CONTRACT NO . � � � �
AMENDMENT NO. 1 TO CITY SECRETARY CONTRACT NO. 24106
STATE OF TEXAS §
COUNTY OF TEXAS §
WHEREAS, the City of Fort Worth ("City") and HDR Engineering, Inc. ("Consultant")
made and entered into City of Fort Worth City Secretary Contract No. 24106, ("Contract") which
was authorized by the City Council by M&C G16874 on the 7th day of July, 1998; and
WHEREAS, the Contract involves professional planning and engineering services related
to the Solid Waste Transfer Station Project; and
WHEREAS, it has become necessary to amend the Contract to include an increased scope
of services and revised maximum fee.
NOW, THEREFORE, City and Consultant, acting herein by and through their
duly authorized representatives, enter into the following agreement which amends the contract:
1.
Section 1 of the Contract is amended to include the additional Basic Services involved
with preparation and evaluation of a Request For Proposals for private development of a solid
waste transfer station as specified in M&C C-17741, approved by the City Council on the 2"d
day of November, 1999, and as further described in Consultant's proposal contained in a letter to
Ron Stults, Assistant Director of the City Services Department, dated October 8, 1999, copies of
which are attached hereto and incorporated herein.
►.�
Consultant will perform the additional Basic Services described in Section 1, above, in
accordance with the Contract, for an amount not to exceed Thirty-eight Thousand Dollars
($38,000).
3.
All other provisions of the Contract which are not expressly amended herein shall remain
in full force and effect.
uf��BCB�� U`'��'�'�'L�
CD�I ����G�C�G%ti'
Y Oo UUG�'�UU9 �t���o
.. ,.
Executed on this the 1 Sth day of November
CITY OF FORT WORTH
� '� �� / �� , ��
Name: Charles R. Boswell
Title: Assistant City Manager
HDR ENGINEERING, INC. ("ENGINEER")
By. -%' � � .
Name: William R. Hindman
Title: Senior Vice President
Address: 512 Main Street, Suite 600
Fort Worth, Texas 76102
ATTEST:
���'/�l�! /
( , .,
APPROVED AS� TO FORM AND LEGALITY:
GGG� � l//.�i�
Assistant City Attorney
, 1999.
. �
��
�/�� � ' r,�
`:
C- /� �� /
ContraCt Authorization
f/-�-9 �l
Date
�
'. .
October 8, 1999
Mr. Ron Stults �
Assistant Director
City Services Department
4100 Columbus Trail
Fort Worth, Texas 76133
Dear Mr. Stults:
Per our discussions with you last week, HDR Engineering is pleased to present
the following amendment to our transfer station project agreement. Services
provide� under this proposal are designed to assist the City develop a request for
proposals for the possible private operation of a transfer station to serve the City
of Fort Worth. HDR will also assist the City further evaluate the cost of
developing a publicly owned transfer station and determine which option best
achieves the City's long-term goals for this facility.
HDR was pleased to help the City during the first phase of this project which was
to determine the project's feasibility. The recommendation to develop a transfer
station was presented by the City's Citizens Advisory Committee when the City
developed its twenty year solid waste management plan. Based on our findings
to date, a transfer station has the ability to save the City long-term haul costs and
provide greater opportunities to take advantage of competitive market forces in
the solid waste collection and disposal industries.
The purpose of the scope of services attached is to develop a request for
proposals for soliciting proposals from private firms to provide a turnkey transfer
station project. Services to be requested will include facility siting, construction,
operation, waste haul to landfill and disposal. In bur initial feasibility study,
ownership issues were addressed, including a matrix identifying risks associated
with the various phases of facility development and operation. Other issues
identified in the feasibility report were project control, residual value and
economics. At the initiation of the project, it was assumed that the facility would
be publicly owned. This assumption was important�in terms of how certain
financial evaluations were performed.
♦
The feasibility study did provide the City with the information needed to
determine that such a facility is in the City's long-term interest. There appears to
be issues related to ownership, procurement and financing of the facility that still
need to be addressed by City officials. A request for proposals process can �
provide decision makers with the necessary information to determine which
ownership option provides the greatest long-term benefits to the City's residents
HDR Engineering, Inc.
Employee-owned
512 Main Street
Suite 600
Fort Worth, TX
76102
Telephone
817 810-9132
Fax
817 810�772
.`
and businesses. However, in order to be able to accurately compare proposals it
is necessary that the document provide sufficient information for vendors to make
reasonable assessments of risks and costs. A detailed request for proposal will
also allow the City to move more quickly into contract negotiations with as few
surprises as possible. � �
We look forward to working with you on this project. If you have any questions,
feel free to give either Charlie Fiedler or Mike Carleton a call.
Sincerely, .
��
% , -�
William R. Hindman P.E.
Senior Vice President
Fort Worth Transfer Station
Request for Proposals Scope of Services
Task 1— Prepare Request #or Proposals
Objective �
HDR staff wili work with the City staff to prepare a request for proposals for the
construction and operation of a transfer station. It is assumed that private -
entities and the city will submit a proposal. The goal of the RFP is to solicit
proposals for solid waste transfer and disposal as well as other services the City
desires for the transfer station, including, but not limited to recycling and brush
management. In order to prepare the document, the following specific tasks are
to be completed. .
HDR Responsibilities
HDR staff will prepare a checklist of potential activities that the operator of the
transfer station must address in their proposal. The City will determine which
services are to be included as part of the base level of services. Additional tasks
may also be identified to be included as part of an acceptable alternative
proposal. The goal of this process is to develop a scope of services that must be
included in the proposals in order for the respondent to be considered
"responsive." Non-responsive proposals should not be accepted by the City for
the process to have any credibility. �
A risk matrix was prepared as part of the overall feasibility study. These risk
issues identify basic contractual responsibilities for the transfer station. HDR will
work with the City to determine what responsibilities are to be accepted by the
City and what contracting responsibilities are tQ be included in the proposal.
There must be certain risks that are considered base level service for the
proposal to be considered responsive.
In order for the proposals to be fairly evaluated, sufficient information must be
presented in the RFP. The greater the understanding of the project by the
private entity, the less risk they will have to assume. Specific information that are
proposed to be included in the RFP document are as follows. HDR will prepare
draft and final text addressing these issues.
• Waste quantities to be delivered annually
• Types of waste to be accepted
• Recyclable material delivery and acceptance requirements
• Brush material delivery and acceptance requirements
• Operational and permitting requirements
� Site requirements.
• Terms of payment (per ton/frequency of payment)
• Other related operational issues
The method of evaluating the proposals must also be�discussed in the RFP.
Because there is no fixed location for a private transfer station, the economic
benefits/costs of site location will have to be considered. In order to reduce
future misunderstandings about the process of evaluating the proposals, the
evaluation criteria should be clearly defined in the RFP. A model for evaluating
the proposals, similar to the process used to determine the project's initial
feasibility will be developed for evaluating the economics of the proposal. Other
specific evaluation criteria and methodology will be developed before the RFP is
issued. These criteria will require input and final approval from the City.
Once the necessary decisions have been made by the City regarding risk
management and contractual requirements, a RFP document can be prepared.
The outline for the document will consist of the following sections
• Introduction
• Background and Facility description
• General Submittal Requirements and Timetable
• Qualifications and Bond Requirements
• Scope of Work
• City of Fort Worth Commitments
• Contractuallssues
• Proposal Evaluation Method
• Proposal Forms
HDR recommends a minimum of three project meetings to discuss the request
for proposals, scope, risk assessment and final document presentation.
Deliverables for Phase 1
Risk matrix for making decisions regarding ownership, permitting,
construction, material acceptance and operations
Ten copies of a draft request for proposals
Ten copies of the final request for proposals and one camera ready copy, it is
assumed that the City will have responsibility for final distribution
City Responsibilities
The City will be responsible for evaluating risk matrix and making final
decisions regarding contractual issues
The City�will secure legal services to evaluate the document for legal issues
and final contract documents to be included in the document. HDR can
arrange for a separate legal review for an additional fee if requested by the
City.
The City will be responsible for any legal notice and distribution of the RFP.
2
• The City will be responsible for addressing questions from firms responding to
the RFP.
• The City will be responsible for any pre-proposal meeting.
Schedule
A draft RFP can be developed within one month of a notice to proceed. A final
RFP can be prepared within two weeks of receiving comments from the City.
Task 2— City Proposal Assistance
Objective
During the feasibility analysis, HDR prepared "budgetary. cost" projections as
proposed in our scope of services for this project. These costs assume a"worst-
case" scenario for the cost of construction and operation of the facility. This was
done to determine if the project was feasible given unfavorable economic
conditions, thereby reducing the potential � that there would be future budgetary
surprises. to determine public or private ownership of the facility, under the
proposal process, it is necessary to develop a"competitive" price proposals to
provide equal services and comparable risks. During this phase of the project,
HDR will assist the City develop specific costs for the facility construction and
operation. � �
HDR Responsibilities
HDR will provide up to forty (40) hours of technical assistance to the City of Forth
to respond to the RFP. This assistance will include development of construction
costs, operational costs, haul and disposal.
Key Understanding
• The City will be responsible for completing proposal forms. HDR's role in this
task is to assist the City prepare a proposal, but makes no guarantee that
costs for a publicly owned facility will be lower than any privately submitted
� proposal.
Deliverables
• HDR will provide written comments on the City's proposal. HDR staff will
meet at least two times to discuss the City's proposal and assist in the
development of accurate and defensible cost estimates for the construction
and operation of the transfer station. �
. , . 1
Schedule
HDR will begin work on this task once the request for proposals has been issued
by the City. The task will be completed prior to final submittal of a proposal by� �
the City. � �
Task 3 — Proposal Evaluation
Objective
The City will evaluate the proposals to determine which proposal offers the City
with the best Iong-term solution to its solid waste transfer and disposal needs. A
report on the proposals will be prepared and presented to staff and the City
Council.
It is assumed that the City will be responsible for addressing other issues
required for a responsive proposal and will be responsible for completing
proposal forms.
HDR Responsibilities
HDR will evaluate the proposals prepared by the City and private firms to
determine if they are responsive. In the case of alternative proposals submitted
by companies, HDR will follow-up and gather additional information that is
typically required to complete an analysis of the alternative proposal.
The evaluation report will consist of a summary of the proposals received, a
determination of its responsiveness to basic requirements, a description of the
proposed facility, location of the site, a cost evaluation of the proposal,
description of other issues pertinent to the City's selection.
This task assumes that no more than five proposals will be required to be
evaluated, including the City's proposal. Any additional proposals will be
considered additional services.
Deliverables
• Ten copies of a draft report will be prepared for the City.
• Ten final copies of fhe report and one camera ready copy of the proposal.
Key Understandings
• The City will have ultimate responsibility for the selection of a proposal.
4
� . t
• The City will arrange for legal review of the proposals. HDR can arrange for
this review as an additional service.
Schedule
The review of the proposals can be completed within one month of the proposais
being delivered to HDR for evaluation. A final report will be prepared within this
time frame.
Project Fee
HDR proposes to perform the project for a fee of Thirty-eight thousand dollars
($38,000).
City of Fort Worth, Texas
�1►�1'j�yc�r �nd Caunc�l C,ammu�n9cAt�an
DATE REFERENCE NUMBER LOG fVAME PAGE
11 /2/99 C-17741 21 STATION 1 of 2
SUBJECT AMENaMENT TO PROFESSIONAL SERVICES CONTRACT WITH HDR
ENGINEERING, INC. FOR FLANNING AND ENGINEERING SERVICES FOR A SOLID
WASTE TRANSFER STATION
RECOMMENDATION:
It is recommended that City Council authorize the City Manager to execute an agreement to the
professional services contract with HDR Engineering, Inc. to change the scope of services relevant to a
proposed transfer station, for an amount not to exceed $38,000.
7�Y�i�b�Y[�]�
On July 7, 1998 (M&C C-16874), the City Council authorized the City Manager to enter into a contract
with HDR Engineering, Inc. for Phase I of a four phase project. Phase I was a study to determine the
necessity of a transfer station. The M&C and contract require a briefing to the City Council before
proceeding with each phase. The cost of the initial Phase I was $40,000. Phases II, III, and IV will cost
$210,000. A description of the four phases is as follows:
Phase I
Economic Feasibility
Site Selection
Determining Permitting/Registration Requirements
Financing Options
Management and Operational Issues
• Phase II
Initiate Permitting/Registration Process
Develop Design and Site Development Plans
• Phase III
Prepare Construction and Bidding Documents
• Phase IV
Construction Management
Phase I of the study has been completed and indicates that a transfer station needs to be developed
and operational within the next two to three years. Presentations were made to the Citizen's Solid
Waste Advisory Committee, the Governmental Relations Committee (GRC) and the City Council. After
review of the study findings and presentations, the consensus is that a transfer station is needed.
At a briefing with the GRC on September 20, 1999, the staff was asked to evaluate the possibility of the
facility being developed by the private sector instead of the City. The GRC requested that the staff and
its consultants develop a Request for Proposal (RFP) to solicit proposals from the private sector before
proceeding with Phase II of the project. This direction changes the scope of the original project
somewhat and therefore the existing contract needs to be amended.
City of F"o�t Wo�th, Texas�
�I�A�aiC A�1� �aunc�l C,an1f11ut11cA�tlan
DATE REFERENCE NUMBEF� " LOG NAME ' PAGE
11/2/99 C-.17741 I 21STATION I 2 of 2
SUBJECT AMENDMENT TO PROFESSIONAL SERVICES CONTRACT WITH HDR
ENGINEERING, INC. FOR Pl.ANNING AND ENGINEERING SERVICES FOR A SOLID
. WASTE<TRANSFER STATION .
HDR Engineering, Inc. has submitted a revised scope of services to include this new direction. HDR
Engineering, Inc. will develop the RFP, assist in the evaluation of responses, and compute/compare
total cost considerations of e�ch proposal, against the City's cost of constructing �the facility. It will then
make •a recommendation and give a detailed briefing to tl�e City Council. Th°e schedule for this revised
phase is to have the RFP sent out by February 1, 2000, and an analysis and presentation given to City
Council by July 1, 2000 for Council's final decision. The goal is to have a transfer station on line and
receiving Fort Worth residential solid wast� by October 1, 2002. This will coincide with the start up of
the new solid waste collection contracts.
HDR Engineering, Inc. is� in compliance with the City''s M/WBE Ordinance by approval of a waiver
request of the M/WBE requirement. There are no�subcontracting opportunities in this amendment.
FISCAL INFORMATION/�ERTIFICATION:
The Finance Director certifies that funds are available in the current operating budget, as appropriated,
of the Solid Waste Fund.
CB:j
Submitted for City Manager's
Office by:
Charles Boswell
� Originating Department Head:
Tom Davis
Additional Information Contact:
Tom Davis
�
I FUND � ACCOUNT
I (to)
8511 I
�
G300� � (from)
w I PE64 531200
6300 I
�
CENTER
0211004
� AMOUNT
$38,000.00
CITY SECRETARY
APPROVEO
CfTY COUNCIL
�NOV 2 1�
�� ��..`'
,p�t9 Sscretary Gt the