Loading...
HomeMy WebLinkAbout025402 - Construction-Related - Contract - Pittman Construction, INc.� � �E d "� �E:.���%�QY � ' 0 D.V'.�. ��i.� ' CITY SECRETARY� ,� ��i �, ��������� {'; ��.;;�;�;;,'�f,'r �ECIFICATIONS CONTRACT NO. ' " AND � ��������'e�f��'� ��ja� e'CONTRACT DOCUMENTS fz. �ra -.-,�. �--�•� ::; ,.. _ FOR � -� � �_� ��57 � w'r � =�-' � � � � ��=aGi�NSTR�.�CTION AND INSTALLATION OF � PARKIMPROVEMENTS FOR ARCADIA �ARK NORTH DEVELOPMENT � LRJ � .� D.O.E. NO. 2645 OWNER: L � �. �� � ��� � C IN THE CITY OF FORT WORTH, TEXAS �, CITY PROJECT NUMBER GR76/541200/080306402010 CITY OF FORT WORTH PARKS AND COMMUNITY SERVICES DEPARTMENT 4200 SOUTH FREEWAY, SUITE 2200 FORT WORTH, TEXAS 76115 (817) 871-8700 LANDSCAPE ARCHITECTS/ENGINEERS: CARTER & BURGESS, INC. Consultants in Engineering, Architecture, Planning and the Environment 3880 Hulen Street Fort Worth, Texas 76107 (817) 735-6000 CB�B 971163010 C8�6 971163020 � � FUNDING OF PROJECT BY: TEXAS PARKS AND WILDLIFE DEPARTMENT ARCADIA PARK NORTH DEVELOPMENT GRANT STATE PROJECT NO. 50-00141 ���:�E �F T�qs *� _ �...:* � a �!�'?� . � � ��..: . . 'r�'ii � �. q ._ ' G �0.���!�T��°.-' � -�•rz-�9 . �' � �• .'t�:�;`' �Gs'�. T •. �,-" �,,-+ ° . 0 � ��} * � , 1 . . o.�.....�.. ... � � KEVN J. LACEY , . ; ..�"` �m sQ': ,'�•z � � �;�, • .�,c�C �� EN����G��,, • ••.....•• � ' • S�OWAL ��• -...• ���z1 � � ���Q���� ������ � �� ��'r���� [�o �}G�I�, ��o , �� �� � J �� !1 TABLE OF CONTENTS 1. NOTICE TO BIDDERS 2. SPECIAL INSTRUCTIONS TO BIDDER 3. PROPOSAL 4. CITY OF FORT WORTH - MNVBE ENTERPRISE SPECIFICATIONS 5. PREVAILING WAGE RATES 6. WEATHER TABLE 7. VENDOR COMPLIANCE TO STATE LAW 8. � CONTRACTOR'S COMPLIANCE WITH WORKER'S COMPENSATION 9. TECHNICAL SPECIFICATIONS � DIVISION I - GENERAL REQUIREMENTS Section 01010 Summary of Work Section 01035 Contract Time Section 01100 Altematives � • � Section 01150 Payment to Contractor Section 01300 Submittals Section 01400 Quality Control � Section 01410 Testing Section 01500 Temporary Facilities and Controls Section 01640 Substitutions and Product Options � Section 01700 Project Closeout Section 01800 Contractor's Responsibility for Damage Claims � DIVISION 2 - SITE WORK Section 02220 Earthwork Section 02221 Trenching, Backfilling & Compacting � Section 02272 Gabons Section 02537 Wood Fiber Playground Surfacing Section 02860 Playground Equipment � Section 02870 Site Furnishings Section 02890 Seeding � � � � � �j DIVISION 3 - CONCRETE Section 03300 Cast-in-Place Concrete DIVISION 4 - Section 04100 Section 04200 Section 04220 Mortar Brick Masonry � Concrete Unit Masonry DIVISION 5 - METALS Section 05120 Structural Steel DIVISION 6- WOODS AND PLASTICS Section 06112 Framing and Sheathing Section 06150 Wood Decking Section 06180 Glue Laminated Construction CjJ Il � DIVISION 7- THERMAL 8� MOISTURE PROTECTION Section 07410 Preformed Metal Roofing � 10. CERTIFICATE OF iNSURANCE � 11. BIDDER'S STATEMENT OF QUALIFICATIONS � 12. PERFORMANCE BOND 13. PAYMENT BOND 14. MAINTENANCE BOND � 15. CONTRACT 16. TEMPORARY SIGNAGE ,I � �J � � -�� � � � � '� � �� �� ��l J � i� � � r �i �) � � � !�J � J � !J � NOTICE TO BIDDERS Sealed Proposals for the following: CONSTRUCTION AND INSTALLATION OF PARK IMPROVEMENTS FOR ARCADIA PARK NQRTH PROJECT NO. GR76/5412001080306402010 Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Division Office until 1:30 p.m., Thursday, August 12, 1999, and then publicly opened and read aloud at 2:00 p.m. in Council Chambers 2"d floor — N.E. corner of City Hall. Plans, Specifications and Contract Documents for this project may be obtained at the Park Planning section, Parks and Community Services Department, 4200 South Freeway, Suite 2200, Fort Worth, Texas 76115-1499. Documents will be provided to prospective bidders for a deposit of $50 per set; deposits shall be made in the form of a check or money order. The deposit will be refunded if the document is returned in good condition within ten days after bids are opened. These documents contain additional information for prospective bidders. All Bidders will be required to comply with Provision 5159a of "Ver�non's Annotated Civil Statutes" of the State of Texas with respect to the payment of the prevailing wage rates; and City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City Code, Section 13-A-21 through 13-A-29) prohibiting discrimination in employment practices. In accord with City of Fort Worth Ordinance No. 11923, as amended by Ordinance No. 13471, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the M/WBE office or from the Office of the City Secretary. In addition, the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM ("Documentation") must be received no later than 5:00 P.M., five city business days after the bid opening date, exclusive of the bid opening date. The bidder shall submit documentation at the reception area of the Department of Engineering, 2"d floor, City Hall, and shall obtain a receipt. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non- responsive. n The following list is provided to assist bidders in obtaining the services of M/WBE vendors � qualified to provide such services/materials for this project. A listing of qualified M/WBE vendors may be obtained at the City of Fort Worth M/WBE office, 3rd floor City Hall. � Services/materials for this proiect are as follows: � demolition/site prep clearing/grubbing site furnishings � wood decking pre-formed metal roofing ■I earthwork concrete seeding structural steel gabions brick masonry playground equipment grading subdrainage concrete masonry glue laminated construction / � � � 5/7/99 NTB - 1 C&B 971163 � � � � The City's minimum M/WBE goal on this project is 17% of the total dollar value of this contract. The City will award one contract with a combination of base bids and/or alternates which is most advantageous to the City. A pre-bid conference will be held with prospective bidders at the Parks and Community Services Offices Conference Room 1 on Tuesday, August 3, at 10:30 am. The pre-bid is non- mandatory, however, representation is part of the good faith effort in meeting the requirements of the M/WBE Ordinance. � The City reserves the right to reject any or all bids and waive any or all formalities. AWARD OF CONTRACT: No bid may be withdrawn until the expiration of 49 days from the day bids are opened. The award of contract, if made, will be within 49 days after the opening of bids, � but in no case will the award be made until all necessary investigations are made as to the responsibility of the bidder to whom the contract will be awarded. � RICHARD ZAVALA, JR., DIRECTOR PARKS AND COMMUNITY SERVICES DEPARTMENT BOB TERRELL CITY MANAGER LJ � � tiJ � � [e, L�J � � l�l By� ��lY��� k� Mike Ficke, Landscape Architect (817) 871 - 5746 July 15, 1999 July 22, 1999 Fort Worth, Texas � 5/7/99 NTB - 2 GLORIA PEARSON CITY SECRETARY C&B 971163 � � � � � J !� !J SPECIAL INSTRUCTIONS TO BIDDERS 1. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the Cit�� of Fort Worth, in an amount of not less than 5 percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeit in the event the successful bidder fails to e�cecute the contract documents within ten days after the contract has been awarded. To be an acceptable surety on the bond, (1) the name of the surety shall be included on the current U.S. Treasury, or (2) the surety must have capital and surplus equal to ten times the limit of the bond. The Surety must be licensed to do business in the state c�f Texas. The amount of the bond shall not exceed the amount shown on the treasury list or one-tenth the total capital and surplus. 2. PROPOSAL: After proposals have been opened and read aloud, the proposals will be � tabulated on the basis of the quoted prices, the quantities shov�n in the proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. �� a The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject � any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. �� � �� � !, �� I�l I� The quantities of work and materials to be furnished as may be listed in the proposal forms or other parts of the Contract Documents wiil be considered as avvroximate only and will be used for the purpose of comparing bids on a uniform basis. Payment w�ill be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans. The quantities of �vork to be performed and materials to be furnished may be increased or decreased as hereinafter provided, without in any way invalidating the unit prices bid or any other requirements of the Contract Documerits. 3. ADDENDA: Bidders are responsible for obtaining all addenda to the Contract Documents prior to the bid receipt. Information regarding the status of addenda may be obtained by contacting Parks and Community Services Department telephone number indicated in the Notice to Bidders. Bids that do not acknowledge all applicable addenda may be rejected as non-responsive. (See Item G in the Proposal.) 4. AWARD OF CONTRACT: The Contract may not necessarily be a�varded to the low�est bidder of the Base Bid. The City Engineer shall evaluate and recommend to the City Council the best bid based on the combined benefits of total bid price and number of contract days allotted, as specified in the Proposal, and which is considered to be in the best interest of the City. � 5/7/99 SIB - 1 C&B 971163 L#; � � � � L1 Regardless of the Alternative chosen, the Contractor ag�-ees to complete the Contract within the allotted number of days. If the Contractor fails to cornplete the work within the number of days specified in the Construction Documents, liquidated damages shall be charged as outlined in General Provisions, Item 8.6 Failure to Complete Work on Time, found in the Standard S�ecifications for Street and Storm Drain Construction of the City of Fort Worth, Texas. 5. PAYMENT. PERFORMANCE AND MAINTE�'ANCE BOND:, The successful bidder entering into a contract for the work will be required to give the City surety in a sum equa] to the amount of the contract awarded. The successful bidder shall be required to furnish bo�ding as applicable in a sum equal fo the amount of the contract awarded. The form of the bond shall be as herein provided and the surety shall be acceptable to the City. All bonds fumished hereunder shall meet the requirements of Chapter 2254 of the Texas Government Code, as amended. � A. If the total contract price is $25,000 or less, payment to the contractor shall be made in one lump sum. Payment shall not be made for a period of 45 calendar days from the date the work has been completed and accepted by the City. ��J l� B. If the contract amount is in excess of $25,000, a Payment Bond shall be executed, in the amount of the contract, solely for the proteciion of all claimants supplying labor and material in the prosecution of the work. C. If the contract amount is in excess of $100,000, a Performance Bond shall be o executed, in the amount of the contract conditioned on the faithful performance of the work in accordance with the plans, specifications, and contract documents. Said bond shall solely be for the protection of the City of Fort Worth. ��' C l�l ,4� � u �I l!�I I� Maintenance Bond shall be required for all Parks and Community Services Department projects to insure the prompt, full and faithful performance of the general guarantee as set forth in Division 1, Section 01700-Project Closeout, Item 1.02. � In order for a surety to be acceptable to the City, (1) the name of the surety shall be included on the current U.S. Treasury List of Acceptable Sureties [Circular 870], or (2) the surety must have capital and surplus equal to ten times the amount of the bond. The surety must be licensed to business in the state of Texas. The amount of the bond shall not exceed the amount sho���n on the Treasury list or 1/lOth of the total capital and surplus. If reinsurance is required, the company �i-riting the reinsurance must be authorized, accredited or trusted to do business in Texas. No sureties will be accepted by the City which are at the time in default or delinquent on any bonds or which are interested in any litigation against the City. Should any surety on the contract be determined unsatisfactory at any time by the City, notice will be given to the contractor to that effect and the contractor shall immediately provide a new surety satisfactory to the City 6. LIOUIDATED DAMAGES: The Contractor's attention is called to Part 1- General Provisions, Item 8, Paragraph 8.6, Standard Snecifications for Street and Storm Drain Construction of the City of Fort Worth, Texas, concerning liquidated damage for late completion of projects. 5/7 99 SIB - 2 C&B 971163 i� I�l �� ��� � � J ,I _� �RJ �' � � � 7 EMPLOYMENT: All bidders will be required to comply with City Ordinance No. 7278 as amended by City Ordinance No. 7400 (Fort Worth City Code Section 13-A-21 through 13-A-29) prohibiting discrimination in employment practices. WAGE RATES: All bidders will be required to comply with provision 5159a of "Vernons Annotated Ci��il Statutes" of the State of Texas with respect to the pa�-ment of prevailing wage rates as established by the City of Fort Worth, Texas, and set forth in Contract Documents for this project. Disregard if Federal Wage Rates are applicable to this project. 9. FINANCIAL STATEMENT: A current certified financial statement may be required by the Department of Engineering Director for use by the CITY OF FORT WORTH in determining the successful bidder. This statement, if required, is to be prepared by an independent Public Accountant holding a valid permit issued by an appropriate State Licensing Agency. 10. INSUR.ANCE: Within ten days of receipt of notice of award of contract, the Contractor must provide, along with executed contract documents and appropriate bonds, proof of insurance for Workers Compensation and Comprehensive General Liability (Bodily Injury) -$250,000 each person, $500,000 each occurrence; Property Damage -$300,000 each occurrence. The City reserves the right to request any other insurance coverages as may be required by each individual project. For worker's compensafion insurance requirements, see Special Instructions to Bidders - Item 16. 11. NON-RESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a non-resident bidder unless the non-resident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a non-resident bidder to obtain a compazable contract in the state in which the non- resident's principal place of business is located. "Non-resident bidder" means a bidder w•hose principal place of business is not in � this state, but excludes a contractor whose ultimate parent company of majority owner has its principal place of business in this state. � i� �� � �J � "Texas resident bidder" means a bidder «•hose principal place of business is in this state, and includes a contractor whose ultimate parent company or majority ow�ner has its principal place of business in this state. This provision does not apply if this contract involved federal funds. The appropriate blanks of the Proposal must be filled out by all non-resident bidders in order for its bid to meet specifications. The failure of a non-resident contractor to do so will automatically disqualify that bidder. 12. MINORITY.��VO:VIEN BUSINESS ENTERPRISE: In accordance with City of Fort Worth Ordinance No. 11923, as amended by Ordinance No. 13471, the City of Fort Worth has goals for the participation of minority business enterprises and women 517�99 SIB - = C8B 971163 � 1� J business enterprises in City contracts. You may obtain a copy of the Ordinance from the Office of the City Secretary. The M/WBE Utilization Form, Prime Contractor Waiver Form and the Good Faith Effort dForm, as applicable, must be submitted no later than five (5) City business days after the - bid opening date, exclusive of the bid opening date. The bidder shall submit the documentation at the reception area of the Department of Enaineering ("VlanaginQ � Department"), 2nd floor, City Hall, and shall obtain a receipt. Failure to comply shall render your bid non-responsive. �l � J � �J Upon contract execution between the City of Fort Worth and the successful bidder, now known as Contractor, a pre-construction meeting will be scheduled at which time the Contractor is required to submit either Letters of Intent or executed agreements v�•ith the M/WBE firm(s) to be utilized on this project. Such Letters of Intent or executed agreements shall include the following information: 1. Name of Contract 2. Name of M/WBE firm utilized 3. Scope of Work to be performed by the M/WBE firm � 4. Monetary amount of work to be performed by the M/WBE firm 5. Signatures of all parties �� � � A notice to proceed will not be issued until the signed letter(s) or executed agreement(s) have been received. Throughout the duration of this project, the City of Fort Worth is requiring that the Contractor continue to adhere to the M/WBE Ordinance by complying with the following procedures: • A M/VVBE Particination Revort Form must be submitted monthly until the contract is � completed. The first report «-ill be due 30 days after commencement of work. The monthly report MLTST have an original signature to ensure accountability for audit purposes. - !J � � �J � • Reports are to be submitted monthly to the M/WBE Office, regardless of whether or not the vt/WBE firm has been utilized. If there was no activity by an M/WBE in a particular month, place a"0" or "no participation" in the spaces provided, and pro�•ide a brief explanation. The Contractor shall provide the 1�1/WBE Office nroof of navment to the M/V�BE subcontractors and suppliers only. The M/WBE Office �t-ill accept the followina as proof of payment: v 1. Copies of submitted invoices with front and back copies of canceled check(s), OR 2. A notarized letter explaining, in detail: � a Subcontractor/supplier Scope of Work b. Date when services «-ere received from subcontractor/supplier c. �mounts paid to the subcontractor/supplier � 5�'7,'99 SIB - 4 C&B 9' 1163 � f!1 � L� � � � � � � d. Original signatures from both parties must be included on this letter. • If the Contractor foresees a problem with submitting participation reports and/or proof of payment on a monthly basis, the M/WBE Office should be notified. If the Contractor wishes to change or delete an M/WBE subcontractor or supplier, adhere to the following: l. Immediately submit a Request for Aparoval of Chan�e Form to the M/WBE Office explaining the request for the change or deletion. 2. If the change affects the committed MI�L'BE participation goal, state clearly how and why in documentation. a. All requests for changes must be reviewed and pre-approved by the M/WBE Office. b. If the Contractor makes change(s) prior to approval, the change will not be considered when performing a post compliance review on this project. • Upon the Contractor's successful completion of this project, and within ten days after receipt of final payment from the City of Fort Worth, The Contractor will provide the M/WBE Office with a Final Particination Report Form to reflect the �total participation from ALL subcontractors/suppliers utilized on the project. • All forms are available at the M/WBE Office, 3rd floor - City Hall. For additional information regarding compliance to the M/WBE Ordinance, call (817) 871-6104. (� Upon request, Contractor agrees to provide to Owner Complete and accurate information �� regarding actual work performed by a Minority/Women Business Enterprise (M/WBE) on the contract and payment therefore. Contractor further agrees to permit an audit andlor � examination of any books, records or files in its possession that will substantiate the actual «•ork performed by an M/WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the cbmmission of fraud by the Contractor will be � grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation {other than a negligent misrepresentation) and/or commission of fraud � will result on the Contractor being determined to be irresponsible and baned from participating in City work for a period of time of not less than three years. � � 13. PROTECTION OF TREES. PLANTS AND SOIL: All property along and adjacent to the Contractor's operations including lawns, yazds, shrubs, trees, etc., shall be preserved or restored, after completion of the work, to a condition equal or better than existed prior to start of work. � By ordinance, the Contractor must obtain a permit from the City Forester before any ��vork (trimming, removal, or root pruning) can be done on trees or shrubs growing on public property including street Rights-Of-Way and designated alleys. This permit can � be obtained bv callin� the Forestry Office at 871-5738. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arbonst Association. A copy of these standards can be provided by calling the above � 5; 7•99 SIB - 5 C&B 971163 � � !�' � p �4. � � !�l� r�J l�J L�1 � number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Societ�� of Arboriculture. Payment for negligent dama�e to public trees shall be made to the City of Fort Worth and may be withheld from funds due the Contractor by the City. To nrevent the svread of the Oak ��'ilt fun�=iis, all wounds on Live Oak and Red Oak trees shall be immediatel�- sealed usin� a commercial vrunine naint. This is the onlv instance when nruning naint is recommended. BIDDER'S STATEMENT OF OUALIFICATIONS A. QUALIFICATION OF BIDDERS: Bidders shall be prepared to demonstrate the capability to perform the work. The Bidders' specific experience, stability and history of performance on projects of a similar nature and scope will be considered. The BIDDERS ST:�TEMEl�TT OF QUALIFICATIONS must be delivered to the Project Manager v��ithin 48 hours of the request. ` Location and responsive ability of the firm will be considered. If your firm anticipates entering into a joint venture with any other firm to conduct all or part of the performance required under the proposed project, that firm should be specified in your response. For each firm included in the joint �enture, please provide the information required above. Under the Contract executed for this work the City will require your firm to be completely 100 percent responsible for fulfilling all aspects of the contract bonds. Other firms and employees that may be in�•olved in their joint venture will be treated by the City under the contract as if they were emplo�-ees or subcontractors of your firm. Other than those firms noted in the contract as a part of the joint venture, no other firms will be allo«�ed to participate in the joint venture without written consent from the City. {�'� 15. OZONE ALERT DAYS: The Contractor shall be required to obsen-e the following 1-�1 guidelines relatin� to working on City construction sites on days designated as "OZONE ALERT D aYS". Typically, the Ozone Alert season �ti•ithin the Metroplex area runs from � May throuah September, «�ith 6:00 a.m. - 10:00 a.m. being critical ozone forming periods each day. � L! � � � 5 7'99 The Texas �atural Resource Conservation Commission (TNRCC) in coordination with the National Weather Service, will issue the Ozone Alert by 3:00 p.m. on the afternoon prior to the alert day. On designated Ozone Alert Days, the Contractor shall bear the responsibility of being aware that such days have been designated Ozone Alert Days and as such shall not begin ��ork until 10:00 a.m. whenever construction phasing requires substantial use of motorized equipment. However, the Contractor may begin �i•ork earlier if such wor% minimizes the use of motorized equipment prior to 10:00 a.m. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. - 6:00 p.m., on a designated Ozone Alert Day, that day SIB - 6 C&B 971163 U � 16 � � � D U � U � � will be considered as a weather day and added onto the allowable weather days of a given month. WORKERS COMPENSATION INSURANCE COVER�GE: Contractors compliance with Workers Compensation shall be as follows: A. Definitions: Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TR"CC-84), sho�-ing statutory workers' compensation insurance coverage for the person's or entity employees providing services on a project, for the duration of the project. Duration of the project - includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project ("subcontractor" in - 406.096) - includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of ��hether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, ow�ner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage �-endors, office supply deli�•eries, and delivery of portable �toilets. B. The contractor shall provide coverage, based on proper reporting of classification ("� codes and payroll amounts and filing of any coverage agreements, �ti-hich meets the (.r4 statutory requirernents of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing ser�-ices on the project, for the duration of the project. I,� u '6� � f�l �� � � C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the proj ect, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that co�•erage has been extended. E. The contractor shall obtain from each person providing services on a project, and pro�•ide to the City: (1) a certificate of coverage, prior to that person beginning work on the project, so the City will have on file certificates of coverage showing co�•erage for all persons pro�-iding services on the proj ect; and � 5/7/99 SIB - 7 C&B 971163 J (2) no later than seven days after receipt by the contractor, a new certificate of acoverage showing ertension of covera�e, if the coverage period sho�;�n on the current certificate of coverage ends durina the duration of the project. C'� LJ � � � �J C�_l L�I L�i � � � � u L�J L�J a 5 = 99 F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. i he contractor shall notify the governmental entity in �-riting by certified mail or personal delivery, within ten days after the contractor knew or should ha�•e known, of any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify co��erage and report lack of coveraae. I. The contractor shall contractually require each person �i-ith whom it contracts to provide services on a project, to: _ (1) provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; (2) provide to the contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person prov-iding services on the project, for the duration of the project; (3) provide the contractor, prior to the end of the coverage period, a new� certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (4) obtain from each other person or entity with �t�hom it contracts, and provide to the contractor: (a) a certificate of covera�e, prior to the other person or entity beginning work on the project; and (b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage pe :od shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter. (6) notify the govemmental entity in writing by certified mail or personal delivery, within ten days afler the person knew or should ha�-e known, of any change that materially affects the pro�-ision of coverage of an}• person providing services on the project; and SIB - 8 C&:B 971163 L�J (7) contractually require each person with whom it contracts, to perform as required aby paragraphs (1) -(7), with the certificates of coverage to be provided to the person for whom they are providing services. � f■I � u !�J I' ,J �� I� � J. By signing this contract or providing or causing to be pro��ided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project �t•ill be covered by workers' compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and pa}Toll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of Self-Insurance Regulation. Providing false of misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties or other civil actions. K. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor ��vhich entitles the City to declare the contract void if the eontractor does not remedy the breach within ten days after receipt of notice of breach from the City. "The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. —T-his notice does not satisfy other posting requirements imposed by the Texas Workers' Compensation Act or other Texas Workers' Compensation commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: REQUIRED WORKERS' COMPENSATION COVERAGE `�� '!J L�; � � LJ l�l "The law requires that each person working on this site or providing ser�•ices related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at (512) 440-3789 to receive information on the legal requirement for coverage, to �-erify w•hether your employer has provided the required coverage, or to report an employer's failure to provide coverage." END OF SECTION n Si7/99 SIB - 9 C&B 971163 lJ � �� � MR. BOB TERRELL City Manager Fort Worth, Texas PROPOSAL FOR: CONSTRUCTION AND INSTALLATION OF PARK IMPROVEMENTS FOR: � � ARCADIA PARK NORTH DEVELOPMENT CITY PROJECT NO. GR76/541200/080306402010 TEXAS PARKS & WILDLIFE DEPARTMENT PROJECT NO. 50-00141 _ �ursuant to the foregoing "Notice to Bidders," the undersigned has thoroughly examined the pfans, specifications, nd the site, understands the amount of work to be done, and hereby proposes to do all the work and furnish all labor, equipment, and materials necessary to fully complete all the work as provided in the plans and specifications, �nd subject to the inspection and approval of the Parks and Community Service Department Director of the City of ort Worth. he "approximate quantity" category is for information purposes only. The Contractor shall be paid on the basis of ctual installed quantities on non lump sum items. Additionally, the Contractor shall be aware that the Proposal ontains both Lump Sum and Unit Price items. �the lowest bid received exceeds the funds budgeted for the project, the City reserves the right to decrease the uantities contained in any line item or to eliminate any specific items before award of the contract in order to bring the work within budget. By submitting a bid, the bidder acknowledges the City's right to adjust or eliminate line items �nd agrees to honor without recourse its line item bid price. . Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish, if �pplicable; Performance, Payment, and Maintenance Bonds approved by the City of Fort Worth for performing and ompleting the said work within the time stated and for the following sums, to-wit: �- �AY EM Area 1 �1. .0 2. .L! �3. � 4. � � 5R/99 BASE B1D - - - - - . _... -- APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL QUANTITY PRICE WRITTEN IN WORDS �PRICE AMOUNT BID 2180 LF Concrete Hike/Bike Trail (8' wide) �� -- ;-tJ �`"`�`"'� Dollars & �,�,� � Cents per LF $ a%. (P C7 $(Q 0,/� Q � �- � 1068 SF HC Ramp/Concrete Paving at Playground Area Dollars & � -�,� ,�,� Cents per SF $ � • (05 $�g� (�� C� 2 Each Columbia Cascade 6' Bench Model # 2016-6 �,ti,�. �� Dollars & � � ,�f Cents per Each 4 Each Columbia Cascade 6' Picnic Table Model �#2�16 -� concrete slab Dollars & � Cents per Each PROPOSAL-1 � 9ao $ $ � o�o $ : � • �U�p C&B 971163 � 5. 1 Each Columbia Cascade 8' Picnic Table Model � #216 -6-M on concrete slab �w. Dollars & �d Cents per Each $ 30 0� $ 3 4� c,� � 6. 1 Each Playworld System Play product model #350- a � �� � ;�na.�Q Dollars & � Cents per Each $,�S,�flO $� S, �� b � , , � 7. 1 Each Columbia Cascade "Pipeline" Play product model #'�583-4 � ��-� Dollars & � � Cents per Each $��� $ c3a d� �8. LS ite grading/preparatio ollars& "�-��Oc�(j �b/� C�a r- '�. , � Cents per LS $• a J,v"J $ , , � a 9. LS Playground Surfacing, Underdrain system, ��b er mats, etc. � �Dollars & � 1� Cents per LS $ �(�� SO c� $ ��o ,�6 C� a 10. LS Temporary Signage ���,,,,r,�e'l�.� �.�-�#� Dollars & � Cents per LS $ �O � $ �� � 11. LS Permanent Signage Marker/Plaque _ �,, ��Q Dollars & � Cents per LS $ a..sso o $ ��6-�"C� � Total for Area 1 $%11�5�� y-v��7 � �Area 2 � 1. 1365 LF Concrete Hike/Bike Trail (8' wide} ���� Dollars & � Cents per LS $ � �• (� O $ 37, (P 7 � � � , 2. 479 SF HC ramp/Concrete Paving at Playground Area � a � � Dollars & � Cents per EA $ �,C� � $ o� ,a � `/ � J � 3. 2 EA Columbia Casca e 6' bench model#2016-6 �y,,�;,.�,�, �-.� Dollars & DC� Cents per EA $ �OC� $ �' �, c�t� . / v , �5/7/99 PROPOSAL - 2 C&B 971163 � 4. � � 5. � a 6. � a7. a as� D 9. � � 10. � � � � Area One �4rea Two D �/7/99 1 EA Columbia Cascade "Pipeline" play product #9661-M � l�� ��o.�� Dollars & � Cents per EA 1 EA Columbia Cascade "Pipeline" play product #1583-4 �j,�,�, ,��,�I Dollars & � Cents per EA LS Site grading/preparation �_ Dollars & Qf Cents per EA LS Playground surfacing, underdrain system, rubber mats, etc. ��Q_ ��,,,�, Dollars & � Cents per EA LS Footbridge Dollars & �' Cents per EA LS Temporary Signage �/Z�..�,�-�C Dollars & , � Cents per EA LS Permanent Sign/Plaque �.,,,� ��,,�,�,,.� Dollars & � Cents per EA Total for Area 2 $ ( S,oaO $ �510oD i � $ 3,o�d $ �3yoa o , , 2�j �� �-o� ��° � � ' $ � 13,S�� $ 1��,��0� $,��� ��� $'� S� c� c� d , $ y0 c� $ �9� $ �. o � v $ �cs-�- c� BASE BID - RECAPlTULATtON Total Base Bid PROPOSAL-3 � ����� �� �.� $ / S��i� ��. � � � $ � 3a,�ol-�� $ a��'�c��S- --���_ C&B 971163 � . � �,4 � BA 1. 2180 LF � �BA 2. 1365 L.F. a � �.. . l■J / BID ALTERNATES Concrete Hike/Bike Trail (6' wide) in lieu of 8" wide concrete trail (located in Area 1) Dollars & � .,, �. c/ J Cents per LF Concrete Hike/Bike Trail (6' wide) in lieu of 8' wide concrete trail (located in Area 2) �f �.�Lc, Dollars & � Cents per LF �� p"� d • �C c� ��(, �( `7 a _�`� ' �j � $ � - �, _ . $ ao��� $ a?�8v� 617 LF Area 2 Concrete Hike/Bike Trail (6' wide) (located in Area 2) o�,"�. Dollars & � ��,� Cents per LF $ � � . � � $ � �l ,� ��. `� � � , . ,,a aBA 4. 617 LF � ':. � :• . � ��,, 913 LF 913 LF � BA 7. 1 LS � ':. ; 1 EA � liJ Concrete Hike/Bike Trail (8' wide) (located in Area 2) o,,,"� v G�L��Dollars & _�� Cents per LF Concrete Hike/Bike Trail (6' wide) (Located in Area 2) g�`R' Dollars & Cents per LF Concrete Hike/Bike (8' wide) (located in Area 2) r��� gVLC� Dollars & � ��_ Cents per LF 25' X 25 ` Pavilion and flat work (located in Area 2) ollars & � Cents per LS Columbia Cascade 8' Picnic Table Model # 2165-6- at Pavilion (located in Area 2) �.� ,,,� Dollars & Cents per EA $ �� • cQv $ �. �,c� c��.a � , , $ 3� •a� � $ a`�� � �s• �� � yr . �o $ `�-7,9�v �gc� � ��i �,(� o b �`� 3, o c� c� , , � ,� o o l� $�. 6 b-� � �/7/99 PROPOSAL - 4 C&B 971163 ��� � :. . � �:� � � �BA 11. L• �BA 12. � � BA 13 � a BA 14. l�J � � . � � � 2 EA Columbia Cascade 6' Picnic Table Model , #2164-6-M at Pavilion (located in Area 2) 2,_,<.�,., 1�,,,�,,,,�� Dollars & � Cents per EA $ l� 6 0 $.3� °� 1 EA Columbia Cascade 8' Picnic Table Model # 2165-6-M on Concrete Slab (located in Area 2) ,�}.c.�, —�u„�,✓( Dollars & �' Cents per EA . 1 EA Columbia Cascade 6' Picnic Table Model #2164-6-M on Concrete Slab (located in Area 2) � Dollars & � Cents per EA a a � �l $ �c��� $ �o $ �?n a � l>o a 1 EA Columbia Cascade 6' Picnic Table Model # 2164-6-M on Concrete Slab (located in Area 2) , ��,,�,,.,�, a �,,,,,,�, h�^`� Dollars & � Cents per EA $ � 7 6'0 $ /? o a 1 EA Columbia Cascade 6' Picnic Table Model # 2164-6-M on Concrete Slab (located in ����rea 2) .��.- Dollars & � Cents per EA $ � �o � $ 7? d� 1 EA Columbia Cascade 6' Picnic Table Model # 2164-6-M on Concrete Slab (located in � Area ) g�u� `�`''`�"'�"�� Dollars & � Cents per EA $ /`� a o $ j 7� c'� This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04 (F) of the Texas Limited Sales, Excise and Use Tax Act. The Contractor performing this contract may purchase, rent or lease all materials, supplies, equipment used or consumed in the performance of the contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate complying with State Comptroller's ruling tax, said exemption certificate complying with State Comptroller's ruling #95-0.07. Any such exemption certificate issued by the Contractor in lieu of the tax shall be subject to the provisions of the State Comptroller's ruling #95.09 as amended to be effective October 2, 1968. �R/99 PROPOSAL - 5 C&B 971163 � The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractor or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance 7278, as � amended by City ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. j�. The undersigned agrees to complete all work covered by these contract documents within Eighty-Five (85) �-� Workina Days after the date for commencing work as set forth in the Notice to Proceed to be issued by the � Owner and to pay not less than the "Prevailing Wage Rates for Highway Construction" as established by the City of Fort Worth, Texas effective June 6, 1995. � � � F � G. � Within ten (10) days of receipt of notice of acceptance of this bid, the undersigned will execute the formal contract and will deliver applicable Surety Bonds for the faithful performance of this contract. The attached deposit check in the sum of $ Dollars ($ ) is to become the property of the City of Fo�t Worth, Texas, or the attached Bidder's Bond is to be forFeited in the event the contract and applicable bonds are not executed within the time set forth, as liquidated damages for delay and additional work caused thereby. In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous price for construction thereof to the City or to reject the proposal. Receipt is hereby acknowledged of the following addenda: No.1 No.2 No.3 No.4 . �tespectfully submitted, !! � � �' YY�.C�.,V\, �� r��� �ompany Name) �� �/ y (Authorize Signature) � ate: � �- ! a —� � � Address: ��( � �����y,�,� � � -t�..� .� N +-1� _ �! (o � � �1 �l7 Telephone: ( � ) �70� lg Qj (p � � tJ 'J SEAL (if corporation) �/7/99 PROPOSAL - 6 C&B 971163 r It;+� . ATTACHMENT 1A Page t of 2 City of Fort Worth Minority and Women Business Enter rise���e@�ications � � �NCINEERIN�/C�w ' MBE/WBE UTILIZATION ��-��MG,(� ����v� S''�- '� AUG 195.��1 1� 5�G9q PRIME COMPANY NAME � � � BIO DATE � � �o u e.m� n�S (�c- c� i�, �' � Co2> �sy�ao� I a� 0 3 a � y oa CA / o PROJECT NAM PROJECT NUM�ER � ` �-CITY'SJt/WBE pROJ CTGp �� O o���y0aa/o �t/��'BE PERCE\TAGEACHIEVED: � � � � �� - 3�/' � Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive Af bid opening date, wili result in the bid being considered non-responsive to bid specifications. The undersigned bidder agrees to enter into a formal agreement with the MBE and/or WBE firms for work listed in this schedule, conditioned upon execution of a contract with the City .of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to specifications. Company Name, Contact Name, Address, and Telephone No. �- R C��n c���.f,P SL�. � i k�.��(. =7" �Jorf-� 1'X {-iMSA�3tgK0`f� ., � / � � M n -_-�� S-���1 3,�._ . _��: _� ? � a`�. _ . _ _. _ t"� � �a��� �—�-- - - -�/V+�S-p =5�.1�.1� tl � [� ---.. _ . V C. 'rL` v��� � a'� � �._..._ � . -� �---,�F' -t�.bru�.. r� �,J�%J+� l/�_ �__.._��.__� w�-Sf�Se�3iyo3o��-- /� 11 C��c�`��2. ��+�s� -�.� r � � el��,,. �p. Cw11Zc � `}'�Q, i (` � - .- _���Q-� f c c�.�,r•�.{-,� � �-= S�t �-��`��-��� S}-.e.�� T (3.�,�.,s. ►,n � �.�'�Q.C.���o� � �(' � c�c�� 0 �' -E-�-� � � 'f--,e..1r �- o,� 0 /� - ���. Y�X,�u-4�.�.l�'uoti �t. -l�r �.St�. h�l o �f 31---- . ----� `�-'- �---�.- - - - -._. ._._. . _ ____. c � � � � h \� � N Dollar Amount '� ' `��'C7 .�c1j0�0 "�- aV�OJ (� s�� � � � � � l��� r�� �I �`j ,� s�p ptv�r ,s �, ri..i �r, r:r�. �, �,l-1 �o M/WBEs must be locatdd in the 9(nine) co�rfty marketplace or currenEly doing business in the marketplace at'the time of bid. �n � y Specify all areas in which MWBE's are to be utilized and/or items to be supplied: C) A complete listing of items to be supplied is required in order to receive credit toward the M/WBE poal. ;") ldentify each Tier level. Tier: Means the level of subconVacting below the prime contractorlconsultant, i.e., a direct payment from the prime contractor to a subcontractor is considered 1^ tier, a payment by a subcontractor to its supplier is considered 2n° tier. THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE (5) CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Certified �> p0 o� � S Specify All Contracting Scope of Work (') Specify All Items to be Supplied(•} �,: • U ` �� a V � U Z ��/7199 Rev. 6/2/98 ��� Pages 1 and 2 of Attachment 1A must be received by the Managing Department �� . ' . �.. : . , � ..::.� :: . . � : . � _. � _--: : ;: - ATTACHMENT 'SA Page 2 of 2 Cit�y of Fort Worth Minority and Women Business Enterprise Specifications � �� � � MBEIWBE UTILIZATION � Company Name, Contact Name, Cenified : Address, and Telephone No. � — . q :; F � " � ,s:-� �� � Q O , . . -.. Z �� Specify Ali Contracting Scope of Work (') Specify All Items to be ` Supplied(') ,�_ �� m v� F Doliar Amount L��, , . . . �� .'�:�_.�ne..r.�.�� i���- �1,� �.:.ar�,..s �Co�e.�.� �1 _..sj � VJ i�r,y_►w�K.�. � �' '�r^"'t'„� 4 CI'e+�w� ,` • • �'Y`..i� v�. �.-�.. � � � C�.�`,�'� iL �� t � S g��� ` r �. ��e.,, r �- .. _ _ .� � - � � � -t-.�� _ '•. ;'�',:'�..-�"'�L.._�:�`_?�._� 5-��e. � F'r..�r�cw�J.."L CJ.-t,.Jc..q.� _ �.�uti � -��d�,:'?ya�y . . . _ . . ' ' ' F.�l� W an-��. l X� `}- � `�\v � ti' � � ���J `�- ` � ,( t. �� - � .. . . . . ' N � , �� CJ C`�� ; :,::,�:.;.: __ . , . . . . � . � -�--�,; i � �I--� � �.. �' : =�: � `,�j- �''C'�`� c_.12,� - � . . ���f�`�"�':':�:��. �'���.Q�,►1�. � .� �-�v�. �c�.,-�.�,�.r�. -r�,: =.�� _.,::,. . • . � � ,,:�, .•.:�;�w,� -� ! � �c.�,�„� �-1,�,,.�h hh.,l c:� � Ci v �. � �4:" � . • � • - , . : ' • . •• . ' . . . • y ' ��.J / � . . . �.� r .. .... � . . . • �.:. .'t ..�. .' .:.: Y , . . • � ^�.'.i,._:if��ti:4�i_�i.�..}�S.'. . . .. ....i �.:ll ..i �- '. .. he,bidder further�agrees;to provide, directly to the City upon request, complete and accurate information� regarding actual work performed by..all subcontractors, including MBE(s) andlor WBE(s) arrangements submitted with this bid. �v�.�. . . . ��:The.bidder:also�agrees.to�alloW�an audit.andlor examinaiion of any books, reco�ds and files heid by their company that :_:�:,..,. �-.�, .,;� ..::.: -. � . . . . . . tll-substantiate-the actuai �work `petformed by the MBE(s) andlor WBE(s) on this contract� _by an author�zed officer or .�. � ,..��. ., _.. mployee`.of��the�_City::Any,intentio9ai,andlor-knowing misrepresentation of facts will be grounds for terminating�the ._,�,cont act,�or;debarment from.�City;work for a period of riot less than three (3) years and for initiating action under Federal, ��'State�'or.-iLocal�.laws ,concerning� fals'e statements. � Any failure to �comply with this ordinance and creates a material reach of contract'may�result. in a determination of an irresponsible offeror and barred from participating in City work . or'a�perloeL,of time n t less'than one�(1) year. � ;: .::,�-:..:�,.. .��..:.V..: ,. • - ...,;��:; �:, ... :�..�.:: -:�: _- . � i.,_ '%F{..- �K :� � �-� `�� A BEs . d WBEs MUST B� CERTIFIED BY TH B FORE,p NT CT AWARD �i=��:;;:: ;: - : ��%�/'��es �vr��/ �°��`� � � �,...,...: . ..:� : ;_. . v j ~ � Authorized Signature . � - Printed Signature ,.`Y%ti� � ,,: . ':::..���`'�� �iT�S�/�5'�;' �Ii)'Lk;�...P4�' � itle'_.:.. � ,. � �� Contact Name and Title (if different) . � :;'�� °� .`D�1�� �:z�� -�- � � � � —�l7 ��� �� � �l � �ompany Name � : . . _ . Telephone Number (s) -� . _ :=�s � s-�` 1 - 8� � � a � �. � , .. . � �r�,�l�i �_ �� Address �- � ' - . = � f . Fax Number � �.-� . : ;�:��`��,;��,.-��- � n � � � � � �-= � �9� . CitylState2ip Code , _ Date � '. �... . . . .- . •�.�•THIS�FORM MUST BE RECEIVED SY THE MANAGING DEP�tRTMENT BY 5:00 p.m., FIVE {5) CITY BUSINESS DAYS AFTER BID =. p�' - OPENING, EXCLUSIVE OF THE BID OPENING DATE . 5l7/99 -.' .:` ' ' - . Rev.612l98 � � -� Pages 1 and 2 of Attachment 1A must be received by the Managing Department � L; l� � � � � � L� L � I�1 � � � � L!�! CI`tY OF FOi2'r WCIRTH Hic� oot�Rvcriorr pREY�iLIt+G YiAC�E R�1'I'E FnR I995 CL•ASSIFICATION gp� CL�A.�.SYFICATION �� za=s��===�;=�_====_=__======t=============cce;acasaa=====r====cora_n�=======~,a=,. AI�2 TOOL OP�2ATOR ASPHALT RAKFR ASFfiALT SFiOVELIIt BATCiiING P7�NT WEIC�i�t BATI'giB�0,Ai2D S�TPF�t C�RP`F1�I�'FR OONt�tEPE FINISiiF�2 (PAV) OO�IC�tis`PS FINIb'f�R (SI�tS) QON� RU88II2 E�ICIAN F`i.A�t p'OFdM! EiTiI+DFR (S2'R.S) FORM LINFR FORM 6E'i'L'FR (PAV & C�tB) F�OFiM S�t (STRUCT(JRES} I�FI�ORII2. �iON L�BORFR. UTIF,IT'X �IIC OILER SFRVI(�i Pi L�3RIV� PIPELAYER BI,ASTgt F�OWFR EOUIF�'r OPF�2A� ASPHALT DISTRIBU'POR ASPfiALT PAVIiQC� MAQiINE BROOM OR a�rr.C.rr� OP�'POR BUULDOZER, 150 HP OR LFSS BtJLLDOZIIt, CN�t 154 KP COrIc�I`E PAVING G9RING MAC1i. C70NCREi� PAV FINiSHiNG MAE�i. QONC.}�E PAVING FORM GFiADgt QONC�2ETE PAVING JOINT MAQi. OONCRETE PAV f t�G JOINT SFAI�2 t70NCii�TE PAVIIQG b'7,QAT OONCREI`E PAViNG SAW � Qoi�iCREi'E PP►VTNc; S�PRE�DEit SLIPF�fil�i MAQiIi�tE CRANE,cr.aM�r.r., SAQ�OLE, DFRRTC�C. DRACLINE. SHOVEL ( LESS 7�iAtd 1 1/ 2 CY ) CRP�NE.CLAtrS��t•, BACKf{OLE, DF�iR,IC�C, p�A�LINE, b�iC�TEG (1 ]./Z CY & c7VIIt) CRUSHING OFt SG'RNG PLT OPR. EI�sVATING C�FiADER FWN�ATIaN DRILI, OPF�2ATOR (C�iAWL�t MOUIdTED) . FCXJNDATZON DRiLL OP�TOR � " JUNE 6, 1995 S7 .554 $8.565 58.255 $9.37i $8.920 s9.447 $9.345 s9.o5s $7.733 S1Z.761 55.598 $8.717 $8.913 $8.686 $8.427 $6.402 5�.461 $10.658 $8.698 S8.iO4 s�r.soa $8.509 SLl . 333 OPF�iATORB MILLIPiti 2�C�iINE OPF�tAZ�OR Mi�R (ONF.R 16 C.F. ) MIi�R (16 C.F. & LFSS) MIX�- QON(�2EPE PAVING MO'IrOR C�iADP�t OPkRP�'i�OR (FINE G�iDE) . Mo�R �RAU� oPFRAmoR PAVF3�F��iT M�2KII� MACRINE POSTfi0I,8 DRILT�R OPF.RA'I`QIt ROLLIIt, 5'I'�I. �i+ (PLANT-3�tIX PAVF�2�s) ROLLER, b`I'��. Wii� (FLA7i�IIiEEL OR TAt�+�ING) 120LLFR, F'N��IATIC S�I,F- l?RO SCRAPFR- 1? C.Y . � L�ESS �PFR-� a!VER 17 C.Y. BIDE BOOtd TRACI'OR- (�iAWLLR TYPE i 150 EP � i.ESS) TR�,CI'O�t- t�ii�WLFR TYPE (CyVF�t I50 HP) �,cro� -��xc TRAVFLZRG MIXQt TRII�iCiiING 2�iQiINE-LYGZiT TFtII`I(�iINO 2��INE-HF�iVY WAC�OiIY-taitII.L. BORINCi MACHINE REII�tF�QRCII�iG STF� SEITER (PAVING), REINFORCINC3 SZ�i. SETI�R i S`I�JCIVRAL ) STEEL WORi�t-S�'F2U�IVRAL SIGrt EREG�'OR s�n� eox oP�� BP�RRICADE SERVIC,FR Z� WK. MWIZTF� SIt�I INSTALLFR (P�.NII�iT C�it0�llvD) TRUCK �tIVFR-SINCiLE AXLE � iLIC�ZiT') TRUC�C D12IVIIt-SINGLE AXLE iHFAVY) TRUC�C DRIVFR-TANDFM I��E ( SF�3I-TRAII,ER) TRUC� DRIVIIt-L�$OY/F3AAT TRUCK DRIVIIt--Z�ZANSTT MIX TK[TCK URIVFR-3r1INt�i VIBRATOR OPFRATOR WELDIIZ S6.6S0 SS.000 57.913 59.500 $8.444 $9.053 $7.908 S8.703 $9.160 $8.213 59.453 58.500 59.042 $7.350 57.875 $9.290 $9.750 59.000 $9.000 $9.513 $10.517 59.500 $10 .000 Hti2�lN R�:�JCTRG'�:S 510.346 $9.891 S6.402 S9.000 $8.339 S7 . 963 $7.443 53.138 .58.205 •57.793 S8.448 $8.8?3 57.735 $7.615 58.188 $12 . 498 59.000 S9.218 511.548 $16.300 511.436 $6. 988 56.402 56.402 57.465 58.06? $7.816 $9.b53 S7.50? 58.200 57.000 $10.459 95F. � � � � � � O � � � � L.1 � � � a 0 � � � cx� oF Fo�r wott�t . HI(��IAY QON'IRUGTiGQV PREUAILIHO W,�,CiF 12ATE FOR 1995 ('I'RIKK M(XTNiF�} $11.138 F�1qt�A'�I�i DRILL OPR i�[,pER FRODIT IIVT LAADnt ��� � �� ) $8.823 (CNFR 2 X/2 CYi $4.311. 80TS`T (DOUBI,E DiZt�t & L�SS) $8.917 3UNE 6, 1995 � . . 7: • • �a. ■ ' � � � � � � � � � � � ' �, � � � ' WEATHER TABLE MONTH JANUAR�' FEBRUARY MARCH APRIL MAY NNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER ANNUALLY AVERAGE DAYS RANFALL (1) 7 7 7 9 8 6 5 5 7 6 6 7 80 INCHES RAINFALL (2) 1.80 2.36� 2.54 4.30 4.47 3.05 1.84 2.26 3.15 2.68 2.03 1.82 32.30 SNOW/ICE PELLETS (3 ) 1 * s 0 0 0 0 0 0 0 0 * 1 (1) A��erage normal number of days rainfall, 0.01" or more. (2) Average normal precipitarion. (3) One inch (1 "} or more. ' * Less than one-half inch (1/2"). Unseasonable weather is defined for contract purposes as rain/snow days which exceed the average number of days or inches of rainfall in any given month. This table is based on information recorded at the former Greater Southwest International Airport, Fort Worth, Texas, covering a period of 18 years. Latitude 32° 50' N, Longitude 97° 03' W, elevation (ground} 537 ft. 5/7/99 WT - 1 C&B 97116: !J � A. Non-resident vendors in (give state). our principal place of business, are required to be _percent lower than resident bidders by state law. A copy of the statute is attached. (�} The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to non-resident t� bidders. This law prati7des that, in order to be awarded a conrract as low bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal place of business are outside of the State of Texas) bid projects for � construction, improvements, supplies or ser�•ices in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a non-resident bidder in order to obtain a comparable cor.tract in the State in which the non-residenYs principal place of business is located. T°he � appropriate blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state or nan-resident contractors to do so will automarically disqualify that bidder. Resident bidders must check the box in Section B. - ,■1 � � VE'�'DOR C01iPLIAiVCE TO STATE LAW Non-resident vendors in _(gi�•e state), our principal place of business, are not required to underbid resident bidders. B. Our principal place of business or corporate offices are in the State of Texas. � BIDDER: 4� ��� � L�J � � L�J �� Sr'7 99 (please print) [� Please Check ar mark with an "X" : Company (please print) Signature: Title: City State (please print) THIS FORM MUST BE RETURNED tt7TH YOUR OUOTATION VCSL - 1 Zip _ C&B 9711b3 � LJ LJ STATE OF TEXAS Q Pursuant to Article 8308-3.23 of Vernon's Annotated Civil Statutes, Contractor certifies that it provides Workers' Compensation Insurance coverage for all of its employees employed on City of Fort ��'orth Project Number . � 0 ��] !J � � LJ ;J � � L�� I� L�J � � L�J COUNTY OF TARRANT CONTR�CTOR CO:�iPLIA�'�'CE WITH R'ORKER'S COMPENSATION LAW � � � ��� �oNs%►-� � r ,a �-, ,Y �� , C`ONTR.ACTOR '�'� ( h��,-�X�r✓� Title //-�' � � Date BEFORE ME, the undersigned authority, on this day personally appeared , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of for the purpose and consideration therein expressed and in the capacity therein stated. GIVEN LTNDER MY HAND AI�� SEAL OF OFFICE this f day of ��� , 19 � l` ����� ��� � ,,.-r•y �; C KIi�1G f�rs'..... e�;+� STAiE OF TEXAS �`_°� '•�' ° NOiR�'(PIIBLIC 4���; ��flmroission Expires: Notary Public in arid for the State of Texas �oP�,�,``rI ���Y3,2002 , ontractor agrees to provide to the City a certificate showing that it has obtained a policy of Worker's Compensation insurance covering each of its employees empIo�•ed on the project in compliance with State law. No Notice to Proceed will be issued until the Contractor has complied with this section. � b. Contractor agrees to require each and every subcontractor who wi11 perform work on the project to provide to it a certificate from such subcontractor stating that the subcontractor has a policy of Worker`s Compensation Insurance covering each employee employed on the project. Contractor �vill not permit any subcontractor to perform work on the project until such certificate has been acquired. Contractor shall provide a copy of al] such certificate to the City. � 5/7 99 CCWC - 1 C&B 971163 c� c� o a a c� � c� c� �� o c� � o o�� o TU THE EMPLOYER/CONTRACTOR: Pursuant to Texas V�orker's Compensation Commission Rule 110.110(d)(7), a contractor engaged in a building or construction project for a government entity is required to post a notice on each project site informing all persons providing services on the project that they are required to be covered by workers' compensation insurance. The notice required by this rule does not satisfy other posting requirements imposed by the Texas Workers' Compensation Act or other Commission rules. This notice must: (1) be posted in English, Spanish and any other �language common to the employer's employee population; (2) be displayed on each project site; (3) state how a person may verify current coverage and report failure to provide coverage; (4) be printed with a title in at least 30-point bold type and text in at least 19-point normal type; and (5) contain the exact words as prescribed in Rule 110.110(d)(7) without additional words or changes. The notice on the reverse side meets the above requirements. Failure to post the notice as required by lhis rule is a violation of the Act anci c;ommission rules. The violator may be subject to aclminititrative penalties. Q G7 C3 C! C1 C] I� Q C� Q C� C� C� C� � C] � C.7 �7 REQUIRED WORI�:ERS' COMPENSATID1oT C OV�RAGE The law requires that each person working on this site or providing services related to this co�nstruction proj ect must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee. Ca11 the Texas Workers' Compensation Commission at 512-440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage. c� c� ca c� c� c� �� c� c� r� c� e� o�a o c� c� c� COBERTURA REQUERIDA DE C(JMPENSACION PARA TRABAJADORES La Iey requiere que cada persona trabaj ando en este sitio o proporciona servicios relacionados con este proyecto de construccion tiene que estar cubierto por aseguranza de compensacion para trabaj adores . Esto incluye personas que pro9porcionan, cargan, entregan equipo 0 materiales o proporcionan mano de obrra, transportan, o cualquier servicio relacionado con este proyecto, sin considerar la identidad del patron o estado del empleado. Llame a la Comision Tejana de Compensacion para Trabajadores al 512-440-3789 para recibir informacion de los requerimientos legales de cobertura, para verificar si su patron le ha proporcionado la cobertura requerida o para reportar falta del patron en proporcionarle cobertu L�J � � � �� �a� ��� I� � �. C�� �I L�I � � �� L�' TECHNICAL SPECIFICATIONS DIVISION 1 - GENERAL REQUIREMENTS SECTIO�` 01010 - SUMMARY OF WOR� The contractor shall supply all superintendence and shall perform all �+•ork and furnish all labor, equipment, materials and incidentals necessary and complete all work as described in the plans and specifications. All construction and other work shall be done by the Co.ntractor in . accordance with the best engineering and construction practices for the skill or trade invol�-ed. The work to be accomplished under these plans and specifications for Arcadia Park North — Area No. 1(Mapsco 36-E) Arcadia Park north — Area No. 2(Mapsco 36-P) Area No. 1— Installation of HikeBike Trails, playground and picnic stations. Area No. 2— Installation of HikeBike Trails, playground, pavilion and picnic s'tations. These plans and specifications were prepared by Carter & Burgess, Inc. for the Parks and Community Services Department. The Department of Engineering will administer the contract and fumish inspection. The Contractor shall be responsible for construction layout and stake lines and grades in order to complete work as described in plans and specifications. The applicable items contained in the Standard Snecifications for Street and Storm Drain Construction for the City of Fort Worth, Texas, shall apply to this contract just as though each � were incorporated in these documents. Where the provisions or specifications contained in those documents are contrary to this publication, this publication shall govem. In case of conflict between plans and specifications, the plans shall govern. A copy of the Standard Snecifications for Street and Storm Drain Construction can be purchased at the �ffice of the Transportation and Public Works Department , 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, Texas. The contractor shall provide all permits and licenses and pay all charges and fees, and give all � notices necessary and incidental to the due and lawful prosecution of the work. The Contractor shall contact the City of Fort Worth's Development-Plans Exam Section for a determination of applicable permits or variances required for this project. � � � GENER.�L REQUIREMENTS � -1- 5/7/99 L�J � � I�l � � L�J SECTION 01035 - C0�ITRACT TIi11E I.OI PROGRESS AND COMPLETION Upon receipt of a notification letter and the executed construction contract, the Contractor shall be responsible for scheduling a preconstruction conference, which shall be held no later than ten working days from the date of the notification letter. At the time of the preconstruction conference , a construction start date �shall be established and indicated in the Notice to Proceed (Work Order} issued by the Engineering Department. The Contractor shall begin the work to be performed under the contract on or before ten working days from the date the Work Order is issued. The Contractor shalI carry the v�•ork forward expeditiously with adequate forces and shali complete it within the period of time stipulated in the contract. � 1.02 LIQUIDATED DAMAGES �I � '�J L�J L■J � L�l � L�J u L�J This project will be completed within the specified days aIlowed. Liquidated damages will be assessed if the project z-uns over the allotted time. SECTION 01100 - ALTERNATIVES The City reserves the right to abandon, without obligation to the contractor, any part of the project (subject to conditions set forth in Section 01150 - Payment to Contractor) or the entire project at any time before the Contractor begins any construction work authorized by the City. SECTION 01150 - PAYMENT TO CONTRACTOR 1.01 SCOPE OF PAYMENT: The Contractor shall accept the compensation as pro��ided in the contract in full payment for fumishing and paying for all materials, supplies, subcontracts, labor, tools and equipment necessary to complete the work of the contract; for any loss or damage which may arise from the nature of the work from the action of the elements, or from any unforeseen difficulty �•hich may be encountered in the prosecution of the work, until the final acceptance of the work by the City; for all risks of e��ery description connected with the prosecution of the work; for all expenses and damages which might accrue to the Contractor by reason of delay in the initiation and prosecution of the work from any cause whatsoever; for any infringement of patent, trademark or copyright, and for completing the work according to the plans and or specifications. The payment of any current or partial estimate shall in no way affect the obligations of the Contractor to repair or remove, at his own expense, the defective parts of the construction or to replace any defective materials used in the construction, and to be responsible for all damages due to such defects if such defects or damages are discovered on or before the final inspection and acceptance of the �vork. 5/7/99 GEI�ERAL REQUIREMENTS -2- L■1 I�l � L�J I� L�J I!J � � CJ L�J � � 1.02 Partial pay estimates shall be submitted by the Contractor or prepared by the City on the Sth day and 20 day of each month that the work is in progress. The estimate shall be processed by the City on the lOth day and 25th day respectively. Estimates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of the pay estimate ha�-e not been so installed. If such materials are included within a pay estimate, payment shall be based upon 85% of the net.invoice value thereof. The Contractor >ti•ill furnish.the Engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. 1.03 It is understood that the partial pay estimate amounts will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate rendered following the discovery of the mistake in any previous estimate. Payment of any partial pay estimates shall not be an admission on the part of the Owner of the amount of work done or of its quality or sufficiency or as an ac�eptance of the work done; nor shall same release the Contractor of any of its responsibilities under the Contract Documents. 1.04 The City reserves the right to withhold the payment of any.partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other provisions of this Contract. 1.05 For contracts of less than $400,000 at the time of execution, retainage shall be 10 percent. For contracts of $400,000 or more at the time of execution, retainage shall be 5 percent. 1.06 Contractor shall pay subcontractors in accord with the subcontract agreement within five business days after receipt by Contractor of the payment by City. Contractor's failure to make the required payment to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished. 1.07 Contractor hereby assigns to City any and all claims for overcharges associated with this � contract which arise under the antitrust laws of the United States, 15 U.S.C.A. Sec. 1 et s� (1973). �� � L�J � u 1.08 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity of any item or items of work to be done or materials to be furnished by the 25 percent or more, then either party to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or belo�� the 25 percent of the original 5/7.99 GENERAL REQI.�IREMEN7'S -3- � � i� I� i�l �� �� J L,J �I CI Cl�i �� �� I L�! !J I� �� �� L�� quantity stated in the proposal; such re��ised consideration to be determined by special agreement or as hereinafter provided for "Extra Work." No allowance will be made for any changes in anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. 1.09 PAYMENT FOR EXTRA WORK: Extra work performed by the Contractor, that is authorized and approved by the Cit�- Engineer, will be paid for under "Change orders" made in the manner hereinafter described, and the compensation thus provided shall be accepted by the Contractor as payment in full for all labor, subcontracts, materials, tools, equipment and incidentals, and for all supervision, insurance, bonds and all other expense of whatever nature incurred in the prosecution of the extra work. Payment for extra work will be made under one of the follo�ring types of "Change orders" to be selected by the - City: A. Method "A". By unit prices agreed upon in the contract or in writing by the Contractor and City Engineer and approved by the City Council before said extra work is commenced subject to all other conditions of the �ontract. B. Method "B". By a lump sum price agreed upon in writing by the Contractor and City Engineer and approved by the City Council before said extra work is commenced, subject to all other conditions of the contract. C. Method "C". By actual field cost of the work, plus 15 percent as described herein below, agreed upon in writing by the Contractor and City Engineer and approved by the City Council after said extra work is completed, subject to all other conditions of the contract. In the event extra work is to be performed and paid for under Method "C", the actual field costs of the work will include the cost of all workmen, foremen, timekeepers, mechanics and laborers working on said project; all used on such extra work only, plus all power, fuel. lubricants, �rater and similar operating expenses; and a ratable proportion of premiums on performance and pa}�nent bonds, public liability, workmen's compensation and all other insurance required by law or ordinance. The City Engineer will direct the form in which the accounts of actual field cost v�-ill be kept and will recommend in writing the method of doing the work and the type and kind of equipment to be used, but such extra work will be performed by the Contractor as an independent contractor and not as an agent or employee of the City. The 15 percent of the actual field cost to be paid the Contractor shall cover and compensate him for profit, overhead, general supervision and field office expense, and all other elements of cost and expense not embraced within the actual field cost as herein specified. The Contractor shall �ive the City Engineer access to all accounts, bills, invoices and vouchers relating thereto. 5/7/99 GENERAL REQUIRE�fE\TS -4- !J � � � � ��� � � � � � !J 1.10 DELAYS: If delay is caused by specific orders given by the City to stop work, or b�• the performance of extra work, or by the failure of the City to provide material or necessary• instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the approval of the City Council; no such eYtension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. 1.11 , CLAIMS AND DAMAGES: Any claims for extra work or for any other related matter or cause must be made in writing to the City Engineer �vithin seven calendar days from and a$er the cause or claim arises. Unless such claim is so presented, it shall be held that the Contractor has waived the claim, and he shall not be entitled to receive pay thereof. 1.12 TRANSPORTATION: No allowance or deduction w•ill be made for any charge of freight rates. No allowance for transportation of inen, materials or equipment will be allo�;�ed. 1.13 ACCEPTANCE AND FINAL PAYMENT: The City, upon receipt of the Director's "Certificate of Completion" and "Final Estimate" and upon receipt of satisfactory evidence from the Contractor that all subcontractors and persons furnishing labor or materials have been paid in full and all claims of damages to property or persons because of the carrying on of this work have been resolved, or the claims dismissed or the issues joined, shall certify the estimate for final payment after previous payments have been deducted and shall notify the Contractor and his surety of the acceptance of the project. On projects divided into two or more units, the Contractor may request a final payment on one or more units which have been completed and accepted. The final acceptance of the completed work will be by the Parks and Community Services Department and all guaranties covering the completed work and all maintenance periods shall begin with the date of this acceptance. , (`� On delivery of the final payment, the Contractor shall sign a written acceptance of the U final estimate as payment in full for the work done. All prior partial estimates shall be subject to correction in the final estimate and payment. � SECTION 01300 - SUBMITT_aI,S � Prior to construction, the contractor shall furnish the Parks and Community Services Department a schedule outlining the anticipated time each phase of construction will begin and be completed, including sufficient time for clean-up. �' � � � The Contractor shall submit to the Project Manager shop drav�•ings, product data and samples required in specification sections. 5; 7/99 GENER.4L REQUIREME��r� -5- !J � SECTIO� 01400 - QLT:�I.ITY CONTROL � The contractor will receive all instructions and approvals from the Director of Engineering and/or his assigned inspectors. The inspector will be introduced to the contractor prior to be�ituling «�ork. Any work done at thz direction �f any other authority will not be accepted or apaid for. Final approval for the finished project shall be given by the Director of Engineering. Cit�� of Fort Worth. '] � � !J �J � =1 � � J � � The contractor or a competent and reliable superintendent shall oversee the work at all times. The superintendent shall represent the contractor in his absence and all directions given to him shall be binding as if given to the contractor. SECTION 01410 - TESTING All tests made by the testing laboratory selected by the City will be paid for by the City. In the event manufacturing certificates are requested, they shall be paid for by the Contractor. SECTION QP500 - TEl1'IPORARY FACILITIES AND CONTROLS The contractor shall take all precautions necessary to protect all existing trees, shrubbery, sidewalks, buildings, vehicles, utilities, etc., in the area where the work is being done. The contractor shall rebuild, restore, and make good at his own expense all injury and damage to same which may result from work being carried out under this contract. The utility lines and conduits shown on the plans are for information only and are not guaranteed by the Owner to be accurate as to location and depth; they are shown on the plans as the best information available from the owners of the utilities involved and from evidences found on the ground. The contractor shall determine the exact location of all existing utilities and conduct his �vork to prevent interruption of service or damages. SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES A waming sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet, shall be placed inside and outside vehicles such as cranes, derricks, power shovel, drilling rigs, pile drivers, hoisting equipment or similar machinery. The warning sign shall read as follows: "WARNI?�TG - UNLAWFUL TO OPERATE THIS EQUIPMEI�TT . WITHIN SIX FEET OF HIGH VOLTAGE LINES." � Equipment that may be operated within six feet of high voltage lines shall have an insulating cage-type guard about the boom or arm, except backhoes or dippers, and insulator links on the lift hood connections. J J �J When necessary to work within six feet of high voltage electric ]ines, the Contractor shall notify power company (TUElectric) to erect temporary mechanical barriers, de-energize the line, or 5/7/99 GENERAL REQt;IREMENTS -6- � � � CJ l�J I �J J u u L�J l�►J � � � � I� � I� raise or lower the line. The contractor shall maintain a log of all such correspondence. The Contractor is responsible for all costs incurred. SECTION 01640 - SUBSTITUTIONS AND PRODUCT OPTIONS 1.01 GENERAL Mike Ficke, Landscape Architect (81�871-5746 Parks and Communih• Services Department 4200 S. Freeway Suite 2200 Fort Worth, Texas 76115-1499 1.02 PRODUCTS LIST Send submittals for substitutions to: A. Within ten (10} days after date of Contract, submit to Landscape Architect two (2) copies of complete list of all products which are proposed for installation. : C. Tabulate list by each specification section. For products specified under reference standards, include with listing of each product: 1. Name and address of manufacturer 2. Trade name 3. Model or catalog designation 4. Manufacturer's data a. Performance and test data b. Reference standards � 1.03 CONTRACTOR'S OPTIONS A. : C. For products specified only by reference standards, select any product meeting standards, by any manufacturer. For products specified by naming several products or manufacturers, select any product and manufacturer named. For products specified by naming one or more products, Contractor must submit request, as required for substitution, for any product not specifically named. GENERAL REQUIREMENTS U 7 5 i:�9 �1 l!1 � C 1.04 SUBSTITUTIONS A. During bidding, Landscape Architect will consider written requests from prime bidders for substitutions, received at least ten (10) days prior to bid date; reque�ts received after that time will not be considered. B. Within thirty (30) days after date of Contract, Landscape Architect v�•ill consider O� formal requests from Contractor for substitution of products in place of those specified. �� � � C� � ,�� '�J � I�l C. Submit two (2) copies of request for substitution. Include in request: 1. Complete data substantiating compliance of proposed substitution with Contract Documents. 2. For products: a. Product identification, including manufacturer's name and address. b. Manufacturer's literature: (1) Product description (2) Performance and test data (3) Reference standards , c. Samples, if required. d. Name and address of similar projects on which product was used, and date I�� E. of installation. In making request for substitution, Bidder/Contractor represents: 1. He has personally investigated proposed product or method, and determined that it is equal or superior in all respects to that specified. 2. He will provide the same guarantee (or better) for substituted product or method specified. � - 3. He will coordinate installation of accepted substitution into «�ork. making such changes as may be required for work to be complete in all respects. 4. He waives all claims for additional costs related to substitution �-hich consequently become apparent. Substitutions will not be considered if: l. They are indicated or implied on shop dra�vings or project data submittals D without formal request submitted in accord with Paragraph 1.04. 2. Acceptance will require substantial revision of Contract Documents. u I�I 1�1 � SECTION 01700 - PROJECT CLOSEOUT 1.01 CLEANING The Contractor shall make final clean-up of the construction area, to the satisfaction of the Parks and Community Services Department, as soon as construction in that area is 5/7/99 GENERAL REQUIRE;vIENTS -8- � L� I�d L�J L�J ��1 � ii�� �� ;� ,� �el �` � fl �� � �' � complet�d. Clean-up shall include remo��al of all construction materials, pieces of concrete. equipment and/or other rubbish. No more than five (5) days shall elapse after the completion of construction before the area is cleaned. Surplus materials shall be dispose� of by the Contractor, at this own expense, and as directed by the Parks and Comm�,:nity Services Department. Cleanin� of equipment by Contractor or Subcontractor, such equipment as cement mixers, ready-mix trucks, tools, etc., shall take place in an area designated by the Parks and Community Services Department. 1.02 GUAR�VTEE The Contractor shall be responsible for defects in this project due to faulty workmanship or materials, or both, for a period of one (1) year from the date of final acceptance of this project by the Parks and Community Services Department. The Contractor will be required to replace, at his own expense, any part, or all, of this project which becomes defecti��e due to these causes. SECTIOn 01800 - CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAiMS The Contractor covenants and agrees indemnify City's engineer and architect, and their personnel at the project site for the contractor's sole negligence. In addition, Contractor covenants and a�ees to indemnify, hold harmless and defend, at its. own expense, the Owner, its officers, agents, servants and employees, from and against any and all claims or suits for property loss or damage and/or personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not caused, in whole or in part, bv the ae�ligence or alleged neEli�ence of Owner. its officers, servants or emnlovees. Contractor like��-ise cot�enants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to the Owner's officers, servants and employees and any damage, loss or destrucrion to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not anv such iniury or dama�e is caused in whole or in aart bv the neg,li�ence or alle�ed negli�ence of Owner, its officers, servants or emalovees. In the event the Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to O��ner satisfactory evidence that the claim has been settled and/or a release from the claimant invol�-ed, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems appropriate, refuse to accept bids on any other City of Fort worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. END OF DIVISION 5/7/99 GENERAL REQUIREMENTS -9- 1.� � � � � � � � � � U � � A. Unclassified fill shall consist of all fill within the limits of the work. All suitable native materials removed in unclassified excavation, or similar imported materials, shall be used insofar as practicable as unclassified fill. Properly deposited, conditioned, and compacted fill is hereinafter referred to as "earth embankment." B. Rock: Minor quantities of rock not greater than four inches in greatest dimension are permissible in fill materials used to construct earth embankment. Minor quantities of rock of greater dimensions may be placed in the deeper fills in accordance with the State Department of Highways and Public Transportation requirements for construction of rock embankments, provided such placement of rock is not immediately adjacent to structures or piers. Also, rock may be placed in the portions of embankments outside the limits of the completed graded width where the size of the rock prohibits their incorporation in the normal embankment layers. 2.3 TOPSOIL �� On-Site Topsoil: Topsoil shall consist of an average depth of six inches of native surface soil left in place after the ground cover of herbaceous vegetation and other objectionable matter has been cleared by "blading," as specified in Section 02100, "Site Preparation." Topsoil may � be greater or less, than the upper six inches in depth. � 2.4 L� � SECTION 02200 EARTHWORK PART 1 -GENERAL 1.1 SCOPE: Work in this section includes furnishing all labor, materials, equipment, and services required to construct, shape, and finish earthwork to the required lines, grades, and cross sections as specified herein and on the plans. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Grading Plan: Refer to plan sheets. 1.3 METHOD OF PAYMENT: Earthwork is a necessary and incidental part of the work. The total cost will be included in the Bid Proposal. Payment will not be made on a unit price basis. PART 2 - PRODUCTS 2.1 UNCLASSIFIED EXCAVATION: Unclassified excavation shall consist of all excavation, unless separately designated, within the limits of the work. Unclassified excavation includes all material encountered regardless of its nature or the manner in which it is to be excavated. 2.2 UNCLASSIFIED FILL IMPORTED FILL A. Imported fill materials shall be used for the construction of earth embankment in the event that (1) the volume of unclassified excavation is less than the volume of fill required for earth embankment and/or (2) the condition of materials removed in unclassified excavation makes them unsuitable for use in the construction of earth embankment. � 5/7/99 02200 - 1 C&B 971163 � � � � � 2.5 � � � � L� 2.6 � � � � � � � � 5/7199 B. The Contractor shall haul and place imported fill obtained from off-site sources as necessary to construct the embankment and various other details of the construction plans. All costs related to such imported fill will be included in the contract price, and no additional or separate payment for imported fill will be due the Contractor. C. A sample of the proposed imported fill must be provided by the Contractor and be approved by the Owner. In general, imported material must be equal to or better than native material in quality and engineering characteristics. The ArchitecU Engineer may also require the Contractor to provided a material analysis test of the proposed fill. SELECT MATERIALS Select materials shall be imported from offsite sources, unless they are available from specifically designated areas on the site as marked on the plans. A. Cushion Sand: Clean fine sand, free from clay clumps, rocks, or other deleterious material. � Playground Sand: Sand backfill for sand dig areas shall be fine white sand graded with the following sieve analysis limits: ' C Size Percent No. 16 No. 30 No. 50 No. 100 No. 200 UNSUITABLE MATERIALS Percent Passing 100 98 62 17 0 -1 A. Topsoil, select material, imported fill, or unclassified fill will be declared as "'unsuitable" by the Owner if, in his opinion, any of the following conditions or matter and particles are present to a degree that is judged detrimental to the proposed use of the material. 1. Moisture 2. Decayed or undecayed vegetation _ 3. Hardpan clay, heavy clay, or clay balls 4. Rubbish 5. Construction rubble 6. Sand or gravel 7. Rocks, cobbles, or boulders 8. Cementious matter 9. Foreign matter of any kind B. Unsuitable materials will be disposed of as "waste" as specified in Section 02100. C. Wet Material: If fifl material is unsatisfactory for use as embankment solely because of high moisture content, the Architect/Engineer may grant the Contractor permission to process the material to reduce the moisture content to a usable optimum condition. 02200 - 2 C&B 971163 '!1 � PART 3 - EXECUTiON 3.1 SlTE PREPARATION: In general, "site preparation," as specified in Section 02100, shail be � performed in advance of grading and earthwork operations and shall be completed over the entire area of earthwork operations. (� 3.2 TOPSOIL u � � � a � � � � t! � � � � 3.3 !! � 5/7/99 A. The removal and storage of topsoil sha(I occur after site preparation is complete and before excavation and embankment construction begin. Likewise, topsoil will be replaced after excavation and embankment construction are complete. B. Removal: Topsoil shall be stripped to an average depth of six inches from areas where excavation and embankment construction are planned. Topsoil may be obtained from greater depths if it is uncontaminated by the substratum and it is of good quality, in the opinion of the Architect/Engineer. C. Storage: Topsoil shall be stored in stockpiles conveniently located to areas that witl later receive the topsoil. Stockpiles shall be out of the way of earthwork operations in locations approved by the Owner or Architect/Engineer. Stored topsoil shall be kept separate from other excavated materia(s and shall be protected from contamination by objectionable materials ihat wouid render it unsuitable. D. Timing: Topsoil will not be replaced (deposited) until construction activities are complete that would create undesirable conditions in the topsoil, such as . overcompaction or contamination. Trenching for items such as electrical conduit and irrigation pressure lines must be complete before topsoil replacement may begin. E. Replacement: Topsoil will be deposited in a single layer or lift. It will be placed, processed, compacted, and graded to leave a finished layer of topsoil not less than five inches in depth. Unless otherwise indicated, topsoil will be replaced over all areas of earthwork (including slopes), except where pavement is planned. F. Grading: Topsoil will be final graded to the elevations shown on the p(ans. Fine grading wi(I be accomp(ished with a weighted spike harrow, weighted drag, tractor box blade, light maintainer, or other acceptable machinery. All particles of the finish grade shall be reduced to less than one inch in diameter or they shall be removed. All rocks of one inch or greater shall also be removed. Grading operations and equipment will be such that topsoil does not become overcompacted. Bulldozer blades and front-end loader buckets are not acceptable devices for topsoil grading operations. Final grading within five feet of constructed or instatled elements shall be hand raked. G. Acceptability: Finished areas of topsoil are satisfactory if they are true to grade, true in plane, even in gradient (slope), uniform in surface texture, and of normal compaction. Areas of loose granular pockets or of overcompacted soils are not acceptable and will be reworked. Finished areas will promote surface drainage and will be ready for turfgrass planting. UNCLASSIFIED EXCAVATION A. All excavated areas shall be maintained in a condition to assure proper drainage at all times, and ditches and sumps shall be constructed and maintained to avoid damage to the areas under construction. 02200 - 3 C&B 971163 LF � l.i � � � n 3.4 �� � � � 3.5 � � � a � � L� � � 5/7/99 B. Surplus Material: 1. Surplus excavation is that quantity of material that may be left over after the grading plan is executed, and all earthwork operations, including excavation, embankment construction, topsoil replacement, and final grading, are completed. Any other surplus material shall be disposed of as "waste" as specified in Section 02100. 2. At this Park, the ArchitecUEngineer shall permit the Contractor to "waste" the surplus by constructing additional embankment in an approved location. No additional payment for such work would be due that Contractor. C. Excavation in Rock: The use of explosives will not be permitted. Unless otherwise indicated on the plans, excavation in solid rock shall extend six inches below required subgrade elevation for the entire width of the area under construction and shall be backfilled with suitable materials as indicated on the plans. EXCAVATION OF STRUCTURES A. At slab-on-grade the existing subgrade to be proofrolled with a pneumatic tired roller or loaded dump truck weighing approximately 10 tons to check fior pockets of soft or loose material. The Owner's Representative to be present during proofrolling operations. All loose or unacceptable material to be replaced with suitable backfill materials. Excavation for shelter footings to be inspected prior to concrete placement for suitable bearing stratum by Owner's Representative. After proofrolling, the existing subgrade to be scarified to a depth of 6 inches and recompacted to 95 percent of the maximum dry density per ASTM D 698 at 0 to 4 percent above optimum moisture content. EARTH EMBANKMENT A. Earth embankment is defined as embankment composed of suitable materials removed in unclassified excavation and/or imported fill. The construction of embankment includes preparing the area on which fill is to be placed and the depositing, conditioning, and compaction of fill material. B. General: Except as otherwise required.by the plans, all embankment shall be constructed in layers approximately parallel to the finished grade of the graded area, and each layer shall be so constructed as to provide a uniform slope as shown on the grading plan. Embankments shall be constructed to correspond to the general shape of the typical sections shown on the plans, and each section of the embankment shall correspond to the detailed section or slopes established by the drawings. After completion of the graded area, embankment shall be continuously maintained to its finished section and grade until the project is accepted. C. Preparation: Prior to placing any embankment, all preparatory operations will have been completed on the excavation sources and areas over which the embankment is to be placed. The subgrade shall be proof rolled to detect soft spots, which if exist, should be reworked. Proof rolling shall be performed using a heavy pneumatc tired roller, loaded dump truck, or similar piece of equipment weighing approximately 25 tons except as otherwise specified for tree protection and areas inaccessible to vehicular compactors. Stump holes or other small excavations in the limits of the embankments shall be backfilled with suitable material and thoroughly tamped by approved methods before commencing embankment construction. The surface of the ground, including plowed, loosened ground, or surfaces roughened by small washes or 02200 - 4 C&B 971163 � � � � � �� � � � � �i �1 � otherwise, shall be restored to approximately its original slope by blading or other methods, and, where indicated on the pians or required by the Owner, the ground surface, thus prepared, shall be compacted by sprinkling and rolling. D. Scarification: The surface of a!I areas and siopes over which fill is to be placed, other than rock, shall be scarified to a depth of approximately six inches to provide a bond between the existing surface and the proposed embankment. Scarification shall be accomplished by plowing, discing, or other approved means. Prior to fill placement, the loosened material shall be adjusted to the proper moisture content and recompacted to the density specified he�ein for fill. E. Benching: Scarification is normally adequate for sloping surfaces. However, in certain cases where filf is to be placed against hilfsides or existing embankment with slopes greater than 4:1, the Owner may direct the Contractor to key the fill material to the existing slopes by benching. A minimum of two feet normal to the slope shaN be removed and recompacted to insure that the new work is constructed on a firm foundation free of loose or disturbed material. F. Depositing: FiU material shall be placed in horizontal layers or lifts, evenly spread, not to exceed eight inches in loose depth before conditioning and compaction. Unless otherwise permitted, each layer of fill material shall cover the length and width of the area to be filled and shall be conditioned and compacted before the next higher layer of fill is placed. Adequate drainage shall be maintained at all times. G. Watering: At the time of compaction, the moisture content of fifl material shatl be such that the specified compaction will be obtained, and the fi(I will be firm, hard, and unyielding. Fill material which contains excessive moisture shall not be compacted until it is dry enough to obtain the specified compaction. H. Compacting: Each layer of earth fil! shall be compacted by approved tamping or sheepsfoot rollers, pneumatic tire rollers, or other mechanical means acceptable to the Owner. Hand-directed compaction equipment shall be used in areas inaccessible to vehicular compactors. I. Grading: Embankments shall be constructed in proper sequence and at proper � densities for their respective functions. All embankment serves in one capacity or another as subgrade (e.g., under topsoil, under concrete and asphalt pavement, under structures, etc.). Accordingly, the upper layer of embankment sha(( be graded to within plus or minus 0.10 foot of proper subgrade elevation prior to depositing topsoii, and � prior to the construction of pavements, slabs, etc. D 3.6 � � � f � 5niss U DENSfTY CONTROL A. Earth Embankment in General: Earth embankment shall be compacted in lifts at a minimum of 90 percent of Standard Densiry ASTM D698 with plus 4 percent or minus 0 percentage points of optimum moisture content. B. Earth Embankment Under Structures and Pavement: The top 6 inches of natural earth comprising the subgrade for structural slabs or for areas of pavement shall be 95 percent to 98 percent of Standard Density ASTM D698 with the moisture content at 0 percent to plus 4 percent of optimum. 02200 - 5 C&B 971163 � � 3.7 MOISTURE MAINTENANCE: The specified moisture content shail be maintained in all embankments that are to function as subgrade for structures, areas of pavement, or for se!ect embankment. After completion of the embankment, the Contractor shall prevent excessive loss of moisture in the embankment by sprinkling as required. Loss of moisture in excess of 2 apercent below optimum in the top 12 inches of the fill will require that the top 12 inches of the embankment be scarified, wetted, and recompacted prior to placement of the structure, select fill or pavement. If desired, the Contractor may place an asphalt membrane of emulsified or � cutback asphalt over the completed embankment and thus eliminate the sprinkling requirement. j^j� 3.8 TOPSOIL REPLACEMENT: Topsoil shall be carefully placed to avoid any displacement or �� damage to the subgrade. If any of the subgrade is rutted, damaged or disp(aced it shall be restored prior to placing topsoil. Topsoil shall be replaced as specified herein per Item 3.02. � � � � i� �� � �� � ,� ,I � � .*f � END OF SECTION � 5/7,99 02200 - 6 C&B 971163 U D LJ � � U a � � ,� I� � �� � �� l� ,� � � SECTION 02221 TRENCHING, BACKFILLING AND COMPACTING PART 1 - GENERAL 1.1 DESCRIPTION A. Scope of Work 1. Subdrainage system for the playground area. B. Related Work Specified Elsewhere 1.2 1. Division 1, General Requirements 2. Section 02200, Earthwork PROTECTION - A. Protection of Existing Utilities 1. Existing utility lines to be retained that are shown on drawings or locations of which are made known to Contractor prior to excavation, as well as all utility lines uncovered during excavation operations, shall be protected from damage during excavation and backfilling. 2. If damaged, repair at Contractor's expense. PART 2 - PRODUCTS 2.1 MATERIALS A. Normal Backfill: Earth, loam, sandy clay, sand and gravel, soft shale, or other approved materials free from large clods of earth or stones over two and one- half (2-1/2") inches maximum dimension. B. Compacted Backfill: Granular in nature not containing roots, sod, rubbish, or stones over two and one-half (2-1/2") inches maximum dimension as approved by Owner's Representative. Plasticity Index (PI) should be greater than five (5) but less than thirty (30). PART 3 - EXECUTION 3.1 INSPECTION A. The Contractor shall stake out the location of proposed trenching and be verified by the Landscape Architect. The system shall be approved by the Parks and Community Services Department before actual installation is started. The Contractor will be responsible for removing and/or replacing turf. 5!7/99 02221 - 1 C&B 971163 � � 3.2 EXCAVATION AND TRENCHING l�J � ��� � ' � � � � f�' '�! � l�f l� A. Trench Excavation � 1 2. 3. 4 �. [� Excavate trench width necessary to properly lay pipe with banks as nearly vertical as practical. Accurately grade trench bottom to provide uniform bearing and support for each section of pipe on undisturbed soil at every point along entire length. Except where rock is encountered, do not excavate below indicated depths. Where rock excavation is required, excavate to a minimum overdepth of six (6") inches below trench depths. Backfill rock excavation overdepths and unauthorized overdepths with loose, granular, moist earth and thoroughly tamp. Remove wet or otherwise unstable soil that is incapable of supporting - pipe, as determined by Owner's Representative, to depth required and backfill trench bottom to grade with coarse sand, fine gravel, or other material as approved. 7. Shape bottom of pipe trenches to give substantial uniform circumferential support to lower third of pipe. Depth of Cover: Excavate trenches for utilities to a depth that will provide the following minimum depths of cover from existing grade or from indicated finish grade, whichever is lower: 1. Minimum depth as shown on drawings, or fourteen (14") inches minimum for water lines. 3.3 BACKFILLING A. Do not perform backfilling of trenches until all required pressure and other tests have been performed and utility system is approved. B. Normal Backfill: 1. Where compacted backfill is not specified, carefully backfill with excavated materials approved for backfillings. 2. Uniformly distribute backfill material to required grades; feather back to where grades remain unchanged. 3. Compact in manner conducive to the growth and maintenance of good turf. � 5/7/99 02221 - 2 C8�6 971163 � � � � � � � L.S Q � � � � � � � � � � 3.4 5/7/99 4. Setting of backfill with water will be permitted. 5. Degree of finish shall be that ordinarily obtainable with blade or scraper operations. Remove rubbish, vegetation, and rocks over one and one- half (1-112") inches in diameter. Leave areas smooth and suitable for establishment of lawns and plantings. Correct irregularities and areas where water will stand. - 6. Where trenching is done; leave backfill mounded over trenches in a uniform and neat condition. CLEAN AND ADJUST A. Settlement: 1. Reopen any trenches improperly backfilled or where settlement occurs to depth required for compaction. • 2. Refil! and compact with surface restored to required grade. 3. Leave in a completed surface condition as specified. END OF SECTION 02221 - 3 C&B 971163 � � aPART 1 - GENERAL � 1.1 DESCRIPTION � � l�! � � � � C � � t�' �' L� �I SECTION 02272 GABIONS A. Gabion structures, including wire baskets, stone, permeable barrier fabric and miscellaneous-related requirements. B. Definition: Gabion structures consist of sized crushed stone or rock in heavy wire mesh baskets, square or rectangular in shape which are used as erosion . control structures such as flexible aprons, channel linings, and slope protection. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 02220 - Earthwork. B. Section 02221 - Trenching, Backfilling, and Compacting. 1.3 QUALITY ASSURANCE � � C� Source Quality Control: Wire basket and permeable barrier fabric manufacture�'s brochures with technical and testing data. The Gabion Contractor shall have a minimum of 5 years of continuous experience in the construction of gabion structures. The Gabion Contractor shall submit qualifications to the City for approval prior to construction. 1.4 LOCATION OF AND DAMAGE TO EXISTING UTILITIES A. Locate underground obstacles and exercise caution to prevent damage to existing facilities during the progress of the construction work. Where possible, locate underground facilities in advance of the actual work. B. The City will render all assistance possible to the Contractor in the matter of determining the location of existing utilities by making available such maps, records and other information as may be accessible to him, when requested to do so, but the accuracy of such information will not be guaranteed. C. Cease operations and notify the City if any pipe, underground facility or structure, the location of which was not been furnished by the City, is encountered. Do not resume operations until the City has determined the best method to remove, bypass or coordinate with such obstructions. � sniss o2272 -� cs�6 s7> > ss ,� � � 1.5 EXISTING SITE CONDITIONS � � � 1.6 � J ,� J I� � .I i'� J � � � J -] � �) `i � A. Before ordering any materials or beginning work, verify aii measurements of existing and new work. Any differences found shall be submitted to the City for consideration before proceeding with work. B. The Contractor shall be responsible for coordinating his work with the other trades so that all phases of work may be properly coordinated without delays or damage to any parts of the work. PROTECTION A. Send proper notices, make all necessary arrangements and perform all other services required for the care, protection and maintenance of all public utilities, utility poles, buried cables, and all other items of this character on or about the site, assuming all responsibility and paying all cost for which the City may be liable. B. Construct and maintain all necessary temporary drainage and do all pumping necessary to keep excavations free of water. 1.7 SUBMITTALS A. Provide copies of complete brochures describing materials, including names of manufacturers, catalog number, trade names, instructions for placement, testing data and any other information required by the City in accordance with Section 01340 - Shop Drawings, Product Data and Samples. B. Samples of stone shall be submitted for gradation and appearance. C. Laboratory test reports for results of abrasion tests and specific gravity of stone. D. All wire used, including tie and connecting wire, shall be certified by Mill Test Reports showing compliance with specification requirements. Q5/7/99 �22�2 " 2 C&B 971163 � � PART 2 - PRODUCTS � 2.1 � � � � 2.2 U � � U �J � Q � D l�J GENERAL The construction of gabion structures shall be in accordance with the specifications and in close conformity with the lines and grades shown on the construction drawings. Gabion Baskets are to be of single unit construction; the base, end and sides are to be either woven into a single unit or one edge of these members connected to the base section of the unit in such a manner that strength and flexibility at the point of connection is at least equal to that of the mesh. Where the length of the Gabion Basket exceeds the horizontal width, the Gabion Basket is to be equally divided by diaphragms, of the same mesh gauge as the body of the gabion, into cells whose length does not exceed the horizontal width. The Gabion Basket shall be furnished with the necessary diaphragms, secured in proper position on the base section in such a manner that no addition tying at this junction will be necessary. GALVANIZED BASKETS A. Gabion Basket Mesh: 2. Wire used in the body of the mesh gabion baskets shall be equal to or exceed Federal Specification QQ-W-461 a,1'IVire, Steel, Carbon, (round, bars, and coated), including the following specific requirement: finish 5, Class 3 weight of zinc coating. Mesh wire for Gabion Baskets (cage thickness 12 inches and greater) shall be not less than 0.118" diameter or approximately U.S. 11 gauge. 3. The selvedge on each sheet of inesh shall be galvanized steel wire (as per specification above), not less than 0.150" diameter or approximately U.S. 9 gauge. All perimeter edges of the-mesh forming the Gabion Baskets shall securely selvedged, so that the joints formed by tying the selvedged wires together have at least the same strength as the body of the mesh. When tested, the first wire to break shall occur in the mesh rather than at the selvedge joint. 4. Mesh opening shall not exceed 4 1/2 inches in the longest dimension. Wire mesh shall be fabricated in such a manner as to be nonraveling. 5. The wire mesh shall have elasticity sufficient to permit elongation of the � mesh equivalent to a minimum of 10% of the length of the section of mesh under test without reducing the gauge or tensile strength of individual wire strands to values less than those for similar wire one gauge smaller in diameter. 6. All Gabion Basket dimensions are subject to a tolerance limit of plus 5%, except the length of the Gabion which is subject to a tolerance of plus 3%. Gabion Baskets furnished by a manufacture shall be of uniform size. � 5/7/99 02272 - 3 C&B 971163 � U Q � d' 2.3 D � U (� 2.4 �„1 B. Tie and Connecting Wire: Tie and connecting wire shall be supplied for securely fastening all edges of the Gabion Baskets and Diaphragms. Tie wire shall meet the same specification for the wire mesh used in all Gabion Baskets except that the tie wire for Gabion Baskets shall be not less than 0.0860" diameter or approximately U.S. 13 1/2 gauge. GABION STONE Crushed stone or rock {Gabion Stone) shall have a specific gravity of at least 2.25 and shall have a percent of wear not more than 30 when testing by the Los Angeles Abrasion Test, ASTM C131 and shall also be resistant to the action of air and water, freeze and thaw. Native white rock limestone, flaking and/or fragmental rock or strong or broken concrete will not be permitted. Gabion Stone shall be a nominal 4-inch to 8- inch size with not more than 5 percent retained on an 8-inch screen and not more than 15% passing and 4" screen. Facing stone shall be hand selected large stone and shall be selected for best appearance. PERMEABLE-BARRIER FABRIC High strength permeable-barrier fabric for use as a filter medium, shall be placed along ('1 the earth side of the Gabion Structures. The permeable-barrier fabric to be used shall �,� be TREVIRA S 1115 as manufactured by Hoechst Industries, Spartenburg, S.C., or approved equal. � PART 3 - EXECUTION � 3.1 PERMEABLE BARRIER FABRIC � The permeable-barrier fabric shall be place with a minimum overlap of 12". Fabric shall be secured as necessary by pihs or other suitable means before placing gabion baskets. a 3.2 D � LJ � � sniss WIRE BASKETS After excavation to grade has been performed and the high strength permeable-barrier fabric has been placed, the gabion baskets shall be placed to conform to the details and lines and grades shown on the drawing. Gabion baskets are assembled by unfolding the basket on a hard flat surface and stamping out all kinks. Fold up front, back and end panels, and fasten together with the projecting heavy gauge wire, hold the diaphragms up and secure in the same manner. All edges and diaphragms are now laced together in the following manner: cut a length of lacing wire approximately 5 feet long, secure the wire at one end by looping a twisting together, then proceed lacing with a double loop approximately every 4-inches to 5-inches apart pulling the basket pieces tightly together. Gabion 3 feet high that are to be placed in a straight row are to be stretched in the following manner before being tied to the adjacent gabions. Tie together approximately 100 feet of gabion baskets end to end. Secure on end of the row by tying to gabions 02272 - 4 C&B 971163 t�1 � L�' � already filled or fill the end gabion with stone and then stretch baskets sufficientiy to remove kinks. While maintaining tension, tie the row of baskets to its neighbor and then fill with stone. All gabion baskets shall be tied together each to its neighbor along all contacting edges in order to form a continuous connecting structural unit. Tying shall be in the same manner as that used to assemble baskets. � 3.3 GABION STONE � When the assembled gabion baskets have been installed, the gabion stone shall be placed in close contact in tfie basket cell so that maximum fill shall be obtained. The gabion baskets may be filled by machine with sufficient additional hand work to � accomplish a maximum density and a minimum amount of voids. Vertical outside surfaces shall be placed by hand with select stone in order to achieve the best appearance. Baskets are to be filled in 12 inch layers in order to install a looped inner � tie wire in each height. Individual cells may not be filled more than one foot above any adjacent cell. 3.4 D a Q 3.5 � a - 3.6 � � i! � � a CLOSING BASKETS When each gabion basket has been filled to its maximum, the lids shall be closed and tied to the edges and tops of diaphragms in the same manner as the baskets are assembled so that the finished joint is as strong as the body of the mesh. The lids of the gabion baskets shall also be tied together, each to its neighbor along all contacting edges to insure the formation of a continuous`connecting structural unit. FITTING BASKETS Gabion baskets may be cut to form curves or bevels. Re-tying of the basket shall be in the same manner as the assembly resulting in a connection that is as.strong as before it was cut. CLEANUP A. The Contractor shall make final cleanup of all parts of the work before final acceptance. This cleanup shall include removal of all construction materials and equipment, and in general repairing the site to a neat and attractive appearance. B. The Contractnr shall stockpile or dispose of, as directed by the City, any rock or extra dirt that resulted from the work of this section and he shall restore the site to is original condition or better, subject to the approval of the City. END OF SECTION l.l smss o2272 - s c&e s� � � ss a � � PART 1 - GEN ERAL D1.1 SCOPE � � 1.2 � U � L�J SECTION 02537 WOOD FIBER PLAYGROUND SURFACING Surfacing tasks for shredded wood fiber surfacing with gravel and subdrain include all labor, materials and equipment rrecessary for, and pertinent to, thework to be done. Work will be accomplished in a thorough and workmanlike manner. The specified products will be applied strictly in accordance with the manufacturer's recommendations. DESCRIPTION OF SYSTEM A. Shredded Wood Fiber Surfacing System with Gravel and Subdrain: Shall be Fibar System 200, Woodcarpet system with Terrbond and gavel layer, or approved equal. � B. Fibar Systems, FibarMat, and FibarGard are available from Modlin Recreation Equipment, Inc., P. O. Box 50048, Denton, Texas 76026-0048, 1-800-433-5347 (local Exclusive Representative) or Robert Godfrey, Ltd., 141 Halstead Avenue, Mamaronecic, NY 10543-2650. Call 800-Fibar-21, or 914-835-151. Fax 914- 835-6975. C. Woodcarpet Systems, Woodcarpet Mat, and TerraFlow System are available from Hunter Knepshield, P.O. Box 260677, Plano, Texas 75026-0677, 1-800- 451-4138 (local representative) or Zeager Hardwood Co., 340 Butt Road, Franklin, Kentucky, 42134, 1-502-586-4491. . � PART 2 - PRODUCTS � 2.1 LJ � � � D MATERIALS A. WOOD FIBRE SURFACING. 1. Surfacing shall be a mix of random-sized hardwood fibres. Standard wood chips or bark mulch will not be acceptable. 2. To allow for compaction, the following formulas must be used to determine the correct number of cubic yards: 9" deep: Sq. ft. of playground x 0.0375. 3. Bidder will guarantee sieve analysis of wood fibre as follows: Greater than 85 percent passing 3/8" sieve. Less than 50 percent passing #60 sieve. 4. Wood fibre shall have no recycled wood from pallets or waste wood and no finrigs, bark, leaf debris or other organic material incorporated within. a5/7/99 02537 - 1 C8�8 971163 � L■J L DRAINAGE FABRIC � � � L■J C. 1. Product used shail be FibarFelt, DuraLiner, or approved equal polyester nonwoven engineering geotextile fabric. 2. Bidder will provide enough material to allow for 12" overlap on ail seams. WEAR MATS Product used shall be FibarMat, WoodCarpet Mat, or approved equal rubber matting, meeting ASTM F1292-91 playground surfacing standard for a drop height not to exceed 3.5 feet. Must be installed under all swings and slides to preserve warranty. Method of anchorage must be approved by Owner. � PART 3 - SPECIAL REQUIREMENTS 3.1 QUALITY CONTROL � � The Bidder will provide the engineered wood fiber system to be constructed exactly according to manufacturer's installation instructions. A. The Bidder will provide the owner or its designated contractor with all necessary licenses prior to start of construction in accordance with U.S. Patents. B. Supplier must provide test results for impact attenuation in accordance with ('1 ASTM F1292-93; Standard Specification for Impact Attenuation of Surface (.j Systems Under and Around Playground Equipment. Results must be provided for new material and for 5-year old material. . L�J � � � �� � � C. Testing must show "g" rating of not more than 155g for the 8" thick system, or 120g for the 12" system of 12' fall heights, and HIC valves of less than 1,000 for both new and 8-year-old material. D. Product must be wheelchair accessible and meet the requirements of the 1990 Americans with Disabilities Act (ADA) in accordance with ASTM PS83-97. E. The Bidder will provide copies of flammability testing procedures and results using (i) Section 1500.44 of the Federal Hazardous Substance Act, Title 16, Chapter II, Subchapter C, for rigid and pliable solids, and (ii) 16 CFR Part 1630 Standard for the Surface Flammability of Carpets and Rugs (FF 1-70), Modified Procedure. Testing should be performed by an independent laboratory. F. The Bidder will provide copies of testing procedures and results of (i) new shredded wood fibre, anci (ii) shredded wood fibre not less than five years old taken from an existing site, performed by an independent testing source using the ASTM F1292-91 playground safety surfacing standard.� G. The Bidder will provide at least three references of handicapped-accessible playgrounds that have been installed with said surface. � 5/7/99 02537 - 2 C&B 971163 � � �J � !1 ' J !� �� � � � � �7 � � �7 � 3.2 WARRANTY All materials and labor under this Section shail be installed by a contractor authorized by the manufacturer. Safety surface shall be warranted for labor and materials for a period of no less than two years. Written warranty must be submitted by the manufacturer and the authorized installer. PART 4 - EXECUTION A. PREPARATION Installer shall thoroughly examine the site and specifications, carefully checking the dimensions before starting work. 6. SUBGRADE 1. The subgrade shall be graded a minimum of 1 percent. It is not recommended that the surFacing system be installed on a grade greater than 10 percent. All roots, stones, and vegetation shall be removed. 2. The first 6" of subgrade shall be compacted to at least 95 percent of the dry density, as determined by the provision5 of AASHTO or T205, as modified in 203.24. C. APPLICATION 1. SHREDDED WOOD FIBER SURFACING SYSTEM WITH GRAVEL AND SUBGRAIN: Install per plans and specifications and in accordance with cross-sectional drawings and detailed installation instructions available from approved manufacturers. a. Drainage Fabric - 1) Subgrade shall be covered with drainage fabric as specified, overlapping all seams at least 12". 2) !n areas where equipment exists, it is necessary to cut the fabric to fit. Once fitted, any cuts should be overlapped wherever possible. b. Aggregate Drainage Material 1) Cover bottom layer of drainage fabric with washed stone to a uniform depth of 3-4 inches. 2) Place an additional layer of drainage fabric over and in contact with the aggregate drainage material. c. Wear Mat 1) A wear mat must be installed under every swing and slide, to preserve warranty. a5/7l99 02537 - 3 C86 971163 � D U � � D U D D � 0 � �l a a a D � � 5/7/99 � 2) Install the wear mat over surfacing and anchored to the subsoil in an approved method. Shredded Wood Fiber 1) The shredded wood fiber surface shall be spread to a uniform depth. All material supplied by the manufacturer must be installed to allow for settling and natural compaction. Machinery shall not disturb or travel on the drainage fabric. � 2) Contractor shall be responsible for applying additional material as required to maintain design grades and anticipated settling for a period of sixty (60) days following project acceptance. END OF SECTION 02537 - 4 C&B 971163 C � L�J I�l LJ � L�7 C�, , !�J � A. Codes and Standards: All equipment and materials shall meet the standards and requirements of the latest editions of the U. S. Consumer Product Safety Commission's (CPSC) Handbook for Public Playground Safety and of ASTM Designation F1487: Standard Consumer Safety Performance Specification for Playground Equipment for Public Use. B. Submittals: D 1. Submittals Prior to Construction - Submit manufacturers' documentation of product compliance with CPSC and ASTM F1487 Standards including: � a. All paints and other similar finishes must meet the current CPSC regulation for lead in paint (0.06 percent�maximum lead by dry weight). - � b. Regardless of the material or the treatment process, the manufacturer shall ensure that the users of the playground (� equipment cannot ingest, inhale, or absorb any potentially L! hazardous amounts of substances through body surFaces as a result of contact with the equipment. u � L�J � 5/7/99 1.1 DESCRIPTION SECTION 02860 PLAYGROUND EQUIPMENT PART 1 - GENERAL A. This section shall include all materials, labor, tools, equipment, transportation and supervision required for the installation of new playground equipment. 1.2 RELATED WORK A. Section 02870 - Site Furnishings B. Section 03300 - Cast-In-Place Concrete 1.3 QUALITY ASSURANCE c. Submittals must be received and approved by the Landscape Architect prior to ordering equipment. 2. Submittals Prior to Project Acceptance — Contractor shall submit all maufacturers' literature to the Landscape Architect prior to acceptance of the project. 02860 - 1 C& B 971163 L�J ' � � � � � ' � ' � � � � � � � � a5,�,99 PART 2 — PRODUCTS 2.1 NEW PLAY EQUIPMENT A. Contractor shaii provide and install new play equipment as indicated on the plans. See equipment list on drawings. B. Approved Product: Pipeline equipment as manufactured by Columbia Cascade, Portland, Oregon. Local Supplier: Paul E. Allen Co., 972-724-1110, Contact: Debra Finch. C. Approved product: Equipment as manufactured by Playworld Systems, Inc. Lewisburg, PA. Local Supplier: The Playwell Group, Inc. 972-488-9355 Contact: Tom Smith PART 3 - EXECUTION GENERAL: All items shall be supplied and installed by Contractor as shown on the plans and as recommended by the manufacturer. FALL ZONES: Contractor shall verify all fall zone clearances onsite prior to installing the equipment. Notify the Landscape Architect of any conflicts or discrepancies. CONCRETE FOOTINGS: The finished grade of all concrete footings shall be set twelve inches below the finish grade of surfacing material. 3.1 3.2 3.3 3.4 FASTENERS: All nuts and bolts shall be upset and tack welded to prevent disassembly. 3.5 PROTECTION: Contractor shall be responsible for protection of unfinished work and shall erect temporary signage and barriers as necessary to prevent park users from utilizing unfinished equipment. 3.6 INSTALLATION: Cont�actor shall follow manufacturers installation instructions. Set play equipment level. END OF SECTION 02860 - 2 C& B 971163 L�J �.1 � � � U � � � � D � U � � � a D D a SECTION 02870 SITE FURNISHINGS PART I - GENERAL 1.1 DESCRIPTION Furnish and supply all labor, equipment, materials and incidentals necessary to assemble, instalt and otherwise construct park equipment as listed under products. 1.2 RELATED WORK � A. Section 03300 - Cast-in-Place Concrete. 1.3 QUALITY ASSURANCE A. All equipment shall be free of sharp edges and corners, or extremely rough surfaces. , B. All materials shall be new and conform to all standards as specified. C. The bidder shall be responsible for defects in equiprx�►ent due to faulty materials or manufacturing, damage or loss. D. Metal shall be straight or at design radii or bends, without kinks, and shall be true to shape. E. Codes and Standards: All 'accessible° site furnishings shall comply with the current Texas Accessibilitv Standards (TAS1 of the Architectural Barriers Act, Article 9102, Texas Civil Statutes (512) 453-3211. 1.4 PRODUCT DELIVERY, STORAGE AND HANDLING A. Protect from inclement weather: wet, damp, extreme heat or cold. B. Store in a manner to prevent warpage and/or bowing. 1.5 JOB CONDITIONS The contractor shall be responsible for protection of unfinished work and shall be responsible for the safety of park users utilizing unfinished equipment. PART2-PRODUCTS 2.1 NEW PARK EQUIPMENT A. Contractor shall provide and install new park equipment as indicated on the plans. See equipment list on drawings. 5/7/99 02870 - 1 C&B 971163 O � � a U a � � � � � � a 0 a 0 � 0 � B. Approved Product: Equipment as manufactured by Columbia Cascade, Portland, Oregon. Locai Supplier: Paul E. Allen Co. 972-724-1110, Contact: Debra Finch. PART 3 - EXECUTION 3.1 GENERAL: All items shall be supplied and installed by Contractor as shown on the plans and as recommended by the manufacturer. 3.2 FASTENERS: All nuts and bolts shall be upset and tack welded to prevent disassembly. 3.3 PROTECTION: Contractor shall be responsible for protection of unfinished work and shall erect temporary signage and barriers as necessary to prevent park users from utilizing unfinished equipment. 3.4 INSTALLATION: Contractor shall follow manufacturers installation instructions. Set play equipment level. ` END OF SECTION , 5/7/99 02870 - 2 C&B 971163 � D U � D D � � � � � U � a � � � � � SECTION 02930 SEEDING PART 1 - GENERAL 1.1 DESCRIPTION A. Work Included: Seeding of grass seed or wildflower seed, as specified on the plans. B. Related Work Specified Elsewhere: Section 02220, Earthwork. 1.2 REFERENCE STANDARDS A. Standardized Plant Names 1. For exotic plant materials: American Joint Committee of Horticultural Nomenclature, Second Edition, 1942. 2. For native materials a. Manual of the Vascular Plants of Texas by Correll and Johnston b. Check List of Vascular Plants of Texas by Hatch . c. Flora of North Central Texas by Shinners and Moller B. Texas Highway Department: Standard Specifications for Construction, Item 164, "Seeding for Erosion Control" and Item 180, "Wildflower Seeding". • 1.3 SUBMITTALS � A. Seed 1. Vendors' certification that seeds meet Texas State seed law including: a. Testing and labeling for pure live seed (PLS) b. Name and type of seed ' 2. If using native grass or wildflower seed, seed must have been harvested within 100 miles of the construction site. 3. All seed shall be tested in a laboratory with certified results presented to the Project Manager, in writing, prior to planting. 4. All seed to be of the previous season's crop and the date on the container shall be within twelve months of the seeding date. 5. Each species of seed shall be supplied in a separate, labeled container for acceptance by the Project Manager. 1.4 5/7/'99 B. Fertilizer 1. Unopened bags labeled with the analysis 2. Conform to Texas fertilizer law JOB CONDITIONS A. Planting Season: The season varies according to species (see Part 2- Products). Do not seed when soil is excessively wet or dry or when wind exceeds 10 miles per hour. B. Schedule After All Other Construction and Planting Is Complete. C. Protect and Maintain Seeded Areas 02930 - 1 C&B 971163 l�J � 1. From erosion 2. From traffic and all other use 3. Until seeding is complete and accepted l�l � � u � A. Seed All seed shall be planted at rates based on pure live seed (PLS = purity x germination) per acre. Substitution of individual seed types due to lack of availability-shall be made only by the a Project Manager at the time of planting. The Contractor shall notify the Project Manager, prior to bidding, of difficulties locating certain species. Only those areas indicated on the plans and areas disturbed by construction shall be seeded. Prior to seeding, each area Q � shall be marked in the field and approved by the Project Manager. Any adjustment of area location by the Project Manager shall be considered incidental and shall not entitle the Contractor to additional compensation. � � L! LI l�l L�J L�J �al I�I 1.5 QUALITY CONTROL The contractor who plants the seeds, whether the general contractor or a subcontractor, is responsible for daily supervision of his crew, while planting the seed and maintai�ing the seedlings until the project is accepted by the City. PART 2 — PRODUCTS 2.1 MATERIALS Weed seed shall not exceed 10 percent by weight of the total of pure live seed (PLS) and other material in the mixture. Johnsongrass and nutgrass seed shall not be allowed. The seed shall be clean, dry and harvested within one year of planting. tf planted between April 15 and September 10: 1. Non-native ctrass seed shall consist of: Lbs./Acre Common Name Scientific Name Puri 25 Berrnuda (unhulled) Cynodon dactylon 85% 75 Bermuda (hulled) Cynodon dactylon 95% Substitute the following if planted between September 10 and Aprif 15: 220 Rye Grass Lolium mu/tiflorum 82% 40 Bermuda (unhulled) Cynodon dactylon 84% Germination 90% 90% 80% 85% 2 Native arass seed - The seed shall be planted between February 1 and October 1 and shall consist of: Lbs. PLS/Acre Common Name Botanical Name 16 Green Sprangletop Leptochloa dubia 40 Sideoats Grama* 8outeloua curtipendula 64 Little Bluestemt Schizachyrium scoparium a5/7/'99 02930 - 2 C&B 971163 .� � II�I li� � � � � L� 1 LJ I� 200 Buffalograss 40 indian Grass* 16 Big Top Lovegrass' 16 Weeping Lovegrass 80 Canada Wiid Rye' *These grasses are not to be planted within ten feet of a road or park;ng lot or within three feet of a walkway. Buchloe dactyloides Sorghastrum avenac�um Eragrostis hirsufa Eragrostis curvula Elymus canadensis var. canadensis 3 . 1Nildflower seed - All wildflower seeds are to be hand broadcast, (sEe 3.02,A). The seed shall be planted between March 5 and May 31 or between September 1 and December 1 and shall consist of: Lbs. PLS/Acre 10 20 50 10 10 20 10 0 10 Common Name Foxglove* Lanceleaf Coreopsis Bluebonnet Pink Evening Primrose Purple Coneflower' Indian Blanket Mexican Hat Maximillian Sunflower* Winecup Lemon Mint* Botanical Name Penstemon cobaea Coreopsis lanceclata Lupinus texensis Oenothera speciosa Echinacea purpurea Gaillardia pu/chelfa Ratibida columnaris Helianthus maximiliana Callirhoe involucrata Mon�rda citriodora *These wildflowers are not to be planted within ten feet of a road or parking lot or within three feet of a walkway. 4. Temporary erosion control seed When specified on the plans, temporary control measures shall be performed. � These measures shall consist of the sowing of cool season ptant seeds and the work and materials as required in this section. i� B. u �!I � L�J �1 � Mulch 1. Mulch should be designed for use with conventional mechanical or hydraulic planting of seed, either alone or with fe�tilizer. 2. Mulch should be wood cellulose fiber produced from virgin wood or recycled paper-by-products (waste products from paper mills or recycled newspaper). 3. Mulch should contain no growth or germination inhibiting factors. 4. Mulch should contain no more than 10 percent moisture, air dry weight basis. 5. Additives shall include a binder in powder form. 6. Material shall form a strong moisture retaining mat. C. Fertilizer 1. All fertilizer shall be delivered in bags or containers clearly labeled showing the analysis. 2. All fertilizer shall be in acceptable condition for distribution and shall 5e applied uniformly over the planted area. 3. Analysis of 16-20-0, 1 fi-8-8, or as designated on the plans. Fertilizer rate: a. No fertilizer is required for wildflower seeding. � 5/7/'99 02930 - 3 CS�B 971163 !�1 � l� �. � � �� � �, � � � � � � b. Where applying fertilizer on newly established seeding areas - 100 pounds of Nitrogen per acre. c. Where applying fertilizer on established seeding areas - 150 pounds of Nitrogen per acre. D. Water: Shall be furnished by the Contractor and shall be clean and free of industrial wastes or other substances harmful to the germination of the seed or to the growth of the vegetation. The amount of water will vary according to the weather variables. Generally, an amount of water that is equaf to the average amount of rainfall plus 1/2" per week should be applied for approximately three weeks or until project is accepted by the Project Manager. E. Erosion Control Measures 1. For seeding application in areas up to 3:1 slope, use cellulose, fiber or recycled paper mulch, (see 2.01, B. Mulch and 3.03). 2. For seeding application in areas 3:1 slope or greater, use the following soil retention blanket (Follow the manufacturer's directions): 2.2 MIXING Seed, mutch, fertilizer and water may be mixed provided that: 1. Mixture is uniformly suspended to form a homogenous slurry. . 2. Mixture forms a blotter-like ground cover impregnated uniformly with grass seed. 3. Mixture is applied within 30 minutes after placed in the equipment. PART 3 — EXECUTION 3.1 3.2 � � 5/7/'99 SEEDED PREPARATION A. Clear Surface of All Materials, Such As: 1. Stumps, stones, and other objects larger than one inch. 2. Roots, brush, wire, stakes, etc. 3. Any objects that may interfere with seeding or maintenance. 6. Tilfing 1. 2. 3. "Curlex I" from American Excelsior, 900 Ave. H East, Post O�ce Box 5624, Arlington, Texas 76001, 1-800-777-SOIL. In all compacted areas till one inch deep. If area is sloped greater than 3:1, run a tractor paralle! to slope to provide less seed/water run-off. In areas near trees: Do not till deeper than 1/2 inch inside "drip line" of trees. C. Watering: Soil should be watered to a minimum depth of four inches within 48 hours of seeding. SEEDING A. If Sowing Seed By Hand 1. Broadcast seed in two directions at right angles to each other. 2. Harrow or rake lightly to cover seed. , 3. Never cover seed with more soil than twice its diameter. 02930 - 4 C&B 971163 �l � � � � � 3.3 4. For wildflower piantings, scalp existing grasses to one inch, remove grass clippings, so seed can make contact with the soil. B. Mechanically Seeding (Drilling): If inechanically seeding (drilling) the seed or seed mixture, the quantity speciFed shall be uniformly distributed over the areas shown on the plans or where directed. All varieties of seed, as well as fertilizer, may be distributed at the same time prc�ided that each component is uniformly applied at the specified rate. Seed shall be drill�d at a depth of from 1/4 inch to 3/8 inch utilizing a pasture or rangeland type drill. A' drilling is to be on the contour. After planting, the area shall be rolled with a roller intecral to the seed drill, or a corrugated roller of the "Cultipacker" type. All rolling of slope areas shall be on the contour. MULCHING A. Apply uniformly after completion of seeding in areas up to 3:1 slope. Mulch may be � applied concurrently with fertilizer and seed, if desired. ,� � B. Apply at the following rates unless otherwise shown on plans: 1. Sandy soils, flat surfaces - minimum 1,500 Ibs./acre. 2. Sandy soils, sloping surfaces - minimum 1,800 Ibs./acre. 3. Clay soils, flat surfaces - minimum 2,500 Ibs.lacre. 4. Clay soils, sloping surfaces - minimum 3,000 Ibs./acre. 5. �°Flat" and "sloping" surfaces will be shown on the plans if not visually obvious. � C. Apply within 30 minutes after placement in equipment. Keep mulch moist, by daily water application, if necessary: 1. For approximately twenty-one days, or � 2. Until seeds have germinated and have rooted in soil, (see 3.04, B) and project has been accepted by the Project Manager. � 3.4 MAINTENANCE AND MANAGEMENT � � a � a � � 5/7/'99 A. Includes protection, replanting, maintaining grades and immediate repair of erosion damage until the project receives final acceptance. B. Replanting 1. Replant areas where a stand of grass or wildflowers are not present in a reasonable length of time, as determined by the Project Manager. 2. A"stand" shall be defined as: a. Bermuda/Rye grasses: Fourteen growing plants per square inch established within two weeks of seeding date on a smooth bed free of � foreign material and rocks or clods larger than one inch diameter. b. Native grass and wildflowers: 80% percent coverage of growing plants within seeded area within twenty-one days of seeding date on a smooth bed free of foreign material and rocks or clods larger than one inch diameter. c. Having no bare spots greater than six inch square. END OF SECTION 02930 - 5 C8�B 971163 a � a � � � � � � �, � � � � i � � � � SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.1 SCOPE A. This section provides for the furnishing and installing of formwork, reinforcing and required supports, and cast-in-place concrete for slabs on grade and other concrete components. B. Work Included: 1. Formwork for cast-in-place concrete, with shoring, bracing and anchorage. 2. Formwork accessories. 3. Form stripping. 4. Reinforcing steel for cast-in-place concrete. 5. Cast-in-place concrete, including concrete for the following: - a. Foundations and footings. b. Slabs on grade. 1.2 sniss 6. Concrete curing. REFERENCES A. ACI 211.1 - Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete; American Concrete Institute; 1981. B. ACI 301-1 - Specifications for Structural Concrete for Buildings; American Concrete Institute. C. ACI 304-1 - Guide for Measuring, Mixing, Transporting, and Placing Concrete; American Concrete Institute. D. AC( 305-1 - Hot Weather Concreting; American Concrete Institute. E. ACI 318-1 - Building Code Requirements for Reinforced Concrete; American Concrete Institute. F, AC! 347-1 - Recommended Practice for Concrete Formwork; American Concrete Institute. G. ACl SP-66 - ACI Detailing Manual; American Concrete Institute. 03300-1 C8B 971163 � i� ��� � r � �� � � � � � � � � � �1 � H. ASTM A 185 - Standard Specification for Steel Welded Wire Fabric, Plain, for Concrete Reinforcement. l. ASTM A 615 - Standard Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement. J. K. L. M, N. O. ASTM C 31 - Standard Practice for Making and Curing Concrete Test Specimens in the Field. ASTM C 33 - Standard Specification for Concrete Aggregates. � ASTM C 39 - Standard Test Method for Compressive Strength of Cyfindrical Concrete Specimens. ASTM C 94 - Standard Specification for Ready-Mixed Concrete. ASTM C 143 - Standard Test Method for Sfump of Portland Cement Concrefe. ASTM C 150 - Standard Specification for Portland Cement. P. ASTM C 260 - Standard Specification for Air-Entraining Admixtures for Concrete. Q. ASTM C 309 - Standard Specification for Liquid Membrane-Forming Compounds for C�ring Concrete. R. ASTM C 494 - Standard Specification for Chemica! Admixtures for Concrete. S. CRD-C 621 - Corps of Engineers Specification for Nonshrink Grout; U.S. Army Corps of Engineers. T. CRSI Manual of Standard Practice; Concrete Reinforcing Steel Institute. U. PS 1- Voluntary Product Standard: Construction and Industrial Plywood; U. S. Department of Commerce/National Bureau of Standards; U. S. Govemment Printing Office. 1.3 DEFINITIONS � smss A. Unexposed Finish: A general use finish, with no appearance criteria, applicable to aiI formed concrete concealed from view after completion of construction. B. Exposed Finish: A general use finish applicable to all formed concrete exposed to view except those indicated to receive textured finish, and including surfaces which may receive a paint coating. 03300-2 C88 971163 � � � � � � � � � � � � � � � � � � � 1.4 SUBMITTALS A. Make submittals under provisions of Section 01340. 1.5 5/7/99 B. Product Data: Submit manufacturer's product data for the following: 1. Concrete admixtures. 2. Grout. � � � � 3. Curing compound. 4. Bonding compound. C. Shop Drawings: Submit shop drawings for fabrication and placement of the following: Reinforcement:� Comply with ACI SP-66. Include bar schedules, stirrup spacing, diagrams of bent bars, arrangement of concrete reinforcement. Include details of reinforcement at openings through concrete structures. D. Quality Control Submittals: Submit the following, information related to quality assurance requirements specified herein: 1. Design data: Submit proposed mix designs and test data before concrete operations begin. Identify for each mix submitted the method by which proportions have been selected. 2. Certifications: Submit affidavits from an independent testing laboratory certifying that all materials furnished under this section conform to specifications. 3. Certifications: Provide certification from manufacturers of concrete admixtures that chloride content complies with specified requirements. QUALITY ASSURANCE A. Codes and Standards: Comply with the following documents, except where requirements of the contract documents or of governing codes and authorities having jurisdiction are more stringent: 1. ACI 301. 2. ACI 318. 3. CRSI Manual of Standard Practice. 03300-3 C8�6 971163 1� � � � � � � � � � B. Testing Laboratory Services: 1. City will engage testing laboratory to conduct tests and perform other services required for quality assurance. C. Source of Materials: Obtain materials from same source for the entire project. 1.6 DELIVERY, STORAGE AND HANDLING A. � Deliver reinforcement to project site bundled and tagged with metal tags indicating bar size, lengths, and other data corresponding to information shown on placement drawings. B. Store concrete reinforcement materials at the site to prevent damage and accumulation of dirt or rust. PART 2 - PRODUCTS 2.1 FORM MATERIALS A. Facing Materials: 1. Unexposed finish concrete: Any standard form materials that produce structurally sound concrete. Provide lumber dressed on at least two edges and one side for tight fit. 2. Exposed finish concrete: Materials selected to offer optimum smooth, stain � free final appearance and minimum number of joints. Provide materials with sufficient strength to resist hydrostatic head without bow or deflection in excess of allowable tolerances, and as follows: a � � � �� � � a. Plywood: PS-1 "B-B (Concrete Form) Plywood," Class I, Exterior Grade, mill-oiled and edge-sealed. - B. Formwork Accessories: 1. 2. 3. Form release agent: Commercial formulation form-coating compound that will not bond with, stain nor otherwise adversely affect concrete surfaces, and which will not impair subsequent coating of concrete surfaces. Metal ties: Commercially manufactured types; cone snap ties, taper removable bolt, or other type which will leave no metal closer than 1-1/2 inches from surface of concrete when forms are removed, leaving not more than a 1-inch diameter hole in concrete surface. Fillets: Wood or plastic fillets for chamfered corners, in maximum lengths possible. 5/7/99 03300-4 C&B 971163 � � � � � � � � � � � � � D � � � � � � 22 2.3 5/7/99 4. Waterstops: Rubber or PVC, 1,750 psi tensile strength, minimum 50EF to 175EF working temperature range, maximum lengths possible, ribbed profile, preformed corner sections, heat welded jointing. REINFORCING MATERIALS A. Reinforcing Bars: ASTM A 615, Grade 60, deformed except where plain bars are indicated. B. Welded Wire Fabric: ASTM A 185, plain cold-drawn steel. C. Reinforcing Accessories: 1. Tie wire: Black annealed type, 16-1/2 gage or heavier. 2. Supports: Bar supports conforming to specifications of CRSI's Manual of Standard Practice. a. Class 1(plastic protected) at all formed surfaces which will be exposed to weather. CONCRETE MATERIALS A. Portland Cement: ASTM C 150, and as follows: 1. Type I, except where other type is specifically permitted or required. B. Water: Potable. C. Aggregates: 1. Normal weight concrete: ASTM C 33. 2. Maximum size of coarse aggregates, whichever is least: a. One-fifth narrowest dimension between sides of forms. b. One-third of depth of slabs. c. Three-fourths of minimum clear distance between reinforcing bars or between bars and side of form. D. Admixtures - General: Calcium chloride thiocyanates or admixtures which result in more than 0.1 percent of soluble chloride ions by weight of cement are not permitted. E. Air-Entraining Admixture: ASTM C 260, certified by manufacturer to be compatible with other required admixtures. F. Water-Reducing Admixture: ASTM C 494, Type A. 03300-5 C&B 971163 � l!1 G l�, � Water-Reducing, Retarding Admixture: ASTM C 494, Type D. High-Range Water-Reducing Admixture (Superplasticizer}: ASTM C 494, Type F or G. � 2.4 MISCELLANEOUS MATERIALS AND ACCESSORIES � A. Vapor Retarder: Membrane for installation beneath slabs on grade, resistant to decay when tested in accordance with ASTM E 154, and as follows: �r�� L � LJ C. �� � l�i 1. Polyethylene sheet, not less than 6 mils thick. Nonshrink Grout: CRD-C 621, factory pre-mixed grout. 1. Type: Provide nonmetallic type only. Absorptive Cover: Burlap cloth made from jute or kenaf, weighing approximately 9 ounces per square yard, complying with AASHTO M 182, Class 2. D. Liquid Membrane Forming Curing Compound: ASTM C 309, Type I, Class A; moisture loss not more than 0.055 grams per square centimeter when applied at rate of 200 square feet per gallon. E. f� Bonding Compound: Polyvinyl acetate or acrylic base. Epoxy Adhesive: ASTM C 881, two component material suitable for use on dry or damp surfaces; material "Type," "Grade," and "Class" to suit project requirements. G. Expansion Joint Sealant: Self-leveling polyurethane joint sealant, type "NR-201" as ("j manufactured by Precora and primed with manufacturer (Precora) approved l.� sealing or caulking compound. Final color to be submitted and approved prior to installation. - I�J � � 2.5 CONCRETE MIX DESIGN A. General: Prepare design mixes for each type and strength of concrete on the basis of either field experience or trial mixtures, as specified in ACI 301. If trial mixtures method is used, employ an independent testing facility acceptable to architect for preparing and reporting proposed mix designs. � B � C � 5�7/99 � 1. Review: Do not begin concrete operations until proposed mixes have been revieweii by architect. Mixes: Design mixes to achieve properties of concrete as indicated in concrete schedule. Proportions, Slump, and Water-Cement Ratio: Comply with ACI 211.1 for normal weight concrete and ACI 211.2 for structural lightweight concrete. 03300-6 C&B 971163 � � � �J � �� � ��� �i 2.6 L� � � D. Adjustment to Concrete Mixes: Mix design adjustments may be requested by Contractor when characteristics of materials, job conditions, weather, test results or other circumstances warrant, provided no additional expense to City results. Submit laboratory test data for revised mix design to architect for approval before using in the work. E. Admixtures: 1. 2. 3. 4. 5. Air-entraining admixture: Add at rate between 5 percent and 7 percent for all concrete provide on project. Water-reducing admixture: Add as required for placement and workabiliry. Water-reducing and retarding admixture: Add as required in concrete mixes to be placed at ambient temperatures above 90 degrees F. High-range water-reducing admixture (superplasticizer): Add as required for placement and workability. - Do not use admixtures not specified or approved. CONCRETE MIXING A. Transit Mixers: Comply with requirements of ASTM C 94. 1. At ambient temperatures of 85 to 90 degrees F, reduce mixing and delivery time to 75 minutes. 2. At ambient temperatures above 90 degrees F, reduce mixing and delivery time to 60 minutes. � PART 3 - EXECUTION 3.1 CONCRETE FORM PREPARATIOd D � � D � � a 5/7/99 a A. General: Comply with requirements of ACI 301 for formwork, and as herein specified. Contractor is responsible for design, engineering and construction of formwork, and for its timely removal. B. Design: Design and fabricate forms for easy removal, without impact, shock or damage to cast-in-place concrete surfaces and adjacent materials. Design to support all applied loads until concrete is adequately cured, within allowable tolerances and deflection limits. C. Construction: Constn.ict forms to sizes, shapes, lines and dimensions shown and to achieve accurate final alignment, locations and grades, with work level and plumb. Provide for openings, offsets, sinkages, keyways, recesses, moldings, rustications, reglets, chamfers, blocking, screeds, bulkheads, anchorages, inserts and other features required in the work. 03300-7 C86 971163 � � � � Ll � � � � � 3.2 � � � ('� 3.3 j�,} U � 3.4 � � 5/7/99 � ❑� 1. 2 Joints: Minimize form joints and make watertight to prevent leakage of c�ncrete. a. Align joints symmetrically at exposed conditions. �hamfers: Provide chamfered edges and corners at exposed locations, unless specifically indicated otherwise on the drawings. 3. Permanent openings: Provide openings in concrete formwork to accommodate work of other trades, sized and located accurately. Securely s�pport items built into forms; provide additional bracing at openings and discontinu�ties in formwork. 4. Temporary openings: Provide temporary openings for cleaning and inspection in most inconspicuous locations at base of forms, closed with tight fitting panels designed to minimize appearance of joints in finished concrete work. Tolerances: Comply with minimum tolerances established in AC� 347, unless more stringent requirements are indicated on the drawings. E. Release Agent: Provide either form materials with factory-apptied nonabsorptive liner or field applied form coating. If field applied coating is employed, thoroughly clean and recondition formwork and reapply coating before each use. Rust on form surfaces is unacceptable. CONNECTION TO EXISTING CONCRETE A. Preparation: At locations where new concrete is to join existing concrete, prepare existing surface by cleaning with wire brush and applying bonding compound in accordance with manufacturer's instructions. B. Dowelled Connections: At locations where new concrete is dowelled to existing work, drill holes in existing concrete, insert steel dowels, and pack solid with nonshrink epoxy grout. VAPOR RETARDER INSTALLATION A. General: Place vapor retarder sheet over prepared base material, aligning longer dimension parallel to direction of pour and lapped 6 inches. Seal joints with appropriate tape. PLACING REINFORCEMENT � L� General: Comply with requirements of ACI 301 and as herein specified. Prepara+�on: Clean reinforcement of loose rust and mill scale, earth, ice and other materials which reduce or destroy bond with concrete. 03300-8 „&B 971163 � � a � � U � � � � � � � Q � � � � � 1. Wire fabric: Install in lengths as long as practicable. Lap adjoining pieces at least one full mesh and lace splices with tie wire. Offset end laps in adjacent widths to prevent continuous laps in either direction. 3.5 JOINT CONSTRUCTION 1. Reinforcement: Continue reinforcement across and perpendicular to construction joints, unless details specifically indicate otherwise. 3.6 INSTALLATION OF EMBEDDED ITEMS .. A. General: Set and build into work anchorage devices and other embedded items required for other work that is attached to or suppo�ted by cast-in-place concrete, using setting drawings and instructions from suppliers of items to be embedded 1. Edge Forms and Screed Strips: Set edge forms or bulkheads and intermediate screed strips for slabs, to obtain required elevations and contours in finished slab surface. 3.7 1. Wood forms: Moisten wood forms immediately before placing concrete in locations where form coatings are not used. 1. Deposit concrete continuously, or in layers of such thickness that no concrete will be placed on concrete which has hardened sufficiently to cause the formation of seams or planes of weakness. C. Placement: Place reinforcement to obtain at least minimum coverages for concrete protection. Accurately position, support, and secure reinforcement against displacement, using bar supports and tie wire, as required. Set wire ties so ends are directed into concrete and not toward exposed concrete surfaces. D. Welding: Welding of reinforcement is not perrrtitted. A. Construction Joints: Locate and instatl construction joints as indicated on drawings. If construction joints are not indicated, locate in manner which will not impair strength and will have least impact on appearance, as acceptable to Landscape Architect. CONCRETE PLACEMENT A. Inspection: Before placing concrete, inspect and complete formwork installation, reinforcing steel and items to be embedded. Notify crafts whose work is to be installed and cooperate with them in setting such work. B. Placement, General: Comply with requirements of ACI 304 and as herein specified. 2. If a section cannot be placed continuously, provide construction joints as specified herein. 5i?!99 03300-9 C8B 971163 L�' LJ I�I C � L U � � � L� ��] �J � � 3. Deposit concrete as nearly as possible to its final location, in order to avoid segregation. Placement In Forms: Deposit concrete in forms in horizontal layers not deeper than 24 inches and in a manner to avoid inclined construction joints. � 3. Consolidate concrete by mechanical vibrating equipment supplemented by hand-spading, rodding or tamping. Do not use vibrators to transport concrete inside forms.� Insert and withdraw vibrators vertically through freshly placed layer and at least 6 inches into preceding layer, at uniform spacing not exceeding visibly effective range of machine. Limit duration of vibration in each instance to time necessary to achieve consolidafion without causing segregation of mix. Placement of Slabs: Deposit and consolidate concrete slabs in a continuous operation, within limits of constructian joints, until panel oF section is completed. Consolidate concrete during placement, so that concrete is thoroughly worked around reinforcement, embedded items and into corners, without displacing reinforcement or other items. � 2. Bring slab surfaces to correct level with straightedge and strikeoff. Use highway straightedges, bull floats, or darbies to smooth surface, free of humps or hollows. Do not disturb slab surfaces prior to beginning finishing operations. E. Hot Weather Placement: Comply with recommendations of ACI 305 when combinations of high air temperature, low relative humidity and wind speed are such that the rate of evaporation from freshly poured concrete would. othervuise exceed 0.2 pounds per square foot per hour. � a � Q F. � U smss � Do not add water to approved concrete mixes under hot weather conditions. 2 Provide mixing water ai lowest feasibfe temperature, and provide adequate proteciion of poured concrete to reduce rate of evaporation. 3. Cover reinforcing steel with water-saaked burlap if it becomes too hot, so that steel temperature does not exceed air temperature at time of concrete placement. 4. Fog spray forms and reinforcing steel just before concrete is placed. Cold Weather Placement: ACI 306; the methods of protection used for cold weather concreting are to be reviewed with the Architect. Sufficient protection material is to be on the job site in advance of the time when mean daily temperatures are expected to drop below 40EF (5EC). Provide strong and secure weather protection 03300-10 C&B 971163 t=J lJ � � L�J L'J �� around the building for at least one story above and one story below the floor being concreted to prevent infiltration of wind. Submit to the Architect for review the details and materials of the weather protection system. Distribute unit heaters throughout the floor to maintain temperatures in the range between 50EF and: c. Heated Concrete Temperature: 1) Maximum 100EF (38EC) in mixer. 2) Maximum 90EF (32EC) leaving mixer. d. Accelerators: Review with Engineer. 1) Calcium Chloride: Shall not be used. 3.8 FINISHING FORMED SURFACES � Q a U � U 3.9 �..f 1J � � � sniss � A. Repairs, General: Repair and patch defective areas with cement mortar immediately after removal of forms. 1. Cut out honeycomb, rock pockets, voids over 1/4 inch in any dimension, and holes left by tie rods and bolts, down to solid concrete but in no case to a depth of less than 1 inch. 2. Make edges of cuts perpendicular to concrete surface. Thoroughly clean, dampen with water, and brush-coat the area with bonding compound. Place patching mortar while bonding compound is still active. B. Unexposed Form Finish: Repair tie holes and patch defective areas. Rub down or chip off fins or other raised areas exceeding 1/4 inch height. C. Exposed Form Finish: Repair and patch defective areas, with fins or other projections completely removed and smoothed. FINISHING SLABS A. Float Finish: Apply float finish to monolithic slab surfaces other than those above. 1. After screeding, consolidating and leveling concrete slabs, begin floating when surface water has disappeared or when concrete has stiffened sufficientfy to permit use of power-driven floats. � 2. Hand-float small areas and those inaccessible to power floats. 3. Check and level surface plane so depressions between high spots do not exceed 5/16-inch under a 10-ft. straightedge. Cut down high spots and fill low spots, sloping uniformly to drains where required. 03300- � 1 C&B 971163 � C�J �� L�J �J L■J � � �1 L�J 4. Immediately after leveling, refloat surFace to a uniform, smooth granular texture and medium broom finish. B. Repair of Slab Surfaces: Test slab surfaces for smoothness and to verify surface plane to tolerance specified. Repair defects as follows: High areas: Correct by grinding after concrete has cured for not less than 14 days. 2. Low areas: Immediately after comp�etion of surFace finishing operations, cut out low areas and replace with fresh concrete. Finish repaired areas to blend with adjacent concrete. Proprietary patching compounds may be used wt�en approved by Landscape Architect. 3. Crazed or cracked areas: Cut out defective areas, except random cracks and single holes not exceeding 9 inch in diameter, by cutting out and replacing with fresh concrete. Remove defective areas to sound concrete with clean, square cuts and expose reinforcing steel with not less than 3/4 inch clearance. Dampen exposed concrete and apply bonding compound. Mix, place, compact and finish patching concrete to match adjacent concrete. 4. Isolated cracks and holes: Groove top of cracks and cut out holes not over a 1 inch in diameter for repair by dry-pack method. Dampen Geaned concrete surfaces and apply bonding compound; place dry pack while bonding compound is still active, as follows: � � a. Dry-pack mix: One part portland cement to 2-1/2 parts fine aggregate passing No. 16 mesh sieve and enough water as required for handling and placing. b. Compact dry-pack mix in place and finish to match adjacent _ concrete. Keep patched areas continuously moist for not less than 72 hours. L�� ��] 3.10 CONCRETE CURING AND PROTECTlON A. � L1 � � B. o �,99 General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Start initial curing as soon as free water has disappeared from concrete surface after placing and finishing. Weather permitting, keep continuously moist for not less than 7 days. 2. Begin final curing procedures immediately following initial curing and before concrete has dried. Continue final curing for at least 7 days in accordance with ACI 301 procedures. Avoid rapid drying at end of final curing period. Curing Methods, Genera(: Provide curing of concrete by one of the methods listed and as appropriate to service conditions and type of applied finish in each case. 03300-12 C8B 971163 � � � LJ L�J LJ �� � L�� C� L�J L�J � � � l!1 � � 1. Curing formed surfaces: Cure formed concrete surfaces, including undersides of beams and similar surfaces by moist curing with forms in place for full curing period or until forms are removed. If forms are removed, complete curing by one of the applicab(e methods specified. 2. Curing surfaces not in contact with forms: a �•7 Moisture curing: Provide curing by one of the following methods: 1) Provide continuous water-fog spray. 2) Cover concrete with specified absorptive cover, saturate with water and keep continuously wet. Place absorptive cover to protect adjacent concrete edges, and provide 4 inch minimum overlap at joints in cover. Application of Curing and Sealing Compound: Apply only to exterior concrete. 1) Apply curing and sealing compound to concrete surfaces within two hours of completing final finishing operations. 2) Apply uniformly in continuous operation by power spray or roller, in accordance with manufacturers directions. Recoat damaged areas or those subjected to heavy rainfall within three hours of application. 3.11 FORM REMOVAL A. Non-Load-Bearing Formwork: Forms not actually supporting weight of concrete may be removed after cumulatively curing at not less than 50 degrees F for 24 hours after placing concrete, provided concrete is sufficiently hard that it will not be damaged by form removal operations, and further provided that curing and protection operations are maintained. 3.12 MISCELLANEOUS CONCRETE ITEMS A. Fill-in: Fill in holes and openings left in concrete structures for passage of work by other trades after such work is in place. Place such fill-in concrete to blend with existing construction, using same mix and curing methods. 3.13 CONCRETE REPAIRS A. General: Perform cosmetic repairs of concrete surfaces as specified under concrete application. O5R/99 03300-13 C&B 971163 D �l � � 3.14 � " - a � � � � � � � � � � � � 1. Perform structurai repairs with prior approval of Landscape Architect for method and procedure, using epoxy adhesive and mortar. Architect's approval is required for repair methods using materials other than those specified. QUALITY CONTROL TESTING DURING CONSTRUCTION A. Sampling: ASTM C 172, except modified for slump to comply with ASTM C 94. 1. 2. 3. CQ C. 4. Slump: ASTM C 143. One test at point of discharge for each day's pour of each type of concrete, and additional tests if concrete consistency changes. Air content: ASTM C 173 or ASTM C 231 for normal weight concrete. One test for each day's pour of each type of air-entrained concrete. Concrete temperature: a 0 Compression test specimen: ASTM C 31. One set of four standard cylinders for each compressive strength test. Test hourly when air temperature is 90 degrees F or above. Test each time a set of compression test specimens are made. Compressive Strength Tests: ASTM C 39. One set for each day's pour of each concrete class exceeding 5 cubic yards. 1. 2. Test one additional set of cylinders for each 50 cubic yards over and above the first 25 cubic yards of each class of concrete placed in any one day. Test one specimen at 7 days, two at 28 days, and retain one from each set for later testing, if required. _ 3. When frequency of testing would otherwise provide fewer than 5 strength tests for a given class of concrete, conduct testing from at least 5 randomly selected batches, or from each batch if fewer than 5 are used. 4. When strength of field-cured specimens is less than 85 percent of companion laboratory-cured cylinders, evaluate current operations and provide corrective procedures for protecting and curing the in-place concrete. 5. Strength level of concrete will be considered satisfactory if averages of sets of three consecutive strength test results equal or exceed specified compressive strength, and no individual strength test result falls below specified compressive strength by more than 500 psi. Test Results: Laborato .ry shall report test results in writing to architect and Contractor within 24 hours of test. 0 5/7/99 03300-14 C&8 971163 � � L�J LJ l�! � � L�J l�J �J l� � � � � � � � �7 1 2. 3. Compressive strength test reports shall contain the minimum following data: a. Project identification name and number. b. Name of concrete testing service. � c. Date of concrete placement. d. Concrete type and class. e. Location of concrete batch in structure. f. Design compressive strength at 28 days. g. Concrete mix proportions and materials. . h. Compressive breaking strength and type of break for both 7-day tests and 28-day tests. Nondestructive testing: Impact hammer, sonoscope, or other nondestructive device may be permitted but shall not be used as the sole basis for acceptance or rejection. Additional tests: The testing service shall make additional tests of in-place concrete when test results indicate specified concrete strengths and other characteristics have not been attained in the structure, as directed by architect. a. Testing service may conduct tests of cored cylinders, complying with ASTM C 42, or by other methods as directed. b. Cost of additional testing shall be bome by the Contractor when unacceptable concrete has been verified. Testing: City of Fort Worth will pay for all testing of concrete as specified. END OF SECTION a5/7/99 03300-15 C8B 971163 SECTION 04100 MORTAR PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. This Section specifies the mortar for unit masonry materials. . _ 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 04200 - Bricic Masonry. B. Section 04220 - Concrete Unit Masonry. 1.3 APPLICABLE SPECIFICATIONS AND STANDARDS . A. The following publications of the issues listed below, but referenced to thereafter by basic designation only, apply to this Section to the extent applicable in each reference thereto. � 1. American Society for Testing and Materials (ASTM) (Latest Edition): C91 Specification for Masonry Cement C144 Specification for Aggregate for Masonry Mortar C150 Specification for Portland Cement C207 Specification for Hydrated Lime for Masonry Purposes C270 Specification for Mortar for Unit Masonry 1.4 QUALIN ASSURANCE A. Use the same source or brand of masonry mortar materials for the duration of the Project. 1.5 MATERIAL STORAGE A. Store mortar materials in a dry place, off the ground, under cover. 5/7/99 04100-1 C8�6 971163 � D � � D � � � Q a � � � � Q a � t! U PART 2 - PRODUCTS 2.1 MATERIALS A. Portland Cement: ASTM C150, Type I: Use Type ill high-early strength for laying masonry in cold weather. 2.2 B. Masonry Cement: ASTM C91, with 12 percent maximum air content by volume. C. Hydrated Lime: ASTM C207, Type S. . D. Aggregates: ASTM C144. E. Water: Clean, free of deleterious amounts of acids, alkalies or organic materials. MORTAR MIXES A. General: , Do not lower the freezing point of mortar by use of admixtures or anti-freeze agents. The use of calcium chloride in mortar is not permitted. B. Mortar for Unit Masonry: Meeting the requirements of ASTM C270. C. Masonry Cement: 1 part masonry cement to 3 parts sand, proportioned by volume. PART 3 - EXECUTION 3.1 MIXING A. Mix mortar with sufficient water for minimum of three minutes in a drum type batch mixer. Mix mortar thoroughly and only in such quantity as is needed for immediate use. Use mortar within two hours after mixing. Discard mortar not used within specified time. Clean mixer after four or five batches have been mixed . sniss oa�oo-2 C&B 971163 � � U � � � � � D u U U � �J D � �� 1 � 3.2 sn�ss B. Add water to lime at least 24 hours before mixing it with other materials. C. Mortars that have stiffened within time interval stated above because of evaporation of moisture may be retempered to restore workability by adding water. Do not retemper mortar that has reached initial set. D. In cold weather, heat sand or water sufficiently to maintain temperature of mortar above 50 ° F as follows: �- Air Temperature Requirements 40°F - 32° F Heat sand or mixing water 32°F - 20° F Heat sand and mixing water MEASURING MATERIALS A. Measure materials by volume or equivalent weight. B. Do not measure by shovel. END OF SECTION 04100-3 C&B 971163 a 0 a a D a � � a a D � Q � a � U � O SECTION 04210 BRICK MASONRY PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. . Brick masonry for brick columns at shelter and. seat wall near playground. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 04100 - Mortar. B. Section 04220 - Concrete Unit Masonry. 1.3 SAMPLES AND INSPECTIONS A. Samples: Submit samples of the following materials to the Landscape Architect for his approval prior to instaflations: 1. Samples for grout and expansion joint sealant compounds. 2. One laid up, grouted two (2') foot X two (2') foot sample for each type of brick and pattern. 3. Approved samples shall be standards for completing the work. B. Inspections: Inspections shall be made by the Landscape Architect and City representative of brick work for conformance to these specifications and good practice. General Contractor is to advise Landscape Architect and City � representative when Masonry Contractor has commenced his work. PART 2 - PRODUCTS 2.1 BRICK MASONRY A. Brick masonry to match existing brick work at Park Glen Addition entry walls and existing park shelter off Glen Springs Trail. B. Brick to be Acme Brick Company, blend 137 "burgundy modular' and blend 104 "All dark (accent) modular." The following shapes are required: Shape A - Modular Bullnose Shape B- Modular Bullnose Soldier 5/7/99 04210 - 1 C8�6 971163 . O a �J � � a � � D U � a � lJ a � a � � 2.2 2.3 2.4 2.5 2.6 Shape C- Modular Bullnose Rowlock Corner Shape C-1 - Modular Bulinose Rowlock Corner Shape D- Modular Solid Stretcher C. Supplied by Acme Brick Company, Fort Worth, Texas, {817) 390-2409. PORTLAND CEMENT � A. ASTM C150, Type I or II. GROUT SAND A. ASTM C404. LATEX PORTLAND CEMENT MORTAR A. Shall be "TA303 Lifetime Cement Set" with "ACRYLBOND TA865" latex additive as manufactured by Technical Adhesives (H.B. Fuller Company), Palatine, Illinois. BRICK CLEANER A. Sureklean 101 Lime Solvent. BRICK SEALER A. Sureklean Weather Seal Siloxane. PART 3 - EXECUTION 3.1 INSTALLATION A. All brick work shall be laid plumb and true in accordance with approved standards of masonry construction. B. Grouting (Latex-Portland Cement Mortar): Allow bricks to set for a minimum of forty-eight (48) hours before grouting. Force a maximum amount of grout in to joints. Fill all gaps and skips. Finished grout shall be uniform in color, smooth and without voids, pin holes, or Iow spots. C. Joints: Joints shall be concave tooled joints. All joints shall be of a uniform width or uniform thickness to maintain proper coursing. Grout shall be tooled at approximately the same degree of hardness to achieve uniform color. Expansion joints with sealant shall be constructed as shown in the plans. 5/7/99 04210 - 2 C&B 971163 � � a !J � a D D a 3.2 a U � � U L�J D. Pointing: Point and fill all holes and cracks in exposed joints with fresh mortar. Tooling shall be done at the proper time to match existing color of mortar. E. Embedded Items: Install miscellaneous items specified under other sections of the specifications such as bolts, anchors, sleeves, etc., require to be built into the masonry work. Accurately position and securely anchor these items in place so that they will not be displaced during placing of concrete. F. Cleaning: Clean exposed surfaces thoroughly. Cleaning with soap powder or other mild solution shall not be attempted less than forty-eighty (48) hours after construction. The use of job mixed acid solutions or proprietary cleaning materials, when approved by the City, shall be restricted to well hardened mortar, not less than � seven (7) days old. Protect metal, stone, or other woric. Use only stiff fiber brushes and hardwood scrapers to help remove mortar smears. Rinse surfaces thoroughly with clean water immediately after cleaning to avoid etching or staining of the work. Apply approved cleaning agent to a section approximately five (5') feet square, in an inconspicuous place, to insure that there is no adverse effect on either the mortar joint or the masonry units. Allow adequate time for adverse effects to occur on test area before proceeding with work. Do not use muriatic acid on any brick work. . PROTECTION A. Protection Against Cold Weather: In cold weather, sand and water shall be heated sufficiently to maintain the temperature of mortar above 50 degrees F. No masonry shall be laid when the temperature is below 35 degrees F., unless adequate precaution against freezing is provided. No masonry shall be constructed on or with frozen materials. All masonry units stored in the open shall be covered with canvas or waterproofed material at all times. 1n cold weather, masonry shall be protected against freezing for at least forty-eight (48) hours. B. Protection Against Hot Weather: Protect mortar batches from heat by covering with damp burlap. Do not store bricks in sun; bricks should be as near the same temperature as the mortar as possible. Cool base concrete by moistening if exposed to sun and slow cure all freshly laid sections by covering with moist burlap. C. Protection of Adjacent Work: Protect all adjacent work from damage, any damage shall be repaired by this Contractor at his own expense. 3.3 CLEAN UP � a � sniss a A. Remove from the site all debris resulting from the work of this Section. END OF SECTION 04210 - 3 C&B 971163 i� � I � � � 1 � �� 1 � ' � � ' � � � � SECTION 04220 CONCRETE UNIT MASONRY PART 1 - GENERAL 1.1 1.2 1.3 1.4 � WORK INCLUDED A. Unit masonry required for work as indicated on the Drawings. RELATED WORK B. Section 03300 - Cast-in-Place Concrete. C. Section 04100 - Mortar. D. Section 04200 - Brick Masonry. � QUALITY ASSURANCE A. Qualifications of Workmen: , , � 1. For the actual cutting and placing of unit masonry use only skilled joumeymen who are thoroughly experienced with the materials and methods specified and thoroughly familiar with the design requirements. 2. In acceptance or rejection of installed unit masonry, no allowance will be made for lack of skill on the part of workmen. 3. Provide one skilled journeyman who shall be present at all times during execution of the work of this section a�d who shall personally direct all execution of the po�#ion of the work. B. Codes and Standards: 1. Comply with all pertinent codes and regulations. PRODUCT HANDLING A. Protection: 1. Store masonry in manufacturers original packing until ready for use. Do not stack loaded pallets of delivered CMU. Store in protected location off the ground. B. Replacements: 1. In the event of damage, immediately make all repairs and replacements necessary to the approval of the City and at no additional cost. 04220-1 C8B 971163 � � i � � � � � i I � � ' � ' � � � � PART 2 - PRODUCTS 2.1 CONCRETE MASONRY UNITS A. Shali be standard concrete masonry units, in the sizes shown on the Drawings, and shall conform with the requirements of ASTM C-90, Grade N, Type 1, normal weight units. 2.2 MORTAR � A. All mortar for unit masonry shall be type 'S' and shall conform with ASTM C-476, 2,500 psi, in 28 days and shall consist of one part Portland Cement by Volume, 1/4 to 1/2 part hydrated lime and four parts of damp, loose sand, plus water. 2.3 JOINT REINFORCING A. Ladder type, 9 ga. galvanized, steel cross and side rods as manufactured by Dur-O- Wall Products, AA Wire Products or approved equal. Widths and lengths as required. Provide prefabricated comers and tees. 2.4 OTHER MATERIALS A. All other materials, not specifically described, but required for a complete and proper installation of unit masonry shall be as selected by the Contractor subject to the approval of the City's Representative. PART 3 - EXECUTION 3.1 SURFACE CONDITIONS � A. Inspection: . 1. Prior to all work of this section, carefully inspect the installed woric of all other trades and verify that all such work is complete to the point where this installation may properly commence. 2. Verify that unit masonry may be installed in accordance with all pertinent codes and regulations, the referenced standards and the original design. B. Discrepancies: 1. In the event of discrepancy, immediately notify the City's Representative. 2. Do not proceed with installation in areas of discrepancy until all such discrepancies have been fully resolved. ��99 04220-2 C&B 971163 � � � � � ' � r � � � r � � � � 1 '1 � 3.2 COORDINATION A. Carefully coordinate with all other trades to ensure proper and adequate interface of the work of other trades with the work of this Section. 3.3 MIXING MORTAR � A. General: 1. Use a mechanical mixer of one sack minimum capacity. 2. Mix mortar at least three minutes after all materials have been added. 3. Mix only as much mortar as can be used in one hour after water has been first mixed into the batch. B. Retempering: 1. Do not retemper mortar. 3.4 INSTALLATION A. General: 1. Lay up CMU in uniform running bond unless othervvise shown or noted on the Drawings. 2. Clean all CMU and wet thoroughly before placing, except in freezing weather. 3. Use no warped, spalled, cracked or broken units. If any such units are - discovered in the finished wall, the City may require their immediate removal and replacement with new units at no additional cost to the City. 4. Tolerances: a. Vertical: Within 1/8 inch in 5 feet. b. Horizontal: Within 1/4 inch for length of wall. B. Laying Up: 1. Shove units (do not lay) into full bed of mortar without furrows. Adjust to final position while mortar is soft and plastic. Remove any unit disturbed after mortar has stiffened, clean joints and re-lay unit with fresh mortar. 2. Step back any unfinished work for joining with continued work. 3. Grout solidly behind any build-in items. � 04220-3 C&B 971163 � � � � � � � � � LJ � � � � � L! a a 0 3.5 .. C. 4. Cover all unfinished work at night against the elements with plastic sheet, building paper, heavy canvas or other material approved by the City's Representative. 5. All masonry shall be protected from freezing for a period of at least four days after it is laid. The Contractor shall submit for approval of the City the method he proposes to use for maintaining masonry temperatures specified. 6. Masonry material5 shall be preconditioned so that the minimum tempErature of the masonry when laid shall be 50°F and after laying this minimum temperature shall be maintained for not less than 48 hours. Reinforcement Steel: 1. Install all reinforcement as indicated on the Drawings. 2. Fully embed reinforcement in grout, not in mortar or mortar joints. 3. Furnish and install all required metal accessories to ensure accurate alignment of steel during grout filling operations. D. Joints: " ' 1. Provide 3/8 inch flush joints between all CMU. Tool joints when mortar becomes thumb print hard. CLEANING UP A. Inspection and Adjustment: 1. Upon completion of the work of this Section, make a thorough inspection of all installed unit masonry and verify that all units have been installed in accordance with the provisions of this Section. Rake out any defective joints in exposed work, fill with mortar and retool. Make any other necessary adjustments. B. Cleaning: 1. Upon completion of all work of this Section, promptly remove from the job site all mortar droppings, broken units, debris arising from the work of this Section and all tools and equipment of this Section, leaving all areas in a neat and orderly condition to the approval of the City. END OF SECTION 04220-4 C&B 971163 � Q � � U � � � � � U � � L� � � � � t! SECTION 05120 STRUCTURAL STEEL PART 1 - GENERAL � 1.1 SECTION INCLUDES A. Structural steel bridge members, support members, and connection plates and bearing piates. B. Base plates. C. Grouting under base piates. 1.2 RELATED SECTIONS A. Section 03300 - Cast-in-Place Concrete: Supply of anchors for casting into concrete. 1.3 REFERENCES A. AISC - Code of Standard Practice - Manual of Steel Construction - Allowable Stress Design (ASD). B. ASTM A 36 - Structural Steel. C. ASTM A 123 - Zinc (Hot Dipped Galvanized) Coatings on Iron and Steel Products. D. ASTM A 307 - Carbon Steel Externally Threaded Standard Fasteners. E. AWS A2.4 - Symbols for Welding, Brazing, and Nondestructive Examination. F. AWS D1.1 - Structural Welding Code. G. Painting Manual 1.4 SUBMITTALS A. Shop Drawings: 1. Indicate profiles, sizes, spacing, locations of structural members, attachments, and fasteners. 2. Connections. 3. Cambers. 4. Indicate welded connections with AWS A2.4 welding symbols. Indicate net weld lengths. B. Manufacturer's Mill Certificate for Information: Certify that steel meets or exceeds specified requirements. ���gg 05120 - 1 C&B 971163 � � � � � U � W � � � � � a � � a � D C. Mill Test Reports for Information: Submit indicating structural strength, destructive and non-destructive test analysis. D. Welders Certificates for Information: Certify welders employed on the Work, verifying AWS qualification within the previous 12 months. 1.5 QUALITY ASSURANCE A. Fabricate structural steel members in accordance with AISC Code of Standard Practice. B. Fabricator: Company specializing in performing the work of this section with minimum 5 years experience. C. Erector: Company specializing in performing the work of this section with minimum 3 years experience. PART 2 - PRODUCTS 2.1 MATERIALS A. Structural Steel Members: ASTM A 36. B. Bolts, Nuts, and Washers: ASTM A 307, galvanized to ASTM A 123 for galvanized structural members. C. Anchor Bolts: ASTM A 307. D. Welding Materials: AWS D1.1; type required for materials being welded. E. Grout: Non-shrink type, pre-mixed compound consisting of non-metallic aggregate, cement, water reducing and plasticizing additives, capable of devetoping a minimum compressive strength of 6,000 psi at 28 days. F. Touch-Up Primer for Galvanized Surfaces: SSPC Paint 20 Type I Inorganic. 2.2 FABRICATION A. Fabricate connections for bolt, nut, and washer connectors. 2.3 FINISH A. Prepare structural component surfaces in accordance with SSPC standards for galvanizing. B. Galvanize structural steel members to ASTM A 123. Provide minimum 1.25 ounce per square foot galvanized coating. Snl4o 05120 - 2 C88 971 �53 � U � a D D � a � a � � � a � LJ � � � PART 3 - EXECUTION 3.1 EXAMINATION A. Verify existing conditions prior to beginning work. 3.2 ERECTION A. Allow for erection loads, and for sufficient temporary bracing to maintain sttucture safe, plumb, and in true alignment until completion of erection and installation of permanent bracing. B. Field weld components indicated on Drawings. C. Field connect members with threaded fasteners. D. Do not field cut or alter structural members without approval of Architect/Engineer. E. After erection, prime welds, abrasions, and surfaces not galvanized, except . surFaces to be in contact with concrete. � F. Grout under base plates in acco�dance with Section 03300. Trowel grouted surFace smooth, splay neatly to 45 degrees. 3.3 ERECTION TOLERANCES A. Maximum Variation From Plumb: 1/4-inch from ve�tical. • B. Maximum Offset From True Alignment: 1/4-inch. 3.4 FIELD QUALITY CONTROL _ A. Field inspection and welds. END OF SECTION 5/7/99 05120 - 3 C86 971163 U a a � � a � D � �.1 � � D � a � � � � SECTION 06112 FRAMING AND SHEATHING PART 1 - GENERAL 1.1 SUMMARY ,.2 1.3 1.4 1.5 A. Section includes miscellaneous�framing for the shelter structure, preservative treatment of wood, fire retardant treatment of work. RELATED SECTIONS A. Section 06150 - Wood Decking. B. Section 06180 - Glue Laminated Construction: Roof Support Members REFERENCES A. ALSC - Softwood Lumber Standards. B. AWPA C1 - All Timber Products - Preservative Treatment by Pressure Process. C. AWPA C20 - Structural Lumber Fire Retardant Treatment by Pressure Process. D. SPIB - Lumber Grading Rules. � SUBMITTALS A. Manufacturer's Certificate: Certify that products conform to specified requirements. _ QUALITY ASSURANCE A. Perform Work in accordance with the following agencies: Lumber Grading Agency: Certified by ALSC. PART 2 - PRODUCTS 2.1 LUMBER MATERIALS A. Lumber Grading Rules: SPIB. B. Miscellaneous Framing: Stress Group D, Southern Pine species, 19 percent maximum moisture content, pressure preservative treat. 5R/99 06112 - 1 C&B 971163 a a U � � � � ' � � r � � � � � M i � 2.2 ACCESSORIES A. Fasteners and Anchors: Fasteners: Hot dipped galvanized steel for high humidity and treated wood locations, unfinished steel elsewhere. 2.3 FACTORY WOOD TREATMENT A. Wood Preservative (Pressure Treatment): AWPA Treatment C1 using water borne preservative with 0.30 percent retainage. PART 3 - EXECUTION 3.1 FRAMING A. Set structural members level and plumb, in correct position, B. Make provisions for erection loads, and for sufficient temporary bracing to maintain structure safe, plumb, and in true alignment until completion of erection and installation of permanent bracing. C. Place horizontal members, crown side up. D. Construct load bearing framing and curb members full length without splices. E. Double members at openings. Space short studs over and under opening to stud spacing. 3.2 TOLERANCES A. Framing Members: 1/4-inch from true position, maximum. END OF SECTION smss 06112 - 2 C8�B 971163 ' � � � �'� �� � � a D � � � D a D D � D � SECTION 06150 WOOD DECKING PART 1 - GENERAL 1.1 SUMMARY 1.2 1.3 1.4 1.5 1.6 �� A. Section includes heavy timber structural wood decking and preservative treatment of wood. RELATED SECTIONS A. Section 06112 - Framing and Sheathing - Frarriing at shelter cupola. B. Section 06180 - Glue Laminated Construction - Roof support members. REFERENCES A. AITC 112 - Standard for Tongue and Groove Heavy Timber Decking. B. AWPA C1 - All Timber Products Preservative Treatment by Pressure Process. C. AWPA C20 - Structural Lumber Fire Retardant Treatment by Pressure Process. D. SPIB - Lumber Grading Rules. SUBMITTALS A. Shop Drawings: Indicate deck framing system, loads and cambers, and bearing _ details. B. Product Data: Submit technical data on wood preservative materials. QUALlTY ASSURANCE A. Perform Work in accordance with the following agencies: Lumber Grading Agency: Certified by AITC 112. � B. In lieu of grade stamping exposed to view lumber submit manufacturer's certificate certifying that products conform to specified requirements. QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum five years experience and certified by AITC. 06150 - 1 971163 � � � � � U � '' �I ' ' � �'' � M � O � 1.� B. Installer: Company specializing in performing Work of this section with minimum five years experience approved by manufacturer. PART2- PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: 1. Georgia Pacific Corp. 2. Louisiana-Pacific Corp. 3. Weyehaeuser Engineered Strand Products. 2.2 MATERIALS A. Lumber Grading Rules: A�TC 112. B. Lumber Decking: Southern Pine species, select quality, 2-inch by 8-inch size classification, 15 percent maximum moisture content; single tongue. 2.3 ACCESSORIES A. Fasteners and Anchors: Fasteners: Hot dipped galvanized steel for high humidity and treated wood locations, unfinished steel elsewhere. 2.4 WOOD TREATMENT A. Wood Preservative (Pressure Treatment): AWPA Treatment C1 AITC 109 using oil bome preservative with 0.30 pounds per cubic foot retention. � PART 3 - EXECUTION 3.1 EXAMINATION . A. Verify that support framing is ready to receive decking. 3.2 PREPARATION A. Coordinate placement of support items. 3.3 INSTALLATION - LUMBER DECKING A. Install decking perpendicular to framing members, with ends staggered over firm bearing. On sloped surfaces, lay decking with tongue upward. sniss 06150 - 2 971163 a � a a � � � � � ' ' ' ' ' � � � � � 3.4 5mss B. Fit butt end deck joints on centercurring between support members with metal splines to maintain tight, aligned joints. C. Engage decking tongue and groove edges. D. Secure with fasteners. Side spike planks together, through pre-drilled holes. E. Maintain decking joint space of 1/16-inch maximum. F. Attach decking to roof support members by toenaling each piece through the � tongue and face using one nail per support. Use 16d common nails. TOLERANCES A. Surface Flatness of Decking Without Load: 1/4-inch in 10 feet maximum. END OF SECTION 06150 - 3 971163 � � D a � a � � ' � ' ' ' � � � � ' � SECTION 06180 GLUE-LAMINATED CONSTRUCTION PART 1 - GENERAL 1.1 SUMMARY �� A. Section includes glued larr�inated timber beams, purlins; and preservative treatment of wood; and steel hardware and attachment brackets connections. 1.2 RELATED SECTIONS A. Section 05120 - Structural Steel - Supply of attachment bracket anchor bolts for placement by this section. B. Section 06112 - Framing and Sheating - Framing at shelter cupola. C. Section 06150 - Wood Decking - Roof decking at shelter and bridge. 1.3 REFERENCES � A. AITC 117 - Standard for Laminated Wood Design. B. ANSI A190.1 - Structural Glue Laminated Timber. C. ASTM A 36 - Carbon Structural Steel. D. ASTM A 123 - Zinc (Hot Galvanized) coatings on Products Fabricated Frorri Rolled, Pressed, and Forged Steel Shapes, Plates, Bars, and Strip. E. ASTM D 2559 - Adhesives for structural laminated wood products for use under exterior (wet) exposure conditions. F. AWPA C1 - All Timber Products Preservative Treatment by Pressure Process. G. AWPA C20/C28 - Structural Lumber/Wood Laminated Fire Retarded Treatement by Pressure Process. H. AWS D1.1 - Structural Welding Code - Steel. 1.4 DESIGN REQUIREMENTS A. Design and laminate members to AITC 117 Standard. 5/7/99 06180 - 1 C&B 971163 1 1 � � ' � � a � � � D � � � � � D 1..T 1.5 SUBMITTALS A. Shop Drawings: Indicate framing system, sizes and spacing of inembers, loads and cambers, bearing and anchor details, bridging and bracing, and framed openings. B. Product Data: Submit technical data on wood preservative materials, application technique and resultant performance information. 1.6 QUALITY ASSURANCE A. Perform Work in accordance with City of Fort Worth, Texas. B. Perform welding Work in accordance with AWS D1.1. 1.7 QUALIFICATIONS A. Manufacturer/Fabricator: Company specializing in manufacture of glue laminated structural units with five years experience, and certified by AITC in accordance with ANSI A190.1. B. Erector: Company specializing in erection of this Work with five years experience approved by manufacturer. 1.8 DELIVERY, STORAGE, AND HANDLING A. Protect members to AITC requirements for [individually wrapped. B. Leave individual wrapping in place until members are installed. PART 2 - PRODUCTS 2.1 MATERIALS A. Manufacturers: 1. Engineered Wood Systems. 2. Rigidply Rafters, Inc. 3. Unadilla Laminated Products. B. Lumber: Softwood Southern Pine lumber conforming to Architectural Appearange Grade grading rules with 12 percent maximum moisture content before fabrication. Design for the following values: 4. Bending (Fb): 2,600 psi. 5. Compression Perpendicular to Grain Bottom (F�): 650 psi. 6. Compression Perpendicular to Grain Top (F�): 650 psi. 7. Horizontal Shear (Fv): 200 psi. sniss os�$o - 2 C&B 971163 � � D D � D � ' � ' � � � ' � � ' � r � � 2.2 2.3 8. Modulus of Elasticity (E): 1,800,000.00 psi. C. Steel Connections and Brackets: ASTM A 36/A36M weldable quality, hot dip galvanized to 1.5 ounces per square foot to ASTM A 123. D. Hardware: ASTM A 325, structural quality steel, hot dip galvanized to 1.5 ounces per square foot to ASTM A 123. E. Laminating Adhesive: ASTM D 2559; for wet condition of service. . WOOD TREATMENT A. Wood Preservative (Pressure Treatment): AWPA Treatment C1 using water borne preservative with 0.30 pounds per cubic foot retention. FABRICATION A. Fabricate glue laminated structural members in accordance with AITC or APA/EWS Architectural grade. B. Verify dimensions and site conditions prior to fabrication. C. Cut and fit members accurately to length to achieve tight joint fit. D. Do not splice or join members in locations other than tt�ose indicated without permission. E. Fabricate steel hardware and connections with joints neatly fitted, welded, and ground smooth. - D. After end trimming, seal with penetrating sealer in accordance with AITC or APA/EWS requirements. _ PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that supports are ready to receive units. B. Verify sufficient end bearing area. 3.2 PREPARATION A. Coordinate placement of support items. 5mss 06180 - 3 C&B 971163 . ., ' � � � � � � � 1 ' ' � ' ' � i 1 � � 3.3 ERECTION A. Lift members using protective straps to prevent visible damage. B. � Set structural members level and plumb, in correct positions or sloped where indicated. C. Provide temporary bracing and anchorage to hold members in place until permanently secured. � - D. Fit members together accurately without trimming, cutting, or other unauthorized modification. . E. Swab and seal the interior wood surfaces of field drilled holes in members with primer. 3.4 TOLERANCES A. Framing Members: 1/2-inch maximum from true position. END OF SECTION smss 06180 - 4 C8B 971163 , � � � � � � D � � � � � ' � � � ' � � SECTION 07410 PREFORMED METAL ROOFING PART 1 - GENERAL 1.1 RELATED WORK A. Section 06150 - Wood Decking. � � B. Section 06180 - Giue Laminated Construction. 1.2 SUBMITTALS A. Samples: Submit two 12" square samples of finished metal panels. B. Shop Drawings: Include small scale layouts of panels on roof, large-scale details of edge conditions, joints, anchorages, trim, closures, and special details. PART 2 - PRODUCTS � 2.1 ACCEPTABLE MANUFACTURER A. Provide preformed standing seam roof panels as manufactured by Berridge Manufacturing Company. Local supplier, Conner 8� Kovacs, (214) 638-7803. 2.2 MATERIALS A. Steel Sheets for Coating: Hot-dip zinc coated steel sheet, ASTM A 446, Grade A, G90 zinc coating, surface treated for maximum coating performance. B. Fasteners: Manufacturer's standard noncorrosive types, with heads gasketed. C. Accessories: Provide components required for a complete panel system, including trim, closures, clips, gaskets, fillers, and similar items. Match materials and finishes of preformed panels. D.. Coping Covers: Provide coping covers fabricated to the sizes, shapes, and profiles indicated. Match materials and finishes of preformed panels. E. Paper Slip Sheet: 5-Ib. resin-sized building paper. F. Felt Underlayment: ASTM D 226, No. 15 roofing felt. G. Bituminous Coating: Cold-applied asphalt mastic, SSPC paint 12, compounded for 15 mil dry film thickness per coat. 5/7/99 07410 - 1 C&B 971163 LRJ L�!' �!; �I I■ � �J � 2.3 1 � � ' � � � � � � � H. Hardware: Attach roofing with No. 1 0 stainless steel sheet metal screws. I. Finish: 1 Apply coating either before or after forming and fabricating panels, as required by coating process and as required for maximum coating performance capability. Protect coating promptfy after application and cure, by application of strippable film, and retain until all installation has been completed. 2. Fluorpolymer Coating: Full-strength 70% "Kynar 500" coating baked-on for 15 minutes at 4504F in a dry film thickness of 1.0 mil, 30% reflective gloss, over min. 0.2 mil baked-on modified epoxy primer. Color to be Hariford Green and approved by Landscape Architect prior to installation. FABRICATION A. General: Fabricate and finish panels and accessories at the factory to greatest extent possible, by manufacturer's standard procedures and processes. Comply with indicated profiles and dimensional requirements. B. C. D. Metal Gage: Fabricate panels and accessories of not less t'han 24 gage (0.0239") sheet steel. Fabricate and install panels and other components of roof system to withstand a loading of 40 Ibs. per sq. ft. inward; 15 Ibs. per sq. ft. outward. Fabricate snap-on seam with extruded vinyl weather seal gaskets. PART 3 - EXECUTION 3.1 3.2 5/7/99 INSPECTION A. Examine surfaces to receive preformed panels for conditions that will adversely affect the execution and quality of work. Do not start this work until unsatisfactory conditions are corrected. INSTALLATION A. General: Comply with panel fabricator's and material manufacturer's instructions and recommendations for installation, as applicable to project conditions and supporting substrates. Anchor panels and other components of the work securely in place, with provisions for thermal and structural movement. Install panels with concealed clips and fasteners. 07410 - 2 C&B 971163 � 1 � � � � � � � r � � � � � � � � � 3.3 5/7/99 B. Installation Tolerances: Shim and align panel units within installed tolerance of 1/8" in 20'-O" on plumb, curve, and line as indicated, and within 1/1 6" offset of adjoining faces and of alignment of matching profiles. C. Underlayment: Install a slip sheet of resin paper and a course of felt underlayment. CLEANfNG AND PROTECTION • � - - - A. Damaged Units: Replace panels and other components of the work which have been damaged or have deteriorated beyond successful repair by means of finish touch-up or similar minor repair procedures. B. Cleaning: Remove strippable films as each panel is instatled. Upon completion of panel installation, clean finished surfaces as recommended by panel manufacturer, and maintain in a clean condition during construcfion. END OF SECTION 07410 - 3 C&B 971163 � �� �. ' ' � �I�. � � � � � � L� � a � � a a � BIDDER'S STATEMENT OF QUALIFICATIONS Firm Name: Address: City: State: Zip: Telephone Number: Fax �Tumber: - Number of years in business under present name: Former name(s) of organization: CLASSIFICATION: � General � Building � Electrical � Plumbing � HVAC � Utilities � Earthwork � Pavin� � Other l. LIST OF SIMILAR COMPLETED PROJECTS AMOUNT TYPE OF DATE NAME and TELEPHONE NUMBER OF OF CONTRACT WORK COMPLETED OWNER 2. LIST OF SIMILAR PROJECTS UNDER CONSTRUCTION OR UNDER CONTRACT Date Organized: ❑ PARTVERSHIP � CORPORATION � AMOUNT TYPE OF DATE NA_ySE and PHONE NUMBER OF OWNER OF CONTRACT WORK COMPLETED 5/7/99 BSQ - i C&B 971163 � -- �� ' ' ��. ��i � � � � � � � � ' � � ' � L� 3. LIST SURETY BONDS IN FORCE ON ABOVE INCOMPLETE WORK (LIST 2): DATE OF TYPE OF AMOiTNT OF NAME AND TELEPHONE NUMBER OF SLRETY CONTRACT BOND BOND 4. LIST CONSTRUCTION SUPERINTEIti-DEVT'S NAME �ND CONSTRUCTION EXPERIENCE: 5/7/99 BSQ-2 C&B 971163 il/11/99 THU 11:15 FAX 817 336 6501 TUCRER AGENCY .. CERTfFICAZ'E OF INSLfItANCE To: Cii� OF FORT woR� �zao s Fx�v�r #zzoa, Ft a�, Tx �'3 November 11, 1999 76I.15 � NAM£ O� �R�JECT: Arr.adi,a Parlt North Derelopment ' 't-s •, PAOTECYNUMBER: Gx7s/s�iZoo/oea3oe�osoio _ IS TO CERT�Y THAT : P1.ttman Constr�c:tion� IYtc.: 5513 D�othY, Fort Wortl�. T� 76II9 is, at t�e aate of tfiis �.s, Ins�ued bY this CamP�a�r• �t r�l� to t�e bas�ess operauaas 6ereinaft+er de�cn'bed, far t�e ty� of ivsuraace and accocd�ttz witb ptoviaions ofthe sffic�detd pol�cies used by ti�is Cova�my, md £iutber hereinaEFer dnscn'bed. Eza�ptious te s�qn�fard pviicy aaud oa reverse side �a� ' � OF INSURl1NCE �� r�ooi - - Poiicy � Effec�va � E�ices �:uaiu ofLiab�ity , Wozlcer's COlnpeasaQoa TSFD001020011 7-17-99 7�x7-2000 Statutcrp Coaipreheffiive Geacral �.iabiIity ��x (Pabl'sc CxR48348� L�ah�7ityj Bl�tsss� . Catiapse ogBulding or StiuChucs adjaccnt to CRR483i87 � exCavatioas D�age ta Uadergrouad Uti'�p�q, CRR483487 Suilder's i2isk Comprehtnsiva Autonnobile Liability �bo�2 Contractual Li�biSity Otiter [l�reSia 3-23-99 3-Z3-00 3 �3-99 3-23-OD 3-�3-99 3-23-00 3��3-99 CRR483487 3-23'99 L`gb2680b? 3-23-99 3-23-W 3 -Z3-00 3-23-00 �Y �]�Y= EaOccurroac� Si.000,000 �unbinEa pi.oP�, ��� sinqle iimit �. o�na: s � o��: s Fa,, Qccut�A,C� S1,Ooo,oQo �a.OcCul'tet3CC. S 1,Q04,00[ �odily tnjary: Es.Pecson: S1�000�Q00 ce ibined sinqle �a,. Qccurceace: S iinit Prop�ty f?amagc: F� 4c�rreace: S BodiIy Injury: �Occurtence: S]..00O,OOC coabiued p�Q�, p��_ siaqle linaf.t Ea..Occwtrmr.e: S F.ach xcarence: SZ,006�QG . Lacatioas cqvered: T� - --- DesCiigtion o�ope�ions cqversd: li.sted abov�e_ - • 'Ti�c abvre policies either in the body thet�oiar bY aPP�F� mdo�stmt�i pravided that they maY not bc changtd or caaccied by the ins�er ia less t�n five i� days af%r #he i�sured i+� received wsittay mtia of such eba�tgdor canceitatias�. Wtxc�e app�iCable lacal laws a� iegulations rsQnine more t�t �i�►a (S) ciaps ac�al natic� of ciiangs or eaaedlation to be �ssured, tixe abave pvliaies conta� s�h special requu�, e�a u� th. body thereof or by �propriace md�rsemens thtreto �ched. A2e:iccv �cA�ez Aqenc�'. Iac- , - , Fort Worti� AIIes�t Address PO 8ox 2a85. Ft wort� Tx 7&ii3 B1! + �� Title Tobin Tncker. Auhherized Reozesenta+��ve tJ l *' L'1 LI � � � � Q 1 CERTIFICATE OF %JSURANCE TO: CITY OF FORT WORTH, 4200 S Freeway #2200, Ft Worth TX Date_ October 26, 1999 76115 NANfE OF PROJECT: Arcadia Park North Development PROJECT NUMBER: GR76/541200/080306402010 IS TO CERTIFY THAT : Pittman Construction, Inc. ; 5511 Durothy, Fort Worth, TX 76119 is, at the date of this certificate, Insured by this Company with respect to the business operations hereinafter described, for the type of insurance and accordance with provisions of the standard policies used by this Company, and further hereinafter described. Exceptions to standard policy noted on reverse side hereof. TYPE �� INSUI�ANCE Policy � Effective Expires � Limits of Liability � Worker's Compensation Comprehensive General Liability Insurance (Public CRR483487 Liability) Btasting Collapse of Building or structures adjacentto excavations Damage to Underground Utilities Builder's Risk Comprehensive Automobile Liability CRR483487 CRR483487 NRAK60082 Contractual Liability Other Umbrella CRR483487 CRDZ68067 3-23-99 3-23-99 3-23-99 3-23-99 3-23-99 3-23-99 Bodily Injury: 3-23-00 Ea.Occurrence: $1,000,000 combined Property Damage: single limit Ea.Occurrence: $ Ea.Occurrence: $ 3-23-00 Ea.Occurrence: $1,000,000 3-23-00 Ea. Occurrence: $ 1,000,00C Bodily Injury: 3-23-00 Ea.Pecson: $1,000,000 cc�nbined single Ea Occurrence: $ linit Property Damage: Ea. Occurrence: $ Bodily Injury: 3-23-00 Ea. Occurrence: $1,00O,OOC combined Property Damage: single limit Ea.Occurrence: $ 3-23-00 Each occurence: $2,000,00�. , Locations covered: Texas Description of operations covered: listed above The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or canceled by the insurer in less than five (5) days after the insured has received written notice of such change/or cancellation. Where applicable local laws or regulations require more than five (5) days actual notice of change or canceliation to be assured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement thereto attached. A�enCY Tucker Agency, Inc. Fort Worth Aeent By �''--��'""`—T � Address PO Box 2285, Ft Worth TX 76113 Title Tobin Tucker, Authorized Reoresentative � L�J CII CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuaut to V.T.C.A Labor Code Section 406.096, Contractor certifies that it provides workers' compensarion insurance coverage for aIl its employees employed on city of Fort Worth Project Number GR76/541200/08306402010 . PITTMAN CONSTRUCTION, INC. CONTRA TOR By: � � . Gary Pittman, President Title October 26, 1999 Date L�.I L�J '� L�J ��� �� STATE OF TEXAS COUNTY OF TARRANT � 0 BEFORE ME, the undersigned authoriiy, on this day personally appeared Gary Pittman , known to me be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of for the purpose and consideration therein expressed and in ttte capacity therein stated. GIVEN LJNDER MY HAND AND SEAL OF OFFICE this z6th day of October ,19 99 . ,,,,... �,,...,..�,,,,,,,,,,,,,,,,,,,,,,,,.,> o�"�' c� C KING " � r "`, �1 � �* ,� t�or,�rpu�uc sr�rE a� r�xAs � ��}� ! Commission Explres; = � �F „:+'� � JULY 3, 200y � . ...,�....,.,adu�y% � Notary Public in an for the State of Texas 0 l■J C l�J � � � PERFORMANCE BOND TI-iE STATE OF TEXAS � COUNTY OF TARRANT � Bond ��S700-8478 KNOW ALL MEN BY THESE PRESENTS: That we (1) PITTMAN CONSTRUCTION, INC. a(2) CORPORATION of TEXAS, hereinafter call Principal, and (3)Northland Insurance Company a corporation organized and existing under the laws of the State and fully authorized to transact business in the State of Texas, as Surety, aze held and firmly bound unto the City of Fort Worth, a municipal corporation organized and existing under the laws of the State of Texas, hereinafter called Owner, in the penal sum of: THItEE HUNDRED ELEVEN THOUSAND THREE HUNDRED TWO AND 75/100 ................................, ($311,302.75� Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for D the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents. L�J f�J �THE CONDITION OF THIS of: OBLIGATION is such that Whereas, the Principal entered into a certain contract with the City of Fort Worth, the Owner, dated the 12�"` of October, 1999 a copy of which is hereto attached and made a part hereof, for the construction of CONSTRUCTION OF PARK IMPROVEMENTS AT ARCADIA PARK NORTH designated as Project No. (s) GR76l541200/080306402010, a copy of which contract is hereby attached, referred to, 0 and made a part hereof as fully and to the same extent as if copied at length herein, such project and construction being hereinafter referred to as the "work". Do NOW THEREFORE, if the Principal shall well, truly, and faithfully perform the work in accordance with the plans, `specifications, and contract documents during the original term thereof, and any extensions thereof which �"' may be granted by the Owner, with or without notice to the Surety, and if he sha11 satisfy all claims and demands � incurred under such contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense �� which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in n�; full force and effect. r � F1 � � a i� � � � C� L'J � l wl C �LL �.. PROVIDED FURTHER, that if any legal action filed upon this bond, venue shall lie in Tarrant County, State of Texas. AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and a�ees that no change, extension of time, alteration or addition to the terms of the conti-act or to the work to be performed thereunder or the specifications accompanying the same shall in any wise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications. IN WITNESS WHEREOF, this instrument is executed in 6 counterparts each one of which shall be deemed an original, this the 12'� of October, 1999. ATTES . �� � PITTMAN CONSTRUCTION. INC. �� � (Pr' cipal) Secretar� P CIPA (4) � � (SEAL) Wifiess as to Principal Address ATTEST: (Surety) Secretary (SEAL) BY: X � �y Title: Gary Pittman, President 5511 DOROTHY FORT WORTH, TX 76119 (Address) Northland Insurance Company �Surety � �� i �� --� f —. B�:��—�� � % _ _, � (�ttor�ey m fact) (5) Tracy Tucker P 0 Box 2285 Ft Worth, TX 76113 (Address) NOTE: Date of�Bond must not be prior to date of Contract (1) �2) (3) (4) % � L' `1� . C.�'���� Witness as to Surety P 0 Box 2285 Ft Worth, TX 76113 (Address) (5) Correct Name of Contractor A Corporation, a Partnership or an Individual, as case may be Correct name of Surety If contractor is Partnership all Partners should execute Bond A true copy of Power of Attomey shall be attached to Bond by Attorney-in-Fact.. � F2 �J I�� ��J �� �� '�l Bond ��S700-8478 PAYMENT BOND TI-�E STATE OF TEXAS § COUNTY OF TARRANT � KNOW ALL MEN BY THESE PRESENTS: That we (1) PITTMAN CONSTRUCTION. INC. a(2) Cornoration of Texas, hereinafter call Principal, and (3) Northland Insurance Comvanv, a corporation organized and existing under the laws of the State and fully authorized to transact business in the State of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation organized and existing under the laws of the State of Texas, hereinafter called Owner, and unto all person, firms, and corporations who may furnish materials, for or perform labor upon the building or improvements hereinafter referred to in the penal sum of : THREE iiUNDRED ELEVEN THOUSAND THREE HUNDRED TWO AND 75/100 ..............................., D ($311,302.751 Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators � and successors, jointly and severally, firmly to these presents. � '�J THE CONDITION OF THIS OBLIGATION is such that Whereas,,the Principal entered into a certain contract with the City of Fort Worth, the Owner, dated the 12rH day of October A.D. , 1999, a copy of which is hereto attached and made a part thereof, for the construction of:: CONSTRUCTION OF PARK IMPROVEMENTS AT ARCADIA PARK NORTH, � Project No. (s) GR76/541200/080306402010 a copy of which is hereto attached, referred to and made a part hereof as fully and to the same extent as if copied at length herein, such project and construction being . hereinafter referred to as the "work". � ��w � � � NOW TF�REFORE, the condition of this obligation is such that, if the Principal shall promptly make payment to ali claimants as defined in Article 5160, Revised Civil Statutes of Texas, supplying labor and materials in the prosecution of the work provided for in said Contract, then this obligation shall be null and void, otherwise it shall remain in full force and effect. . F10 J � u C� TF-IE BOND IS MADE AND ENTERED into solely for the protection of all claimants supplying labor and material in the prosecution of the work provided for in said Contract, as claimants are defined in said Article 5160, and all such claimants shall have a direct right of action under the bond as provided in Article 5160 of the Revised Civil Statutes. ' PROVIDED FURTHER, that if any legal action be filed upon this bond, venue shall lie in Tarrant County, � State of Texas, that the said Surety, for value received, hereby stipulates and a�ees that no change, extension of time, alteration of addition to the terms of the contract or to the work to be performed thereunder or the specification s accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any ' such change, extension of time, alteration or addition to the terms of the contract or to the work to the specifications. ['J � � PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge tt�e right of any beneficiary hereunder whose claim may be unsatisfied. IN WITNESS WHEREOF, this instrument is executed in 6 counterparts each one of which shall be deemed an original, this the 12'�" day of October A.D., 1999. ATTEST: d ,G��i�� r-- . r (Principal) Secretary Wimess as to Principal ATTEST: (�EALI Address (Surety) Secretary i � f � . CS� � Wimess as to Surety PITTMAN CONSTRUCTION, INC. �nu��IPAL (4) BY: Title: Gary Pittman, President 5511 DOROTHY FORT WORTH, TX 76119 (SEAL) (Address) Northland Insurance Company Sure _ BY: �- _ - � � - Attorney-in-fact) (5) --'�racy Tuc er (Address) P 0 Box 2285 Ft Worth, TX 76113 (Address) NOTE: Date of Bond must not be prior to date of contract (1) Correct Name of Contractor (2) A Corporation, a Partnership or an Individual, as case may be (3) Correct name of Surety (4) If contractor is Partnership all Partners should execute Bond (S) A true copy of Power of Attorney shall be attached to Bond by Attomey-in-Fact.. P 0 Box 2285 Ft Worth, TX 76113 Q(Address) iJ L�.! � � � u � THE STATE OF TEXAS COUNTY OF TARRANT MAINTENANCE BOND � �� Bond ��5700-8478 KNOW ALL MEN BY THESE PRESENTS: That (1) PITTMAN CONSTRUCTION, INC. as Principal, acting herein by and through (2) Gary Pittman its duly authorized President and (3� Northland Insurance Company a corporation organized under the laws of the Stateof t�innesota as surety, do hereby acknowledge thems�lves to be held and bound to pay unto the City of Fort Worth, A Municipal Corporation, chartered by virtue of Constitution and laws of the State of Texas, at Fort Worth, in Tarrant County, Texas the sum of � THREE HiJNDRED ELEVEN THOUSAND THREE HUNDRED TWO AND 75/100 ..............................., ($311,302.75) in lawful money of the United States, for the payment of which sum well and truly be made unto said City of Fort Worth and its successors, said Contractor and surety do hereby bind themselves, their heirs, executors, administrators, assigns and successors, jointly and severally. This obtigation is conditioned, however; that, L■J ��J � WHEREAS, the Principal has entered into a certain contract with the City of Fort Worth, October 12, 1999 the performance of the following described public work and the construction of the following described public unprovements: CONSTRUCTION OF PARK IMPROVEMENTS AT ARCADIA PARK NORTH of same being referred to herein and in said contract as the Work and being designated as project GR76/541200/080306402010 and said contract, inctuding all of the specifications, conditions and written insmiments referred to therein as contract documents being hereby incorporated herein by reference for all purposes and made a part hereof, the same as if set out verbatim herein; and , WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during the period One (11 Year after the date of the fmal acceptance of the work by the City; and WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of � One (11 Year; and, WHEREAS, said, Contractor binds itself to repair or reconstruct the work in whole or in part at any time within said period, if in the opinion of the Director of the Water Department of the City of Fort Worth, it be necessary;and, WHEREAS, said Contractor binds itself, upon receiving notice of the need therefor to repair or reconstruct said work as herein provided. � � � � � � � � NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconstruct said work in accordance with all the terms and conditions of said Contract, these presents shall be null and void, and have no force or effect. Otherwise this Bond shall be and remain in full force and effect, and said City shall have and recover from the said Contractor and its surety damages in the premises prescribed by said Contract. This obligation shall be continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. WHEREAS, all parties covenant and agree that if any legal action be filed upon this bond, venue shall lie in Tarrant County, Texas; and, IN WITNESS WHEREOF, this instrument is executed in 6 counterparts, each one of which shall be deemed an original, dated October 12, 1999. ATTEST: ���'� � " -1 (Pr ncipal) Secret�ary (Seal) 5511 DOROTHY FORT WORTH, TX 76119 (Address) Witness as to Principal (Address) ATTEST: (Surety) Secretary (SE.yL) � � ���v(.� PITTMAN CONSTRUCTION, INC. RINCIPAL (4) BY: � ,� �,1 1pii Title: Gary Pittman, President Northland Insurance Company Surety � �Y: -'_ _ _-- - �_ - (Attorn�=iri-fact) (5) Tracy Tucker P 0 Box 22$5 Ft Worth, TX 76113 (Address) NOTE: Date of Bond must not be prior to date of Contract (1) Correct Name of Contractor (2) A Corporation, a partnership or an Individual, as case may be (3) Correct name of Surety (4) If Contractor is Partnership all Partners should execute Bond (5) A true copy of Power of Attomey shall be attached to Bond by Attorney-in-Fact. Wimess as to Surety � � P 0 Box 2285 Ft Worth, TX 76113 F6 �`y ti *< r . , � ,� �} �.,e .2.i �����.,F . .-,y, � .�,,. :; �.,� ,, r �: x,�, aG '#. - . . " .. ' . =i �2 xS `'' � �` F 8 � � :: � .�o �•� �' ,,, � 3� ��,aR- � v �" >�' ;�' x .�' � � *•`.. ,, x a � 2k � � s �'^���ii� `�' " `i i 'f`e'.' E� :Q �x �,� < -�:. ��' �, '� .;�� � � ;. D :� �a,�^� �� t„ >�� u }r� � _ o- ,,, �:z � L�'3» �'w �> 4 at� S 7 y° -'�"'� �+ >.� � �� . n ,. �i � e" ',��+� r 43,'3.: si V F k - �:r '�k � � 1 }z �, �' y �S. � ,,,.� rsc -�� �� � ���� � � �`��ri�� ��� ,NOR'T�:�ND �`�i��l�'�E�fl��1PAN�Z" �.` k � � # '� � X . � � ��f� � �. ���,.� � �: � � ,, > ` • 3 a . � ` t ,; � 4 � ; `a�"" ` A�;�; �:� PQ�R� O� AT'I`U�tNEX �� $;�3 � ' ` x &� ; >* � � °� � , :� � � �. s De �'� ��,¢"� . � t 4 c � � � ��`✓ � .r �v�s � � ; tii .� �, ; „`,Ez� i, . ; ..5� �,� , h. �y a � ^ a �`i,� �s d°.. y � a, �c � � �'t � k � €�'� � _ .s`a � a � A � .: a �� fs,.�� � � s �x� a ; > v ��, : � y < _ ;'KNO� �I�P�R��U�S ,�'''.'�.H�S�PR���1�'�� ��'.�at'tli`e f��I�'��L��N� I�t�d � 4 � �„ s,� ,� S `� = g� s � �T � �i �'Y a°�a���ho��ok �riiz�� �°.�'+`�'` �`�, ��_ � ,c ,�a >�� �S- �z ,�� � �c " � .�� ,� ,�.h � g under tbe 1� s �f �� -�taf� of l�i " e�sc�ta, doe�s���eU�a�ipoint r � ;� p� � � � � ;`.,� ��,�� , � ;�x � p � „� �� • �% �`� � � � � � � .<� �< � � } f „�.«; ; } � '� w� � ,c r ,�, '� � ,� �� { �- �' �c • � � �� •y'� e � _ � .��' '� l : . � �:� ^�. ��;� . � : � � � �' � y,t � 's� * -, : ��x(y^�� X+� �:/'�'1' i�.,. � � %"' f �� e rty!Yp:'y r :`s* �3°t� � '� �, u..� '^ �` �- r#z% p� jK-�'l�l�Try �3�„ !�¢i� a . w §� �* - o � �`?}�, R" t� �� U� fi �� P �:f� } ♦'+ ��.��� �.r._J T�� +`4+y� ` ��,��� J������ �Vi�+%i.�h `i� ��. Y� "�}t.. ��, N �I;� � 4 :.� � x;. , -. � � �'"• , , _ � � .'�_ �'• `_�: , "� E�i��Ii�T�,�IiEIR SEP.��ii`F CAP,ACI`I`�' � _ � '�� ` - � `��' �';- �,� , ' � `" - , � , �. `" ' �*� ` � y; : � t '-� � ` ' ,� �» � » `� � "� � t ` - its irue. and lawfiil�.Attorney(s) an-Fact to s��n, execute, seal, �d deliv�r on rts behalf�as.;Suret�y,4 an� and all bonds and �nd�rtakings,�' , ;.�`. �?�:�.. f �'�..Yr , ..,....�.�;. "...v' .. ...�w�, ..:�. ., <t., . . :..t� ,.�",�: . i'�._^°`'im•;� .:w '� :� ` .o-„ _�_.t..r.. ult_.....v:7 ..s..,..,.�,.,7 .....:.:'.�`r.�:.. the 3��#+ �� jT£�� �� ��� � Ks�y �i� ' - Ts.' �;. � �� r`>'' 4 'b , �a ` ThisF Power o�At�orriey shall �3e limited,in amount ` This appii�i�ne�.t��s made.�3.�r and�b,��uxho�x#y �f t] h on thr���st�day�a�l�ar��Z�; 199.fr ��cl�-e�olut�bn ��� � `e �4 �ti%, f $ .:: ti �` � j F� . �' ri g� , Wi' �:`.. �ek' ,� "` . �'�;'� .�>_ 3�' .�rF•` � � :�., �ots �F '� ,��r �.L �'?� �*� � ,wl",w 0 ^a�,+ '� �ky. $3,S�O,U00 00�'for a sin; : �rt . s t- � . ry T `-�`. � ._ . , �� ithJU� V�l�x;�lTa.�T,�1�,Y��SiC�erii��3T aii.� <Y.�Cer�re�51g�1� ae nerev� aut[c,�v,F��r�., au� ��,upv.�'G�u ,.,� a�,y� �� �,«��u�,�a-u� :. a..�.:�� �u�::� ;, �'� fhe cqrpt�i�te`���a�„ an�<e ec'�t�te on �e�al��f �nt�tp�ny;��bonds, poli�zes,'uric�,�rtal�t���,�r dth�ir �s�utn�ts o�'�im3lai �atur`e,�i�,�r� . . , y . .2 > v., 2. p '�£, ✓ ' &. p'- . P 3 �. � �'p ,:v � � � . . Y � . �, . a . � . � . shall be bin�ii`i�'upon th����it�i�ny aswi��iey I�ad dil�� executed anH a��twleclget��y'x�h� regu�a.��� ele�#ec� �i�eers'of the�coz��'a�ii�+� ; URTHER� ;SOLVED$ .tl�at said `officers`ma renarrie°an"such Attorne is-in-F,act�arid �evok`e anyPPower }of Attoin;ey previously4 F �E , Y Y , Y .� ,, Y6f��CO S �C�'1-� £T�'S? . x o � r � . ` � �� '�' h � � ° �. � �� � '� , �* ` � g ; � . � � � y� � �� ���.� . �'� �6 � f �u . s � 4 � � �' 1 c - _^r."�, 7 �; ffi o �,gy '`s" ��... � 4 �: a ' �. '� ��s - : .;✓ � . �" e t'� k, �y� s '� '�'S ,�y„'e� � z ��... '� �.�" �; �" .. .F#- 'y,,. �. ?'�"" � �v.. � �",'�w �w '��-w 3� ^�m r .�. �'�'n�. �, a;v �,:k �'�����,�' �.�^�. x� ::� � �t� rs���a� ,s,...,y+,. � � 'r aE �,.` � r� x'� `� VVY�'I�ESS� 3�tORTFii,t� f�T�.CTR.AN��COIi�P��`� T��s caus�cl th�s��reseiit��to �e se��ec�� th x�Cs co�i�raf��� :„ �r '� a �' �� �. � i- ,d - �.� �i " �: � � ..^'"�'c � ; z .a �.y -^y � � ,� g� £i . '� , .A! g � ,v� x '�z �se�l, duly att���iv������t ty,IS 1� at� c�� �u1 , ���.� �� : �; � � �� �= �, � ,� �� .��` �'s . � � !�`� �=J a x . ,y8 �:� }%' ,'�t� .�_�� e �,� x � Y3,'i . `�,�, °'t�.,. '� t+.;,> ,y*c• s_.�rE •�,b� ��p � �'S'��,�y Q��� 'a �{r<��'' ;� +;'y�f �`.� �; ,a � . y �� x �'b� ,�g } �%.. �r,��� e $_ . 5r' : � c�n �. `�- 2 � � � � '`� f:.� Y1 ���. ° � `t:y+�� �'4. �c �y r ... � ' ° y'�` � . �t _. ' . .�a 'as� ai'' � . a ' w � ��� �.,/�\ •���;• � � T �k�l\��11Y 11,1.7�+.�u+1\VL �O;\�11 �� � R.: � � � � ���`�. ¢` �/ /,L% 7 � � % � M - J" `i. " g �" ." €: � :` a �, �T �~ � . v' ' � ,c� �� ~ T�� ' ' � . 4� ' ��L 0 - �,> 'a � �� >. h �"� � � �$ � �w� .� � » 4$ $`� � � 4 �R� .h" �} 'A � 4 � �^.�.ws .S. j `,e�'% J'Y'i ,e 3 t.�Q .��'� .� � .,�� � .�° ,z� �� �.�e : �.^ � � x t .�„ �'i�"' '�i� 5� ,�y ...'�'� t �� ." � �:�a [ � q► �'' � ��� �.��;�.�L, �e � �w `� 3�� ✓ �; e i2 W � ��[ ;!�"ri�"`��.� ,�,�.% � $'" �"�.`�` ,gYS" u 3I1�� �Cj��'nS; ��.��`Il���:+� '�' <a'` ��r ay �';�'�' s '�' , �, � �_ ` � .. �'. �j a .t" .ry - - > ,a. . . * .. r �' � �`' t �'. Tr�c7 1 A lFi'i �i����� L.� §:'� �{ — ���.;3�{' ��' �2E � � Y�', y � k � i'� �' xi,,. x� Y .�� �, x t +p �` a y ry _ . � k yi - .•.s � . � . Zc` �i..i?� �ty:._ v� ���T ' ; � "., a;;��t . s� . ,;: "�`e 1�3 "� ,�s '�' � ,o-�'k �' � ' # f t 4 � A . ;�, ' � �� ,�r ' .�$ "� � ����k/����y������`\ �b$.�tt ,�i �'r` ',i} �3's '� `* • �` { '`.,� � �} �' ,r.., � '���si.t } �i' 3s z .0 � . { t .�. _ y+� �"' .i� � �#� ��OUNT�.�7�=�1��iDflf�ill��� "� )���� �;_� ��`� � �� x� T�, �" ` �`� �;"��, � �``�.�`��_ "'��� ''� _ , ~ '`k'�f, - � :;� "�� _�` ei �' `?� € 4`� « � `A` iy � i' • • ia ;"F _� `z 9`+ ta'�'� ` � �p. s� Ve* a: $�> : ' On fhis�l st da� of July, 1997;� b�fore m� personally came Ran�tall�D �ones, to me known, who °bem� b3� me� �iuly swom, did;�epose � k . - . ,. .-a :.� � � C. �` '3: e� ;� s � t '� � ,Lx .: az �;� >�:� ,� �, �_ . , . _� : { � �'� _ ,: �. � I, th��rlde�sig of I�TO���i.�AfiTp.�SUR-,�N� �1; �hat �s w� so �#fi�ed b�,qrYi � , � r�i ,s� �.' u�y¢' O ;J:;iL V�,'�yaa :'��i'.�'r3 '^„ 3 ¢'��` �` : irEl R. !�+Oltfi�� .� _ . �',� :�' � � . A �� ''' My Co��a::issi •n Ex'�irss Jan.31, 2CQ0 nnnnnn:rvvw�vv,.vv�.rsrsn:�v�v�n,w�nn • �. , �> ���� � . ,�„ ��, a -� ;i�r.__.��'_ �'-.a.�...a ,.FS.'`t!'c�Ti3r��'�' �n -.�`�� _ .?4%''�.` ?i �.� n^ x , . =`���iel R l�itil,tne,"r : ` ; �viy Commission �� � � _ .` _ �.. �. �� � .... - . tfor� a" � . y "� . �<� ''��� � :x'� ,� •- ,� � • �� � �� ��'� �� Signed-�nd s&a1� a�th� ci1����1eri�ot� He��s�in t�ie=�tat . .� �r, � .� } < ..�� ^�� ��• a r pv � § - y*V � ` A t'� .3.i6 . F' f�. .3'� /� __� .£T �� .. - � ��� ��S F'� � s,.,, d,�..n` � <a ��3 �+ �S � ,�. �y , x g�'° �. "�/ ��F � h «:3s , '� -. '� -� e . fr5 �^ '. ',�,y' �i' a',�'� +� fi. ,"�"�` ti'; r. ys�`` xr'� ,Y 7 E 2__ k x�`� �'4 � t .. '� .'�,`. ,> ,�� . ,.. ,.. a , �,, ::�.� «. „� .,K�:�.. . ' �'�� �,� ��� �� �5 x¢ �� �� � � of 1�.i3�.es�ta, datE �p �, . l, � � c��rd J �g� .�c��.'�re�,�t�e ��i� � � ._ � � E � .. .�.'��.� �7a �. ,� . � >.. ;i�eo �luch,a�e o�`�r o�,��cbq izrstcu�Ten�S �n� `�im�ti�,'fo aI���n� �ffi�e�`'� � . � �� � , r,>, + '�{ e obligaiion: �� ry�` .; �_£ `-y6" t � or.i •`41v3t1� a .12 narrl..nf4T' { ��... F � ? �, .� `� `=`_.., y �..,��`� : ' of sa,}�co: 3 �c �'''7 � ...r s � � �, �S �� � � �bg '4c� '<y. "�� �' � 4 �t � k�',' a i b, fi.F x' . � ye�,�to�� o� sa�d Co�n�y �,� +%L .���� _.� �$ .An Kj.�$ �g ��e t qi �, � .�.- .>a`;�'a'� `k'F4 ;.3�h.< ��, .� .. ° ... s� _- �. .: -�f3 � � ��" �, #z .i �il�v � o ,� �:V .% ;�, ., <s: �5 f <� t�� � � '" �� < �, ��> y `` ; � �•`�VIIC yy w r�'`;,vh.�,�. .K,.^�'_���y� �y-0�s �� ��;�i. �es: ; January�� 1, •2000} • . ' . ;� � ` _ ` , Y , ,�a ; < �' _..� � .. .�._ � .��. .,. . _ �'.�. _ , . JA�, an��er.���r��'� �he Res�lt�iior� t�f "� � , ,, � .: �,: �. :��,e� _ �'� ,� � , z � �;.,< � `r` �.''' :� � x. � �:. ;� � �,. � �,� � � . '�., ,� ': � .�t,. }�. �.�. �� ¢ _ „ $� � s� � x���na���o� ; °` �������,- �. ,��q���� .�� � �.�; � � � f � � � '� �-�.�,ay t. ;;� n �, . _ V•. _.., �d'�� �. .r`:�.. Lt�r � � `5 . ry.`.` E �. � �-�, ' � �� , ' "� r � � � �- -f'� a ���::'�. Y'." '4 r:}t` ����� �' -�,s � -��`. � �'` r V £� ,��. �ax��- . y�. �; ��`�a r.� ;r : �: � � � � � r � �'�'y :^ ,�,. . . a4 ,»'F .. ;: . . � ? t� ;S ��.:.;.�,�X y .� _""�`�„�,y�•��i ' �.�.=��.`�...4C...��7."��='� =��-�:�`�='�.,:.�: �=�w���.�..:n.�ae�e�,�.�..,.��M:� �. .,.d.�..�.. .�.. � � ., - �.e, _.,... .��,., �. �. �. �.„�„,e ,o.�.,.��. �..W. .�..-� �- = y. �,.s� �..�.� �.... ..� .�., �,.� .� � . � U � � �.,..�.. .,.� .�._Y,....m,..�y ._ . �, _ �.�... .�..� �� ..�, .� z _ A.a..,.��.,.���.... � .� .� _. _�.... �. � c� �. .� _,�.�.,. ..,�,._._....�. ..,.�...�.. ,.. ...� ..�. .�,..� � � o � ,.�.,�.... ,m.,�,�,.. w--.�-: -�-�-� m�,....m .� � .� " — �„ � .� .. ,. �..�.�..�..�..�. ,.w. e ,�...�... ,., � .. .. � ��� c � '..".' . .M _ Z�No �' �.. ... � ..�.,. .�... � .�. - m .� .�.�..� .... .. �:. ... N .,«.,.....m.w �.. u.. »». .,o.m.,�. �.,.�., v�,. ,,�......- ,.. „„ w C ...�.e.,..� ,��. .. ..,.,� �.- „ �,,...d ..,.,. _ . �. .�, �. .,�a,W .�,. ° _ � ,�.,,,,,a„a, . . � s �. . .M �.�..,. : ,,,�..,. _ .,.,....� _..,. �...... ,..o., Q -a s � ao .:._, ,�.:,. ,�. ., . ,.�.v ._,.r.. w �. _,... �.�.. . �. .�,.m.�, � ,� � ,aA_ .,.�.., . . � � c rn � �o �.�. ...�. �. � ... �, � _ .��._.� � ,w�.. . - ta�nw.r,ryw�m.«re.M n.or�w, zw . � .�nw.or+.n+�+r-+uv�. . �a . ..:�.�... - m.. e,a ...,� � a' �.�...�... - - ..,�._ . ... ..� ,. ,� Y y W � l� ,....�.0 � e....o.,�,.,,.�.�,�,.. . . ... . . -.., - �..�.,� �.�., ,.d�.o.w,.>..... � o. . .�..�� . . . - ....� . �. . . � . , .a.�..,� . �.. � ... . �.«.�..�W... ...a� .m„ � �....a.�..«. ,.a..c � �.��. . A . � .,.,d .e,..,..�� ,., - .,._.,�. - _ . . , ..�.w � „«.�..v., ..� , ...a.s, . . .' � Q � � m i-- m CV L�L 00 ...,...�e «..... �. . ,,. .,,..�. d.»...e..�.�».�. r..�...w�. W..�.�..�,. `.. _ ..,,.n...�....�„s ..�.....o...e=.....w.. �.. �.� , . r,�,. . .....m....,��...... .. �„o..._.sYw �.�� .,,,�....,o�...�.,. ....�M,...,_d.�m_,,, , .,,. ,. .,., . m ,_,. „ , _. . �..,..�,.,�,�,�...:.�..,...<�,,.,.��.,, .,,. �. ..�.,� » ,m..... .�,......., ., ....,..�..,.,...�. .,.r, ,.�,.,.�,� e,m. ., �,.�,., . � �. . r .,,�,�,. �...�.......'...� ,,�...�.. � .�_....�... . ,.�.., �. ...�,w.. µ �...,....,�. ...,�. � �.,. .�. �M _ � , ,. � . H �b� �a, � .�.;:. �.� ., - , �xr�:::_ � �� � .e... . .� Y,.��,.o. ,. � ... �.�. �._....e. �.. . .Y.. .,� � . � .� .y... .d.w. �. ..�.. ,�... .. � � -� � � ... . ..�.... .M:�,...�xR,. � ..., _,� �....�..,� �_ . , _ �, _. ..� .� - .�... .� .�... , :. w�.Y�.��.,� . . . y �..�... .,,,. �. w.� .n � -. _ ,���., � � L!' ��� ��l LJ � I� I� I� l�J '� i� L�J � L�J CITY OF FORT WORTH, TEXAS CONTRACT THE STATE OF TEXAS COUNTY OF TARRANT KNOW ALL MEN BY THESE PRESENTS That this agreement, made and entered into this 12`h day of October, A.D. 1999 by and between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under and by virtue of a special charter adopted by the qualified voters within said City of the 11�' day of December, A.D. 1924, under the authority of the Constitution of Texas, and in accordance with a resolution duly passed at a regular meeting of the City Council of said City of Fort Worth being hereafter termed Owner, and PITTMAN CONSTRUCTION., INC. hereinafter called Contractor. 1. That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: CONSTRUCTION OF PARK IMPROVEMENTS AT ARCADIA PARK NORTii 2. That the work herein contemplated shall consist of furnishing all labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications heretofore prepared by the Parks and Community Services Depart of the City of Fort Worth and adopted by the City Council of said City, as an independent contractor, and which plans and specifications are incorporated herein by reference. - 3. The contractor hereby agrees and binds himself to commence the construction of said work within ten (10) days after being notified in writing to do so by the Depart of Engineering Director of the City of Fort Worth. , 4. The Contractor hereby agrees to prosecute said work with reasonable diligence,after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Depart of Engineering Director of the City of Fort Worth and the City Council of the City of Fort Worth within a period of 240 workin�, days from the time of commencing said work; that said Contractor shall be entitled to an extension of said time for doing said work for such time as he may necessarily lose or be delayed by unavoidable accidents caused by unforeseen matters over which said Contractor has no control, such as inclemency in the weather, acts of Providence, labor strikes and delivery of materials, in all of which cases the negligence or carelessness of the Contractor is not contributing to such delay. 5. � Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said specifications, then the City shall have the right to take charge of and complete the work in such a manner as it may deem proper, and if, in the � completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifications made a part hereof, the Contractor shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. � 6. u L�J � � !1 l�l � CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor covenants and agrees to, and does hereby indemnify, hold harmless and defend Owner, its officers, agents, servants and employees from and against any and all claims or suits for property damage or loss and/or personal injury, including death, to any and all persons, of whatsoever kind or character, whether real or asserted, arising out of or in connection with, directly or indirectly, the work and services to be performed hereunder by Contractor, its officers, agents, employees, contractors, subcontractors, licensees or invitees, whether or not caused in whole or in part, by alleged negligence on the part of officers, agents, servants, employees, contractors, subcontractors, licensees and invitees of the Owner; and said Contractor does hereby covenant and agree to assume all liability and responsibility of Owner, its o�cers, agents, servants and employees for property damage or loss, and/or personal injuries, including death, to any and all persons of whatsoever kind or character, whether real or asserted, arising out of or in connection with, directly or indirectly, the work and services to be performed hereunder by Contractor, its officers, agents employees, contractors, subcontractors, licensees and invitees, whether or not caused, in whole or in part, by alleged negligence of officers, agents, servants, employees, contractors, subcontractors, licensees or invitees of the Owner. Contractor likewise covenants and agrees to, and does hereby, indemnify and hold harmless Owner from and against any and all injuries, loss or damages to property of the Owner during the performance of any of the terms and conditions of this Contract, whether arising out of or in connection with or resulting from, in whole or in part, any and all alleged acts or omissions of o�cers, agents, servants, employees, contractors, subcontractors, licensees, or invitees of the Owner. � ("� In the event a written claim for damages against the Contractor or its subcontractors remains unsettled at uthe time all work on the project has been completed to the satisfaction of the Director of the Departinent of Engineering, as evidenced by a final inspection, final payment to the Contractor shall not be recommended by the Director of the Department of Engineering for a period of 30 days after the date of such fmal inspection, unless the � Contractor shall submit written evidence satisfactory to the Director that the claim has been settled and a release has been obtained from the claimant involved. L�J I�I LJ � L�J � LJ Although the claim concerned remains unsettled at the expiration of the above 30 day period, the Contractor may be deemed to be entitled to a semi-final payment for work completed, such semi-final payment to be in an amount equal to the total dollar amount then due less the dollar value of any written claims pending against the Contractor arising out of the performance of such work, and such semi-final payment may then be recommended by the Director. The Director shall not recommended final payment to a Contractor against whom such a claim for damages is outstanding for a period of six month following the date of the acceptance of the work performed unless the Contractor submits evidence in writing satisfactory to the Director that: 1. The claim has been settled and a release has been obtained from the claimant involved; or 2. Good faith efforts have been made to settle such outstanding claims, and such good faith efforts have failed. If condition 1 above is met at any time within the six month period, the Director shall recommend that the final payment to the Contractor be made. If condition 2 above is met at any time within the six month period, the Director may recommend that the fmal payment to the Contractor be made. At the expiration of the six month period, the Director may recommend that final payment be made if all other work has been performed and all other obligations of the Contractor have been met to the satisfaction of the Director. The Director may, if he deems it appropriate, refuse to accept bid on other Department of Engineering contract work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 7. J L�J The Contractor agrees, on the execut6ion of the Contract, and before beginning work , to make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful performance of the terms and stipulations of the contract, including the exhibit attached hereto and made a part hereof and such bonds shall be 100 percent of the total contract price, and the said surety shall be a surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City Council of the City of Fort Worth. ���J ' �J u II� 8. Said City agrees and binds itself to pay, and the said Contractor agrees to receive, for all the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on the proposal submitted by the successful bidder hereto attached and made a part hereof. 9. It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or � assigned to anyone else by said Contractor without the written consent of the Department of Engineering Director of said City of Fort Worth. ��� � !i 'J 10. The Contractor agrees to pay at least minimum wage per hour for all labor as the same is classif'ied, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto and made a part hereof the same as if it were copied verbatim herein. 11. It is mutually agreed and understood that this agreement is made and entered into by the parties hereto with reference to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with reference to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of the same. � IN WITNESS WHEREOF, the City of Fort Worth has caused this instrument to be signed in triplicate in its � name and on its behalf by the City Manager and attested by its Secretary, with the corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in 6 counterparts with it corporate seal attached. � � �� � Done in Fort Worth, Texas, this the 12TH day of Oc�ober . A.D. 1999. RECOMMENDED BY AP ROVE �� ' G�. � . 1 DEPARTMENT OF ENGINEERING PA S AND COMMUNITY SERVICES DIRECTOR DIRECTOR ITY OF FORT W TH . ATTEST: � � ' .!�i[/Vl 1 ��`U�c.� Ey: .�N � _ �`MAN�iG �J CITY SECRETARY a PITTMAN CONSTRUCTION, INC. 5511 DOROTHY FORT WORTH. TX 76119 � CONTRACTO By: -� � � \ �hes%�e,..� � TITLE .�`'�11 � U I�+D��o h � � � ADD SS '�J \�! J / / L. �`� . Contract F�uthorization ��v� 1�- 9�I Date A R S TO F�ND LEGALITY � ITY ATTORNEY ���