Loading...
HomeMy WebLinkAbout025425 - Construction-Related - Contract - Black & Veatch Corporation. � AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. ��J�aS (No. M&C Needed) COUNTY OF TARRANT § WHERAS, the City of Fort Worth (City) and Black & Veatch Corporation (Engineer) made and entered into City Secretary Contract No. 24676 (the Contract) which was authorized by the City Council by M&C C-17264 on the 2"`� day of February, 1999; and W��RAS, the Contract involves engineering services for the following project: Engineering Contract for the Pavement Reconstruction and Water Replacements on Foard Street (East Seminary to Dead End), Brookline Avenue (Trentman to Algerita) and Algerita Street (Trentman to Miller). WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated August 17, 1999, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $ 6,230.00 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work atid services shall not exceed the sum of $65,108.00 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. ����C�I�L� G'C��GuG�D � 0� �S��cQ�Q� �� UUVG'1lUilp �LylNo EXECUTED on this the ��v<.�-- day of �,�Z,��������� , 19��`�, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: -�:�—��, c.� A. Douglas Rademaker, P.E. Director, Department of Engineering ENGINEER B : �� �� �. Y Name: Randv McIntvre. P.E. Proi ect Mana�er Black & Veatch Corp. APPROVED: Mike Groomer Assistant City Manage� ATTEST: 1 ( .u-,L�'1 %f,`�l� � �Lc-a G�-���7_» �zi-Glozi� Pearson, City Secretary ,N�2.�rn � c_ � _ - Contract 1�uthorization APPROVED AS TO ORM AND LEGALITY: Gary Steinberger Assistant City Attorney Date �� � BLACK & VEATCH 100 E. 15th Street Suite 600 Fort Wonh, Texas 76102 USA City of Fort Worth, Texas 1998 CIP Project; Reconstruction 1) Foard St. 2) Brookline Ave. 3) Algerita St. Mr. Gopal Sahu, P.E., Project Manager Fort Worth Department of Engineering 1000 Throckmorton Street Fort Worth, Texas 76102 Black & Veatch Corporation B&V Project 58937 B&V File B-1.01 August 17, 1999 Subject: City Contract #24676, Amendment No. 1 Dear Mr. Sahu: In response to various meetings and discussions regarding the additional paving and drainage improvements required for the street improvements, we are submitting this request for contract amendment. This amendment is for the surveying and engineering services necessary to design additional paving and drainage improvements. This letter is the result of a Concept Review meeting on August 4, 1999 and revised Concept Plan report dated August 16, � 999 (copy of concept plan report attached). � The current contract amount is $58,878 and we are requesting $6,230 to provide field surveying and engineering services necessary for the additional design efforts, giving a new contract amount of $65,108. Additional Survevin4 Services: Foard Street — storm drainage pipe; 300 If x$3.00/lf ... ......... $. 900 Foard Street — drainage easements; 2 ea x $300 ... ... ... ... .... $ ...600 Fdard Street — street right-of-way parcels; 4 x$350 ............. $ 1.400 Subtota( ............................... $ 2,900 Additional Enaineerina Services: Engineering design services in the origina! contract for paving and drainage improvements was calculated as follows; OPlNION OF PROBABLE CONSTRUCTION COSTS $303,476 CURVE (9.3% x 0.85 x$303,476) _$ 23,990 for Engineering Design j:�fw cip�corspondlamend_1.doc the Imagine•bulld company� Y � City of Fort Worth, Texas . 1998 CIP Project; Reconstruction August 17, 1999 Page No. 2 Using the revised cost estimates for the paving and drainage improvements and changes identified in the Concept Plan Report, the engineering design services can be calculated as follows; OPINION OF PROBABLE CONSTRUCTION COSTS $349,358 CURVE (9.2% x 0.85 x$349,358) _$ 27,320 for Engineering Design $27,320 -$23,990 =$3,330 for additional Engineering Design Services. Sincerely, BLACK & VEATCH � c t r—�` Randy Mclntyre, P.E. Project Manager Enclosures cc: Ms. Dena Johnson, Fort Worth DOE j:\fw cip�corspond�amend_1.doc