Loading...
HomeMy WebLinkAboutContract 40827-CO1 . CITY CONTRACT CO —C NO. gay C) DATE 4-18-10 DEPARTMENT OF ENGINEERING CHANGE ORDER JUSTIFICATION RECORD PROJECT NAME: Improvements at Parkwood Hills Park and Anderson Campbell Park CHANGE ORDER: I DOE NO. 6311 CLIENT PROJECT NO C280/541600/806470114683 6301 C280/541600/806470114583 INSPECTOR: Adilda Cazorla PHONE NO: 817-392-8306 PROJECT MANAGER: Eric Seebock PHONE NO: 817-392-5742 REASON(S) FOR CHANGE: It was decided to leave the existing drive into the site to use for maintenance access. Electrical service hookup was not included in the plans and specifications. free needed to be removed per electric company requirements. Sealant was not specified for the parking lot. TPW inspector suggested this area be sealed for increase longevity of concrete. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX INSPECTOR DATE PRROJECT MANAGER DA�TE G DIRECTOR OF NIANAGING DEPT DATE MANAGER OF CONSTUCTION SERVICE. DA"rE CJ, CJ /z/zor� - z -may DIRE ' OR OF CON"rRACrI 1. � �a , `l`r, Attegted by: ryy A P, 0 4 ,, ; Marty Hendrix, ity Secretary 1,� 1RED i CI.1'Y OF FORT WORTH i� J, CHANGE ORDER REQUEST ORIGINAL CHANCE ORDER NO.I DA TE 4-18-11 D.O.E.NO 6311 PROJECT NO. C280/541600/806470114683 6301 C280/541600/806470114583 PROJECT DESCRIPTION Improvements at Parkwood Hills Park and CITY SECRETARY CONTRACT NO. 40827 Anderson Campbell Park ORIGINAL CONTRACT AMOUNT $ 468,891.69 EXTRAS TO DATE -0.00- CREDITS TO DATE -0.00- CONTRACT COST TO DATE $468,891.69 AMOUNT OF PROPOSED C1"IANGE ORDER $ 1,512.50 REVISED CONTRACT AMOUNT $470,404.19 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS $70,000.00 REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS $68,487.50 ADDITIONAL FUNDING(IF NECESSARY) $0.00 IN ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SFIALL: ITEM DESCRIPTION QUANTITY UNIT COST TOTAL DELETE Match existing concrete curb and gutter 30 LF $25.00 $ <750.00> UNIT TWO / LINE ITEM 5 ADD Add 2"electrical service conduit from transformer LS $375.00 $375.00 UNIT ONE to new meter; concrete for pedestal and installation LINE ITEM 17 of electric meter pedestal, complete in place ADD Add 2"electrical service conduit from transformer LS $ 375.00 $ 375.00 UNIT TWO to new meter; concrete for pedestal and installation LINE ITEM 16 of electric meter pedestal, complete in place INCREASE Removal of existing tree to allow for new LS $450.00 $450.00 UNIT TWO electrical meter service LINE ITEM 4 ADD Furnish and install a one-part, self-leveling sealer 850 LF $ 1.25 $ 1,062.50 UNIT TWO on parking lot joints, complete in place LINE ITEM 17 It is understood and agreed that the acceptance of Ihts Change Order by the contractor constitutes an accord and satistaction and represents Payment in full(both time and(Honey)for all costs arising out of,or inclderual to,the above Change Order CON TRAUTO R'S NA S1 E: Henneberger Construction, Inc. ORIGINAL CON TRACT TIME \DDIT IO N.\LAPIP ROV I:D TINE TO DA I \PPROVED CONTRACT TINE TO DA lE .\UDCTIONAL FINE FOR rtlts CHANGE ORDER 100 Working Days 0 Working Days 100 Workin, Days 0 Working Days CUVIR\C7UR / U.al. ,l) P"R( ,lGi jt/� U1 F. ,,. DIREClUR'CUN I U.1 1 y> I t ril \ITO RV EV D%FE C S. ( d�J�V T�ITV AI A A/ II N 1104 IIF RFQI IRFDI U\IF I U \YPRO\FD J 015\PPRO\FD 9 UIHFR