Loading...
HomeMy WebLinkAbout025591 - Construction-Related - Contract - Gutierrez, Smouse, Wilmut and Assoc., Inc... AI�PID�NT NO. 1 STATE OF TERAS COUN'PY OF TARRANT 0 0 CITY SECRETARY CONTRACT NO . � `-� � ��, � (No M&C Needed) WSEREAS, the City of Fort Worth (City) and Gutierrez, Smouse, Wilmut and Assoc., Inc., (Engineer) made and entered into City Secretary Contract No. 24855, (the Contract) rvhich was suthorized by the City Council by M�C C-17395 on the 5th day of Apri.l 1999; and WHEREAS, the Contract involves engineering services for the following project: Enqineering contract for the design of Main 21. Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 3), Part 4. WSEREAS, ssid Contract maximtm4 fee; it has become necessary to execute Amendment No. 1 to to include an increased scope of rvork and revised NOW THEREFORE, City and Enqineer, acting herein by and through their duly suthorized representatives, enter into the following agreement �ahich amends the Contract: 1. Article I of the Contract is amended to include the additioaal engineering services specified in a proposal letter dated October 20, 1999, a copy of which is sttached hereto and incorporated herein. The cost to City for the additional services to be per£ormed by Engineer total $5,598.24. 2. � Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineex for all work and sernices performed under the Contract, as amended, so that the total fee paid by the City for all vrork and services shall not exceed the svm of $76,823.24. �rF�'''��,�� ,'���R� �'i'�`� ��� �Ei�AR`� r� ,'�'� 1H 1EX � � 3. All other provisions of the Contract �vhich are not expressly amended herein shall remain in full force and effect. E�CUTED on this the c"//�l. �Y of � � 2000, in Fort Worth, Tarrant County, Texas. AT ST: �Q�� Gloria P arson, City Secretary APPROVAL RECOM�NDED: -��� � `�'-�`� '�a� A. Douglas Ra.deaaa.ker, P.E. Director, Department of Engineerinq `� � t�. I�,�� Contract Authorization Date APPROVED: . Mike Groomer Assistant City.Manager GUTIE�tREZ, SMOIISE, WILMU'P & ASSOC., INC. ENGINEER $y= � 0 Name: Steven,D. Sanders, P.E. Executive Vice-President 23Z3 East Loo� 820 Fort Worth, TX 76118 APPROVED AS TO EORM 1�,ND LEGALITY: , Gary einberger Assistant City Attorxaey 24855 d� , 4 - H � October 20, 1999 �� � ' GUTIERREZ, SMOUSE, WILMUT � ASSOC., INC. • � Civil / Environmental Engineers Mr. Rakesh Chaubey, P.E. City of Fort Worih Department of Engineering P.O, Box 870 Fort Worth, Texas 76101-0870 Reference: Supplemental Authorization Request Main 21 Drainage Area Sanitary Sewer Rehabilitation and Improvements Group 7, Contract 3, Part 4 Sewer Project No. PS46-070460310 DOE Project No. 2489 Dear Mr. Chaubey: This letter is a request for Supplemental Authorization to provide additional engineering services as requested by the City. • During the conceptual design review for this project, GSW was requested to obiain five permanent easements. The easements were requested due to a sewer realignment and to the current placement of sewers in locations without permanent easements. 7'his will require additional survey, easement preparation, and coordination between GSW and ANA, which is providing surveying services. In addition, the City requested twelve copies of the preliminary specifications, the cost of which was not included in � the original contract. The additional costs are summarized below: " CONTRACT FEE SUMMARY Amendment No. 1 gasic Fee • Provide additional survey. • Prepare 5 additional permanent easements. • Provide 12 copies of prefiminary specifications. Total Proposed Amendment No. 1 Fee •� (A detailed breakdown of the estimated fees is attached) ;, � PROJECT FEE DETAILS " Contract Item Original Contract Amendment No. 1 TOTAL PROJECT Description $5,59$.24 City Secretary Contract No. 24855 Add'I. Easements & Copies Fee $73,225.00 $ 5,598.24 $78,823.24 2313 FAST LOOP 820 NORTH • FORT WORTH, TEXAS 76118 • PHONE 817/595-4111 � � � i 0 �� Mr. Rakesh Chaubey, P.E. City of Fort Worth Department of Engineering . October 20, 1999 Page 2 If you have any questions or need additional information concerning this request, please call me. Sincerely, GUTIERREZ, SMOUSE, WILMUT & ASSOC., INC. ��l't2.6 ��� � Thelma Flores Box, P.E. Project Manager Attachments pc: Peter Fu, P.E. - FWWD ., � Maln 21 DRAINAGE AREA SANITARY SEWER REHABlLITATION AND iMPROVEMENTS GROUP 7, CONTRACT 3, PART 4 SEINER PROJECT NO. - PS46-070460310 DOE PROJECT NO. - 2489 ' MODIFIED TO INCLUDE AMENDMENT N0.1 DESIGN SERVICES FOR SANITARY SEWER PIPELINE REHABILITA710N � ACTUAL HOURS FOR EACH TASK I $ 110.00 $ 90.00 I$ 66.00 I$ 56.00 $ 65.00 $ 38.00 Task Work Task Descriptions Prin. P.M. Enqr, Enqr. Asst CAD Tech Clerical PARTA CONCEPTUALDESIGN 1 �Coordina6on wlOiher Projects ! 2 4 0 � 0 0 2 2 Preliminary ConcePtual Design Report 0 2 10 30 0 8 3 �CoordinationMeetinqw/City 0 2 2 0 0 2 1 Subtotat 2 8 12 � 30 0 '!2 �PART B �CONSTRUCTION PLANS & SPECS I� � 1 � 1 IPrelimina�Pians and S�ecs � a �Plan & Pro ile Sheets w/ nqinee�'s Cost Estimate 0 8 40 � 168 272 I 0 b �Surveys & Field Mea ureme�ts 0 0 0 I 0 � 0 I 0 ` c Contract Documents� S eeafications I 0 2 8 � 8 I 0 � 8 � d Final Cortceptual Design Report � 0 0 2 I 2 I 0 I 0 � e Standard/Special Details 0 0 2 0 6 I 0 � f Right-of-Entry Research, Database & Exhibits � 0 0 0 ' 100 40 � 8 ( Existing UGIitY Resear�ch (As-Builts) 0 0 0 � 12 4 0 R Data AcquisiUon ((rom SSES) 0 0 0 I 6 4 0 1 Proc�ress MeeUnqs ' 0 2 0 0 0 2 j Public Meeting 0 2 2 0 0 4 k Review MeeGn,Q with Ci�( 0 2 2 0 0 2 I Reproduction of Plans / Specs & Report 0 0 0 � 2 0 0 Subtotat 0 i6 56 � 298 326 24 2 Final Ptans and Specs a Inco orate CiIY Review Comments b Fina�onsUucUon Documents c Engineers Final Cost EsGmate d ReproducGon of Plans & Specs Subtotal 3 Bid Documents a SRF Plans & Documents b SRF Reproduction of Plans & Documents c �Tabulate Bids d IEvaluate Bids & Low Bidders � Subtotal I I �PART C �CONSTRUCTION ASSISTANCE I 1 IAdministration a Attend Pre-Const. Meetinq b ite Visils & Final Inspection Subtotal AMENDMENT N0.1 Additional Easements & Copies Subtotal TOTAL 0 2 4 0 2 4 0 0 8 0 0 0 0 4 i6 0 0 2 0 I 0 0 0 � 2 I 6 0 � 2 I 2 0 4 � 10 o � 2 0 � 8 o � �o � 0 � 0 2 I 42 8 12 0 4 0 4 0 0 2 2 0 0 14 12 6 I I 0 � 6 2 0 � 0 � 0 0 0 � 2 0 0 � 2 0 I 6 I 6 o � o 0 0 0 0 � a j o I 98 I 342 TOTAL + Direct AMOUNT I Costs BUDGETED I � - $ 656.00 � 40.00 $ 2,864.00 $ - $ 388.00 $ 40.00. $ 3,908.00 I � I I I � $ - $ 30,448.00 � $ 16,000.00 I $ 16,000.00 I $ - I $ 1,46D.00 �$ - I$ 244.00� $ - � $ 522.00 � $ 46.00 I $ 8,550.00 � $ 46.00 $ 978.00 $ 20.00 $ 616.00 � $ - $ 256.OQ $ 30.00 $ 494.00 $ - $ 388.00 $ 430.00 $ 542.00 $ 16,572.00 $ 60,498.00 � I I I I $ - I $ 1.672.00 � $ - I $ 820.00 $ - I $ 604.00 � $ 2,190.00 I $ 2,302.00 $ 2.190.00 � $ 5,398.00 $ - I $ 598.00 I $ 135.00 $ 135.00 $ - $ 652.00 + $ - �, $ 388.00 $ 135.00 � $ 1,773.00 o I 2 I$ - 8 � 4 � $ - 8 I 6 I$ - 4 356 4 I $ 4,922.24 � 58 I $ 23,859.24 � $ 2ss.00 � $ 1.392.Q0 � $ �,saa.00 $ 5,598.24 � � $ 78,823.24 � a FO T O TH � � � � _. �_ .� -,.;=-- MEMORANDUM .� i TO: FROM: DATE : A. Douglas Rademaker, Director DOE and Mike Groomer, Assistant City Manager Tony Sholola j � � . January 25, 2000 RE: DESIGN FEE AMENDMENT NO. 1 TO SANITARY SEWER MAIN 21 DRAINAGE AREA REHABILITATION AND SEWER IM- PROVEMENTS (GROUP 7, CONTRACT 3), PART 4, DOE NO. 24$9�— SEWER PROJECT NO. PS46-070460410310 The proposed amendment will reimburse Gutierrez, Smouse, Wilmut & Associates, Inc., (GSV� for the additional services they provided on the project as requested by the City. The amendment will reimburse GSW for the additional design and survey services in- volved with the preparation of five additional permanent easements due to the realign- ment of a sewer lateral. In addition, staff requested that GSW point twelve additional preliminary project plans for utility distribution. Gutierrez, Smouse, Wilmut & Associates, Tnc., has requested reimbursement in the amount of $5,598.24 for the services, thereby increasing the contract fee from $73,225.00 to $78,823.24. I believe this fee is fair and reasonable for additional services that were provided and recommend approval. Please authorize the additional design fee by your signa.ture on the attached contract amendment form. � cc: Rakesh Chaubey, Project Manager ��' Berdena Hamilton, Water Department �' Dan Pepon, Water I)epartment MEMO 2489 >%�: :�'.,`��I ` ENGINEERING DEPARTMENT THE Cfl'Y OF FORT WORTH � lOOO THROCKMORTON STREET * FORT WORTH, TEXAS 76102-G311 �817) 871-7941 * Fax (81?� 871-7854 �� Printed on recycled paper