HomeMy WebLinkAbout025496 - Construction-Related - Contract - APAC-Texas, Inc.CITY SECRETARY (�
CONTRACT NO . �� � I �
SPECIFICATION
�
CONTRP,CT DOCUMENTS
FOR
H.M.A.C. SURFACE OVERLAY (99-8)
AT VARIOUS LOCATIONS
IN THE,CITY OF FORT WORTH, TEXAS
PROJECT NO. GS93-02093052204
1999
KENNETH L. BARR
MAYOR
1liIS COPY FQt
����
�������.
' / . CIT1r SECRETARY
CRYI�IWAGFlCS OfF►CE
��ts�cG Qtv.
tlPW - fllE COPY
BOB TERRELI�
CITY MANAGER
HUGO A. MALANGA, P.E., DIRECTOR
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
A. DOUGLAS RADEMARER, P.E., DIRECTOR
DEPARTMENT OF ENGINEERING
�J
0
PREPARED BY TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
ENGINEERING COORDINATION OF�T
►� ,► *S�P�E ���s#�k'�
EXHIBIT A * �'' ,� .�
................�=�.
�i.A.JiB h1. �` � "-.S �4
r��'•. . . �`; . .:•j(r'; ';;
�i<` ''9�cGIST'c.'��'�:.�`C� �" i ,{ �
��`'''••,... • �'��'i,r/
/ y�� � sTc�
� �� �..
1 �� �l l�'
�
0
City of Fort Worth, Texas
M�yor �nd �ouncil �ommunrcation
DATE REFERENCE NUMBER LOG NAME PAGE
�11 /23199 **C-17760 20APAC 1 of 2
SUBJECT AWARD OF CONTRACT TO A AC-TEXAS, INC. FOR HMAC URFACE OVERLAY 99-8 AT
SPECIFI�D LOCATIONS
� RECOMMENDATION:
�
J
�
�
�
�
�
�
�
�
�
It is recommended that the City Council authorize tt�e City Manager to execute a contract with APAC-
Texas, Inc. in the amount of $826,172.25 for 100 wo�king days for HMAC Surtace Overlay 99-8.
17I•�d�b��[�7►�
In the 1998-99 Contract Major Maintenance Program, various types of street maintenance techniques
are grouped into specific contract packages. HMAC Surface Overlay 99-8 provides for surface and
base rehabilitation, curb and gu#ter, and valley gutter replacements for asphalt streets at specified
locations, funded from the Contract Street Maintenance Fund and the Street Improvements Fund.
The following list details the limits for each of the streets included in this project:
STREET
FROM
TO
American $oulevard
Barwick Drive
Bellaire Drive South
Camelot Road
Colusa Drive
Dalford Street
� �` Di�rie�Drive ' � -
Driskell Boulevard
Ellis Avenue
FAA Boulevard
Glenmont Drive
� North Hampton Street
Longstraw Drive
Silver Sage Drive
Trail Lake Drive
Trinity Boulevard
South Hulen Street
Change of pavement
Sycamore School Road
Walton Avenue
North Sylvania Avenue
l�lren Avenue - -- .� .
Bonnell Avenue
NW 25th Street
Highway 360
Vega Drive
N E 29th Street
North Riverside Drive
Western Center Boulevard
Woodway Drive �
FAA Boulevard
South Drive
Meadows West Drive South
Burmeister Drive
Denbury Drive
2401 Dalford Street
• -•--' Walton 74vent�e - - - - •- -�
� Micki Lynn Avenue
NW 23rd Street
American Boulevard
Woodway Drive
NE 32nd Street
Whitewood Drive
Basswood Boulevard
I-20 Service Road
This project is located in COUNCIL DISTRICTS 2, 3, 4, 5, 6, and 7.
�
�
�
�
This project was advertised for bid on September 9 and 16, 1999. The following bids were received on
October 7, 1999. .
�
� C'ity of .Fort WoYth, Texas
�
�t�yor �n� �ounciI �ommunic�tion�
DATE REFERENCE NUMBER LOG NAME RAGE
�11/23/99 **C-17760 20APAC 2 of 2
SUBJECT AWARD OF CONTRACT TO APAC-TEXAS, INC. FOR HMAC URFACE OVERLAY 99-8 AT
SPECIFIED LOCATIONS
� BIDDERS AMOUNT
APAC-Texas, Inc. $ 826.172.25
� Sutton and Associates, Inc. $ 844,160.25
J. L. Bertram Construction and Engineering, Inc. $ 857,031.30
� Peachtree Construction $ 869,748.50
Austin Bridge and Road, Inc. . $ 904,135.25
Branch and Sons Contractors, Inc. $ 947,920.00
� Pavecon, Inc. . $1,103,413.25
Alshall Construction Company $1,270,340.00
�The low bidder, APAC-Texas, Inc. is in compliance with the City's M/WBE Ordinance by committing to
17% M/WBE participation. The City's goal on this project is 17%.
� FISCAL INFORMATION/CERTIFICATION: .
The Finance Director certifies that funds are available in the current capital budgets, as appropriated, of �
the Contract Street Maintenance and the Street Improvements Funds.
� MG:k
� _,. R � ._ .,�,. � .. ,: .. .. • 4. �„ .... _.,.n .,�,� .
� �. � .
Q
LJ � .
Submitted%r City Manager's I FUND � ACCOUNT I CENTER I AMOUNT I CITY SECRETARY
� Office by: � (to)
�
Mike Groomer 6140 I
aOriginating Department Head:
Hugo Malanga 7801 I(from) ' � Approved 11/23/99
�' GS93 541200 020930522040 $823,723.25 �
Additional Information Contact: C111 541200 020111053211 $ 2,450.00
� �
Najib Fares 7800 I ,
a � � �
a �
�
�
'
�
�
'
�
'
'
'
�
I
1
�
a
0
a
0
0
SPECIFICATIONS
AND
CONTRACT DOCZJMENTS
FOR �
Fi.M.A.C. SURFACE OVERLAY (99-8)
AT VARIOUS LOCATIONS
IN THE CITY OF FORT WORTH, TEXAS
PROJECT NO. GS93-02093052204
� 1999
f -�� �� � (?�Iu��oa,t t� i..o�� �
A. DOUGLAS i2ADEMAi�R, P. E.
DIRECTOR, DEPARTMENT OF ENGINEERING
`"� ��
GEORGE A. BEHNlP.NESH, P.E.
ASSISTANT DIRECTOR
+ TRANSP�RT ON PUBLIC WORKS DEPARTMENT
,�� �� - �- . ..A
DOO KIM, P.E.�
CAPITAL PROJECT ENGINNER WATER DEPARTMENT
TERNUS, P.E.
ASSISTANT DIRECTOR
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
q (� ``��
DATE
� � L � l 1
DATE
f ��'���� �
DATE
�/� �! rf-'
DATE
�
�
�
'
�
�
'
t
'
a
� -
D
a
�
�
D
0
0
�
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
TABLE OF CONTENTS
Notice to Bidders
Special Instructions to Bidders
Prevailing Wage Rates
Proposal
Vendor Compliance
Disadvantaged Business Enterprise
Special Provisions
Contractor Compliance with Worker's Compensation Law
Certificate of Insurance
Performance Bond
Payment Bond
Contract
Project Designation Sign
Details
Street Locations
a
C�
f�
L�1
L�l
L�J
LJ
� Addressed to Mr. Bob Terrell, City Manger of the City of Fort
Worth, Texas will be received at The Purchasing Office until 1:30
P.M.,October 7, 1999 and then publicly opened and read aloud at
� 2:00 P.M. Plans, Specifications and Contract Documents for this
project may be obtained at the office of the Department of
Engineering, Municipal Office Building, 1000 Throckmorton Street,
Fort Worth, Texas.
u
�
�
�
NOTICE TO BIDDERS
Sealed proposals for the following project:
H.M.A.C. SURFACE OVERLAY (99-8)
AT VARIOUS LOCATIONS
Project No. GS93-02093052204
A pre-bid conference will be held at 9:00 A.M.,September 21, 1999
in the Transportation and Public Works Conference Room 270, 2nd
floor, Municipal Building.
One set of documents will be provided to prospective bidders for
a deposit of twenty dollars ($20.00): such deposit will be
refunded if the document is returned in good condition within 10
days---�fter bzd°s= are ope�r�d. Addi���onal seat,� may be- p�xchaseda�r�
a non-refundable basis for twenty dollars ($20.00) per set.
For additional information contact Mr. Najib N. Fares at (817)
871-7802.
L�J
L�J
Bob Terrell
City Manger
Hugo Malanga, Director
Transportation and Public Works
�
�
�
�J
PUBLICATION:
September 9, 1999
September 16, 1999
. � .
� (! ^ ���� ,
By: ���y�y
N� ib N. Fares, P.E.,
Street and Storm Drainage, TPW
LJ
�
�
�
'
�
�
�
�
�
�
�
�
�
�
�
'
�
'
1
0
P R O P O S A L
TO: MR. BOB TERRELL ' Fort Worth, Texas
City Manager
Fort Worth, Texas
FOR: H.M.A.C. SURFACE OVERLAY (99-8)
AT VARIOUS LOCATIONS
PROJECT NO. GS93-02093052204
Pursuant to the foregoing "Notice to Bidders", the undersigned has thoroughly
examined the plans, specifications and the site, understands the amount of work
to be•done, and hereby proposes to do all the work and furnish all labor,
equipment, and materials necessary to fully complete all the work as provided
in the plans and specifications, and subject to the inspection and approval of
the Director of the Department of Engineering of the City of Fort Worth.
Total quantities given in the bid proposal may not reflect act�al quantities;
however, they are given for the purpose of biddi.ng on and awarding the
contract.
Upon acceptance of this proposal by the City Council, the bidder is bound to
execute a contract and furnish Performance and Payment Bond approved by the
City of Fort Worth for performing and completing the said work within the time
stated and for the following sums, to-wit:
SPEC PAY APPROX.
ITEM ITEM QUANTITY
S.P. 1 2 Ea.
�
S.P. 2
406 3
450
S.P.
406 4
450
S.P.
S.P. 5
Lump Sum
67 Ea.
42 Ea.
3 Ea.
DESCRIPTION OF ITEMS WITH BID UNIT
PRICES WRITTEN IN WORDS PRICE
Project Designation Sign @
Two-Hundred Dollars &
;No,a . Cents Per Ea,,_� $ 200.00
Utility Adjustment @
Six-Thousand Dollars &
No Cents Per L.S. $ 6,000.00
Ma.nhole Adjustment @
Two-Hundred and Fift� Dollars &
No Cents Per Ea. $ 250.00
Water Valve Boxes Adjustment @
Two-Hundred Dollars &
No Cents Per Ea. $ 200.00
Water Meter Boxes Adjustment @
Thirty-Five Dollars &
No Cents Per Ea. $ 35.00
P-1
TOTAL
AMOUNT BID
$ 400.00
$ 6,000.00
$16,750.00
$ 8,400.00
$ 105.00
L�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
1.�
0
SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BIDUNIT TOTAL
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID
104 6 2,570 L.F. Removal and Replacement of
502 Concrete Curb and Gutter @
S . P . Se.v�t�� Dollars &
� Cents Per L.F. $ ��•�� $ �'3,Ce�p'�
104 7 365 S.Y. Removal and Replacement of 6"
504 Concrete Driveway @
S . P . �a.�� ��c Dollars &
F��� Cents Per S.Y. $ y\��� $�S �\�1'��
104 8 350 S.Y. Removal and Replacement of 4"
504 Concrete Sidewalks @ •
S. P. �� o.z�i sE�Er( Dollars &
� N a Cents Per S . Y . $ 3-1 . � $ �2 � �Sp• �
300 9 1,074 C.Y. Removal and Replacement of
304 H.M.A.C. Pavement and
312 Base (Base Repair) @
S.P. ���t.-�� �,,cz.�� Dollars &
,.�y Cents Per C . Y . $ �� • � $ $g � \y a-' �
208 10 100 C.Y. Graded Crushed Stones @ �
S.P. ��rc^t �c�.�--,� Dollars &
F•F�c� Cents Per C.Y. $ a-3-So $ a,"�So' �
S.P. 11 65,600 L.F. Wedge Milling 2" to 0" Depth
5.0' Wide @
oc�•c Dollars &
���� �.b� Cents Per L . F . $ `' � � $ 83 , Q�oS � �
S.P. 12 38 Ea. Butt Joint-Milled�@� �
'�kperc l��rC4�{�F��s Dollars &
�o Cents Per Ea. $ . ��s•�� $ \l,sqvm
300 13 517 Ton H.M.A.C. Level-Up @
312 �.�� �� x Dollars & �
F ��-q Cents Per Ton $ �f,o • �� $ `� _ g'Zp • S"
312 14 141,900 S.Y. 2" H.M.A.C. Surface Course
313 (Type "D" Mix) @ .
S.P. ^c�o�� Dollars &
F��� Cents Per S.Y. $ "u'�S $ �3a,'l�{S'�
104 15 100 S.Y. Removal & Replacement of 7"
314 Concrete Valley Gutter @
S. P. S�, ��-� �.�rL Dollars &
� � Cents Per S . Y . $ �� `� $ -1, �00' �
314 16 35 S.Y. New 7" Concrete Valley Gutter @
S . P . S��s�-� Dollars &
r�ro Cents Per S. Y. $"� p''`�� $� cZ c�, o. o0
P-2
�
'
'
�
r
�
'
�
,.
�
�
�
�
�
�
�
'
�
�
SPEC PAY APPROX.
ITEM ITEM QUANTITY
104 17 20 S.Y.
505
S.P.
402 18 800 L.F.
500
620
S.P.
502 19 200 L.F.
504 20 20 S.Y.
214 21 11,135 S.Y
S.P.
214 22 180 Ton
S.P. 23 5 Ea
106 24 100 C.Y
S.P.
S.P. 25 5000 S.Y.
DESCRIPTION OF ITEMS WITH BIDUNIT
PRICES WRITTEN IN WORDS PRICE
Standard 4" Reinforced Concrete
Wheelchair Ramps @
���� F� ��, Dollars &
rc o Cents Per S. Y. $ b s'�`�
6" PVC Perforated Pipe Subdrain @
�� �� � Dollars &
,y o Cents Per L. F. $�• o0
TOTAL
AMOUNT BID
�` � � � DO' CA
$ `o. � bJ , d�
New Concrete Curb and Gutter @
�c�,�o��,rcr.� Dollars &
rt.o Cents Per L. F. $�� �� $� a, g�p�
New 4" Concrete Sidewalk @
�� s�� S�x Dollars &
�t� Cents Per S . Y . $ 3� � $ "Z a o ' �v
8" Pavement Pulverization @
�o Dollars &
{'�fT� F�36 Cents Per S.Y. $ c�-•�� $ aB,3Q�•�
Cement @
�s� 4.y�,�Dp.�o Dollars &
tvo Cents Per Ton $ ��o � �� $ `� , pCY���
Remobilization @
Five Hundred Dollars &
No Cents Per Ea. $ 500.00 $ 2,500.00
Unclassified Street Excavation
-�� R��.�,.� Dollars &
� Cents Per C.Y. $ �'3'� $ � ,3�b'�
2" Surface Milling @
'��o Dollars &
. `''�
g�E,y F��� Cents Per S.Y. $�-'� $�a'�5�'
TOTAL BID
P-3
g ��e, �1� �s
J��
m
a
�
�
�
�
a
�
1__1
�
�
This contract is issued by an organization which qualifies for exemption
pursuant to the provisions of Article 20.04 (F) of the Texas Limited Sales,
Excise and Use Tax Act.
Taxes. All equipment and materials not consumed by or incorporated into the
project construction, are subject to State sales �taxes under House Bill 11,
enacted August 15, 1991.
The Contractor shall comply with City Ordinance 7278, as amended by City
Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29),
prohibiting discrimination in, employment practices.
The undersigned agrees to complete all work covered by these contract documents
within One-Hundred (100) Working Days from and after the date for
commencing work as set forth in the written Work order to be issued by the
Owner, and to pay not less than the "Prevailing Wage Rates for Street, Drainage
and Utility Construction" as established by the City of Fort Worth, Texas.
The Contractor shall start work within 15 calendar days of executing the
contract. Within ten (10) days of receipt of notice of acceptance of this bid,
the undersigned will execute'the formal contract and will deliver an approved
Surety Bond for the faithful performance of this contract. The attached
deposit check in the sum of
Dollars ($ ) is to become the property of the City of Fort Worth,
Texas, or the attached Bidder's Bond is to be forfeited in the event the
contract and bond are not executed within the time set forth, as liquidated
damages for delay and additional work caused thereby.
I(we), acknowledge receipt of the following addenda to the plans and
� specifications, all of the provisions andRrequirements of which have been taken
into,conside�a�ion in �r�paration,of the foregoin�sbid:
� Addendum No. 1 (Initials)
Addendum No. 2 (Initials)
Addendum No. 3 (Initials)
u
�
�
(Seal)
� Date:
�
�
P9�z�� 99
r �
Respectfully submitted
APAC - TEXA�, �NC.
BY ��4-� ��cOr-c�
��EL S. MICHAEL
BRANCH MANAGER
Address:
� o. �a� is�rt
�aRi' �V Oi�Tfi ?'� 7�i 4t� t�
Telephone:
P-4
S I7 33�i-�3� 1
�
D .. .�
��
�
�
I�
�!
�
.J
J
�
�
�
��!
�
VENDOR COMPLIANCE TO STATE LAW �
The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of
contracts to non-resident bidders. This law provides that, in order to be awarded a contract as
a low bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal
place of business are outside the state of Texas) bid projects for construction, improvements,
supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the
same amount that a Texas resident bidder would be required to underbid a non-resident bidder
in orcler to obtain a comparable contract in the state in which the non-resident's principal place
of business is located. The appropriate blanks in Section A must be filled out by all out-of-state
or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state
or non-resident contractors to do so will automatically disqualify that bidder. Resident bidders
must check the box in Section B.
A. Non-resident vendors in (give state), our principal place
of business, are required to be percent lower than resident
bidders by state law. A copy of the statuie is attached. �
Non-resident vendors in (give state), our principal
piace of business are not required to. underbid resident bidders.
B. Our principal place of business or corporate offices are in the State of Texas. �
Bidder:
1�►��►� - ����. ���.i.
DCompany �'.C�. �3��� f S{?7`
FC��T 1N{)7f�'i"!�, il� 7�14�
� Address
a
�J
��+
City/State/Zi.p
'�.
JOEL S. MICHAEL
By (Please Print)
Si a re
��A�tCH RI4AANf���
Title (Please Print)
THIS FORM MUST BE RETURNED WITH YOUR QUOTATION,
�
�
Minorit and Women ity of Fort Worth
Y Business Enterprise Specifications
SPECIAL INSTRUCT(ONS FOR BIDDERS
r
r�
APPLICATION OF POLICY
If the total dollacvalue of the contract is 525,000 or more, the M/WBE goal is applicable
vatue of the contract is less_ than �25,000, the M/WBE goal is not applicable.
If the total doliarl
1
POLICY STATEMENT
It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business
Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. The objective
of the Policy is to increase the use of M/WBE firms to a level comparable to the availability of M/WBEs that provide
goods and services directly or indirectly to the City.
MNVBE PROJECT GOALS
The City's MBE/WBE goal on this project is
% of the base bid value of the contract.
COMPLIANCE TO BID SPECIFICATIONS
On City contracts of $25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance
�- by either of the following:
r-
l.
I
L
�
l
r�
1. Meet or exceed the above stated M/WBE goal, or;
2. Good Faith Effort documentation, or;
3. Waiver documentation.
SUBMITTAL OF REQUIRED DOCUMENTATION
The applicable documents must be received by the Managing Depa�tment, within the fo(fowing times allocated, in
order for the entire bid to be considered responsive to the specifications.
1 • MNVBE Utilization Form:
2. Prime Contractor Waiver Form:
3. Good Faith Effort Form:
received by 5:00 p.m., five (5) City busi�ess days after the
bid opening date, exclusive of the bid ope�ing date.
received by 5:00 p.m., five (5) City business days after the
bid opening date, exclusive of the bid opening date.
received by 5:00 p.m., five (5) City business days after the
bid opening date, exclusive of the bid opening date.
FAILURE TO COMPLY WITH THE CITY'S MNVBE ORDINANCE, WILL RESULT IN THE BID BEING
CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS.
Any questions, please contact the M/VYBE Office at (817) 871-6104.
Rev. 6/2/98
�.+
�
' . ' . i
� " Ci{y of Fort Worth
�� ��'li� �ty and Women 6usiness Enterprise Specificaiions
D�
�' OCT 2 0 1999 MBEIWBE UTILlZATION,
APAC— Texas OctobPr 7, 1999
� V�4IE P BID DATE
�.H.". Surface Overlay (99-8) GS93-02093052204
°ROJECT NAME _ PROJEC7 NUMBER
ATTACHMENT 1
Page 1 of
� TY'S M/WBE PROJECT' GOAL• 17� � ' M/WBE PESCENTAGE AC�VED: 17 . 31 � f
��ture to � compiete this form, in its entirety- with supporting documentation,� and � received �: tiy the � Managinc
�partment on or before 5:00 p.m. five (5) City business 'days� after bid opening, � exclusive of bid _opening date, wii
�sult in the bid being considered non-responsive to bid speciftcatio�s. � � ": � = = _' °�: �,-� k��, � •::>�;::: : '�:: ==:.. - - ._
} - . . . . . . ��, - . ,
, .... _ - � -
� undersigned bidder agrees to enter into a formal agreement with tt�e MBE andlor WBE firms for work�listed in thi;
chedule, conditioned upon execution of a contract with the City of Fort Wo�th. � The intentionai and/o� knowinc
r:representation of facts is grounds for consideration of disqualification and will result in the bid being considerec
I�-responsive to specifications. . _ . . � .. .
- - . _ .. : .- - : --- ;: --- -� , .
:ompany Name� Co�tact Name, �a�ted � Specify AII Contracting � Specify 1�11 Items to be � Ootiar Amount
� Address� and Telephone No. � „ Scope of Work (•) � Supplted(•j �,��. � '
I.r
AVAIQT TRiFCKI�G C0.
�P.O..BOX 1310
'.1�iTSTIAI TEXAS 76247
,
�_(940) 648-8004
McRYAN HAULING, INC.
P.O. BOX 1679
ROAAiOKE, TE%AS 76262
(817) 430-3213
2
� �a
Z �
Y Y
Y Y
Y Y
1. ) HAUd.ING AGGREGAT�
2. ) HADL HA�fAC
l.) HAULING AGGREGATi
u t
•
fA F
1.7 � 27,000.'00
1
2.).$ 57;000.00
1.) � 41,OOQ.00
BRENDA PRICE TRUCR�NG
152 W. MAIN
AZLE, TE%AS �76020
(817) 444-0836
1. ) CONTRACT EAUI.ING
1
�
2 1.) $ i0,000.00
ANVBEs must ba locabad in tho 8(Nne) oouMy mukalplace or cumently doinl7 businws in tho mark�taca at the tlme oi bid.
�" 5pectty aU anas In which MWBE's an to ba utlitr.ed anNor itams to b� suppU�d: -.
�_ A eompleEa Itstlnq of ttams to ba suppliad b requiesd tn order to recoive uedR towar�d tho MMBE goel.
ieMify eaa, Tler �e,►.6
7kr: Mwna tho levei of sub .. „ �,,.:., g bdow ttw prima corttraetodconsuftant� I.a.. a direct paymwrt
fe+om tho prima coMractor to a subeontractor Is considar+ed 1" Uar, a pa�rment by a subcocrtractor to
ifs supplier b considered 2'� tlar.
°�HIS FORM MUST BE RECEiVED BY THE MANAGiNG DEPARTMENT BY 5:00 p.m., FIVE (5) CITY BUSINESS DAYS AFTER BiD
� OPENING, EXCLUSIVE OF THE H1D OPENING DATE
Rev. srvas
,�� p�G�[�QC��� .
�
OCT 2 0 1�95 C; of Fart wo�t,
J
- Minori� and Women usiness Enterprise Specifications
„
gy� MBEIWBE UTILIZATION �
= Company Name, Contact Name, �ert�ed y' SpecNy Ail Contracting
Address, and Tetephone Nc. . � a� Scope of Work ('j
� . �� . � :� .. _ • � ..
' . . . _. :. . . . . z � .: . . �
LUi�YA TRUCRING �� Y 1. ) COIdTRACT HAULING
, �2100• ,N. SYLVA�'�IA - .
' FORT WORTH, TEXAS. .. . . .
(817) 8�4-8919 � ' -
� - . :
� - --. _ _ __ -- � . __ .
! '
ATTACHMENT �,
Page 2 of
Specify ►�tt Items to be . . Dol�arlimount
SuppliedCi �t ' � �
� • �
� ..
�
�
I
L- . . .
r
.
� F. ,� .. .
2 1.) $ 8,000.00
�he bldder further agrees to provide, directly to the City upon request, comptete artd accurate information regardir
��ctuai woric performed by alt snbcontractors, irtcludtrtg NiBE(s) arttUor W8E(s) arrangements submitted with this bI
��he bidder aiso agrees to allow an a�dit and/or examieatton of any books, records and files held by their compar
+hat will substaetiate the actual work per�ormed by the MBE(s) and/or WBE(s) on this contract, by an authorizE
r ifficer or empioyee oi the Ctty. Any intentionai andlor knowing misrepresentatton of facts will be grounds f�
�erminating the contract or debarment from Ctty work for a period of not less than three (3j years and for initiatic
action under Federal, State or Local iaws conceming false statements. Any failure to comply with this ordinance ar
:reates a materiai breach of contract may casuit in a detetmi�ation of an iResponsibie offeror and barred fro
��articipating in City work for a period of time not less than one (1) year. ... .. ,
- •--�-- --..... . _.._ . _. .._�__ . . .
ALL MBEs and WBEs ST 8E CERTIFIED BY THE ClTY BEFORE CONTRACT AWARD
��,��—�� , � , , JOEL S , MT�AA F.T. . . .
Author�nature � - -� - - - .- - P�inted Signatut+e - .
� BRANCH MANAGER �� � � . -
fitle y Contact Name and Title (if different)
AFA6-�E%�S, INC. _. _._._. .. � - f817) 3�R_n5?�
�:ompany Name - � � � � = � Telephone Number (s)
1902 COLn SPRiNGS RD.. P.�. Box i�n� �- - l8171 877-49�R
�FORT.WORTH, TR 7 . .`.�. � �� . � ..:OCTOBER 18, " 1 L
ddress Fax Number
� ^ 6101 999
� .
1ty/State2ip Code . . - Date
� .
1
� THIS FORM MUST BE RECEfVED BY THE MANAGING DEPARTMENT BY 5•QO p.m.. FIVE (5) CITY BUSINESS DAYS AFTER B�D
OPENING, EXCLUSNE OF THE 8!D OPENING DATE
Rev �
, ; • ' ATTACHMENT 1 B
� Page 1 of 1
, City of Fort Worth
�i Minority and Women Business Enterprise Specifications
�
Prime Contractor Waiver
_ APAC-T�XAS, I�i�C. !-�.M.A.C. Su.RF'ACE OY��RLAY C Rq-8�
Prime Company Name Project Name
�` io /o�/q9 C�S 93- ozo y,3a522 0�
Bid Opening Date � Project Number �
If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form).
All questions on this form must be completed and a detailed explanation provided, if applicable. If
�+ the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only
applicable if both answers are yes.
t
_.�
r''
�_
Fai(ure to complete this form in its entirety and be received tiy the.Manaqinq Department on or
before 5:00 p.m:, five (5) Citv business days after bid openin4, exclusive of the bid opening daie,
will result in the bid being considered non-responsive to bid specifications.
Will you perform this entire contract without subcontractors? Yes No
If yes, please provide a detailed explanation that proves based on the size and scope of
this project, this is your normal business practice and provide an operational profile of
your business.
Will you perform this entire contract without suppliers? Yes No
� If yes, please provide a detailed explanation that proves based on the size and scope of
this project, this is your normal business practice and provide an inventory profile of
your business.
� The bidder further agrees to provide, directly to the City upon request, complete and accurate
�information regarding actual work performed by alf subcontractors, including MBE(s) and/or
�, WBE(s) on this contract, the payment therefore and any proposed changes to the original MBE(s)
andlor WBE (s) arrangements submitted with this bid. The bidder also agrees to allow an audit
and/or examination of any books, records and files held by their company that will substantiate
the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer
��" or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds
for terminating the contract or debarment from City work for a period of not less than three (3)
years and for initiating action under Federal, State or Local laws concerning false statemerlts. Any
failure to comply with this o�dinance and creates a material breach of contract may result in a
� determination of an irresponsible offeror and barred from participating in City work for a period of
time not less than one (1) year.
JOEL S. MICHAE�
r�
L
Authorized Signature
g.R�MdCH NtANA'a�
Title
Printed Signature
Contact Name (if different)
��l�t+ - ����`3, ���`i. !I7 336-�3Zt
Company Namep,Qt, g;,�J� �$a7 Contact Telephone Number (s)
�ORTw�R�`H, TX 7�t�� si� s��-��as
� Address
�" Authorized Signature
L.�c
Fax Number
APAC - TEXAS, �NC,
Company Name
Rev. 6/2/98
�
�
0
�
ATl'ACHMENT 1C
Page 1 of 3
City of Fott Worth
Minority and Women Business Enterprise '
GOOD FAITH EFFORi
PAC - T��CAS. �NC`. ro / 07 / 9 q
Prime Company Name � � Bid Date' '
� H.m.A.C. su.�z�acE ov��A�t
Project Name
a
�
�
�
U
a
�
�
a
�
a
�
�J
�
GS 9a—ozoq3o5zzoy-
Project Number
�If yo.ti- have faited to secure M/WBE participation and you have �subcontracting andior suppiier opportu�ities or if �
yourNi/WBE participation is less than the City's p�oject goat,.you must�complete this form.
If the bidder's method of comp[iance with the MlWBE goa! is based upon demonstration of a
"good faith effort", the bidder will have the burden of�cocrectty and accuratety preparing and:
submitting the documentation required hy the City. Comptiance with each item, 1 thru 6 be(ow,
shall satisfy the Good Faith Effort �equirement absent proof oi frauc{, inteniional andtor
knowing misrepresentaiion the facis or intentiona[ discrimination by the E�idder.
- � -- , ,T -_�- .
rFai(ure xo comp[ete .ttiis . fomi; in4 its.: enti�ety.:. wifh'.._�upp'ort�ng documentation.,_ an�d receiued =�by} the.
�_ . . . i .,., _ . . ; . . � - - � . . ..
' . .'"..t i _ �_'# . ._.
;�Vlanag�ng Depa�finent�;on�orbefoce a.00 p fn: �veG{5j-Cifj��u��ne�s day:safiferbtd���mn�;�e�tctus�v.e�of bid'.
_openttig,date, wilf �cesult�in tF�e bid�fi�ing:considered non=cesponsive:to liid speci�cations. �
1.) Please list each and every subcontracting and/or supptier opportunity (DO NOT LiST NAMES OF
,� _.FiRMS) �a�vhich wili be usedin-th�c:ompletion of this project;'r�gardt�ss=of whether ii is to��pi�i�`d�'
by a M/WB� or non- MlWBE. � �
(Use additional sheets, if necessaryj
List of: Subcontractinq Opportunities
f�€�,��'L { R-EPuac��rr7' aF c�r��'r'�
List of: Supplier Opportunities
c�rt c.�tz,E�'
-�.�. �c�
1.����C-rEs M lU �f'�(T ��1.�..1� .�F'��.SrIS !�1 1.��
�3a��..�n�s
����� ���
A� ��vkr--,.�,�-`
t'��c� P�QG
c�rn�r�S ;
� ATTACHMENT 1C
Page 2 of 3
� 2.) Did you obtain a current list of M/W8E firms from the City's M/WBE Office? The list is considered in
compliance, if it is not more than 3 months old from the date of bid opening.
n ✓ Yes
�{ No
L�
4.j Did you solicit bids from M/WBE firms, within the subcontracting andlor supplier areas previously
listed, at least ten calendar days prio�r to bid opening by telephone, exclusive of the day the bids are
opened?
� 3:) Did you solicit bids from MNVBE firms, within the subcontracting and/or supplier areas p�eviousfy
listed, at ieast ten calendar days prior to bid opening by mail, exciusive of ihe day the bids are
opened? �
� �Yes � li yes, attach M/WBE mai! listing to include name of firm and address and a dated
No copy of letter�mailed: '
r
�I
�
✓Yes
� No
�
�
J
�
t� -
�
J
Date of Listing �`� ! a-'� / ��
If yes, attach list to include name of M/WBE firm, erson contacted,
phone num6er and date and time of contact.
NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. lf a facsimile
is used, attach� the fax confirmation, which is to provide M/WBE name, date, time, fax number and
documentation faxed.
NOTE: If a SIC list of �M/WBE is ten or less, the bidder.must contact the entire tist to be in compliance with
questions 3 and:4. Ifda sic .tist of �M/W8E is more than ten, the bidder must contact at least two-thirds of
the list but nof=less=ttian ten to be an compliance with questions 3 and 4:
5.) Did you provide plans and speci�cations to potential M/WBEs or information regarding the tocation of
plans and specifscations in order to assist tf�e M/WBEs?
� ,�Yes
No
L�J
C�J
�
►
1J
�
L
r
�
6.) If MIWBE bids were received and rejected, you must:
(1} List the M1WBE �rms and the reason(s) for rejection (i.e., quotation not commercially reasonable,
quatifications, etc.) and
(2) Attach affidavit andlor documentation to support the reason(s) listed below (i.e., letters, memos,
bids� telepho�e calls, meetings, etc.)
/Please use additional sheets, if aecessary, and aftach.j
Company Name Telephone Contact f'erson Scope of Work Reason for
� Rejection
�J
l�
l•J
�
�
�
�'
'
�
�
�
�
'
�
�
�
�
�
�
ADQI�Tl�NAL (NFORMATiON:
ATTACHMENT'lC
Page 3 of 3
Please provide additionat info�mation you feel wili further explain your good and honest efforts to obtain
M/V1/BE participation on this project.
PLOti�iD A'f�J�Trc�t,�L`i Fe�ci rr�t,1A�'�r R6'�mA-r�,p�rC[s su.�v�jr,Y'�n�pC-� !@c.c.o?79'/�'�.f5�.
�c�2_ '(t�c S��-i�� c�J � F-o2T �Ja2a'7f 5'?A� 7 L�. "r�1.A/!1 . CSEP% ZS� �949�
The bidder further agrees to provide, direcily to the Ciiy u�on request, complete and
accurate information regarding actual work performed on this contract, tf�e paymeni
thereof and any pro�osed changes to the original arrangemenis submitted wiih ihis bid.
The bidder atso agrees to atlow an audit andlor examinaiion of any books, records and .
fles held by iheir company ihat wi[t subsiantiaie the actua( work performed on this
contract, by an authorized offtcer or employee�of the City. �
Any intentional andlor knowing misrepresentation of facts wiil be grounds for
terminating the contract or debarment from City work for a period of not less ihan three
(3) years and for initiating action under Eederaf, State or Local taws concerriing false
s�atemenfis. Any failure io comply with this ordinance and creates a material breach of
contract may resu[t in a determination of an irresponsibte offeror and barred from
participating in City work for a�period of time not less than one (1) year. '�
The undersigned certifies that the information provided and the MlWBE�s} (isted
was/were � contacted in good faith, � lt is' undersfood that any MlWBE(sj tisted in
Atiachment ZG wil! be contacted and the reasons for not using ihem wi[I be verified by
the City's MlVYBE Of�ce. .
���� �—��C` O `��r���a.�'
Aut r� d Signature �
�Qc� C �d�Ck#A�3�
Printed Signature gpqHCH MANAQER
BRAt�lCH MA�'lAL3f�
Title
i���Ci ' ���3� �� .t�i.
Company Name P�. �Q�( � 8{}7 .
�o�rr �liio��, i: 7S1 Q�
Contact Name and Title (if different)
iT7 3�an��t
Telephone Number(s)
SiT 8�7-�9ag
Address
City/State/Zip
Fax Number
•� 0 9�z� / 9 9
Date
�
�
,
1�
�
�
�
�
�
a
a
�
1
'
'
'
e
�
OCT 20 1999 14�36 FR APAC-TEXAS INC
8178774908 TO 8718092 P.02
D..�.���d�'��
L OCT 2 0 1999 J
� �
TM 8y
APAC-Te�s, Inc. Fort Worth Hranch + 1901 Coid Springs Raad * P.O. Box 1807
Fort Worth, Texas 76101 •(S1'n 336-0521 • FAX (81'n 877-Q908
dctober 20, 1999
Mr. Najib N. �'ares, P.E.
City of Fort Worth
1000 Throckmortan St.
Fort Worth, Texas 76102
Re� H.M.A.C. Surface Overlay, 99-8
Dear Mr. Fares,
APAC-Te�cas, Inc., wovld like to utilize M/W8E participation and achieve the stated goal on the
above referenced project. As indicated on tite documsntatian, the existing M/WBE participation
exceeds the allotted l 7% project goal.
Should there be any questions or further infdratation required, please contact me immediately at
(817) 336-OS21.
Sincerely,
��"� � -�--� � �
Joei S. Michael
$ranch Manager
** T�TAL PRGE.02 **
a
� �C
0
APAC-Texas, Inc. • Fort Worth Division • 1901 Cold Springs Road • P.O. Box 1807
aFort Worth, Texas 76101 •(817) 336-0521
� September 27, 1999
�
City Manager's Office
� Minority/Women Business Enterprise Office
1000 Throckmorton Street
Fort Worth, Texas 76102
� To Whom It May Concern:
The putpose of this letter is to request a current listing of the Fort Worth M/WBE participants under the
� following categories, for the following project: HMAC Surface Overlay (99-8), in the City of Fort Worth,
which bids on 10-7-99.
� BARRICADES
CONCRETE
MILLING
a Due to the extremely limited time remaining, by which we must contact all current M/WBE businesses, the
courtesy of a response by facsimile would be appreciated. If any additional information is needed, please
contact me at (817) 336-0521.
` j ; , Thank you, �� - . . _ mm � r _ _
� �' � ��
� Charles M.A. Daniels
Pro�ect Estimator
� '
l�
�
n
0
�
0
�
D
�
�
�
a
0
a
0
0
o�
a
0
0
0
0
a
0
a
"** TX STATUS REPORT *� AS OF SEP 27 1999 10�58 PAGE.01
APAC-TEXAS INC
DATE TIME TOiFROM MODE MINiSEC PGS JOB# STATUS
07 09i27 10�58 5178716185 EC--S 00'20" 001 OK
. � � •� .•�..+••�LJJ L1�IL1<I'fII.�C UI.�/i.�IiViEH
Please be advised, lhe City of Fdr1 Vltorth does nol make any reoomm�dations as to t-is c2pahil:y or qualifications o( zny et Ihese bus�nesses to perforrn the �vorB required on City wntracs.
T�� City, (;�fEfArP., �vfll nol guardn tee, remmmend or �r've viarcanry or other assurances as to the corngetenc.y ancrnr fdness ot cErtified h1:t'�BE firms. A! !he presenl lirne, this tist ot oectiF:ed tAA4'BE
firms is being lortnulated and rnaintained by ihe Norih Cenfral Texas Regional Certification Agency (NC7RCA) solelyfor the purpose o� disseminating intamalion ot the availab�iry of
611WBE �usinesses for the Ciy. 7hese I�stings undergo cont»va1 revisions.
7he City o1 Fort LVorth w7� accept aer6f�cation of a ver�dor by Ihe IVCTRCA or Texas Department of Transportalion (highway division) in Ihe rnarketplaoe, prior to AWARD c( Qie contrad. me marketptace
area incbdes Ihe aounGes oF. Ta aant, Padcer, ,bhnson, CoIGn, DaMas, �enton, El�is, fCaufman and Rockwall. •
Piease aontacl tt►e MinuitylWomen Susiness Enterpr'se Offioe at (B17j 8T1 �6104 for any subseGuenc change(sj and�br q�estions. 11 a oer�iTied vendor's namedces rol appear nn the li�ting{s).
please call 1he MANBE O(iioe to verify. •
� M1tilIrBE Contractors Alphab�tical StC Listing
A�� ca��S nna� o�l Zsl ��
i FIRM ��DR� _ _ _.� � __ CITY _��. _ . ST Z!P
�00349903 BARRICADES
iBell Anderson P.O. Box 740052 <<��to NO�WSV��� Dallas �� TX 753740052
• Cowtown Tratiic Control, Inc. 4603 Horne Sl. I I:('1 �.Af�+ti''►Ci Fo�1 Wor�h TX 76107
� F M W DisUibutors 601 Summeri�ee Ct. t �: �$ j�p�Sh� �OY�'�"�52� Colleyvil�g 7X 76034
i Lectric Safety Lites Company. Inc. P. O. Box 5�936 ��;� �y�t� �eJ� Dallas • YX 75229-1938
I F
00177102 CONCRETE CONSTRUCTION (EXCEPT PAVING & F�UNDATION)
Alex Watton Canstruction 6510 Ctub Wood Orive 11�22 M5.11dU.3'�W1 Dallas
Allied Builders.lnc. P.O. Box 763339 - Datlas
ARedondo Construction Group 131$ W. Dickson Fort Worth
Brooks Paving Company 1411 E. Abrams �tE � 1� 24 1.P�F�!' N1eS5�'j2- a�linglon
Cantu Construction Co 4634 Kyle Circle I1:�� Le�t Messcge BaICh Springs
Charlie Vasquez Cancrete Contractor 213 W. Drew St. ! l: ZQ Po�1,5G1�^ Fvh Worth
Copetand Concrete Contractors, tnc 828 Stetla Ave �): y� y��j1i� Cop��• d. �WD I as
Dowager Construction, Inc. 64t8 la Manga Or, t j'.30 f�ta►�r�t. No �� �s
Earl's General Construction 2829 South Wood �r �1:32 Le��r MCSsaqe Oallas
F. R. Concrete 516 W. Hamrtoond Fort Worih
Gat Tex Constrvctian Co 441 E. Hwy. SO���z•�w► Gt�r��w 17oh��D�eb''dltibfK Sunnyvale
General Concrete, lnc. P.O. 6ox 532086 11 �48 WY�'►y # Grand Prairie
Gomez Consfruction 6905 Capitol Hill Dt.11�4q De,bot'a� Bus�{-buiaF`i�A�linglon'�
Guadalupe Cancrete Conslruction 3132 Lubbock ��:5'� Ne /�S Wr,f' Fod Worth
Hayden Capital Corp. P.O. Box 8369 ((:5x Lek Mcu,c�ae -Gt�lld K�'Z Fori Wort�
r
InCa Contraclors, lnc. 3dOD Peoria Ave �1:53 sy�vrc� Dallas ;
J. L. Steel, lnc. P.O. Box 1910 Roanoke��
J.E.M. IV Company 1520 Reynoldston La�e ��:55 le�r Me4sc.�e Dallas ��� •
J.R. Speedway Construction, Inc. 1720 Boyd St. Dallas ��
JEB Contractors 3115 Erie FoK Wori
JS Constrvctors, lnc. P.O. Box 862 �Z �+� �d`% Keller �
L& E Hact Enterprises, Inc. P.O. Box 861273 l2: e2 �D �� Plano ;�
Lake Richardson Construction Cornpany 4245 Avenue J I2:IS L,G�t� Mt Sta.ga Fa� N/a�
Munlcipal Development and f�Aarketing 1025 Grinnell St. Dallas t
Omega Contracting, Inc. 2818 Ruder St. Dallas ii
Onycfia IndustTies 29181vanridge l.n. �Z;�,r•) ttho►� �,{,,,�r Garland
Orena Consfruction Group, Inc. 2036 Hillview Mesquile
Payton Construction Co P.O. Box TB3265 {Z:g� Gc,� nqtS,S�e Dallas
9l27199 '
�
TX
TX
TX
7X
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
TX
C�7 � C� � C� C� C7 C� Cl C� � C�
75237
75376-3339
76110
76010
7s�ao
�s��o
75216
75248
75233
76115
75162
75450
76017
761Q9
76124
75212
76262
75232
7522A-1361
76112
78244-Q862
75086-1273
76015
75216
75212
75044
75�49
75376
PHONE
(972) 231-7317
(817) 924-A524
(817) 498-4507
(972) 243-7272
(214) 337-6156
(972) 224-8883
(817) 926-1851
(817� 22fr7283
(972� 287-1991
(s17� 923•ss7a
(214) �42-6738
(972) 931-1263
(214) 46T-8666
(817j 923-4858
(972)203-1T00
(972) 263•2670
(817) 572-2085
(817) 921•4341
(817) 478-3765
(214) 630-9423
(817) 43Q-2410
{214) 376•3955
(214) 942-4348
(817) 429-7362
(817) 431•0997
5972) 517-7652
(817) 538-1806
(214j 376-6167
(214) 689-3815
(972) 495•3734
(972) 288-2121
(214 ) 376-1130
FAX
(817) 926-2725
(817) 577-9080
(214)337-1433
(972) 224-8784
(817) 926-8078
(817j 795-8040
(972)913-8251
(214) 942-6741
(972)93i-1263
(817� 824-9879
(972) 203-9383
(972) 264-0203
(817j 572-2085
(817) 923-6ti 18
(817) 561-2368
(214) 88&0122
(817) 491-3831
(214�942-4457
(817} 446-1730
($17� 379-6043
(972)517-78�2
(8175 531-7143
(214) 689-0489
(972) 496-3760
(972) 2if8-4922
{214� 376-2817
1 of 2
C� [� C.� G� C� C�7 C=7
FIRM
R d� ��oncreie Systems � - �
Rambo Conlracling Ca., Inc.
Reece Construction Co., Inc.
Rey-Mar Construction Co.
S.Y.B. Conslnuti�n Company. InC.
Sanlos Construclion
Sesna Cvncrete
SMR Construction
Stephen 8 Associates 6uilders, Inc.
Valencia Contracting Company
Zeno Services
���� vv�sc �.ontractors l�lphab�tical SiC Listing
� ��
ADDRESS C17Y ,� ST ZIP PNONE
�i �01 ichabod C�. I: Co No ANSi�iZ -'"-' iiving ��-� TX �� 75061 �� (972) 25�-8153
P.O. Bax 731 2:/8 5�7� Alvarado TX 760U9 (817) 568-0030
P.O. Box 247 2: !4 � 6�i5y Prosper TX 750T8 (972) 347-2702
3209 Avenue J y;?,p pSC�r Marfi Kt Z Fon Warih TX 76105 (817) 535-3451
P.O. 8ox 136i4 Z:25 Le� Mt5su-�qc Arlington TX 76094 (817j 261-022(3
4751 Meadvw Trail Or Z: Z(o L,��f' Mt55�f6 Dallas TX 75236 (972) 296-5813
2105 Wagner Forl Worih TX 76106 (817) 625-0d64
500 E_ Asapaho, Ste.205 Richardson TX 75485 (972� 231-7272
6330 LBJ Freeway, Suite 230 Dalias TX 75240 (972� 7B8-0905
19U8 Arizona 2: 30 s�OLc �G � Fort WoRh 7X 76104 (817) 923-2337
520 Rorary Or Richardson TX 75081 (912) 234�174
,t
,
{F
�
FAX ,.
�—(972j 259-3211
(8 t 7 ) 5GB-0904
(972} 346-2703
(817� 53�0153
(817� 46p-0266
(972) 231-4595
(972) 786-0912
(972) 234-6174
9127199 2 of 2
C7 O [� C� C� C� C� C3 C� � 0 C� C� 0 C� C� C� C� G7
�
l!I
l■I
�
L■J
C'
l!1
�
��l
�
�
L�J
�
LJ
L�J
�
�
�
P.O. Box 1807, Fort Worth, Tx. 76101 * 1901 Cold Springs Road, Fort Worth, Tx.
76102 * Phone: (817) 336-0521 * FAX: (817) 877-4908
September 27, 1999
ez Construct'
6805 Ca i 1 Drive
Ar ' on, Texas 17
To: All subcontractors and material suppliers
APAC-Texas Inc. is soliciting Minority Business Enterprises (MBE's) and
Women Owned Business Enterprises (WBE's) to bid as subcontractors or material
suppliers on the following project(s):
City of Fort Worth- H.M.A.C: Surface Overlay ( 99-8) - Bids: October 7,1999
Project # GS93-02093052204
Plans aze available at the City of Fort Worth, 1000 Throckmorton Street, Fort Worth,
Texas "7� 102-631 l; an��we will on��cept faxed c3�ailed bids t�trt�l-'10:00 a.m: vrrt�e
date of the bid opening.
APAC-Texas Inc. requires the following minimum insurance requirements:
Coveraee Minimum Limits
A) Workers Compensation Statutory
B) Employers Liability $1,000,000.00 each accident
C) General Liability $1,000,000.00 combined single limit (occurrence basis)
D) Automobile Liability $1,000,000.00 combined single limit
E) All policies except Workers Compensation and Employers Liability shall name APAC-Texas Inc. as
additional insured and shall be primary to certificate holders own insurance coverage.
F) All policies shall provide that all rights of subrogation against APAC-Texas Inc. are waived.
Additional costs, if any, associated with these insurance requirements will need to be
included in the prices quoted. �
Sincerely,
Charles M.A. Daniels
Estimator
CMD/ms -
.
.
�r
�
�
�
�
�
Q
�
D
�
�
�
a
a
a
0
0
0
a
APAC-Tesas, Inc.
P.O. Box I80?, Fort 4�'orth, T� � 610I
September 27, 1999
SECTION - PUBLIC NOTICES
AD DESCRIPTION - BIDS WANTED
:�D RLiv Dt1TE - SEPTEVIBER 28,1999
(one day only)
APAC-Te�as, Ina :s seeldng material and,br subcontract quotations from :VI/WBE's for the following
projects: FORT WORTH-HMAC SURFACE OVERLAY (99-8)
�11 quotes must be received by mail or fa� by 1Q:00 a.m., October 7,1999. Phone (81'7} 336-4521. Fax
(81 � 877-�908.
Please contact Joel Michael at (81'� 336-0521 if you have any questions or need additional information
conceming the placement of this ad in the 'Iiiesday edition of the Fort Worth Star Telegram.
Billing address: APAC-Texas, Inc.
P.O. Box 1807
+ ;� T T -�ort VVorth, Te1as 7610 i- 2 307 f T' f
�+
a
a
�
D
�
�
'�
�
a
0
�
a
a
0
0
D
0
a
�
-** TX STATUS REPORT ** AS OF SEP 27 1999 09�17 PAGE.01
APAC-TEXAS INC
DATE TIME TOiFROM MODE MIN/SEC PGS JOB# STATUS
03 09i27 09�17 3907532 EC--S 00'18" 001 �K
• ------ ----.'---..
9
�r-Tele�ram ; � ADVERTISING INVOICE/STATEMENT
W, 7� STfeAY � � � � &Ll1NGPEfd00 2 � ADVERIIgR/CIIENTNAME
ORT WORiH, TX 761(i2 i 09/O1/1999 - 09/30/1999 I APAC TEXAS INC
�'}� 39Q7761 � I1J I TOTALAMOLNiDIE �UNAGGLtEDAMOUJ� 7I iFAu1SOFPAVMENf
L J I $66.12 I 50.00 I Net due in 21 days
�41 � QFSiNT 7S � 1-JODAK J1�ODAYS 61-0ODA1S 9t-110DAK OVER1200AY5
ederal Tcnc ID 723148254 $66.12 I $0.00 I $0.00 I $0.00 I $0.00 � $0.00
� &IIEpACCOUNfNAMEANDADIXi55 0 � f�MITTANCEA00f¢5$ � �;AGEf IS � 09/30/1999
APAC TEXAS INC Star-Telegram �
PO BOX 1807 P.O. Box 901051 � &�A��T��
� APA04
� FORT WORTH, TX 76101-1807 FORT WORTH, TX 76101-2051 b � 4o��mgaic�rNu.�a
� APA04
(800) 776-7827 I
� •.
� pAIE �� NEWSVAPQt{�F{{�NCE 1? 13 Ild I DESCAG ON .iHERCCWiMENT5/CH4P.GE5 IS SAU9� 17 11MESRlN 19 Gf�4AMOlf'7i 9 NEfAMqNf I
I I �26 I RBUC4i4YJ �¢ � 4JC4PON /D�SIfdBUINiN � VAGE IIb � &LLED WIR ID RA1E I I I I �
Previous Balance $0.00
$0.00
�8/1999 158975011 APAC-Tezas.lnc. is seeking 1 X 12 1
Start: 09/28/1999 ST FULLRUN C1 I357/FULL 0 12 LINE 5.51 $66.12 ,
$66.12
D ��
fATEMEM SUMMARY Previous Balance: $0.00
� New Chazges: ' $66.12
Debit Adjustments: $0.00
� Credit Adjustments: $0.00
Payments: $0.00
� y y� T,y . 1NVOIGE APPRQVAL.
JOB NO.'�380� ��►3���� T.RQ
� � C'Nv,
ACC4UNTAI�lT SUPT.
0 ._._......�_ ,
0
D ... .. .. . .... .... .... .... _.. ____ _.__ ..__ .__ _. __ __ __ __. __ _. _ _ _ _ __
1.. '1�-� y � � . .
� '
�
a
0
�
a
a
a
a
�
�
�
Q
��
� . .
D
�
a
0
D
a
0
0
M/WBE REQUIRED DOCUMENTATION RECEIPT
Transportation & Pubiic Works
10-11-9SF02:17 RCVD
Officiat Date: �Q .l �� l� Official Time:
Bid Date:
���� ��
Project Name: � �, ��,( �,�� �/(� ,��- �
�
. �
Project Manager: � A �r �('�Q�
Forms Submitted By
Name:
�-�/ �-� . �� ,
�P1��. - T�xcs?��,�,
�
Company:
Received By:
���� �z
�L�
L�1
�
CI
,r�
LJ
�'�
LJ
1�J
�
� . ._. ,. _..R�
�.
�I
SPECIAL
INSTRUCTION TO BIDDERS
l. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of Fort=Worth,
in an amount of not less than five (5%) per cent of the total of the bid submitted must accompany the
bid, and is subject to forfeit in the event the successful bidder fails to execute the contract documents
within ten (10) days after the contract has been awarded.
To be an acceptable surety on the bond, (1) the name of the surety shall be included on the current
U.S. Treasury, or (2) the surety must have capital and surplus equal to ten times the limit of the bond.
The surety must be licensed to do business in the state of Texas. The amount of the bond shall not
exceed the amount shown on the treasury list or one-tenth (1/10) the total capital and surplus.
2. PAYMENT BOND AND PERFORMANCE BOND: The successful bidder entering into a contract
for the work will be required to give the City surety in a sum equal to the amount of the contract
awarded. In this connection, the successful bidder shall be required to furnish a performance bond as
well as payment bond, both in a sum equal to the amount of the contract awarded. The form of the
bond shall be as herein provided and the surety shall be acceptable to the Ciry. All bonds furnished
hereunder shall meet the requirements of Article 5160 of the Revised Civil Statutes of Texas, as
amended.
In order for a surety to be acceptable to the City, (1) the name of the surety shall be included on the
cuirent U.S. Treasury List of Acceptable Sureties (Circular 870), or (2) the surety must have capital
and surplus equal to ten times the amount of the bond. The surety must be licensed to do business'in`
the State of Texas. The amount of the bond shall not exceed the amount shown on the Treasury list or
one-tenth (1/10) of the total capital and suiplus. If reinsurance is required, the company writing the
reinsurance must be authorized, accredited or trusteed to do business in Texas.
No sureties will be accepted by the City which are at the time in default or delinquent on any bonds or
which are interested in any,litigation against the City. Should any surety on the contract be determined
unsatisfactory at any time by the City, notice will be given to the contractor to that effect and the
; contractor shall immediately provide a new surety satisfactory to the City. �
�If the contract amount is in excess of $25,000 a Payment�Bond shall be executed,�in the amount of the
contract, solely for the protection of all claimants supplying labor and materials in the prosecution of
the work. '
If the contract amount is in excess of $100,000, a Performance Bond shall be executed, in the amount
� of the contract conditioned on the faithful performance of the work in accordance with the plans,
specifications, and contract documents. Said bond shall solely be for the protection of the City of fort
Worth.
��
�
l�J
,�
3. LIOUIDATED DAMAGES: The Contractor's attention is called to Part 1, Item 8, paragraph 8.6, of
the "General Provisions" of the Standard Specifications for Construction of the City of Fort Worth,
Texas, concerning liquidated damages for late completion of projects.
4. AMBIGUITY: In case of ambiguity or lack of clearness in stating prices in the proposal, the City
reserves the right to adopt the most advantageous construction thereof to the City or to reject the
proposal.
5. EMPLOYMENT: All bidders will be required to comply with City Ordinance No. 7278 as amended
by City Ordinance No. 7400 (Fort Worth City Code Section 13-A-21 through 13-a-29) prohibiting
discrimination in employment practices.
�''�
L1
�
�
l�J
L;
l'�J
�
�
L�J
L!
i
l�]
l�'
LwJ
lw1
�
C�
L1
6. �VAGE RATES: All bidders will be required to comply with provision 5159a of "Vernons Annotated
Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates as established
by the City of Fort Worth, Texas and set forth in Contract Documents for this project.
7. FINANCIAL STATEMENT: A current certified financial statement may be required by the
Department of Engineering if required for use by the CITY OF FORT �VORTH in determining the
successful bidder. This statement, if required, is to be prepared by an independent Public Accountant
holding a valid permit issued by an appropriate State Licensing Agency.
8. INSURANCE: Within ten (10) days of receipt of notice of award of contract, the Contractor must
provide, along with executed contract documents and appropriate bonds, proof of insurance for
Worker's Compensation and Comprehensive General Liability (Bodily Injury-$250,000 each person,
_ $500,000 each occurrence; Property Damage -$300,000 each occurrence). The City reserves the right
to request any other insurance coverages as may be required by each individual project.
NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statutes, the City of Fort
Worth will not award this contract to a non resident bidder unless the nonresident's bid is lower than the
lowest bid submitted by a responsible Texas resident bidder by the same �mount that a Texas resident
bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in
which the nonresident's principal place of business is located.
"Nonresident bidder" means a bidder whose principal place of business is not in this
state, but excludes a contractor whose ultimate parent company or majority owner
has its principal place of business in this state. .
"Texas resident bidder" means a bidder whose principal place of business is in this
state, and includes a contractor whose ultimate parent company or majority owner
has its principal place of business in this state.
This provision does not apply if this contract involves federal funds.
The appropriate blanks of the Proposal must be filled out by all non resident bidders in order for its bid to
�' m "+ mee�ecific,�i`ioii� Y Tti�'�i � of �"bn nreside�t co�nitractort6 �io—so will aui`omatica�ly �lisquati�f}�that -- _-=n-=
bidder.
10. MINORITY AND WOMEN BUSINESS E1vTERPRISES: In accord with City of Fort Worth
Ordinance No. 11923, as amended by Ordinance 13471, the City of Fort Worth has goals for the
participation of minority business enterprises and women business enterprises in City contracts. A
copy of the Ordinance can be obtained from the. office of the City Secretary. In addition, the bidder
shall submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM
and/or the GOOD FAITH EFFORT FORM ("Documentation") as appropriate. The Documentation
must be received no later than 5:00 p.m., five (5) City business days after the bid opening date. The
bidder shall obtain a receipt from the appropriate employee of the managing deparhnent to whom
delivery was made. Such receipt shall be evidence that the Documentation was received by the City.
Failure to comply shall render the bid non-responsive.
Upon request, Contractor agrees to provide to owner complete and accurate information regarding
actual work performed by Minority Business Enterprise (WBE) on the contract and payment therefore.
Contractor further agrees to permit an audit and/or examination of any books, records or files in its
possession that will substantiate the actual work performed by an MBE and/or WBE. The
misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud
by the Contractor wiIl be grounds for termination of the contract and/or initiation action under
appropriate federal, state or local laws or ordinances relating to false statement; further, any such
misrepresentation (othe� than a negligent misrepresentation) and/or commission of fraud will result in
�
LJ
lai
L�
�
�
�
�
lJ
�
�
�--� _= o .__ - . ,� 4
�
a. Definitions:
Certain of coverage ("certificate"). A copy of a certificate of insurance, a certificate of
authority to self-insure issued by the commission, or a coverage agreement (TWCC-81,
TWCC-82, TWCC-83, or TWCC-84), showing statutory worker's compensation insurance
coverage for the person's or entity's employees providing services on a project, for the
duration of the project� - - � . T mmT TP �_ _ — * T T 'T'!� _ '
Duration of the project-includes the time from the beginning of the work on the project until
the contractor's/person's work on the project has been completed and accepted by the
governmental entity.
� Persons providing services on the project ("subcontractor" in §406.096)-includes all persons
or entities perfomung all or part of the services the contractor has undertaken to perform on
the project, regardless of whether that person contracted directly with the contractor and
regardless of whether that person has employees. This includes, without limitation,
Q independent contractors, subcontractors, leasing companies, motor carriers, owner-operators,
employees of any such entity, or employees of any entity which furnishes persons to provide
services on the project. "Services" include, without limitation, providing, hauling, or
� delivering equipment or materials, or providing labor, transportation, or toner services related
to a project. "Services" does not include activities unrelated to the project, such as
food/beverage vendors, office supply deliveries, and delivery of portable toilets.
�
Lsl
the Contractor being determined to be irresponsible and barred from participation in City work for a
period of time of not less than three (3) years.
i l. A�VARD OF CONTRACT: Contract will be awarded to the lowest responsive bidder. The City
reserves the right to reject any and/or all bids and waive any and/or all irregularities. No bid may be
withdrawn until the expiration of forty-nine (49) days from the da[e the M/WBE UTILIZATION
FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM
("Documentation") as appropriate is received by the City. The award of contract, if made, will be
within forty-nine (49) days after this documentation is received, but in no case will the award be made
until the responsibility of the bidder to whom it is proposed to award the contract has been verified.
12. PAYMENT: The Contractor will receive full payment (minus 5% retain age) from the City for all
work for each pay period. Payment of the remaining amount shall be made with the final payment,
and upon acceptance of the project.
13. ADDENDA: Bidders are responsible for obtaining all addenda to the contract documents prior to the
bid receipt time and acknowledging them at the time of bid receipt. Information regarding� the status
of addenda may be obtained by contacting the Department of Engineering Construction Division at
(817) 871-7910. Bids that so not acknowledge all applicable addenda may be rejected as non-
resvonsive.
f4. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW:
A. Workers Compensation Insurance Coverage
b. The contractor shall provided coverage, based on proper reporting of classification codes
and payroll amounts and filing of any coverage agreements, which meets the statutory
requirements of Texas Labor Code, Section 401.011 (44) or all employees of the
contractor providing services on the project, for the duration of the project.
c. The Contractor must provide a certificate of coverage to the governmental entity prior to
being awarded the contract.
IRl
�
L�i
�
LJ
L�J
d. If the coverage period shown on the contractor's cunent certificate of coverage ends
during the duration of the project, the contractor must, prior to the end of the coverage
period, file a new certificate of coverage with the governmental entity showing that
coverage has been extended.
e. The contractor shall obtain from each person providing services on a project, and provide
to the governmental entity: -
(1) a certificate of coverage, prior to that person beginning work on the project, so the
govemmental entity will have on file certificates of coverage showing coverage for
ail persons providing services on the project; and
(2) no later than seven days after receipt by the contractor, a new certificate of coverage
O " showing extension of coverage, if the coverage period shown on the current
certificate of coverage ends during the duration of the project.
�
f. The contractor shall retain all required certificates of coverage for the duration of the
project and for one year thereafter
•g. The contractor shall notify the governmental entity in writing by certified mail or
a personal delivery, within ten (10) days after the contractor knew or should have known,
of any change that materially affects the provision of coverage of any person providing
services on the project.
�
�
r,_ ��
���
L�
�
L�J
�I
��
�
�
h. The contractor shall post on each project site a notice, in the text, form and manner
prescribed by the Texas Worker's Comp�nsarion Commission, informing all persons
providing services on the project that they are required to be covered, and stating how a
person may verify coverage and report lack of coverage. '
I. The contractor shall contractually require eachperson with whom it contracts to provide
services on a project, to:
_ � _ _ _ (�i j p�vid� cever$ge=based on'propef're�"o"rti�fg"on c'taS`sifica�io�codes�nd payioll = � -� - -� - _
amounts and filing of any coverage agreements, which meets the statutory
� requirements of Texas labor Code, Section 401.011 (44) for all of its employees
providing services on the project, for the duration of the project;
(2) provide to the contractor, prior to that person beginning work on the project, a
certificate of coverage showing that coverage is being provided for all employees of
the person providing services on the project, for the duration of the project;
(3) provide the contractor, prior to the end of the coverage period, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(4) obtain from each other person with whom it contracts, and provide to the contractor:
(a) a certificate of coverage, prior to the other person beginning work on the
project; and
(b) a new certificate of coverage showing extension of coverage, prior to the end
of the coverage period, if the coverage period shown on the current certificate
of coverage ends during the duration of the project;
(5) retain all required certificates of coverage on file for the duration of the project and
for one year thereafter. �
�
C
�
�
�
l�J
LJ
�
�
�
�#
l�
�
�
(6) notify the governmental entity_ in wiring by certified mail or personal delivery,
within ten (10) days after the person knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on the
project; and .
(7) contractually require each person with �vhom it contracts, to perform as required by
paragraphs (t) -(7), with the certificates of coverage to be provided to the person for
whom they are providing services.
By signing this contract or providing or causing to be provided a certificate of coverage,
the cbntractor is representing to the governmental entity that all employees of the
contractor who will provide services on the project will be covered by worker's
compensation coverage for the duration of the project, that the coverage will be based on
proper reporting of classification codes and payroll amounts, and that all coverage
agreements will be filed with the appropriate insurance canier or, in the case of a self
insured, witti the commission's Division of Self-Insurance Regulation. Providing false or
misleading information may subject the contractor to administrative, criminal, civil
penalties or other civil actions.
k. The contractor's failure to comply with any of these provisions is a breach of contract by
the contractor does not remedy the breach within ten days after receipt of notice of
breach from the governmental entity.
B. The contractor shall post a notice on each project site informing all persons providing services on the
project that they are required to be covered, and stating how a person may verify current coverage and
report failure to provide coverage. This notice does not satisfy other posting requirements imposed by
the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules.
This notice must be printed with a�title in at least 30 point bold type and text in at least 19 point riormal
type, and shall be in both English and Spanish and any other language common to the worker
population. The text for the notices shall be the following text, without any additional words or
changes:
.� _ _ ,. . � •`I�Q�JIR�D W=ORKE�S.E�MP�NS�IT,ION �OV�R�ACE" _� , ,. .. .. � � . .
The la�v requires that each person working on this site or providing services related to this construction
project must be covered by worker" compensation insurance. This includes persons providing, hauling
or delivering equipment or materials, or providing labor or transportation or other service related to the
project, regardless of the identity of their employer or status as an employee".
Call the Texas Worker's Compensation Commission at 512-440-3789 to receive information on the
legal requirement for coverage, to verify whether your employer has provided the required coverage,
or to report an employer's failure to provide coverage".
15. NON DISCRIMINATION: The contractor shall not discriminate against any person or persons
D because of sex, race, religion, color, or national origin and shall comply with the provisions of City
Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13A-21 through
13A-29), prohibiting discrimination in employment practices.
� 16. AGE DISCRIMINATION: In accordance with the policy ("Policy") of the Executive Branch of the
federal government, contractor covenants that neither it nor any of its officers, members, agents, or
employees, will engage in performing this contract, shall, in connection with the employment,
^ advancement or discharge of employees or in connection with the terms, conditions or privileges of
U their employment, discriminate against person because of their age except on the basis of a bona fide
occupational qualification, retirement plan or statutory requirement.
��
�
�
C��
0
�
Contractor fi�rther covenants that neither it nor its officers, members, agents, or employees, or person
acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this
Contract, a maximum a�e limit for such employment unless the specified maximum age limit is based
upon a bona fide occupational qualification, retirement plan or statutory requirement.
Contractor warrants it will fully comply with the Policy and will defend, indenu►ify and hold City
('� harmless against any and,all claims or allegations asserted by third parties against City arising out of
�� Contractor's alleged failure to comply with the above referenced Policy concernin� a�e discrimi►tation
t,.J
in the performance of this Contract.
L�J
l� 1
L�
l�l
L1
��J
17. DISCRIMINATION DUE TO DISABILITY: In accordance �vith the provisions of the Americans
�vith Disabilities Act of 1990 ("ADA"), Contractor warrants that it will not unlawfully discriminate on
the basis of disability in the provision of services to the general public, nor in the availability, terms
and/or conditions of employment for applicants for employment with, or cunent employees of
Contractor. Contractor warrants it will fully comply with ADA's provisions and any other applicable
federal state and local laws concerning disability and will defend indemnify and hold City harmless
against any claims or allegations asserted by third parties against City arising out of Contractor's
alleged failure to comply with the above-referenced laws concerning disability discrimination in the
performance of this Contract.
Revised March 15, 1996
� _ ,.,. . , . . _ ,..� ..
�
l!]
�
�
�
�
LJ
�
�
le�
L�I
r�,
I�'
I�l
LJ
�'�J
���
L�J
�
��
�
�;
���
�
�
�
�
�
�
�
CITY OF FORT WORTH
HIGHWAY CONTRUCTION
PREVAILING WAGE RATE FOR 1999
CLASSIFACTION
AIR TOOL OPERATOR
ASPHAI.T RAKER . �
ASPHALT SHOVELER
BATCHING PLANT WEIGHER
CARPENTER •
CONCRETE FII�IISHER-PAVIlVG
CONCRETE FII�ISHER-STRUCTURES
CONCRETE RUBBER
ELECIRICIAN
FLAGGER
FORM BUII.DER-STRUCT'URES
FORM LINER-PAVING & CURB
FORM SETTER-PAVING & CURB
FORM SETTER-STRUCTURES
LABORER-COMMON
LABORER-UTILITY
MECHANIC
OILER
SERVICER .
PAII�ITER-STRUCTURES
PIPE'i�`�'ER _ _ ; � - , - ._
BLASTER
ASPHALT DISTRIBUTOR OPERATOR
ASHPALT PAVING MACHINE
BROOM OR SWEEPER OPERATOR
BULLDOZER
CONCRETE CURING MACHINE
CONCRETE FINISHIIIG MACHINE �
CONCRETE PAVING JOINT MACHINE
CONCRETE PA�/II�1G JOINT SEALER
CONCRETE PAVING SAW
CONCRETE PAVING SPREADER
SLIPFORM MACHINE OPER.ATOR
CRANE, CLAMSHELL, BACKHOE, DERRICK, DRAGLINE, SHOVEL
FOUNDATION DRILL OPERATOR CRAWLER MOUNTED
FOUNDATION DRILL OPERATOR TRUCK MOUNTED
FRONG END LOADER �
MILLING MACHINE OPERATOR �
MIXER
MOTOR GR.ADER OPER.ATOR FINE GRADE
MOTOR GRADE OPERATOR
HOURLY RATE
$9.00
9.55
8.80
11.51
10.30
10.50
9.83
8.84
I5.37
7.55
9.83
9.00
9.24
9.09
7.32
8.94
I2.68
10.17
9.41
11.00
�.8� .�.
11.50
10.29
10.30
. 8.72
10.74
9.25
11.13
10.42
9.00
1039
10.50
9.92
11.04
10.00
11.83
9.96
8.62
10.30
11.97
10.96
�
�
�
L�'
�.'''
L�
� CLASSIFACTION
CITY OF FORT WORTH
HIGIiWAY CONTRUCTION
PREVATLING WAGE RATE FOR 1999
(� PAVEMENT MARKING MACHINE
l.l ROLLER, STEEL WHEEL PLANT-IVIIX PAVEMENTS
ROLLER,, STEEL WHEEL OTHER FLATWHEEL OR TAMPING
� ROLLER, PNEUMATIC, SELF-PROPELLED SCRAPER
SCR.APER
TRACTOR-CR.AWLER TYPE
� TRACTOR-PNEUMATTC
TRAVELING MIXER
WAGON-DRILL, BORING MACHINE .
REINFORCING STEEL SETTER PAVING
� REINFORCING STEEL SET'I'ER STRUCTURES
STEEL WORKER-STRUCTURAL
SPREADER BOX OPERATOR
� WORK ZONE BARRICADE
TRUCK DRNER-SINGLE AXLE LIGHT
TRUCK DRIVER-SINGLE AXLE HEAVY
�TRUCK DRIVER-TANDEM AXI,E SEMI TRAILER
- =� =��J�K�DF�NER-LOWBOY/FLOAT • .
TRUCK DRNER-TRANSIT NIIX
� TRUCK DRNER-WINCH
VIBR.ATOR OPER.ATOR-HAND TYPE
WELDER
a
�
�
L__I
�
�
2
U
HOURI,Y RATE
732
9.06
8.59
8.48
9.63
10.58
9.15
8.83
12.00
13.21
13.31
14.80
10.00
7.32
8.965
9.02
, � 8.77
10.44
9.47
9.00
732
11.57
�
�
L!'!J
L1
u
�
L!
�
I�J
�
�
LI
,� � �
�
l�]
LJ
�
�
�
�
CITY OF FORT WORTH, TEXAS
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
SPECIAL PROVISIONS
FOR: H.M.A.C. SURFACE OVERLAY (99-8)
AT VARIOUS LOCATIONS
PROJECT NO. GS93-02093052204
1. SCOPE OF WORK: The work covered by these details and specifications
consists of the surface rehabilitation of existing pavement. Including the
addition of a new surface layer of H.M.A.C. as described in the Special
Provision of these specifications. The work shall include all other
miscellaneous items of construction to be performed as outlined in the
details and specifications which are necessazy to satisfactorily complete
the work.
The contractor is encouraged to conduct site visits and survey all these
possibilities. The contractor shall verify these locations with the
Construction Engineer.
For street locations see list at the back of this document. Additional
locations may be added if needed.
Al1 short cul-de-sac streets and turnouts that intersect with a street
listed above shall be included in this contract, even though they may not
be listed due to their size. The contractor shall mill, clean, apply tack
coat, overlay and adjust facilities.
Included, in addition to the resurfacing process, 'will be the removal
(only) of all traffic buttons, removal and replacement of concrete curb
_. _ and��c�r�ter, , base repair�.and all� ather mis,�ellanep��.s, item��� const.ruction
to be performed as outlined in these specifications which are necessary to �
satisfactorily complete the work.
Total quantities given in the bid proposal may, not reflect actual
quantities, but represent the best accuracy based on a reasonable effort
of investigation; however, they are given for the purpose of bidding on
and awarding the contract.
2. Contract will be awarded to the lowest responsible and responsive bidder.
3. The Contractor agrees to complete the Contract within the allotted number
of days. If the Contractor fails to complete the work within the number
of days specified, liquidated damages shall be charged, as outlined in
Part 1, Item 8, Paragraph 8.6, of the "General Provisions" of the Standard
Specification for Construction of the City of Fort Worth, Texas.
4. The City reserves the right to abandon, without obligation to the
Contractor, any part of the project, or the entire project, at any time
before the Contractor begins any construction work authorized by the City.
SP-1
il�
L�
� 5
L�J
0
l� +
INCREASE OR DECREASE IN QUANTITIES: The quantities shown in the proposal
are approximate. It is the Contractor's sole responsibility to verify all
the minor pay item quantities prior to submitting a bid.
When the quantity of the work to be done or materials to be furnished
under any major pay item of the contract is more than 125� of the quantity
stated in the contract, whether stated by Ovmer or by Contractor, then
either party to the contract, upon demand,�zr '�De-entitled to negotiate
for revised consideration on the portion of work above 125� of the
quantity stated in the contract.
When the quantity of the work to be done or materials to be furnished
under any major pay item of the contract is less than 75� of the quantity
� stated in the contract, whether stated by Owner or by Contractor, then
either party to the contract, upon demand, shall be entitled to negotiate
� for revised consideration on the portion of work below 75� of the guantity
stated in the contract. This paragraph shall not apply in the event Owner
deletes a pay item in its entirety from this contract.
t�J
�
L�J
�
r...
�
�
�
�
L�J
�
�
A major pay item is defined as any individual bid item included in the
proposal that has a total cost equal to or grea�ter than 5 percent of the
origina]: contract.
A minor pay item is defined as any individual bid item included in the
proposal that has a total cost less than 5 percent of the original
contract.
In the event Owner and Contractor are- unable to agree on a negotiated
price, Owner and Contractor agree that the consideration will be the
actual field cost of the work plus 15� as described herein below, agreed
upon in writing by the Contractor and Department of Engineering arid
approved by the City Council after said work is completed, subject to all
other conditions of the contract. As used herein, field cost of the work
will include the cost of all workmen,.foremen, time keepers, mechanics and
laborers; all materials, supplies, trucks, equipment rental for such time
as actually used on such work only, plus all power, fuel, lubricants,
water and similar operating expenses; and a ratable portion o£ premiums on
performance and payment bonds, public liability, Workers Compensation and
all other insurance required by law or by ordinance. The Director of the
Department of Engineering will direct the form in which the accounts of
actual field cost will be kept and will recommend in writing the method of
doing the work and the type and kind of equipment to be used, but such
work will be performed by the Contractor as an independent Contractor and
not as an agent or employee o£ the City. The 15� of the actual field cost
to be paid to the Contractor shall cover and compensate him for profit,
overhead, general supervision and field office expense, and all other
elements o£ cost and expense not embraced within the actual field cost as
herein specified. Upon request, the Contractor shall provide the Director
of the Department of Engineering access to all accounts, bills and
vouchers relating thereto.
SP-2
�
l!'J
� 6. This contract and project are governed by the two following published
specifications, except as modified by these Special Provisions:
� STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION-CITY OF
FORT WORTH
�
�
�
�
�
�
�
�
.�
�
�
�
�
�
�
�
�
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION-NORTH CENTE2Ai, TEXAS
A copy of these specificatiqns may be purchased at the office of the
Department of Engineering, 1000 Throckmorton Street, 2nd Floor, Municipal
Building, Fort Worth, Texas 76102. The specifications applicable to each
pay item are indicated in the call-out for the pay item by the designer.
If not shown, then applicable published specifications in any of these
documents may be followed at the discretion of the Contractor. General
Provisions shall be those of the Fort Worth document rather than Division
1 of�the North Central Texas document.
7. Bidders shall not separate, detach or remove any portion, segment or
sheets from the contract documents at any time. Failure to bid or fully
execute contract without retaining contract documents intact may be
grounds for designating bids as "non-responsive" and rejecting bids or
voiding contract as appropriate and as determined by the Director of the
Transportation and Public Works Department.
8. The Contractor shall be responsible for defects in this project due to
faulty materials and workmanship, or both, for a period of one (1) years
from date of final acceptance of this project by the City of Fort Worth
and will be required to replace at his expense any part or all of the
project which becomes defective due to these causes.
E']
�
TRAFEIC CONTROL: The Contractor shall be responsible for providing
traffic control during the construction of this project consistent with
the.�rflvisions.�et forth�r,in. the "Latest Edition�.Texas Mazilsal on iT�grm
Trafiic Control Devices for Streets and Highways" issued under the
authority of �the "State of Texas Uniform Act Regulating Traffic on
Highways", codified as Article 6701d Vernon's Civil Statues, pertinent
sections being Section Nos. 27, 29, 30 and 31.
The Contractor will not remove any regulatoxy sign, instructional sign,
street name sign, or other sign which has been erected by the City. If it
is determined that a sign must be removed to permit required construction,
the Contractor shall contact �the Transportation and Public Works Depart-
ment, Signs and Markings Division (phone number 871-8075), to remove the
sign. In the case of regulatory signs, the Contractor must replace the
permanent sign with a temporary sign meeting the requirements of the above
referenced manual and such temporary sign must be installed prior to the
removal of the permanent sign. If the temporary sign is not installed
correctly or if it does not meet the required specifications, the
permanent sign shall be left in place until the temporary sign
requirements are met. When construction work is completed to the extent
that •the permanent sign can be re-installed, the Contractor shall again
contact the Signs and Markings Division to re-install the permanent sign
and shall leave his temporary sign in place until such re-installation is
SP-3
e�a
�
�
�
D
�
�
�
�
�
U
�
�
�
�
�
�
�
L�
a
�
completed.
The Contractor shall limit his work within one continuous lane of traffic
at a time to minimize interruption to the flow of traffic.
10 . PAYMENT : The
retainage) from
remaining amount
of the project.
Contractor will receive bi-weekly payment (minus 5�
the City for all work for each pay period. Payment of the
shall be made with the final payment, and upon acceptance
11. DELAYS: The Contractor shall receive no compensation for delays or
hindrances to the work, except when direct and unavoidable extra cost to
the Contractor is caused by the failure of the City to provide information
or material, if any, which is to be furnished by the City. When such
extra compensation is claimed a written statement thereof shall be
presented by the Contractor to the Engineer and if by him found correct
shall be approved and referred by him to the Council for final approval or
disapproval; and the action thereon by the Council shall be final and
binding. If delay is caused by specific orders given by the Engineers to
stop work, or by the performance of extra work, or by the failure of the
City to provide material or necessary instructions for carrying on the
work, then such delay will entitle the Contractor to an equivalent
extension of time, his application for which shall, however, be subject to
the approval of the City and no such extension of time shall release the
Contractor or the surety on his performance bond from all his obligations
hereunder which shall remain in full force until the discharge of the
contract.
12.
DETOURS AND BAF2t2ICADES: The Contractor shall prosecute his work in such a
manner as to create a minimum of interruption to traffic and pedestrian
facilitie5,��and to the,�flow of vehicul�x and pedestrian traffi�. �thin the ,
project area. Contractor shall protect construction, as required by
Engineer, by providing barricades. _
Barricades, warning and detour signs shall conform to the Standard
Specifications "Barriers and Warning and/or Detour Signs", Item 524,
and/or as shown on the plans.
Construction signing and barricades shall conform with the latest edition
of the "Texas Manual on Uniform Traffic Control Devices, Vol. No. 1".
13. DISPOSAL OF SPOIL/FILL MATERIAL: Prior to the disposing of any spoil/fill
material, the contractor shall advise the Director of the Department of
Engineering acting as the City of Fort Worth's Elood Plain Administrator
("Administrator"), of the location of all sites where the contractor
intends to dispose of such material. Contractor shall not dispose of such
material until the proposed sites have been determined by the Administra-
tor to meet the requirements of the Flood Plain Ordinance of the City of
Fort Worth (Ordinance No. 10056). All disposal sites must be approved by
the Administrator to ensure the filling is not occurring within a flood
plain without a permit. A flood plain permit can be issued up'on approval
SP-4
L*J
�
l �J
�
�
�
�
l"_"J
LJ
o£ necessary engineering studies. No fill permit is required if disposal
sites are not in a flood plain. Approval of the contractors disposal
sites shall be evidenced by a letter signed by the Administrator stating
that the site is not in a known flood plain or by a Flood Plain Fill
Permit authorizing fill within the flood plain. Any expenses associated
with obtaining the fill permit, including any necessary engineering
studies, shall be at contractors expense. In the event that the
contractor disposes of spoil/fill material at a site without a fill permit
or a letter from the administrator approving the disposal site, upon
notification by the Director of the Department of Engineering, Contractor
shall remove the spoil/fill material at its expense and dispose of such
materials in accordance with the Ordinance of the City and this section.
14. During the construction of this project, the Contractor shall comply with
present zoning requirements of the City of Fort Worth in the use of vacant
property for storage purposes.
15. Final cleanup work shall be done for this project as soon as the work has
been completed. No more than seven days shall elapse after completion of
construction before the roadway and right-of-way is cleaned up to the
satisfaction of the Engineer.
16. PROPERTY ACCESS: Access to adjacent property shall be maintained at all
times unless otherwise directed by the Engineer.
17. CONSTRUCTION SCHEDULE: It shall be the responsibility of the Contractor
nto furnish the Construction Engineer, prior to construction, a schedule
�.� outlining the anticipated time each phase of construction will begin and
be completed, including sufficient time being allowed for cleanup.
�. � 18. SAFETY RESTRICTIONS. � WORK. NEAR HIGH _V.pLTAGE..LINES: .���
�
�
�
�
�
LJ
l�l
The following procedures will be followed regarding the subject item on
this contract: _
(1) A warning sign not less than five inches by seven inches, painted
yellow with black letters that are legible at twelve feet shall be
placed inside and outside vehicles such as cranes, derricks, power
shovels, drilling rigs, pile drivers, hoisting equipment or similar
apparatus. The warning sign shall read as £ollows:
"WARNING --UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF
HIGH VOLTAGE LINES."
(2) Equipment that may be operated within ten feet of high voltage lines
shall have an insulating cage-type of guard about the boom or arm,
except back hoes or dippers, and insulator links on the lift hood
connections.
(3) When necessary to work within six feet of high voltage electric
lines, notification shall be given the power company (TU Electric
SP-5
���
l�J
�
�
�
�
L�J
�
l:J
L�
�
L�
�
�
�
l�J
L1
�
Service Co.) which will erect temporary mechanical barriers, de-
energize the line, or raise or lower the line. The work done by the
power company shall not be at the expense of the City of Fort Worth.
The notifying department shall maintain an accurate log of all such
calls to TU Electric Service Company, and shall record action taken
in each case.
(4) The Contractor is required to make arrangements with the TU Electric
Service Company for the temporary relocation or raising of high
voltage lines at the Contractor's sole cost and expense.
(5) No person shall work within six feet of a high voltage line without
protection having been taken as outlined in Paragraph (3).
19. RIGHT TO AUDIT:
(a) Contractor agrees that the City shall, until the expiration of three
(3) years after final payment under this contract, have access to and the
right to examine any directly pertinent books, documents, papers, and
records of the Contractor involving transactions relating to this
contract.
Contractor agrees that the City shall have access during normal working
hours to all necessary Contractor facilities and conduct audits in
compliance with the provisions of this section. The City shall give
contractor reasonable advance notice of intended audits.
(b) Contractor further agrees to include in all its subcontracts
hereunder a provision to the effect that the subcontractor agrees that the
City shall, until the expiration of three (3) years after final payment
und�r�.,��w . c�.bc,�n�act, have access to,:�nd��hea�right to examine an�r A
directly pertinent books, documents, papers,- and records of such
subcontractor, involving transactions to the subcontract, and further,
that City shall have access during normal working hours to all appropriate
work space, in order to conduct audits in compliance with the provisions
of this article. City shall give subcontractor reasonable advance notice
of intended audits.
CONSTRUCTION
The City of Fort Worth maintains a"CONFINED SPACE ENTRY PROGRAM" for its
employees and all contractors and their sub-contractors must comply with
this program as a condition of the contract. Al1 active sewer manholes,
regardless of depth, are defined as "permit required confined spaces".
Contractors will be required to complete the "CONFINED SPACE ENTRY PERMIT"
used by the Fort Worth Water Department (Field Operations Division) for
each entry and possess and use the equipment necessary to comply with this
program. The cost of complying with this program will be considered
subsidiary to the pay items involving work in confined spaces (e.g. vacu»m
testing, cleaning, televising, construction, etc.).
SP-6
�
LJ
���
� NON-PAY ITEM NO. 1- SPRINKLING FOR DUST CONTROL:
� All applicable provisions of Standard Specifications Item No. 200,
"Sprinkling for Dust Control" shall apply. However, no direct payment
will be made for this item and it shall be considered incidental to this
� contract.
NON-PAY ITEM NO. 2- REMOVAL OF TRAFFIC BUTTONS AND TEMPORARY LANE TAPE:
� All traffic buttons shall be removed from the existing asphalt surface
before resurfacing begins. The contractor shall be responsible for the
rem.oval of all buttons. Upon completion of the job the City will install
� new buttons after proper notification.
The contractor shall�also be responsible for all materials, equipment and
� labor to place temporary adhesive lane marking tape, at locations as
directed by the Construction Engineer, to direct traffic flow until
permanent markers are installed.
n , The contractor shall notify the Construction Engineer to arrange £or the
� replacement of the buttons and adhesive lane markers (arrows, etc.). All
costs to the contractor shall be figured as subsidiary to this contract.
aNON-PAY ITEM NO. 3- LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES:
The contractor shall be responsible for locating and marking all
� previously exposed manholes and water valves in each street of this
contract before the resurfacing process commences for a particular street.
(�"� The contractor shall attempt to include the Construction Engineer (if he
�� is available) in the observation and marking activity. In any event a
street shall be completely marked a minimum of two (2) working days before
� resurfacing begins on any street. Marking the curbs with paint is a
recommended procedure.
It shall be the contractors responsibility to notify the utility companies
� that he has commenced work on the project. As the resurfacing is completed
(within same day) the contractor shall locate the covered manholes and
valves and expose them £or later adjustment. Upon completion of a street
� the contractor shall notify the utilities o£ this completion and indicate
the start of the next one in order for the utilities to adjust facilities
accordingly. The following are utility contact persons:
L�1
�
�
SP-7
l!J
l■�
�
�
�
�
l�J
l�
L"J
[il
�
�
l�J
I�J
G!1
�
t�J
�
�
Company
Southwestern Bell Telephone
Texas Utilities
Lone Star
City of Fort Worth,
Street Light and Signal
Telephone Number
338-6275
336-9411
Ext. 2121
336-8381
Ext. 6982
871-8100
Contact Person
"Hot Line"
Mr. Roy Kruger
Mr. Jim Bennett
Mr. Jim Bob Wakefield
Of course, under the terms of this contract, the contractor shall complete
adjustment of the storm drain and Water Department facilities, one traffic
lane at a time within five (5) working days after completing the laying of
proposed H.M.A.C. overlay adjacent to said facilities.
Any deviation from the above procedure and allotted working days may
result in the shut down of the resurfacing operation by the Construction
Engineer.
The contractor shall be responsible for all materials, equipment and labor
to perform a most accurate job and all costs to the contractor shall be
figured subsidiary to this contract.
PAY ITEM NO. 1- PROJECT DESIGNATION SIGN:
The Contractor shall construct and install two (2) Project Designation
Signs and it will be the responsibility of the Contractor to maintain the
signs in a presentable condition at all times on each project under
construction. Maintenance will include painting and repairs as directed
by the Engineer.
It will be the responsibility of the Contractor to have the individual
project signs lettered and painted in accordance with the enclosed detail.
The quality of the paint, painting, and lettering on the signs shall be
approved by the Engineer.
The height and arrangement of the lettering shall be in accordance with
the enclosed detail.
The sign shall be constructed of 3/4" fir plywood, grade A-C (exterior) or
better.
These signs shall be installed on� barricades or as directed by the
Engineer, and in place at the project site upon commencement of construc-
tion. •
The work, which includes the painting of the signs, installing and
removing the signs, furnishing the materials, supports and connections to
the support, and maintenance shall be to the satisfaction of the Engineer.
The unit price pre bid per each will be full compensation for�all labor,
SP-8
: �J
LJ
L�J
�
l�l
�
�
�
�
material, equipment, tools, and incidentals necessary to complete the
work.
PAY ITEM NO. 2- UTILITY ADJUSTMENT:
This item is included for the basic purpose of establishing a contract
price which will be comparable to the final cost of making necessary
adjustments required due to�street improvements to water, sanitary sewer,
and natural gas service lines and appurtenances where such service lines
and appurtenances are the property owner's responsibility to maintain. An
arbitrary figure has been placed in the Proposal; however, this does not
guarantee any payment for utility adjustments, neither does it confine
utility adjustments to the amount shown in the Proposal. It shall be the
Contractor's responsibility to provide the services of a licensed plumber
to make the utility adjustments determined necessary by the Engineer. No
payment will be made for utility adjustments except those adjustments
determined necessary by the Engineer. Should the Contractor damage
service lines due to his negligence, where such lines would not have
required adjustment or repair otherwise, the lines shall be repaired and
adjusted by the Contractor at the Contractor's expense.
The payment to the Contractor for utility adjustments shall be the actual
a cost of the adjustments plus ten percent (10$) to cover the cost of bond
and overhead incurred by the Contractor in handling the utility adjust-
ments.
�J
�
L*J
�
l�
�
�
LJ
�
PAY ITEM NO. 3- MANHOLE ADJUSTMENT:
This item shall include adjusting the tops of existing manhole to match
proposed grade as shown on the plans, in the detail at the back of this
document or as directed by the Engineer. Standard Specification Item Nos.
450 "Adjusting Manholes and Inlets" and 406 "Concrete £or Structures"
shall apply except as herein modified.
The concrete shall be designed to achieve a minimum compressive strength
of 3000 pounds per square inch. Work shall be completed and street open to
traffic within seven (7) calendar days.
If the contractor fails to complete the work within seven (7) calendar
days, a$100 dollars liquidated damage will be assessed per each manhole
per day.
Prior to beginning of work, the Contractor shall make an inventory of the
condition of existing manholes. The Engineer will field verify this•
inventory and provide the Contractor replacements for broken manhole
covers. The contractor shall replace the manhole covers which are damaged
during construction at no cost to the City.
SP-9
�
LJ
l�J
u
L�1
l�J
�
�
�
�
L�J
� .
�
Included as part of this pay item shall be the application of a
cold-applied preformed flexible butyl rubber or plastic sealing compound
for sealing interior and/or exterior joints on concrete manhole sections,
as per current City Water Department Special Conditions.
The unit price pre bid per each will be full compensation for all labor,
materials, equipment, tools, and incidentals necessary to complete the
work.
PAY ITEM NO. 4- WATER VALVE BOXES ADJUSTMENT:
Contractor will be responsible for adjusting water valve boxes to match
new pavement grade. The water valves themselves will be adjusted by City
of Fort Worth Water Department forces.
Prior to beginning of work, the Contractor shall make an inventory of the
condition of existing water valve boxes. The Engineer will field verify
this inventory and provide the Contractor replacements for broken valve
boxes. The contractor shall replace the valve boxes which are damaged
during construction at no cost to the City.
The concrete shall be designed to achieve a minimum compressive strength
of 3000 pounds per square inch. Work shall be completed and street open to
traffic within seven (7) calendar days.
If the contractor fails to complete the work within seven (7) calendar
days, a$100 dollar liquidated damage will be assessed per each water
valve box per day.
The unit price pre bid per each will be full compensation for all labor,
materials, equipment, tools, and incidentals necessary to complete the
work.
PAY ITEM NO. 5- WATER METER BOX ADJUSTMENT:
This item only apply when the adjacent curb and gutter has been determined
a to be removed and replaced as directed by the Engineer. The adjustment
shall include raising or lowering the existing water meter box to the
proper grade.
�
L�J
The unit price pre bid per each will be full compensation for all labor,
materials, equipment, tools, and incidentals necessary to complete the
work.
PAY ITEM NO. 6- REMOVAL AND REPLACEMENT OF CONCRETE CURB 21ND GUTTER:
o These provisions require the contractor to remove all failed existing curb
and gutter, as designated by the Construction Engineer, and replace with
standard concrete curb and gutter, laydown curb and gutter, or in like
0 kind, as governed by the standard City Specifications. Pay limits for
laydown curb and gutter are as shown in Drawing No. S-S5 of the Standard
�
SP-10
�
�
�
�
�
�
�
L�J
LJ
Specifications. Included, and figured subsidiary to this unit price, will
be the required excavation into the street to aid in the construction of
the curb and gutter. The pay limit will be 9" out from the gutter lip,
with same day haul-off of the removed material to a suitable dump site.
The street void shall be filled with H.M.A.C. "Type D" mix and compacted
to standard City densities and top soil, if needed, shall be added and
leveled to grade behind the curb. Existing improvements within the parkway
such as water meters, sprinkler system, etc. damaged during construction
shall be replaced with same or better at no cost to the City.
Backfill for curb and gutter shall be completed within fourteen (14)
calendar days from the day of demolition to date of completion. if the
contractor fails to complete the work within fourteen (14) calendar days,
a$100 dollar liquidated damage will be assessed per block per day.
The unit price bid per linear foot shall be full compensation for all
materials, labor, equipment and incidentals necessary to complete the
work.
PAY ITEM NO. 7- REMOVAL AND REPLACEMENT OF 6" CONCRETE DRIVEWAYS:
� This item shall include the removal and replacement of existing concrete
a - driveways, due to deterioration or in situations where curb and gutter is
replaced to adjust grades to eliminate ponding water with same day haul-
off of the removed material to a suitable dump site. For specifications
governing this item see Item No. 104 "Removing Old Concrete", Item No.
� 504" Concrete Sidewalk and Driveways". Pay limits for concrete driveway
are as shown in Drawing No. S-S5 of the Standard Specifications.
�
�
The unit price bid per square yarct shall be full comp�nsation for all
labor, material, equipment, supplies, and incidentals necessary to
- complete the work. •
PAY ITEM NO. 8- REMOVAL AND REPLACEMENT OF 4" CONCRETE SIDEWALK:
This item shall include the removal ancl replacement of existing concrete
� sidewalk due to failure or in�situation where curb and gutter is replaced
to adjust grades to eliminate ponding water with same day haul-off of the
removed material to a suitable dump site. For specifications governing
� this item see Item No. 104 "Removing Old Concrete", and Item No. 504
"Concrete Sidewalk and Driveways".
�
�
�
u
The unit price bid per square yard shall be full compensation for all
labor, material, equipment, supplies, and incidentals necessary to
complete the'removal and replacement work.
PAY ITEM NO. 9- REMOVAL AND REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE:
The contractor shall remove all existing deformed H.M.A.C. pavement and/or
bad base material that shows surface deterioration and/or complete
failure. The Engineer will identify these areas upon which time the
SP-11
�sJ
C�
�
L'��
���
���
L�J
contractor will begin work. The failed area shall be saw cut, or other
similar means, out of the existing pavement in square or rectangular
fashion. The side faces shall be cut vertically and all failed and loose
material excavated. As a part of the excavation process, all
unsatisfactory base material shall be removed, if required, to a depth
sufficient to obtain stable sub-base. The total depth of excavation could
range from a couple of inches to include the surface-base-some sub-base
removal for which the Engineer will select the necessary depth. The
remaining good material shall be leveled and uniformly made ready to
accept the fill material. All excavated material shall be hauled off site,
the same day as excavated, to a suitable dump site.
� After satisfactory completion of removal as outlined above, the contractor
shall place the permanent pavement patch, with "Type D" surface mix. This
item will always be used even if no base improvements are required. The
� proposed H.M.A.C. repair shall match the existing pavement section or the
depth of the failed material, whichever is greater. However, the patch
thickness shall be a minimum of 2 inches. Generally the existing H.M.A.C.
pavement thickness will not exceed 6". Before the patch layers are
� applied, any loose material, mud and/or water shall be removed. A liquid
asphalt tack coat shall be applied to all exposed sur£aces. Placement o£
the surface mix lifts shall not exceed 3 inches with vibrator compactions
� to follow each lift. Compactions of the mix shall be to standard densities
of the City of Fort Worth, made in preparation to accept the recycling
process.
l�J
L� 1
�
�
L*J
L�J
�
LJ
�
Al1 applicable provisions of Standard Specification Item Nos. 300
"Asphalts, Oils, and Emulsions", 304 "Prime Coat", and 312 "Hot-Mix
Asphaltic Concrete" shall govern work. _
The unit price bid per cubic yard shall be full compensation for all
materials, labor, equipment and incidentals necessary to complete the
work.
PAY ITEM NO. 10 - GRADED CRUSHED STONES:
This item shall be used to repair the failed base material in areas exceed
8" deep as directed by the Engineer. The material shall be graded crushed
stones.
For specifications governing this item see Item No. 208 "Flexible Base".
The unit price bid per cubic yard shall be full compensation for all
materials, labor, equipment and incidentals necessary to complete the
work.
SP-12
�
LJ
L'J
�J
L�J
�
�
PAY ITEM NO. 11 - WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE:
1. Description
This item shall consist of milling the existing pavement from the lip
of gutter at a depth of 2" and transitioning to match the existing
pavement (0" cut) at a minimum width of 5' . The existing pavement to
be milled will either be asphalt, concrete, or brick pavement. The
removal and disposal of the milled materials shall be as directed by
the Engineer. The milled surface shall provide a smooth surface free
from gouges, ridges, oil film, and other imperfections of workmanship
and shall have a uniform textured appearance. In all situations where
the existing H.M.A.C. surface contacts the curb face the wedge milling
shall include the removal of the existing asphalt covering the gutter
up to and along the face o£ curb.
� The wedge milling operations for this project will be performed in a
continuous manner along both sides of the street. Details of milling
locations are at the back of this document. Contractor is required to
begin the overlay, within five (5) calendar days from the date of the
� wedge milling completion of any one street. Should the contractor fail
to meet th'is condition, the wedge milling will be shut down, and
liquidated damage of $500.00 per day per street will be assessed until
� all wedge milled streets are overlayed. The overlay, once begun on a
street shall continue uninterrupted until complete.
L�J
�
�
�
L�J
L�l
�
�
�
The Contractor shall haul-off the removed material to a suitable dump
site.
2. Equipment
The equipment for removing the pavement surface shall be a power
operated milling machine or other equal or better mechanical means
capable of removing, in either one pass or two passes, the necessary
pavement thickness in a five-foot minimum width. The equipment shall
be self-propelled with sufficient power, traction and stability to
maintain accurate depth of cut and slope.
The machine shall be equipped with an integral loading and reclaiming
means to immediately remove material being cut from the surface of the
roadway and discharge the cuttings into a truck, all in one operation.
Adequate back-up equipment (mechanical street sweepers, loaders, water
truck, etc.) and personnel will also be provided to keep flying dust
to a minimum and to insure that all cuttings are removed from street
surface daily. Stockpiling of planed material will not be permitted on
the project site unless designated by the Engineer. The machine shall
be equipped with means to control dust created by the cutting action
and shall have a manual system providing for uniformly varying the
depth of cut while the machine is in motion thereby making it possible
to cut flush to all inlets, manholes, or other obstructions within the
paved area. The speed of the machine shall be variable in order to
leave the desired grid pattern specified under Surface Texture.
SP-13
L�!J
LJ
LwJ
Cl
L�J
L#
LJ
��
�
�
I�i
L�7
�
L� 1
�
�
L�J
L'FJ
�
The unit price bid per linear feet shall be full compensation for all
labor, material, equipment, tools, and incidentals necessary to
complete the work.
Description:
PAY ITEM NO. 12 - BUTT JOINTS - MILLED:
This item requires the contractor to mill "butt joints" into the existing
surface, in association with the wedge milling operation (PAY ITEM NO. 9)
to the depth and at locations as described below. The but joint will
provide a full width transition section, whereby the new overlay shall
maintain constant depth at the point the new overlay is terminated and the
new surface elevation matches the existing pavement. The construction
activities, performance standards and equipment needed for the butt joints
milling operations shall be governed by the special provisions of Pay Item
No. 9- Wedge Milling. The configuration of the butt joints is described
in more detail below. General details of butt joint locations - along
with wedge milling in general - are shown in plan form at the back of this
document.
Construction Details:
Prior to the milling of the butt joints, the contractor shall consult with
the construction Engineer for proper location of these joints and verify
that the selected limits of the projects street are correct.
The general locations for but joints are at all beginning and ending
points of streets listed in the project and as more graphically detailed
at the back of this specification book. The joints are also required on
both sides of al railroad tracks and concrete valiey gutters, bridge decks
and culverts and all other items which transverse the street and end the
continuity of the asphalt surface. Each butt joint shall be 20 feet long
and milled out across the full width of the street section to a tapered
depth of 2" . This milled area shall be tapered within the 20 feet to a
depth from 0" to 2" at a line adjacent to the beginning and ending points
or intermediate transverse items. This butt joint - when overlayed - will
consist of a asphalt section that will transition the new overlay to match
the existing pavement elevation.
The contractor shall provide a temporary wedge of asphalt at all butt
joints to provide a smooth ride over the bump.
Measurement and Payment:
Butt joints as prescribed above, will be measured by the unit of each butt
joint milled. The disposal of excess material involved will not be
measured £or payment.
Each butt joint-milled, measured as above, complete-in place-in accordance
SP-14
�
LJ
I�l
LJ
�
�
�
L�1
L�J
L�J
L*J
LJ
�
L�1
L�J
�
u
�
LJ
with these specifications, will be paid for at the unit price shown in the
proposal for "Butt Joints". The unit price bid per each shall be £ull
compensation for all milling, including material haul-off, tools, labor,
equipment and incidentals necessary to complete the required work.
PAY ITEM NO. 14 - 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX):
Al1 applicable provisions of Standard Specifications, Item Nos. 312 "Hot-
Mix Asphaltic Concrete" and 313 "Central Plant Recycling-Asphalt Concrete"
shall apply to the construction methods for this portion o£ the project.
Standard Specification 312.5 (1) shall be revised as follows: The prime
coat, tack coat, or the asphaltic mixture shall not be placed unless the
air temperature is fifty (50) degrees Fahrenheit and rising, the tempera-
ture being taken in� the shade and away from artificial heat. Asphaltic
material shall also not be placed when the wind conditions are unsuitable
in the opinion of the Engineer.
The contractor shall furnish batch design o£ the proposed hot mix
asphaltic concrete for City approval 48 hours prior to placing the
H.M.A.C. overlay. The City will provide laboratory control as necessary.
The unit price bid per square yard of H.M.A.C.� complete and in place,
shall be full compensation for all labor, materials, equipment, tools, and
incidentals necessary to complete the work.
PAY ITEM NO. 15 - REMOVAL AND REPLACEMENT OF 7" CONCRETE VALLEY GUTTER:
This item shall include the removal and reconstruction of existing
concrete valley gutters at locations to be determined in field:
Removal of existing concrete valley, asphalt pavement, concrete base, curb
and gutter, and necessary excavation to install the concrete valley
gutters all shall be --s�bsic�aFy -to-t�is- pay-i�e�—E��n3si3-irtg and placing
of 2:27 concrete base and crushed limestone to a depth as directed by the
Engineer and necessary asphalt transitions as shown in the concrete valley
gutter details, shall be subsidiary to this Pay Item.
See standard specification Item No. 314, "Concrete Pavement", Item 312
"Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item
No. 106, "Unclassified Street Excavation" Item No. 208 "Flexible Base."
Measurement for final quantities of valley gutter will be by the square
yard of concrete pavement and the curb and gutter section will• be
included. '
Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu
of Crushed Stone at no additional cost. See Item 314" Concrete Pavement".
Asphalt base material may be required at times as directed by the Engineer
to expidite the work at locations idenfified in the field.
SP-15
L�J
�
CI
l�J
�
�
u
��
The concrete shall be designed to achieve a minimum compressive strength
of 3000 pounds per square inch. Contractor shall work on one-half of
Valley Gutter at a time, and the other half shall be open to traffic. Work
shall be completed on each half within seven (7) calendar days.
If the contractor fails to complete the work on each half within seven (7)
calendar days, a$100 dollars liquidated damage will be assessed per each
half of valley gutter per day.
The unit price bid per square yard for Concrete Valley as shown on the
proposal will be full compensation for materials, labor, equipment, tools
and incidentals necessary to complete the work.
PAY ITEM NO. 16 - NEW 7" CONCRETE VAI,LEY GUTTER:
This item shall include the construction of concrete valley gutters at
various locations to be determined in field.
Removal of existing, asphalt pavement, concrete base, curb and gutter, and
a necessary excavation to install the concrete valley gutters all shall be
subsidiary to this pay item. Ftiirnishing and placing of 2:27 concrete base
and crushed limestone to a depth as directed by the Engineer and necessary
D asphalt transitions as shown in the concrete valley gutter details shall
be subsidiary to this Pay Item.
y See standard specification Item No. 314, "Concrete Pavement", Item 312
;i "Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", ItP�
tJ No. 106, "Unclassified Street Excavation" Item No. 208 "Flexible Base."
. Measurement for final quantities of valley gutter will be by the square
("'j yard oP concrete pavement and the curb and gutter section will be
�� included.
u
Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu
of Crushed Stone at no additional cost. See Item 314, "Concrete Pavement".
The concrete shall be designed to achieve a minimum compressive strength
� of 3000 pounds per square inch. Contractor shall work on one-half of
Valley gutter at a time, and the other half shall be open to tra£fic. Work
shall be completed on each half within seven (7) calendar days.
l�'
�
l�J
L�J
L�1
If the Contractor fails to complete the work on each half within seven (7)
calendar days, a$100 dollars liquidated damage will be assessed per each
half of valley gutter per day.
The unit price bid per square yard for Concrete Valley as shown on the
proposal will be full compensation for materials, labor, equipment, tools
and incidentals necessary to complete the work.
PAY ITEM NO. 17 - NEW 4" STANDARD WHEELCHAIR RAMP:
The Contractor shall construct standard concrete wheelchair ramps as shown
SP-16
L�J
L1
��I
LJ
�
�
LJ
l�
�J
u
�
L�1
L�J
LJ
C�r
LJ
L+'�J
C��
�
on the enclosed details, or as directed by the Engineer.
The removal of existing substandard wheelchair ramps and sidewalk as
required for the installation of new wheelchair ramps shall be subsidiary
to this pay item. The removal and replacement of existing curb and gutter
as required for the installation of new wheelchair ramps shall be included
in Pay Item 5(Removal and Replacement o£ Curb and Gutter). Pay limits for�
laydown curb and gutter are as shown in the Standard Pay Limit Detail (WR-
1). The pay limit will extend from 9" outside the lip of gutter to 15"
back from the face of curb. Any asphalt tie-in shall be subsidiary to the
curb and gutter pay item. Pay limits for "Standard Wheelchair Ramp�' will
start 15" back from the face of curb and encompass the remainder of the
ramp and sidewalk.
All applicable provision of standard Specifications Item 104 "Removing Old
Concrete" and Item 504 "Concrete Sidewalk Driveways" shall apply except as
herein modified.
All concrete flared surface shall be colored with LITHOCHROME color
hardener as manufactured by L.M. Sco£ield Company or equal. The color
hardener shall be brick red color and dry-shake type, and shall be used in
accordance with manufactures instructions. Concrete stain may be applied
after concrete is poured (Product sold by BAER).
"Contractor shall provide a colored sample concrete panel of one foot by
one foot by three inches dimension, or other dimension approved by the
Engineer, meeting the aforementioned specification. The sample, upon
approval by the Engineer, shall be the acceptable standard to be applied
for all construction covered in the scope of this pay item.
The method of application shall be by screen, sifter, sieve or other means
in order to provide for a uniform color distribution."
The unit price bid per square yard for 4" standard wheelchair ramp as
shown on the proposal will be full compensation for materials, labor,
eguipment, tools and incidentals necessary to compete the work.
PAY ITEM NO. 18 - 6" PERFORATED PIPE SUBDRAIN:
This item shall consist of furnishing and installing 6" perforated
subdrain and £ilter material all as shown on the enclosed details, or as
directed by the Engineer.
A11 applicable provision of standard Specifications Item 500 "SUBDRAINS"
shall apply except as herein modified. The pipe material shall be poly
vinyl chloride (PVC) with the standard dimensional ration of 35 {SDR35)
and meet the ASTM D 1784. Filter fabric shall have the capability of
passing ground water without transporting the soil placed around the
filter fabric. The fabric shall be constructed exclusively of synthetic
thermoplastic fibers and may be either woven or nonwoven to form a mat of
uniform quality. Fabric fibers may be either continuous or discontinuous
SP-17
L�J
��l
�
LJ
�
�
and oriented in either a random or a aligned pattern throughout the
fabric. The fabric shall be mildew resistant, rot proof, shall be
satisfactory for use in a wet soil and aggregate environment, contain
ultraviolet stabilizers and have nonravelling edges.
The fabric shall meet the following requirements when sampled and tested
in accordance with the methods indicated.
Test
Original Physical Properties Method
Fabric weight, on an ambient SDHPT Test Method
� temperature air-dried tension Tex-616-J
£ree sample, expressed in "Testing of Construc-
oz/sq. yd. tion Fibers"
L!'�J
LJ
L�J
Water flow rate by falling
head method, 7.9 inches
(20 cm) to 3.9 inches (10 cm)
on 2 inch ID cylinder with 1
inch diameter orifice, with
flow rate expressed in
gal/sq. ft/minute. •
Tex-616-J
� Breaking load in either
machine or cross-machine
direction, expressed
in pounds.
LJ
�
�
�
�
�
C'�
�
Equivalent opening size
(US Standard sieve no.)
"Apparent elongation" at
breaking load in either
machine or cross-machine
direction, expressed as
percent.
ASTM Designation:
D 1682 grab method G
as modified by Tex-
-616-J
Requirements
4.0 minimum for under
drains and Slope
Stabilization, 6.0
minimum for Gabions
Revetment
80 minimum
100 minimum
CW-02215, US Army 70 to 100
Corps of Engineers,
Civil Works Construction
Guide Specification.
"Plastic Filter Fabric",
November, 1977.
ASTM Designation: 100 maximum
D 1682 grab method G
as modified by Tex
-616-J
The "Filter Fabric" shall be installed in accordance with the
manufacturer's recommendations, as indicated or as directed by the
Engineer. When lapping is required, it shall be in accordance with the
manufacturer's recommendations. Backfilling around the Filter Fabric shall
be done in such a way as not to damage the Filter Fabric material during
the placement.
The unit price bid per L.F, shall be full compensation for all labor,
SP-18
�
L�J
tJ
�
materials, equipments, tools, and incidentals necessary to complete the
work. .
PAY ITEM NO. 21 - 8" PAVEMENT PULVERIZATION:
� Contractor shall pulverize the existing pavement to a depth of 8". After
pulverization is completed, contractor shall temporary remove and store
the 8" deep pulverized material, then cut the base 2" to provide place for
the new 2" H.M.A.C. surface. The 2" base cut shall start at a depth of 8"
� from the existing pulverized surface. After the undercut operation is
completed, contractor shall spread, mix, and compact the pulverized
material to a 95� compaction per City's Standard Specifications or as
{� directed by the Engineer in the field. A 5� portland cement shall be used
Uto mix the pulverized material.
� If the existing pavement has a combination of 10" H.M.A.0 and crushed
stone/gravel, undercut will not be required, the contractor will pulverize
10" inches, the 2" inch cut will be taken from the 10" pulverized
material. (see soil test report) .
�
LiJ
�
LJ
�
LJ
L�J
�
L�J
l�J
�
The unit price bid per square yard shall be full compensation for all
labor, material, equipment, tools, and incidentals necessary to pulverize,
remove and store the pulverized material, undercut the base, mixing,
compaction, haul off, sweep, and dispose of the undercut material.
The 2" H.M.A.C. surface will be paid by separate item.
PAY ITEM NO. 23 - REMOBILIZATION:
This item shall compensate the Contractor to remobilize personnel,
equipment, supplies, and material to perform an additional work as
directed by the Engineer. Remobilization will be considered when concrete
"Flat-work" has been completed, personnel and equipments were demobilized,
and the street is clean and ready for the overlay. Remobilization shall be
determined by the Engineer. Any Remobilization without the approval of the
Engineer will not be compensated. .
The unit price per bid per each will be full compensation for all labor,
equipment, material, tools, and all incidentals necessary to complete the
work.
PAY ITEM NO. 24 - UNCLASSIFIED STREET EXCAVATION:
This item will be used if additional excavation is needed that is not
covered by Pay Item No. 21 -" 8" PAVEMENT PULVERIZATION". Additional
Excavation is the removal of the excessive crown and base to bring the new
base to proper grade & City standard specifications for street
reconstruction. All applicable provisions of Item 106 shall apply, work
shall be paid per cubic yard.
SP-19
�■J
LJ
� PAY ITEM NO'. 25 - 2" SURFACE MILLING:
a This item shall consist of milling the existing pavement at a depth of 2".
All applicable provisions of Item No. 11 "Wedge Milling" shall apply. The
unit price bid per square yard shall be full compensation for all
� materials, labor, equipment and incidentals necessary to complete the
work.
�
�
�
�
�
�
�
�
LJ
�
L�J
�
�
�
END OF SECTION
SP-20
�'
�
L� I
u
THE STATE OF TEXAS
CITY OF FORT WORTH, TEXAS
CONTRACT
KNOW ALL MEN BY THESE PRESENTS:
L■J
�
�
I�I
COUNTY OF TARRANT
This agreement made and entered into this the 23'" day of November , 19 99
by and befinreen the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas,
organized and existing under and by virtue of a special charter adopted by the qualified voters within
said City on the 11th day of December, A.D., 1924, under the authority (vested in said voters by the
"Home Rule" provision) of the Constitution of Texas, and in accordance with a resolution duly passed at
a regular meeting of the City Council of said city, and the City of Fort Worth being hereinafter termed
Owner, and APAC-Texas, Inc. HEREINAFTER CALLED Contractor.
� WITNESSETH: That said parties have agreed as follows:
� 1.
That for and in consideration of the payments and agreements hereinafter mentioned to be
(�'j made and performed by the Owner, and under the conditions expressed in the bond bearing even date
L� herewith, the said Contractor hereby agrees with the said Owner to commence and complete the
construction of certain improvements described as follows:
u
'�
HMAC SURFACE OVERLAY 99-8
AT VARIOUS LOCATIONS
� Designated as project number,
�J
GS93-02093052204
��
That the work herein contemplated shall consist of furnishing as an independent contractor all
�labor, tools, appliances and materials necessary for the construction and completion of said project in
accordance with the Plans and Specifications and Contract Documents prepared by the Department of
Engineering for the Transportation and Public Works Department of the City of Fort Worth adopted by
� the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are
hereto attached and made a part of this contract the same as if written herein.
�
�
� C-1
C
�,
3.
�l
I�l
�
L■JI
�
�
I�I
I■I
L�J
L�J
l�J
n
The Contractor hereby agrees and binds himself to commence the construction of said work
within ten (10) days after being notified in writing to do so by the Department of Engineering of the City
of Fort Worth. �
4.
The Contractor hereby agrees to prosecute said work with reasonable diligence after the
commencement thereof and to fully complete and finish the same ready for the inspection and approval
of the Department of Engineering of the City of Fort Worth and the City Council of the City of Fort Worth
within a period of One Hundred (100) working days.
If the Contractor should fail to complete the work as set forth in the Plans and Specifications and
Contract Documents within the time so stipulated, plus any additional time allowed as provided in the
General Conditions, there shall be deducted from any monies due or which may thereafter become due
him, the sum of $ 315.00 per working day, not as a penalty but as liquidated damages, the
Contractor and his Surety shall be liable to the Owner for such deficiency.
5.
Should the Contractor fail to begin the work herein provided for within the time herein fixed or to
carry on and complete the same according to the true meaning of the intent and terms of said Plans,
Specifications, and Contract Documents, then the Owner shall have the right to either demand the
surety to take over the work� and complete the same in accordance with the Contract Documents or to
take charge of and complete the work in such a manner as it may deem proper, and if, in the
completion thereof, the cost to the said City shall. exceed the contract price or prices set forth in the said
Plans and Specifications made a part hereof, the Contractor and/or its Surety shall pay said City on
demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said
excess cost.
:
�
u
�
I_�I
�
Contractor covenants and agrees to indemnify City's engineer and architect, and their
personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and
agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants
and employees, from and against any and all claims or suits for property loss, property damage,
personal injury, including death, arising out of, or alleged to arise out of, the work and services to be
performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or
invitees, whether or not anv such iniurv, damaqe or death is caused, in whole or in ,part. bv the
C-2
'I�
�neplicxence or al/eped neqliqence of Owner, its officers, servants, or emplovees. Contractor
likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and
all injuries to Owner's officers, servants and employees and any damage, loss or destruction to
�praperty of the Owner arising from the performance of any of the terms and conditions of this
Contract, whether or not anv such iniury or damaqe is caused in whole or in part bv the
neqlipence or aUeqed neqliqence of Owner, its officers, servants or emplovees.
� In the event Owner receives a written claim for damages against the Contractor or its subcontractors
prior�to final payment, final payment shall not be made until Contractor either (a) submits to Owner
psatisfactory evidence that the claim has been settled and/or a release from the claimant involved, or
(b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been
referred to the insurance carrier.
� The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public
work from a Contractor against whom a claim for damages is outstanding as a result of work
� performed under a City Contract.
�
7.
The Contractor agrees, on the execution of this Contract, and before beginning work, to make,
� execute and deliver to said City of Fort Worth good and sufFcient surety bonds for the faithful
perFormance of the terms and stipulations of the Contract and for the payment to all claimants for labor
�and/or materials furnished in the prosecution of the work, such bonds being as provided and required in
Article 5160 of the Revised Civil Statutes of Texas, as amended, in the form included in the Contract
Documents, and such bonds shall be 100 percent (100%) of the total contract price, and the said surety
�shall be a surety company duly and legally authorized to do business in the State of Texas, and
acceptable to the City Council of the City of Fort Worth.
■I
��
� Said City agrees and binds itself to pay, and the said agrees to receive, for all of the aforesaid
work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted
�by the successful bidder hereto attached and made a part hereof. Payment will be made in monthly
installments upon actual work completed by contractor and accepted by the Owner and receipt of
invoice from the Contractor. The agreed upon total contract amount (including/excluding) alternates
� shall be
Eight Hundred Twenty Six Thousand, One Hundred Seventy Two Dollars
� and Twenty Five Cents
�
L!J
$826.172.25
C-3
L�1I
�
�
�
� It is further agreed that the perFormance of this Contract, either in whole or in part, shall not be
sublet or assigned to anyone else by said Contractor without the written consent of the Director of the
� Department of Engineering.
u
10.
The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is
aclassified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto
and made a part hereof the same as if it were copies verbatim herein.
LI
11.
aThe Contractor shall procure and shall maintain during the life of this contract insurance as
specified in paragraph 8 of Special Instruction to Bidders of this contract documents.
�
12.
� It is mutually agreed and understood that this agreement is made and entered into by the parties
hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of
�the State of Texas with references to and governing all matters affecting this Contract, and the
Contractor agrees to fully comply with all the provisions of the same.
�N WITNESSETH WHEREOF, the City of Fort Worth has caused this instrument to be signed in Six 6
counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the
. corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through
aits duly authorized officers in Six 6 counterparts with its corporate seal attached.
CI�'
C��
C!
�
�
��
a�
� Done in Fort Worth, Texas, this the 23�d day of November , 19 99 .
�
L AJ
RECOMMENDED:
CITY OF FO T WO �
0
v�
^ --
ASSISTANT CITY MANAGER v
���-�� C-��=- � ��� � `t`
DIRECTOR, DEPARTMENT OF �
ENGINEERING
Ai�AC - TEXAS, �IC.
�
�q
�
�
L'J
(Contractor)
BY: �"�.��v : �
� (Representative)
JOEL. S. MiCHAEL
� BAANCH MANAGER
(TITLE)
�
�
�
�
�
�
�
(Address)
P. Q. �OX ISO�f
,� T ��v��TH. TX '?�id3t
(City/State/Zip)
November 1960
Revised May 1986
Revised September 1992
Revised January 1993
Revised April 1999
Revised June 1999
APPRO EQ,,_ _
� �' yd!� � _, �
, �t-' � �,'
DIREC ,R, Tf�`ATiSPORTATION ,'�ND
PUBLIC WORKS
ATTEST:
o � ��1_.-r�
CITY SECRE�Y
(SEAL)
APPROVED AS TO FORM &
LEGALITY:
�
SSIS NT CITY ATTORNEY
�_— � ���f'�
Contract Authorization
..,,,,L.,L..�„_,,.,;� � � C� -- --
�9���
C-5
�
�
■1
CONTRACTOR COMPLIANCE WITH
WORKER'S COMPENSATION LAW
�
Pursuant to Article 8308-3.23 of Vernon's Annotated Civil Statutes, Contractor, APAC-Tegas, Inc. certifies
� that it provides worker's compensation insurance coverage for all of its employees employed on City of
Fort Worth project HMAC Surface Overlav 99-8 project number, GS93/020930522040.
J
iJ
��
�
STATE OF TEXAS
COUNTY OF TARRANT
BY� (�C\��..Z-��
J4EL S. MICHAEL
BRANCH MANAC3ER
Title
!2/0� 1 99
� �Date
3
E
BEFORE ME, the undersigned authority, on this day personally appeared
� JOEL S. MICHAEL , known to me to be the person
�
�
�
�
�
whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as
the act and deed of ��A� - T�X�, �. , for
the purposes and considerations therein expressed and in the capacity therein stated.
GIVEN LTNDER MY HAND AND SEAL OF OFFICE this l st day of
�eCem er'
�t�YPV�, MARY SIMPSON � �� �
* �� NOTARY PUBLIC - � �
STATE OF TEXAS Not Public in and for the State of Texas
�f+rfoFs��''' . My COI11m. Exp. 07-09-2001 � �'
(a) Contractor agrees to provide to the City a certificate showing that it has obtained a policy
� of workers compensation insurance covering each of its employees on the project in compliance
with state law. No Notice to Proceed will be issued until the Contractor has complied with this
asection.
(b) Contractor agrees to require each and every subcontractor who will perform work on the
Oproject to provide to it a certificate from such subcontractor stating that the s�bcontractor has a
policy of workers compensation insurance covering each employee employed on the project.
� Contractor will not permit any subcontractor to perform work on the project until such certificate
has been acquired. Contractor shall provide a copy of all such certificates to the City.
�
� A:13WORKCOM.FRM
�
��l
�
' �J
�J
L�J
�
�J
BOND N0. 14-000-060-0026
PERFORMANCE BOND
TF� STATE OF TEXAS
COUNTY OF TARRANT
KNOW ALL MEN BY THESE PRESENT: That we (1) APAC-Texas, Inc.
(2) Comaanv of Tezas hereinafter called Principal and� (3)
Liberty Mutual Insurance Company � ,
a corporatiori organized and existing under the laws of the State and fully authorized to transact business
in the State of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a municipal
corporation organized and existing under the laws of the State of Texas hereinafter called Owner, in the
penal sum of:
Ei�ht Hundred Twentv Six Thousand, One Hundred Seventy Two Dollars & Twentv Five Cents
$826,172.25 Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County,
Texas, for the payment of which sum well and truly be made, we hereby bind ourselves, our heirs,
executors, administrators, and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a
� � certain contract with the City of Fort Worth, the Owner, dated the 23rd day of November .1999 , a
copy of which is hereto attached and made a part hereof, for the construction of:
�I
I,I
�J
�
L■J
�
�
�
�
LJ
f �J
HMAC SURFACE OVERLAY 99-8
AT VARIOUS LOCATIONS
designated as Project Number GS93/020930522040 ., a copy of which contract is
hereto attached, referred to, and made a part hereof as fully and to the same extent as if copies at length
herein, such project and construction being hereinafter referred to as the "work".
NOW THEREFORE, if the Principal shall well, truly and faithfully perform the work in
accordance with the plans, specification, and contract document during the original term thereof, and any
extensions thereof which may be granted by the Owner, with or without notice to the Surety, and if he
shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save
harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and
shall reimburse and repay the owner all outlay and expense which the Owner may incur in making good
any default, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED FURTI�R, that if any legal action be iiled upon this bond, venue shall lie in
Tarrant County, State of Texas. �
AND PROVIDED FURTI�R, that the said Surety, for value received, hereby stipulates and
agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work
to be performed thereunder or the specifications accompanying the same shall in any wise affect its
obligation on this bond, and it does hereby waive notice of any such change, extension of time alteration
or addition to the terms of the contract or to the work or to the specifications.
A:l4PERBOND.FRM
�
� . IN WITNESS WHEREOF, this instrument is executed in 6 Counterparts each one of which
shall be deemed an original, this the 23rd day of November .1999.
a
OATTEST: �
� (Princi al) ecre
a(SEAL)
a
�
� 12750 Merit Drive, Suite 710
(Address)
Dallas, TX 75251
�
ATTEST:
�
(Surety) Secretary
� � , � , �-.
(SEAL) � � �
a .. �
. � . �;��� �� ,
�Vitness as to Surety
a
�
�
This instrument is executed in six
� counterparts, each one of which shall
be deemed an original.
a �� �
� A:14PERBOND.FRM
A{�AC - TEXAS, �C•
Principal (4)
By: �.���
Et, S. MICHAE�
Bf�ANCH MANA(3ER
(Printed Name/Title)
ADDRESS
P. O. �X 18t!?
FOR'�' �7V0'�tTH. 'f'�l' �1��
CITY/STATE/ZIP
Liberty Mutual Insurance Company;�
(Surety)
����:����� '
By:
(Attorney-in-Fa t) (5)
Elaine Wakefield
(Printed Attorney-in-Fact)
Note:
(1)
i2�
i3i
i4�
(S)
Date of Bond must no1 be prior to date of
Conhac!
Correct name of Contractos
A Corporalion, a Parmership or and
Individual, as case may be
Correct Name of Surety
IJContractor is partnership all Partners
should execute bond
A true copy of Power of Attorney shall be
attached to bond by Attorney-in-Fact
�
�
THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. S 4 Z� H�
This Power of Attorney limits the act of those named herein, and they have no authority to bind the Company except in the
manner and to the extent herein stated.
LIBERTY MUTUAL INSURANCE COMPANY
BOSTON,MASSACHUSETTS
POWER OF ATTORNEY
KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the "Company"), a Massachusetts
mutual insurance company, pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name,
� constitute and appoint, DIANE ESTEP, CYNTHIA PREWITT, JAMES M. RUTLEDGE, ELAINE WAKEFIELD,
`' RANDY WHITE, LINDA F. HUGHES, ALL OF THE CITY OF FORT WORTH, STATE OF TEXAS ...................................
...............................................................................................................................................................................................
...............................................................................................................................................................................................
...............................................................................................................................................................................................
...............................................................................................................................................................................................
, each individually if there be more than one named, its true and lawful attomey-in-fact to make, execute, seal, acknowledge and deliver, for and on its
behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding
E(FTEEN MILLION AND 00/10f1*"�*"** l** DOLLARS ($ 15,000,000.00*"*''* ) each, and the execution of such bonds or
' undertakings, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by
.,.; the secretary of the Company in their own proper persons.
.�
'i
�
aN
Y �
d
, � C
� j
d
��
i�
d>
ti �
n�
sN
O i
qj O
i ;;
�
ai +.
�a
rL
a�
> _
i +�+
Q co
�
3 �•
- t�
.3 C
� i
��
v
That this power is made and executed pursuant to and by authority of the following By-law and Authorization:
ARTICLE XVI - Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer or other official of the company authorized for that purpose in writing by the chairman or the president, and subject to such
limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the
company to make, execute, seal, acknowledge and deliver as surety any and atl undertakings, bonds, recognizances and other surety
obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the
company by their signature and execution of any such instruments and to attach thereto the seal of the company. When so executed such
instruments shall be as binding as if signed by the president and attested by the secretary.
By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys-in-fact:
Pursuant to Article XVI, Section 5 of the By-laws, Assistant Secretary Garnet W. Elliott is hereby authorized to appoint such attorneys-in-fact
as may be necessary to act in behalf of the company to make, execute, seal, acknowledge and deliver as surety any and aIl undertakings,
bonds, recognizances and other surety obligations.
That the By-law and the Authorization above set forth are true copies thereof and are now in full force and effect.
IN WITNESS WHEREOF, this instrument has been subscribed by its authorized officer and the corporate seal of the said Liberty Mutual Insurance
Company has been affixed t�ert�io in Plymouth Meeting, Pennsyivania this 23rd day of MafCh , 1999 .
�- �
" LIBERTY MUTUAL INSURANCE COMPANY
gy ��e.� G✓. = ,��'G�•.T.6
Garnet W. Elliott, Assistant Secretary
COMMONWEALTH OF PENNSYLVANIA ss
COUNTY OF MONTGOMERY
On this 23rd day of March , A.D. i 9� , before me, a Notary Public, personaily came the individual, known to
me to be the therein desc�bed=i- idual and officer of Liberty Mutual Insurance Company who executed the preceding instrument, and he acknowled-
ged that he executed 1� ar�ie artd< the seal affixed to the said preceding instrument is the corporate seal of said company; and that said corporate
seal and his signatu,�:���#��� was duiy affixed and subscribed to the said instrument by authority and direction of the said company.
� IN
_�
o_
I , REOF, l`t� �o set my hand and affix my official seal at Plymou Meeting, P, the day and year first above written.
�, .� � t - - �
�� �
� .�,i ��, �� � � ,� ����� �, � � r ; Notary Public ��
�'r�. �
� x`Ps.��t����� t:. .�. ___ _ . _� � CERTt�1�A�E
I, the undersigned; ��ta�'i�' retary of Liberty Mutual Insurance Company, do hereby certify that the original power of attorney of which the
, foregoing is a full, true and coYt�c�y, is in full force and effect on the date of this certificate; and I do further certify that the officer who executed the
' said power of attorney was one of the officers specially authorized by the chairman or the president to appoint any attorney-in-fact as provided in Article
� XVI, Section 5 of the By-laws of Liberty Mutual Insurance Company.
This certificate may be signed by facsimile under and by authoriry of the following vote of the board of directors of Liberty Mutual Insurance
� Company at a meeting duly called and held on the 12th day of March, 1980.
VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company wherever appearing upon a certified
copy of any power of attorney issued by the company, shall be valid and binding upon the company with the same force and effect as
though manually affixed.
�
�
IN TE IMON WHEREOF, I have her ubscribed my name and affixed the corporate seal of the said company, this 23rd day of
�ovember Pl'��'9S
, ;� �
�,->~�-',-',�;%, sistant ec etary
THIS POWER OF ATTORNEY MAY NOT BE USED TO EXECUTE ANY BOND WITH AN INCEPTI E AFTER March 23 , 20 Ol
�'
C�
I■'
�
�I
�
f�l
BOND N0. 14-000-060-0026
PAY�VIENT BOND
TI� STATE OF TEXAS
COUNTY OF TARRANT
BOND NO. 141503264
KNOW ALL MEN BY THESES PRESENTS: That we, APAC-Texas, Inc. a corporation
Tarrant County, Texas , hereinafter called Principal and (3)
Liberty Mutual Insurance Company
of _,
�
corporation organized and existing under the laws of the State and fully authorized to transact business in
the State of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a municipal
corporation organized and existing under the laws of the State of Texas, hereinafter called Owner, and
unto all persons, frms, and corporations who may furnish materials for, or perform labor upon, the
building or improvements hereinafter referred to in the penal sum of:
Ei�ht Hundred Twentv Six Thousand. One Hundred Seventv Two Dollars & Twentv Five Cents
$826,172.25 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the
� payment of which sum well and truly be made, we bind ourselves, our lieirs, executors, administrators
and successors jointly and severally, firmly by these presents.
� TI� CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a
certain contract with the City of Fort Worth, the Owner dated the 23rd day of November . 1999,
a copy of which is hereto attached and made a part hereof, for the construetion of:
�
'�
�
�
�
L�J
HMAC SURFACE OVERLAY 99-8
AT VARIOUS LOCATIONS
designated as Project Number GS93/020930522040 copy of which contract is hereto
attached, referred to, and made a part hereof as fully and to the same extent as if copied at length herein,
such project and construction being hereinafter referred to as the "works".
NOW, TF�REFORE, the condition of the obligation is such that, if the Principal shall promptly
make payment to all claimants as defined in Article 5160 of the Revised Civil Statutes of Texas,
supplying labor and cnaterials in the prosecution of the work provided for in said Contract, then this
obligation shall be null and void, otherwise it shall remain in full force and effect.
THIS BOND IS MADE AND ENTERED into solely for the protection of all claimants supplying
labor and material in the prosecution of the work provided for in said Contract, as claimants are defined
in said Article 5160, and all such claimants shall have a direct right of action under the bond as provided
in Article 5160 of the Revised Civil Statutes.
PROVIDED FURTHER, that if any legal action be filed upon this bond, venue shall lie in
� Tarrant County, State of Texas, and that the said Surety, for value received, hereby stipulates and agrees
that no change extension of time, alteration or addition to the terms of the contract or to the work to be
performed thereunder or the specification accompanying the same shall in any wise affect its obligations
Q on this bond, and it does hereby waive notice of any such change, extension of time, alteration or
addition to the terms of the contract or to the work or the specifications.
�
!!J
PROVIDED FURTHER, that no iinal settlement between the Owner and the Contractor shall
A:15PAYBOND.FRM
It!
I■I
CI
u
�
I■I
abridge the right of any beneficiary hereunder whose claim shall be unsatisfied.
IN WITNESSETH WHEREOF, this instrument is executed in 6 counterparts, each one of which
shall be deemed an original, this the 23rd day of November ,1999.
ATTEST:
(Pri ip Secr tary
� (SEAL)
�
�
�
�
12750 Merit Drive, Suite 710
(Address)
Dallas, TX 75251 �
ATTEST:
(Surety) Secretary
D� �� - ��� - .
L■J
I�J
�
(S�.AL) .
Witness as to Sure�y
�
This instrument is executed in six
n counterparts, each one of. which shall
U be deemed an original.
��
0
0
A'�I��C - TEXAS, �C.
Principal (4)
BY: o ��.,Q4.�_
EL, S. MiCNAEL
�sw-�,ar�� n
� (Printed Name/Tit e�
ADDRESS
P. 4 �X !8U't
F�t3R'�` WOR'��i, '�"7�C '�1�t
CITY/STATE/ZIP
Liberty Mutual Insurance Company
(Surety)
� ���/i ' r
By: G��(idGCiC d%G�
(Attomey-in-F ct) (5)
Elaine Wakefield
(Printed Attorney-in-Fact)
Note:
(1)
(Z)
(3)
(4)
Date of Bond must not be prior to date of
Contract
Correct name of Contractor
A Corporation, a Parmership ar and
Individual, as case may be
Correct Name of Surety
If Contractor is Parmership all Partners
should execute bond
f�41
� arrr i�■i r� ww w �� � r � a� � .� � �■rr iwrr �,r� � ■�
�
�
�
N
�
q,_�„
, „
a 1 —5 0�
�� I
PMS 288 (BLUE)
�
�
� � � ��� .
� -
� , , . +�-- - �.�, '
O' .. . .�i.:�w�Yb'� � ili . . �
--�-� ',�,, x \ PMS 167 ( COPPER )
� --.....�f �.-�..-
STREET MAINTENANCE PROGRAM
;
� �
CONTRACTOR' S NAME �
�- �
� TELEPHONE NUMBER .
� �
PROJECT ��SI�NATIQN SI�N
�
�
�
�
�
?� �� �r� ,c� , ,c� � � � � � �,-�,,, .�-� �,�„ � c,_� , , �
; �
f , .
: � � "- `' � L E�GE�O . _ - _ �
�
� . �' < �
' ' , r � � �� H.M;A.C. REHA!lIL,ITATION � '
r .. .
� �I 11 11 ft�� WEOOEMILLMIQ :
� z � (R�CYCLE /OVERL.AY ONLY �) '
_ � .
o -
,/ z � . � .. . . / .
• J � . . .
�.
� BUTT JOINT ,,
� •• `
. . � .
. � �
�
� STREET 8£G!N OR -
� . END POINT. .
. . � � . REGAROLESS OF �
� THE INTERSECTIN(3 =
o , STREETS ANGLE: :
z NOTE: BU7T JO1NT3 NOT
o REpU1RE0 WITH ,
,� REMIXIN� PROCESS.
o—� '
� i'YPIC�AL . � � R�,,,SEo:
' LAYOUT. FOR RECYCLiN6 ACTiVITE3 . ncv.M., o�rt:
� � 1 t990
� UNLESS NOTE�' OTMERWiSE IN STREET SCHEOUL£ ` �
' I �
� .
L��
,rs.�._ �-•-��u,r� �r-w,�,�-�'1 , ' �"""";
��
i
. � '`�
. �
i . .
�
�
�
LEGEND�
� �
�t� �� �� t�
a
i�
� ' �
H.M.A.C.RENABiI.lTATION �`�
�
1NE�GEMILLfNG ( RECYCLE
IOVERLAY ONIY.) �
NOTE �1)if ANY COM91NA110N OFiSLANDS �
ANQ RIGHT TURN LANES ARE ABSENT
' TURN RAOtt1S SHALL 8� TREATED
, AS S7ANDARO. BUTT JOINT SHALI
8E SQUAR�� 0�'F, IF NEEOEO
AS A RESUL7 OF EXIS'TiM(3 CONC,
YALLEY (itlTTER.
(2) BU7T JOINTS NOT REOUIREO
WITH REMIXING PROCESS,
� TYPlCAL �
� I.AY�UT FOR RECYCLINB ACTIV171E3 WHEN INTER3ECTING
- STREETS ARE RECYCLED SIMULTANEOUSLY
� UNLESS NOTEO OTHERWISE IN STREEY SCHEOULE • '
,• , :
� �""'� "
-- ;
yr
�
,�
;
�
��
a
�-4 �
RE VISEO:
REV. M�. I OATt!
1 I 19 90
1
�
�
1 �J
L�J
�
��
�J
�
�
�
�
�
�
�
�
�
�■1
STREET
AMERiCAN BLVD
BARWICK DR
BEC.LAIRE DR S
CAMELOT RD
COLUSA DR
DALFORDST
DIANE DR
DRISKELL BLVD
ELLIS AV
FAA BLVD
GLENMONT DR
N HAMPTON ST
LONGSTRAW DR
S[LVER SAGE DR
TRAIL LAKE DR
HMAC SURFACE OVERLAY (99-8)
FROM TO TYPE btAP LNI
FAA BLVD TRINITY BLVD MOL 56J 2.59
SOUTH DR S HULEN ST MOL 89P l32
MEADOW$ WEST DR S CHANGE OF PAVEMEN MOL 88K 2.48
- BURMEISTER DR SYCAMORE SCHOOL R MOL 104D 1.7
DENBURY DR WALTON AV MOL 90S 0.44
2401 DALFORD ST N SYLVANIA AV , MOL 63Q 0.61
WALTON AV WREN AV MOL 90T 0.16
MICKI LYtV�f AV BONNELL AV POL 75P 1.3
NW 23RD ST NW 25TH ST MOL 62G 0.98
AMERICAN BLVD HWY 360 MOL 56J 1.14
WOODWAY DR VEGA DR MOL 89V 0.8
NE 32ND ST NE 29TH ST MOL 36S 0.92
WHITEWOOD DR N RIVERS[DE DR MOL 35V 1.51
BASSWOOD BLVD WESTERN CENTER BL MOL 36T 2.31
I-ZO SERVICE RD WOODWAY DR MdL 89R I.OS
Total Lane Miles 19.31
n POL = Pulverized Overlay
is
CD
5
3
3
6
6
2
6
7
2
5
6
2
4
4
6
NIOL = Niill Overlay MIC = Microsurfacing Thursday, September 09,1999
L�l
L
LJ
�
�
�
�
L�J
�
�
`�J
�
,�
L! i
�
�
�
1�
STREET
AMERICAN BLVD
BARWICK DR
BELLAIRE DR S
CAMELOT RD
COLUSA DR
DALFORDST
DIANE DR
DRISKELL BLVD
ELLIS AV
FAA BLVD
GLENMONT DR
N HAMPTON ST
LONGSTRAW DR
SILVER SAGE DR
TRAIL LAKE DR
HMAC SURFACE OVERLAY (99-8}
FROM TO TYPE MAP LM
FAA BLVD TRINITY BLVD MOL 56J 2.59
SOUTH DR S HULEN ST MOL 89P 132
MEADOWS WEST DR S CHANGE OF PAVEMEN MOL 88K 2.48
BURMEISTER DR SYCAMORE SCHOOL R MOL 104D 1.7
DENBURY DR WALTON AV MOL 90S 0.44
2401 DALFORD ST N SYLVANIA AV MOL 63Q 0.61
WALTON AV WREN AV POL 90T 0.16
MICKI LYNN AV BONNELL AV POL 75P 1.3
NW 23RD ST NW 25TH ST MOL 62G 0.98
AMERIC.AN BLVD HWY 360 MOL 56J 1.14
WOODWAY DR VEGA DR MOL 89V 0.8
NE 32ND ST NE 29TH ST MOL 36S 0.92
WHITEWOOD DR N RIVERSIDE DR MOL 35V 1.51
BASSWOOD BLVD WESTERN CENTER BL MOL 36T 231
I-20 SERVICE RD WOODWAY DR MOL 89R 1.05
Total Lane Miles 19.3t
POL = Pulverized Overlay MOL = Mill Overlay MIC = Microsurfacing
�
CD
5
3
3
6
6
2
6
7
2
5
6
2
4
4
6
Friday, September 10, 1999
�
City of Fort Worth, Texas
�1►�Ayar And C,,aunc�l C,ammun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
11 /23/99 **C-17760 20APAC 1 of 2
SUBJECT AWARD OF CONTRACT TO APAC-TEXAS,INC. FOR HMAC URFACE OVERLAY 99-8 AT
SPECIFIED LOCATIONS
• ��, •
It is recommended that the City Council authorize the City Manager to execute a contract with APAC-
Texas, Inc. in the amount of $826,172.25 for 100 working days for HMAC Surface Overlay 99-8.
DISCUSSION:
In the 1998-99 Contract Major Maintenance Program, various types of street maintenance techniques
are grouped into specific contract packages. HMAC Surface Overlay 99-8 provides for surface and
base rehabilitation, curb and gutter, and valley gutter replacements fo� asphalt streets at specified
locations, funded from the Contract Street Maintenance Fund and the Street Improvements Fund.
The following list details the limits for each of the streets included in this project:
STREET
���
�
American Boulevard
Barwick Drive
Bellaire Drive South
Camelot Road
Colusa Drive
Dalford Street
Diane Drive
Driskell Boulevard
Ellis Avenue
FAA Boulevard
Glenmont Drive
North Hampton Street
Longstraw Drive
Silver Sage Drive
Trail Lake Drive
FAA Boulevard
South Drive
Meadows West Drive South
Burmeister Drive
Denbury Drive
2401 Dalford Street
Walton Avenue
Micki Lynn Avenue
NW 23rd Street
American Boulevard
Woodway Drive
NE 32nd Street
Whitewood Drive
Basswood Boulevard
I-20 Service Road
This project is located in COUNCIL DISTRICTS 2, 3, 4, 5, 6, and 7.
Trinity Boulevard
South Hulen Street
Change of pavement
Sycamore School Road
Walton Avenue
North Sylvania Avenue
Wren Avenue
Bonnell Avenue
NW 25th Street
Highway 360
Vega Drive
N E 29th Street
North Riverside Drive
Western Center Boulevard
Woodway Drive
This proj�ct was advertised for bid on September 9 and 16, 1999. The following bids were received on
October 7, 1999.
Caty of Fort Worth, Texas
�1✓��yar And � .�,aunc��� -.C,�mmun�cA��an
DATE REFERENCE NUMBER LOG NAME PAGE
11 /23/99 **C-17760 � 20APAC 2 of 2
SUBJECT AWARD OF CONTRACT TO APAC-TEXAS, ING FOR _,HI�IAC SURFACE OVERLAY 99-8 AT
SPECIFIED LOCATIONS
' �! :�
APAC-Texas• Inc• , -
Sutton and Associates, Inc..
J. L. Bertram Construction and Engineeri�ng, lnc.
Peachtree Construction
Austin Bridge and Road, Inc.
Branch and Sons Contractors, inc.
,
Pavecon, Inc. r
Alshall Constru�tion Corrapany.,
Il �'� C�1�] ►`�ii
� 826.172.25
� $ 844,1,60.25
$ 857,031.30
$ 869,748.50
$ 904,135.25
$ 947,920.00
$1,103,413.25
$1,270,340.00
The low bidder, APAC-Texas, Inc. is in compliance with the City's M/WBE Ordinance by committing to
17% M/VVBE participation: The City's goal on this project is 17%.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budgets, as appropriated, of
the Contract Street Maintenance and the Street Improvements Funds..
MG:k
.
Submitted for City Manager's
Office by:
Mike Groomei , ��
Originating. Departdtent Head:
I FUND
� (to)
.• , �
6140, �
Hugo Malanga ' 7801 I (from)
GS93
Additional Information Contact: I C111
. .. �
Najib Eares , 7800 I
ACCOUNT I CENTER I AMOUNT
541200 020930522040 $823,723.25
541200 020111053211 $ 2,450.00
CITY SECRETARY
�ov�o
CiTY COUN�i�.
�QY 23 �,g
i ��)
., l�u��/
City Secretary of the
City of Fort @Vorth, Texas