Loading...
HomeMy WebLinkAboutContract 40853-CO3 v f FORT WORTH, City of Fort Worth CITY SECRETARY Change Order Request CONTRACT NO. �2 3 Project Name Village Creek WWT Second Area S Filter RehabiNtation/Modifications City Sec# 40853 Client Project#(s)l Fort Worth(01289); Caroib(8258A.20); Archer Western(210138) Project Description Contractorl Archer Western Contractors Ltd Change Order# 0 Date L 8/26/2011 City Project mgr.1 Farida S Goderya,PhD,PE City Inspector F Mike Hill Dept. Water Totals Select Day Type Original Contract Amount $8,214,000.00 $8,214,000.00 455 Extras to Date $43,650.00 $43,650.00 0 Credits to Date Pending Change Orders(in MdC Process) Contract Cost to Date $8,257,650.OQ 455 Amount of Proposed Change Order 523,689,00. Q Revised Contract Amount $8,281,339.00 455 Original Funds Avail"for Change Orders $0.00 Remaining Funds Available for this CO Additional Funding(if necessary) $23,689.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2S9Q This Change Order#3 covers the foNowing: OFFICIAL RECORD CMR 07-24'RCCP to DIP Pipe Adapters at RS Pipe Area CITY St N TARY CMR 08-Concrete Blocks Demo at Meter Vault 13 'FT. CRTHI TX CMR 10-Rotation of Two 16'Plug Valves at AB 12N RS Piping Area ' _ Per Change Order#3: AtftW�t c�°�1rok# �a Amount Requested$23,689.00 "7• �� a000000 0��� Contract Time extension for 00 days. 0 0.10 The additional details for CMRs maybe found in subsequent pages. Marty Head , City S � , o � o d 00 00 0 o o b a It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represen in kA(both time and money)for al costs arising out of,or incidental to,the above Change Order. Archer Westem Contracbrs Ltd Mark T Tinton Stafford Troy Lames Bhandai ! Zo K 1 Farida S.Goderya,PhD,PE 11 I ZI t Andrew T Cron ,PE I S.Frank Crumb,PE D Black _ ( I 1 Femando Cosh � / MSC Number (— N/A M&C Data Approved NIA 09-03- 11 A09 :40 OUT f ca, FORTWORTH Enonews..Working Wonders With Water" WATER CONTRACT MODIFICATION REQUEST 7 Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: August 12, 2011 P275- Secondary Area and Rehabilitation and 70130 Project: Modifications Project No.: 0128980 Recipient: City of Fort Worth Subject: 24" RCCP to DIP Pipe Adapter at RS Piping Area. Contractor: Archer Western Contractors, Ltd. Engineer Carollo Engineers Contract Mod. No.: CMR T Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 7 (CMR 7) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore recommended to City of Fort Worth to approve the CMR 7. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. CMR 7 includes the cost related to the pipe adapter at RS piping area. During the construction it was found that the existing 24" RS which is called out as CIP is actually 24" RCCP. The RCCP has a bigger OD than Ductile Iron Pipe and will not allow a flexible coupling connection. Contractor will provide an adapter to connect the new 24" DIP and existing 24" RCCP. Contractor's request for change and detailed cost breakdown is attached with this document. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work, which was included in the original procurement by public bid. Reviewed By Manish Bhandari Date: August 12, 2011 Approved By Farida Goderya, P.E. Daft: August 12, 2011 09-03-11 A09 :40 OUT .r ra w"I y»._....,4,:dW+t —�:1'T^.'-1!"T1a.IN)�.- r r �' r i �r:.fir i7---�♦ :7r:r1 —C•i^'i�"'•'"^7T'�:'Ti.:^SG'i"'• 'i'I:T.,,,:� i r (.�.�'.' : i r �?�?r![i:r7---�?c.?f[r:r] � 1_c^^r�q^:r. �..� : ���' i it �;•r.:xii7---�'r:•i:xr:r7 —17.•:r�'7Y`.r i r �' rir ;:`. i r ---die_�i.rl — SOMEONE SOMEONE SOMEONE!UAMM ' r r v r r SOMEONE —(,.MMM e i r EMEMMULA-- it — —UAMM a it i MISOMR-M.-I--- 'r it —Ua'wommmuzo L r r --- UMit �IuI •ri 1 i r MENOMONEE MMMMMMMlM N it MONSOON ---MOMMIL-M-A---Emmons r i r Emission —SENSE— rrr --- L it r`aPiFte RN • ,"' � z 4:. r r r mmoui[=r1i7— i r �NNOME4Y r 71 xi.r7 — — MOMMININ —�-- Er ri — t 'Aw WOW s.. MENNINIEFT — —7'-!0M'?, #1 _— —INIMIN----IMMEMEMMUMA r r'r ENEMIES is;:+,w�i . .:.._?.°.a.___.!.:��-� :tit ��: ?a�3#u�.:�'.�rsAs �":�� �'k u . '::s'-; ,�;��;a'Q;i'�4�„' u"� �a .:£�';Y�l�'�a�#��•ri*.3. ..'�:r$,:..t3.: — —mmomotit I, MOMMEN EMMONS • �IMMEMEMENO IMEMEMEMEN�! l Sulu_��_�••.;uratiYK.�y!•::••s..,��;.�. .,r� �, _ ,::: �L1Y<:.iKl r coo FORTWORTH ftinem...Working Wonders With Water WATER CONTRACT MODIFICATION REQUEST 8 Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: August 12, 2011 P275- Secondary Area and Rehabilitation and 70130 Project: Modifications Project No.: 0128980 Recipient: City of Fort Worth Subject: Concrete Encasement Demolition @ Meter Vault 13 Contractor. Archer Western Contractors, Ltd. Engineer Carollo Engineers Contract Mod. No.: CMR 8 Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 8 (CMR 8) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is.' The Engineer has therefore recommended to City of Fort Worth to approve the CMR 8. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. CMR 8 includes the cost demolition of concrete thrust blocks around the primary effluent piping, which were uncovered during the excavation for the new meter vault for Aeration Basin 13. Contractor's request for change and detailed cost breakdown is attached with this document. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work, which was included in the original procurement by public bid. Reviewed By Manish Bhandari Date: August 12, 2011 Approved By Farida Goderya, P.E. Date: August 12, 2011 09-08-11 A09:40 OUT C ,1 7 X11: r rltr^� ��tr, atr��-^7•�r-'i��*-^�'�t��-,^-a �r�-----:;ra �a'�"`�,�,"�' " . i i k�.f A 'i.,£•',,`.s. h .,..rti> :�}�x'--'�,k(b�<. .,.��Sn.�,•S'�i"s3���..��}t.�+ 1 ,wrs!.i.C` '"r'$'�.�'4+SA1.,^" `�°�.f'�d.�. �": ,"� -..�..m'��%"'�.+..f�`i.i'i� ,"��'° ..i i.9Y°�,' &3,-ii.'ICX± SOMEONE nommokGir17Uj•'nommaiL'Ia a�a:Ic ii�17- =LL^'S!?',•'�^Ti��. „ �"� y „ w=�pi?::. Il ---wZI,T 7i�7 mommou SIEMENS SIEMENS Z. sommot, SIEMENS SIEMENS - IMMENSE _�.•+' "I. �a..a� 11 MENEM_-..Lrj--- ?1 i' SIEMENS INIMMIMME SIEMENS SESSION SIEMENS 1 11 ---- 'I I1 mommisimmis a I1 SIEMENS SIEMENS ---- 1 -a mommaL. .,I sionomi -_T• :..:�, �.:. 'i Vi+��:L 1(i,1--�11..1�117 a L.1 i1 SIEMENS " yy��i1�•I1�17-- „111 III 11 ,, .. _ .": v«�n,�i€ > . S +.mot : ,t.,;•r, s ,e �t .a ?Wx "stf�.?.: a s stn v ? aa5 z4km=5 dt � G»l� 4 +t .. SIEMENS NIMENIS -- 1 1 I I al i1 .''J�`7-?'7h'��'dro _-.L'a�'LL'Zi'1..'►"'T'_il;•;1.f�'"""r'7"" ili'i•`^=':�1-_----- IMMENSE AP4 A ' INIMISIM 1ru7--- L i I I�..:�.:ulasiK•�7r-•.,-,..,�,,. .r1- c_-"..". ����2d'J�srR:..�.■ ar►_1 fr_ ca rfw%f f;,%, FORTWORTH EngirWts...Working Wonders With Water" WATER CONTRACT MODIFICATION REQUEST 10 Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: September 1, 2011 P275- Secondary Area and Rehabilitation and 70130 Project: Modifications Project No.: 0128980 Recipient: City of Fort Worth Subject: Rotate 16" Plug Valves Contractor: Archer Western Contractors, Ltd. Engineer Carollo Engineers Contract Mod. No.: CMR 1Q CMR 10 includes the cost of rotating the two plug valves and actuators installed in the meter vaults located in the RS piping area outside RS 6. Detailed cost breakdown for the construction work are attached with this document Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 10 (CMR 10) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore recommended to City of Fort Worth to approve the CMR 10. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work, which was included in the original procurement by public bid. Reviewed By Manish Bhandari Date: September 1, 2011 Approved By Farida Goderya, P.E. Date: September 1, 2011 09-08-11 A09 :40 OUT -y 1 .1 • 1[ • 7 :I1: ■?5licail •_�. .,. F 1 tlT"�l'T=7�E�''_rr.,.^"_MU."r^^-yy::Lm MILM MISSION MONSOON SOMEONE -� 11 11 11 -• ' 1'1 1 11 --- :1 i I SIEMENS 11 1 II --- JI 11 SIMMONS SESSION SIEMENS -�..•' e i 1 v� i 1 --- 11 i 1 -�j„•''�iF:7�:11 Lit --- ?I i 1 - a �L..:-....... SIEMENS - mommuLl 11 MINE soNK:l—vLl a, SIEMENS!INNER mmmmmt7-.]U-2 . :n t S;,'x u At�"::fitd�:.'v'i"r.r. :s � t� 3rs;.�.{ro'sT v, 4 TSB•Sa'K>.'� `• .s'� b��,,,," 7;�`y�'' &5r.,.;::1 { t° �!':� l"+ P�:#I �'..,:Vii:,§sa, �u��+F�".t.,;,° " " ,, ._,:.,.....,.1 E., .... i::.?",..'.;'s..a'`-�i '''<,kx,a�S:t$d.,?t.? �..tx,.t sr3« .a� Ip„ 's''`ds,"�, •:a ,ar.3'1:xEh�t ` �?os,c<3'' CA .'i .'. F e";id3 esF, X mmmomt_-i-A-.S - U4'� fir. ?;a x-r"`�z,�i.n.,x4 r>.�r q r'.,a. �- y'�? :d •, �,. *�.aiTlst MONSOON - ------ - ------ - ------ • .1 '11,1■ �I II +Lli< 11 �I it 1 I1 • - ----lvYCl:ia n•IGI�a�•yla■.:i6Y•S.�7r::�•,�-.,�1. .1ri .... ���l.A.J�iRL�•1