HomeMy WebLinkAbout025412 - Construction-Related - Contract - J.L. Bertram Construction & Engineering, Inc.,
�
�
�
r
�;Rs'., ��'C���e�R�/�/'�'
�" ,. �'�a �
. y�4•;sa
t
1 l
�� ►
SPECIFICATIONS
.�I_ ►�
�.
CONTRACT DOCUMENTS
C�OC�iRAC�R'S BC}N�I�'�!� C�. CITY SECRETARY �
, 1998 CIP VARIOUS LOCATIONSCorvTRACT NO .��� ��"
CO(dSTRUCTiON S COPY
CONTRACT 99C �
�LIE(VT DEPARTMENT
PROVINE FROM MEADOWBROOK TO NORMANDY
� NW 19"' FROM GRAND TO HOMAN
CURZON FROM WINTHROP TO BRYANT IRVIN
WINTHROP FROM CAMP BOWIE TO LOVELL
. � p•. A
UNIT II: PAVING IMPROVEMENTS ALTERNATES NO. 1& NO. 2
PROVINE FROM MEADOWBROOK TO NORMANDY DOE # 2004 K-1535 C115-020115040591
NW 19'�` FROM GRAND TO HOMAN DOE # 2008 K-1012 C1 1 5-020 1 1 5040590
CURZON FROM WINTHROP TO BRYANT IRVIN DOE # 2011 K-1520 C115-020115040589
WINTHROP FROM CAMP BOWIE TO LOVELL DOE # 2015 K-1524 C115-020115040589
IN THE CITY OF FORT WORTH, TEXAS
1999
�
KENNETH L. BARR
MAYOR
.—�..���
�'�P�:� �� •TF�'qS,�1�
� '�� � .*��
� *�............*.
� �JCHARD a aRGOMANZ
/ 'O`, �',1560 ' '��Q,
r ��•.
r�1�l�Ss .��,�,ST�! �G�``'�
�
�
, � FORT WORTH WATER DEPARTMENT. �•�•• FG�
t cr'• S
r, �'l�l�i9 =�� `�•"•
HUGO A. MALANGA, P.E. - DIRECTOR �_' • �
L. DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
�
��
L
PW77-060770155690
PS46-070460135390
�
DOE # 2004
DOE # 2008
DOE # 2011
DOE # 2015
BOB TERRELL
CITY MANAGER
u[��O�B�� `�'[����Gs�
�0� ��������
�o �� �,�N�, ����-�,
�••����
/ ��'�E Oi TE�,`
,• ••� 1
�+:'• � �.*�1
:
,.� :.........................:'.
' RICHARD J. ZOHNE
� ............ .................
�������'��� EE C. BRADLEY, P.E. - DIRECTOR t��.,�.. 55363 i�e�
N�'��*�'° '. r
�_�
��
/4�9 i
A. DOUGLAS 12.��;�MAKER, P.E. - DIRECTOR
DEPAR'�' (�d�;NT OF ENGINEERING
1
�� � � �� � �
� � �� � � �
�
� '� � � �� �
•.� "�'�`
s
yx..
� ' .
'.-�.+
� �
( _ -
t'
�
i
�
�
.�;
�
SPECIFICATIONS
�
�
C�
��I
C��
L�'
��
��
��'
�
l�
�
�
�1
�
�
�
AND
CONTRACT DOCUMENTS
1998 CIP VARIOUS LOCATIONS
. CONTRACT 99C �
UNIT I: WATER AND SEWER REPLACEMENTS IN
PW77-0607701556 0
PS46-0704601353 0
PROVINE FROM MEADOWBROOK TO NO NDY DOE # 2004
NW 19'�`�' FROM GRAND TO HOMAN DOE # 2008
CURZON FROM WINTHROP TO BRYANT IRV DOE # 2011
WINTHROP FROM CAMP BOWIE TO LOVELL DOE # 2015
UNIT II: PAVING IMPROVEMENTS A ERNATES NO. 1& NO. 2
PROVINE FROM MEADOWBROOK TO NORMANDY DOE # 2004 K-1535
NW 19'�`�' FROM GRAND TO HOMAN DOE # 2008 K-1012
CURZON FROM WINTHROP TO BRYANT IRVIN DOE # 2011 K-1520
WINTHROP FROM CAMP BOWIE TO LOVELL DOE # 2015 K-1524
IN THE CITY OF FORT WORTH, TEXAS
1999
KENNETH L.BARR
MAYOR
r �,�A�� 0� TF��s'��1
�t• �� .*I
i*. :*
r � �.
� _ , fJC1iARD A, ARGOMANZ
rt �0., .9 �� .'�Q
# F �: �k,:
ti , ic�. • Qt �
, i i,S,s�OS7�.��.:
C115-020115040591
C115-020115040590
C115-020115040589
C115-020115040589
,
BOB TERRELL
CITY MANAGER
� •�: •- -.,;v- ��
i• �': s �
�• .
f � :...........:............: *
� ��cH�►an �. zof+►�e
(� ` ��� .. i. .� ........................:..
,, �� � EE C. BRADLEY, P.E. - DIRECTOR �t � ; 'e,
� FORT WORTH WATER DEPARTMENT ���o,�.� 553fi3 0; ��,� ;
�,��i /�� ��``SCOIkTL�NG�t��^ �:
�y. � � �:
.. ``� :.�
� HUGO A. MALANGA, P.E. - DIRECTOR ���• 1���u •�`� �
NT OF TRANSPORTATION A W �
DEPARTME ND PUBLIC ORKS �/gl q�'
A. DOUGLAS RADEMAKER, P.E. - DIRECTOR
DEPARTMENT OF ENGINEERING
�
J
,� �
�
�
�
�
�
��
�
�
�
L�J
l�i
L■J
�
!'�J
�
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
TABLE OF CONTENTS
Notice to Bidders
Special Instructions to Bidders (Water Department)
Proposal
Unit I: Water and Sanitary Sewer Replacements
Minority and Women Business Enterprises Specifications-Unit I
General Conditions (Water Department)
Special Conditions (Water Department)
Technical Specifications
Material Specifications
Certificate of Insurance
Contractor Compliance With Worker's Compensation Law
Performance Bond
Payment Bond
Maintenance Bond
Contract
Special Instructions to Bidders (Transportation/Public Works Department)
Proposal �
Unit II: Paving Improvements Alternates No. 1& No. 2
Minority and Women Business Enterprises Specifications-Unit II
Special Provisions —(Transportation/Public Works) Unit II
Certifcate of Insurance
Contractor Compliance With Worker's Compensation Law
Equipment Schedule (Unit II)
Experience Record (Unit II)
Performance Bond
Payment Bond
Maintenance Bond (L1nit I)
Contract
I�
���.�
�{ ,
�
II���
;
',���
' ����, �\P-- �� C:..
UNIT II - Alternate 2
city of Fort worth ���-r o F
Minority and Women Business Enterprise���if3k�a��Vs
� '�9 S_Fp 7 P�l 2 �.S
SPECIAL INSTRUCTIONS FOR BID�I�ERS
. .,
�
APPLICATION OF POLICY
-- - - _ _ . _ _ _
If fhe total'doilar-value of:the conEract ts $25,000 or more� the MIWBE goal=is applicabte, tf:the tota( dollar�
value of the confract is fess than 525,000, #fie N[tWBE goaf is not appticatite.
POLICY STATEMENT
It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business
Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual bas�s: �he objective
of the Poticy is to increase the use of MMBE firms to a level comparable to the availability of MMBEs that provide
goods and services directly or indirectly to the City. -:
M/WBE PROJECT GOALS p
The City's MSE/WBE goal on this project is �o % of the base bid value of the contract.
COMPLIANCE TO BID SPECIFICATIONS
On Cfty contracts of $25,000 or more, bidders are required to comply with fhe intent of the City's MMBE Ordinance
by either of the following:
1. Meet or exceed the above stated M/WBE goal, or;
2. Good Faith Effort documentation, or;
3. Waiver documentation. .
� SUBMITTAL OF REQUIRED DOCUMENTATION
The applicable documents must be received by the Managing Department, within the following times allocated, in
order for the entire bid to be considered responsive to the specifications.
�
�
�
�
�
1. M/WBE Utilization Fonn:
2. Prime Contractor Waiver Fonn
3. Good Faith Effort Form:
received by 5:00 p.m., five (5) City business days after the
bid opening date, exclusive of the bid opening date.
�eceived by 5:00 p.m.� five (5j Clty business days after the
bid opening date, excluslve of the bld opening date.
received by 5:00 p.m., five (5) City business days after the
bid opening date, excluslve of the bid opening date.
p CONS(DERED NON RE$PONStVE TO, gp RESULT (N THE BID BEiNG
,
' ECIFIGATiONS.
FAILURE TO COMPLY W(TH THE GITY S NVWBE ORDIN.ANCE, iNtL
Any questions, please contact the M/WBE Office at (817) 871-6104.
Rev. 612/98
u
l'�J
J�; �;�':� �. ;;�.:� �.,� ��
"� �r x�: � '�+ �"
K�
. �. . . , � '' ' . ' , r � . .. ' . ' ._ - . , .:�;,�:uw�Y�:;�4F
. .. . . _ . . §3M� .Y . �,
r . . :i L."
' ... ♦ . ' .. . � � � r .a .y _ , �.. . . A a. r • ' hr "�}� �i. .
t ' f .. ` �. .� ,. � � ,� .j , y ... r s �Y,�'�' �*"' .
. . _ ' _ , . - . � . ^�.�- ' . �. ➢:��'�';AT'TACHMENT ., � �,,
. . ' `4 � ' - .. - t , . _ - � a��.���s:�Pa9e 1 of 2
� , A. .,. �� � .�ci� of -Fort worth , E �~� '� - � ' �� a - 4 -, ��� s .
Minority.and Women usiness Enterprise Specifications '.�� � �
. ..F•b�, "tGt..;eT�.�n1 �;�wr �'';a�, je ..�i+,., ..a':,�`. Q�w��... ... . « . ... �f ..«u'�.,. '1t�,.. .:�:5� _ .:._.
, �� , �.
� �-� . � � MBE/WBE�UTILIZATION ; . � � . . �.
.��. ��r-a,/�Ca�•�sc ���, � 1,.�� ,...�.. _ . r .�E.c�c: d,_ 1� .,�_ ..._..�. .. ,.. ._n�w�,
�?RIME COMPANY NAME ' • � � • - u • ^ �-� � _ :;81D DATE �`" ^ A - ''�°' , '
c tP VAR k6u5 �.�cazic��=-���. : -�, � . . . ,., : , ' ��(��0"7 �- = 1 �,�' - . . - �- �°� �
PROJECT NAME �N�T„3T;�?}►.V l,k,�.,. A1•'+C"- I��, s� . _. ,. _ ,. µPROJECT NUMBER . , , . , . � �.
,; . , . . M
�� CIIY•S M/WBE PROJECT GOAL: �� �, - ,. � q . L _ v- � MNYSE PERCENTAGE ACHIEVED: 'a�Ci�� Y `` ^� �
i � . .. . . � � .
Failure to compiete this form, in its entirety with supporting documentation, and received by the Managing Department i-
°�on�or before 5:00 p.m. five (5) City business days after bid opening, exctusive of bid opening date, wil! resuit in�the bid~'•
being considered non-responsive to bid specifications. � " "" ` �""'""""" '� '"` ""� ��'"""'�
a The undersigned bidder agrees to enter into a formal agreement with the�MBE and/or WBE firms for work listed in this
° schedule, conditioned upon execution of a contract� with the City of� Fort Worth. The intentional= and/or kriowing
misrepresentation of facts is grounds for consideration of disqualification and will �esult in the. bid being considered
non-responsive to�specifications. • - . �
: . ,
Company Name, Contact Name, Certified Specify All Contracting Specify All Items to be �� � Dollar Amount �
Address, and Telephone No.
�I
�C�S�J���+� �'� L
�� � S��t A��Y R �
-��'T- -=�c�t-N�jX.�t5,1�°1_.�. _
�M�41C NOI.A.'� J 6.�'C=R�
��� �l�l•�,Cfl�^ (��O%
�AP�T�kL�G�C2P.
���i,T�
���ud�� �� }��
�c,.w�R�s K�-c�z,. .
�i�'7-� 4i7�-�7 t•�5
'c'cca. ��'►�b?uc-�1.�!`?' _
�� �?c�.C�3ax ��t5��., �
�•\�.ls��cc�►1�.IX.i�ili -
�I:l� I�Lr�/ t,�•�i/� �i'Z
� �\ i � �..�i�"��'� �
V OG
� O
~ X
Z ~ 2
u
v
E�
Scope of Work (')
�x�A�a�. a�►�
R���
S�w�.L�A��v ��
5�R uc.�li'R�t=-5
�is��i�i�.�P+��c-T
�
4� �. .1. .
- �4 ►3 �.do
!�'c�i.�
r- IIAMBEs must be located in the 9(ninel county ma�icetplace or currenUV doinp business in the marketplace at the time of bid.
�-(') Specify all areas in which MYVBE's are to be utilized a�dlor items to be supplied: • -� ;•
_(') A complete Iistinq of items to be supplied is required in order to receive credit toward the M/WBE goaL �
'' (") Identify each Tier level. Tier: Means the level of subcontracting betow the prime contrectodconsultant, i.e., a� direct payment
. from the p�ime contractor to a subcontractor is considered 1" tier, a payment by a subcontractor to
' its supplier is cortsidered 2"° tier.
� '
'f-
THIS'FORM MUS7 BE RECEIVED SY THE MANAGING DEPARTMENT BY �:00 p.m., FIVE (5) CITY BUSINESS DAYS AFTER BID
OPENING, EXCLUSIVE OF TNE BID OPENlNG DATE
Rev. 6/Zl96
Pages 1 and 2 of Attachment 1A must be received by the Managing Department
Supplied(") ,�,:
� "
' (A �
. d
city of Fort worth
Minority and Women Business Enterprise Specifications
MBE/WBE UTILIZATION,
Company Name, Contact Name, Cert;fied Specify Ail Contracting - Specify All Items to be
Address, and Telephone No. Q � Scope of Worfc (') Supplied(') ,� �
� °° �m
u �� N�-
z
ATTACHMENT 1A
Page 2 of 2
Dollar Amount �
• i �G��.,s-t-�,.� c.-r � �i ✓ ` "�T'csP� t �. � `a 11 � aO
� �V' -ac�x 45d�
FI--r-V�oRT�1��:7 toi l`7
I�i,. � N F Z
. � ��c'
S� NS ^�iC",��ct�1+�1.L�► V �%'�U�..1�aCc,�'it^�iXiC�3- � `J�- �
� _��C��07. i ►,a ��V �..V O • ._ � Q � L'i�b�?' 1-A�l"C"
��:�Uac�-�, - -T'-�--.,�► �
r � �.� +, o
�L. �r. i,�c ti' �v�� � �o,oc'�.�
��.o .
� ��a
� �gvr.►�5ro�cZ-�C�a���
��,r7_ala� -��,`-i �l�
Aov�,-,�,.a►-�+�,�. � s� 1�.��..�. a-c� P
� he bidder further agrees to provide, directly to the Ciry upon request, complete and accurate information regarding
actual work performed by a{I subcontractors, incfuding MBE(s) and/or WBE(s) arrangements submitted with this bid.
he bidder also agrees to allow an audit andlor examination of any books, records and fites heid by their company that
�ill substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or
employee of the City. Any intentio�al andlor knowing misrepresentation of facts will be grounds for terminating the
-ontract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal,
tate or Local laws concerning fatse statements. Any failure to comply with this ordinance and creates a material
dreach of contract may result in a determination of an irresponsible offeror and barred from participating in City work
for a period of time not less than one (1) year.
ALL MBEs ar�d WBEs MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD
�.. .�-.-�-� � -�� � �� �AMC�� . �v N���t�C-J�
ut�rized Signature Printed Signature
���1��"'�
Title
� .l. , C� �.RTt��.r�,C��ST- �4,�/� - 1 r�C •
Vompany Name
.. i. 4tJ.c.J� Y i^��` 5 �J�i /"lV.� - .
' ddress
i �uL.INL�;��►:j, .�'X. `?�s,c� �'
� �ity/State2ip Code `
fp
Sk . ... . ..._ . . .
F •
Contact Name and Title (if diffe�ent)
�47� �l(�.1 �-��cl l
Telephone Number (s) �
8i�._'�;,�.1--3c5 �
Fax Number
S��T=�� l.�i,�°�
Date
R° TH1S FORM MUST BE RECEIVED BY THE MANAGING DEPARTMEN7 BY 5:00 p.m., FIVE (5) ClTY BUSINESS DAYS AFTER BtD �'
OPENING, EXCLUSIVE OF THE BID OPENING OATE
<y, �, , Rev. 6l2/96
d+.e �x�,v . �.
hµj Pages 1 and 2 of Attachment 1A must be received by the Managing Department . __
P
� �J �
; �.
,..
�,� ,. ..
�,,*�„�,.�-:�_ . .;,_�...,,-_.--�,:�-� __ ____... _�__..�..-.�,..�..�-._„...,�...._........._._..,._...__....._.._.._....._ ... __'_ -- _ __ _. -- -- ___... --------
r
� • '+
1
.�.
.�
,
0
., `
e
. . • .
�'C'T�G1.�� ' .
Ci of FortWocth
Minority and Women �usiness EnterPrise Specifications
MBEIWB� UTiL�ZATION .
ATTACNMENT �q
Page 2 o f 2
Company Name, Contact Kame, Certified Specify A11 Contract�ng Specify Ail items to be Dollar Amount
� Address, and Telephone Na .�. Scope of Wotic {') Supplied(') ,� ;
.
V O O v ''
� � Q�
H y
z ��
C4�.,,-ro..�,.►�atcn��. '� F?zn,s��. �=c�s - 1 3�v.�'
a-�� �����.�.+ .
�'--r.\, RZ F1. ( X.�7 �t oa ,
C�A�L �� A�gi , ' _
���-�a�-.�a� � _ . "
�.cz 5�ev ��- � � v S,-e-��.�., �� � l -': �� 1€� .�°
��
����.-r� ,���
J�, u t.�.�.�[ `.�c+�,�s�,�+.t,
e�� -��a� ��
�
.�
;
�
a
�
a
a
�
�
�
�
�
a
�
�
u
a
�
�
a
a
,,� � -
.- _ _h
CITY OF FORT WORTH
DEPARTMENT OF ENGINEERING
ENGINEERING SERVICES DIVISION
ADDENDUM NO.1
1998 CIP VARIOUS LOCATIONS
CONTRACT 99C
PROJECT NOS. C115-020115040589, C115-020115040590,
C115-020115040591, C115-020115040592
DOE NOS. 2004, 2008, 2011, 2015, 2260
RELEASE DATE: August 25, 1999
BIDS RECEIVED: September 2, 1999
INFORMATION TO BIDDERS:
The Specifications and Contract Documents for the above mentioned project are revised and amended as follows:
I. � PROPOSAL SECTION
1. Add the following project:
UNiT II: PAVING IMPROVEMENTS ALTERNATES NO.1 AND NO. 2:
BOLAND FROM DARCY TO W. 7TH ST. DOE # 2260 N/A C115-020115040592
2. Delete existing PROPOSAL pay items and add:
ITNIT II: PAVING IMPRC?VEMENTS ALTERNATE 1
SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES UNIT TOTAL
ITEM ITEM QUANTITY WRITTEN IN WORDS PRICE AMOUNT BID
S.P, 1. 1 LS. UTILITY ADJUSTMENT
TWENTY-SIX THOUSAND Dollars &
. • , . NO Cents Per LS. $ 26,000.00 $ 26.000.00
S.P. 2. 10 EA. PROJECT DESIGNATION SIGNS
THREE HUNDRED Dollars &
NO Cents Per EA. $ 300.00 $ 3.000.00
'
�
�
�
�
I
I
�
�
�
r
�
�
�
�
�
�
�
�
\}
104 3.
104 4.
104 5.
104 6.
106 7.
S.P.
452 8.
452 9.
5621 LF. REMOVE EXIST. CURB & GUTTER
\ w�, Dollars &
_�ti� Cents Per LF.
1690 SF. REMOVE EXIST. CONCRETE VALLEY.
Dollars &
�'�r�; y ��.p Cents Per SF.
6096 SF. REMOVE EXIST. CONCRETE SIDEWALK,
LEADWALK AND/OR WHEELCHAIR
RAMPS
� Dollars &
��t�"�ivs.y Cents Per SF.
6358 SF. REMOVE EXIST. CONCRETE DWY.
'i*i.�' Dollars &
� ��GZi"q �v2 Cents Per SF.
1662 CY. iJNCLASSIFIED STREET EXCAVATION
�CtiikT Dollars &
"�i'w�s�i %(1� Cents Per CY.
9 EA. REMOVE EXIST. 5' INLET
�,�C.�a�tii,��'-tFN/ Dollars &
?�l� Cents Per EA.
126 LF. REMOVE 18" R.C.P.
� ��C; 1`�— Dollars &
Cents Per LF.
440 10. 12 LF. PROP. 18" CL. III R.C.P.
440 11
����Rc��iu� Do�t�s &
�_Cents Per LF.
114 LF. PROP. 21" CL. III R.C.P.
Q����j�y,�t�,t�Q'�� Dollars &
t�D Cents Per LF.
440 12. 10 LF. PROP. 24" CL. III R.C.P.
444 13
��iF� Dollars &
Cents Per LF.
9 EA. PROP. STD. 1' INLET
��'w N��F2� Dollars &
��'O Cents Per EA
$ a�i $ ►i���.�,�
$ �.vo� $ �i%�i. �a�
$ O•� $ �� �i-`�o�i
$ c�-� $ a) �o.� .� �
$ �.oi� $ ���'7%.�1�
$ �9 •oO $ ��� �
$ � $ d�3�•�
$ �a5.� $ +a�s�v
$ 1t�5�.�0 $ � 1� 70 �
$ 41.5,� $ 115C�,C�J
�, ��l �1� �, l� � r
S.P. 14. 114 LF. TRENCH SAFETY
525 ��� Dollars &
1 '�.—ctiY Cents Per LF. $ �,..a,� $ ��� ��
402 15. 125 CY. TRENCH $XCAVATION & BACKFILL
��a�T Dollars & e �
'(=�F�t-S/ Cents Per CY. $ ��� $ � �[-�
�
�
�
�
O
O
�
�
�
�
�
Q
a
a
�
41
�
Q
�
S.P. 16. 1 LS. REMOVE & REPLACE CONCRETE
104 ISLAND '' ����
�'µlo.TS/ l-����RE�Dollars &
� Cents Per LS.
S.P. 17. 1 • LS. REMOVE & REPLACE CONCRETE
3 t4 PAVEMEN
104 �C�'Z`y51 �uki�� Dollars &
� � � Cents Per LS.
502 18. 6271 LF. PROP. 7" CURB & 18" GUTTER
S•P• -�^��; � �=a=1J Dollazs &
�{�-T��.( Cents Per LF.
504 19. 3766 SF. PROP. STD. 7" VALLEY GUTTER
��y� t �l it•
'. . . ►� ���, � .�� �•
$ t5.1@ $ �5�:� �$
'��R Dollazs &
S��t�sISC�►,� Cents Per SF. $ 1�,.(�,� $}%�%„�a
504 20, 6514 SF. PROP. STD. 4" REINFORGED CONCRETE
SIDEWALK, LEADWALK AND/OR
WHEELCHAIR RAMPS
T'v�t� Doii� & $ _ � .71� $ 17�C7�.b�
Sc��—�n15 i1( Cents Per SF.
504 21. 8182 SF. PROP. STD. 6" REINFORCED CONCRETE
2I4 22.
S.P.
DWY.
�---,
. ��1�C Dotlars &
�l�-'�/f�i� Cents Per SF.
11904 SY. 8" PULVERIZATION W/ 5% CEMENT
STABILIZATION
s�O Dollazs &
��.a4-T��I.(. Cents Per SY.
214 23. 242 Ton CEMENT
312 24.
S.P.
�l��{�C� Doilars &
� Cents Per Ton
11904 SY. 3" H.M.A.C. PAVEMENT TYl'E "D" MIX
� Dollars &
��-�/ Cents Per SY.
312 25. 60 TON 6" H.M.A.C. TRANSITION
S.P.
500
S.P.
116
�l�DolIars &
6. Cents Per TON.
26. 235 LF. 6" PIPE SUBDRAIN
1 1��'� LV G Dollazs &
�1 F`C� Cents Per LF.
27. 235 CY. TOP SOIL
� NINE Dollars &
NO Cents Per CY.
$�� $�.��
$�_ $ ����.7�
$ �� $ ��L�J. �
$ l� •�� $ i�4�'c�� .�
$ �•C� $ 3at�► r�
$ 1�.Sd $ ��37. �3
$ 9.00 $ 2.115.00
.� �
a
�
a
�
�
�
�
a
0
a
a
0
�
0
�
0
a
a
�
S.P. 28. 6 EA. ADNST WATER VALVE BOX
TWO HiJNDRED Dollars &
NO Cents Per EA.
S.P. 29. 13 EA. MANHOLE ADJUSTMENT
THREE HLTNDRED FIFTY Dollazs &
NO Cents Per EA.
S.P. 30. 30 EA. ADNST WATER METER BOX
THIRTY FIVE Dollars &
NO Cents Per EA.
TOTAL AMOUNT BID-iTNIT II-ALTERNATE NO. 1
$ 200.00 $ 1,200.00
$ 350.00 $ 4,550.00
$ 35.00 $ 1,050.00
$ '�k- � / � 0 �. � /
�
�
�
a
a
D
�
�
a
�
�
�
�
�
a
a
a
�
a
0
UNIT II PAVING IMPROVEMENTS ALTERNATE 2
SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BID
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS
S.P. 1.
S.P. 2.
104 3.
104 4.
104 5.
104 6
106 7
S.P.
452 8.
452 9
1 • LS. UTILITY ADJUSTMENT
TWENT'Y- SIX THOUSAND Dollars &
NO Cents Per LS.
10 EA. PROJECT DESIGNATION SIGNS
THREE HUNDRED Dollars &
NO Cents Per EA.
5621 LF. REMOVE EXIST. CURB & GUTTER
rac�tG Dollars &
�x�,t*j - �SQ`Cents Per LF.
1690 SF. REMOVE EXIST. CONCRET'E VALLEY.
h% Dollars &
S�Jr�u'T�!-'(J�e1C Cents Per SF.
6096 SF. REMOVE EXIST. CONCRETE SIDEWALK,
LEADWALK AND/OR WHEELCHAIR
RANII'S
fJo Dollazs &
�vd►si� -l.��ae Cents Per SF.
6358 SF. RE�IOVE EXIST. CONCRETE DWY.
I�10 Dollars &
SEn1CN� -�i+✓�c Cents Per SF.
2552 CY. UNCLASSIFIED STREET EXCAVATION
�1Gc�'t" Dollars &
�R.T�= 1wa Cents Per CY.
9 EA. REM(�VE EXIST. 5' INLET
�IGN-� �ttND¢,�z+o �F� Dollars &
1�6o Cents Per EA:
126 LF. REMOVE 18" R.C.P.
�.14.R.1-y - onr� Dollars &
S�•i,s�c�1 Cents Per LF.
!
LTNIT
PRICE
TOTAL
AMOUNT BID
$ 26,000.00 $ 26,000.00
$ 300.00 $ 3,000.00
$ 1 g� $ co3�4z. ��
$ Cj�� $ 133� , �,°
$ O .'q $ ����-' , ��
� O 7�
$ SdZZ . gZ
$��Z
$ Z I 4 �'?. ��
� �50 � $ 7�50. ao
$ 3 I.�° $ ��r�(. 6°
440 1 Q. 12 LF. PROP. 8" CL. III R�.S .P.
C��•' ��bt.Ea T1u�'Dollars& eo 00
�o Cents Per LF. $ � 0'ca •"' $�Z.�o 0—
440 11. 114 LF. PROP'.{21" CL. III R.C.P.
� �c.tNOP.,�b -�-�J� Dollazs &
DJ.a Cents Per LF. $� 0� °` $ i lCi a O, °°
.�
�
�
�
�
�
�
�
�
�
�
�
�
1
I
�
�
�
�'
�
440
444
S.P,
525
402
S.P.
104
S.P.
314
104
502
S.P.
504
504
504
210
212
12. 10 LF. PRO�. 24" CL. III RC.P.
Q�� �,t,cpp(2�p �iFtx�.iJ Dollazs &
tJo Cents Per LF.
13. 9 EA. PROP. STD. 10,' IINLET
�'W��. �E �u�tND��ollars &
I�,o � Cents Per EA
14. 114 LF. �NCH SAFETY
, � Dollars &
1 WP K'1-�► Cents Per LF.
15. 125 CY. TRENCH EXCAVATION & BACKFILL
�'�C��-� Dollars &
�'4� ; y Cents Per CY.
1
16. 1 LS. REMOVE & REPLACE CONCRETE
�SLAN�1. 'I
( {{�,�tt,�� (ulo �in��Rs10 Dollars &
� Cents Per LS.
17. 1 LS. REMOVE & REPLACE CONCRETE
,,,,,,,EAVE� �
�{} ��,1� '��� Dollars &
y�o Cents Per LS.
18. 6271 LF. PROP. 7" CURB & 18" GUTTER
' � 'EN Dollars &
S� ,c,-c�,� - �ou.R., Cents Per LF.
19. 3766 SF. PROP. STD. 7" VALLEY GUTfER
�,�,Q,, Dollars &
-��p(t,.� - ,$� �c. Cents Per SF.
20. 6514 SF. PROP. STD. 4" REINFORCED CONCRETE
SIDEWALK, LEADWALK AND/OR
WHEELCHAIR RAMPS
''(„Wb Dollazs &
S� Zc � v-�sx�.2 Cents Per SF.
21. 8182 SF. PROP. STD. 6" REINFORCED CONCRETE
��
1l�.� Dot�ars &
���K.�-p� Cents Per SF.
22. 9268 SY. 6" LIME STABILIZED SUBGRADE @
28#/S.Y.
� Dollazs &
1J �,� �tU .�tyy�T Cents Per SY.
I
23. 131 Ton LIME "�
j� �►er� - N�+� � Dollars &
� ' /�Ln Cents Per Ton
$ �l� °� $ (ISO. °o
$ Zl00 °� $� 0 �'! 0� Co
$ `'1" ?� $ �'� 0 . �
$ �s° $ 10�Z. ��
$ 32oo.°O $ 3200 °�
$ �s� �� $ �8� p
$ ip 6� $ �7� �-�
$ �� $ 167t�,3�
$ Z 6� $ 17�a�.9�
$3�� $3�r�3,�-z
$ l �� $1�350 �`�
$ 1� oo g 1�.��09, ao
a
0
�
�
�
�
�
D
�
�
a
4
�
a
a
a
a
Q
0
312 24. 11904 SY. 5" H.M.A.C. PAVEMENT
S.P. ���,K., � Dollars &
�;�-rc.�-'1�,�Cents Per SY.
312 25. 60 TON 6" H.M.A.C. TRANSITION
"�oR'�'�► • �4G�'+ Dollars &
� �o Cents Per TON.
S.P. 26. 235 LF. 6" PIPE SUBDRAIN
500 '�'W�t, dC Dollars &
, IJ,o Cents Per LF.
S.P. 27. 235 CY. TOP SOIL
116 MNE Dollazs &
NO Cents Per CY.
S.P. 28. 6 EA. ADNST WATER VALVE BOX
TWO HUNDRED Dollars &
NO Cents Per EA.
S.P. 29. 13 EA. MANHOLE ADJUSTMENT
THREE HUNDRED FIFTY_Dallars &
NO Cents Per EA.
S.P. 34. 30 EA. ADNST WATER METER BOX
THIRTY FIVE Dollars &
NO Cents Per EA.
214 31. 64 Ton CEMENT
1�tta�r�-���C Dollars�4�
_�., Cents Per Ton
214 32. 4570 SY. 6" CEMENT STABILIZED SUB( iRADE @
28#/S.Y.
'�t^w o Doilars &
i"c,u r, Cents Per SY. ,
�
$ -1 I 53 � $ t37Zs3, '-
$ � °" $ 2 �''8'D eo
$ IZ a� $ Z�za. oP
$ 9.00 $ 2,115.00
$ 200.00 $ 1,200.00
$ 350.00 $ 4,550.00
$ 35.00 $ 1,050.00
$ -�i� °° $ �►�� . �n
$� $ �Z3! , `�4
TOTAL AMOUNT BID-U1vIT II-ALTERNATE NO. 2 $—`55 ,� 1�' ��
SUMMARY OF BIDS:
TOTAL AMOUNT BID-U1�IIT II-ALTERNATE NO. 1$'�,�- � f�.- 7�
TOTAL AMOUNT BID-U1vIT II-ALTERNATE NO. 2 S�S`� � S 1 O. �^�
�
i�
�
�
�
II. SPECIAL PROVISIONS SECTION
1. Delete page one of the SPECIAL PROVISIONS SECTION and add:
SPECIAL PROVISIONS (TRANSPORTATION/PUBLIC WORKS)
a �
FOR: UNIT II: PAVING IMPROVEMENTS ALTERNATES NO.1 & NO. 2
�I
u
�
�
I�I
��I
U
LJ
LJ
l�J
�
F�
�
�'
L�J
�
BOLAND FROM DARCY TO W. 7�' ST. DOE # 2260 N/A C115-020115040592
PROVINE FROM MEADOWBROOK TO NORMANDY DOE # 2004 K-1535 C115-020115040591
NW 19'$ FROM GRAND TO HOMAN DOE # 2008 K-1012 C115-020115040590
CURZON FROM WINTHROP TO BRYANT IRVIN DOE # 2011 K-1520 C115-020115040589
WINTHROP FROM CAMP BOWIE TO LOVELL DOE # 2015 K-1524 C115-020115040589
1. SCOPE OF WORK: The work covered by these plans and specifications consist of Unit II Alternate No. 1: 3"
H.M.A.C. pavement over 8" cement stabilized pulverized subgrade or Unit II Alternate No. 2: 5" H.M.A.C.
pavement over 6" lime stabilized subgrade and all other miscellaneous items of construction to be performed as
outlined in the Plans and Specifications which are necessary to satisfactorily complete the work. This contract
shall consist of three water/sewer sections and four paving sections. Section I will be Boland paving only.
Section II will be Provine. Section III will be NW 19"' Street. Section IV will be Curzon and Winthrop.
The paving improvements for each section will not proceed until the water and sanitary sewer
replacements have been completed in each of these sections.
2. AWARDING OF CONTRACT: Contract may not necessarily be awarded to the lowest bidder of either Unit II
Alternate No. lor Alternate No. 2. The City Engin`eer shall evaluate and recommend to the City Council the
best bid which is considered to be in the best interest of the City.
3. WORK ORDER ISSUANCE: All utilities and right-of-way easements are expected to be clear and easements
and/or permits obtained on this project within sixty (60) days of advertisement of this project. The work order
for subject project will not be issued until all utilities , right-of-ways, easements and/or permits are cleared or
obtained. T'he Contractor shall not hold the City of Fort Worth responsible for any delay in issuing the work
order for this Contract.
In addition, specific to this contract, the Contractor will not be issued work orders until the water and
sanitary sewer replacements in each section have been completed and accepted. Upon acceptance of
utility work, the Contractor will be issued work orders for each section and will have fourteen (14)
working days to begin work. When the work order is issued, the Contractor will be considered to be in
control of this section of the work. It should be noted that the work should progress from Section I, to
Section II, to Section III then Section N.
In order to aid the Contractor in preparing his bid, an estimated schedule for the water, sanitary sewer, and
paving replacements for each section has been included at the end of the special provisions section. A ..
breakdown'of the paving'bid items has also been included. The schedule �and quantity breakdown are for
informational purposes only. However, the Contractor should understand that adverse weather and unforeseen
circumstances can affect these estimated dates and shall not hold the City of Fort Worth responsible for any
delays in issuing the work orders for this Contract. Therefore, the paving contractor will be required to attend
the pre-construction conference for the water and sewer project and will be provided with a more accurate
schedule at that time. Paving Contractor should be aware that contract time may be required to run concurrently
on more than one section.
L�J
�
L�I
I�J
IAI
�
f�i
�
�
L�I
�
��'J
�
�
2. To the last page of Special Provisions Items Section, add:
SPECIA.L PROVISION - BOLAND STREET RECONSTRUCTION
Boland Street &onn Dazcy to VJ� 7`� is a 1998 Capital Improvement Project. Tlzis street will be completely
reconstructed, however, no paving plans are available or will be provided for this project. Construction stakes will
be provided before construction begins and all removals will be designatad on the site. The working days for this
section of work shall be 30 (thirty). The working days allotted for Boland Street reconstruction are specific to the
Boland Street project, Working days not used will not be applied to the overall project.
3. Delete Project Schedule page and replace with Exhibit "A".
4. Delete street paving quantity breakdown sheets for AIternate 1 and Alternate 2 and replace
� with Exhibits "B" and "C". � �' ` �
. .. . . ..�,�� - . .
:� . . , .
Please acknowledge receipt of the Addendum in the bid proposal and on the outside of the sealed envelope.
RECEIPT ACKNOWLEDGED: I
W �/,�� �l�' �-._
v
a
�
�I
A. DOUGLAS RADEMAKER, P.E.
DIRECTOR, DEPARTIvIENT OF ENGINEERING
By: �/u-t,r�.
John F' " g, P.E.
�I � Manager, Engineering Services
. I �
0 C� i� C� L� p'�7 C! G7 � C7 C� 0 �i [� u � u ►...�
EXHTBIT "A" � -
�
I `I November Il DecemWr Janu FWru�(y MarcA 1 I` M�r Jun� Juiy I A yust � �
D 6 I T�sk Nam� ! Dunt)on I St:d I Finish 2$ 1 5 1 13 121 �29 I 7 I 15 I 23 ��1 I 8 I� 24 I 1 I 9 I 17 I Z� I 4 I 12 � 20 I� 1 5� � 27 I 19 1 7 I'15 I 23 �31 I 8 I 18 I 24 � 2 I 10 I 18 I 28 1 3 � 11 I 19 ' '
1 Contraet 99C 130 days Tw 11l9N9 Npd 8I21ro0 .
2 �-- Sectla� 2 YVater and Sewer _._. __��� .__ Tue 119/99 Wed 17R9A9 -
3 0� Sectlon 3 Water end Sewer ----- 30 days -- Wed 115�00 Thu 2/24A0 .
------ ._ __ _ _.. _.___ _ . -----•--- --. .�.__ —. _ _—_--- � � � � ; : : :
4 � Secllon 4 Waier end Seaer 20 deys Ttxi 3f2/00 Wed ��AO �
3 .. _ _. .. ._ _____ ._.... _-- -_. - - - —._ _—
� � � � � �
�
6
_ � _ _ _ _. _ . _ .. _ __.. .-- ' - - _ . _- - - � � � , . � � �
._.. .. __ ... ..._ _...__ .. _ .. _ ...__..__ �_. ..._.._ __._.. _ .. . ..._.. _ _ .__ _ .,: . ... ._ __ .._ �
7 '
8 . . . � _ . . . .
_ __ .____ .. .._.--... ._ . .. _. ... . _.._ � � �
8 • -- - - _
to �-_-- Sectlon 1 Paving . -_�_30 days �. Tue 11/9F3�J Wed 122999 � I I I I I I � I I I 1 I I I I I I� ,
11 [� � SecUon 2 Paving 35 days �---Tue 125I00 ----Thu 323/00 .
v��IIIIIIIIII�IIIIIII�
12 --- secnon 3 PaNng 30 Eays --Wed 3rz2Ao mu 5n 7ro0 � I I' I I 1 I I I I I I I�, j,�� .
13 secuon 4 Pavtc�g � 3o deys Tue 5/2�o Wed s2lroo �I I I I I I I I I�� I I I I I I I�
.......... __ _ _ .__ . _...._ ._ _ _-.---.... _... __.. _ _ _ __. ... ..- - - _ -- - -. . � chedufe is based on i6 wo 9 ys r month
; ; S rkin da pe
, I,
ProJeck98CIPTemplate j Tesk �� � � � � �� � �� �4i�estone � RWeQUFTask E .::.:::: .:::::•`'::_:_3 RdedUpPro9ess F�CemelTasks E, ,.��������j .
Data: Mon 823199 I ���a . ��y Roled Up Milastone Q � Spit project Sunnery
.............. il �
Page 1
0 C� �7 Q Ci Ci �7 0 C� L� G� 0 �! [.�1 u u u u �..�
Pavinp AIL f1 (Pulver¢ation) 4:18 PM 8/20/99
EXHIBIT "g" � -
t
PAY Street tll Street #2 Street #3 Street #4 Sheet #5
TfEM Provine NW 19th Cutzon Winthrop Boland
�
1 7,000 6,000 6,000 6,000 1,000
2 2 2 2 2 2
3 2,550 I,270 458 913 430
4 980 30 680
5 3,794 2,230 - 72
6 4,154 1,040 543 621 �
7 508 540 195 334 � 85
8 6 3
9 114 �Z
10 ` 12
11 114
12 10
13 6 3
14 114
15 125
16 1
17 1
18 2,550 1,770 458 913 580
19 980 606 1,500 680
20 4,152 2,290 72
21 5,142 1,660 543 737 100
22 3,944 3,176 1,680 2,345 765
23 99 64 34 50 15
24 3,944 3,170 1,680 2,345 765
25 7 15 38 �
26 50 50 50 85
27 70 50 10 30 75
28 3 2 �
29 6 1 � 2 3 I 1
30 23 6 1
ALTERNATE 1-3" HMAC ON 8" PUWERIZED SUBGRADE
QY'y_ UNIT DESCRIP'I'ION OF ITEM
1 IS. Uuliry Adjustment
10 EA. Project Designation Signs
5,621 LF. Remove Facist. Curb & Gutter
1,690 SF. Remove Exist. Concrete Vallcy Gutter
6,096 SF. Remove Exist. Conc. Sidewalk, Leadwatk, Steps, Wheelchair camps
6,358 SF. Remove Exist. Conc, Driveway
1,662 CY. Unclassifed Street Excavation
9 EA. Remove Exist 5' Inlet
126 LF. Remove Exist. 18" R.C.P.
12 LF. Prop. 18" CL. III RC.P.
114 LF. Prop. 21" CL. III RC.P.
10 LF, Prop. 24" CL. III R.C.P.
9 EA. Prop. Std. 10' Inlet �
114 LF, Trench Safety
125 CY. Trench Excavation & Bac�ll
1 LS. Remove & Replace Concrete Island
1 LS. Remove & Replace Concrete Pavement
6,271 LF. Prop.7" Curb & IS" Gutter
3,766 SF. Prop. Std. 7" Concrete Valley Gutter
6,514 SF. Prop. Std. 4" Conc. Sidewalk, Leadwalk, Wheelchair Ramps
8,182 SF. Prop. Std. 6" Conc. Driveway
11,904 SY. Prop. 8" Pulverized Base Cement Stabilized @ 5%by Unit weight
242 1'N. Prop. Cement
11,904 SY. Prop. 3" H.M.A.C. Pavement _
60 TN. Prop. 6" H.M.A.C. Transi6on
235 LF. Prop. 6" Pipe Subdrain
235 CY. Prop. Topsoil
6 EA. Prop. Adjust Water Valve Box
13 EA. Prop. Adjust Manhole
30 EA. Prop. Adjust Water Meter Box
a
� C7 � C7 C7 � C7 0 [� C7 � 1 U u u �.�, u � • � � -
�
Paving Alt it2 (5" HMAC)
EXI�BIT "C"
PAY Street # 1 Shtet !12 Street #3 Street #4 Street #5
[TEM Provine NW 19th Cwwn Winthrop Boland
1 7,000 6,000 6,000 6,000 1,000
Z 2 2 2 2 2
3 2,550 1,270 458 9l3 430
4 980 30 680
S 3,744 2,230 72
6 4,154 1,040 543 621
7 730 945 265 467 !45
8 6 3
9 114 ' l2
10 12
11 lI4
l2 ]0
13 6 3
14 114
IS 125 .
16 l
17 1
18 2,550 1,�70 458 9l3 580
19 980 606 1,500 680
20 4,152 2,290 72
21 5,142 1,660 543 737 100
22 4,514 1,934 2,820
23 63 " 28 40
24 3,944 3,170 � 1,680 2,345 � 765
2S 7 15 38 �
26 50 ' S0 50. 85 �
27 � 70 � 50 � IO 30 � 75
28 � 3 � 2 � � � 1
29 + 6 1 � 2 � 3 � 1
30 23 � � 6 � � 1
31 52 � 12
32 ,,' 3,690 ' ' ! 880
I I I I �
I I I I I
.
QTY.
1
10
5,621
1,690
6,096
6,358
2,552
9
126
12
114
10
9
114
125
1
1
6,271
3,766
6,514
8,182
9.268
13l
l 1,904
60
235
235
6
13
30
64
4,570
ALTERNATE 2-5" HMAC ON 6" LIME STAB. SUBGRADE
UNIT DESCRIP'CION OF ITEM
LS. Utility Adjustment
EA. Project Designation Signs
LF. Remove Exist. Curb & Gutter �
SF. Remove Exist. Concrete Valley Gutter .
SF. Remove Exist. Conc. Sidewalk, Leadwelk, Steps, Wheelchair ramps
SF. IRemove Exist. Conc. Driveway
CY. Lnclassifed Street E�ceava[ion
EA. Remove Exist. 5' lnlet
LF. Remave F.xist 18" RC.P.
LF. Prop. 18" CL.. III R.C.P.
LF. Prop. 21" CL. IlI R.C.P.
LF. Prop. 24" CL. lIl RC.P.
EA. Prop. Std l0' [nlet
LF. Tronch Safety
CY. Trench Excavation & Backfill '
LS. Remove & Replace Concrete Istand
LS. Remove & Replace Concrote Pavement
LF. Prop. 7" Clirb & I8" Gutter
SF. Prop. Std 7" Concrete Valicy Guttcr
SF. Prop. Std. 4• Conc. Sidewalk, Leadwalk, Wheelchair Rsmps
SF. Prop. Std. 6" Conc. Driveway
SY. Prop. 6" Lime Stabiliud Subgade C3a 281bsJs.y.
TN. �Prop. Lime
SY. �Prop. 5" H.M.A.C. Pavemcnt
TN. �Prop. 6" H.M.AC. Transidon
LF. �Prop. 6" Pipe Subdrain
CY. �Prop. Topsoil
EA. Prop. Adjust Water Valve Box
EA. Prop. Adjust Manhole
EA. Prop. Adjust Water Meter Box
T7J. Prop. Cement
SY. Prop. 6" Cement Stabitiud Subgrade (a3 281bs,/s.y.
I
4:18 pM 820199
i
ij
0
L+fJ
l�
�
I�i
�
l_�J
Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will
deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful
performance of the Contract. The attached bid security in the amount of 5% is to become the property of the
City of Fort Worth, Texas, in the event the contract and bond oi bonds are not executed and delivered within the
time above set forth, as liquidated damages for the delay and additional work caused thereby.
The undersigned bidder further certifies that he has been furnished at least one set of the `Standard
Specifications for Street and Storm Drain Construction-City of Fort Worth', and that he has read and thoroughly
understands all the requirements and� conditions of that document and the specific Contract Documents and
appurtenant plaris�: ' �. � � . . j t. .�y.., tst�a,
The undersigned agrees to pay not less than the "Prevailing Wage Rates" as established by the City of Fort
Worth, Texas.
The undersigned assures that its employees and applicants for employment and those of any labor organization,
� subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned
are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City
Ordinance No. 7400.
aThe Bidder agrees to begin construction within 14 working days after issue of the work order for each sections
and to corqp�lete each section of this contract within the allotted time as
� I�Ctalle(� III ttl8 SDeClal Dl'OV1S10riS after beginning construction as set forth in the written work
order to be furnished by the Owner.
I�J
�
�
I �J
�
�
�
�
(Complete A or B below, As applicable:)
A. The principal place of business of our company is in the State of
Nonresident bidders in the State of , our principal
place of business, are required to be percent lower than resident bidders
by state law. A copy of the statute is attached.
Non resident bidders in the State of , our principal
place�of business, are not required to underbid resident bidders. �
�B. The principal place of business of our company or our parent company or
majority owner is in the State of Texas.
I(we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and
requirements of which have been taken into consideration on prepazation of the foregoing bid:
Addendum No. 1 (Initial
Addendum No. 2 (Initials)
Addendum No. 3 (Initials)
Addendum No. 4 (Initials)
R�,espectfully submitted,
J. L... F���2'��►��^�3
'�:bNS'fRUC'Tg0�9 t� ��Si�i�t��&�11V6a,1�iG.
�
<�= J�r,�
`� ��
I�VJ7 f7/•4�9'11�i��iV 6'�7I�.
�RLI!'eEC'�'C�f�, "Y'���►� 7�i011
0
�
(Seal) ��� ���
Date:
1 '
B��i ,,� =� -}--�`
v
Title ��� �
.�
Address
, pp7 hIARFiISON AVE.
�RLINGTON, TEXA5 7Ei011
Telephone��� 7� � � � �� �
�
���
0
LJ
�
�
L�J
L�J
�
�
�
�
L■J
�
l�l
o City
�
[�1
��I
VENDOR COMPLIANCE TO STATE LAW
The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to
nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders
(out-of-State contractors whose corporate offices or principal place of business are outside of the State of Texas)
bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest
Texas resident bidder by the same amount that a Texas resident bidder would be required too underbid a
nonresident bidder in order to obtain a compazable contract in the State in which the nonresident's principal
place of business is located. T'he appropriate blanks in Section A must be filled out by all out-of-State or
nonresident bidders in order for your bid to meet specifications. The failure of out-of-State or nonresident
contractors to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B.
A. Nonresident vendors in (give State), our principal place of business, are required to
be percent lower than resident bidders by State law. A copy of the Statute is attached.
Nonresident vendors in (give State), our principal place of business, aze not
required to underbid resident bidders.
B. Our principal place of busine�s or corporate offices are in the State of Texas.
BIDDER:
J. �.. BEFii'��i�'�
GONSTR�UCTION & ENtaW��R1NG, {PIC.
1007 �•
ARLiNGTO1V, Ti EXAS 7601 "�
State Zip
A
By: �i �-rrL�S � � �e`��
(Please print) �''
Signature. ✓' � � � `
<�/ ���
Title: `�2� � �� �
(Please print)
THIS FORM MUST BE RETURNED WITH YOUR OUOTATION
�
l!�J
�
SPECIAL PROVISIONS (TRANSPORTATION/PUBLIC WORKS)
� FOR: UNIT II: PAVING IlVIPROVEMENTS ALTERNATES NO. 1& NO. 2
�
O
u
�
l�l
�J
L1�
1�"I
�
l�l
�
f*9
�
�
PROVINE FROM MEADOWBROOK TO NORMANDY DOE # 2004 K-1535 Cl 15-020115040591
NW 19'$ FROM GRAND TO HOMAN DOE # 2008 K-1012 C115-020115040590
CURZON FROM WINTHROP TO BRYANT IRVIN DOE # 2011 K-1520 CI IS-020115040589
WINTAROP FROT'v1 CAMP,BOWIE TO LOVELL DOE # 2015 K-1524 Cl 15-020115040589
1. SCOPE OF WORK: The work covered by these plans and specifications consist of Unit II Alternate No. 1:
3" H.M.A.C. pavement over 8" cement stabilized pulverized subgrade or Unit II Alternate No. 2: 5"
H.M.A.C. pavement over 6" lime stabilized subgrade and all other miscellaneous items of construction to be
performed as outlined in the Plans and Specifications wHich are necessary to satisfactorily complete the
work. This contract shall be constructed in three sections. Section I will be Provine. Section II will be
NW 19'h St. Section III will be Curzon and Winthrop. The paving improvements for each section will
not proceed until the water and sanitary sewer replacements have been completed in each of these
sections.
2. AWARDING OF CONTRACT: Contract may not necessarily be awazded to the lowest bidder of either Unit
II Alternate No. lor Altemate No. 2. The City Engineer shall evaluate and recommend to the City Council
the best bid which is considered to be in the best interest of the City.
3. WORK ORDER ISSUANCE: All utilities and right-of-way easements are expected to be clear and
easements and/or permits obtained on this project within sizty (60) days of advertisement of this project.
The work order for subject project will not be issued until all utilities , right-of-ways, easements and/or
permits are cleared or obtained. T'he Contractor shall not hold the City of Fort Worth responsible for any
delay in issuing the work order for this Contract.
In addition, spetific to this contract, the Contractor will not be issued work orders until the water and
sanitary sewer replacements in each section have been completed and accepted. Upon acceptance of
utility work, the Contractor will be issued work orders for each section and will have fourteen (14)
working days to begin work. When the work order is issued, the Contractor will be considered to be
in control of this section of the work. It should be,noted that the work should progress from Section I,
to Section II, then to Section III.
In order to aid the Contractor in preparing his bid, an estimated schedule for the water, sanitary
sewer, and paving replacements for each section has been included at the end of the special provisions
section. A breakdown of the paving bid items has also been included. The schedule and quantity
breakdown are for informational purposes only. However, the Contractor should understand that
adverse weather and unforeseen circumstance's can affect these estimated dates and shall not hold the
City of Fort Worth responsible for any delays in issuing the work orders for this Contract. Therefore,
the paving contractor will be required to attend the pre-construction conference for the water and
sewer project and will be provided with a more accurate schedule at that time. Paving Contractor
should be aware that contract time may be required to run concurrently on more than one section.
4. WORKING DAYS: The Contractor agrees to complete the Contract within the allotted number of working
days. Time will be charged on each section as noted in the schedule included at the end of
the Special Provisions section. Liquidated damages will be based on the aggregate value of each
section, not on the total contract value.
1�
5. INCREASE OR DECREASE IN OUANTITIES: The quantities shown in the proposal are approximate. It
i''s the Contractor's sole responsibility Co verify all the minor pay item quantities prior to submitting a bid.
When the quantity of work to be done or materials to be furnished under any major pay item of the contract
is more than 125% of the quantity stated in the contract, whether stated by Owner or by Contractor, then
either party to the contract, upon demand, shall be entitled to negotiate for revised consideration o�n the
portion of work above 125% of the quantity stated in the contract.
When the quantity,of the work"to be done or materials to be furnished under any major,pay item of the
contract is less than 75% of the quantity stated in the contract, whether stated by Owner or by Contractor,
then either party to the contract, upon demand, shall be erititled to negotiate for revised consider"ation on the
portion of work below 75% of the quantity stated in the contract. This pazagraph shall not apply in the
event Owner deletes a pay item in its entirety from this contract.
A major pay item is defined as any`in�ividual bid item included in the proposal that has a total cost equal to
or greater than 5 percent of the original contract.
A minor pay item is defined as any individual bid"item included in the proposal that has a total cost less than
5 percent of the original contract. �
In the event Owner and Contractor are unable to agree on a negotiated price, Owner and Contractor agree
'that the consideration will be the actual field cost of the work plus 15% as described"herein below, agreed
upon in writing by the Contractor and Department of Engineering and approved by the City Council after
said wbrk is completed, subject to all other conditions of the contract. As used h�rein, field cost of the work
will include the cost of,:all workmen, foremen, time keepers, mechanics and laborers; all materials, supplies,
trucks, equipment rental for such time as-actually used on such work only, plus all power, fuel, lupricants,
water and similar operating expenses; and a ratable portion of premiums on performance and payment
bonds, public liability, Workers Compensation and all other insurance required by law or by ordinance. The
Director of the Deparlment of Engineering will direct the form in which the accounts of actual field cost
will be kept and will recommend in writing the method of doing the.work and the type and kind of
equipment to be used but such work will be performed by the Contractor as an independent Contractor and
not as an agent or employee of the C:ity. ,i he 15% of the actual field co�t to be paid to the Contractor shall
cover and compensate him for profit, overhead. �eneral supervision and field office expense and all other
elements of cost and eXpense not embraced wiih the act,µal field cost as herein specified upon request, the
Contractor shall provide the Director o,f Engineering access to all accounts, bills and vouchers relating
thereto.
6. RIGHT TO ABANDON: The City resecves the right to abandon, without obligation to the Contractor, any
gart of the project or the entire project at any time before the Contractor begins any construction work
authorazed by the City.
7. CONSTRUCTION SPECIFICATIONS: This contract`and project are governed by the two following
published specifications, except"as modified by these Special Provisions:
STANDARI� SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION
CITY OF FORT WORTH
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION
NORTH CENTRAL TEXAS
A copy of either of these specifications may be purchased at the O�ce of the Department of Engineering,
1000 Throckmorton Street, 2"d Floor, Municipal�Building, Fort Wort�"i, Texas 76102. Tlie specifications
applicable to each pay item are indicated in the call-out for the pay item by the Engineer. If not shown, then
applicable published specifications in either of these documents may be followed at the discretion of the
L�'J
I�1
�
���
Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of �the
North Central Texas document. .
8. CONTRACT DOCUMENTS: BiBders shall not separate, detach or remove any portion, segment or sheets
from the contract documents at any time. Failure to bid or fully execute contract without retaining contract
documents intact may be grounds for designating bids as "nonresponsive" and rejecting bids or voiding
contract as appropriate and as determined by the Director of the Department of Engineering.
9. MAINTENANCE STAT'EMENT: The Contractor shall be responsible for defects in this project due to
� faulty materials and workmanship, or both, for a period of one (1) year from date of final acceptance of this
project by the City Council of the City of Fort Worth and will be required to replace at his expense any part
or all of the project which becomes defective due to these causes.
I�
I�
�
��
L�
[AJ
l�l
�
�
f�l
u
O
10. CONSTRUCTION STAKING: Construction stakes for line and grade will be provided by the City as
outlined on page 17, Standard Specifications for Construction, City of Fort Worth.
11. TRAFFIC CONTROL: The contractor shall be responsible for providing traffic control during the
construction of this project consistent with the provisions set forth in the "1980 Texas Manual on Uniform
Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas
Uniform Act Regulating Traffic on Highways," codified as Article 6701 d Vernon's Civil Statues, pertinent
sections being Section Nos. 27, 29, 30 and 31.
The Contractor will not remove any regulatory sign, instructional sign, street name sign or other sign which -
has been erected by the City. If it is determined that a sign must be removed to permit required
construction, the Contractor shall contact the Transportation and Public Works Deparhnent, Traffic Services
Division (phone number 871-8100), to remove the sign. In the case of regulatory signs, the Contractor must
replace the permanent sign with a temporary sign meeting the requirements of the above referenced manual
and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign
is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in
place until the temporary sign requirements are met. When construction work is completed to the extent
that the permanent sign can be reinstalled the Contractor shall again contact the Signs and Markings
Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation
is completed.
12. DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when
direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide
information or material, if any, which is to be fumished by the City. When such extra compensation is
claimed a written statement thereof shall be presented by the Contractor to the Engineer and if by him found
correct shall be approved and referred by him to the Council for fmal approval or disapproval; and the
action thereon by the Council shall be fmal and binding. If delay is caused by specific orders given by the
Bngineers to stop work or by the performance of extra work or by the failure of the City to provide material
or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an
equivalent extension of time, his application for which shall, however, be subject to the approval of the City
Council; and no such extension of time shall release the Contractor or the surety on his performance bond
, form all his obliga'tions hereunder which shall remain in full force until the discharge of the contract. .
13. DETOURS AND BARRICADES: T'he Contractor shall prosecute his work in such a manner as to create a
minimum of interruption to tra�c and pedestrian facilities and to the flow of vehicular and pedestrian
traffic within the project area. Contractor shall protect construction as required by Engineer by providing
barricades.
Barricades, warning and detour signs shall conform to the Standard Specifications "Barriers and Warning
and/or Detour Signs," Item 524 and/or as shown on the plans.
L�J
Construction signing and barricades shall conform with "1980 Texas Manual on iJ�iform Traffic Control
Devices, Vol. No. 1."
14. DISPOSAL OF SPOIL/FILL MATERIAL: Prior to the disposing of any spoiUfill material, the contractor
shall advise the Director of the Departrnent of Engineering acting as the City of Fort� Worth's Flood Plain
Administrator ("Administrator"), of the loc�tion of all sites where the contractor inten�ds to�dispose of such
material. Contractor shall not dispose of such material .until the proposed sites have been determined by the
Administrator to meet the requirements'of the Flood Plain Ordinance of the City of Fort'Worth (Ordinance
No. 10056). All disposal sites must be approved by the Admiriistrator to ensure the filling is not occurring
within a flood plain.pwithout a permit. A flood plain permit can be issued upori' approval of necessaryr
engineering studies. No fill permit is required if disposal sites aze not in a flood plain. Approval of the
contractors disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is
not in a known flood plain or by a Flood Plain fill Permit authorizing fill within the flood plain. Any
expenses associated with obtaining the fill permit, including any necessary engineering studies, shall be at
the contractors expense. In the event that the contractor disposes of spoiUfill materials at a site without a fill
permit or a letter from the administrator approving the disposal site, upon notification by the D'uector of
Engineering, contractor shall remove the spoiUfill material at its expense and dispose of such materials in
accordance with the Ordinance of the City and this section.
15. ZONING REpUIREMENTS: During the construction of this project, the Contractor shall comply with
present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes.
16. OUALITY CONTROL TESTING:
(a) The contractor shall furnish, at its own expense, certifications by a private laboratory fo'r all materials
proposed to be used on the projec±, including a mix design for any asph�ltic and/or Portland cement
concrete to be used and gradation analysis for sand and crushed stone to be used along with the name of
the pit from which the material was taken. The contractor shall provide manufacturer's certifications
for all manufactured items to be used in the project and'will bear any expense related thereto.
(b) Tests of the design concrete mix shall be, made by the contractor's laboratory at least nine days prior to
the placing of concrete using the same aggregate, cement and mo�tar which are to be used later in the
concrete. The contractor shall provide a certified copy of the test results to the City.
(c) Quality control testing of in situ material on this project will be performed by the City at its own
expense. Any retesting required as a result of failure of the`material to meet project specifications will
be at the expense of the contractor and will be billed at commercial rates as determined by the City. The
failure of the City to make any tests of materials shall in no way relieve the contractor of its
responsibility to furnish materials and equipment conforming to the requirements of the contract.
(d) Not less than 24 hours notice shall be provided to the City by the contractor for operations requiring
testing. The contractor shall provide access and trench safety system (if required) for the site to be
tested and any work effort involved is deemed to be included in the unit price for the item being tested.
(e) The contractor sha11 provide a copy of the trip ticket for each load cf fill material delivered to the job
site. The ticket shall specify the name of the pit supplying the fll material.
17. PROPERTY ACCESS: Access to adjacent property shall be maintained at all times unless otherwise
directed by the Engineer.
18. SAFETY RESTRICTIONS - WORK NEAR�HIGH VOLTAGE LINES:
The following procedures will be followed regazding the subject item on this contract:
�
�
(a) A warning sign not less than five inches by seven inches, painted yellow with black letters that are
� legible at twelve feet shall bz placed inside and outside vehicles such as �cranes, derricks, power
shovels, drilling rigs, pile dr`ivers, hoisting equipment or similar apparatus. T'he warning sign shall read
as follows: . •
� "WARNING—UNLAWFUL TO OPERATE THIS EQUIPIVIENT WITHIN SIX FEET OF HIGH
VOLTAGE LINES." (
n (b) Equipment that may be operated within ten feet of high voltage lines shall have an insulating cage-type
Uof guard about the boom or ann, except back hoes or dippers and insulator links on the lift hood
connections.
� (c) When necessary to work within six feet of high voltage electric lines, notification shall be given the
power company (TU Electric Service Company) which will erect temporary mechanical barriers, de=
energize the line or raise or lower the line. The work done by the power company shall not be at the
� expense of the City of Fort Worth. T'he notifying department shall maintain an accurate log of all such
calls to TU Electric Service Company and shall record actio� taken in each case.
(d) The contractor is required to make arrangements with the TU Electric Service Company for the
temporary relocation or raising of high voltage lines at the contractor's sole cost and expense.
(e) No person shall work within six feet of a high voltage line without protection having been taken as
outlined in Pazagraph (c).
19. WATER DEPARTMENT PRE-OUALIFICATIONS: Any contractor performing any work on Fort Worth
� water or sanitary sewer facilities must be pre-qualified with the Water Department to perform such work in
accordance with procedures described in the cunent Fort Worth Water Department Geneial Specifications
which general specifications shall govern performance of all such work.
20. RIGHT TO AUDIT:
(a) Contractor agrees that the City shall, until the expiration of three (3) yeazs after final payment under
� this contract have access to and the right to examine and photocopy any directly pertinent books,
documents, papers and records �of the contractor involving transactions relating to this contract.
Contractor agrees that the City shall have access during normal working hours to all necessary
contractor facilities and shall be provided adequate and appropriate work space in order to conduct
Q audits in compliance with the provisions of this section. The City shall give contractor reasonable
advance notice of intended audits.
� (b) Contractor further agrees to include in all its subcontracts hereuntler a provision to the effect that the
su6contractor agr�es'that the City. shall,.under the expiration of ttiree (3} yeazs after fmal payment�under
the subcontract, have access to and the right to examine and photocopy any directly pertinent books,
� documents, papers and records of such subcontractor involving transactions to the subcontract and
further, that City shall have access during normal working hours to all subcontractor facilities and shall
be provided adequate and appropriate work space in order to conduct audits in compliance with the
� provisions of this article together with subsection (c ) hereof. City shall give subcontractor reasonable
advance notice of intended audits.
(c) Contractor and subcontractor agree to photo copy such documents as may be requested by the City.
The City agrees to reimburse contractor for the cost of copies as follows:
1. 50 copies and under $0.10 per page.
� 2. More than 50 copies $0.85 for first page plus $0.15 for each page thereafter.
�■J
(d) "Contractor agrees that the City shall, until the expiiation of three (3) years after fmal payment under
this contract have access to and the right to examine any directly pertinent books, documents, papers
and records of such subcontractor, involving transactions to the subcontract and further, that City shall
have access during normal working hours to all appropriate work space, in order to conduct audits in
compliance with the provisions of this article. City shall give subcontractor reasonable advance notice
of intended audits."
CONSTRUCTION
NON-PAY I`I'EM No. 1- CLEARING AND GRUBBING:
All objectionable items within the limits of this project and not otherwise provided.for. shall be removed under
this item in accordance with Standard Specification Item 102, "Clearing and Grubbing." However, no direct
payment will be made for this item and it shall be considered incidental to this contract.
NON-PAY ITEM No. 2- SPRINKLING FOR DUST CONTROL:
All applieable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall apply.
However, no direct payment will be made for this item and it shall be considered incidental `to this contract.
NON-PAY ITEM No. 3- PROTECTION OF '!'KEES, PLANTS AND SOIL:
All property along and adjacent to the Contractor's operations including lawns, yards, shrubs, trees, etc. shall be
preserved or restored after completion of the work to a condition equal or better than existed'prior to start of
work.
By ordinance, the contractor must obtain a permit from the City Forester before any work (trimming; removal or
root pruning) can be done on trees or shrubs growing on public property including street rights-of-way and
designated alleys. Tliis permit can be obtained by calling the Forestry Office at 871-5738. All tree work shall
be in compliance with pruning standards for Class II Pruning as d'escribed by the National Arborist Association.
A copy of these standards can be provided by calling the above number. Any damage to public trees due to
negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined
by the International Society of Arboriculture. Paymerit for negligent damage to public trees shall be made to the
City of Fort Worth and may be withheld from funds due to the Contractor by the City.
To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall be immediately
sealed using a commercial pruning paint. T'his is the only instance when pruning paint is recommended.
NON-PAY ITEM No. 4- CONCRETE COLORED SURFACE:
Concrete wheelchair ramp surfaces, exclu�ing the side slopes and curb, shall be colored with LITHOCHROME
color hardener or equal. A brick red color, a dry-shake`hardener manufactured by L.M. Scofield Company or
equal, shall be used in accordance with manufacturers instructions. Contractor shall provide a sample concrete
panel of one foot by"one foot by three inches dimension, or other dimension approved by tha Engineer, meeting
the aforementioned specifications. The sample, upon approval of the Engineer, shall be the acceptable standard
to be applied for all construction covered in the scope of this Non-Pay Item. No direct payment will be made for
this item and it shall be considered incidental to this contract.
The method of application shall be by screeri, sifter, sieve, or other means in order to provide for a uniform color
distribution.
NON-PAY ITEM No. 5- SILICONE JOINT SEALING FOR WHEELCHAIR RAMP JOINTS:
CITY OF FORT VI�ORTH, TEXA S
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
SPECIFICATION
for
�
�
L'�1
�
�
L�9
�
L�'J
l_�J
l�]
1. SCOPE
This specification for silicone joint sealing Portland Cement Concrete pavement and
curbs shall supersede Item 314.2. (11) "Joint Sealing Materials" of STANDARD
SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION -
CITY OF FORT WORTH, and Item 2.210 "Joint Sealing" of STANDARD
SPECIFICATIONS FOR PUBL,.IC WORKS CONSTRUCTION - NORTH TEXAS
COUNCIL OF GOVERNMENTS.
3. MATERIALS
3.1 The silicone joint sealant shall meet Federal Specification TT-S-001543A for
Class A sealant except as modified by the test requirements of this specification.
Before the installation of the joint sealant, the Contractor shall fumish the
Engineer certification by ati independent testing laboratory that the silicone joint
sealant meet these requirements.
3.2 The manufacturer of the silicone joint sealant shall have a minimum two-year
demonstrated, documented successful field performance with Portland Cement
Concrete pavement silicone joint sealant systems. Verifiable documentation shall
be submitted to the Engineer. Acetic acid cure sealants shall not be accepted.
The silicone sealant shall be cold applied.
3.3 Self-Leveling Silicone Joint Sealant
SILICONE JOINT SEALING
(Revision 1, October 18, 1989)
(Revision 2, May 12, 1994)
T'he joint sealant shall be Dow Corning 890-SL self-leveling silicone joint sealant
� as manufactured by Dow Corning Corporation, Midland, MI 48686-0994, or an
approved equal.
� Self-Leveli�a Silicone Joint Sealant
Test Method Test ReQuirement
� AS SUPPLIED
....
� MIL-S-8802
ASTM D 1475
«**.
....
� .«.*
�
�
L
Non Volatile Content, % min.
Extrusion Rate, grams/minute
Specific Gravity
Skin-Over Time, minutes max.
Cure Time, days
Full Adhesion, days
96 to 99
275 to 550
1.206 to 1.340
60
14 to 21
14 to 21
AS CURED - AFTER 21 DAYS AT 25C (77F) AND 50% RH
ASTM D 412, Die C
ASTM D 3583
(Sect. 14 Mod.)
ASTM C 719
ASTM D 3583
(Sect. 14 Mod.)
Mod. Elongation, % min.
Modulus @ 150% Elongation, psi max.
Movement, 10 cycles @ +100/-50%
Adhesion to Concre�e, % Elongation min.
1400
9
No Failure
600
�
ASTM D 3583 Adhesion to Asphalt, % Elongation min. 600
(Sect. 14 Mod.)
3.4 The joint filler sop shall be of a closed cell expanded polyethylene foam backer
rod and polyethylene bond breaker tape of sufficient size to provide a tight seal.
The back rod and breaker tape shall be installed in the saw-cut joint to prevent
the joint sealant from flowing to the bottom of the jd'int. The°backer rod and
breaker tape shall be compatible with the silicone joint sealant and no bond or
reaction shall occur between thPm. Reference is made to the "Construction
Detail" sheet for the various joint details with their respective dimensions.
4. TIME OF APPLICATION
On newly constructed Portland Cement Concrete pavement, the joints shall be
initially saw cut to the required depth with the proper joint spacing as shown on
the "Construction Detail" sheet or as�d'uected by the Engineer within 12 hours of
the pavement„placement. (Note that for the "dummy" joints, the initial 1/4 inch
width "green" saw-cut and the "reservoir" saw cut aze identical and should•be
part of the same saw cutting operation. Immediately after the saw cutting
pressure washing shall be applied to flush �the concrete slurry from the freshly
saw cut joints.) T'he pavement shall be allowed to cure for a minimum of seven
(7) days. Then the saw cuts for the joint sealant reservoir shall be made, the
joint cleaned, and the joint sealant insta'lled. During the application of the joint
sealant, the weather shall not be inclement and the temperature shall be 40F (4C)
and rising.
5. EQUIPMENT
5.1 All necessary equipment shall be furnished by the Contractor. The Contractor
shall keep his equipment in a satisfactory working condition and shall be
inspected by the Engineer prior to the beginning of the work. The minimum
requirements for construction equipment shall be as follows;
5.2 Concrete Saw: The sawing equipment shall be adequate in size and power to
complete the joint sawing to the required dimensions.
5:3 High Pressure��Water Pump: The high pressure cold water pumping system shall
be capable of delivering a sufficient pressure and volume of water to thoroughly
flush the concrete sl�irry from the saw-cut joint.
5.4 Air Compressors: The delivered compressed air shall have a pressure in excess
of 90 psi and 120 cfin. There shall be suitable reaps for the removal of all free
water and o�l from the compressed air. The blow-tube shall fir into the saw-cut
joint.
5.5
5.6
Extrusion Pump: The output shall be capable of supplying a sufficient volume of
sealant to the joint.
Injection Tool: T'his mechanical device shall apply the sealant uniformly into the
joint.
5.7 Sandblaster: The design shall be for commercial use with air compressors as
!�1!
l!9
�
�
�
{�
�L�J
�
specified in Pazagraph 5.4.
5.8 Backer Rod Roller and Tooling Instrument: These devices shall be clean and free
of contamination. They shall be compatible with the join depth and width
requirements.
6. CONSTRUCTION METHODS
6.1 General: The joint reservoir saw cutting, cleaning, bond breaker instailation, and
joint sealant placement shall be performed in a continuous sequence of
operations
6.2 Sawing Joints: The joints shall be saw-cut to the width and depth as shown on
the "Construction Detail" sheet. T'he faces of the joints shall be uniform in width
and depth along the full length of the joint.
6.3 Cleaning Joints: Immediately after sawing, the resulting concrete slurry shall be
completely removed from the joint and adjacent area by flushing with high
pressure water. The water flushing shall be done i;► one-direction to prevent
joinf contamination.
When the Contractor elects to saw the joint by the dry method, flushing the joint
with high pressure water may be deleted. The dust resulting from the sawing
shall be removed from the joint by using compressed air. (Paragraph Rev. 1,
October 18, 19891
� After complete drying, the joints shall be sandblasted. The nozzle shall be
attached to a mechanical aiming device so that the sand blast will be directed at
an angle of 45 degrees and at a distance of one to two inches from the face of
� the joint. Both joint faces shall be sandblasted in separate, one directional
passes. Upon the termination of the sandblasting, the joints shall be blown-out
using compressed air. The blow tube shall fit into the joints.
L�J
L��
LJ
The blown joint shall be checked for residual dust or other contamination. If
any dust or contamination is found, the sandblasting and blowing shall be
repeated until the joint is cleanedf Solvents will not be permitted to remove
stains and contamination.
Immediately upon cleaning, the bond breaker and sealant shall be placed in the
joint. Open, cleaned joints shall not be left unsealed ovemight.
Bond Breaker Rod and Tape: Th� bond breaker rod and tae shall be installed in
the cleaned join,t prior to the application� of the joint sealant in a manner that will
p'roduce the req�ired dimensions.
6.4 Joint Sealant: Upon placement of the b�nd breaker rod and tape, the joint
p� sealant shall be applied using the mechanical injection tool. The joint sealant
�� application shall not be permitted when'the air and pavement temperature is less
than 40F (4C�, Joints shall not be sealed unless they are clean and dry.
L�!"i
�
Unsatisfactorily sealed joints shall be refilled. Excess sealant left on the
pavement surface shall be removed and.discarded and shall� not be used to seal
the joints.
The pavement surface shall present a clean fmal condition.
�
L�
Traffic shall not be allowed on the fresh sealant until it becomes tack-free.
Approval of Joints: A representative.of t�e sealant manufacturer shall be present
at the job site at the beginning of the fmal cleaning and sealing of the joints. He
shall demonstrate to the Contractor and the Engineer the acceptable method for
sealant installation. The manufacturer's representative shall approve the clean,
dry joints before the sealing operation commences.
..:::. ri
The Contractor shall provide the Engineer a manufacturer's written guarantee on all
joint sealing materials. The manufacturer shall agree to provi�le any replacement
material free of chargesto the City. Also, the Contractor shall provide the Engineer a
written warranty on all sealed joints. T'he Contractor shall agree to replace any failed
joints at no cost to the City. Both warranties shall be for one year after fmal
acceptance of the completed work by the Engineer.
8. BASIS OF PAYMENT
No separate payment will be made for Silicone Joint Sealant. This item will be considered
subsidiary to th� contract will include �arnishing all materials and for all p'reparation, delivery,
and application of those sealing materials and for all labor, equipment, tools and
incidentals necessary to complete the silicone joint sealing in conformity with the plans
. and these specifications.
NON-PAY ITEM No. 6— RECONNECTION` OF EXISTING DRAINS:
All drain lines that draiti through the existing curb will be reconnected through the proposed curb. Any
relocations or adjustments required to the existing drain line to connect through the proposed curb will be
considered subsidiary to this contract and no additiona] payment will be made.
NON-PAY ITEM No. 7— PROJECT CLEAN-UP:
The Contractor shall be awaze that keeping the project site in a neat and orderly condition is considered an
integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items.
Clean up work shall be don� as directed by the Engineer as the work progresses or as needed. If, in the opinion
of the Engineer it is necessary, clean-up shall be done on a daily basis.� Clean up work shall include, but not be
limited to:
• Sweeping the street clean of dirt or debris
• Storing excess material in appropriate and organized manner
• Keeping trash of any �f�ind off of residents' property
If the Engineer does not feel that the jobsite has been kept in an orderly condition;=on the next estimate payment
(and all subsequent payments.until completed) of the appropriate bid item(s) will be reduced by 25%.
Final cleanup work shall be done for this project as soon as the paving and curb and gutter has been consttucted.
No more than seven days shall elapse after completion of construction before the roadway and right-of-way is
cleaned up to the satisfaction of the Engineer.
NON-PAY ITEM No. 8— PROJECT SCHEDULE:
a
Contractor shall be responsible for producing a project schedule at the pre-cons^truction conference. This
schedule shall detail all phases of construction, including project cleanup, and allow the contractor to complete
the work in the allotted time. This schedule will also provide the Construction Manager with an estimated
completion date of work to be performed under this Contract. Contractor will not move on to the jobsite nor
�
� will work begin until said schedule has been received and approval secured from the Construction En ineer.
g
However, contract time will start even if the project schedule has not been turned in. Project schedule will be
� updated and resubmitted at the end of every estimating period. All costs involved in producing and maintaining
the project schedule shall be subsidiary to this contract.
t�J
D PAY ITEM Unit II Alternates No. 1& No. 2-No. 1- UTILITY ADNSTMENT:
This item is included for the basic purpose of establishing a contract price which will be comparable to the final
cost of making nece'ssary adjustments required due to street improvements�to water, sanitary sewer and natural
gas service lines and appurtenances where such service lines and appurtenances are the property owner's
D responsibility to maintain. An arbitrary figure has been placed in the Proposal; however, this does not guarantee
any payment for utility adjustments, neither does it confine utility adjustments to the amount shown in the
Proposal. It shall be the "Contractor" responsibility to provide the services of a licensed plumber to make the
� utility adjustments determined necessary by the Engineer. No payment will be made for utility adjustments
except those adjusUnents determined necessary by the Engineer. Should the contractor damage service lines due
to his negligence, where such lines would not have required adjustment or repair otherwise, the lines shall be
� repaired and adjusted by the contractor at the contractor's ezpense. The payment to the contractor for utility
adjustments shall be the actual cost of the adjustments plus ten percent (10%) to cover the cost of bond and
overhead incurred by the contractor in handling the utility adjustments.
l�J
C�J
l*J
�
�
L�J
L�1
PAY ITEM Unit II Alternates No. 1& No. 2-No. 2- PROJECT DESIGNATION SIGN:
The contractor shall construct and install two (2) Project Designation Signs and it will be the responsibility of
the contractor to maintain the signs in a presentable condition at all times on each project under construction.
Maintenance will include painting and repairs as directed by the Engineer.
It will be the responsibility of the Contractor to have the individual project signs lettered and painted in
accordance with the enclosed detail. The quality of the paint, painting and lettering on the signs shall be
approved by the Engineer. �The height and arrarigement of the lettering shall 6e in accordance with the enclosed
detail. The sign shall be constructed of'/." fir plywood, grade A-C (exterior) or better. These signs shall be
installed on batricades or as directed by the Engineer and in place at the project site upon commencement of
construction.
The work, which includes the painting of the signs, installing and removing the signs, furnishing the materials,
supports and connections to the support and maintenance shall be to the satisfaction of the�Engineer.
The unit price bid per each will be full paytnent for materials including all labor, equipment, tools and
incidentals necessary to complete the work.
PAY IT'EM Unit II Alternate No. 1-No. 7- LJNCLASSIFIED STREET EXCAVATION:
Contractor should be aware that this item will cover all excavations required including, but not limited to, 3"
undercutting as described in attached recommendations, any excavation due to lowering of proposed curb line,
and any excavation required to shape existing subbase to the standard crown for the proposed roadway.
a All objectionable material found within the limits of excavation sha 1 be removed from the job site and disposed
of in a manner satisfactory to the Engineer. Removal of such shal� be subsidiary to this item unless otherwise
provided herein. .
a During the construction of this project, it is required that all parkways be excavated and shaped at the same time
the roadway is excavated (if applicable.) Excess excavation will be disposed of at locations approved by the
engineer. ,
�
l�!I
The intention of the owr�er is to pa� only the plan,quantity without measurement. Should either contr,acting
party be able to show an error in the q�antities exceeding 10 per�ent, then actual quantities will be paid for at the
unit prices bid. The party requesting the payment of actual rather than plan quantities is responsible for bearing
any survey and/or measurement costs necessary to verify the actual �quantities.
PAY ITEM Unit II Alternate No. 2-No. 7- LTNCLASSIFIED STREET EXCAVATION:
All objectianable materia? found within the limits of excavation shall be removed from the job site and disposed
of in a manner satisfactory to the Engineer. Removal of such shall be subsidiary to this item unless otherwise
provided herein.
During the construction of this project, it is required that all parkways be excavated and shaped at the same time
the roadway is excavated (if applicable.) Excess excavation will be disposed of at locations approved by the
engineer.
The intention of the owner is to pay only the plan quantity without measurement. Should either contracting
party be able`to show ari error in the quantities exceeding 10 percent, then actual quaritities will be paid for at the
unit prices bid. The party requesting the payment of actual rather than plan quantities is responsible for bearing
any survey ancl/or measurement costs necessary to verify the actual quantities.
PAY ITEM LThit II Alternates No. 1& No. 2-No. 10, No. 11, & No.12 — PROP '18" RCPs — PROP 21" RCP. —
PROP 24" RCP:
Trench Safety for these items shall be as follows:
Description: This item will consist of the basic requirements which the contractor must comply with in order to
provide for the safety and health of workers in a trench. T'he contractor shall develop, design and implement the
trench excavation safety protection system. T'he contractor shall bear the sole responsibility for the adequacy of
the trench safety systein anil'providing "a safe place to work" for the workm'an: ' �
The trench excavation safety protection system shall be used for all trench excavations deeper than five (5) feet.
The Excavating and Trenching Operation Manual of the Occupational Safety and Health Administration, U.S.
Deparhnent of Labor, shall be the minimum goveming requirement of this item and is hereby made a part of this
specification. The contractor shall, in addition, comply with all other applicable Federal, State and local rules,
regulations and ordinances.
PAY ITEM Unit II`Alternates No. 1& No. 2-No. 16 — REMOVE & REPLACE CONCRETE ISLAND:
This item consists of removal and replacement of existing concrete island as shown on detail sheet 2 of 4 and
paving plan sheet 4 of 4.
The lump sum payment shall be full compensation for the contractor to perfor�n work.
PAY ITEM Unit II Alternates No. 1& No. 2-No. 17 — REMOVE & REPLACE CONCRETE PAVEMENT:
This item consists of removal and replacement of existing concrete pavement as shown on paving plan sheet 4 of
4, between stations 2+65+ and 3+55+.
The lump sum payment shall be full compensation for the contractor to perform work.
;a
PAY ITEM Unit II Alteinate No. 1-No. 18 — 7" CURB & 18" GUTTER:
All provisions,of Standard Specif cation No. 502 `Concrete Curb &� Gutter' shall apply except as.modified
herein:
Subsidiary to the unit price bid per linear foot shall be the following:
a) A minimum of 5" or greater as required depth of flexbase material properly compacted under the proposed
curb and gutter as shown in the construction details.
lJ
�
�
b) Flexbase �aterial to a depth of at least 8" and a width as required in the roadway adjacent to the proposed
gutter where the existing pavement and subbase was removed to allow for the forms to be placed to pour the
proposed curb anc� gutter. This is intended to replace the necessary material required for the pulverization
process.
c) If the Contractor fails to backfill either in front of the gutter or behind the curb within seven (7) calendar
a days of pouring the curb and gutter, the amount paid for the curb and gutter shall be reduced by 25% until
the backfill operation is complete.
�
�
�
��
�
C'J
L'�J
L�.'�
�
�!1
PAY ITEM Unit II Alternate No. 2-No. 18 — 7" CURB & 18" GUTTER:,
All provisions of Standard Specifcation No. 502 `Concrete Curb & Gutter' shall apply except as modified
herein:
Subsidiary to the unit price bid per linear foot shall be the following:
If the Contractor fails to backfill behind the curb within seven (7) calendar days of pouring the curb and gutter,
the amount paid for the curb and gutter shall be reduced by 25% until the backfill operation is complete.
Measurement and Payment: All methods used for trench excavation safety protection shall be considered
subsidiary to the cost of in�talling the pipe as shown on the plans. No separate payment will be made.
PAY ITEM Unit II Alternate'No. 1-No. 22 & PAY ITEM Unit II Alternate No. "1-No.24-- 8" PULVERIZA`TION,
& 3" H.M.A.C. PAVEMENT T'YPE "D" MIX:
The construction sequencing for this project and specifically for this item is described by the following attached
recommendations provided by Deparkment of Engineering Construction Services Division.
PAY IT'EM Unit II Alternate No. 2-No. 24 — 5" H.M.A.C. PAVEMENT:,
All provisions of Standard Specification No. 312 `Hot-Mix Asphaltic Concrete' shal] apply except as modified
herein:
The base course shall be a 3" deep Type "B" course placed in one lift. The surface course shall be a 2" deep
Type "D" course placed in one lift.
PAY ITEM Unit II Alternates No. 1&.No. 2-No. 25 - HMAC TRANSITION:,
This item will consist of the furnishing and placing at varying thicknesses an H.M.A.C. surface in transition
areas where indicated on the plans, as specified in these specifications and at other locations as may be directed
by the Engineer.
This item shall be gnverned by all applicable provisions of Standard Specifications Item 312.
The price bid per ton HMAC Transition as shown in the Proposa] will be full payment for materials including all
labor, equipment, tools and incidentals necessary to complete the work.
� PAY ITEM Unit II Alternates No. 1& No. 2-No. 26 - 6" PIPE SUBDRAIN:,
No specific location for this item is designated on the plans. Subdrain shall be installed only if field conditions
indicate ground water at subgrade level after excavation and if deemed necessary by the Engineer.
rL�J
I_�J
�
PAY ITEM Unit II Alternates No. 1& No. 2-No. 27 - TOPSOIL:,
The proposed quantities are estimates only and intended for use in the pazkway. This pay item is intended to
pay for topsoil that must be imported where suitable material is either not available on the job or cannot
reasonably be stored on-site. Payment will be made on the basis of loose truck volume (full truck with
sideboards up) tickets and material must meet City of Fort Worth standards for topsoil. Only the volume
imported will be paid for and may be substantially less than the proposal quantities listed.
��J
PAY ITEM Unit II Alternates No. 1& No. 2-No. 28 - ADNST WATER VALVE BOX:
Contractor will be responsible for adjusting water valve boxes to match new pavement grade. Subsidiary to this
item shall be the installation of a concrete collaz per attached detail. The water valves themselves will be
adjusted by City of Fort Worth Water Department forces.
The concrete shall be designed to achieve a minimum compressive strength of 3,000 pounds per syuareA inch.
Work shall be completed and the street open to traffic within seven (7) calendar days of beginning work on the
water valve box. If the Coatractor fails to complete the work within seven (7) calendar �ays, a$100.00 per
day liquidated damage will be assessed per water valve box per day.
The unit price bid will be full payment for materials including all labor, equipment, tools and incidentals
ne�essary to complete the work.
PAY ITEM Unit II Alternates No. I& No. 2-No. 29 - Iv1ANHOLE ADN�TMENT:
'This item shall include adjusting the tops of existing and/or proposed manholes to match proposed grade as
shown on the plans or as directed by the Engineer. Standafd Specification Item No. 450 shall �apply except as
follows:
Included as part of this pay item shall be the application of a cold-applied preformed flexible butyl
rubber or plastic sealing°�compound for sealing interior and/or exterior joints on concrete manhole
sections as per current City Water Department Special Conditions.
Subsidiary to this item will be the installation of a concrete collar per Water Department GCD Figure 121. The
concrete shall be designed to achieve a minimum compressive strength of 3,OQ0 pounds per square inch. Work
shall be completed and the street open to traffic within seven (7) calendar days of beginning work on the
manhole. If the Contractor fails to complete the work within seven (7) calendar days, a$100.00 per day
liquidated damage will be assessed per manhole per day.
PAY ITEM Unit II Alternates No. 1& No. 2-No. 30 - ADNST WATER METER BOX:
This item shall include r�ising or lowering an existing meter box to the parkway grade specified. No payment
will be made for existing boxes which are within 0.1' of specified parkway grade.
The unit.price bid will be full payment for materials including all labor, equipment, tools and incidentals
necessary to complete the work.
�
�
C� C� C� �'J C� 0 � � C� �J C.� 0 0 �l �3 C� C� C7 �1
Paving Alt. #1 (Pulverization) 3:12 PM 8/4/99
PAY Street #1 Street #2 Street #3
ITEM Provine NW 19th Curzon
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
7,000
2
2550
3794
4154
-508
6
114
114
10
6
114
125
2550
4152
5142
3944
79
3944
50
70
3
6
23
6,000
2
1270
980 ,..
2230 �
1040 •w�.
540
1770
980
2290
1660 '
3170
64
3170
7
50
50
2
1
6,000
2
458
30
72
543
195
458
606
72
543
1680
34
1680
15
50
10
2
6
Street #4
Winthrop
�
� 6,000
2
913
� 621
� 334
� 3
I 12
I 12
3
1
1
913
1500
737
2345
50
2345
38
85
30
3
QTY
ALTERNATE 1--3" HMAC ON 8" PULVERIZED SUBGRADE
UNIT DESCRIPTION OF ITEM
1 LS. Utility Adjustment �
8 EA. Project Designation Signs
5191 LF. Remove Exist. Curb & Gutter
1010 SF. Remove Exist. Concrete Valley Gutter ..
6096 SF. Remove Exist. Conc. Sidewalk, Leadwalk, Steps, Wheelchair ramps
6358 SF. R�emove Exist. Conc. Driveway MF
� 1577 CY. Unclassifed Street Excavation �-
� 9 � EA. Remove Exist. 5' Inlet
�126 � LF. � Remove Exist. 18" R.C.P. •
12 � LF. Prop. 18" CL. III R.C.P.
� 114 � LF. Prop. 21" CL. III R.C.P.
� 10 � LF. Prop. 24" CL. III R.C.P.
� 9 + EA. Prop, Std. 10' Inlet '
� 114 � LF. Trench Safety
+ 125 � CY. Trench Excavation & Backfill
� 1 � LS. �Remove & Replace Concret� Island
�1 � LS. �Remove & Replace Concrete Pavement _
5691 � LF. �Prop. 7" Curb &�18" Gutter
� 3086 � SF. �Prop. Std. 7" Concrete Valley Gutter
� 6514 � SF. �Prop. Std_ 4" Conc. Sidewalk, Leadwalk, Wheelchair Ramps
� 8082 � SF. �Prop. Std. 6" Conc. Driveway , .
� 11139 � SY. �P,rop. 8" Pulverized Base Cement Stabilized @ 5% by Unit weight
� 227 I TN• �P.rop• Cement
I 11139 � SY. �Prop. 3" H.M.A.C. Pavement
I 60 � TN. �Prop. 6" H.M.A.C. Transition
235 � LF. �Prop: 6" Pipe Subdrain �
160 � CY. �Prop. Topsoil
5 � EA. �Prop. Adjust Water Valve Box ••
12 � EA. �Prop. Adjust Manhole •
29 � EA. �Prop. Adjust Water Meter Box
��
� � �
U 6___� 6....�.� d�� �� �J 6.;..� �....� �...� d_,� b.�.J ►_..�1 ��1 �.� 8..�� �� �� 0�
I' ' l Nowmbet l D�eamber January F�bruary � March April May I` Juns
ID 8 7ask Nam� Duratlon StaR Finish Predeoessors 28 � 5 � 13 � 21 � 29 � 7 � 15 � 23 �31 � 8 � 18 � 24 I t � 9 � 17 � 25 � 4� 12 � 20 ��8 � 5 � 73 � 27 ��9 � 7 � 15 � 23 � 31 � 8 � 18 � 24
It Contrad f9C 130 Mys- Tw 1119199 W�d W21/00 - . . .
2 � Saction 1 Watar and Sewer 30 days Tue 71l9/99 Wed 12/29l99 !
i
3 Q Section 2 Water and Sewer 30 daya Wed 1/5/00 Thu 2/24100 ' i .
4 � Section 3 Wabr and Sewer 20 days Thu 312/00 Wed M5/00 '� i
5 ' !
I
6
7
� a �
� '
_ ; i
10 Q Sactfon t PaWrp 35 daya Tua 125/00 Thu 3I23/00 2FS+�4 days
17 � Settion 2 Pavinp 30 days Wed 322/00 Thu 5l11/00 3FS+14 days i
i
72 Section 3 Paving 30 days Tue 5/2/00 Wed 821/00 4FS+14 days
�
0
Project 98 CIp Template I Task - Mibstone .
Date: Fri 7/30199 progiess Summary
Rolled Up Task - Roiled Up Ropress
Rdled Up Milestone O Sp�k
Page 1
Extemat Tasks
Projed Summary
J ��
Ju
,2�10
- Paving AIL �2 (5" HMAC)
PAY Street # 1 Street #2 Street #3
ITEM Provine NVJ 19th Curzon
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
Street #4
Winthrop QTY. UNIT
6,000
2
913
621
467
3
12
12
3
1
1
913
1500
737
2820
40
2345
38
83
30
3
� 1
8
5191
1010
6096
� 6358
� 2407
� 9
� 126
� 12
� 114
� 10
� 9
� 114
� 125
� 1
� 1
� 5691
� 3086
� 651a
� 8082
� 9268
� 131
� 11139
� 60
� 235
� 160
� 5
� 12
� 29
� 52
I 3690
LS.
EA.
LF.
SF.
SF.
SF.
CY.
EA.
LF.
LF.
LF.
LF.
EA.
LF.
CY.
LS.
LS.
LF.
SF.
SF.
SF.
SY.
TN.
SY.
TN.
LF.
CY.
EA.
EA.
EA.
TN.
SY.
ALTERNATE 2--5" HMAC ON 6" LIME STAB. SUBGRADE
DESCRIPTION OF ITEM
�Utility Adjustment �
Project Designation Signs
Remove Exist. Curb & Gutter
Remove Exist. Concrete Valley Gutter
Remove Exist. Conc. Sidewalk, Leadwalk, Steps, Wheelchair ramps
Remove Exist. Conc. Driveway
�Unclassifed Street Excavation
�Remove Exist. 5' Inlet
Remove Exist. 18" R.C.P.
�Prop. 18" CL. III R.C.P.
�Prop. 21" CL. III R.C.P.
�Prop.24"CL.IIIR.C.P. ��- - �—
�Prop. Std. 10' Inlet
�Trench Safety
�Trench Excavation & Backfill
�Remove & Replace Concrete Island
�Remove & Replace Concrete Pavement
�Prop. 7" Curb & 18" Gutter
�Prop. Std. 7" Concrete Valley Gutter
�Prop. Std. 4"Cona Sidewalk, Leadwalk, WheelchairRamps -
�Prop. Std. 6" Conc. Driveway
�Prop. 6" Lime Stabilized Subgrade @ 28 Ibs./s.y.
Prop. Lime
Prop. 5" H.M.A.C. Pavement
�Prop. 6" H.M.A.C. Transition
�Prop. 6" Pipe Subdrain
�Prop. Topsoil
�Prop. Adjust Water Valve Box
�Prop. Adjust Manhole
�Prop. Adjust Water Meter Box
�Prop. Cement
�Prop. 6" Cement Stabilized Subgrade @ 281bs./s.y.
�
�
�
c..� c-� �� ��-� �� c�..-� �-- � i,.._--� �� o o� o c� r� a
7,000
2
2550
3794
4154
730
6
114
114
10
6
114
125
2550
4152
5142
4514
63
3944
50
70
3
6
23
6,000
2
1270
980
2230
1040
945
1770
980
2290
1660
3170
7
50
50
2
1
52
3690
6,000
2
458
30
72
543
265
458
606
72
543
1934
28
1680
15'
50
10
2
6
LJ
CITY OF FORT WORTH
HIGHWAY CONSTRUCTION
PREVAILING WAGE'RATES FOR 1999
AIR TOOL OPERATOR
ASPI-�ALT RAKER
ASPHALT SHOVELER
BATCHING PLANT WEIGHER
CARPENTER ,
CONCRETE FINISHER-PAVING
CONCRETE FINISHER-STRUCTURES
CONCRETE RUBBER
ELECTRTCIAN
FLAGGER
FORM'BUILDER-STRUCTURES
FORM LINER-PAVING & CiTRB
FORM SETTER-PAVING & CUR$
FORM SETTER-STRUCTURES
LABORER-COMMt�N
LABORER-UTILITY
MECHANIC
OILER
SERVICER
PAINTER-STRUCTURES
PIPE LAYER
B�A5TER
ASPHALT DISTRIBUTOR OPERATOR
ASPHAI.T PAVING MACHINE
BROOM OR SWEEPER OPERATOR
BULLDOZER
CONCRETE CURING IvIACHINE
CONCRETE FINISHING 1�ACHINE
CONCRETE PAVING JOINT MACHINE
CONCRETE PAVING 70INT SEALER
CONCRETE PAVING SAW
CONCRETE PAVING SPREADER
SLIPFORM MACNINE OPERATOR
CRANE, CLAMSHELL, BAGKHOE, DERRICK, DRAGLINE, SHOVEL
FOUNDATION DRILL OPER'ATOR CRAWLF.R MOUNTED
FOUNDATION DRILL OPERATOR TR[JCK MOUNTED
FRONT"END LOADER
MILLING MACHINE OPERATOR
MIXER
MOTOR GRADER OPERATOR FINE GRADB
MOTOR GRADER OPERATOR
PAVEMENT MARKING MACHINE
ROLLER, STEEL VJHEEL PLANT-MIX PAVEMENTS
ROLLER, STEEL WHEEL OTI�R FLATWHEEL OR TAMPING
ROLLER, PNEUMATIC, SELF-PROPELLED SCRAPER
SCRAPER
TRACTOR-CRAWLER 'TYPE
TRACTOR-PNEUMATIC
TRAVELING MI7�ER
WAGON-DRILL, BORING MACHINE
REINFORCING �STEEL SETTER-PAVING
REINFORCING STEEL SETfiER-STR.UCTURES
STEEL WOR�,{ER-STRUCTURAL
SPREADER BOX OPERATOR
WORK ZONE BARRICAD� �
$9.00
9.55
8.80
11.�1
1030
10.50
9.83
8.84
15.37
7.55
9.83
9.00
9.24
9.09
7.32
8.94
1�2.68
10.17
9.41
11.00
&.98
11.50
10.29
10.30
8.72
] 0,74
9.25
11.13
10.42
9.OQ
10.39
10.50
9.92
11.04
10.00
11.83
9.96
8.62
10.30
11.97
] 0.96
7.32
9.06
8.59
�.48
9.63
10.58
4 9.15
8.83
12.00
13.21
13.31
14, 80
10.00
7.32
�
���
l�
L
l�'
�
L-=J
�
L�,I
�
L�J
�
l�J
CI
lJ
�
�
�
�
L�J
�
�
�I
L�
'�
I�J
�
i�'
�
�
u
u
�
TRUCK DRIVER-SINGLE AXLE LIGHT
TRUCK DRIVER-SINGLE AXLE HEAVY
TRUCK DRIVER-TANDEM AXLE SEMI TRAILER
TRUCK DRIVER-LOWBOY/FLOAT
TRUCK DRIVER-TRANSIT MIX
TRUCK DRIVER-WINCH
VIBRATOR OPERATOR-HAND TYPE
WELDER
8.965
9.02
8.77
10.44
9.47
9.00
7.32
11.57
��J
�
�
a-�
PROJECT OEStGNATION' S1GN
�uY �
A, � • .
1f � .
�- Ctt o l�ort �I�'o�t�t �
r. �
.l
s�z• -
I. �.
s r�
. .
; l � �ro ect Title .
�
1;. � .
{
� �� � �ontractor:
�
_�•' � C:ontractars l�ame
.•.�
T i/�4'
'�*'� Scheduled Compietion Oate
f
� � Year
r
. =1 � .
� .
� �n- .
. _. �
: ,�.o.� .
tor+a+aRK rnuTt � �tuE t�►acc�ou�o r� �rNise t.�nvts ),
6ETTE�KQ�Cst�r or FORT ro+tTx•�oauxrw DEw tTux -
rIt0�1LCT TRLE .CONiRACTOR • OAT! iM NELYETICw . .
0
. O
� �
�
�
1
� v4~ �
s
f
. . �r:�:.:"'_- .
. � ;
��'4w �
� �
� .�
3
,o
,
1
3
D
�
1
�
�
a
.�
0
�
0
�
a
.�
.o
1
. O
I
� 6�1
�
�
/
��
a
�
a
�
a
L�
O
�
�
L�J
D
�
Q
4J
a
�
Q
,
�
�
�
�
Ext3T. w.
IVM�T 1
���.
\1
�
[=t�MS�ON
�O{MTi
�
��rcM Lx�sT�wo
aur TCR
_—�-_
A�.T
` � - ////////% � -
/ TRIJitIT10M
ARiw• �
• /////// �
// .
�owR[ rt[r or v�«cv
cuTTCR �t•su�[o
/R01t �aCK�OI�CVl1�
TO �1�CR�Of-WR•
�
.:
�
TR �A (w10TM AS REOV�RE01
• DUr�tT
A �o�MT:
PLQN �VIEW
' Nor ro s�e�.
Aa inr��� ao aeor� tAaa r1� 4��14 •�I I• /It� JOo� �i�I/► O�>fA
�i// Ot ii p�iiil /R o!/ a�ri4� ro//ir ��t /sr� Tii to� tiidoi iJ/!
D< <iQai�i4 Ia /irt lb� 0����r sitA irotlr bilo�i lAt job It Ictyl�4.
7'CONCRCT[ •
YACLCT j• Kti�,�,
cuTTc� TR,wsmou
M0.3 t !1' C-C �
. . , . 1'� 1
��� � � �M0.3� 1�'C�C
� ��* � / ( t _ s I • . t ..;,;r • •.;« �. � �!� .
�'�•� ' `i. ' • �; ! ! : •= j•
j1 �'� . L..»
;' II.WA.C.
T�t�utitilGl
� tTE1t M0. 302 � ,
C NGIETt kiC Crushed CO=itGlCTf
Limestone
a._�.
4ESIOCNTIAL fTRCCTi
SECTIOH 'A—A'
• Kor re sco% ,
w
L�
1
- [7ctST. K1ult.
►VY'i i *;SE
TAe-T ��inlarc�d cav�cntt rol/i}�sho!/��ploc� !h+ >o�7."a/ lbspor�mtnl �11h llie�imointn�
oo�tioa ot povimeat lo bi �onst�aelid /ncludlnp ��b�rodi t�fotmi�l, !ir oceoidonei
w!!h th♦ lyploo/povl�p s�C!lo�. Tbt concr�t� rv/liy.�lllb� �or«4�d otcordin� lo
city iJondord� lo� �cat�i�l� c��b o�d pall��. T1i• aoAc��ti sAoll bt of rashed
ond sc�ttnsd o�pi�patt rith � �ala. ol tiv�(Jj�ocls af ctmiat �t� cabtcyord
ot con«�ti . with a minimum �compressive strength of 3,000 pounds per
square inch in seven days. �
CONCRETE VAL L EY DETA/LS
� 4ril 194 �
MANHOLE
WATER VALVE
� � 1/Z W TYP `
♦ 4.0' MH 2.0'� WV
8-�4BARSTYP.
PLACED MIN 3"
BELOW SURFACE
A
PVMT
BASE
GRADE RiNGS •AND
RAM NECK
� —.---
' � •' • � � % �• .. !_ ' :�;. .•� � . ,_;,• "
;: �A . '���,�' � �''• � �' • .
.y •:�,. +,/ � a o�::., ' �•
i. �� ;(�• � .d � �i
.. � .'� , � . .a .
'• '• ' . ' • 3" TYP.
:.:.t� .i�'..4—
.� ,� • , i •
�.•' .L• ' . . •� ..
:. � , .��:
;: '. \ ;. • � . l :
•��''�• '•'' j'�. 1 �ts �,
.•/• � •
. Q. \ �. �' � 0 O
: � ��- '`.�•. S_�: • / ,.'� � . � �
�'�• • ; L ��:'. �.�`•�� i • ;,,i; / '� • � d �-. a• '�'' C
. . . .a•. . ; : � • •O• . : • .
. .•tj ��. �.� . . �.�'• , � '�. � 7"��� � �. . • , ,n
�
. G �'_.:x- _: �:�.t:�a2n.'�,��'� •�, : ' � • .
r—•� -
A
�� _ : � '�. • PVMT
f ` f'' , •
� �' ,�, BASE
:+� • . . . .
- � , ._.._._..._
� � .
• • CONCRETE COLLAR
HEIGHT VARIES
1. ALL CONCRETE USED &HALL BE 300 0 PSL . '
2. CONCRETE COLLAR SHALL EXTEND TO THE BOTTOM OF BASE (MIN.).
3. eONCRETE COLLAR SHALL BE:
a)�4' x 4' for MANIiOLE
b) Z' x 2' for WATER VALVE.
CONCRETE COLLAR •
for � �
MANHOLE and `NATER VALVE .
NTS
February 1q93
,
�
�
�
�
'
�
�
�
�
�
�
'
�I
�
�
�
�
�
�
0
�
0
ATTENTION : •
CURB RAMPS SHALL 6E COPISTRUCTE� PERPENDICULAR TO THE CURB AT
STREE7 CROSSINGS WITI�i LANDINGS IPi LIEU OF DIAGONAL CROSSINGS
WHERE FEASIBLE.°SEE FIGS. 58.59 � 60. __
r
��
�
. .r. .�..�
�.r ..�
.
a
0
CITY OF FORT VORTF�, TEXAS - C�1S7R11C7ION STAhDARD
OCTOBER. 2992 J
0
�
0
� ..
�
. MONOLITHIC :
SIDEWALK CURB
0
SCAIED V/=J�ICQ�+E
u��iCA�IE To �� N T S
C�D-.lOIMT� .
STREET CURB LINES TO BE . ���
�+� 1/4" DEEP
TIWtS1Ti0t'
9" 18" �
-♦- - �- 1.4 J�INT, 3" GAP
*��Y
rr nx.v��• ..
�,.. I +N I ,.� ,.. R...` , � ��.
� \y! � �
���� •��■ �i�� �,'« �
j' ' tiDEVAIK •
� -- -� CURB PAY LIMIT
w+x �t�H aF suer�cE �T�r�rt a�enav�
a� FRoh nif �►ac o� a�a�
� E)Q'MfS1QN lfATERIAL .
R[CCSSfD t/�" MtD
.
�N
U fOR PARKI�IA� 1�/ITN EL.EVATION BELO�I STREET
' EIEVAiON, THE SIDENALK CURD NUST BE 2"
_HIGHER THAN THE STREET CURB.
?� S[DE�IALK CURH SHAU. NOT ENCROACH ON THE
PROPOSED VIDTH �F THE SIDEVAl.K OR� RAMP.
3� FOR TYPE I RAMP MAXIMUM S[DEI�/AL'K CURB
HEIGHT 0" TO 7' :
TYPICAL RAMP X-SE-CTION
_ '� � . .
R.O. W,
�,
,
;
ia
�
CITY �' fORT 1�fORTH, TEXAS — CONSTRUCTIQN StI�NDARD �
' , OCTOBE�L 1992 � �
� � � �3 �7 $� � �9 �3 �7 � � Q � L7 @� �i � �
�
�
L��
(I
a .
, �w�s
�a
u
l�J
L�J
liJ
CJ
1�:_�
. j
6"
»- a tr
� -
�
� .
�
I�
1
. �
�
�t�s �
/'�. o.
'�l
. ' � � ���
� • ..
... . �
•�• .
• � • • •
•�•� •�
•�• • �
• • • �
� • • �•
• • ••
• � • • •
• �• • •
•�•
•�•• •
\�\
EXISTING 15' R
SCALE f" = S'
� � SIDEWAI.K RAMP
NOTES � ,
U E��WS10N .AINT IWD S1l.1GDNE SEAtp�G
t 3?iAl.� �E SlIfS1DIlIRY TO UWT PR1tE ItD
Fae s�c�vax.
� n n�+f �cnu�t. �aRs oF �r�crvk. oF' oust-
IHG CtJR� M� GU?T�t MID SIDEVAtX'Sti�LL
•�� �� ar�crEa �Y T�€ acir+Ea a tr+e
a� EOHoi.tnoc a,as aa �o uoP�s w�Y
�8E MSTI�.IED Q�1 �QTH SLDES Q' T� R/�!P
�r+� a t� �a c�airmri aR ws
DaR£CTED 1Y tiE CNG�ER.
<� C1JR� RN�t VlTH R£tURNED CUR2S WIY !E
IJ�SEf YHERE PEDESTRZMIS VDUL� t�T
t�O�.LY Y�It.IC ACROSS TFf RA�.
SJ S�OP[ � G�tt RMP Mm/at SIDEYN.K
SHAtL �E A W1XIHt�1 ff l� iLNttO
S1DES �' RA�P StiN.L. W1i/E� A l4AXIM,M
SLOP£ �' 1+f� t1t�ESS PEDESTRIAt�S COI��
YALK AC�SS hE RMP ?F�?i TF� KAXIM�
SLOPE � S�iAi.l 1E 14Z
, . , .
; �waroae axv�ex aw
� � �� r
i r
•� • � •�1 +� �
� � -
•• � ••
..;• � • •• `
. . ..
'' \'�''•� �• �'•• �
.
.
•'• • '•.
.��.�:• � � •
� • _• ••
• ••; .. .
� • • � •
•..•.
._
��' �� *� ►
EGEND ��
�f
� � ♦
j ;YiIF.ELCHAIR RAl�iP
I,J
........
. •... _
..,,�.
•••..• .
' •: • . :
LAYDOWN C/G
SPIiALT TIE-JN
�
i
�,
w su�r�a aR aa sHw. x caoo
�oo , .
� t+�oc ar n�ar. a�!
— — -- —
---- — -- — —
r�.�c �o►. r cw
o� ee "' __.. _..
• aR�x
_ 1 vart � co+c�s�rt N►vvoet .
STANDARD PAY LIMIT � DEi'AIL
�
' CIiY � F�21 VflR�iK TEXAS - CONSTRIJCTION STAND�IRD
OCT�B£R, 1932
' WR-1 •
�
0
��
�,
�
7
�
.�
1
,..�
�i
�
�
�t
l
��
p
.�
�
1
�
�l
�
� li �
�°,�
6"
�e-� a t+-
s�►vctrt �
ra+�c rv�t -
� �
,___.� �
. ar
rRrr. cs
. r .- -_�
�K �
VI' V/ �
� � �
�
�
EXISTING 15' R
SCA�.E i" = 5'
� � SIDE�,IAL.K RAMP
!
�� �������,�
���„�����
� � b � W��t N�ID Y ���E� �� �+t
1:C OK�[a �/ :K P�G1
�
' ioo�nac sacw�tx as
�
i
��
�
�K
� � � v�.lQ'bti�i .
� T�.
�� ��
��
� ��
�����
��►,�.�
� -- - -
._ _ ._ ___.
\ FACt 1�. ?" QW
` CXISTA�. ~�
t ilRC�
VWT iOt C�LiL ►AVOC�ff
J.DINT D�TAIL
CITY �OF FORT YORTK, TEXAS -� COkSTRtJCTION STAt,lDARD
OC708ER. 1992„ .
�
a �
�
a
a � �
a. .
a-
0
�
�
� � •� - .
. y,.�....
�:�t o�L:rd Lsr�r� ac'tbp oiFcrj�tar �btsG
, ..•,,..-. 5�de.raric C1�rb 1 .
� . ' " l�it.5a
� .
�
� .
a� -
� I
� '
.,� '
�
!
�
�
6
' Fit.59
Publlc Sidewalic Cnrb Rssaps
P.
. ,
0
r�a�� � ssa� c�► �,
taraIIel labl�e Sidr*r�Y �i Rs�t
COmbSa�d � I'c�it
61de��tY C�rb Raa�
� , ATTENTION : � " a
CURB RAMPS SHALL BE COKSTRUCTE� PERPENDICULAR TO THE CURB AT �
STREET CROSSINGS WITH LANDINGS IN LZEU OF DIAGONAL CROSSINGS No.30
WHERE FEASIBJ�,a SEE FIGS. 58.59 � 60. . 7o-2151
24.Z.a 'G�ehSetilsr Wa» aad �'scCitS�s - � . . -n
�I
�
�
•-•
��
� �.� �
0 -
. � . ` 4 �
. �� 4� . .
f � � �
i .
�� �� � ��,.
- � - �
�`'� � p Q • M �
� � � � :� � . �
4 , ,� 4 � _ .
••• � +., � �
✓ .
� , ' - . �
fl .
.,
. _ p� , � � �
.
�••.�`" � �. �. �«�.. �*',�:,.� � a.,, . a�
. wa�.�..� � ti �,cae.�e..,t
. • o �
� ° . ,
. i � ° . � ; ,� �
. o. c �
�
. Q �
_ t , . .
�
. —} �� `--- l' � a i . . �
., �. �
. 0
.,r.a.�puEie � arl1,�.. C�L�tlo�,,c+i�e.idr,.t eur. .. �,� sfd...t..r. • . . 0
_ M}nDie tbe��Hc tswp M p'�rOiC 1�b�w�t t�b� re�� • Ia�p.1�t'e�w,lra k�w,b1�
. � Pv:hiic 83�c.r�3c Cmb �p�s at ;�carked G�oss�a.pt D
Gov�*+qr� e 1!'1t or ��+.w a wsari Af�ara. r+c �u �
�M
i
O"
�
LJ
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
a
a
�
�
0
u
1�48
-�--
' � _-- �12
U12 '
' _!
� � .
�
�
�
� �
�
�
�
. TYPE � I�
EXISTING i5' R
SCAL.E i" = S'
� � PROP. 4' RAMP .
��Nii��iw
�� =�-•-�-�-�•���-�� �� COLORED SURFACE
� �
� �
�
�
�
. __
VARIABLE I�EIGHT CURB
1 1/2' R CTYPJ
CITY ff' FQRT V�t7lt TEXAS - CU�ST'R'L1CiIQN STAl1DaRD
OCT08Qt. 1442
�
_. ATTENTION !
CURB RAMPS SHALL BE CONSTRUCTED PERPEN�ICULAR TO THE CURB AT
57REET CROSSINGS WITH LANOINGS IN LIEU OF OIAGONAL CROSSINGS
� WHERE FEASIBLE. 5EE FIGS. 58.59 b 60.
' • .
•
�'
J
t
r•
�
-.�
�
0
(
0
Ci7Y � F�tT VORTK TEXAS — COKSTRUCTIQd S?At�ARD
� OCTOBER.I99Z
0
0
m
�
�
� �
. :
� �
�
�
. `�
�
�
��
�
�
. �,] .
�
�
.�
�
�
,r�
u
.�•� p�, I
�XiS?I�;, s�SR
�. s� �� E 1
�
:���_�
1
�
�
�.-�
�. �t�a� s�N��
.. C�y�S
F�Z �S piCt�" 1� .
GISY �
� .
� -.
Y�;�Bt�
k�I�T �$ .
�-1 �l2' R tt`�'J
� 4, RpMP�
pROp' f p,CE
�`o�E�y �UR
C
� ��
��
� 6"
M- aR r+-
s�vwt �
rwrc nnez -
�
TYPE III
EXZSTING 15' R
SC�L.E 1" = S'
� 3 SIDEI�ALK RAMP
' BROOM F'INISH
1
��������� HMaC TiE-iN
�� .
;�
�
samss .
� �cas�o
Moc � �
�+a�►. a _ ..
��
a ��oa.rnac mc�iuc a�s
uc . --- ---- ---_
�
/i� •
� �\� . � � .
�
��
�
A! K��
1� 1�CK Q M�. �'i�l't
, r �� �� � ��
�� �� �� �� ��
i�rs r�v� r� oas
oQiroc — •.—
t amLt
fu mcx�t �,,w�xi
CITY OF' FQR� V�2i}�, TEXAS� - C�TRUCTIQ{ StaKDARD
OCTOBET� 1952
�
�
.�
�Q
��
�
�
�
��
�
���
�
�
�
�
�
�
�
�
�
�
�I 1l
� I�
«�T� � � � �
..� �
��W
��
��
0
.._ _
� �� � A
C ��. r %tir�i
�� �
ai�
� �..
� .....
..� '
���
CITY OF' F�t? VORT?� TEXA.S - CQISTRUCTIQ�! STANDARD
OCT08ER 1992
0
. T Y�'E I I I
' EXISTING 2C' R
SCALE 1" = 5' .
�� � PRDP. RAMP
f' - `- r - ' BRO�M F'IN�SH
!
C��//////� TRANSITION
I
0
;�
�. ._... _.... . � . � D
CURB RAMPS SFiALL BE COt�tSTRUCTEO PERPENOSCULAR TO THE CURB� AT` �
S7REET CROSSINGS WI?H LANDINGS IN LIEU OF DIAGONAL. CROSSINGS No.�O
�ERE FEASIBLE, SEE FIGS. 58;59 � 60. . ' 7Q:2151
1�.Z.a �G!ehSca�as WaTs sad �''aeiSitS�s � �
U , . . � . �
. � � 0 -
I • 7 ' ' _ �
, i� .
"'�r ' +. .
i = � �' �
� T � •
i� �� T
� • - �
4
Y
�,�y--�=�� D . . 4 _ � .� �
r i Y - �
r Y
� � �� � � ��
�� �
./ •
� i ' ���
0 � ' ' �I
. D - *--� .
h�p.�a�edr�b a+e".�e.,..�c ouw � �vrp�+r6evl�r p,e�G "c .�d...+k a.s u.� ' � �
i� ►��C �r.r+� W►'�rt�r � In pupa� sfd��dt
0 . ' �
� � . . �
� ; � t. � .
. ; : . G �
, d • �•�
� • �
� �� .�.�. �� ` . . � C
Tl � �` • •
. . �
.
Fsrsa+lp� � ew11f� CoewL�nttlon K�c N�6�wt ltiel •• h�9�Ct�ir j b�e til�wic weM .,: �
L � j� b i C M d e w r i[ t M � p M� A i C t k�� 1 i � l O r„ r r l c w r • l i 1� y N� e� Y' M � t M s� M
� ��O 6�CR� �i� �2tm� �t iiiT�bd Qt'Oit�II� �
7-7s � ,�,Op�*�l O 1!!t br T1r �v'wu ot lissontl A�ata. t+c itf �
�
�
� `
�
Pb.Y .
�
�
�
�
�
.
�'_
�
�
�
�
�
fl
,�
.��
�
RUNNiNG � X
� Y
SLQPE � AUNNING SLOPE �
�� � � 1•t2 man COUNTERSLOPE
" • i 1:20 max
•,•,;,f�� �,..;., �titi' y:;;; �� / � •
•�� ;:;?:� S�.fi?ti��; Lfti��'�wy� :;:j�� �:tivi �/% r�t•iir i.•..;
.� . , �, �,'ti•� �• ; }�:;}:. �.�f .{•r:� :.L•:}•Y „//I.•:
'•...... �• . • . u:..�. .::• . . _. • • ��:�\
WA�� � CURS RAMP ` S7REET
s�TE:
t 11 S�ope . dc,.►!KK �.. i k.ci �ta�e
lt��.wn�en{ope.Ast1 na ea.�eN 1.�0
FiQ. 84.�.Z
Mtasusemen! oi Ct�b Rsmp Stopa
1� "
NOTE: if c c 11c M►1 !� mms. �h� tlr: .k�a uf dY
ilar�tf .xk-. �hatt �s tuttd 1:l:.
(n) F1ot+c6 S�dq
.
0
St
DE
�. sa.i.S
s�a� of cu� ��
F3s. 84.7.6
Buiti•up Cutb Ramp
,
P1aNTlNG OA OTHER
NONWALKlNG SURFACE
�
.�:'=�a��°...MNlfli�!'f�ll'
, � .� Y�/� .
\�
(bj Rtt�rnMd Grr6
.
���
���
��
���
�
� �
1G
0
3"H.M..A.C. OVERLAY ON 8" CEMENT
PULVERIZED BASE
� CONSTRUCTION DIVISION
RECOMMENDATIONS
c
�
�:-
n F�
a-
�•
�
�
� Date:
To:
� From:
�
�l
�i
L�!
�
��
I�
�
�J
�
!�
INTER-OFFICE CORRESPONDENCE
September 9, 1998
Richard Argoma,niz
Ryan Jeri
Re: Recommendation for Rehabiiitating of
Provine (Meadowbrook to Normand_y)
D.O.E. No: 2004
Upon review of the scope of construc�ion on this project and also by taking core samples
and evaluating ttie thickness and condition of the surface and base material and evaluating
t�c suitability of the existing material for futurc use, it is m_y recommendaiion that this
street is a good candidate to be pulverized.
Upon completion of utility work all ditches must be capped with a temporary patch
compl,ying with City of Fort Worth Specifications. .
The contractor shall putverize the existing pavement / base to a depth.of 8 inches below the
surface of the e,tisting pavement. After pulverization is completed, the confiractor shall
temporarity remove the pulverized material and undercut an additional3 inches of base
rnaterial. The removal of the base material shall start a minimum of 8 inches below the
existing pavement surface, Af�er the undercut is complete, tiie contractor shall replace the
putverized material and mix it with 5 percent Porttand Cement, spread the material as a
base and compact all in accordance with It�m 214, Portland Cement Treamient (Material
Manipulation), of thc latcst rdition of the City of Fort Worth Sbndard Spccifications for
Construction of Streets and Storm Drains. Whcn proper compaction is achieved the
contracfor ahall ov�crlay with 3 inches of HMAC type "D" surfacc course on top of thc new
base and aIl applicable provisions of Item 312 (Hot I�x Asphalt Concrete) and Item 313
(Central Plant Recycling Asphalt Concrete} of the ]atest edition of the City of Fort Worth
Standard Specifications for Conshuction of Streets and Storm Drains. These spec'�ications
shall apply to all aspects of construction methods for this project.
You may want to include a copy of the attached document in the contract documents for
the benefit of the ,contractor' lrid�iing the project and for use in construction of the project.
� anJ ' .
i���en
�
PAVEMENT PULVERIZATION
The contractor shall ptih�erize.the eYisting pavement / base to a depth of eight (8) inches
below the sui�ace of the e�:isting pavement. A$er pulvexization is completed the contractor
shail tempvrarily nmovc the pulvcrizcd ma�crial and rCmovc an additionai three (3) inches
of Uase material. The removal of the base material shall start a miniiniim of eight (8) incl�cs
bclow thc surfacc of ihc cxisling pavcmcnt. Aftcr thc undercut operation is complctc, thc
contractor shall mi.� the pulverized material with ftve (5) percent Portland cement and
spread the material as a base all in accordance with Item 214 Portland Cement Treafiment
(Material Manipulation) of the latest edifion of the City of Fort Worth Standard
Specifications for Street and Storm Drain Constxuction� as follows:
�` Cemenf shall be applied only to such an area that all the operations can be
continuous and completed in day light within six (6) hours of such application.
* Gradations have to be taken just a few minutes before a�lying cement.
* No equipmcant except that used in the sprcading and mixing will be allowed to
pass over the freshly spread cement until it is mixed with the soil.
* Any mixture of so�1 and cement that has not been compacted and finished shall
not remain undisturbed for more than tlurt� (30) minutes.
* Surface compaction and finishing shall proceed in such a maiuier as to produce,
in not more than two (2) hou.rs, a smooth, closely knit surface free of cracks,
ridges or loose material, conforming to the crown, grade and line shown on the
plans. . -
* Aftcr thc roadway �as bccn $nishcd as spccifiod hcrcin it shall bc immcdiatciy
protected ag,ainst rapid diyitig by applying two tenths {0.2) gallons per square
yards of RC-2 or aomc othcr E.P.A. approvrd watcr bascd emulsion. Should it
be necessary for construcfiion equipment or other tra�cc to use that section of
roadway before the emulsion has dried sufficiently, it is the responsibility of the
contractor to dust ar sand the surface before such use to prevent pickup of
material.
* The contractor shall also maiiitain this protective cover during the seven (7) day
curing period so that all the soil cement base course will be co'vered effectively.
* The soil cement couise may be opened to local tra�'ic as sdon as the water based
emulsion has been applie.d ad dusted or sanded as necessary to prevent pickup of
matcrial by tra�ic. It may bc opcncd to all tr�ic aftcr scv�cn (7) days.
After the minimum aeven (7) day of curing the contractor ah�l overlay with three (3)
inches af ��AC Type "D" course on top of the new base.
O
�
�
r
HMAC SL7RFACE COURSE (TYPE "D" MIX)
page 2
� All applicable provisions of Standard Specifications Item Numbers 312 "Hot-Mix Asphaltic
Concrete" and 313 "Central Plant Rccycling Asphalfic Concretd' of the City of Fort Worth
Standard Specifications of Street and Storm Drain Construction shall app13� to the
� construction methods for this portion of thc project.
Standard Specification 312.5 (1) shall be revised as follows: The prime coat, tack coat or
� the asphalfic mixture shall not°be placed uniess flie air temperature is fifty (50) degrees
Fahrenheit and rising the temperature being taken in the shade and away from artificial
heat. Asphaltic material shall also not be placed when the wind conditions are unsuitable in
� the opinion of the Engineer. The contractor sha11 fiunish a batch design of the proposed
hot mix asphalric concrete for City approva148 hours prior to placing the HMAC overlay.
The City will provide laboratory control as necessary.
�
1�'!
�
l�
�
�
�
!�
��
CITY OF FORT WORTH
CONSTRUCTION SERViCES
LABORATORY RESULTS FOR
T�ST HOLE AND PLASTICITY.•INDEX
PROJECT: 1998 CAPTTAL IMPOROVEMENT PROGRAM
�PROVINE STREE•T (MEADOWBROOK TO NORMP►NDY)
DOE NO.: 1952
FUND CODE: 03 �
'�
__________________________________________,_________________________'__=====1-�`j
HOLE # 1 LAB NO.: 28399 I�j
LOCATION: 222y PRO`IINE ST. E/4 1
------ --- -- ------- -- ---- - -- - - - - - - -- ------ - --- -- -- - -y ---------- ----------- - �
1. 2 5N HMAC � I,�
6.50" BROWN�CLAY W/CRUSHED STONE J
10.0Q^' BROWN CLAY ' i �
ATTERBURG LIMITS LL 37.3 PL 18 5 PI: 18.8 SHRKG 11 O�S j �
MUNSEL COLOR CHART: Ei/3 PALE BROWN CLAY � � �
UNIT WEIGHT:�130.9 LBS PER CUBIC FOOT ��fl
_- ____________________________________�________=___________======1
y����__= ______�______�__��c= =coc_�___==c=c=====�._�____=c===cc=_____�___ ( . *
_�_.._ _-__�_-----_____ �____ ___-_._ ___-____�
HOLE � 2 � . LAB NO.: 28400 �
LOCATION: 2006 PROVINE ST. CL �' �
--------------------------------------------------------------------------)
1.75N HI�fAC . � �
6.00" BROWN CLAYW/CRUSHED STONE ' . �
10.04"' BROWN CLAY �
° =-----=----�-------I �!
ATTERBURG LIMITS: LL: 44.8 PL: 22.4 PT: 22.4 SHRKG: 13.0$ (
MUNSEL COLOR CHART: 6/4 LIGHT YELLOWISH BROWN CLAY 1
UNIT WEIGHT: 138.7 LBS PER CUBIC FOOT - ��
__�-�__==_______________________________=____-____--___________=====1
APPROVAL:�
JER�
DATE TESTED: 42-12-98
DATE REPORTED: 02-17-98
TESTED BY: CARDWELL,DESAI
5l� iTA��,` 1�'l� ��1 L�� f�Z�(i �
�'�� Z� t�� SIA(�11.(Zajto!�
� $ �
.�41��
�
ROUTING.
JAMES ANDERSON
NAJIB FARES
FILE
�
��
�
�
---- �
�
r
r
�
�
�
�
�
�
�
LR,,
��1
!�i
�
f�l
LJ
�
��
INTER-OFFICE CORRESPONDENCE
Date:
To:
From:
Re:
Septembe�• 9, 1998
Rick Zohne
Ryan Jeri
Recommendation for �ehabilitating of
NW 19� St. (Grand to Homan.)
D.O.E. No: 2008
Upon review of the scope of construction on this project and also by taking core samples
and evaluating the thickness and condition of the surface and base material and evaluating
the suitability of the existing material for fufiure use, it is my recommendation that this
street is a good candidate to be putverized.
Upon completion of utility work all ditches must be capped with a temporary patch
comptying with City of Fort Worth Specifications.
The contractor shall putverize the existing pavement / base to a depth of 8 inches below the
surface of the exisfiing pavement. After pulverization is completed, the contractor shall
temporarily remove the putverized material and undercut an additional3 inches of base
material. The removal of the base material shall start a minimum of 8 inches below the
existing pavement surface. Af�er the undercut is complete, the contractor shall replace the
pulverized material and mix it with S percent Portland Cement, spread the material as a
base and compact all in accordance with Item 214, Portland Cement Treatment (Mateiial
Manipulation), of thc latcst cdition of the City of Fort Worth Standard Specifications for
Construction of Streets and Storm Drains. When proper compaction is achieved the
contractor shall ovcrlay with 3 inchcs of HMAC typc "D" surfacc coursc on top of the new
base and all applicable provisions of Item 312 (Hot Mix Asphalt Concrete) and Item 313
(Central Plant Recycling Asphalt Concrete) of the latest edition of the City of Fort Worth
Standard Specifications for Construction of Sireets and Storm Ihains. These specifications
ehall appty to all aspects of construction methods for this project.
You may want to include a copy of the attached document in the contract documents for
the benefit of the contractor bidding the project and for use in conshuction of the project.
an Jeri
YAVEMENT PULVERIZATION
The ,contractor shall puh�erize the eYisting pati�ement / hase ��o a depih of eight (8) inch�s
Uelow "ttie suiiace of flie eaisting pavement. After pulverization is completed the contractor
shall t�mpvraril���remove th� pulverized material and remove an adiiitional thr�e (3) inches
of base material. The r`emoval of the base material shall start a minimum of eight.(8) inches
bclovv the suriace of t'hc existina pavement. After the undcrcut operation is complete, th�
contractor shall mil the pulveiized material w�th five (5) percent Portland cement and
spread the materia] as a base all in accordance with Item 21�'Portland Cement Treatment
(Material Manip�lation) of the latest edition of the City�of Fort WQ�th "Standard
Specifications for Street and Stornn Drain Conetruction as follows:
'` Cement s�iall be applied only to such an area that all the operations can be
continuous and completed fn day lig�t within six (6) hc�urs of such applicarion.
* Cir"a,�lations have.to be taken just a fzw minutes, before a�lying cement.
* No equipment except that used 'in the spreading and mixirig will be allowed to
pass over the freshly spread cement until it is mixed with the soil:
* Any mixture of soil and cement that°has not been compacted and finished shall
not remain undisturbed for more than,ihirty (30) minutea.
* Surface compaction and finishing sh�ll proceed in such a manner as�.to produce,
in not more than two (2) hours, a smooth, closely knit surf�ce free of cracks,
ridges or loose material, confoxming to the crown, grade�and-line shown on the
plans.
�` After the roadway has been finished as� specified hcrein it shall be immediatcly
protected again�t rapid drying by' apptying two tenths (0.2) gallons per square
yards of RC-2 or somc othcr E.P.�. approved watcr based cmulsion. Should it
be.necessary for construction equipment or other tra�ic to use that section of
roadway before the emulsion has dried sufficient�y, it is the responsibility of the
contractor to dust or„ sand the� s�rface before such use to prevent pickup of
material.
* The contractor shall also maintaiii this protective,cov�er during theyseven (,7) day
curing period so that all the soil cement base course will be covered effectively.
* The soil cement course may be opened to local �traffic as svon as the water based
emulsion has been applied ad dusted or sanded as necessary to�prevent pickup of
material by tra�Fic. It mxy be opened to a11 traffc after seven (7) days.
After the minimum seven (7) day of curing the contractor shall overlay with.three (3)
inches of I�vIAC Typa "D" course on top of the new base.
�
�
!J
l�'
�
�
�
�
�
�
�
�
�
�
�
u
t_��
�
page 2
I-IlVLAC SL�I2FACE COURSE (TYPE "D" �) '
All applicable provisions of Standard Specifications Item Numbers 312 "Hot-Mix Asphaltic
Concrete" and 313 `'Central Plant Recycling Asphaltic Concrete" of the City of Fort Worth
Standard Specifications of Street and Stomi Drain Construction shall apply� to the
construction methods for this gortion of the project.
Standard Specification 312. 5(1) shall be revised as follows: The prime coat, tack coat or
the asphaltic mixture shall not be placed unless the air temperature is fifly (50) degrees
Fahrenheit and rising the temperature being talcen in the shade and away from aitificial
heat. Asphaltic material shall also not be placed when the wind conditions are unsuitable in
the opinion of the Engineer. The contractor shall furnish a batch desigz� of die proposed
i�ot mi� asphalric concrete for City approva148 hours prior to placing the HM.qC overlay.
The City will provide laboratory control as necessary.
�
�
.,
, ,
��I T1 OF FGRT ,'�nTORTH
CUNS'I'RUCTI.ON SERVICES
L=-:� t�t'w.TOT:Y r;r �ULT� TOF
'J'i:;:�'.(' l�t)LL; AtJI) �'.l�F�:�7'1C:11'Y 1'NI)L:X
!-'h(i,7F.C'.i': NW 1�7'H ti'i'k}�:}�:7' (�kAWC) `1'U �IOMAN)
i��E: ra� _ . �."',:_'
'r'UN1_i� i.;uDE: �:s
:- _ -:•- ___ �..:_ :__--____�-__=___=-__�______________________---------------
--�------------.,I
i'.t;I,�. � .i L.i;l'i tJc).. 173,U%
� n�-T,TTC�r�, ? ;?'.? nn,� , �,,TI1 •?T. �/4 I
` I
-------------------------------=-------------------------------i
7 . � �n" H1�U-1C � .
= 7•�J:;" C`!'U•`;•';�D GTvi�L u RC'CK (T7� �7�MPLE DUE TO ROCK) �
�-�--�-=.---_--__----_-_-___ _=:_� _-_-
-_--- =____= _� ____ =_-
r:---�------- =--=-�_----�--__-_--------------�-�=�Q=--=--------�_-- =___ �
i1C;.�1; r:' ' I�AB ;�0.: 273�08 -- ----------- �
I�OC:A'I':1 C)N: h`�' WES7' UF COl_�UNtHiJS AVF. CENTERLINE �
---------------------------------------------------------------�
i. i� i; " nl�lAC �
i3. i)0" �'RUS}�r D STONE (NO SAMPLE UUE 7'O CRUSHED S'PONE) �
--_ -----_ -_ - _-_-_ -_ --__------= _ _�-_= ______ ________________________ �
APPkOVAI,:
/
�
R . �JERI
DATE TESTED: 01-16-9R
D.�1TE REFOP.TED: 01-20-98
TESTED isY : CHkDWELL, PATTERSON
ROUTING
�TAMES AIcIDERSON
NAJIB FARES
FILE
�
�.
�
� Date:
� To:
From:
� Re:
�
Li!
LJ
�
l�!1
�
���
L�1
�
��
�
INTER-OFFICE CORRESPONDENCE
September 9, 1998
Rick Zohne
Ryan Jeri
Recommendation for Rehab�7itating of
Curzon Ave. (Winthrop to Bryant Irvin North)
D.O.E. No: 2011
Upon review of the scope of construction on this project and also by taking core samples
and evaluating the thickness and condition of the surface and base material and evaluating
the suitability of thc existing matcrial for future use, it is my recommendation that ti�is
street is a good candidate to be pulverized.
Upon completion of utility work all ditches must be capped with a temporary patch
complying with City of Fort Worth Specifications.
The contractor shall putverize the e�sting pavement / base to a depth of 8 inches below the
surface of the e�usting pavement. After pulverization is completed, the contractor shall
temporatity remove the putverized material and undercut an additional3 inches of base
material. The removal of the base material sha11 start a minimum of 8 inches below the
existuzg pavement surface. A$er the undercut is complete, the contractor shall replace the
pulverized material and mix it with 5 percent Portland Cement, spread the material as a
base and compact all in accordance with Item 214, Portland Cement Treafiment (Material
Manipulation), of thc latcst cdition of thc City of Fort Worth Standard Spccifications far
Construction of Streets and Storm Drains. When proper compaction is achieved the
contractor sha11 overlay with 3 inches of HMAC type "D" surface eourse on top of the new
base ,and all applicable provisions of Item 312 (Hot IViix Asphalt Concrete) and Item 313
(Central Plant Recycling Asphalt Concrete) of the latest edition of the City of Fort Worth
Standard Specifications for Construction of Streets and Storm Drains. These specifications
shall apply to all aspects of construcfiion methods for this projec�
You may want tp include a copy of the attached document in the contract documents for
the benefit of the contractor bidding the project and for use in construction of the project.
an Jeri
,
f
PAVEMENT PULVERIZATION
The contractor sha11 puh�erize the etiisting pavement / base to a dePth of eight (8) inches .
Uelow the suiiace of the e�;isting pavement. After pulverization is completed the contractor
sha11 teinporarily rcmvv� thc pulvarized material and remov� an additional three (3) inches
of base material. The removal of the Uase material shall start a minimum of eight (8) inchcs
bclow thc surfacc of thc existing pavement. After the undercut operation is completc, thc
contractor shall mil the pulverized material with frve (5) percent Portland cement and
spread the material as a base all in accordance with Item 214 Portland Cement Treatmeni
(Material Manipulation) of the latest edition of the City of Fort Worth Standard
Specifications for Street and Storm Drain Construction as follows:
�` Cement sha�11 be applied only to such an area that all the operations c�n be �
cczntinuous and completed in day light within six (6) hours of such application.
* Gradations have to be taken just a few minutes before a�lying cement.
* No cquipment except that`used in the spreading and mixing wi�l be allowed to
pass over the freshly spread cement..until it is mixed with the soil.
* Any mixture of soil and cement that has not been com�sacted and finished shall
not remain undisturbed for more tham #lw-ty (30) minutes.
* Surface compaction and finishing sha11 proceed in su�h a manner as to produce,
in not more than two (2) hours, a smooth, closely knit surface free of cracks,
ridges or loose°material, conforming to the.,crown, grade and line shown on tlie
plans. .
?►ftcr the rvadway has bccn finished as spccified hcrcin, it sha11 be immcdiatcly
protected against rapid dtying by applying two tenths (0.2) gallons per square
yards of RC-2 or some othcr E.P.A, approved watcr based emulsion. Should it
be necessary for construction equipment or other traf�c to use �that section of
roadway before the e�ulsion has dried sufficiently, it is the r�sponsibility of the
contractor to dust or sand the surface,before such use to prevent picicup of
material. .
* The contractor sha11 also maintain this protective cover during the seven (7) day
curing period so that all the soil cement base course will be covered effectrv�ly.
�` The soil cement couise may be opened to local traffic as soon as the water based
emulsion has been applied ac� dusted or sanded as necessary to prevent pickup of
material by trafiic. It may be opened to all traffic after seven (7) da_ys.
After the m;n;m� seven (7) day of curing the contractor shall overlay with three (3)
inches of HIVIAC Type "D" course on top of the new base.
�
O
'.,RJ,
� , page 2
IiMAC SURFACE COURSE ('I'I'PE "D" NIIX)
n All applicable provisions of Standard Specifications Item'Numbers 312 "Hot-Mix,,Asphaltic
t� Cancretd' and 313 `'Ccntral Plant Recycling Asphaltic Concrotd' of the City of Fort Worth
Standard Specifications of Sh-eet and Storm Drain Construction shall apply to the
� construction methods for this portion of the project.
Standard Specification 312. 5(1) shall be revised as follows: The prime coat, tack coat or
� the asphaltic mixture shall not be placed unless the air temperature is fifly (50) degrees
Fahrenheit and rising the temperature being taken in the shade and away from artificial
� heat. Asphaltic material shall also not be placed when the wind conditions are unsuitable in
the opinion of the Engineer. The contractor shall furnish a batch design of the proposed
hot mix asphalt�c concrete for City approva148 hours pnor to placutg the HMAC overlay.
The Ciiy will provide laboratory control as necessary.
�
�
�
�
�
�
1=�
L�J
t�!I
�
� .V
� � � CI TY OF FORT 'W�ORTH -
CONSTRUCTION SERVICES �
LABORATORY RESULTS FOR.
TEST HOLE AND.PLASTICITY INDEX
. Y .
PROJECT: 1998 CAPITAL IMPOROVEMENT PROGRAM ,
CURZON AVENUE (WINTHROP TO BRYANT—IRZi-IN)
DOE NO . : ,19 52
FUND CODE: 03
________________________________________________________________1
HOLE � 1 LAB NO.: 27804 (
LOCATION: 6026 CURZON AVE. CENTERLINE � �
----------------------------------------------------------------�
1.00" HMAC �
6.00" PALE BROWN CLAY W/CRUSHED STONE J
10.00n PALE BROWN CLAY � �
--------------------------------------------------------------- �
ATTERBURG LIMITS: LL: 31...7. PL: 15.2 PI: 16.5 SHRKG: 9.0� �
MUNSEL COLOR CHART :�� 7/ 4 VERY PATsE� BROTn�I CLAY �
UNIT WEIGHT: 132.O��LBS PER'CUBIC FOOT �
______________________�____ =_____________________________=====1
APPROVAL:
�i �
R JERI
DATE TESTED: 01-22-98
DATE REPORTED: 01-29-98
TESTED BY: CP,RDWELL,DESAI
ROIJTING
JAMES ANDERSON
NAJIB FARES
FILE
k.
,..
�
0
L�J
I�I
�
INTER-OFFICE CORRESPONDENCE
� Date:
To:
� From:
�
L*J
�
L�
�
L*J
�Ll1
�
�]
!J
��
September 9, 1998
Rick Zohne
Ryan Jeri
Re: Recommendation for Rehabilitating of
Winthrop Ave. (Camp Bowie to Lovell)
D.O.E. No: 2015
LTpon review of the scope of construction on this project and also by taking core samples
and evaluating the thickness and condition of the surface and base material and evaluating
the suitabiiity of the existing material for future use, it �s my recommendation that this
street is a good candidate to be putverized.
Upon completion of utility work all ditches must be capped with a temporary patch
complying with City of Fort Worth Specifications.
The contractor ehall pulverize the existing pavement / base to a depth of 8 inches below the
surface of the existing pavement. After pulverization is completed, the contractor shall
temporarity remove the putverized material and undercut an additional 3 inches of base
material. The removal of the base material shall start a mininlum of 8 inches below the
existing pavement surface. After the undercut is complete, the contractor shall replace the
pulverized material and mix it with 5 percent Portland Cement, spread the material as a
base and compact all in accordance with Item 214, Portlaxid Cement Treatment (Material
Manipulation), of the latcst cdition of thc City of Fort Worth Standard Spccifications for
Construcfion of Streets and Stortn Drains. When proper compaction is achieved the
contractor sha11 ov�crlay with 3 inchcs of HMAC typc "D" surfacc coursc on top of thc ncw
base and all applicable provisions of Item 312 {Hot IVfix Asphalt Concrete) and Item 313
(Central Plant Recycling Asphalt Concrete) of the latest edition of the City of Fort Worth
Standard Specifications for Construction of Streets and Storm Drains. These specifications
shall apply to all aspects of construction methods for this project.
You may want to include a copy of the attached document in the contract documents for
the benefit of the contractor tridding the project and for use in construction of the project.
�
an Jeri
L�J
PAVEMENT PULVERIZATION
T'he contractor shall puh�erize the eYisring pavement / base to a depth of eight (8) inches
Uelow the sui�ace of the eaisting pavement. Afler pulveri�ation is completecl the contractor
shali tempvrarily remvvc the pulverized material and remove an add.itional three (3) inches
of base material. The removal of the Uase material shall stai�t a minimum of eight (8) inches
bclow thc surfacc of thc e�sting pavcment. After the undcrcut oparation is complete, the
contractor shall mii tlie pulverized material with five (5) percent Portland cement and
spread the material as a base a11 in accordance with Item 214 Portland Cement Treatrnent
{Material Manipulation) of the latest edition of the City of Fort Worth� Standard
Specifications for Street and Storm Drain Construction as followe:
�` Cement sha11 be applied only to such an area that all the operations can be
continuous and completed in day light within six (6) hours of such applicarion.
* Gradarions have to be taken just a few minutes before a�lying cement.
* No equipmcnt except that uscd in thc spreading and mixing will be allowed to
pass over the freshly spread cement until it is mixed with the soil.
* Any mixture of soil and cement that has not been compacZed and finished shall
no� remain undisturbed for more than tlw-ty (30) minutea.
* Surface compaction and fuiishing shall proceed in such a manner as to produce,
in not more than two (2) hours, a smooth, closely knit surface free of cracks,
ridges or loose material, conforming to the crown, grade and line shown on the
plans.
After the roadway has been finished as specified hercin it shall be immediatoly
protected against rapid drying by applying two tenths (0.2) gallons per square
yards of RC-2 or somc othcr E.P.A. approv�cd watcr bascd cmulsion. Should it
be necessary for construction equipment or other traf�c to use that section of
roadway before the emu.Lqion has d.ried sufficiently, it is the responsibility of the
contractor to dust or sand the surface before such use to prevent pickup of �
material.
�` The contractor shall also maintain this protective cover during the seven (7) day
curing period so that all the soil cement base course will be covered effective,ly.
'" The soil cement course ma,y be opened to local traffic as soon as the water based
emulsion has been applied ad dusted or sanded as necessary to:uprevent �pickup of
material by traiiic. It may be opened to all traffc after scven (7) days. �
After the minimum seven (7) day of curing the contractar shall overlay with three (3)
inches of HIvIAC Type "D" course on top of the new base.
�
�
!�J
� page 2
I�VIAC SL�I2FACE COtJRSE (TYPE "D" MIA)
� All applicable provisions of Standard Specifications Item Nuinbers 312 "Hot-Mix Asphaltic
Concrete" and 313 "Central Plant Recycling Asphaltic Concrcte" of thc City of Fort Worth
Standard Specifications of Sireei and Storm Drain Construction shall apply to the
� construction methods for this portion of the project.
Standard Specification 312. 5(1) shall be revised as follov�s: The prime coat, tack coat or
�� the asplialtic mixture shall not be placed unless the air te�erature is fifty (50) degrees
Fahrenheit and°rising the temperature being taken in the s�4ade and away from artificial
heat. Asphaltic material shall aLso not be placed when the t�vind conditions are unsuitable in
�"j the opinion of the Engineer. The contractor sha11 furnish a� batch design of the proposed
�..� hot mix asphaltic concret.e for C'ity approva148 hours priox to placing the HMAC overlay.
The Cit�� will provide laboratory control as necessary.
�
�
�l
0
C��
0
0
F�
�,
�i�
0
�'
�
c
F
0
CITY OF FORT WORTH
CONSTRUCTION SERVICES
LABORATORY RESULTS FOR
TEST 1HC�.T�E AIdD PLASTICITY INDF.�
PROJECT: 19"98 CAPI°TAL IMPOROVEMENT PROGRAM —� >
WINfiHROP AVENUE (CAMP BOWIE �O LOVELL)„„
GOE NO.: 1952 ,.
FUND CODE: 03
______��___ =__=_=_____________________���___��__-�_-_�_= I
HOLE � 1 LAB NO.: 27797, I
LOCATION: 150' NORTH OE' C�JRZON AVE. CENTERLI�IE ���
----------------------------------------------------------------�
�1.SOp HMAC u �
6.00" BROWN CLAY W/CRUSHED.STONE �
11.00"' BROWN CLAY ` �
----------------------------------------------------------------)
ATTERBURG LIMITS: "LL: 42.8 PL: 24.3 PI: 18�5 SHRKG: 12.0$ j
MUNSEL COLOR CHART: 6/2 LIGHT BROWNISH GRAY CLAY �
UNIT WEIGHT: 126.4�LBS PER CUBIC FOOT �
—_��------_�___�_�_----- __ ���=�-----------� �
���______�_��� ____��coa)
Coc��=�caa��C=��c�cccco����-��ca- ���� --sc�v-
HOLE � 2 LAB NO.: 27798 (
LOCATION: 200' NORTH OF CAMP BOWIE W/4 �
--------------------------------------�-------------------�------�
2.00"' I�IAC (
6.00" BRO�t CLAY W/-CRUSHED STONE �
10.00" BROWIJ CLAY . n�
----------------------------------------------------------------�
ATTERBURG LIMITS: LL: 42.7 PL: 25.6 PI:� 17.1 SHRKG: 12,,.Q.$3 �
MUNSEL COLOR CHART : 5/ 3„ BROT�I � CLAY � p�
UNIT WEIGHT: 130.9 LBS PER CUBIC FOOT (
---------- ,. -----�-------------------- — -- �,.
APPROVAL:
� : v,
1
JERT'
DATE TESTED: 01-23-98
UATE REPORTED: 01-29-98
TESTED BY: C7�RDWELL,DESAI
ROUTING
JAMES ANDERSON
`NAJI B Ep►RES
FILE
�
9
0
�
a
D
�
0
0
a
�
�
�
�
�
U
�
�
Q
�
�
EXPERIENCE RECORD
List of projects your organization has successfully completed:
Amount Of Contract Type of Work Date Accepted Name and Address of Owner
Award
List of projects your organization is now engaged in completing:
Amount Of Contract Type of Anticipated Name and Address of Owner
Award Work Date of
Completion
List Surety Bonds in force on above incomplete work:
Date of Contract Award Type of Work Amount of Name and Address of
Bond Bond Surety
D
�
�
�
�
Q
a
�
�
�
�
�
�
�
�
�
�
�
�
EOUIPMENT SCHEDULE
List of Equipment owned by Bidder that is in serviceable condition
and available for use:
Portions of work Bidder propose:� to sublet in case of Award of
Contracts including amount and type:
., .,,; .
I��
L�!'.
L
L�1
I�
L�J
0
�
I�'i
L�.
�
L�J
L�J
�
��
��
a
��
CONTRACTOR COMPLIANCE WITH
WORKERS' COMPENSATION LAW
Pursuant to V.T.C.A Labor Code Section 406.096, Contractor certifies that it provides workers'
compensation insurance coverage for all its employees employed on city of Fort Worth Project Number PW77-
060770155690 & PS46-0704604135390
J.L. BERTRAM CONSTRUCTION &
ENGINEERING, INC.
CONTRACTOR
By. � . /i �.-_--- -
,r�--
v
�,��5�b�i�i
� Title
/l /0��'/�
Date
STATE OF TEXAS
COUNTY OF TARRANT
�
�
BEFORE ME the undersi ned authorit on this da ersonall a eare �jy1� �%J �9/���
known to me be the person whose name is subscribed�to �e��a��ument and ac wledged to me that he
executed the same as the act and deed of �DIUSTR�iGYIOI� ��NGINEER���G, 0�the purpose and consideration
therein expressed and in the capacity therein stated.
GIVEN UNDER MY�°'ND AND SEAL OF OFFICE this
d'l�', . 19 � 7 .
� ,[ G:�c�'
- �
ary�'ublic in and for
the State of Texas
/�O� day of
�eLm�e - - - - . ,:.�e
� LI(��@ ��.IP�"..^.."�� �
�w NOT,��Y � :,. ;
s�: STATE O F T t:;., .., >
'� i���" My Comm. Exp. 3-10•2�01 j
v .. .•� .. �vv-v+..r� v+r-v-v-,.-v..-v �..�v-v a
��
�
�J
�
�
I�I
�
�
�I
�
�
L!J
LJ
THE STATE OF TEXAS
COUNTY OF TARRANT
PERFORMANCE BOND
0
0
BOND N0. 929088300
KNOW ALL MEN BY THESE PRESENTS: That we (1) J.L. BERTRAM CONSTRUCTION &
ENGINEERING, INC. a (2) CORPORATION of TEXAS, hereinafter call P�incipal, and
(3)CONTINENTAL CASUALTY COMPANY a corporation organized and existing under the laws of the State
and fully authorized to transact business in the State of Texas, as Surety, are held and firmly bound unto the City of
Fort Worth, a municipal corporation organized and existing under the laws of the State of Texas, hereinafter called
Owner, in the penal sum of:
FOUR HUNDRED FIFTY-FIVE THOUSAND FIVE HUNDRED TEN AND 48/100 .................................
($455,510.481 Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for
the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators
and successors, jointly and severally, firmly by these presents. �
THE CONDITION OF THIS of: OBLIGATION is such that Whereas, the Principal entered into a certain
contract with the City of Fort Worth, the Owner, dated the 2ND of November. 1999 a copy of which is hereto
attached and made a part hereof, for the construction of: •
1998 CIP VARIOUS LOCATIONS CONTRACT 99C UNIT II: PAVING IMPROVEMENTS ALTERI�IATE
NO. 2
designated as Project No. (s) PW77-060770155690 & PS46-0704604135390. a copy of which contract is hereby
attached, referred to, and made a part hereof as fully and to the same extent as if copied at length herein, such
project and construction being hereinafter referred to as the "work".
� NOW THEREFORE, if the Principal shall well, truly, and faithfully perform the work in accordance with
the plans, specifications, and contract documents during the original term thereof, and any extensions thereof which
may be granted by the Owner, with or without notice to the Surety, and if he shall satisfy all claims and demands
incurred under such contract, and shall fully indemnify and sava harmless the Owner from all costs and damages
� which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense
which the Owner may incur in making good any default, then this obtigation shall be void; otherwise to remain in
full force and effect. •
�
L�'J
�
II�
� F1
�
�
�
L_J
�
�
�
L�l
LJ
C
PROVIDED FURTHER, that if any legal action filed upon this bond, venue shall lie in Tarrant County,
State of Texas. �
AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no
change, extension of time, alteration or a.dition to the terms of the contract or to the work to be performed
thereunder or the specifcations accompanying the same shall in any wise affect its obligations on this bond, and it
does hereby waive notice of any such chang�;, extension of time, alteration or addition to the terms of the contract or
to the work or to the specifications.
IN WITNESS WHEREOF, this instrument is executed in 8 counterparts each one of which shall be deemed
an original, this the4thof November. 1999.
ATTEST:
(Prin 'pal) Secre �
(SEAL)
��.P�.n ,a o( • �vu��0
1 o c�i'�tt�� ��s��$�'���1
r
�t�tt�i,iC)I���e`�--�1 {
ATTEST:
�
� (SEAL)
�
�
L�J
�
�
(Surety) Secretary
0
0 � �.�e�
'tness as t Surety
P.O. x 8700, Fort Worth, TX 76124
(Address)
J.L. BERTRAM CONSTRUCTION &
ENGINEERING, INC.
PRINCIPAL (4)
BY: /� -�� _ ' �
Title:
1007 HARRISON AVENUE
ARLINGTON, TX 76011
(Address)
CONTINENTAL CASUALTY COMPANY
Surety
BY: �(�/ JI�L�.. �
Tamara E. Murray iAttorney-in-f ct (5)
CNA Plaza
Chicago. IL 60685
(Address)
NOTE: Date of Bond must not be
prior to date of Contract
(1)
�2)
(3)
(4)
(5)
Correct Name of Contractor
A Corporation, a Partnership or an
Individual, as case may be
Correct name of Surety
If contractor is Partnership all
Partners should execute Bond
A true copy of Power of Attorney
shall be attached to Bond by
Attorney-in-Fact..
� � F2
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
I I�� �' � � _ �_�M � d
To obtain information or make a complaint:
You may conta.ct the Texas Department of Insurance to obtain information on
companies, coverages, rights or complaints at:
1-800-252-3439
You may write the Texas Department of Insurance at:
P.O. Box 149104
Austin, Texas 78714-9104
Fax # (512) 475-1771
PREMIUM OR CLAIM DISPUTES
Should you have a dispute concerning your premium or about a claim, you
should contact the agent or the company first. If the dispute is not resolved, you
may contact the Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR BOND
This notice is for information only and does not become a part or condition of the
attached document.
�
���
U
�
f�l
�
u
I�l
LJ
�
��
l�
i�
�'
��J
C'
L�J
'J
�
PAYMENT BOND
THE STATE OF TEXAS
COUNTY OF TARRANT
BOND N0. 929088300
KNOW ALL MEN BY THESE PRESENTS: That we (1) J.L. BERTRAM CONSTRUCTION &
ENGINEERING, INC. a (21 Cornoration of Texas, hereinafter call Principal, and (3)
CONTINENTAL CASUALTY COMPANYa corporation organized and existing under the laws of the State and fully
authorized to transact business in the State of Texas, as Surety, are held and firmly bound unto the City of Fort
Worth, a municipal corporation organized and existing under the laws of the State of Texas, hereinafter called
Owner, and unto all person, firms, and corporations who may furnish materials, for or perform labor upon the
building or improvements hereinafter referred to in the penal sum of :
FOUR HUNDRED FIFTY-FIVE THOUSAND FIVE HUNDRED TEN AND 48/100 .................................
($455,510.48) Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for
the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators
and successors, jointly and severally, firmly to these presents.
THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain
contract with the City of Fort Worth, the Owner, dated the 2ND day of November A.D. , 1999, a copy of which is
hereto attached and made a part thereof, for the construction of:: ,
1998 CIP VARIOUS LOCATIONS CONTRACT 99C UNIT II: PAVING IIVIPROVEMENTS ALTERNATE
NO. 2
Project No. (s) PW77-060770155690 & PS46-0704604135390 a copy of which is hereto attached, referred
to and made a part hereof as fully and to the same extent as if copied at length herein, such project and construction
being hereinafter referred to as the "work".
NOW THEREFORE, the condition of this obligation is such that, if the Principal shall promptly make
payment to all claimants as defined in Article 5160, Revised Civil Statutes of Texas, supplying labor and materials
in the prosecution of the work provided for in said Contract, then this obligation shall be null and void, otherwise it
shall remain in full force and effect.
F10
!'J
�
�
�
LJ
L�l
�
CI
[�,
L■J
C.I
I■�
L�1
THE BOND IS MADE AND ENTERED into solely for the protection of all claimants supplying labor and
material in the prosecution of the work provided for in said Contract, as claimants are defined in said Article 5160,
and all such claimants shall have a direct right of action under the bond as provided in Article 5160 of the Revised
Civil Statutes.
PROVIDED FURTHER, that if any legal action be filed upon this bond, venue shall lie in Tarrant County,
State of Texas, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of
time, alteration-of addition to the terms of the contract or to the work to be performed thereunder or the specification
s accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any
such change, extension of time, alteration or additiori to the terms of the contract or to the work to the specifications.
PROVIDED FURTHER, that no final settlement be�ween the Owner and the Contractor shall abridge the
right of any beneficiary hereunder whose claim may be unsatisfied.
IN WITNESS WHEREOF, this instrument is executed in 8 counterparts each one of which shall be deemed
an original, this the 4ttday of November A.D., 1999.
ATTEST: � l ,
�/ ��
(Principal) Secretary
c-��G�I�C� �� � �
100�����N ��al
ARLING7QN, TEXAS 76011
Address
� ATTEST:
�
� (SEAL)
a -
�
J.L. BERTRAM CONSTRUCTION &
ENGINEERING, INC.
PRINCIPAL (4�
BY ..� � ,� �
Title� �����.�
100� HARRISON AVENUE
ARI�INGTON, TX 76011 (SEAL)
� (Address)
! C NTINENTAL CASUALTY COMPANY
uret
BY: � uYYI � �, � rn
� (Attorney-in-fact) )
( Tamara E. Murrav
�
(Address)
(Surety) Secretary ' CNA Plaza .
. Chicago. IL 60685
� (Address)
NO�i E: Date of Bond must not be prior to date
! of contract
(1)
�2)
(3)
(4)
(5)
� � �o� �?�� �� �
Wi ess as to� ety
�
Correct Name of Contractor
A Corporation, a Partnership or an
Individual, as case may be
Correct name of Surety
If contractor is Partnership all
Partners should execute Bond
A true copy of Power of Attorney
shall be attached to Bond by
Attorney-in-Fact..
'�
C�
�I,
THE STATE OF TEXAS
MAINTENANCE BOND
BOND N0. 929088300
���
I�JII'
COUNTY OF TARRANT
0
�
KNOW ALL MEN BY THESE PRESENTS: That (1) J.L. BERTRAM CONSTRUCTION &
� ENGINEERING. INC. as Principal, acting herein by and through (2) . its duly
authorized and (3) CONTINENTAL CASUALTY COMPANY a corporation organized
under the laws of the State oflllinoi.as surety, do hereby acknowledge themselves to be held and bound to pay
a unto the City of Fort Worth, A Municipal Corporation, chartered by virtue of Constitution and laws of the State of
Texas, at Fort Worth, in Tanant County, Texas the sum of
��I
�
u
�
�
FOUR HUNDRED FIFTY-FIVE THOUSAND FIVE HUNDRED TEN AND 48/100 .................................
($455,510.48i in lawful money of the United States, for the payment of which sum well and truly be made unto said
City of Fort Worth and its successors, said Contractor and surety do hereby bind themselves, their heirs, executors,
administrators, assigns and successors, jointly and severally.
This obligation is conditioned, however; that,
WHEREAS, the Principal has entered into a certain contract with the City of Fort Worth, November 2.
1999 the performance of the following described public work and the construction of the following described
public improvements:
1998 CIP VARIOUS LOCATIONS CONTRACT 99C UNIT II: PAVING IMPROVEMENTS ALTERNATE
NO. 2
of same being referred to herein and in said contract as the Work and being designated as project PW77-
� 060770155690 & PS46-0704604135390 and said contract, including all of the specifications, conditions and
written instruments referred to therein as contract documents being hereby incorporated herein by reference for all
purposes and made a part hereof, the same as if set out verbatim herein; and ,
�
lwl
I�
�
■I
L�J
WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work that
it will remain in good repair and condition for and during the period One (1) Year after the date of the final
acceptance of the work by the City; and �
WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of
One fll Year; and,
WHEREAS, said Contractor binds itself to repair or reconstruct the work in whole or in part at any time
within said period, if in the opinion of the Director of the Water Department of the City of Fort Worth, it be
necessary; and,
WHEREAS, said Contractor binds itself, upon receiving notice of the need therefor to repair or reconstruct
said work as herein provided.
l�l
�
� �
NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or
� reconstruct said work in accordance with all the terms and conditions of said Contract, these presents shall be null
and void, and have no force or effect. Otherwise this Bond shall be and remain in full force and effect, and said
City shall have and recover from the said Contractor and its surety damages in the premises prescribed by said
� Contract. This obligation shall be continuing one and successive recoveries may be had hereon for successive
breaches until the full amount hereof is exhausted.
t�J
�
L■J
L�J
��J
�
��
�I
WHEREAS, all parties covenant and agree that if any legal action be fled upon this bond, venue shall lie
in Tarrant County, Texas; and, �
IN WITNESS WHEREOF, this instrument is executed in 8 counterparts, each one of which shall be
deemed an original, dated November 4. 1999.
ATTEST: _
' ����
(Principal) Secre ry
(S�al)
ENGINEERING,INC.
�� � � ��
���
Witness as to Prin al
1007 HARRIS�N A��
ARLINGTON, TEXAS 76011
(Address)
aATTEST:
� (SEAL)
�
a -
L�J
L�
(Surety) Secretary
_�.���Sk�
ness as to Surety
P.O. Box 8700. Fort Worth.�TX 76124
J.L. BERTRAM CONSTRUCTION &
PRINCIPAL (4)
BY: �
Title: ��(,(�L!'���
1007 HARRISON AVENUE
ARLINGTON, TX 76011
(Address)
CONTIN� TAL CASUALTY COMPANY
Sure
BY: �yY�t,l,o�. � , (rl.t,�u.c
Tamara E. Murray. (Attorney-in-fact) (5�
CNA Plaza, Chica�o, IL 60685
(Address)
NOTE: Date of Bond must not be prior to
date of Contract
(1) Correct Name of Contractor
(2) A Corporation, a partnership or an
Individual, as case may be
(3) Correct name of Surety
(4) If Contractor is Partnership all
Partners should ex�cute Bond
(5) A true copy of Power of Attorney
shall be attached to Bond by
Attorney-in-Fact.
a � F6
I�
�
��
I�
I�I
��
,�
(�
�
L�J
L#1
�
I!
�
L�J
�
POWER OF ATTORNEY APPOINTlNG INDlViDUAL ATTORNEY-IN-FACT
Know All Men By These Presents, That CONTINENTAL CASUALIY COMPANY, an Illinois corporation, NATIONAL FIRE INSURANCE •
COMPANY OF HARTFORD, a Connecticut corporation, AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA, a Pennsylvania
corporation (herein collectively called "the CCC Surety Companies"), are duly organized and existing corporations having their principal offices in
the City of Chicago, and State of Illinois, and that they do by virtue of the signature and seals herein affixed hereby make, constitute and appoint
Bobby E. Mayo, Tamara E. Murray, Charles D. Sweeney, Kyle W. Sweeney, Individuaily
of Fort Worth, Texas
their true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on their behalf bonds,
undertakings and other obligatory instruments of similar nature
- In Unlimited Amounts -
and to bind them thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of their corporations and
all the acts of said Attomey, pursuant to the authority hereby given are hereby ratified and confirmed.
This Power of Attomey is made and executed pursuant to and by authority of the By-Laws and Resolutions, printed on the reverse hereof,
duly adopted, as indicated, by the Boards of Directors of the corporations.
In Witness Whereof, the CCC Surety Companies have caused these presents to be signed by their Group Vice President and their
corporate seals to be hereto affixed on this 7th day of March , 1998 .
�'��l� ��Cr �
�pp�oMrE
Z • 'o
�� 5EAl. �
1897
CONTINENTAL CASUALTY COMPANY
hyc,��"'�0`4rl;� NATIONAL FIRE INSURANCE COMPANY OF HARTFORD
�`���T`o'��, AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA
JUIY 3f. '� /����/`���� V •
\ '� ~ �
•
d�+
Marvin J. Cashion Group Vice President
State of Illinois, County of Will, ss:
On this 7th day of Maroh , 1998 , before me personally came
Marvin J. Cashion, to me known, who, being by me duly sworn, did depose and say: that he resides in the City of Chicago, State of Illinois; that
he is a Group Vice President of CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF HARTFORD, and
AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA described in and which executed the above instrument; that he knows the
seals of said corporations; that the seals affixed to the said instrument are such corporate seals; that they we�e so affixed pursuant to authority
given by the Boards of Directors of said corporations and that he signed his name thereto pursuant to like authority, and acknowfedges same to
be the act and deed of said corporations.
O�T. Pic
�� � ��i
+� NOTARY �
P(181IC
/y� `�.
� co.
My Commission Expires June 5, 2000
CERTIFICATE
.tQt�t,�...� . F"��..
�
Eileen T. Pachuta Notary Public
I, Mary A. Ribikawskis, Assistant Secretary of CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF
HARTFORD, and AMERICAN CASUALTY COMPANY �OF READING, PENNSYLVANIA do hereby certify that the Power of Attomey herein
above set forth is still in force, and further certify that th� By-Law and Resolution of the Board of Directors of each corporation printed on the
reverse hereof are still in force. In testimony whereof I have hereunto subscribed my name and affixed the seals of the said corporations
this 4th day of November � 1999 •
a���� ����T �
�' cos�°Mre
z � �
�J SEAL �
a 1897
� I (Rev.10/1/97)
IJ
� 1NSUR�H b�aPPNr oF
F�P CF ,tL . ��,�1
� �t � ��' �1,�caeoaatEo F
� s S JULY 71. #
�� C=� e � 19C2 *
� JiAR�O� t � �
CONTINENTAL CASUALTY COMPANY
NATIONAL FIRE INSURANCE COMPANY OF HARTFORD
AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA
�
Mary A. Ribikawskis Assistant Secretary
L�
a
TO:
CERTIFICATE OF INSURANCE
CITY OF FORT WORTH, TEXAS
Date 11/03/99
1000 Throckmorton, Ft Worth, Tx 76102
�NAME OF PROJECT: 1998 CIP Various Locations, Contract 99C, Unit II
�PROJECT NUMBER:
�THIS IS TO CERTIFY THAT
J.L. BERTRAM CONSTRUCTION & ENGINEERING INC.
1007 HARRISON AVE., ARLINGTON, TX 76011-7327
(Name and Address of Insured)
�'�j is, at the date o£ this certificate, insured by this Company with respect to the business operations
Uhereinafter described, for the type of insurance and in accordance with the provisions of the standard
policies used by this Company, and further hereinafter described. Exceptions to standard policy noted on
reverse side hereof.
� TYPE OF INSURANCE
Workers' Compensation
� Comprehenaive General
Liability Inaurance
(Public Liability)
aBlasting
Collapse oP Suildings
of atructures adjacent
to excavations
Damage to underground
�Utilities
Builder's Risk
Comprehensive
�Automobile
Liability
aContractural Liability
* Other Umbrella
Policy No.
WC3069286
CLP3069283
CLP3069283
CLP3069283
CAP2543370 �
CLP3069283
XYZ00074885732
Effective Expires Limits of Liability
09/30/99 09/30/00 $1,000,000./1,000,000./1,000,000.
Bodily Injury:
09/30/99 09/30/00 Ea. Occurrence: $ 1�000,000.
Property Damages: Combined Single �
Ea. Occurrence: Limit
Ea. Occurrence: $
09/30/99 09/30/00 Ea. OccurrenceCombined1SingleOLimit
09/30/99 09/30/00
09/30/99
09/30/99
09/30/99
�I,ocations covered: Texas
�bescription of operations covered:
Ea. Occurrence: $ 1,000,000. CSL
Bodily Injury:
09/30/00 Ea. Person $ 1,000,000.
Ea. Occurrence Combined
Property Damage: Single
Ea. Occurrence: Limit
Bodily Injury:
09/30/00 Ea. Occurrence $ 1,000,000.
Property Damage: Combined
Ea. Occurrence: Single Limit
09/30/00 $10,000,000. Combined Single Limit
See above �ro�ect
he above policies either in the body thereof or by appropriate endorsement provide that they may not be
hanged or cancelled by the insurer in less than thirty (30) days after the insured has received mritten
otice of such change/or cancellation.
ere applicable local laws or regulations require more than thirty (30) days actual notice of change or
ancellation to be assured, the above policies contain such special requirements, either in the body
hereof or by appropriate endorsement thereto attached.
Bituminous Casualty Market
enc The Sweeney Company *Fireman's Fund (Casualty Market)
j�'ort Worth Agent P. O. Box 8700 B�r �(""�'�� �,.,,,�.,�'��4 a1p ;l
_ r
L1 817-457-6700
Address Ft Worth, Tx 76124-0700 Title Authorized Re�resentative
HIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY & CONFERS NO RIGHTS
PON THE CERTIFICATE HOLDER. THIS CERTIFICATE NEITHER AFFIRMP,TIVELY NOR NEGATIVELY
�MENDS, EXTENDS OR ALTERS THE COVERAGES AFFORDED BY THE POLICIES LISTED HEREIN.
u
L�J
I�I
�
�
IR1
�
�
�
�
CITY OF FORT WORTH, TEXAS
CONTRACT
THE STATE OF TEXAS
KNOW ALL MEI�1 BY THESE PRESENTS
COUNTY OF TARRANT
This agreement made and entered into this the 2ND day of November A.D., 1999, by and
between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas,
organized and existing under and by virtue of a special charter adopted by the qualifed voters
within said City on the 11`�' day of December, A.D. 1924, under the authority (vested in said
voters by the "Home Rule" provision) of the Constitution of Texas, and in accordance with a
resolution duly passed at a regular meeting of the City Council of said city , and the City of Fort
Worth being hereinafter termed Owner, J.L BERTRAM CONSTRUCTION &
ENGINEERING. INC., HEREINAFTER CALLED Contractor.
WITNESSETH: That said parties have agreed as follows:
1.
That for and in consideration of the payments and agreements hereinafter mentioned to
� be made and performed by the Owner, and under the conditions expressed in the bond bearing
even date herewith, the said Contractor hereby agrees with the said Owner to commence and
complete the construction of certain improvements described as follows:
I�I
L■J
u
�
1998 CIP VARIOUS LOCATIONS CONTRACT 99C UNIT II: PAVING
IMPROVEMENTS ALTERNATE NO. 2
2.
That the work herein contemplated shall consist of furnishing as an independent
contractor all labor, tools, appliances and materials necessary for the construction and completion
of said project in accordance with the Plans and Specifications and Contract Documents prepared
by the Deparhnent of Engineering for the Transportation and Public Works Department of the
City of Fort Worth adopted by the City Council of the City of Fort Warth, which Plans and
Specifications and Contract Documents are hereto attached and made a part of this contract the
same as if written herein.
� 3.
The Contractor hereby agrees and binds himself to commence the construction of said
� work within ten (10) days after being notified in writing to do so by the Department of
Engineering of the City of Fort Worth.
u
�
4
The Contractor hereby agrees to prosecute said work with reasonable diligence after the
commencement thereof and to fully complete and finish the same ready for the inspection and
!J
u
I�I
I!1
�
I�I
�
I�I
�
l�l
l�
�
��
�
�!1
L�
approval of the Department of Engineering of the City of Fort Worth and the City Council of the
City of Fort Worth within a period of 130 WORKING days.
If the Contractor should fail to complete the work as set forth in the Plans and Specifications and
Contract Documents within the time so stipulated, plus any additional time allowed as provided
in the General Conditions, there shall be deducted from any monies due or which may thereafter
become due him, the sum of $210 Per working day, not as a penalty but as liquidated damages,
the Contractor and his Surety shall be liable to the Owner for such deficiency.
5.
Should the Contractor fail to begin the work herein provided for within the time herein
fixed or to carry on and complete the same according to the true meaning of the intent and terms
of said Plans, Specifications and Contract Documents, then the Owner shall have the right to
either demand the surety to take over the work and complete same in accordance with the
Contract Documents or to take charge of and complete the work in such a manner as it may deem
proper, and if in the completion thereof, the cost to the said City shall exceed the contract price or
prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its
Surety shall pay said City on demand in writing, setting forth and specifying an itemized
statement of the total cost thereof, said excess cost.
Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel
at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees
to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and
employees, from and against any and all claims or suits for property loss, property damage,
personal injury, including death, arising out o£, or alleged to arise out of, the work and services to
be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees
or invitees, whether or not anv such iniurv, damage or death is caused, in whole or in
part, by the ne�li�ence or alleQed ne�li�ence of Owner, its officers, servants, or
emplovees. Contractor likewise covenants and agrees to indemnify and hold harmless the
Owner from and against any and al( injuries to Owner's officers, servants and employees and any
damage, loss or destruction to property of the Owner arising from the performance of any of the
terms and conditions of this Contract, whether or not anv such iniury or damage is caused
in whole or in nart bv the ne�lisence or alleged negligence of Owner, its officers„
servants or emnlovees..
In the event Owner receives a written claim for damages against the Contractor or its
subcontractors prior to final payment, final payment shall not be made until Contractor either (a)
submits to Owner satisfactory evidence that the claim has been settled and/or a release from the
claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance
carrier that the claim has been referred to the insurance carrier.
� The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth
public work from a Contractor against whom a claim for damages is outstanding as a result of
work performed under a City Contract.
�
iJ
7.
I�l
�
�
�
I�'�
L�J
The Contractor agrees, on the execution of this Contract, and before beginning work, to
make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the
faithful performance of the terms and stipulations of the Contract and for the payment to all
claimants for labor and/or materials furnished in the prosecution of the work, such bonds being as
provided and required in Article 5160 of the Revised Civil Statutes of Texas, as amended, in the
form included in the Contract Documents, and such bonds shall be for 100 percent of the tatal
contract price, and said surety shall be a surety company duly and legally authorized to do
business in the State of Texas, and acceptable to the City Council of the City of Fort Worth.
8.
Said City agrees and binds itself to pay, and the said Contractor agrees to receive, for all
� of the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on
the Proposal submitted by the successful bidder hereto attached and made a part hereo£ Payment
will be made in monthly installments upon actual work completed by contractor and accepted by
� the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount
(including/excluding) alternates N/A, shall be FOUR HiTNDRED FIFTY-FIVE THOUSAND
FIVE HUNDRED TEN AND 48/100 ...........................................Dollars, ($455,510.481.
[�I-'
Q
It is further agreed that the performance of this Contract, either in whole or in part, shall
� not be sublet or assigned to anyone else by said Contractor without the written consent of the
Director of the Department of Engineering.
!J
�
�
�
Lil
�
�
0
�
10.
The Contractor agrees to pay at least the minimum wage per hour for all labor as the
same is classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is
attached hereto and made a part hereof the same as if it were copied verbatim herein.
11.
It is mutually agreed and understood that this agreement is made and entered into by the
parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth
and the laws of the State of Texas with references to and governing all matters affecting this
Contract, and the Contractor agrees to fully comply with all the provisions of the same.
IN WIT'NESS THEREOF, the City of Fort Worth has caused this instrument to be signed in 8
counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with
the corporate seal of the City of Fort Worth attached. The Contractor has executed this
instrument through its duly authorized officers in 8 counterparts with its corporate seal attached.
Done in Fort Worth, Texas, this the 2ND day of November , A.D., 1999.
RECOMMENDED: CITY OF FORT WO TH
;
-��' �,c.� �.�- BY:
.
DIRECTOR, DEPARTMENT OF � CITY MANAGER
ENGINEERING
D�
IJ
�
�
0
�
�
a
�
�
�
�
L.�
�
�
�
a
�
p
�
�
APP ��D:
��.-�-�. �..�. � �'���'
� �___.�-
TRANSPORTATION/PUBLIC WORKS
DIRECTOR
ATTEST:
J.L. BERTRAM CONSTRUCTION & ENGINEERING. INC.
1007 HARRISON AVENUE
ARLINGTON, TX 76011
CONTRACTOR
. -?� �..
CITY SECRET.�Y
(SEAL)
BY:�� `� � % _ ._ �
�.,t�,� i �.�i�
TITLE
1007 HARRISON AVE.
ARLINGTON, TEXAS 76011
ADDRESS
November 1960
Revised May 1986
Revised September 1992
APPROVED AS TO FORM AND
LEGALITY:
�' • � ��, U�C�
y
CITY A ORNEY
�--1�`7,�/
Con�ract Authorization
._,LJ � � �
D�t�
City of Fort Worth, Texas
�1►�Ayar And Caunc�l Cammun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
11/2/99 **C-17731 30SHERMAN I 1 of 3
SUBJECT AWARD OF CONTRACT TO SHERMAN HUDSON, D/B/A SHERMAN HUDSON UTILITY
CONSTRUCTION COMPANY, FOR 1998 CIP VARIOUS LOCATIONS CONTRACT 99C
UNIT I: WATER AND SEWER REPLACEMENTS; AND AWARD OF CONTRACT TO J. L.
BERTRAM CONSTRUCTION & ENGINEERING, INC. FOR 1998 CIP VARIOUS
LOCATIONS CONTRACT 99C UNIT II: PAVING IMPROVEMENTS ALTERNATE NO. 2
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the City Manager to execute a contract with Sherman Hudson, d/b/a Sherman Hudson
Utility Construction Company, in the amount of $405,524.90 and 80 working days for 1998 CIP
Various Locations Contract 99C Unit I: Water and Sewer Replacements; and
2. Authorize the City Manager to execute a contract with J. L. Bertram Construction & Engineering,
Inc. in the amount of $455,510.48 and 130 working days for 1998 CIP Various Locations Contract
99C Unit II: Paving Improvements Alternate No. 2.
DISCUSSION:
Contract 99C consists of five street reconstruction projects funded by the 1998 Capital Improvements
Program. The Water Department has determined that the water and/or sanitary sewer lines in these
streets (except Boland) need to be replaced prior to street reconstruction. The streets to be
reconstructed include:
Boland (Darcy to West 7th Street)
Provine (Meadowbrook to Normandy)
NW 19th (Grand to Homan)
Curzon (Winthrop to Bryant Irvin)
Winthrop (Camp Bowie to Lovell)
The street projects will include the replacement of water and sewer utilities (Unit 1) and reconstruction
of the pavement structure (Unit II).
Units I and II were advertised August 5 and 12, 1999. The following bids were received September 2,
1999.
UNIT I BIDDERS (Water and Sanitary Sewer)
Sherman Hudson, d/b/a
Sherman Hudson Utilitv Construction Com�anv
Larry H. Jackson Construction, Inc.
Circle 'C' Construction Company, Inc.
B & H Utilities, Inc.
Burleson Utilities, Inc.
Long•Construction & Engineering
AMOUNT
$405.524.90
$408,824.25
$474,916.50
$486,599.00
$498,168.50
$510,467.25
TIME OF COMPLETION
80 Working Days
; City of Fort Worth, Texas
A c�r A�1d C,auncil �,�mt»�un�cAt�c�n
y
DATE REFERENCE NUMBER LOG NAME PAGE
� 11/2199 �"'�C-17731 ` 30SHERMAN I 2 of 3
sus�ECT , AWARD OF CONTRACT TO SHERMAN HUDSON, D/B/A SHERMAN HUDSON UTILITY
� CONSTRUCTION COMPANY, FOR 1998 CIP VARIOUS LOCATIONS CONTRACT 99C
UNIT I: WATER AND SEWER REPLACEMENTS; AND AWARD OF CONTRACT TO J. L.
BERTRAM CONSTRUCTION & ENGINEERIN,G, INC. FOR 1998 CIP VARIOUS
LOCATIONS CONTRACT 99C UNIT II: PAVING IMPROVEMENTS ALTERNATE NO. 2
Contingencies for Unit ( change orders are $20,276.00 and $30,414.00 for associated construction
inspection and survey.
Sherman Hudson Utility Construction Company is in compliance with the City's M/WBE Ordinance by
committing to 15% M/VVBE participation. The City's goal on this project is 15%.
The bid documents for Unit II paving improvements included two alternates as follows:
• Alternate No. �, included pulverization and HMAC resurfacing, construction of standard concrete
curb and gutter, driveway approaches, and sidewalks where shown on the plans.
• Alternate No. 2 included 5-inch HMAC pavement on 6-inch lime stabilized subgrade,
construction of standard concrete curb and gutter, driveway approaches, and sidewalks where
shown on the plans. ,
Considering both alternates, Alternate 2 wi11 provide a more durable pavement surtace. Staff is
recommending award to Paving Improvements Alternate 2.
UN1T II. ALTERNATE 2 BIDDERS fPavina�
J. L. Bertram Construction & Enaineerina. Inc.
Branch & Son, Contracting, Inc.
APAC-Texas, Inc.
McClendon Construction Company, Inc.
Reyno{ds Asphalt & Construction Company
AMOUNT
$455.510.48
$516,184.88
$587,354.80
$557,091.90
$595,807.00
TIME OF COMPLET{ON
130 Working Days
Contingencies for Unit II change orders are $22,776.00.
J. L. Bertram Construction & E�gineering, Inc. is in compliance with the City's M/WBE Ordinance by
committing to 28% M/WBE participation. The City's goal on this project is 28%.
Boland is located in COUNCIL DISTRICT 7.
Pro"vine is located in COUNCIL DISTRICT 4.
NW 19th is located in COUNCIL DISTRICT 2.
Curz:ort=and Winthrop are located in COUNCIL DISTRICT 3.
City of Fort Worth, Texas
�►�Ay�r Artd Caunc�l �ammun;cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
11/2/99 **C-17731 I . 30SHERMAN I 3 of 3
SUBJECT AWARD OF CONTRACT TO SHERMAN HUDSON, D/B/A SHERMAN HUDSON UTfLITY
CONSTRUCTION COMPANY, FOR 1998 CIP VARIOUS LOCATIONS CONTRACT 99C
UNIT I: WATER AND SEWER REPLACEMENTS; AND AWARD OF CONTRACT TO J. L.
BERTRAM CONSTRUCTION & ENGINEERING, INC. FOR 1998 CIP VARIOUS
LOCATIONS CONTRACT 99C UNIT II: PAVING IMPROVEMENTS ALTERNATE NO. 2
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies funds are available in the current capital budgets, as appropriated, of the
Commercial Paper-Water and Sewer Funds and the Street Improvements Fund.
MG:j
Submitted for City Manager's
Office by: •
Mike Groomer
Originating Department Head:
A. Douglas Rademaker
Additional Information Contact:
` FUND � ACCOUNT � �ENTER � AMOUNT
, (to)
� �
6140 I �
6157
(from)
PS46
PW77
C115
C115
C115
C115
541200
541200
541200
541200
541200
541200
070460135390
060770155690
020115040590
020115040589
020115040591
020115040592
$289,333.40
$116,191.50
$106,956.90
$138,059.67
$183,749.56
$ 26,744.35
A. Douglas Rademaker 6157
CITY SECRETARY
�PPROVED
C1TY COUNCIL
� oV 2 f999-.
����
CitT Secretary ot tha
Citq of Fort Worth,'lt�za+