Loading...
HomeMy WebLinkAbout025563 - Construction-Related - Contract - Carter & Burgess, Inc.1 � AMENDMENT NO. 7 STATE OF TEXAS b CITY SECRETARY CONTRACT NO.:.XSS �� (No M&C Needed) COUNTY OF TARRANT b WHEREAS, the City of Fort Worth (City) and Carter & Burgess, Inc., (Engineer) made and entered into City Secretary Contract No. 22566, (the Contract) which was authorized by the City Council by M&C 15928 on the 4th day of March 1997; and subsequently revised by six previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Main 207R Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 5, Contract 3), Part 2. WHEREAS, it has become necessary to execute Amendment No. 7 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: E� Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated November 22, 1999, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $7,500.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $527,195.00. �(�����G�� U`�'��'JV`?�� C0� ���GG����G?"� r ,2� �o �}!'-,��G�9 ?IS��`=o 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. (�,����_� EXECUTED on this the �-�'� �L day of ;� 1.9�J9, in Fort Worth, Tarrant County, Texas. ATT�T : , . t�,,�,�,!� ,. , ��� - /�' �E.�_.�� jr � it/A..,� Gloria Pearson, City Secretary �'l,� Y�.4,� �tAl�-�i Contract Authorization Date APPROVAL RECONIl��NDED : -�•'�-L-�..1.%r�� �-`�.,'�.�.d�.°""-�"1?---'� A. Douglas Rademaker, P.E. �� Director, Department of Engineering � CARTER & BURGESS, INC. ENGINEER BY : � C� Name: J�hn H. Cook, P.E. Vice President 3880 Hulen Street Fort Worth, TX 76107 APPROVED AS TO FORM AND LEGALITY: �_ j ��' ``' i _ � Gary Stei erger Assistant City Attorney 22566-7 APPROVED: �.. . �� P V,� / Mike Groomer Assistant City Manager -2- �' , , r�- � � Cart�r �= Burgess � _ ----.-.�:���� �� -= ��_.__-__ -: :•r�_ :• : �.�,ara,;��,� `_. . _ `_. _ _� 5-� . �.._-. fVovember 22, 1999 Mr. Rakesh Chaubey, P.E. City of Fort Worth Department of Engineering 811 Lamar Street, Suite 310 Fort Worth, Texas 76102 Reference: Main 207R Drainage Area Sanitary Sewer Rehabilitation & Improvements (Group 5, Contract 3), Pa�t 2& Part 9 Dear Rakesh: We are providing this letter to request additional compensation for work beyond the engineering services outlined in the contract for Main 207R Drainage Area between � Carter and Burgess and the City of Fort Worth. The additional services are due to revisions on the approved construction documents during the construction phase of the project. These revisions are described under Amendment No. 7 below. Amendment No. 7 Amendment No. 7 includes an increase in total contract amount of $7,500 in order to accommodate the following design changes: 1. Prepare an exhibit showing the proposed revisions to the sanitary sewer alignment and deliver five color copies to the City of Fort worth. . 2. Revise plan and profile sheet (8A) to change the sewer line length and alignment. 3. Attend meetings with the City of Fort Worth to discuss revisions. 4. Prepare 12 prints of sheet 8A of plans and deliver to the City of Fort W orth. 5. Field verify the location of the existing sanitary sewer. � 6. Revise easement documents through the Leonard's Property. The engineering fee required to make these revisions on the construction documents is $7,500.00. Attached is a summary of the engineering fees for the project including � amendments 1 through 7. � If you have any questions or need additional information, piease call me at (817) 735- 6150. Sincerely, CARTER & BURGESS, INC. �,-. Sam M. Zabaneh, P.E. Assist�nt Manager Public Works SMZ/mds Enclosures ��'w�cEa.wP cc: Correspondence Tony Sholoia- P.E. • FW DOE John H. Cook, P.E. Gretchen N. Williams, P.E. SMZ � C � �' Main 207R Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 5, Contract 3), Part 2 Billing & Status Summary Oric�inai Contract Amount Amendment No. 1 . . � � - Service JM Leonard Properties Revise M207R Ali�nment Amendment No. 2 Design & PIaNProfile Sheets� for Bid Altemate Environmental CoordinatioNSpecification (Contaminated Soils Area) Amendment No. 3 Revise Alignment of M208 to Raton Dr. Realignment of M207R at SH183 � Amendment No. 4 Delete Ridgmar Mall SS Improvements from Plans Additional Bidding Assistance Attend Additional Bid Opening Amendment No. 5 Revise Plan/Profile Sheets 6A & 7A Revise PIaNProfile Sheet 7A � Meetings and prepare Easements Amendment No.6 Revise sheets 1 through 11 Revise specifications Provide copies of plans and specifications Amendment No.7 Revise sheet 8A Revise easement description Provide copies of plan and profile Subtotals Contract Amount $444,505.00 � �24,010.00 $12,480.00 $13,090.00 $4,610.00 $9,500.00 $11,500.00 $7,500.00 $527,195.00 a R � . � FOT OTH � R � �=,��-- MEMOR.ANDUM TO: FROM DATE: A. Douglas Rademaker, Director DOE and Mike Groomer, Assistant City Manager Tony Sholola f ' � � D.ecember 14, 1999 RE: DESIGN FEE AM�NDMENT NO. 7 TO MAIN 207R DRAINAGE AREA SANITARY SEWER REHABILITATION AND IMPROVE- MENTS (GROUP 5, CONTRACT 3), PART 2, DOE NO. 1360 The proposed amendment will reimburse Carter and Burgess, Inc., for the additional en- gineering services that will be provided on the project as requested by the City. During construction of the project, it has been determined that the existing sewer line is not located within the easement prescribed for it and consequently that the new sewer line will not be located within the additional easement that was obtained adj acent to the ex- isting easement. Staff directed Carter and Burgess to determine the exact location of the existing sewer line and to revise the applicable project plan/profile sheet. Staff also di- rected Carter and Burgess to prepare new easement documents to accommodate the alignment of the new sewer line which was installed in the wrong location. Carter and Burgess, Inc., has requested a fee of $7,500.00 for the additional services to be provided thereby increasing the contract fee from $519,695.00 to $527,195.00. I believe this fee is fair and reasonable for the additional services that were provided. Please authorize the additional design fee by your signature on the attached contract amendment form. cc: Rakesh Chaubey, Project Manager Berdena Hamilton, Water Department Dan Pepon, Water Department MEMO I7G(1 � ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * lOOO THROCKMORTON STREET * FORT WORTH, Texa,s 76102-6311 (81 � 871-7941 * Fnx (81'� 871-7854 �^J Pdnted on recycled paper