Loading...
HomeMy WebLinkAbout057854-A2 - Construction-Related - Contract - Texas Department of Transportation (TxDOT)Docusign Envelope ID: 65BC58D7-31 F6-8F39-80F9-AD1 E96A70504 TxDOT: CCSJ # 0902-00-317 1 AFA ID Z00002845 AFA CSJs 0902-00-317 District # 02 Code Chart 64# 15000 Project Name 2018 Railroad TRE at Riverside Drive THE STATE OF TEXAS § THE COUNTY OF TRAVIS § Federal Highway Administration: CFDA No. 1 20.205 1 CFDA Title I Highway Planning and Construction AFA Not Used For Research & Development ADVANCE FUNDING AGREEMENT CSC NO. 57854-A2 For Federal Railway -Highway Crossing Program Off -System AMENDMENT #2 THIS AMENDMENT is made by and between the State of Texas, acting through the Texas Department of Transportation, called the "State", and the City of Fort Worth, acting by and through its duly authorized officials, called the "Local Government". The State and Local Government shall be collectively referred to as "the parties" hereinafter. WITNESSETH WHEREAS, the parties executed a contract on 07/12/2022 to effectuate their agreement for safety improvements at the crossing of Riverside Drive and the Trinity Railway Express (TRE)'s track; from 150 feet South of the Railroad (TRE) Crossing to 100 feet North of the Railroad (TRE) Crossing; and, WHEREAS, the parties executed Amendment #1 to the contract on 01/23/2023 to increase Federal funding to 100% from 63% due to project meeting fully funded eligibility federal requirements and decreasing indirect state cost by $177.00 due to fiscal year 2023 new rate of indirect state cost; and, WHEREAS, it has become necessary to amend that contract in order to increase Federal funding for construction due to low bid amount, increase construction direct state costs by $6,850, and decrease indirect state costs by $18,981 due to fiscal year 2026 new rate and calculation method of indirect state costs; NOW THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the parties, the parties do agree as follows: AGREEMENT 1. Attachment B-1, Project Budget, is deleted in its entirety and replaced with Attachment B-2, Project Budget, which is attached to and made a part of this Amendment. The total estimated cost of the Project increased by $231,844.00, from $489,498.00 to $721,342.00, due to the increase of Federal funding for construction because of the low bid amount and the increase of construction direct state costs because of the increased construction funding. OFFICIAL RECORD CITY SECRETARY AFA Amend Page 1 of 2 FT. WORTH, TX Rev. 10/03/2024 Docusign Envelope ID: 65BC58D7-31F6-8F39-80F9-AD1E96A70504 TxDOT: CCSJ # 1 0902-00-317 1 AFA ID I Z00002845 I AFA CSJs 0902-00-317 District # 02 Code Chart 64# 1 15000 Project Name 2018 Railroad THE at Riverside Drive Federal Highway Administration: CFDA No. 120.205 CFDA Title I Highway Planning and Construction AFA Not Used For Research & Development 2. Attachment C-1, Resolution, Ordinance, or Commissioners Court Order, is supplemented by adding Attachment C-2, Resolution, Ordinance, or Commissioners Court Order. The resolution is being updated to reflect the increase of Federal funding for construction due to the low bid amount and the increase of construction direct state costs because of the increased construction funding. All other provisions of the original contract are unchanged and remain in full force and effect. Signatory Warranty Each signatory warrants that the signatory has necessary authority to execute this agreement on behalf of the entity represented. Each party is signing this Agreement on the date stated under that party's signature. THE STATE OF TEXAS THE LOCAL GOVERNMENT D—Signed by: Signed by: igna ure igna ure Kenneth Stewart Typed or Printed Name Director, Contract Services Jesica McEachern Typed or Printed Name Assistant City Manager Typed or Printed Title Typed or Printed Title 6/17/2026 6/16/2026 Date Date AFA Amend Page 2 of 2 Rev. 10/03/2024 Docusign Envelope ID: 65BC58D7-31 F6-8F39-80F9-AD1 E96A70504 TxDOT: cCSJ # 0902-00-317 1 AFA ID Z00002845 AFA CSJs 0902-00-317 District # 02 Code Chart 64# 15000 Project Name 2018 Railroad THE at Riverside Drive Federal Highway Administration: CFDA No. 20.205 CFDA Title Highway Planning and Construction AFA Not Used For Research & Development ATTACHMENT B-2 PROJECT BUDGET Costs will be allocated based on 100% Federal funding until the Federal funding reaches the maximum obligated amount. The Local Government will then be responsible for 100% of the costs Description Total Federal State Local Estimated Part ici ation Participation Participation Cost % Cost % Cost % Cost Environmental (by $15,17 0% $0 0% $0 100% $15,175 Local Government) Engineering (by Local $123,78 0% $0 0% $0 100% $123,784 Government) Right of Way (by Local $33,76 0% $0 0% $0 100% $33,760 Government) Utilities (by Local $45 0% $0 0% $0 100% $450 Government) Construction (by Local $512,26 100% $512,266 0% $0 0% $0 Government) Subtotal $685,435 $512,266 $0 $173,169 Environmental Direct $75 0% $0 0% $0 100% $759 State Costs Engineering Direct $6,18 0% $0 0% $0 0% $6,189 State Costs Right of Way Direct $1,68 01 $0 0% $0 0% $1,688 State Costs Utility Direct State $2 0% $0 0% $0 100% $23 Costs Construction Direct $25,61 0% $0 0% $0 01 $25,613 State Costs Subtotal $34,272 $0 $0 $34,272 Indirect State Costs $1,63 0% $0 100% $1,635 0% $0 (4.77%) TOTAL $721,342 $512,266 $1,635 $207,441 Initial payment by the Local Government to the State: $_8,659.00 . Payment by the Local Government to the State before construction: $ 25,613.00 Estimated total payment by the Local Government to the State $ 34,272.00 This is an estimate. The final amount of Local Government participation will be based on actual costs. Page 1 of 1 AFA LongGen Attachment B-2 Docusign Envelope ID: 65BC58D7-31F6-8F39-80F9-AD1E96A70504 TxDOT: CCSJ # 0902-00-317 1 AFA ID Z00002845 AFA CSJs 0902-00-317 District # 02 Code Chart 64# 15000 Project Name 2018 Railroad THE at Riverside Drive Federal Highway Administration: I CFDA No. 1 20.205 1 CFDA Title I Highway Planning and Construction AFA Not Used For Research & Development ATTACHMENT C-2 RESOLUTION, ORDINANCE, OR COMMISSIONERS COURT ORDER A Resolution . f 308-05-2026 A RPSOL[iTION AUTHORIZING ING FNFCI TION OFANIENDNIEItiT NO-2 TO AN ADVAG FUNDING A[:REFINIE'tiT WITH THP TEXAS DEPARTMENT OF TRANSPORTATION TO INC'RFAtiF. TIIF. PROJECT AMOUNT TO $ 721,595.00 WITH CCTV PARTICIPATION IN THE AMOUNT OF $207.441.00 PLUS A? V COST OVERRUNS FOR THE CONSTRUCTION OF THE 201H RAILROAD TRINITY RAMWAY EXPRF4S (TRE) AT RIVERSIDE DRIVF PRO.TFCT. W111CREAS, on July 12, 20?2, the City of Fort Worth and the. Texas Department of Transportation c,TxD T") cntcred icto a Local Prt?ject Advance 'Funding Agreement ("AFA'.) for the construction of the 2018 Railroad Trin4 Railway Express (TRE) at Riverside Drive project (NI&C. 22-0335. Resolution No. 55 4-05 202y: City. 'Secretary Contract No. 57854; C:SJ90!) 4)0-3 l ; WIMREAS, rrn January 23, 2023, the City and TxDOT executed Amendment No, I to the Advance Funding Agreement to increase federal funding to 100°.6 from 63% and decrease indirect state cost by 3177.00 (City Secretary ContractNo. 57854A-1, Resolution No. 5656-11-2022. M&:C 22-0990); WTIEREAS. due to the Infrastructure Investment and .IT,lrs Act of 20,21 (1I A), 100% of the construction estimate can now be covered by the federal Iliehway Administration Rail way-1lighway Crossing Section 130 l"rog rare fund; WIIEREAS, bids weiv received on January 22, 21026 and the low laid was S244,228,00 higher than the estimated constriwtiort cosh anticipated in the AFA, as amended; -and WH[E- REAS, it has beaottte necessary to .mend the AFA to increase the federal funding up to S512,2+ .00. revise State Costs to $108_00 and increase; City funding to $207.441,00, NOW, THEkE;a`C1111E, HE I'1' I E5C3r<..'4 ED BY `.['HE CITY COUNCIL OF T11E cn'v of Thc City C OU11cil artlbMiMl the City Manager nr Assistant ON Manager to execute Arne-adment No. 2 to the Advance FnmtdiFng Agymment ww'iIh the I cxas Department of Trarasportauon roT the ?018 RaIITOad Trinity I ailwzy Fxprrss (TRE) m R veaiide Drive PTojcet ({.iN Sa~.cretary No, 57854, C'*i #090 2- 00-317) to incTCaXt the total arnount to $721.595.00 with city p=cipatioai iti the annuunt of S207,441.OG plus any cost overruns_ Adopted this 1.2U-1. clad of May 2026. ATTEST Jarmutte S. Goodall Cit� Sectcta Page 1 of 4 AFA LongGen Attachment C-2 Docusign Envelope ID: 65BC58D7-31 F6-8F39-80F9-AD1 E96A70504 TxDOT: CCSJ # 0902-00-317 1 AFA ID Z00002845 AFA CSJs 0902-00-317 District # 02 Code Chart 64# 15000 Project Name 2018 Railroad THE at Riverside Drive Federal Highway Administration: CFDA No. 20.205 CFDA Title Highway Planning and Construction AFA Not Used For Research & Development Mayor & Council Map j CPN lt104004 1 2018 Bond FORTWORTH Railroad Crossing I Trinity Railway Express at Riverside Drive ( CD #11 Pnplct location 121 - r natlroods Paths r Council Districts pir " 11 Jewnettf. M++liner v~i f N o a y BROWN�- BROWN AVE A H z z r U1 J � a i b K U Galw.I J oc W O z 03 W a..,. P.- W 8 O rr a Z E 1cT ct v'—� z = _ CHENAULT 3T F b Ot w "' E 4TH ST U z V � 11 - Jnan�ttsr Martinet us z Y GALVEY AVE c N CA r'� W LAWNWQ0( cr w a �r ur Q or 1wkwAN r16HER AVE ["07 L.., 1, r i mum=a . .i`n Februgry 7g2tS I i►'1V FArsnazs _ D 0 375 790 C:ot�YNtO qrp M! waa uaWLavuwf rarmiamcn Felt r a w�lr�r MYar Yw f �Y rliY M 1D a! NI pf «y4tY1 �ww.Mr flyrRr,.rr►s.ase�UlanYwl«An Yh7 wwpsr The Co V F&T 0" ws..af ro r 1M dIIIIIIIf& a1 rd dw Page 2 of 4 AFA LongGen Attachment C-2 Docusign Envelope ID: 65BC58D7-31 F6-8F39-80F9-AD1 E96A70504 TxDOT: CCSJ # 0902-00-317 1 AFA ID Z00002845 AFA CSJs 0902-00-317 District # 02 Code Chart 64# 15000 Project Name 2018 Railroad THE at Riverside Drive City of Fort Worth, Texas Mayor and Council Carnmunlcaticnl Federal Highway Administration: CFDA No. 1 20.205 1 CFDA Title I Highway Planning and Construction AFA Not Used For Research & Development DATE: 05112l26 M&C FIL F NUMRFR: M&C 26-0377 LOG NAME: 20t9 BOND RR TR€ AT RIVERSIDE SUBJECT (CD 1 t ) Adopt Resntutlrm Ailionorig Execution at Amendment No. 2 to an Adwanm Funding Agreement WM Vie Texas 0apariment of Trarmportation to Increase the Advance! Funding Agreement Amount to $721.595,00 4V1th City Parkipabon in the Amount of 5307.441,00, Plus Cast Overruns for the 2018 Bond Railroad Tni ty Railway Express at Reside Drove ProjecL Authorize'Execution of a Centric, w-tn The Fain raroup L.LC in the Amount of 5445,,449,00 for Construction, Adopr Appmpnation Ordinance. and Amend the Fiscal Years 2025-2D+30 Capital Ii nvv{r+nerrk Program v-k i Yi m \ s [-];.A It,:s rectrrimenftd Lip ii the City Coumil 1, Adapt the attached resi?jirtion axrlhorizing exeGubtw of Amendment No. 2 to 'he Advance Funding Agreement Yvith the Texas Departrnenl of 1 ranWartation tar the 2018 Sond Railtoad'rrinity Railway Express at Riverside Dnvs pmjed (City i'rojert No, I04M4) to increase the Advanoe, Funding Agreement amount to $721,595.00 with city participation in the amount of 5207.441.00, plus cost overruns; 2. Authorize executior of a contract wren The Fain Group. LLC, in Vhe. amount of V45,449. 00. for the construction of the 2018 Railroad Trinity Railway Express at R vers=de Drive project (City Prefect No, 1134004}; 3, adapt the atta&sd appropriation ordinance, iri,-rsasing estFinated receipts and appropriations in the Gfants Capital Projects Fedefal Fund, subject to receipt fif the grant, in the amount of $244,228.00 for Federal patticpetion for the purpose of fariding the 2018 Bond Railroad Tria1y Railway Express at riverside Drive project (City Progect NoAD4004): and 4. Ame ct I:he Fiscal Years 202&2a30 Capital Impraverneni FItagrarr, DISCUSSION: The purpose ofthrs Mayor and Counpil CnMMUnAQatlrin (MZC) 01 to sid#rpt a reralr+ticm authanzing exreotrlmn cf Amendment No, 2 W the Advance Fundt q Agreement (AFA) with the Texas Departm ent of Transportation J)=T) to increase the Advanfie Funding Agreement arruunt to $721,595,00 4th City partecipation in the amount of $207,441, OC, plus cos: overruns, for the 2018 ®and Trinity Railway Express. {TREj at FRrverxide Drive project and to authorize execution of cdnsVwction contactwO The Fain Group, LLC bis the an• ouRt of 5445,449.00'. The 2018 Bond Rail road -TRE at Rivaraide Dive prolacrt emetic 6 is rad road crossing safety Improvements, whi-h includei the elirrunatim of the roadway hurnp, instaltation of a niadiaA- installation of p&destian crossings, refreshing the pavenieait rnarkngs, installation of signage, and the reconstiuetinn of the deteriorated roadway, The City of Fort ''4^ Deli advertised ties 2018 Bond Railroad -TRE at Riverside Drive (Ciiy Project No.104004) in the Fon VVorfh Star Tokgrani on November 12 and November 19 20?5 The fatlumog kills ware ra.CNiv@d al January 22. 2026, Bidders I Amount The Fain Group, LLC $445,,449;00 Coronado Roadway Construct in LLL $527,Cr42,917 capko Can creie Stwouires LLC $612,93A,th7 Me-Clendon Cvnstrurilan Co, Inc, $7A$,5{19,2ri' The table below sumrnarrzes past appropmotions, sources, additional funding, and the eefematea total coEA of the oroject at oompletlon7 2018 Rallroad -TRE at Rlv$raIdo Drive (City ProjectNo. 144ou4) -=LlYlilY�Y: Fund Existing Fundl.0g Additional App•ropriation�l Prolwt Funding 341)18-201El Hand Program Fund $395,000.00 $0.00 $395,000.00 31a1)1 -Grants Gap llmiects-fedefal 2Li8.039.00! 244.228,130 512,266,00 rand Tota Gl _ __ $663,038.00 k — ..i44,226.tD84 �01 $907 i66.t10 Cm May 10, 2422, {M&C 22-0335), the City Counell ampted Resoludort No, 5564-tf5--2022 authoraiiig oxecubw. of am AFA with TXMT ;Cay 5ecresary Contract No. 57354) for the sanstruction of :he 2018 Brmid Railroad -TRE at Rivarside Drive project ?.C,ity Project No.104004). On Page 3 of 4 AFA LongGen Attachment C-2 Docusign Envelope ID: 65BC58D7-31 F6-8F39-80F9-AD1 E96A70504 TxDOT: CCSJ # 0902-00-317 1 AFA ID Z00002845 AFA CSJs 0902-00-317 District # 02 Code Chart 64# 15000 Project Name 2018 Railroad THE at Riverside Drive Federal Highway Administration: CFDA No. 1 20.205 CFDA Title I Highway Planning and Construction AFA Not Used For Research & Development f lovember 29, 2022, (M&C.22-0990), the City Council adapted Reuel mon No. 5656-11-a,1322 authorizing exacuflon of Amendment No. 1 to the AFA for an increase in fe,400.1 0aftipadon to ICC%frrnding, from 635. The lacy bidders bid pica, plus a 15% c onsttuetion confingenffy, was $244,228,00 higher than the estimated cons.rti6ofi cost recited in the AFA, The Transportation and Public Works Department (TPVV) petikned Tx3pT for additional federal Runde to cover the additional corisbt:cfon cost, which were granted, Amendment No. 2 amends the AFA to include this additional S244,22$,00an federal funding fix a total federal funding amount of $512,266.03. The Coy will be resporsible fix ardd1bgral constuutior cast ircreases and ;cyst Nerruns, Tots amendment incraases the C'ity'a ccG3t partiuipation to $257,279,00 dine to TKDOT's Fiscal Year (FY) 2026 new rate and w1w1ation Method of indirect sitafe costs. The ap-prDpriations for the federal grant will b�a increased, as shown belt' v, Fund Ofily nal Budget Amendment No, t A nendmortt No, 2 Revised (M&C 2 335) (Ir &C 22-OM) (Baia M&Cj Budget ,'.1:�i 1-irants Cap. Projects- S160,964,30 99.174.00 S244,228,0+3 5512,206100 Federal Uriapprapriated Ircirrect State 21,CA6,g0 (177.00) (1&,tf�f.00:i 1,d ,t7fl �6St 34Qt8-2G19 Brand program 395,000.0 0.00 0,M 3s5,1000,00 FuM Grand Total S584,910.00 699,997.00 $225,247.00 Sg09,154.000 The a#didanal (mitered funding awarded for this, project was nut included in the FY2026-2G30 Capital Improvement Program because grant funding is appropriated at Nia firne ortne grant awdid, The action in this M&C twiN amend the FY202rr20aD Capital Irnproutment Program as approved in wrinectian with Ordirimicu 2797r3-49-2025, Toe curistrur t on portion of this c o rtraot is 100% federally funded, -he Ciity's contrihutian is for preconstruction and administrative roosts. Iglu city salar€es will toe charged to the grartit profect, rrinect cost rermvery does not aimly, The City teeters to the State s small or disadvantaged business goal procedures: thus, the Gity's srnatl busmass goal does not apply. Tile state he% rewinddd its goal program. The prgact Is located In COUNCIL [DISTRICT 11, A Farm 1295 m not required because, ThMs opnl actwill be with a governnw_ntal entity state agency or pu'bk insWition of higher education Txp4t Tha Diractor of Finance eanifies that upon approval of the: above raconnmKidati ems and adoption or tho attached appropriation ordtrlanos, fatnds wile be available in the current capital budget_ as appropriated, in the Grans Cap Projects Fedt=Pal Fungi for the 2M Bona RR THE at Riverside project, The Transportation and Public Ww—ks Depi tmert hand Financial V anagemert 9 ervices'i will be raspcnkiblp for the endlec`ian and deposit of funds due to the City. Pnor to are expenditure being inmrred, the T ansportation and Public War ks Deparhrterit hZs the responsibility to validate the awallabilay of funds, This is a reimbursement grant, Subm ttc d for City Mamger's Office ce by! Jesica'dcEac kern 5£ti54 Originating Business Unit Head: Lauren Preur 60313 Additional Infnrmatlon Contact: Monty Hall 5562 Page 4 of 4 AFA LongGen Attachment C-2 0 docusign.. Certificate Of Completion Envelope Id: 65BC58D7-31 F6-8F39-80F9-AD1 E96A70504 Status: Completed Subject: EXPEDITE - 6/30/26 - FTW - AFA SECT 130 Amend 2 - CSJ 0902-00-317 / Z00002845 - City of Fort Worth Source Envelope: Document Pages: 14 Signatures: 2 Envelope Originator: Certificate Pages: 5 Initials: 0 Brenda Boyd AutoNav: Enabled 125 E. 11th Street Envelopeld Stamping: Enabled Austin, TX 78701 Time Zone: (UTC-06:00) Central Time (US & Canada) Brenda.Boyd@txdot.gov IP Address: 209.112.107.133 Record Tracking Status: Original 6/16/2026 12:52:18 PM Security Appliance Status: Connected Signer Events Jesica McEachern jesica.mceachern@fortworthtexas.gov Assistant City Manager Security Level: Email, Account Authentication (Optional) Electronic Record and Signature Disclosure: Accepted: 6/16/2026 2:03:30 PM ID: aa0963cb-703f-4fff-bO9f-88f6fel aaa8a Kenneth Stewart ken neth.stewart@txdot.gov Director, Contract Services Texas Department of Transportation Security Level: Email, Account Authentication (Optional) Electronic Record and Signature Disclosure: Not Offered via Docusign In Person Signer Events Editor Delivery Events Agent Delivery Events Intermediary Delivery Events Certified Delivery Events Carbon Copy Events Paul Clutts Pau I.Clutts@fortworthtexas.gov Security Level: Email, Account Authentication (Optional) Electronic Record and Signature Disclosure: Not Offered via Docusign Holder: Brenda Boyd Location: DocuSign Brenda.Boyd@txdot.gov Pool: StateLocal Signature Timestamp 9 edhy* Sent: 6/16/2026 1:21:55 PM fP�tJ Viewed: 6/16/2026 2:03:30 PM Signed F51"27.. Signed: 6/16/2026 2:03:55 PM Signature Adoption: Uploaded Signature Image Using IP Address: 208.184.124.181 [11—SiUlld bl Sent: 6/16/2026 2:03:57 PM � Viewed: 6/17/2026 1:39:50 PM F1C°A80F°88C4B6... Signed: 6/17/2026 1:39:54 PM Signature Adoption: Pre -selected Style Using IP Address: 204.64.21.50 Signature Timestamp Status Timestamp Status Timestamp Status Timestamp Status Timestamp Status Timestamp RI E Sent: 6/16/2026 1:21:54 PM Viewed: 6/16/2026 1:22:34 PM Carbon Copy Events Shelia Jenkins Shelia.Jenkins@txdot.gov Texas Department of Transportation Security Level: Email, Account Authentication (Optional) Electronic Record and Signature Disclosure: Not Offered via Docusign Status COPIED FIN —LOCAL -PARTICIPATION COPIED FI N_LOCAL-PARTI CIPATION@TXDOT. GOV Security Level: Email, Account Authentication (Optional) Electronic Record and Signature Disclosure: Not Offered via Docusign Timestamp Sent: 6/16/2026 1:21:53 PM Sent: 6/17/2026 1:39:56 PM Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 6/16/2026 1:21:54 PM Certified Delivered Security Checked 6/17/2026 1:39:50 PM Signing Complete Security Checked 6/17/2026 1:39:54 PM Completed Security Checked 6/17/2026 1:39:56 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure Electronic Record and Signature Disclosure created on: 1/9/2015 7:21:34 AM Parties agreed to: Jesica McEachern ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Texas Department of Transportation (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per -page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact Texas Department of Transportation: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: kevin.setoda@txdot.gov To advise Texas Department of Transportation of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at kevin.setoda@txdot.gov and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from Texas Department of Transportation To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to kevin.setoda@txdot.gov and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with Texas Department of Transportation To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check -box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to kevin.setoda@txdot.gov and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: lAccess to a valid email account Screen Resolution: 1800 x 600 minimum Enabled Security Settings: . Allow per session cookies • Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and Until or unless I notify Texas Department of Transportation as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by Texas Department of Transportation during the course of my relationship with you. ADVANCE FUNDING AGREEMENT CSJ: 0902-00-317 PROJECT NAME: 2018 Railroad THE at Riverside Drive ADDITIONAL ROUTING SIGNATURES CITY OF FORT WORTH Contract Compliance Manager: By signing 1 acknowledge that 1 am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Paul Clutts /Pa'da_ Name of Employee/Signature Title: Sr. Professional Engineer Email: paul.clutts@fortworthtexas.gov APPROVAL RECOMMENDED: BY: Lauren Prieur (Jul 14, 2026 15:30:52 CDT) Lauren Prieur, Director Transportation and Public Works Email: Lauren.Prieur@fortworthtexas.gov CONTRACT AUTHORIZATION M&C: 26-0377 Date Approved:05/12/26 Form 1295: N/A APPROVED AS TO FORM AND LEGALITY: BY: Douglas Black (Jul 15, 2026 12:37:03 CDT) Douglas W. Black Senior Assistant City Attorney Email: douglas.black@fortworthtexas.gov ATTEST AS TO CITY MANAGER SIGNATURE: o44�an a4 F�Rp B l paw F0 ooe00000 �YO9p0 �0 BY: ono oid Jannette S. Goodall aaa nEZAsabb City Secretary OFFICIAL RECORD Email:Jannette.Goodall@fortworthtexas.gov CITY SECRETARY FT. WORTH, TX FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Texas Department of Transportation Subject of the Agreement: Amendment No. 2 to CSC No. 57854, an Advance Funding Agreement for the 2018 Railroad Trinity Railway Express at Riverside Drive Project M&C Approved by the Council? * Yes 8 No ❑ If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 8 No ❑ 57854-A2 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: Expiration Date: If different from the approval date. If applicable. Is a 1295 Form required? * Yes ❑ No 8 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 104004 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.