HomeMy WebLinkAboutContract 40853-CO1 CoNTRACTNO. LAo%1 -� RECEIVED
MAY 092011
FORT WORTH. City of Fort Worth
Change Order Requt4 of Fort MM Water p
Project Name Creek WWT Secondary Area&Filter Reh Citll Sec ar 4 953
CWo Pmod ols Fort Worth(01289). Carom 8258A.20); Archer Weslem 2101
Projsd Descrip
C Archer Wesbrn Contractors Ltd Change Order M l� Dab 51512011
C4Y MY
Farida S Goderya,PhD.PE City inspector Mike HB
Dept. Warr Totals Sel°d Day T
Original Conlrad Amount $8.214, $8.214, .00 455
Eudrae to Dais $0•00 0
Credo to Dab
pm"Change Orders fin M&C Process)
Contract Cost 10 Deb $&-2%000,10}-Q'' �':`# $8.214,000.00 455
jAmoupt d Chum rdsr 0
Revised Contract Amount �' .> - $8,236. 455
6.
OngiW Fwrds Amiable lor Change Orders $0.00
Remafnng Funds Available fa this CO
Additional Funding(if necessary) 1 $4,
$2Z98&92
92
CHANGE ORDERS to DATE ONCLUDtM THIS oW AS%OF ONGINAL CONTRACT
ANX ALLOWABLE CONTRACT AMOUNT(OWMAL CONTRACT COST+2S%)
This Change Order 01 covers the faMorft
CMR 01-Yr Buttedy Valve Connec6an:00.00)
CMR 02.Cieritiers Fitting and AdepWs.4$10,831.34)
CMR 05-Mrdorized Robrk Actuator and related eginpmeM witit laborASIZ357.58)
Per change order d t: OFFICIAL RECORD
Amount Requested$22.988.92 CITY SF
CRETp►RY
ConkW time extension for 00 days. FT.WOR",TX
The adoorral detail for CMRs may be found in subsequent pages.
it is urrdsrsbod and agreed that the acceptance of this change Order by ds contraclor cwW A*n an accord and satisfaction and represents payment
;n Lott Ooth Liras and money)far all costs w*"ow of.or i imb Mai lo,the abovr Change Order
Atdtar wrabra Contasrdont ltddt TWM4Mft SWyord —
T LanarMMorii*Bhandarl S Zoo / Fadds S PE 1
y I( Ar.* w T Cron PE /
Dongsd 1,j
= 0 jo
• 000000°' � NO Mdt:C REQUIRED
)p
r
FORTWORTH
Engineer&..Working Wonders With Water"
WATER
CONTRACT MODIFICATION REQUEST 1
Village Creek Wastewater Treatment Plant Secondary Area
Rehabilitation and Modifications
City of Fort Worth, Texas
Date: Jan 31, 2011
P275-
Secondary Area and Rehabilitation and 70130
Project: Modifications Project No.: 0128980
Subrecipient: City of Fort Worth
Engineer. Carollo Engineers
Contractor. Archer Western Contractors, Ltd.
Contract Mod. No.: CMR 1 Change Order No.: 1
Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced
Contract Modification Request 1 (CMR 1) represents work items not included in the original bid and changes
the as-bid price of work items that were included in the original bid. The nature of the change is adequately
described in the justification provided with the CMR.
The Contractor's change proposal has been reviewed by the Engineer, and the Engineer has certified that
there is no incremental cost and is reasonable to accept"as-is."The Engineer has therefore recommended to
City of Fort Worth to approve the CMR 1.
The need for this work was discovered during construction of related work items. Therefore, consideration of
procuring this work by any means other than by Change Order to the Contract already under construction to
do the related work was neither practical nor desirable.
The Contractor has proposed 30" flanged butterfly valves in lieu of 30" grooved butterfly valves shown on
Contract Documents. A grooved coupling is also provided by each valve for future disassembly. Contracts
request for change and detailed drawing of new piping configuration are attached with this document.
Procurement of this item by Change Order to this contract is justified in that the work is directly related to and
intermingled with other work which was included in the original procurement by public bid.
Sincerely,
Prepared By:
Manish l3handad
CMR #1
December 9, 2010
Attn: Mr. Troy Laman
Carollo Engineers
100 E. 15t' St., Suite 100
Fort Worth, TX 76102
RE: VCWWTP Secondary Area & Filter Rehab& Modifications—Contract
Modification Request#1-30" Butterfly Valve Connection
Dear.Mr. Laman:
Per previous correspondence, contractor request to use QTY- 18 Flanged Butterfly
Valves in Lieu of the Grooved Valves as shown in the contract documents at Return
Sludge Pump Stations 1. 2. & 33. This modification is being requested to provide the
space needed to install the valves in the existing structures. : grooved coupling is being
added near each valve to allow future disassembly and assembly. Attached is a drawing
of the proposed request and a drawing of the grooved valve layout. There "ill be no cost
change for this modification. Contractor has been notified through email that this is
acceptable, but please respond to this CMR accordingly.
If you have any questions. please contact me at(214) 827-8019.
Sincerely.
Archer Western Contractors, Ltd.
!J
V
Clint Stafford
ProJect Engineer
Enclosures
3 a�
w�
iE ggg$��5
� \\ \ \1 ��g�ss8�•3Y
J
Ci
r > I I I
•c I
LL
1 L
\ .$
I i
9x
o
LJ
Qj
IA � g •I � l
R iO
r y�
s6uIMejQ gejwo0 Z
ad uogeJn6'JuOO 6uwld panoo.�
a
. w �
5 Qa� i
$'g �gy ;g
:Hj N
�.: g Fl.$5
'L (I
I
Ij 1 I
� I i
I I
� I
� I
a \\ L
yyN
MC•1
Vol
LLJ
• 1 L
0
I
aAS d
• '^ ya
S
r
uoileJn YuoO
6uldid p96uejj pesodoJd
1�
CP!'!"� ! FORTWORTH
Engineers...Working Wonders With Water"
WATER
CONTRACT MODIFICATION REQUEST 2
Village Creek Wastewater Treatment Plant Secondary Area
Rehabilitation and Modifications
City of Fort Worth, Texas
Date: March 28, 2011
P275-
Secondary Area and Rehabilitation and 70130
Project: Modifications Project No.: 0128980
Recipient: City of Fort Worth
Prepared By: Manish Bhandari, Carollo Engineers
Contractor: Archer Western Contractors, Ltd.
Subject Clarifier fittings and Adaptor CMR No.: 2
Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced
Contract Modification Request 2 (CMR 2) represents work items not included in the original bid and changes
the as-bid price of work items that were included in the original bid. The nature of the change is adequately
described in the justification provided with the CMR.
The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has
certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore
recommended to City of Fort Worth to approve the CMR 2. The increased cost breakdown is attached with
this CMR.
The need for this work was discovered during construction of related work items. Therefore, consideration of
procuring this work by any means other than by Contract Modification was neither practical nor desirable.
The Contractor has proposed 30" flanged butterfly valves in lieu of 30" grooved butterfly valves shown on
Contract Documents. A grooved coupling is also provided by each valve for future disassembly. Contractor
request for change and detailed drawing of new piping configuration are attached with this document.
During the construction it was found that the existing 36" ML which is called out as CIP is actually 36" RCCP.
The RCCP has a bigger OD than Ductile Iron Pipe and will not allow a flexible coupling connection as shown
on the drawings. Contractor will provide an adapter to connect the new 36" DIP and existing 36" RCCP. The
adaptor detail is attached with this CMR. Also, 12" Drain line is shown to have a 45 bend going to the sump
box. After excavation, contractor found the existing pipe to be a straight run without a 45. The existing sump
box was built to where a 45 was not required. Contractor will provide a cost to supply/install the 45 degree
bend.
Procurement of this item by Contract Modification to this contract is justified in that the work is directly related
to and intermingled with other work which was included in the original procurement by public bid.
bA-
I VI
Z
co 9 Wi IW
<
LL 16
IVi
LA
z
co
W
SIB'
wLLJ z
Ui
z
LLJ
z i<
L)
CY 6
t7
3
(L
LLJ
%
Si
I�
�i
l ��
LLJ IL
<
V)>
D M
-----....... ........... q— p
CD
■_Ir.lrr->t
—UMT- WOr.rTr*1:i.Iol:M:l i:[dRiJl:!-FSi?^ZdFTIr[.!:-1•��Ir'll � PI �:i.-?r?:x1:11---�i•'.1?:)(I:rl
�I��rrR±;�*��r-.->r:�_mz;inarnrim:mr-rrrr>t�raNre�^iZxr:,l�' •1, +G. r'r --- +L'. 1'1
—I�Tr+!f4]aG1-rT'1"i=RTT.IR'(�,_:,. iLxlbl�'y' 1I mid.:?,x1I11---�'kT.:?IxPll
� �Lila� •,'r 1 rl ��— , 1'1
� �LiL' •1', I rl ��— , 1'I
� �L41:� •,'r 1 1'1 ��� r 1',
�Mi •1'1 ,1'I
� �LSt:� •rr 1 1'1 ��— 1 1',
� �I�l;!•�3GxC11 1 1'1 ��� 1 1'1
�LMMMEME .-'PZF 1:,l—�icx:ii7fl:,l--�icx3rl[r:rl
—I�r!G11r'-791:.'-7i�i,4j(:j(�]u,,,�' r'r (���3�?:x1'11—��•I:I:xr:rls—�jf':r: 1',
r-
- IC�1 7 .. MEN&"If l.F]r'�.YY 1'r --�i:TdxP11- O41
11f —Mmmmmffilj r'r
1fj�Mmmmmffm A
Al 1 1'1
1 @«
11 � I I r
1 Ian 1'1
1 r,
6-
• .••. Pr �,.AV. °.IV SOMMELMI—Ill 19 MMERIMIll)11:11
�I:l•kxpm'm---Mmmmti3:Bx l
�• �i[I!.Ik!,1��� r� v
• - • - • ----lfaiU!:dlyJ
�---liN26il
i(H/_1•.1!.�1•1:1�1:11�t.I•b71�:i•�:.1•�1�.yls�!ci• :- :0 4tkwwfii soft-paqu:
ce
Otto SORT WORTH__
Engineers..Working Wonders Wkh Wawl
WATER
CONTRACT MODIFICATION REQUESTS
Village Creek Wastewater Treatment Plant Secondary Area
Rehabilitation and Modifications
City of Fort Worth, Texas
Date: April 20, 2011
P275-
Secondary Area and Rehabilitation and 70130
Project: Modifications Project No.: 0128980
Recipient: City of Fort Worth
Subject: RS 1 and 2 8 Inch Motorized Actuator
Contractor: Archer Western Contractors, Ltd.
Engineer Carollo Engineers
Contract Mod. No.: CMR 5
Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced
Contract Modification Request 5(CMR 5)represents work items not included in the original bid and changes
the as-bid price of work items that were included in the original bid. The nature of the change is adequately
described in the justification provided with the CMR
The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has
certified that there is incremental cost and is reasonable to accept "as4s.' The Engineer has therefore
recommended to City of Fort Worth to approve the CMR 4.
The need for this work was discovered during construction of related work Items. Therefore, consideration of
procuring this work by any means other than by Contract Modification was neither practical nor desirable.
s
CMR 5 Includes the cost of providing one 8 inch motorized actuator for the waste sludge pipe in RS 2.The
CMR also include the electrical equipment and work required to install the actuators at RS 1 and RS 2.
Contractor request for change and detailed cost estimate for are attached with this document
i
Procurement of this item by Contract Modification to this contract is justified in that the work is directly related
to and intermingled with other work which was included in the original procurement by public bid.
Reviewed By Manish Bhandari Date: April 20, 2011
Approved By Date: I
f
r
CUR 66
VILLAGE CREEK WWTP
S2CONDARY AREA i FILTER REHAB AND MODS
OWNER: CITY OF FORT WORTH TEXAS WORK DESCRPTION:
PrWdeElatldeOoM SWRWR RS PS 1i2 per RR9.
Pmvft d Bell EMO for&Pkig V"per RM a
ENGHEM CAROLLOENGNEERS
147aS PrNIm Rood.Suaa 950
DALLAS,TX 75254
CONTRACTCM ARCHER WESTERN CONTRACTORS,LTD
2121 AVENUE J.SURE VM
ARLa4GTON.TEXAS 78009
Sid hem D n CRY Unil I UniUPrke I Labor Malarial EQYWMI I SubwnbacWr T
:,Mr`: ti:IABORt -ws :a:.r s...:n• ti:,rt +;'1': ?L ti7 eS�S? CaZ•. ixSFIS
MH S19 $0. 50.00
MH S19,00 $0.00 50.00
MH $1 B40 S0.0D
MH $19.00 $0.00
MH S19.0p Mo $0.00
MH $19A $0.00 $0.00
MH 19.00 50.00
MH $19.00 $0.00 $0.00
MH S19.00
MR S1 J>D Koo
Mtt s19.00 .00 50.00
KIM $19AQ 50100 sp.00
MH 519.00 50.00 50.00
$0.00 50.00
SOM 50.00
.... A� .,w,,,,.• ,< •,•�(�.�:.i:'s?.1?;3i%7i�S,aL'. F:' .Jr; >3lr.'tvu'c., 1:ih.:r?`%'y„'ts'.{:M�'.�„•"W.G.' ,�^o: .ti.' `a:#i3v�,•'S?niP1.':7tf i'S'SWcc;.P{£.e !E'3�
E krS`PkigVAWq 1.00 1 LS SS.171A0 55171.40 $5,171AQ
SOX 50.00
SOM 50.00
00
50
$0.00 s0A0
e EAUIP.MENTtii.>,ls;xfin� - .'�` nr�Xl^e:.:+ .,.a.?ae:.it: :^:}�`i�7: c,.: •it'i.vr;.�. .�X;�l'as::`,'.tiT!T?e:'.3rw,Sia3�•v.Hbew�q't?'i:+ z4' .z''.`.,:=k !,.wit=.
0.00
0.00 SOAR
50.00 i S0.
000 son
$0.00 1 50.00
SU87.OMTRAOT::i `.c :+:; FES ?=di?��l! :Reei 7 s}' 3'.i:11� �:: cl•. ;cy?a.:'' T.,?�i75t�?t+.ua R1 r 'vw<r M1tk:{�.;< ^^yam 77.57..'M T
~` F 18se sUachoM 1.00 LS SSMS.52 %5415.52 I 55415
solw SO.00
.00 50.00
:.t:<e..MIBDEI:L'J1lIEO'US7TEMS17.i::.::x• ij;>,•�..?:n`. ix'=K•%.iigi.'S'<"+.;> •`:J'• `Y::.\�S,S`+R�`Yb"•".a.4:'Sti�..<.r�Nlz�:#iitiR;�;._,ti•; :i4\'t.yin`.:i�.
TOTALS: $0.00 $6,171,40 , 1
Labor Burden 48%of Laos NA moo
Smat Toolt®15%of Labor sm 50.00
S&Igi SUPOU 0 7.5%of Labor Saw. Mop
TOTAL DIRECT COSTS: $10A
CHiP 15% S1
rlwa.R..Ir s«+d 11sx ftu
S0. 1
TOTAL .......................... V 112,357,561
Pga1
I
9FSG electric
PROPOSED CHANGE ORDER
I
Client Address: CCN# 2
Date: 31112011
Archer Western Contractors Project Name: Wine Creek WWT
Contact Client Stafford Project Number. 30J1913
4500 Wilma Lane Contract#. 210086501
Arlington,TX 76012 Page Number. 1
Contact:Clint Stafford
Work Description
This change notice includes all labor,material and supervision for the scope of work shown below. We
reserve the right to correct this change notice for errors and omissions. This price is good for acceptance within
14 days from the date of recipt.
Scope of work:
1. Provide Iabor and materials for power to MOV's in RSPS 1 and 2 not shown on drawings.
Exclusions:
1.Any utility and permit cost.
2.Any wall or ceiling covering cutting,patching and painting.
3.Any concrete/asphalt cutting and or patching.
4.Roof penetrations or patching of any kind.
5.Overtime unless specifically stated in scope of work above.
Itemized Breakdown
Description Qty Net Price U Total Mat. Labor l.) Total Hm.
314"LT FLEX B 231.34 C 13.88 7.20 C 0.43
3/4"LT STRAIGHT CONN 1 583.12 C 5.83 20.40 C 0.20
314"LT 90 DEG CONN 1 1,008.84 C 10.09 18.00 C 0.18
3W ARC(AL) 40 180.35 C 72.14 9.00 C 3.80
31W ARC MYERS HUB 2 650.18 C 13.00 14A0 C 0.29
3W AL BUSHING 2 218.28 C 4.37 3.60 C 0.07
314"ARC STRAP 2 238.80 C 4.78 SAS C 0.13
3W AL STRUT CLAMP 2 285.12 C 5.70 6.12 C 0.12
#12 XHHW BLACK 280 188.00 M 47.04 8.1 S M 1.73
1/4x1 3W WEDGE ANCHOR 15 85.00 C 12.75 9.80 C 1.44
MCC POWER SHUT DOWN 1 0.00 E 0.00 4.00 E 4.00
30A 2506WV NOWFUS DSN SW NEMA 4X 2 1,228.87 E 2,457.74 1.50 E 3.00
1 SA 480V 3P BOLT-ON CS 1 206.77 E 206.77 1.25 E 125
MOUNTING PLATE FABRICATION 1 100.00 E 100.00 0.50 E 0.50
Totals 2,955.09 16.95
Summary
ORIGINAL
2525 WALNUT HLL LANE#100,DALLAS,TX 75229,T 214-357-507,F 214-357-5794,TELL#17904
PROPOSED CHANGE ORDER
Client Address:
CCN# 2
Archer Western Contractors Date: 3/1112011
4500 Wilma Lane Project Name: Village Creek WWT
Arlington,TX 76012 Project Number. 30J1913
Page Number: 2
Summary(Conrd)
General Materials 2,954.09
Material Total 2,954.09
JOURNEYMAN (16.95 Hrs Q$5200) 881.40
FOREMAN @ 25% (4.24 Hrs @$55.00) 233.20
PROJECT MANAGER Q 12.5% (1.00 Hrs @$55.00) 55.00
SAFETY (0.25 His Q$52.00) 13.00
CLEAN UP (025 Hrs @$52.00) 13.00
MATERIAL HANDLING (0.50 Hrs Q$52.00) 26.00
Labor Burden 42.000%) 513.07
Subtotal 4,688.76
Overhead (010.000%) 468.88
Markup (®5.000%) 257.88
Subtotal 5,415.52
Final Amount $5,415.52
CLIENT ACCEPTANCE
CCN#:2
Final Amount:$5,415.52
Name:
Date:
Signature:
Change Order#:
I he"9=0;4 Wo wototion KW Whatm tea eonwclar to 001*010 the above dualbed wont
ORIGINAL