HomeMy WebLinkAbout063360-CO3 - Construction-Related - Contract - Woody Contractors, Inc.CSC No. 63360-0O3
City of Fort Worth
Change Order Request
Project Name 1 2022 Bond Year 2 Contract 12 City Sec # 63360
Client Project #(s) 104213
Project Description Water, sewer and paving improvements on various streets
Contractor Woody Contractors, Inc. Change Order # 3 Date 6/1/2026
City Project Mgr. Brittany Darrah City Inspector F Hector Montoya
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Unit 1: Water
Unit 2: Sewer
Unit 3: Paving
Unit 4: Streetlights
Unit 5: Stormwater
Totals
Contract Time
(CD)
$4,051,626.25
$1,071,153.50
$4,005,068.00
$0.00
$0.00
$9,127,847.75
450
$59,156.50
$411,746.50
$100,561.40
$571,464.40
95
$4,051,626.25
$1,071,153.50
$4,064,224.50
$411,746.50
$100,561.40
$9,699,312.15
545
Amount of Proposed Change Order
$0.00
$0.00
$0.00
$0.00
$0.00
0
Revised Contract Amount $4,051,626.25 $1,071,153.50 $4,064,224.50 $411,746.50
Original Funds Available for Change Orders $202,581.00 $53,558.00 S200,254.00 $0.00
Remaining Funds Available for this CO $202,581.00 $53,558.00 $141,097.50 $0.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
$100,561.40
$9,699,312.15
545
$0.00
$456,393.00
$0.00
$397,236.50
$11,409,809.69
JUSTIFICATION (REASONS) FOR CHANGE(
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL furnish all labor, materials, equipment, and incidentals necessary to complete the work described in Change
Order No. 3. Change Order No. 3 adds several new pay items required to address unforeseen field conditions encountered during construction. These items include concrete paving
improvements in the alley between Lisbon Street and W. Vickery Boulevard; tree removals necessary to provide adequate space for construction activities in the alleys between Alamo Avenue
and Valentine Street and between Lisbon Street and W. Vickery Boulevard. This change order also adds a pay item for a 16-inch sanitary sewer casing where the proposed sewer line crosses
through an existing stormwater arch pipe in the alley between Alamo Avenue and Valentine Street. The casing is required to provide separation and protection of the sanitary sewer line and to
reduce the risk of contamination of the storm drainage system in the event of a sanitary sewer failure.
Cost: Staff has reviewed the contractor's proposed unit prices and compared them with pricing from recent, comparable projects. Based on this evaluation, the proposed pricing is determined
to be fair and reasonable. The higher cost for the larger tree removals and 6" pavement is due to tight alley conditions that limit equipment access and increase labor and effort.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time
and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person
responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name Contractor (Name) Contract Signature
Date
Woody Contractors, Inc. Troy Woody T 1:1 °1 -Me Mls:.C.1
06/22/2026
Inspector/Inspec
Date
Project and Contract Compliance Manager
Date
�26°°498CDT)
06/22/2026
06/22/2026
Program -Man
Date
Senior Capi, f
Date
06/22/2026
z„ e
zo r n:aa ore
c
06/23/2026
Date
Director, Contracting Department (Dept)
Date
Pcitricia 1- WadSIoK
'-� , trivia L. Wad—k (J- 25, 2026 11:41:11 CDT)
06/25/2026
X-7&--
06/25/2026
Assistant City 'A to
Date
Assistant City Manager
Date
03 °°n
06/25/2026
1
07/0 3/2026
Council Action (if required)
M&C Number IN/A M&C Date Approved NIA
ATTEST FFogry?opd�
Jannette Goodall, City Secretary °PP %'* moo* a
dp4nnnEp656q
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
V--- Change Order Additions
Project Name 202.2 Bond Year 2 Contract 12 City Sec # 63360
Client Project# 104213
Contractor Woody Contractors, Inc. PM Brittany Darrah Inspector Hector Montoya
Change Order Submittal # 0 Date 61112026
ADDITIONS
ITEM
DESCRIPTION
uEPT
ty
Unit
Unit Cost
Total
65
0241.010 emove i ewal
nd Ma -ter-
500.00000000
F
3.50
1,750.00
66
3213.0301 4" Conc Sidewalk
Unit 1: Water
500.00000000
SF
$12.05
67
0241.0300 Remove ADA Ramp
Unit 1: Water
2.00000000
EA
$200.00
00.00
68
3213.0501 Barrier Free Ramp, Type R-1
Unit : Water
1.00000000
EA
3,750.00
,75 .
69
3213.0504 Barrier Free Ramp, Type M-2
Unit 1: Water
1.00000000
EA
$3,600.00
3,600.00
37
3110.0102 6"-12" Tree Removal
Unit 2: Sewer
3.00000000
EA
$375.05
25.00
38
3110.0104 18"-24" Tree Removal
Unit 2: Sewer
2.00000000
EA
$3,112.50
$6T225.00
39
3305.1002 16" Casing By Open Cut
Unit 2: Sewer
20.00000000
LF
$245.054,90
.00
40
3213.0101 6" Conc Pvmt
Unit 2: ewer
815.00000000
SY
139.00
13, 5.
41
3211.0111 4" Flexible Base, Type A, GR-1
Unit 2: Sewer
875.00000000
SY
$14.052,
5 . 0
Unit 1: Water
$15,500.00
Unit 2: Sewer
$137,785.00
Unit 3: Paving
$0.00
Unit 4: Streetlights
$0.00
Unit 5: Stormwater
$0.00
Sub Total Additions
153,285.00
Change Order Additions Page 2 of 3
Foe_�0RTH City of Fort Worth
Change Order Deletions
Project Name 2022 Bond Year 2 Contract 12 City Sec # 63360
Client Project # 104213
Contractor Woody Contractors, Inc. PM Brittany Darrah Inspector Hector Montoya
Change Order Submittal # 0 Date 61112026
DELETIONS
�'
' rrr
3201.0400 Temporary Asphalt Paving Repair
'.- rrr rI
3305.0204
I IIII1111�
., II
'.� II II
®3305.0207rI
rrrlrrrl
rI
r rI rI
Unit 1: Water
0 r1
II
Unit 3: Paving
1 II
Unit 4: Streetlights
1 II
ter1
,�•
II
.
'. Ir
Change Order Deletions Page 3 of 3
104213-CNCO-2022 Bond Year 2 Contract 12 —
Change Order #3
Interim Agreement Report
Created: 2026-06-22
By: Andrea Munoz(Andrea. M unoz@fortworthtexas.gov)
Status: Out for Signature
Transaction ID: CBJCHBCAABAA6YmTZZ6k1LMImEo5Jjv84t5F1jBX5gnn
Agreement History
2026-06-22
Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will
be generated when the agreement is complete.
"104213-CNCO-2022 Bond Year 2 Contract 12 — Change Order
#3" History
,_j Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2026-06-22 - 2:12:21 PM GMT- IP address: 208.184.124.181
Document emailed to Jaylyn HarrelsonOaylyn.harrelson@fortworthtexas.gov) for filling
2026-06-22 - 2:31:03 PM GMT
Document emailed to Troy Woody (twoody202O@aol.com) for signature
2026-06-22 - 2:31:04 PM GMT
'— Document emailed to Hector Montoya (Hector.Montoya@fortworthtexas.gov) for signature
2026-06-22 - 2:31:04 PM GMT
Email viewed by Hector Montoya (Hector.Montoya@fortworthtexas.gov)
2026-06-22 - 2:31:31 PM GMT- IP address: 204.10.90.100
Document e-signed by Hector Montoya (Hector.Montoya@fortworthtexas.gov)
Signature Date: 2026-06-22 - 2:42:28 PM GMT - Time Source: server- IP address: 204.10.90.100 - Signature Appearance Selected: DRAW
'21 Email viewed by Troy Woody (twoody202O@aol.com)
2026-06-22 - 3:13:15 PM GMT- IP address: 104.22.104.72
Document e-signed by Troy Woody (twoody202O@aol.com)
Signature Date: 2026-06-22 - 3:15:33 PM GMT - Time Source: server- IP address: 50.84.77.98 - Signature Appearance Selected: DRAW
FORTWORTH. P--dby
Adobe
Acrobob
at Sign
m. Email viewed by Jaylyn Harrelson Qaylyn.harrelson@fortworthtexas.gov)
2026-06-22 - 4:44:14 PM GMT- IP address: 104.47.64.254
Form filled by Jaylyn Harrelson(jaylyn.harrelson@fortworthtexas.gov)
Form filling Date: 2026-06-22 - 4:53:32 PM GMT - Time Source: server- IP address: 208.184.124.181 - Signature Appearance Selected:
TYPE
Document emailed to Gary Deyon (Gary.Deyon@fortworthtexas.gov) for signature
2026-06-22 - 4:53:36 PM GMT
Document emailed to Brittany Darrah (brittany.darrah@fortworthtexas.gov) for signature
2026-06-22 - 4:53:36 PM GMT
Email viewed by Brittany Darrah (brittany.darrah@fortworthtexas.gov)
2026-06-22 - 4:53:55 PM GMT- IP address: 104.47.64.254
Email viewed by Gary Deyon (Gary.Deyon@fortworthtexas.gov)
2026-06-22 - 5:18:56 PM GMT- IP address: 108.145.134.56
rc Document e-signed by Gary Deyon (Gary.Deyon@fortworthtexas.gov)
Signature Date: 2026-06-22 - 5:21:19 PM GMT - Time Source: server- IP address: 104.28.78.92 - Signature Appearance Selected:
MOBILE —IMAGE
FORTWORTH. Pmw lly
Adobe
Acrobob
at Sign
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: 2022 Bond Year 2 Contract 12 — Change Order #3
M&C: N/A CPN: 104213 CSO: 63360 DOC#:
Date: 06/22/2026
To:
Name
Department
Initials
Date Out
1.
Jaylyn Harrelson
TPW - initial
06/22/2026
2.
Troy Woody
Contractor - signature
T Q.�ood
06/22/2026
3.
Hector Montoya
TPW - signature
H c--'.. [ova
06/22/2026
4.
Gary Deyon
TPW - signature
Ga . evon
06/22/2026
5.
Brittany Darrah
TPW - signature
w
06/22/2026
6.
Greg Robbins
TPW - signature
06/22/2026
7
Mary Hanna
TPW - signature
m,,,l
06/23/2026
8
Patricia Wadsack
TPW - signature
PLW
06/25/2026
9
Lauren Prieur
TPW - signature
&P
06/25/2026
10.
Doug Black
Legal - signatures
06/25/2026
11.
Jesica McEachern
CMO - signature
07/03/2026
12.
Jannette Goodall
CSO - signature
"
07/06/2026
13.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: DYES ®No
RUSH: DYES ®No SAME DAY: DYES ®No NEXT DAY: DYES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts ccbFortWorthTexas.g_ov at ext. 7233 for pick up when completed.
Thank you!
FORTWORTH.-
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Woody Contractors, Inc.
Subject of the Agreement:
2022 Bond Year 2 Contract 12 - Change Order 3
M&C Approved by the Council? * Yes ❑ No
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ® No ❑
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes IN No ❑
If unsure, see back page for permanent contract listing.
63360, #3
Is this entire contract Confidential? *Yes ❑ No ® If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: Ifapplicable. 104213
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.