HomeMy WebLinkAbout065501 - Construction-Related - Contract - Lennar Homes of Texas Land and Construction Ltd.CSCO NO. 65501
TRANSPORTATION IMPACT FEE CREDIT AGREEMENT
THIS TRANSPORTATION IMPACT FEE CREDIT AGREEMENT (the
"Agreement") is made and entered into effective as of the Effective Date (as defined below), by
and among THE CITY OF FORT WORTH, TEXAS (the "City"), a Texas home rule municipal
corporation, and Lennar Homes of Texas Land and Construction, LTD, a Texas Limited
Partnership company authorized to do business in Texas (the "Owner") (the City and the Owner a
"Party", and collectively, the "Parties").
RECITALS
WHEREAS, the Owner is the owner of approximately 84.739 acres in Tarrant County,
Texas, as described by metes and bounds in Exhibit "A" (the "Property") located within the
corporate boundaries of the City. A map of the Property showing its location is attached hereto as
Exhibit "B"; and
WHEREAS, the Owner desires to proceed with development of the Property as described
or illustrated on the Development Plan, attached hereto as Exhibit "C ", which identifies the on -
site and/or off -site transportation facilities necessary for serving full development of the Property;
and
WHEREAS, the City has adopted a Transportation Impact Fee program pursuant to Texas
Local Government Code Chapter 395, codified in City Code Chapter 30, Article VIII, as amended,
under which transportation impact fees are imposed on new development for impacts to the City's
transportation facilities as a result of said development; and
WHEREAS, transportation impact fees are collected and must be spent by the City on
impact fee eligible transportation facilities identified within the City's adopted Transportation
Improvements Plan ("TIP"), as amended, within the service area(s) in which the new development
is located; and
WHEREAS, the Transportation Impact Fee Program provides for credits against impact
fees for dedication of right-of-way and/or construction of transportation improvements identified
as impact fee eligible on the adopted TIP; and
WHEREAS, the Property is located within service area Z; and
WHEREAS, certain transportation facilities depicted on Exhibit "D" are identified as
impact fee eligible within the City's adopted TIP and therefore eligible for impact fee credit; and
WHEREAS, Owner has agreed to dedicate the right-of-way and/or construct the
transportation improvements shown on Exhibit "D" for which credits against transportation
impact fees shall be granted; and
WHEREAS, the Owner has received preliminary plat approval for Pecan Meadows, PP-
22-004, on 1/11/2023; and
OFFICIAL RECORD
Transportation Impact Fee Credit Agreement- CA-25-274 CITY SECRETARY page 1 of 15
Pecan Meadows FT. WORTH, Tx 6/29/2026
WHEREAS, the Owner has dedicated 20,240 square feet of right-of-way for Shelby Road
with FP-24-006, recorded as Instrument D224208199, on 11/12/2024; and
WHEREAS, the Owner has dedicated 32,320 square feet of right-of-way for Shelby Road
with FP-24-131, recorded as Instrument D225214201, on 11/14/2025; and
WHEREAS, the Owner has received approval for construction plans (IPRC22-0154) on
9/25/2023, and executed a Community Facilities Agreement (CFA23-0057, CSCO 60222), on
10/6/2023 and obtained final acceptance by the City for Pecan Meadows Phase 1, City Project
Number 104143, on 10/15/2025.
WHEREAS, the Owner has received approval for construction plans (IPRC23-0037) on
8/4/2024, and executed a Community Facilities Agreement (CFA24-0102, CSCO 61986), on
9/13/2024 and obtained final acceptance by the City for Pecan Meadows Phase 2, City Project
Number 104616, on 10/13/2025.
NOW, THEREFORE, for and in consideration of the mutual agreements, covenants, and
conditions contained herein, and other good and valuable consideration, the City and the Owner
hereby covenant and agree as follows:
1. Recitals. The recitals contained in this Agreement are true and correct as of the
Effective Date and form the basis upon which the Parties negotiated and entered into this
Agreement.
2. Transportation Improvements. Owner agrees to dedicate the rights -of -way for
and/or construct the system facilities identified in Exhibit "D". For any transportation
improvement which has been previously dedicated or constructed by Owner on the Property and
accepted by the City prior to execution of this Agreement, the improvement shall be identified as
completed on Exhibit "D".
3. Credits. The Parties agree that the estimated value of the credits for each
transportation improvement, expressed in current dollars, shall be as set forth in Exhibit "E". The
value of credits associated with the improvements first shall be reduced by the Schedule 2 impact
fee associated with any lot for which a building permit has previously been issued, and the net
value of credits shown on Exhibit "E" shall be considered as exact.
4. Phasiniz. The Parties acknowledge that, where it is anticipated that the project will
be developed in phases, the anticipated construction of improvements by phase shall be as depicted
in Exhibit "D", which is attached hereto and incorporated herein by reference.
5. Allocation of Credits by Phase. The general allocation of credits to each phase of
the development shall be as shown on Exhibit "F", which is attached hereto and incorporated
herein by reference. The Parties agree that the credits identified in this Agreement shall not be
deemed to have been created until the system facility for which credit is to be granted has been
dedicated and accepted (in the case of right-of-way) or constructed through an executed
Community Facilities Agreement (for 75% of the eligible roadway construction credit) and final
acceptance by the City has been obtained (for 100% of the eligible roadway construction credit).
Transportation Impact Fee Credit Agreement- CA-25-274 Page 2 of 15
Pecan Meadows 6/29/2026
6. Term and Effective Date. The term of this Agreement shall be ten (10) years from
its Effective Date.
7. Assignment. Owner shall have the right to assign this Agreement to any person or
entity ("Owner's Assignee") with the written consent of the City, provided: (a) the assignment is
in writing executed by the Owner and its assignee; and (b) the assignment incorporates this
Agreement by reference and binds the Owner's Assignee to perform (to the extent of the
obligations assigned) in accordance with this Agreement. Each Owner's Assignee shall become a
Party to this Agreement upon the execution of such assignment. In no event may this Agreement
be construed to authorize assignment of any credits attributable to a system facility to be dedicated
or constructed hereunder for use outside the boundaries of the Property. A credit agreement
amendment executed by the City, any remaining Owners, and the Owner's Assignee will be
required to formally transfer any credits for use.
8. Amendment. This Agreement shall not be modified or amended except as follows:
(a) Any revision, amendment, assignment, or modification to this Agreement
or any Exhibit or schedule hereto shall be in writing and signed by the Parties.
(b) Any revision, amendment, assignment, or modification to this Agreement,
the Development Plan, or any Exhibit or schedule thereto, shall become effective on the date
executed by the Parties or, as applicable, upon the date of approval by the City Council or
designated city official.
9. Exhibits. The exhibits attached to this Agreement are incorporated as part of this
Agreement for all purposes as if set forth in full in the body of this Agreement.
(Remainder of Page Intentionally Left Blank)
Transportation Impact Fee Credit Agreement- CA-25-274 Page 3 of 15
Pecan Meadows 6/29/2026
IN WITNESS WHEREOF, the undersigned parties have executed this Agreement to be
effective as of the date subscribed by the City's Assistant City Manager.
CITY OF FORT WORTH, TEXAS
A UVW&—
Dianna Giordano (Jul 9, 2026 13:46:02 CDT)
Jesica McEachern
Assistant City Manager
Date: 07/09/2026
Recommended By:
Dalton Harrell (Jul 1, 2026 22:13:51 CDT)
DJ Harrell
Director, Development Services
Approved as to Form and Legality:
Douglas Black (Jul 8, 2026 13:03:48 CDT)
Douglas Black
Assistant City Attorney
M&C: None required
Form 1295: None required
ATTEST:
od
Qan4 nEX6544a
Jannette Goodall
City Secretary
OWNER
Lennar Homes of Texas Land and Construction,
LTD., a Texas Limited Partnership
By: U.S. Home, LLC, a Delaware limited
liability company, its General Partner
By: Jennifer Eller -(Jul 1, 2 18:15:53 CDT)
Name: Jennifer Eller
Title: Authorized Agent
City Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Kamal L. Crues
Sr. Capital Projects Officer, Development
Services Department
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Transportation Impact Fee Credit Agreement- CA-25-274 Page 4 of 15
Pecan Meadows 6/29/2026
EXHIBIT LIST
"A" Description of the Property
"B" Map of Property
"C" Development Plan
"D" Eligible Transportation Improvements
"E" Credits Against Transportation Impact Fees
"F" Allocation of Credits
Transportation Impact Fee Credit Agreement- CA-25-274 Page 5 of 15
Pecan Meadows 6/29/2026
EXHIBIT A
Description of Property: Pecan Meadows Final Plat FP-24-006 and FP-24-131
BEING A 84.739 ACRE TRACT OF LAND SITUATED IN THE SHELBY COUNTY
SCHOOL LAND SURVEY, ABSTRACT No. 1375, TARRANT COUNTY, TEXAS, AND
BEING ALL OF A TRACT OF LAND DESCRIBED TO KLLB AIV LLC BY DEED
RECORDED IN COUNTY CLERK FILE No. D222218354, OFFICIAL PUBLIC RECORDS,
TARRANT COUNTY, TEXAS, AND BEING MORE PARTICULARLY DESCRIBED BY
METES AND BOUNDS AS FOLLOWS:
BEGINNING AT A 5/8-INCH IRON ROD WITH PLASTIC CAP STAMPED "LJA
SURVEYING" FOUND (HEREAFTER REFERRED TO AS A "CAPPED IRON ROD
FOUND") IN SOUTH FOREST HILL DRIVE (A VARIABLE WIDTH RIGHT-OF-WAY)
FOR THE NORTHWEST CORNER OF SAID KLLB AIV LLC TRACT;
THENCE WITH THE BOUNDS OF SAID KLLB AIV LLC TRACT, THE FOLLOWING
COURSES AND DISTANCES:
NORTH 89000'57" EAST, A DISTANCE OF 572.96 FEET TO A 4-INCH PIPE FENCE POST
FOUND FOR THE SOUTHWEST CORNER OF A TRACT OF LAND DESCRIBED TO
EVERMAN CEMETERY ASSOCIATION BY DEED RECORDED IN VOLUME 2838, PAGE
240 OF SAID OFFICIAL PUBLIC RECORDS;
NORTH 89039'22" EAST, A DISTANCE OF 564.32 FEET TO A 4-INCH PIPE FENCE POST
FOUND FOR THE SOUTHEAST CORNER OF SAID EVERMAN CEMETERY
ASSOCIATION TRACT;
NORTH 88058'22" EAST, A DISTANCE OF 1,088.65 FEET TO A CAPPED IRON ROD
FOUND FOR THE NORTHEAST CORNER OF SAID KLLB AIV LLC TRACT;
SOUTH O1001'38" EAST, A DISTANCE OF 439.28 FEET TO A 1/2-INCH IRON ROD
FOUND;
SOUTH 06000'00" WEST, A DISTANCE OF 313.94 FEET TO A CAPPED IRON ROD
FOUND;
SOUTH 07003'00" WEST, A DISTANCE OF 304.19 FEET TO A 1/2-INCH IRON ROD
FOUND FOR THE SOUTHWEST CORNER OF A TRACT OF LAND DESCRIBED TO
DALE E HUFF BY DEED RECORDED IN VOLUME 15498, PAGE 49 OF SAID OFFICIAL
PUBLIC RECORDS, SAME BEING THE NORTHWEST CORNER OF A TRACT OF LAND
DESCRIBED TO JAMES P REEVES BY DEED RECORDED IN VOLUME 17102, PAGE
370 OF SAME;
SOUTH 05037'54" WEST, WITH THE WEST LINE OF SAID REEVES TRACT, A
DISTANCE OF 386.89 FEET TO A CAPPED IRON ROD FOUND FOR THE
EASTERNMOST SOUTHEAST CORNER OF SAID KLLB AIV LLC TRACT AND BEING
THE NORTHEAST CORNER OF LOT 3, CANELOS GROVE ADDITION, AN ADDITION
TO TARRANT COUNTY, TEXAS AS SHOWN BY PLAT RECORDED IN COUNTY
CLERK FILE No. D216049745 OF SAID OFFICIAL PUBLIC RECORDS;
Transportation Impact Fee Credit Agreement- CA-25-274 Page 6 of 15
Pecan Meadows 6/29/2026
SOUTH 89000'36" WEST, WITH THE NORTH LINE OF SAID CANELOS GROVE
ADDITION, A DISTANCE OF 472.22 FEET TO A 1/2-INCH IRON ROD FOUND FOR THE
NORTHWEST CORNER OF LOT 1 OF SAME;
SOUTH 01010'34" EAST, WITH THE WEST LINE OF SAID LOT 1, PASSING A 1/2-INCH
IRON ROD AT 70.24 FEET FOR A TOTAL DISTANCE OF 478.03 FEET TO A 4-INCH PIPE
FENCE POST FOUND FOR THE SOUTHERNMOST SOUTHEAST CORNER OF SAID
KLLB AIV LLC TRACT ON THE NORTH RIGHT-OF-WAY LINE OF SHELBY ROAD (A
VARIABLE WIDTH RIGHT-OF-WAY);
SOUTH 89011'13" WEST, A DISTANCE OF 1,309.41 FEET TO A CAPPED IRON ROD
FOUND FOR THE SOUTHERNMOST SOUTHWEST CORNER OF SAID KLLB AIV LLC
TRACT AND BEING THE SOUTHEAST CORNER OF A TRACT OF LAND DESCRIBED
TO METRO MANUFACTURING SUPPORT SERVICES BY DEED RECORDED IN
VOLUME 11344, PAGE 1100 OF SAID OFFICIAL PUBLIC RECORDS;
NORTH 01 °02'47" WEST, A DISTANCE OF 304.51 FEET TO A CAPPED IRON ROD
FOUND;
NORTH 07022'13" EAST, A DISTANCE OF 362.00 FEET TO A 1/2-INCH IRON ROD
FOUND FOR THE NORTHEAST CORNER OF SAID METRO MANUFACTURING
TRACT;
SOUTH 89019'10" WEST, PASSING A 1/2-INCH IRON ROD FOUND AT 348.20 FEET, A
TOTAL DISTANCE OF 373.22 FEET TO A CAPPED IRON ROD FOUND FOR THE
WESTERNMOST SOUTHWEST CORNER OF SAID KLLB AIV LLC TRACT IN THE
RIGHT-OF-WAY OF SAID SOUTH FOREST HILL DRIVE;
NORTH 00059'03" WEST, A DISTANCE OF 1,251.41 FEET TO THE POINT OF
BEGINNING AND CONTAINING A CALCULATED AREA OF 84.739 ACRES (3,691,219
SQ. FEET) OF LAND.
Transportation Impact Fee Credit Agreement- CA-25-274 Page 7 of 15
Pecan Meadows 6/29/2026
EXHIBIT B
Map of Property: Pecan Meadows Preliminary Plat, PP-22-004
Transportation Impact Fee Credit Agreement- CA-25-274 Page 8 of 15
Pecan Meadows 6/29/2026
D3'%LYiSLi:
D225214201
EXHIBIT C
Development Plan: Pecan Meadows
Final Plat FP-24-006
`QyQyy$� � ttkk t—Y..
CEO'' y5
Final Plat FP-24-131
Papa 2 of 3
Papa 3 of
ES
sr- __ ^.rem`?
•�r_c=�-a., -m`
it i
�'sR—
_.._.
...'
-
..
9
.r.._ -
...-
.�-..^..�.._._...
Transportation Impact Fee Credit Agreement- CA-25-274 Page 9 of 15
Pecan Meadows 6/29/2026
EXHIBIT D
Eligible Transportation Improvements
FORT WORTH.
,
i
JE Pecan Meadows
Eligible Transportation Improvements for
Credit against Transportation Impact Fees
Key
Development Plan Area
r �
• - _ Right -of -Way Dedication /
` Roadway Construction
J
VALENTIA
SWEET
PECAN
y
>
zuw
BULLSEYE
W
- VOLCANO
Q
W ti
m
s
L U
y
OLD DINO
3 DAVIE
.
BLUES
r
Q
OLD MAMBA j
r �
-
� x
NANDO
sHEtsr
sue.8r -
- E °
Eligible Improvements
Reference #
Limits
Shelby Road
FP-24-006
Right-of-way dedication
& FP-24-131
Shelby Road
CFA24-0102 & CFA23-0057
Construction of paving,
CPN 104616 & 104143
sidewalks, streetlights and
IPRC23-0037 & IPRC22-0154
drainage
Transportation Impact Fee Credit Agreement- CA-25-274
Page 10 of 15
Pecan Meadows
6/29/2026
EXHIBIT E
Credits Against Transportation Impact Fees
Pecan Meadows
Transportation Impact Fee Credit Overview
Value of ROW Dedication
Instrument # Final Plat # Eligible Arterial
Value
D224208199 FP-24-006 Shelby Road
$170,820.00
D225214201 FP-24-131 Shelby Road
TOTAL ROW TRANSPORTATION IMPACT FEE CREDIT
$170,820.00
THE Eligible Community Facilities Agreement Construction - 100% Eligible
City Secretary # CFA # Eligible Arterial
Value
60222 CFA23-0057 & 24-0102
61986 CPN 104143 & Shelby Road
$557,082.00
104616
IPRC23-0037 &
IPRC22-0154
TOTAL COMMUNITY FACILITIES AGREEMENT
$557,082.00
CREDIT
Engineering, Surveying, and Material Testing = 20% of total
$111,416.40
eligible construction costs
TOTAL TRANSPORTATION IMPACT FEE
$839,318.40
CREDIT
Transportation Impact Fee Credit Agreement- CA-25-274 Page 11 of 15
Pecan Meadows 6/29/2026
Right -of -Way Valuation for
Pecan
Meadows
Valuation Method 1- Percentage of TIP Project Cost
Eligible Arterial
Shelby Rd
2022 Transportation Improvements Plan Project Number
Z-4
Estimated Construction Costs from 2022 Transportation
Improvements Plan
$2,321,000
Value of Total Project Right -of -Way (20% of Construction Cost)
$464,200
Total Project Length (LF)
1,300
Arterial Cross -Section Width (LF)
110
Additional ROW needed for Roundabout (SF)
$0
Total Project Right -of -Way (SF)
143000
Right -of -Way Value Per Square Foot
$3.25
Valuation Method 2 - Percentage of Construction Project Cost
Eligible Arterial
Shelby Rd
City Project Number
104143 & 104616
Final Construction Costs from Notice of Completion (Green
Sheet)
$557,082.00
Value of Total Project Right -of -Way (20% of Construction Cost)
$111,416
Total Project Length (LF)
1314
Arterial Cross -Section Width (LF)
40
Additional ROW needed for Roundabout (SF)
0
Total Project Right -of -Way (SF)
52,560
Right -of -Way Value Per Square Foot
$2.12
Valuation Method 3 - TAD appraised value
TAD Value as of 08/9/2023
Shelby Rd
TAD Account
4152905
Total Area (SF)
6,970
Appraised Value
$3,485.00
Value per Square Foot
$0.50
Right -of -Way Dedication
Shelby Rd
Recording Instrument Number
D224208199 &
D225214201
Final Plat Number
FP-24-006 & FP -
24-131
Recording Date
11/12/2024 &
11/14/2025
Total area of ROW dedicated (SF)
52,560
Value per SF
$3.25
ROW Credit Available
$170,820.00
Transportation Impact Fee Credit Agreement- CA-25-274
Pecan Meadows
Page 12 of 15
6/29/2026
Pecan Meadow
Value of Eligible Community Facilities Agreement Construction, CPN 104143 & 104616
Bidlist
Item
No.
Description
Unit
Completed
Quantity
Eligible
Quantity
Unit Price
Credit Available
UNIT III: DRAINAGE IMPROVEMENTS
1
2
0241.3015 Remove 24" Storm Line
0241.4201 Remove 4' Drop Inlet
LF
EA
26
26
1
$40.00
$1,040.00
$2,000.00
1
$2,000.00
3
3305.0109 Trench Safety
LF
325
325
$2.00
$650.00
4
3341.0201 21" RCP, Class III
LF
344
344
$70.00
$24,080.00
5
3341.0205 24" RCP, Class III
LF
150
150
$80.00
$12,000.00
6
3349.0001 4' Storm Junction Box
3349.5001 10' Curb Inlet
3349.5002 15' Curb Inlet
EA
1
1
$5,500.00
$5,500.00
$15,200.00
$4,800.00
7
_EA
EA
4
1
4
$3,800.00
$4,800.00
8
1
TOTAL UNIT III: DRAINAGE IMPROVEMENTS
$65,270.00
UNIT IV: PAVING IMPROVEMENTS
1
3211.0400 Hydrated Lime (36#/SY)
3211.0502 8" Lime Treatment (36#/SY)
TN
60
60
$235.00
$4.00
$14,100.00
$13,380.00
2
SY
3,345
3,345
3,067
3
3213.0105 10" Conc Pvmt
3213.0302 10' Conc Sidewalk
SY
3,067
$88.00
$4.50
$269,896.00
$56,979.00
4
SF
12,662
_
12,662
5
3213.0506 Barrier Free Ramp, Type P-1
EA
2
2
$2,200.00
$4,400.00
$3,136.00
6
3291.0100 Topsoil
CY
112.0
112
$28.00
7
3292.0400 Seeding, Sodding
SY
669
669
$8.00
$5,352.00
8
9999.0005 Construct Pvmt Header
EA
2
2
$1,000.00
$2,000.00
9
9999.0007 Connect to Existing Header (Leave
Barricade)
3211.0502 8" Lime Treatment (36#/SY)
EA
2
2
$500.00
$1,000.00
$2,245.00
10
SY
449
449
$5.00
11
3211.0400 Hydrated Lime (36#/SY)
TN
9
9
$235.00
$2,115.00
12
3213.0105 10" Conc Pvmt
SY
419
419
$96.00
$40,224.00
13
9999.0012 Speed Limit Sign (R2-1)
9999.0014 Construct Pvmt Header
EA
2
2
2
2
$500.00
$1,000.00
$1,000.00
$2,000.00
14
EA
TOTAL UNIT IV: PAVING IMPROVEMENTS
$417,827.00
Transportation Impact Fee Credit Agreement- CA-25-274 Page 13 of 15
Pecan Meadows 6/29/2026
UNIT V: STREET LIGHTING
IMPROVEMENTS
1
2605.3015 2" Condt PVC SCH 80 (T)
LF
EA
1,339
6
1,339
6
$15.00
$950.00
$20,085.00
$5,700.00
2
3441.1632 Install Type 33A Ann
3441.1772 Furnish/Install 240-480 Volt Single
Phase Transocket Metered Pedestal
3441.3302 Rdwy Illum Foundation TY 3,5,6,
and 8
3441.3342 Rdwy Illum TY 18 Pole
9999.0003 Arterial Luminaire
3
EA
1
1
$9,500.00
$9,500.00
4
5
6
EA
6
6
$1,800.00
$10,800.00
EA
EA
6
6
6
$3,700.00
$22,200.00
6
$950.00
$5,700.00
TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS
$73,985.00
UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS
1
$0.00
TOTAL UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS
$0.00
Bid Summary
UNIT III: DRAINAGE IMPROVEMENTS $65,270.00
UNIT IV`. PAVING IMPROVEMENTS $417,827.00
UNIT V: STREET LIGHTING IMPROVEMENTS $73,985.00
UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS $0.00
CPN 104143 & 104616 ELIGIBLE CONSTRUCTION SUBTOTAL 1 $557,082.00
Transportation Impact Fee Credit Agreement- CA-25-274 Page 14 of 15
Pecan Meadows 6/29/2026
EXHIBIT F
Allocation of Credits
Credits shall be allocated by the Owner(s) on a first -come, first -served basis within the
preliminary plat boundary of Pecan Meadows Final Plat, FP-24-006 and FP-24-131 and shall run
with the land; provided, however, that no development within the boundary shall have the right
to utilize credits under this agreement unless the Owner submits to the City a written request or
notice approving the use of credits for the applicable development.
Final Plat FP-24-006
� 1%
Pag2M3
�I
o:zmazoi
I
A
M I. Mun
P
PW]a
Final Plat FP-24-131
i
Transportation Impact Fee Credit Agreement- CA-25-274 Page 15 of 15
Pecan Meadows 6/29/2026
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Lennar Homes of Texas Land and Construction Ltd
Subject of the Agreement:
Road Construction and ROW dedication
M&C Approved by the Council? * Yes ❑ No M
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 0
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: Date ACM signs
If different from the approval date.
Expiration Date: 10 years of when ACM signs
If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. CA-25-274
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.