HomeMy WebLinkAbout048211-A4 - Construction-Related - Contract - MV Engineering, Inc.OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX AMENDMENT No . 4 TO CITY SECRETARY CONTRACT No. 48211 CSC No. 48211-A4 WHEREAS, the City of Fort Worth (CITY) and MV Engineering, Inc., (ENGINEER) made and entered into City Secretary Contract No. 48211, (the CONTRACT) which was authorized by M&C C-27916 on the 13th day of September, 2016 in the amount of $ 263,877.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No.l in the amount of $19,725.00 which was administratively authorized on September 2, 2020, Amendment No. 2 in the amount of $62,256.00 administratively authorized on November 17, 2022, and Amendment No.3 in the amount of $123,187.00 which was authorized by M&C 23-0496 on June 13, 2023; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 96, CPN CO2692; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $18,618.00. (Water: $14,387.00; Sewer: $4,231.00) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $487,663.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 96 Prof Services Agreement Amendment Template CO2692 Revision Date: June 13, 2025 Page 1 of 2 EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth Jesica McEachern Assistant City Manager 07/07/2026 DATE: ATTEST: pQ� FOR tnpd �o /J pdaan nE�p5o4 Jannette Goodall City Secretary APPROVAL RECOMMENDED: Christophor Rardor Christopher Harder (Jun 30, 2026 06:43:06 CDT) Christopher Harder, P.E. Director, Water Department Contract Compliance Manager: of the date subscribed by the City's Engineer MV Engineering, In David Hosseiny, P.E. Vice President DATE: 6-23-2026 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. — (;I -el 41�4" Jose Andrade Project Manager APPROVED AS TO FORM AND LEGALITY: a&-oc- Douglas Black (Jun 30, 2026 10:57:34 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2025 Page 2 of 2 M&C No.#: N/A M&C Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Sanitary Sewer Rehabilitation, Contract 96 CO2692 CE G, INC June 9, 2026 Jose Andrade Project Manager City of Fort Worth Water Department 100 Fort Worth Trail, Fort Worth TX, 76102 Subject: Amendment No.4 to the City Secretary Contract (CSC) No. 48211 Utility Scope Modifications to (CPN 02692 — Sanitary Sewer Rehabilitation Contract 96) Dear Mr. Andrade, On behalf of MV Engineering, Inc (MVE), we respectfully submit this request for the Fourth Amendment to the above -referenced project This amendment incorporates additional utility scope modifications identified through coordination with the City of Fort Worth Water Department and Field Operations. A summary of the original contract amount, previously approved amendments, and the current amendment request is provided below for reference. Description Amount Original Contract Amount $263,877.00 Amendment No.1 $19,725.00 Amendment No. 2 $62,256.00 Amendment No. 3 $123,187.00 Amendment No. 4 (This Request) $18,618.00 Total Contract Amount to date $487,663.00 The requested Amendment No. 4 reflects additional scope associated with utility replacement coordination and design services necessary to advance the project to completion in accordance with current City standards. A detailed Level of Effort (LOE) spreadsheet is included with this amendment request. The LOE provides a breakdown of labor hours, classifications, and costs associated with the Utility Scope Revisions to support transparency in scope and fee allocation. Based on prior discussions and direction received, the following scope revisions are requested: 1. Cast Iron (CI) Water Lines - Include evaluation and replacement of all existing cast iron (CI) water lines located within the project limits. Ductile Iron (DI) Water Lines (Pre-1970 Installation) - Per coordination with Mr. Chris Harder, all ductile iron (DI) water lines within the project limits that were installed prior to 1970 shall be identified and included for replacement. 6100 Southwest Blvd, Ste 240, Fort Worth, TX 76109 I Phone: (817) 615-9850 1 Email: infocalmv-engineering.com r 3. Vitrified Clay (VC) Sewer Lines - Include evaluation and replacement of all vitrified clay (VC) sanitary sewer lines within the project limits. 4. Rockdale Drive — Water Line Revision - Remove the previously proposed water line installation along Rockdale Drive. Based on verification with Field Operations, water service will instead be extended from the existing water line located on the west side. Exclusions The Amendment 4 scope is limited to evaluation and replacement of identified utility infrastructure (CI water lines, pre-1970 DI water lines, and VC sewer lines) within the project limits. The following items are specifically excluded from this scope unless otherwise authorized: subsurface utility engineering (SUE) investigations, right- of-way or easement acquisition, environmental assessments, private service line replacements beyond project Purpose of Amendment These revisions and additions are intended to: • Align the project with current City standards and asset management practices • Address aging and obsolete infrastructure within project limits • Ensure compliance with the latest design manual requirements • Facilitate development of complete, bid -ready construction documents Next Steps Upon approval of this amendment and prior toupdating the design, cost estimate, and project schedule accordingly, we will proceed with preparing exhibits to fully establish the limits of the improvements associated with the Utility Scope Modifications. Any impacts to budget and timeline will be documented and submitted for review. We appreciate the City's continued guidance and coordination on this project. Please do not hesitate to contact Fabian Herrera should you have any questions or need additional information fherreragmv-en in�g com Sincerely, David Hosseiny P.E. Vice President 6100 Southwest Blvd, Ste 240, Fort Worth, TX 76109 1 Phone: (817) 615-9850 1 Email: infocalmv-engineering.com A � o I ( (mo umm ° fl1 o - ilQ .. C, �•- W WESTCRESTpR T T O O O m 0 0 o l c o ti N �D o n n a C O A D� i" i y RANDELLO i' .3A"tlM. A 000 o0o IN) IN) N GF RAZIER AVE m crc m C y`'i 0r �Oh n CL ® ; 'r: o•- 112 a ® 0 1 C TOWN DR T Nv. o /Ce4 � I CRO w i : OD - CONN tv, A� 4 LL DR 11 �<<p1 AVE Alf. ° • I l�P�: G fi STq•C�� H���J�Y7g 1_S0 `THCRESTyCT J O! N�Eyq� 0 3 44ia.a1� I - e'. JAMES AVE AID �m @ 4 -' I rr m s. �fi Q� TBASIL AVE Ey+t•.�J D ^1_ p G:' a A.. I tip 0 A■ o c Jy o cn cmi BRENTON RD I -a r , h f. 0 O - p . A o c? ~ j� � v • 4 1"PR 9 - o _ _ 6TH AVE C- j A Z r 9 C n coOm 17y 1 _ �;', j17 ; m m :. ml CQ y oa 6 ml C C) Q co -I ,u153210N3 y I ar1 FA LS ADAMS ST, 51atlgOH f7 ' Ar•'� �_ d _,.ap CI C i'B C' ' I 9. _ c .-. Igo, Hallmark Map 2 o 1.' ,. Gomm o SHERIDAN GAR rn yY cc 0 3 LL b.1 w z� Q emmca < � � eF F ► NFf� l 3 C0 J, i yetr LL } H O = cYi t 0 J I0 i1 - M 35 LF of 8" CI S. ------ c~ HIGHLAND TER �� C c RM-0 ' b e- 300 LF of 6" DI ' Q - 450 LF of 6" DI G 9 ' l w �a r Q C Y o C CHA a� o 20 LF of 6" CI SFOR� °r I _ 600 LF of 6" DI SALEM CT1117 M► rr'• `.- _ __ —2,0, BERKSHIRE LN Ole J, (�-�i r Z -,�.�_..___ _ __NALLMARKrDR AF` b � LU ' �'NI m OL -4' LL ti, Y j F6 O LL N �f AL w�� n �LU OF SHEFFIELLD DR �o�Q Proposed Project CO2692 Sewer -- Proposed Project CO2692 Water Proposed Project CO2692 Addition 140 70 0 140 280 420 560 Feet I� \�\ k 2m n � / FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: MV Engineering, Inc. Subject of the Agreement: Sanitary Sewer Rehabilitation Contract 96 M&C Approved by the Council? * Yes ❑ No M If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 0 No ❑ 48211-A4 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see backpage for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: 6/23/2026 If different from the approval date. Expiration Date: N/A If applicable. Is a 1295 Form required? * Yes ❑ No ED *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. CO2692 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 0 No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.