Loading...
HomeMy WebLinkAbout064740-A1 - Construction-Related - Contract - Dunaway Associates, LLCAMENDMENT No .1 CSC No. 64740-A1 TO CITY SECRETARY CONTRACT No. 64740 WHEREAS, the City of Fort Worth (CITY) and Dunaway Associates, LLC, (ENGINEER) made and entered into City Secretary Contract No. 64740, (the CONTRACT) which was administratively authorized on the 16th day of February, 2026 in the amount of $ 70,089.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Exposition Way Slope Stabilization Project, CPN 105816; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $16,900.00. (See Attached Funding Breakdown Sheet, Page -4-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $86,989.00. OFFICIAL RECORD CITY SECRETARY 3. FT. WORTH, TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as designated Assistant City Manager. City of Fort Worth, Texas Prof Services. Agreement Amendment Template Revision Date: June 13, 2025 Page 1 of 3 of the date subscribed by the City's Exposition Way Slope Stabilization Project CPN105816 APPROVED: City of Fort Worth Jesica McEachern Assistant City Manager DATE: 07/02/2026 4,p9vvanq ATTEST: p°t'foRT009dd Pv8 g=o *o KLI.(JCK/!./.YI.� GGCi ��a� nEX654dp Jannette Goodall City Secretary APPROVAL RECOMMENDED: ENGINEER Dunaway Associates, LLC Jcofi WfigM(Jun 21, 2026 23:16:41 CDT) Josh Wright, PE Associate Principal DATE: 06/21 /2026 Lauren Prieur (Jun 25, 2026 11:59:25 CDT) Lauren Prieur, PE Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Iretomiwa Otuyelu (Jun 17, 2026 11:43:23 CDT) Iretomiwa Otuyelu, PE Professional Engineer APPROVED AS TO FORM AND LEGALITY: Douglas Black (Jun 25, 2026 18:32:09 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services. Agreement Amendment Template Revision Date: June 13, 2025 Page 2 of 3 M&C No.#: NA M&C Date: NA OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Exposition Way Slope Stabilization Project CPN105816 FUNDING BREAKDOWN SHEET City Secretary No. 64740 Amendment No. 1 Fund Dept ID Account Project ID CF1- Activity CF2 - Bond Reference Amount 30100 0200431 5330500 105816 E03330 9999 $16,900.00 Total: $16,900.00 City of Fort Worth, Texas Exposition Way Slope Stabilization Project Prof Services Agreement Amendment Template CPN105816 Revision Date: June 13, 2025 Page 3 of 3 DUNAWA y Dunaway No. 5081.025 May 21, 2026 Iretomiwa Otuyelu, PE City of Fort Worth, Transportation and Public Works 100 Fort Worth Trail Fort Worth, Texas 76102 Reference: Exposition Way Slope Stabilization Project Amendment No. 1 City Secretary Contract No. 64740 CPN 105816 On February 16, 2026, Dunaway Associates, LLC entered into a contract with the City of Fort Worth to provide Professional Engineering Services for the above -referenced project in the amount of $70,089.00 (lump sum). Following receipt of the Notice to Proceed (NTP), Dunaway prepared and submitted 60% and 90% PS&E deliverables for City review. During the development of the 60% PS&E, Dunaway was directed to incorporate approximately 3,700 linear feet of already delineated pavement repair along Exposition Way. This additional scope was incorporated in the 60% submittal. After review of the 60% deliverables, the City requested additional scope items. A summary of the additional scope items include: • Addition and incorporation of pavement repair, including sidewalk and ramp replacements, along with associated design sheets, details, and site visits. • Expanded scope of wall repair and replacement along the entire section of roadway, including incorporation of the wall into the plans, site visits, details, and structural analysis. • Tree survey along Exposition Way and incorporation of the survey data into the construction plans. • Additional French drain and slope seepage mitigation along the wall near 4816 Exposition Way. • Additional coordination, site visits, and RFI during construction. The design elements noted above have already been incorporated into the 90% PS&E deliverable, with the exception of the tree survey, which is currently ongoing. To complete the additional scope requested by the City, Dunaway has determined that supplemental consulting engineering effort is required to bring the project through final design, construction phase services, and project closeout. Accordingly, we respectfully request an amendment to the current contract in the amount of $16,900.00, increasing the total not -to -exceed amount from $70,089.00 to $86,989.00. This amount represents a conservative estimate of the additional funding needed to complete the project while maintaining the high level of service the City of Fort Worth expects from Dunaway. dunaway.com Oakland Blvd & Miller Ave Safe Streets Project —Amendment No. 2 May 21, 2026 Page 2 Thank you for the opportunity to continue serving the City of Fort Worth on this project We look forward to your approval of this amendment and are available to discuss any questions or provide additional detail as needed. Sincerely, DUNAWAY ASSOCIATES, L.L.C. a Texas limited liability company Josh Wright, PE Sr. Project Manager I Associate Principal Attachments: LOE spreadsheet - Amendment No. 1 to Contract 64740 (Dated 5/21 /2026) dunaway.com O a wr ■irnir IIIII li FORT WORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Exposition Way Slope Stabilization — Engineering Agreement M&C: 25- OOXX CPN: 105816 CSO: DOC#: 2 Date: To: Name Department Initials Date Out 1 Lizbeth Medina Bus-Sppt LM 06/17/2026 2. Josh Wright Consultant Signature 06/21 /2026 3. Iretomiwa Otuyelu TPW — Signature o. 06/17/2026 4. Zelalem Arega TPW - Initial 06/23/2026 5. Mary Hanna TPW - Initialer 06/23/2026 6. Patricia Wadsack TPW AD — Initial pLVY 06/25/2026 7. Lauren Prieur TPW Director — Signature xxen Pr;eur 06/25/2026 8. Doug Black Legal - Signature _�_ Douc las Black 06/25/2026 9. Jesica McEachern CMO - Signature 07/02/2026 10. Jannette Goodall CSO - Signature c 07/02/2026 11. TPW Contracts TPW 12. 13. CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts ALSO List: - Bus Sppt: Lizbeth Medina; Prg Mgr.: Zelalem Arega; Sr CPO— Mary Hanna DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: EYES ®No RUSH: ❑YES ®No SAME DAY: EYES ❑No NEXT DAY: EYES ❑No ROUTING TO CSO: ❑YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: Please notify TPWContracts(kfortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you! FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Dunaway Associates, LLC Subject of the Agreement: Amendment No. 1 to CSC No. 64740, an Engineering Services Agreement for the Exposition Way Slope Stabilization Project M&C Approved by the Council? * Yes ❑ No 8 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 8 No ❑ 64740-A1 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: Expiration Date: If different from the approval date. If applicable. Is a 1295 Form required? * Yes ❑ No 8 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 105816 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.