seal. Signature Signature of Notary Public Vr 1 IVI11!'1L Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document 1 CC"�"��� Title or Type of Document: C41Ao> 'FIX+w�+AA-RPA 00 �SiYyG�lWl tlaJem�vtf Document Date: 2I 1-2( En23 Number of Pages: 3 Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer is Representing: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer is Representing: .,.fi. i!{-. .xy,t. 4. r ., Tl .', lY:n'?! :x!•:5�:. .lS:' clC..�:. wf:. leJF.) F<}:"di:'.•, a'•K •c ,l�. �.;Y,.J :'F ). ids �3Ft�'ICsF�=F.%1?Fi,: 'F� ;Fklc:F,^,: :t.. ,.c..s..�•t`:• tFt�F F71. ri:F .: ��'%. (02019 National• • • D224030876 Page 5 of 8 GRANTEE: City of Fort Worth rj tin BGCYACi/d1� C.inz ruthtlIfyF:F .1G711.; ie C;7� By: (Name) Dana Burghdoff (Title) Assistant City Manager APPROVED AS TO FORM AND LEGALITY By: (Name) Matthew Murray (Title) Assistant City Attorney ACKNOWLEDGMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this da personally ap eared D 44 n IS a ra A -P4 of the City of Fort Worth, a Texas home rule municipal corporation, kndwn to met be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of the City of Fort Worth and that they executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of %1b rU AEI 8J`2oa y [SEAL] Rebecca J Reese My Commission Expires * 2/14/2026 Notary ID 5149109 TEMPORARY CONSTRUCTION EASEMEN"r Rev. 20231013 FotY_ r„ R— D224030876 Page 6 of 8 EXHIBIT "A" City Project No.: 103309 City Project Name: N. Tarrant Pkwy. At N. Beach St. Parcel 03 TE 8412 North Beach Street Lot 1, Block A, North Tarrant Parkway Walgreens Being a 250 square foot (0.0057 acre) tract of land situated in the Eli W. Shriver Survey, Abstract No. 1455, City of Fort Worth, Tarrant County, Texas, and being a portion of Lot 1, Block 1 of North Tarrant Parkway Walgreens, an addition to the City of Fort Worth, Tarrant County, Texas as recorded in Cabinet A, Slide 8374 of the Plat Records of Tarrant County, Texas, said Lot 1 being described as Tract 1 in the deed to Tarrant Beach Partnership, L.P. recorded in Instrument No. D204211678 of the Official Public Records of Tarrant County, Texas, said 250 square foot (0.0057 acre) tract of land being more particularly described by metes and bounds as follows: BEGINNING at a 5/8 inch iron rod with cap stamped "Clark Geogram" found for the northwest corner of said Lot 1, said 5/8 inch iron rod with cap stamped "Clark Geogram" being the intersection of the existing southwesterly right-of-way line of North Tarrant Parkway (a 200' right-of-way) with the existing east right- of-way line of North Beach Street (a variable width right-of-way); THENCE South 69 degrees 08 minutes 34 seconds East, with the existing southwesterly right-of-way line of said North Tarrant Parkway and with the northeasterly line of said Lot 1, a distance of 7.99 feet to a calculated point for the beginning of a non -tangent curve to the left having a radius of 55.00 feet, a central angle of 50 degrees 45 minutes 21 seconds, and a chord that bears South 49 degrees 54 minutes 12 seconds West, a chord length of 47.14 feet; THENCE Southwesterly, with said non -tangent curve to the left, an are length of 48.72 feet to a calculated point for corner; THENCE South 69 degrees 54 minutes 33 seconds West, a distance of 6.76 feet to a calculated point for corner in the existing east right-of-way line of said North Beach Street, in the northwesterly line of said Lot 1 and being the beginning of a non -tangent curve to the right having a radius of 60.00 feet, a central angle of 49 degrees 04 minutes 42 seconds, and a chord that bears North 44 degrees 31 minutes 34 seconds East, a chord length of 49.84 feet, from which a 5/8 inch iron rod with cap (illegible) found for corner in the existing east right-of-way line of said North Beach Street and in the west line of said Lot 1 bears a chord bearing of South 09 degrees 12 minutes 58 seconds West, a distance of 22.43 feet; THENCE Northeasterly, with the existing east right-of-way line of said North Beach Street, with the northwesterly line of said Lot 1 and with said non -tangent curve to the right, an arc length of 51.39 feet to the POINT OF BEGINNING and containing 250 square feet or 0.0057 acres of land. Exhibit "A" Page 1 of 2 Yellow Rose Mapping LLC 2011 Woodland Hills Lane Weatherford, Texas 76087 817-703-6578 D224030876 Page 7 of 8 Notes: 1. A parcel plat of same date accompanies this legal description. 2. Bearings are based on the Texas Coordinate System of 1983 (NAD83) (NA2011), North Central Zone (4202). Distances and areas are surface values using the grid to surface adjustment factor of 1.00012. 3. This survey was performed without the benefit of a title report. There may be easements and/or covenants affecting this property not shown hereon. * SURVEYOR CERTIFICATE * TO ALL PARTIES INTERESTED IN TITLE TO THE PREMISES SURVEYED, I DO HEREBY STATE THAT THE ABOVE LEGAL DESCRIPTION WAS PREPARED FROM PUBLIC RECORDS AND FROM AN ACTUAL AND ACCURATE SURVEY UPON THE GROUND AND THAT SAME IS TRUE AND CORRECT. Company Name: Yellow Rose Mapping LLC 000, �E OF R �P�� 0% By. Lin Sur or's Name: Charl S. CHARLES S. RUBY Registered Professional Lan g rve or Y < °p 6574 � • o!�fss��'�O Texas No. 6574 ** Date of Survey: June 25, 2023 S U R`I Texas Firm No. 10194700 Exhibit "A" Page 2 of 2 Yellow Rose Mapping LLC 2011 Woodland Hills Lane Weatherford, Texas 76087 817-703-6578 D224030876 Page 8 of 8 EXHIBIT "B " PARCEL NO. 03 TE P.O.B. FOUND 5/8'1RON ROD WITH CAP STAMPED "CLARK GEOGRAM" /vqt N �7G ...... ..,•. �� 20'X20' PUBLIC \ \ R'GAI r�OF pry" 'k .. C, OPEN SPACE EASEMENT ^ CABINET .R SLIDE 8374 P.R.T.C.T. .! \ TEMPORARY \ CONSTRUCTION \ EASEMENT AREA \ 250 SQUARE FEET OR 0.0057 ACRES FOUND 5/8"IRON ROD WITH CAP (ILLEGIBLE) TRACT 1 w „ TARRANT BEACH PARTNERSHIP, L.P. Lu Q INSTRUMENT NO. D204211678 I O.P.R.T.C.T. � 0 _ = U c-� LOT 1, BLOCK 1 NORTH TARRANT m m PARKWAY WALCREENS s CABINET A, SLIDE 8374 rr > P.R.T.C.T. O v z ELI W. SHRIVER SURVEY EASEMENT ABSTRACT NU. 1400 LOCATION - LINE TABLE LINE BEARING DISTANCE L1 S 69-OB-34" E 7.99' L2 I S 69'54'33" W 6.76' SUBJECT TRACT & LOCATION OF EASEMENT CURVE TABLE CURVE RADIUS DELTA ANGLE CHORD BEARING CHORD LENGTH ARC LENGTH Cl 55.00' 50'45'21" S 49'S4'12" W 47.14' 48.72' C2 60.00' 21'32'30" S 09'12'58" W 22.43' 22.56' C3 60.00' 49'04'42" N 44'31'34" E 49.64' 51.39' NOTES: 1. A LEGAL DESCRIPTION OF SAME DATE ACCOMPANIES THIS PARCEL PLAT. 2. BEARINGS ARE BASED ON THE TEXAS COORDINATE SYSTEM OF 1983 (NAD83) (NA2011), NORTH CENTRAL ZONE (4202). DISTANCES AND AREAS ARE SURFACE VALUES USING THE GRID TO SURFACE ADJUSTMENT FACTOR OF 1.00012. 3. THIS SURVEY WAS PERFORMED WITHOUT THE BENEFIT OF A TITLE REPORT. THERE MAY BE EASEMENTS AND/OR COVENANTS AFFECTING THIS PROPERTY NOT SHOWN HEREON. 30' 15' 0 30' SCALE IN FEET LEGEND SET 1/2" IRON ROD WITH CAP � STAMPED "YELLOW ROSE 6574" (OR NOTED OTHERWISE) O CALCULATED POINT --- PROPERTY LINE PROPOSED RIGHT—OF—WAY LINE — — — — — — EASEMENT LINE O.P.R.T.C.T. OFFICIAL PUBLIC RECORDS TARRANT COUNTY, TEXAS P.R.T.C.T. PLAT RECORDS TARRANT COUNTY, TEXAS ORTWORTH CITY OF FORT WORTH �� OF T� N. TARRANT PKWY. AT N. BEACH ST. .�STf�;�,.-/� PARCEL N0, 03 TE CITY PROJ. N0. 103309 �.•' `� � � •'•. � TEMPORARY CONSTRUCTION EASEMENT CHARLES S. RUBY OWNER: ARRANT EACH PARTNERSHIP, L.P. r'•;A,p 6574 SURVEY: ELI W. SHRIVER SURVEY, ABSTRACT N0. 1455 y .Ss�o�?:• O LOCATION: CITY OF FORT WORTH, TARRANT COUNTY, TEXAS F ACQUISITION AREA: 250 SQUARE FEET OR 0.0057 ACRES S U � WHOLE PROPERTY ACREAGE: 1.851 ACRES LES S. RUB JOB N0. FNI2204_82 DRAWN BY: MP CAD FILE: PARCEL 03 TE.DWG REGISTERED PROFESSIONAL D SURVEYOR DATE: JUNE 25, 2023 EXHIBIT B PAGE 1 OF 1 SCALE: 1" = 30' N0. 6574 TEXAS Fl No. 10194700 YELLOW ROSE MAPPING LLC 2011 WOODLAND HILLS LANE WEATHERFORD, TX 76087 817-703-6578 GC-4.02 Subsurface and Physical Conditions THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH North Tarrant Partway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 1, 2025 Geotechnical Report - North Tarrant Parkway and North Beach Street FREESE City of Fort Worth CPN103309 F,11NICHOLS APPENDIX A Vicinity Map (1 page) Boring Location Map (1 page) Traffic Control Plan (4 pages) CITY OF FORT WORTH North Tarrant Park-wav and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 ' e.ir . tt,1 �ti dt� I r, j: Ta rra nt Pa rkwa —�1 17 r FN, PROJECT: FT122711 Fw,REESE FILE: �� AICHOLS T:\GEO\5_Study (GEO)\06_Study Reports & Memos DATE: 801 Cherry Street, Ste. 2800 March 2023 Fort Worth, TX 76102 PREPARED MK JT I I V C l�r� Y —' 1 Pro,�ect-Locatic ;11L z 0 n CPN 103309 N Tarrant Pkwy & N Beach St. City of Fort Worth Vicinity Map N W+E S FIGURE 1 CITY OF FORT WORTH North Tarrant Parkway artd North Beach Street haeeyection Irnprovernent.y STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Ar r: .db i '�'•: r .. y c� n t W •Gomm I ' �w 0 kv I ant park ay m-m oil .•,. � . .-_ 'A, 0 G fD � � n �. N N _ r-r ' -t �;'• W E #� � f � �rs•. - S FNI PROJECT: FT122711 FREESE CPN 103309 N Tarrant Pkwy & N Beach St FILE: •� <NICHOLS City of Fort Worth FIGURE T:\GEO\5_Study (GEO)\06_Study Reports & Memos DATE: 801 Cherry Street, Ste. 2800 March 2023 Fort Worth, TX 76102 2 PREPARED MK Boring Location Map CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Geotechnical Report - North Tarrant Parkway and North Beach Street FREESE City of Fort Worth CPN103309 F,11NICHOLS APPENDIX B Logs of Borings-B-2301 through B-2304 (4 pages) Boring Log Legend and Nomenclature (2 pages) CITY OF FORT WORTH North Tarrant Parinvav and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 rMNICHOLS LOG OF BORING NO. B-2301 Project Description: N. Tarrant Pkwy and North Beach St Intersection Project Location: Fort Worth, Texas Project No.: FT122711 Date Drilling Started: 2/27/2023 Phase No.: **** Logged By: A. Brewer Drilling Co.: Texplor of Dallas, Inc. Date Drilling Completed: 2/27/2023 Rig Type: CME 75 Hammer Type: Automatic Drill Method: CFA Latitude: 32.894179 Longitude:-97.290262 Elevation: 645.3 ft. SAMPLE e a x W > N H N ♦+ wa o W J Z F = C7 (J ZW ~ C~C C Z Y W J Z a Wa o _ W W W W co MATERIAL DESCRIPTION o 3 Q$ o � �= g LL p F U awZ > OW Cr v}i oG o}C aN Cr F 8VU Q > UJ aOC Q a\°Z J C J ZN Q W m =FO 3 z a m H Asphalt paving 8 inches over suspected lime treated subgrade u-1 3.5 (P) 67 FAT CLAY with variable SAND and 1.75/643.6 GRAVEL content, dark gray and brown, U-2 3.0 (P) 40 very stiff, moist, with organic rich layers 24 100 78 58 23 35 3 6.6 (possible fill), fine grained sand and gravel 5 U-3 3.5 (P) 50 640 3.5 (P) 50 -dark brown below 7 feet 23 01 82 54 21 33 3 9.8 u-4 13-14-14 GRAVELLY CLAY, yellow -brown and dark 8/637.3 SPT-5 (28) brown, medium stiff, moist, fine to coarse limestone gravel; gravp/f context is 10 variable (gravelly clay to clayey gravel) 635 LEAN TO FAT CLAY, yellow -brown, very 11/634.3 stiff, moist, bhcky, jointed, occasional fossil fragments (Rersldual to Highly Weathere) U-6 4.5+ (P) 40 15 630 MARL, gray to d rk gr y, very soft rock, 16/629.3 50/3" shay, wrath fossil fragments (oysters) TCP s0/2° 'otal boring depth-_18.0 ft. 20 625 25 620 GROUND WATER OBSERVATIONS Remarks: 0-18 feet - continuous flight augers. Backfilled with soil cuttings at completion and patched with asphalt. MEASUREMENT SZ At Time Of Drilling t At End of Drilling Z After Drilling DATE DEPTH (ft.bgs.) NOTES None None The stratification lines represent approximate strata boundaries. In situ, the transition may be gradual.These logs are subject to the limitations, conclusions, and recommendations in the associated report. Sheet 1 of 1 rMNICHOLS LOG OF BORING NO. B-2302 Project Description: N. Tarrant Pkwy and North Beach St Intersection Project Location: Fort Worth, Texas Project No.: FT122711 Date Drilling Started: 2/27/2023 Phase No.: **** Logged By: A. Brewer Drilling Co.: Texplor of Dallas, Inc. Date Drilling Completed: 2/27/2023 Rig Type: CME 75 Hammer Type: Automatic Drill Method: CFA Latitude: 32.895028 Longitude:-97.289713 Elevation: 643.9 ft. SAMPLE e a x W > N H N ♦+ wa o W J Z F = C7 (J ZW ~ C~C C Z Y W J Z a Wa o _ W W W W co MATERIAL DESCRIPTION o 3 Q$ o � �= g LL p F U awZ > v}i oG o}C aN Cr F 8VU Q > UJ o a0z o °` a o a Z J a J ZVI a J W m XWO 3 z a X 7.5 inches concrete over lime treated subgrade U-1 4.5+ (P) 85 FAT CLAY with GRAVEL, dark brown, 2/641.9 U-2 4.5+ (P) 40 Iffil stiff, gravel content is variable 21 104 45 53 18 35 2.7 10.5 4.5+ (P) 60 U-3 5 639 SPT-4 10-12-9 (21) U-5 3.25 (P) 90 49 51 19 32 LIMESTONE, light yellow -brown, chalky, 8/635.9 highly weathered FAT CLAY, yellow -brown, very,, ff, 9/634.9 (T), 10 U-6 4.5 4.5+(p) 63 blocky, jointed 21 106 2.7 12.6 634 MARL, dark gray, very soft rock, shalt', 10.5/633.4 with fossil fragments 50/3" 50/3" TCP 15 629 20 _- Wbonngdept 624 25 619 GROUND WATER OBSERVATIONS Remarks: 0-13 feet - continuous flight augers. Backfilled with soil cuttings at completion and patched with concrete. MEASUREMENT SZ At Time OfDritting t AtEndofDrilling Z After Drilling DATE DEPTH (ft.bgs.) NOTES None None The stratification lines represent approximate strata boundaries. In situ, the transition may be gradual.These logs are subject to the limitations, conclusions, and recommendations in the associated report. Sheet 1 of 1 rMNICHOLS LOG OF BORING NO. B-2303 Project Description: N. Tarrant Pkwy and North Beach St Intersection Project Location: Fort Worth, Texas Project No.: FT122711 Date Drilling Started: 2/27/2023 Phase No.: **** Logged By: A. Brewer Drilling Co.: Texplor of Dallas, Inc. Date Drilling Completed: 2/27/2023 Rig Type: CME 75 Hammer Type: Automatic Drill Method: CFA Latitude: 32.893821 Longitude:-97.288715 Elevation: 642.2 ft. SAMPLE e a x W > N ~ N ♦+ wa o W J Z F = C7 (J ZW ~ C~C C Z Y W J Z a Wa o _ W W W W co MATERIAL DESCRIPTION o 3 Q$ o � �= g LL p F U awZ > OW v}i oG o}C aN Cr F 8VU Q > UJ aOC Q a\°Z J C J ZN Q J W m =FO 3 z a m H 7.25 inches asphalt over lime treated subgrade SPT-1 3-4-5 (9) FAT CLAY, dark gray, very stiff, some 1.5/640.7 g Y, Y gravel, organic (probable fill) q. 0 (Tp' 36 60 21 39 FAT to LEAN GRAVELLY CLAY, yellow brown and brown, very stiff, fine to 10-14-16 course limestone gravel, gravel content is 5 sPT-3 (30) variable, alternating hard to soft layers 637 and seams 4.5+ (P) 70 42 43 16 27 U-4 SPT-5 50/4.00" 10 632 FAT CLAY, dark brown, very stiff, blocky, 95/632.7 jointed, with iron stains U-6 4.5 (P) 75 MARL, dark gray, very soft rock, shaly, 13/529.2 ua 4.5+(P) 63 with fossil fragments - 15 50/2.5" 50/2 otal boring depth 15.0 ft. 627 TCP 20 _ 622 25 617 GROUND WATER OBSERVATIONS Remarks: 0-15 feet - continuous flight augers. Backfilled with soil cuttings at completion and patched with asphalt. MEASUREMENT SZ At Time OfDritting t AtEndofDrilling Z After Drilling DATE DEPTH (ft.bgs.) NOTES None None The stratification lines represent approximate strata boundaries. In situ, the transition may be gradual.These logs are subject to the limitations, conclusions, and recommendations in the associated report. Sheet 1 of 1 rMNICHOLS LOG OF BORING NO. B-2304 Project Description: N. Tarrant Pkwy and North Beach St Intersection Project Location: Fort Worth, Texas Project No.: FT122711 Date Drilling Started: 2/27/2023 Phase No.: **** Logged By: A. Brewer Drilling Co.: Texplor of Dallas, Inc. Date Drilling Completed: 2/27/2023 Rig Type: CME 75 Hammer Type: Automatic Drill Method: CFA Latitude: 32.893590 Longitude:-97.289620 Elevation: 641.8 ft. SAMPLE e a x W > N ~ N ♦+ wa o W J Z F = L7 (J ZW ~ C~C C Z Y L. Z a Wa o _ W W W W co MATERIAL DESCRIPTION o 3 Q$ o � �= g LL p F U awZ > OW Cr v}i oG o}C CL Cr F 8VU Q > UJ aOC Q a\°Z J C J ZN Q W m =FO 3 z a � m H 7.75 inches concrete over lime treated 10-4-5 su bgrad e SPT-1 (9) 3.0 (T), FAT CLAY with gravel, dark gray, stiff, 2/639.8 u-z 4.5+(P) 53 with asphalt and fine limestone gravel, 85 54 20 34 FILL SPT-3 3.5/638.3 CLAYEY SAND with GRAVEL, dense, 35-18-14 (3z) yellow -brown and brown, fine to coarse 5— grained, with limestone gravel 637 U-4 4.5+ (P) 30 11 119 37 46 19 27 1.2 2.2 LEAN to FAT CLAY, with sand and fine 7/634.9 U-5 3.0 (P) 60 gravel, dark brown, very stiff,; blocky, jointed 10 4.5+ (P) 75 632 U-6 LEAN to FAT CLAY, yellow -brown, very 9.5/6323 stiff, blocky, jointed 4.5+ (P) 100 MARL, dark. gray, very soft rock, shal 13/528.8 g Y', Y Y� U_7 50/2" with fossil fragments TCP 50/2° Total boring depth,14.0 ft. 15 627 20 _ 622 25 617 GROUND WATER OBSERVATIONS Remarks: 0-14 feet - continuous flight augers. Backfilled with soil cuttings at completion and patched with concrete. MEASUREMENT SZ At Time OfDritting t AtEndofDrilling Z After Drilling DATE DEPTH (ft.bgs.) NOTES None None The stratification lines represent approximate strata boundaries. In situ, the transition may be gradual.These logs are subject to the limitations, conclusions, and recommendations in the associated report. Sheet 1 of 1 BORING LOG LEGEND AND NOMENCLATURE Abbreviations U — Undisturbed Sample (tube) SPT—Standard Penetration Test NT— Not Testable A — Auger Sample TCP — Texas Cone Penetration NP — Non Plastic CS — Continuous Sample CFA —Continuous Flight Auger ATD — At Time of Drilling C — Rock Core HSA — Hollow Stem Auger AD —After Drilling General Terms Term Description Blow Counts Results from either the Standard Penetration Test (SPT) or the Texas Cone Penetration (TCP) test. Recovery Length of sample or core recovered divided by the total length pushed, driven, or cored (expressed as a %) Rock Quality Designation (RQD) Cumulative length of unfractured pieces of core material more than 4 inches in length divided by the total length of material cored (expressed as a percentage) Consistency of Cohesive Soil Description Comp. Strength, tsf SPT Blows TCP Blows Criteria Very Soft < 0.25 0-2 0-8 Sample sags under its own weight and is easily deformed Soft >_ 0.25 — < 0.5 > 2 — 4 > 8 — 20 Easily pinched between fingers and remolded with light finger pressure Medium Stiff >_ 0.5 — < 1.0 > 4 — 8 N/A for TOOT Imprinted easily with fingers and remolded with firm finger pressure Stiff >_ 1.0 — < 2.0 > 8 — 15 >20 — 40 Imprinted with strong finger pressure or indented easily with fingernail Very Stiff >_ 2.0 — < 4.0 > 15 — 30 > 40 to 80 Light imprint from finger or light indent with fingernail Hard >_ 4.0 > 30 >80 Difficult to indent with fingernail Apparent Density of Cohesionless Soil Description SPT Blow Count Texas Cone Blow Count Very Loose 0-4 0-8 Loose > 4 — 10 > 8 — 20 Medium Dense > 10 — 30 > 20 to 80 Dense > 30 — 50 80 to >_ 5" Very Dense > 50 0" to < 5" Soil Structure Description Criteria Stratified Alternating layers of varying material/color with layers >_ 1/4-inch thick Laminated Alternating layers of varying material/color with layers < 1/4-inch thick Fissured Breaks along definite planes with little resistance Slickensided Fracture planes appear polished or glossy; shows movement direction Blocky Cohesive soil that can be broken into small, angular lumps Lensed Inclusion of small pockets of soil that is different from dominate type Homogenous Same color and appearance throughout Moisture Condition Textural Adjectives Description Criteria Textural Item Description Dry Absence of moisture, dusty, dry to the touch Pit Pinhole sized openings Vug Small openings up to 4 inches in size Moist Damp but no visible water Cavity Opening larger than 4 inches Honeycomb Numerous and grouped pits and vugs Wet Visible free water Vesicle Small openings in volcanic rocks 07FREESE Copyright Freese and Nichols, Inc., Version 1.4 (September 8, 2014) =NICHOLS Page 1 of 2 BORING LOG LEGEND AND NOMENCLATURE Rock Hardness Descriptors Approx. Comp. Approx. Grade Field Test Strength, tsf TCP Range Very Soft < 10 - 100 >6" Can be peeled with pocket knife, crumbles under firm blows of geological hammer Soft 100 - 500 4" - 6" Can be peeled with pocket knife with difficulty, indented by firm blows of geological hammer Hard 500 - 1000 1" - 5" Cannot be peeled with pocket knife, can be fractured by single firm blow of hammer Very Hard 1000 - 2000 0" - 2" Specimen requires more than one blow of geological hammer to fracture it Extremely Hard > 2000 0" Specimen requires many blows of geological hammer to fracture it Degree of Rock Weathering Description Criteria Unweathered No evidence of chemical or mechanical alteration Slightly Weathered Slight discoloration of surface or discontinuities; < 10% volume altered Weathered Discoloring evident; 10 to 50% of volume altered Highly Weathered Entire mass discolored; alteration through majority of rock Decomposed Rock reduced to soil consistency with some rock -like texture Rock Bedding Structure Description Criteria Laminated < 3/8 inch Very Thinly Bedded 3/8-1 inch Thinly Bedded 1 inch-4 inches Moderately Bedded 4 inches-1 foot Thickly Bedded 1 foot-3 feet Very Thickly Bedded 3-10 feet Massive > 10 feet Soil Column Graphic Symbols* Graphic Represented Soil Types Graphic Represented Soil Types 0 Fat Clay, Fat Clay with sand, Sandy Fat Clay .;?;?{• Well -Graded Sand or Poorly -Graded Sand; little to no fines r•r• ® Lean Clay, Lean Clay with sand, Sandy Lean Clay, Silty Clay Clayey Gravel, Gravel -Sand -Clay Mixtures ® Inorganic Silt and Organic Silt „ o Silty Gravel, Gravel -Sand -Silt Mixtures F71Clayey Sand, Clay -Sand Mixtures© Well -Graded Gravel or Poorly -Graded Gravel; little to no fines E] Silty Sands, Sand -Silt Mixtures Fill with Significant Debris or Deleterious Material Rock Column Graphic Symbols* Graphic Represented Rock Types Graphic Represented Rock Types Limestone, Shaly/Marly Limestone, Limestone with Shale Marl, Marl with Limestone, Marl with Shale ® Shale, Shale with Limestone ❑ Sandstone, Shaly Sandstone, Sandstone with Shale Mudstone l Generic Bedrock Symbol /'. * Combined graphics may be used for dual classifications. Not all graphics represented. Refer to lithology description for soil classification or rock type. IrFRE ESE l,11°NICHOLS Copyright Freese and Nichols, Inc., Version 1.4 (September 8, 2014) Page 2 of 2 Geotechnical Report - North Tarrant Parkway and North Beach Street FREESE City of Fort Worth CPN103309 F111NICHOLS APPENDIX C Laboratory Test Results (1 page) Lime Testing (1 page), Sulfate Testing (1 page) Unconfined Compression Tests (10 pages) CITY OF FORT WORTH North Tarrant Parinvav and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 SUMMARY OF LABORATORY RESULTS PAGE 1 OF 1 PROJECT NAME A Tarrant Pkwv and North Beach St Intersection PROJECT NUMBER FT122711 PROJECT PHASE **** PROJECT LOCATION Fort Worth, Texas TESTING PERFOMED BY: Beyond Engineering Borehole Depth, ft Water Content, % Unit Dry Weight Ib/ft % Passing No. 200 Sieve Liquid Limit Plastic Limit Plasticity Index Unconfined Compressive Strength, Compressive tsf Strain at Failure, % B-2301 2.0 24.1 100.3 78 58 23 35 3 6.6 B-2301 6.0 22.9 100.5 82 54 21 33 3 9.8 B-2302 2.0 20.9 103.9 45 53 18 35 2.7 10.5 B-2302 7.0 49 51 19 32 B-2302 9.0 21.4 105.6 2.7 12.6 B-2303 2.5 36 60 21 39 B-2303 6.0 42 43 16 27 B-2304 2.0 85 54 20 34 B-2304 5.0 10.9 119.0 37 46 19 27 1.2 2.2 CITY OF FORT WORTII North TarrantPar"w.v and North Beach Street Intersection hnprovenaents STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 aw /WJ Eva ND SOIL -LIME TESTING pH Series Client: Freese & Nichols, Inc. Project: Tarrant Pkwy and N Beach St, Fort Worth (PN: FT 122711) Sample: 2301 (U-3) at 4-6 ft pH versus Percent Lime 14 12 10 8 6 4 2 0 0 2 4 6 8 12 Recommended Percent Lime, %: -- Note: Hydrated Lime was used. Beyond Engineering & Testing, LLC 3801 Doris Lane, Suite B Round Rock, TX 78664 (512)358-6048 Beyond Project No.: LT2302012 Test Method: Tex- 121-E, Part III Test Date: 3/7/2023 Lime pH 0 8.73 2 12.16 4 12.34 6 12.40 8 j 12.41 1 10 12.44 Temp: 25.0 °C HuaMiao Cao, P.E., 3/9/23 Analysis & Quality Review/Date Specimen prepared by: L.P. The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the sample tested and / or inspected. They are not intended to be indicative of qualities of apparently identical products. The use of our name must recieve prior written approval. Reports must be reproduced in their entirety. Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 /w*EYONco Client: Freese & Nichols, Inc. Project: Tarrant Pkwy and N Beach St, Fort Worth (PN: FT122711) Beyond Engineering & Testing, LLC 3801 Doris Lane, Suite B Round Rock, TX 78664 (512) 358-6048 Beyond Project No.: LT2302012 Testing Method: TEX-145-E Test Date: 3/6/2023 Water -Soluble Sulfate Content in Soil Sample ID in Sulfate Content in Soil (ppm) 2302 at 4-5 ft <100 2303 at 2.5-4 ft <100 Note: sulfate content calculated as an average of at least 3 separate test trials HuaMiao Cao, P.E., 3/9/23 Quality Review/Date Tested by: T.A.W. Page 1 of 1 The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the sample tested and / or inspected. They are not intended to be indicative of qualities of apparently identical products. The use of our name must recieve prior written approval. Reports must be reproduced in their entirety. Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 /jlEYOND Unconfined Compression Test Report Client: Freese & Nichols, Inc. Project No.: LT2302012 Project: Tarrant Pkwy and N Beach St, Fort Test Method: ASTM D2166 Worth (PN: FT122711/0002/OAG1/1140) Sample I.D.: 2301 (U-2) at 2-4 ft 60 50 .y a. y 40 L W 30 L 20 is 0 U 10 0 0 3 6 9 12 15 Axial Strain (%) Mohr Circles for Peak Stress at Failure 60 50 a. 40 f 30 Q 20 10 0 0 10 20 30 40 50 60 Compressive Stress (psi) Beyond Engineering & Testing, LLC 3801 Doris Lane, Suite B Round Rock, TX 78664 (512)358-6048 Type of Specimen: Shelby Tube Strain Rate: 1.0 %/min Test Date: 3/2/2023 Initial Specimen Conditions Avg. Diameter (in) Do 2.74 Avg. Height (in) Ho 5.65 Water Content (%) wo 24.1 Total Unit Weight (pcf) 7total 124.4 Dry Unit Weight (pcf) 7dry 100.3 Saturation (%) Sr 95.4 Void Ratio eo 0.68 Specific Gravity (Assumed) G, 2.70 Stresses at Failure Compressive Strength, q „ (tsf) 3.0 Axial Strain at Failure (%) 6.6 Axial Strain at 50 % of q u (%) 1.7 Total Stresses at Failure Major Principal Stress, al (psi) 41.6 Minor Principal Stress, a3 (psi) 0 Undrained Shear Strength, S„ (tsf) 1.50 Note: Failure was determined at the maximum deviator stress or deviator stress at 15 % axial strain, whenever is obtained first. Te-An Wang, EIT, 03/08/23 Quality Review/Date Specimen prepared & tested by: A.B. The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the sample tested and / or inspected. They are not intended to be indicative of qualities of apparently identical products. The use of our name must recieve prior written approval. Reports must be reproduced in their entirety. Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 /^EYOND Beyond Engineering & Testing, LLC 3801 Doris Lane, Suite B Round Rock, TX 78664 (512)358-6048 Unconfined Compression Test Report Client: Freese & Nichols, Inc. Project No.: LT2302012 Project: Tarrant Pkwy and N Beach St, Fort Worth Test Method: ASTM D2166 (PN: FT122711/0002/OAG1/1140) Test Date: 03/02/23 Specimen: 2301 (U-2) at 2-4 ft Failure Mode: Single Inclined Failure Plane The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the sample tested and / or inspected. They are not intended to be indicative of qualities of apparently identical products. The use of our name must recieve prior written approval. Reports must be reproduced in their entirety. Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 /,�EYON0 Unconfined Compression Test Report Beyond Engineering & Testing, LLC 3801 Doris Lane, Suite B Round Rock, TX 78664 (512)358-6048 Client: Freese & Nichols, Inc. Project No.: LT2302012 Type of Specimen: Shelby Tube Project: Tarrant Pkwy and N Beach St, Fort Test Method: ASTM D2166 Strain Rate: 1.0 %/min Worth Test Date: 3/2/2023 (PN: FT122711/0002/OAG 1/1140) Sample I.D.: 2301 (U-4) at 6-8 ft 60 50 0 I1 E50% 3 6 9 12 15 Axial Strain (%) Mohr Circles for Peak Stress at Failure 60 50 40 30 eLc 20 10 0 L 0 S,, = 20.8 psi 10 20 30 40 50 60 Compressive Stress (psi) Initial Specimen Conditions Avg. Diameter (in) Do 2.75 Avg. Height (in) Ho 5.66 Water Content (%) wo 22.9 Total Unit Weight (pcf) ytotai 123.5 Dry Unit Weight (pef) ydry 100.5 Saturation (%) Sr 91.2 Void Ratio eo 0.68 Specific Gravity (Assumed) G, 2.70 Stresses at Failure Compressive Strength, q ,, (tsf) 3.0 Axial Strain at Failure (%) 9.8 Axial Strain at 50 % of q u (%) 1.1 Total Stresses at Failure Major Principal Stress, a, (psi) 41.5 Minor Principal Stress, a3 (psi) 0 Undrained Shear Strength, S. (tsf) 1.49 Note: Failure was determined at the maximum deviator stress or deviator stress at 15 % axial strain, whenever is obtained first. Te-An Wang, EIT, 03/08/23 Quality Review/Date Specimen prepared & tested by: A.B. The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the sample tested and / or inspected. They are not intended to be indicative of qualities of apparently identical products. The use of our name must recieve prior written approval. Reports must be reproduced in their entirety. Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 ^EYOND Beyond Engineering & Testing, LLC 3801 Doris Lane, Suite B Round Rock, TX 78664 (512) 358-6048 Unconfined Compression Test Report Client: Freese & Nichols, Inc. Project No.: LT2302012 Project: Tarrant Pkwy and N Beach St, Fort Worth Test Method: ASTM D2166 (PN: FT122711/0002/OAG1/1140) Test Date: 03/02/23 Specimen: 2301 (U-4) at 6-8 ft Failure Mode: Multi -inclined Failure Plane The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the sample tested and / or inspected. They are not intended to be indicative of qualities of apparently identical products. The use of our name must recieve prior written approval. Reports must be reproduced in their entirety. Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 /,�EYON0 Unconfined Compression Test Report Client: Freese & Nichols, Inc. Project: Tarrant Pkwy and N Beach St, Fort Worth (PN: FT 122711/0002/OAG1/1140) Sample I.D.: 2302 (U-2) at 2-4 ft 60 50 y a 40 30 a Q 20 0 U 10 0 4 0 '50% Project No.: LT2302012 Test Method: ASTM D2166 3 6 9 12 Axial Strain (%) Mohr Circles for Peak Stress at Failure 60 50 40 30 s. eLc 20 10 0 L 0 S„ = 18.6 psi 10 20 30 40 50 60 Compressive Stress (psi) 15 Beyond Engineering & Testing, LLC 3801 Doris Lane, Suite B Round Rock, TX 78664 (512)358-6048 Type of Specimen: Shelby Tube Strain Rate: 1.0 %/min Test Date: 3/2/2023 Initial Specimen Conditions Avg. Diameter (in) Do 2.74 Avg. Height (in) H,, 5.55 Water Content (%) wo 20.9 Total Unit Weight (pcf) ytotai 125.6 Dry Unit Weight (pef) ydry 103.9 Saturation (%) Sr 90.6 Void Ratio eo 0.62 Specific Gravity (Assumed) G, 2.70 Stresses at Failure Compressive Strength, q ,, (tsf) 2.7 Axial Strain at Failure (%) 10.5 Axial Strain at 50 % of q u (%) 2.0 Total Stresses at Failure Major Principal Stress, a, (psi) 37.2 Minor Principal Stress, 63 (psi) 0 Undrained Shear Strength, S. (tsf) 1.34 Note: Failure was determined at the maximum deviator stress or deviator stress at 15 % axial strain, whenever is obtained first. HuaMiao Cao, P.E., 03/09/23 Quality Review/Date Specimen prepared & tested by: A.B. The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the sample tested and / or inspected. They are not intended to be indicative of qualities of apparently identical products. The use of our name must recieve prior written approval. Reports must be reproduced in their entirety. Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 ^EYOND Beyond Engineering & Testing, LLC 3801 Doris Lane, Suite B Round Rock, TX 78664 (512) 358-6048 Unconfined Compression Test Report Client: Freese & Nichols, Inc. Project No.: LT2302012 Project: Tarrant Pkwy and N Beach St, Fort Worth Test Method: ASTM D2166 (PN: FT122711/0002/OAG1/1140) Test Date: 03/02/23 Specimen: 2302 (U-2) at 2-4 ft Failure Mode: Single Inclined Failure Plane The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the sample tested and / or inspected. They are not intended to be indicative of qualities of apparently identical products. The use of our name must recieve prior written approval. Reports must be reproduced in their entirety. Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 /,�EYON0 Unconfined Compression Test Report Beyond Engineering & Testing, LLC 3801 Doris Lane, Suite B Round Rock, TX 78664 (512)358-6048 Client: Freese & Nichols, Inc. Project No.: LT2302012 Type of Specimen: Shelby Tube Project: Tarrant Pkwy and N Beach St, Fort Test Method: ASTM D2166 Strain Rate: 1.0 %/min Worth Test Date: 3/2/2023 (PN: FT122711/0002/OAG 1/1140) Sample I.D.: 2302 (U-6) at 9-11 ft 60 50 y a 40 30 a Q 20 0 U 10 Of 0 E50% - 3 6 9 12 15 Axial Strain (%) Mohr Circles for Peak Stress at Failure 60 50 40 30 s. eLc 20 10 0 4 0 S„ = 18.8 psi 10 20 30 40 50 60 Compressive Stress (psi) Initial Specimen Conditions Avg. Diameter (in) Do 2.75 Avg. Height (in) Ho 5.65 Water Content (%) wo 21.4 Total Unit Weight (pcf) ytotai 128.2 Dry Unit Weight (pef) ydry 105.6 Saturation (%) Sr 97.1 Void Ratio eo 0.60 Specific Gravity (Assumed) G, 2.70 Stresses at Failure Compressive Strength, q ,s (tsf) 2.7 Axial Strain at Failure (%) 12.6 Axial Strain at 50 % of q u (%) 2.6 Total Stresses at Failure Major Principal Stress, a, (psi) 17.7 Minor Principal Stress, a3 (psi) 0 Undrained Shear Strength, S. (tsf) 1.36 Note: Failure was determined at the maximum deviator stress or deviator stress at 15 % axial strain, whenever is obtained first. HuaMiao Cao, P.E., 03/09/23 Quality Review/Date Specimen prepared & tested by: A.B. The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the sample tested and / or inspected. They are not intended to be indicative of qualities of apparently identical products. The use of our name must recieve prior written approval. Reports must be reproduced in their entirety. Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 �1�EYOND Beyond Engineering & Testing, LLC 3801 Doris Lane, Suite B Round Rock, TX 78664 (512) 358-6048 Unconfined Compression Test Report Client: Freese & Nichols, Inc. Project No.: LT2302012 Project: Tarrant Pkwy and N Beach St, Fort Worth Test Method: ASTM D2166 (PN: FT122711/0002/OAG1/1140) Test Date: 03/02/23 Specimen: 2302 (U-6) at 9-11 ft Failure Mode: Single Inclined Failure Plane The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the sample tested and / or inspected. They are not intended to be indicative of qualities of apparently identical products. The use of our name must recieve prior written approval. Reports must be reproduced in their entirety. Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 /,�EYON0 Unconfined Compression Test Report Client: Freese & Nichols, Inc. Project No.: LT2302012 Project: Tarrant Pkwy and N Beach St, Fort Test Method: ASTM D2166 Worth (PN: FT 122711/0002/OAG1/1140) Sample I.D.: 2304 (U-4) at 5-7 ft 30 25 .y a 20 15 a Q 10 0 U 5 0 0 2 4 6 8 10 Axial Strain (%) Mohr Circles for Peak Stress at Failure 30 25 20 15 I S„ = 8.6 eLc 10--..--..--- 5 0 L 0 5 10 15 20 25 30 Compressive Stress (psi) Beyond Engineering & Testing, LLC 3801 Doris Lane, Suite B Round Rock, TX 78664 (512)358-6048 Type of Specimen: Shelby Tube Strain Rate: 1.0 %/min Test Date: 3/3/2023 Initial Specimen Conditions Avg. Diameter (in) Do 2.74 Avg. Height (in) H,, 5.73 Water Content (%) wo 10.9 Total Unit Weight (pcf) ytotai 131.9 Dry Unit Weight (pef) ydry 119.0 Saturation (%) Sr 70.3 Void Ratio eo 0.42 Specific Gravity (Assumed) G, 2.70 Stresses at Failure Compressive Strength, q u (tsf) I Axial Strain at Failure (%) 2.2 Axial Strain at 50 % of q u (%) 0.5 Total Stresses at Failure Major Principal Stress, a, (psi) 17.1 Minor Principal Stress, a3 (psi) 0 Undrained Shear Strength, S. (tsf) 0.62 Note: Failure was determined at the maximum deviator stress or deviator stress at 15 % axial strain, whenever is obtained first. HuaMiao Cao, P.E., 03/09/23 Quality Review/Date Specimen prepared & tested by: A.B. The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the sample tested and / or inspected. They are not intended to be indicative of qualities of apparently identical products. The use of our name must recieve prior written approval. Reports must be reproduced in their entirety. Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 ^EYOND Beyond Engineering & Testing, LLC 3801 Doris Lane, Suite B Round Rock, TX 78664 (512) 358-6048 Unconfined Compression Test Report Client: Freese & Nichols, Inc. Project No.: LT2302012 Project: Tarrant Pkwy and N Beach St, Fort Worth Test Method: ASTM D2166 (PN: FT122711/0002/OAG1/1140) Test Date: 03/03/23 Specimen: 2304 (U-4) at 5-7 ft Failure Mode: Brittle Failure The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the sample tested and / or inspected. They are not intended to be indicative of qualities of apparently identical products. The use of our name must recieve prior written approval. Reports must be reproduced in their entirety. Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 GC-4.04 Underground Facilities THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH North Tarrant Partway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 1, 2025 3 c s t c 3 C� H � O O O O O'> Om 4 0.v 3 0 O'_ 3 Ox Ox Ox Ox Ov$ O Ow 3 c O x N t � s C � Y � i L o 0 O N& � p t o =^ — z z z z z z z z r r z z � 5`oL 3 O n n n Z \ N O o < U z z z z z z z z z z z z N 9 e �.3 0 0 0 0 8 �zp2 q z 199eN �+ - � U� O GC-6.06.1) — Small Business Utilization Form THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH North Tarrant Partway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 1, 2025 U) 0 bA co d C E E O \ U O p x ~ O O a� U 1 m � m LL uj O W ❑ m � c •� W o LL m M W U cnW m N U U m N U (n a) DC c ❑ U- cc E D N c/) 00 W Z ❑ N m J � Q cn Z a O a) ❑ Z U 0 W W O O V W DoV *' _ W Q LL Z Q �_ L V O C Q N L. 0 O LL - � Z Z F- Z F— W c6 O = cc 'o O Q to a W_ O y U F' U i j, W W W_ Q Y L 0 0 0 X E m c N L a m 0 a a m U m a m O 0 u 7 = -p O U O -0 > cnC O 00 O — w Q Co O co H N F 0 i O U O � � O C O Q) as = v c y c ' ai O a) a) 0 cn cn E � to s m O c E o a) 0 cc � m +� c 3 3: O (D c c a) N O E V () m u`n y co s c o co c O U .Q co 7 � H O O U C = O •0 n 7 U y a) L X nn a) t' c O o` 0- U) O O O E >O w O Cn m LL +�+ U O a) T U CL © -0a) cna) O c bA v O C2 r a`) c V O i !t C ,+ 7 V O O O O c CL LM H OU E a) s 0 c U) O T m m a) �, U W U a) Q) C m o co c I H O U) U p C X OO �- '� U c O U O 0 m O � � a o 0o CO cc a) E o 0 w - E -0 Q Nco cU[ Cl Q)~ Q) U > Z U a) c H bQ) -0 Q co Q) c U O -- co co p Q) U E U p � C . + U C O C o O U CO C O X a) cn ~ O E E o +, ii Q) > � U p c Q) cn O a Z)Z a 00 O E U C ' U) N O cn Q c O Up - Cc U) fo a) c E U tz LL ID . — co E a) a) E O c O U a) cn E 7 Cr- � U a) U � o c cn W Da) m � c E ai LO N O N 1 00 d7 Q) U) .5 0 Mw U) 0 N a) bn ca d a o a) a) 0 U a) O cCD E o a E U C as .— O C � m O m N U a) co E a) no a) O a) +J E CO U LF- - a o � � U O -0 C 0 O E _r_ O , Cl) U -0 E O v7 0 O � i a, a a� � � O U (A o C° U i (n � O a, co U bA a) � C � 0 O '� 0 U � O p U a) O 3 5 m a) �' 3 a) O o } m U � � U E o o E cn a i E cnn c o a) Cl) o � U m Q � Z E a) o CO O c O N +' U o +, U U bA Q bA Q 0 a U c F a U(1) F- iO U m Z 2 m U m �X Z ca U t- m O w ca V w m O w f- V U ❑ ❑ ❑ ❑ U U E] E] E] ❑ w � 4) L aa) (D L aaD � 0 w w 0 0 1= � a a W W J a N " J 0. h a a a N Q y CL N_ ° 3 Cl) cn_ W 7 U)W U L y a) U L v7 •� W cr i O W i a) cn a) cc a) U) 0 z ZLL cn () LL a) 0 z Z w V 0 cn p w V 0 cn C) p C:cV CL H Q Z � Q z a) Q Z Q F.-Z 46 F �'' br3 cnw cnw d (n a Cl) a �- w w a N ci c O N ui c Q cc E O Q cc E O Q O as L Q O coi z'' Q U Z U)a a) z I--Z Q U y a cn oac 4) 0 u N CC� y � LU F-- C 0) +m W I— C 4) C +O+ Q O 3 m s E O Q O 3 m t E O Z V m Q a w U Z U m Q a w V LO N O N 1 00 d7 N U) .5 N Cr Mw 0 CO a) bA ca d = U U U LOUD Q to Q � to Q Cl) a c a C) W F U p a o acr C)C/) F U p a o a C) W � C) p ++ U U-x Y U 0>0 x ++ U co '� x >m 0 O U O 0 O L U L U ❑ ❑ ❑ ❑ L U L U ❑ ❑ ❑ ❑ L U L UEl El El 11 !F !F !F 0 a L 0 0 L 0 ( L CL Q (D Q w w w a a a W W W J t%1 J f%1 J y (n (/A N N LU U(D U) U U) LU U U) y y W � i O �O ~ W 0,i O W Eri O �O (n d O Z U) O d p z Z (/) O O Z z V U) DO OH N 0 O N 0W U wU O U Ew a) U xa 0. z a Z s Hz a z sH H v0> �> occ o� occ N W (n Lu W W LU y a N a N a a a a w w c w c D w c N O N ui c ui c N ui c acc E O QCC E O Qcc O O O cEa z U Q Z a z Q U Z y a z~ Q U Z y a a N OG 0 y v U) CC a) U)v (N OC a) U) W H C i C +O+ W F- _ +O+ W H C i C +O+ Z Q O y O -a O s O E = O Z Q O M 3 'O -a O t O E O O � Z Q O y 3 O m O s O E = O Z U m Q a w 0 Z 0 to Q a w U Z U in Q a w U LO N O N 1 00 O 0 U) .5 Lf) 0 q* & CL i 49- -Ga -60)- 40- 0 m \ § U) q k 2 \ . o m Cl)D = @ = / e o t a � A 0 Q @ 0 $ § / t § 2 k 2 ■ § 0 ° / � § / k 2 2 D � LU 7 2 / LL k$ cc J z z 0 0 0 < < 0 / « O \ / \ � / / / O 0 } 0\ 0 ¥f 0 m a) ƒ \ \ 0 E § > E \ 0 \ / � 0 kc §# / ° � E > _ 0 \ \ / _ \ / 3 0 o \\ �\ \ ) ƒ E = \ /7 ƒ\ { / 0 J c { o ( 0 0 2 2 } 0 _ \_ // \ ) ƒ ( 0 \ / Co .2 \ a 0 _ 0 / / ¥ 0 m \ .E \ cog ± _ $ 0 \ 9 0 " 0 6 0 a g = § 4 7 / ? ƒ \ 2 c \\ Mi6 / '/ 3 9 = 'a ± CO y co /< 7/ / / ( = o Co 0 / 4 m \ ■ / 0 3 3: # _ \ \ \ ( f = y \ \ \ \ \ ) (D / \ § � \ O \ 0 \ / } 0 2 k _ 0 o c [ Ems/ m to E o o 2 C13 41 \ k k g 0 » o cc a Q \ \ 0 U 2 / [ 0 cc D § \ ƒ # u e �) 0 \ \ 2 { Co COE 2 s / \ \ 0 cn '- co« \ \ ) / CO 0 \ \ 0 to EL 2 0 0 0 = a f \�0 « / 7 \ m 0 [ > 2 U /0 N : \/ 1 o � E 2 ■ 0 E 0 E 2 � k E 0 Q § � � ■ k ■ � 0 Q q CL 41 cn � Al n 04 0 04 00 ± � % .& ƒ \ s Ln 0 Ln a) bQ CO d LO N O N 1 00 N N GC-6.07 Wage Rates THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH North Tarrant Partway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 1, 2025 2013 PREVAILING WAGE RATES (Heavy and Highway Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate Asphalt Distributor Operator $ 15.32 Asphalt Paving Machine Operator $ 13.99 Asphalt Raker $ 12.69 Broom or Sweeper Operator $ 11.74 Concrete Finisher, Paving and Structures $ 14.12 Concrete Pavement Finishing Machine Operator $ 16.05 Concrete Saw Operator $ 14.48 Crane Operator, Hydraulic 80 tons or less $ 18.12 Crane Operator, Lattice Boom 80 Tons or Less $ 17.27 Crane Operator, Lattice Boom Over 80 Tons $ 20.52 Crawler Tractor Operator $ 14.07 Electrician $ 19.80 Excavator Operator, 50,000 pounds or less $ 17.19 Excavator Operator, Over 50,000 pounds $ 16.99 Flagger $ 10.06 Form Builder/Setter, Structures $ 13.84 Form Setter, Paving & Curb $ 13.16 Foundation Drill Operator, Crawler Mounted $ 17.99 Foundation Drill Operator, Truck Mounted $ 21.07 Front End Loader Operator, 3 CY or Less $ 13.69 Front End Loader Operator, Over 3 CY $ 14.72 Laborer, Common $ 10.72 Laborer, Utility $ 12.32 Loader/Backhoe Operator $ 15.18 Mechanic $ 17.68 Milling Machine Operator $ 14.32 Motor Grader Operator, Fine Grade $ 17.19 Motor Grader Operator, Rough $ 16.02 Off Road Hauler $ 12.25 Pavement Marking Machine Operator $ 13.63 Pipelayer $ 13.24 Reclaimer/Pulverizer Operator $ 11.01 Reinforcing Steel Worker $ 16.18 Roller Operator, Asphalt $ 13.08 Roller Operator, Other $ 11.51 Scraper Operator $ 12.96 Servicer $ 14.58 Small Slipform Machine Operator $ 15.96 Spreader Box Operator $ 14.73 Truck Driver Lowboy -Float $ 16.24 Truck Driver Transit -Mix $ 14.14 Truck Driver, Single Axle $ 12.31 Truck Driver, Single or Tandem Axle Dump Truck $ 12.62 Truck Driver, Tandem Axle Tractor with Semi Trailer $ 12.86 Welder $ 14.84 Work Zone Barricade Servicer $ 11.68 The Davis -Bacon Act prevailing wage rates shown for Heavy and Highway construction projects were determined by the United States Department of Labor and current as of September 2013. The titles and descriptions for the classifications listed are detailed in the AGC of Texas' Standard Job Classifications and Descriptions for Highway, Heavy, Utilities, and Industrial Construction in Texas. CITY OF FORT WORTH Page 1 of 1 North Tarrant Parkmay and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103309 GR-01 60 00 Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH North Tarrant Partway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 Revised September 1, 2025 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03107/2023 Note: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis, Special beddin¢ may be required for some pipes. Approval I. Classsification Manufacturer ModelNo. Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/161 07/23/97 33 05 13 Urethane Hydrophilic Watersto Asahi Kgy. K.K. Adeka Ultra -Seal P-201 ASTM D2240/D412/D792 04/26/00 3305 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 04/26/00 3305 D Profile Gasket for 4' Diam. MH. Press -Seal Gasket Corp. 250AG Gasket ASTM C-443/C-361 SS MH 1/26/99 3305 13 HDPE Manbole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring Traffic and Non -traffic area 5113105 33 05 13 Manhole External Wrap Canusa - CPS Wra idSeal Manhole Encapsulation Syatem Water & Sewer - Manholes & Bases/Fiberglass 33-39-13 (1/8/13) 126/99 33 39 13 Fiber=lass Manhole Fluid Containment, Inc. FI—ite ASTM 3753 Non-naffic area 08/30/06 33 39 13 Fiber g lass Manhole I L.F. Manufacturing Non---c area Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16) 33 05 13 1 Manholc Frnmcs and Covers I Weston nun Works. Hass & Hays Foundry 1001 24"x40" WD Water & Sewer - Manholes & Bases/Frames & Covers/Standard Round 33-05-13 Rev 2/3116 • 33115 I ,Manhole Frames and Covers Western Iron If, nays & Hays Found, 30024 24" Dia. 33 05 13 Manhole Frames and Covers McKinley Iron Works Inc A 24 AM 24" Dia. 08/24/19 3305 13 Manhole Frames and Covers Neenah Foun R-1272 ASTM A48 & AASHTO M306 24" Dia. 08/24/19 3305 13 Manhole Frames and Covers Neenah Foundry R- 165-LM (Hinged) ASTM A48 & AASHTO M306 24" Dia. 09/24/18 3305 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry R-1743-LM Hin ed) ASTM A48 & AASHTO M306 30" dia. 3305 13 Manhole Frames and Covers Sigma Corporation MH-144N 3305 13 Manhole Frames and Covers Sigma Corporation MH-143N 33 05 13 Manhole Frames and Covers Pont-A-Mousson GTS-STD 24" dia. 33 05 13 Manhole Frames. and Covers Neenab Cast 24" dia. 10/31/06 33 05 13 Manhole Frames and Covers ng ed Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. 7125103 3305 13 Manhole Frames and Covers Saint-Gobain Pi clines ParnaWrexus RE32-RSFS 30" Dia. 01/31/06 3305 13 30" Dia. MH Ring and Cover East Jordan Iron Works V 1432-2 and V 1493 Designs AASHTO M306-04 30" Dia 11/02/10 3305 13 30" Dia. MH Ring and Cover Sigma Corporation MH1651FWN & MH16502 30" Dia 07/19/11 3305 13 30" Dia. MH Ring and Cover Star Pipe Products MF132FTWSS-DC 30" Dia 08/10/11 1 3305 13 30" Dia. MH Ring and Cover Aecucast 220700 Heavy Du with Gasket Ring 30" Dia 10JI4113 33 05 13 30" Dia. MH Ring and Cover I in d & Lockable East Jordan Iron Works 30" ERGO XL Assembly with Cam Leck/MPIC/T-Gasket ASSHTO M 105 & ASTM A536 30" Dia 06/01/17 3405 13 30" Dia MH Ring and Cover Hind & Lockable CI SO Industries 2280 32") ASTM A 48 30" Dia. 09/16/19 33 05 13 30" Dia. MH Ringand Cover Composite Access Products. L.P. CAP-ONE-30-FTW, Composite, w/ Lock w/o Ring 30" Dia. 10/07/21 34 05 13 30" Dia, MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and Cover 30" Dia. Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16) AL 33 05 13 Manholc Frames and Covers Pom-A-Monson Pamti ht 24" Dia. 33 05 13 Manhole Frames and Covers Neenah Casting 24" Dia, 33 05 13 Manhole Frames and Covers Western Iron Works.11ass & Hays Foundry 300-24P 24" Dia. 33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. 03/08/00 3305 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48 24" Dia. 04/20/01 3305 t3 Manhole Frames and Covers SlI fSeram ore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia. _ Water & Sewer - Manholes & Bases/Precast Concrete (Rev 1/8/13) _ 33 39 t0 Manhole, Precast Concrete Hydra Conduit Corp SPL Item #49 ASTM C 478 48" 33 39 10 Manhole, Precast Concrete Wall Concrete Pie Co. Inc. ASTM C-443 48" 09/23/96 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 49" w/32" cone 05/08/18 33 39 10 Manhole, Precast Concrete The Turner Com an 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" 10/27/06 33 39 10 Manhole, Precast Conerete Oldeastle Precast Inc. 48" I.D. Manbole w/ 24" Cone ASTM C 478 49" Diam w 24" Ring 06/09/10 33 39 10 Manhole, Precast (Reinforced PolynnerfConcrete US cornposite Pie Reinforced Pol er Concrete ASTM C-76 48" to 72" 09/06/19 33 3920 Manhole, P—st Concrete Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" 10/07/21 33 3920 Manhole, Preerst (Reinforced Polymer) Concrete Armoroek 48" & 60" I.D. Manhole w/32" Cone 48" & 60" 10/07/21 33 3920 Manhole, Precast (Hybrid) Polymer & PVC Predl Systems 48" & 60" LD. Manholc w/32" Cone 48" & 60" Non Traffic Areas 03/07/23 33 3920 Manhole, Precast Concrete AmeriTex Pipe and Products, LLC 48" & 60" LD. Manhole w/32" Cone ASTM C-478; ASTM C-923; ASTM C-443 03/07/23 33 3920 Manhole, Precast Reinforced Polymer) Concrete P3 Polymer, RockHardsc 49" & 60" I.D. Manhole w/32" Cone 04/29/07 Manhole, Precast (Reinforced Polyncr) Concrete Amitech USA Moyer Pol crcte Pi e Water & Sewer - Manholes & Bases/Rehab Svstems/Cementitious Ll-I4 ,Manholc Rehab S -moms puadex 04/23/01 E1-14 Manhole Rehab Systems Standard Cement Materials, Inc. Renner MSP E1-14 Manhole Rehab Systems APM Permaform 4/20/01 EI-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System 5112/03 EI-14 Manhole Rehab System (Liner) Tri lm Linn System MH repair product to stopinfiltration ASTM D5813 OS/30/06 General Concrete Re air FlexKrete Technologies Vinyl Polyester Repair Product Misc. Use From Original Standard Products List CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03107/2023 Note: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special beddin¢ may be required for some pipes. Approval Sr• No. t t Manufacturer Water &Sewer -Manholes &Bases/Rehab Systems/NonCementitious ModelNo. National 05/20/96 EI-14 Manhole Reha65 stems S rayroi. Spray WeII Polymethane Coating ASTM Dfi39/D7no 12/14/01 Coating for Corrosion protection(Exterior) ERTE•CH Series. 20230 and 2100 As hatic Emulsion) Structures OnI 01/31/06 Coatings for Corrosion Protection Chesterton Are 791. SIHB, Sl. S2 Acid Resistance Test Sewer Applications 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications 03/19/19 ' 33 39 20 Coming for Corrosion rotecticn(Exterior) Sherwin Williams Grade (As hatic Bmuls'on) Structures 6.1 Water & Sewer- Manhole Inserts -Field Operations Use Only (Rev 2/3/16) 33 05 13 Manhole Insert Knutson Enterprises Made to Order - Plastic ASTM D 1248 For 24" dia. 33 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia. 33 05 13 Manhole Insert Neflow-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia, 09/23/96 3305 13 Manhole Insert Southwestem Packing & Seals, Inc. Lifesaver - Stainless Steel For 24" dia. 09/23/96 3305 13 Manhole Insert Southwestern Packing & Seals, Inc. TetherLok - Stainless Steel For 24n dia Water & Sewer - Pipe Casing Spacers 33-05-24 (07/01/13) 1I/04102 Steel Band Casing Spseus Advanced Products and Systems. Inc. Carbon Steel Spacers, Model SI 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer. Model SSI 04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers W14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48" 09/14/10 Coated Steel Casio Spacers Pipeline Seal and Insulator Coated Steel Casin Spacers Up to 48" 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Powe liml, Up to 48" 03/19/18 Casing Spacers BWM I SS-12 Casing Spacer(Steinless Steel) 03/19/18 Casing Spacers BWM FB-12 Casing Spacer (Coated Carbon Steel) for Non pressure Pipe and Grouted Casing 03/29/22 3305 U Casing Spacers CCI Pipeline Systems CSC12, CSS12 Water & Sewer - PiyesMuctile Iron 33-11-10(1/8/13) 33 11 10 Ductile Iron Pipe Gri1Hn Pipe Products, Co. Super Bell -rite Ductile Iron Pressure Pipe, AW WA C 150. C 151 3" thou 24" 08/24/I8 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Fastite Pipe (Bell Spigot) AW WA C I50. C 151 4" thou 30" 08/24/18 33 11 10 Ductile from Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) A W W A C 150, C151 4" thou 30" • 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. A W W A C 150, C151 " 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AW WA C150, C151 Water & Sewer - Utility Line Marker (08/24/2018) Sewer - Coatings/Epoxy 33-39-60 (01/08/13) _ 02/25/02 Epoxy Lining System Sauereisen. Ine SewerGard 21ORS LA County H210-133 12/14/01 EposEposy Lining System Ertmh Technical Coatings Ertech 2030 and 2100 Series 04/14/05 Interior Ductile Iron Pie Coating Induron Protecto 401 ASTM B-117 Ductile tron Pie Only 01/31/06 Coatings for Corrosion Protection Cbesterton Are 791, S1HB, SI, S2 Aid Resistance Test Sewer Applications 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications Sewer - Coatings/Polyurethane Sewer - Combination Air Valves 05,15/19 33-31-70 Air Release Vulva A.R.I. USA, Inc. D025LTP02(Com site Body) Sewer -Pipes/Concrete EI-04 Co... Pipe, Reinforced Wall Cone'et. Pipe Co. ine. ASTM C 76 E1-04 Cone. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76 EI-04 Conc. Pipe, Reinforced Hanson Concrete Products ASTM C 76 EI-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C. 76 Sewer - Pipe Ealargment System (Method)33-31-23 (01118/13) PIM System P1M Corporation Polyethylene PIM Corp., Piscata Way. N.J. A roved Previous) McCeanell S ems McLat Construction Polyethylene Houston, Texas A roved Previous) TRS S tems Treachless Replacement System Polyethylene Calgary, Canada Approved Previous) Sewer - Pipe/Fiberglass Reinforced/ 33-31-13(1/8/13) 1 7/21197 3331 13 Cent. Cast Fiber days (FRP) Hobas Pipe USA, I.e. Hobas Pic (Non -Pressure) ASTM D3262/D3754 03/22/10 33.3113 Fiber lass Pie (FRP) Ameron Bondsm"d RPMP Pie ASTM D3262/D3754 04/09/21 3331 13 Glass -Fiber Reinforced Polymer Pie (FRP) Thom son Pipe GroupThompson Pie (Flowtite) ASTM D3262/D3754 03/07/23 3331 13 IFibrgi.sa Pipe (FRP) I Future Pipe Industries Fiberstrong FRP ASTM D3262. ASTM D3681. ASTM D4161, AW WA M45 Sewer - Pipe/Polymer Pipe 4/14/05 1 Pot er M2lifled Concrete Pi 0 Amitech USA Meyer Pol Crete Pie ASTM C33, A276, F477 8" to 102", Class V 06/09/10. E I-9 Reinforced Pol. er Concrete Pil, US Composite Pip. Reinforced Pol er Concrete Pie ASTM C-76 Sewer - Pipes/HDPE 33-31-23(1/8/131 From Original Standard Products List CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03107/2023 Note: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis, Special beddin¢ may be required for some pipes. Approval 1. Classsification Manufacturer Model No. Hi -densitypolythyle.pipe Phillis Drisco J e, Inc. O ticore Ductile Pol eth lone Pie ASTM D 1248 8" Hi -density1 eth lone pipe Plexco Inc. ASTM D U. 8" Hi h-densi[, nalvctirvione rice Poll Pi .Inc. ASTMD 1249 8" Fligh-deasity polyethylene pipe CSRH tiro ConduitiPi eline S [ems McConnell Pipe Enlargement I ASTM D 1248 Sewer - Pipes/PVC (Pressure Sewer) 33-11-12 (4/1/13) _ 12/02/11 33-11-12 1 DR-14 PVC Pressure Pipe Pipelife Jctstream IPVC Pressure Pipe IAW WA C900 4" thru 12" 10/22/14 1 33-I1.12 DR-14 PVC Pressure Pipe Royal Building Products I Royal Seal PVC Pressure Pipe IAW WA C900 4" thou 12" Sewer - Pipes/PVC* 33-31-20 (7/1/13) 33-31-20 PVC Sc— Pic J-M Mam facturin Co., Inc. JM Eagle) SDR-26 ASTM D 3034 4" - IS" 12/23/97" 33-3l-20 PVC Sewer Pie Diamond Plastics Corporation SDR-26 ASTM D 3034 4" thou 15" 33=31.20 PVC Sewer Pie Lamson V Ion Pie ASTM F 789 4" thru 15" 01/18/19 33-31-20 PVC Sewer Pie Vin (tech PVC Pie Gravi Sewer ASTM D3034 4" thou 15" 11/11/98 33-31-20 PVC Sewer Pie Diamond Plastics Corporation "S" Gravi Sewer Pie ASTM F 679 18" to 27" 33-31-20 PVC Sewer Pie J-M Manufacturing Co, Inc. JM Eagle) SDR 26/35 PS 115/46 ASTM F 679 19" - 28" El 1/12 33-31-20 PVC Sewer Pie Pi elife Jet Stream SDR-26 and SDR-35 ASTM F-679 18" 05/06/05 33-31-20 PVC Solid Wall Pipe Diamond Plastics Corporation SDR 26/35 PS 115/46 ASTM F-679 18" to 48" 04/27/06 33-31-20 PVC Sewer Fittings Harco SDR-26 and SDR-35 Gasket Fittings ASTM D-3034, D-1784, etc 4" - IS" 33-31.20 PVC Sewer Fittings Plastic Trends, Ine.(Westlake) Cmsketed PVC Sewer Main Fittings ASTM D 3034 3/19/2018 33 31 20 PVC Sewer Pie Pi elite Jet Stream SDR 35 ASTM F679 18"-24" 3/19/2018 1 33 31 20 PVC Sewer Pie Pi elife Jet Stream SDR 26 ASTM D3034 4"- 15" 3/29/2019 333120 Gasketed Fittings (PVC) GPK Products, Inc. SDR 26 ASTM D3034/F-679 4%15" 10/21/2020 33 3120 PVC Sewer Pie NAPCOCWesdake) SDR 26 ASTM D3034 4" - 15" 10/22/2020 33 31 20 PVC Sewer Pie Sanderson Pi a Co SDR 26 ASTM D3034 4"- IS" 10/21/2020 1111 20 PVC S-cr Pi c NAPCO(Westlakc) SDR 26/35 PS 115/46 ASTM F-679 18"- 36" Sewer - Pipes/Rehab/CIPP 33-31-12 (QL18/13) Cured in Place Pie lnsitoform Texark, Inc ASTM F 1216 05/03/99 Cured in Place Pipe National Envirotmh Group National Liner, SPL ltem #27 ASTM F-1216/D-5813 05/29/96 Cured in Place Pipe Reynolds Inc/Inliner Techno] g (Inliner USA). Inliner Technology ASTM F 1216 Sewer - Pipes/Rehab/Fold & Form Fold and Foam Pie Cullum Pipe S stems. Inc. 11/03/98 Fold and Form Pipe Insituform Tmhuolo 'es, Inc. Insituform "NUPI e" ASTM F-1504 Fold and Form Pie American P' e & Plastics, Inc. Demo. Purpose Only 12/04/00 Fold and Fnrm Pie Ultraliner Ultraliner PVC AIIo Pi eliner ASTM F-1504, 1871, 1967 06/09/03 Fold and Form Pie Miller Pipeline Corp. EX Method ASTM F-1504, F-1947 Up to 19" diameter Sewer - Pipes/Open Profile Large Diameter 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Lamson V lon Pie Carton V lon H.C. Closed Profile Pipe, ASTM F 679 1811 to 48" 09/26/91 EI00-2 PVC Sewer Pipe, Ribbed Extension Technolo 'es, Inc. Ultra -Rib Open Profile Sewer Pie ASTM F 679 18" to 48" E100-2 PVC Sewer Pipe, Ribbed Uponor ETI Company I1/10/10 EI00-2 Polypropylene (PP) Sewer Pipe, Double Wall Advanced Drainage Systems (ADS) SaniTite HP Double Wall (Corrugated) ASTM F 2736 24"-30" 11/10/11) EI00-2) Polypropylene (PP) Sewer Pipe, Triple Wall Advanced Drainage Systerns (ADS) SauiTite 14P Triple Wall Pie ASTM F 2764 30" to 60" 05/16/11 Steel Reinforced Polyethylene Pie ConTech Construction Products Durmaxx ASTM F 2562 24" to 72" From Original Standard Products List CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a proiect specific basis. Special bedding may be required for some pipes. Approval St• I t t iWater-Avourtenances 33-12-10 07/01/13 Manufacturer ModelNo. tSpec Size 01/18/18 33-12-10 Double Stra Saddle Romme 202NS Nylon Coated AWWA C800 1"-2' SVC. up to 24" Pipe 08/28/02 Double Strap Saddle Smith Blair #317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AWWA C900 1"-2" SVC, up to 24" Pipe 03/07/23 33-12-10 Double Strap Service Saddle Powerseal 3450AS, Incl. Corp. Stop, Did Strap, Stainless NSF ANSI 372 1"-2" SVC, up to 24" Pipe 10/27/87 Curb Stops -Ball Meter Valves McDonald 6100M.6100MT & 61OMT 3/4" and 1" 10/27/87 Curb Stops -Ball Meter Valves McDonald 4603B, 4604B, 6100M, 610OTM aad 6101M 11/2" and 2" 5/25/2018 33-12-10 lCurb Stops -Ball Meter Valves Ford Meter Box Co., Inc. FB600-7NL. FB1600-7-NL, FV23-777-W-NL, L22-77NL AWWA C900 2" 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. FB600-6-NL, FB1600-6-NL, FV23-666-W- NL, L22-66NL AWWA C800 I-1/2" 5/25/2018 3342-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. F3600-4-NL, FB1600-4-NL, BI1-444-WR- NIL, B22444-WR-NL, L28-44NL AWWA C900 1" 5/25/2019 33-12.10 Curb Stops -Ball Meter Valves Mueller Co.. Ltd. B-25000N, B-24277N-3, B-20200N-3, H- 15000N, . H-1552N, H142276N AWWA C800, ANSF 61, ANSI/NSF 372 2" 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co.. Ltd. B-25000N. B-2020ON-3, B-24277N-3,H- 15000N. H-I4276N, H-15525N AWWA C800, ANSF 61, ANS1/NSF 372 1-1/2" 5/25/2018 33-12-10 Curb Sto s-Ball Meter Valves Mueller Co., Ltd. 15530N ANSI/NSF 372 1" 01/26/00 Coated TappingSaddle with Double SS Straps JCM Industries, Inc. #406 Double Sand SS Saddle 1"-2' Taps on up to 12" 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel) JCM Industries. Inc. 412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/ 12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel) ,JCM Industries, Inc. 415 Tapping Sleeve AWWA C-223 Concrete PiN Only 05/10/11 Tapping Sleeve Stainless Steel) Powerseal 3490AS (Flange) & 3490MJ 4%8" and 16" 02/29/12 33-12-25 Tiumim, Slceve (Coated Steel) Romac FTS 420 AWWA C-223 U p to 42" w/24" Out 02/29/12 33-12-25 TappingT.ppmg Slceve (Stainless Steep Romac SST Stainless Steel AWWA C-223 Up to 24" w/12" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clam 4" to 30" Plastic Meter Box w/Com osite Lid DEW Plastics lue. DFW37C-12-IEPAF FTW Plastic Meter Box w/Com osite Lid DFW Plastics Inc. DFW39C-12-JEPAF FTW 08/30/06 Plastic Meter Box w/Com osite Lid DEW Plastics Inc. DFW65C-14-IEPAF FTW Class "A" Concrete Meter Box Bass & Hays CMB37-612 1118 LID-9 Concrete Meter Box Bass & Hays CMB-I8-Dual 1416 LID-9 Concrete Meter Box I Bass & Ha a CMB65-B65 1527 LID-9 Water - Bolts, Nuts, and Gaskets 33-11-05 (01/08/13) Water - Combination Air Release 33-31-70 (01/08/13) " El-1 I Combination Air Relusc V,,Kc GA Indusaries. Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 1" 12" EI-11 Combination Au Release Valve Multiplex Marmfuctiomg Co. Crispin Air and Vacuum Valves, Model No, 1/2" 1" & 2" El-11 lCombinotion Air Relusc Valve Valve and Primer Corp. APCO #143C. #145C and #147C V, 2" & 3" Water - Dry Barrel Fire Hydrants 33-11-40 (01/15/141 10/01/87 E-1-12 Dry Barrel Fire Hydrant American -Darling Valve Dr —mg Nos. 90-18608. 94-18560 AWWA C-502 03/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-502 09/30/87 E-1-12 Dry Bartel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AWWA C-502 01/1293 E-1-12 Dry Barrel Fire 14dmnt American AVK Company Model 2700 AWWA C-502 08/24/98 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436. B20506 AWWA C-502 E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-502 09/24/87 E-142 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502 10/14/87 1 E-1-12 jDry Barrel Fire Hydrant Mueller Company Shop Drawings No. 6461 A-423 Centurion AWWA C-502 01/15/98 EI-12 Dry Barrel Fire Hydrant Mueller Company A421 Sirlicr Centurion 200 AWWA C-502 10/09/87 E-1-12 D Barrel Fire Hydrant U.S. Pie & Foundry Shop Drawing No. 960250 AWWA C-502 09/16/87 E-1-12 D Bartel Fire Hydrant American Flow Control AFC Watemus Pacer WB67 AWWA G302 09/12/16 3342-40 jDry Barrel Fire Hydrant EJ (East Jordan Iron Works) WaterMaster 5CD250 Water - Meters 02/05/93 EI01-5 I Detector Cheek Meter Ames Company Model 1000 Detector Check Valve AWWA C550 4" - Ill" 08/OS/114 Ma etic Drive Vertical Turbine I H—cy I Magnetic Drive Vertical I AWWA C701, Class 1 3/4" - 6" From Original Standard Products List CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03107/2023 Note: All water or sewer pipe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes. Approval Spec N1 1 1 Manufacturer ModelI 11 Water - Pipes/PVC (Pressure Water) 33-31-70 (01/08/13) _ U- 01/IS/18 33-11-12 PVC Pressure Pie Vin !tech PVC Pipe DR14 ASTM D1794 4"-12" 3/19/2018 33 11 12 PVC Pressure Pie Pi elife Jet Stream DRI4 AWWA C900 4"-12" 3/19/2018 33 11 12 PVC Pressure Pie Pi elite Jet Stream DR19 AWWA C900 16"-24" 5/25/2018 33 11 12. PVC Pressure Pie Diamond Plastics Corporation DR 14 AWWA C900 4"-12" 5/25/2019 33 11 12 PVC Pressure Pie Diamond Plastics Corporatim DR 18 AWWA C900 16"-24" 12/6/2018 33 11 12 PVC Pressure Pipe IN Manufacturing Co., Inc d/b/a JM Eagle DR 14 AWWA C900-16 UL 1285 ANSI/NSF 61 FM 1612 4%28" 12/6/2018 3311 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 18 16"-24" 9/6/20I9 33 1 112 PVC Pressure Pipe Underground Solutions Inc. DRI4 Fusible PVC AWWA C900 4" - 8" 9/6/2019 3311 t2 PVC Pressure Pipe NAPCO(Westlake) DR18 AWWA C900 16"-24" 9/6/20I9 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR 14 AWWA C900 4"-12" 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp. DRI4 AWWA C900 4"- 12" Water - PipesNalves & Fittings/Ductile Iron Fittings 33-11-11 (01/08/131 07/2392 E1-07 Ductile Iron Finings Star Pipe Products. hie. Mechanical Joint Fittings AWWA C153&Ct10 EI-07 Ductile Iron Fittings Griffin Pipe Products- Co. Mechanical Joint Fittings AWWA C 110 EI-07 Ductile Iron Fittings MCWme/T ler pipe/ Union Utilities Division Mechanical Joint Fittings, SSB Class 350 AW WA C 153, C 110, C III 09/11/98 EI-07 Ductile Iron Fittings Si , Co. Mechanical Joint Fittings, SSB Class 351 AWWA C 153, C 110, C 112 02/26/14 El-07 MJ Fittings Accucast Class 350 C-153 MJ Fittings AWWA C153 4"-12" 05/14/99 EI-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flan e Uni-Flange Series 1400 AWWA Cl t l/CI53 4" to 36" 05/14/98 EI-24 PVC Joint. Restraints Ford Meter Box Co./Uni-Flan e Uni-Flange Series 1500 Circle -Lock AWWA C1I1/CI53 4" to W 11/09/04 EI-07 IDuctfle Iron Joint Restraints One Bolt, Inc. One Bolt Restrained Joint Fitting AWWA C 111/C 116/C 153 4" to 12" 02/29/12 334I41 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron. Inc. Megalug Series I100 (f DI Pipe) AWWA Cl I t/C 1 WC 153 4" to 42" 02/29/12 33-11-1l PVC Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 2000 (for PVC Pipe) AWWA CI I I/C I t6/C 153 4" to 1" 09/05/04 EI-07 Mechanical Joint Retainer Glands PVC Sigma, Co. Sigma One-Lok SLC4-SLC10 AWWA CI II/C 153 4"to10" 03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC) Si , Co. Sigma One-Lok.SLCS4- SLCS 12 AWWA Cll l/CI53 4" to IT 08/05/04 EI-07 Mechanical Joint Retainer Glands(PVC) Signers. Co. Sigma One -Lk SLCE AWWA C111/CI53 12" to 24" 08/10/99 E1-07 MJ Fittin s DIP Sigma, Co. Sigma One -Lk SLDE AW WA C153 4" -24" 10/12/10 EI-24 Interior Restrained Joint System S & B Techncial Products Bulldog System ( Diamond Lk 21 & JM ASTM F-1624 4" to 12" 08/16/06 EI-07 IMechurnical Joint Fittings SIP Industries(Ser ore) Mechanical Joint Fittings AWWA C153 4" to 24" 11/07/16 3341.11 Mechanical Joint Retainer Glands Star Pie Products, Inc. PVC Stargrip Series 4000 ASTM A536 AW WA CI I I 11/07/16 33-I1-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stargrip Series 3000 ASTM A536 AW WA CI1 I 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Seeam ore) EZ Grip Joint Restraint (EZD) Black For DIP ASTMA536AWWACIII 3"-48" 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Smampore) EZ Grip Joint Restraint (EZD) Red for C900 -14 PVC Pipe ASTM A536 AW WA CI I I 4"-12" 03/19/18 33-II-11 Mechanical Joint Retainer Glands SIP lndustries(Serampore) ASTMA536AWWAC111 16"-24" Water- PipesNalves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15) American Flow Conu'oI Series 2500 Drawing tt 94-20247 16" Resilient Wedged Gate Valve w no Gears I2/13 02 Resilient Wedge e Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515 30" and 36" 09/3 t 99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SD 94-20255) AW WA C515 20" and 24" 05/19/99 Resilient Wedge Gate Valve American Flow Control Series. 2516 (SD 94-20247) AW WA C515 16" 10/24/00 E1-26 Resilient Wedge Gate Valve American Flow Control Series 2500 (Ductile Iron) AWWA C515 4" to 12" 09/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515 42" and 48" 05/23/91 EI-26 Resilient Wedge Gate Valve American AVK CompanyCmapany American AVK Resilient Seaded GV AWWA C509 4" to 12" 01/24/02 E1-26 Resilient Wedge Gate Valve American AVK Company 20" and smaller EI-26 Resilient Seated Gate Valve Kenned V - 12" EI-26 Resilient Seated Gate Valve M&H 4" - 12" EI-26 Resilient Seated Gate Valve Mueller Co. 4" - 12" 11/08/99 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AWWA C515 16" 01/23. 03 Resilient Wcd c Gatc Valve Mucllct Co. Series A2360 for 18"-24" (SD 6709) AWWA C515 24" and smaller 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AWWA C515 30" and 36" 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AW WA C515 42" and 48" 01/28/88 EI-26 Resilient Wedge Gate Valve Clow Valve Co. AWWA C509 4" - 12" 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AWWA C515 16" 11/09/99 E1-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AW WA C515 24" and smaller 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36' C-515 AWWA C515 30" and 36' (Note 3) 11/30/12 Resilient Wedge Gate Valve Clow Valve Co. Clow Valve Model 2638 AWWA C515 24" to 48" No[e 3 05/08/91 E1-26 Resilient Seated Gate Valve Stoekham Valves & Fittings AWWA C 509. ANSI 420 - stem, 4" - 12" E1-26 Resilient Seated Cate Valve U.S. Pipe and Foundry Co. Meuoseal 250, re uj.—ts SPL #74 3" to 16" 10/26/I6 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iran Works) EJ F1owMaster Get Valve & Boxes 08/24/18 Matco Gate Valve I Matco-Norca 225 MR AWWA/ANSI C115/An21.15 4" to 16" From Original Standard Products List CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Nntec All Water nr sewer nine I -- than 1.1 inch diameter shall he annrn-1 fnr use by the Water Department on a nrniert snerifir hasis. Snorinl heddinv may he remti—I for snme nin- Approval Spec1 11 E6 Manufacturer Water - Pipes/Valves & Fittings/Rubber Seated Butterfly Valve 33-12-21 (07/10/14) Model1. National Spec EI-30 Rubber Seated Butterfly Valve Henry Pratt Co. AWWA C-504 24" E1-30 Rubber Seated Butterfly Valve Mueller Co. AWWA C-504 24"and smaBet- 1/11/99 EI-30 Rubber Scated Butterfly Valve D—ik Valves Co. AWWA C-504 24" and larger 06/12/03 E1-30 Valmatic American Butterfly Valve Valmatic Valve and Manufacturing Corp. Valmatic American Butterfly Valve. AWWA C-504 Up to 84" diameter 04/06/07 EI-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AWWA C-504 24" to 48" 03/19/18 33 1221 Rubber Seated Bunerfly Valve G. A. Industries (Golden Anderson) AWWA C504 Butterfly Valve AWWA C-504 30"-54" Water - Polyethylene Encasement 33-11-10 (Ol/0a/13) 05/t2/05 EI-13 Pol ethvienc Encasment Flexsol Nchgi.g Fulton Ente r AWWA C105 8 mil LLD 05/12/05 E1-13 Poll cfl i— Encasment Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AW WA C105 8 mil LLD 05/12/05 EI-13 Polyediylcnc Encasment AEP Industries Bullstron by C-1—n Bolt & Gasket AWWA C105 8 roil LLD 09/06/19 334I-1 I jPolyahyleneEncasrucut Northtown Products Inc. PE Encasement for DIP AWWA C105 8 mil LLD Water - Sampling Station _ 03/07/23 1 33 12 50 1 Water Sampling Sint- Edi se Number 88. 12-inch Dcpth Mury As shown ins ee. 33 12 50 Water - Automatic Flusher t0/21/20 Automated Ilushin S stem Mueller H dro and HG2-A-IN--2-PVC-018-LPLG(Pemraneut) 04/09/21 Automated Flushing System Kupferie Foundry Company Eclipse #9800wc 04/09/2] lAutomated Flushing System Kupfcdc Foundry Company Eclipse #9700 (Portable) From Original Standard Products List CITY OF FORT WORTH North Tarrant Parkway and North Beach Street Intersection Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103309 FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Rebcon, LLC Subject of the Agreement: Authorize Execution of a Contract with Rebcon, LLC, LLC, in the Amount of $4,504,400.00 for the North Tarrant Parkway and North Beach Street Intersection Improvements Project M&C Approved by the Council? * Yes 8 No ❑ If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No 8 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: 05/12/2026 If different from the approval date. Expiration Date: 05/11 /2031 If applicable. Is a 1295 Form required? * Yes ❑ No ❑ *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 103309 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department. FORT WORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: 103309_N. Tarrant Parkway and N. Beach Street Intersection Improvements M&C: 26-0375 CPN: 103309 CSO: DOC#: Date: 06/01/2026 To: Name Department Initials Date Out 1. Sophia Flores TPW - Review SFL 06/01 /2026 2. Philip Trinh TPW-Approver 70—/ 06/01 /2026 3. Donnette Murphy Risk -Approver DM 06/01 /2026 4. Patricia Wadsack TPW-Approver 15LW 06/05/2026 5. Lauren Prieur TPW — Signer XxQ Prieur 06/07/2026 6. Lorita Lyles Legal - Approver LL- 06/08/2026 7. Douglas Black Legal -Signer Douglas Black 06/08/2026 8. Jesica McEachern ACM -Signer CA 06/18/2026 9. Katherine Cenicola CSCO-Approver Kc 06/18/2026 10. Jannette Goodall CSCO-Signer ele�ood, 06/18/2026 11. Allison Tidwell CSCO-Form Filler Ar 06/26/2026 12. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: [-]YES ®No RUSH: []YES ®No SAME DAY: []YES []No NEXT DAY: ❑YES ❑No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return to: Please notify TPWContract&fortworthtexas.gov. Thank you!