NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Ventana Phase 8B
City Project No.: 105702
Improvement Type(s): ❑x Paving ❑x Drainage ❑x Street Lights ❑ Traffic Signal
Original Contract Price:
$4,233,732.50
Amount of Approved Change Order(s):
$859.49
Revised Contract Amount:
$4,234,591.99
Total Cost of Work Complete:
$4,234,591.99
Arturo Sancen (Jul 7 2026 08:24:26 C77
Contractor
Superintendent
Title
Conatser Construction TX, L. P
Company Name
Ty ce L is (Jul 7, 2026 08:33:36 CDT
Project Inspector
d 01,
Ahmed Musa (Jul 8. 2026 14:49:55 CDT)
Project Manager
CFA Manager
Lauren Prieur Wul 9. 2026 12:45:48 CDT)
TPW Director
07/07/2026
Date
07/07/2026
Date
07/08/2026
Date
07/09/2026
DV/09/2026
Date OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 1 of 2
Notice of Project Completion
Project Name: Ventana Phase 8B
City Project No.: 105702
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety 'u!
Statement of Contract Time
Contract Time: 210 WD Days Charged: 180 WD
Work Start Date: 9/17/2025 Work Complete Date: 6/5/2026
Completed number of Soil Lab Test: 2515
Completed number of Water Test: 23
Page 2 of 2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name VENTANA PHASE 8B
Contract Limits
Project Type DRAINAGE
City Project Numbers 105702
DOE Number 5702
Estimate Number I Payment Number I For Period Ending
City Secretary Contract Number
Contract Date
Project Manager NA
Contractor CONATSER CONSTRUCTION TxL.P
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors T. GARDNER / R. HARP
Contract Time
Days Charged to Date
Contract is 100.00
6/5/2026
WD
210 WD
180
Complete
Monday, July 6, 2026 Page 1 of 6
City Project Numbers 105702
Contract Name VENTANA PHASE 8B
Contract Limits
Project Type DRAINAGE
Project Funding
UNIT In: DRAINAGE IMPROVEMENTS
DOE Number 5702
Estimate Number 1
Payment Number 1
For Period Ending 6/5/2026
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed Completed
No.
Quanity
Total
Quanity
Total
---------------------------------------
1
POST -CCTV INSPECTION OF STORM DRAIN
5382 LF
$4.00
$21,528.00
5382
$21,528.00
2
TRENCH SAFETY
5382 LF
$2.00
$10,764.00
5382
$10,764.00
3
21" RCP, CLASS 111
724 LF
$75.00
$54,300.00
724
$54,300.00
4
24" RCP, CLASS III
1325 LF
$85.00
S112,625.00
1325
$112,625.00
5
27" RCP, CLASS III
287 LF
$105.00
$30,135.00
287
$30,135.00
6
30" RCP; CLASS III
400 LF
$115.00
$46,000.00
400
$46,000.00
7
36" RCP, CLASS III
1645 LF
$160.00
S263,200.00
1645
$263,200.00
8
42" RCP, CLASS III
299 LF
$200.00
$59,800.00
299
$59,800.00
9
48" RCP, CLASS 111
15 LF
$235.00
$3,525.00
15
$3,525.00
10
54" RCP, CLASS III"
349 LF
$285.00
$99,465.00
349
$99,465.00
11
4' STORM JUNCTION BOX
7 EA
$7,214.28
$50,499.96
7
$50,499.96
12
Y STORM JUNCTION BOX
7 EA
$7,928.57
$55,499.99
7
$55,499.99
13
4' STACKED MANHOLE
2 EA
$15,000.00
$30,000.00
2
$30,000.00
14
6' STORM JUNCTION BOX
2 EA
$10,500.00
$21,000.00
2
$21,000.00
15
10' CURB INLET
29 EA
$4,000.00
$116,000.00
29
$116,000.00
16
15' CURB INLET
5 EA
$5,000.00
$25,000.00
5
$25,000.00
17
4' X 4' DROP INLET
3 EA
$4,500.00
$13,500.00
3
$13,500.00
18
DUAL 3X3MBC
338 LF
$560.00
S189,280.00
338
$189,280.00
19
12'-10"X 6' JUNCTION BOX
I EA
$28,500.00
$28,500.00
1
$28,500.00
20
IT-10" X 10'-6" JUNCTION BOX
I EA
$50,500.00
$50,500.00
1
$50,500.00
21
24" 4:1 SLOPED END HW
I EA
$3,500.00
$3,500.00
1
$3,500.00
22
30" 4:1 SLOPED END HW
I EA
$4,500.00
$4,500.00
1
$4,500.00
23
DUAL 3'X3' 4:1 SLOPED END HW
I EA
$18,500.00
$18,500.00
1
$18,500.00
24
36" 4:1 SLOPED END HW
I EA
$6,500.00
$6,500.00
1
$6,500.00
25
42" 4:1 SLOPED END HW
I EA
$8,500.05
$8,500.05
1
$8,500.05
26
12" LARGE STONE TYPE "A" DRY RIP RAP
283 SY
$165.00
$46,695.00
283
$46,695.00
27
INLET PROTECTION
37 EA
$250.00
$9,250.00
37
$9,250.00
Sub -Total of Previous Unit
$1,378,567.00
$1,378,567.00
Monday, July 6, 2026 Page 2 of 6
City Project Numbers 105702
Contract Name VENTANA PHASE 8B
Contract Limits
Project Type PAVING
Project Funding
UNIT IV: PAVING IMPROVEMENTS
Item Description of Items
No.
-----------------
1 HYDRATED L ME(32 LBS/SY - RESIDENTIAL &
42 LBS/SY - ORCHARD WAY) (C#1)
2 4" FLEXIBLE BASE, TYPE A, GR-1
3 6" LIME TREATMENT (CO#1)
4 8" LIME TREATMENT
5 6" CONC PVMT (CO#1)
6 4" CONC SIDEWALK
7 BARRIER FREE RAMP, TYPE P-1
8 TOPSOIL
9 BLOCK SOD PLACEMENT
10 7.5" CONC PVMT
11 CONSTRUCT TYPE III BARRICADE
12 CONSTRUCT STD. PVMT HEADER
13 REMOVE BARRICADE AND CONNECT TO
EXISTING PAVEMENT HEADER
DOE Number 5702
Estimate Number 1
Payment Number 1
For Period Ending 6/5/2026
Estimated
Unit
Unit Cost
Estimated
Completed
Completed
Quanity
Total
Quanity
Total
----------------------
545.22
TN
$282.13
$153,822.92
545.22
$153,822.92
795
SY
$16.00
$12,720.00
795
$12,720.00
24458.13
SY
$4.00
$97,832.52
24458.13
$97,832.52
7326
SY
$5.00
$36,630.00
7326
$36,630.00
23738.098
SY
$62.00
471,762.08
23738.098
1,471,762.08
23094
SF
$4.25
$98,149.50
23094
$98,149.50
22
EA
$2,400.00
$52,800.00
22
$52,800.00
420
CY
$28.00
$11,760.00
420
$11,760.00
2524
SY
$8.00
$20,192.00
2524
$20,192.00
6950
SY
$78.00
S542,100.00
6950
$542,100.00
3
EA
$799.99
$2,399.97
3
$2,399.97
95
LF
$25.00
$2,375.00
95
$2,375.00
4
EA
$1,000.00
$4,000.00
4
$4,000.00
14 STOP SIGNS 9 EA $850.00 $7,650.00 9 $7,650.00
15 STREET NAME BLADE PAIR 10 EA $250.00 $2,500.00 10 $2,500.00
16 STREET SIGN POLE 10 EA $300.00 $3,000.00 10 $3,000.00
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- -
Sub -Total of Previous Unit $2,519,693.99 $2,519,693.99
UNIT V: STREET LIGHTING IMPROVEMENTS
Item Description of Items
No.
-----------------
1 2" CONDT PVC SCH 80 (T)
2 INSTALL TYPE 33B ARM
3 FURNISH/INSTALL 120-240 VOLT SINGLE
PHASE METERED PEDESTAL
4 RDWY ILLUM ASSEMBLY TY 8,11,D 25, AND D-
30
6 RDWY ILLUM FOUNDATION TY 1,2, AND 4
7 NO 2 INSULATED ELEC CONDR
8 NO 10 INSULATED ELEC CONDR
Estimated Unit
Unit Cost
Estimated
Completed
Completed
Quanity
Total
Quanity
Total
----------------------
3593 LF
$15.00
$53,895.00
3593
$53,895.00
48 EA
$600.00
$28,800.00
48
$28,800.00
1 EA
$10,500.00
$10,500.00
1
$10,500.00
48 EA
$2,500.00
$120,000.00
48
$120,000.00
48 EA
$1,200.00
$57,600.00
48
$57,600.00
1714 LF
$8.00
$13,712.00
1714
$13,712.00
1879 LF
$6.00
$11,274.00
1879
$11,274.00
Monday, July 6, 2026 Page 3 of 6
City Project Numbers 105702
Contract Name VENTANA PHASE 8B
Contract Limits
Project Type STREET LIGHTING I
Project Funding
DOE Number 5702
Estimate Number 1
Payment Number 1
For Period Ending 6/5/2026
9 FURNISH/INSTALL GROUND BOX TYPE B, 5 EA $750.00 $3,750.00 5 $3,750.00
W/APRON
10 TYPE R2 LED LIGHTING FIXTURE (50W) 44 EA $750.00 $33,000.00 44 $33,000.00
11 TYPE R4 LED LIGHTING FIXTURE (50W)T 4 EA $950.00 $3,800.00 4 $3,800.00
Sub -Total of Previous Unit $336,331.00 $336,331.00
Monday, July 6, 2026 Page 4 of 6
City Project Numbers 105702
Contract Name VENTANA PHASE 813
Contract Limits
Project Type STREET LIGHTING I
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 1
Change Order Number
DOE Number 5702
Estimate Number 1
Payment Number 1
For Period Ending 6/5/2026
$4,233,732.50
$859.49
Total Contract Price $4,234,591.99
Total Cost of Work Completed $4,234,591.99
Less % Retained $0.00
Net Earned $4,234,591.99
Earned This Period $4,234,591.99
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$4,234,591.99
Monday, July 6, 2026 Page 5 of 6
City Project Numbers 105702
Contract Name VENTANA PHASE 813
Contract Limits
Project Type STREET LIGHTING I
Project Funding
Project Manager NA
Inspectors T. GARDNER / R. HARP
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
DOE Number 5702
Estimate Number 1
Payment Number 1
For Period Ending 6/5/2026
City Secretary Contract Number
Contract Date
Contract Time 210 WD
Days Charged to Date 180 WD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $4,234,591.99
Less % Retained
$0.00
Net Earned
$4,234,591.99
Earned This Period $4,234,591.99
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$4,234,591.99
Monday, July 6, 2026 Page 6 of 6
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECT NAME:
VENTANA PHASE 8B
CONTRACT:
(UNIT 1) WATER, (UNIT II) SEWER, (UNIT III) STORMWATER, (UNIT IV) PAVEMENT, &
UNIT V STREET LIGHTS
CHANGE
ORDER No:
CFA#
25-0055 CITY PARTICIPATION: NO
CITY PROJECT#
105702
FID #
FID # 30114-0200431-105702-EO7685
X-Number
X-28290
FILE #
W3088
INSPECTOR: Jason Inocencio Phone No: 817-530-3321
PROJECT MANAGER: Ahmed Musa Phone No: 817-392-2084
CONTRACT UNIT
WATER
SEWER
PAVING
DRAINAGE
STREET LIGHTS
CONTRACT DAYS
Developer
Cost
City Cost
Developer Cost
City Cost
Developer Cost
City Cost
Developer Cost
City Cost
Developer
Cost
City Cost
ORIGINAL CONTRACT
$1,318,980.00
$0.00
$1,571,229.00
$0.00
$2,518,834.50
$0.00
$1,378,567.00
$0.00
$336,331.00
$D.00
210
EXTRAS TO DATE
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0
CREDITS TO DATE
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0
CONTRACT TO DATE
$1,318,980.00
$0.00
$1,571,229.00
$0.00
$2,518,834.50
$0.00
$1,378,567.00
$0.00
$336,331.00
$0.00
210
AMOUNT OF PROP. CHANGE ORDER
$0.00
$0.00
$0.00
$0.00
$859.49
$0.00
$0.00
$0.00
$0.00
$0.00
0
REVISED CONTRACT AMOUNT
$1,318,980.00
$0.00
$t,571,229.00
$0.00
$2,519,693.99
$0.00
$1,378,567.00
$0.00
$336,331.00
$0.00
210
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
$1,318,980.00
$1,571,229.00
$2,519,693.99
$1,378,567.00
$336,331.00
REVISED COST SHARE
Dev. Cost:
$7.124,800.99
City Cost:
$0.00
TOTAL REVISED CONTRACT
$7,124,800.99
You are directed to make the following changes in the contract documents
UNIT IV: PAVING IMPROVEMENTS (Residential)
PAY ITEM #
CITY BID ITEM
#
QUANTITY
UNIT
ITEM DESCRIPTION
UNIT PRICE
TOTAL
1
3211.04
0.23
TON
Hydrated Lime(32 Ibs/sy for Residential 8 42 Ibs/sy for Orchard Way)
$ 282.13
$ 64.89
3
3211.0501
11.13
SY
6" Lime Treatment
$ 4.00
$ 44.52
5
3213.0101
1 12.10
SY
6" Conc Pvmt
1 $ 61.99
$ 750.08
TOTAL PAVING
1 $ 859.49
Asterisk (`) indicates new Pay Item
REASONS FOR CHANGE ORDER This change order includes the addition of Hydrated Lime, Lime Subgrade, and Concrete Pavement quantities at the intersection of Starpoint Road and Alley 14 in Ventana
8B due to the increase in curb radius from 10' to 15'.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED: APPROVED: APPROVED:
LJA Engineering, Inc
By:
Name: BRIGHTON YAU, P.E.
PMB SWFW Dev Co Mannager LLC
By:
Name: KTAYLOR BAIRD
Conatser truct on
BY: :ej
Name: BROCK HUGGINS
Title: PROJECT MANAGER Title: MANAGER Title: PRESIDENT
REVIEWED
By Ahmed Musa at 9:24 am, Dec 01, 2025
FORTWORTH.
�0
TRANSPORTATION AND PUBLIC WORKS
January 26, 2026
Conatser Construction TX, L. P
3527 Wichita St
Fort Worth, TX 76119
RE: Acceptance Letter
Project Name: Ventana Phase 8B
Project Type: Water,Sewer, and Paving Improvements
City Project No.: 105702
To Whom It May Concern:
On June 8, 2026 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on July 2, 2026. The final inspection and
the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is
therefore accepted by the City. The warranty period will start on July 2, 2026, which is the date of the
punch list completion and will extend of two (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-2084.
Sincerely,
401,
Ahmed Musa (Jul 8. 2026 14:49:55 CDT)
Ahmed Musa, Project Manager
Cc: Tyrece Lewis, Inspector
Marc Cantrell, Inspection Supervisor
Charles Hayes, Senior Inspector
Andrew Goodman, Program Manager
UA Engineering, Inc, Consultant
Conatser Construction TX, L. P, Contractor
PMB, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared 'Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Construction TX. LP, known to me to be a credible person, who
being by me duly sworn, upon his oath deposed and said:
That all persons, Firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
VENTANA PH. 8B
WATER, SANITARY SEWER, DRAINAGE,
PAVING, & STREET LIGHT IMPROVEMENTS
CFA #: 25-0055
CPN: 105702
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
dM&-A. On " -
Brock Rugg
Subscribed and sworn to before me this 4 h day of June, 2026.
Y` KAiHERME ROSE Notary Public in Tarrant County, Texas
rarurPs ST.TEa a+ts
0.1
br 1334'a7933
{UYM E7fD. t i-34-2026
CONSENT OF
SURETY COMPANY
TO FINAL PAYMENT
Conforms with the American Institute of
Architects, AIIA Document C707
PROJECT:
(name, address)Ventana Phase 8B
Fort Worth, TX
TO {Owner)
OWNER
9L
ARCHITECT
C�
CONTRACTOR
SURETY
OTHER
Band No 02.70885
PNt8 VENTANA DEVELOPER SOUTH, L-L C. AND THE I ARCHITECT'S PROJECT NO: CFA25-oo55
CITY OF FORT (NORTH CONTRACT FOR:
4001 Maple Avenue, Suite 270 Waler, Sanitary Sewer, Drainage raving, 8 Street Light Improvements
for Ventana Phase aB
Dallas Tx 75219 —J CONTRACT DATE:
CONTRACTOR: CONATSER CONSTRUCTION TX, L P
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(here insert name and address of Surety Company)
BERKLEY INSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 . SURETY COMPANY
on bond of {here inasrt name end address of Convector)
CONATSER CONSTRUCTION TX, L.P
5327 Wichita St
Fort Worth TX 76119-6035 , CONTRACTOR,
hereby approves of the final payment to the Contactor, and agrees that fans] payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert nsma and addrasa of OwnaO
PMB VENTANA DEVELOPER SOUTH, L.L.0 AND THE CITY OF FORT WORTH
4001 Maple Avenue, Suite 270
Dallas TX 75219 . OWNER,
as set forth in the said Surety Company's band.
IN WITNESS, WHEREOF,
the Surety Company has hereunto set its hand this
Attest, c
(Seal):
3rd 'day of June, 2026
BERKLEY INSURANCE' COMPANY
Surety Company
Signature of Authorized Representative
Ro; M-.rales Attorney -in -Fact
Title
NOTE: TMs form is to be used as a companion document to AIA DOCUMENT G748. CONTRACTOR'S AFFIDAVIT OF PAYMENT OF Di 6TS AND CLAIMS,.
Current Edition
ONE PAGE