Loading...
HomeMy WebLinkAboutContract 40853-CO1 CoNTRACTNO. LAo%1 -� RECEIVED MAY 092011 FORT WORTH. City of Fort Worth Change Order Requt4 of Fort MM Water p Project Name Creek WWT Secondary Area&Filter Reh Citll Sec ar 4 953 CWo Pmod ols Fort Worth(01289). Carom 8258A.20); Archer Weslem 2101 Projsd Descrip C Archer Wesbrn Contractors Ltd Change Order M l� Dab 51512011 C4Y MY Farida S Goderya,PhD.PE City inspector Mike HB Dept. Warr Totals Sel°d Day T Original Conlrad Amount $8.214, $8.214, .00 455 Eudrae to Dais $0•00 0 Credo to Dab pm"Change Orders fin M&C Process) Contract Cost 10 Deb $&-2%000,10}-Q'' �':`# $8.214,000.00 455 jAmoupt d Chum rdsr 0 Revised Contract Amount �' .> - $8,236. 455 6. OngiW Fwrds Amiable lor Change Orders $0.00 Remafnng Funds Available fa this CO Additional Funding(if necessary) 1 $4, $2Z98&92 92 CHANGE ORDERS to DATE ONCLUDtM THIS oW AS%OF ONGINAL CONTRACT ANX ALLOWABLE CONTRACT AMOUNT(OWMAL CONTRACT COST+2S%) This Change Order 01 covers the faMorft CMR 01-Yr Buttedy Valve Connec6an:00.00) CMR 02.Cieritiers Fitting and AdepWs.4$10,831.34) CMR 05-Mrdorized Robrk Actuator and related eginpmeM witit laborASIZ357.58) Per change order d t: OFFICIAL RECORD Amount Requested$22.988.92 CITY SF CRETp►RY ConkW time extension for 00 days. FT.WOR",TX The adoorral detail for CMRs may be found in subsequent pages. it is urrdsrsbod and agreed that the acceptance of this change Order by ds contraclor cwW A*n an accord and satisfaction and represents payment ;n Lott Ooth Liras and money)far all costs w*"ow of.or i imb Mai lo,the abovr Change Order Atdtar wrabra Contasrdont ltddt TWM4Mft SWyord — T LanarMMorii*Bhandarl S Zoo / Fadds S PE 1 y I( Ar.* w T Cron PE / Dongsd 1,j = 0 jo • 000000°' � NO Mdt:C REQUIRED )p r FORTWORTH Engineer&..Working Wonders With Water" WATER CONTRACT MODIFICATION REQUEST 1 Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: Jan 31, 2011 P275- Secondary Area and Rehabilitation and 70130 Project: Modifications Project No.: 0128980 Subrecipient: City of Fort Worth Engineer. Carollo Engineers Contractor. Archer Western Contractors, Ltd. Contract Mod. No.: CMR 1 Change Order No.: 1 Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 1 (CMR 1) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. The Contractor's change proposal has been reviewed by the Engineer, and the Engineer has certified that there is no incremental cost and is reasonable to accept"as-is."The Engineer has therefore recommended to City of Fort Worth to approve the CMR 1. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Change Order to the Contract already under construction to do the related work was neither practical nor desirable. The Contractor has proposed 30" flanged butterfly valves in lieu of 30" grooved butterfly valves shown on Contract Documents. A grooved coupling is also provided by each valve for future disassembly. Contracts request for change and detailed drawing of new piping configuration are attached with this document. Procurement of this item by Change Order to this contract is justified in that the work is directly related to and intermingled with other work which was included in the original procurement by public bid. Sincerely, Prepared By: Manish l3handad CMR #1 December 9, 2010 Attn: Mr. Troy Laman Carollo Engineers 100 E. 15t' St., Suite 100 Fort Worth, TX 76102 RE: VCWWTP Secondary Area & Filter Rehab& Modifications—Contract Modification Request#1-30" Butterfly Valve Connection Dear.Mr. Laman: Per previous correspondence, contractor request to use QTY- 18 Flanged Butterfly Valves in Lieu of the Grooved Valves as shown in the contract documents at Return Sludge Pump Stations 1. 2. & 33. This modification is being requested to provide the space needed to install the valves in the existing structures. : grooved coupling is being added near each valve to allow future disassembly and assembly. Attached is a drawing of the proposed request and a drawing of the grooved valve layout. There "ill be no cost change for this modification. Contractor has been notified through email that this is acceptable, but please respond to this CMR accordingly. If you have any questions. please contact me at(214) 827-8019. Sincerely. Archer Western Contractors, Ltd. !J V Clint Stafford ProJect Engineer Enclosures 3 a� w� iE ggg$��5 � \\ \ \1 ��g�ss8�•3Y J Ci r > I I I •c I LL 1 L \ .$ I i 9x o LJ Qj IA � g •I � l R iO r y� s6uIMejQ gejwo0 Z ad uogeJn6'JuOO 6uwld panoo.� a . w � 5 Qa� i $'g �gy ;g :Hj N �.: g Fl.$5 'L (I I Ij 1 I � I i I I � I � I a \\ L yyN MC•1 Vol LLJ • 1 L 0 I aAS d • '^ ya S r uoileJn YuoO 6uldid p96uejj pesodoJd 1� CP!'!"� ! FORTWORTH Engineers...Working Wonders With Water" WATER CONTRACT MODIFICATION REQUEST 2 Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: March 28, 2011 P275- Secondary Area and Rehabilitation and 70130 Project: Modifications Project No.: 0128980 Recipient: City of Fort Worth Prepared By: Manish Bhandari, Carollo Engineers Contractor: Archer Western Contractors, Ltd. Subject Clarifier fittings and Adaptor CMR No.: 2 Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 2 (CMR 2) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore recommended to City of Fort Worth to approve the CMR 2. The increased cost breakdown is attached with this CMR. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. The Contractor has proposed 30" flanged butterfly valves in lieu of 30" grooved butterfly valves shown on Contract Documents. A grooved coupling is also provided by each valve for future disassembly. Contractor request for change and detailed drawing of new piping configuration are attached with this document. During the construction it was found that the existing 36" ML which is called out as CIP is actually 36" RCCP. The RCCP has a bigger OD than Ductile Iron Pipe and will not allow a flexible coupling connection as shown on the drawings. Contractor will provide an adapter to connect the new 36" DIP and existing 36" RCCP. The adaptor detail is attached with this CMR. Also, 12" Drain line is shown to have a 45 bend going to the sump box. After excavation, contractor found the existing pipe to be a straight run without a 45. The existing sump box was built to where a 45 was not required. Contractor will provide a cost to supply/install the 45 degree bend. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work which was included in the original procurement by public bid. bA- I VI Z co 9 Wi IW < LL 16 IVi LA z co W SIB' wLLJ z Ui z LLJ z i< L) CY 6 t7 3 (L LLJ % Si I� �i l �� LLJ IL < V)> D M -----....... ........... q— p CD ■_Ir.lrr->t —UMT- WOr.rTr*1:i.Iol:M:l i:[dRiJl:!-FSi?^ZdFTIr[.!:-1•��Ir'll � PI �:i.-?r?:x1:11---�i•'.1?:)(I:rl �I��rrR±;�*��r-.->r:�_mz;inarnrim:mr-rrrr>t�raNre�^iZxr:,l�' •1, +G. r'r --- +L'. 1'1 —I�Tr+!f4]aG1-rT'1"i=RTT.IR'(�,_:,. iLxlbl�'y' 1I mid.:?,x1I11---�'kT.:?IxPll � �Lila� •,'r 1 rl ��— , 1'1 � �LiL' •1', I rl ��— , 1'I � �L41:� •,'r 1 1'1 ��� r 1', �Mi •1'1 ,1'I � �LSt:� •rr 1 1'1 ��— 1 1', � �I�l;!•�3GxC11 1 1'1 ��� 1 1'1 �LMMMEME .-'PZF 1:,l—�icx:ii7fl:,l--�icx3rl[r:rl —I�r!G11r'-791:.'-7i�i,4j(:j(�]u,,,�' r'r (���3�?:x1'11—��•I:I:xr:rls—�jf':r: 1', r- - IC�1 7 .. MEN&"If l.F]r'�.YY 1'r --�i:TdxP11- O41 11f —Mmmmmffilj r'r 1fj�Mmmmmffm A Al 1 1'1 1 @« 11 � I I r 1 Ian 1'1 1 r, 6- • .••. Pr �,.AV. °.IV SOMMELMI—Ill 19 MMERIMIll)11:11 �I:l•kxpm'm---Mmmmti3:Bx l �• �i[I!.Ik!,1��� r� v • - • - • ----lfaiU!:dlyJ �---liN26il i(H/_1•.1!.�1•1:1�1:11�t.I•b71�:i•�:.1•�1�.yls�!ci• :- :0 4tkwwfii soft-paqu: ce Otto SORT WORTH__ Engineers..Working Wonders Wkh Wawl WATER CONTRACT MODIFICATION REQUESTS Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: April 20, 2011 P275- Secondary Area and Rehabilitation and 70130 Project: Modifications Project No.: 0128980 Recipient: City of Fort Worth Subject: RS 1 and 2 8 Inch Motorized Actuator Contractor: Archer Western Contractors, Ltd. Engineer Carollo Engineers Contract Mod. No.: CMR 5 Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 5(CMR 5)represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as4s.' The Engineer has therefore recommended to City of Fort Worth to approve the CMR 4. The need for this work was discovered during construction of related work Items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. s CMR 5 Includes the cost of providing one 8 inch motorized actuator for the waste sludge pipe in RS 2.The CMR also include the electrical equipment and work required to install the actuators at RS 1 and RS 2. Contractor request for change and detailed cost estimate for are attached with this document i Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work which was included in the original procurement by public bid. Reviewed By Manish Bhandari Date: April 20, 2011 Approved By Date: I f r CUR 66 VILLAGE CREEK WWTP S2CONDARY AREA i FILTER REHAB AND MODS OWNER: CITY OF FORT WORTH TEXAS WORK DESCRPTION: PrWdeElatldeOoM SWRWR RS PS 1i2 per RR9. Pmvft d Bell EMO for&Pkig V"per RM a ENGHEM CAROLLOENGNEERS 147aS PrNIm Rood.Suaa 950 DALLAS,TX 75254 CONTRACTCM ARCHER WESTERN CONTRACTORS,LTD 2121 AVENUE J.SURE VM ARLa4GTON.TEXAS 78009 Sid hem D n CRY Unil I UniUPrke I Labor Malarial EQYWMI I SubwnbacWr T :,Mr`: ti:IABORt -ws :a:.r s...:n• ti:,rt +;'1': ?L ti7 eS�S? CaZ•. ixSFIS MH S19 $0. 50.00 MH S19,00 $0.00 50.00 MH $1 B40 S0.0D MH $19.00 $0.00 MH S19.0p Mo $0.00 MH $19A $0.00 $0.00 MH 19.00 50.00 MH $19.00 $0.00 $0.00 MH S19.00 MR S1 J>D Koo Mtt s19.00 .00 50.00 KIM $19AQ 50100 sp.00 MH 519.00 50.00 50.00 $0.00 50.00 SOM 50.00 .... A� .,w,,,,.• ,< •,•�(�.�:.i:'s?.1?;3i%7i�S,aL'. F:' .Jr; >3lr.'tvu'c., 1:ih.:r?`%'y„'ts'.{:M�'.�„•"W.G.' ,�^o: .ti.' `a:#i3v�,•'S?niP1.':7tf i'S'SWcc;.P{£.e !E'3� E krS`PkigVAWq 1.00 1 LS SS.171A0 55171.40 $5,171AQ SOX 50.00 SOM 50.00 00 50 $0.00 s0A0 e EAUIP.MENTtii.>,ls;xfin� - .'�` nr�Xl^e:.:+ .,.a.?ae:.it: :^:}�`i�7: c,.: •it'i.vr;.�. .�X;�l'as::`,'.tiT!T?e:'.3rw,Sia3�•v.Hbew�q't?'i:+ z4' .z''.`.,:=k !,.wit=. 0.00 0.00 SOAR 50.00 i S0. 000 son $0.00 1 50.00 SU87.OMTRAOT::i `.c :+:; FES ?=di?��l! :Reei 7 s}' 3'.i:11� �:: cl•. ;cy?a.:'' T.,?�i75t�?t+.ua R1 r 'vw<r M1tk:{�.;< ^^yam 77.57..'M T ~` F 18se sUachoM 1.00 LS SSMS.52 %5415.52 I 55415 solw SO.00 .00 50.00 :.t:<e..MIBDEI:L'J1lIEO'US7TEMS17.i::.::x• ij;>,•�..?:n`. ix'=K•%.iigi.'S'<"+.;> •`:J'• `Y::.\�S,S`+R�`Yb"•".a.4:'Sti�..<.r�Nlz�:#iitiR;�;._,ti•; :i4\'t.yin`.:i�. TOTALS: $0.00 $6,171,40 , 1 Labor Burden 48%of Laos NA moo Smat Toolt®15%of Labor sm 50.00 S&Igi SUPOU 0 7.5%of Labor Saw. Mop TOTAL DIRECT COSTS: $10A CHiP 15% S1 rlwa.R..Ir s«+d 11sx ftu S0. 1 TOTAL .......................... V 112,357,561 Pga1 I 9FSG electric PROPOSED CHANGE ORDER I Client Address: CCN# 2 Date: 31112011 Archer Western Contractors Project Name: Wine Creek WWT Contact Client Stafford Project Number. 30J1913 4500 Wilma Lane Contract#. 210086501 Arlington,TX 76012 Page Number. 1 Contact:Clint Stafford Work Description This change notice includes all labor,material and supervision for the scope of work shown below. We reserve the right to correct this change notice for errors and omissions. This price is good for acceptance within 14 days from the date of recipt. Scope of work: 1. Provide Iabor and materials for power to MOV's in RSPS 1 and 2 not shown on drawings. Exclusions: 1.Any utility and permit cost. 2.Any wall or ceiling covering cutting,patching and painting. 3.Any concrete/asphalt cutting and or patching. 4.Roof penetrations or patching of any kind. 5.Overtime unless specifically stated in scope of work above. Itemized Breakdown Description Qty Net Price U Total Mat. Labor l.) Total Hm. 314"LT FLEX B 231.34 C 13.88 7.20 C 0.43 3/4"LT STRAIGHT CONN 1 583.12 C 5.83 20.40 C 0.20 314"LT 90 DEG CONN 1 1,008.84 C 10.09 18.00 C 0.18 3W ARC(AL) 40 180.35 C 72.14 9.00 C 3.80 31W ARC MYERS HUB 2 650.18 C 13.00 14A0 C 0.29 3W AL BUSHING 2 218.28 C 4.37 3.60 C 0.07 314"ARC STRAP 2 238.80 C 4.78 SAS C 0.13 3W AL STRUT CLAMP 2 285.12 C 5.70 6.12 C 0.12 #12 XHHW BLACK 280 188.00 M 47.04 8.1 S M 1.73 1/4x1 3W WEDGE ANCHOR 15 85.00 C 12.75 9.80 C 1.44 MCC POWER SHUT DOWN 1 0.00 E 0.00 4.00 E 4.00 30A 2506WV NOWFUS DSN SW NEMA 4X 2 1,228.87 E 2,457.74 1.50 E 3.00 1 SA 480V 3P BOLT-ON CS 1 206.77 E 206.77 1.25 E 125 MOUNTING PLATE FABRICATION 1 100.00 E 100.00 0.50 E 0.50 Totals 2,955.09 16.95 Summary ORIGINAL 2525 WALNUT HLL LANE#100,DALLAS,TX 75229,T 214-357-507,F 214-357-5794,TELL#17904 PROPOSED CHANGE ORDER Client Address: CCN# 2 Archer Western Contractors Date: 3/1112011 4500 Wilma Lane Project Name: Village Creek WWT Arlington,TX 76012 Project Number. 30J1913 Page Number: 2 Summary(Conrd) General Materials 2,954.09 Material Total 2,954.09 JOURNEYMAN (16.95 Hrs Q$5200) 881.40 FOREMAN @ 25% (4.24 Hrs @$55.00) 233.20 PROJECT MANAGER Q 12.5% (1.00 Hrs @$55.00) 55.00 SAFETY (0.25 His Q$52.00) 13.00 CLEAN UP (025 Hrs @$52.00) 13.00 MATERIAL HANDLING (0.50 Hrs Q$52.00) 26.00 Labor Burden 42.000%) 513.07 Subtotal 4,688.76 Overhead (010.000%) 468.88 Markup (®5.000%) 257.88 Subtotal 5,415.52 Final Amount $5,415.52 CLIENT ACCEPTANCE CCN#:2 Final Amount:$5,415.52 Name: Date: Signature: Change Order#: I he"9=0;4 Wo wototion KW Whatm tea eonwclar to 001*010 the above dualbed wont ORIGINAL