HomeMy WebLinkAbout064766-PM1 - Construction-Related - Contract - Housing Authority of the City of Fort Worth dba Fort Worth Housing Solutions and Jackson ConstructioCSC No. 64766-PM1 FORTWORTH PROJECT MANUAL FOR THE CONSTRUCTION OF Wastewater and Pavement Improvements Called Cavile - Hughes House II - Parker Street Sewer Improvements IPRC No. 24-0002 City Project No. 105364 FID No.30114-0200431-105364-EO7685 W-3025 X- 28057 Mattie Park Jesus "Jay" Chapa Mayor City Manager Christopher P. Harder, P.E. Director, Water Department Lauren Prieur Director, Transportation and Public Works Department Prepared for The City of Fort Worth July 2026 Prepared by: Kiml,ey>))Horn Texas Registered Engineering Firm F-928 801 Cherry Street, Suite 1300, Unit 11 Fort Worth, TX 76102 817.339.2269 Kimley-Horn No. 061298200 07/08/2026 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 000010 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS SECTION 00 0010 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions Page 1 of 5 Last Revised 00 1113 Invitation to Bidders 03/20/2020 0021 13 Instructions to Bidders 03/20/2020 00 41 00 Bid Form 04/02/2014 00 42 43 Proposal Form Unit Price 05/22/2019 0043 13 Bid Bond 04/02/2014 0045 11 Bidders Prequalification's 04/02/2014 00 45 12 Prequalification Statement 09/30/2021 00 45 13 Bidder Prequalification Application 03/09/2020 00 45 26 Contractor Compliance with Workers' Compensation Law 04/02/2014 00 45 40 Minority Business Enterprise Goal 08/21/2018 00 52 43 Agreement 06/16/2016 006125 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 Maintenance Bond 01/31/2012 00 72 00 General Conditions 11/15/2017 00 73 00 Supplementary Conditions 07/01/2011 0073 10 Standard City Conditions of the Construction Contract for Developer Awarded Projects 01/10/2013 Division 01- General Requirements Last Revised 01 11 00 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 013120 Pr-ejeetMee 07/01/2011 01 32 33 Preconstruction Video 08/30/2013 01 3300 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 0157 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 02/14/2018 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised March 20, 2020 00 00 10 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 5 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents NONE Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: htti)://fortworthtexas.coy/ti)w/contractors/ or htti)s://apps.fortworthtexas.gov/ProgectResources/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 12/20/2012 0241 14 Utility Removal/Abandonment 12/20/2012 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical Division 31- Earthwork 31 1000 Site Clearing 12/20/2012 3123 16 Unclassified Excavation 01/28/2013 31 23 23 Borrow 01/28/2013 31 24 00 Embankments 01/28/2013 31 25 00 Erosion and Sediment Control 12/20/2012 31 36 00 Gabions t 2�12- 3t� Rip� ,2�'fzzrzOQ0ii Division 32 - Exterior Improvements 3201 17 Permanent Asphalt Paving Repair 12/20/2012 3201 gTempefafyl2�12 32 11 23 Flexible Base Courses 12/20/2012 32 11 29 Lime Treated Base Courses 12/20/2012 32 1133 Cement Treated Base Courses 12/20/2012 32 1216 Asphalt Paving 12/20/2012 CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised March 20, 2020 00 00 10 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 5 •. • • • • • may D.M11,411--alm • • • • . .WOMEN= Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 12/20/2012 33 01 31 Closed Circuit Television (CCTV) Inspection 03/03/2016 3303 10 Bypass Pumping of Existing Sewer Systems 12/20/2012 3304 g 1242042012 33 04-11 Corrosion Control Tort Stations 12/ 1'2�z Ti1agnesiuti. Anode Cathodic Pr-oteetjon System.. QQ 33 04 30 Ta......., ,-. W to. Services n�/�11 33--0440 Clo,,,,;.... and Accept, nee Testing .,4'Water- Mai 01/ 6A20 -3 33 04 50 Cleaning of Sewer Mains 12/20/2012 3305 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 33-0512 12lz n�i 3305 13 Frame, Cover and Grade Rings - Cast Iron 01/22/2016 3 3 n�0 Ffae, Cover- ade Rings Composite n 1 /o 2moo 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 12/20/2012 3305 16 C er-ete Water- Vaults 12/20/2012 3305 17 Concrete Collars 12/20/2012 33--" , � /�tz 33 05 22 Steel Casing Pipe 12/20/2012 330523 Hand Ttmae4ng 12/20/2012 Z1� installation Carrier Pipe i Casing r Tunnel Liner r Plat-e 06/1 3 of 33� Utility Markers/Locators 17/7 z 33 05 30 Location of Existing Utilities 12/20/2012 33 55 Belts, Nuts, -and -Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/20/2012 33 11 11 Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 11/16/2018 33 11 Goner-e Pi-essufe Pipe, Bar- Wrapped,Stool Cyliader Type 1242042012 e 4 Btifie.1 Stool Pipe .,.-..a Fittings 1242W2 Z1� T ., ge Water Meters 12/20/2012 CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised March 20, 2020 00 00 10 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 5 33 1220 Resilient Seme,1 G e V l„0 12»�12 Z'2� ANVWA Rubber Seated -BtMer-toy V 17/7 404-2 33 1225 r n„eetien to Existing xxl.,te f: Mains 02/W2 33 1230 Combination Air- Valve Assemblies for- Potable WaterSystems, i2Q0Q0i2 33 0 Fife Hydfflffts 01 /no�.4T 33 1250 xxl.,tor Sample Stations 12L 2'2� Standard 121..w off V.,ly A ssembly 06/1�9014 2'2� Cufed i Place Ripe (CIDD) 1 X20Q0 L Z'2� Fiber -glass Reinforced Pipe for Gravity Sanitary Co 1X20,9012 3331 15 High Dens;t,. Polyethylene (14DPE) Pipe f r San t.,r,. Sewer 12Q0,42012 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 06/19/2013 .,1 D1�.,.iny Chloride Closed Profile Gravity Sanitary Sewer '2 Z� (PVC) Pipe 7 /7z 33 3122 171 /7�zr-sW20 33 31 23 Sanitary Sewer Pipe Enlargement 12/20/2012 33 31 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 Z'2� G..m1.;...,t;..,,. A;r x7a4ye f r Sanitary 12/20/2012 3339 10 Cast -in -Place Concrete Manholes 12/20/2012 33 39 20 Precast Concrete Manholes 12/20/2012 33 3930 Fib 1�/7�iz 3339 40 Wastew ter A .,eels !''1,.,m be (xx7 A G) 12QOQ014 33 39 60 Epoxy Liners for Sanitary Sewer Structures 12/20/2012 33 44 10 Reifif feel r „erote St,.,.,., Sewer Pipe/r„� 07/01 0i �n 33 41 }Pelyed+ylefie1 71 /7z 33-'46 00 S4dr-a'inage 12/20/2012 07 /no lei 07/no 14r 33 49 0 G'aq-t ;,,, Ul.,.,o A4;4 ,hAIt l I,metio Be 17/7 z 33 4920 12 20/204i 33 4940 Stor.,, Dr.,;,, - uo,alls and Ix i ,, all 07/n -1 Division 34 - Transportation 3n�o Traffie Signals 104242015 Zn 41 10.01 A tt.,.,l„ ent A- C. ,-,filler Cabin t 12/1 8QO15 3n n�02 rArttaehme rtB Goitfeller Speei eatien 02QO12 3 n A�-r 4 1 10.03 Aaaehment C Software Speeif c-atien 01A2012 3^Tempor-afy„/3 34 41 15 Reet.,,,..,,1.,r Rapid 1 lashi . 1?0.,,,e 1 , /7 Q 34Roadway1 2 /7zzi-20/ viz 3n n�OT AFterial LED Roadway L 06/1w/zvz5 14 4120.02 . Freeway LED Roadway 1 , o !16/lvv4540i5 3 n n�03 064 5,9� 34 4130 1 Aluminu Signs ,1/1�1-3 '2^� Single Mode Filer Opt; !'able I1726 3471 13 Traffic Control 11/22/2013 CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised March 20, 2020 000010 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 5 Appendix GC-4.02 Subsurface and Physical Conditions GC-4.04 Underground Facilities GC-6.06.13 Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GC-6.09 Permits and Utilities GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH Cavile Place - Hughes House H - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised March 20, 2020 SECTION 00 1113 INVITATION TO BIDDERS RECEIPT OF BIDS 0011 13 INVITATION TO BIDDERS Page 1 of 3 Electronic bids for the construction of Cavile Place — Hughes House II — Parker Street Sewer Improvements ("IPRC24-0002, CPN# 105364") will be received by the City of Fort Worth via the Procurement Portal https://fortworthtexas.bonfirehub.com/portal/?tab=openopportunities, under the respective Project until 12:00 P.M. CST, Thursday, May 15th, 2025). Bids will then be opened publicly and read aloud beginning at 2:00 PM CST in the New City Hall CH MZ10_12. Your submissions must be uploaded, finalized and submitted prior to the Project's posted due date. The City strongly recommends allowing sufficient time to complete this process (ideally a week prior to the deadline) to begin the uploading process and to finalize your submission. Uploading large documents may take time, depending on the size of the file(s) and your Internet connection speed. The Bonfire portal can be accessed using Microsoft Edge, Google Chrome, or Mozilla Firefox. Javascript must be enabled. Browser cookies must be enabled. Electronic submission is subject to electronic interface latency, which can result in transmission delays. All bidders or proposers assume the risk of late transmission/ submission. The City shall not be held liable if an interested bidder or proposer is unable to submit a complete bid/response before the published deadline due to transmission delays or any other technical issues or obstructions. The City strongly recommends allowing sufficient time to complete the submission process (ideally a week before the deadline) to begin the uploading process and to finalize your submission to give adequate time in the event an issue arises. All submissions must be submitted electronically prior to the close date and time under the respective Project via the Procurement Portal: https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities Failure to submit all completed required information listed in the respective Solicitation will be grounds for rejection of a bid as non -responsive. No late bids/proposals shall be accepted. Bids delivered in any other manner than using the Bonfire Platform (Procurement Portal) will not be accepted or considered. If, upon being opened, a submission is unreadable to the degree that material conformance to the requirements of the procurement specifications cannot be ascertained, such submission will be rejected without liability to the City, unless such bidder provides clear and convincing evidence (a) of the content of the submission as originally submitted and (b) that the unreadable condition of the Electronic Bid was caused solely by error or malfunction of the Bonfire Platform (Procurement Portal). Failure to scan a clear or readable copy of a bid into the system does not constitute and shall not be considered an error or malfunction of the Bonfire Platform (Procurement Portal). Bidders are encouraged to fully review each page of every document within their submission prior to submitting to ensure all documents are clear, legible, and complete. SUPPORT For technical questions, visit Bonfire's help forum at https://vendorsupport.gobonfire.com/hc/en- us CITY OF FORT WORTH Cavile Place — Hughes House 11— Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN# 105364 Revised 2/08/24 0011 13 INVITATION TO BIDDERS Page 2 of 3 Contact the Bonfire support team at Support@GoBonfire.com or by calling 1-800-354-8010. To get started with Bonfire, watch this five-minute training video: Vendor Registration and Submission [VIDEO] — Bonfire Vendor Support (gobonfire.com) GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: • 300 LF 15" D.I. SANITARY SEWER PIPE BY OPEN CUT • 1,842 LF 15" SDR-26 SANITARY SEWER PIPE BY OPEN CUT • 2,142 LF OF RESIDENTAL ASHPALT PACVING REPAIR PREQUALIFICATION Certain improvements included in this project must be performed by a contractor or designated subcontractor who is pre -qualified by the City at the time of bid opening. The procedures for qualification and pre -qualification are outlined in the Section 3 of 00 21 13 — INSTRUCTIONS TO BIDDERS. DOCUMENT EXAMINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or obtained via the Procurement Portal https:Hfortworthtexas.bonfirehub.com/portal/?tab=openOpportunities, under the respective Project. Contract Documents may be downloaded, viewed, and printed by interested contractors and/or suppliers. EXPRESSION OF INTEREST To ensure potential bidders are kept up to date of any new information pertinent to this project, all interested parties should indicate their intent to bid in the Procurement Portal by selecting "yes" under the Intent to Bid section. All Addenda will be posted in the Procurement Portal https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities, under the respective Project. PREBID CONFERENCE —Web Conference A prebid conference will be held as discussed in Section 00 21 13 - INSTRUCTIONS TO BIDDERS at the following date, and time via a web conferencing application: DATE: 0510212025 TIME: 10: 00 am Invitations with links to the web conferencing application will be distributed directly to those who have submitted an Expression of Interest. If a prebid conference is held, the presentation and any questions and answers provided at the prebid conference will be issued as an Addendum to the call for bids. If a prebid conference is not being held, prospective bidders should direct all questions about the meaning and intent of the Bidding Documents electronically through the Vendors discussions section under the respective Project via the Procurement Portal. If necessary, Addenda will be issued pursuant to the Instructions to Bidders. CITY OF FORT WORTH Cavile Place — Hughes House 11— Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN# 105364 Revised 2/08/24 0011 13 INVITATION TO BIDDERS Page 3 of 3 CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject any or all bids. AWARD City will award a contract to the Bidder presenting the lowest price, qualifications and competencies considered. ADVERTISEMENT DATES April23rd 2025 April 30'h, 2025 May 7", 2025 END OF SECTION CITY OF FORT WORTH Cavile Place — Hughes House 11— Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN# 105364 Revised 2/08/24 0021 13 INSTRUCTIONS TO BIDDERS SECTION 00 2113 1. Defined Terms Page 1 of 9 1.1. Capitalized terms used in these INSTRUCTIONS TO BIDDERS are defried in Section 00 72 00 - GENERAL CONDITIONS. 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the meanings indicated below which are applicable to both the singular and plural thereof 1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents. 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents whose principal place of business is not in the State of Texas. 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City (on the basis of City's evaluation as hereinafter provided) makes an award. 2. Copies of Bidding Documents 2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations resulting from the Bidders use of incomplete sets of Bidding Documents. 2.2. City and Engineer in making electronic Bidding Documents available do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license or grant for any other use. 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 3.1. Bidders or their designated subcontractors are required to be prequalified for the work types requiring prequalification as per Sections 00 45 11 BIDDERS PREQUALIFICATIONS and 00 45 12 PREQUALIFICATION STATEMENT. Firms seeking pre -qualification, must submit the documentation identified in Section 00 45 11 on Section 00 45 13 PREQUALIFICATION APPLICATION at least seven (7) calendar days prior to Bid opening for review and, if qualified, acceptance. The subcontractors listed by a Bidder on 00 45 12 must be prequalified for the appropriate work types. Subcontractors must follow the same timelines as Bidders for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at the time bids are opened and reviewed may cause the bid to be rejected. Prequalification requirement work types and documentation are available by accessing all required files through the City's website at: https://gpps.fortworthtexas. og v/ProjectResources/ CITY OF FORT WORTH Cavile Place — Hughes House II— Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN # 105364 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 2 of 9 3.1.1. Paving —Requirements document located at: https://apps.fortworthtexas.gov/Proj ectResources/ResourcesP/02%20- %20Construction%2ODocuments/Contractor%2OPrequalification/TPW%2OPaving %20Contractor%2OPrequalification%2OProgram/PREQUALIFICATION%20REQ UIREMENTS%20FOR%20PAVING%2000NTRACTORS.pdf 3.1.2. Roadway and Pedestrian Lighting — Requirements document located at: hops://gpps.fortworthtexas. gov/Proj ectResources/ResourcesP/02%20- %20Construction%2ODocuments/Contractor%2OPrequalification/TPW%2ORoadwa y%20and%2OPedestrian%2OLighting%2OPrequalification%2OProgram/STREET% 20LIGHT%20PREQUAL%20REQMNTS.pdf 3.1.3. Water and Sanitary Sewer — Requirements document located at: htlps:Hgpps.fortworthtexas. o�jectResources/ResourcesP/02%20- %20Construction%2ODocuments/Contractor%2OPrequalification/Water%20and%2 OSanitary%2OSewer%2OContractor%2OPrequalification%2OProgram/WSS%20pre qual%20requirements.pdf 3.2. Each Bidder, unless currently prequalified, must submit to City at least seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 45 11, BIDDERS PREQUALIFICATIONS. 3.2.1. Submission of and/or questions related to prequalification should be addressed to the City contact as provided in Paragraph 6.1. 3.3. The City reserves the right to require any pre -qualified contractor who is the apparent low bidder for a project to submit such additional information as the City, in its sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule to assist the City in evaluating and assessing the ability of the apparent low bidder to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information, if requested, may be grounds for rejecting the apparent low bidder as non -responsive. Affected contractors will be notified in writing of a recommendation to the City Council. 3.4. In addition to prequalification, additional requirements for qualification may be required within various sections of the Contract Documents. 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 4.1. Before submitting a Bid, each Bidder: CITY OF FORT WORTH Cavile Place — Hughes House II— Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN # 105364 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 3 of 9 4.1.1. Shall examine and carefully study the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to in Paragraph 4.2. below). No information given by City or any representative of the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.2. Should visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work. 4.1.3. Shall consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work. 4.1.4. Shall study all: (i) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in the Contract Documents as containing reliable "technical data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in the Contract Documents as containing reliable "technical data." 4.1.5. Is advised that the Contract Documents on file with the City shall constitute all of the information which the City will furnish. All additional information and data which the City will supply after promulgation of the formal Contract Documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. No information given by the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.6. Should perform independent research, investigations, tests, borings, and such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project. For projects with restricted access, upon request, City may provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies. 4.1.7. Shall determine the difficulties of the Work and all attending circumstances affecting the cost of doing the Work, time required for its completion, and obtain all information required to make a proposal. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is understood that the submission of a proposal or bid is prima -facie evidence that the Bidder has made the investigations, examinations and tests herein required. CITY OF FORT WORTH Cavile Place — Hughes House II— Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN # 105364 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 4 of 9 4.1.8. Shall promptly notify City of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related documents. The Contractor shall not take advantage of any gross error or omission in the Contract Documents, and the City shall be permitted to make such corrections or interpretations as may be deemed necessary for fulfillment of the intent of the Contract Documents. 4.1.9. Indicate their intent to bid by selecting "yes" in the Procurement Portal under the Intent to Bid section. You must indicate your intent to bid to be able to submit a bid to the City. 4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of: 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by City in preparation of the Contract Documents. The logs of Soil Borings, if any, on the plans are for general information only. Neither the City nor the Engineer guarantee that the data shown is representative of conditions which actually exist. 4.2.2. those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by City in preparation of the Contract Documents. 4.2.3. copies of such reports and drawings will be made available by City to any Bidder on request. Those reports and drawings may not be part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02. of the General Conditions has been identified and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any "technical data" or any other data, interpretations, opinions or information. 4.2.4. Standard insurance requirements, coverages and limits. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder: (i) that Bidder has complied with every requirement of this Paragraph 4, (ii) that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, (iii) that Bidder has given City written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolutions thereof by City are acceptable to Bidder, and when said conflicts, etc., have not been resolved through the interpretations by City as described in Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract Documents. CITY OF FORT WORTH Cavile Place — Hughes House II— Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN # 105364 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 5 of 9 5. Availability of Lands for Work, Etc. 5.1. The lands upon which the Work is to be performed, rights -of -way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by City unless otherwise provided in the Contract Documents. 5.2. Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- of-way, easements, and/or permits are not obtained, the City reserves the right to cancel the award of contract at any time before the Bidder begins any construction work on the project. 5.3. The Bidder shall be prepared to commence construction without all executed right-of- way, easements, and/or permits, and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require permits and/or easements. 6. Interpretations and Addenda 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to City electrically through the Vendor Discussions section under the respective Project via the Procurement Portal https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities on or before 2 p.m., the Monday prior to the Bid opening. Questions received after this day may not be responded to. Interpretations or clarifications considered necessary by City in response to such questions will be issued by Addenda. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by City. 6.3. Addenda or clarifications shall be posted under the respective Project via the Procurement Portal https://fortworthtexas.bonfirehub.com/portaV?tab=openOpportunities 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or INVITATION TO BIDDERS. Representatives of City will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. City will transmit to all prospective Bidders of record such Addenda as City considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. 7. Bid Security CITY OF FORT WORTH Cavile Place — Hughes House II— Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN # 105364 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 6 of 9 7.1. Each Bid must be accompanied by a Bid Bond made payable to City in an amount of five (5) percent of Bidder's maximum Bid price, on the form attached or equivalent, issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. 7.2. The Bid Bonds provided by a Bidder will be retained until the conditions of the Notice of Award have been satisfied. If the Successful Bidder fails to execute and return the Contract Documents within 14 days after the Notice of Award conveying same, City may consider Bidder to be in default, rescind the Notice of Award and act on the Bid Bond. Such action shall be City's exclusive remedy in the event Bidder is deemed to have defaulted. 8. Contract Times The number of days within which, or the dates by which, Milestones are to be achieved in accordance with the General Requirements and the Work is to be completed and ready for Final Acceptance is set forth in the Agreement or incorporated therein by reference to the attached Bid Form. 9. Liquidated Damages Provisions for liquidated damages are set forth in the Agreement. 10. Substitute and "Or -Equal" Items The Contract, if awarded, will be on the basis of materials and equipment described in the Bidding Documents without consideration of possible substitute or "or -equal" items. Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or - equal" item of material or equipment may be furnished or used by Contractor if acceptable to City, application for such acceptance will not be considered by City until after the Effective Date of the Agreement. The procedure for submission of any such application by Contractor and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General Conditions and is supplemented in Section 01 25 00 of the General Requirements. 11. Subcontractors, Suppliers and Others 11.1. In accordance with the City's Business Equity Ordinance No.25165-10-2021 the City has goals for the participation of minority business and/or women business enterprises in City contracts $100,000 or greater. See Section 00 45 40 for the M/WBE Project Goals and additional requirements. Failure to comply shall render the Bidder as non -responsive. Business Equity Ordinance No.25165-10-2021, as amended (replacing Ordinance No. 24534-11-2020), codified at: hgps://codelibrga.amlegal.com/codes/ftworth/latest/ftworth tx/0-0-0-22593 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Contractor or City has reasonable objection. 12. Bid Form 12.1. The Bid Form is included with the Bidding Documents. CITY OF FORT WORTH Cavile Place — Hughes House II— Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN # 105364 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 7 of 9 12.2. All blanks on the Bid Form must be completed and the Bid Form signed electronically or signed in ink and scan. A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein. In the case of optional alternatives, the words "No Bid," "No Change," or "Not Applicable" may be entered. Bidder shall state the prices for which the Bidder proposes to do the work contemplated or furnish materials required. 12.3. Bids by corporations shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the signature. 12.4. Bids by partnerships shall be executed in the partnership name and signed by a partner, whose title must appear under the signature accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 12.5. Bids by limited liability companies shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown. 12.6. Bids by individuals shall show the Bidder's name and official address. 12.7. Bids by joint ventures shall be executed by each joint venture in the manner indicated on the Bid Form. The official address of the joint venture shall be shown. 12.8. All names shall be typed or printed in ink below the signature. 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. 12.10. Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown. 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance to State Law Non Resident Bidder. 13. Submission of Bids Bids shall be submitted electronically in the Procurement Portal on the prescribed Bid Form, provided with the Bidding Documents, prior to the time indicated in the Advertisement or INVITATION TO BIDDERS. 14. Withdrawal of Bids 14.1. Bids submitted electronically may be withdrawn prior to the time set for bid opening via the Procurement Portal https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities. CITY OF FORT WORTH Cavile Place — Hughes House II— Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN # 105364 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 8 of 9 15. Opening of Bids Bids will be opened and read aloud publicly. An abstract of the amounts of the base Bids and major alternates (if any) will be made available to Bidders after the opening of Bids. 16. Bids to Remain Subject to Acceptance All Bids will remain subject to acceptance for a minimum of 90 days or the time period specified for Notice of Award and execution and delivery of a complete Agreement by Successful Bidder. City may, at City's sole discretion, release any Bid and nullify the Bid security prior to that date. 17. Evaluation of Bids and Award of Contract 17.1. City reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if City believes that it would not be in the best interest of the Project to make an award to that Bidder. City reserves the right to waive informalities not involving price, contract time or changes in the Work and award a contract to such Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists among the Bidders, Bidder is an interested party to any litigation against City, City or Bidder may have a claim against the other or be engaged in litigation, Bidder is in arrears on any existing contract or has defaulted on a previous contract, Bidder has performed a prior contract in an unsatisfactory manner, or Bidder has uncompleted work which in the judgment of the City will prevent or hinder the prompt completion of additional work if awarded. 17.2. In addition to Bidder's relevant prequalification requirements, City may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work where the identity of such Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Contract Documents or upon the request of the City. City also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.3. City may conduct such investigations as City deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to City's satisfaction within the prescribed time. 17.4. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. CITY OF FORT WORTH Cavile Place — Hughes House II— Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN # 105364 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 9 of 9 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and responsive Bidder whose evaluation by City indicates that the award will be in the best interests of the City. 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. 17.7. A contract is not awarded until formal City Council authorization. If the Contract is to be awarded, City will award the Contract within 90 days after the day of the Bid opening unless extended in writing. No other act of City or others will constitute acceptance of a Bid. Upon the contract award, a Notice of Award will be issued by the City. 17.7.1. The contractor is required to fill out and sign the Certificate of Interested Parties Form 1295 and the form must be submitted to the Project Manager before the contract will be presented to the City Council. The form can be obtained at https://www.ethics.state.tx.us/data/forms/1295/1295.pdf 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 18. Signing of Agreement 18.1. When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Project Manual. Within 14 days thereafter, Contractor shall sign and deliver the required number of counterparts of the Project Manual to City with the required Bonds, Certificates of Insurance, and all other required documentation. 18.2. City shall thereafter deliver one fully signed counterpart to Contractor. END OF SECTION CITY OF FORT WORTH Cavile Place — Hughes House II— Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN # 105364 Revised/Updated 1/17/24 0035 13 - 1 CONFLICT OF INTEREST AFFIDAVIT Page I of I SECTION 00 35 13 CONFLICT OF INTEREST AFFIDAVIT Each bidder, offeror or respondent (hereinafter referred to as "You") to a City of Fart Worth procurement may be required to complete a Conflict of Interest Questionnaire (the attached CIQ Form) and/or a Local Government Officer Conflicts Disclosure Statement (the attached CIS Form) pursuant to state law. You are urged to consult with counsel regarding the applicability of these forms to your company. The referenced forms may be downloaded from the links provided below. ://www.etliics.state.tx.Lis/foriTis/CI http://www.ethics.state.tX.us/forms/CIS.pdf CIQ Form does not apply 0 CIQ Form is on file with City Secretary F7 CIQ Form is being provided to the City Secretary CIQ Form does not apply CIS Form is on File with City Secretary Q CIS Form is being provided to the City Secretary BIDDER: Jackson Construction, Ltd. By: Troy L. Jackson Company (Please Print) 5112 Sun Valley Dr. Signature: Address Fort Worth, TX 76119 Title: -resident City/State/Zip (Please Print) END OF SECTION CITY OF FORT WORTH Cavile Place - Huehes House 11- Parker Street Sewer Imorovemeats STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 105364 Revised August 21, 2018 SECTION 00 41 00 BID Publicly Bid Developer Awarded Projects - BID FORM TO: FOR: Cavile - Hughes House 11- Parker Street Sewer Improvements City Project No.: 105364 Units/Sections: UNIT I: SEWER IMPROVEMENTS 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Developer in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. to submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATIONTO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements in the construction contract. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Developer (b) to establish Bid prices at artificial non- competitive levels, or (c) to deprive Developer of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of 'Developer, a purpose of which is to establish Bid prices at artificial, non- competitive levels. d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: (Provide all Major Work Categories that will need Prequalification) a. Sewer Collection System — New Construction, All Sizes 4. Time of Completion 4.1. Bidder agrees to complete WORK for FINAL ACCEPTANCE within r working days ater the date when the Contract Time commences to run as provided in the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones) within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Proposal Form, Section 00 42 43 Required Bid Band, Section 00 43 13 issued by a surety meeting the requirements of Paragraph c' 5.01 of the General Conditions. d. MBE Forms e. Prequalification Statement, Section 00 45 12 f. Any additional documents that may be required by Section 12 of the Instructions to Bidders g. Bidder pre -qualification application (Optional) 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 6.3 TOTAL BID <Final Bid Amount lgere> 7. Bid Submittal This Bid is submitted on May 15, 2025 Respectfully submatte By: 1 (5igna re) Ftoy L. Jackson (Printed Name) Title: President Company: Jackson Construction, Ltd. Address: 5112 Str Valley Drive Fort Worth. Texas 76119 State of Incorporation: TX Email: ofitice jacksontx.net Phone: 817-572-3303 END OF SECTION by the entity named below. Receipt is acknowledged of the following Addenda: Initial Addendum No, l: X Addendum No. 2: X - Addendum No.3: Addendum No, 4: Corporate Seal: Seal Here> SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Cavile - Hughes House II - Parker Street Sewer Improvements UNIT PRICE BID Bidder's Application Project Rein lofomialion Bidd6s Pioposd Bidlisf ftem No. Description Spoetfication Section No. Unir of Measure Bid Quaeitiiy UnR Price Bid Value J 0171.0101 Construction Staking 017! 33 LS 1 56,500.00 56,500.00 2 0241. 00 Remove Asphalt Pvmt 0241 i5 Sy 2550 $7.66 28,050.00 3 0241.1300 Remove Cone Curb&Gutter 0*41 IS LF 390 $26.00 510,140.00 4 0241.20o1 $nnitary Line€irouting 024T 14 Cy 10 t600.00 $9,000.00 5 0241.2104 10" Sewer Abandonment Plug 024115 EA 2 $1.900.00 3.600.00 6 0241.2201 Rempve 4' $gwer Manhole 024114 EA 4 $2,400.00 SB.600.00 7 320I.0117 10' Wide Asphalt Pvmt Rgpair, Residerrtial 3201 17 LF 2150 1 S190.00 $408,5DO.00 8 201.0150 Asphall Pvmt Repair, $ewer Service 3201 17 LF 235 5226.00 553.110.00 9o2 1.0201Asphall Pvmt Repair Beyond Defined Width, Resi 3201 17 Sy 1125 79.00 588.875.00 10 o216.0101 6" Conc Curb and Gutter 321613 LF 390 138.00 $53,620.00 11 >292.0101 Utility Service Surface Restoration Sodding 329213 Sy 400 15.00 S0,000.00 12 3301.0001 Pa.CCTV Inspection 330131 LF 6g0 $4.00 82,760.00 13 3301.0002 Post -CCTV Inspection 330131 LF 2150 S4 00 58,600.00 14 3301.0101 Menhole Vacuum Testing 330130 EA 9 $500 00 94,500.00 15 3303.0001 Bypass Pumping 330310 LS 1 $50000 00 $50,00000 16 3305.0109 Tranch Safaty 330510 LF 2150 $2.00 S ,300.00 17 13305.0112 Conceete Collar for Manhole 330517 EA 9 894000 58,460.00 16 3305.1105 30" Casing By Other Than Opon Cut 330131 LV 30 8840.00 512,80000 18 3331.3101 4" Sewer Service 333150 EA 13 $7800 00 510140000 ZO 3331.3105 4" Private Sawor Service 333150 LF 400 512000 $4800000 21 3331.4215 15" Sewer Pipe 331110,3331 LF 2105 8374.00 $787 270 00 22 3331.4217 15" Sewer Pipe, Select Backfil 331110,333' LF 400 $386 00 $15440000 23 3331.42Z2 16" DIP Sewer 331110 LF 45 $66200 $29790.00 24 3331 575516" DIP Sewer, CLSM Backfill 331110 LF 20 $1150.00 $23,006.00 2S 3331 5753 15" Sewer Pipe, CLSM Backfill 331110,3331 LF $594.00 $35,640.00 26 3339 0001 Epoxy Manhole Liner 333960 VF 130 $780.00 $101,400.00 27 33391001 4' Menhole 333910,333` EA 6 $17,000.00 $102,000.00 28 5339.1002 4' Droe Menhole 333910,3339 EA 3 $35,000.00 $105,000.00 29 3339.1003 4' Extra Depth Manhole 343910, 333 VF 90 200.00 18,000.00 30 3471.0001 Taeffic Control 347113 MO 1.5 $10,000.00 $15,000.00 31 3505.0113 Trench Water Stop 330515 EA 4 1 $2,200.001 8,800.00 32 9699.0001 Drop Manhole ConnecOon and Coring of 000000 EA 1 $21,000.001 $21,000.00 33 9999.0002 Erosion Control 000000 EA 4 $2,000.001 s8,000.00 TOTAL UNIT I SANITARY SE\NER IMPROVEMENTS 1 $2,327,515.00 BU Total Conametioo 00 42 W DAF - BID PROP055L BegeI oft CRY OF Pour WORTH sTANDxkO CON5TRUcTIOn SPECIHCATIDu DOCUuEnTS - DEvELOPE AwakDED PR0J8¢zS Fomi YcemnMm22 . 2010 00 42243 B.4 Pmpord DAP (ab 004243 Bm Ptt0POSAL Pala, I rd I SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Cavile - Hughes House B - Parker Street Sewer Improvements CITY BASE ITEMS Bidder's Proposal Bidlist Item No. Description Specification Section No Unit of Measure Bid Quantity Unit Price Bid Value 1 3331.4201 10" Sewer Pipe 33 11 10.33 31 12, 33 3120 LF 2103 $346.00 $728 330.00 2 3331.4203 10" Sewer Pipe,Select Backfill 33 It 10,33 31 12.33 3120 LF 400 5362.00 S144,800.00 3 3331.4205 10" DIP Sewer 33 11 10 LF 45 $507.00 S22,815.00 4 3331.5730 10" DIP Sewer. CLSM Backfill 3311 10 LF 20 $1,047.00 S20,940.00 5 3331.5749 10" Sewer Pi e , CLSM Backfill 33 11 10,33 31 12 33 3120 LF 60 S594.00 S35,640.00 8 13.305.1103 20" Casing By Other Than Open Cut 1330522 LFT 20 1 S560.00 S11.200.00 Total Base Item 1 $083 725.00 END OF SECTION Crl'Y uP IORI WON Ill STANDARDCONMUC130N SPECH ICATiON IX)CUMEN'IN 1— R—.d 20120120 W 4` 43 Alli—W Bid I'r,p—l. %1, SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Caviie - Hughes House II - Parker Street Sewer Improvements UNIT PRICE BID Bidder's Application Project hem Information Bidder's Proposal Bidlisi ttcm Description 5pecification Unit of Bid unit Prim Bid Value No. Section No. Measure Quantity This Bid is submitted by the entity named below: BID0MIL. .I:Ack.s<in tunstr i<fiun. Ltd. 5112 Sun 1'agev Drive Forl Worth, I evm 76119 Conirecror »g- In complete WORK for FINAL AtCEPTANCE wilhin COFfIRACT coenmencci to run ss provided in the General CondiGens. BY: I nn I_ ter bun TITLIE: lflKti4eAf DATE: (i'lifiL.17 END OF !iECTION working days after Ike date wkett Ike CRY OF FORT WORTH sTxNo/uLo cousTcucTiou seEciric<zioH oocvu£uTs - oEvrLoeEx sv.'s(rozDrRo;EcTs Firm VcrYjQn Mai 22, 20'I9 iR 42 43 Bid Prapmul OAP (.xlv SECTION OQ 43 13 DAP - BID BOND BY THESE PRESENTS: 0043 13 DAP BID B0ND FORM FOR PUBLICLY BID PR03EM ONLY Page 1 of J That we, Jackson Construction, Ltd. called the Principal, and The Hanover Insurance Company a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety, are held and firmly bound unto the City, hereinafter called the Obligee, in the sum of Five Percent of Amount Bid (5% of Bid) said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firm by these presents. WHEREAS the Principal has submitted a proposal to perform work for the following project of the Obligee identified as: Cavile Place - Hughes House 11 - Parker Street Sewer Improvements NOW, THEREFORE, if the Obligee shall award the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with the Obligee in accordance with the terms of such proposal, then this bond shall be null and void. If the Principal fails to execute such Contract in accordance with the terms of such proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal, this bond shall become the property of the Obligee, without recourse of the Principal and/or Surety, not to exceed the penalty hereof, and shall be used to compensate Obligee for the difference between Principal's Total Bid Amount and the next selected Bidder's Total Bid Amount. SIGNED this 12th day of By: Jackson Construction, Ltd. (Signature and By: The Har, v�r Insurance Company May 20 25 . e of Principal) Clevenger,10iPrney-in-Fact (S(i&ature of Attorney -of -Fact) *Attach Power of Attorney (Surety) for Attorney -in -Fact END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION BID BOND FORM — DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 President Impressed Surety Seal Only (104313_Bid Bond DAP.docx Cavlle Place - Hughes House II - Parker Street Sewer Improvements THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSURANCE COMPANY OF AMERICA 1201rila fIN -M THIS Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. KNOW ALL PERSONS BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being corporations organized and existing underthe laws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation organized and existing under the laws of the State of Michigan, (hereinafter individually and collectively the "Company') does hereby constitute and appoint, Jack M. Crowley, Laurie Pflug, Holly Clevenger and/or Christine Clinger Of Willis Towers Watson Insurance Services West, Inc of Dallas, TX each individually, ifthere be more than one named, as its true and lawful attomey(s)-in-fact to sign, execute, seal, acknowledge and deliver for, and on its behalf, and as its act and deed any place within the United States, any and all surety bonds, recognizances, undertakings, or other surety obligations. The execution of such surety bonds, recognizances, undertakings or surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company, in their own proper persons. Provided however, that this power of attorney limits the acts of those named herein. and they have no authority to bind the Company except in the manner stated and to the extent of any limitation stated below: Any such obligations in the United States, not to exceed Fifty Million and No/100 ($50,000,000) in any single instance That this power is made and executed pursuant to the authority of the following Resolutions passed by the Board of Directors of said Company, and said Resolutions remain in full force and effect: RESOLVED: That the President or any Vice President, in conjunction with any Vice President, be and they hereby are authorized and empowered to appoint Attorneys -in -fact of the Company, in its name and as it acts, to execute and acknowledge for and on its behalf as surety, any and all bonds, recognizances, contracts of indemnity, waivers of citation and all other writings obligatory in the nature thereof, with power to attach thereto the seat of the Company. Any such writings so executed by such Attorneys -in -fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company in their own proper persons. RESOLVED: That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto, granted and executed by the President or Vice President in conjunction with any Vice President of the Company, shall be binding on the Company to the same extent as if all signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile. (Adopted October 7, 1981 - The Hanover Insurance Company; Adopted April 14. 1982 - Massachusetts Bay Insurance Company; Adopted September 7, 2001 - Citizens Insurance Company of America and affirmed by each Company on March 24, 2014) IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE COMPANY OF AMERICA have caused these presents to be seated with their respective corporate seals, duly attested by two Vice Presidents, this 2811' day of June, 2024 1I:c llAausct I11.LN6C( l u1141,413� \tanachasetts Ray Insurance Company Citizens Issurasce Companypf Arnerics 4PM J e H. Kawiecki, Vice President STATE OF CONNECTICUT COUNTY OF HARTFORD ) ss. 1 h. Ilulu.cr iusutanc. Cwr,µa+ii achuwtts Bat Insurance Company f li as Insursace Company of Amcrica ..-AX A? lion M. Mendoza, Vice President On this 28" day of June, 2024 before me came the above named Executive Vice President and Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, to me personally known to be the individuals and officers described herein, and acknowledged that the seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said instrument by the authority and direction of said Corporations. 4GAWendy Latournes Notary Public, State of Connedicut Y CoftwiSOM Expires July 31. 2025 1 tr -� i k . ! t, --- Wend j Latoulres. ot&ry My commission expires July 31. 2025 I. the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, nereby certify that the above and foregoing is a full, true and correct copy of the Original Power of Attorney issued by said Companies, and do hereby further certify that the said Powers of Attorney are still in force and effect GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts. this 121h day of May 2025. CERTIFIED COPY I'll, an I wrasce .ompaa M c is Bay 1.34 asy C' a sure « A oha Rewedder, Vice PresMkat IMPORTANT NOTICE To obtain information or make a complaint: You may call The Hanover Insurance Company/ Citizens Insurance Company of America's toll -free telephone number for information or to make a complaint at: fiff:I111IIKic11:Y1, You may also write to The Hanover Insurance Company/ Citizens Insurance Company of America at: 440 Lincoln Street Worcester, MA 01653 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1.800.252.3439 You may write the Texas Depanment of Insurance P. O. Box 149104 Austin, TX 78714-9104 Fax: (S12) 475-1771 Web: http://www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIM DISPUJT-S: Should you have a dispute concerning your premium or about a claim you should contact the agent or the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. Texas Complaint Notice Commercial Lines AVISO IMPORTANTE Para obtener informacion o para someter una queja: Usted puede Ilamar al numero de telefono gratis de The Hanover Insurance Company/Citizens Insurance Company of America's para informacion o para someter una queja al: J-B00-343-6044 Usted tambien puede escribir a The Hanover Insurance Company/Citizens Insurance Company of America al: 440 Lincoln Street Worcester, MA 01653 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos o quejas al: 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas: P. 0. Box 149J04 Austin, TX 787149104 Fax: (512) 475-1771 Web: http://www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov DISPUTAS SOBRE PgIMAS 0 RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o la com- pania primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de informacion y rio se convierte en parte o condicion del documento adjunto. The Hanover Insurance Company 1 440 Lincoln Streer, Worcester, MA 01653 n2,i3� v,,. „r, Citizens Insurance Company of Ameilca 1808 North Highlander Way, Howell, /a148843 hanovmcom 0045 12 DAP PREQUALIFICATION STATEMENT Page I of I SECTION 00 45 12 DAP - PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work Type" box provide the complete major work type and actual description as provided by the Water Department for water and sewer and TPW for paving. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Wastewater Mains (all sizes) for New Development, Rehabilitation, and Redevelopment using Open Cut and Trenchless construction methods Jackson Construction, Ltd 04/30/2027 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Jackson Construction, Ltd BY: Troy L. Jackson 5112 Sun Valley Drive - Fort Worth, TX 76119 (S' ature) TITLE: President DATE: 06/25/2026 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS Cavile Place - Hughes House II — Parker Street Sewer Improvements Form Version September 1, 201S `a 4 5 6 7 8 9 10 it 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 9M Gil 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORK ER'SCOMPEbiSATION LAW Page 1 Of I SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 105364. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Jackson Construction, Ltd Company 5112 Sun Valley Dt. Address By: T oy L. Jackson (Please Print) Signature: Fort Worth, TX 76119 Title: Troy L. iackson City/State/Zip (Please Print) THE STATE OF TEXAS COUNTY OF TARRANT BEFORE ME, the undersigned authority, on this day personally appeared Troy L. Jackson known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of President for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this 15th day of May 92025 / Notary Public in and for State of Texas •�►R!"i:''� JOSE CONTRERAS ?a4: Notary Public, State of Texas ' Expires J2.27-2028 END OF SECTION ••<•rY ID 129238976 CITY OF FORT WORTH Cavile Place — Flughes House II - PBrker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOC UMENT8 CPN105364 Revised April 2, 2014 ADDENDUM NO.1 To the Plans, Specifications & General Contract Documents Wastewater and Pavement Improvements To Serve Cavile - Hughes House II - Parker Street Improvements CITY PROJECT NO.:105364 Bid Date:05/15/2025 at 2:00 PM Addendum No. 1: Issued 04/23/2025 The Contract Documents, Specifications, and Plans for the subject project are hereby amended as follows: 1. Document Modified: 00 42 43_Alternate Bid Proposal Workbook. Description of Change: A separate Bid Proposal Workbook "00 42 43_Alternate Bid Proposal" has been uploaded to Bonfire. All bidders must complete both bid proposal forms separately and submit as part of their bid package. Note: Do not include the sum from the alternate bid proposal in the project's total amount, as it is solely for determining city and developer cost contributions. PAGE 1 This Addendum, forms part of the Contract Documents referenced above and modifies the original Contract Documents and Plans. Bidder shall acknowledge receipt of this addendum in the space provided below, on the last oaae of the Bid Form and acknowledge receipt on the outer envelope of your bid. A signed copy of this Addendum should be included in the sealed bid envelope at the time of bid submittal. Failure to acknowledge the receipt of this Addendum could cause the subject bidder to be considered "NONRESPONSIVE," resulting in disqualification. RECIEPT ACKNOWLEDGEMENT company Address: 51!1 Z � w v4 f City:FOA WoY4 k Stater ISSUED BY: Kimley-Horn By: Tyler Scott PE Project Manager ACCEPTED BY CITY APPROVED by 00"dgp NM&— o *a N I1:25 ill. Apr n. 2025 Mosadage Mohammdeen, P.E., PMP Project Manager PAGE 2 ADDENDUM NO. 2 To the Plans, Specifications & General Contract Documents Wastewater and Pavement Improvements To Serve Cavile Place - Hughes House II - Parker Street Improvements CITY PROJECT NO.:105364 Bid Date: 5/15/2025 2:00 PM Addendum No. 1: Issued 4/43/2025 Addendum No. 2: Issued 5/12/2025 The Contract Documents, Specifications, and Plans for the subject project are hereby amended as follows: BIDDER QUESTIONS AhID ANSWER PRE -BID MEETING: Question 1: Is 2-way traffic expected to be maintained throughout the project? Answer: A lane will be out of service during installation. Access to homes should be maintained. Communication with homeowners is critical but both lanes are not expected to be maintained. Contractor to submit a TCP. City to further confirm both lanes to be opened overnight. BONFIRE: Question 2: Is an estimated cost available? Answer: No estimate of cost is available Question 3: How do we attend the prebid meeting? Answer: The prebid meeting information/credentials is located under *Ttles" & is titled "IPRC24- 0002_PreBid_Meeti ng_I nformation". PAGE 1 This Addendum, forms part of the Contract Documents referenced above and modifies the original Contract Documents and Plans. Bidder shall acknowledge receipt of this addendum in the space provided below, on the last page of the Bid Form and acknowledge receipt on the outer envelope of your bid. A signed copy of this Addendum should be included in the sealed bid envelope at the time of bid submittal. Failure to acknowledge the receipt of this Addendum could cause the subject bidder to be considered "NONRESPONSIVE," resulting in disqualification. RECIEPT ACKNOWLEDGEMENT: ISSUED BY: Kimley Horn BY Y : c/L B : / Tyler Scott P.E. Project Manager CompanyJackson Construction, LTD Address: �117. synyo,L City: t (y 7 t Wo r 4 k State: C� ACCEPTED BY CITY: Andrew Goodman, P.E., Engineering Manager PAGE 2 00 45 40 - 1 Business Equity Goal Page 1 of 2 1 SECTION 00 45 40 2 Business Equity Goal 4 APPLICATION OF POLICY 5 If the total dollar value of the contract is $100,000 or more, then a Business Equity goal is applicable. 6 A Business Equity Firm refers to certified Minority-, and/or Women-, owned Business Enterprises 7 (M/WBEs). 9 POLICY STATEMENT 10 It is the policy of the City of Fort Worth to ensure the full and equitable participation of Business Equity 11 Firms when applicable, in the procurement of all goods and services. All requirements and regulations 12 stated in the City's Business Equity Ordinance No.25165-10-2021, (replacing Ordinance No. 24534-11- 13 2020 (codified at: htips:Hcodelibrqa.amlegal.com/codes/ftworth/latest/ftworth tx/0-0-0-22593) apply to 14 this bid. 15 16 BUSINESS EQUITY PROJECT GOAL 17 The City's Business Equity goal on this project is 7.80% of the total bid value of the contract (Base bid 18 applies to Parks and Community Services). 19 20 METHODS TO COMPLY WITH THE GOAL 21 On City contracts where a Business Equity Goal is applied, offerors are required to comply with the City's 22 Business Equity Ordinance by meeting or exceeding the above stated goal or otherwise comply with the 23 ordinance through one of the following methods: 1. Commercially useful services performed by a 24 Business Equity prime contractor, 2. Business Equity subcontracting participation, 3. Combination 25 of Business Equity prime services and Business Equity subcontracting participation, 4. Business 26 Equity Joint Venture/Mentor-Protege participation, 5. Good Faith Effort documentation, or 6. Prime 27 contractor Waiver documentation. 28 29 SUBMITTAL OF REQUIRED DOCUMENTATION 30 Applicable documents (listed below) must be submitted electronically with the other required bidding 31 documents at the time of the bid under the respective Project via the Procurement Portal: 32 https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities 33 OR received no later than 2:00 p.m., on the third City business day after the bid opening date, 34 exclusive of the bid opening date with the respective Project via the Procurement Portal by 35 responding to the message sent within Bonfire to all the bidders. It is highly encouraged that bidders 36 submit required documentation at the time of bid submission. 37 38 The Offeror must submit one or more of the following documents: 39 1. Utilization Form and Letter(s) of Intent, if the goal is met or exceeded; 40 2. Letter of Intent, for all M/WBE Subcontractors; 41 3. Good Faith Effort Form and Utilization Form, including supporting documentation, if 42 participation is less than stated goal, or no Business Equity participation is accomplished; 43 4. Prime Contractor Waiver Form, including supporting documentation, if the Offeror will perform 44 all subcontracting/supplier opportunities; or 45 5. Joint Venture/Mentor-Protege Form, if goal is met or exceeded with a Joint Venture or Mentor- 46 Proteg6 participation. 47 48 These forms can be accessed at: 49 Business Equity Utilization Form and Letter of Intent CITY OF FORT WORTH Cavile Place — Hughes House II — Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN# 105364 Revised June 7, 2024 00 45 40 - 2 Business Equity Goal Page 2 of 2 1 https:Hgpps.fortworthtexas. og v/ProjectResources/ResourcesP/60 - MWBE/Business Equity Utilization 2 Form DVIN 2022 220324.pdf 3 4 Letter of Intent 5 h!tps://gpps.fortworthtexas.gov/ProjectResources/ResourcesP/60 - MWBE/Letter of Intent DVIN 6 2021.pdf 7 8 Business Equity Good Faith Effort Form 9 https://gpps.fortworthtexas. og v/ProjectResources/ResourcesP/60 - MWBE/Good Faith Effort 10 Form_ DVIN2022.pdf 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Business Equity Prime Contractor Waiver Form https:Hgpps.fortworthtexas. o� jectResources/ResourcesP/60 - MWBE/MWBE Prime Contractor Waiver-220313.pdf Business Equity Joint Venture Form https:Hqpps.fortworthtexas.gov/ProiectResources/ResourcesP/60 - MWBE/MWBE Joint Venture_220225.pdf FAILURE TO ACHIEVE THE GOAL OR OTHERWISE COMPLY WITH THE ORDINANCE WILL RESULT IN THE BIDDER/OFFEROR BEING DECLARED NON -RESPONSIVE AND THE BID REJECTED. FAILURE TO SUBMIT THE REQUIRED BUSINESS EQUITY DOCUMENTATION OR OTHERWISE COMPLY WITH THE ORDINANCE WILL RESULT IN THE BID BEING DECLARED NON- RESPONSIVE, THE BID REJECTED AND MAY SUBJECT THE BIDDER/OFFEROR TO SANCTIONS AS DESCRIBED IN SEC. 20-373 OF THE ORDINANCE. For Questions, Please Contact the Business Equity Division of the Access and Opportunity Services Department at (817) 392-2674. END OF SECTION CITY OF FORT WORTH Cavile Place — Hughes House II — Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN# 105364 Revised June 7, 2024 00 52 43 - 1 Developer Awarded Project Agreement Pagel of4 1 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on 06/25/2026 is made by and between the Developer, 4 Housing Authority of the City of Fort Worth, Texas dba Fort Worth Housing Solutions., authorized to do business in Texas ("Developer"), and Jackson Construction. Ltd., authorized to do business 5 in Texas, acting by and through its duly authorized representative, ("Contractor"). 6 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 7 follows: 8 Article 1. WORK 9 Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project 10 identified herein. 11 Article 2. PROJECT 12 The project for which the Work under the Contract Documents may be the whole or only a part is 13 generally described as follows: 14 Plans for the Construction of Wastewater and Pavement Improvements Called Cavile - Hughes 15 House II - Parker Street Sewer Improvements 16 CPN 105364 17 Article 3. CONTRACT TIME 18 3.1 Time is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract Documents 20 are of the essence to this Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within 90 working days after the date when 23 the Contract Time commences to run as provided in Paragraph 12.04 of the Standard City 24 Conditions of the Construction Contract for Developer Awarded Projects. 25 3.3 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that Developer will 27 suffer financial loss if the Work is not completed within the times specified in Paragraph 3.2 28 above, plus any extension thereof allowed in accordance with Article 10 of the Standard City 29 Conditions of the Construction Contract for Developer Awarded Projects. The Contractor also 30 recognizes the delays, expense and difficulties involved in proving in a legal proceeding the 31 actual loss suffered by the Developer if the Work is not completed on time. Accordingly, 32 instead of requiring any such proof , Contractor agrees that as liquidated damages for delay 33 (but not as a penalty), Contractor shall pay Developer Two -Hundred Fifty Dollars 34 ($250.00) for each day that expires after the time specified in Paragraph 3.2 for Final 35 Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised June 16, 2016 005243-2 Developer Awarded Project Agreement Page 2 of 4 36 Article 4. CONTRACT PRICE 37 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 38 Documents an amount in current funds of Two Million Three Hundred Twenty -Seven Thousand Five Hundred Fifteen Dollars ($2,327,515). 39 Article 5. CONTRACT DOCUMENTS 40 5.1 CONTENTS: 41 A.The Contract Documents which comprise the entire agreement between Developer and 42 Contractor concerning the Work consist of the following: 43 1. This Agreement. 44 2. Attachments to this Agreement: 45 a. Bid Form (As provided by Developer) 46 1) Proposal Form (DAP Version) 47 2) Prequalification Statement 48 3) State and Federal documents (project specific) 49 b. Insurance ACORD Form(s) 50 c. Payment Bond (DAP Version) 51 d. Performance Bond (DAP Version) 52 e. Maintenance Bond (DAP Version) 53 f. Power of Attorney for the Bonds 54 g. Worker's Compensation Affidavit 55 h. MBE and/or SBE Commitment Form (If required) 56 3. Standard City General Conditions of the Construction Contract for Developer Awarded 57 Projects. 58 4. Supplementary Conditions. 59 5. Specifications specifically made a part of the Contract Documents by attachment or, if 60 not attached, as incorporated by reference and described in the Table of Contents of the 61 Project's Contract Documents. 62 6. Drawings. 63 7. Addenda. 64 8. Documentation submitted by Contractor prior to Notice of Award. 65 9. The following which may be delivered or issued after the Effective Date of the 66 Agreement and, if issued, become an incorporated part of the Contract Documents: 67 a. Notice to Proceed. 68 b. Field Orders. 69 c. Change Orders. 70 d. Letter of Final Acceptance. 73 74 CITY OF FORT WORTH Cavile Place - Hughes House H - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised June 16,2016 00 52 43 - 3 Developer Awarded Project Agreement Page 3 of4 75 Article 6. INDEMNIFICATION 76 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 77 expense, the city, its officers, servants and employees, from and against any and all claims 78 arising out of, or alleged to arise out of, the work and services to be performed by the 79 contractor, its officers, agents, employees, subcontractors, licenses or invitees under this 80 contract. This indemnification provision is specifically intended to operate and be effective 81 even if it is alleged or proven that all or some of the damages being sought were caused, in 82 whole or in part, by any act, omission or negligence of the city. This indemnity provision 83 is intended to include, without limitation, indemnity for costs, expenses and legal fees 84 incurred by the city in defending against such claims and causes of actions. 85 86 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the 87 city, its officers, servants and employees, from and against any and all loss, damage or 88 destruction of property of the city, arising out of, or alleged to arise out of, the work and 89 services to be performed by the contractor, its officers, agents, employees, subcontractors, 90 licensees or invitees under this contract. This indemnification provision is specifically 91 intended to operate and be effective even if it is alleged or proven that all or some of the 92 damages being sought were caused, in whole or in part, by any act, omission or negligence 93 of the city. 94 95 Article 7. MISCELLANEOUS 96 7.1 Terms. 97 Terms used in this Agreement are dcfined in Article I of the Standard City Conditions of the 98 Construction Contract for Developer Awarded Projects. 99 7.2 Assignment of Contract. 100 This Agreement, including all of the Contract Documents may not be assigned by the Contractor 101 without the advanced express written consent of the Developer. 102 7.3 Successors and Assigns. 103 Developer and Contractor each binds itself, its partners, successors, assigns and legal 104 representatives to the other party hereto, in respect to all covenants, agreements and obligations 105 contained in the Contract Documents. 106 7.4 Severability. 107 Any provision or part of the Contract Documents held to be unconstitutional, void or 108 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining 109 provisions shall continue to be valid and binding upon DEVELOPER and CONTRACTOR. 110 7.5 Governing Law and Venue. 111 This Agreement, including all of the Contract Documents is performable in the State of Texas. 112 Venue shall be Tarrant County, Texas, or the United States District Court for the Northern 113 District of Texas, Fort Worth Division. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised June 16, 2016 00 52 43 - 4 Developer Awarded Project Agreement Page 4 of4 114 115 7.6 Authority to Sign. 116 Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized 117 signatory of the Contractor. 118 119 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 120 counterparts. 121 122 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 123 Contractor: Developer: B ZIZ21ZZ,A� B Y Kn5Wn C7n25. 202611.12:2 LWn (S' ature) (Signature) Housing Authority of the City of Fort Worth, Troy L. Jackson Texas dba Fort Worth Housing Solutions (Printed Name) (Printed Name) Kristen Carnareno, authorized delegate for Title: President Title: MarvTitle: Marv�aret Lemons President Lemons President Company Name: Jackson Construction, Ltd. Company name: Fort Worth Housing Solutions Address: 5112 Sun 5112 Sun Valley Address: 1407 Texas St. Cif/State/Zip: Fort Worth, Texas 76119/State/Zip: Fort Worth, Texas 76119 Cif/State/Zip: Fort Worth, Texas 76102/State/Zip: Fort Worth, Texas 76102 06/25/2026 06/25/2026 Date Date 124 CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised June 16, 2016 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 006125-1 CERTIFICATE OF INSURANCE Page 1 of 1 SECTION 00 6125 CERTIFICATE OF INSURANCE END OF SECTION CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 105364 Revised July 1, 2011 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 006213-1 PERFORMANCE BOND Page 1 of 2 Bond1125634 Section 00 6213 PERFORMANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, Jackson Construction, Ltd known as "Principal" herein and The Hanover Insurance Company a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Housing Authority of the City of Fort Worth, Texas dba Fort Worth Housing Solutions., authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sung Two Million Three Hundred Twenty Seven Thousand of Five Hundred Fifteen & 00/100 Dollars ($ 2,327,515.2� lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made jointly unto the Developer and the City as dual obligees, we bind ourselves, ourheirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth by and through a Community Facilities Agreement, CFA Number Insert Project CFA #; and WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the 25th day of June 20 26, which Contract is hereby referred to and made apart hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories defined by law, in the prosecution of the Work, including any Change Orders, as provided for in said Contract designated as Plans for the Construction of Wastewater and Pavement Improvements Called Cavile - Hughes House II - Parker Street Sewer Improvements. NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully perform the Work, including Change Orders, under the Contract, according to the plans, specifications, and contract documents therein referred to, and as well during any period of extension of the Contract that may be granted on the part of the Developer and/or City, then this obligation shall be and become null and void, otherwise to remain in full force and effect. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised January 31, 2012 00 62 13 - 2 PERFORMANCE BOND Page 2 of 2 1 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 3 Worth Division. 4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 6 accordance with the provisions of said statue. 7 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this 8 instrument by duly authorized agents and officers on this the 25th day of June 9 , 2026 . 10 11 12 13 14 15 16 17 18 19 20 21 B 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 ATTEST: - (&e6 (Principal) Secretary qa� W'� a� Witness as to Principal r Witness as to Surety Crowley PRINCIPAL: Jackson Construction, Ltd �. BY: Signature 6, Troy L Jackson, President Name and Title Address: 5112 Sun Valley Drive SURETY: The Hanover Insurance Company BY: gnatuxe Jack M Crowley, Attorney in Fact Name and Title Address: 500 N Akard Street, #4300 Dallas. TX 75201 Telephone Number: 972-385-9800 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Cavile Place - Hughes House 11- Parker Street Sewer Improvements STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised January 31, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 00 62 14 - 1 PAYMENT BOND Page 1 of 2 Section 00 6214 Bond 1125634 PAYMENT BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we Jackson Construction, Ltd known as "Principal" herein, and The Hanover Insurance Company a corporate surety ( or sureties if more than one), duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Housing Authority of the City of Fort Worth, Texas dba Fort Worth Housing Solutions., authorized to do business in Texas "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal su,%o Million Three Hundred Twenty Seven Thousand of Five Hundred Fifteen & 00/100 Dollars ($ 2,327,515.00 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth, by and through a Community Facilities Agreement, CFA Number Insert Project CFA #;and WHEREAS, Principal has entered into a certain written Contract with Developer, awarded the 25th day of June . 2026 , which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and other accessories as defined by law, in the prosecution of the Work as provided for in said Contract and designated as Plans for the Construction of Wastewater and Pavement Improvements Called Cavile - Hughes House II - Parker Street Sewer Improvements. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under the Contract, then this obligation shall be and become null and void; otherwise to remain in full force and effect. CITY OF FORT WORTH Cavile Place - Hughes House I1- Parker Street Sewer Improvements STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised January 31. 2012 0062I4-2 PAYMENTBOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this 5 instrument by duly authorized agents and officers on this the 25th day of 6 June .20 26 . 7 8 9 10 11 12 13 14 ATTEST: ATTEST: (S 'ty) t* Witness as to ure rowley PRINCIPAL: Jackson Construction, Ltd Troy L Jackson, President Name and Title Address: 5112 Sun Valley Drive Fort Worth, TX 76119 SURETY: The Hanover Insurance Company BY: Signature Jack M Crowley, Attorney in Fact Name and Title Address: 500 N Akard Street, #4300 Dallas, TX 75201 Telephone Number: 972-385-9800 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN I05364 Revised January 3I, 2012 2 3 4 5 6 9 10 11 12 13 14 15 16 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 0062 19-1 MAINTENANCE BOND Page 1 of 3 Bond1125634 Section 00 62 19 MAINTENANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT That we Jackson Construction, Ltd known as "Principal" herein and The Hanover Insurance Company , acorporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Housing Authority of the City of Fort Worth, Texas dba Fort Worth Housing Solutions, authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the sum Two Million Three Hundred Twenty Seven Thousand of Five Hundred Fifteen & 00/100 Dollars ($ 2,327,515.00 1 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly unto the Developer and the City as dual obligees and their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth by and through a Community Facilities Agreement, CFA Number Insert Project CFA #;and WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the 25th day of June , 20 26 , which Contract is hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories as defined by law, in the prosecution of the Work, including any Work resulting from a duly authorized Change Order (collectively herein, the "Work") as provided for in said Contract and designated as Plans for the Construction of Wastewater and Pavement Improvements Called Cavile - Hughes House 11- Parker Street Sewer Improvements; and WHEREAS, Principal binds itself to use such materials and to so construct the Work in accordance with the plans, specifications and Contract Documents that the Work is and will remain free from defects in materials or workmanship for and during the period of two (2) years after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and CITY OF FORT WORTH Cavile PIace - Hughes House II - Parker Street Sewer Improvements STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised January 31, 2012 006219-2 MAINTENANCE BOND Page 2 of 3 1 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon 2 receiving notice from the Developer and/or City of the need thereof at any time within the 3 Maintenance Period. 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by Developer or City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the Developer or City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance Bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall he in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised January 31, 2012 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 30 31 33 34 35 36 37 38 39 40 41 006219-3 MAINTENANCE BOND Page 3 of 3 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 25th day of .2o26 ATTEST: A - (Principal) Secretary Witness as to Principal June PRINCIPAL: Jackson Construction, Ltd Troy L Jackson, President Name and Title Address: 5112 Sun Valley Drive Fort Worth, TX 76119 SURETY: The Hanover Insurance Company BY: ignature Jack M Crowley, Attorney in Fact ATTEST: Name and Title Address: 500 N Akard Street, #4300 (Siurety) Secretag Uallas, TX 75201 Witness as to Sure MK Crowley Telephone Number: 972-385-9800 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Cavile Place - Hughes House 1I - Parker Street Sewer Improvements STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised January 31, 2012 THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSURANCE COMPANY OF AMERICA POWER OF ATTORNEY THIS Power of Attorney limits the acts of those named herein, end they have no euthority to bind the Company except in the manner and to the extent herein stated. KNOW ALL PERSONS BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being corporations organized and existing under the laws of the State of Naw Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation organized and axisting under the lews of the State of Michigan, (hereinafter individually and collectively the "Company") does hereby constitute and appoint, Jack M. Crowley, Laurie Pflug, Misty Witt, Holly Clevenger and/or Christine Clinger Of Willis Towers Watson Insurence Services West, Inc of Dallas, TX each individually, if there be more than one named, as its true and lawful attomay(s)- in-fact to sign, execute, saal, acknowledge and deliver for, and on its bahelf, and as its act and deed any place within the United States, any and all surety bonds, recognizances, undartakings, or other surety obligations. The exacution of such surety bonds, recognizances, undertakings or surety obligations, in pursuance of thesa presents, shall be es binding upon the Company as 0 they had been duly signed by the president and attested by the secretary of tha Company, in their own proper persons. Provided however, that this power of attorney limits the acts of those named herein; and they have no authority to bind tha Company except in the manner stated and to the extant of any limitation stated below: Any such obligations in the United States, not to exceed Fifty Million end No/100 ($50,000,000) in any single instance That this power Is mada and executed pursuant to the authority of the following Resolutions passed by the Board of Directors of said Company, and said Resolutions remain in full force and effect: RESOLVED: That the President or any Vice President, in conjunction with eny Vice President, be and thay hereby ara authorized and empowered to appoint Attorneys -in -fact of the Company, in its name and as it acts, to execute and acknowledge for and on its behalf as suraty, any and all bonds, recognizances, contracts of indamnity, waivers of citation and all othar writings obligatory in the nature thareof, with power to attach thereto the seal of the Company. Any such writings so executed by such Attorneys -in -fact shall be binding upon the Company as if they had been duly axecuted end acknowladged by the regularly elected officers of tha Company in their own proper persons. RESOLVED: That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto, granted and executed by the President or Vice President in conjunction with any Vice President of the Company, shell be binding on the Company to tha same extent as if all signatures therein were manually effaced, even though one or more of arty such signatures thereon may ba facsimile. (Adopted October 7, 1981 — The Hanover Insurance Company; Adopted April 14, 1982 — Massachusetts Bay Insurance Company; Adopted September 7, 2001 —Citizens Insurance Company ofAmerica and effirmed by each Company on March 24, 2014) IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE COMPANY OF AMERICA have caused these presents to be sealad with their respective corporate seals, duly attested by two Vice Presidents, this 22nd day of April 2026 The llasortr losaraact Company MaaaisoegaftyhrraesaI Company Citistis taaaraacrCssllaray.OrArareriea 610" 44�tVAA JtfiPKK&wbcKVkePmIftnt STATE OF CONNECTICUT ) COUNTY OF HARTFORD ) ss. The ltlaso►tr la"Waacc Company 4WMk h wrmace Cowhr y CamweyOfAeerinX6vie* r110si1111W On this 220d day of April, 2026 before me came the above named Executiva Vice President and Vica President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, to me personally known to be the individuals and officers described herein, end acknowledgad that the seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company, Massachusetts Bay Insurance Company end Citizens Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and subscribed to seid instrument by the authority and direction of said Corporations. KATH� MV i s• 2027 5111), i,7T!-n r,-,Y-,T,', r7W -T7 -- -T— --r= I, the undersigned Vice President of The Hanover Insurence Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, hereby certify that the above and foregoing is a full, true and correct copy of the Original Power of Attorney issued by said Companies, and do hereby further certify that the said Powers of Attorney are still in force end effect. GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this _ _ day of_ CERTIFIED COPY Vie♦ �'�i i Hanover Insurance Group® The Hanover Insurance Company 1 440 Lincoln Street, Worcester, MA 01653 Gtizens Insurance Company of America 1645 West Grand River Avenue, Howell, MI 48843 Texas Complaint Notice IMPORTANT NOTICE To obtain information or make a complaint: You may call The Hanover Insurance Company/Citizens Insurance Company of America's toll -free telephone number for information or to make a complaint at: 1-800-608-8141 AVISO IMPORTANTE Para obtener informacion o para someter una queja: Usted puede Ilamar al numero de telefono gratis de The Hanover Insurance Company/Citizens Insurance Company of America's para informacion o para someter una queja al: 1-800-608-8141 You may also write to The Hanover Insurance Company/ Usted tambien puede escribir a The Hanover Insurance Citizens Insurance Company of America at: Company/Citizens Insurance Company of America al: 440 Lincoln Street Worcester, MA 01615 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.texas.gov E-mail: ConsumerProtection@tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent or the com- pany first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or con- dition of the attached document. 440 Lincoln Street Worcester, MA 01615 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companies, coberturas, derechos o quejas al: 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas: R O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.texasgov E-mail: ConsumerProtection@tdi.state.tx.us DISPUTAS SOBRE PRIMAS O RECL.AMOS: Si tiene una disputa concemiente a su prima o a un rec- lamo, debe comunicarse con el agente o la compania primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de informacion y no se convierte en parte o condicion del documento adjunto. 181-1457 (5/12) STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article 1 — Definitions and Terminology.......................................................................................................1 1.01 Defined Terms..........................................................................................................................1 1.02 Terminology............................................................................................................................. 5 Article2 — Preliminary Matters.....................................................................................................................6 2.01 Before Starting Construction..................................................................................................... 6 2.02 Preconstruction Conference......................................................................................................6 2.03 Public Meeting..........................................................................................................................6 Article 3 — Contract Documents and Amending............................................................................................6 3.01 Reference Standards..................................................................................................................6 3.02 Amending and Supplementing Contract Documents.................................................................6 Article4 — Bonds and Insurance...................................................................................................................7 4.01 Licensed Sureties and Insurers..................................................................................................7 4.02 Performance, Payment, and Maintenance Bonds....................................................................... 7 4.03 Certificates of Insurance...........................................................................................................7 4.04 Contractor's Insurance..............................................................................................................9 4.05 Acceptance of Bonds and Insurance; Option to Replace.........................................................12 Article 5 — Contractor's Responsibilities.....................................................................................................12 5.01 Supervision and Superintendent..............................................................................................12 5.02 Labor; Working Hours............................................................................................................13 5.03 Services, Materials, and Equipment........................................................................................13 5.04 Project Schedule.....................................................................................................................14 5.05 Substitutes and "Or-Equals"....................................................................................................14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16 5.07 Concerning Subcontractors, Suppliers, and Others..................................................................16 5.08 Wage Rates.............................................................................................................................18 5.09 Patent Fees and Royalties........................................................................................................19 5.10 Laws and Regulations.............................................................................................................19 5.11 Use of Site and Other Areas....................................................................................................19 5.12 Record Documents..................................................................................................................20 5.13 Safety and Protection..............................................................................................................21 5.14 Safety Representative..............................................................................................................21 5.15 Hazard Communication Programs..........................................................................................22 5.16 Submittals...............................................................................................................................22 5.17 Contractor's General Warranty and Guarantee...............................................23 Indemnification 24 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 10, 2013 5.18 Delegation of Professional Design Services.............................................................................24 5.19 Right to Audit.........................................................................................................................25 5.20 Nondiscrimination..................................................................................................................25 Article 6 — Other Work at the Site...............................................................................................................26 6.01 Related Work at Site...............................................................................................................26 Article 7 — City's Responsibilities..............................................................................................................26 7.01 Inspections, Tests, and Approvals...........................................................................................26 7.02 Limitations on City's Responsibilities.....................................................................................26 7.03 Compliance with Safety Program............................................................................................27 Article 8 — City's Observation Status During Construction.........................................................................27 8.01 City's Project Representative...................................................................................................27 8.02 Authorized Variations in Work...............................................................................................27 8.03 Rejecting Defective Work.......................................................................................................27 8.04 Detenninations for Work Performed.......................................................................................28 Article 9 — Changes in the Work.................................................................................................................28 9.01 Authorized Changes in the Work............................................................................................28 9.02 Notification to Surety..............................................................................................................28 Article 10 — Change of Contract Price; Change of Contract Time...............................................................28 10.01 Change of Contract Price........................................................................................................28 10.02 Change of Contract Time........................................................................................................28 10.03 Delays.....................................................................................................................................28 Article 11 — Tests and Inspections; Correction, Removal or Acceptance of Defective Work .......................29 11.01 Notice of Defects....................................................................................................................29 11.02 Access to Work.......................................................................................................................29 11.03 Tests and Inspections..............................................................................................................29 11.04 Uncovering Work....................................................................................................................30 11.05 City May Stop the Work.........................................................................................................30 11.06 Correction or Removal of Defective Work..............................................................................30 11.07 Correction Period...................................................................................................................30 11.08 City May Correct Defective Work..........................................................................................31 Article12 — Completion.............................................................................................................................32 1201 Contractor's Warranty of Title................................................................................................32 1202 Partial Utilization...................................................................................................................32 1203 Final Inspection......................................................................................................................32 1204 Final Acceptance....................................................................................................................33 Article13 — Suspension of Work................................................................................................................33 13.01 City May Suspend Work.........................................................................................................33 Article14 — Miscellaneous.........................................................................................................................34 14.01 Giving Notice.........................................................................................................................34 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 10, 2013 1402 Computation of Times............................................................................................................34 14.03 Cumulative Remedies.............................................................................................................34 14.04 Survival of Obligations...........................................................................................................35 14.05 Headings.................................................................................................................................35 CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Pagel of 35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) --A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right -of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right -of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds I . Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions In. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings P. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the ContractDocuments i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day —A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer —An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as sodefined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans —See definitionofDrawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of theProject. 28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made apart of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at theSite. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent— The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor orSubcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours —Hours beginning at 9: 00 a.m. and ending at 5: 00 p. m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day —A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, technical or construction industry or trade meaning accordance with such recognized meaning. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 words or phrases that have a well-known are used in the Contract Documents in 0073 10-6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non - Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the followingways: 1. A Field Order; CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit A. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 eachoccurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each jobsite. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. B. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the followingamounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage B. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the followingrequirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: NONE 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroadproperty: a. General Aggregate: NONE b. Each Occurrence:: NONE 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separatelocations. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repairwork performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. C. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. D. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the precedingThursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made byparticipating change orders. 5.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal " Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials orequipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.13. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 XRequired for this Contract. ❑ Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates 9 Required for this Contract. ❑ Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 I th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shallbe open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and OtherAreas A. Limitation on Use of Site and OtherAreas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2 At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve theDamage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean- up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endangerit. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph5.16.C. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage causedby: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or fmalpayment; the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.13. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN PART. BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes ofactions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN PART, BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing Cityfunds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided byothers. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily corrector repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasonstherefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2 consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation proj ects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the otherparty. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receivingparty. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 0073 10-35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 10, 2013 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 01 11 00 f11 LVAIL&FA K63= 13-S 011100-1 DAP SUMMARY OF WORK Pagel of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— Developer Awarded Projects CPN 105364 Revised December 20, 2012 01 11 00 - 2 DAP SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy famished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission, neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— Developer Awarded Projects CPN 105364 Revised December 20, 2012 01 11 00 - 3 DAP SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— Developer Awarded Projects CPN 105364 Revised December 20, 2012 SECTION 0125 00 SUBSTITUTION PROCEDURES 11.1 SUMMARY A. Section Includes: 012500-1 DAP SUBSTITUTION PROCEDURES Pagel of 5 1. The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 11.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 11.3 REFERENCES [NOT USED] 11.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: CITY OF FORT WORTH Cavile Place - Hughes House H - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 5 a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, b. Contractor proposes a cost and/or time reduction incentive to the City. 11.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City CITY OF FORT WORTH Cavile Place - Hughes House H - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 5 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. 4. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer's opinion, acceptance will require substantial revision of the original design d. In the City's or Developer's opinion, substitution will not perform adequately the function consistent with the design intent 11.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 11.7 CLOSEOUT SUBMITTALS [NOT USED] 11.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: I . Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 11.10DELIVERY, STORAGE, AND HANDLING [NOT USED] 11.11 FIELD [SITE] CONDITIONS [NOT USED] 11.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION CITY OF FORT WORTH Cavile Place - Hughes House H - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 Revision Log DATE NAME SUMMARY OF CHANGE EXHIBIT A REQUEST FOR SUBSTITUTION FORM: 10] 012500-4 DAP SUBSTITUTION PROCEDURES Page 4 of 5 PROJECT: DATE! We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. CITY OF FORT WORTH Cavile Place - Hughes House H - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 012500-5 DAP SUBSTITUTION PROCEDURES Submitted By: Signature as noted Firm Date Telephone For Use by City: _Approved _ Rejected City For Use by City Recommended Recommended Not recommended Received late Remarks Address By Date Date Page 5 of 5 CITY OF FORT WORTH Cavile Place - Hughes House H - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 SECTION 013119 PRECONSTRUCTION MEETING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 0131 19- 1 DAP PRECONSTRUCTION MEETING Page I of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 0131 19 - 2 DAP PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 013119-3 DAP PRECONSTRUCTION MEETING Page 3 of 3 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 013233-1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO lamI AYI -'I IU E A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infll developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 013233-2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 SECTION 0133 00 DAP SUBMITTALS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 DAP SUBMITTALS Pagel of 8 1. General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 01 33 00 - 2 DAP SUBMITTALS Page 2 of 8 c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal crossreference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 'h inches x 1 linches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 01 33 00 - 3 DAP SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of. a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 01 33 00 - 4 DAP SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 01 33 00 - 5 DAP SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 01 33 00 - 6 DAP SUBMITTALS Page 6 of 8 b. Code 2 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the fmal product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 01 33 00 - 7 DAP SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification Sufficient information shall be attached to permit a written response without further information. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] II0QDX1 *1X* X'1 CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 013300-8 DAP SUBMITTALS Page 8 of 8 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August 30, 2013 013513-1 DAP SPECIAL PROJECT PROCEDURES Page 1 of 7 1 SECTION 013513 2 SPECIAL PROJECT PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 i Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1 — General Requirements 23 3. Section 33 12 25 — Connection to Existing Water Mains 24 25 1.2 REFERENCES 26 A. Reference Standards 27 1. Reference standards cited in this Specification refer to the current reference standard 28 published at the time of the latest revision date logged at the end of this Specification, unless 29 a date is specifically cited. 30 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High 31 Voltage Overhead Lines. 32 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 33 Specification 34 1.3 ADMINISTRATIVE REQUIREMENTS 35 A. Coordination with the Texas Department of Transportation 36 1. When work in the right-of-way which is under the jurisdiction of the Texas Department of 37 Transportation (TxDOT): 38 a. Notify the Texas Department of Transportation prior to commencing any work therein in 39 accordance with the provisions of the permit CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August, 30, 2013 0135 13 -2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 1 b. All work performed in the TxDOT right-of-way shall be performed in compliance with 2 and subject to approval from the Texas Department of Transportation 3 B. Work near High Voltage Lines 4 1. Regulatory Requirements 5 a. All Work near High Voltage Lines (more than 600 volts measured between conductors 6 or between a conductor and the ground) shall be in accordance with Health and Safety 7 Code, Title 9, Subtitle A, Chapter 752. 8 2. Warning sign 9 a. Provide sign of sufficient size meeting all OSHA requirements. 10 3. Equipment operating within 10 feet of high voltage lines will require the following safety 11 features 12 a. Insulating cage -type of guard about the boom or arm 13 b. Insulator links on the lift hook connections for back hoes or dippers 14 c. Equipment must meet the safety requirements as set forth by OSHA and the safety 15 requirements of the owner of the high voltage lines 16 4. Work within 6 feet of high voltage electric lines 17 a. Notification shall be given to: 18 1) The power company (example: ONCOR) 19 a) Maintain an accurate log of all such calls to power company and record action 20 taken in each case. 21 b. Coordination with power company 22 1) After notification coordinate with the power company to: 23 a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the 24 lines 25 c. No personnel may work within 6 feet of a high voltage line before the above 26 requirements have been met. 27 C. Confined Space Entry Program 28 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA 29 requirements. 30 2. Confined Spaces include: 31 a. Manholes 32 b. All other confined spaces in accordance with OSHA's Pen -nit Required for Confined 33 Spaces 34 D. Use of Explosives, Drop Weight, Etc. 35 1. When Contract Documents permit on the project the following will apply: 36 a. Public Notification 37 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to 38 commencing. 39 2) Minimum 24 hour public notification in accordance with Section 013 1 13 40 E. Water Department Coordination 41 1. During the construction of this project, it will be necessary to deactivate, for a period of 42 time, existing lines. The Contractor shall be required to coordinate with the Water 43 Department to determine the best times for deactivating and activating those lines. 44 2. Coordinate any event that will require connecting to or the operation of an existing City 45 water line system with the City's representative. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August, 30, 2013 0135 13 -3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 1 a. Coordination shall be in accordance with Section 33 12 25. 2 b. If needed, obtain a hydrant water meter from the Water Department for use during the 3 life of named project. 4 c. In the event that a water valve on an existing live system be turned off and on to 5 accommodate the construction of the project is required, coordinate this activity through 6 the appropriate City representative. 7 1) Do not operate water line valves of existing water system. 8 a) Failure to comply will render the Contractor in violation of Texas Penal Code 9 Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be 10 prosecuted to the full extent of the law. 11 b) In addition, the Contractor will assume all liabilities and responsibilities as a 12 result of these actions. 13 F. Public Notification Prior to Beginning Construction 14 1. Prior to beginning construction on any block in the project, on a block by block basis, 15 prepare and deliver a notice or flyer of the pending construction to the front door of each 16 residence or business that will be impacted by construction. The notice shall be prepared as 17 follows: 18 a. Post notice or flyer 7 days prior to beginning any construction activity on each block in 19 the project area. 20 1) Prepare flyer on the Contractor's letterhead and include the following information: 21 a) Name of Project 22 b) City Project No (CPN) 23 c) Scope of Project (i.e. type of construction activity) 24 d) Actual construction duration within the block 25 e) Name of the contractor's foreman and phone number 26 0 Name of the City's inspector and phone number 27 g) City's after-hours phone number 28 2) A sample of the `pre -construction notification' flyer is attached as Exhibit A. 29 3) Submit schedule showing the construction start and finish time for each block of the 30 project to the inspector. 31 4) Deliver flyer to the City Inspector for review prior to distribution. 32 b. No construction will be allowed to begin on any block until the flyer is delivered to all 33 residents of the block. 34 G. Public Notification of Temporary Water Service Interruption during Construction 35 1. In the event it becomes necessary to temporarily shut down water service to residents or 36 businesses during construction, prepare and deliver a notice or flyer of the pending 37 interruption to the front door of each affected resident. 38 2. Prepared notice as follows: 39 a. The notification or flyer shall be posted 24 hours prior to the temporary interruption. 40 b. Prepare flyer on the contractor's letterhead and include the following information: 41 1) Name of the project 42 2) City Project Number 43 3) Date of the interruption of service 44 4) Period the interruption will take place 45 5) Name of the contractor's foreman and phone number 46 6) Name of the City's inspector and phone number 47 c. A sample of the temporary water service interruption notification is attached as Exhibit 48 B. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August, 30, 2013 013513-4 DAP SPECIAL PROJECT PROCEDURES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Page 4 of 7 d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. H. Coordination with United States Army Corps of Engineers (USACE) At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. I. Coordination within Railroad Permit Areas 1. At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed to comply with the railroad's requirements. J. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. K. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August, 30, 2013 0135 13 -5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 1 1.4 SUBMITTALS [NOT USED] 2 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.6 CLOSEOUT SUBMITTALS [NOT USED] 4 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.8 QUALITY ASSURANCE [NOT USED] 6 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.10 FIELD [SITE] CONDITIONS [NOT USED] 8 1.11 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 14 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.3.13— Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 01 35 13 -6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: NOTICE OF CONSTRUCTION THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August, 30, 2013 1 2 3 01 35 13 -7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 EXHIBIT B Dos NO. xxxx Project Name: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALM..: R. AT (CONTRACTORS SUPERINTENDENT) . (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE.,.. THANK YOU, CONTRACTOR CITY OF FORT WORTH Cavile Place - Hughes House 11 - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised August, 30, 2013 01 45 23 DAP TESTING AND INSPECTION SERVICES Pagel of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART 1 GENERAL IKI 10LVJ 1►J M IVA A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another form of distribution approved by the City. CITY OF FORT WORTH Cavite Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised March 20, 2020 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor D. a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 03/20/2020 D.V. Magana Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised March 20, 2020 01 50 00 - 1 DAP TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL A. Section Includes: 1. Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised JULY 1, 2011 01 50 00 - 2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 1) Contact City 1 week before water for construction is desired d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing 1. Provide and maintain for the duration or construction when required in contract documents CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised JULY 1, 2011 01 50 00 - 3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 E. Dust Control 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised JULY 1, 2011 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised JULY 1, 2011 01 55 26 - 1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Pagel of 3 SECTION 0155 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART 1 - GENERAL IKI &10uy I A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised July 1, 2011 01 55 26 - 2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control 1. Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised July 1, 2011 PART 3 - EXECUTION [NOT USED] 01 55 26 - 3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised July 1, 2011 015713-1 DAP STORM WATER POLLUTION PREVENTION Pagel of 3 SECTION 015713 STORM WATER POLLUTION PREVENTION PART 1 - GENERAL E91 &YIhA I►A M MA A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 3125 00 — Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than I acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. Eggs-1214�i4 4mi A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. B. Construction Activities resulting in: CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised July 1, 2011 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 3926088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 3. 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP Submit in accordance with Section 0133 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised July 1, 2011 015713-3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 01 33 00. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised July 1, 2011 01 60 00 DAP PRODUCT REQUIREMENTS Pagel of2 SECTION 0160 00 PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City's website at: https:Happs.fortworthtexas.gov/ProiectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. C. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. D. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised March 20, 2020 01 60 00 DAP PRODUCT REQUIREMENTS Page 2 of 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/2020 D.V. Magana Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised March 20, 2020 016600-1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 3 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS EKI &Y0uy I A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 66 00 - 2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 3 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 66 00 - 3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 3 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 70 00 - 1 DAP MOBILIZATION AND REMOBILIZATION Page 1 of 4 SECTION 0170 00 MOBILIZATION AND REMOBILIZATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 70 00 - 2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site for the issued Work Order. b) Establishment of necessary general facilities for the Contractor's operation at the Site for the issued Work Order 2) Demobilization shall consist of the activities and cost necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b) Site Clean-up for each issued Work Order c) Removal of all buildings or other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract. 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects a. A Mobilization for Miscellaneous Projects when directed by the City and the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Mobilization and Demobilization a. Measure 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Remobilization for suspension of Work as specifically required in the Contract Documents a. Measurement 1) Measurement for this Item shall be per each remobilization performed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Specified Remobilization" in accordance with Contract Documents. c. The price shall include: 1) Demobilization as described in Section 1.1.A.2.a.1) 2) Remobilization as described in Section 1.1.A.2.a.2) CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 70 00 - 3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 d. No payments will be made for standby, idle time, or lost profits associated this Item. Remobilization for suspension of Work as required by City a. Measurement and Payment 1) This shall be submitted as a Contract Claim in accordance with Article 10 of Section 00 72 00. 2) No payments will be made for standby, idle time, or lost profits associated with this Item. 4. Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include: 1) Mobilization as described in Section 1.1.A.3.a.1) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Emergency Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1) Mobilization as described in Section 1.1.A.4.a) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 70 00 - 4 DAP MOBILIZATION AND REMOBILIZATION 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 017123-1 DAP CONSTRUCTION STAKING AND SURVEY Page 1 of 4 SECTION 017123 CONSTRUCTION STAKING AND SURVEY PART1- GENERAL 19t.Y1LA I►A /_1'IVA A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Staking a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Submittals, if required, shall be in accordance with Section 0133 00. B. All submittals shall be approved by the City prior to delivery. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS A. Certificates 1. Provide certificate certifying that elevations and locations of improvements are in conformance or non-conformance with requirements of the Contract Documents. a. Certificate must be sealed by a registered professional land surveyor in the State of Texas. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 017123-2 DAP CONSTRUCTION STAKING AND SURVEY Page 2 of 4 B. Field Quality Control Submittals 1. Documentation verifying accuracy of field engineering work. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Construction Staking 1. Construction staking will be performed by the Contractor 2. Coordination a. Contact City's Project Representative at least 2 weeks in advance for scheduling of Construction Staking. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes furnished by City. b. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed or disturbed, by Contractor's neglect, such that the contracted Work cannot take place, then the Contractor will be required to pay the City for new staking with a 25 percent markup. The cost for staking will be deducted from the payment due to the Contractor for the Project. B. Construction Survey 1. Construction Survey will be performed by the Contractor Coordination a. Contractor to verify that control data established in the design survey remains intact. b. Coordinate with the City prior to field investigation to determine which horizontal and vertical control data will be required for construction survey. c. It is the Contractor's responsibility to coordinate Construction Survey such that construction activities are not delayed or negatively impacted. d. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. 1) City shall perform replacements and/or restorations. General a. Construction survey will be performed in order to maintain complete and accurate logs of control and survey work as it progresses for Project Records. b. The Contractor will need to ensure coordination is maintained with the City to perform construction survey to obtain construction features, including but not limited to the following: 1) All Utility Lines a) Rim and flowline elevations and coordinates for each manhole or junction structure 2) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Every 250 linear feet Cavile Place - Hughes House II - Parker Street Improvements CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 7123 - 3 DAP CONSTRUCTION STAKING AND SURVEY Page 3 of 4 (2) Horizontal and vertical points of inflection, curvature, etc. (All Fittings) (3) Cathodic protection test stations (4) Sampling stations (5) Meter boxes/vaults (All sizes) (6) Fire lines (7) Fire hydrants (8) Gate valves (9) Plugs, stubouts, dead-end lines (10) Air Release valves (Manhole rim and vent pipe) (11) Blow off valves (Manhole rim and valve lid) (12) Pressure plane valves (13) Cleaning wyes (14) Casing pipe (each end) b) Storm Sewer (1) Top of pipe elevations and coordinates at the following locations: (a) Every 250 linear feet (b) Horizontal and vertical points of inflection, curvature, etc. c) Sanitary Sewer (1) Top of pipe elevations and coordinates for sanitary sewer lines at the following locations: (a) Every 250 linear feet (b) Horizontal and vertical points of inflection, curvature, etc. (c) Cleanouts c. Construction survey will be performed in order to maintain complete and accurate logs of control and survey work associated with meeting or exceeding the line and grade required by these Specifications. d. The Contractor will need to ensure coordination is maintained with the City to perform construction survey and to verify control data, including but not limited to the following: 1) Established benchmarks and control points provided for the Contractor's use are accurate 2) Benchmarks were used to furnish and maintain all reference lines and grades for tunneling 3) Lines and grades were used to establish the location of the pipe 4) Submit to the City copies of field notes used to establish all lines and grades and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City to verify the guidance system and the line and grade of the carrier pipe on a daily basis. 6) The Contractor remains fully responsible for the accuracy of the work and the correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to City. 9) If the installation does not meet the specified tolerances, immediately notify the City and correct the installation in accordance with the Contract Documents. 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 7123 - 4 DAP CONSTRUCTION STAKING AND SURVEY Page 4 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. It is the Contractor's responsibility to maintain all stakes and control data placed by the City in accordance with this Specification. B. Do not change or relocate stakes or control data without approval from the City. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 1 2 3 PART1- GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 11 12 1.2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 017123-1 DAP CONSTRUCTION STAKING AND SURVEY Page 1 of 7 SECTION 017123 SPECIAL PROJECT PROCEDURES A.Section Includes: 1. Requirements for construction staking and construction survey B.Deviations from this City of Fort Worth Standard Specification 1. See Changes (Highlighted in Yellow). C.Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements PRICE AND PAYMENT PROCEDURES A.Measurement and Payment 1. Construction Staking a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised February 14, 2018 01 71 23 - 2 DAP CONSTRUCTION STAKING AND SURVEY Page 2 of 7 1.3 REFERENCES 2 A.Definitions 3 1. Construction Survey - The survey measurements made prior to or while construction is in 4 progress to control elevation, horizontal position, dimensions and configuration of 5 structures/improvements included in the Project Drawings. 6 2. As -built Survey —The measurements made after the construction of the improvement 7 features are complete to provide position coordinates for the features of a project. 8 3. Construction Staking — The placement of stakes and markings to provide offsets and 9 elevations to cut and fill in order to locate on the ground the designed 10 structures/improvements included in the Project Drawings. Construction staking shall 11 include staking easements and/or right of way if indicated on the plans. 12 4. Survey "Field Checks" — Measurements made after construction staking is completed and 13 before construction work begins to ensure that structures marked on the ground are 14 accurately located per Project Drawings. 15 B.Technical References 16 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) 17 — 01 71 23.16.01— Attachment A_Survey Staking Standards 18 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available on City's 19 Buzzsaw website). 20 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 21 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land 22 Surveying in the State of Texas, Category 5 23 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A.The Contractor's selection of a surveyor must comply with Texas Government Code 2254 26 (qualifications based selection) for this project. 27 1.5 SUBMITTALS 28 A. Submittals, if required, shall be in accordance with Section 01 33 00. 29 B.All submittals shall be received and reviewed by the City prior to delivery of work. 30 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS 31 A.Field Quality Control Submittals 32 1. Documentation verifying accuracy of field engineering work, including coordinate 33 conversions if plans do not indicate grid or ground coordinates. 34 1. Submit "Cut -Sheets" conforming to the standard template provided by the City (refer to 01 35 71 23.16.01— Attachment A — Survey Staking Standards). 36 37 1.7 CLOSEOUT SUBMITTALS 38 B. As -built Redline Drawing Submittal CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised February 14, 2018 01 71 23 - 3 DAP CONSTRUCTION STAKING AND SURVEY Page 3 of 7 1 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of 2 constructed improvements signed and sealed by Registered Professional Land Surveyor 3 (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A — Survey Staking 4 Standards) . 5 2. Contractor shall submit the proposed as -built and completed redline drawing submittal one 6 (1) week prior to scheduling the project final inspection for City review and comment. 7 Revisions, if necessary, shall be made to the as -built redline drawings and resubmitted to 8 the City prior to scheduling the construction final inspection. 9 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 10 1.9 QUALITY ASSURANCE 11 A.Construction Staking 12 1. Construction staking will be performed by the Contractor. 13 2. Coordination 14 a. Contact City and Developer's Project Representative at least one week in advance 15 notifying the City of when Construction Staking is scheduled. 16 b. It is the Contractor's responsibility to coordinate staking such that construction 17 activities are not delayed or negatively impacted. 18 3. General 19 a. Contractor is responsible for preserving and maintaining stakes. If City surveyors or 20 Developer's Project Representative are required to re -stake for any reason, the 21 Contractor will be responsible for costs to perform staking. If in the opinion of the 22 City, a sufficient number of stakes or markings have been lost, destroyed disturbed or 23 omitted that the contracted Work cannot take place then the Contractor will be required 24 to stake or re -stake the deficient areas. 25 B. Construction Survey 26 1. Construction Survey will be performed by the Contractor. 27 2. Coordination 28 a. Contractor to verify that horizontal and vertical control data established in the design 29 survey and required for construction survey is available and in place. 30 3. General 31 a. Construction survey will be performed in order to construct the work shown on the 32 Construction Drawings and specified in the Contract Documents. 33 b. For construction methods other than open cut, the Contractor shall perform 34 construction survey and verify control data including, but not limited to, the following: 35 1) Verification that established benchmarks and control are accurate. 36 2) Use of Benchmarks to furnish and maintain all reference lines and grades for 37 tunneling. 38 3) Use of line and grades to establish the location of the pipe. 39 4) Submit to the City copies of field notes used to establish all lines and grades, if 40 requested, and allow the City to check guidance system setup prior to beginning each 41 tunneling drive. 42 5) Provide access for the City, if requested, to verify the guidance system and the line 43 and grade of the carrier pipe. 44 6) The Contractor remains fully responsible for the accuracy of the work and 45 correction of it, as required. 46 7) Monitor line and grade continuously during construction. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised February 14, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 01 71 23 - 4 DAP CONSTRUCTION STAKING AND SURVEY Page 4 of 7 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as -built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 250 linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) d) Fire hydrants e) Valves (gate, butterfly, etc.) 0 Air Release valves (Manhole rim and vent pipe) g) Blow off valves (Manhole rim and valve lid) h) Pressure plane valves CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised February 14, 2018 01 71 23 - 5 DAP CONSTRUCTION STAKING AND SURVEY Page 5 of 7 1 i)Underground Vaults 2 (1) Rim and flowline elevations and coordinates for each 3 Underground Vault. 4 3) Sanitary Sewer 5 a) Cleanouts 6 (1) Rim and flowline elevations and coordinates for each 7 b) Manholes and Junction Structures 8 (1) Rim and flowline elevations and coordinates for each manhole 9 and junction structure. 10 4) Stormwater — Not Applicable 11 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 12 1.11 FIELD [SITE] CONDITIONS [NOT USED] 13 1.12 WARRANTY 14 PART 2 - PRODUCTS 15 A. A construction survey will produce, but will not be limited to: 16 1. Recovery of relevant control points, points of curvature and points of intersection. 17 2. Establish temporary horizontal and vertical control elevations (benchmarks) sufficiently 18 permanent and located in a manner to be used throughout construction. 19 3. The location of planned facilities, easements and improvements. 20 a. Establishing final line and grade stakes for piers, floors, grade beams, parking areas, 21 utilities, streets, highways, tunnels, and other construction. 22 b. A record of revisions or corrections noted in an orderly manner for reference. 23 c. A drawing, when required by the client, indicating the horizontal and vertical location 24 of facilities, easements and improvements, as built. 25 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all 26 construction staking projects. These cut sheets shall be on the standard city template which 27 can be obtained from the Survey Superintendent (817-392-7925). 28 5. Digital survey files in the following formats shall be acceptable: 29 a. AutoCAD (.dwg) 30 b. ESRI Shapefile (.shp) 31 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use standard 32 templates, if available) 33 6. Survey files shall include vertical and horizontal data tied to original project control and 34 benchmarks, and shall include feature descriptions 35 PART 3 - EXECUTION 36 3.1 INSTALLERS 37 A. Tolerances: CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised February 14, 2018 01 71 23 - 6 DAP CONSTRUCTION STAKING AND SURVEY Page 6 of 7 1 1. The staked location of any improvement or facility should be as accurate as practical and 2 necessary. The degree of precision required is dependent on many factors all of which must 3 remain judgmental. The tolerances listed hereafter are based on generalities and, under 4 certain circumstances, shall yield to specific requirements. The surveyor shall assess any 5 situation by review of the overall plans and through consultation with responsible parties as 6 to the need for specific tolerances. 7 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical 8 tolerance. Horizontal alignment for earthwork and rough cut should not exceed 1.0 ft. 9 tolerance. 10 b. Horizontal alignment on a structure shall be within .0.1 ft tolerance. 11 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and walkways 12 shall be located within the confines of the site boundaries and, occasionally, along a 13 boundary or any other restrictive line. Away from any restrictive line, these facilities 14 should be staked with an accuracy producing no more than 0.05ft. tolerance from their 15 specified locations. 16 d. Underground and overhead utilities, such as sewers, gas, water, telephone and electric 17 lines, shall be located horizontally within their prescribed areas or easements. Within 18 assigned areas, these utilities should be staked with an accuracy producing no more than 19 0.1 ft tolerance from a specified location. 20 e. The accuracy required for the vertical location of utilities varies widely. Many 21 underground utilities require only a minimum cover and a tolerance of 0.1 ft. should be 22 maintained. Underground and overhead utilities on planned profile, but not depending 23 on gravity flow for performance, should not exceed 0.1 ft. tolerance. 24 B.Surveying instruments shall be kept in close adjustment according to manufacturer's 25 specifications or in compliance to standards. The City reserves the right to request a calibration 26 report at any time and recommends regular maintenance schedule be performed by a certified 27 technician every 6 months. 28 1. Field measurements of angles and distances shall be done in such fashion as to satisfy the 29 closures and tolerances expressed in Part 3.1.A. 30 2. Vertical locations shall be established from a pre -established benchmark and checked by 31 closing to a different bench mark on the same datum. 32 3. Construction survey field work shall correspond to the client's plans. Irregularities or 33 conflicts found shall be reported promptly to the City. 34 4. Revisions, corrections and other pertinent data shall be logged for future reference. 35 36 3.2 EXAMINATION [NOT USED] 37 3.3 PREPARATION [NOT USED] 38 3.4 APPLICATION 39 3.5 REPAIR / RESTORATION 40 A. If the Contractor's work damages or destroys one or more of the control monuments/points set 41 by the City or Developer's Project Representative, the monuments shall be adequately referenced 42 for expedient restoration. 43 1. Notify City or Developer's Project Representative if any control data needs to be restored or 44 replaced due to damage caused during construction operations. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised February 14, 2018 01 71 23 - 7 DAP CONSTRUCTION STAKING AND SURVEY Page 7 of 7 1 a. Contractor shall perform replacements and/or restorations. 2 b. The City or Developer's Project Representative may require at any time a survey 3 "Field Check" of any monument or benchmarks that are set be verified by the City 4 surveyors or Developer's Project Representative before further associated work can 5 move forward. 6 3.6 RE -INSTALLATION [NOT USED] 7 3.7 FIELD [OR] SITE QUALITY CONTROL 8 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the City or 9 Developer's Project Representative in accordance with this Specification. This includes 10 easements and right of way, if noted on the plans. l l B. Do not change or relocate stakes or control data without approval from the City. 12 3.8 SYSTEM STARTUP 13 A. Survey Checks 14 1. The City reserves the right to perform a Survey Check at any time deemed necessary. 15 2. Checks by City personnel or P party contracted surveyor are not intended to relieve the 16 contractor of his/her responsibility for accuracy. 17 3.9 ADJUSTING [NOT USED] 18 3.10 CLEANING [NOT USED] 19 3.11 CLOSEOUT ACTIVITIES [NOT USED] 20 3.12 PROTECTION [NOT USED] 21 3.13 MAINTENANCE [NOT USED] 22 3.14 ATTACHMENTS [NOT USED] 23 24 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text"; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised February 14, 2018 SECTION 0174 23 CLEANING PART 1 - GENERAL A. Section Includes: 017423-1 DAP CLEANING Page 1 of 4 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling a Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. b Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. 1.11 FIELD [SITE] CONDITIONS [NOT USED] CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 74 23 - 2 DAP CLEANING Page 2 of 4 1.12 WARRANTY [NOT USED] PART 2-PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents a Compatible with surface being cleaned b New and uncontaminated c For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING 1 General i Prevent accumulation of wastes that create hazardous conditions. ii Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. iii Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. iv Dispose of degradable debris at an approved solid waste disposal site. v Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. vi Handle materials in a controlled manner with as few handlings as possible. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 74 23 - 3 DAP CLEANING Page 3 of 4 vii Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. viii Remove all signs of temporary construction and activities incidental to construction of required permanent Work. ix If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. x Do not burn on -site. 2 Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. 3 Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. i Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 6 Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. iii If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. iv Clean signs, lights, signals, etc. CLOSEOUT ACTIVITIES [NOT USED] b PROTECTION [NOT USED] MAINTENANCE [NOT USED] d ATTACHMENTS [NOT USED] CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 74 23 - 4 DAP CLEANING Page 4 of 4 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 017719-1 DAP CLOSEOUT REQUIREMENTS Pagel of 3 SECTION 017719 CLOSEOUT REQUIREMENTS PART 1 - GENERAL IKI&10 d 10 M %14 1 Section Includes: a The procedure for closing out a contract 2 Deviations from this City of Fort Worth Standard Specification a None. 3 Related Specification Sections include, but are not necessarily limited to: a Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract b Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] f �!� 17u 11►iLyl 1�7�1Y ►`1 01.1 RL11u i7 04U 101►1 Ky 1 Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. 2 Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE 1 Prior to requesting Final Inspection, submit: i Project Record Documents in accordance with Section 0178 39 ii Operation and Maintenance Data, if required, in accordance with Section 0178 23 2 Prior to requesting Final Inspection, perform final cleaning in accordance with Section 0174 23. 3 Final Inspection After final cleaning, provide notice to the City Project Representative that the Work is completed. 1 The City will make an initial Final Inspection with the Contractor present. 2 Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. i Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. ii Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. iii Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts 1 Adequate oil and grease as required for the first lubrication of the equipment 2 Initial fill up of all chemical tanks and fuel tanks 3 Light bulbs 4 Fuses 5 Vault keys 6 Handwheels 7 Other expendable items as required for initial start-up and operation of all equipment 4 Notice of Project Completion 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). 5 Supporting Documentation Coordinate with the City Project Representative to complete the following additional forms: 1 Final Payment Request 2 Statement of Contract Time 3 Affidavit of Payment and Release of Liens 4 Consent of Surety to Final Payment 5 Pipe Report (if required) 6 Contractor's Evaluation of City 7 Performance Evaluation of Contractor 6 Letter of Final Acceptance CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.1 REPAIR / RESTORATION [NOT USED] 3.2 RE -INSTALLATION [NOT USED] 3.3 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 3.4 SYSTEM STARTUP [NOT USED] 3.5 ADJUSTING [NOT USED] 3.6 CLEANING [NOT USED] 3.7 CLOSEOUT ACTIVITIES [NOT USED] 3.8 PROTECTION [NOT USED] 3.9 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 017823-1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: a Product data and related information appropriate for City's maintenance and operation of products furnished under Contract b Such products may include, but are not limited to: i Traffic Controllers ii Irrigation Controllers (to be operated by the City) iii Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification a None. C. Related Specification Sections include, but are not necessarily limited to: a Division 0 —Bidding Requirements, Contract Forms and Conditions of the Contract b Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 3 Prepare data in form of an instructional manual for use by City personnel. 4 Format i Size: 8 1/2 inches x 11 inches ii Paper 1 40 pound minimum, white, for typed pages 2 Holes reinforced with plastic, cloth or metal CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 78 23 -2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 1. Text: Manufacturer's printed data, or neatly typewritten 2. Drawings a Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. B. Provide fly -leaf for each separate product, or each piece of operating equipment. a Provide typed description of product, and major component parts of equipment. b Provide indexed tabs. C. Cover a Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". b List: 1 Title of Project 2 Identity of separate structure as applicable 3 Identity of general subject matter covered in the manual 1 Binders a Commercial quality 3-ring binders with durable and cleanable plastic covers b When multiple binders are used, correlate the data into related consistent groupings. 2 If available, provide an electronic form of the O&M Manual. 1 Manual Content 1. Neatly typewritten table of contents for each volume, arranged in systematic order 1 Contractor, name of responsible principal, address and telephone number 2 A list of each product required to be included, indexed to content of the volume 3 List, with each product: a The name, address and telephone number of the subcontractor or installer b A list of each product required to be included, indexed to content of the volume c Identify area of responsibility of each d Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data 1 Include only those sheets which are pertinent to the specific product. 2 Annotate each sheet to: a Clearly identify specific product or part installed b Clearly identify data applicable to installation c Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: a Relations of component parts of equipment and systems b Control and flow diagrams 1 Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. 2 Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 b. Provide logical sequence of instructions of each procedure. 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: a Proper procedures in event of failure b Instances which might affect validity of warranties or bonds 2 Manual for Materials and Finishes i Submit 5 copies of complete manual in final form. ii Content, for architectural products, applied materials and fmishes: a. Manufacturer's data, giving full information on products a Catalog number, size, composition b Color and texture designations c Information required for reordering special manufactured products b. Instructions for care and maintenance a Manufacturer's recommendation for types of cleaning agents and methods b Cautions against cleaning agents and methods which are detrimental to product c Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products a Applicable standards b Chemical composition c Details of installation b. Instructions for inspection, maintenance and repair 3 Manual for Equipment and Systems i Submit 5 copies of complete manual in final form. ii Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts a Function, normal operating characteristics and limiting conditions b Performance curves, engineering data and tests c Complete nomenclature and commercial number of replaceable parts b. Operating procedures a Start-up, break-in, routine and normal operating instructions b Regulation, control, stopping, shut -down and emergency instructions c Summer and winter operating instructions d Special operating instructions c. Maintenance procedures a Routine operations b Guide to "trouble shooting" c Disassembly, repair and reassembly d Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required 1 Manufacturer's printed operating and maintenance instructions 2 Description of sequence of operation by control manufacturer CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 a Predicted life of parts subject to wear b Items recommended to be stocked as spare parts 1 As installed control diagrams by controls manufacturer 2 Each contractor's coordination drawings 1) As installed color coded piping diagrams a Charts of valve tag numbers, with location and function of each valve b List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage c Other data as required under pertinent Sections of Specifications Content, for each electric and electronic system, as appropriate: a. Description of system and component parts i Function, normal operating characteristics, and limiting conditions ii Performance curves, engineering data and tests iii Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards i Electrical service ii Controls iii Communications a As installed color coded wiring diagrams b Operating procedures i Routine and normal operating instructions ii Sequences required iii Special operating instructions e. Maintenance procedures i Routine operations ii Guide to "trouble shooting" iii Disassembly, repair and reassembly iv Adjustment and checking Manufacturer's printed operating and maintenance instructions List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. CLOSEOUT SUBMITTALS [NOT USED] b MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: a Trained and experienced in maintenance and operation of described products b Skilled as technical writer to the extent required to communicate essential data c Skilled as draftsman competent to prepare required drawings 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 —title of section removed 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 017839-1 DAP PROJECT RECORD DOCUMENTS SECTION 0178 39 PROJECT RECORD DOCUMENTS PART 1- GENERAL L9IMNLJ 10 /_\:7.1 1 Section Includes: Pagel of4 a Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings 1. Water Meter Service Reports 2. Sanitary Sewer Service Reports 3. Large Water Meter Reports 2 Deviations from this City of Fort Worth Standard Specification a None. 3 Related Specification Sections include, but are not necessarily limited to: a Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract b Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1 Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2 Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 78 39 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 3 To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4 Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. A. Storage and Handling Requirements a Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. b In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS 1 Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. 2 Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. ACCESSORIES [NOT USED] b SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 78 39 - 3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". 2 Preservation 1 Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. 2 Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. 3 Maintain the job set at the site of work. 1 Coordination with Construction Survey a At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 2 Making entries on Drawings a Record any deviations from Contract Documents. b Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c Date all entries. d Call attention to the entry by a "cloud" drawn around the area or areas affected. e In the event of overlapping changes, use different colors for the overlapping changes. 3 Conversion of schematic layouts a In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. i Final physical arrangement is determined by the Contractor, subject to the City's approval. ii However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. i Final physical arrangement is determined by the Contractor, subject to the City's approval. ii Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). iii Make all identification sufficiently descriptive that it may be related reliably to the Specifications. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents 1. Transfer of data to Drawings i Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. ii Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. iii Call attention to each entry by drawing a "cloud" around the area or areas affected. CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 iv Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents 1 If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. 2 If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH Cavile Place - Hughes House II - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised April 7, 2014 000010 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Appendix Page 5 of 5 GC-4.02 Subsurface and Physical Conditions GC-4.04 Underground Facilities GC-6.06.13 Minority and Women Owned Business Enterprise Compliance GC-6.09 Permits and Utilities GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH Cavile Place - Hughes House H - Parker Street Sewer Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 105364 Revised March 20, 2020 GC-4.02 Subsurface and Physical Conditions THIS PAGE LEFT INTENTIONALLY BLANK 0LOGZ10890ZO-896d 89i IZ-X Z 121C'd - Z9) 117 LDVYI-N0D N011d11718VH3,Y Y3M3S dNd1INdS v^ w 212nn sa r �a jqo Sp .�C�tistiv�.�N NN�.tiW am�Oin NE-1NNnaN F. � � � Z 2g3W`�m �006nE!UUDD40o��T�gRmr�$U�OOAIm.QQ< Q �W WW3t v3CUY .^.00Ocan$ '��SS�Fn�O ovfnv~ip^i�a �. 14 O a vK 4W0&mi oNm000fN .` �Atagyn2 I` U yaa�aA� m��m�'Nu'i.A �mwm mmm ry��.�M1Anma Yh�t `I^`�"RN�W�`1_v�`acN@ (� ❑Iit nt III IIIIIII III ItI111111111111W LU 0 E` O..NM�ln mnm a�����.nb �9wNN�MrvNNNM�al9 bM+h"nih C��i¢ 2 Whe � 3 n w 0.p V o m t �nnw='a I moil .�^ y Ir 10 Q h r "V 4Lu l CO e ma z nZ��v, yxb ' a J 20 m en a w ° °�- w co Ui r m LZU NI r W `tl m IY A8?J3HD 00 N� 00co o Baee��a e � � ��✓. :z;. ti Lr) Ln V E O 3•0'0 ozo9z;oe9ozo-89sd a9v1z—x z INTd — � � W 2 U ; p C 3 W N x I I I W I I 1 I I I p 0 I T `••J h 3 I � I I � 1 I l O Z w C? w x o c z$ a a a H 3 3 f1' Z?j c a tip Mp -..ice x $mom $� 4' SSG cgs 1�s I � e yy � jn gill ay Rg,zg JR P i5 a � Lag.i _hag b 4p ° �cyp = �� P;42� fly BV-ass�elag, RE NMI Q 2F p GC Y-y lh" W gF It d pol Nag m 1,WIN * MINI P WN pm IR Ai UH J set _ � a� R nLa �fl� i� - C���`. w u�wffiW �� PIP a� � � a�a° ��N c �� 'zY3� 4Cc ��xm €. � P i W 3 ow ffi4 r a a a aka N HIM M I� 11 iki<i!� �11� jsIC� IG Amy HI 968£# '3'0'O OZ09Z10890ZO-B9Sd 85plZ-X Z 1XVd - Z9) 117 10bb1N00 NO11411718D'H3N 83M3S .&VJ.INVS I� Z N O _ � O \� r m ®3 LLJ Z J F wmLLJ 3 o w (ifcn a so 12 La SIM 9 � O ¢N trail, r4a I h,- �i }�i RZ � J� n.m ; ■ lit �h�C fA PC w a �Eli N k e W Rt LT, N i.J G� 'V a A c Ens A i J Z 3S Y1JN.4'S � a f • � � p a �, ��o g'3� Poll ep i n IT Z � �G�r�yy�wiiw Q W p [Vx] v � O R W N z x of q al m N °� n `- w • 0fpl M r - � ° R [,, Fla �1 �a r x N •w tom^ g @ v F y r � z o 4 y : 9 8 0 R a' y N I \ {�I Q col N N L E v m m22== ozogw092A-99d 99PIzx .7kk- J giommoJJ&q£mk £3AYqwVr \ § \ /(/a( 11 U- Lu @ [(of ±� \ § \ ) 2 _ * @«�•.� � let � ■ � � )) � a - - .2 \ ,�} / { '� \ � 2 ! � K 2 | � � g [ ` ) U 2 , ƒ . E - 2 . . � � - § k Ii® n : i i F - �IIP� 11111111001 110i�11�l1 o e©©��aov _ �0®®� ���j - 1Q1 I- POOR 11111111 Raw 16111 f�99911�1a0.1�� 11 ' � 11011 110 I 11F101910���' 1 1911/90011 �,�I�111111��101 �. 01w0 991�1111101 ��1000 911s 11111111W 11 1v •10101111111110991991 � Film �., g1A 1 PROVE- 1.11Q11� lir ;:li � �Gi i 11111� r�� � Milli0 1110111011�1�111 ���9� � 1091091��'� d®�®©'� S 6 _ � 1 009� a-1� N MEMO a •' FBI e z e R c p 9 L �ILI ?lz- 1 1 ""1-- 111 11 I,Lr1, ;, 1 1 I I NJ x m � N F L LL R O LL o S V s � Q ® 0 J �O F _ mO J�J o g Z 3 W Z F p �- ? Z O F N w U>�fnj Q 7LL'—LL. p] �Zu~i U ZO Z U 0 0, ai�OU W Z Y�o�O U a a Wao a a'S o>a UQo<op ULL¢UO L1j UZpm�z O wU O�OU Z = W LL'cnU w s a 11 w J irZ¢wtio x > Q OZU' VWw Uj an 3 i a K tttt CMW zi W W W U' oja _o m QLLQ Hm Qwti O^ mZ ��w• y 0 o o L • o 1j�a O � ao crt 3LU W QO LU Gam~ LL� a 4 i 5 c o � N Q N W � 2Z as o z Nm m m N HH .. .. .-.. •0 . • " - .10Of . .. . IIIIIPIIIilillllll���� ' WIN 10110011019911 �lee�'191�®� � � /= ., 100100111999� 100po-�1� - gO pp�pop0a ° - voe o�0 oo_EE�p. °°° ��°� o peeve° eoves °0000�°ate°° � - 99p0p°°pE� - �EOpp�p� . p ppppppppppp 00000111�e00 l0 ° 0�1°°° pEE� �10000 p0a ess00dl - 99100�1 �'� 10�i� od p@pQg° - E�0 10aaEE . �pEEp°��� �00A0 = 000000 0o00 4 0 p�Epp°°° OpEE°°°I°�� pppp0�pp06� 0 �,,aa0ol0� - °°°°°�91° p°0 pa 9d0 - 0s - °0 �Eppppp��l p°°°°°p° 9I . pppppppp00. 0000Iloilo I° pop°°p� �6 6a°��� ppppEp�O ° pppe - �► � - 0ppp°paa�� ° 111111 Iloilo PIT .1111111 444 to a U N 41 � N N 1 HAH y Na a ,o ru __y LI � tiJ N l �77.� II tlS 4p ii a ,8_ g a Ley _ H99 . CONTRACT Ul (52) — PART 2 X-21458 PS58 75070 A 2.E. *43M CA 0 z � Rl — CD Zm$O + o p �� CD aUT o oGnm� r �g x W D H Cn �l VI SAN RY I I I I I I I � I � a I I N S I 1 g I cR�� Ip I �A 1 A 1 1 �- I G --- I � I C I I I 4 I T I i i l• /�4%y��..✓w.ww M'WX/WWM'WwwJHM't/ww+wwHfk ww xe : s ----------- 4 � NARm P e 2 X-21458 P558-07058 `175 D.O.E 13Vb1N q o� t y 9 ?Z 1 a 0 m 95&97 3 O O OLOSLlO8SOL0—S5Sd BSYIZ—X d III — ZSJ 117 18VU1NOO NO11V11718MM d3M3S A&V1INV5 J s w� 9€g F €£tlr"' fee I o_ N �'" � y A�� s --- L. I...... _ .. ....._._ a -_.. RIX PH PU RE O ww I,_ � o 0 F � ., � ��x����e ra� ..I. ILL a v xx x _ H m I .. ... o� ICJUI J -I-U a "m ly`uvx^. I 01 olT ymz:W. .�wot9 j 1-i'o?Tr- I I w lllY II Cis I "j d� /IIII x lafj y` �- m _ _ ! r I 77 �. wKLLe RIC FliIN ..... I _ -- - I I jq I s" i I �I. m�we "� a — 1-i L - W as< I f Ir II _ o V F'uy II 1 III 11 Ir ; i' 1,1 1 — �•� I OI i I II W .. �. Nil pp ee O N M, 111 11 I114l: 111 I I PAIllITME11 I11111111AW II I fll 'a�iyW Aga IFl^ z�w �W°'S .II, � I :I o 1I I III II �I I 1'� II II AIAAIAIAAIIIIIIAIIIAIIIIIIIAltlANAlANII tlNIIAAlAIAllll Imliiiuo'm' 11IIIII�III�l81YloVIUN®I uYlutllWl IBM Hill I®Id1uIH9tl� 9 IDII pIIINI®Iplllllll®I®AAI®AIIIIM s6grI .0 •a OLOSL10890L0 BSSd 99PIIZ-X T Y1 I I A7 n S 7�n IPJ OdM1NOO NOI VI � Nl(7 m No co 213M3S d1IN /i y N co N � h p� N F � I •¢�¢ M F �d o FCL o 0. 0 LilW o Z¢ 4 a a 0 0 0 I� se9€# -3-a- OZ09ZIORG LO-BSSd SS zgg 1VVd - (ZS) 'Ell illy paSxR t �'� ��rb6pbb 1, P T rIN,y x e■� 71� I, g �I I 2 � I �Fz o> CC y 77.... r p -mow ----> - N ��S//1/M,t fNNN/ N/,�t�H N✓N.YfHH N.41'rYHM - i�SWN I rVr -3- _ -- ------ ----- - ------ - x -� 3 �3�ek i h is I I I I { I I I , I 0 I I -Ei C OL09L1089010-99Sdx 99tIZ-X a 1dVd - (Z9) 117 lOb'211N00 NOI1V11719VH3& 83M39 AdV11NVS iIP 8 yro €- 4 A313 -VA o M W Will Poll, LD "z'€sw g-s .tee m m �s�e a spa _ - J o o ��❑ g g III f i�I 7T 09+9 WIS 3Nn1-1101VW Os+4': "Ib15 3NI H�J.bV itz Lii a cF- 3nY 11�9SIZL am •i .,,:: _ -��� '� III '- m �YI -_ L..Iio ,1, eo IL- n� ---.- I -.J g 9AR �a6 �3� € y'• 4 6 d-Ir II IT II _ I II � g,e� N ;gM$ I® 81 gsa g h II I I ri I.',I _ I 11 I 1 1 1 ® I g111 I Q. NVIIINI Will 9 i oSgaY I!It I. U hmIIIIIIIIIIIHIIIIIII Ill I Iu i1 I 7� h III II ? a _ -- I II 2 - A Igo i IIIIIIIII it 1 o�ail a 'I x I'I UN�4 c� U p' a� It MIJI+ W 1 2 cat_ Y�I aE 2p ryWL` ! 11. S y 4 .IIN11111I r�T I I —J ,• I I I I I � ... 1� ------------� a-<----F---� � 133Ue aoe99 BaalIt 11111111 1 Ill --- f. I '''.I 1 C� o �� ..�..ro. I. II I 1111111111 ---a� !I 1 1. 111111111I - i fI I I ill ti 11111111 Jill lijill I 1 I I x I Ill ill it I I I Io II I I I�. I o O n31= CIA OLO5tl08BOtO-9SSd SSYIZ-X �Rp UUp big �g v I. a N6 n6 0-1 � Z 12IVd - ZfiJ Ill L0VN1NOO NO11V117181AH321 d3M3S A.YVIINVS HH n e w _ a 4 �A a to m •n3O 1/-J r I Li �1 _I =r -*ApU -liL ? g Mg . IV +s,�l �IIIUIIUInIUIIIIR111�U@I�AAIIUU...._ .iu11AINU� N!� f E' _ � �� i IImi111111111 IUIIUININIUIIIIIIUNWIUIIUIIIUWIlUINIUWIII� 11111111 711111fllllllllllll91If11111111I1N '° �° Wllmill�ItlU IIOIOIIiII JS.i113fdIY JI c:IA ;' IYUUWIIUUUIUW1WIWUW9 IIUlIIIIIUiIItlIIItlUIUUIUIIIINNUIIIUUIUWN",an4�imi�mlNi®+dN IIIUIImoulUItlO�UUIWUWIlUIIiUWUIU UmrolfDIIUm UIUIIINIUIIIIIUII@IUUIIIIIWUIUUUItlWU 11111INUINUIUmNIUUItlA IU41UtlUfUUIW11Ul 110.IUUiAIUUIOBU 111F UIUUIIUUIIR''A IUIIIIIUIIIIIUIUIUIIIIIIIIIIIIIIIUIIIillimlUI14 IUII:911UIIIUIIINIIUIIIIUIINIIIIIIiIIUIIINIIIIuIlUG9111UUiIlUItNIIUI;UUIUUIUW I ll1911111111111Hill11111111111H1111111IIIIINIIIIIfUIU lK �NIIIIIIIIUIl7111UIUUIIIINUIUIIIINIIIIIIIUIUUUI�IWIUIIII UINIUIUFINU1NI UUIUUIUIIUUIUININE • ¢��/ � I% IFII'UIIIIIIIIUIIUIIIIUIIIUIIUIfIIUIIIlUUtlIVIeIInW III^II"UII111111NWIIIIIII11111111UIIIItlM1fIIIIItl If�aEiY1WUINIiIHUII1tlIIIIIIIIIIEIIIIIIIiIItlG['llll wIIIIIIIIIIUIIIllpUUIINNIIIIlU111111U1'lINN111UlUNlI'tlllUlll IIIIIIIIUUti6tlIUNIIIiIIIIIIlUlU11111UIIlUIUiIIIIIIUIIII IIIIUIIIUICI(N=IUIUIIIIINIUIIIIIIIIINIIIIIIIIIIIIUiIIIIUtlUII ��SL�'I tlnGL-IllltlllEllllIUIIIWIIIIUIIIIIIIIIIItlUtUlll�l{NtlIWUIU�!IIIIIlIIIIIUIIIIUIUIIIUUIWINIIIIIWIIWUWI UIINIIIUIINUIIIIIII11111111111UUIUhlliilUll IIUIUN911Iii1IU IIUNIUUUIUIUIIIIIUUIIIUiIUIIIUU®I _ / �I �� ltlfi�aNImIINIIIWIUNIIIIIW11111111UNIMIHUII*IUIIII�1fM�631.IUINNIIIIIIIIUIIIUIIIIIIIItlUiHUl11®I 1 IllllltltllllllllltlillNllktlltl11111111UUllllllltllf 3F11iNUINItlutlNN111111 IEl€IIIIINIIUIUIIIIIIIIIIIUIIIIIIIIIIIIIIIIIIUIIIIIn`"u 11111lIlIIIIINfIIUIUlW1f IUIUUPuIN IIUIIIUi IIIUIUU UlaUllltlllllNIIIIINIIAUIUIIUIU1UUNIUIIWI Il�ll➢IIIIIIIIIUIIIItlIIIIiIIIIIIUNIIIUIIEtllllllll 1111fNNINIIIIIII11111111NIIlINIIIUtllaw 0l� � I <IipF�ilNl'IUUIHIIIIIlUIIIIIfIUIIIIUIIItlNtlllblh�lll I>IRfi;IIIII11111U111111UUINfIIIIUIIIIIIIINIUIIIt IUUIIIUIIIIII[UIINtltlfIIIUIIIIIIIIIIIItlNIIIIItl6fIN��IINIIIlU711G�mI�EIUIItlUIIINIUIIIIIIIIIIIIIIINUiIIIIIIWII Il IIIEI U IIIIIIIUIIUIIIIUIIIIIIII111111NIIIIIIItlIUhC1111.z11➢IIUNUaI:_Itllitl 111111 IDUIUI6 911NdIII1lU" YI6'S➢Y31111111MIIIIUIIIIIIIUIUUINIIIIIWIUIII 1GIIkUIIIUIIIIIiiiimiIItltlUIIIIUimiiiiiiI UI UIIUIIIIUIIIUIIINIUWIItlUNII UI fll �� �� � IUIIIIIIIIIfUUIIIUUIIINEUIIIUUINUIIIIUIIUIlUi9h11111 IIUIIIfIIINIIIUIIINlUUIIIUINIIIIIUIMIIUUUIUIIIUIhUUIIIIU111.wilElllUUll9fll[IUIUIIIIUI1UUIIIIINUIIIWI IUUIlNNIIlUUNUllllliUlIIIUUNUI€IIIIIIIUIIItlI[Illitt UUIINiIGINI4�lU1hIlUlUI11NiIIIfUIUIIINNIUiIIUllllllll 9tlIIIlUoil ill1611111UIUIIIUUIMIUIIIIIIIIIIUIIUINNII mllll@lnllllUIUIUIIIIIUIIIIIIIININ Y��tlUlhsU�II{tlh�liiflnu.l�!......l11Ul1UU.. Uil11UININI .................. n M N '0 W 3'0'0 OZOSLl08SOtO-BSSd 8Sk1Z-X Z lIII - (Z3) 117 lOV81N0,O NOIIVI1718VH38 d3M3S A&VIINVE S 28}I tl U EIS q "b6"OiF F) l0 N IO 'i313 -Vj H w tp _q HER p, — g �4 e en x otg I ill III III I' '� d �LLwuz E l IIII III �I:; r Q p k€NWNAN �� I.dJw O a gAffa Ho a3As J i� z h Uik1'. € PIN Wa`A! fi�8 5 I 3 _Ln I " 9H >!��`s�6 � o m �°a �'€a�e��U�=��a� i5�6� � I _ I ... c". LLJ 2' 0 2 _.. o$X<� 4a i ... u~ J 00+5 'V15 3NnHOlb'W ,� � i GO 8 '�fi5 3NI7Hi"W�� I + L5 w � - ,.,� Y=_ I FIFI -! I o � II III II I i = "cbe yo ;III a + � 1= I �� .'.I..... a If F3<n ..PdI■ I ' � � ,Illy ®■L [�III@II@A@ARA�u@I@fA9?@ � @III@IN@u@DAINAIA@u@Ft!II IAlll@II@f@IIIAAAAIA@ANI�i.INAI@ - I@IIIQlllnll®II®InHn@@n�ru m 1111M 9 IIAII@III@Alll@N@A@IIIIIAI•.�1@HIM n@N@@lip NNI^_'I I1NII@I@NN@@NN@11111I in Mill ou@�7it"1@ I@II@I@N@@mm@n@niunlllnV@A@NA@,9s11 - I@AINIinu@NtgBIANN@@N@ANAIN@IunINNI@IANIAh�+u4.�ulnll®INlnn@ I@IIINIIAAINIIIIINAAIAINIlNIIIIIII@IIINII@fllNlll@IIN1lNA�ISi diIIIIUIIlAIN1fIIIlY;1@NAI I@ InIInIIIIIINIInIIIIILIIIIII@INNII�IIAAII@IANANIIIAIIIIuII@h1�S"IIIAINIAIIIAEb•INIINA@ IIIIIIIIIYIIIIIIII IINIIIIIIIIIIIIIIINIIIIIIII@IIIIINIIIIIIIIIIIilllllll}94UlNIIII@Illllk L'IIIIIIIIAIN @ - I@illifillNlNIWWII`_=IIIIIIIIIIIIIIIIIII@11lAlINIINIIINIIIIIIIIIIIIIIEIhVAIlWlllllll"1 J'-'IANllllllnn N@oil IMIANIIIInUalY3aknIlIIINAll11111@IAAIAIIN@111dANIN@IIIIIA4nInllNIN@U4GI@IINIII @A ^+ ` / INlll@IINAd i t IIINAA@I@N@IINiIINII@nlnnuNlnlNl®911 �llNufA@tr iPlINmINII® � INIJNIIINIII'I IIN'+IIIIIIIINNIIIAIINIIIINIIANI@IANI@NINIIIANIId�IIIAIn@�'I le<11€nnlnll@u@■®N@ lIIIIIINIIIIAx IK�IJIUN11111111@II@AnfY71ANYI,IN@Illlllt6ACdIUA@INAti"6��;f1@NINA@G@I�11�i NIIIINII@I' IIn4`.IIUIIIIIfIINNIN@NIIIIiS'al& UII@IIIIIInCJII'N111NININIIS.E; IIIIIlNIININII@N@IINIIIiII INIIIIUIINII fIR InIINIIINIIINAIuIUNIIIIF.ill{,�116111111111:NA'1�IIIINIAINI!1111{IIIIIIIIIIIII@IIIIIIII@IUNIIIIN " � ' '� _ _ - IIIIIIII�iINliuliillhh11111111111111AlIIIIININIe111111ouBllll"IIIAIYhlIIBih'IIIIIIA'YdtlIIIIIIIIIIIIIIIIIIIANIIIIIIIII@IIII1111 " � INIEIN1jj0aIIIIIIYIIINIIIIIIIIIINIINIINNIAIIIAno'�Illlllm" III!_ f111t°tl1''N!;ill@1IN11111111111@IIIINIIIIIIIINNAIIIIII + - - ' ��� IIIIIIIu+mIlNll nIN1 R I l 11 I@ 16y 4r INIIII Ilnminl IIIIIIIIIIIIIIIIIIIIII@IlllllllllllllilN@!..IIII i:.r I nlp n l um i i _��I 6nIIIIIII1N11rIIIIIINnN11iU:?"nNln.�il�'R��'lll@I '!"- I i' fIIII;eUII' 7u@nIIINInIIIUlllllll i� IIIIIIINIINIII@IIIIUTA14!@gmnpllWfl�n�,nnnl Illllllll mnnm 5" IIIC6uUlli 1111111NA@111NIINIIIIN /�• IIII;UYIIIIII@NIIIIIi1nllAns°.,II�'p�I�'} ""_IIII@I'Im"'�'°` " luullll@@IINIIIINIIIIII@NIIIIIAIN i�t IIIIIIIIIiI@1NIIINlNIIINIAIIIIFn r�mldllrniE,±dlFf IIII@Illmiimr�iiiomm�un411AlIIIIIIIAIIINIIIIIIIIIIINIUIIINIIIn = - IIIIIININIIIIiI11NI111111fIIInIIIIII IIIIIINll1@inllUNllllllll@iIIIIINIIIiIII llINIINI I1111AlIIIIIIiI111111AVNlllll@IIIAlNIIIIIA { ' I. •"'.` � IIIIIII]IIIIIIII@IINIII@IIINIIIIIIAIIIIIIIIIINIINNIAIIIININIIIIIIllll11111111iIIIIIINIIIANIIIIIIIIIIIIIu11111111N@NINIIIII@N —��� IIIIIIInIIkIIIIINIUUIIIIIIIIIAIINIIIIIIIINIIlU11111@IIIIIIILIILIIIIIIIIIglllllpllll.......IIII@.IIII IIIIIIiIIIIIIlI111111101111111111H � N 'A3T3 � t0 TOV OL031IO8SOL0-8SSd G!gkIE—X Z 11vV•d — (ZS) 117 131181NOO N011V"11710V'H32I 213M3S ,{MINYS g@ a jag- a In In - ---- co to JOR fix $v $O $� 151I NPE` a I R? tl'UP"* as€8 z- REn 01 Ell H Q C�ZDo O I Ij 8 I jl I I I I \ II I I ji I o �UU qq ¢�«ab f R��V 3a QIt G^ a mi _a-__-__,__� 40 cc 1 J � 1 oN 1pg a, e'a e . 2 SIM, 3 cc gi illll101111 ill I11Id€11111111H JI�III�IIIIIIII5 jIIIflIIINllllllll lllllll�ll�lll]II 11111111111111�JII dl(If��lulll�l illllHillllllnfl Hill 1Hu Jl101111tllllllll IIINItl111�011111 luumululuml mllllllmulalll IPIIIIIIIIIIJIIIIII ulluulullullil U-IiII �III�III it I i -- -- —. �r n ,n m NEI ro a am o� gym-. m�cE LL -j A ELEV. q.O SANITAW SEWER REHABILITA a CO, RVIRM tit OF 0�0 H191 i a NONA- zn R.=Y logo II o r5g jjMNS'! IN lot 4Ph ZA 13 � C.9LOWAV-pII - Ul it yq 1151 ji. pll. 1 ?A c 2 X-2 I T58 P558-070580 75 70 D.O.E. #389 i 3Q05 r AFB.Bs rm L erB Be A- 2001`C0AVE r}00mmoacn` n ]era �1 1 "LAPPLY TA +13 151I• wsnwr DROP SSW ONNECT DOW.. s• ss (B£57)CLUDE GUNC. COLLAR+ INIMOR PR07EC77Ws A MAm. W li ® N• - F Sz�< •. R.QE �}S9 1 I � ]q Wn[R t♦ \ �f 62A4 3W1 COLW8L4 ANE ; 18R R a ]AJW � ABOWABLE 13 (L- 21) FLF!a I � \ SEE AxAMOVAWNr I �r a Btmr S Zone COLUUWBIISA AVE. Al c I d®NIW6 AYE. J LOT. tm % YFJO`BCWaLiuV a AVE I .. to�tnDl��L� OLUMBtR 4�Ar4E. II d *�C�" :s\rae`rBWFcnaLmUwB,CIm�uu�s x20�1]N`1MwW 20l] pis AAa-sM wwamu[tBuURs]v �AV4E a I Al\ ]�0u'9.E94yu1,1 e'!>5m•J�ALE. �z�opY[b1i`l� C��cO0.i]Uui0Nv. nuB, U'5isa�� My�` I I I 1Jj ol L -�,I } O 4 -2 C%UMM AYE. - - - - ev_ - - FERMANENT ASPHAL I - - k � S V _ _ SU N17.79 r� TRVCT L-1514' PABPrFIJT RFPAdr OpYG CIM'd h Q/T/ER e• w - — J O O f FWSIAYC I R REP ACE I �p �d I Ili RG ) LaCA nws) r CURSTRUCT 570. 4 D A SSW UNIT 2 se• RCP rrerae m �sr Gavc anl,YwArl / lNCL Cara COLLAR coxsmucmw F d2ar J]144P 8' SAM. SEWFRIF'°" ( neon iinr mci O rr✓:If 1--lf.ir1I.II11I1,�;II,I �w� :a 1����auT.Yr✓r)r © � f8 SF COAxC. dd'IEM%Y I 7 7" IREMOVE d: R&VACE I I' 1 417 SF rPtAlft ORINiYA _ I' COtiVC. SN1Elvntx L. R.O.E y91 6Tt. ferT c2c45., I ` Y Szo sF Asrx. oWMrwAr I _ 4lIdY smaWc AT 11� <LaCAnays)� ♦ ,J� I I SPECIAL NOTE p (1T/TRNCELOCA80Ns 3 •'YsAarrA a msran.n:sEw[nsw'ML* t flCAL S COCrIIILWs) CrI \ sfB CLEAN OUTS AT + r I ^aE mpmarw tc Lr n Ll Q -I I YAKS .:• ' I k \ (rnvc& 9 LxARONs) tar ] oCA �♦ S W Us � � I ' � TG�c I R.0.E /M � � 4 i ; I �sp SPECIAL NOTE: RA.E 09 snJYxfs cw PRrvA1E a raJ w>rB e.�'°"" n "` R cRUL4u"p` a� II \. R.aE /A \ vIII ; fY[ TO BE w�iBuiba� Tama ae m m�s�+�u"'1L u1 IT'S' ] p _ �I 1 I < \ Iy t¢Exse atwem wms wufcr ` �w' 's R.0.E RTS - I 1 •el I Fjt sn \ .4 , s' ISM 4' 1 Sty I I N TABLE OP BENCHMARKS 2010UNBUS AYE. .er s, aver r♦ "'"� ,. °t0a t• tar a woar r. fora .oer t♦ L ♦ I BM /45 80N OWCUT AV THE Ttw Or" RiE CURB AT LIE a - 2 CMBus A- O QUMBVS AYE. 2-COLUMBUE AK. Y024 COLVMBUs AVE. 1321 NW 21ST ST. F 8Y Vy B�,R ES1FA'' I AW Bfv[ro Tm t'atxwM+ UBRn4. auao4tw[ J SW RI EH8 wT R nY or 20 AT THE I Wn uFRm rx nIT.oes I °M"� m rc mim ropr wm, 141 rerBe` r'� I J20iuOi'1W.nn vB 1 sWINEAtT RrffR8EC11pN' GF P87x AMD R01IAN. 1i xTVeLRMBI%"161a06 I TM7 wg9nl 1M ]Ir19 Fld. 621A2' I I I - RM N cur xl i RTE ......_.. ...■.. ■■■LrP1. • ,Tr, I�IIIIIIL.. 11 _� ■■1ia .� .�.......... ... ..�.MIN ■ ■_•■■■■■■■■■■ ■■■ ■■1■I IN I ■rige- ME ■■■■■■■■ m■■ ■■■■■nn ■■ ■■�I■■ I No E■a(ilirfr_� ME M ■■■■■■■111 wil ■■■■■■i■■■■■■■r ■■■■■■■ ■�■��■■�■INFIR ■�■■■■■ ■■■■■■■■■■■■_■ ■■■■' ■ ■■ ■■I�In� ■E.'■tif■■■��■o■ ■■■■■■ ■■■■■■■ ■■■■■n■ ■■■ ■ MEMO ommi ■OE■ ■ t'1■■ ■ _■�E!■■ ■_mil■M EMra■■ tG r■EM■■ ■■■MEMO■ EM■■�■■ ■III!I���_!¢! ■ ■■■■■■■■■■■■_■ ■ ■ ■■■ ■■■�■OEM■�■■Oi' R 7■����__����.rrB���.��, ■MEMO■ ■■■■■ ■■■■� ■ ■ I ■ 9 - Y 9 ■ ■■ i�MA 111p11N1 . ,a�Lu .. ■w!o■ �r�wvp rmr��9.��■■�■■■�����■n■■OEM■■■■�■■O■-, r� B�wrr `rdd��ri�■OEM■■■iJ �T�l= ■, ■■��■■■�■■■M■■■�■■ ■■■■1�l� 9 I.EC.EMI�.YIM■■_ �T 1N1111ll I ■ ■ :■.�I IIIMIIIIIII ■■■■ ■_EM��■■ ■�■■■�■■■■■■■■■■SFFaMM■ ■M■■1 O ■■■ ■ ■ ■■■ ■■■■■■■OEM■■ ■!l�k7\■■ ■■M■■■ ��■■■■■■■■ ■■IT■■■■::i■■O■■■■■�■MMt1■SleGi snow!O■ ■■OEM _�■■■■■M■■ ■�■■■■■■■■■O■■■■■■■■ ■■�■■sGtf ....._.M... .■■_ .........�._ ......................�._I ��,...........Illlil IIIII IIIII II. �Illl�llll�l�lllll�llllllllllllllll.n,l WMllMEMINUUM lllllll III I�IIIIM MOEN IIIiII I IIII�II'IIII�IIII IIIIIIC'f■IIIIIIIIIII■.■■■.■.M■ NO. 5+00 6+00 AOBEB SEWER M-CE FA I-VAMIN I ML 4/20J31 AND WORT( ON PWIYAIE PROPERTY ROLE - FORT WORT SCALE 1` 20' I 1• 4- DATE RMASION I BY BATEI APR 2013 7+00 8+00 TEAGUE NAU AND PERKINS fiu0 MeaOn SfTBBf r�C FOTI WOIr A, Tesee 161O2 APh0007(HI7)339-57734F,,'(BT7)336 -1818 WE RePf..ff0n N. FL230 WWW.In9-a n 10n e. c9m 9+00 o ' rf r1 PE a AL H CITY OF FORT WORTH, TEXAS FTW0223a CONTRACT VI (52) - PART 2 SHEET CC SEWER REHABILITATION 20 PLAN AND PROFILE: L-1514e 2 STA. 4+75 TO STA. 9+4•1.17.79 36 y i68f'f 3'0"O OLOSL1089OL0-89Sd BSYId—X Z e ME Oe�c�sa�€���m 6 N gig, Y €� a 90.i 813M t LO $Ws-4A 3_� a b i I vl i o JI iy a, q N Ug O f� UNU�� b a �yWzu n ' l I 121Vd — (z5) 117 1OV211N00 NO11V11119VH3N X3M3S AMVIINVS Ln ICE) 'A313 -1/J r� �N I . + In _I III o g O O _L I - --_ J II I ,III I -1 -f I 1 ft Ll I I II !_IL I i .IIIJI I II -- i t I Ti a 968£# 3.0.0 OLOSLIOBSOLO—BSSd 8SYlZ—X 0 1Ndd — ZS) //7 IOdN1NOO NO/1D1/7/&dH3?/ 83M3S ANdl/NDS = Y�� w 04 � a�EMU 0iAj —1. 8 Q�g x of C) �[ W COCD al a N N14 9ZPIS 3 a n. - r iiki Ir iq �¢ � egg' $ �•• �"' ..,. � -..,, Q mm ;gg� a �1 � 'hOry ado+ ; o o ; g t�N g w ;4 t: i @ N el Zp C1 e L.L affi W-9 AIM I..L I �xRe 0 w Fa.� Pad Pm� Puy Phi P z 969f# '3'0'O OLO9LI0890L0-ACS`l ACb[7-X 7 INV.J - (7.C) ll"! MVH/AIn7 Alf)/lWll710Vu7L vv.uvc ¢Lwuuyc N m$ p� O N x O o a F W �m� MONN �0 t5 Q a a O ,•] eZ4 ~iGk� gsxy i, � o >km��z mgh L a d €CNN ��H � �li aW� a J `""wnc arcs L`,.�. i ""'�l-'�a'� � ¢•,' "�lii�:� - m m ""� •��e a W `d .ncatnrz Q e� eo n eww"..w �4Q'Iw mAMu w � Oe®3 fAr b ,. a .- W s E-- �i O K I 968£# '3'0'(7 OLOSL108SOL0—BSSd 89Y1Z—N Z 1MVd — (er) !77 iJVY.LNO0 N011V11718VH3d dJM3S AYV11NVS w = d ye �a N q . E G / �Q a zz [� Q y WWry O F� oQ $ R 70 7 „Q'iti a 2 v °U. 3:zm AMA Moo h oN � �L d : gg ry O aye u Mill rl V ' SOP 7 V c a - ° •ls a o a W µ1 � 4 - • aZ7 s a s ° s lIxji „ aso+6 Qa+s W O s'pa U� • g 9 ^ m 0 2 Z-7Nn I I on ^ff o S 1 `n 9 S 4 d YO'O OLOSGl09SOL0—.99I-sd 8S61Z—X Z 1NVd — ZS) 117 1,OV.'INOO MOI1V1I7I9VH3& 83M3S A.YV11MVS 9 4. e€ n- Ppji F arc, A N h I! w iy '6 c0 �wg a��k'�f E€S �w Rm 'a�ay GD W 'A3'?3 vj N IM YS� �s€k$"b`g8a Z ib O I _ Ili g NJ A1111110111111 111111milifli Ld s A U W z I I Ic, j i I II WE IIIIIIWIIINIIamIaIIlmNNmINllllNllllh- maNlIDlmNllmlfmlmloil mal 1111011111i m+h3111mr'! IN' 116IINJ8!"f�AamamaNlllNlllllll.amNNl am mumlmdaaumimaam.uaaalum!alllllllolllmin,Ilnmmaonlmumuiaaam'laumllmam �filN tlIIIIIIIIUIIaalliNllllNllNllllllamllllllllNla;!nlllaaWlllNl i4mmNllllllflialallllll IIIlI I m�:all I IIIII IlalllmalllliNP aNl IIIIIINIaIIflJfllllllllllllNlllNlNlllalll[IImI'IIlllaalllllllCdll!IINIIIIIIIaINPIIIIIIIIIaIII mFNll 111111aNllllllllllW114 NNlJlllaallillllllllllllllllllNlllNlNllalllllIII°:,Nllllf I1IafIlJiA➢IIIIIIIILJIN111111111aNIIm6iIIIINIIIIlIIIIIINNINIIIa aAI INIIIIIIIillllllNlllalllll€IlllNltlllllllfllll!:1111111a1lalllllliladlllllllllll!aIIIINIIlllN9lill mE�JI INNIIIIIIIIIIINIIIHNE ROf1111Nlllllllla�flll�F N�Ia �I��lE�4 lil t�iiiii!yi�i MINIM lllllIIiHIIIIIINIIIlIIYnPialNIaIIIIIa JI mllNNlllNlNllltlm amfulmllrllaml,rva;�.�amummi�ulaa Namry1'r�llmrmlmNllmmll.lall a��1 aallau.ammu mlNllamu I� �J mmuu111aJf.All1a aamou m I11JNNmm!Namilmalull uaml Ia mmNlma. luunlluola,airYsc:amNNaliu!a*;uuliml4nY.aulugmlmllaummmllllaaAalumliammum. IlmJlllllNllll14�1 Fli �IIIIIa111111L lllllllalllfe'INlill'mHIIIIIIIII1NNIIIINIIImI Nf"11 MINIM Ilm'IIIIIIII i I d IIN°I>R IIIIaNNIaa.aINIIIIPIIIIIJialV IIIIIIli91NI,HIIIIININIIINIIImI NI.1AI NS IIaP,llllllli I' fl'4I, aIIIIIINIIIIII IIIINIIaVIIalIIII?!111111A9'eIP416'IPIIm9llnraa°Il,!fm... IIAIiIIIIIIIAd"I ilr2FAAia1➢111111111111! IIINIIIIIIIINiIIIllaIilllIIINIAJ[ rer�l N191i>a Oal'aIiNlNll IfJ Elw� mNNlmll illlllllll➢,AlllmlaalllCllllf4aIIIIIfINllllaNlNaaaldlNm� NaIIIIAIIIIINIIlnniNNlwilnnmonll !!'�n�nmllm : _ .._'et - � , aalml.laN..ml..am�lll� mNmNmAaW�.ma.laNlNi ra'la ' amOil 1pa .mNlNll� `I arll.ma■�0�m .ai■ms�ls. afn� aail ea 110 m aml . .Id■..■■ ■.munoA�. Hial.m 11111 I .mama, — OEM Q yi{�6G�mN�lmaahim`�momoommnmomouw�mmnlwN-T� .I.. MRIaIP9mIA9a14Ab �ma.ma..mu.l all 11121 (l' ®I Ate:. - I OEM 1101 V MINIM uiunaiuNmu..i�. maufNumamllumum aaanommaumomaNfamumiuml�mualllaalllullummllmlmiuou mama allllllllllll111111BIIIIImINIalNlllmllall��'lllNllml[tiimllialllNWmlaallaa IIII IINmaIIINIIII1�IBlmlllNl�llllllNll!S�IIallllll�`i�H mllNNlaalaaNa mlllll'mllmanBl.aIIIC;. >W&W low A09Z 0$9OZO-99Sd SSvIZ—X Z _Wd — (79) 17 1072I1N00 SO114"IOUVH321 N3M3S .IXG'IINVS r ��� � � NLO 14 fG g�g 'sW ini M peg PIS m g III II II 1 m aQ It ��� a�� F1�u�IY3$ r'i's �_ �I she � m of ' h��§aIT U.m $ IN' X<V! I . II �, i '� � o� �.I � 4. W s ua °z SII,I II III 'I'I — d it > zQ 1� II I I h l II lil III NM.*� r a I I ,III II I PIII I� ll I l a TIat- N'M a Ell u by7 1 Imo- W 4 o& W �}�x�d a w tim 2 6 In R oil Sdb! E:3 1" k ��Y> x� x 4 8"h�SaW��g py�W II �I � $4waW=s >d'3€•+ � — — N s I I 4s � m I{ sk'��>AI;'N 01 1 to N �S If 'Y_LS 3NnH3l'dW gq+� ON 011m*.E--'1CI-Irlmla mQ3m'"�.A®AI® L ® r=i HImRRIumlonwrnr�aasAlh ..� w�auwlgrma®u nnau.i4:Ii�euslllA110CYERil° IIIAIRGIRRIIIIRIARIIRIIIINRIIIIRAiIAI�I YIYIYYEA1n14y� Inn - per'°INIIOfar°N RIMRNIYlAYBRYIA�IDUI�IlOI YIUA® M®umuourR Y®�®IiBerl�an ItiIY��YYIIRAIhIII�Yo�I�Yf±lt �NIIrHIAAYI1NArGIIIOIrIIIW Iltl11PIlUR9In?RtllrJ AII� M� W�IIIYY GINY��g®®� AURI®■ ®®®®® la �A6,QNINNNIAIHIIItYIInIRA II IQNN9NIHAAIlldll'IIN1 11 r 1111R1RI HAIRHN11 tlIIRIYIYYIYRRIRYIIBYIA m RYI®AIY YI HVNM1111fIRIIIIIitl1IIIIllA I iIIIAAINNI iI IIIIIINNIR IIII ''IIIQIIIMIIIGIANIIfIIIRIIIIIIIIIAIlIQIINiQ1NllGllIlIlllIlQllIlIlI'IMNIIII'IIRINIIIHIIIIIININN]IIIIIIIIIIIIIIIIIIAGfIRIIQfIIIGIII1 E IHINIRHI RNE A111R9RHIRARIIRIIQNIIIpRfNRA�RIf�IANEIrIR111G111�@IIAIN-� qR `AAIIIIAAFlIIIIIIAIEiI1IR@'1V11V1l1MINE I I 711111RIlIRI = GIliQ;IFIIHrI - 0 OIIIGRHGIIIIIIIHI111Q{IRINHIIIIINII11111RIIIII1IIAlI111A1QHIIR;IIIIIIIIIHQIIIifNIIIIIG II IQIIIINIIIIIIIIIIIIIIIIRIIIINIII@INIIIIIIIIINIIIGIfIIHIIlA111111N1 IIIIRIIAIIRIIIIIAIIIIUIRAlII111RIIIIQIIERIIIINIAIINIHIAR11111NA OIIIYII ullluu�ulu YRIGAIARIIYAAWNIANW®IARIItlIIQIIIlARIHlIIq'E+N10IIIAIIILQQIAAiAlII11111MRAIAINQAI6AN YIAARIIAIIRIAII®IIAIARIAIAQIARIRIYANIIV iIIRIHVIIIIIAdIIANGIQfI6GIY111NlAIRGEQHuI'M iN11111111illUVIIIIIIIIIIIIIU"IIRIIINIIIENI11YH111NiQ NlIIWIGIIIVIAIIRIIIG]AQIY IIINIIN11111111VNHRIIIIIIlII{G IINIIRIIIIIII1111GIIIR tlIIN11RAAAlAA1AGIQIAAAIQ11111tAlUlAA9(m11RAlYN GIIINIAYAINIggfIIII IIIIIIIAIllQRlIAUINHIMI1111111111R 1111,11111QHI1ImallN111Him JIQQ111111PIIIlI11111111IGIAl181HI111111GII1HIIlPIHII 111111M 11110lml11GAlIIQIQII HIANIgANIGIQAIIIIIkRIIIIIIIHINHIRIIAIIAAIHHIIIIIIRAIIIIIN�YEIIRINQAI,IIAIIIVIIIAI'IIII�IIIIIRRIQIQIIIQiIIIRI — - IIIgIIIRRNAl11AIRIIRIAlI111RIQNWIIIAYIUIRAIIGIIIAIIURH III II1111RIIHIIII 10111111111111111 iNGIIIII1111 iU91111111fIVIIIM1Gtl11111Af1lNIRIIIIEIIIGIIIHIIIIHIIII I111111 milli iIIIIIRIIINEI11 jilNal AI' YIIIIHHIIGIIIIIIIiIII{IiGI;IQIIWIIIIHfill1EIIIli1HRIIlYIQII1HIlAlIIIIQIIEIIIIII11 IIII' 1RilIIHININIYgfIAll'IAWIIIIIII111HIIIIIIIIIIVIQHIY1111AHfAH1fUHA1 9 YYIB81111AIA1�IINgINIIIYIVIIAIIIIYIlY1111111Y IINIIAAINH1NIgWA Y •= .IIRIIIIIRIIIII .Q[umoNIRIuolAvuuA AINRIRIY IRIIIIIIoi I AAfAQINII 'NIIIIRIIIRIHIAIIIIIIIRIPRRQm® I HEM III@IRIAIRAIRAE ARIMEEN IRI IIRRIRIRRRRIR IIIHIIIIIIIIQIIIIIIIIIIIIIIQlIIAIGINIIIII1I111111111AlNIIN1411111111gNRdIIIIIHIIIIIN9R MRIRIRRINIIRAYRIYI.;IfQIQIIIIAIIRIHIIIIIAIII IGfIAIIARI IINIHfIIGP II IBIIIRRRIIrR Iill1,1 lP!III lIllIGl11111N11111111I1MIIIIIInI 119 lII IE,JR;IIIIIIImulciim IIIIYIIRIIHOIAiII IIAINIQIRIIIGIIINfH I = hi�IIIIIIIiIIINfIIIIIIIIII11111IIIRIIIIIIIIINIRII i'P111111fIIIIIM,'HIIIIIIAIYIV IfINIHIIIIIhI1111GPIA IIIGIIIIIIl11GIQIIIRH pulIIW1�111hIMIMIU1u1u�Mlrru111101n1YNMfilnmwmll iMIENnni�u�' 4in ioiiim� iinniiinl31 N 'A3_3 v3 � +a F o m m FA ELEV. IN 9W y� i 89 :s■3� S @ 4£� g m 2 X-214s8 PS58— 70 750 D. OLOSLIOSSOLO—BSSd SBi lZ—X Z 121G'd — (ZS) 117 1OVYINOO NO1ld11718VHjY 831111 A8VIlNVE In CA Mal c gt� co s� <cy��=erg -- —I 1iII N &9>atl go cn 5°¢h g°gh.$ ® €S - y` ICI EEL o L,J =J oLLJ LLJ¢la— � IJ ! ctaa�+ J' 1 mn d w o':sI �7 I 1'10 vo[: l co cs I I I 1 I, u sod Nil 1 0 I g1 €_-- II if' i1 q I'.I ._ -7 I 7 IIIo Z Emu W Is I a I — VI �= C tit,k acre-, st.awhvv.�a�wMNth Y ��, _:_ IHEN- 9 f II" ,. V y n / 9 8 R I I I I I GJ.�- I....I W° `p 3 611 IIII IIII_I III ^om, I I 1 1 :'I1; 111111hill 1111111 Arm M11,111 111111lilil I lwr4qN e 111111111111111111111 1111119 IIJ111 U III I I iiiic ..,I II;,, n ' ° © FdclJ3rorxs Huvn KIM _ "I 1 I 11111I I iAliiiii ' I Y I _ pl II i 41 I'l i1'ilrl ch II J � ----- N ; W• al I. li ? 9mm '' I rl III �'I 111 11111111111111111111W � 4 E— ne$5 II rn In ul s+zti "'Ile � I I IN I . -- --- — � _ I Y mill 1 I I I m li y° LIM '25 n rn M Cd +D (O 968£'# 3'0'O OZOSLl08&OLOI—aSS BSkIZ—X SSZ 1dVdddd— d(.7. )!l7 1OVYIN0O HOUV11718MMf gE{N3.g$oAS3Sgygg(,YV.LINVS ui$ SkRf 73sy5°pn cm 3 g _ ip 12 is "---— -- �I ae � ao �iw n ax s4a: m � � o UMI gi ga W w ---- -- -- €t€.aV---- eq.�t 94 ZH xx I o � GG x a ��R I Y I': �� `Sf �❑ & �" � m W I X III � I a d'p 1LEs 'ii F"s g6&E Soo $^ s aii pa 1 ' s sez tie° pt x 5S $ 4`s;s sa%€-o :g =K §s � e$5 ab5 aF $'bgc ine 'fiLg': =5 ism 5 •'a 'su C �g. - ve 5e ��. 6fin8 ^59 F`es �� ���� a a ` K° aa�Y yy �E s^36g 5�g=3'Fyg ' a� os SSA a`-£e'g s 3s s.2 s3 H4 PI 5a"e Jss ;M A161 s Np a j' ill H, ngob.-�°J � s �S 6 §ey 5 it€S e� E°y -�e5 , ".,®e s e3 5 a E s" s aE !-a r, �3 3 d 8�-e°l mg g EC 5 59 i iT Fay ry �s� 1 ¢xE 's"� s5 eI 3 b E—+ IC4 w OLOSLIOSSOLO-B.SSd S9_Y1Z-X Z 1Xhd - (ZS) !17 1O 211N00 N01114 7'11711 a g Emu - NO o 0 4� € Q � i� :M m m g,$g »� g ka a s IK hSig 9456 �� �g 1 2 IBA€��JNQI -I II J �- UNI k�, o il Iaw Aa«' R son M, C¢a g R3 — } 4� -lid gg33F k 5 `erg - —.._ @E 3 Slm F �tYt dg b� I_ °U �I Hit' Ills N1.1 l Z W Was I q ucei • `g hy�2�mz� �I I li s K... Co N o j E I n 1 I lags I �•I.rAt�-rvl sso+- • (�rnva ♦xu,cv iE' pa) a A£ lb®'SBA41pP er— ski - ._.' X Rig cue r U 7� J M35 .t21D"1lN7'S M M L O N � � O � W O O sza¢ a o •n3 VA ` s 9691'11 -3'0'0 OLDSt10890L0-9SSd BSk1Z—X Z Ladd — (ZS) I17 1011 1NOO NOIlh'11718VN3& d3li (dIlINNS sit 6 Of Of amm LLA EL ILi LI og[Kou7 — > L 1 --- - — I_ I_ _ 1 Narircf m —�_ 1 .. 1 _ II, mn- ' $ R a I� 9gpH 6 li 111 11 1 '� 0 01� 1 g� 4 11 II 1. _w ._ I'.i li�2 �� I� �. 1 ��" ��: j �j___ o$$ narsz ass sIY} - F II.'. Ilitl».� Tr Q a '•�—ca����— - - rr F'�7 ✓' ' t Ff9, + _ I I g 11 III A' ro I r- •� I y _ � I 1'�, III � w W pF •166Z-I S6 _ N ;, "`.v,ce.�e x5 ssvvaHry wx H,w�rH; N--- _7 I61 4 ma_E L >a � w � - a _ SS 4 a°m'3 o �Irko -- +co V Ny I I I 4 �I 2 N I 'III lulr.l INIIIIII (arvure ir�x�al �8 L -- jIlit "flio MOLT !%73N�Jh9 1 it I a �N� N�Nltla. c I 114 II IIII II' g � { S b L 1 I I Lli,: IIIIII !II � a - im ��^I In ul { i 4z w ��,r m � /AAR77#filiJT,'1AfT I I ' FA�/I 1. YC u W 1 a iI • "w+e rI +cI � 09+2 •V1S 3NnHOiVN { L OLO9L1089OL0-85'Sd BSgIZ—X Z I.YVd — (ZB) 1/7 1DYY1N0;7 N011b'11719VH38 83M3S (Mt/11NdS IV A $����`� a § gNa ll h�5 €azbaa sy Sn¢a rc OR, of AU 6 1 1 §s3�€ayn£4a t.I .III i' J N� or It a' N "4au �m��all —I _.---- 3 a e pb as NZ "g I�' �s L I < g UU y ,u «� a �negg� a e - _ — Q vQ � p w 6 i \ amp F �S=�z �g YW yi L S= Q Rya s�I §ax3g3 ssYga IT; i o ` o y... l'T -_ -...1 N� I I --- o o z ■®■■■■�■■gtl�4iril ■■ ■ ■■■ I ■4°9""I'II'�"D�uPRY,7u''� - ' � o■■YM■Mlltf ■ = •� � r �9■■MIIImMIIM�■■ I ■1 ■1RI■UIIIIIUIIIIUMIIIRtl■■■I�M] I` 111UIMIUMImIIM RMIIIMIIIUIUIIUMmFl`161111111111UUIIIIIIIUIIIIIIIIIIIIIIUIRmM11tltlM1 II IIRIIIIIIIMMI IRYIIIIII■Mu IIMIUMmuMUMIUMIMIIUIWImIMYIM -'� _ `, - � � , UIIIIIM unRll■ ■tlWIMI■I■ lu�lll 'ph cm 9mWll� ■ 9 CIII® 7RkWll mIlUUIRU■ImfUmMlUmUmmIIIMIIIIIi�i�91UUIHIIIUMImRI®� IM N� i IIIU IlIIMUUIIIIIUI■IMUMumIRIIIIIUIIUItliL:� �IIIIIIIIIIM691 IImdWIRRNIIIIImilliIIIIUUIUUWWII IIU@IIIIIIIIUWUIIlR'111f UlIII mU@p11R n� IULIIIIIRHNIRNmumumlMumIMIIIIIIIUIIIIImIRlIIIIIU11111111UUf-11;1g1- MBIUIIIRRUIUIIIIlfIMUNI lmllmllllllllmilluln IIIIIIfllllllllllllliilFl, m IUIIIIIIIIgtli1111111UUINIUUIIIUIMIIUIIIUUUIUIIIUMIIIIUMU!IIIIIIUIII�: flilall - Elm IMII111MAIU11111UNINMmUNMIIIRIIUIIUIIIIM111umNIIRIIIRIIIINIIfP!'U th mR I■■■■■MYmMM Wlllp MR■■e41� I � � Yf1k�■um MGl�imlll{ul ■Mtl■ IIP+CiIRIIIUIR IM■■ma■■■mlllUUYm ■ Mull°�MIIIIR■mIRI111RmIIMIWRmIm11M11UIIluluulmRMllaNWRU1RUmIMmr's� RIoIEuIIM IIIIIII■IIIIIm1111111111111WIIIHIIIIIIIUIIIYIIW'IIN9111MIIHillUIIII NIIIMIINm IMIf' WUlRIWIIIIIIIIMUYIIWIYUu{WRW■$PUIIINil RUMUIIM I IINII �mlI�IIlIItl1110911uIINlr11R■IRR611,Y�!II�II��IINll�lll�lllllf lim Im INYIIIRMII■■IIIIIIIUIIIUIUIIIMIIRIIIIIURIIIIIINIImNUI IIIIIMEUMmuINIIIUYIIIII IIIUII@FlUulllllll M1111111511NIN11111RMlY1RRRltill Illialy! !m1mumul1WIIIlullm �` IIIII!IIIIIIRIIIIIIIMmY■■■■IIUINMIIIIIIIu11UUYIIIIIIIIIIIIIlUR111UImI1WU1: o11UIIIIIIIIIUlllIIIIIIUIIIIII IIIR111111111RIIIIIIRIIIIIUinlimE IUNll1111111111111111UIUUIMIIIIfIIIUIIIIIriIIIIIIUIIIU{'11111111111111RIUIR111CIIIIIRUIu IMI111111161kuuIRNIIIURIIIIIIIIIIIIIIIIIIIIINIIIR@IIRIRMIINNIIIM{RIIIIIIIIIIIIIIIUIIIkIY�II'IIIIIIIWIIIIIIIRIIIIIIIMIIIR �r Iloillilill@{lliliiiil1llm1V1III! 11111111111111U111ullIYIIIIIIIIIIIIIIIkI�Q�111FlN m� a1i119111fIIIIIG11 illllVllllllll llilllll I'lull IUYIIIIIIIIIIIlUIM11111111111111UIIIIIIIIIN1111111111M111111111111111111FlIU{�':i"IIIIIUIII@IIINlllkl@,IIIIIIIIIUUIIIIIIIIIIMIIIIII '�' UIRIiUIII{IIIIIIIIlNIIifI{111111111111EBIUIIImIIIINIIIIII1MllIIIMIIIMIIUr' IIIIm�MIIIIIIIYlII,I[IIIIIIIIIIII11111YIIRUIM mU'11VIIIIIIIIRIUIIIIIUIIIIIIIllllllllllllUllU111MINUu1UIIWMII111NUU�44IIINIMIIIIu11mJL1111MPIIIIIRIIRIUU111{R _ IIIIISIUIIIIIIWIfIMYMIUIIIRIiIIIIIIIIIIIIIIIIIfIIIIIUIII@IIIIUIYIIIIIMIU.3iIIIIIIIMIIIMUW{'l@IINImuIMIlUl111WIIM � II9IiIIIIIMIIIIIlill111110 IIIIl1U11111111NIIIlIIIIIlYll11I IIIIIIRIIRIII IIIRMIIIIUII111111@I{IINIIIIIIIPII Illllllll llklllllllllllllllll RIIII RNIIRIRRIf Fll'IIIIIIIIIUIIIII IIIIIIRIIIIII IMUUUI IIRI I{IIIIMIII{UYIUUu1uIUMIIUIIUMImgCllllll@I RIIIIIUIIIiu IIIII mill IIIUIIIIIIIIIIIURIINIIII1111UMIIIIIUIIIINItltlIIIIlUU111U111111111UIIN11111111111WYIIIIIUWImullll111uIHImIIIRllllll ` RMIINIIuuUlllmlluulUlRlliIIUINUIIIIVUIIIllll911111@RIIIIIUIUMUMIIIMIIIII1u111�IIIIIIWllll4l'@I111IIIIIIIIUIIIR€III - tlIRIIIIIIIIIIUIUREI@IIIIIIIIFl@IUIUIIIINIIIIIIIIIUIIIIIIIIIIIIIIMIMIMURIIIIIIIIIUIINIIIUWIIIIlU616111111RIIIRU I�„ril IUUtlRIUII@IlHIiiII@IIRWUIIIIIIIIIIIIIIIIIIIIIYIIIIIUIIIUIuiIIIIIIIMIIMIIIIIIIIl111111111111YImIlUtl@d 11111M11u111111111111 ",,,®' IUIIIIIIWIIIII€IIIIIIIIINIulllll{IIIIIIIlUUI111111111UIIWmIUIIIIIIIIRIIIIIIIMIIIUIIINIRIIIWIIRIIUIII IIIIIIRIIUIIRIRIIIII IIUII IIIIIIIII ICIIIINNIIIIUFlIIIMIIIIII umI IIIIIRU11111111111mlIilUIIIIIIIIIII IIIIIIU@IINIUfI]MIIWII@I I I'lllUmMIIIIIIIIM IIUIIIIIIIUIIIRIIIIIIIIIIIIIIIIIIIIIIIIICFlIIIIIIIImIIIWIIINIIIIIIUIIiINuull]IIIUENIkumIU9WIIRIImRINIIIIullIIIIIIIIIIUI "�"� IUIIIIMUUIIIIIIII�llmllllll�{IIIIUI1'llv'9'Rfll{d°ml IW C�Ilu1+9a91R��IIWIIIIRIUUYNRIIIIIIIIIIIIlI11M1 s su m 3g " AS i — — I 3 �q �kfi ge 9 A 'Imp m rzz,55 Ciwna .m,se ' ' 7 �Aooa® ��oAawvaws v S A110® AlM S1+1Z-X Z 141 - (Z51 117 LDYdLNOD NO11Y11718VH38 ill ° 0 CID Ibli M a 4R n3_3 VA € t24 i, Jx 16gRM32 °7755€ I- ILL F' -Y m� I aagz�13� €�SigaS III a I @ I I , - m y ah C �I�I 8 Pads �ilkg IJI ILIi _ iI -- II I I I II II III__ II II I I r" 91 I i 1' _'. II I -- II _ II I I I -I 11 1 7 I_ I B li I, ............... s d@Igd+fll��ll uF � �IIIY@nilll�lllll �1v ulll'Iltl�fllR@I@I@II@AN�@@�ldrl(�irl _ 9A@II@I�IIIIIIIII➢Illlfll@IIW6\`�AI ' uPlnlimm�lnlnlmnn�rr� 911111111IllulIDllllllllllllf:IIIIIIIIQiulAD@I@Ilimu@�IBI9Wl0111� Irch ��n�. Inmm�lmnnurii`�ilalN, 11@@tlldu1�10�111111'fn91111hf.:�hl iunmlm"�1e 1111YIE='�IIIII _ ullllltullllluullulllllllll@IlluuulH@ 9@IANlPoIHNN@PoI@@@uH99N�;Ai+IP 9@lila{f ulf[iIiIII�fMI HI^CI Y1011111111IIP @�IIIR@Ilhnl@V�9 I@�®1`rAfi�'�iOdl WI9111111111f110111111lIIIl[f@lu 1113f eid wllllulliul10ll IIIIIIIIOIIP�u@IIIIIII@ElYlllhlu'P, W11'I1Ill110111IIIIP!Il116l"11'R9i'It'=�81110WE i:.:::croeaecenrnr"1UHM'm A@@@!i@ =1IIMIIMlu@u@ �:IIu9111A[I@III@I@E@ul@fln@BUu01 � IPoI@91118 I@III@�Po I@III@@u �IIl1[II@0@�u@0@0@uWu@uul@uu� II�fIIIMII@fllllll@IIIIIHIIIIIVIIIIIIIII@Illllllllllllllu@ S N ssas# '3'0'(7 fip4 g�g ---- a g:se Ng tl I I e--¢. ------ § i8� --- ---------1.....,.. E -- ...... J I + e —�L I Q D o 1ii1110 YIIgw�� i -� I W z `tl � - -- j•* rr ����/-III _-- �i H Q Hy OO � I I �yN IsyIc � a � o s � o I W II i J-1 I I I a1 5 a ! _ �eriTwowinlaQ `J S) � Y1 d117197H321 N: M3S 0 0 U_ � :6HFF 3"0"O OLO5L10H90LO-H9Sd SSYIZ-X L 187d - 4-9 117 IDMINOO NO117117187H38 83M35 ,187'11NVE a a 3a" o F� bsp S 9 c0 A313 l/j a Q7 oKl '13 egg p €' LD akICU. IN a UP`g -- -- ,i. II I M qs— gig u igIca � y �� Jd a k` w k% gE 0 SSE t ... _ I � vQ � O N s s us ' RIM ����a@��� -i I -I - o � w 0 � o o z �II:.I II II tit T�ITIL- -14 LLJ R PI 13mut I'M Lo J 5G+£L 'd1S n , I -A3I3 -V-A o rn m �n �68F '3'O'O OLOSLl08SOLO—BSSd 8SklZ—X Z IVVd — (Z9) 117 IOVYINOO N0UVD71GVH28 N3M3S d21V'11N4'S jj 9 j In rn c m w aw nmay� _. €. � n373 VA J__ 'ElSe e g a g yy z 4 $giE c S z R- Q_ ff` U WiiAu �2 b ry�� g� H €a �G @@pa�� „ O .. 0,0 a@ a a Z8Gi� 8��€R�� ®���a� €B II-;I1 II §°sass $.1:; III I III I_— IIHLO IU;1 I L.nI f II q r LLJ d F L 0 t II _ I, CD�E z m3 Wd g I I i n 3 -- d AWE Vl � I O I-' (9pNYd iT'Ne3Y -'ML'a ABY 1 �` '�a oaoaea�es � ais�- I �- 3 � riNaU V OOOu xx� hl i A�.mHml��' IHHm@1�mH�1�l1nHmH fHllimB�JlHIm@umd9Pm@mBiHll9m flmmmlu�auimHumlll+ml[Hl@Hmumo� ISHHkmt�?mm@m@BpfNi im@f@fllf7l@m@mlml�!ummHImlmIIIIHIIImIml IIIHiIIHIH[ft IIIHllllpinlllIIIIIIIIIIIIIIMAllllnJmisl�lHHllllllllml�`fIIIIIIIINIHIIIIIllllllfrrc+� HIInHIIHIH@!'lIHn9111U�111f11111mm1++11111HIflPllllllllllml1111m IIIIIIHIIIII@Ir;EIIHHILIP"1HfiHHi�IHHu1fIIIlEIIIIIIIIIs,I�IIIIIIIIIIJIIIIIIIIIIIIIIiIIIIIIIIIH IHIIIIIIH'u1111F,llll[fP!I@11110111 fIIHl111 q@[IIP JIIICtG,mm1111lmNln Iill n"Illllllllllllll0 mu[mmlf 1 I�Irlllllln'llmlinlllll11111 i I1111111110111111illIIIImllm _ IHHIm� lllulm IH[HI+IHk[]imHmmHmn lummi�amumHmaaluloHlu�,ti,lummu��laullnmmtlmulmllmom �,1,'IIIHIIIHmfitbfirlllllNlmll@@mHIIIHI@9 IIIHIH!@Hf@IlEllflti"tIIIIIIIlHIIIfl147111HIIHm4�1111H11mk��1 lummulHuuIHIH 11u@mHIIP11111mlullll4vIIHIIIHIHII'11i9111G[IkIIImIIiIIIIImIH@ `,raumml@uuIHIIIHI11Hm IHUIHIHIIINkIIIllllf IIIIHIIIIIIIHIII[IIIHH,umumum111uu11111E11 IIH@IIGIImIIIHIIHIIIaH@IIHUIII@11111p1111G pIIIGIIIIIHII�IIIUIIHmHIi'rIHHHIHaI;'cllWllll€IIIIIIIUHIII[llHlu +IIIIHII�II� Ilmllllll@ud`M 911111111HIIIIII[IIIIIIHIIIIII it@pmEIIIImIIIfr,L,is� - IIIHIIIIIIIIIIIIIIIIpmiKsllllllllllllHl!HIIlmilfTvdlllHml�',, ,Illllllllll@Iulllllllplllm ow II�ImIIIIAi@IIIIIH' lluummonlmHHUJru��Imumnm�Hummua�;unlHuau;� fAllmplMltlum@imlm3mp@m�'mm@@I111m�JIHIpHEIIHHiHmllm�lp@ mom @B4JImHI0IIniIIIl10 lmt tl 111 mntl h llHmllHlllllfllmllHmHm �mmHmlmmjulumiHu 3HHIfHIIIIHIHiIJIIGIIIIH gIMI�HmI@N@#!m€mP.7llmtim67mll@@miVml@IHd 9i@I@HiNHimll@HIHIII�� tlllmmHlmIIIINIi�HUClIm tlIMIHGI6NIIIIIIH;vo'�Iulllm9,lumltlmllllllmuHull@IIIEIm:iIIIIIHGIHIIIIImHPII@IIIH@ IIHmmH&GHIHHIIIIYIHlupm ;!III11H'IIHHIIIMII@mIImH tlll@IIIIlIIIIHIIIIIIIIIIHlIIIIHIIi�IlIIIIHHIftlllllllllllilHHllm IIImHuul1111HHHIHIIHIIIlOuG IIIIIIIIIIIIH11111111111HmIIIHHIIp'@I@IIIluillklllllllll'91H'Ilu JIImuIIf:91uuIH@ fIU IHIIIIIIumHHHulI@ IIII[IIIIIIIIIIHIIIIIIIIIIIIIIH llll€IIIIIIIIIIIIIIIGIIIIIIIim _ ��� IIHnIHIIHIIIIIIIIIIUIIHII@mplpFgIIHIIIIIIIUIHIIIHIfi1HHlI IIHmuWIUIIIIIHIIIIIIIIH11mIWi141mIHIIICtI@HININL'6111'm pll@mIIIIIIIIIIIHIIHIIINH 11111HIH1111111@pVIlHllim IIHHI@IHIIIIIIIIIIIII@IIlIIIIIHIH@ml IHIHIII ill Im111HIIINmIIIIIWInIIHH 911HIIINIIIIImIm °IllflllIf ImflIIHIIRTAIR I t HI@H '111tlIHIlINI[11111[IIIInI11m 91111111111111HIII@Iliulnil pImIIIIIIIIHIIIIGiu411Hum1111f11IIIII"Illili 9IIII11111021y;IllIIIIIIIIIUIIIIIIIIIIIIIInH pIHIIIIIHBIIIIIIIIII@IIIIIHIHIIIHIIIIII109111EIH'IIIIG@IIHUNO IIHIIIIIIIIIHIIIII IIIII IIIIIIIIII II III1111111C!11111111 Ill II@Illmllm alPlllllllllllllllllllllllllu@ :i IHIHIIIHm@IIIIII@I@HII IIIIIIp IIIIIIIHIIIIIIIII@IIimIIWIIIIIIIIHIulufllllllfhlli@IumlHuyIIIHIHIIHl11uIII11111HH1 IIIIIIIIIIHIIIIIIIIIIIIIIIIIHIIIHIIIIIIIIHIHIIIf'IIIIHImII@@Illmlll�,IIIIHIIIIIIIIIIIGE IUIGI IIUIIIHIIIUIUGIEIINIIGIumIllHlllflll`�VlHllllflll 'If!b�)tt+"f9kIIGf^FIIHIIIIIIIIIII?IIIIIIIGlIIUIIHIII I Ill,u1Y� rllHumllIlu+ ImIIIHPrI' s IIIIIIIIIIIIIIII IIIII mHHIIIIIIIPIIII[ml IGII@Illlu@ in HI1YntIdn6H idl'81ir�iHGl ullll@IIIIIIIHIIIIIIIunn++mmnnn+ iuLnndHlllll lllllllllul@Iu ulllumullHIIHEIIImMIIIIIIIIIGIIIIIIlIII[IHIIIImIIIIIG1111mHH1I+>�<III!='lIIIIIII[IIIIIIImHIIIH @IIIIIHIHIIHI IIIII@IIIIIIIIII IIIIIII IIIII11111HIII IIIIIHI11111II IIIII IIIIIIIIHIIIEIIIIIIIIIIIHI IIIIIIIIIIIIIIIIIIIII@II IIHIII6S'llmllmllx IIHIHIWIIHIG}IIIIrnIIIIIIEIIIIIIIIHIIIIIH IIIf iJlJl I!I I[IIIHIIIIlllflll � IIIHIIIIIIIIIIIIIIIIIIIIHHHIIIHIIIIIIIIIIIIIIIIIUIIIininHIIOHllumfll,IHIiIIHIIGIIIIIIIIIIIIIIHI IIIIIIIImIIIIIIIIIIIIIIIIHHIHIIIIIHIII11111111H@IIHIIn@IRI@HHlmllllHrllllllllllllllllllJllllllum HIIIIIIIIIIIIflIIII@IIIII@IflIH@IIHIIIIlIIIIIIIIHIHI1IHIl111I1111111HHII II IP:JIHIIIIIIII[IIIIIIII@IHIII -m-0 -VA a rn m >n u JOS 68 < n7. "s gig 6 6 Z—X Z 18Vd — (ZS) 1I7 1. YHINOO NO111Y1ORM32 68-2e §P o 0 0 888 ,d �6^2.�-A'NW'' 'n313 __ al �€s���� '�' I- © I I I I m e � SU ±�w� - - - f,6a.sLLJ �, NI. N I . to $ [4 `n Nfl 19 I SIN I I I I I &f J ,LU„ INVIIND'5 G O SP N + H O = c — LJ o O ¢ ct� 00 Z a d Q O v � N — (ZS) ll7 LOVa1NOD NOI1V117/8VH32/ 83M3S A8V1lNV! i i W Q m I Lu /M Z Z U a 'MIDI A 1 \ 7Q 6 U CC W N6l .9 (n � n] E DI o � 1 1c, 'NIIJ .aE� �'�ma.e-sue B ,IIIZ/t^l-,Z �yII N � O� d U p N 1� y� qY n Itry�p m n 1 m gn d m n n a uryi n o S So8 m m g s oQW Um Tn �o ai %w j�i� ap ih dza0 xy &� � O> w . q�m �a o rn mz o d N m ie o mm ooN qa oC�"d oa a xc�i d F MIN t N! 1 __"A 1 N 0 rya IL ? Fn W n U) NO mA�E JOf c VU �J O w` a Q o�•' Of"^ W �o a¢ L-LL OOg3 00 p�q; fA F w OO ^4� c� b CO tv+Q LU a NIA ,0-,9 W by S soq H it �y F� DWI CL 0 rc a r� mo r2o�.0-j W 6 a vym' osom+oa+010 - Md 'ON road a3M3s (l 3StlHd) '8tlH32! OLL-W il3M3S JINVlll�l9S/�- LO 0 a��r O Nd' VOO� LO N W 3 �.O �O O O� r p p • (., �I Lo Okit ad' X Ifa _ W wr �X /Q� w I J m Lu J k :D 'r, , m NNN O i�N zW G m wo Zao OW J z z V Z g IN Ca z 9. O W � � �� m W c Ix � J 0 o 7 V a = L � 11 O C) 3 z W a o O W W n I� LU Cc cc L LI ' a WLU U Ofi � Q z CD J :o o wzLU LJJ = w o--- G LO O z ~ JM ■_i------ M w W y _/ B fill LL Z Q CL O 1 Z w O < W cc W Q LL z O I 4 Q w LU- �Q LJJ �Q LU 4 L LLJ Q Z Q Q W JI= W z U) O Q W0 2� Z w 19 a O � >. W a a 17 O Q X 4 a w U �Z rw , O z s O Z g y c m t w w N N y }O O O ¢0 �ii �rc ¢ eiiq4 m�� pF� �n€et > r a'•' h y BOO tj¢o > N ¢� SJJWSK pp w HW < L rn}� wwo WHKp0 00o 2K w`amw g yo w gguz_ 7aUUtj� wa M!ao �lil ia ¢a tow3 �w� NN >_www 0��� m>viw c3�a� rc3o�3 G Eo xNNo22NWOoF.o3 0 ¢��y�p-,zzw�w iz��s r� o wwaoomx w, ww as •,�'. oaaop� cno2���¢ zx xKv�o�i 3wwc�}wm su w�wwxwin SV¢ �� oi¢rc u¢rcU F m�ly y w SNcw�vyma9�i .0 rw sa�-Na>w�tfiyi R� o ua z 1zWw p ^oMrR+LL0�Q`�'�pne �LL ^n� �q�rnl:, ���^,Nn 8V-pIrn��-I0oMtDn� tCJywmw-'�" -F '3pWz �- tn �"=-�- ��VgNOI Cg~aa-m}-kJ0`+`�+^oO�^w,nn AmGoawrw<v ay�wo. 8,z €=<O a R$Se w -O000000 r Og z�w Zmw QvV�K u zawm-�_ HU � d'o,0-iv-'•w�T�+ Ny - N�o - amRo m, m wa�y giE x uw w Lw zz ppz�KKKNv Ci o$�� ng o�Mo1 >x mmg�QO"0qq � IOU0 oUuoo��UO oRoR w vzi a Z °'oal F W rgF zz¢Z s¢ �¢z W � } F Q Nmo �I W� S �NI�V w�prm qOT.-V �7t rom N ITV NN N NNNNNCO'l q zK > wa 2 ¢ iorc pz �ze ffi �MGrym "a€ "3�w �Ul �' ®£®y uio z3m tyo �w good Ko a n F Sam zdN _ �$. K ~ ¢€� �x�o MJ}K U r i'n's 'i+ $oyu z zkY oy �g �x $s �a �' jr� Zzcwi Fm c�.ao < 4 LLz m 'U y �� �r0 rc E - �jzd �{ 3� 3 412 haw Zytl z3Q "N -�cnNNo'n? y �� nV8 o aH p 31 y y P -z a U o <u �uz. aw 5 Lw oauF N �n' go, tw `-� .0 � 9w i ��wmhvawmuii��eiy�QO8 W- w u ogo U J� �a wMn zygo�U= am zwF m ow ai y mOmi9 w 8 Oi¢ <nu - - S z0�z , i-2LL1UG 0J �A z�m(jw~za'n w o-F o'� V. > la U ¢o OU y <wpj m ,O Zw Fw 20 - y ox -goKsor En r 9i " Oz, Z. - W. x�_¢ N Qi n� 3 N Ni Eu. y LL u w pwd yyrr > r w £o� h=m; �wowy-5s .-��� y <" s„ i �z ty - o FsawYi <$5 tw. �u?iyw ¢m��8p�wo osk'� U $� -T z $ z aw d ZF o 6�_ K �ft<_ nip >o 2 �o5 =o - _ ems" �w s oLL� a>o= w, �a�:� 3o iS=o� ,w �o.o "Ea g�&m ao� T> w •3 ww �_ paa6a u� x°wa . ai woa= ozm zQ�g a �a a �oz fdw __'�L zpW-w �i�z �yo rc w F= ws e= €� u- owa =�4W z dib 5.91 d k'wa�<LLom ou�m > ono -'� > w '� za"w oort"w7 1 Q�_t=m �wa�a � 3LL:$C°z �y�W~a� �'W owm F �y�•• wy [ g=n w oa3Z wo ww W-o m o wE° " Fo? oaco�`� � x� �o�� ��o�, I o�w.; o°-°�ws i�a�=off' J�mzu� ww F" i w �w�k' dy"�'=Qe Simi �� u Qo�` F 6 op 6 "a =�a ° m�'= ww �yaaaa,- s P' yao w >aw °a�c"iw lyw_a.9iww o = wN o °' �a gg rcmY �w os' �m<w� �xn �w"m-oz �q LL - K z d G :� a< c�o�a€ o�J pr== No Grcy°k'=� z tyy oz3yo �Y `" �c >F�- €nor dr t i; F6� " 6�_'_"" uF� m'� �'�`d am'< tw wFwz o'- <�-� r�LL?� ��n�a �w t wzm tiNmU z<�= ","_ �W Wo <r' _ wzw' Np w��ow8$p5E3 ��`� =w=� p� . w y-� <=g>'�w NON=� y °�Wm'�o- c� new Imp-.5 ooa <`w3 ty rizzu �' �ww" ��:. IYtG > r d J 3 3 2Ua k'��r ww t: Wm" J2y �mn � wz o wg °�� s G 3 �� J o o��' m az taw>o k'o w �` a wxzaa 33�� 3§� EzG _ �� � �rco aw ": mR U 1IYza> Hu .H s.cai � ®O..'' a z �wz Ww o �e °wo a I� �° N. Na U a�i Nc �aao�d9 dw,ni� rr�iU wo NFna 9`o,nLL °mom oawa r � w ty wok �Z-' z S moE� m %, _ Hk zaoF 1'*d -. a poi Sao Fys z o w �N wto x _ a '>g� ` _ ��g i az k o °'" �'a w&y i w pJ'zN i a$ opmm„�" Q?y Fri 5 LLuoopwwao LL5 u z6o �� z ap 'aom y ,. ow rz" - €�Row�om �w„F5= P 'y w H =QN� y= _ w �� m. wa- w m ww� o.z` _ 00 "lytx Bob $ �6-_--eY„ �iF m ems= nm mw fix_ k�a iy o Sow ��b > y o,.w i~'z=Qffiw gw m���� o " - 0aa Via€ a� > ; a _g QLL �a ywe _ N ��'Fw �N= z- �5 a: w o o�a w� p QUA �F��aF �� �p�w w�:NQw`> a �� aJ5� mw a _ �gQ w. _ky w�� °3_ w,. �-wm0� i8o".w =� how-""-j3Up - �wVo __ wwnw= 5om"W=-mm ss Z.z.. mo _�Oc�w dim - y� x=. tz p� 3� wGNrc��iwJx Fmcai EN zw�w~9a�E x z o M_g ° < -°mom oogw m?m�a 000"w2 w� Marc o LL=w.< 6y m -boy " �- °rci � � zN 3� ty - '€`m�`Y"~F w�ya �i'oc=i °���m of a _w 9y .9-3 vo oU.$ �zw w a h� o��°aJrcwa LL^awuLL v ow- J m �$ ° am�w s Q4SLLa yty Iw,zox m =oo �s yw wN= 3m = >azVo�� ua� F2'� alyrc z ¢ �f <� - i "_ h -JLLwo - - z=� rc6�y>"o w. w t',gw-y w- mS"wx _ mo 2- =ww o FQo o -y PJa - a w `a awm m o�EQ�'a a 3 wa=o arc�w �" o �w hWzu m �W� 'w ����wa� =o� �u= Naw.Qyaaow se qa= QoyN� _ o� boo > aef m k' �NLLw .zZ- a G- moa " __ a 8 s zG zS�a uzw w«o� 5 pew 3ooz<!5 s J"z'w' �o w�5n o, owe w o�F iyy�wo w N s Nzj= oo�. �z�� ei N°su `�-nw �_< �I r1 N w d d 3W_ & Uoo �� RFU - �Z�i� = m o,wao .-n o wuw�u� U �U - " .nm oY >W ��yy o O� ly �OaoQ ~w �o yur�rcoom� w s'0do zOxtxwx + N w Nnr°nt 'o �°m wn NcSHww du��? n-z-H N5��3 _ m �- 0 z � b F 0 A -I M A A 9 133HS - 3Nn HD1V14 NOW '� � 'J ,��! , ;�� •fit ;� ti .�� _ .� ;�� 'Y #4 •i 3 � 'r. et',; | | \� j|)|§ � ) |■ ��� | � � \��)( ��(\��/t �■ ��§ -� /))�/ �\ | ¥ P-a S E _ p 45 a g €8 s ¢ "m seo� Al aoosm Y�YF 3 e mg39«g� �� ri4d, 5� s @ :� 3 E ma = � �T m g€ a amp fr p e��� ;�-_�fr�a o�g 3 - b'fd m i,i�mm m r 3➢g`�Tf3i �.4 3� m [`fU�-amV�mm m 8u �50 cai a m $E$ 3® �m o� a � m$"" mN b° s `e'`sm 5^�' ' ;iS, 5 �g s" 0 € s`mr d s i s o x� ' ate OIZU 8190 h a s -54, ENRM��T-7 «" naxild J _ �) seffis - ooss'6s soya oos o- o sffis solos` osss__ _ _ - ss5o s`o5 os os sss`oCoa aos o` mffis os'S'o`o5000sSb obc os W W W J om mMmm lir YiHq £ 133HS — 3NIl MiWi etie6=i p �; a - mo J 3NnAnove e ��Z n ^ fI, Im �Ob �9p1TS �'•1� l ss99 �", �p w 6� a `ll �LI I L I `i * U b n q� III h\ i p � d x Z ¢� gg B g"� .. to j d �LL N its SPRINGFIELD ST 88 Box lom 3SOP NVS---_ -- r ap 3I -- '!10 Sd`J911J - NOII3"S __--1rv�1�tI I -'-__aa 11; o F " o . n uI "f'-r11HNVC , Z _ tom z y c =c F a IQQJI ao L-L I _ Ktt•1 � Y 3 s 30nugi - 000M3003 i �10 311W3SOA c I I ~ 1 I� I A 0 I anti ,Ou1 Ilnl1 I • I I I WL I I tl�n� i _ II � I nLs 03615 LNOMM } Mo Jx n I ,� ure �' I re III 7 II, i�wne niA - -tlBU / •-, I ag. I I I env n e I I II�I I NLA pmi ,rvzt ° i � • '� � NCI I I S Y nw a w„ O!ZZ i p 0 I 1 + IS b I ■ C 'lli■i::i� : I ■C Em llim I HIM ! 1�4 : _:■■■ o Is ■■ :"M:: 111111 ■• m rs �W,01 ■ ME IN 00 MIRE III I�10 MWI --t:loss II i■■■Mw 11, a l N ■ W'nMi" ::■�� : ■�:ME ■ : :11: �161N_ ie 11 , �� ■:■ ■■ ■ ■ ■_ 1�' +yyyy,, � 11:��II E :: :: .1:: I■: �1 �1■■ 1 ■::: �:■::: .: ■ : II11 11� 1::■� ■1 No m mi ON ■ 1 ' : 11 11 I: :IH■ ■■■■■ =1■■■■:■■ :...■ 1 11 .11■■ O yo`6 raj aao_ N °� �yo��� $� - •H�� €� R`�<,o JL :7iI; �oz� � � wa■ ''; ��,I �`iIr'i_' Wp3 aa Gy Eb7�` N n n a 1 g *HttCZ_i 90+CZ tits 3Nf1_MD1tl11 � [ I I +o+u x d31 A- f�.n- ll I _.L. I„ 118•f'Ot L .11 11 1 r. l `-.� _ _- .-.- _ _ —_ "•° i' Hen X� fw - 99 L I 9n,•, n,fw-= 1 lSSy p;� I I 1 e afC me A rc 1.o 3 1 { 7s�n A� j 9E — 6E+oy 1`1 +61 d d 2L+61 I J dL ,roe � 0 98 � �RR x I {i9cr+91 � + i v > �8 L6+Lf i IYM341n113er�2 � aww � �\ a ti� � it 'Lit ` lllli _t � i ;I i 18491 1 I_ ne • ..�A= — - ---- "� a i I l - Ul e m„�.,I o-,IIJI � 1 c ■_fir a I I ' I, 1j r n . _.. W utT nnw � IQ nun nr, • �: - v m s 1 I�.� d _ f Ifl- 0 N J ii If �11 --:.�y''' � �- S ♦ ► �li ► • "1 R . � - - - Q:ME r•: :■■ ■■■■■ .�■SE■■ES■ ■ ■■■■■■■■■ ■■■ on ■ ■M■MMMMMM N■ ■ m:■■■EE SEEMS E0 :■0 :■E::E■Ema:g■:■ :NUN:■::: aa:■■MN man moms ■■M■■■■s■M■■UUM■M■M■EE{� lam:::;:::;;: ::::::: ............ is Im MEN is 1 11:::::M11 EE r ■■■lM El mmECtl. ■■M� SE■■MM=■ EEEE { ■ : MEMMEMMEME ■EE■■MM■■■■SMSESSW-ME■■■■ ■N■EI!%■■Fa P. ■■N■■■moommons H ill E■ ■ E:rr{.■ ■ _� nl��_ G.II :1Tu ,isN l■■M EMEM:lEEmE ■■M ■ A M ■ ■ �r ■on ::. {EMME4 MOF■■ : ■:::::mail: �� EE 1�ES■■fi■ �.■L.E� I: ■■ a::SNE:::�:::::::F Imo: .■ ■■■■■■■■ESE■■ ■■ EMCN EE■■ ■::::a::■E:n:N:::NEp p■!■ : am '�,� : M:: am■:M:::■::::m:::::mm:mmM■:mama ::■L:l ■E■■!■■■■■■■■■■��■■■■■■:■■OR ■■■ ' New on WIEN" NM��6■__i��T '::::I:: :::'.:::::::=��d so .: ■■ ■Mid' IFI SEES■■■A■■■■■■■EEESEE M■ io ■ ■{ EEE■■E SEES■■ ME ■ E:ara■■■I�EEM■EEE SEE■■N -- � s ■■ M!■■■■1 E■EEE■■■EE■E■EE■■■ EE■ME■It :: ■■ ■M ,O:::::::::::MMMMIH: din■■■■■■■■■ ■■■■■■n M■M�a ■■I�6V NII■E■ ■■ qqp ■■ ■■■■Mil■■■■■■■■ N 1�■■ lullISEIIEEI■l. I AMEMSEI k ■ � �� E■■■E■■■■M■■N■■a •' : :9lli:: ■ ■ ■'' i �tfIm 1�� al ' � mama . SaaMEm:m:::aN■::: l- E■■■E■MN■M■EM■■■ : omm sommossommj" r ME•. {( ■SEES SEES■ ■■E■■ FAME EME■ME■E■■■■■■MMM:■■- SENSE IN MMMU i H■■M■ ■■!MM■MM ■■M■ :summon �in: :: ::::::::CUM :gym::::i:u ma ma:: �n ■�:�■lM:mm ■ h■ ■■_■N■■E■■ ■ ■ !■■■■■■Si:::■EE■MSl■ 11111 Nommomm::111 ■�EN::�■. m:::::MEN: ' i ::::::::�� Mom MENEM i0 R_:3:NIMMAM ::; No MM::MENEM Monello ��� a■N:a�■■�:: �� gym:::::::::� mama: ::::::::: inun aMM:M�::m::::::::::::: mama::: • •••••• mom mom un NONE 01101111110111111:1111 mill■■E ■/ MM■■■M■■■■■■■■■M■ M_ N Monsoon ■■=l::{%::E'::ia:::mm::■M :nE ::::::::a ::n■ME■■■■■■M■/ ■■:■■: ■ ::::E::EEi■■::i'■:u:::i:m�i��iM::EEi�E RUBBER:EM■■E■M■■/■■EB ■■SE■ENM MENEM - IIII 1 III Y 6 r _ l.Cl ■ _ �„• �� !:lH :�.:::®::! on ON OEM son is so 0 loll �aC. ■ :::l.a�s:::::::e::::::: N I P. I:'.. all : a::: . 0 i'E ! :: Jill II 100 !::UCa:.......:.... !:• ::::::: ! . .... .. am ` .......111...■ .. ..... I ISO •. : Y �. ■11■ l E ... ON ■ 3 moil :l:� �� 1, 11 Ili 11 - i�..on ■ ....■ an! ..! .. ...: until , I t11 t r ■ ■ ■ .:=.N. :._ ■ I • • .{�,��,� NMI i�■ ...ri�iONON .■ so ��■■■ . .■.Clii ■a,! ti �t..r, i.. l:...i:.�:zla...■moommor ON MI'mr no ■ ■ ..■IIIIIINNIN ...... ■ ....III7■III.. MEM ::l::::�No _io..`L_■■9il::...s.•• n mat ma1� •: : n• _ !:_.:. C ::CC•:CC::::•::.0 9::....::....... ...;�E ! ..................... Q P) ` ��� _ ° d ..:.:. .. / eID ° _ _iii ►� - , ONO■S:- M IN non:■iei■■ in• ■: ■■ ■Own ii ■ lg:Son::Oi��� wNN:■N■SEwwiwU::M:wNi7 :: � ii ii:: ■ MEMO ■■■■ gm■O■■ ■■0 ■ ■ ■ ■ ■ ■■■■ ■/ n■:E■niM :: ullM 0 Cmo MEOS■o. ::: ON :!MENNUM ME in E:.�� ::. : NONE NONE■:::� ■MNwa� ENNE::Mg0 M0MEN a S:MMS :■■■M:■:: wall.. ilimimmmmmmmmmmmiii ■ on ■■N■■■■■■■■ ■ ■■■■i■■■■M■■ � ■� a e :iiM MOn■::■::■ :■:■■Brno ■N ■N ■ ■■ WOMEN ■■■ ■■ MESS ■■ ■. ■Mi■On a■e■■■■m■MOMINE ■ Ow ISSUES:M.:■ T � : N■■■■iMmiiMe■i R m■■ ■■■■■■■MM■ ■ R ■ ---- on :::: ■SMe ions OMEN w N i1' ■ I a a� on Ii::i::::E 1 .: ::: �. M:10 mmoun .: ■o t■MM a■■e .. iMEMO: M ■eEM ■NM MoM EnMon 1r :■::::::_ n aan ■'M:on NNE: ::::: oMn MN - ■■�:EN I ...■■ MN ' :NME ...■■... ■ ■ ■■�� : MM ■■ an I'w: MOO■■ mama ■ ■S■O.MM■MN■NM. ■NNaa:ww ww::wawn:wa:NM:: Pon gMgn s M: ■ M■NO ME oil :MM::::Mw::::■:I IONEMO . :: ■■■■N■■■■:■■ ■M ■■Uion: No :::Enna UE aN NM ■i ■ "' ■ N■■E ■ ■ .,. ■■■■w�i■■■■■■■EOM■■ mono ■■Mta■■■■iM■M■i■■ +:::MNMNSMN:NO n:Yi■" M�aME 11nm0■i■0 ■■■■�■■loom■a■oM■M■ Moge■Nl■■■lliN■■■■M ■mN■N ■MOM■■■■M■■maN■O■ e■ ■■i■M■■i■MM :10 OO :■O■■■mM■ mo Ell:: immusamommomm:: �l l■■■■■■■■■■nes■ ME:_ inn::■ ::nnNN :::MEN:: Em■e■■■n■■■■l■■■■■■■■■ 'MOM O■a ■N■■■■■iN woman ■E.gin■.■■.■■■■:.■aIUMMUMME MNM N■Mii■■■■■■■■■ ■■ ona a a vn Z� _ .� �Ga grlEl wes �P � Im '"<' 8a m S ag � ¢ ZI 10 a 1 ' I 3 til �3 .II II mtl c1 1 J ... p I '1M "LA%3011�3NNOL 1� i J � - mn xrt ".ft GgELO 1 i all7sa , w ppp ° I .. r� iAd airga I � n ''li � 'un �asrc3 or. iasnu I_ mu .a,wne,la''".i' III I I I � . �I� 1 'I c r .:.fi:e ' mom NMI so 11■NO • . :N •N0 ::i N:: .. ■ ■ /■■■■.■■■ E:N.N� Mi■ :■:■oll :MMME10111 .:N:N� �■.MO • • No 11111 on on mMENEM om .. fA... !. ............. ■ ■.■NB■. ./:N:.� wwwmom 8001 i/■■.■...■ ■. M mmm:m::SEMEN ■ # ■ :::::::::: Olio■.■ ■■ m ■ ■ ■ :ice ` ■EE O ONE 0 SEMEN No ..CEm M Emsl.. ■ HE..E . m m_:_ ' :m■ mm sm/ 1 ' 0 M : MEMO m //■ :::. q�mmNtr ::::: MEMO ■ • EMUEo :■ : m:E••MN_ ::.. •_ O■■.o oll _ il LIZ .. m.m�...no ■ ONE !!ME: ME■ •� �::::�■__ :. :: . ::�::::::::.: ........... : m.:m..:. �M m'.� N MMOMEMEMEN ..MO.M■:o■o . gins■: MMM•OOOM .....iOM..::■. . nM Ems EmmL- Sol :� MVm■..MM:: M SEEMS : :mOMMO■l�ENNEREME : ::::::onmommi IN : ■ MMm■Mo■ ■MOM■■ ■ 11NONE E : E: Ova ■ 10 O0 ME MMi.M ■ MMMMM ::::::if�yM0 Is EMS .Wo ..Moon.■mop .■li' ■. ■ m �=�■ :::::::mMUNCH ■.■■iM ■. ■ No ...■moss■ ■ ■ RIN Us .■ MEMNON ■■■.■■ ..on • ■ prsagrullmmm ::::. I mom ■ ■ C mmmmm�••._i• Emig:■.�...■m1■:::1m m� 1111 m E•::Np::s�N:■.00M.o■MOMsIMOMMMM.MMM: ■ .gNm':M.:'�. ■i■�::::::::::: m MMu:OH-MM ll •:::N':::N:::::�E::::: 0 m EDEE■E■.Ni:\:::M"w :: ::N:::::::�■:::• : mossamommounnoun U)R => do �4y�+I �y� au•ruw _� � •,. tv�. ��a �u3rc ..._ -, _ 1. ,y az_rom �� __ �w una�•x c '� `\ �,. • m w•iuel Q Z � .a a `I e .� I`R � y m arRo 'n ci o • + nx,� ; >.,.�. 1�5 + I LE ml .w.a, a op • � - .soT�o� 3w ;� K ?� , _ I I , { �i k 3 twMM _ I m Ii I � 'uw rn•w-'fl 1111: I I 4 .. _.: ..._ r I f '� i .. ; x•, wn.a I III �� ', � , r.. . i �. I �.1 I .{ I . '..I _I I _ ,m M wn�ws _ MOO 1 j I IV I� d pin - v a 1 1 � YM Ff 13S y gllF WA f - 1 I 1 SJtlMa 1 1 I z+ qLr qLw. I w r\ - .� \ / \,// E3/ •/ / /®` � wvinf uMFM JI / \ 1 1 2Pgl: N 1/f Lj OOf Zv[ali tit l � oe 6 r , _L. t' -� && - _ 1 LL4 ZEEI If11 151%3 310113tl - 41 I Ti II I 4 - F'fFx] YAF3tl I I �..� }- L4 -SOS f9 IS y-i �IH'I{I"� Ll� c ' - I . . 17 + - - 7- - -ILL HR 41144 vaa.ar-/ I • 1 F� H o i b $p T �2t ----- VOMMA Nn - �1-4 I Eym^ GGG �W y�QyF V �$ E -♦- �O yCoo � t■ V i 41 a yZ tt 9� i ilkla J-a'. — — ---1 ig `gyp f o� Ik�tnz 3R� I - ��n I¢ . 4-Al TAN )Ir0 M'II�LYr �'� !3 - unn I ' I 1 I N �� I LI%NI 1NeLLY3lM I � $g•-x 'r , T MIL N �zc ' •_ To , I q`tivTi Ir Ip�g ' I I I • I I I I I i I- _ -- 71M1350A _ _ _— _ - lrE a iLLr IM _ 1tlfWJ - t� I 13S3i �6e6Lk�- 12M M i h oQe w.v � ooe a�aaam Q$ '. k'�°�:12 Z kUZ q 4I 1 x i , saaov3w II{I M S�aO'�1S w%� l�f W f ICI ' 1 I III I I `Ia= w IOOHOS AW1N314313 ma, T`3rc�es SIIIH NN31SV3 Lme rl3n �a dl I 1 t IN, ZN� o aZ-r m oR to E v Zs,�„m oa 1.0 4t .:_..I R ¢ztQ I` Ha O t zO7J pp slw. ass•u .�.4..f.1 - :1 , ene, 1 wtl .15 1 u 1 J.. g� i ' I i I. L( 4— ILL �// wl w.als I i I � 1I- /� 00+St+i't11S 3NIl HOIVW G _ p �n II U336�lm_-� 5i. I I I � 1 � I I R G� �• ,� atom 1 I 5 ��o� W�a-WJJ-t-I- !1 iFO - S ® t ✓i • A-18 3HIHSdWVH Hinos _T, R I I I I o U l �,o F cpyo £ ❑ 5 } e =m0 r`.'�I IR'0A-l8 3HIHSdWdH H18ON Film, w=MOM ■ all 11■ m :l=:' :■■■ ::■(sm M M ! ■■■IB■Ism■■■ ma on 1 ■:■I■:■ ■ II :I! IN :■■I ■■■I ::■o■I ■■� ■■■ �I mmrlm s Ma ME ME M ilm ■■■■.. ■■■■■::I ]II ■■■■I ■■■■ . m■■ ' il ■■I ■I: ■' ■■:I :q �,li:: ■= ■ 1 ■�I I _ : ■■ II 0 n 0 iiaQ w �m ¢ f s =m m � 3 & ■■■■■■■Rmj;j=mmmkjj © I ��% • a \ II �E I, - ' - - sass::::..:::::: ■.■. I :' ::■ :.. ...........� ...: I■■ MEMO ..■■. ■ . E■ :isms::=::s: :::a:: :: ... sa ss sim I■■a■MMa■■ n■M■■■■■ MMEM�� ■ .. E..■■■=... ..a ..sass:: O. rl .::m .■ . IE■ .. 0 MEMO■ .. ■no, ME M■■ olmom son I ON I 1 no', ti,e« •'•' �� 111fa Ufa En �N���fa�� ���� E ILm� \ Ims 0 ■Mass:' mama ::: : µk ■M■■0 ■■■ ■■ MOMME F ■Eq m■ E ■M■■ ■■ ■EEE■E: 0 so 1I ■E■sMMMEmm■EC ■■ anmoo IN MM■M■■E■: ::::mmmmmmon ° Ma:m::aUEMmI No is a II" ■ �1■■■■1 minummuniom MEEE t 00 EO feeM=mE ■ ■■s N O■■ E■E■■■ ON nos?am�� � :::a ■■ on 'r ■ ::::a::a:■M in ME ral EN- LMOOSE ■■E■:L� ■■■■/■■rommosommi■■■M■■■■!■■■Nm: e a ag 111111IN■ ■: ■ M■MM■ ISO imoss moil I HUNG .EM�l:a■ Loll EMM ■■ :m M■ ' :m M■ ■Mm ■a E■:a ::■ so m:■M MI lmillooll Is :■ MO■ ■ ■n■E■■■■ ■OM ■ ii:i:m::E: ■■M mamm a mail loom ...! ::::a:::=:::: I:::� ma::: iG ■M�i 1M811E on ■Em■ on m■ E■E E■E■E a ■!m ■ ■:■ !EE■O M■■ m:m M'� :: 's�i:�s = =I ml- I ME no Mimi i'ii iN' M-170R4 � a Ta [e.,. y0d' 4~RTC` FDR DAKS IIDDN A/ 0 o"T T 2 I I I I LC �, I I I I I I z � Tx wATeEra T T T CRT roOEHco ll3 4 I 6 6® 7 B 9 IBCo>TLMll 12 qq w gW lei ` ` T —9A.-• �g nvc6.� _ � � -1 _ _— Y — �� I_ k) ae.b �� /'IP�_ � -`S _. .. \ � IJvC'.illl G ••.••� 9 � " CORDepae . r a r u �a H A le N. u a cM 9 I vmc as•corvc.nuI LJfIl v1' / . Y 5lIf1RY I "Y.w JR. • �s ..._. �� �< , � .a arvr - 7' Trra s. Is xe _ aE „ I In.ivcvM o rx a m�c�¢_ Tsl zM \ AbR c 8 Im -[sr..rC� BiJ J STA m Cq x swlo uc'rIIDaI�o L nrlmt wNST1YIc yr Ylr R�=� ��y,i� �\ N I -. �� ' AB T// ONST. ' I I I KW lNaOIO LR III-TJ01. I IB'TENP.CONST. i I y 0� = DESCRIPTION= LUT Oi LNB RRLET���S[ T . \ Ofl F.AEBF TENT /ID CT TOSNCY YN I CM CID ! 1,3 SS I $ M N CIBC OF MFJpWCImt 0. t �\ 2—R S ..Y� 4 5 6 7 '� woe cT To NCB Yw 4 -I 9 ennEtlENr 2 I 1 n Q 'e�=nx.ATPal"vA e` n`I'vxev°nY I D F---F---Fo) ______� xrRAcr &FOREDICTNGMEADOWBROOK ��`\1 Q �TrFCQ®^11GOLF COURSE Q Q nsA Fu�.i. Ea, O BLACKBURN TERRACE ADDN. srwrx:s B �ulT- n �1;t I I 1 I I 1 I I Oraaarn la �n,a^AUY� SHALDN ACRES AODH. I I I Z ^ Rae'ii a�im9 \ I—R vn 1�nm"""x rnn,ilc u� I, a sM O is osPl. J I I I I I I I .�ISCBLES NTAL r HNZEI- 1 YERT- 1 -9 — — d+ — • - TZrF RuhPa.-ra— AT I fi cA D _ -} - }LLLL ism A i Yi..oc s c c41. tt4ICour _--Y __ - PA as [dcM -4lpl.n ..-�.-'Ls-11►t -{-; k .--��i`,� _�- S°.�s IN41 °■ -L CITY OF FORT MDRTH. TE S w /lE Y SETER MA ENTO REPLACEMENT SANITARY SETER MATH ITO REPLACEMENT R fil�i, . 570 AHD DRAIHACR AREA REHABILITATION IPHASR 1, M-170RR)?.V- *4•S4,GO TO UAL 104.00.001 47-4— awn TumerCdlie�cjBraienlrx. wo xnNn aeB eaN. eeaNnma 24°�i3T0 91 m +9.F+ 99-08 9j M 99� 98. RR Ift-m 181I♦R8 /8'+ 1 3�88 E it Of IIII - fr ._ /= II'� 01ONiHnd f NAll \ II�i l - - = , �ri�::�:�:a:i/i:� �■ Winnri a::::__ 'a•:on Chia ■■..■.. so: ■■ ■ on .. ....... a : ■. a= as- .../ ■■■ son on /E .... . � : ■�■ ::• m/•=0 NONE .■■/■■■ a:.- ia: nss i sass.:: Naas :: ■ .■ ■a/��� H H 's mono ° : �- :�::�.. a�..�••..NMoo ::.=::a�a�:: F. •� aO ..:. . /:. .�a. E ■ a ■ ■�/ a�::::::Ca • ■ r s::::::aa:a.... ;;a: �mal /■■/■///a am/■:a .. //N :�:�:/■iG vrm Mq ■ /■■ a:Milo • 11 ::::I ■�/ ■ i ::: momemonomm i■■ i :.n iaaaa■ ■ ■ME ■■ ■E■E■■amo�. 0.0-PERWOOR W.N. ■ ON : . ■ mall NONE■ M sass:' /.::ME II so :� ::a:OI ■ s. » �e._; i' ■ / ■a: a : ■■■■/ NONE Elm■■ .■' IS ■////NOON/■■■/on /■ as i1I ■ \�aa■m �■ a■1 salsa: am sasa a:::::::a :s 4z $ �40 �W Hp a gA ---—- _ n _a�•I o. M1 xsre "�A° s I E (slvn� S F3 F _.!i MMs �unas3xssre 1 i I Y. r�,� '. - (alw 1ovYxn ms ' M.oa ly 3AtlN3,A1V1!IM Yn+ �j G ffi 19+0£ NIS 3Nn Holtl11 t' I I I I I I I I 133tl15- _ _m _ u s rrn x5 Jy F ffig �i ttl �o sz 9�Is A � T I }t li. - I - - - I - 1 t- 4 � L+DLL831 _� Nl }- IM _. d 4- _ + �. al i NM1fO.I`o LLLILL� n}�s'M�- si°w3 3 111 k - - 9f4L=S OU*6 Yi5 of Ls6 IX' YS L j I � y i1. 1 iTl' ij•� Il—ii Y' _I _ 4- { I _; iM1 H 1 .IOL F tCs9tL (p '7Y15 1- 4 zIS�.. ••_ '. I _ �O owmn.�? -; S eiue •{Y`3 41 C r O Fes¢ IZ .. -j 4 l Iw umiws —� - ... )Slal aSol• 'Xn r '- u i 1 i 1 r 1 I I . ' � '1 "� �. �-_ ]Soil riM.• I 1 I L • I I "n awna.Sar I 1 aaxlll uroul w nl 1 1 t I A _klkl➢A:�I' z 1 B 1:01 � ! i91 60l + I . � I i 4 M i A] ers Ilele . .. .. . .. .. .. . . ..•,A { - .' xgl�ienD.r ica eaa � -._ _ .. — j 'fl •.\._ 3 .. _. .... _ _ _ _I oral .,la• I - 1. j L, I 1 .I I .I 1 _ .. _ .._..-. .._ �e .a6il•n co�se.wl Yaa .j .1 .I � -coz-n aoro v ':q FT o R J GE 7 wW G mu U w J LL 0 r z 0 J_ D m Q I i3nr 3ia3a � t! I ICI _ r e3 33n xro � I � � I r n 1 . I F- _ �� wrrv.3 I I I -l➢ snmmoa I I I sw�rr03 i nurr„e �raan __� I I �I'I I' ■ III 3 I I 1 oe 6 � I I I va • rus t 3enru3n� R I•_ 33n3 .� g I I`I She � g I 111 no�"a'arn�ae I 1 [s] �T � 6 1 0 � tCJ S ¢ SC c •S i. .. p 6 N - �L Q Z N F' KKII ' Q b b - m� •long low um wassomon ON IN M NONE SEEL mill, IN I'll mm IN OR on on Em 0 ON No OEM NMI mom EIIIIIII0mumm IS 0 MEN I MEN 0 ME son OEM limmmisiscm OWE on 0 0 In 11MINES 0 INNER no 1 iiiiiii _ _ ■ -� r | To v.f o w. | o _ \ « _ ° � ` I ; I ) SU ° LU . ;§ .§ ! ;_ B § & y; \ 2� k� 1. 2/2 - !fF) V- 2§|G ; _ cA . |§ § 0 § z \ , 52 5 _ . { . LLI in § ` 0 § �0.0 IL Ul §§ �§k B B B cn k ( |�■ . � �a| L.0 1. � \ k� S kkk| ) §E 2 / { ƒ IL \ /l \/ \ � | � | (� k� \�| ;■� §|■ `¥ k� « § @ - z.r w u} 2 ! � \}/jj\{ S zw r �o � \ m �P. ~u Ou mY Z O .o R J �Iz / add d0 d01 za 'a 3AOBtl .0-.b aoc u 2 WV mom m z om �d tl �LL Y - s W LU u� wz. y w roi U �� neLL tt U a F j �d Y a m 9 Wnc W - o c S' �cc a�° 10, W u V _ WS q z- t 2 3.2wy= dyf CC ~ 0g00 2 JtO am3Npw0 � =0=22_~ rf~�SF O awwo�u .a ��mwiy� ~um �z wFn 4,z.E,.3u W t. ¢�Q LLf�6m 5 1 o O 0 w bi o m ul u C d Y m a r 00 W Q U X w 6 f u�i 3-m m� z o =I �z wr mi t� �3Ot tl W �LL m � ug ti S U u w y !e w a3 F tsi a • {y W J i chi i ff '•�� I OY Cl .sz or 6oww am wwa� w zw fFnu Utz: w nu wyWm �ur- r smzpi o- LL3 of W � �lzIia - ae~~ aW — y 7[ o. f LL 3 � Yi xa mow= _ o FFm1Y u HE E W tlm yi�3:m ~ �= - _na6 Ndmf vti GC-4.04 Underground Facilities THIS PAGE LEFT INTENTIONALLY BLANK GC-6.06.1) Minority and Women Owned Business Enterprise Compliance THIS PAGE LEFT INTENTIONALLY BLANK O U. 4m O U E LL C O N 9 N d tal 2>1 () o a) C CL 00 N c co00 c z w (, C° a) L O ch c 0 ❑ C U) M a) `m (m cr N ❑ U- ❑ 1p rn 0 C C N > } U) 4; m ca N a) m a) U O > E rn E w ° m a) O E cu E O cu p (D c O U u m Q. o F—I C C C) w .N OR N 0 U)O C = r > w coa) a) co z c Q) U w O d m 0 coLU +' C coL) �'S M O a' 0 U) ❑ ' ❑ < ❑ � N c E m a) N d 00 h w cu N E ® U) �U �, ❑ a) U a m O C U m Ui O s2 .E U 2 coC/to O (1) =+7 X O a) U cu 6- h zc, ¢ '5 N o ❑ = ❑ a) N U c s 0 a)) a) O U e a) Lo O M c U O EC m C = m qNj < _ U.m O 0 O Q U •fA L) O N :� K U zE U a, N w w U N _ m c a) Og a) w �� uw M c �O :.I= ¢ N com q�' M d- sz � �= U U. > h 'o d c in w a 22 O O ; c m a U d d U a U ._ w 0) � _ a) c 0) =N. 0 > U c �M c m a).Q .0 0w= C �W a Y o m 00 00) N ..- a) A o N C r O O N 'a aU Cp Q, _ U C C N O y N N coO p N p ,._.. O O .O c a) C N N f�j C- m o ` > N 5 m w a) ° V- . C N p C U N m ;S a) -p 0 a) 0- Q >� c N om a)N 0 .�.+ oa)E w� � O U = = m .N C �oa)E CC0 .7 .p in p�- �� x ° x- N U 0 N ° N t0 Y a) N C ca) m U �_ m �� a)(D� cOMc a) .N oa°ui U c °a) a C c C C .0 Q-p CL ° a)E E A -Q w cn C -p U to C N �y �S w N=N U c6 U a) LA O p N ,O a) c0 .� N N c E "� C U - v) 0 U a) ° 0 0 'C} 0 O y � a) NCU p C .i= 0 C CU a) a) .N .0 c E E eo a) -O a) .0 N O = G E t0 O .� U- E O O Oo+� N- a) cu Cr " oN N O C O � C O QN 0 Ua)a) U-0 N; C U N p "- — �O c C C_ a) ca O �I° �cn -o °� mU cm w C 0 a) N N N O C ca o O c m E a 0 p (a N h N 0 a) O C N E- N Uc Mn E Of0 CO o Nm U a) cu a) a O- ? 5N.0 -0 =— fV fC0 ° ':.. Y N C� N Q _ C O' z 3: .Q N ° E o U N ci n) Q y,, o ac m 1_n E�'S a) 0 <n w O w N a) ° N L� w ��°'� U Vic( N �� N Via) a)N ro fn C caa))� f0 o 0 L eo cU o= . �ea�? U 3co mom, �NUNa)U a) �U- z N z o° =o a) �;_ if @0 � 0co °-pCO �w � cu0 � c cu 0 ° a ) C c E NU ui cN �-x C° o °° E N O O a) w �cca) E 'p 'o .Q O � 0sa) .3y Ncni Oa) c0 U(0 'm N O CL 0 a) o cu E c E a a) N m 5 Cc -0 =Q c" m a) U) � eca ° aE o o 0 _ E , U � cu V i l0 O_ U c 0 aa)) o c ° () 6 .c a)= p h a) U m E M eo L a N C h'- Q - I p U N U E 0� CL C N UI0N o -Na) O NC a) a) oN ma) O 0 M O °C Z N a) O a) O o 0 . N _ . cu O Rf E A aSr`n+)W a) 2 ° w a) 7 a) In ) o � O a) � N C O .N N U .� _ E E Z a) Lcu _ E N = a) a) j •� O N o a) E x° N N� a) U N° cu f0 N E ' o?� o C w Q a a) E E� o y a) a) N N N a) a) a N o m a) c a) O a) p= a) x a) C .0 y y a =.. O 0. EE0 C ° 0 �j c :~ a)~ f0 Um O' C �`0 V) ° o 3 O'c.=.� V) Q' w 00 a) E C N."'Lw Ao 0 a).Q s in � cn o=o a) �v �~� . o u.3m c o I-UU m m oU12 z =:3Um a a=o0 u.v)Ead Lti 0 U. a 0 N vi '0 0 o > w 0 C 0- -0 CL 0 CL 0 0- 0 (D CL E E CL =) GE go 0 (D (n (D 0 Z to a) cn o 0 0 in cc c '20 (D E 0 .0 4= o 4 E 0 '0 0 (Dw m 0 CL 0 2! C, Cc "CL E > 0 cc CL 0 0) CL CO 0 0 CD E CL oc" c cn cn A- E (D 0) o w 0 8 M o — -- 4z Z� m 0 E a) " " (D 2 o -� g E E ' 0 0 6 00 cr -0— 0 a) cn C: inE cn CL E co CL E W 0 0 CL "0 F- a) (D I= '5 0 E ui aim 0 E Q) a) ai to E 10 E CL.c ' in 0 a) cr cn 1=a) :3 -S UJ 72 In Co 'o A cc w�: "0 M E a) o (L p r- — 0 0 "0 o c c E 6-0 = Co >, 0) 0 m cn 0 0 cn cn CL o cn E E (D t —0 a) py :G "0 0 LL 0 0 UJ uj 00 USE cn 4)852 -0 w W 0 -0 C C cn o tft Z .2 o N F 0 -f5 M =S Y) — N (D 41 E E C r .2 D CL (D uj cr CL o) :e .n CL cn 7y, tT () rr 0 -E o Lij ul co 0 W CA in =1 cn cts (D .g-_ a 0 r as a) (n cn :3 O)mn a) a) (D , r- a) w 20 ca m 8 'E a) 0).Q'O 0 FL -(D � cr-4 ID U U rc-n rill 0 CL cu CL cc 0 r > a) 0 z El S 13 E z < El (D ca E a) r- m .2 U- N E r- ca ca cu 0 r r- cc cc 0 =$ i5 ca L�j L-1 L-1 El U) U) 4) U0 C) LL X 0 0 z 1- 01 11 >111 11 1 0 ca r_ 0 cu a) 0 z CL S > a) E z < El 1:1 a m E a) c cc U- 1:1 E < c m (D cu 0 (CO 0 M m < < 0 1:1 El 1:1_ U) 0 IN U) 0 L nF7nn co IL 3 CO va U) wCL CL '5r CL M Im CL co U) C14mz M, U) C14 T- cl) LU 0) N � S; '5 U- a) a 4) "a 0 U) 0 0 z S U) 0 f 0 Z co o C.) w 0 a. U) 2 0 a 0 4) -6 0 2 4) 2 E 0 2 CL 0 p w ;R < CL 0 :R < z z z 4a E 0 Lo 'S co w 0 o Itt M2 'w -j M, 0 r- to w :3 cO a. u) a. 0 # 0 C14 C> a C 1.0 to = �s — f- 04 4� .1,1 750xoD LU 0 CLO X V4 5 mLu 00 j.: C> = 'o -ld 4) J-� m M 2 U) C: X co 1p) -�, to 0 ca E 4T) c w go C - V� 0 0) c z co 0 Z , 0- Sc OD H W, 0. 0 00 :4 C> W) to cm ca w _3 w Z E 0 E 0 E 0 0 m 12 m J2 m 2 Z U Z 4) IL z U) 4) IL z (a 4) CL U) U) U) 2 4) E r 44 V) 'a 0 10 c: E 0 E 0 'a 10 0 m E 0 < IL LU C.) co < 0- w C.) Im < IL W T! Val [A 2� co c c CL c m 0 in z El M E z < El c 0)E m U- E El < c S2 4= in cu In m < < 0 El 0 El F1 < 0 in 2 0 W 0 t 0 u !"E U-- o x 0 4MFITIF� LL w U. _I 0 X ul z I 0 ui LU w w =i w U) CL 0 U) CL I-- W _ D 0 0 ul to z z 0 0 z E 0 m z Z cu co a) > CL 0 Ln z = ;-- a) cu E z < ca a E cu 0) .0 U- - ElE Q Co ca c co co 0 ca .0 15 < El LJ < 0 EIF] U) 0 m 3: Li >, < w A P 0 0 o S 0 0 Flr-4—IFI z 0 2� cu C: .0 c c m m C, > z El M: El z < 1-1 E m U- E El < c m in U C: Fn m < < 0 m 3: Ll co 5 < U U- w 0 0 0 (D �E 0 z 0 FTIFTI 0 z U) 0 z U) 0 v z D 0 0 0 CO n 0 z Ca cu a) > 0 z CL L m Z:; a) cu E z < El El El -T cu E C: cu U- F E < c cu in c cu 1:1 < < 0 El EI— U) 0 tJ U) < V U- w 0 0 L-: X :s 0 41 0 F� z FIF-11 0 I to 4. 0 z 0 5, 0 40 0 ai E c 0 (D E E 0 h; E 0 am z 12 0 m z LA (D m z E CL CL 0 = E o v 0 = E 0 0 = E 0 0 V V 0 = E o CL W 0 00 a CL W 0 m a CL W 0 m < 0. w 0 O w D I- 0 LL c 0 N M ?I co 0 co m CL 0 M m E z T- Z < F -1 El El a) m E LL E < cin m < < Li Ll Li— U) co < 0 ;p U) < W 0 LL 6 z 0 El El F] 1 1 E CO L m 0 z — U) w Oa. 0- cr W 0 > d. w cl 0) W CL CL LL Cl 0— > 0 V 0 w 0 0- Ix 0 0- 4) > z = co E z < E LL F E c< r_ U m in r- < < El 1:10 El cn co Ll < U- 0 U 0 :2 E 0 z 0 40 1- , F- z LL 0 w C, 0 0 U) w Cn Z >- W }- , ry aro 00(o o 0 z ,(<n W CL Lu co _5 0 W Z E 0 Z0 U w Z 'a o = E o CL W 0 0 cc m E z = z < co E r_ mo LL ❑E < r_ m 76 cc .2 c m < 1:1 El El 1:1 Lo 0 CD H < p r LL 0 FI0 z FI FIF-I > 0 Z CL A L E z < co E fU mo LL E < r_ CR r_ U (n r_ cc cu < < 0 1:1 El El_ U) C) U) < !t LL 0 F-I z F� FlFl F- z 0) 0 z to 0 z =) o 0 4- U. 0 co :3 0 4- 0 0 :3 44 F- z v3 F�z 64 E 0 E 0 w 12 w z 0) 0. z U) CL r 'a = E o v m E 0 co < CL W u m < CL W u Iv E C 0 w LA z 0 CL 'a a 0 = E < CL W 00 O CN E 0 U. R" 4 co co r.: r- m Le Mm in w N cq m w C� LO -F5 0 0 w U cu :3 CL U) a. 0 0 =3 CL U) c 0 O CL CL z cu 0 0 0 w in u) Er w 4) a. U- O 0 z m z :3 0 0 0 0 0 0 E E E < cu cu 0 0 0 —co —CU 0 0 0o F- L� 0 c Lzi 0 C: (D 0 0 0 c -14 c co 0 • 0 M E cu :t-- 0 L- cu i5 -"a x — a) G :3 t C: >1 S2 -M a) cu CU 0 " a) a5 rr c co cu w M M E EZ:3 _0 O co cu M C D CU 0 (D 0 c o z! c O =E (D m 'n o (n a) cu -0 C a) a) r _a " 4)0 o S 0 0 -r- 0— M 0 E An FE , m = C: (D (n 0 0 E 0 L) (n E 75 " X 4-; c (n 0 " a) " " a) 0-0 a) 0 D 0 0 < cp ,4- 4-- CL a) 0 - 0= - CD m E CD c Z 0 Ea.0 0 a) 0 -0 a) CD = a) Z, = —o 0 F- 0 cf) . 0 a) CD a) 0 a) C: 0) Er a) >, M E o) m0 o — M C 0-0 C -0 "0 CD —2) O < 0 to 0 D CD 0 a) CD cn . 4) CD 0 � a w o CU 0 t11M (n W CL 0 0 (n E CD n >0 c " 0 E (D -0 . 8- a) a CD 0 = N 0 0 co E c W o o (n o 0 a) E :3 O (D (D a) 0) cu c 0 M CL _0 %P 0) CD CD C m EtV 0 0 " 0 0 C ,0 CD CL o -0 _0 " 0 0 - CD CD a) o 4- CD _a t5 =3 M 0 W,=— 00-0�"-Q — C C CD a) 00 .0 a) cu 0 C: 0 a) R 0 CD 0 s 0 0 = a- c w CD "0 0- m 0 C L. 0 0 (n o E (o (D E -2 HE 0 -0 CU E U., tr m -0 -V 4) -0 CU M 0 w o 0 E 0 0 �cU CE M.S CD >, W E -0 E CU CM " C 0 E o (n I- - - (n CL (n 0 CD COo 0 W -,.,e o 0 C -0 CD 0 cn CD (n 0 o E 0 c (n m CD C CD a) a 45 E a CU co 0 F= (n 0 Er E 0 m c M E a) 0 0 0) 0 C CU 4].—C E CD 0" 30: 0 M MZM 't= 015- CD 0 >1 cD X M 'C CDC F- -C cn " a) 0- a �e c 0 w. C c 0) E Z m U) U) m E O c E- 0 m e% o Z 0 mCJ� U) 4� 0. U) ATTACHMENT18 Page 1 of 1 City of Fort Worth Business Equity (E) Specifications ContractorPrime OFFEROR COMPANY NAME: Jackson Construction, Ltd Check applicable block to describe Prime E NON-MWBE p PROJECT NAME: Cavile Place - Hughes House 11 - Parker Street Sewer Improvements BID DATE 05/15/2025 City's MBE Project Goal: Offeror's MBE Project Commitment: PROJECT NUMBER If both answers to this form are YES, do not complete ATTACHMENT 1C (Good Faith Effort Form). All questions on this form must be completed and m detailed explanation provided. if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only applicable if bDth answers are yes. Failure to complete this form in its entirety and be received by Bonfire to the ftigegt Manaser no later than 2:LO g.m., on the third C& busin2ls dly after bLd 2geLil 9, exclusive of the bid opening date, will result in the bid being considered non -responsive to bid specifications. Will you perform this entire contract without subcontractors? 1:1 YES If yes, please provide a detailed explanation that proves based on the size and scope of this 1:X1 NO project, this is your normal business practice and provide an operational profile of your business Will you perform this entire contract without suppliers? E] YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. I X I NO The Offeror further agrees to pnovide, directly to the City upon roquey, complete and aoourmha information regarding actual work pedbnnod byall subcontractors, including certified M/VVBE(u)onthis oontnani, the payment thereof and any proposed changes to the original M/VVBE(y) arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any booku, records and files held bytheir company that will substantiate the actual work performed by the K4888BEu on this oontnaot, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of tmotu will be grounds for terminating the contract or debarment from City work for a period of not |muu than three (3) years and for initiating action under Fmdena|. State or Local |mwu concerning false statements. Any failure to comply with this ordinance creates m material breach of contract and may result in m determination of an irresponsible Offeror and barred from DarticiDatinq in Citv work for a period of time not less than one (1) year. Authorized Signatu T/ Printed Signature President Title Jackson Construction, Ltd Company Name Address Fort Worth, TX 76119 City/State/Zip Business Equity Division Email: oNw_osDffica���mwono�xam.gmwPhone (o17)aex'uor^ Contact Name (if different) Phone Number Fax Number Email Address 07/08/2026 Date Rev. 02/07m025 FoRTWORTH. City of Fort Worth ATTACHMENT 1C Business Equity Division Page I of 4 Good Faith Effort Form PRIME1OFFEROR COMPANY NAME: Jackson Construction, Ltd Check applicable box to describe Prime/Offerors Certification . Business Equity Finn Non -Business 1111 E2ulty Firm PROJECT NAME: Cavile Place - Hughes House 11 - Parker Street Sewer Improvements BID DATE 05/15/2025 Business Equity Goal: Business Offeroes Business Equity Goal Commitment: PROJECT NUMBER 78 % 8.8 % � 105364 If the Offeror did not meet or exceed the Business Equity Goal for this project, the Prime/Offeror must complete this form. If the Prime/Offeror's method of compliance with the Business Equity Goal is based upon demonstration of a "Good Faith Effort", the Prime/Offeror will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, I thru 10 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Prime/Offeror. Failure to complete this form, In Its entirety with supporting documentation, and received by the Purchasing Division no later than 2:00 p.m. on the third City business day after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. Exception: CFA, ICA, and CDBG projects, documents will be submitted to the City Project Manager if publicly bid or to the Developer If privately bid. 1.) Please Ilst each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a Business Equity firm or non -Business Equity firm. (DO NOT LIST NAMES OF FIRMS). On all projects, the Prime/Offeror must list each subcontracting and or supplier opportunity regardless of tier. (Use additional sheets, if necessary) I List of Subcontracting Opportunities I List of Supplier Opportunities I Effective 03/1612022 ATTACHMENT 1C Page 2 of 4 2.) Obtain a current (not more than two (2) months old from the bid open date) list of Business Equity subcontractors and/or suppliers from the City's Business Equity Division. Date of Listing 3.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? R7 Yes (if yes, attach list to include name of Business Equity firm, person contacted, Rtgae number and date and time of contact) M. 4.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by fax, exclusive of the day the bids are opened? r__11 Yes (if yes attach list to Includwa BusirM Equity firm, fax number and date and time of contact. in addition, if the fax is returned as undeliverabliftn to llundAftibie confirmation" received must be printed directly from the facsimile for proper documentation. ubriffollkmation and/or "undeliverable confirmation" documentation may render the ONo GFE non -responsive.) N P% 5.) Did you solicit bids from �11 111 111R, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened? Yes (if yes, attach email confirmation to include name of Business Equity firm, date and time. In addition, If an email is returned as undeliverable, then that "undeliverable message" receipt must be printed directly from the email system for proper documentation. Failure to submit confirmation and/or "undeliverable message" F-] No documentation may render the GFE non -responsive.) NOTE: The three methods identified above are acceptable for soliciting bids, and each selected method must be applied to the applicable contract. The Prime/Offeror must document that either at least two attempts were made using two of the three methods or that at least one successful contact was made using one of the three methods in order to deemed responsive to the Goodj—Fai Faith NOTE: The Prime/Offeror must contact the entire Business Equity list specific to each subcontracting and supplier opportunity to be in compliance with questions 3 thru 6. 6.) Did you provide plans and specifications to potential Business Equity firms? F-1 Yes F-] No 7.) Did you provide the Information regarding the location of plans and specifications in order to assist the Business Equity firms? F] Yes [] No Effective 03/15/2022 ATTACHMENT 1C Page 3 of 4 8.) Did you prepare a quotation for the Business Equity firms to bid on goods/services specific to their skill set? Yes (it yes, attach all copies of quotations.) ❑ No 9.) Was the contact information on any of the listings not valid? F-1 Yes (if yes, attach the information that was not valid in order for the Business Equity Division to address the corrections needed.) No 10.) Submit documentation if Business Equity firms quotes were rejected. The documentation submitted should be in the firms forms of an affidavit, include a detailed explanation of why the Business Equity firms was rejected and any supporting documentation the Prime/Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Prime/Offeror will provide for confidential in -camera access to an inspection of any relevant documentation by City personnel. (Please use additional sheets, if necessary; and attach.) Company Name Tale hone Contact Person Scope of Work Reason for Rejection ba AIL ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain Business Equity firm participation on this project. The Prime/Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Prime/Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. A Prime/Offeror who intentionally and/or knowingly misrepresents material facts shall be Debarred for a period of time of not less than three (3) years. Effective 0311512022 ATTACHMENT IC Page 4 of 4 The undersigned certifies that the information provided and the Business Equity firms listed was/were contacted in good faith. It is understood that any Business Equity firms listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City's Business Equity Division. EL M Authorized Signature President N Title N 'M JAAwF Jackson Construction, Company Name 5112 Sun Valley Dr. Address Fort Worth, TX 76119 City/State/Zip Business Equity Division Email: DVIN—BEOffice@fortworthtexas.gov Phone: (817) 392-2674 Jackson Construction, Ltd Printed Signature Contact Name and Title (if different) 817-572-3303 / 817-478-0330 Phone Number Email Address 5/20/2025 Date Effective 0311512022 2 CITY OF FORT WORTH M/WBE Joint Venture Eligibility Form All questions must be answered, use "NIA " if not applicable. Name of City project: Chapel Hill West 24 Inch Water Line A joint venture form must be completed on each project RFP/Bid/Purchasing Number: 1. Joint venture information: Joint Venture Page I of 3 Joint Venture Name: Joint Venture Address: (If applicable) Telephone: Facsimile: E-mail address: Cellular: Identify the firms that comprise the joint venture: Please attach extra sheets if additional sp&re d tailed explanations of work to be performed by each firm comprising the t Aei,�titenture NVWBE finn name: Non-M/WBE firm name: Business Address: k Business Address, City, State, Zip. City, State, Zip Telephone Facsimile E-mail Telephone Facsimile Cellular Cellular Certification Status: E-mail address Name of Certifying Agency: "l-VIV741 PHI 'M MON, 2. Scope of work pertormea i3y the joint venture: Describe the scope of work of the M/WBE: I Describe the scope of work of the non-MIWBE: Rev. 2/13/19 Joint Venture Page 2 of 3 3. What is the percentage of MfWBE participation on this joint venture that you wish to be counted toward meeting the project goal? 4. Attach a copy of the joint venture agreement. 5. List components of ownership of joint venture: (Do not complete if this information is described in joint venture Profit and loss sharing: Capital contributions, including equipment: Other applicable ownership interests: 6. Identify by name, race, sex and firm those individuals (with titles) who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable): Management decisions: a. Estimating b. Marketing and Sales c. Hiring and Firing of management personnel d. Purchasing of major equipment and/or supplies Supervision of field operations The City's Business Equity Division will review your joint venture submission and will have final approval of the M/WBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City's Business Equity Division immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's Business Equity Ordinance 25165-10-2021 . Rev- 2113/19 Joint Venture Paae 3 of 3 AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall agree to provide to the joint venture the stated scope of work, decision -making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits, interviews with owners and examination of the books, records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or willful misre resentation of facts. Name of MBE firm Name of non -MBE firm Printed Name of Owner Printed Name of Owner Signature of Owner F S ure of Owner Printed Name of Owner me of Owner Signature of Owner Signature of Owner Title Title President Date Date 5/20/2025 State of Notarization County of On this day of , 20 , before me appeared and to me personally known and who, being duly sworn, did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public Signature Commission Expires Office of Business Diversity Email: mwbeoffice@fortworthtexas.gov Phone: (817)392-2674 (seal) Rev. 2/13119 FORT WORTH, 17, A. &Wrml EW* A certhMd StIll 511111 IY ftmiii lip14taw [Pursuant to the City of Fort Worth's Business Equity Ordinance, certified Business Equity firms participating under the Ordinance must be certified prior to recommendation of award in order to be counted towards the Business Equity contract goal. Certifying agencies acceptable by the City: North Central Texas Regional Certification Agency (NCTRCA), Dallas/Fort Worth Minority Supplier Development Council, Inc, (DFW MSDC), Women's Business Council - Southwest (WBCS), or the Texas Department of Transportation (TXDOT). Note: For Federally -Funded projects the firm must be certified as a Disadvantaged Business Enterprise (DBE) by the NCTRCA and/or TXDOT only.) All Fl" are RequkW - Do not lem blank I . Name of Project — Cavile - Huohes J g,e ll Parkes 5 fewer ImproygMenr 2. Name of Offeror/Prime Contractor: 3. Name of Business Equity Firm; LB Transportation Address: Po Box 1016, Keller, TX 76244 _ Firm Contact NamelPhone: Lauren Burton -Munro saran rif Feon c�,com e above, �roe 4. The undersigned is prepared to perform the following described work and/or supply the material listed in connection with the above project (where applicable specif&qly",y"lnsAr or both): NAICSCode: 212321 Int the amount of$ 34,344. 00yv _._ I Authorized Ager" or Print Nam (Name of Catiffe4 Bu*m Ecr* Firm) 1� 94nature of OwnarlAuthadzad Agent of Certified Bu*W8sEq*Firm} mate 11, 11 _.0 , C, I !i: , _Z, _2 (Phone Number) I HEREBY DECLARE AND AFFIRM that Troy r 3a^nam the duly authorized representative of (OwnedAuthorizad Agent) Jackson onstruction Ltd and that I have personally reviewed the material and facts (Name of Offerodprime) set forth in this Letter of Intent. To the best of my knowledge, information and belief, the facts in this form are true, and no material facts have been ornitted. Pursuant to the City of Fort Worth's Business Equity Ordinance, any person/entity that makes a false or fraudulent statement in connection with participation of a certified firm in any City of Fort Worth contract may be referred for debarment procedures under the City of Fort Worth's Business Equity Ordinance. I do solemnly swear or affirm that the signatures contained herein and the information provided by the Offeror/Prime are true and correct, and that I am authorized on behalf of the Offeror/Prime to make the affidavit. Troy L. Jackson Jackson Construction, Ltd (Owned Autrtoriser! Agent) Type or Pr6rt Name - (Nam of 01)erof/Prim�— (Signature of PkWr1AUlJ1oyr Agent) (Email Address) (Phone Number) Department of Diversity and inclusion Eftfive 0 1/0 112021 Businm Equity Division Revised. 6,8-21 Email: DVIN BEoff1cC@f0ftw0rthtcXas.90V Ph:817-392-2674 PROJECT # BID # _ (If Appkable Please Check One) Arrmndment [] Change Order Business Equity Division LETTER OF INTENT A. Buskm Equiiy in #hm A certlftad Btsnes Egtliky firm is owned bar a Minority or Woman Business Eftterpti a (MWBE) [Pursuant to the City of Fort Worth's Business Equity Ordinance, certified Business Equity firms participating under the Ordinance must be certified prior to recommendation of award in order to be counted towards the Business Equity contract goal. Certifying agencies acceptable by the City: North Central Texas Regional Certification Agency (NCTRCA), Dallas/Fort Worth Minority Supplier Development Council, Inc. (DFW MSDC), Women's Business Council - Southwest (WBCS), or the Texas Department of Transportation (TXDOT). Note: For Federally -Funded projects the firm must be certified as a Disadvantaged Business Enterprise (DBE) by the NCTRCA and/or TXDOT only.] All Fields are Requh W - to not INVe blank. 1. Name of Project: Cavile - Hughes House II_ Parker5treel Sewer Im row vements 2. Name of Offeror/Prime Contractor: _ _ _Jackson _Construlction Ltd 3. Name of Business Equity Firm: Reliant Haulers, LLC Address: PO Box 1802, Decatur, TX 76234 Firm Contact Name/Phone: Don Elkins/sales@relianthauler: 4. The undersigned is prepared to perform the following described work and/or supply the material listed in connection with the above project (where applicable specify;Aypply" qr "install" or Oothl: n r NAILS Code: 212321 Don Todd Elkins (Owner/ Authorized Agent) Type or Print tNName (Signature of Owner /Authorized Agent of Certified Business Equity Firm) sales.reliant@relianthaulers.com In the amount of $ 16,185.44 Reliant Haulers LLC (Name of Certified Business Eq* Firm) 5/19/2025 (Date) 940-210-9400 (Phone Number) I HEREBY DECLARE AND AFFIRM that Trey I Jackson am the duly authorized representative of (Owner/Authorized Agent) Jackson Construction Ltd and that I have personally reviewed the material and facts (Name of OfferodPrime) set forth in this Letter of Intent. To the best of my knowledge, information and belief, the facts in this form are true, and no material facts have been omitted. Pursuant to the City of Fort Worth's Business Equity Ordinance, any person/entity that makes a false or fraudulent statement in connection with participation of a certified firm in any City of Fort Worth contract may be referred for debarment procedures under the City of Fort Worth's Business Equity Ordinance. I do solemnly swear or affirm that the signatures contained herein and the information provided by the Offeror/Prime are true and correct, and that I am authorized on behalf of the Offeror/Prime to make the affidavit. Troy L. Jackson (Owned Authorize gent) T)pe or print Name (Signature o Owner, orized Agent (Email Address) Department of Diversity and Inclusion Business Equity Division Email: DVrNBEOffice@fortworthtexas.gov Ph:817-392-2_674 Jackson Construction, Ltd (Nameofror/grime) 917-572-3303 (Phone Number) Effective 01/01/2021 Revised. 6-8-21 FQRT ORTH. PROJecr# eia (If Plea Check One) Ame Wment ❑ Change order Business Equity Division LETTER of INTENT X Bushm Equ ty S In on. A Certified Business firm MW ino ' gr An L3n Business En [Pursuant to the City of Fort Worth's Business Equity Ordinance, certified Business Equity firms participating under the Ordinance must be certified prior to recommendation of award in order to be counted towards the Business Equity contract goal, Certifying agencies acceptable by the City: North Central Texas Regional Certification Agency (NCTRCA), Dallas/Fort Worth Minority Supplier Development Council, Inc. (DFW MSDC), Women's Business Council - Southwest (WBCS), or the Texas Department of Transportation (TXDOT). Note: For Federally -Funded projects the firm must be certified as a Disadvantaged Business Enterprise (DBE) by the NCTRCA and/or TXDOT only.) All Flelft are Required - Do not leave blank. 1. Name of Project: vil�Hughes House 11- Parker Street Sewer Impromements 2. Name of Offeror/Prime Contractor: Jackson Construction, Ltd 3. Name of Business Equity Firm: Silvas Trucking, LLC Address: 2509 Janice Ln., Fort Worth, TX 76112 Firm Contact Name/Phone: Benito Silva/benito.silva _silvan 4. The undersigned is prepared to perform the following described work and/or supply the material listed in connection with the above project (where applicable specify "supply" or "install" or both): Trucking/Hauling NAICS Code: 484220 Sandra Rodriguez (Ow ;1 Autho ' Agent) Type or ' t Name (S nature of Ow/Authorized Agent of Certified Business Ecprtty Firm) benito.silva@silvastruckingllc.com 20-1 "� 1 In the amount of $ 57,145.44 Sivas Trucking, LLC (Name of Certified Business Etpttiy Firm) 5/19/2025 (Date) 8177297682 (Phone Number) I HEREBY DECLARE AND AFFIRM that Troy I_ Jackson am the duly authorized representative of (Owner/Authorized Agent) Jackson Construction. Ltd and that I have personally reviewed the material and facts (Name of Offeror/Prime) set forth in this Letter of Intent. To the best of my knowledge, information and belief, the facts in this form are true, and no material facts have been omitted. Pursuant to the City of Fort Worth's Business Equity Ordinance, any person/entity that makes a false or fraudulent statement in connection with participation of a certified firm in any City of Fort Worth contract may be referred for debarment procedures under the City of Fort Worth's Business Equity Ordinance. I do solemnly swear or affirm that the signatures contained herein and the information provided by the Offeror/Prime are true and correct, and that I am authorized on behalf of the Offeror/Phme to make the affidavit. Troy L. Jackson (OwnerTAut'h"o—'rued Agent) 'lsype or Print Name Li 44 (Signature of4wrier/Au orized Agent) (Email Address) Department of Diversity and Inclusion Business Equity Division Email: DVIN BEOfftce@fomvorthtexas.gov Ph 817-392-2674 Jackson Construction, Ltd (Name of Offeror/Prime) (Date) t A72-1343 (Phone Number) Effective 01/01/2021 Revised. 6-8-21 PROJECT#— BID #— (ff AWable Plew Check One) Amendment [] Change Order 0 Business Equity Division LETTER OF INTENT A certified Business _Eguity fiffin is owned by a Minority or Woman Business Enterprise (MWBE) [Pursuant to the City of Fort Worth's Business Equity Ordinance, certified Business Equity firms participating under the Ordinance must be certified prior to recommendation of award in order to be counted towards the Business Equity contract goal. Certifying agencies acceptable by the City: North Central Texas Regional Certification Agency (NCTRCA), Dallas/Fort Worth Minority Supplier Development Council, Inc. (DFW MSDC), Women's Business Council - Southwest (WBCS), or the Texas Department of Transportation (TXDOT). Note: For Federally -Funded projects the firm must be certified as a Disadvantaged Business Enterprise (DBE) by the NCTRCA and/or TXDOT only.] All Fields am Required - Do not leave blank. 1. Name of Project: Qavile - Hughes House 11 - Parker Street Sewer Improvements 2. Name of Offeror/Prime Contractor: Jackson Construction, Ltd 3. Name of Business Equity Firm: Madero Engineers & Constructors, LLC Address: 11712 Roaring Fork Tr, Aubrey, TX 76227 Firm Contact Name/Phone: Frank Madero 281-610-0367 4. The undersigned is prepared to perform the following described work and/or supply the material listed in connection with the above project (where applicable specify "supply" or "install" or both): Supply and Install Epoxy Coating for Concrete Sanitary Sewer Manholes NAICSCode: 238190 Frank Madero (Owner/ Authorized Agent) Type or Print Name (Signature of Owner /Authorized Agent of Certified Business Equity Firm) Frank@madero.net *177 IX-177 77 In the amount of $ 51,883.00 Madero Engineers & Constructors LLC (Name of Certified Bushesis Eq* Firm) 5/30/2025 (Date) 281-610-0367 (Phone Number) I HEREBY DECLARE AND AFFIRM that���� am the duly authorized representative of er/AuthorizidAgent) Jackson Construction, Ltd and that I have personally reviewed the material and facts (Name of Offeror/Prime) set forth in this Letter of Intent. To the best of my knowledge, information and belief, the facts in this form are true, and no material facts have been omitted. Pursuant to the City of Fort Worth's Business Equity Ordinance, any person/entity that makes a false or fraudulent statement in connection with participation of a certified firm in any City of Fort Worth contract may be referred for debarment procedures under the City of Fort Worth's Business Equity Ordinance. I do solemnly swear or affirm that the signatures contained herein and the information provided by the Offeror/Prime are true and correct, and that I am authorized on behalf of the Offeror/Prime to make the affidavit. n-l - %� J ^ '05 b-6 f�*l nerl AutUo ized­Agent) Typ" Print Name (Signature of OwneaWo—rized Agent) (Email Address) Department of Diversity and Inclusion Business Equity Division Email DVIN - BEOffice@fortworthtexas,gov Ph 817-392-i674 Jackson Construction, Ltd (Name of Off "me) _817ATMIM (Phone Number) Effective 0 1/0 112021 Revised. 6-8-21 ................ PROJECT # BID # (if Amicable Pose check one) Amendment ❑ change Order ❑ Business Equity Division LETTER OF INTENT XBusiness Equity Sub-Contmbr/Cmultant'lnbrmatim: A certified Business Equity firm is oned by a Minaft or Woman Business Enterprise NMg) [Pursuant to the City of Fort Worth's Business Equity Ordinance, certified Business Equity firms participating under the Ordinance must be certified prior to recommendation of award in order to be counted towards the Business Equity contract goal. Certifying agencies acceptable by the City: North Central Texas Regional Certification Agency (NCTRCA), Dallas/Fort Worth Minority Supplier Development Council, Inc. (DFW MSDC), Women's Business Council - Southwest (WBCS), or the Texas Department of Transportation (TXDOT). Note: For Federally -Funded projects the firm must be certified as a Disadvantaged Business Enterprise (DBE) by the NCTRCA and/or TXDOT only.] All Fields are Required - Do not leave blank 1. Name of Project: Gavile - 2. Name of Offeror/Prime Contractor. Jackson Construction,, L d 3. Name of Business Equity Firm: Cowtown Redi Mix Concrete Address: PO Box 162327, F7 Worth, TX 76161 Firm Contact Name/Phone: Archie White/awhite ,cowtowrj, 4. The undersigned is prepared to perform the following described work and/or supply the material listed in connection with the above project (where applicable specify "supply" or "install" or bot]1): ,) , NAICS Code: 327320 4' (owner) Authorized Agent) Type or print Name a x,.I (Signature of Owner lAuthorized Agent of Certified Business Equity Firm) n" �. eZQn"A�k* QS (Email Address) B. Affidavit of Offemr/Prime In7th amount of $ 46,420.00 �j� 1) / I d]Qu yi, &40� I d kc ( ame of Cert' ed Business Eqt* Firm) - ' P (Date) (Phone Number) I HEREBY DECLARE AND AFFIRM that Tmy !_ ,lackct}n am the duly authorized representative of (ownerlAuthorized Agent) Jackson Construction Ltd and that I have personally reviewed the material and facts (Name of OfferodPrime) set forth in this Letter of Intent. To the best of my knowledge, information and belief, the facts in this form are true, and no material facts have been omitted. Pursuant to the City of Fort Worth's Business Equity Ordinance, any person/entity that makes a false or fraudulent statement in connection with participation of a certified firm in any City of Fort Worth contract may be referred for debarment procedures under the City of Fort Worth's Business Equity Ordinance. I do solemnly swear or affirm that the signatures contained herein and the information provided by the Offeror/Prime are true and correct, and that I am authorized on behalf of the Offeror/Prime to make the affidavit. Troy L. Jackson (Owner/ Authorized Agent) Type or Prin Name (Signature Owner/A orized Agent) (Email Address) Department of Diversity and Inclusion Business Equity Division Email; DVIN BF-,Oliicer&fortworthtaras.gov Ph;817-392-2674 Jackson Construction, Ltd (Name of O rorlPrl e) a a5 R17.,72-31m (Phone Number) Effective 01/01/2021 Revised. 6-8-21 GC-6.07 Wage Rates THIS PAGE LEFT INTENTIONALLY BLANK 2013 PREVAILING WAGE RATES (Heavy and Highway Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate Asphalt Distributor Operator $ 15.32 Asphalt Paving Machine Operator $ 13.99 Asphalt Raker $ 12.69 Broom or Sweeper Operator $ 11.74 Concrete Finisher, Paving and Structures $ 14.12 Concrete Pavement Finishing Machine Operator $ 16.05 Concrete Saw Operator $ 14.48 Crane Operator, Hydraulic 80 tons or less $ 18.12 Crane Operator, Lattice Boom 80 Tons or Less $ 17.27 Crane Operator, Lattice Boom Over 80 Tons $ 20.52 Crawler Tractor Operator $ 14.07 Electrician $ 19.80 Excavator Operator, 50,000 pounds or less $ 17.19 Excavator Operator, Over 50,000 pounds $ 16.99 Flagger $ 10.06 Form Builder/Setter, Structures $ 13.84 Form Setter, Paving & Curb $ 13.16 Foundation Drill Operator, Crawler Mounted $ 17.99 Foundation Drill Operator, Truck Mounted $ 21.07 Front End Loader Operator, 3 CY or Less $ 13.69 Front End Loader Operator, Over 3 CY $ 14.72 Laborer, Common $ 10.72 Laborer, Utility $ 12.32 Loader/Backhoe Operator $ 15.18 Mechanic $ 17.68 Milling Machine Operator $ 14.32 Motor Grader Operator, Fine Grade $ 17.19 Motor Grader Operator, Rough $ 16.02 Off Road Hauler $ 12.25 Pavement Marking Machine Operator $ 13.63 Pipelayer $ 13.24 Reclaimer/Pulverizer Operator $ 11.01 Reinforcing Steel Worker $ 16.18 Roller Operator, Asphalt $ 13.08 Roller Operator, Other $ 11.51 Scraper Operator $ 12.96 Servicer $ 14.58 Small Slipform Machine Operator $ 15.96 Spreader Box Operator $ 14.73 Truck Driver Lowboy -Float $ 16.24 Truck Driver Transit -Mix $ 14.14 Truck Driver, Single Axle $ 12.31 Truck Driver, Single or Tandem Axle Dump Truck $ 12.62 Truck Driver, Tandem Axle Tractor with Semi Trailer $ 12.86 Welder $ 14.84 Work Zone Barricade Servicer $ 11.68 The Davis -Bacon Act prevailing wage rates shown for Heavy and Highway construction projects were determined by the United States Department of Labor and current as of September 2013. The titles and descriptions for the classifications listed are detailed in the AGC of Texas' Standard Job Classifications and Descriptions for Highway, Heavy, Utilities, and Industrial Construction in Texas. Page 1 of 1 2013 PREVAILING WAGE RATES (Commercial Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate AC Mechanic $ 25.24 AC Mechanic Helper $ 13.67 Acoustical Ceiling Installer $ 16.83 Acoustical Ceiling Installer Helper $ 12.70 Bricklayer/Stone Mason $ 19.45 Bricklayer/Stone Mason Trainee $ 13.31 Bricklayer/Stone Mason Helper $ 10.91 Carpenter $ 17.75 Carpenter Helper $ 14.32 Concrete Cutter/Sawer $ 17.00 Concrete Cutter/Sawer Helper $ 11.00 Concrete Finisher $ 15.77 Concrete Finisher Helper $ 11.00 Concrete Form Builder $ 15.27 Concrete Form Builder Helper $ 11.00 Drywall Mechanic $ 15.36 Drywall Helper $ 12.54 Drywall Taper $ 15.00 Drywall Taper Helper $ 11.50 Electrician (Journeyman) $ 19.63 Electrician Apprentice (Helper) $ 15.64 Electronic Technician $ 20.00 Floor Layer $ 18.00 Floor Layer Helper $ 10.00 Glazier $ 21.03 Glazier Helper $ 12.81 Insulator $ 16.59 Insulator Helper $ 11.21 Laborer Common $ 10.89 Laborer Skilled $ 14.15 Lather $ 12.99 Metal Building Assembler $ 16.00 Metal Building Assembler Helper $ 12.00 Metal Installer (Miscellaneous) $ 13.00 Metal Installer Helper (Miscellaneous) $ 11.00 Metal Stud Framer $ 16.12 Metal Stud Framer Helper $ 12.54 Painter $ 16.44 Painter Helper $ 9.98 Pipefitter $ 21.22 Pipefitter Helper $ 15.39 Plasterer $ 16.17 Plasterer Helper $ 12.85 Plumber $ 21.98 Plumber Helper $ 15.85 Reinforcing Steel Setter $ 12.87 Page 1 of 2 Reinforcing Steel Setter Helper $ 11.08 Roofer $ 16.90 Roofer Helper $ 11.15 Sheet Metal Worker $ 16.35 Sheet Metal Worker Helper $ 13.11 Sprinkler System Installer $ 19.17 Sprinkler System Installer Helper $ 14.15 Steel Worker Structural $ 17.00 Steel Worker Structural Helper $ 13.74 Waterproofer $ 15.00 Equipment Operators Concrete Pump $ 18.50 Crane, Clamsheel, Backhoe, Derrick, D'Line Shovel $ 19.31 Forklift $ 16.45 Foundation Drill Operator $ 22.50 Front End Loader $ 16.97 Truck Driver $ 16.77 Welder $ 19.96 Welder Helper $ 13.00 The prevailing wage rates shown for Commercial construction projects were based on a salary survey conducted and published by the North Texas Construction Industry (Fall 2012) Independently compiled by the Lane Gorman Trubitt, PLLC Construction Group. The descriptions for the classifications listed are provided on the TEXO's (The Construction Association) website. www.texoassociation.org/Chapter/wagerates.asp Page 2 of 2 GC-6.09 Permits and Utilities THIS PAGE LEFT INTENTIONALLY BLANK GR-01 60 00 Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK 2+ eeee>eeeeeevoaeee�ee°aeveee°eveveeeee eaeee<e°eeeeaee°ae _ E E E a c?>' mom rl E a E F>> s q E a p e E a MMm�m s a q 9 p e E E a s "a`." E a 6 a 2 E a a E a E a E a❑ E aM E P a s F3 E E a a 9 E a a E E a a E E o a E E a a 9 E a a E a Q. 0 0 �c000000�n 0 0 0 0 0 0 0 o�c0000000000 0 0 0 0 0 0 0 0 0 0 0000000 0 0 0 0 0 0 0 0 0 0000.ao 0 0 0 0 0 oO�o 0 0 0.0 oo00 0 0 0 00 0 o 0 O o 0 oo.�o 0 0 Oro 0 0 .cO000�n000�o 0 0 0 0 0 0 0 0 0 0 �o 0 0 O M H ul m m. M rl 7 M d A Vo W rye, a 0 t 'o - y w •fl a A O ro C O T 33 0 W b v a w 06 d � U UNJ--. I mN n N M �JUU m N fx 7) u _O Qa L U ♦h A o o x x U H cd c U o °o U U v •E 4 G N N N .A. .`�. .`e. re m .�. .`�. .�. m k k X N d v v E.4 c % G vv >. .G F. n O �. U v v v Nr CC F" F" Cli �i F" F C 'E gq qq 'E 'E FP a❑ 'E 'E pF 9 a gq qq 'E .� FF 3 = UGFH o o v N �UFFFv u 'a 3 3 3 y- -� o A W qa UUUUP.'C7 Z C7 C7 2 2 �+.� toqa 0 op E N s a N�oFFFF 3 F FFFF 3 3 3 3 `� 3 A Q moj a p]P�UUUUUUUUw=-'i",--1���i5 " o 0 0 2 2���ZzO W� m W,a v�rn rn v�FFFFf�FFF r�'j aF 3 mmmUUUUUUUUUUUUU ❑ 3 u u o 0 0 0 0 0 0 0 0 W y O ti - CQ x � a A � C . mc000a0000000caooaaa 3ci0000caoa00000ca000000000000000000000caocacaa00000caoa" % % X_ % % % % X t s ai Vi m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 FN U m 0 N N N N N N N N N N N N N N N N N N N N .`-: .m-� N N N N N N m-� -.mi��.m-��m M- N N- M M M M O N V N N N N N N N N N N N T z N V V O o0 d' N N N N N •y N �� N N N N N N N N N N N -• Q� V 1� V Q� O� O� 4 P P a-, � T 12 a N W Q h l� T 4 O O. ,-. O V 7: .-. �O �O O. vet 1� .-� O� T T T O� O� O� P P o� aeeeeeeeereeee>�e Joeeeaeeee�°ovo emommam Meeeem eeeeaoeee �o �o �o �o �o �o �o �c� � �����e�e���e�������J, �c �c �c �c �a f-.-'-.-.-'-`�' '-�n �o �n �o �c !• �o �o �o �n��e���er�o op O O p 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O p O p 0 0 0 0 0 0 0 0 o O O.O O O O o 0 O.O O o 0 o O p o 0 0 0 0 0 0 0 0 p 0 0000�000 o nm�O vioo0o00 �o �c0000v��c w vxo Oo ������o�c����co�o � o oo�o �o goo Oro o�oo Y� M� Y •", Y V V a m v v v v v d' M M m M m a�� m M 7 m M V M M m. M m m M V m M m. M m M M Q V � m m M V� V� m d' M '7 0 Q W 0 O 3 O N Q ¢ Q 94 F NF40.y?4 NNNoYCQz- uz z U U p__=,3_a��aamaaaaaa U M oMw o A �oo`�oNvaia�vvN % A C t '6 r '6 t '6 fi n i i i° o 0 0 0 0 o U U F o d G a v U U U U U U cW� c4 w w FWi H w w All Is�sss�ru���syM;ruy��NNy���� % T 0 0 o m 3 3 3 3 3 U UUUUUUty CU7� � O M U M M _ V 21 __ M jjj _MM M N M U__O M m � M mmmmN _N _N N m mNMNMNrrO m U m oO mM oO Mm O N N O O N N N N N N N N N N N O N N O O O O N N O O N O N N O O O O N O O N O N O O N O O N N N O N N N N O O O N N N 21 1 N�N 2+ �ooaea<aee c FEE � E Ec E 0 o��oe��ceo 0 0 0 0 0 0 0 o Oo �o U Q U ti Ly O Lyv� 6 U 6 T w Z a a a e F O F o `�Ftk-vMv ° o3v k k « BAR°0000r U U U U U 0 R c OOOL1O000C7O N 3 C d O M m 0 0 0 M 0 N m N N m O U N O O O N N N N 0 0 O 0 N O N O N 0 y as aaQaaaaaaaaaaaQaaaaaaaQ¢aa�¢aaaa��aa� eaaeeee<a°ee°eeeevee°oe<ee<e°ee<oe��ee< E E E E E ES E E E E E E FS E FS E E E E E E FS E E E E E E E E E E E E o O 0 o �o o o �00000�o O O O O O o 0 0 ono 0 0 0 0 a e.000�0 0 0 0 0 0 0 0 0 0 Opp0000�o 0 0 0 0 0 0 0 e 0 0 0 o ppoo�°o 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 o �o 0 0 goo 0 0 0 0 0� T m v J w w 3 33 = 3 3 3 3 3 3 E u o E N V] Q 0tNy .M. IP0 Uh 6 r �mdkNd [z'.Un�'MF�vi .] ddddFvvvVNN�woov v x U U a o UpO UO UO UPP0 0 �'' E ppCppG FpC ppC C= N Oy y G 1 'CO v 9 'E GC a x E3 3 3 5 3 E" U U E o 30 30 30 3o a Q Q9'�6 a o 0 0 0 0 0 0 a U .� .� .� F CFI. F°F°E-°[-° p° •. yUFF FF �.E P i P.S�n', ,oOOODU¢¢ _ C7 UC7 UC7 H r o 0 0 0 '�' o o 9'A Q m m m m m m UUUUUUUU W'rZ z. :2:9:� z z a NNNy Nvy VI VIFFFF F F c m g q q q 0 0 0 0 0 0 0 0 q q q q q q q q q p q O O O q q p q q 0 q 0 N N O O O N N N N m N N N N N N N N N N N N N N N N N N N N N N N N O O N N N O O N N O O O N N O O N N O N O O N N O O N N O N N O O O O N N N O O N C O N N O O N N V N N N O O. N 0 N N. O O N N N N 0 0 N N N N N 0 O N N N N O O O N N -+ V m zt ` N Cd �y W <aaa�aaaaaaaaaa� °o<eeee>�e<eeeee M v m E E c E>> E F c O Oo 0 O O 0 0 O o 0 o 00 o c Oo O o Oo O 0 o S 0 0 0 0 0 �T V d' c 3 L o Q O O O o o iD U O ON kJ:Jdd U W h x r V vU wv v N n o - U N F o UUU0F F F IIu mU H �mw'mmmuuuc°c°wcu; U EL 6 f a1 6� 4 a�, 8� .: O 22f «« ««<«<«<«««<««« «« <«««<<««<«<«< <«« eeeeee<�eee�eeeeeeee< eeeeeeeeeeeeee�eeee veeeeeeeeeeeeeeeeeee eeeee�e M v M M a M E �n - 5 E 53 - - E - - E E - - E E 7Nvi - - E E - - E vi 51 - - P5 E - - F5 E F, - - 5 E vi vi - - E E 7, 53 - - E E vi F, - - E F5 U',5i - - c a i5 - - c E � �c^n - - F5 vi - - 3 E � vi - - E E inhhin - - E - - E E � Ee3 - - E E � � - - E E � � - - E vi � - - E E �� - - � c^n - - vi � - - F5 c � � - - c>; � � - - � Z - - vi 53 - - E 53 - - E E En 555353 - - E E - - E E ^i - - - M a M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OO O O 00 O O O O 00 O O O O O O O O O O 0 0 0 0 0 0 0 0 0 O O N O O 0 0 0 0 O O O O O O O v v v v v v� a v v v a v v� a a v v a v v v v a a v a v��� a v "'v v v�� v a v� a v� y. � h v o�� v a a v v a �•o r o N F R� � O O O M b N Ov o a A 0 A WC L T e e e e e e E U s a _ e m _ j�M1. o'��r1�Q.y0000 w Q � x N ewe z h&�- ii�-I� v N w w F F o o v v U U MI� U � v ry U a U v— a W M i' U M a' � Q y d 7 U N .S N o q N N i i i O ����� i O i r t t 0 0 d d�. v x o a a O O U° c� u_ o f E E E d v� O o o U U cG cC u u u U 'v u U U c-' U C7 C7 C7 F7 G$ w y F F F F ;o ,❑ U u U U U UUU U LJ W CC C d L � � _ L ❑ ❑ L O O O A O O O O A O O A O O O O O O O A G O O O O G O O D O 0 0 0 0 0 0 0 0 O _ A G O Q C Cx_ x_ x_ Wt � � . i W x _ _ _ 22 2 _ M ^ _ _ 2 2 _ 2 _ 2_2 _ _ 2 _ M M O M _ _ _ U M �1 rr�ll v 0 eN+1 N N N O N N V V V N °j ON CN N N N N O N ON O O N N N N N N N N\ N N h h N N N N N N N N N N O O O O N N T V O C N N V O O N N N V h N N O O N N N N N N •� O O N N N N O O N N N O N N O O N 0 N N N 0 0 N N M P N N O C O N �D N N N N ry O O N N 00 T N O 0 N N O O N r O N N O O N N O N N O N O O N 7 N N N N N O N N N N N T O.� U 6-1vim) L OO h 7 s -� O\ S T D\ Q\ b ^ .-. - N T h .-. .� .� h l� T O� S O� Q� T Qi �D �D .-� Q� .N+ .- N v� Q� O� O� .� .: N Q� - V - N N N 2+ a o -ao 0 0����o Ns¢e aaE e a �n •n � � -oo vi ri .... o � � iu n i ? � � E N � 00 00 00 0, 9 N R? F N 3 3" ro 3 a N 5 N N F N N N F D N N F b y F o o {i [i o Li A o o d: d: r o [i 0-- o '^00000000 0000 0 00 'O o oo'^'^'^�_o a F• q � Vi V] G O 3 N 3 mm ro o mw m Am� H '''; k69 c o U mm�ojmmFgN m °� mN�mm�QU N.�- 9 o pp N m C G 4 N- r- N N V N N K K is a a N N N C7 N C2 NVN N �Vq V V o r N H^ �O V C.' 1� V .-. V W M In k. U U Vl 0. 5 W U W W W N M tV•1 M N M V N •D V] N a V N Nw W w 3N y Voo N o c r m Q o O�O U >NJ� 3 W O P7Qm rON Q O F M r^ Y V 0 UNN 0 0 0 V ww V V d' ttyy ttyy n] V i O O U mmmQmmRi FHHv-. ovor�.-.vI r Q N N N l Q O O O W W U U- U °, o �oM.aFo T W a o U W W W M �o v N N N M M N M T N �° o N x � � � G v v u Q ¢, Q .0 0 G - 0 0 0, o o °F°, U °F°, Fo E ._ 9 ._ KK°UU C.0 V V ,G .9 o o [- U U E p C 0 m N 3 0 3 u u c, _c _ o �K ❑❑ �a. i, �. a X X X z p� m m m U U U UU UU U'S 'S 'S 'S z z d viFFH� 2 m m U r/ ¢¢¢a c°'mKaaNNHFHFHF aki F U 0 rL a caaacaci5; 00000000000000ca aac �a oQ r a oAocaCa00000acaca0000ca MMM MMMMMM MMMMMMM_ MM M� 51o�o����G������_�G���GG� y � t�•t M M M M M M M M M M M M M M M M � M M M M t'S+ C n � � � � .Ni .Ni � � � .Ni � N .Ni .Ni � .Ni � .Ni � .N+ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2121212 0 �, ICh., vt �n N N O O N N O N N N O N �n N N O O N O N N N O �D N N N O O N h N N O O N vt �n N N O O N �D v1 N N O O N N M •D N N O O N N N N O N N O N �D. N N 0 0 m N 0 N N O O O N N �D �D N N O O N N �� �D N O N r �D N O � N N N N O O N N N d' N N O O N N N N N N O O N N �D �n N N O O N �D N N N O O N N N •D N N O O N N N N 0 0 N N�� N N 0 0 N N 0 0 N vet � a T o0 .- S T V S v�i o�0 N T .-V N� Q� V V V d' V v�1 �O V Oi O• P h P Q• V V V -N- P vet P O�� T P V vet , �It C A 5 V ' o ro G G p, o 0 y y ce W 'a` S,o 55 -ww oF.FSSSS � F4 i`�i 'c 'x �- d d�❑ 7 � � � F � 3 � aaFFFFg off a q C m V o � w mc b m m 5 5 'p MMUUa � VJ HIM Vl 000N Vl VI N Vl VJ V] � G C vim= 3coaaaca 9s° a � a0. C V _ d N N N N M O O N N N N N N N N N N N N N N O O O O O N N 5 � O.� P m r -8 ag '2 M .M-i o 0 0 0 0 0 o c O O O O N O O E 0 0 O F F F F x F F V U U U V @ Q ¢ Q Q d d d d d E FFE E t--�E F F F N EFEE E ti ti < ti ti s d F �c a O f' M v N y N itl N am^ N ti y ti � N' d M O O ❑❑ M q Q C NF O G �vN Nv 6 [E [nmv5aw mod' o � � Nin2 r� ❑ U r7- a � Z � Z � � N N W N N � e a f7 qpp yd ~ N 2+ C u a x N Z p aUN b 5 U. in a q > 5 A A N > ,'�❑❑ ..w W w W W .77 hUwn. i� m ¢z z z z z ti�cv�in '3 p d d d > a" a+ U U U UU `o d y U b y Fti �a�-5oc G o o r� r 9 L-" oS S u E E E E E L A p wwwww � �"� � � '� x UU v F � 0 0 0 0 0_2 m m 12 m_ o rim M �n 0 0 0 0 0 N N N N N N 0 0 N N N N T U T M V U M M U U U U U �O �OF �Ur �U�++ �Ui E F E E �d EE ¢ d EE �Q d i RR @ Q d¢ Q F¢ddd k X k X X k N NkavXvi�S kkookakvl �S ° N N N VI �S N v v N v fw/] N v y N v Vwl v. * 0 v1 M V] M vJ 4 4 4 M 4 L] F It a v1 E M V] F Fa�h�o7EEEFP7�Fo7� F F F F E F F W 6 F F ¢ U U U) to @a[tQ��Ww¢W@Ww@iwCy.l V] N V] N 4 d d In Vj Vj N V] VJ N U1 WU [cy,@d¢QdQ@dd V V d' 0 0 0 0 -. -. -. 0000�k����ovkiNiC�iC�vki vki�Xc� EEEEEEEEEEu( P wwwwwwwwwwHH[M.[M.[M.tM-'[M.[M-'H[M.[M.[M-' 0 0 0 0 0 0 o A o o a o a a.ao:aa'a, a 'c,aaaa A A C A A A A A A A A A �u:rir.°w°w°O[�. 0 0 0 0 0 0 0 0 0 0 0 0 i°u°. ri u: [��[�-'�FH[��[�•F[�•�F t�-'[�- S S S S o 0 0 0 0 0..2 2 S o o S o 0 0 0 0 0 ','A uu,u,U'7;2;:7000�2;:F ;F 0 0 N N 0 o N N a o N N 0 0 N N 0 0 N N 0 pN 0 0 N 0 0 N N 0 0 N N 0 N 00 N N O O 0 N N O O 0 0 N N O O 0 0 N N O O 0 0 N N O O 0 0 N N 7-- 0 0 N N 0 0 N N 0 0 N N 0 0 N N 0 0 N N 0 O N N �oUUvUUOul U uuuuuuu u U U F F F F F F F F F F F F F F 00" F F F F QdQdQQQQQQQQ Q K k V U � O °mam Vh �O a0 ❑O m ❑" a °' c °o c W `iv' `..-yw W V]FF y `� W �. F F F� x 0 x x 0 0 x� 0 0 c*° 0 E E E X 0K 0 '� FO Op.� Q . . c . o c M. " E" u r - Q Q Q Q Q Q Q Q Q -pa, +8- F F F ❑y a '.� a '� �. L[UWJ W Li UW� L* UW� W. Ri L* UW� Li UW� �i �i L UW[� [ UiJ ai W U Li UJ W CL' qq p.ppa-, qq pa O O O vi E;C 'Y E VJ Vl u.aNaaNawwv"i -'.• _'• J u — o 0 o K oo V v� �p op oo V .5.E FC FC .E N f.� N, N ri �..�.. V kX ? ,^ C o ti N � N C � N � ❑ •_ r K n r W k V' �n V vt �O a0 v� O O O O 2 y y G � oX0 oX0 vki a K W FFFFFFFFFaaa`.a a`a. a. c4 "v �, �n211&L1L a`a`. �n a. 7. a. B. a a a a a a a a a a a a b a a U OC7 UrOOCJ CJO C7 Cj0. aaa.0.c. aa` a o O O O O O N O yC7 a i i i 'a i 'a 'a - .a a O a c❑ y0 O c O O c O o � a❑ y -E a y a a K u x u F u eKi F v v v E E E E E E E E E E E E G G C C F(�-FFFF P.O OOOOOO a��n'aFEF000QQQ4QQ¢6¢ 0 0 0 o a o S° S '-' o � 0 0 � S' 0L C u o 0 0 L' S S S ocaca�3uu'uauu _ o 0 00 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 M 0 0 M M 0 0 0 0 0 0 M 0 0 M M N N N N N N N N y N 0 N N 0 0 N N 0 0 N N 0 0 N N 0 0 0 O O O O O O O N O O N O O O O N O O N O O O C N O 0 N 0 0 N 0 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N P N O� O� �D �O y W W W — — — — x o °aU .000UU U V MU �! UMU � U U U U U U U UUC O D O-IEJUMU N ? N N N a N x a a a a N .E '� o .E .❑ .E �o 'o Ci� N c "cc' �F: CJ�U�r+i0 0 n N y R y F r > C O a VI t a O y O� °'�v'-❑ .9 �U�U�UF n xx,3 c vx pc. K x xd 0. C °O O G o °o °o c c c c c c FC o p U 0 U E O�°t (� V v c U U U U ° U U U .o `g a R a a a a 04 q E o ° E O a F u ❑ F a a� aa0 w° wo E E❑ w° wo E wo wo w° E E E 6 ao'a[o° FFF H zzzaa"rza 0 Q U U ❑' X X� C F F E ,� ° u y ❑ ❑ C C C C ,❑ EE' QQF 'o Q w�afxaan:a d f�'k-00 n.w a. a:MM c i c% V U U U U U c c x ❑ '�tl ° v v v abi v v .. ° ' n m ° .E ua4wc4c424 9<tiu u�uti 0 r 0 0 r r 0 0 r r 0 o r r r o 0 r r M 0 0 r r V 0 0 0 r r N O N N . O O N N .... O O N N O O N N .O O N M O O �-�� N M N N R V 7 0 0 0 N N N FORTWORTH,,. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated:2-26-26 Approvall Spec No. I Classsification I Manufacturer Model No. National Spec I Size Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) 07/23/97 33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra -Seal P-201 ASTM D224004120792 04/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing Ne- 35-0048-001 04/26/00 33 05 13 Profile Gasket for 4' Diam. MH. Press -Seal Gasket Corp. 2504G Gasket ASTM C-443/C-361 SS MH 1/26/99 33 05 13 HOPE Manhole Adjustment Rings Ladtech, Inc HOPE Adjustment Ring Traffic and Non -traffic area 5/13/05 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeat Manhole Encapsulation System Water & Sewer - Manholes & Bases/Fiberglass 33-39-13 (1/8/13) 1/26/99 33 39 13 1 Fiberglass Manhole Fluid Containment, Ine. Elamite ASTM 3753 Non -traffic area 09/30/06 33 39 13 Fiberglass Manhole L.F. Manufacturing Non -traffic area Water & Sewer - Manholes & Bases/Frames & Covers/Rectanaular 33-05-13 (Rev 2/3/16) 33 05 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 1001 24"x40" WD Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) 33 05 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 30024 24" Dia 33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. A 24 AM 24" Dia 0824/18 3305 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" pia 08/24/18 33 05. 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. 33 05 13 Manhole Frames and Covets Sigma Corporation MH-144N 3305 13 Manhole Frames and Covers Sigma Corporation MH-143N 33 05 13 Manhole Frames and Covers Pont-A-Mousson GTS-STD 24" dia. 33 05 13 Manhole Frames and Covers Neenah Casting 24" dia 10/31/06 33 05 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia 7/25/03 33 05 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-RSFS 30" Dia 01/31/06 33 05 13 30" Dia. MH Ring and Cover East Jordan Iron Works V 1432-2 and V 1483 Designs AASHTO M306-04 30" Dia 11/02/10 33 05 13 30" Dia. MH Ring and Cover Sigma Corporation ME1651FWN & ME16502 30" Dia 07/19/1I 33 05 13 30" Dia. MH Ring and Cover Star Pipe Products MH32FTWSS-DC 30" Dia 08/10/11 33 05 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring 30" Dia 10/14/13 3305 13 30" Dia. MH Ring and Cover (Hinged & Lockable) East Jordan Iron Works 30" ERGO XL Assembly with Cam Lock/MPIC/T-Gasket ASSHTO M105 & ASTM A536 30" His 06/01/17 3405 13 30" Dia. MH Ring and Cover (Lockable) CI SIP Industries 2280 (32") ASTM A 48 30" Dia 12/05/23 34 05 13 30"Dia. MH Ring and Cover (Hinged & Lockable) CI SIP Industries 4267 WT -Hinged (32") ASTM A 48 30" Dia 09I16/19 33 05 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. CAP-ONE-30-FTW, Composite, w/ Lock w/oiling. 30" Dia 1Q/0721 3405 13 30" Dia. MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and Cover 30" Dia Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16) ' 33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamdght 24" Dia 33 05 13 Manhole Frames and Covers Neenah Casting 24" Dia. 33 05 13 Manhole Frames and Covers Westem Imn Works,Bass & Hays Foundry 300-24P 24" Dia 33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. 03/08/00 33 05 13 Manhole Frames and Covers Accueast RC-2100 ASTM A 48 24" Dia. 04/20/01 33 05 13 Manhole Frames and Covers (SIP)Semmpore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia Water & Sewer - Manholes & Bases/Precast Concrete (Rev 1/8/13) 33 39 10 Manhole, Precast Concrete Hydro Conduit Corp SPL Item #49 ASTM C 478 1.. * 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. ASTM C-443 11, 09/23/96 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone 12/05/23 33 39 10 Manhole, Precast Concrete The Turner Company 72" I.D. Manhole w/ 32" Cone ASTM C 478 72" 05/08/19 33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" 09/0324 33 39 10 Manhole, Precast Concrete Oldcastle Precast Inc. Manhole, 32" Opening and Flat top, (No Transition Cones) ASTM C 478 48" to 84" I.D. 06/09/10 33 39 10 Manhole, Precast (Reinforced Polymer)Concrete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" 09/06/ I9 33 39 20 Manhole, Precast Concrete Fort— Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & M" 10/07/21 32 39 20 Manhole, Precast Concrete Fort,- Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 I., 10/07/21 33 39 20 Manhole. Precast (Reinforced Polymer) Concrete Armorock 48" & 60" I.D. Manhole w/32" Cone 48" & I" 10/07/21 33 39 20 Manhole, Precast (Hybrid) Polymer & PVC Geneva Pipe and Precast (Predl Systems) 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic Areas 03/0723 33 39 20 Manhole, Precast Concrete AmenTex Pipe and Products, LLC 48" & 60" I.D. Manhole w/32" Cone ASTM C-478; ASTM C-923; ASTM C-443 03/0723 33 39 20 Manhole, Precast (Reinforced Polymer) Concrete P3 Polymers, RockHardsep 48" & 60" I.D. Manhole w/32" Cone 0428/07 Manhole. Precast (Reinforced Polymer) Concrete Amitech USA Meyer Polycrete, Pipe 0210426 33 3920 Manhole, Precast Concrete Thompson Pipe Group 48", 60", 72" I.D. Manhole w26" Cone Sewer -(WACI Wastewater Access Chamber 33 39 40 12/29/23 333920 For use when Std. MH cannot be Wastewater Access Chamber Quickstream Solutions, Inc. Type 8 Maintenace Shaft (Poopit) installed due to depth Water & Sewer - Manholes & Bases/Rehab Systems/Cementitious EI-14 Manhole Rehab Systems Quadex 04/23/01 El-I4 Manhole Rehab Systems Standard Cement Materials, Inc. Reliner MSP El-14 Manhole Rehab Systems AP/M Permaform 4/20/01 EI-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System 5/I2/03 El-14 Manhole Rehab System (Liner) Triplex Lining System MH repair product to stop infiltration ASTM D5813 08/30/06 General Concrete Repair FI.Krete Tecbnologies Vinyl Polyester Repair Product Mi.. Use *From Original Standard Products List 1 FORTWORTH,,. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated:2-26-26 Approval Spec No. Classsification Manufacturer Model No. National Spec Size Water & Sewer - Manholes & Bases/Rehab Systems/NonCementitious 05/20/96 E1-14 Manhole Rehab Systems Spreyroq, Spray Wall Polyurethane Coating ASTM D639/D790 12/14/01 Coating for Corrosion proteetion(Extenor) ERTECH Series 20230 and 2100 (Asphatic Emulsion) Structures Only 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, S 1, S2 Acid Resistance Test Sewer Applications 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications 03/19/18 33 05 16, 33 39 10, 33 3920 Coating for Corrosion protection(Exterior) Sherwin Williams RR&C Dampproo6ng Non-Fibered Spray Grade (Asphatic Emulsion) For Exterior Coating of Concrete Structures Only 02/04/26 Exterior Precast Joint Seal Wrapidseal Exterior Sealant Tape/Shrinkwmp Doesnot ,,place rubber gasket or Ram-Nck Water & Sewer - Manhole Inserts - Field Operations Use Only (Rev 2/3/16) * 3305 13 Manhole In art Knutson Enterprises Made to Order - Plastic ASTM D 1248 For 24" dia. 33 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia 33 05 13 Manhole Insert Noflow-Jnaow Made to Order - Plastic ASTM D 1248 For 24" dia. 0923/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. LdI Saver - Stainless Steel For 24" dia. 09/2N96 3305 13 Manhole Insert Southwestern Packing & Seals, Inc. TetherLok- Stainless Steel For 24" the Water & Sewer - Pipe Casing Spacers 33-05-24 (07/01/13) 11 /04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless. Steel Spacer, Model SSI 04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers 09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48" 09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Casing Spacers Up to 48" 05/10/11 Stainless Steel Casing Spacer Powersea( 4910 Powerchock Up to 48" 03/19/18 Casing Spacers BWM SS-12 Casing Spacer(Stainiess Steel) 03/19/18 Casing Spacers BWM FB-12 Casing Spacer (Coated Carbon Steel) for Non_pmsmm Pipe and Grouted Casing 03/29/22 33 05 13 Casing Spacers CCI Pipeline Systems CSC12, CSS12 09/03/24 33 01 13 Casing Spacers Raei (Completely HDPE) Per Manufacturers Requirements (Sewer Applications Only) 8" - IT (Sewer Only) Water & Sewer - Pipes/Ductile Iron 33-11-1WILD) * 33 It 10 Ductile Iron Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AW WA C150, C151 3" tbm 24" 08/24/18 33 It 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Fmme Pipe Bell Spigot) AW WA C150, C151 4" thm 30" 08/24/18 33 1110 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AW WA C150, C151 4" ff- 30" " 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AW WA C150, C151 * 33 11 10 Ductile Iron Pipe McWanc Cast Iron Pipe Co. AW WA C150, C151 Water & Sewer - Utility Line Marker (08/24/2018) Sewer -COatines/EDOXV 33-39-60(01j 13) 02/25/02 Epoxy Lining System Sauercisen, Inc S—c Gard210RS LA County#210-1.33 12/14/01 Epoxy Lining System Enoch Technical Coatings Enech 2030 and 2100 Series 04/14/05 Interior Ductile Iron Pipe Coating Induron Pmteeto 401 ASTM B-t 17 Ductile Iron Pipe Only 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, SI HB, SI, S2 Acid Resistance Test Sewer Applications 8282006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications Sewer - Coatings/Polyurethane Sewer - Combination Air Valves 05/25/18 33-31-70 Air Release Valve A.R.I. USA, Inc. D025LTP02(Compoaite Body) Sewer - Pipes/Concrete EI-04 Cone. Pipe, Reinfined Wall Concrete Pipe Co. Inc. ASTM C 76 E1-04 Cone. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76 * E1-04 Conc. Pipe, Reinforced Hanson Concrete Products ASTM C 76 E1-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76 Sewer - Pipe Enlargment System (Method)33-31-23 (01/18/13) PIM System PIM Corporation Polyethylene PIM Corp., Piscata Way, N.J. Approved Previously McConnell Systems McLaLConstruction Polyethylene Houston, Texas Approved Previously TRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Approved Previously Sewer - Pipe/Fiberglass Reinforced/ 33-31-13(1/8/13) 721/97 33 31 13 Cent. Cast Fiberglass (FRP) Hobas Pipe USA, Inc. Hobas Pipe (Non -Pressure) ASTM D3262ID3754 0322/ 10 3331 13 Fiberglass Pipe (FRP) Ameron Bondstrand RPMP Pipe ASTM D3262/D3754 04/0921 33 31 13 Glass -Fiber Reinforced Polymer Pipe (FRP) Thompson Pipe Gmup Thompson Pipe (Flowtite) ASTM D3262/D3754 03/07/23 33 31 13 Fiberglass Pipe (FRP) Future Pipe Industries Fiberstrong FRP ASTM D3262, ASTM D368 t, ASTM D4161, AW WA M45 09/0324 33 31 13 Fiberglass Pipe (FRP) Superlit Bom Sanayi A.S. Superlit FRP ASTM D3262, ASTM D3517, ASTM 3754, AW WA C950 *From Original Standard Products List CITY OF FORT WORTH FORT WORTH,.. WATER DEPARTMENT STANDARD PRODUCT LIST Updated:2-26-26 Approval Spec No. Classsification Manufacturer Model No. National Spec Size *From Original Standard Products List FORTWORTH,,. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated¢-26-26 Approval Spec No. Classsification Manufacturer Model No. National Spec Size Sewer - Plpe/Po1ymer Pipe 4/14/05 Polymer Modified Concrete Pipe Anritech USA Meyer Polyerete Pipe ASTM C33, A276, F477 8" to 102", Class V 06/09/10 El-9 I Reinforced Polymer Concrete Pipe US Composite Pipe Reinforced Polymer Concrete Pipe ASTM C-76 Sewer - Pipes/HDPE 33-31-23(1/8/13) High -density polyethylene pipe Phillips Driscopipe, hrc. Opticore Ductile Polyethylene Pipe ASTM D 1248 ft" High -density polyethylene pipe Plexco Inc. ASTM D 1248 8" High -density polyethylene pipe Polly Pipe, Inc. ASTM D 1248 8" High -density polyethylene pipe CSR Hydro Conduit/Pipeline Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - Pipes/PVC (Pressure Sewer) 33-11-12 (4/1/13) 12/02/11 33-11-12 DR-14 PVC Pressure Pipe Pipelife Jetstresm PVC Pressure Pipe AW WA C900 4" thou 12" 1022/14 33-11-12 DR-14 PVC Pressure Pipe Royal Building Products Royal Seal PVC Pressure Pipe AWWA C900 4"thou 12" Sewer - Pipes/PVC* 33-31-20 (7/1/13) 33-31-20 PVC Sewer Pipe J-M Manufacmring Co., Inc. (.IM Eagle) SDR-26 (PS1I5) ASTM D 3034 4" - 15" 12/23/97* 33-31-20 PVC Sewer Pipe Diamond Plastics Corporation SDR-26(PS115) ASTM D3034 4"firu 15" 33-31-20 PVC Sewer Pipe Lamson Vylon Pipe SDR-26 (PS115) ASTM D 3034 4" thru 15" 12/05/23 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe SDR-26.(PS115) ASTM D3034 4"thou 15" 12/0523 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe Gravity Sewer PS 115 ASTM F 679 18" 33-31-20 PVC Sewer Pipe J-M Manufacturing Cc, Ina (JM Eagle) PS 115 ASTM F 679 18" - 28" 05/06/05 33-31-20 PVC Solid Wall Pipe Diamond Plastics Corporation PS 115 ASTM F-679 I'll, 11, 0427106 33-31-20 PVC Sewer Fittings Hareo SDR-26 (PS 115) Gasket Fittings ASTM D-3034, D-1784, etc 4" - 15" * 33-31-20 PVC Sewer Fittings Plastic Trends, Ine.(Westlake) Gasketed PVC Sewer Main Fittings ASTM D3034 3/19/2018 33 31 20 PVC Sewer Frye Pipelife Jet Stream SDR 26 (PS 115) ASTM F679 18"- 24" 3/t92018 333120 PVC Sewer Pipe Pipelife Jet Stream SDR 26 ASTM D3034 4"-15" 3/292019 3331 20 Gasketed Fittings (PVC) GPK Products, be. SDR 26 ASTM D3034 4"- 15" 10/21/2020 333120 PVC Sewer Pipe NAPCO(W.Uske) SDR26 ASTM D3034 4"-IS" 10'22/2020 333120 PVC Sewer Pipe Sanderson Pipe Corp. SDR 26 ASTM D3034. 4"- 15" 10/21/2020 333120 PVC Sewer Pipe NAPCO(Westlake) SDR 26 PS 115 ASTM F-679 lft"-36" 2/4/2026 33 31 20 1 PVC Sewer Pipe Hawk Plastics Corp. SDR 26 ASTM D3034 4"- 15" *From Original Standard Products List CITY OF FORT WORTH FORT WORTH,.. WATER DEPARTMENT STANDARD PRODUCT LIST Updated:2-26-26 Approval Spec No. Classsitication Manufacturer Model No. National Spec Size Water - Appurtenances 33-12-10 (07/OL13) 09/03/24 33-12-10 Double Strap Saddle Ford Meter Box Co., Inc. 202B 1"-2" SVC, up to 16" Pipe 01/I8/18 33-12-10 Double Strap Saddle Romae 202NSNylon Coated AWWA C800 1"-2"SVC, up to 24" Pipe 08/28/02 Double Soap Saddle Smith Blair #317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AWWA C800 1"-2" SVC, up to 24" Pipe 03/07/23 33-12-10 Double Strap Service Saddle Powerseal 3450AS, Incl. Corp. Stop, Old Strap, Stainless NSF ANSI 372 1 "-2" SVC, up to 24" Pipe 10/27/87 Curb Stops -Ball Meter Valves McDonald 6100M,610OMT & 610MT 3/4" and 1" 10/27/97 Curb Stops -Ball Meter Valves McDonald 4603B, 4604B, 6100M, 610OTM and 6101M I%" and 2" 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. FB600-7NL, FB1600-7-NL, FV23-777-W-NL, L22-77NL AWWA C800 2" 5/25,2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., hie. FB600-6-NL, FB1600-6-NL, FV23-666-W-NL, L22-66NL AWWA C800 1-12" 5252018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co, hie. FB600-4-NL, FB I600-4-NL, B I1-444-WR-NL, B22444-WR-NL, L28-44NL AWWA C800 I" 525/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd, B-25000N, B-24277N-3, B-2020ON-3, H- 15000N„H-1552N, H142276N AW WA CSOO, ANSF 61, ANSI/NSF 372 2" 5/252018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd B-25000N, B-2020ON-3,B-24277N-3,H- 15000N, H-14276N, H-15525N AWWACSOO,ANSF61, ANSI/NSF 372 1-12" 525/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd B-25000N, B-2020ON-3,H-15000N, H- 1553ON AWWACSOO,ANSF61, ANSFNSF 372 l" Ol /26/00 Coated Tapping. Saddle with Double SS Straps JCM Industries, Ins. #406 Double Band SS Saddle 1 "-2" Taps on up to 12" 0/521/12 33-12-25 Tapping Sleeve (Coated Steel) JCM Industries, hie. 412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel) JCM Industries, Inc. 415 Tapping Sleeve AWWA C-223 Concrete Pipe Only 05/10/11 Tapping Sleeve (Stainless Steep Powerseal 3490AS (Flange) & 3490MJ 4"-8" and 16" 0229/12 33-12-25 Tapping Sleeve (Coated Steep Rome FTS 420 AWWA C-223 U p to 42" w/24" Out 02/29/12 33-12-25 Tapping Sleeve(Stainless Steep Romac SST Stainless Steel AWWA C-223 Up to 24"w/12"Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Stec) Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp 4" to 30" Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW37C-12-1EPAFFTW Plastic Meter Box w/Composite Lid DFW Plastics Inc, DFW39C-12-IEPAFFTW 08/30/06 Plastic Meter Box w/Composite Lid DFW Plastics hie, DFW65C-14-IEPAFFTW Class"A" Concrete Meter Box Bass & Hays CMB37-B12 1118 LID-9 Concrete Meter Box Bass & Hays CMB-l8-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CMB65-1165 1527 LID-9 Water - Bolts, Nuts, and Gaskets 33-11-05 (01/08/13) None Water - Combination Air Release 33-31-70 (O1/08/13) * EI-11 Combination Air Release Valve GA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A E1-11 Combination Air Release Valve Multiplex Manufacturing Co. Crispin Air and Vacuum Valves. Model No. 1/2", 1 " & 2" E1-11 Combination Air Release Valve Valve and Primer Corp. APCO #143C, #145C and #147C V.2" & 3" Water - Dry Barrel Fire Hydrants 33-1240 (01a 14) 10/01/87 E-1-12 Dry Barrel Fire Hydrant American -Darling Valve Drawing Nos. 90-18608, 94-18560 AWWAC-502 03/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-502 09/30/87 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No.. D-19895 AWWA C-502 01/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-502 08/24/88 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502 E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-90783FW AWWA C-502 0924/87 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502 10/14/87 E-1-12 Dry Barrel Fire Hydrant Mueller Company Shop Drawings No. 6461 A-423 Centurion AWWA C-502 01/I5/88 E1-12 DryBarrel Fire Hydrant Mueller Company Shop Drawing FH-12 A-423 Super Centurion 200 AWWA C-502 10/09/87 E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-502 09/16/87 E-1-12 Dry Barrel Fire Hydrant American Flow Control (AFC) Waterous Pacer WB67 AWWA C-502 08/12/16 33-1240 Dry Barrel Fire Hydrant EJ (East Jordan Iron Works) WaterMaster 5CD250 W ater - Meters 02/05/93 E 101-5 Detector Check Meter Ames Company Model 1000 Detector Check Valve AWWA C550 4" - 10" 08/05/04 1Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AWWA C701, Class I "1. - fi" *From Original Standard Products List FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated;2-26-26 Approval Spec No. Classsification Manufacturer Model No. I National Spec I Size Water - Pipes/PVC (Pressure Water) 33-31-70 (01/08/131 12/05/23 33-11-12. PVC Pressure Pipe Vinyltech PVC Pipe DR14 AW WAC900, AW W A C605, ASTMD1784 4"-16" 12/0523 33-I1-12 PVC Pressure Pipe Vinyltech PVC Pipe DR18 AW W A C900, AW WA C605, ASTM D1784 16"-18" 0910324 33-11-12 PVC Pressure Pipe Northern Pipe Products DR14 AW WAC900, AW WA C605, ASTMD1784 4"-16" 09/0324 33-11-12 PVC Pressure Pipe Northern Pipe Products DRIS AW WA C900, AW WA C605, ASTM D1784 16"-18" 31192018 331112 PVC Pressure Pipe Pipeli£e Jet Stream DR14 AWWA C900 4"-12" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DRI8 AWWA C900 16"-24" 525/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AWWAC900 4"-12" 5252018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AWWA C'900 I6"-24" 12/62018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co, Inc d/b/a JM Eagle DR 14 AW W A C900-16 UL 1285 ANSI/NSF 61 FM 1612 4" 28" /2/62018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co, Inc d/b/a JM Eagle DR 18 AWWA C900-16 UL 1285 ANSI/NSF 61 FM 1612 9/6/2019 33 11 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AWWA C900 9/6/2019 33 PVC Pressure Pipe NAPCO(Wesdake) DRI8 AWWA C900 16"-24" 9/6/20I9 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR14 AWWA C900 4"-12" 9/6/2019 33 11 12 PVC Pressure Ape Sanderson Pipe Corp. DR14 AWWA C900 4"- 12" Water - PipesNalves & Fittings/Ductile Iron Fittings 33-11-11(01/08/13) 0723/92 EI-07 Ductile Iron Fittings Star Pipe Products, Inc. Mechanical Joint Fittings AWWA C153&C110 E1-07 Ductile Iron Fittings Griffin Pipe Products, Co. Mechanical Joint Fittings AWWA C 110 E1-07 Ductile Iron Fittings Me Wane/Tyler Pipe/ Union Utilities Division Mechanical Joint Fittings- SSB Class 350 AW WA C 153, C 110, C Ill 08/11/98 E1-07 Ductile iron Fittings Sigma, Co. Mechanical Joint Fittings, SSB Class 351 AWWA C 153, C 110, C 112 02/26/14 E1-07 MJ Fittings Accucast Class 350 C-153 MJ Fittings AWWAC153 4"-12" 05/I4/98 E1-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1400 AWWACIII/C153 4" to 36" 05/l4/98 EI-24 PVC Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1500 Circle -Lack AWWACIII/C153 4"124" 11/09/04 EI-07 Ductile Iron Joint Restraints One Bolt, Inc. One Bolt Restrained Joint Fitting AWWACIII/Cll6/C153 4"to 12" 0229/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series I100 (for DI Pipe) AW WA C11I/Cl I6/C153 111,0111 02/29/12 33-11-11 PVC Pipe Mechanical Joint Rostrum EBAA Iron, Inc. Megalug Series 2000 (for PVC Pipe) AW WA CI11/Cl l6/CI53 4" to 24" 09/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One -Lek SLC4-SLCIO AWWACIII/C153 4" to 10" 03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCS4-SLCS12 AWWA Cl I I/C 153 4" to 12" 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLOE AWWACIII/C153. 12"to 24" 08/10/98 E147 MJ Fittings(DIP) Sigma, Co. Sigma One-Lok SLDE AWWAC153 4"-24" 10/12/10 E 1-24 Interior Restrained Joint System S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM Eagle ASTM F-1624 4" to 12" 04/07/69 Interior Restrained Joint System Hultec Hydrogrip-R ASTM D395, D412, D471, D573, D883, D1149, D1229, D1349, D1414, D1415, DI566, F913 4'-12" 08/16/06 E1-07 Mechanical Joint Fittings SIP hrdustries(Seampore) Mechanical Joint Fittings AWWAC153 4" to 24" 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargop Series.4000 ASTM A536 AWWA Cl II 11/07/16 33-I1-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stargrip Series 3000 ASTM A536 AW WA CI I I 03/19/18 33-11-II Mechanical Joint Retainer Glands SIP lndustries(Serampore) FZ Grip Joint Restraint (EZD) Black For DIP ASTM A536- AWWA CIII 3"-,1' 03/19/18 33-II-II Mechanical Joint Retainer Glands SIP lndustries(Serampore) EZ Grip Joint Restraint(EZD) Red for C900 DR14 PVC Pipe ASTM A536AWWA CIII 4"-12" 03/l9/18 33-I1-11 Mechanical Joint Retainer Glands SIP lndustdes(Seampore) EZ Grip Joint Ras traint(EZD) Red for C900 DRI8 PVC Pipe ASTMA536AWWAC111 16"-24" *From Original Standard Products List FORTWORTH,,. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated¢-26-26 Approval Spec No. Classsification Manufacturer Model No. National Spec Size Water - PipesNalves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15) Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing # 94-20247 16" 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515 30" and 36" 08/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520&2524(SD 94-20255) AWWA C515 20"and 24" 05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516(SD 94-20247) AWWA C515 16" 10/24/00 E3-26 Resilient Wedge Gate Valve American Flow Control Series 2500 (Ductile loon) AWWA C515 4" to 12" 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515 I.. and 48" 05/23/91 E1-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seaded GV AWWA C509 4" to 12" 0124/02 E1-26 Resilient Wedge Gate Valve American AVK Company 20"and smaller E1-26 Resilient Seated Gate Valve Kennedy 4"-I2" E1-26 Resilient Seated Gate Valve M&H V - 12" * EI-26 Resilient Seated Gate Valve Mueller Co. 4" - 12" 11/08199 Resilient Wedge Gate Valve Mueller Co. Series A2361 ISO 6647) AWWA C515 16" 01/23/03 Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18"-24" (SO 6709) AWWA C515 24" and smaller 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AWWA C515 30" and 36" 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AWWA C515 42" and 48" 0128/88 Et-26 Resilient Wedge Gate Valve Clow Valve Co. AWWA C509 4"-12" 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SO D-20995) AWWA C515 16, 11/08/99 E1-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AWWA C515 24" and smaller 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AWWA C515 30" and 36" (Note 3) 11/30/12 Resilient Wedge Gate Valve Clow Valve Co. Clow Valve Model 2638 AWWA C515 24" to 48" (Note 3) 05/08/9) E I-26 Resilient Seated Gate Valve Stockham Valves & Fittings AWWA C 509, ANSI 420 - stem, 4" - 12" E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co. Metroseal 250, requircmeats SPL #74 3" to 16" 10/26/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works) EJ FI—Master Gate Valve & B— Remove Mateo 225 MR (2-4-26) Water - PiyesNalves & Fittines/Rubber Seated Butterfly Valve 33-12-21 (07/10/14) EI-30 Rubber Seated Butterfly Valve Henry Pratt Co. AWWA C-504 24" Et-30 Rubber Seated Butterfly Valve Mueller Co. AWWAC-504 24"and smaller 1/I1/99 E1-30 Rubber Seated Butterfly Valve Dezurik Valves Co. AWWA C-504 24" and larger 06/12/03 EI-30 Valmatic American Butterfly Valve Valmatic Valve and Manufacturing Corp. Valmatic American Butterfly Valve, AWWA C-504 Up to 84" diameter 04/06/07 E1-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AWWA C-504 24" to 48" 03/19/18 331221 Rubber Seated Butterfly Valve G. A. Industries(Goldea Anderson) AWWA C504 Butterfly Valve AWWA C-504 30"-54" 09/03/24 33 1221 Rubber Seated Butterfly Valve American AVK Company AWWA C504 Butterfly Valve Class 250B AW W A C-504 24" -48" 02/04/26 331221 Rubber Seated Butterfly Valve Mueller Water Products(Pmtt) XR-70W/Segmented Seats AWWA C-504 24"-54" Water - Polyethylene Encasement 33-11-10 (01/08/13) 05/12/05 E1-13 Polyethylene Eneasment Flessol Packaging Fulton Enterprises AWWAC105 Sail LLD 05/12/05 EI-13 Polyethylene Encasment Mountain States Plastics(MSP) and AEP Ind Standard Hardware AWWAC105 8mil LLD 05/12/05 EI-13 Polyethylene Encasment AEP Industries Bullstrong by Cowtown Bolt &Gasket AWWA C105 Sail LLD 09/06/19 33-11-11 Polyethylene Enessirent Northtown Products Inc. PE Encasement for DIP AWWAC105 8mi1 LLD Water -Sampling Station 03/0723 331250 1 Water Sampling Station Kupferle Foundry Company Eclipse, Number 88 , 12-inch Depth o£Bury As shown in spice. 33 12 50 Water - Automatic Flusher 102120 Automated Flushing System Mueller Hydroguard HG6-A-fN-2-BRN-LPRR(Ponable) HG2-A-IN-2-PVC-0I8-LPLG(Permanent) 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipae#9800wc 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9700 (Portable) The Fort Worth Water Department's Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department's Standard Specifications during utility construction projects. When Technical Specifications far specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's Standard Products List and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Fort Worth Water Department's Standard Products Yellow Highlight indicates recent changes *From Original Standard Products List