Loading...
HomeMy WebLinkAbout065501 - Construction-Related - Contract - Lennar Homes of Texas Land and Construction Ltd.CSCO NO. 65501 TRANSPORTATION IMPACT FEE CREDIT AGREEMENT THIS TRANSPORTATION IMPACT FEE CREDIT AGREEMENT (the "Agreement") is made and entered into effective as of the Effective Date (as defined below), by and among THE CITY OF FORT WORTH, TEXAS (the "City"), a Texas home rule municipal corporation, and Lennar Homes of Texas Land and Construction, LTD, a Texas Limited Partnership company authorized to do business in Texas (the "Owner") (the City and the Owner a "Party", and collectively, the "Parties"). RECITALS WHEREAS, the Owner is the owner of approximately 84.739 acres in Tarrant County, Texas, as described by metes and bounds in Exhibit "A" (the "Property") located within the corporate boundaries of the City. A map of the Property showing its location is attached hereto as Exhibit "B"; and WHEREAS, the Owner desires to proceed with development of the Property as described or illustrated on the Development Plan, attached hereto as Exhibit "C ", which identifies the on - site and/or off -site transportation facilities necessary for serving full development of the Property; and WHEREAS, the City has adopted a Transportation Impact Fee program pursuant to Texas Local Government Code Chapter 395, codified in City Code Chapter 30, Article VIII, as amended, under which transportation impact fees are imposed on new development for impacts to the City's transportation facilities as a result of said development; and WHEREAS, transportation impact fees are collected and must be spent by the City on impact fee eligible transportation facilities identified within the City's adopted Transportation Improvements Plan ("TIP"), as amended, within the service area(s) in which the new development is located; and WHEREAS, the Transportation Impact Fee Program provides for credits against impact fees for dedication of right-of-way and/or construction of transportation improvements identified as impact fee eligible on the adopted TIP; and WHEREAS, the Property is located within service area Z; and WHEREAS, certain transportation facilities depicted on Exhibit "D" are identified as impact fee eligible within the City's adopted TIP and therefore eligible for impact fee credit; and WHEREAS, Owner has agreed to dedicate the right-of-way and/or construct the transportation improvements shown on Exhibit "D" for which credits against transportation impact fees shall be granted; and WHEREAS, the Owner has received preliminary plat approval for Pecan Meadows, PP- 22-004, on 1/11/2023; and OFFICIAL RECORD Transportation Impact Fee Credit Agreement- CA-25-274 CITY SECRETARY page 1 of 15 Pecan Meadows FT. WORTH, Tx 6/29/2026 WHEREAS, the Owner has dedicated 20,240 square feet of right-of-way for Shelby Road with FP-24-006, recorded as Instrument D224208199, on 11/12/2024; and WHEREAS, the Owner has dedicated 32,320 square feet of right-of-way for Shelby Road with FP-24-131, recorded as Instrument D225214201, on 11/14/2025; and WHEREAS, the Owner has received approval for construction plans (IPRC22-0154) on 9/25/2023, and executed a Community Facilities Agreement (CFA23-0057, CSCO 60222), on 10/6/2023 and obtained final acceptance by the City for Pecan Meadows Phase 1, City Project Number 104143, on 10/15/2025. WHEREAS, the Owner has received approval for construction plans (IPRC23-0037) on 8/4/2024, and executed a Community Facilities Agreement (CFA24-0102, CSCO 61986), on 9/13/2024 and obtained final acceptance by the City for Pecan Meadows Phase 2, City Project Number 104616, on 10/13/2025. NOW, THEREFORE, for and in consideration of the mutual agreements, covenants, and conditions contained herein, and other good and valuable consideration, the City and the Owner hereby covenant and agree as follows: 1. Recitals. The recitals contained in this Agreement are true and correct as of the Effective Date and form the basis upon which the Parties negotiated and entered into this Agreement. 2. Transportation Improvements. Owner agrees to dedicate the rights -of -way for and/or construct the system facilities identified in Exhibit "D". For any transportation improvement which has been previously dedicated or constructed by Owner on the Property and accepted by the City prior to execution of this Agreement, the improvement shall be identified as completed on Exhibit "D". 3. Credits. The Parties agree that the estimated value of the credits for each transportation improvement, expressed in current dollars, shall be as set forth in Exhibit "E". The value of credits associated with the improvements first shall be reduced by the Schedule 2 impact fee associated with any lot for which a building permit has previously been issued, and the net value of credits shown on Exhibit "E" shall be considered as exact. 4. Phasiniz. The Parties acknowledge that, where it is anticipated that the project will be developed in phases, the anticipated construction of improvements by phase shall be as depicted in Exhibit "D", which is attached hereto and incorporated herein by reference. 5. Allocation of Credits by Phase. The general allocation of credits to each phase of the development shall be as shown on Exhibit "F", which is attached hereto and incorporated herein by reference. The Parties agree that the credits identified in this Agreement shall not be deemed to have been created until the system facility for which credit is to be granted has been dedicated and accepted (in the case of right-of-way) or constructed through an executed Community Facilities Agreement (for 75% of the eligible roadway construction credit) and final acceptance by the City has been obtained (for 100% of the eligible roadway construction credit). Transportation Impact Fee Credit Agreement- CA-25-274 Page 2 of 15 Pecan Meadows 6/29/2026 6. Term and Effective Date. The term of this Agreement shall be ten (10) years from its Effective Date. 7. Assignment. Owner shall have the right to assign this Agreement to any person or entity ("Owner's Assignee") with the written consent of the City, provided: (a) the assignment is in writing executed by the Owner and its assignee; and (b) the assignment incorporates this Agreement by reference and binds the Owner's Assignee to perform (to the extent of the obligations assigned) in accordance with this Agreement. Each Owner's Assignee shall become a Party to this Agreement upon the execution of such assignment. In no event may this Agreement be construed to authorize assignment of any credits attributable to a system facility to be dedicated or constructed hereunder for use outside the boundaries of the Property. A credit agreement amendment executed by the City, any remaining Owners, and the Owner's Assignee will be required to formally transfer any credits for use. 8. Amendment. This Agreement shall not be modified or amended except as follows: (a) Any revision, amendment, assignment, or modification to this Agreement or any Exhibit or schedule hereto shall be in writing and signed by the Parties. (b) Any revision, amendment, assignment, or modification to this Agreement, the Development Plan, or any Exhibit or schedule thereto, shall become effective on the date executed by the Parties or, as applicable, upon the date of approval by the City Council or designated city official. 9. Exhibits. The exhibits attached to this Agreement are incorporated as part of this Agreement for all purposes as if set forth in full in the body of this Agreement. (Remainder of Page Intentionally Left Blank) Transportation Impact Fee Credit Agreement- CA-25-274 Page 3 of 15 Pecan Meadows 6/29/2026 IN WITNESS WHEREOF, the undersigned parties have executed this Agreement to be effective as of the date subscribed by the City's Assistant City Manager. CITY OF FORT WORTH, TEXAS A UVW&— Dianna Giordano (Jul 9, 2026 13:46:02 CDT) Jesica McEachern Assistant City Manager Date: 07/09/2026 Recommended By: Dalton Harrell (Jul 1, 2026 22:13:51 CDT) DJ Harrell Director, Development Services Approved as to Form and Legality: Douglas Black (Jul 8, 2026 13:03:48 CDT) Douglas Black Assistant City Attorney M&C: None required Form 1295: None required ATTEST: od Qan4 nEX6544a Jannette Goodall City Secretary OWNER Lennar Homes of Texas Land and Construction, LTD., a Texas Limited Partnership By: U.S. Home, LLC, a Delaware limited liability company, its General Partner By: Jennifer Eller -(Jul 1, 2 18:15:53 CDT) Name: Jennifer Eller Title: Authorized Agent City Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Kamal L. Crues Sr. Capital Projects Officer, Development Services Department OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Transportation Impact Fee Credit Agreement- CA-25-274 Page 4 of 15 Pecan Meadows 6/29/2026 EXHIBIT LIST "A" Description of the Property "B" Map of Property "C" Development Plan "D" Eligible Transportation Improvements "E" Credits Against Transportation Impact Fees "F" Allocation of Credits Transportation Impact Fee Credit Agreement- CA-25-274 Page 5 of 15 Pecan Meadows 6/29/2026 EXHIBIT A Description of Property: Pecan Meadows Final Plat FP-24-006 and FP-24-131 BEING A 84.739 ACRE TRACT OF LAND SITUATED IN THE SHELBY COUNTY SCHOOL LAND SURVEY, ABSTRACT No. 1375, TARRANT COUNTY, TEXAS, AND BEING ALL OF A TRACT OF LAND DESCRIBED TO KLLB AIV LLC BY DEED RECORDED IN COUNTY CLERK FILE No. D222218354, OFFICIAL PUBLIC RECORDS, TARRANT COUNTY, TEXAS, AND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: BEGINNING AT A 5/8-INCH IRON ROD WITH PLASTIC CAP STAMPED "LJA SURVEYING" FOUND (HEREAFTER REFERRED TO AS A "CAPPED IRON ROD FOUND") IN SOUTH FOREST HILL DRIVE (A VARIABLE WIDTH RIGHT-OF-WAY) FOR THE NORTHWEST CORNER OF SAID KLLB AIV LLC TRACT; THENCE WITH THE BOUNDS OF SAID KLLB AIV LLC TRACT, THE FOLLOWING COURSES AND DISTANCES: NORTH 89000'57" EAST, A DISTANCE OF 572.96 FEET TO A 4-INCH PIPE FENCE POST FOUND FOR THE SOUTHWEST CORNER OF A TRACT OF LAND DESCRIBED TO EVERMAN CEMETERY ASSOCIATION BY DEED RECORDED IN VOLUME 2838, PAGE 240 OF SAID OFFICIAL PUBLIC RECORDS; NORTH 89039'22" EAST, A DISTANCE OF 564.32 FEET TO A 4-INCH PIPE FENCE POST FOUND FOR THE SOUTHEAST CORNER OF SAID EVERMAN CEMETERY ASSOCIATION TRACT; NORTH 88058'22" EAST, A DISTANCE OF 1,088.65 FEET TO A CAPPED IRON ROD FOUND FOR THE NORTHEAST CORNER OF SAID KLLB AIV LLC TRACT; SOUTH O1001'38" EAST, A DISTANCE OF 439.28 FEET TO A 1/2-INCH IRON ROD FOUND; SOUTH 06000'00" WEST, A DISTANCE OF 313.94 FEET TO A CAPPED IRON ROD FOUND; SOUTH 07003'00" WEST, A DISTANCE OF 304.19 FEET TO A 1/2-INCH IRON ROD FOUND FOR THE SOUTHWEST CORNER OF A TRACT OF LAND DESCRIBED TO DALE E HUFF BY DEED RECORDED IN VOLUME 15498, PAGE 49 OF SAID OFFICIAL PUBLIC RECORDS, SAME BEING THE NORTHWEST CORNER OF A TRACT OF LAND DESCRIBED TO JAMES P REEVES BY DEED RECORDED IN VOLUME 17102, PAGE 370 OF SAME; SOUTH 05037'54" WEST, WITH THE WEST LINE OF SAID REEVES TRACT, A DISTANCE OF 386.89 FEET TO A CAPPED IRON ROD FOUND FOR THE EASTERNMOST SOUTHEAST CORNER OF SAID KLLB AIV LLC TRACT AND BEING THE NORTHEAST CORNER OF LOT 3, CANELOS GROVE ADDITION, AN ADDITION TO TARRANT COUNTY, TEXAS AS SHOWN BY PLAT RECORDED IN COUNTY CLERK FILE No. D216049745 OF SAID OFFICIAL PUBLIC RECORDS; Transportation Impact Fee Credit Agreement- CA-25-274 Page 6 of 15 Pecan Meadows 6/29/2026 SOUTH 89000'36" WEST, WITH THE NORTH LINE OF SAID CANELOS GROVE ADDITION, A DISTANCE OF 472.22 FEET TO A 1/2-INCH IRON ROD FOUND FOR THE NORTHWEST CORNER OF LOT 1 OF SAME; SOUTH 01010'34" EAST, WITH THE WEST LINE OF SAID LOT 1, PASSING A 1/2-INCH IRON ROD AT 70.24 FEET FOR A TOTAL DISTANCE OF 478.03 FEET TO A 4-INCH PIPE FENCE POST FOUND FOR THE SOUTHERNMOST SOUTHEAST CORNER OF SAID KLLB AIV LLC TRACT ON THE NORTH RIGHT-OF-WAY LINE OF SHELBY ROAD (A VARIABLE WIDTH RIGHT-OF-WAY); SOUTH 89011'13" WEST, A DISTANCE OF 1,309.41 FEET TO A CAPPED IRON ROD FOUND FOR THE SOUTHERNMOST SOUTHWEST CORNER OF SAID KLLB AIV LLC TRACT AND BEING THE SOUTHEAST CORNER OF A TRACT OF LAND DESCRIBED TO METRO MANUFACTURING SUPPORT SERVICES BY DEED RECORDED IN VOLUME 11344, PAGE 1100 OF SAID OFFICIAL PUBLIC RECORDS; NORTH 01 °02'47" WEST, A DISTANCE OF 304.51 FEET TO A CAPPED IRON ROD FOUND; NORTH 07022'13" EAST, A DISTANCE OF 362.00 FEET TO A 1/2-INCH IRON ROD FOUND FOR THE NORTHEAST CORNER OF SAID METRO MANUFACTURING TRACT; SOUTH 89019'10" WEST, PASSING A 1/2-INCH IRON ROD FOUND AT 348.20 FEET, A TOTAL DISTANCE OF 373.22 FEET TO A CAPPED IRON ROD FOUND FOR THE WESTERNMOST SOUTHWEST CORNER OF SAID KLLB AIV LLC TRACT IN THE RIGHT-OF-WAY OF SAID SOUTH FOREST HILL DRIVE; NORTH 00059'03" WEST, A DISTANCE OF 1,251.41 FEET TO THE POINT OF BEGINNING AND CONTAINING A CALCULATED AREA OF 84.739 ACRES (3,691,219 SQ. FEET) OF LAND. Transportation Impact Fee Credit Agreement- CA-25-274 Page 7 of 15 Pecan Meadows 6/29/2026 EXHIBIT B Map of Property: Pecan Meadows Preliminary Plat, PP-22-004 Transportation Impact Fee Credit Agreement- CA-25-274 Page 8 of 15 Pecan Meadows 6/29/2026 D3'%LYiSLi: D225214201 EXHIBIT C Development Plan: Pecan Meadows Final Plat FP-24-006 `QyQyy$� � ttkk t—Y.. CEO'' y5 Final Plat FP-24-131 Papa 2 of 3 Papa 3 of ES sr- __ ^.rem`? •�r_c=�-a., -m` it i �'sR— _.._. ...' - .. 9 .r.._ - ...- .�-..^..�.._._... Transportation Impact Fee Credit Agreement- CA-25-274 Page 9 of 15 Pecan Meadows 6/29/2026 EXHIBIT D Eligible Transportation Improvements FORT WORTH. , i JE Pecan Meadows Eligible Transportation Improvements for Credit against Transportation Impact Fees Key Development Plan Area r � • - _ Right -of -Way Dedication / ` Roadway Construction J VALENTIA SWEET PECAN y > zuw BULLSEYE W - VOLCANO Q W ti m s L U y OLD DINO 3 DAVIE . BLUES r Q OLD MAMBA j r � - � x NANDO sHEtsr sue.8r - - E ° Eligible Improvements Reference # Limits Shelby Road FP-24-006 Right-of-way dedication & FP-24-131 Shelby Road CFA24-0102 & CFA23-0057 Construction of paving, CPN 104616 & 104143 sidewalks, streetlights and IPRC23-0037 & IPRC22-0154 drainage Transportation Impact Fee Credit Agreement- CA-25-274 Page 10 of 15 Pecan Meadows 6/29/2026 EXHIBIT E Credits Against Transportation Impact Fees Pecan Meadows Transportation Impact Fee Credit Overview Value of ROW Dedication Instrument # Final Plat # Eligible Arterial Value D224208199 FP-24-006 Shelby Road $170,820.00 D225214201 FP-24-131 Shelby Road TOTAL ROW TRANSPORTATION IMPACT FEE CREDIT $170,820.00 THE Eligible Community Facilities Agreement Construction - 100% Eligible City Secretary # CFA # Eligible Arterial Value 60222 CFA23-0057 & 24-0102 61986 CPN 104143 & Shelby Road $557,082.00 104616 IPRC23-0037 & IPRC22-0154 TOTAL COMMUNITY FACILITIES AGREEMENT $557,082.00 CREDIT Engineering, Surveying, and Material Testing = 20% of total $111,416.40 eligible construction costs TOTAL TRANSPORTATION IMPACT FEE $839,318.40 CREDIT Transportation Impact Fee Credit Agreement- CA-25-274 Page 11 of 15 Pecan Meadows 6/29/2026 Right -of -Way Valuation for Pecan Meadows Valuation Method 1- Percentage of TIP Project Cost Eligible Arterial Shelby Rd 2022 Transportation Improvements Plan Project Number Z-4 Estimated Construction Costs from 2022 Transportation Improvements Plan $2,321,000 Value of Total Project Right -of -Way (20% of Construction Cost) $464,200 Total Project Length (LF) 1,300 Arterial Cross -Section Width (LF) 110 Additional ROW needed for Roundabout (SF) $0 Total Project Right -of -Way (SF) 143000 Right -of -Way Value Per Square Foot $3.25 Valuation Method 2 - Percentage of Construction Project Cost Eligible Arterial Shelby Rd City Project Number 104143 & 104616 Final Construction Costs from Notice of Completion (Green Sheet) $557,082.00 Value of Total Project Right -of -Way (20% of Construction Cost) $111,416 Total Project Length (LF) 1314 Arterial Cross -Section Width (LF) 40 Additional ROW needed for Roundabout (SF) 0 Total Project Right -of -Way (SF) 52,560 Right -of -Way Value Per Square Foot $2.12 Valuation Method 3 - TAD appraised value TAD Value as of 08/9/2023 Shelby Rd TAD Account 4152905 Total Area (SF) 6,970 Appraised Value $3,485.00 Value per Square Foot $0.50 Right -of -Way Dedication Shelby Rd Recording Instrument Number D224208199 & D225214201 Final Plat Number FP-24-006 & FP - 24-131 Recording Date 11/12/2024 & 11/14/2025 Total area of ROW dedicated (SF) 52,560 Value per SF $3.25 ROW Credit Available $170,820.00 Transportation Impact Fee Credit Agreement- CA-25-274 Pecan Meadows Page 12 of 15 6/29/2026 Pecan Meadow Value of Eligible Community Facilities Agreement Construction, CPN 104143 & 104616 Bidlist Item No. Description Unit Completed Quantity Eligible Quantity Unit Price Credit Available UNIT III: DRAINAGE IMPROVEMENTS 1 2 0241.3015 Remove 24" Storm Line 0241.4201 Remove 4' Drop Inlet LF EA 26 26 1 $40.00 $1,040.00 $2,000.00 1 $2,000.00 3 3305.0109 Trench Safety LF 325 325 $2.00 $650.00 4 3341.0201 21" RCP, Class III LF 344 344 $70.00 $24,080.00 5 3341.0205 24" RCP, Class III LF 150 150 $80.00 $12,000.00 6 3349.0001 4' Storm Junction Box 3349.5001 10' Curb Inlet 3349.5002 15' Curb Inlet EA 1 1 $5,500.00 $5,500.00 $15,200.00 $4,800.00 7 _EA EA 4 1 4 $3,800.00 $4,800.00 8 1 TOTAL UNIT III: DRAINAGE IMPROVEMENTS $65,270.00 UNIT IV: PAVING IMPROVEMENTS 1 3211.0400 Hydrated Lime (36#/SY) 3211.0502 8" Lime Treatment (36#/SY) TN 60 60 $235.00 $4.00 $14,100.00 $13,380.00 2 SY 3,345 3,345 3,067 3 3213.0105 10" Conc Pvmt 3213.0302 10' Conc Sidewalk SY 3,067 $88.00 $4.50 $269,896.00 $56,979.00 4 SF 12,662 _ 12,662 5 3213.0506 Barrier Free Ramp, Type P-1 EA 2 2 $2,200.00 $4,400.00 $3,136.00 6 3291.0100 Topsoil CY 112.0 112 $28.00 7 3292.0400 Seeding, Sodding SY 669 669 $8.00 $5,352.00 8 9999.0005 Construct Pvmt Header EA 2 2 $1,000.00 $2,000.00 9 9999.0007 Connect to Existing Header (Leave Barricade) 3211.0502 8" Lime Treatment (36#/SY) EA 2 2 $500.00 $1,000.00 $2,245.00 10 SY 449 449 $5.00 11 3211.0400 Hydrated Lime (36#/SY) TN 9 9 $235.00 $2,115.00 12 3213.0105 10" Conc Pvmt SY 419 419 $96.00 $40,224.00 13 9999.0012 Speed Limit Sign (R2-1) 9999.0014 Construct Pvmt Header EA 2 2 2 2 $500.00 $1,000.00 $1,000.00 $2,000.00 14 EA TOTAL UNIT IV: PAVING IMPROVEMENTS $417,827.00 Transportation Impact Fee Credit Agreement- CA-25-274 Page 13 of 15 Pecan Meadows 6/29/2026 UNIT V: STREET LIGHTING IMPROVEMENTS 1 2605.3015 2" Condt PVC SCH 80 (T) LF EA 1,339 6 1,339 6 $15.00 $950.00 $20,085.00 $5,700.00 2 3441.1632 Install Type 33A Ann 3441.1772 Furnish/Install 240-480 Volt Single Phase Transocket Metered Pedestal 3441.3302 Rdwy Illum Foundation TY 3,5,6, and 8 3441.3342 Rdwy Illum TY 18 Pole 9999.0003 Arterial Luminaire 3 EA 1 1 $9,500.00 $9,500.00 4 5 6 EA 6 6 $1,800.00 $10,800.00 EA EA 6 6 6 $3,700.00 $22,200.00 6 $950.00 $5,700.00 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $73,985.00 UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS 1 $0.00 TOTAL UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS $0.00 Bid Summary UNIT III: DRAINAGE IMPROVEMENTS $65,270.00 UNIT IV`. PAVING IMPROVEMENTS $417,827.00 UNIT V: STREET LIGHTING IMPROVEMENTS $73,985.00 UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS $0.00 CPN 104143 & 104616 ELIGIBLE CONSTRUCTION SUBTOTAL 1 $557,082.00 Transportation Impact Fee Credit Agreement- CA-25-274 Page 14 of 15 Pecan Meadows 6/29/2026 EXHIBIT F Allocation of Credits Credits shall be allocated by the Owner(s) on a first -come, first -served basis within the preliminary plat boundary of Pecan Meadows Final Plat, FP-24-006 and FP-24-131 and shall run with the land; provided, however, that no development within the boundary shall have the right to utilize credits under this agreement unless the Owner submits to the City a written request or notice approving the use of credits for the applicable development. Final Plat FP-24-006 � 1% Pag2M3 �I o:zmazoi I A M I. Mun P PW]a Final Plat FP-24-131 i Transportation Impact Fee Credit Agreement- CA-25-274 Page 15 of 15 Pecan Meadows 6/29/2026 FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Lennar Homes of Texas Land and Construction Ltd Subject of the Agreement: Road Construction and ROW dedication M&C Approved by the Council? * Yes ❑ No M If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No 0 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see backpage for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: Date ACM signs If different from the approval date. Expiration Date: 10 years of when ACM signs If applicable. Is a 1295 Form required? * Yes ❑ No 21 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. CA-25-274 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 0 No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.