HomeMy WebLinkAboutContract 40853-CO5 Cmr SEOWARY qo�S5-(ff FORT WORTH. City of Fort Worth CONTRA[NO` r Change Order Request Project(Jame ViMge Creek WVVT Secondary Area&Filter RehabilitatiftModifications City Sec$ f 40853 Ciienl Prc)ect#(s) Fort Worth(01289), Carollo(8258A 20); Archer Western(AeM Project Description Contractor Archer Westem Contractors Ltd Change Order R L U Date 51512012 City Project M,,r. Fanda S Goderya.PhD,PE City Inspector bike Hill Dept. Water Select Day Totals Type Original Contract Amount S8,214,000.00 S8.214,000.00 455 Extras fo Date $116.716.00 S116,71500 90 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $8.330.716110 $8,330,715.00 545 Amount of Proposed Change Order 427 2 -$27,727.00 6G Revised Contract Amount $8302 S8 302,989.00 605 Criginal Funds AvaiiaLVe for Change Crd_trs 50.00 Remaining Funds Available for this CC $Q Additional Funding jif necessary; CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1,0896 MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) 1 S10,267,500,00 7Change rder#5 covers the following: 17.CMR 20.UIR 21,CMR 22,CMR 23 CMR 24 and deletes the aid Item 8-3. xlersicn of 60 Days is covered by CMR 20. 4,d-p'OD.1Z�n� The additional details may be found in subsequent pages. •o� Fe ��o�0000000 � �a�� AT": g OFFICIAL RECORD*$ ,y d ,?r. C ITY SECRETARY ooary Kayser, City �o 00000p FT. WORTH, TX tt is understood and agreed that the acceptance of this Change Order by �onrrt4r4cshtutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. _. Stu 8 Archer Western Contractors Ltd Mark Tapera or Clinton Stafford r a • Tro Laman I Hutch Musall 5 3! 12. Fanda S. a,PhD.PE - -f Z Andrew T Cronber ,P S.Frank Crumb,PE Dou Black Fernando Costa t -- _ 'M3C"dumber tit&C Date Apprwet1 CD 8 8@\ \ 00 clq m C::, co m kC C\! /o. e m y\ co / Ll a k y 37y $ G ƒ ? \ G ® ~ � wc n G J q m � e § = G ƒ \ < * f CO 2 2 2 2 = ƒ 0 0 0 0 0 RRR9 # / 6 � � = 2 0 / k ■ C) � 2 txo c ° � 0 D = O y \ 7 $ & 7 2 2 0 � k � � � ~ / / / / / k R « p \ 2 ¥ < � 2 / ƒ d ) 2 ƒ 0 0 k G ƒ 0 @ / < / ® \ U ? / / u 2 k \ / 2 � $ \ � 7 o 2f / E % _ ƒ � G m 2 E i \ / ° / - Q - ± 0 @ m \ � / a G § 0 .e / * c ° % 2 % f & ƒ C') / U) \ \ f / $ \ _ ƒ \ \ $ u m \ p / m \ J-12U ~ / E © D / s � / - Q .2 a) _ e = 2 I = % § ¥ � m ° ( 'L- LD \ / f / / / e 6 2 Q \ - r & % gR3 8 G / \ « ± I - ® b a -, R R k k k - ± m » z m w \ g k k k e g 2 o co C.0 Q � \ E co # \ G k co / Z $ $ 0 Z) h ¥ « _ 7 % # / > 7 \ \ y m \ e \ E \ m Z � 0 m k \ _» $ o � w LL q / % O kCl) \ c / u U2 / � U 7 / ® G = = 5 / ƒ / \ ° / ƒ k cl \ \ / ° ° ƒ m \ ƒ o 0 4 m = f t = 2 = 3 2 / ƒ § I / f S 2 G ® p / \ \ ° G » \ » _ / — � O G �S FORTWORTH Engineers... CONTRACT MODIFICATION REQUEST 15 WATER Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: February 24, 2012 P275- Secondary Area and Rehabilitation and 70130 Project: Modifications Project No.: 0128980 Recipient: City of Fort Worth Subject: AB 12 & 13 Air Valve Rotation Contractor: Archer Western Contractors, Ltd. Engineer Carollo Engineers Contract Mod. No.: CMR 15 CMR 15 includes the cost of rotating the air release valve, so that the valve actuators are accessible to the plant staff. This is a CMR associated with Field Order 3 (see attached). Detailed cost breakdown for the construction work are attached with this document. Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 15 (CMR 15) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore recommended to City of Fort Worth to approve the CMR 15. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work, which was included in the original procurement by public bid. Reviewed By Manish Bhandari Date: February 24, 2012 Approved By Farida Goderya, P.E. Date: February 24, 2012 r CMR 15 VILLAGE CREEK WWTP SECONDARY AREA&FILTER REHAB AND MODS OWNER CITY OF FORT WORTH TEXAS WORK DESCRIPTION: Rotate it valves on AB and so that actuators can be accessed from walkway per FO 3. ENGINEER: CAROLLO ENGINEERS 14785 Preston Road,Suite 950 DALLAS,TX 75254 CONTRACTOR: ARCHER WESTERN CONTRACTORS,LTD 2121 AVENUE J,SURE#103 ARLINGTON,TEXAS 76006 d tern _ Desrn bon Z Unit Uni ce abor atena E w ment Subcontractor otas setumandreassembevalvj., '• '<?' .i_.^ }•4a ;,..• 3 00 n -9 0 6 .00 3 0 9 6 .00 Turn actuator on va ve H 9.0 3 0 08. 0 Tou u aint 0 0 0 0. 0 0 0. 0 1 0. MH 19.00 0.00 0.00 MH 19.00 0.00 0.00 MH 19.00 0.00 0.W 9. 0.0 9. .00 0 0.00 o. o Gas els Ls 0. 0 0. 0.0 0. .0 . .00 0 .00 .00 0 430 Backhoe -=t ..�.,�. _�_ r=:f 0 0 1.00 Da 333.00 U '` Sca d o 0 a 1 . 03'� 333.00 0 0. .0 0. 00 FSG Electric > :a >' `85 .f 58. .0 U. .00 U. 0.0 .00 .0 TOTALS: Labor Burden @ 48%of Labor $160.00 $533.00 5 . Small Tools @ 15%of Labor .56 802. Safet Su lies 7.5%of Labor 250.80 250. TOTAL C S 5. $125.40 1 N4 4n1 7T OHBP @ 15% Insurance and Bond @1.5% Subtotal: AMOUNT COST PROPOSAL SUMMARY 1 $000 FSGelectric (C PROPOSED CHANGE ORDER Client Address: CCN# 4 Date: 11/17/2011 Archer Western Contractors Project Name: Village Creek WW Contact:Clint Stafford Project Number: 30J1913 4500 Wilma Lane Contract#: 210066S01 Arlington,TX 76012 Page Number: 1 Contact: Clint Stafford Work Description This change notice includes all labor, material and supervision for the scope of work shown below. We reserve the right to correct this change notice for errors and omissions. This price is good for acceptance within 10 days from the date of recipt. Scope of work: 1. Disconnect and reconnect butterfly valves located at ab12S and 13S for plant staff access. Exclusions: 1. Any utility and permit cost. 2. Any wall or ceiling covering cutting,patching and painting. 3. Any concrete/asphalt cutting and or patching. 4. Roof penetrations or patching of any kind. 5. Overtime unless specifically stated in scope of work above. Itemized Breakdown Description Qty Net Price U Total Mat. Labor U Total Hrs. 3/4"LT FLEX 20 295.00 C 59.00 8.20 C 3/4"LT STRAIGHT CONN 1.64 4 538.12 C 21.52 20.40 C 0,82 3/4"ARC(AL) 10 180.35 C 18.04 6.80 C #12 XHHW BLACK 96 168.40 M 16.17 6.18 M 0 68 DEMO 0.59 3 0.00 E 0.00 1.00 E 3,00 Totals 114.73 6.73 Summary General Materials 114.73 Material Total JOURNEYMAN (6.73 Hrs(@$52.00) 114.73 FOREMAN @ 25% (1.68 Hrs @$55.00) 349.96 Labor Burden (@ 42.000%) 92.40 185.79 Subtotal Overhead (@ 10.000%) 742.88 Mai kup 74.29 (@ 5.341;!o} 40.86 ORIGINAL "525 WALNW HILL LAW 0100.DALU S,TX 75729,T 214.357-%97,F 214-337-S794,TECL 117904 C xk PROPOSED CHANGE ORDER Client Address: Archer Western Contractors CCN# 4 4500 Wilma Lane Date: 11/17/2011 Arlington, a Project Name: Village Creek WW7 Project Number: 30J1913 Page Number: 2 Summary(Cont'd) Subtotal 858.03 Final Amount $858.03 CLIENT ACCEPTANCE CCN M 4 Final Amount:$858.03 Name: Date: Signature: Change Order#: hereby accept this quotation and authorize the contractor to complete the above described work ORIGINAL C CPPAI , FORTWORTH Engineers_..; CONTRACT MODIFICATION REQUEST 17 WATER Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: February 4, 2012 P275- Secondary Area and Rehabilitation and 70130 Project: Modifications Project No.: 0128980 Recipient: City of Fort Worth Subject: Resurfacing of Nelson Road Contractor: Archer Western Contractors, Ltd. Engineer Carollo Engineers Contract Mod. No.: CMR 17 Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 17 (CMR 17) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. CMR 17 includes the cost for milling and repaving Nelson Road from the north end of AB 11 to JR Hendricks. While the original contract called for resurfacing, which is an overlay on top of the existing pavement, the work identified in the CMR will remove the top 2" of the existing pavement and allow a new top layer of pavement which will be more durable than the overlay. Detailed cost breakdown for the construction work are attached with this document. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore recommended to City of Fort Worth to approve the work as CMR 17. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work, which was included in the original procurement by public bid. Reviewed By Troy Laman Date: February 4, 2012 Approved By Farida Goderya P.E Date: February 6, 2012 CMR 17 VILLAGE CREEK WWTP SECONDARY AREA&FILTER REHAB AND MODS OWNER: CITY OF FORT WORTH TEXAS WORK DESCRIPTION: Mill Approx o existing asphalt and Remove from site ENGINEER: CAROLLO ENGINEERS 14785 Preston Road,Suite 950 DALLAS,TX 75254 CONTRACTOR: ARCHER WESTERN CONTRACTORS,LTD 2121 AVENUE J,SUITE#103 ARLINGTON,TEXAS 76006 Bid Item Desch lion ON I Unit Unit/Price I Labor I Material I Equipment Subcontractor Totals IMH .00 1 0.00 1 .. 0.00 IMH 19.00 0,00 1 0.00 .00 1$19.00 0.00 1 O.Go 00 0.00 1 .00 MH 00 0.00 i 10.00 MH $19.00 0.00 1 0.00 MH 00 0.00 I MH 19.00 0.00 $0.Q0 M 0.0 0 MH 19.00 0.00 0.00 MH 9.0 0.0 0.0 H 9.00 0.00 0.0 00 0.0 00 0.00 9$'o0.00 .00 0. 0 0.0.,r,.. 0 _ -, _ .- 0. $0.00 1 &00 0.0.00 ==40K000.00 0. 0.00 Alltex FlaN 1.00 LS 8500.00 $8.500.00 $8.500.00 0.00 $0.00 0. 0. 00 0.00 TOTALS: 0.00 0.00 0.00 8 500.00 8 500.00 Labor Burden @ 48%of Labor 0.00 0.00 Small Tools @ 15%of Labor $0.00 0.00 Safet Su lies 7.5%of Labor 0.00 0.00 L I C CO 5 0. OH&P @ 15% 1 275.00 Insurance and Bond @1.5 Subtotal: 0 9. .6 OTAL AMOUNT THIS COST PROPOSAL SUMMARY............................... 9 921.63 "CMR #20 June 6, 2012 Attn: Mrs. Farida Goderya City of Fort Worth, Texas 1000 Throckmorton Street Fort Worth, TX 76102 RE: VCWWTP Secondary Area & Filter Rehab & Modifications— Contract Modification Request#20- Time Extension 2 Dear Mrs. Goderya: Archer Western requests a 60 day time extension due to coordinating the pavement work and obtaining the final punch list. If you have any questions, please contact me at (214) 837-8019. Sincerely, Archer Western Contractors, Ltd. Clint Stafford Project Engineer Ca r0ft FORTWORTH Engineers...Lvorkirg 1vorrtels h✓„h �U.�:er CONTRACT MODIFICATION REQUEST 21 WATER Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications OCR City of Fort Worth, Texas Date: April 26, 2012 P275- Secondary Area and Rehabilitation and 70130 Project: Modifications Project No.: 0128980 Recipient: City of Fort Worth Subject: Motorized Actuators for waste sludge service at RS 1 and 2 Contractor: Archer Western Contractors, Ltd. Engineer Carollo Engineers Contract Mod. No.: CMR 21 Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 21 (CMR 21) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. CMR 21 includes the cost for changing the cards in two motorized Rotork actuators from open/close (O/C) service to modulating (mod) service. The original contract included the O/C cards for the actuators, however the plant requires modulating capability to control waste activated sludge flow rates and solids inventory. CMR 21 includes only the purchase of the cards. Installation of the cards and programming will be completed by Fort Worth VCWRF maintenance and Instrumentation staff. The warranty for the actuators will remain intact in light of plant staff replacing the cards. Detailed cost breakdown for the construction work are attached with this document. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore recommended to City of Fort Worth to approve the work as CMR 21. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work, which was included in the original procurement by public bid. Reviewed By Troy Laman Date: April 26, 2012 Approved By Farida Goderya, P.E Date: April 26, 2012 1.� CMR 21 VILLAGE CREEK WWTP SECONDARY AREA$FILTER REHAB AND MODS OWNER: CITY OF FORT WORTH TEXAS WORK DESCRIPTION: Cost is to supply the Girds only. The cards will be turned ov er to the plant staff to install and program. ENGINEER: CAROLLO ENGINEERS 14785 Preston Road,Suite 950 DALLAS,TX 75254 CONTRACTOR: ARCHER WESTERN CONTRACTORS,LTD 2121 AVENUE J,SUITE#103 ARLINGTON,TEXAS 76006 & Item p�pi _ r4, _, ,. Material E ui ment b tra or T al r,.,:4 _ c MH -..c:19.00. 0.00 MH 19.0 0. 0 MH 19.00 0.00 0.00 MH 19.0 0. 0 .00 MH 19.00 0.00 0.00 MH 19.0 MH 19.00 0.00 MH 19.0 0.0 0.00 MH 19.00 0.0 0.00 MH 1 .00 0.00 0. 0 MH 1 .00 .00 0. MH 19.00 0.00 0.00 MH 19. 0 .00 0' .0 0.00 0.00 - - _ 0.00 IOT Actuator Modulating Card 200 EA 1 855.00 3 710.00 710.00 3 710.00 .00 0. 0 .00 0. .00 0. .00 0.00 0.00 0.00 .0 .00 0.0 .00 .t -�.... 0.0 .00 000 X0.00 0 0.00 OU 0.00 0.00 0.00 TOTALS: Labor Burden @ 48%of Labor 0.00 3 710.00 0.00 0.00 3 7 0.00 Small Tools @ 15%of Labor 0.00 0.00 Safe Su lies 7.5%of Labor $0.00 0.00 TOTAL DIRECT COSTS: 0.00 0.00 3 710.00 OH&P @ 15% Insurance and Bond @1.5% $556.50 TOTAL AMOUNT THIS COST PROPOSAL SUMMARY Subtotal: 64.00 ............................... 0.00 14,330.50 4 330.50 Ca rOft 110W FORTWORTH Engineers...lt{>r�Jrg CONTRACT MODIFICATION REQUEST 22 WATER Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: May 2, 2012 P275- Secondary Area and Rehabilitation and 70130 Project: Modifications Project No.: 0128980 Recipient: City of Fort Worth Subject: Column repair at RS 7. Contractor: Archer Western Contractors, Ltd. Engineer Carollo Engineers Contract Mod. No.: CMR 22 Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 22 (CMR 22) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. CMR 22 includes the cost for repairing concrete at an existing column and adding support brackets for the grating support beam. The unit cost for concrete repair of$60/sf is in accordance with the unit price set forth in the bid form as bid item B-9. Detailed cost breakdown for the construction work are attached with this document. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore recommended to City of Fort Worth to approve the work as CMR 22. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work, which was included in the original procurement by public bid. Reviewed By Troy Laman Date: May 2012 Approved By Farida Goderya, P.E Date: May 2, 2012 C' CMR 22 VILLAGE CREEK WWTP SECONDARY AREA&FILTER REHAB AND MODS OWNER: CITY OF FORT WORTH TEXAS WORK DESCRIPTION: Extra Work Involved in Repairing the Concrete at PST Does Not Include the ENGINEER: CARDLLO ENGINEERS Actual Concrete Repair. That lis part of Bid Item B-9. 14785 Preston Road,Suite 950 DALLAS,TX 75254 CONTRACTOR: ARCHER WESTERN CONTRACTORS,LTD 2121 AVENUE J,SUITE#103 ARLINGTON,TEXAS 76006 Bid Item crl an Uni Unit/Pnce La or M erial E ui m nt Su c tra Total. r.-C.:. Remove/R lace Gratin 4.00 MH19.00 76.00 Install nd Rem ve horin t Su or Beam 12.0 MH 19. 228 76.00 Remove Exisun An les 4.00 MH 19.00 76.00 22 .00 Drill N Holes and Drill Holes in PI to f Exis in fs .0 MH 19. 1 0 76.00 Install New Plates 16.00 MH 19.00 304.00 1 MH 19.0 304.00 MH 19.00 0.00 MH 1 .00 .00 0.00 MH 1 .0 .00 0. 0 MH 1 .00 0.00 0' MH 1 0 0. .0 MH 19.00 0.00 .0 MH 19. 0 0 0.00 >.. MATE %, _.... 0.00 0.00 00 FNates Anchors and o - 1.00 LS 325.00 325.00 325.00 0. 0 0.0 0. 0. 0. 0 0.0 0.00 .00 0.00 QUIP .00 0.00 0.00:. 0. 0 0. 0. 0 0. 0 0 00 Welder . . o 0 0 . �. 1.00 LS 260.00 260.00 260.00 0.00 0. 0.00 Craft v a . j 0.00 p 0 0 e .0 MH 60. 0 0. ` i- 4 TOTALS: Labor Burden @ 48%of Labor 1 236.00 1 325.00 0.00 260.00 1 821.00 Small Tools @ 15%of Labor 593.28 593.28 Safe Su lies 7.5%of Labor 185.40 185.40 TOTAL DIRECT COSTS: 92'70 92.70 2 692.38 OHBP @15% Insurance and Bond @1.5% 403.86 Subtotal: 46.44 TOTAL AMOUNT THIS COST PROPOSAL SUMMARY............................... 0.00 3 14 .68 3 142.68 Troy Laman From: Chris Story[cstory@jgeng.com] Sent: Thursday, April 26, 2012 10:36 AM Z To: Troy Laman; Goderya, Farida C Cc: Hutch Musallam; Hill, Mike Subject: RE: punch list item; VC Sec Rehab; RS7 Column Repairs(internal) Plates to be primed carbon steel to match the existing steel beams. Adhesive anchors shall be 316 stainless. CHRIS STORY,PE PRINCIPAL 2105 COMMERCE STREET, DALLAS,TEXAS 75201 214 623.5810 PHONE 972 742.0206 CFLI_ JQENG.COM The information in this e-mail is confidential and may be legally privileged.It is intended solely for the addressee.Access by any other person to this e-mail is not authorized.If you are not the intended recipient,please delete this e-mail.Any disclosure of this e-mail or of the parties to it,any copying,distribution,or any action taken or omitted in reliance on it is prohibited,and may be unlawful. From: Troy Laman [mailto:TLaman @carollo.com] Sent: Thursday, April 26, 2012 10:27 AM To: Chris Story; Goderya, Farida Cc: Hutch Musallam; Hill, Mike Subject: RE: punch list item; VC Sec Rehab; RS7 Column Repairs (internal) Chris, What are the materials for the bent plates?Should they be steel,galvanized steel, stainless, aluminum, etc. From: Chris Story [mailto:cstoryCc0Jgeng com] Sent: Thursday, April 26, 2012 10:12 AM To: Goderya, Farida; Troy Laman Cc: Hutch Musallam; Hill, Mike Subject: RE: punch list item; VC Sec Rehab; RS7 Column Repairs (internal) This was the only deficiency noted from all the stations on the secondary project. CHRIS STORY,PE PRINCIPAL 2105 COMMERCE STREET,DALLAS;TEXAS 75201 214 623.5810 PHONE 972 742.0206 0 LL JQt NG.COM The information in this e-mail is confidential and may be legally privileged.It is intended solely for the addressee.Access by any other person to this e-mail is not authorized.If you are not the intended recipient,please delete this e-mail.Any disclosure of this e-mail or of the parties to it,any copying,distribution,or any action taken or omitted in reliance on it is prohibited,and may be unlawful. From: Goderya, Farida [ma I Ito:Farida.GoderyaCabfortworthtexas Qov] Sent: Thursday, April 26, 2012 8:41 AM To: Troy Laman; Chris Story Cc: Hutch Musallam; Hill, Mike Subject: RE: punch list item; VC Sec Rehab; RS7 Column Repairs (internal) Importance: High T,. ;C, Proceed, I am nk with authorizing this I .a,=h :,30ed +his conversation two weeks ago 1 I would also suggest to take this opportunity and quickly review notes/field conditions and see if any such work is needed at other stations (PS 1, 2 or 3; 1 believe, PS 2 is pretty much taken care of). Call or email with questions..........Regards...........Farida 2�` �l +Farida S Goderva.Piz-D.,P.E. +Fort Worth Water Department ♦Engineering&Fiscal Sergi ices _ +1000 Throckmorton St_Fort Wort h_'TN'76102 #917391_8-11 t office+817.851 4910 Cell as. o\ How am f doing?Please contact my supermor:Day for-w,II liteati._ov From: Troy Laman [mailto:TLamanCa1icarollo.com] Sent: Thursday, April 26, 2012 7:28 AM To: Chris Story; Goderya, Farida Cc: Hutch Musallam Subject: RE: punch list item; VC Sec Rehab; RS7 Column Repairs (internal) Farida, Based on Chris' email below, he feels the repair should be completed now. At your direction, I will get pricing from the Contractor to include in CO 5. Troy Lamar, P.E. Associate Carollo Engineers,Inc. 100 East 15th Street, Suite 300 Fort Worth,Texas 76102 P:817-882-0528 x 227 C: 214-226-8327 F: 817-882-9975 www.carollo.com Carollo is...Focused on Sustainability. Please consider the environment before printing this email. From: Chris Story [mai Ito:cstory(aJgeng_com] Sent: Wednesday, April 25, 2012 3:49 PM To: Troy Laman; Goderya, Farida Cc: Hutch Musallam Subject: RE: punch list item; VC Sec Rehab; RS7 Column Repairs (internal) The repair should occur now. If the spall was not located at the steel beam to concrete connection, I would likely let it slide. However, its at a critical location and should be addressed now. The deficiency was not observed with the original grating system in place but was visible from the top side during our walkthrough. It is a relatively minor repair that I think will be in the$3k range. We can ask for pricing before authorizing them to proceed. CHRIS STORY, PE F- 2 The information in this e-mail is confidential and may be legally privileged.It is intended solely for the addressee.Access by any other person to this e-mail is not authorized.If you are not the intended recipient,please delete this e-mail.Any disclosure of this e-mail or of the parties to it,any copying,distribution,or any action taken or omitted in reliance on it is prohibited,and may be unlawful. From: Troy Laman [mai1to:TLaman(2carollo om] Sent: Wednesday, April 25, 2012 3:30 PM "1 To: Goderya, Farida; Chris Story C� Cc: Hutch Musallam Subject: RE: punch list item; VC Sec Rehab; RS7 Column Repairs (internal) Farida, During the punchlist walk through, Chris noticed cracking/spalling of one of the concrete columns at RS near the connection to the steel beams that support the grating, Photos are attached for your reference. We felt it important to point out so the City can determine whether to repair now or in the future. As a reminder, CO No.5 is still a substantial credit of bid item B-9 for discretionary concrete repair, and if the City elects to make this repair by using some of the money from that bid item on CO no. 5, 1 believe there would still be a net credit on the change order. I will leave it to Chris to provide opinion/assessment on how critical or urgent this repair is, but in light of the status of CO 5,the City may consider getting a price from the contractor based on bid item B-9. If it can be completed within the 60-day extension on CO 5, there may be some value there as the City would still net a credit. Troy Laman, P.E. Associate Carollo Engineers, Inc. 100 East 15th Street, Suite 300 Fort Worth,Texas 76102 P:817-882-0528 x 227 C: 214-226-8327 F: 817-882-9975 www.carollo.com .JF-;*'s*ze'+ '#'TM Carollo is...Focused on Sustainability. Please consider the environment before printing tftiis emai;i- From: Goderya, Farida [ma i Ito:Farida Goderya(Oortworthtexas aov] Sent: Wednesday, April 25, 2012 3:05 PM To: Troy Laman; cstoryL)Jgen com Cc: Hutch Musallam Subject: FW: punch list item; VC Sec Rehab; RS7 Column Repairs (internal) Troy/Chris, Can you please fill me in, what is the matter here I .am ocit sure, why/what Clint is asking from me about this ",That does our plans and spec say? Regards..._. ...Farida ♦; .i , ., ' � 1'1 ♦l rr Dili . .i 1 . r .. • .. 3 From: Stafford, Clinton [mai Ito:cstaffordCdIwalshgroug com] L Sent: Wednesday, April 25, 2012 1:07 PM "l To: Goderya, Farida Cc: Troy Laman; Lisenby, Robert; Tepera, Mark Subject: FW: punch list item Farlda, Punch list item N. 1) is in regards to an existing column that is spalling at a beam connection. The punch list items says that it is recommended to repair the concrete if the spalling extends through the beam connection. Attached is 1Q's recommendation on how to fix the beam. Archer Western can perform the work, but this will be a cost change because these are existing conditions. Would you like us to put a price together to do the work? I do not believe you were copied on the original email,so I will forward it along with some photos. Please let me know. Thanks, Clint From: Troy Laman [mailto:TLaman(c�carollo.com] Sent: Wednesday, April 25, 2012 11:16 AM To: Stafford, Clinton Cc: Tepera, Mark; Lisenby, Robert; Chris Story Subject: RE: punch list item Clint, See attached. From: Stafford, Clinton fmai Ito:cstafford(d�walsharouo com] Sent: Tuesday, April 24, 2012 3:19 PM To: Troy Laman Cc: Tepera, Mark; Lisenby, Robert Subject: FW: punch list item Troy, Any word on this? From: Lisenby, Robert Sent: Tuesday, April 10, 2012 12:13 PM To: Troy Laman (TLamanCacarollo com) Cc: Tepera, Mark; Stafford, Clinton; Chris Story cstorya j eng,com) Subject: punch list item Troy,this is in response to an item on page number 5, N., 1)= please see photos. This is at RS#7 where we only replaced the grating. Please advise, thanks Bob Lisenby 4 CP r'' '� FORT WORTH Engineers. vv,or�,;oq a� CONTRACT MODIFICATION REQUEST 23 WATER _ Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: June 5, 2012 P275- Secondary Area and Rehabilitation and 70130 Project: Modifications Project No.: 0128980 Recipient: City of Fort Worth Subject: Stair, landing, and handrail at RS6 electrical enclosure Contractor: Archer Western Contractors, Ltd. Engineer Carollo Engineers Contract Mod. No.: CMR 23 CMR 23 includes the cost for installing aluminum landings, stair and handrail at the RS6 electrical enclosure doors to improve safety. The detailed cost breakdown for the construction work is attached with this document. Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 23 (CMR 23) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore recommended to City of Fort Worth to approve the work as CMR 23. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work, which was included in the original procurement by public bid. Reviewed By Troy Laman, P.E. Date: June 5, 2012 Approved By Farida Goderya, P.E Date: June 5, 2012 I 23 CMR 23 VILLAGE CREEK W WTP SECONDARY AREA&FILTER REHAB AND MODS OWNER: CITY OF FORT WORTH TEXAS WORK DESCRIPTION: Install Aluminum Platform,Stairs and Handrail @ Electrical Building doors. ENGINEER CAROLLO ENGINEERS 14785 Preston Road,Suite 950 DALLAS,TX 75254 CONTRACTOR: ARCHER WESTERN CONTRACTORS,LTD 2121 AVENUE J,SUITE#103 ARLINGTON,TEXAS 76006 Bi Item l7esrn lion Unit ni Price r Material Equipment Subcon r cta Totals y Install Metals 48.00 MH $912.00 1 914.00 MH 19.00 .00 3011,00 MH 19.00 0.00 MH 1 .00 MH 19.00 0.00 MH 1 00 MH 1900 0.00 MH 19. 0 0.0 MH $19.00 $0.00 MH 1 S19.00 0.0 0, MH 19.0 0.00 $0.00 MH 19.00 0.00 $0.00 MH 19.00 $0.00 $0.00 0.00 0.00 . , ,.. s , Metals 1.00 ILS 1 $5,63 0.00 5,63 0.00 5 630.00 0.00 0. 0.00 1 00 $0.00 0 0.00 0.00 $0.00 EQ IP EN'f « . 0.00 1 0.00 0. 00 0.00 00 $0.00 0.00 0.00 $0.00 0.00 0. 0.00 $O.GO 0 00 8'I1'E S',' .��,-.x'F�K '4:- .Es-: t z_ _ .- r Superintendent 1 4.On IMH O 1 $50.00 $200.()0 20 . " TOTALS: 1 112.00 5 630.00 0.00 0.00 6 74200 Labor Burden @ 48%of Labor 533.76 533.76 Small Tools @ 15%of Labor $166.80 166.80 Safe Su lies 7.5%of Labor 83.40 83.40 TOTAL DIRECT COSTS: 7525.96 OH&P @ 15% 1,128.89 Insurance and Bond @1.5% 129.82 Subtotal: 0.00 8 784.68 TOTAL AMOUNT THIS COST PROPOSAL SUMMARY............................... 8 784.68 L� CMR 23 VILLAGE CREEK WWTP SECONDARY AREA&FILTER REHAB AND MODS OWNER: CITY OF FORT WORTH TEXAS WORK DESCRIPTION: Install Aluminum Platform,Stairs and Handrail @ Electrical Building doors. ENGINEER: CAROLLO ENGINEERS 14785 Preston Road,Suite 950 DALLAS,TX 75254 CONTRACTOR: ARCHER WESTERN CONTRACTORS,LTD 2121 AVENUEJ,SUITE#103 ARLINGTON,TEXAS 76006 . Bi Item QperiQtJon nit niVPri Labor M aterial E i men Sub Valor Total Install -- Metals 49.00 IMH 19.00 912.00 - $912.00 MH 0 .00 MH E",o 0 p MH 0 p MH 0 0.00 MH 0. 0 MH 0 0.00 MH . 0 0.0 MH 19.00 .00 p MH 19.00 0 0.00 MH 19.00 0.00 -H 1900. 0.00 0.00 MH 1 .00 0. 00 0.00 0.00 Metals 1.00 LS $5.630.00 5 630.00 5 630.00 0. p 0, $0.00 0.0 .00 0.00 .00 0.00 0.00 0 MEP .00 .00 O.00 0.00 0 $0.00 00 $0.00 0.00 p, 0. - 0.00 x ..0.00 '00 $0.00 0.00 $0.00 .:1 Sr aft Su erin den •"s `' - - _&x`�.�`�- ..F,';.�,`�'�. -:= + $0.00 4. 0 MH .00 20.0 6 -�; TOTALS: $1,112.00 5630.00 0.00 0.00 $6_742.00 Labor Burden @ 48%of Labor 533.76 533.76 Small Tools @ 15%of Labor $166.80 166.80 Safe Su lies 7.5%of Labor 83.40 83.40 TOTAL DIRECT COSTS: $7525.96- OH&P @15% Insurance and Bond @1.5% 1 12-RA 9 129.82 Subtotal: 0.00 8 784. TOTAL AMOUNT THIS COST PROPOSAL SUMMARY............................... 8 784.668 8 CP roftlbl FORT WORTH Engineers...Wnrkgng vvo� !water CONTRACT MODIFICATION REQUEST 24 WATER Village Creek Wastewater Treatment Plant Secondary Area _ `k Rehabilitation and Modifications City of Fort Worth, Texas Date: June 5, 2012 P275- Secondary Area and Rehabilitation and 70130 Project: Modifications Project No.: 0128980 Recipient: City of Fort Worth Subject: Orifice Plates at WS 61 and WS 62. Contractor: Archer Western Contractors, Ltd. Engineer Carollo Engineers Contract Mod. No.: CMR 24 CMR 24 includes the cost for installing 2" orifice plates in each of two waste sludge pump discharge pipes at pump 61 and 62 aluminum landings, stair and handrail at the RS6 electrical enclosure doors to improve safety. The detailed cost breakdown for the construction work is attached with this document. Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 24 (CMR 24) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore recommended to City of Fort Worth to approve the work as CMR 24. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work, which was included in the original procurement by public bid. Reviewed By Troy Lama n, P.E. Date: June 5, 2012 Approved By Farida Goderya, P.E Date: June 5, 2012 CMR 24 VILLAGE CREEK WWTP SECONDARY AREA&FILTER REHAB AND MODS OWNER: CITY OF FORT WORTH TEXAS WORK DESCRIPTION: Install Orifice Plates at the Waste Pump Discharge ENGINEER: CAROLLO ENGINEERS 14785 Preston Road,Suite 950 DALLAS,TX 75254 CONTRACTOR: ARCHER WESTERN CONTRACTORS,LTD 2121 AVENUE J,SUITE#103 ARLINGTON,TEXAS 76006 Bid I m LABOR De cn ion ON Unit I Unit/price Unit/price Labor Mat ial Eauioment I Sub tr dar _ Total ,.. Install Orfce Plates MH1,00 0 304.00 0 0.0 304.00 0 0.00 0 .00 0 p,p0 0 .00 0 0 19. 0 .00 0 MH 19. ,pp 0 MH 19. 0,00 0. MH 19.00 0.00 0.0 MH 19.0 0.00 0'00 0.00 0.00 0.00 MATE .-.., _ - _ 0.0 .00 Ofice Plates 2 Total - 1.00 LS 200.00 200.00 - 0 200.00 0.00 $0.00 0. 0 0. 0. 0 0. 0.00 0.00 EQUIPM 0.0 0.00 0. 0.00 0.00 0.00 .00 0.00 000 0.00 .00 SUBC T - a 0.00 0.00 Dobbs-R eintBoRs/Flan eArea 1A0 LS 100.00 - ' 100.00 100.00 00 0. 0 0.00 0.00 M C1 LLAHEOU RE °: 00 0. 0 0. 0 TOTALS: 304.00 200.00 0.00 100.00 604.00 Labor Burden @ 48%of Labor $145.92 Small Tools @ 15%of Labor 45.60 145.92 Safe Su lies 7.5%of Labor 22 80 $45.60 TOTAL DIRECT COSTS: 22.80 818.32 OH&P @ 15% Insurance and Bond @1.5% 2 5 Subtotal: 14.12 TOTAL AMOUNT THIS COST PROPOSAL SUMMARY......_ ...... 955.18 955.18