AMENDMENT NO. 7
STATE OF TEXAS b CITY SECRETARY CONTRACT NO.:.XSS ��
(No M&C Needed)
COUNTY OF TARRANT b
WHEREAS, the City of Fort Worth (City) and Carter & Burgess,
Inc., (Engineer) made and entered into City Secretary Contract No.
22566, (the Contract) which was authorized by the City Council by
M&C 15928 on the 4th day of March 1997; and subsequently revised
by six previous amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Main 207R Drainage
Area Sanitary Sewer System Rehabilitation and Improvements
(Group 5, Contract 3), Part 2.
WHEREAS, it has become necessary to execute Amendment No. 7
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
E�
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated November 22, 1999, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $7,500.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $527,195.00.
�(�����G�� U`�'��'JV`?��
C0� ���GG����G?"�
r ,2�
�o �}!'-,��G�9 ?IS��`=o
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
(�,����_� EXECUTED on this the �-�'� �L day of ;�
1.9�J9, in Fort Worth, Tarrant County, Texas.
ATT�T :
, .
t�,,�,�,!� ,.
,
��� - /�' �E.�_.�� jr � it/A..,�
Gloria Pearson, City Secretary
�'l,� Y�.4,� �tAl�-�i
Contract Authorization
Date
APPROVAL RECONIl��NDED :
-�•'�-L-�..1.%r�� �-`�.,'�.�.d�.°""-�"1?---'�
A. Douglas Rademaker, P.E. ��
Director, Department of
Engineering �
CARTER & BURGESS, INC.
ENGINEER
BY : � C�
Name: J�hn H. Cook, P.E.
Vice President
3880 Hulen Street
Fort Worth, TX 76107
APPROVED AS TO FORM AND LEGALITY:
�_ j
��' ``' i
_ �
Gary Stei erger
Assistant City Attorney
22566-7
APPROVED:
�.. .
��
P V,� /
Mike Groomer
Assistant City Manager
-2-
�' , ,
r�-
� � Cart�r �= Burgess
� _
----.-.�:���� �� -= ��_.__-__
-: :•r�_ :• : �.�,ara,;��,� `_. . _ `_. _ _� 5-� . �.._-.
fVovember 22, 1999
Mr. Rakesh Chaubey, P.E.
City of Fort Worth
Department of Engineering
811 Lamar Street, Suite 310
Fort Worth, Texas 76102
Reference: Main 207R Drainage Area
Sanitary Sewer Rehabilitation & Improvements
(Group 5, Contract 3), Pa�t 2& Part 9
Dear Rakesh:
We are providing this letter to request additional compensation for work beyond the
engineering services outlined in the contract for Main 207R Drainage Area between
� Carter and Burgess and the City of Fort Worth.
The additional services are due to revisions on the approved construction documents
during the construction phase of the project. These revisions are described under
Amendment No. 7 below.
Amendment No. 7
Amendment No. 7 includes an increase in total contract amount of $7,500 in order to
accommodate the following design changes:
1. Prepare an exhibit showing the proposed revisions to the sanitary sewer
alignment and deliver five color copies to the City of Fort worth. .
2. Revise plan and profile sheet (8A) to change the sewer line length and
alignment.
3. Attend meetings with the City of Fort Worth to discuss revisions.
4. Prepare 12 prints of sheet 8A of plans and deliver to the City of Fort
W orth.
5. Field verify the location of the existing sanitary sewer.
� 6. Revise easement documents through the Leonard's Property.
The engineering fee required to make these revisions on the construction documents is
$7,500.00. Attached is a summary of the engineering fees for the project including
� amendments 1 through 7. �
If you have any questions or need additional information, piease call me at (817) 735-
6150.
Sincerely,
CARTER & BURGESS, INC.
�,-.
Sam M. Zabaneh, P.E.
Assist�nt Manager Public Works
SMZ/mds
Enclosures
��'w�cEa.wP
cc: Correspondence
Tony Sholoia- P.E. • FW DOE
John H. Cook, P.E.
Gretchen N. Williams, P.E.
SMZ
�
C �
�'
Main 207R Drainage Area
Sanitary Sewer System Rehabilitation and Improvements
(Group 5, Contract 3), Part 2
Billing & Status Summary
Oric�inai Contract Amount
Amendment No. 1 . . � �
- Service JM Leonard Properties
Revise M207R Ali�nment
Amendment No. 2
Design & PIaNProfile Sheets� for Bid Altemate
Environmental CoordinatioNSpecification
(Contaminated Soils Area)
Amendment No. 3
Revise Alignment of M208 to Raton Dr.
Realignment of M207R at SH183 �
Amendment No. 4
Delete Ridgmar Mall SS Improvements from Plans
Additional Bidding Assistance
Attend Additional Bid Opening
Amendment No. 5
Revise Plan/Profile Sheets 6A & 7A
Revise PIaNProfile Sheet 7A �
Meetings and prepare Easements
Amendment No.6
Revise sheets 1 through 11
Revise specifications
Provide copies of plans and specifications
Amendment No.7
Revise sheet 8A
Revise easement description
Provide copies of plan and profile
Subtotals
Contract
Amount
$444,505.00 �
�24,010.00
$12,480.00
$13,090.00
$4,610.00
$9,500.00
$11,500.00
$7,500.00
$527,195.00
a
R � . �
FOT OTH
� R
�
�=,��--
MEMOR.ANDUM
TO:
FROM
DATE:
A. Douglas Rademaker, Director DOE and
Mike Groomer, Assistant City Manager
Tony Sholola f ' � �
D.ecember 14, 1999
RE: DESIGN FEE AM�NDMENT NO. 7 TO MAIN 207R DRAINAGE
AREA SANITARY SEWER REHABILITATION AND IMPROVE-
MENTS (GROUP 5, CONTRACT 3), PART 2, DOE NO. 1360
The proposed amendment will reimburse Carter and Burgess, Inc., for the additional en-
gineering services that will be provided on the project as requested by the City.
During construction of the project, it has been determined that the existing sewer line is
not located within the easement prescribed for it and consequently that the new sewer line
will not be located within the additional easement that was obtained adj acent to the ex-
isting easement. Staff directed Carter and Burgess to determine the exact location of the
existing sewer line and to revise the applicable project plan/profile sheet. Staff also di-
rected Carter and Burgess to prepare new easement documents to accommodate the
alignment of the new sewer line which was installed in the wrong location.
Carter and Burgess, Inc., has requested a fee of $7,500.00 for the additional services to be
provided thereby increasing the contract fee from $519,695.00 to $527,195.00. I believe
this fee is fair and reasonable for the additional services that were provided.
Please authorize the additional design fee by your signature on the attached contract
amendment form.
cc: Rakesh Chaubey, Project Manager
Berdena Hamilton, Water Department
Dan Pepon, Water Department
MEMO I7G(1