HomeMy WebLinkAbout056504-CO2 - Construction-Related - Contract - The Fain Group, Inc.CSC No. 56504-CO2
FORT WORTH City of Fort Worth
Change Order Request
Project Name TS-18 HROM Safety Site Locations City Sec # 56504
Client Project #(s) HROM Safety and Closure Improvements Construction Contract - Citywide Various Projects Site Locations and CPNs
Project Replacement, extension and/or improvements of existing Hazardous Road Overtopping Mitigation (HROM) construction contract through citywide
Description work orders.
Contractor The Fain Group, Inc. Change Order# 2 Date 6/16/2026
City Project Mgr. Caleb Luebbert City Inspector N/A
Contract Time
Dept. TPW Totals CD
Original Contract Amount $2.000,000.00 $2,000,000.00 1,304
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $2.000.000.00 $2.000.000.00 1.304
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $2,500,000.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Additional bid items are needed but were not included in the original unit price contract. The items being added are needed for the construction of the HROM safety
improvements at various locations around the City as per changing City request for these sites, differing conditions, or railroad requirements. For example, removal and
replacement of signs on existing post at the Keller Hicks Road site. Another example, 36" RCP for a turn around at the Greenbeld Road site.
The proposed unit cost have been compared to the Traffic improvement "Recommended Unit Prices" Master List. The City finds that the Contractor's proposed installation
price is fair and reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Company Name �i
_ Contractor (Name)
Contract Signature
Dgte ,
The Fain Group, Inc.
Steven Aouirre
—'If a
06/22/2026
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
`— ,
06/22/2026
_,� ; 1 ,�, .,�
06/22/2026
Program Manager
Date
ital Project Officer
Date
06/25/2026
06/26/2026
Assistant Director Dept —
Date
Director, Contracting Department (Dept)
Date
2026 ''.
Ii12.33 CDC
06/26/2026
�--�'
06/29/2026
Assistant City Attom2y
Date
JAssistant City Manager
Date
06/30/2026
07/07/2026
Council Action if require
ATTEST:
Jannette Goodall, City Secretary
M&C Number 21-0524 M&C Date Approved 8/3/2021
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
Change Order Additions
Project Name TS-18 HROM Safety Site Locations City Sec # 56504
Client Project # HROM Safety and Closure Improvements Construction Contract - Citywide Various Projects Site Locations and CPNs
Contractor The Fain Group, Inc. PM Caleb Luebbert Inspector NIA
Change Order Submittal # Date 6/16/2026
ADDITIONS
ITEM
DESCRIPTION
DEPT
Oty
Unit
Unit Cost
Total
1
Remove/Furnish/Replace Sign on Ex. Post
TPW
0.00
EA
$532.38
$0.00
2
Guardrail End TRT (MSKT)
TPW
0.00
EA
$6,792.50
$0.00
3
6" BRK Pvmt Markings HAS (W)
TPW
0.00
LF
$2.00
$0.00
4
8" SLID Pvmt Markings HAS (W)
TPW
0.00
LF
$2.00
$0.00
5
Install Gaurdrail MB GRID FENCE (WOOD) 31"
TPW
0.00
EA
$66.55
$0.00
6
8" Flexible Base, Type D, GR-1
TPW
0.00
SY
$34.17
$0.00
7
3" Asphalt Pvmt Type D
TPW
0.00
BY
$82.68
$0.00
8
36" RCP, Class IV
TPW
0.00
LF
$429.58
$0.00
9
36" Straight Headwall, 2 Pipes
TPW
0.00
EA
$28,016.14
$0.00
10
36" SET, 2 Pipes
TPW
0.00
EA
$15,875.00
$0.00
11
Install Road Closure Gate
TPW
0.00
EA
$8,826.74
$0.00
12
Furnish/Install Delineator on Exist Guardrail
TPW
0.00
EA
$236.25
$0.00
13
Furnish/Install Alum Sign on Existing Pole
TPW
0.00
EA
$532.38
$0.00
TPW
$0,00
Sub TotalAdditions
Change Order Additions Page 2 of 4
Foe1 WoeTH City of Fort Worth �
Change Order Deletions
Project Name TS-18 HROM Safety Site Locations City Sec # 56504
Client Project # HROM Safety and Closure Improvements Construction Contract - Citywide Various Projects Site Locations and CPNs
Contractorl The Fain Group, Inc. PMJ Caleb Luebbert Inspector NIA
Change Order Submittal # 0 Dale 6/16/2026
DELETIONS
ITEM
DESCRIPTION
DEPT
Oty
Unit
Unit Cost Totad$000
P
Sub Total Deletions
Change Order Deletions Page 3 of 4
MISBE for this Change Order
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 08/03/21 M&C FILE NUMBER: M&C 21-0524
LOG NAME: 20SWM HROM SAFETY AND CLOSURE IMPROVEMENTS CONSTRUCTION
SUBJECT
(ALL) Authorize Execution of a Contract with The Fain Group, Inc. in the Amount of $2,000,000.00 for the Construction of Stormwater Hazardous
Road Overtopping Mitigation Safety and Closure Improvements Citywide Project
RECOMMENDATION:
It is recommended that the City Council authorize execution of a contract with The Fain Group, Inc. in the amount of $2,000,000.00 for the
construction of Stormwater Hazardous Road Overtopping Mitigation Safety and Closure Improvements Citywide Programmable project (City
Project No. P00120) with the option to renew the contract up to two times.
DISCUSSION:
This Mayor and Council Communication (M&C) is to provide for a work order based, unit price construction contract for high priority citywide
Hazardous Road Overtopping Mitigation (HROM) safety or closure improvement projects to better protect drivers from life -threatening road
flooding. These projects may involve safety improvements such as guardrails, lighting, signage, and road markings at a stream crossing or low-
lying area of a road. In some cases, the closure of a road based on recommendations from an engineering analysis and considering feedback
from City staff and community members may be the preferred alternative for mitigating the risk. These safety improvement projects will not reduce
road flooding but will better protect the life safety of drivers through better warning of roadway flood risks or the closure of the section of road
subject to hazardous flooding.
The price of each work order will be based on the unit prices bid. The cumulative amount of all work order tasks in the initial term of this contract is
expected to be $2,000,000.00, funded from both 2020 Stormwater Revenue Bonds and Stormwater Capital Projects Funds. The bid amounts
cited below were based on hypothetical quantities for the purpose of establishing unit prices for each work item. Actual payments will be made
based on actual measured quantities at those bid prices. Funding will be verified individually for each work order task prior to its release. This
contract may be renewed up to two times at the City's sole discretion. The term of the contract, inclusive of any renewals, will not exceed five years.
This project was advertised for bid in the Fort Worth Star -Telegram on April 15, 2021 and April 22, 2021. On May 13, 2021, two responses were
received as follows:
Bidders j Bid Amount
The Fain Group, Inc. $3,037,379.57
Fort Worth Civil Constructors, LLC $3,588,700.00
Business Equity - THE FAIN GROUP, INC., is in compliance with the City's Business Equity Ordinance by committing to 14% Business Equity
participation on this project. The City's Business Equity goal on this project is 14%.
This project is located in ALL COUNCIL DISTRICTS.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Stormwater Capital
Projects Fund for future identified task order projects related to the SW Hazardous Rd Overtopping programmable project to support the approval
of the above recommendation and execution of the construction contract. Prior to any expenditure being incurred, the Transportation & Public
Works Department has the responsibility to validate the availability of funds.
Submitted for City Manager's Office by. Dana Burghdoff 8018
Originating Business Unit Head: William Johnson 7801
Additional Information Contact: Linda Young 2485
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: HROM Safety and Closure Improvements Citywide Construction Contract
M&C: 21-0524 CPN: 1`00120 CSO: 56504 DOC#: CO #2
Date:
To:
Name
Department
Initials
Date Out
1
Steven Aguirre — Signature
(saguirre@faingp.com)
Contractor
LF
06/22/2026
2.
Mike Glover - Signature
TPW Inspector
06/22/2026
2.
Caleb Luebbert - Signature
TPW Project Mgr.
06/22/2026
3.
Thanaa Maksimos — Signature
TPW Program Mgr.
TR
06/25/2026
4.
Lissette Acevedo — Signature
TPW Sr. CPO
C�v
06/26/2026
5.
Patricia Wadsack - Signature
TPW Asst. Dir.
I>LW
06/26/2026
6.
Lauren Prieur - Signature
TPW Dir.
ejef, Pf1e
L-l7.
06/29/2026
Doug Black - Signature
Legal
!J�i�<I�s 91�cF
06/30/2026
8.
Jesica McEachern - Signature
CMO
L
07/07/2026
9.
Katherine Cenicola - Review
CSO
07/07/2026
10.
Jannette Goodall - Signature
CSO
.. ni ...
07/07/2026
11.
Allison Tidwell - Review
CSO
A,
07/08/2026
12.
TPW SW Contracts
TPW SW
CC: Program Manager — Thanaa Maksimos, Sr. CPO — Lissette Acevedo, TPW BSPAP Recon
Team — Cindy Sengathith
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: [—]YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tpw sw contractska fortworthtexas.gov Call 817-229-3283 with questions. Thank you!
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: The Fain Group, Inc.
Subject of the Agreement: Change order in regards to the construction contract for the SW HROM
Safety and Closure Improvements Construction Contract (City Project No. P00120)
M&C Approved by the Council? * Yes 8 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 8
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes ❑ No 0
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No IN If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes 8 No ❑
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. P00120
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.