AMENDMENT NO. 6
STATE OF TEXAS
s CITY SECRETARY CONTRACT NO. �� "/ ��
(No M&C Needed)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Carter & Burgess,
Inc., (Engineer) made and entered into City Secretary Contract No.
22566, (the Contract) which was authorized by the City Council by
M&C 15928 on the 4th day of March 1997; and subsequently revised
by five previous amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Main 207R Drainage
Area Sanitary Sewer System Rehabilitation and Improvements
(Group 5, Contract 3), Part 2.
WHEREAS, it has become necessary to execute Amendment No. 6
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated October 12, 1999, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $11,500.00.
�
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $519,695.00.
����COG�,� G?���'G'�C� �
����f ����G'[��� �°�
� ��� �'� r�� �? ,,
��i� ��
o ✓�_ ,��^,:o
+ ' ',
3.
Al1 other provisions of the Contract which are not expressly amended
herein shall reaaain in full force and effect.
E�CUTED on this the �� day of �����2�C�C�if j�
1999, in Fort Worth, Tarrant County, Texas.
ATTEST : '� V) ��l �� � �
r�, rn��c�, FG �C
/� G' ��ntrect �,uthorization
;,J.�/C-'l. i.'�i�,; i ��� ,L� t;� .
�' GlorrSj/a Pearson, City Secretary .. ,
+' Da��
APPROVAL RECONlI��NDED :
('9I �,h,A g ,4 �R�
r ��S�,y��� ` ��a'4;i����:-'.�L�4"C,���,...vY}'}--�
//
A. Douglas Rademaker, P.E.
Director, Department of
Engineering
CARTER & BURGESS, INC.
ENGINEER �
B � ,�� �G�l�
Y � �--
Name: �'ohn H. Cook, P.E.
Vice President
3880 Hulen Street
Fort Worth, TX 76107
APPROVED AS TO FORM AND LEGALITY:
�
Gary Steinberger
Assistant City Attorney
22566
APPROVED:
�, 1
- ,
M1� � � � � �
,, .�'��„��-� �-
� . �
�/
Mike Groomer
Assistant City Manager
-2-
Y� 7 �
�i�i . �Carter �� Bu
rgess
Consultants in Planning, Enginee�ing, Architecture,
Construction Management, and Related Services
October 12, 1999
Mr. Rakesh Chaubey, P.E.
City of Fort Worth
Department of Engineering
811 Lamar Street, Suite 310
Fort Worth, Texas 76102
Reference: Main 207R Drainage Area
Sanitary Sewer Rehabilitation & Improvements
(Group 5, Contract 3), Part 2& Part 9
Dear Rakesh:
We are providing this letter to request additional compensation for work beyond the
engineering services outlined in the contract for Main 207R Drainage Area betwee;,
Carter and Burgess and the City of Fort Worth.
The additional services are due to revisions on the approved construction documents
during the construction phase of the project. Tf�ese revisions are described under
Amendment No. 6 below.
Amendment No. 6
Amendment No. 6 includes an increase in total contract amount of $11,500 in order to
accommodate the following design changes:
Revise twelve plan and profile sheets to prepare a rebid set for Unit 1.
Revised Plan and Profile Sheets 1 through 11 deleting Unit 2 and
indicating the revision note for rebid of project to avoid any confusion with
the previously advertised and bid set of plans. .
2. Revise specifications to indicate that the proposal is for rebid of the
project and revise the special conditions within the specifications to reflect
new beginning of construction and completion dates. Revise notice to
bidders to reflect new dates of advertisement. Remove references and
special conditions that apply to unit 2.
3. Attend meetings with the City of Fort Worth to discuss revisions.
Carter & Burgess, Inc. ,,:ai; �-iulen Strecr 1=ort b"i -1-� -=•rCs 7610�-%�'��
� _. ,�,c, _._._ --. Pp 5.� 985�06 =..� �,v-_� -. .. �: �; SGOo (8i7� '?� -n00 rr,� _ -_�:,��1't =_. _ - ?;
�5-. =B
t ' � �
4. Prepare 40 sets of plans and specifications and deliver to the City of Fort
Worth. � '
5. Prepare bid tabulatidn and letter of recommendation to the City of Fort
Worth.
The engineering fee required to make these revisions on the construction documents is
$11,500.00. Attached is a summary of the engineering fees for the project including
amendments 1 through 6.
If you have any questions or need additional information, please call me at (817) 735-
6150.
Sincerely,
CARTER 8� BURGESS, INC.
i• rr-
Sam M. Zabaneh, P.E.
Assistant Manager Public Works
SMZ/mds
Enclosures
96181301.L64
cc: Correspondence
Tony Sholola- P.E. - FWDOE
John H. Cook, P.E.
Gretchen N. Williams, P.E.
SMZ
��. �
Main 207R Drainage Area
Sanitary Sewer System Rehabilitation and Improvements
(Group 5, Contract 3), Part 2
Billing & Status Summary
Original Contract Amount
Amendment No. 1
Service JM Leonard Properties
Revise M207R Alignment
Amendment No. 2
Design & Plan/Profile Sheets for Bid Alternate
Environmental Coordination/Specification
(Contaminated Soils Area)
Amendment No. 3
Revise Alignment of M208 to Raton Dr.
Realignment of M207R at SH183
Amendment No. 4
Delete Ridgmar Mall SS Improvements from Plans
Additional Bidding Assistance
Attend Additional Bid Opening
Amendment No. 5
Revise Plan/Profile Sheets 6A & 7A
Revise Plan/Profile Sheet 7A
Meetings and prepare Easements
Amendment No.6
Revise sheets 1through 11
Revise specifications
Provide copies of plans and specifications
Contract
Amount
$444,505.00
$24,010.00
$92,480.00
$13,090.00
$4, 610.00
$9,500.00
$11,500.00
Subtotals $519,695.00
...•, s�
FO T OI�TH
R_
_ �_
--�s�-
MEMORANDUM
���
FROM:
A. Douglas Rademaker, Director DOE and
Mike Groomer, Assistant City Manager
Tony Sholola � ' S �
DATE : October 27, 1999
RE: DESIGN FEE AMENDMENT NO. 6 TO MAIN 207R DRAINAGE
AREA SANITARY SEWER REHABILITATION AND IMPROVE-
MENTS (GROUP 5, CONTRACT 3), PART 2, DOE N0.1360
The proposed amendment will reimburse Carter and Burgess, Inc., for the additional en-
gineering services that will be provided on the project as requested by the City.
Due to the rather high bid prices initially received for M207R Part 9, Unit 1 all bids re-
ceived were rejected. Before the project could be readvertised for bids, it was necessary
for Carter and Burgess to remove all references to M207R Part 9, Unit 2 from the project
plans and specification. In addition Carter and Burgess provided 40 sets of plans and
specifications with which to rebid the project.
Carter and Burgess, Inc., has requested a fee of $11,500.00 for the additional services to
be provided thereby increasing the contract fee from $508,195.00 to $519,695.00. I be-
lieve this fee is fair and reasonable for the additional services that were provided.
Please authorize the additional design fee by your signature on the attached contract
amendment form.
cc: Rakesh Chaubey, Project Manager
Berdena Hamilton, Water Department
Dan Pepon, Water Department
�o �;�
ENGINEERING DEPARTMENT
�� THE CITY OF FORT WORTH * lOOO THROCKMORTON STREET * FORT WORTH, TEXAS T6102-6311
(81'� 871-7941 * FAx (81� 871-7854
�^� PrlMed on recycied papu