HomeMy WebLinkAboutContract 40853-CO2 4
FORT, City of Fort Worth CIt*AECWMY
a Change Order Request COldIWT NO• 3 C)a
Project Namel Village Creek WWT Secondary Area&Filter RehabNitabon/Moff*,aatieons City Sec# 40853
Client Project#(s)l Fort Worth(01289); Carollo(8258A.20); Archer Western(210138)
Project Description
Contractor Archer Western Contractors Ltd Change Order# U
City Project Mgr. Farida S Goderya,PhD,PE Date 8/1512011
City Inspector Mike HiN
Dept. Water
Original Contract Amount $8,214,000.00
Totals Select Day Typ
Extras to Date $22,98 8 82 $8,214,000.00 455
Credits to Date $22,988.92 0
Pending Change Orders(in M&C Process)
Contract Cost to Date
Amount of Pro ed Chan s Order $8,236,988.92 455
Revised Contract Arnount $T0,88e.50 0
Original Funds Available for Change Orders $8,257,649.42 455
Remaining Funds Available for this CO $0.00
Additional Funding(it necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGIMAIL CONTRACT $20,660.50
MAX ALLOWABLE CONTRACT AMOUNT(OR(GINAL CONTRACT COST+23%)
This Change Order#2 covers the following:
CMR 03-Concrete Blocks Demo at Meter Vault 12
CMR 04-Rod Attachments Plates for Clavis Hanger Pipe Supports
Per Change Order#2: Attested by
Amount Requested$20,660.50. `7
Contract Time extension for 00 days.
o )�
The additional details for CMRs maybe found in subsequent pages. Marty Hell} *1 E}p�,► �{<<, °
� r UVO irk �d
`i`, �Un040Q �.Cy
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in fuN(both time and money)for al costs arming out of,or incidental to,the above Change Order.
PArctwftstern Contractors Ltd I Mark 4iiiClinton Stafford
Troy LamarVManish Bhandad
ifs Farida S.
GOdsrYa.PhD,PE g 1 V 11
Andrew T Cronb PE /t3 / S.Frank Crumb,PE
Dou Black
.1,17- 11 Femando Cosa
mil
M&C Oats Approved Not R
CITY SECRET R
FT. WORTH, TX
08-25-11 A11 :32 IN
Engineerg...Working Wonders Witt h Wate FORTWORTH r"
CONTRACT MODIFICATION REQUEST 3 WATER
Village Creek Wastewater Treatment Plant Secondary Area
Rehabilitation and Modifications
City of Fort Worth, Texas
Date: August 12, 2011
Secondary Area and Rehabilitation and P275-
Project: Modifications 70130
2_�
Recipient: Ci of Fort Worth Project No.: 01gg
Subject: Concrete Encasement Demolition Meter Vault 12
Contractor: Archer Western Contractors, Ltd.
Engineer Carollo En 'nears
Contract Mod. No.: CMR 3
Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in
Contract Modification Request 3 (CMR 3) represents work items not included in the original bi
the as-bid price of work items that were included in the original bid. The nature of the change cha is adequately
the referenced
described in the justification provided with the CMR. d and changes
The Contractor's contract modification proposal has been reviewed by the Engineer, and the
certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has
recommended to City of Fort Worth to a Engineer has
approve the CMR 3. therefore
The need for this work was discovered during construction of related work items. Theref ore, consideration of
Procuring this work by any means other than by Contract Modification was neither practical nor desira
CMR 3 includes the cost demolition of concrete thrust blocks around the primary effluent i in ble.
uncovered during the excavation for the new meter vault for Aeration Basin 12. Contractor's request for
change and detailed cost breakdown is attached with this document. Piping,g' which were
Procurement of this item by Contract Modification to this contract is justified in that the work is
directly related
to and intermingled with other work, which was included in the original procurement by public bid.
Reviewed By Manish Bhandari
Date: August 12, 2011
Approved By Y�
Date: (,
I
I
CMR#3
VILLAGE CREEK WWTP
SECONDARY AREA d FILTER REHAB AND MODS
OWNER: CITY OF FORT WORTH TEXAS
WORK DESCRIPTION:
efn emove onto oaseme t at Meter Vault 12
ENGINEER: CAROLLO ENGINEERS
14785 Preston Road,Suite 950
DALLAS,TX 75254
CONTRACTOR' ARCHER WESTERN CONTRACTORS,LTD
2121 AVENUE J,SUITE#103
ARLINGTON,TEXAS 76008
i tern eson tion
a x s..
««,
°s alert
and emo nut o � .< � :.. r ,. �� .. ... . ,• errt
u ntractor oy
no emo n
amo ancrate
1 1
19.00 0.00
.00
0.
om or
S ,N
Uitef
m Ram
Ismons
1.
�f
rasa mee a we and 3 ;
ontraotor at to amount
weer and 1
u as a at xmorn of ftft s
Labor Burden 48%of Labor
Small Tools 15%of Labor
Saf&W SaPfies 0 7.5%of Labor
U.00 I
OH3P 0 15%
insuranos and Bond 01.5%
IQIALAMOU Sul' Deduo :111011,34
p.ga 1
C r
arollo.
K;- 7-C
EngvQep-..ftrh„g ftm*8 we W.,,. FORT WORTH------.---:
CONTRACT MODIFICATION REQUEST 4 WATER
Village Creek Wastewater Treatment Plant Secondary Area
Rehabilitation and Modifications
City of Fort Worth, Texas
Date: Aprll 20, 2011
Secondary Area and Rehabilitation and P275-
Project: Modifications 70130
Project No.: 0128980
Recipient: It e of Fort Worth
Subject Concrete Rod Attachment Plates for Clevis Han ers
Contractor- Archer Western Contractors Ltd.
Engineer Carollo En ineers
Contract Mod. No.: CMR 4
Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work
Contract Modification Request 4(CMR 4)represents work items not included in shown in the referenced
the described price of work Items that were Included In the original bid. The nature of he change bed and changes
described In the justification provided with the CMR change is adequately
The Contractor's contract modification
certified that there is incremental cost and is reasonable t reviewed
acce by ass-Engineer, and the
recommended to City of Fort Worth to approve the CMR 4. Englneer has
P is. The Engineer has therefore
The need for this work was discovered during construction of related work items. Therefore cons'
Procuring this work by any means other than by Contract Modification was neither practical nor desin of
desirable.
Proposed to u
The Contractor has r
use concrete rod attachment ueplates for the clevls hanger pipe supports at
RS1, 2, 3, 6 and 7 because the existing roof decks are not thick enough to maintain the minimum embedment
t provide adequate support to the pipes. Contractor request for change and detailed cost estimate for are
attached with this document t
document
Procurement of this item by Conte Modification to this contract is justified in that the work is di
to and intermingled with other work which was included in the original "related
by Public bid.
Reviewed By Manish Bhandari
Date: 20. 2011
Approved By
Date: 4 2e 11
C VW '0 e-'%
CMR 04
VILLAGE CREEK WWrP
SECONDARY AREA A FILTER REHAB AND MODS
OWNER CRY OF FORT WORTH TEXAS WORK DESCRIPTION:
Provide aeoonla rod a0behroara pW Ma forCMris HarVerafhel Oro
taw Owf r.
Reims o RA 14
FJJQINEER CAROLLOENGWEF3i8
14785 Pr*M Rood,SLIM 950
DALLAS,TX 75281
CONTRACTOR:ARCHER WESTERN CONTRACTORS,LTD
2121 AVENUE J.SUITE PW
ARLINGTON,TEXAS 78008
Bid Item Mon OW Ur9t Unit Labor Mafodal E Subcm*sefor Total
�a?r .wr1 L71f30R?s!w' e `�Fi`•5.,:':F::l'sir:.. ............... 'x;
MH I MAD I
MH
OD
MH SI2.00 50.00 MOD
MH $19.00 MAD Mop
S 00
$19.00 son sm
MH I Mou
MH
MH 1
MH SIM S0.00
MH S1
MH 1 $OAD
M•I Mop "a
AO OO
S0.00 S0,
4.v .i'ASti!':. ;a;;' �.5.vi�-ss:.,'is5c. :':.`LrFCb.!\i!>;2�4::i
y
S0. 0 SO.00
11•H
19M EA 1 97 1 6.00 St
1 H
3M EA I S1 . $306.00 1 Op
Ir H 1 ra
Han
1.00 EA 1 7& MAO
:':� .s-fB711 T::i :1r_:.,�1:5!i:V✓a�✓t•fG:>'i!x1V:'ipe}\ilo::`I Y.Cini7+eG4Y ..5.. l4,�u."S,,.Y.'.t.1 Y�At Y:':.t�..::bi•S�K�<O :�i?a�'s.:so`X$.:vt �}Z= 'z:::n6�: 50.00
$0.001 3000
AO
50.00 SOAP
n5i•:.°:t;" i;w.,i<'4 , . ::i:. :. 50.0.0 SOHO
aw
�ti�. '12'.^n.ti:',•:1i+ja9,:4 .Cti >v�'"=' RC�fiSCCYfK;\t^:T.YJF
$0.00 SOHO
so::575'7:M i;}t,9:Y;jr,:'.C;^r.. :Z•;:zz`:� -.:'n+�' - .:ea;ti: ::�' _ $0.00 Sam
TOTALS: 1 1
Labor Burden Q 46%oT Labor $0.00 .
Small Toot 15%of Low SO,O
Sher S 7.5%ofLabor 51100
TOTAL DIRECT COSTS: f
oI+aPQ,S% s17a10
amrana and Bend Q1.5% $51.10
sublow s3 OMM
TOTAL AMOUNTTHS SUMMARtt............. S36BOb0
pap I