HomeMy WebLinkAbout025519 - Construction-Related - Contract - Black & Veatch CorporationA CON R CTENp Y,�,� ,5.� / � CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING SERVICES This AGREEMENT is befinreen the City of Fort Worth (the "City"), and Black & Veatch Corporation (the "ENGINEER"), for a PROJECT generally described as: Sanitary Sewer Mains D104D, D105, D105A, D109, L23 and L108 Rehabilitation, Project Number: PS46- 070460170200. Article I Scope of Services A. The Scope of Services is set forth in Attachment A. Article III Compensation A. The ENGINEER's compensation is set forth in Attachment B. Article II Terms of Payment Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation to reasonably substantiate the invoices. (2) Monthly invoices will be issued by the ENGINEER for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. (3) Upon completion of services enumerated in Article I, the final payment of any batance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing,Only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The City will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. (5) �f the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving seven (7 days) written notice to CITY suspend services under this AGREEMENT until paid in full, including interest In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. ,. ��,�;��GE�G�� J���������� - � - ����li� ��'GQ �° G�� ��o �G'��, ��. �...._ � �._�. _, � � �� �IC�@ n/ Obligations of the Engineer � Amendments to Article IV, if any, are �ncluded in Attachment C. A. Generai The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and fumishing customary services incidental thereto. B. Standard of Cane The standard of care applicable to the ENGINEER's services wilt be the degree of skill and diligence normaliy employed in the State of Te�cas by professional engineers or consultants pertorming the same or similar services at the time such services are perfoRned. C. Subsurtace Investigations (1) The ENGINEER shalt advise the CITY with regarc! to the necessity for subcontract work such as special surveys, tests, test borings� or other subsurface investigations in connection with design. and engineerir�g work�to be pertormed hereunder. The ENGINEER shall also advise the CITY conceming the resutts of same. Such surveys, tests, and investigations shall be fumished by the C17Y� unless otherwise specified in Attachment A. � (2) In soils, foundation, groundwater� and other subs�rface investigations, the actuai characteristics may vary significantly b�tween successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because . of the i�herent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that oould affect the totai PROJECT cost and/or execution. 7hese conditions and cost/execution effects are not the responsibility of the ENGINEER. D. Preparation of Engineering Drawings The ENGINEER will provide to the CIN the original drawings of all ptans in ink on reproducible plastic film sheets� or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however� that the ENGINEER shall not be liable for the use of such drawings for any project other than the PRO.fECT described herein. . E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on-site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not -2 - � K Y .► limited to� all construction methods, means� techniques, sequences� and procedures necessary for coorclinating and completing all portions of the construc�io� worlc in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their wo�ic or any health or safety precautions. (2) Except to the extent of spe�c site visits expressiy detailed and set forth in Attachment A, the ENGINEER or its personnei shail have no obiigation or responsibiiity to visit the construction site to become familiar with the progress or quality of the completed woric on the PROJECT or to . �determine� in general� if the work on the PROJECT is being perfotmed in a manner indicating that the PROJECT, when completed, wiil be in . accondance with the Contrad Documents; nor shall anything in the Contract Documents or the agreement between CIN and ENGINEER be construed as requiring �NGINEER to make exhaustive or continuows . on-site inspections to discover latent defects in the woric or otherwise check �the qualityi or quantity of the work on the PROJECT. If� for any reason� the ENGINEER shouid make an on-site observation(s)� on the basis'�of such on-site observations, if any� the ENGiNEER shall endeavor to keep the CITY informed of any deviation from the Contract Documents coming to the actual notice of ENGtNEER regarding the PROJECT. (3) When professional certification of pertormance or characteristics of materials� systems or equipment is r�easonably required to pertorm the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such oertification to establish materials� systems or equipment and performance criteria to be required �n the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules {1) The ENGINEER shall provide opinions of probabie costs based on the current availabie information at the time of preparation, in accordance with Attachment A. � (2) in providing � opinions of cost� finanaal analyses� economic feasibility projections, and schedules for the PROJECT� the ENGINEER has no controi over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or qualify of pertom�ance by third parties; quality, type� management, or direction of operating personnel; and other economic and operationai factors that may materially affect the uitimate PROJECT cost or schedule. Therefore� the ENGINEER makes no warra�ty that the CITY's actual PROJECT costs, financial asp�cts� economic feasibi(ity� or schedules will not vary from the ENGINEER's opinions, analyses, projections� or estimates. G. Construction Progr+ess Payme�ts Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge� information, and belief from selective sampling and -3- t+ .k observation that the woric has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents; that the finai work will be acceptable in all respects; that the ENGiNEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials� or equipment has passed to the CITY free and ciear of liens, daims, security interests� or encumbrances; or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings� if required� wiii be prepared� in part� on the basis of infortnation compiled and fumished by others� and may not always represent the exact location, type of various components� or exact manner in which the PROJECT was finally constiucted. The ENGINEER is not responsible for any errors or omissions in the infomnation from others that is incorpnrated into the recorci drawings. I. Minority and Woman Business Enterprise (MMBE) pa�ticipation In accorcJ with City of Fort Worth Ordinance No. 11923, the City has goals for the participation of minority business enterprises and woman business enterprises �in City contracts. Engineer acknowfedges the AA/VNBE goal established for this contract and its commitment to meet that goal. Any misrepresentation of facts (other than a n�egligent mis�epresentation) and/or the commission of fraud by the Engineer may re'suit in the termination of this agreement and debarment from partiapating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, untii the expiration of three (3) years after final payment under this contract� have access to and the right to examine and ptiotocopy any directly pertinent books� documents� . papers a�d records of the ENGINEER involving transactions retating to this contract. ENGINEER agrees that the C1TY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shail give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to indude in all its subconsultant agreeme�ts hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of three (3) years after finai payment . under the subcontract, have access to and the right to examine and photocopy any directly pertinent books� documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have acxess during normal working hours to all subconsuitant facilities� and shall be provided adequate and appropriate woric space, in order to conduct audits in compliance with the provisions of this article together with subsection (3)hereof. CIN shall give subcor�sultant reasonable advance notice of intended audits. -4 - �� tl (3) ENGINEER and subconsultant agree to photo copy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. ENGINEER's Insurance (1) Insurance coverage and limits: ENGINEER shall provide to the City certificate(s) of insurance documenting policies of the following coverage at minimum limits which are to be in effed prior to commencement of woric on the PROJECT: Commeraal General Liability S1 �000�000 each occurrence �1,000,000 aggregate Automobile Uability � a1,000�000 each acadent (or reasonably equivalent limits of coverage if writte� � on a split limits basis). Coverage shall be on any vehicle used in the course of the PROJECT. Worker's Compensation Coverage A: statutory limits Coverage B: 5100,000 each accident . 5500�000 disease - policy limit �100,000 disease - each employee � Professionai Liability �. �1.000,000 each claim/annual aggregate (2) Certificates of insurance evidenang that the ENGiNEER has obtained all required insurance shali be delivered to the CITY �rior to ENGiNEER proceeding with the PROJECT. (a) Appiicable policies shail be endorsed to name the CITY an Additionai Insured thereon� as its interests may appear. The term CIN shall include its employees, officers� officials� agents� and volunteers as respects the contracted services. (b) CerGficate(s) of insurance• � shall document that insurance . coverages specified according to items section K.(1) and K.(2) of this agreement are provided under applicable policies documented thereon. (c) Any failure on part of the ClTY to request required insurance documentation shall not constitute a waiver of the insurance requirements. (d) A minimum of thirty (30) days notice of canceilation� non-renewai or material change in coverage shall be provided to the� CITY. A ten (10) days notice shail be acceptable in the event of non- payment of premium. Such ternns shall be endorsed onto ENGINEER's insurance policies. Notice shail be sent to the -5- . ,� respective Department Director (by name), City of Fnrt Worth� 9000 Throckmorton. Fort Worth, Texas 76102. � (e) insurers for all policies must be authorized to do business in the state of Texas or be othervvise approved by the CITY; and� such insurers shall be acceptable to the CITY in terms of their financial strength a�d solvency. (� Deductible limits� or self insured retentions, affecting insurance required herein may be acceptabie to the C{TY at its sole discretion; and� in lieu of traditional insurance, any aitemative coverage maintained through insurance pools or risk retention groups must be also approved. Dedicated financial resources or letters of credit may aiso be acceptable to the City. (g) Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. (h) The City shall be entitled� upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and� at the CITY's discretion, the ENGiNEER may be required to provide proof of insurance premium payments. (I) The Commercial General Uability insurance policy shall have no exclusions by endorsements unless such ace approved by the crnr. � . �� The Professional Liability insurance policy� if written on a Gaims made basis shalt be maintained by the ENGINEER for a minimum two (2) year period subsequent to the term of the respective PROJECT contract with �the CITY .unless such coverage is provided the ENGINEER on an ocxurrence basis. (k) The CITY shail not be responsible for the direct payment of any insurance premiums required by this agreement It is understood that insurance cost is an allowable component of ENGINEER's ovefiead. ' (1) A11 insurance required in section K.� except for the Professional Liability insurance policy, shall be written on an occurrence basis in order to be approved by the CIN. (m) Subconsultants to the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When insurance coverage is maintained by subconsultants, ENGINEER shall provide CITY with documentation thereof on a certificate of � insurance. Notwithstanding anything to the contrary contained herein, in the event a subconsultant's insurance coverage is canceled or tenninated, such cancellation or termination �shall not constitute a breach by ENGINEER of the Agreement � L Independent Consultant The ENGINEER agrees to perform all services as an independent consuitant and not as a subcontractor� agent, or employee of the CITY. M. Disclosur+e The ENGINEER acknowledges to the CITY that it has made fuit disGosure in writing of any existing conflicts of interest or potential conflicts of interest� inGuding personal financial interest, direct or indirect, in properly abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest which develop subsequsnt to the signing of this contrad and prior to finai payment under the contrac�t. N. Asbestos or Hazardous Substances (1). If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. � (2) If asbestos or other hazardous substances are suspected� the ENGINEER will� if requested, assist the CITY in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. Article V Obligations of the City Amendments to Article V� if any, are inGuded in Attachment C. A. City-Fumished Data The CITY wiil make available to the ENGINEER all technical data in the CI'1Y's possession relating to the ENGINEER's services on the PROJECT. The ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY except when verification is necessary to insure the proper delivery of services to be performed. -7- �, B. Access to Facilities and Property The CITY wiil make its facilities accessible to the ENGINEER as required for the ENGINEER's pertormance of its services and wiil provide labor and safety equipment as required by the ENGINEER for such access. The CITY will pertorm, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY wiil be responsibie for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless othervvise agreed to in the Scope of Services� the CITY wiil obtain, arrange, and pay for all advertiseme�ts for bids; permits and licenses required by local, state, or federai authorities; and land� easements, rights-of-way� and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies� r+eports� sketches, drawings, specifications� proposals, and other documents; obtain advice of an attomey� insurance counselor� acxountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule in Attachment D. � E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or . construction contraators. . � F. Asbestos or Hazardous Substances and Indemnffication (1) To the maximum extent permitted by law, the CITY will indemnify and release ENGINEER and its officers, employees, and subcontractors from all claims, damages, losses, and � costs, induding, but not limited to, attomey's fees and litigation expenses arising out of or relating to the presence, discharge� release� or escape of hazardous substances, contaminants, or asbestos or� or from the PROJECT. Nothing contained herein shail be canstrued to require the CITY to levy, assess or coilect any tax to fund this indemnification. (2) . The indemnificatio� and release required above shall not apply in the event the discharge, release or escape of hazardous substances� contaminants, or asbestos is a result of ENGINEER'S negligence or if such hazardous substance, contaminant or asbestos is brought onto the PROJECT by ENGINEER. -8- � . �, G. Contractor Indemn�cation and Claims The CIN agrees to inciude in atl construction contracts the provisions of Article lV.E. regarding the ENGINEER's Personnel at Construction Site� and provisions providing contractor indemnification . of the CITY and the ENGINEER for contractors negligence. H. Contractor Claims and Third-Party Beneficiaries (1) The CITY agrees to include the following clause in ail contracts with construction contractors and.equipment or materials suppliers: "Contractors, subcontractors and equipment and materials supptiers on the PROJECT� or their sureties, shall maintain no direct action against the ENGINEER� its officers, employees, and subcontractors� for any claim arising out of� in connection with, or resulting from the engineering services performed. Only the CIN witl be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and ther+e are no third-party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third-party beneficiary rights under this Agreement (4) Nothing contained in this secction V.H. shali be construed as a waiver of any right the CITY has to bring a daim against ENGINEER: I. CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY wiil ensure that Builders Risk/lnstallation insurance is maintained at the replacement cost value of the PROJECT. The ClTY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. � (3) The CITY will specify that the Builders Risk/installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include casts of the ENGINEER for required or requested assistance to support� prepare, documer�t, bring� defend� or assist in litigation undertaken or defended by the CIN. I� the event CIN requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated befinreen the parties. �'Z • ., K. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article Vt General Legal Provisions Amendments to ArtiGe VI� if any� are included in Attachment C. A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings� specifications, documents� and other woric products of the ENGINEER� whether in hard copy or in electronic form. are instruments of service for this PROJECT, whether the PROJECT is completed or not Reuse� change, or alteratio� by the CITY or by others acEing through or on behatf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The final designs� drawings� specifications and documents shail be owned by the CIN. C. Force Majeure The ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of the ENGINEER. - � � D. Termination (1) This AGREEMENT may be terminated only by the City for convenience on 30 days' written notice. This �AGREEMENT may be terminated by either the CITY or the ENGINEER for cause if either party fails substantially to pertorm through no fault of the other and does not commence correction of such nonpertormance with 5 days of written notice and diligently cbmptete the correction thereafter. (2) if this AGREEMENT is terminated for the convenience of the City, the ENGINEER wiil be paid for termination expenses as foilows: a) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b) Out of-pocket expenses for purchasing storage containers, microfilm, electronic data files, and other data storage suppiies or services; -10- . ., c) The time requirements for the ENGINEER'S personnel to document the work underway at the 6me the CITY'S termination for conver�ience so that the woric effort is suitable for long time storage. (3) Prior to proceeding with termination services� the ENGINEER will submit to the CITY an itemized statement of ail termination expenses. The CITY'S approvai wili be obtained in writing prior to proceeding with termination services. .� E. Suspension, Delay, or Intenvption to Work The CITY may suspend, delay� or intertupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay� or intenvption, an equitable adjustment in the PROJECTs schedule� commitment and cost of the ENGINEER's personnel and subcontractors� and ENGINEER's compensation wili be made. F. Indemnification (1) The ENGINEER agrees to indemnify and defend the CITY from any loss� cost, or expense claimed by third parties for properly damage and bodily injury� inciuding death� caused solely by the negligence or wiliful misconduct of �he ENGINEER,—�s employees� officers� and su�contractors in connection with the PROJECT. (2) if the negiigence or wilifui misconduct of both the ENGiNEER and the CITY (or a person identified above for whom each is liabie) is a cause of such damage or injury, the loss� cost, or expense shall be shared between the ENGINEER and the CITY in proportion to their r�elative degrees of negligence or wiliful misconduct as determined pursuant to T.C.P. & R. Code, section 33.01'�(4) (Vemon Supplement 9996). G. Assignmerrt Neither party will assign all or any part of this AGREEMENT without the prior written consent of the other party. H. interpretation � � Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties and shall apply to ali the different theories of recovery� including breach of contract or warranty� tort including negligence� strict or statutory liability� or any other cause of action� except for wiAful misconduct or gross negligence for limitations of liability and sole negligence for indemnification. Parties means the CITY and the ENGINEER� and their officers, employees� agents, and subcontractors. I. Jurisdiction The law of the State of Texas shall govem the validity of �this AGREEMENT� its interpretation and pertormance� and any other daims related to it The venue for any litigation related to this AGREEMENT shall be Tan~ant County� Texas. -xi- � J. Alternate Dispute Resolution (1) All daims, disputes� and other matters in question between the CITY and ENGINEER arising out of, or in connection with this Agreement or the PROJECT� or any breach of any obligation or duty of CITY or ENGINEER hereunder, will be submitted to mediation. if inediation is unsuccessfui, the Gaim, dispute or other matter in question shait be submitted to arbitration if both parties acting reasonably agree that the amount of the dispute is likely to be less than $50,000� exclusive of attomey's fees, costs and expenses. Arbitration shall be in axordance with the Construction Industry Arbitration Rules � of the American Arbitration Association or other applicable rules of the Association then in effect. Any award rendered by the arbitrators less than a50,000, exclusive of attomey's fees, costs and expenses, will be final� judgment may be entered thereon in any court having jurisdiction, and will not be subjed to appeal or mod�cation except to the extent permitted by Sections 90 and 11 of the Federal Arbitration Act (9 U.S.C. Seations 10 . and 11). (2) Any awar+d greater than $50�000, exclusive of attomey's fees, costs and expenses� may be litigated by either party on a de novo basis. The award shall become fiinal ninety (90) days from the date same is issued. If litigation is filed by either party within said ninety (90) day period, the award shall become null and void and shall not be used by either party for any purpose in the litigation. � K. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid� iliegal, or unenforceable in any respect, such invalidity� iilegafity� or unenfonceabitity will not affect any other provision. a;�d this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F.� VI.B.� VI.D., VI.H., VI.I.� and VI.J. shali survive termination of this AGREEMENT for any cause. . L Observe and Comply ENGINEER shail at all times observe and �comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and compiy with all orders, laws ordinances and regulations which may exist or may be enacted later by goveming bodies having jurisdiction or authority for such enactment No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmiess CITY and ail of its officers, agents and employees from and against all daims or liability arising out of the vioiation of any such order, law� ordinance, or regulation, whether it be by itself or its employees. -12- z Article VII Attachments, Schedules, and Signatures This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A- Scope of Services Attachment B - Compensation Attachment C- Amendments to Standard Agreement for Engineering Services Attachment D — Schedule Attachment E— Location Map Figures ATTEST: Q loria Pearsor( � City Secretary CITY OF FORT WORTH . By: Mike Groomer Assistant City Manager � CITY OF FORT WORTH C-1'�`7�� Contract Authorization �a-,a�-�g Date APPROVED �,:�� c� �'-�.�,�.��.' A. Douglas Rademaker, P.E Director, Engineering Department APPROVED AS TO FORM AND LEGALITY Assistant ity Attorney Black & Veatch Corporation ENGINEER B : �����I�.•d�v ,� Y Randall G. Mclntyre, P.E., P.O.A. -13- ATTACHMENT "A" General Scoae of Services 'Scope of Servioes set forth herein can only be modified by additions, clarifrcations, and/or deletions set forth in the supplemental Scope of Services. !n cases of contlici between the Supp/emenfa! Scope of Servioes and the General Scope of Senric�es, the Supp/ementa/ Scope of Services shal! have precedence over the Genera! Scope of Services." GENERAL 1) Preliminary Confere�ce with City The Engineer shall attend preliminary conferences with authorized representatives of the City reganiing the scope of project so that the plans and specifications which are to be developed hereunder by the Engineer will result in providing facilities which are economical in design and conform to the City's requirements and budgetary constraints. 2) Coordination with Outside Agencies/Public Entities The Engineer shall coordinate with officials of other outside agencies as may be necessary for the design of t�e proposed street, and storm drain and/or water and wastewater facititie�mprovements. It shafl be the Engineer's duty hereunder to secure necessary information from such outside agencies, to meet their requirements. 3) Geotechnicallnvestigations The Engineer shall advise the City of test borings� and other subsurface investigations that may be needed. In the event it is determined necessary to make borings or excavate test holes or pits, the Engineer shall in coordination with the City and the City's geotechnical engineering consultant, draw up specifications ior such testing program. The cost of the borings or excavations shall be paid for by the City. 4) Agreements and Permits The Engineer shall complete alI forms/applications to allow the City of Fort Worth to obtain any and ail agreements and/or permits normally required for a project of this size and type. The Engineer will be responsibie for negotiating and coordinating to obtain approval of the agency issuing the agreement and/or permits � and will make any revisions necessary to bring the plans into compiiance with the requi�ements of said agency� including but not limited to highways, railroads, water authorities, Corps of Engineers and other utilities. 5) Design Changes Relating to Permitting Authorities If permitting authorities require design changes, the Engineer shall revise the plans and specifications as required at the Engi�eers own cost and expense, unless such changes are required due to changes in the design of the facilities made by the permitting authority. If such changes are required, the Engineer shall notify the City and an amendment to the contract shall be made if the Engineer incurs additional cost if there are unavoidable delays, a mutually agreeable and reasonable time extension shalt be negotiated. � -1- J • Y � 6) Plan Submittal Copies of the originai plans shall be provided on reproducible mylar or approved plastic film sheets� or as othervvise approved by the Department of Engineering and shail become the property of the City. City may use such drawings in any manner �t desires; provided, however that the Engineer shail not be liable for the use of such drawings for any project other than the project described herein; and further provided, that the Engineer shall not be iiable for the consequences of any changes that are made to the drawings or changes that are made in the implementation of the drawings without the written approval of the Engineer. � PHASE 1 7) Right-of-Way, Easement and Land Acquisiiion Needs The Engineer shall determine the rights-of-way, easement needs for the construction of the project Engineer shall determine ownership of such land and fumish the City with the necessary right-of-way sketches, pcepare necessary easement descriptions for acquiring the rights-of-way and/or easements for the construction of this project Sketches and easement descriptio�s are to be presented in form suitable for direct use by the Department of Engineering in obtaining rights-of-way, easements, permits and licensing agreements. Ali materials shall be fumished on the appropriate City forms in a �minimum of four (4) copies each. 8) Design Survey The Engineer shall provide necessary field survey for use in the preparation of Plans and Specifications. The Engineer shall fumish the City certified copies of the field data. 9) Utility Coordination The Engineer shail coordinate with all utilities, induding utilities owned by the City, as to any proposed utility liens or adjustment to existing utility lines within the project limits. The information obtained shatl be shown on the conceptuai plans. The Engineer shall show on the prelimir�ary and final plans the location of the proposed utitity tines, existing utility lines, based on the infonnation provided by the utility, and any adjustments and/or relocation of the existing lines within the project limits. The Engineer shall also evaluate the phasing of the water� wastewater, street and drainage work� and shall submit such evaluation in writing to the City as part of this phase of the project. 10) Conceptual Plans The Engineer shall fumish four (4) copies of the Phase 1 concept engineering plans which include layouts, preliminary right-of-way needs and preliminary estimates of probable construction costs for the Engineer's recommended plan. For all submittals� the Engineer shall submit plans and documents for sVeet/storm drain and wateNwastewater facilities. The Engineer shall receive written approval of the Phase 1 Plans from the City's project manager before proceeding with Phase 2. -2- �r PHASE 2 1'i) Design Data The Engineer shall provide design data, reports, cross-sections, profiles, drainage calculations, and preliminary estimates of probable construction cost. 12) Preliminary Construction Plans and Technical Specifications The Engineer shall submit twenty (20) copies of Phase 2 preliminary construction plans and five (5) copies of the preliminary technical specifications for review by the�City and for submission to utility companies and other agencies for the purposes of coordinating woric with existing and proposed utilities. The preliminary construction plans shall indicate location of existing/proposed utilities and storm drain lines. The Engineer shall receive written approval of the Phase 2 plans from the City's project manager before proceeding with Phase 3. PHASE 3 13) Final Construction Plans The Engineer shall fumish five (5) copies of the final construction plans and contract specifications for review by the City. 14) Detailed Cost Estimate The Engineer shall fumish four (4) copies of detailed estimates of probable construction costs for the autho�ized construction project, which shall include summaries of bid items and quantities. 15) Plans and Specification Approvai The Engineer shall fumish an� original cover mylar for the signatures of authorized City officials. The Contract Documents shall comply with applicable local, state and federat laws and with applicable rules and regulations promulgated by local, state and national boards, bureaus and agencies. The Engineer shall receive written approval of the Phase 3 plans from the City's project manager before proceeding with Phase 4. PHASE 4 16) Final Approved Construction Plans The Engineer shall fumish 45 bound copies of Phase 4 final approved construction plans and contract specifications. The approved plans and contract specifications shal! be used as authorized by the City for use in obtaining bids, awarding contracts, and constructing the project. 17) Bidding Assistance The Engineer shall issue addenda as appropriate to interpret, clarify� or expand the bidding documents, and assist the owner in determining the qualifications and acceptability of prospective constructors, sut�contractors, and suppliers. When substitu- tion prior to the. awarci of contracts is allowed by the bidding documents, the Engineer will advise the owner as to the acceptability of aitemate materials and equipment proposed by the prospective constructors. ' -3- m 18) Recommendation of Award The Engineer shal( assist �n the tabulation and review of a(I bids received for the construction of the project and shall make a recommendati�n of award to the City. 19) Prebid Conference The Engineer shall attend the prebid cor�ference and the bid . opening� prepare bid tabulation sheets and provide assistance to the owner in evaluating bids or proposals and in assembling and awarding contracts for construction, materials� equipment, and services. PHASE 5 20) Preconstruction Conference The Engineer shail attend the preconstruction conference. 21) Construction Survey The Engineer shali be available to the City on matters� conceming the layout of the project during its construction and will set control points in the field to allow City survey crews to stake the project The setting of line and grade stakes and route inspection of construction will be performed by the City. 22) Site �sits The Engineer shall visit the project site � at appropriate intervals as construction proceeds to obsenre and report on the progress and the quality of the executed work. 23) Shop Drawing Review The Engineer shail review shop and erection drawings submitted by the contractor for compliance with design concepts. The Engineer shall review laboratory� shop, and miil test reports on materiais and equipmen� 24) instructions to Contractor The Engineer shall provide necessary interpretations and clarifications of contract documents, review change orders and make recommendations as to the acceptability of the work, at the request of the City. . 25) Differing Site Conditions The Engineer shall prepare sketches required to resolve problems due to actual field conditions encountered. 26) Record Drawings The Engineer shall prepare record drawings irom information submitted by the contractor. -4- EXHIBIT "A-'I" SUPPLEMENTAL SCOPE OF SERVICES (SUPPLEMENT TO ATTACHMENT "A") PHASE 1- DESIGN SERVICES: SANITARY SEWER IMPROVEMENTS The following is a clarification of the tasks that the ENGINEER will perform under ATTACHMENT "A". Work under this attachment includes engineering services for sanitary sewer improvements for the following: SANITARY SEWER MAINS D104D, D105, D105A, D109, L23 AND L108 REHABILITATION PROJECT IVUMBER: PS46-070460170200 Upon receipt of notice to proceed, the ENGINEER will pertorm the following tasks: PART A - PRE-ENGINEERING 1. Initial Data Collection a. Pre-Design Coordination Meetings ENGINEER will attend and document meetings, as required, to discuss and coordinate various aspects of the project and to ensure that the project stays on schedule. The project is going to be executed through two schedules - fast-track and standard. For purposes of establishing a level of comfort, two (4) meetings are anticipated. These include the following: Two (2) pre-design kick-off ineetings, fast track & standard, (including the City's Department of Engineering and other departments that are impacted by the project). Two (2) review meetings at completion of the City's review of the conceptual engineering plans, fast track and standard. b. Data Collection In addition to data obtained from the City, ENGINEER will research and make efforts to obtain pertinent information to aid in coordination of the proposed improvements with any planned future improvements that may influence the project. ENGINEER will also identify and seek to obtain data for existing CITY drainage complaint files, existing applicable drainage studies and property ownership as available from the Tax Assessor's office. c. Coordination with Other agencies During the concept phase the ENGINEER shall coordinate with all utilities, including utilities owned by the City, and TxDOT. These entities shall also be contacted if applicable, to determine plans for any proposed facilities or adjustment to existing lines within the project limits. ENGINEER shall complete all forms Necessary for City to obtain permit letters from TxDOT and complete and forms necessary for City to EA1-1 � obtain permit letters from TxDOT and railroads and submit such forms to the City. City shall be responsible for forwarding the forms to the affected agencies for execution. 2. Monthly Progress Report and Presentations a. The ENGINEER shall submit a project schedule after the design contract is fully executed. The schedule shall be updated and submitted to the CITY along with monthly progress reports as required under Attachment B of the contract. b. The ENGINEER shall prepare short project status updates on a bi-weekly and/or as needed basis. The project status updates will be emailed or faxed to a list of project stakeholders identified by the City. The City will provide the ENGINEER with the list of project stakeholders and addresses. c. ENGINEER will prepare exhibits and present project goals and construction to interested customers (Downtown Fort Worth Inc., Developers, Property Owners, Property Managers, etc.). The exhibits and presentation will be reviewed and approved by the City prior to the presentation. PART B- CONSTRUCTION PLANS AND SPECIFICATIONS Conceptual Engineering i. Surveys for Design a. ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, and other features relevant to the final plan sheets. For sewer lines located in alleys or backyards, ENGINEER will obtain the following: Obtain permission for surveying through private property. Locate horizontal and vertical alignment of utility lines. Tie improvements, trees, fences, walls, etc., horizontally along real house corners and building corners in backyards. Profile existing water line centerline. Compile base plan from field survey data at 1"-20' scale. Obtain permission for surveying through private property. Locate horizontal and vertical alignment of utility lines. The improvements, trees, fences, walls, etc., horizontally along rear lot lines in an approximately 20' wide strip. In addition, locate all rear house corners and building corners in backyards. Compile base plan from field survey data at 1"=20' horizontal and 1"=2' vertical scale. EA 1-2 b. ENGINEER Will Provide The Following Information: All plans, field notes, plats, maps, legal descriptions, or other specified documents prepared in conjunction with the requested services shall be provided in a digital format compatible with the electronic data collection and computer aided design and drafting software currently in use by the Department of Engineering. All text data such as plan and profile, legal description, coordinate files, cut sheets, etc., shall be provided in the American Standard Code for Information Interchange (ASCII) format, and all drawing files shall be provided in AutoCAD (DWG or DXF) format (currently Release 12), or as otherwise approved in writing by the CITY, and all data collected and generated during the course of .the project shall become the property of the CITY. The minimum survey information to be provided on the plans shall include the following: A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally on a scale of not less than 1:400: 2. The following information about each Control Point; a. Identified (Existing. City Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and referred bearing base. Z coordinate on City Datum only. c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). 3. Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control. 4. No less than two horizontal control points, per line or location. 5. Bearings given on all proposed centerlines, or baselines. 6. Station equations relating utilities to paving, when appropriate. iii. Public Notiiication Prior to conducting design survey, NGINEER will notify affected residents of the project in writing if neces ary to access private property. The notification letter shall be on com any letterhead and shall include the following: project name limits DOE p►-oject No., Consultant's Project Manager and phone no., scope of survey worli and design survey schedule. The letter will be reviewed and approved by tl�e City prior to distribution. EA1-3 i m iv. Conceptual Engineering Plan Submittal a. Conceptual plans for the fast track project shall be submitted to City 45 days after Notice to Proceed Letter is issued. Remainder conceptual plans shall be submitted to City 70 days after Notice to Proceed Letter is issued. b. The ENGINEER shall perform conceptual design of the proposed improvements and furnish four (4) copies of the concept engineering plans that include layouts, preliminary right-of-way needs and cost estimates for the ENGINEER's recommended plan. ENGINEER shall perform remaining field surveys required for final design of selected route(s). The ENGINEER shall also evaluate the phasing of the water, sanitary sewer, street and drainage work, and shall submit such evaluation in writing to the City as a part of the concept phase of the project. All design shall be in conformance with Fort Worth Water Department policy and procedure for processing water and sewer design. ENGINEER shall review the City's water and sewer master plan and provide a summary of findings pertaining to the proposed project. 2. Preliminary Engineering Upon approval of Part B, Paragraph iv ENGINEER will prepare construction plans as follows: a. Overall water and/or sanitary sewer layout sheets and an overall easement layout sheet(s). b. Preliminary project plans and profile sheets which will show the following: Proposed water and/or sanitary sewer planlprofile and recommended pipe size, fire hydrants, water service lines and meter boxes, gate valves, isolation valves and all pertinent information needed to construct the project. Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. c. For sewer lines, pipelines schedule for point repairs, rehabilitation and replacement will be located on the base sheets prepared from survey information gathered under Part B, Section 2. Confficts shall be resolved where pipelines are to be rehabilitated on the same line segment. Base sheets shall reference affected or adjacent streets. Where open-cut construction is anticipated, below and above ground utilities will be located and shown on the base sheets. d. Existing utilities and utility easements will be shown on the roadway plan and profile sheets. Engineer will coordinate with utility companies and the City of Fort Worth to ascertain what, if any, future improvements are planned that may impact the project. EA1-4 m e. The ENGINEER shall make provisions for reconnecting all water and/or wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are �connected to the existing main and connect said service lines to the relocated main. f. The ENGINEER will prepare standard and special detail sheets for water line installation and sewer rehabilitation or replacement that are not already included in the D-Section of the City's specifications. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. g. Right-of-Way Research The ENGINEER will conduct preliminary research for availability of existing easements where open-cut construction or relocation of existing atignments is probable. Temporary and permanent easements will be appropriated based on available information and recommendations will be made for approval by the City. h. Right-of-waylEasement Preparation and Submittal Preparation and submittal of right-of-way, easements and rights-of- entry will be in conformance with "Submittal of Information to Real Property Division for Acquisition of Property". Utility Clearance Phase The ENGINEER will consult with the City's Water Department, Department of Engineering, and other CITY departments, public utilities, private utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities that have an impact or influence on the project. ENGINEER will design City facilities to avoid or minimize conflicts with existing utilities. The ENGINEER shall deliver a minimum of 13 sets of approved preliminary construction plans to the City's Utility Coordinator for forwarding to all utility companies, which have facilities within the limits of the project. j. Preliminary Construction Plan Submittal Preliminary construction plans and specifications for fast — EA 1-5 � track lines shall be submitted to CITY 20 days after approval o� Part B, Paragraph iv and the remaining lines will be submitted 30 days after approval of remaining lines. ii. The ENGINEER shall deliver two (2) sets of preliminary construction plans and two (2) specifications to CITY for review. Generally, plan sheets shall be organized as follows: Cover sheet Easement layout (if applicable) Plan & Profile Sheets Standard Construction Details Special Details (If applicable) iii. Preliminary Estimate shall submit a preliminary estimate of probable construction cost with the preliminary plans submitted. Engineer shall assist City in selecting the feasible and or economical solutions to be pursued. k. Review Meetings with City The ENGINEER shall meet with CITY to discuss review comments for preliminary submittal. The CITY shall direct the ENGINEER in writing to proceed with Final Design for Final Review. � Developer Meetings After the preliminary plans have been reviewed and approved by the City, ENGINEER shall prepare exhibits along with an invitation letter and attend meeting with to help explain the proposed project to developers, property owners and Downtown Fort Worth Inc. The CITY shall mail the invitation letter. 3. Final Engineering Plan Submittal a. Final construction documents shall be submitted to CITY 20 days for fast-tack plans and 30 days for standard plans after receipt of written notice to proceed with Final Design in Part B, Section 2, Paragraph k. Following CITY approval of the recommended improvements, the ENGINEER shall prepare final plans and specifications and contract documents to CITY (each sheet shall be stamped, dated, and signed by the ENGINEER) and submit two (2) sets of plans and construction contract documents within 15 days of CITY's final approval. Plan sets shall be used for Part C activities. b. ENGINEER's Estimate of Probable Construction Cost The ENGINEER shall submit a final estimate of probable construction cost with the final plans submitted. EA 1-6 PART C PRE-CONSTRUCTION ASSISTANCE Administration a. Deliver Bid Documents The ENGINEER will make available for bidding, upon request by the CITY, up to forty (40) sets for each contract of the final approved and dated plans and specifications and contract documents for the projects to the CITY for distribution to potential bidders. Proposal will be provided in electronic format. b. Bidding Assistance The ENGINEER shall assist the CITY during phase including preparation and delivery of addenda to, responses to questions submitted to the DOE by prospective bidders. Engineer shall attend the scheduled pre-bid conference. The ENGINEER shall assist in reviewing the bids for completeness and accuracy. The ENGINEER shall attend the project bid opening(s) develop bid tabulations in hard copy and electronic format and submit four (4) copies of the bid tabulation. c. Assistance During Construction The ENGINEER shall attend the pre-construction conference for the project. The ENGINEER shall also consult with and advise the CITY on design and/or construction changes, up to a maximum of 40 man- hours. PHASE 2— CONSTRUCTION ADMINISTRATION SERViCES: SANITARY SEWER IMPROVEMENTS FOR PROJECT A ONLY (SEE EXHIBIT B-S) Upon receipt of notice to proceed, the ENGINEER will perform the following tasks: Part A - Project Administration Engineer will perform project administration services during the construction phase of the project. By performing these services, Engineer shall not have authority or responsibility to supervise, direct, or control the Contractor's work or the Contractor's means, methods, techniques, sequences, or procedures of construction. Engineer shall not have authority or responsibility for safety precautions and programs incident to the Contractor's work or for any failure of the Con- tractor to comply with laws, regulations, rules, ordinances, codes, or orders applicable to the Contractor furnishing and performing the work. Specific services to be performed by Engineer are as follows: 1. Interpret construction contract documents when requested by Owner or the Contractor. EA1-7 2. Upon substantial completion, inspect the construction work and prepare a punch-list of the items to be completed or corrected before final completion of the project. Submit results of the inspection to Owner and the Contractor. 3. Upon completion or correction of the items of work on the punch-list, conduct a final inspection to determine if the work is completed. Provide written recommendations conceming final payment to Contractor, including a list of items, if any, to be completed prior to making such payment. Part B— Resident Services During Construction Engineer will fumish a part-time Resident Project Representative on the work. The Resident Project Representative will observe the Contractor's work and perform the services listed below. The Resident Project Representative shall not have responsibility for the superintendence of construction site conditions, safety, safe practices or unsafe practices or conditions, operation, equipment, or personnel other than employees of the Engineer. This service will in no way relieve the Contractor of complete supervision and inspection of the work or the Contractor's obligation for complete compliance with the drawings and specifications. The Contractor shall have sole responsibility for safety and for maintaining safe practices and avoiding unsafe practices or con- ditions. Specific services performed by the Resident Project Representative are as follows: 1. Conduct onsite obsenrations of the general progress of the work to determine if the work is proceeding in accordance with the construction contract documents. 2. Observe pertinent site conditions when Contractor maintains that differing subsurface and physical conditions have been encountered, and document actual site conditions. Review and analysis of Contractor claims for differing subsurface and physical conditions are supplemental services. 3. Visually inspect materials, equipment, and supplies delivered to the worksite. Reject materials, equipment, and supplies that do not conforrn to the construction contract documents. 4. Provide periodic progress updates to Owner when necessary, to review and discuss construction procedures and progress scheduling, engineering management procedures, and other matters conceming the project. PHASE 3— WASTEWATER FLOW ANALYSIS SERVICES: SANITARY SEWER IMPROVEMENTS Engineer will prepare an opinion of anticipated wastewater flow rates for the proposed sanitary sewer improvement lines. PART A — Investigations 1. Compile a list of addresses and locations being served by each line, including locations upstream of the lines being designed. 2. Obtain current water use records for each location and determine maximum month water usage. EA 1-8 s 3. Identify undeveloped property and contact Fort Wortfi Planning Department to determine if development is being planned for properly. If development is not pianned, determine property zoning. 4. If necessary contact property owners and inquire regarding development plans and dates. PART 6 — Wastewater Flow 1. Compare current water usage with TNRCC wastewater flow rate standards and determine probable wastewater flow rates. 2. Compile table of current wastewater flow rates and predict future wastewater flow rates for full development of property. 3. Prepare table of anticipated wastewater flow rates and compare existing pipe capacity and recommend pipe sizes. 4. Prepare Engineering Letter Report of wastewater flow analysis, assumptions and recommendations. PART C — Field Investigations 1. Examine flow in existing manholes, review television tapes and dye water testing, recommend additional field investigations, inspect existing plumbing plans and connections at buildings. It is not anticipated that wastewater flow metering will be necessary. If wastewater flow metering is needed to verify current flows and measure infiltration/inflow, the costs for these investigations will be negotiated and agreed prior to the commencement of field investigations. Costs for this additional work will be an amendment to the contract. PHASE 4— CONSTRUCTION MANAGEMENT SERVICES: SANITARY SEWER IMPROVEMENTS PHASE 4 SER vICES ARE NOT INCL UDED IN THIS CONTRACT AND ARE CONSIDERED ADDITIONAL SERVICES THAT MUST BE NECOTIATEv AND APPROVED BY THE CITY THROUGH CONTRACT AMENI)MENT OR .SEPARATE CONTRACT PRIOR TO THE COMMENCEMENT OF ANY yVORK. Upon receipt of notice to proceed, the ENGINEER will perform the following tasks: PART A - Project Administration Engineer will perform project administration services during the construction phase of the project. By performing these services, Engineer shall not have authority or responsibility to supervise, direct, or control the Contractor's work or the Contractor's means, methods, techniques, sequences, or procedures of construction. Engineer shall not have authority or responsibility for safety precautions and programs incident to the Contractor's work or for any failure of the Con- tractor to comply with laws, regulations, rules, ordinances, codes, or orders applicable to the Contractor fumishing and performing the work. Specific services to be performed by Engineer are as follows: EA1-9 1. Review the Contractor's insurance certificates and forward the certificates to the Owne� for acceptance by the Owner's legal counsel. Engineer's review of the insurance cettificates is only for the purpose of determining if the Contractor maintains the general types and amounts of insurance required by the contract documents, and is not a legal review to determine if the Contractor's insurance coverage complies with all applicable requirements. i 2. At a date and time acceptable to the Owner, conduct a pre-construction conference. Engineer shall prepare an agenda for the conference, and prepare and distribute minutes. 3. Review and comment on the Contractor's initial and updated construction schedule and advise Owner as to acceptability. 4. Review the Contractors initial and updated scl�edule of estimated monthly payments and advise Owner as to acceptability. , Make periodic visits to the construction site to observe progress of the work, and consult with Owner and the Contractor conceming problems and/or progress of the work. These services are separate from any resident engirieering services that may be provided. A total of 10 visits to the site are anticipated du�ing the construction period. 2. Engineer will review the shop drawings and specifications for the manufactures. 3. Review drawings and other data submitte� by the Contractor as required by the construction contract documents. Engineers review shall be for general conformity to the construction contract documents and shall not relieve the Contractor of any of his contractual responsibilities. Such reviews shall not extend to means, methods, techniques, sequences, or procedures of construction, or to safety precautions and programs incident thereto. 4. Receive and review guarantees, bonds, insurance, and certificates of inspection, and tests and approvals that are to be assembled by the Contractor in accordance with the construction contract documents, and transmit them to Owner. 5. Interpret construction contract documents when requested by Owner or the Contractor. 6. Review and process the Contractor's monthly payment requests, and forward to Owner. Engineer's review shall be for the purpose of making a full independent mathematical check of the Contractors payment request. Engineer is responsible for verifying the quantities of work which are the basis of the payment requests. 7. Provide documentation and administer the processing of change orders, including applications for extension of construction time. Evaluate the cost and scheduling aspects of all change orders and, where necessary, negotiate with the Contractor to obtain a fair price for the work. Said negotiation shall be subject to the approval of Owner. Work related to unusually complex or unusually numerous claims is not included in this contract. EA1-10 8. Upon completion of the project, revise the construction contract drawings to conform to the construction records. Submit one mylar copy. 9. Act on claims of Owner and the Contractor relating to the acceptability of the work or the interpretation of the requirements of the construction contract documents. 10. Analyze data from testing by the Contractor or supplier when the construction contract documents require testing. Submit conclusions to Owner. . 11. Upon substantial completion, inspect the construction work and prepare a punch-list of the items to be completed or corrected before final completion of the project. Submit results of the inspection to Owner and the Contractor. 12. Upon completion or correction of the items of work on the punch-list, conduct a final inspection to determine if the work is completed. Provide written recommendations conceming final payment to Contractor, including a list of items, if any, to be completed prior to making such payment. PART B- RESIDENT SERVICES DURING CONSTRUCTION Engineer will fumish a part-time Residerit Project Representative on the work. The Resident Project Representative will observe the Contractor's work and perform the services listed below. The Resident Project Representative shall not have responsibility for the superintendence of construction site conditions, safety, safe practices or unsafe practices or conditions, operation, equipment, or personnel other than employees of the Engineer. This service will in no way relieve the Contractor of complete supervision and inspection of the work or the Contractor's obligation for complete compfiance with the drawings and specifications. The Contractor shall have sole responsibility for safety and for maintaining safe practices and avoiding unsafe practices or conditions. Specific services performed by the Resident Project Representative are as follows: A. Site Observations and Liaison with Owner and Contractor(s) 1. Conduct onsite observations of the general progress of the work to assist Engineer in determining if the work is proceeding in accordance with the construction contract documents. 2. Serve as Engineer's liaison with Contractor, working principally through Contractor's superintendent, and assist Engineer in providing interpretation of the construction contract documents. Transmit Engineer's clarifications and interpretations of the construction contract documents to Contractor. 3. As requested by Engineer, assist in obtaining from Owner additional details or information when required at the jobsite for proper execution of the work. 4. Report to Engineer, giving opinions and suggestions based on the Resident Project Representative's observations regarding defects or deficiencies in the Contractor's work and relating to compliance with drawings, specifications, and design concepts. 5. Monitor changes of apparent integrity of the site (such as differing subsurface and physical conditions, existing structures, and site-related utilities when such utilities are exposed) resulting from construction-related activities. EA1-11 � 6. Observe pertinent site conditions when Contractor maintains that differing subsurface and physical conditions have been encountered, and document actual site conditivns. Review and analysis of Contractor claims for differing subsurtace and physical conditions are supplemental services. 7. Establish and fumish Contractor with necessary baselines and control points that will be used as datum for the work. The Contractor will do actual construction staking. 8. Visually inspect materials, equipment, and supplies delivered to the worksite. Reject materials, equipment, and supplies that do not conform to the construction contract documents. 9. Coordinate onsite materials testing services during construction. Copies of testing results will be forwarded to Owner for review and information. 10. Observe field tests of equipment, controls, structures, and piping, and review the resulting reports, commenting to Engineer, as appropriate. B. Meetings, Reports, and Document Review and Maintenance Explain administrative procedures that will be followed during construction. 2. Schedule and attend periodic progress meetings, and other meetings with Owner and the Contractor when necessary, to review and discuss constnaction procedures and progress scheduling, engineering management procedures, and other matters conceming the project. 3. Report to Engineer regarding work which is known to be defective, or which fails any required inspections, tests, or approvals, or has been damaged prior to final payment; and advise Engineer whether the work should be corrected or rejected or should be uncovered for observation, or requires special testing, inspection, or approval. 4. Review applications for payment with Contractor for compfiance with the established . procedure for their submission, and forward them with recommendations to Engineer, noting particularly their relation to the schedule of values, work completed, and materials and equipment delivered at the site, but not incorporated into the work. 5. Maintain a marked set of drawings and specifications at the jobsite based on data provided by the Contractor. This information will be combined with information from the record documents maintained by the Contractor, and a master set of documents conforming to construction records will be produced. 6. Review certificates of inspections, tests, and related approvals submitted by the Contractor as required by laws, rules, regulations, ordinances, codes, orders, or the Contract Documents (but only to determine that their content complies with the require- ments of, and the results certified indicate compliance with, the construction contract documents). This senrice is limited to a review of items submitted by the Contractor and does not extend to a determination of whether the Contractor has complied with all legal requirements. EA1-12 ' •e 7. Maintain a daily diary or log book of events at the jobsite, including the following information: a. Days the Contractor worked on the jobsite. b. Contractor and subcontractor personnel on jobsite. c. Construction equipment on the jobsite. d. Observed delays and causes. e. Weather conditions. f. Data relative to claims of extras or deductions. g. Daily activities. . h. Observations pertaining to the progress of the work. i. Materials received on jobsite. c. Assistance in Certification of Substantial Completion 1. Before Engineer issues a Certificate of Substantial Completion, submit to Contractor a list of observed items requiring completion or correction. - 2. Assist Engineer in conducting final inspection in the company of Owner and Contractor, and prepare a final list of items to be completed or coRected. 3. Verify that all items on the final list have been completed or corrected and make recommendations to Engineer conceming acceptance. EA1-13 m ATTACHMENT "B" COMPENSATION AND SCHEDULE SANITARY SEWER MAINS D104D, D105, D105A, D109, L23 AND L108 REHABILITATiON PROJECT NUMBER: PS46-070460170200 I. Compensation A. The ENGINEER shall be compensated a total lump sum fee of $ 181,320 as summarized in Exhibit "B-3B". Payment of the total lump sum fee shall be considered full compensation for the services described in Exhibit "A-1" for all labor materials, supplies and equipment necessary to complete the project. B. The Engineer shall be paid in eight partial payments as described in Exhibit "B-1" upon receipt of eight individual invoices from the Engineer. In this regard, the Engineer shall submit invoices for eight partial payments as described in Exhibit "B- 1", Seciton 1— Method of Payment. II. Schedule See Attachment D for Schedule. B-1 � EXHIBIT "B-1" (SUPPLEMENT TO EXHIBlT B) METHOD OF PAYMENT SANITARY SEWER MAINS D104D, D105, D105A, D109, L23 AND L108 REHABILITATlON PROJECT NUMBER: PS46-070460170200 I. Method of Payment The ENGINEER shall be paid in a total of eight partial payments, as outlined below, upon the receipt of eight (8) partial pay request from the ENGINEER. Partial Payment invoices may be billed as completed and not in the particular order as listed below. Partial Payment Number 1, which shall be equivalent to 20% of the total lump sum fee, shall be payable after City FAST TRACK Conceptual Engineering Plan Submittal. Partial Payment Number 2, which shall be equivalent to 10% of the lump sum fee, shall be payable after City approval of FAST TRACK Preliminary Construction Plan Submittal. Partial Payment Number 3, which shall be equivalent to 5% of the lump sum fee, shall be payable after City approval of FAST TRACK Final Engineering Plan submittal. Partial Payment Number 4, which shall be equivalent to 5% of the lump sum fee, shall be payable after FAST TRACK Pre-construction Meetings for the Project have been conducted. Partial Payment Number 5, which shall be equivalent to 20% of the total lump sum fee, shall be payable after City approval of, Conceptual Engineering Plan Submittal. Partial Payment Number 6, which shall be equivalent to 20% of the total lump sum fee, shall be payable after City approval, Preliminary Construction Plan Submittal. Partial Payment Number 7, which shall be equivalent to 10% of the total lump sum fee, shall be payable after City approval of Final Engineering Plan. Partial Payment Number 8, which shall represent the balance of earnings, less previous payments, shall be payable after Pre-construction Meetings for the Project have been conducted. II. Progress Report A. The ENGINEER shall submit to the designated representative of the Director of the Engineering Department monthly progress reports covering all phases of design by the 15`h of every month in the format required by the CITY. The ENGINEER will also provide bi-weekly or as needed project update notes by email or facsimile to a list of project stakeholders provided by the CITY. B. If the ENGINEER determines in the course of making design drawings and specifications that the opinion of probable cost of $ 2,018,610.00 (as estimated in Exhibit "B-5") will be exceeded, whether by change in the scope of the project, increased cost or other conditions, the ENGINEER shall immediately report such fact to the City's Director of Engineering Department. EB3-2 EXHIBIT "B-2" (SUPPLEMENT TO ATTACHMENT "B") HOURLY RATE SCHEDULE SANITARY SEWER MAINS D104D, D105, D1Q5A, D109, L23 AND L108 REHABILITATION PROJECT NUMBER: PS46-070460170200 Title Familv/Level Principal Senior Project Manager Engr/08, 07 � Project Manager, Senior Project Engineer Engr/06, 05 Lead/Project Engineer Engr/04 Design Engineer Engr/03 Associate Engineer Engr/01, 02 Technical Specialisi Spec/07 Spec/06 Spec/05 Spec/04 Spec/03 Sp�c/02, 09 Engineering Technician Tech/08 Tech/07 Tech/06 Tech/05 Tech/04 Drafter Graphics/08 Graphics/07 Graphics/06 Graphics/05 Graphics/04, 03 Graphics/02, 01 Support Services O�ce Services/All Fees Rate/Hour $ 150.00 935.00 920.00 905.00 80.00 70.00 925.00 195.00 910.00 85. 00 75.00 65.00 95.00 80.00 70.00 60.00 50.00 90.00 80.00 70.00 60.00 50. 00 40.00 49.00 E63-3 4 ,y EXHIBIT "B-3A" � SUMMARY OF TOTAL PROJECT FEES SANITARY SEWER MAINS D104D, D105, D105A, D109, L23 AND L9Q8 REHABILITATION PROJECT NUMBER: PS46-070460170200 PHASE Exhibit Sco�e of Services Fee M/WBE % :�►i.erini�ia�i.si,�o�isioi.simioieri.evwiesi.+rtie.isiwreri.a,ucra�iwi .a�i.rri.riotcwr.r,�r�::++i.rri�tz:a-,«...�...._,�...a,..,.,;..,:....,,,. ..... ,�....,�rs•,.^�wio�r:.ri,oic�ap..r.v..�:'.�ri.r�:s;�^•rsi�.ac:+s�i�vr.ri.a�i.siri.rari 1 Field Surveying $ 16,090 $ 16,090 100% 3 Wastewater Flow Analysis $ 10,000 $ 10,000 100% 1 Engineering / Drafting $ 129,510 $ 5,500 4.2% 1 Secretarial Services $ 129,510 $ 3,500 2.7% 1 Printing Services $ 7.880 $ 7,000 89% TOTAL $163,480 $ 45,390 27.8% Proposed M/WBE Sub-Consultants Services Fees % of Total Fee raruiw.ri.,..�.:_.»:....�....siiwiasao�i.r:oi.ririoi.+i.rioi.rirrieria�in.ur:a-r�u:rrawu.���.:u.,,�.....r«eri.••.t•••-,••,,,., i�--c•w,.,_•,-.•,T.._.,.r.o•. _.•-__,..;r, i^a�..;,r.:rs:a.niririr:rsioi Gorrondona & Associates, Inc. Surveying , $ 16,090 8.9% K. E. McDonald & Assoc., Inc. Engineering & $ 15,500 Drafting Secretarial $ 6,000 Printing 7 800 $ 45,390 8.5% Accuracy Plus Hugo C. Trevino & Assoc., Inc. TOTAL E63-4 3.3% 4.3% 25% � EXHIBiT "B-3B" FEE SUMMARY SANITARY SEWER MAINS D104D, D105, D105A, D109, L23 AND L108 REHABILITATION PROJECT NUMBER: PS46-070460170200 (FEE BASED ON PRECENTAGE OF CONSTRUCTION COST) ii,e►i.arfrfm�/s/e'imisi i...�.isiu.iwi.wr.9///i0'/A/�l7I.:+NT/R/?/.,..rrri.�i�ra..n.iJ/6,MA!'//iY.A/.4?',4:/.T':R'/a'�/.p/1!:'P.!�: �//V/':!P/s/.qsY'/?/.1�qP/e'GIDYa�/e�'/A'//�/.t�:P":T%"l%t'/r1'.�%.#YO/iiYE.":A'/.P/f�:'lfJ":'!'/r� *****���FAST TRACK SEWER REHABILITATION (A,B,C & D)**** OPINION OF PROBABLE CONSTRUCTION COSTS = CURVE A�Z� (8.6% x 0.85 x$501,610 =$ 36,668 '`*'`**�'�SEWER TUNNEL IMPROVEMENTS (E & F)**** OPINION OF PROBABLE CONSTRUCTION COSTS = CURVE A�2� (7.2% x 0.85 x$1,517,000 =$ 92,840 ENGINEERING DESIGN FAST TRACK ENGINEERING DESIGN DESIGN SURVEY CONSTRUCTION MGMT (PHASE 2) WASTEWATER FLOW ANALYSIS REPRODUCTION ADDITIONAL SERVICES ASSISTANCE DURING CONSTRUCTION FEE 10% FOR SUB (10% x $45,390) TOTAL FEE $501,610 $1,517,000 $ 36,670 $ 92,840 $ 16,090 $ 2,800 $10, 000 $ 7,880 $ 6,500 $ 4.000 $ 176,780 $ 4.540 $181,320 siQ:mi.sioimisi.i!�wi�'i.�vei�ivicia^:oi.ri.rrs�reri.ciwimiwri.r rwi.aviarwi.r,«..,....,,...�...,.�...:...,�... �.. ,,..,..... ..����... .........: ..... �.-,.. ..�,.�►. -.r,•s:.�r.r.fo-ia•:zm:n::c,.ev.c*i,ri•-ar;:�:a�qsi.�sisi.�.eri.n:�r.sr..ca�r.u- �'�Project will be designed in two separate bid packages with separate review submittals and utitity clearance submittals. ��Curve A is used and not Curve B, which is for less complicated assignments. The existing sewers being rehabilitated and relocated are within in the Central Business District of Fort Worth. The design must account for maintaining existing flows and tra�c. The cost estimates in Exhibit B-5 include tunneling, and other pipeline rehabilitation methods. EB3-5 m EXHIBIT "B-3C" SUMMARY FOR SURVEY FEE, REPRODUCTION FEE AND ADDITIONAL SERVICES FEE FOR: SANITARY SEWER MAINS D104D, D105, D105A, D109, L23 AND L108 REHABILITATION PROJECT NUMBER: PS46-070460170200 DESIGN SURVEY FEE (By Gorrondona) (5,109 LF x $ 3.15/LF) CONSTRUCTION MANAGEMENT (PHASE 2 Only) (For Project A only) Field inspection nights, construction Administration, Traffic Permit WASTEWATER FLOW ANALYSIS (PHASE 3) REPRODUCTION FEE Preliminary 10 sets @ $40 Utility Clearance 26 Sets @ $40 Final Plans 10 sets @ $40 Bid Plans 80 sets @ $40 Mylar Plans $200 Specifications 80 Sets @ $30 ADDITIONAL SERVICES FEE Meetings / Coordination (Developers, Downtown Fort Worth Inc., Property Owners, etc.), Mounted Exhibits, Pre Bid Conference Bid Opening & Review — two separate Projects. ASSISTANCE DURING CONSTRUCTION Consult and advise on design and/or Construction changes. TOTAL = $ 16,090 TOTAL = $ 2,800 TOTAL = $ 10,000 TOTAL = $ 7,880 TOTAL = $ 6,500 TOTAL = $ 4,000 E63-6 { �y EXHIBlT "B-3D" SANITARY SEWER MAINS D104D, D105, D105A, D109, L23 AND L108 REHABILITATION PROJECT NUMBER: PS46-070460'i70200 BREAKDOWN FOR CONSTRUCTION MANAGEMENT FEE FOR PHASE 3, PROJECT A ONLY Acquire Street Closure Permit 2 hrs Field Inspection 6 days 4 hrs/day 24 hrs Meetings with City / Coordination 4 hrs TOTAL 30 hrs 30 hrs x$30/hr x 3.0 multiplier = $2,700 Expenses = 100 TOTAL $2,800 BREAKDOWN FOR WASTEWATER FLOW ANALYSIS (PHASE 3) Research: land use, water use, proposed development, zoning, interview property owners 40 hrs x $100/hr $ 4,000 Wastewater Flow Projections (Report, presentation, revise report) 24 hrs x $100/hr $ 2,400 Field Investigations 24 hrs x $150/hr $ 3.600 TOTAL $10,000 BREAKDOWN FOR ADDITIONAL SERVICES Meeting / Coordination (Developers, Downtown Fort Worth Inc.,Property Owners, etc.), 20 hrs x $100/hr $2,000 Mounted Exhibits Drafting & Printing $2,500 Two Pre Bid Conferences, Bid Openings & Reviews 20 hrs x$ 100/hr 2 000 TOTAL $6,500 BREAKDOWN FOR ASSISTANCE DURING CONSTRUCTION PHASE 1, PART B, 3.,c. 40 hrs Total x$ 100/hr $4,000 � EB3-7 � �� EXHIBIT "B-4" SUMMARY OF OPINION OF PROBABLE CONSTRUCTION COST SANITARY SEWER MAINS D104D, D105, D105A, D109, L23 AND L108 REHABILITATION PROJECT NUMBER: PS46-070460170200 A. Manhole to Connect M-D105B with L-25 B. M-D104D (D.S. L-29) 0+00 to 3+23E C. L-23 0+00 to 4+60E �• L-108 2+73 to 7+18E E• M-D105A (D.S. L-23) 0+00 to 3+16.8 M-D105 (D.S. L-7) 0+00 to 4+25 &(D.S. L-22) 0+00 to 1+43 F• M-D109 (D.S. L-11) 0+00 to 4+05 (Abandon & Reroute) M-D109 (D.S. L-11) 4+05 to 9+82 &(D.S. L-21) 0+00 to 1+69E 8� (D.S. L-21R) 0+00 to 2+84 M-D1096 (D.S. L-11} 9+82 to 14+28E $ 22, 850 $ 97, 360 GRAND TOTAL SANITARY SEWER IMPROVEMENTS $ 260,650 $ 120,750 $ 306,500 $ 1,210 500 $ 2,018,610 EB4-1 � EXHIBIT "B-5" OPINION OF SANITARY SEWER REHABILITATION CONSTRUCTION COST FOR FAST-TRACK PROJECTS A. MANHOLE TO CONNECT M-D1056 WITH L-25 Item I � I I En,9jneer's Opinion of Probable Cost l No. Quantitv Unit Descriotion of Item II Unit Cost I Total I 1 1 EA 5' Internal Drop Sanitary Sewer Manhole $2,500.00 $2,500 � 2 11 VF Extra Depth Manhole � $250.00 $2,750 I 3 1 LS Labor, Excavation, Barricades � $14,812.00 $14,812 � 4 1 LS Flowable backfill around Manhole �I $2,787.50 $2,788 I Above costs from actual amount charged by Circle C to perform the work TOTAL B. M-D104D (D.S. L-2910+00 to 3+23E (Throckmorton Street, 5th to 4th1 Item I No. Quantitv �• Unit Description of item II 1" �73 LF 8-inchcure-in-placeliner I 2• 50 LF Liner Piate Tunnel (to correct reverse grades) 3 1 LS WorkinQ Shafts � 4' 2 EA Service Reconnections � 5• 3 � EA Sanitary Sewer Manhole �I 6 36 I LF I Extra Depth Manhole �� 7' 3 � EA IConc. Coilar & MH Insert �� 8 I 50 I LF IAsphalt Pavement Re�air �I 9• i 1 I LS ITraffic Control(subsidiary� �� 10 I 1 I LS IRedundant Bypass Pumpinp II TOTAL C. L-23 0+00 to 4+60E (AlleV between Main 8 Houston; from 7th to 5th� Item I I � No. QuantiN Unit Descrintion of Item � 1' 2' 3 4' 5* 6 7 8' s 460 50 5 3 3 100 20 1 1 LF LF EA EA EA LF LF LS LS 8-inch PVC Liner Plate Tunnelinq (building & garape) 8-inch PVC bV Open Cut Service Reconnections Sanitary Sewer Manhole Conc. Collar & MH Insert Asphalt Pavement Repair Concrete Pavement Repair - Alley Traffic Control (subsidiary) BVpass Pumpinp SUB TOTAL $22,850 Enqineer's Opinion of Probable Cost 1 Unit Cost � Total , a7o.8o $1�,,,0 � $500.00 $25,000 $20,000.00 $20,000 � $1,000.00 $2,000 � $2,000.00 $6,000 $500.001 $18,000 5250.00 � $750 $30.001 $1,500 30.00 I $0 � $5,000.001 $5,0001 $9�,36� J En qineer's Opinion of Probable Cost Unit Cost I Total a500.00 $230,Od6 5200.00 $10,000 $1,000.00 $5,000 a2,000.00 $s,000 5250.00 $750 $30.001 $3,000 $45.001 $900 ao.00 I �o $5,000.001 $5,000 $260,650 D. L-108 2+73 to 7+18E (Alle� between Houston � Throc�morton; from 9th to 8th) Item No. i' 2` 3• 4` 5 6 7 8` s QuantiN 2�5 150 3 3 6 70 50 1 � Unit LF LF EA EA EA LF LF LS LS Descrintion of Item 6- 8-inch HDPE Pipe Enlargement 8-inch PVC Liner Plate Tunnelinq (parkinA �laraqe) Sanita Sewer Manhole Conc. �ollar & MH Insert Service Reconnections Asphalt Pavement Reaair Concrete Pavement Re�air Traffic Control (subsidiary) Bypass Pumpinq SUB TOTAL ' Unit Costs provided by City of Fort Worth En q_ ineer's Opinion of Probable Cost I Unit Cost Total � S�o.00 I $2o,s�d j 5500.00 $75,000 � 52,000.00 $6,0001 5250.00 $750 $1,500.00 $9,000 $30.00 $2,100 $45.001 $2,250 ao.00 I $o $5,000.001 $5,000 $120,750 EBS-1 EXHlBIT "B-5" OPINION OF SANITARY SEWER REHABILITATION CONSTRUCTION COST E. M-D105A (D.S. L-23) 0+00 to 3+16.8 M-D105; (D.S. L-7) 0+00 to 4+25 &(D.S. L-22) 0+00 to 1+43 Item No. Quantitv Unit Description of Item I 1* 2* 3 4" 5* 6 7• 8* � 9 � 10` � 11 12 � 13 � 815 70 4 5 5 1 40 7 100 1 1 10 1 LF LF EA� EA EA EA LF LF LF LS EA LF LS 8-10 inch Pipeline Enlar�ement 10-inch PVC by Liner Plate Tunnelinq Workinq Shafts Service Reconnections Sanitary Sewer Manholes �Special Sanitary Sewer Manhole �Extra Depth Manhole IConc. Collar & MH Insert �Asphalt Pavement Repair �Traffic Control (subsidiary) �Remove Exist Square Shallow Manhole (L-25) 110-inch Ductile Iron Sanitary Sewer (L-25) �Bypass Pumpinq SUB TOTAL $306, 500 F. M-D109 (D.S. L-11) 0+00 to 4+05 (ABANDON AND REROUTE) M-D109; (D.S. L-11) 4+05 to 9+g2 &(D.S. L-21) 0+00 to 1+69E &(D.S. L-21R) 0+00 to 2+84 M-D109B (D.S. L-11 � 9+82 to 14+28E Item No. 1• 2* 3 4 5 6 7 8• 9* 10* 11 12" 13 Quantitv 1, 030 950 1, 050 7 5 4 1 12 � 100 � 12 I 250 � 1 � 1 � Unit I Descrjption of Item �� LF 8-10 inch Pipeline Enlarqement � LF 8-inch Cured-In-Place-Liner � LF New Sanitary Sewer Tunnel � EA Workin,q Shafts � EA Service Reconnections on CIP � EA IService Reconnections (9th from DSL-9 & L849)�� LS �Abandon DSL-9,& L-849 in 9th; Reconnect � EA ISanitary Sewer Manholes �� LF IExtra Depth Manhole LF �Conc. Collar & MH Insert �� LF �Asphalt Pavement Repair �� LS ITraffic Control (subsidiary) �� LS IBypass Pumpinp �� SUB TOTAL * Unit Costs provided by City of Fort Worth Engineer's Opinion of Probable Cost Unit Cost � Total 5150.00 � �� $122,250 $500.00 $35,000 $20� 000.00 $80,000 55,000.00 $25,000 a2,800.00 � $14,000 $10,000.00' $10,000 a300.00 � $12,000 $250.00 � $1,750 $30.001 $3,000 �0.00 I $0 $2,000.00 � $2,000 $150.00 � $1,500 $15,000.00 � $15,000 Engineer's Opinion of Probable Cost Unit Cost � Total a 150.00 570.00 $700.00 $20, 000.00 $1, 000.00 $5, 000:00 $35,000.00 az,000.00 S200.00 E250.00 $30.00 ao.00 $15, 000.00 $154, 500 $66, 500 $735, 000 $140,000 $5,000 $20, 000 $35, 000 $24, 000 $20, 000 $3, 000 $7, 500 $o $15, 000 $1,210,500 EB5-2 ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT 1. Replace Article IV (k)(2)(g) with the following: "The City of Fort Worth shall agree to waive its right of recovery in favor of Engineer for damage covered under the City's coriimercial property insurance policy. Such waiver shall not be effective regarding damage sustained by the City within the policy's deductible limits. The City authorizes the Engineer to include in the construction documents the requirement that the construction contractor agrees to waive its rights of recovery in favor of the City and Engineer in the contractor's builders risk insurance policy as required by the City. All Project contractors shall be required to include CITY and ENGINEER as additional insured on their General Liability insurance policies, and shall be required to indemnify CITY and ENGINEER to the same extent. ENGINEER agrees to endorse its commercial general liability insurance policy, in a reciprocal manner to include the City of Fort Worth and specific City Project contractors categorically." ATTACHMENT D - SCHEDULE 81ack&Veatch � (817)429-7558 - SANITARY SEWER MAINS D'iO4D, D105A, D109 & LATERLS L23 & L108 Project Number: PS46-070460170200, Fort Worth, Texas " O�N�DIJ�F�M�A�M�JO�J�AIS�O�NI�IJ�F�M�A�MIJO�J�A�S ID Task Name Durat�on Start Finish Total Fioat 1 Design "Fast Track" 121d 12/01/99 05H7/00 130d '�� � v ......�.......... � ....... ....... ... ............. . ............. .. ....... ... ................... :......... . ......... .. ... ............ ........ ..... ..... 2 NoticetoProced 1d 12/01/99 12/01/99 Od .......: . .. ........ .........._.................. .......................... .. .......... .. ;. ... .. 3 Conceptual Design & Surveying 6�v 12/02/99 01/12/00 Od 4 Concept Review by City 1w 01i13/00 01/19/00 Od .......� ... ....:.... ........... ................ ............... ............ .. ...................... ..... . ........ ...... ...... . . . 5 , Preliminary Design Plans & Specs 8w 01/ZO/00 03/15/00 Od .......� . ......:.. ............. .. ....... ... ............ ...... ..�- -......... .:....... 6 Preliminary Design Review by City 1 w 03/16/00 03I22/00 Od 7 Final Design Plans & Specs 6�r 03l23/00 OSl03l00 Od ; : ' . .. .�.. .. . � .. .. ... ... .......... . . .. ...... ..... .. . . . .. ...... . :. . .. .. .. . .... . ..._. ... .. ......... .. . 8 Final Design Review by City 1 w 05/04/00 05/10i00 130d : : : I .........;-�--- .... � ... ............ . .. .... .. .... ... .. ............ .. ...........- �-- �..... ... . ......_..--- -- _... .. ........... ... 9 Incorporate Comments & Prep forAdv. 1w OSN1/00 05/17/00 130d I 10 Design 190d 12/02/99 08/25/00 Od ° � ' �✓ : ... ..... .. ............ .... ....... .... - — -- — ..... ;.. . - • .... . . . .......... . .. .......... . ....... . ........... I . ........... .. ...... .. ......... 11 Conceptuat Design & Surveying 12w 12J0?J99 02123/00 Od : ����� ' . .. .. : � : .....;. ._ . :......... ..... .. .......... ,............_........ ........ I12 Concept Review by City 2w 02/2M00 03/08/00 Od I 13 Preliminary Design Plans & Specs 12w 03/09/00 O6/01/00 Od � � ��� : : �� : 1 -. ....5.. _ ....:..... .......... .. . .......... .. . ............. ........... .. ........ ...,...... 14 PrelirT�inary Design Review by City 2w O6/02/00 06/15/00 Od - . .. .: . . . . ........... ..... .. _. .. ... . .. ........... .. .... ......... ;.... .. . ... .. .. .. .. . .. . .. .. . .. 15 Final Design Plans & Specs 6w '' 06J18/00 07/28l00 Od ` 16 Final Design Review by City 2w 07/31/00 08/11/00 Od : ` ; � ..... :.. .. ... ... . . .. .. . .. . ... ... . ... . ... .... .. . . .. . , . � 17 Incorporate Comments & Prep for Adv. 2w 08/14/00 08/25/00 Od : : ` ' ......: .... ..... . ... . ......... ... ...... ..... ...... ._........ .:..... I18 Bid - Award - Construction "Fast Track" 125d U5I18I�0 11I13I0� 130d � �� 18 Advertise for Construction 20d 05118/00 06/15/00 130d ; : I .. ..S . .. . . . ., .. . .. ... .. _.. . .. . .. . .. . .. ... ......:. . .. . ..... .. . . . _. . .. . .. . ... I 20 Award Process for Const. Contract 40d 06/16/00 08/11100 130d € � ` ...., ... . .: .. .. ........ . ............ . .. ... ,......... . ... ... I 21 Construction 12w 08/14/00 11 /O6/00 130d � : : I 22 Final lnsp. & Accept 1w 11l07/00 11/13/00 130d ; : : — — — ...... : . ....... ._ ., ........... . . ....... ............ ... ..... . ... ... ....._ :...... 23 Bid - Award - Construction 185d 08/28/00 05/17/01 Od ` �� ............ .... .----. . ... _...... . .... ..... .. ........... . .. . . .. . ,....... , .. . . 24 Advertise for Construction 20d 08/28/00 09/25/00 Od 25 Award Process for Const. Contract 40d 09l26/00 11/20/00 Od . ...o ...........:.... ........................................... ._......... .... .. . ._.,......... ......... . .... 26 Construction 24w 11/21/00 OSt10/01 Od ...... , .. . .......... ... ... . .. ... .... .. _. .. .............. .... .... . ... ... ........_ ...... .. .. � 27 Final Insp. & Accept 1w 05/11/01 05/17/01 Od { yJ:�FWTUNNEUCONTRACT\SCHEDULE.MPP D-1 ' 11/12/99 ; � i- � m m � � � m O � 0 0 0 0 4 m � ��`\ g �� -----��Q-1� ] 9 � U� t � a� .,.1 �'' ..4�—�� 7 � �"2 1 .:'=iir i��J f�.` �..�X � � /✓ r�r \ X f ' � n� �.,� � '�'' � /�/. � ''1 ! ) ti �7 ;� 1�'r f��\ l Y� i� . A' L�,� �cS ` ��1 + � . � � ;, ...,. � _. � �j �,i� J.. ..I... / - �� r� �� �%!� 1 � \ \ � '�>.� , �. (� � �a..,,' r, y,,r'' '� �r � . '"� � i ; � \ �� _�.-- ,�- �. . , �, � , . .. r,V,,� �..,-- ! . r J, ; � s�-�� -���Y.- ;.: ,. - ��� � � ` �`�,. . \ ��� � �y ��� ` �\ �a .�` . � . .'�'.�'r,�Y�,�C�'�, ' ,`` ` ' � \ r�: - '`�!�., ';\ ..�. '�l. c;u E �! ,. ��; ; r� t � C � � �,�Yj�y.. �;t ��. y` '1` r � �: � . �'� �,.)i �`�.% �05 i (� �,�'11 x�os L . �' 1-„ t..,. ,,., r� �t Cv ur� �- y l��F?t/F,�rr> z� t r�r� (��;�t f�r� cs�. W N ,l � '` , � '� - v.. � � O �.�. 2 � � `'- ` _ .-S�(' t� `' G = - � ` � N 21 '� , t/� z WO i t-� °+° 2a ��, � 1"�� `; `�� '1 � 3 0+0 _._.��._.. _. 7--- = ST, N -��-- --� ... I +� 2{� �. D-to9 8' .��E D. � L -21-R �� + �� � w--- �o f 3 -.� � rt- �.—�_ � _.__.� 1 �1-+- 4 S OE lQ IL v� a, —�- � `�` `� 2 � i —t�r G r ` � ` \�' � l7 �' ��� � ��\ t % '� ��� P P z .. �+�. �..^ `y� l v ►.., � ..,� .� , Q �•� C� �� 'Z , ,.�,�..._,, {-:;��� ,�� , - ' `�, �J � � � �.�y .� ; 3.O , ``! - ' `, `, ->:� �. �171'>!;- ��-k6fls-.� ( �,�_ - � ��;`��i ,� \ ' .,c",;�-t.?,^�HD . � ��. 1q y� �% r: �0 .4 �, ``` '�;`� ,,. ., W � � I Y� .` ..i a `� � ~~�`,, c�u Jf =�` � �l , �'• ? S�' . 1. '� `' -�.--� \ F , y W ^ �,„.., � ` � � � -,' l-_ ,� ',, ,:'h. '` ,' r 3,��1 . ��,` i� . _¢ � 2 I I •—�� r�r' � t�, r_'\�;•u•tti i.;�• y 1 ,.`'` _____._--.,- .� . .. � � �t • ��J `` '�;;�; � :��, V,^�.ti. -� •'. � — /� .�� I l�\ ;�, ' . . ; '�l `:. , •�i,` f .. "� ". \ lt` � - 7+45��—�� `'� -�----- �_—=�, ... � �, - �' r + . 37+�J3 1 'i ' �'�, \ r�.., ' �` `� .1 �i � c_ -�- `�Q ,—„ - -.--- \'� 1 � ''� �� .(/1 ` J1nU7� � 16 I 1---`� � `� ,, �. `S ? \ \ . � ^ �` I 1 I (' 14 ' �� , ? � � r,\��"��` = '� � ' � � R� � \ _�n _ � _ � ' 3 :�� �"���-�`'�', �-`� ��' `'�� :�.� ^, _ . _-�-' � .��— --c�� ��1: ��;,�� _ _-_��,-_ �r�,''� �1`'� - C" �r� :z\` '', � 3 � � .. ,�;�y ��~'fJ a, '�`� � � `• �` f � � �\ �/� _^I � � �'�r� (��r Tr..j 1 � �� ��. \ ''.� lr�.. ��` "'l t hhV G�.�- - � � _1.'�F .U_ I I S{I�'. r 't.�. �:�_j\ 'i (,:���\ `3 ('-' �.� �.w7 i �...._L...L_�.._ , � � . 45�.,} .C.S`,\ �,(' �� 1�.T1 4 �'i'r `� �'. ' ..._..�,.. ,J_:_J�.. � �i._"�._.:_ � t �' ' ` ---�- ---T �..� 1 r �-,E; ��_ .. _.._.� � ` r `���..v �i,�.,' -. ��`-�� � -15 _;� �3+�;9 �r)�.;,��F_ ` cs' ` i/ � . 1.2+SOE— _._.__._,_.-._-::;__...— -.__ .__...--__, , \ - ��' �. —. , - ">.p \ Btack�veatch SAN I TARY SEWER MA I NS D 104D, D 105, D 1�09, Engineers L23. AND L 108 REHRB I L I TRT I ON � PROJECT PROJECT NUMBER: PS46-070460170200 ss22� ATTRCHMENT E I SEPTEMBER. 1999 FIBURE E1 L J �� " ,� �� �� PROPOSED REROUTE 1��,.. � �~�`' 34+10� ��`C �`f l� �'�J�l` ''4 `�. : � � � ` � ��,. `l\� \� � +,:..b �'. ( � •�^ Y• r'� 1 O 0 0 0 0 4 m U � \� l , �i �� ti,. „�.,,1 ; °� ' S; `, : \ t 1l . � � .. +� r y .' � � (r�'` , � � � C�.'�L�. f ,. -' ` ��v.:�:� , 1 C.� tt , ' <'"'' � �"'} �.,, ,� `t � `� � ., �� � -` '` Q4c�: ' . \ � � � �.. Q�! �, � , A, �� � � t �� � ��V ' � ���� �.\'• 4`� - `�� / , ��tiG � � ,.�'`�� \�( � „� �� � / 'i `�` � `� i y: . .-- � \ } ,��\C. �� , � � � � 3,-��- � r1t��J �ti�: �-.' � r: �i 1 � ` ` \ �~ .� f' .. �,J'v� , l `� i �� � r ' t\ % : 1,` �, ,�., ` . '`,iF' � ` (�`\,r ,1. �,� �a �.�� �� �� ,r. � � �` ���q1� � �t`�i� r \ Y„}� � ^� l. ,� 1 �rr ��`� C ., � �� `, (`)� � �� 1 � / � �, �`� _ f f� ,�.` . X %+ G` . �f !. �*`I.R�A� ..•i ^ \tiY. I {1•� . �.� 11 \ l- `ih - �f � �t,��`' p��/G 3;,/},•l � ' �'� �� r �' �� ` �i, �� � � .� t r �� t� XxOQ � C V"� �, f,, "��`�`;'',,� il� � I S�� "� ,�,;�r-: � � , � .�.��: �i, '� q�' � ,, i� ; ` � ;'; r� � '�; � r'` ���'. � `' - ' ," -`'�., �'ti!f/. �������,.�.'`-���',��Y4CJ,��'�`'f �i.'`�� �� i�' ,;�'� r3�i> `�.V i�w ✓ �(' L. � `l �.Sy.� . � �ti..h` 5,�;5 ��; . .`�h.' y �a � ., ' f y` �`.,��t.: ,r w :.)_,'�4 ,'� y'.; �,. { t� �':��� ' \ ,. �,f'�' `' � l.�'� �X ����: !� � f \}?\ t ��c r `` �. ♦ "� j t � ��� � ' 1 ' ; � . ti .45:.� � )� � �� � y � � r `� f' `C � �4 t ' 4''�1��,!!,,�� \1�+.` + ';'�,``S � � �\ �,T ; z,- ( ' `y 1wi� f �\,t`�`:���'" : \ � i � '�,/ . \ 1 !l` , ,� � '�, � � � �,�� � 4' � ��" `� � `��' r \ . � ..'ti ��� ,� r� ��' �.� ��.� , i l �r� ��' �,�� � �r / � ,t*,�,�•f� ��.. � . ` \ ;��. ��`+ "/Jl�i� � "' k �y\ \ ti� "` / ; �lJ i ''�� ...< \�` y�.�,"'1L� i( \ +, � ,,k\ � �-� �.� f'ti � � 'a..t 7i � � ~ {�2 r (Q '` 'C,r=1 � !. �',r ,\ � 1x . ,,. — .J, .\� �� :� j �\ `�i �.t?� ti.r«, �i`ti ! .--' a •1` � '��' �. t ;(/) �`, +`,� . Ca ��� � Q 1 4t` � � � �� f� �i,� �L-� C�: tp; .•� � � '�(,�1r�.a. � � � �.' ,�� �` � l~ ��1 �C, � �� _-` ' .•� . ,� - ._ 4- . __ -� j •, x �.}• - , � ,, Q � t�l� _,._..--- + .; y� �� - �`, ` 11 C%"�;r i�''�t�,,"� \ > ' _.. " k tl --" � t' „ r � � � � ��, �. .__.-: -�,:.,-�_- �;�7 ' �' � p9 , - �. _...__ � - _,.. �_. f -, 105 , 1 � 5 � '� 1 �3 `� t� `" � � 4D � � ON � � ^T R M�IN� EHRB Asol� R° I � SEWE �g R �-,o 1g99 ,� �p�NI1 A 23 � R NQ,� N�MBER : Ps46' SEpTEM�ER. �v'�`��r P MEN� E c�c p,GN �g na ers ,� �T T F IGURE E2 - pR03EC r^ g622� � � City of Fort Worth, Texas Mayor and Counc�l Communicat�ion DATE REFERENCE NUMBER LOG NAME PAGE 12/21/99 '"�C-17785 30CBD 1 of 2 SUBJECT APPROPRIATlON ORDINANCE AND AWARD OF ENGINEERING SERVICES AGREEMENT WITH BLACK & VEATCH CORPORATION FOR SANITARY SEWER MAINS D104D, D105, D105A, D109, L23 AND L108 REHABILITATION IN THE CENTRAL BUSINESS DISTRICT, FORT WORTH RECOMMENDATION: It is recommended that the City Council: 1. Authorize the City Manager to transfer $184,320 for the Water and Sewer Operating Fund to the Sewer Capital Project Fund; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Fund in the amount of $184,320 from available funds; and 3. Authorize the City Manager to execute an engineering agreement with Black & Veatch Corporation in an amount not to exceed $181,320 for sanitary sewer Mains D104D, D105, D105A, D109, L23 and L108 Rehabilitation in the Central Business District, Fort Worth. DISCUSSION: � As part of an on-going program to improve the wastewater collection system in the downtown central business district, the Water Department recently selected deep sanitary sewer Mains D104D, D105, D105A, D105B, D109, L23 and L108 for rehabilitation. Main D104D is located in Throckmorton Street befinreen 4th and 5th Streets. Main 105 is located in 7th Street between Commerce and Houston Streets. Main D105A is located in Houston Street between 6th and 7th Streets serving the 600 Houston Street Mall, Garage, and Landmark Tower. Main D109 is partially under the Fort Worth Convention Center and runs through 10th and 11 th Streets between Monroe and Houston Streets. The Water Department proposes to rehabilitate the sanitary sewers listed above to accommodate the expansion of the Fort Worth Convention Center and other developments in the Central Business District. Under this agreement, Black & Veatch Corporation will prepare plans and specifications for rehabilitation of the sanitary sewer mains listed above, and will coordinate the design with the business community in the Central Business District. The engineer will also evaluate each sewer line's condition, location, present capacity and future demands. This project is generally bound on the north by 4th Street, on the south by 13th Street, on the east by Commerce Street, and on the west by Throckmorton and Monroe Streets. The project is located in COUNCIL DISTRICT 9, Mapsco 62Z, 76D and 77A. Black & Veatch Corporation is in compliance with the Cit�r's M/WBE Ordinance by committin� to 25% � City of Fo�t Worth, Texas Mayor and Cour�cil Communication DATE REFERENCE NUMBER LOG NAME PAGE 12/21/99 �'`C-17785 . 30CBD 2 of 2 SUBJECT APPROPRIATION ORDINANCE AND AWARD OF ENGINEERING SERVICES AGREEMENT WITH BLACK & VEATCH CORPORATION FOR SANITARY� SEWER MAINS D104D, D105, D105A, D109, L23 AND L108 REHABILITATION IN THE CENTRAL BUSINESS DISTRICT, FORT WORTH M/VVBE participation. The City's goal on this project is 25%. In addition to the above engineering fee, $3,000 is included for project management and review. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval and completion of recommendation 1 and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Sewer Capital Project Fund. MG: j Submitted for City Manager's Office by: Mike Groomer Originating Department Head: FUND (to) � 1&2) PS58 6140 2) PS58 2) PS58 � ACCOUNT I CENTER 472045 070580175030 531200 070580175030 531350 . 030580175030 � aMourrr CITY SECRETARY $184,320.00 $181,320.00 $ 3, 000.00 A. Douglas Rademaker 6157 (from) APPROVED 12/21/99 .' � City of Fort Worth, Texas Ma�or and Council , Communication DATE REFERENCE NUMBER LOG NAME PAGE 12/21/99 '"�C-17785 30CBD 3 of 2 SUBJECT APPROPRIATION ORDINANCE AND AWARD OF ENGINEERING SERVICES AGREEMENT WITH BLACK & VEATCH CORPORATION FOR SANITARY� SEWER MAINS D104D, D105, D105A, D109, L23 AND L108 REHABILITATION IN THE CENTRAL BUSINESS DISTRICT, FORT WORTH 1) PE45 v�38d20 a�osa�a $184,320.00 ORDINANCE NO. 14036 Additional Information Contach I 3) PS58 531200 070580175030 $181,320.00 • � A. Douglas Rademaker 6157 � City of For�t Worth, Texas �i►�Ay�r Artd Caunc�l C,ammun�cAt�an DATE REFERENCE NUMBER LOG NAME PAGE 12/21/99 **C-17785 30CBD 1 of 2 SUBJECT APPROPRIATION ORDI �I�4NCE AND AWARD OF ENGINEERING SERVICES AGREEMENT WITH BL/�cK & VEATCH CORPORATION FOR SANITARY SEWER MAINS D104D, D105, D105A, D109, L23 AND L108 REHABILITATION IN THE CENTRAL BUSINESS DISTRICT, FORT WORTH RECOMMENDATION: It is recommended that the City Council: 1. Authorize the City Manager to transfer $184,320 for the Water and Sewer Operating Fund to the Sewer Capital Project Fund; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Fund in the amount of $184,320 from available funds; and 3. Authorize the City Manager to execute an engineering agreement with Black & Veatch Corporation in an amount not to exceed $181,320 for sanitary sewer Mains D104D, D105, D105A, D109, L23 and L108 Rehabilitation in the Central Business District, Fort Worth. DISCUSSION: As part of an on-going program to improve the wastewater collection system in the downtown central business district, the Water Department recently selected deep sanitary sewer Mains D104D, D105, D105A, D105B, D109, L23 and L108 for rehabilitation. Main D104D is located in Throckmorton Street between 4th and 5th Streets. Main 105 is located in 7th Street between Commerce and Houston Streets. Main D105A is located in Houston Street between 6th and 7th Streets serving the 600 Houston Street Mall, Garage, and Landmark Tower. Main D109 is partially under the Fort Worth Convention Center and runs through 10th and 11th Streets between Monroe and Houston Streets. The Water Department proposes to rehabilitate the sanitary sewers listed above to accommodate the expansion of the Fort Worth Convention Center and other developments in the Central Business District. Under this agreement, Black & Veatch Corporation will prepare plans and specifications for rehabilitation of the sanitary sewer mains listed above, and will coordinate the design with the business community in the Central Business District. The engineer will also evaluate each sewer line's condition, location, present capacity and future demands. This project is generally bound on the north by 4th Street, on the south by 13th Street, on the east by Commerce Street, and on the west by Throckmorton and Monroe Streets. The project is located in COUNCIL DISTRICT 9, Mapsco 62Z, 76D and 77A. Black & Veatch Corporation is in compliance with the City's M/WBE Ordinance by committing to 25% M/WBE participation. The City's goal on this project is 25%. , 1 - City of Fort Wort v, Texas n►�Ayar And Caunc.�l a�,ammun�cAt��n DATE REFERENCE NU�v1BER LOG NAME �` PAGE ' 12/21 /99 **C-17785 � 30CBD I . 2 of 2 SUBJECT qppROPRIATION ORDINANCE AND � ARD OF ENGINEERING SERVICES AG„REEMENT WITH BLACK & VEATCH �ORQORATION FOR SANITARY SEWER MAINS D104D, D105, D105A, D109, L�3 AND 'L108 REHABILITATION IN THE CENTRAL BUSINESS DISTRICT, FORT WO,�TH' , ,� In addition to the above engineering fee, $3,000 is included for project management and review. FISCAL INFORMATION/CERTIFICATION: ��. � The Finance Director certifies that upon approval and comp'letion of recommendation 1 and adoptiori of the attached, appropriation ordinance, funds will be a�ilable in the {current capital budget, as � appropriated, of the Sewer Capital. Project Fund. ; � MG:j ; � f � � a , Submitted for City Manager's Office by: Mike Groomer Originating Department Head: A. Douglas Rademaker Additional Informatioa Contact: A. Douglas Rademaker � FUND � (to) � 1 &2) PS58 G140 I 2) PS58 2) PS58 � G 157 � (from) `I 1) PE45 3) PS58 G157 I ACCOUNT I CE1�iTER 472045 07058 175030 531200 07058�175030 531350 030580�175030 � 538020 07�020 531200 07058 175030 ii .� � CITY SECRETARY I ` AMOUNT $184,320.00 $181,320,00 $ 3,000.00 Ap�o�NG��. ceTY .� D�C ��` 1999 $184,320.00 $181,320.00 � , �� ��� . City �et�:y of°the Tth.'�exag �:IJ�Q Adapted Ordinar�ce No. �-_�Q�% 4