City of Fort Worth
Change Order Request
Project Name Sycamore Park Phase II City Sec # 1 63362
Client Project #(s) 104193
Project Description New Community Park
Contractor Perfect Finish Landscaping Change Order # 1 Date 7/1/2026
City Project Mgr. I Patrick M. Vicknair City Inspector Adrian Aranda
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
PARD
Totals
Contract Time
CD
$4,804,667.01
$4,804,667.01
275
$4,804,667.01
$4,804,667.01
275
Amount of Proposed Change Order
-$3,858.85
-$3,858.85
145
Revised Contract Amount $4,800,808.16
Original Funds Available for Change Orders $500,000.00
Remaining Funds Available for this CO $500,000.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%)
$4,800,808.16
420
$500,000.00
$500,000.00
-0.08%
$6,005,833.76
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Design changes are required to maintain the water level in the pond, to the southern parking area, and to the concrete pavement at the pavilions. These changes are needed
for drainage, safety, and cost savings. Interpretive panels are needed for TPWD grant requirements. Tree sculpture and enhanced landscape areas are added for aesthetics.
Additional pavilion and picnic tables will provide increased opportunities for passive recreation.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name-1 WContractor (Nama Contract Signature
Date
lake "° n
Perfect Finsih Landscaping Jake North ��ke Norm (gym z, zozs 12.07:44 CDT)
07/02/2026
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
.Iz „, „ i�r
07/02/2026
07/02/2026
Programg Manager
Date
Senior Capital Project Officer
Date
07/02/2026
-- /--
07/03/2026
Assistant Director Dept
Date
Deputy Director, Contracti ent Dept
Date
07/04/2026
oa 41:21 CDT)
07/06/2026
Assistant City Attorney
Date
Assistant City Manager
Date
-e m:+swecore
07/09/2026
Dana Burg doff (JW 9, 2126 15:41:52 CDT)
07/09/2026
Council Action
(if require(
M&C Number NIA
ATTEST: U a
KC
Jannette Goodall, City Secretary °nc
FONT a
,�ao> 4o44ao
a=> .40,
ll%hx sad
M&C Date Approved NIA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
IV--- Change Order Additions
Project Name Sycamore Park Phase II City Sec # 63362
Client Project # 1 104193
Contractorf Perfect Finish Landscaping PMJ Patrick M. Vicknair Inspector Adrian Aranda
Change Order Submittal # 0 Date 71112026
AUUITIUN5
Existing terns
UtscRi iCA
Ut
ty
Unit
Unit Cost
otal
nl[U7-U3
Remove o xishng I ree
I TLTdu-uuuuu
,i1b5. 1
$2 ,2
nit 1- /
6' Curb
A
85.0
$2.46
$2,249.1U
Unit -
vvneel Stops
IFARU
17. uuuuu
EA
222.uu
$3,77 .
nit 02-07
ITables
IPARD
10.00000000
EA
$3,339.65
3 6.00
Uni[ c-14
(Interpretive Signage
IPA U
7. u U uu
EA
$5,on 51
'41,uu.5
Unit 02-
1 Grills (pilot rock stainless steel)
IPARD
2.00000000
EA
$823.00
1,b4b.
Unit 02-21
1Ln anced Landscape rimming & Grubbing)
HARD
45,997.56000000
0.3
$i4,/19.22
New Items
Unit u2-2d
I Tree Sculpture
IFARD
1.00000000
S
$5,000.00
5,000.00
Unit ui-29
I City water Connection (revised sheet 1.21)
IPARD
1.00000000
L
$18,265.00
, io,2ti5.UU
Unit 02-30
130x 4 ' Pavilion (revised sheet C1.12 and shop drawings)
IFARLJ
1.
La
as n,261.4
7aua,26 .
Unit 2-3
x ion (revised sheet C1.1z for concrete plaza)
RD
1,i
1
77710.Su
Unit uc 2
au x 40 Pavilion (revised sheet C1. 2 ror concrete footers)
A U
7.
A
2,05 .25
$14,w .1
Unit o-33
30 x 4 ' Paw ion revised sheet C1. 2 for electrical system
PARD
1.00000000
$ ,a .00
$42,VU0.
rntUo-34
Iconic Pavilion (T concrete plaza)
1,U3 . UUu
SY
1U .22
i ,284.36
PARD
$630,218.63
,Y
Ub OI81 n111on5
Z 3 ,YRi.ti3
Change Order Additions Page 2 of 3
FoxT?�rH City of Fort Worth
Change Order Deletions
Project Name Sycamore Park Phase II City Sec # 63362
Client Project# 104193
Contractor F Perfect Finish Landscaping PM Patrick M. Vicknair Inspector FAdrian Aranda
Change Order Submittal# Date 7/1/2026
UILLU IUM
�nam� � - - • �
��� • ��r��rx�`r`omnn�������trsKlt:v�
i .fin. • n- ice rrrrrrrr i_�Insy:blax�.
•D $63 I
77.48
Sub • . Del
Change Order Deletions Page 3 of 3
CSC No. 63362-COl
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: ALCC dba Perfect Finish Landscaping
Subject of the Agreement: Sycamore Park Phase 11 -Change Order No 1
M&C Approved by the Council? * Yes ❑ No 0
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑✓ No ❑ CSN 63362
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No ❑✓ If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: N/A
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes ❑ No ED
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. CPN 104193
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes ❑✓ No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)