Loading...
HomeMy WebLinkAbout025558 - Construction-Related - Contract - Creative 4 Construction and Management Company, Inc.' C�TY �ECRETARY ✓ �-' `�'? � ���.� . , �_ , . ,�. F�w��-. .. � � . ,`'�"'���: ��`� �� �''�c�wx. :.. -� � , ` � ; y � � . . ..,� ��:� ��'� ��� �. , . . . , ,.�. ,l f : � n . i � y s f.,.y �a��,r ' � ' � ..'� 5 C .. ° 4�' S � ' p i w� F.:� i.s' < ! , x � �, � ���_ :�;�CATIONS . , � �� L�_ :. �ND � CONTRACT DOCUMENTS FOR ���\�' :�,_ ,�, _�' � CITY SECRETARY ., C--r CONTRAC'f NO , oo� 'JrJJ `� � CIP PROJECT NO. 1— PLAYGROUND RENOVATION AT NINE SITES (SOUTHWEST REGIOi� � � 4, I' '�i�IL�L�I�`►l:�u� �1 CANDLERIDGE PARK FIRE STATION PARK FOREST/TILLERY PARK HIGHLAND HILLS PARK OVERTONPARK SOUTHWEST PARK WESTCREEK PAI�K WORTH HEIGHTS PARK WRIGHT TARLETON PARK PROJECT NUMBER C181/080181048150 C181/080181048190 C181/080181048200 C 181/080181048230 C181/080181048270 C181/080181048300 C181/080181048320 C181/080181048330 C181/080181048340 IN THE CITY OF FORT WORTH TEXAS KENNETH L. BARR MAYOR RICHARD ZAVALA, DIRECTOR PARKS AND COMMUNITY SERVICES D.O.E. NO. 2737 2738 2739 2740 2741 2742 2743 2744 2745 BOB TERRELL CITY MANAGER ��(�OC�@/�� ��C�G� G�� �� ����� P �'i �r.�"::r} ,�e:-_!,.':a PARKS AND COMMUNITY SERVICES DEPARTMEN T PLANNING AND RESOURCE MANAGEMENT DIVISION � L� FUNDING OF PROJECT BY CITY OF FORT WORTH KELLOGG LANDSCAPE ARCHITECTURE CONSTRUCTION 402 Cedar Street. Bastrop.Texas 78602 Tel (512) 303-2242. FAX (512) 303-2268 0 ��r �+ w :+ City of FoYt Worth, Texas Mayor and Council Y � '` Communication � DATE REFERENCE NUMBER LOG NAME PAGE 1/4/00 C-17813 I. 80PLAY 1 of 3 SUBJECT AWARD OF CONTRACT TO CREATIVE 4 CONSTRUCTION AND MANAGEMENT COMPANY, INC. FOR THE CONSTRUCTION OF PLAYGROUND RENOVATIONS AT NINE PARK SITES RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contact with Creative 4 Construction and Management Company, Inc. in the amount of $273,395.90 for construction of playground renovations at nine park sites. DISCUSSION: The 1998 Capital Improvement Program allocated $863,576.00 for playground renovation at twenty park sites identified in the 1995 Parks and Community Services Department (PACSD) Play Area Renovation Plan. Of this amount, $386,080.00 had been allocated for playground renovation at nine park sites in the PACSD Southwest Region. These sites are: Candleridge, Fire Station, Forest/Tillery, Highland Hills, Overton, Southwest, Westcreek, Worth Heights, and Wright Tarleton parks. On February' 2, 1999 (M&C C-17255), the City Council approved the award of a contract for design services to Kellogg Landscape Architecture in the amount of $64,320.00 for the design of playground � renovations at all nine sites. This project was advertised for bid on August 19 and 26, 1999. On September 16, 1999, the following bids were received: Bidders Northstar Construction Creative 4 Construction and Manaqement Companv. Inc. Eagleton Construction Botanical Tech. Corporate Construction AUI Pittman Construction Base Bid $222,563.70 $248,095.90 $258,679.00 $284,487.75 $350,630.72 $365,344.00 $919,572.45 Add Alternates $28,616.00 $38,740.00 $32,500.00 $39,650.00 $44,134.90 $48,220.00 $31,232.00 Total (Base + Altl $251,179.70 $286,835.90 $291,179.00 $324,137.75 $394,765.32 $413, 564.00 $950,802.45 The base bid includes demolition and replacement of deteriorating or hazardous equipment, and the installation of concrete flatwork and,accessible safety surfacing. The add alternates provide for the installation of age appropriate signage for all the park areas (add alternate No. 2 for each unit) and other site specific equipment modifications or additions (add alternate Nos. 3-6). The apparent low bidder, Northstar Construction, Inc., is not recommended because they failed to comply with the M/WBE Ordinance. It is recommended that the base bid and selected add alternates listed below totaling $273,395.90, as submitted by Creative 4 Construction and Management Company, ._ ., � Communication DATE REFERENCE NUMBER LOG NAME 1 /4/00 C-17813 � 80PLAY PAGE 2 of 3 SUBJECT AWARD OF CONTRACT TO CREATIVE 4 CONSTRUCTION AND MANAGEMENT COMPANY, INC. FOR THE CONSTRUCTION OF PLAYGROUND RENOVATIONS AT NINE PARK SITES City of Fort Worth, Texas Mayor and Council� Inc., be approved for award of the contract. The contract time is sixty working days. Unit One Unit Two Unit Three Unit Four Unit Five Unit Six Unit Seven Unit Eight Unit Nine Candleridge Park Fire Station Park Forest/Tillery Park Highland Hills Park Overton Park Southwest Park Westcreek Park Worth Heights Park Wright Tarleton Park Base bid + add alternates 2, 3, and 4 Base bid + add alternates 2, 3, and 4 Base bid + add alternates 2 and 3 Base bid + add alternate 2 Base bid + add alternates 2 and 3 Base bid + add alternates 2 and 3 Base bid + add alternate 2 Base bid + add alternate 2 Base bid + add alternate 2 Creative 4 Construction and Management Company, Inc. is in compliance with the City's M/WBE ordinance by committing to 23% M/WBE participation on the base bid. The City's goal for this project is 18%. This project budget is as follows: Construction Contract Contingencies: DOE Inspection (7%) PACSD Administration (4%) Change Orders (5%) Total Construction Budget $273,395.90 19,138.00 10,936.00 13,670.00 $317,139.90 The annual operating impact on the General Fund budget beginning Fiscal Year 2000-2001 will amount to: Candleridge Park Fire Station Park Forest/Tillery Park Highland Hills Park Overton Park Southwest Park Westcreek Park Worth Heights Park Wright Tarleton Park no impact no impact $ 900 $ 900 $ 800 $ 750 $ 750 $ 700 625 Total Impact $5,425 DATE 1 /4/00 SUBJECT r u City of Fort Wo�th, Texas r Mayor and Counc�l, Communication REFERENCE NUMBER LOG NAME PAGE C-17813 � 80PLAY 3 of 3 AWARD OF CONTRACT T CREATIVE 4 CONSTRUCTION AND MANAGEMENT COMPANY, INC. FOR THE CONSTRUCTION OF PLAYGROUND RENOVATIONS AT NINE PARK SITES These increases in the General Fund are the result of maintaining the wood fiber playground surfacing. These nine parks are located in COUNCIL DISTRICTS 6, 7, 8, and �9. FISCAL INFORMATION/CERTIFICATION,: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Parks and Community Services Improvement Fund. LW:k Submitted for City Manager's Office by: Libby Watson 6183 Originating Department Head: Richard Zav,ala Additional Information Contact: I FUND I ACCOUNT I CENTER I (to) � 5704 I (from) C181 C181 C181 541200 080181048150 541200 080181048190 541200 080181048200 AMOUNT $18,553.00 I $16,760.00 � $29,668.20 � CITYSECRETARY APPROVED 1/4/00 City d�' Fo�t WoYth, Texas � Mayor and Cou�cil. . Communication DATE REFERENCE NUMBER LOG NAME PAGE 1/4/00 . C-17813 , 80PLAY I 4 of 3 sueJEcr AWARD OF CONTRACT TO CREATIVE 4 CONSTRUCTiON AND MANAGEMENT COMPANY, INC. FOR THE CONSTRUCTION OF PLAYGROUND RENOVAT(ONS AT NINE PARK SITES � � C181 5412a0 080181048230 $31,258.70 � � C181 541200 080181048270 $25,790.00 � � C181 541200 080181048300 $43,53a.00 � 1 C181 549200 080181048320 $49,987.00 I C181 541200 080181048330 $26;005.00 � RichardZavala 5704 � C181 541200 0801810A8340 $31,844.00 � !'I [J' �� �I � L�� � u � � LJ � TABLE OF CONTENTS 1. NOTICE TO BIDDERS 2. SPECIAL INSTRUCTIONS TO BIDDERS 3. PROPOSAL 4. CITY OF FORT WORTH MlWBE ENTERPRI5E SPECIFICATIONS 5. PREVAILING WAGE RATES 6. WEATHER TABLE __ 7. VENDOR COMPLIANCE TO STA'�E LAW 8. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION 9. TECFINICAL SPECIFICATIONS DIVISION 1- GENERAL REQUIREMENTS SECTION 01010 - Summary of Work SECTION 01035 - Contract Time SECTION 01100 - Atternatives SECTION 01150 - Payment To Contractor SECTION 01300 - Submittals SECTION 01400 - Quality Control SECTION 01410 - Testing SECTiON 01500 - Temporary Facitities and Controls � SECTION 01640 - Sabstitutions and Product Optioas SECTION Q1700 - Project Closeout SECTION 01800 - Contractor's Responsibility for Damage Claims DMSION 2 - SITE WORK Section 02100 - Site Preparation , Section 02140 - Site Underdrains Section 02200 - Earthwork • � Section 02537 - Wood Fiber P[ayground Surfacing ------ - Section OZ830 - Seeding ection 02860 - Playground Equipmen� ---�""' " Section 02870 - Site Furaishings DIVISION 3 - CONCRETE � Section 03300 - Cast-in-Place Concrete Section 03350 — Sandblasting � � � � � DIVISION 7- THERMAL & MOISTURE PROTECTION Section 07920 - Caulking and Sealants 10. CERTIFICATE OF INSURANCE 11. BIDDER'S STATEMENT OF QUALIFICATIONS 12. PERFORMANCE BOND 13. PAYMENT BOND 14. MA.INTENANCE BOND 15. CONTRACT l�J � L!Y � Cl � � NOTICE TO BIDDERS Sealed Proposals for the following: CIP PROJECT NO. 1— PLAYGROUND RENOVATION AT NINE PARK SITES (SOUTHWEST REGION) PROJECT NUMBERS: CANDLERIDGE PARK FIRE STATION PARK FOREST/TILLERY PARK HIGHLAND HILLS PARK OVERTON PARK SOUTHWEST PARK C181/080181048150 C181/080181048190 C181/080181048200 C181/080181048230 C181/080181048270 C181/080181048300 C181/080181048320 C181/080181048330 C181/080181048340 � WESTCREEK PARK WORTH HEIGHTS PARK WRIGHT TARLETON PARK I*� LI L�! � I�J I�I � � � � � Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Division Office until 1:30 pm. Thurs., September 16, 1999 and then publicly opened and read aloud at 2:00 p.m. in Council Chambers 2nd floor — N.E. corner of City Hall. Plans, Specifications and Contract Documents for this project may be obtained at the Park Planning section, Parks and Community Services Department, 4200 South Freeway, Suite 2200, Fort Worth, Texas 76115-1499. Documents will be provided to prospective bidders for a deposit of $50 per set; deposits shall be made in the form of a check or money order. The deposit will be refunded if the document is returned in good condition within ten days after bids are opened. These documents contain additional information for prospective bidders. All Bidders will be required to comply with Provision 5159a of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of the prevailing wage rates, and City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City Code, Section 13-A-21 through 13-A-29) prohibiting discrimination in employment practices. In accord with City of Fort Worth Ordinance No. 13471, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the M/WBE office or from the Office of the City Secretary. In addition, the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM ("Documentation") must be received no later than 5:00 P.M., five city business days after the bid opening date. The bidder shall submit documentation at the reception area of the Department of Engineering, 2"d floor, City Hall, and shall obtain a receipt. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non- responsive. �� �� � LJ The following list is provided to assist bidders in obtaining the services of M/WBE vendors qualified to provide such services/materials for this project. A listing of qualified M/WBE vendors may be obtained at the City of Fort Worth M/WBE office, 3rd floor City Hall. � Services/materials for this proiect are as follows,: demolition/site prep clearing/grubbing � concrete seeding site furnishings drainage system signage sandblasting & painting � � LJ � grading/earthwork steel rebar wood fiber safety surface sand safety surface The City's minimum M/WBE goal on this project is 18 % of the total dollar value of this contract. The City will award one contract with a combination of base bids and/or alternates which is most advantageous to the City. A pre-bid conference will be held with prospective bidders at the Parks and Community Services Offices Conference Room 2 on Thurs., September 2. 1999, at 10:00 a.m. The pre-bid is non-mandatory, however, representation is part of the good faith effort in meeting the requirements of the M/WBE Ordinance. � The City reserves the right to reject any or all bids and waive any or all formalities. AWARD OF CONTRACT: No bid may be withdrawn until the expiration of 49 days from the day bids are opened. The award of contract, if made, will be within 49 days a after the opening of bids, but in no case will the award be made until all necessary investigations are made as to the responsibility of the bidder to whom the contract will be awarded. � I�J � l�! ,� {�l C�� RICHARD ZAVALA, JR., DIRECTOR PARKS AND COMMUNITY SERVICES DEPARTMENT By: ', Betty B!Presnall, Landscape Architect (817) 871-5750 Thursday. Auaust 19. 1999 Thursday. Auaust 26. 1999 BOB TERRELL CITY MANAGER GLORIA PEARSON CITY SECRETARY �� !sJ � � L�J ►�I � SPECIAL INSTRUCTIONS TO BIDDERS 1. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of Fort Worth, in an amount of not less than 5 percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeit in the event the successful bidder fails to execute the contract documents within ten days after the contract has been awarded. To be an acceptable surety on the bond, (1) the name of the surety sha11 be included on the current U.S. Treasury, or (2) the surety must have capital and surplus equal to ten times the limit of the bond. The surety must be licensed to do business in the state of Texas. The amount of the bond shall not exceed the amount shown on the treasvey list or one-tenth the total capital and surplus. 2. PROPOSAL: After proposals have been opened and read aloud, the proposals will be � tabulated on the basis of the quoted prices, the quantities shown in the proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. � � The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject � any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. L!' L� LJ � � � �� � I�l The quantities of work and materials to be furnished as may be listed in the proposal forms or other parts of the Contract Documents will be considered as annroximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans. The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided, without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. 3. ADDENDA: Bidders are responsible for obtaining all addenda to the Contract , Documents prior to the bid receipt. Information regarding the status of addenda may be obtained by contacting Parks and Community Services Department telephone number indicated in the Notice to Bidders. Bids that do not acknowledge all applicable addenda may be rejected as non-responsive. (See Item G in the Proposal.) � 4. AWARD OF CONTRACT: The Contract may not necessarily be awazded to the lowest bidder of the Base Bid. The City Engineer shall evaluate and recommend to the City Council the best bid based on the combined benefits of total bid price and number of contract days allotted, as specified in the Proposal, and which is considered to be in the best interest of the City. SPECIAL INSTRUCTIONS TO BIDDERS -1- L�J � Regardless of the Alternative chosen, the Contractor agrees to complete the Contract within the allotted number of days. If the Contractor fails to complete the work within the number of days specified in the Construction Documents, liquidated damages sha11 be � charged as outlined in General Provisions, Item 8.6 Failure to Complete Work on Time, found in the Standard Specifications for Street and Storm Drain Construction of the City of Fort Worth, Texas. � � � LJ � 1!1 5. PAYMENT. PERFORMANCE AND MAINTENANCE BOND:, The successful bidder entering into a contract for the work will be required to give the City surety in a sum equal to the amount of the contract awarded. The successful bidder shall be required to furnish bonding as applicable in a sum equal to the amount of the contract awarded. The form of the bond shall be as herein provided and the surety shall be acceptable to the City. All bonds fizrnished hereunder shall meet the requirements of Chapter 2254 of the Texas Government Code, as amended. A. If the total contract price is $25,000 or less, payment to the contractor shall be made in one lump sum. Payment shall not be made for a period of 45 calendar days from the date the work has been completed and accepted by the City. B. If the contract amount is in excess of $25,000, a Payment Bond sha11 be executed, in the amount of the contract, solely for the protection of all claimants supplying labor and material in the prosecution of the work. C. If the contract amount is in excess of $100,000, a Performance Bond shall be � executed, in the amount of the contract conditioned on the faithful performance of the work in accordance with the plans, specifications, and contract documents. Said bond shall solely be for the protection of the City of Fort Worth. LJ l� � L! [� LJ � � 1�1 Maintenance Bond shall be required for all Pazks and Community Services Department projects to insure the prompt, full and faithful performance of the general guarantee as set forth in Division 1, Section 01700-Project Closeout, Item 1.02. In order for a surety to be acceptable to the City, (1) the name of the surety shall be included on the current U.S. Treasury List of Acceptable Sureties [Circular 870], or (2) the surety must have capital and surplus equal to ten times the amount of the bond. The surety must be licensed to business in the state of Texas. The amount of the bond shall not exceed the amount shown on the Treasury list or 1/l Oth of the total capital and surplus. If reinsurance is required, the company writing the reinsurance must be . authorized, accredited or trusted to do business in Texas. � . No sureties will be accepted by the City which are at the time in default or delinquent on any bonds or which are interested in any litigation against the City. Should any surety on the contract be determined unsatisfactory at any time by the City, notice will be given to the contractor to that effect and the contractor shall immediately provide a new surety satisfactory to the City � 6. LIOUIDATED DAMAGES: The Contractor's attention is called to Part 1- General Provisions, Item 8, Paragraph 8.6, Standard Specifications for Street and Storm Drain Construction of the City of Fort Worth, Texas, concerning liquidated damages for late completion of projects. SPECIAL INSTRUCTIONS TO BIDDERS -2- !�1 � � lfl � L■J � � k�J l� � 7 EMPLOYMENT: All bidders will be required to comply with City Ordinance No. 7278 as amended by City Ordinance No. 7400 (Fort Worth City Code Section 13-A-21 through 13-A-29) prohibiting discrimination in employment practices. 8 WAGE RATES: All bidders will be required to comply with provision 5159a of "Vernons Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates as established by the City of Fort Worth, Texas, and set forth in Contract Documents for this project. Disregard if Federal Wage Rates are applicable to this project. 9. FINANCIAL STATEMENT: A current certified financial statement may be required by the Department of Engineering Director for use by the CITY OF FORT WORTH in determining the successful bidder. This statement, if required, is to be prepared by an independent Public A��countant holding a valid permit issued by an appropriate State Licensing Agency. ` 10. INSURANCE: Within ten days of receipt of notice of award of contract, the Contractor must provide, along with executed contract documents and appropriate bonds, proof of insurance for Workers Compensation and Comprehensive General Liability (Bodily Injury) -$250,000 each person, $500,000 each occurrence; Property Damage -$300,000 each occurrence. The City reserves the right to request any other insurance coverages as may be required by each individual project. For worker's compensation insurance requirements, see Special Instructions to Bidders - Item 16. 11. NON-RESIDENT BIDDERS: Pursuant to Article 601 g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a non-resident bidder unless the non-resident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a non-resident bidder to obtain a comparable contract in the state in which the non- resident's principal place of business is located. "Non-resident bidder" means a bidder whose principal place of business is not in Qthis state, but excludes a contractor whose ultimate parent company of majority owner has its principal place of business in this state. � � L,J � � � "Texas resident bidder" means a b�dder whose principal place of business is in this state, and includes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. � This provision does not apply if this contract involved federal funds. The appropriate blanks of the Proposal must be filled out by all non-resident bidders in order for its bid to meet specifications. The failure of a non-resident contractor to do so will automatically disqualify that bidder. 12. MINORITY/WOMEN BUSINESS ENTERPRISE: In accordance with City of Fort Worth Ordinance No. 13471, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. You may obtain a copy of the Ordinance from the Office of the City Secretary. SPECIAL INSTRUCTIONS TO BIDDERS -3- � � � �J � L�J � [�l � � LJ The M/WBE Utilization Form, Prime Contractor Waiver Form and the Good Faith Effort Form, as applicable, must be submitted no later than five (5) City business days after the bid opening date, exclusive of the bid opening date. The bidder shall submit the documentation at the reception area of the Department of Engineering ("Managing Department"), 2nd floor, City Hall, and shall obtain a receipt. Failure to comply shall render your bid non-responsive. Upon contract execution between the City of Fort Worth and the successful bidder, now known as Contractor, a pre-construction meeting will be scheduled at which time the Contractor is required to submit either Letters of Intent or executed agreements with the M/WBE firm(s) to be utilized on this project. Such Letters of Intent or executed agreements shall include the following information: 1. Name of Contract 2. Name of M/WBE firm utilized 3. Scope of Work to be performed by the M/WBE firm 4. Monetary amount of work to be performe�i by the M/WBE firm 5. Signatures of all parties A notice to proceed will not be issued until the signed letter(s) or executed agreement(s) have been received. Throughout the duration of this project, the City of Fort Worth is requiring that the Contractor continue to adhere to the M/WBE Ordinance by complying with the following procedures: • A M/WBE Particination Renort Form must be submitted monthly until the contract is completed. The first report will be due 30 days after commencement of work. The monthly report MUST have an original signature to ensure accountability for audit purposes. • Reports are to be submitted monthly to the M/WBE Office, regazdless of whether or j'�, not the M/WBE firm has been utilized. If there was no activity by an NI/WBE in a V� particular month, place a"0" or "no participation" in the spaces provided, and provide a brief explanation. �� � � � • The Contractor shall provide the M/WBE Office proof of navment to the M/WBE subcontractors and suppliers only. The M/WBE Office will accept the following as proof of payment: 1. Copies of submitted invoices with front and back copies of canceled check(s), OR 2. A notarized letter explaining, in detail: � a Subcontractor/supplier Scope of Work b. Date when services were received from subcontractor/supplier � c. Amounts paid to the subcontractor/supplier � d. Ori�inal signatures from both parties must be included on this letter. lJ SPECIAL 1NSTRUCTIONS TO BIDDERS -4- i� l�l L'�J � !�l � � F�' l�l 1!� � � � L*J � � � LJ C� • If the Contractor foresees a problem with submitting participation reports and/or proof of payment on a monthly basis, the M/WBE Office should be notified. If the Contractor wishes to change or delete an M/WBE subcontractor or supplier, adhere to the following: 1. Immediately submit a Reauest for ADnroval of Change Form to the M/WBE Office explaining the request for the change or deletion. 2. If the change affects the committed NUWBE participation goal, state clearly how and why in documentation. a. All requests for changes must be reviewed and pre-approved by the M/WBE Office. b. If the Contractor makes change(s) prior to �pproval, the change will not be considered when performing a post compliance review on this project. • Upon the Contractor's successful completion of this project, and within ten days after receipt of final payment from the City of Fort Worth, The Contractor will provide the M/WBE Office with a Final Particination Renort Form to reflect the total participation from ALL subcontractors/suppliers utilized on the project. • All forms are available at the M/WBE Office, 3rd floor - City Hall. For additional information regarding compliance to the M/WBE Ordinance, call (817) 871-6104. Upon request, Contractor agrees to provide to Owner Complete and accurate information regarding actual work performed by a Minority/Women Business Enterprise (M/WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an M/WBE. The misrepresentation of facts (other than a negligent misrepresentation) andlor the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result on the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three years. 13. PROTECTION OF TREES, PLANTS AND SOIL:. All property along and adjacent to the Contractor's operations including lawns, yards, shrubs, trees, etc., shall be preserved or restored, after completion of the work, to a condition equal or better than existed prior to start of work. By ordinance, the Contractor must obtain a permit from the City Forester before any work (trimming, removal, or root pruning) can be done on trees or shrubs growing on public property including street Rights-Of-Way and designated alleys. This permit can be obtained bv callin� the Forestry Office at 871-5738. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association. A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the SPECIAL INSTRUCTIONS TO BIDDERS -5- L■J� � International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due the Contractor by the City. � � 14. � L! , � � � � � � � l�! L! !�i C� l�J �� To nrevent the snread of the Oak Wilt funeus. all wo�znds �n Live Oak and Red Oak trees shall be immediatelv sealed usin� a commercial nrunine naint. This is the onlv instance when nrunin� naint is recommended. BIDDER'S STATEMENT OF OUALIFICATIONS A. QUALIFICATION OF BIDDERS: Bidders shall be prepared to demonstrate the capability to perform the work. � The Bidders' specific experience, stability and history of performance on projects of a similar nature and scope will be considered. The BIDDERS STATEMENT OF QUALIFICATIONS must be delivered to the Project Manager within 48 hours of the request. � Location and responsive ability of the firm will be considered. If your firm anticipates entering into a joint venture with any other firm to conduct all or part of the performance required under the proposed project, that firm should be specified in your response. For each frm included in the joint venture, please provide the information required above. Under the Contract executed for this work the City will require your firm to be completely 100 percent responsible for fulfilling a11 aspects of the contract bonds. Other firms and employees that may be involved in their joint venture will be treated by the City under the contract as if they were employees or subcontractors• of your firm. Other than those firms noted in the contract as a part of the joint venture, no other firms will be allowed to participate in the joint venture without written consent from the City. 15. OZONE ALERT DAYS: The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "OZONE ALERT DAYS". Typically, the Ozone Alert season within the Metroplex area runs from May through September, with 6:00 a.m. - 10:00 a.m. being critical ozone forming periods each day. The Texas Natural Resource Conservation Commission (TNRCC) in coordinatio,n with the National Weather Service, will issue the Ozone Alert by 3:00 p.m. on the afternoon prior to the alert day. On designated Ozone Alert Days, the Contractor sha11 bear the responsibility of being aware that such days have been designated Ozone Alert Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires '� substantial use of motorized equipment. However, the Contractor may begin work earlier if such work minimizes the use of motorized equipment prior to 10:00 a.m. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. - 6:00 p.m., on a designated Ozone Alert Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. SPECIAL 1NSTRUCTIONS TO BIDDERS -6- t�l � 16 u ��� �� WORKERS COMPENSATION INSURANCE COVERAGE: Contractors compliance with Workers Compensation shall be as follows: A. Definitions: Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCG83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity employees providing services on a project, for the duration of the project. Duration of the project - includes the time from the beginning of the work on the � project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. � � � � � � L�J � L1 LJ � � Persons providing services on the project ("subcontractor" in 0 406.096) - includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44} for all employees of the contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The contractor shall obtain from each person providing services on a project, and provide to the City: (1) a certificate of coverage, prior to that person beginning work on the project, so the City will have on file certificates of coverage showing coverage for all persons providing services on the project; and (2) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. SPECIAL MSTRUCTIONS TO BIDDERS -7- � � � LJ � �� � !�1 LiJ � � L! � l�J L�J � � LsJ � F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the proj ect that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: (1) provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; (2} provide to the contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (3) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, ii the coverage period shown on the current certificate of coverage ends during the duration of the project; (4) obtain from each other person or entity with whom it contracts, and provide to the contractor: (a) a certificate of coverage, prior to the other person or entity beginning work on the project; and (b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain al� required certificates of coverage on file for the duration of the �roject and for one year thereafter. (6) notify the governmental entity in writing by certified mail or personal delivery, within ten days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (7) contractually require each person with whom it contracts, to perform as required by paragraphs (1) -(7), with the certificates of coverage to be provided to the person for whom they are providing services. SPECI.AL INSTRUCTIONS TO BIDDERS -8- C� � [�l �J � �� lJ L�J � � J. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by workers' compensation coverage for the duration of the project, that the coverage will-be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of Self-Insurance Regulation. Providing false of misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties or other civil actions. K. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the City to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the City. "The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Workers' Compensation Act or other Texas Workers' Compensation commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: REQUIRED WORKERS' COMPENSATION COVERAGE � . "The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or ,�� providing labor or transportation or other service related to the project, regazdless of � the identity of their employer or status as an employee." l�' L�J � � u �� "Call the Texas Workers' Compensation Commission at (512) 440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." END OF SECTION � SPECIAL INSTRUCTIONS TO BIDDERS -9- C�'1 of��t Qworth "� Minoriiy and Women�E���3'�+�t��fiise Specifications LJ L'�J L�1 LJ n � n � L!1 MB-���T�� , TI Creative 4 Construction 8� Management Co., Inc. Seg�ember 16. 1999 �R1AlIE COMPANY NAM� Blb DATE CIP Project NO. 1- Playground Renovation (Southwest Region) ROJECT NAME PROJ�CT NUMHER ATTACHM�NT 1A P�ga � of 2 1TY'S 111NVBE ?RQTECf GOAL: 18% � � M/WB� PEBCE7YTAG£ ACNIEVED: 43% � FaBure to compiets thia torm� in its entirety with supporting dotumentatton, And recei�eci by the Managing Department n ot beforr �:00 p.m. flva (Sj City business days after bid openJn�, oxc(usi�e of bid opentng date, wllt result in the b1d ing considered non-responsive to bid specifications. e undersigned bidder agrees to enter Into s format agreement with the MBE andlor WBE ftrms for work listed fn this chsdula� conditioned upon execution of a contract with the City oi Fort Worth. The intentionat AndJor knowing larapresent�tlon ot iacta fs grounda for consideratlon of dlsqualttl�Atlan and wlll resutt !n tfie bid betng constderod non-respoqsi�e to specificattona. . � � Company Nsme, Contact Name, carufled Speclry g�J„Contrpcting Speclfy 4�1 items t� be � � t?oUar f�noimt Addnat, and Telephone No. Scope of Work (•) Supptied('j ,t.-- � �� '' �� �. � � . .� � The Playwell Group �� v� Randy Hou�hton , 2750 Northaven, Ste, 103 X Dallas, Texas 75229 972-488=9�.355 ������ See attached list Cen-7ex Seeding , �3312 Jayce Dr. � Fort' Worth, Texa� 76116 See attached list � 817-244-6024 ���- - X � a �..��.. 0 0 � � �� IAMfBEs taust b� locat*d M the A.(nlne� rountY muk�Mlace or currertUy dolr�,1 quslrwss In the msrk�tpiac� st tlu time of bId i �p�cMy all �ross In whtoh �AWB�'s an to b� utilized ar�dlor Itoins to b� wppN�d: (h A compl�b {Istlr►E of ttams to bt supr�il� (s nquirrd in order W roaiw cndit toward the M1WBE �oal. 103,549.25 2,450.00 � 1d�ntlfY pch Ybr Iw�l. Ti�t: Mqns tfk Iew! of subcontnctirw bdow tf+� prime contneboNcansutt�nt, t.�., a dlr�ct paymant 14 trom t!» prkn� contractor tti a;uDcontrictw' Is constdered i'� Ller, � paym�nt br a subcontr�ctor tv I � its supplE�r ts cor�sldend 2'� Wr. � � ilil8 EOR11 t�tli37 SE R�CEIVED BY T4iE MANAGING DEf�ARTMENT $Y 6:bs p.m., F1YE (5) C1TY BllStN�BS flAYS A�T�R 9SD OPENlNG, EXCLUSIVE OF 7HE BID OPENINa DATE R�Y. 6i?�a Psgea 1 and 2 otAttachment 1A muat be nceiMed by the Manaqing pepartment � J � � � � � � I 1 ' 1 1 � � '� ATTACHMENT tA Paye 2 ot 2 City of Fort Worth Minortty and Women Business Enterprise Specifications MBE/WBE UTlLIZA710N Company Name, Cantact Name, Address. and Talephone No. � C�rtlfled � �� � Speclty AI(,Contract�ng �cope of Work (") SpscNy �ll lt�ms to be 5upplled(h ,r� �� Dollar Amount �e bidder furfher agrees tp provide, dicectiy to tfie City upon requeat, comptebe and accumte inforntation regartilnt tual worfc pertormed by A!! aubcontractorg, including MBEjs) and/or WBE(sj arrangements submitted rvith this Wd h� bidder also agrees to ailow an audR andlor examiriation of any booka, recoM� and files hetd by th�i� company tha wiU aubatantiate !he actual work pertormed by the MBE(s) andlor WBE(a) on thta contract, by an authorized offker o �ptoyee oi the City. Any intantional andlor knowing misrepresentation ot facta wt[I be grounds for tetmin�tin� t!r niract or debarment from City work for a period oi nvt lesa than three (3} yeara and for initiatirtg action ander Federol State�or Local lawa conceming fatse atatements. Any faiture to compiy with this ardinxnce ar�d createa a matett� �ach of contract may reauit In a determination oi an irresponsible ofFeror and barred from p�rttcipating !o City wor a period of time not leas than one (1) year. ALL MBEs and WBEs MUST BE CERTIFIED BY THE CRY BEFORE CONTRAC7 AWARD �uthoNzed Signature President �i'itte Creative 4 Construction & Management Co., Inc. Phinetta Hunter Printsd Signature Clvde Hadlev / Estimat�r Cont�ct Name and Title (tf dtfferont) 940-552-6553 Tetephone Number (aj 940-552-6571 Fax Number September 21. 1999 Date a �ompany N�m� 3320 Mai� St. Addresa O Vernon, Texas 76384 :ttyJState2ip Cods �J � THi3 FORM NlUST BE R�CEIVED BY TtiE MANAGING DEPARTMENT sY 5:04 p.m„ FiVE (5) CITY BUSINESS DAYS AFiER BID OPR'NIIV�, EXCLU8IVE OF THE BtD OPENINO bATE Rw. 6l'll' Pages 9 and 2 of Attachment 1A must he received by the Managing Department D ,� � � �: MR. BOB TERRELL City Manager Fort Worth Texas F' � jr rJ PROPOSAL � OR: CIP PROJECT NO. 1— PLAYGROUND RENOVATION AT NINE PARK SITES (SOUTHWEST REGION) PROJECT NUMBERS: L� CANDLERIDGE PARK FIRE STATION PARK FOREST/TILLERY PARK HIGHLAND HILLS PARK OVERTON PARK SOUTHWEST PARK WESTCREEK PARK WORTH HEIGHTS PARK C181/080181048150 C181/080181048190 C181/080181048200 C181/080181048230 C181/080181048270 C18�/080181048300 C181/080181048320 C181/080181048330 WRIGHT TARI..ETON PARK C181/080181048340 ursuant to the foregoing "Notice to Bidders," the undersigned has thoroughly examined the plans, specificatio�i.s, and e site, understands the amount of work to be done, and hereby proposes to do all the work and furnish all labo��, quipment, and materials necessary to fully complete all the work as provided in the plans and specifications, �id ubject to the inspection and approval of the Parks and Community Service Departinent Director of the City of Fort orth. e"approximate quantity" category is for information purposes only. The Contractor shall be aware that the roposal contains both Lump Sum and Unit Price items. The Contractor shall be paid on the basis of actual installed quantities on items that are not Lump Sum. �the lowest bid received exceeds the funds budgeted for the project, the City reserves the right to decrease the quantities contained in any line item or to eliminate any specific line items before award of the contract in order to ring the work within budget. By submitting a bid, the bidder acknowledges the City's right to adjust or eliminate e items and agrees to honor without recourse its line item bid price. pon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and fiunish, if plicable, Performance, Payment, and Maintenance Bonds approved by the City of Fort Worth for performing and completing'th� said work within the time stated and for the following sums, to-wit: �� BASE BID Y APPROX. DESCRIPTION OF ITEMS WITH BID EM QUANTITY PRICE WRITTEN IN WORDS nit One — Candleridse Park � I 1 Lump Sum Remove Wood Structures including .Concrete Footings. / L1r� /u'� �undicd Dollars & �� Cents per LS U1�IIT PRICE ..�� TOTAL AMOUNT BID iaa� 2. 1 EA P Unit Two — Fire Station Park otal for Candleridge ark � 1. 1 Lump Sum Remove.Wood Structures including Concrete Footings. Tivr./ve. I-�ur�c�r� Dollars & ry �, Cents per LS 2. 1 EA T P Unit Three — Forest/Tillery Park .� otal for Fire Station ark 1. 1 Lump Sum Remove Wood Shuctures including Concrete Footings. %,�oe�ve /�urr��c�' Dollazs & yu �� Cents per LS 2. 191 ° CY Remove Sand Play Surface �'�y, Dollars & nr d Cents per CY $ ���.3 $ /a, ���5�3 $ �,a o0 �� $ � `%a ��� $ l a dl� $ �'�'� �D $ � �, � �� $ i,aoo $ �aoo $ 1 a°� $ �. 91 v � Provide & Install GameTime Play Structure QT # 9951752 ..F; .� _ �-y, �« 7'wcJ�c�c�,.r�i ei�h�huhar�iDollars& ry o Cents per EA Provide & Install Little Tikes Play Structure PB 4 Modified �� � (V i ►7P.�'1 GA.,Ya� �r /t4���liS Cents per EA � 1 3. 1 Lump Sum Remove Buck - A- Bout & Spring Animals f u r �un��rc�l Dollars & Cents per LS 4. 4700 CF 5. 15 LF Install 4" PVC Drain Line Th i r��I Dollars & yl/r� � Cents per LF .. ••-, 6. 1 EA Install Concrete Headwall � J 4�.'�r�n 1-rtrnC�re� D0113TS & v W �� Cents per EA 7. 1 EA Install Concrete Accessible Ramp Two 77zousa.,,�J Dollars & ry � Cents per EA 8. 160 SY R � j'�j9. 1 EA P �r� '• � T P � �Jnit Four - Hi�hland Hills Park eseed Disturbed Areas with Bermuda/Rye See Specifications) %h r e e.. Dollars & ..�1�}z� - -}-L,,� p Cents per SY rovide & Install Little Tikes Play Structure Model # PB 5 Modified e71 J(�lou.sundsl �Y�-`SU(�i1�S��Gvc �r v Cents per EA otal for Forest/Tillery ark Q1. 1 Lump Sum Remove Wood Structures including Concrete Footings. nTw�Ive 1�un�1�r�D Dollazs & `r' N;, Cents per LS Y $ $ 1/�L� 0 $ � L $ $ �3 D �D $ $ l, �3� D $ $ r�, /� �� $ $ ,3 �� $ $ �. $ 9. 8 �� y�5�� �� ��� �. QUd �by �.� ,�.�. $0��1£�d9 $ �,aoD $ �a�a Provide & Install Wood Fiber Safety Surface System, including Manufacturer's Drain System and Mats Ti�a Dollazs & e h Cents per CF � �' �. �. 5. � 7. 8. 9. 10. 200 CY Remove Sand Play Surface �'P yi Dollars & y� � Cents per CY 1 Lump Sum Remove Slide & Spring Animal 3765 CF 50 LF 1 EA 1 EA 100 SY 1 EA t 1 EA Fo t.t r��E u, �r � �l Dollars & ry � Cents per LS Provide & Install Wood Fiber Safety Surface System, including Manufacturer's " Drain System and Mats �'�,� � Dollars & ..�:► •�� - P.� G k�- Cents per CF .� � Insta114" PVC Drain Line `�-,�, f�..�,,1 Dollars & � b Cents per LF Install Concrete Headwall ���P_}�� Dollars & Cents per EA Install Concrete Accessible Ramp -T'v,� e i�, hu S u n�4 Dollars & n, o Cents per EA Reseed Disturbed Areas with Bermuda/Rye (See Specifications) <S i x Dollars & h�„ Cents per SY Provide & Install Little Tikes Play Structure Model # PB 5 Modif �ed j-y�{ �ic�h�Thou.�a n�i1�I.oP�1�0�'dl's c��C. � ry v Cents per EA Provide & Install Single Bay Swing pn� T-i�Dk�l T►�f�e S�v�.,�.� Dollars & �� Cents per EA Total for Highland Hills Park ao $�— $ �DD $ �2 s8 00 $�30 $ �$ a, /�/�� $ �00 $ 9, �I � $ �-1 � O l� � ��1e��� $ �vao $ ��nr� $ b� $ � DD $ R, � �.s $ � a � � . , $ $ % ��� $ ��� � � nit Five — Overton Park 1. 1 Lump Sum 2. 163 CY 3. 1 EA 4. 1 EA �. 3400 CF 6. 60 LF 7. 1 EA 8. 1 EA 9 9. 150 SY 10. 1 EA Remove Wood Structures including Concrete Footings.- Tw e.lv c I-��hc1r�� Dollars & � a Cents per LS Remove Sand Play Surface �',e. � Dollars & y� u Cents per CY Relocate Dinosaur S) X �-unc�rcd • Dollars & N o Cents per EA Relocate �Spring Animal 5'� x}.�.1� r,c� r c� Dollars & �y o Cents per EA Provide & Install Wood Fiber Safety Surface System, including Manufacturer's Drain System and Mats '��a� n Dollars & � �}- Cents per CF Insta114" PVC Drain Line `��i r }-� Dollars & � o Cents per LF Install Concrete Headwall �i�},�r�n N-ur.�,r«i Dollars& � d Cents per EA Install Concrete Accessible Ramp j w o fihnus �� Dollazs &� ,,u ,, Cents per EA Reseed Disturbed Areas with BermudalRye (See Specifcations) � r � P Dollazs & �,�6�,�,J _�,,�,� Cents per SY 'J Provide & Install Tire Swing �'�.+�D�}1w�sa n,0 Twa -F►�� T,•��ollars & y�,� Cents per EA $ 1, � �a $ l, �DD $ �p� $_1,1 �� $ (o U� $ ln D(J $ $ b�� $ (o �� ,� �S $ $ . ��3� � $ _30 $ $ $ I 8�� 1. sca d $ � Ddb $ �bbU $ ,�� 8� $ a.a�� $�.5" �b $ � �.� � � a 12. 1 EA Provide & Instal� V�hirl JUinr;},ccn �1,itn��re� Dollars & a� o Cents per EA 4 i LUnit Six — Southwest Park � � 1. 1 Lump Suxn a 2. 265 CY 3. 80 LF 4. 1 EA 4 y 5. 1 EA 6. 3100 CF ,i 7. 77 LF 8. 1 EA Total for Overton Park Remove Wood Structures and Walls including Concrete Footings. �.x.,jJe 1�.�,r,�rr�h �� Dollars & Cents per LS Remove Sand Play Surface ` � � Dollars & � n Cents per CY Remove Concrete Curb ..�i .��t� ,,� Dollars & � p Cents per LF Remove Bench � r P c l�u� Dollazs & Cents per EA Relocate Slide ��,k 1� u��C1Y tra Dollars & Cents per EA Provide & Install Wood Fiber Safety Surface System, including Manufacturer's Draiia System and Mats �W u Dollars & � i x-�--� Cents per CF Install4" PVC Drain Line --`-�, ; r �.-�,� Dollazs & � � Cents per LF Install Concrete Headwall �i�l��-r.�cn �uh•�rtc� Dollars & Yv � Cents per EA $ 1,��� $ r,ao� �$�Q� $ aa, ��o $ ,��a $ 1 (JdU $ �, �O✓� $ 1�5 6� $ 1. �DO $ �360 $ �3oa $ � 6l� $ $ n� � � $ � �3 6 $ $ $ •� • �/�� �� �3 � � ���� 1 EA Install Concr�t� Accessible Ramp T'l�i� �nu,Su n�.� Dollars & ,;v � Cents per EA 0. 130 LF Install Concrete Curb ...�-� .��� v� Dollars & �} p Cents per LF 11. 200 SF � �2. 45 CY 13. 275 SY 4. 105 CY 5. 1 Lump Sum Install Concrete Walk � j x Dollazs & �,�, o Cents per SF Provide & Install Topsoil' Si X �i--� Dollars & yv� � Cents per CY Reseed Disturbed Areas with Bermuda/Rye (See Specifications) � r � � Dollazs & � � Cents per SY Provide & Install Pair of Volleyball Sand � � � � Dollars & ry o Cents per CY Provide & Install Volleyball Standards and Net Fc�ar�et� �uv���l'�°,�� D011ars & Cents per LS 16. 1 EA Provide & Install GameTime Play Structure Model # 11557 � . j T'en��ou.san� �lnrCe e��u��y-���ollars & - � �, Cents per EA � Total for Southwest Park �Unit Seven — Westcreek Park �1. . 1 Lump Sum Remove Wood Structures including �'"� Concrete Footings. �J TwelU c E}u Y,,� r,� � Dollars & r Yv a Cents per LS � $ � 000 �$ $ ,�5 � $ $ � C�b $ $ b0 aa $ $ ( � bD $ � 30 �o $ l.�/di� F iii l. 9�5 � l:aoo a, ��o op gas $ �3, i�s� $ l. �DI $ i6,�3�.5 � 10, <3�S $ � �l 9�31� $ 1,a�D $ 1,��� 250 CY . 375 SF 1 EA 5. 2 EA 1 EA 7. 1 EA . 1 EA 9. 3150 CF 10. 140 LF 11. 1 EA 12. 2 EA Remove Sand Play Surface �P. h Dollars & }v p Cents per CY Remove 3' Wide Concrete Curb �j y }�� Dollazs & W p Cents per SF Remove Bench �r�c ��hdr��� Dollazs & yv � Cents per EA Relocate Double Bay Swings `�'�„��e,lvc. 1-�unc�rY�� � Dollars & ��y p Cents per EA Relocate Whirl �h� �-�-i a nr�_ D011a1'S 8G „T �, Cents per EA Relocate Dome Climber � %`h� u n��r�c�D Dollars & ,.� J Cents per EA Relocate Buck — A - Bout Fi�h� i-��.��r�c� Dollars & ,,, �, Cents per EA Pro :�ide & Install Wood Fiber Safety Surface System, 'including Manufacturer's Drain System and Mats �� p Dollars & � d .�..� Cents per CF Insta114" PVC Drain Line �� � � �-,� Dollars & �v � Cents per LF Install Concrete Headwall E iV M-ct n 1�}u n c� r c �� Dollars & � o Cents per EA Install Concrete Accessible Ramp � 1,�� I�r, u� an.� Dollazs & y�J � Cents per EA � $� �$ $ �� $ $ �3 D 0 $ ��SDD �.3f.0�� �3D� $ I;a ob $ a,�oo $ �6 /� $ ��� $ �60 $ � �l� $ $ • �/ � �D $ � 30 � $ �fS�U $ �D� $ �. � 7.� $ �,a oa $ J,�� o $ �, 0 0 0 $ � DDD 13. 170 LF Install Concrete Curb ���� Dollars & � � o Cents per LF 14. 135 SF Install Concrete Walk F i � � �- Dollars & �o Cents per SF 15. 96 CY Provide & Install Topsoil �� � X -�-� Dollars & N o Cents per CY 16. 575 SY Reseed Disturbed Areas with BermudalRye (See Specifications) � n e � Dollars & �j,�-� �_ �5 j � Cents per SY 17. 88 CY Provide & Install Sand in Tot Play Area �;, r�--,,� Dollars & � � Cents per CY 18. 1 EA Provide & Install Slide �o+.z r� c u� �►� •-�i ut N4 �011 ars & �d Cents per EA 19. 1 Lump Sum Provide & Install Play Panels & Posts �i-�}eer� 1�uhr�rc,� Dollars & yv o Cents per LS Total for Westcreek Park Unit Ei�ht —''Worth Hei�hts Park - 1. 1 Lump Sum Remove Wood Structures and Wa11s including Concrete Footings. /Gve%c /�u� �/r.,/ Dollars & Cents per LS 2. 47 LF Remove Concrete Curb �-���, Dollars & yV� v Cents per LF $ I_5� �$ �a�o $ 8'� $ 1,0�� $ (o� � $ J�.�� � $ �� �� $ �8� $ �D $ �1�5 6 b $ Isoo $ a � �-� . $ �f5d f $ /,�5 02— $ '7� �� % $ � � f� D $ � $ %S �v $ I, a D r'S �� � �� 7. 0. I1. 12. 13. 85 CY 1 EA 1 EA 2900 CF 5 LF 1 EA 1 EA �Li�A�I 40 CY 250 SY 1 EA Remove Sand Play Surface �j-'� � Dollars & � � Cents per CY Relocate Spiral Slide �i Sh� 1-�u ri�rr� Dollars & w o Cents per EA Relocate Buck - A - Bout F ��y, �. }}� h� r�,� Dollars & �� Cents per EA Provide & Install Wood Fiber Safety Surface System, including Manufacturer's Drain System and Mats � �' -�'w � Dollars & .�j ..��� Cents per CF Insta114" PVC Drain Line S ; � }-� Dollars & � ,N v Cents per LF Provide & Install See Saw Snake �rcr Th�u.�ar,.� Dollazs & �vv Cents per EA Install Concrete Accessible Ramp �-�; o -��,,�5 u �� Dollazs & rU n Cents per EA Install Concrete Curb Wall 5 j x �--,,.,, Dollars & � Yv o Cents per LF Provide & Install Topsoil - � � X-�-�a Dollazs & ,,v o Cents per CY Reseed Disturbed Areas with Bermuda/Rye (See Specifications) } � � Dollars & � � � � � Cents per SY Provide & Install Dome Climber (�np �I�nn��son c) Dollars & � a Cents per EA $ ) �°� $ SDD $ R�l� .$ 8�50GD $ ���� $ �Db $ � `�° $ '��v��5 $ �D°� $ �3D0 $ � Qob $ : 3 �Dd � • .� I�►I - I/♦ $ bQ $ Ll a D� $ /�� $ a �D�. $ � �d $ $ � Dd� $ ��� /DD D Total for Worth Heights Park Unit Nine — Wright Tarleton Park 1. 1 Lump Sum Remove Wood Structures and Walls including Concrete Footings. Twelue !-�ur�r��r�cG Dollars & y� � Cents per LS 2. 110 CY Remove Sand Play Surface �'� y� Dollars & �ry � Cents per CY 3. 1 EA Relocate Whirl �i�ti�- I����rc�d Dollars & y� � Cents per EA 4. 1 EA Relocate Buck — A- Bout � ►,� � }�-►, v�r� r,r,� Dolla�-S & n� a Cents per EA 5. 1 EA Relocate Spiral Slide 'F' ; ��, � ��i,,� ,� r,�,D Dollars & W d Cents per EA 6. 2600 CF Provide & Install Wood Fiber Safety Surface System, including Manufacturer's Drain System and Mats �� � � Dollars & S i x. -1- �1 Cents per CF 7. 70 LF Insta114" PVC Drain Line �� i � -�-� Dollars & N ,� Cents per LF 8. 2 EA Install Drain Holes in Wall and Curb at End of PVC Pipe Drain �� rr r {�� Dollars & „�„ Cents per EA 9. 2 EA Install Concrete Accessible Ramp TWO LY\DUS@y�r/i D011�$& �-,�� Cents per EA $ ,1a00 $ �, a a5 $ l.a DD $ l0°� $ l,1ao $ 8�� $ �1D1 $ ��D $ �Ob $ �6d $ �6I $ � �O $� '�� D � $��a $ � � �� $ ��� $ ��d $ � OD� $ �, oao 10. 210 LF Install Concrete Curb (^ i ��-�� ;� Dollars & j�l Q Cents per LF 11. 300 SF Install Concrete Walk � j x Dollars & y� r� Cents per SF 12. 27 CY Provide & Install Topsoil S 1 x �-� Dollars & y�t v Cents per CY 13. 170 SY Reseed Disturbed .Areas with Bermuda/Rye (See Specifications) ' j—pu r pollars & TW P_n�-� Cents per SY 14. 1 EA Provide & Install Single Bay Swing ����,�►-�u � a r�c �i Dollars & 1� o Cents per EA 15. 1 EA Provide & Install Steering Wheel I In r P� N kr�� r�.DDollars & yv � Cents per EA 17. 1 EA Provide & Install Animal Panel and Posts Q vl e�n,�� a n`( Dollars & � � Cents per EA Total for Wright Tarleton Park , . BASE BID - RECAPITULATION . nit One - Total Cost for Candleridge Park .nit Two - Total Cost for Fire Station Pazk nit Three - Total Cost for Forest/Tillery Park nit Four - Total Cost for Highland Hills Park $ l. 5 � � �3, ��5d $ �o �° $ 1.8 4 D ,� $ l�� $ ) � a D $ �/�° $ %l� $ 1 �5 D0 $ , $ �3 d0 $ l�Q� �DD $ l , D�� $ l, � D �5 $ ,��,�3��� $ j �, � ��— $��� $ a �, � b � $ � `� ��5 q , � � l Unit Five - Total Cost for Overton Park ' nit Six - Total Cost for Southwest Park Unit Seven - Total Cost for Westcreek Park nrt Eight — Total Cost for Worth Heights Pazk � ' Unit Nine - Total Cost for Wright Tarleton Park DTotal Base Bid � BID ALTERNATES a UNIT ONE — CANDLERIDGE PARK: �-8id Alternate No. 1— Deduct all Demolition and Removal Items. $ � a. � 9l� $ , � 1, 9� 3Z� $ � _ , ) c'� % _ $ �� , a.1�,:� . � ._ i $ _r�,�1 � � % � '� D Total Deduct Alternate No. 1 $ f o� �� �-�P S� . id Alternate No. 2—Add Provide & Install Two (2) Play Signs . Total Add Alternate No. 2 $ ���5 Q j) /Sign �id Alternate No. 3—Add Remove Existin Picnic Table & Provide & Install8' Accessible Picnic Table g aTotal Add Alternate No. 3 �-�id Altemate No. 4—Add Modify Existing Tot Play Structure U Total Add Alternate No. 4 a :JNIT TWO -= FIRE STATION PARK: �id Alternate No. 1— Deduct all Demolition and Removal Items. � Total Deduct Alternate No. 1 3id Alternate No. 2—Add Provide & Install Two (2) Play Signs � Total Add Alternate No. 2 ("id Alternate No. 3—Add Provide & Install See Saw Snake U Total Add Alternate No. 3 D $ / 0 D 0 �-ump sum $ a� O Q a 2ump Sum $ %, � D � lLump Sum $ � , <5%� l� /Sign $ � �� � (� � 1Each id Altemate No. 4 Add Remove Two Spring Animals Total Add Alternate No. 4 $ __-CL-C�� /Each Alternate No. 5-Add Remove 54 LF Concrete Curb and Insta1153 LF Concrete Curb Total Add Alternate No. 5 Alternate No. 6-Add Sandblast and Paint One Existing Single Bay Swing Total Add Alternate No. 5 THREE - FORES'I'/TILLERY PARK: id Alternate No. 1- Deduct all Demolition and Removal Items. $ �� �, �� /I-ump Sum $ l,�l�/S �..,.�p s� Total Deduct Alternate No. 1 $,�,��) (j /Lump Sum id Alternate No. 2—Add Provide & Install One (1) Play Sign Total Add Alternate No. 2 $ g Q D /Sign id Alternate No. 3— Add Provide & Install One Buck — A— Bout with Aluminum Animal Seats Total Add Alternate No. 3 FOUR — HIGHLAND HILLS Iternate No. 1— Deduct all Demolition and Removal Items. Totai Deduct Alternate No. 1 lternate No. 2—Add Provide & Install Two (2) Play Signs Total Add Alternate No. 2 $ � �Q Q /Lump Sum $ r7 i> lLump Sum $ �,�5 �(� /Sign id Alternate No. 3-Add Remove Existing Picnic Table and Provide & Insta118' Accessible Picnic Table Total Add Alternate No. 3 $�� ��Q� /Lump Sum id Alternate No. 4—Add Provide & Install One Whirl Total Add Alternate No. 4 $ a a d d /Each I� �TNIT FIVE — OVERTON PARK: id Alternate No. 1— Deduct all Demolition and Removal Items. Total Deduct Alternate No. 1 �Bid Altemate No. 2—Add Provide & Install Two (2) Play Signs $ v�,g� � /Lump Sum Total Add Alternate No. 2 $�,�Q� /Sign 4id Alternate No. 3—Add Rem v 'c ' ' i le Picni Ta e o e Existing Pi nic Table and Provide & Install 8 Access b c bl � Total Add Alternate No. 3 $%�J Q� /Lump Sum �IT SIX — SOUTHWEST PARK: �'$id Alternate No. 1— Deduct all Demolition and Removal Items. �� � Total Deduct Alternate No. 1 �id Alternate No. 2—Add Provide & Install One (1) Play Sign $ �� 3�d /Lump Sum pTotal Add Alternate No. 2 $ �(�Q /Sign Bid Alternate No. 3—Deduct Remove Existing Bench and Add Relocate One Existing Bench and Insta1140 SF � Concrete Pad for Relocated Bench Total Bedtrct Add Iternate No. 3 4� IT SEVEN — WESTCREEK PARK: id Alternate No. 1— Deduct all Demolition and Removal Items. Total Deduct Alternate No. 1 , � ici Alternate No. 2—Add Provide & Install Two (2) Play Signs Total Add Alternate No. 2 id Alternate No. 3-Add Provide & Install Steering Wheel $ �� f� /Lump Sum $ a , �� /Lump Sum $ ��J�`(j � /Sign Total Add Alternate No. 3 $ Bid Alternate No. 4— Deduct Remove Existing Bench and Add Relocate One Existing Bench Totai � Add Iternate No. 4 $ � �Q�,i /Lump Sum 8'D D /L,ump s,am � Y. IVIT EIGHT — WORTH HF,IGHTS PARK: - Bid Alternate No. 1— Deduct all Demolition and Removal Items. Total Deduct Alternate No. 1 id Alternate No. 2 Add Provide & Install One (1} Play Sign . Total Add Alternate No. 2 IT NINE — WRIGHT TARLETON PARK: Bid Alternate No. 1— Deduct all Demolition and Removal. Items. � Total Deduct Alternate No. 1 I id Alternate No. 2—Add Provide & Install Two (2) Play Signs Total Add Alternate No. 2 id Alternate No.(3�Add Provide & Insta1170 LF of Handrails, Handrail Footings, � �/ and 66 LF of Concrete Curb Total Add Alternate No��J f� �{ d $ �, % � /I..ump Sum $ ��� � /Sign $ o'� � �()Q /Lump Sum $ %,��� /Sign $ �i! / y � /Lump sum id Alternate No. 3-Add Provide & Install One Bench Total Add Alternate No. 3 $ ��,. �� n j� /Each . This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04 I . � � � I .� I I (F) of the Texas Limited Sales, Excise and Use Tax Act. The Contractor performing this contract may purchase, rent or lease all materials, supplies, equipment used or consumed in the performance of the contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate complying with� State Comptroller's ruling tax, said exemption certificate complying with State Comptroller's ruling #95-0.07. Any such exemption certificate issued by the Contractor in lieu of the tax shall be subject to the provisions of the State Comptroller's ruling #95.09 as amended to be effective October 2, 1968. The undersigned assures that its employees and applicants for employment and those of any labor organization. subcontractor or employment agency in either furnishing or referring employee applicants to the undersigned a��e not discriminated against as prohibited by the terms of City Ordinance 7278, as amended by City ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. The undersigned agrees to complete all work covered by these contract documents within Six 60 WorkinQ Days after the date for commencing work as set forth in the Notice to Proceed to be issued by the Owner and to pay not less than the "Prevailing Wage Rates for Highway Construction" as established by the City of Fort Worth, Texas effective June 6, 1995. � �� z �ro ,� '��� � Within ten (l 0) days bf receipt of notice of acceptance of this bid, the undersigned will execute the formal contract and will de3iver applicable Surety Bonds for the faithful performance of this contract. The attached deposit check in the sum of $_Dollars ($i.� /�'0 6�' %b-iz � 31�).is to become the properry of the City of Fort Worth, Texas, or the attached Bidde�'s Bond is to be forfeited in the event ttie contract and applicable bonds are not executed within the time set forth, as liquidated damages for delay and additional work caused thereby. In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous price for construction thereof to the Ciry or to reject the proposal. . . Receipt is hereby acknowledged of the following addenda: No.l � No.2 No.3 No.4 . Respectfully submitted, �Ll,r� `�f ��r� n� f`rt���i�n (Company Name) � r7�� By (Authorized Signature) ...,,. Sc-�-� � � f=yL�iG��"�- �� 1�s� �� �� . �� /�'lc�; h � S�'� .���. i x � � ��r�' �e: ( 9 /eJ� �`�"v� —���5�j �- �a���.��-� �- �'o., ���. SEAL (if corpora:ion) ;-��'�ri`: ,�:,�� � �^�;,�'., ..UYt � � �� � ,h ��: �_' l'�J � lJ � LJ �� � L�1 � � t� � � l�! L+�J u l�l � . � . . :.. ^. � � � c=_,,,,.. JUN� 6, 1995 :iJMaN RESOGR�=S ��• • CI':Y��OE' FORT WORTH �� � HIGHWAY �CONSTRJCTION •• �' PRE�VAiL'ING �WAGE �`RAT�� FOR � 1995 CLASSIFICATION RATE CLASSIFZCA�ION " • � � ---------------------------------------------...._..-------------=--� � - ,TTE � � POW�� �?UFPMENT O?ERr1TORS �' � . : RIR TOOL OP£RATOR 57.554 '�M�ii�Vu MACF!IN£ 0?ER�►TOit So;bSC P.SPHRLT RAKER S8 . 565 M:?��-R (OV�R ? 6 C. F. }�. �, �� , S9. ��0 P.SPHALT SHOVELER S8 . 25� �, MifCe,'.R t 16 C.. F.. 6 LESS� . S�: yj.3 BATCHING PLANT WEIGHER 59.371 �MIXER-CONCRETE oAVING ���� S9.500 HATTER90ARD SETTER' 58.920 MOTOR GRADER OPEr'tRTOR � CARPENTER 59.447 (=INE GRADE) Si0.345 CONCRETE FINISHER (PAV) S9.345 MOTOR GR.Ab£R OPER.ATOR ` S9.891 CONCRETE FINISHER (STRS) 59.058 PAVEMENT MARKING MACHINE � SE.402 CONCR�TE RUBBER � 57.�33 POSTHOLE DRILLER OPERATOR 5�.000 ELECTRYCIAN ;12.761 ROLLER, STEEL WHEEL " ' � FI:RGGER � 55.598 (P:.r.N':-MIX PAVEMENTS? . :8.339 FORM BUILDER (STRS) ' 98. 717 ROLi.e.R, ST; EL WHEE�, iORM LINER `' S e. 913 { FLATW:iEE.T. OR Tr1MPING ) � '' S 7. 9'03 FORM SETT�R (PAV i CURBj a8.686 ROLLER, PNEUMATIC SELE-?RO 57.403 FORM SETTER �(STRUCTURES} S8.927 SCeZAP£R - 1? C.'l. 6 LESS 59.138 LABORER, COMMON 56.402 SC�?ER - OVER I? C.Y. 58.205 LABORER, UTILZTY S7.4bI�� SID� 800M S7.?93 MECHANIC 510.658 TRaCTOR- CRAWL£� TYP� OILER 58.698 i150 HP b LESS) 58.448 SERVIC�R S8. 104 TR�C':'OR- CRAWLER TYPE � ?TL:DRiV:R 57.�00 (OV�� 150) ' SQ.973 ?I?EL?.YER 58.509 TR3�,:'OR- PN£U.�':IC S%.?3= 5:�.�1STER S� 1. 333 T��'I_�ING MIX�� ;,?. a'J.5 ?OW�R EQUIP."' �E�NT OP£RATORS �. Tc'c.VCciiNG MACF??'N�-LIGHT • 58.:39 ASPHr"�.:T DISTRI3UTOR S3.4Q4 . TR^�C:?I�lG M?�CKZNE-FiEAVY S_2.;98 AS?Hn.TrT PAVING MACHI�IE Sy.053 Wi1^vOti-�RILL� EORING MtiC.'iiN= .79..^�v0 BR00!�! OR S'n1EE?ER O?ER.ATOR S?.903 R=�:+=�RCII��--Si=£� S�TT�R ' ' 3J�,L►�OZ£R, 250 :iP OR L�SS 3"c . 7C3 '=:'JI�); S9. 218 • ..'..tiuLOZ.�r�� Ot4�� �.�io �? � � . �7'J 1��•Y: v�`*�1 �T� �� Sv,wl.�� .. � CONC�:Tz �=.V_TNG • CURING M�.Cv . S? . 2:? . :'RJCTJ�A::; . ' , , - - . �; _ CO2iC��:.. ?iV .:NiSiiING Mt;Cci. S9. J�3 S:'�� _ aORK=R-S:'�;;LTUR�� 5�: .�;,� CONCR?_� _AV=NG rO:t,.'y? G�4�R 5:.;,Ou �_�: �R;�TO� �� 3�_.:?c .. C'J�v�R:�T= ?�V.T,NG JOINT MAC:i. S5. ^v4' 2 S?==."-. i�R LCX G?s�.�.TO� $ �. � � .'�CONCR£T= ?AVING SOr;1T S�.�,LR $ � .3�u Eez�:c:C�OE S :�V.0 :R ZON : ;rFK. :p. -^2 CONCR�:= P�VTNG, �T.OAT 5?."a75 MC�\=_� SiGN �.:�Si�LL=R . . CONC��'!'? PA`,TiNC• �SAW S 3. 2 90 ;?E�NAN�NT GROUND) ' S o" .; J2 CO►ICR�TE� PAVIIIG'SPREADER S9.750 TRJC:C DRIVE�-ST_vGiE AXLE �i� S�,I?FQrZt�.'"MA�CHINE � $5.000 (:.=uiia) � ``57.�;c���`�= CRA,J�, CL.AMSHELL, BACKiIOLE, S9.000 T�GCK DRIV�R-SYNG� : A.�CLE C�sZRICK, Gc'tAGLINE, SHOV=.',, ;-:=.VY) �' - � S8. �07 (L�SS TNAN I 1/2 CYi :3.�?3 T�;;�K �RIV_R-TryDEM AXLE ' C:�.�..�'£, CL;..'�1SHELL, 3ACK:iO�=. ;5=�:=-Tr�ii.,?R; i�'$ %•'-: ��RRI�K, Bic�GLih�. SriOV�i ?'R'.;_.. �R�V?�-�C�ri30Y/FLQAT ���,. 0"�=3 (1 il2 CY a OV=R) 5=... �: i Tce;,�� �R:�I�e't-T�.isNSIT "".:X �' 3�5.', ��% CRJSi?=NG Ot't SCRNG ?LT 0?R. ::. �QO ':�;;•�:<. DRIVE�-W:^i�H 53:2.� EL�Vr^,TT_!3G GRADER VT_3�_ ^_OR 0?��,TOR 57.�9Q FQUN'J ;T_ON DR_TLL OP�RA:OR W�:�=� S 1G .:� 3 (�Ft?riLER MOUt�1TED) S:��. JO eOUNC�TION �RILL OPEl�TOR r�, _ � . .CITY, ,OF. F,ORT .W.QR�'- : ; . � . _. . , . , . HIGHWAY ,COl�iy$,TRCiCTI�y � Q. PREVAI,LING WAC�,E : F�ATE. .�F�R; :�1995 � {TRUCK MOUNTEO) S12. 138 . • .•, ,. •, I,�..: - •. FOUNDATION DR�LI.. O?.F� HEL?�R � . .' . _ -' . ' . ' _ ._.. '_ . _. . .. . FRONT ENT�LOADER,,., , {2 1/2 CY OR' LE,SS?i-- : : �`,.� - ... .; 58..823 ... ,; -: �'j FRON� ENT LOADER Y : :� ,= . : _ � , � _ . ;. .. : . • ; : .' ,. : . . : ' , . '. . . . ' ; , :. . U (OVER 2 1/2 CY). • - :, :, . ., 59.�311 ,� HOIST (OOUHLE 'qRtJM�, {� I:E3S) . 7. ',�, . � 58..427 , � ^ . .. ..... . . . ,:, .., ,. , . . , , �. '. .. - '_ . � � .� �s � � . . � . _. .� ,. .,`.. � � . •? � _ t , • (. . ,:;; . ' . . . _. • . • ' ?`.. ,.. �' .': ., .. ' . . • � � . , . .. � .. . . . - .. .. � ' .. . t .... . .... �� i . . . �l . i � . �4. . _ . . . . � . ; .'. . " . .. _ �. � . , . . i �,',.,� .. ... .. r . . ' . � . . -F. �� - '� ... . . . .� , . ;q J ' ' . �.Y� . . �. . '... ,. . x . . . .. w , .1 , . � � -..' .. f ..., 'l.`.'..� ...:.� ` . . ' .. .. •. ,� ., ' ` . , ' . (. � �� � . . . ' . . � � . ... ..: t� 7 . . . .=1. .�. ., . ... ., � , �. . , .`�." • . .. _ . � � i. � - . .� . . . , , ' Y ` . � . . � : ' ^ 1 � � . ', ' • ' , . , ' , . . a. .' ' . . , . . . : • ,.. ' . . � � . . �� ., ' �. . .,Y. .. � . ' . . `. '1 - ..- _,. �. ., , . � � • . ^ ' ' ' ' ... . v ' ~' . ' .. .� . . '_ , - . . . �: .. . . . i.V � . .. . . . : �` .. . _ . . a-...._. . ..� �. � � .: � ,. ��� .�..�. �.� . . �. D� �� : , . :. : . . . �, . .. .�. �. . ..: - .:,,, � . . .. � , • , ��` . � .+r �_�4'. . . r � �. _ ,i . � . '' . ,..,; .. • �.f ��i W��i'� ,�'� . . . , Y • im"... a • • . � . �. .' � • 1 _ = . � • ` \. . ' ., . . . .. : .� . k�,\., , . . , . . � __. , ' ... . �.. ,. �•.1A'.�\,�4``*i� . � . _ . .. - ' .. ' : . � . ��� .. ' . 5'�. . 4 . • . , , . , . .. . -. � .. �\ . .' � . . . . �:. . '.> . , : . . .: • • , � 4 � 3UNE 6, I995 HUMAN e2�S0URCES C � 95clGH�i ' 1 1 � �� � I■ � � � � � � � � � � � � �J uET��M��l JANiJARY FEBRUARY MARCH APRII, MAY JiJNE NLY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER ��:. _��� WEATHER TABLE AVERAGE DAYS RAINFALL (1) 7 7 7 9 8 6 5 5 7 6 6 7 :� � INCHES RAINFALL (2) 1.80 236 2.54 4.30 4.47 3.05 1.84 2.26 3.15 2.68 2.03 1.82 32.30 SNOW/ICE PELLETS (3) 1 * * 0 0 0 0 0 0 0 0 * 1 (1) Average normal number of days rainfall, 0.01" or more. (2) Average nonnal precipitation. (3) One inch (1 ") or more. * Less than one-half inch (`/Z'). Unseasonable weather is defined for contract purposes as rau�/snow days which exceed the average number of days or inches of rainfall in any given month. This table is based on information recorded at the fonner Greater Southwest International Airport, Fort Worth, Texas, covering a period of 18 years. Latitude 320 50' N, Longitude 970 03' W, elevation (ground) 537 ft. !�1 [1� �J � L" � L� VENDOR COMPLIANCE TO STATE LAW The 1985 Session of the Texas Legislature passed House Bi11620 relative to the award of contracts to non-resident bidders. This law provides that, in order to be awarded a�contract as low bidder, non- resident bidders (out-of-state contractors whose corporate offices or principal place of business are outside of the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a non-resident bidder in order to obtain a comparable contract in the Sta.te in which the non-resident's principal place of business is located. The appropriate blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state or non-resident contractors to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Non-resident vendors in (give state), our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. . oNon-resident vendors in (give state}, our principal place of business, are not required to underbid resident bidders. aB. Our principal place of business or corporate offices are in the State of Texas. � aBIDDER: � . (please print) � � ��� � �� L�J (please print) (please print) � Please Check or mark with an "X" : Company Signature: Title: City State Zip THIS FORM MUST BE RETURNED WITH YOUR QUOTATION VENDOR COMPLIANCE TO STATE LAW � C� �7 C� �] �7 � C�i C� C� C� �] C� �7 C� C� C� O L� �] TO THE EMPLOYER/CONTRACTOR: Pursuant to Texas Worker's Compensation Commission Rule 110.110(d)(7), a contractor engaged in a buiiding or construction project for a government entity is required to post a notice on each project site informing a11 persons providing services on the project that they are required to be covered by workers' compensation insurance. The notice required by this rule does not satisfy other posting requirements imposed by the Texas Workers' Compensation Act or other Commission rules. This notice must: (1) be posted in English, Spanish and any other language common to the employer's employee population; (2) be displayed on each project site; ___ _(3) state how a person may verify current coverage and report failure to provide coverage; (4) be printed with a title in at Ieast 30-point bold type and text in at least 19-point normal type; and (S) contain the exact words as prescribed in Rule 110.110(d)(7) without additional words or changes. � The notice on the reverse side meets the above requirements. Failure to post the notice as required by this rule is a violation of the Act and commission rules. The violator may be subject to administrative penalties. ■� �r■■ � w ■■■� � ir r■�■r � � �w w� w rr ■� � � r � REQUIRED WORKERS' COMPENSATION COVERAGE The law requires �hat each person working on this site or providing services related to this construction proj ect must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing` labor or transportation or other service related to the proj ect, regardless of the identity of their employer or status as an employee. Call the Texas Workers' Compensation Commission at 512-440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage. COBERTURA REQUElZIDA DE '� � � � � � � � � � � � � � � � � � �. COMPENSACION PAR.A TRABAJADORES La ley requiere que cada persona trabaj ando en este sitio o proporciona servicios relacionados con este proyecto de construccion tiene que estar cubierto por aseguranza de compensacion para trabaj adores. Esto incluye personas que pro9porcionan, cargan, entregan equipo 0 materiales o proporcionan mano de obrra, transportan, o cualquier servicio relacionado con este proyecto, sin considerar la identidad del patron o estado del empleado. a Llame a la Comision Tej ana de Compensacion para Trabaj adores al 512- 440-3789 para recibir informacion de los requerimientos legales de cobertura, para verificar si su patron le ha proporcionado la cobertura requerida o para reportar falta del patron en proporcionarle cobertu 9 � � TECHNICAL SPECIFICATIONS DIVISION 1- GENERAL REQUIREMENTS � SECTION 01010 - SUMMARY OF WORK The contractor shall supply all superintendence and shall perform all work and furnish all labor, equipment, materials and incidentals necessary and complete all work as described in the plans and specifications. The Contractor sha11 be responsible for the construction layout and stake lines and grades for this project. All construction and other work shall be done by the Contractor in accordance with the best engineering and construction practices for the skill or trade involved. The work to be accomplished under these plans and specifications for CIP PROJECT NO. 1— PLAYGROUND RENOVATION IN NINE PARKS (SOUTHWEST REGION) includes: Earthwork, Relocate Existing Play Equipment, Removal of Existing Play Structures, Provide & Install New Play Equipment, Removal of Wood Walls, Removal of Concrete Curbs and Walks, Installation of Concrete Curbs and Walks, Removal of Sand Safety Surface and Replacement with Wood Fiber Safety Surface System including Manufacturer's Drain Matrix and Mats, Installation of Sand Safety Surface, Accessible Concrete Ramps, Sandblasting and Painting, Revegetation, PVC Drain Line and Concrete Headwall, Perforated Drain in Gravel Bed, Picnic Tables, Benches, and Signs These plans and specifications were prepared by the Parks and Community Services Department. The Department of Engineering will administer the contract and furnish inspection. The applicable items contained in the Standard Snecifications for Street and Storm Drain � Construction for the City of Fort Worth, Texas, sha11 apply to this contract just as though each were incorporated in these documents. Where the provisions or specifications contained in those documents are contrary to this publication, this publication shall govern. In case of conflict �' between plans and specifications, the plans shall govern. A copy of the Standard Specifications for Street and Storm Drain Construction can be purchased at the office of the Transportation and � Public Works Department , 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort r Worth, Texas. The Contractor shall provide all permits and licenses and pay all charges and fees, and give all �,,, notices necessary and incidental to the due and lawful prosecution of the work. The Contractor shall contact the City of Fort Worth's Development-Plans Exam Section for a determination of � applicable permits or variances required for this project. SECTION 01035 - CONTRACT TIME � 1.01 PROGRESS AND COMPLETION GENERAL REQUIREMENTS -1- �� � � � � At the time of the preconstruction conference , a construction start date shall be established and indicated in the Notice to Proceed (Work Order) issued by the "�' Engineering Department. The Contractor shall begin the work to be performed under the �., contract on or before ten working days from the date the Work Order is issued. The � Contractor shall carry the work forward expeditiously with adequate forces and shall complete it within the period of time stipulated in the contract. 1.02 LIQUIDATED DAMAGES This project will be completed within the specified days allowed. Liquidated damages will be assessed if the project runs over the allotted time. SECTION 01100 - ALTERNATIVES The City reserves the right to abandon, without obligation to the contractor, any part of the project (subject to conditions set forth in Section 01150 - Payment to Contractor) or the entire � project at any time before the Contractor begins any construction work authorized by the City. � SECTION 01150 - PAYMENT TO CONTRACTOR 1.01 SCOPE OF PAYMENT: The Contractor shall accept the compensation as provided in � the contract in full payment for furnishing and paying for all materials, supplies, subcontracts, labor, tools and equipment necessary to complete the work of the contract; for any loss or damage which may arise from the nature of the work from the r� action of the elements, or from any unforeseen difficulty which may be encountered in , the prosecution of the work, until the final acceptance of the work by the City; for all risks of every description connected with the prosecution of the work; for all expenses and damages which might accrue to the Contractor by reason of delay in the initiation ir,Y and prosecution of the work from any cause whatsoever; for any infringement of patent, trademark or copyright, and for completing the work according to the plans and/or � specifications. The payment of any current or partial estimate shall in no way affect the obligations of the Contractor to repair or remove, at his own expense, the defective parts of the construction or to replace any defective materials used in the construction, F" and to be responsible for all damages due to such defects if such defects or damages are � discovered on or before the final inspection and acceptance of the work. 1.02 Partial pay estimates shall be submitted by the Contractor or prepared by the City on �- the Sth day and 20 day of each month that the work is in progress. The estimate shall be processed by the City on the l Oth day and 25th day respectively. Estimates will be paid �" within 25 days following the end of the estimate period, less the appropriate retainage ��r as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent � part thereof, but which at the time of the pay estimate have not been so installed. If such � materials are included within a pay estimate, payment shall be based upon 85% of the net invoice value thereof. The Contractor will furnish the Engineer such information as r" GENERAL REQUIREMENTS -2- � � may be reasonably requested to aid in the verification or the preparation of the pay .,a estimate. " 1.03 It is understood that the partial pay estimate amounts will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate rendered following the discovery of the mistake in any previous estimate. Payment of � any partial pay estimates shall not be an admission on the part of the Owner of the �, amount of work done or of its quality or sufficiency or as an acceptance of the work done; nor shall same release the Contractor of any of its responsibilities under the Contract Documents. 1.04 The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the speciiications or other provisions of this Contract. 1.05 For contracts of less than $400,000 at the time of execution, retainage shall be 10 percent. For contracts of $400,000 or more at the time of execution, retainage shall be 5 percent. 1.06 Contractor shall pay subcontractors in accord with the subcontract agreement within five business days after receipt by Contractor of the payment by City. Contractor's failure to make the required payment to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished. 1.07 Contractor hereby assigns to City any and all claims for overcharges associated with this � contract which arise under the antitrust laws of the United States, 15 U.S.C.A. Sec. 1 et se�c (1973). 1.08 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter � the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work �"; as altered, increased or decreased at the unit prices. Such increased or decreased quantity �„ shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity of any item or items of �'" work to be done or materials to be furnished by the 25 percent or more, then either party , to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal; such revised consideration to be determined by special � agreement or as hereinafter provided for "Extra Work." No allowance will be made for any changes in anticipated profits nor shall such changes be considered as waiving or r"'i'� invalidating any conditions or provisions of the Contract Documents. 1.09 PAYMENT FOR EXTRA WORK: Extra work performed by the Contractor, that is � authorized and approved by the City Engineer, will be paid for under "Change orders" �'� made in the manner hereinafter described, and the compensation thus provided shall be accepted by the Contractor as payment in full for all labor, subcontracts, materials, tools, � � r"9 GENERAL REQUIREMENTS -3- � � equipment and incidentals, and for all supervision, insurance, bonds and all other expense � of whatever nature incurred in the prosecution of the extra work. Payment for extra work will be made under one of the following types of "Change orders" to be selected by the City: � A. Method "A". By unit prices agreed upon in the contract or in writing by the Contractor and City Engineer and approved by the City Council before said extra � work is commenced subject to all other conditions of the contract. B. Method "B". By a lump sum price agreed upon in writing by the Contractor and City Engineer and approved by the City Council before said extra work is commenced, subject to all other conditions of the contract. �, C. Method "C". By actual field cost of the work, plus 15 percent as described herein below, agreed upon in writing by the Contractor and City Engineer and approved by the City Council after said extra work is completed, subject to all other � conditions of the contract. In the event extra work is to be performed and paid for under Method "C", the actual � field costs of the work will include the cost of all workmen, foremen, timekeepers, mechanics and laborers working on said project; all used on such extra work only, plus all power, fuel, lubricants, water and similar operating expenses; and a ratable � proportion of premiums on performance and payment bonds, public liability, workmen's compensation and all other insurance required by law or ordinance. The City Engineer will direct the form in which the accounts of actual field cost will be � kept and will recommend in writing the method of doing the work and the type and kind of equipment to be used, but such extra work will be performed by the Contractor as an independent contractor and not as an agent or employee of the City. �,. The l 5 percent of the actual field cost to be paid the Contractor shall cover and compensate him for profit, overhead, general supervision and field office expense, �"' and all other elements of cost and expense not embraced within the actual field cost Lr as herein specified. F'� The Contractor shall give the City Engineer access to all accounts, bills, invoices and , vouchers relating thereto. 1.10 DELAYS: If delay is caused by specific orders given by the City to stop work, or by the �- performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an � equivalent extension of time, his application for which shall, however, be subject to the approval of the City Council; no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which sha11 remain in � full force until the discharge of the contract. C GENERAL REQUIREMENTS � �4 �� � 1.11 CLAIMS AND DAMAGES: Any claims for extra work or for any other related matter �., or cause must be made in writing to the City Engineer within seven calendar days from and after the cause or claim arises. Unless such claim is so presented, it shall be held that the Contractor has waived the claim, and he shall not be entitled to receive pay thereof. � 1.12 TRANSPORTATION: No allowance or deduction will be made for any charge of freight rates. No allowance for transportation of inen, materials or equipment will be allowed. �I 1.13 ACCEPTANCE AND FINAL PAYMENT: The City, upon receipt of the Director's "Certificate of Completion" and "Final Estimate" and upon receipt of satisfactory �evidence from the Contractor that all subcontractors and persons furnishing labor or ' materials have been paid in full and all claims of damages to property or persons because of the carrying on of this work have been resolved, or the claims dismissed or the issues joined, shall certify the estimate for final payment after previous payments have been �; deducted and shall notify the Contractor and his surety of the acceptance of the project. On projects divided into two or more units, the Contractor may request a final payment on one or more units which have been completed and accepted. � The final acceptance of the completed work will be by the Parks and Community Services Department and all guaranties covering the completed work and all maintenance periods shall begin with the date of this acceptance. �„ On delivery of the final payment, the Contractor shall sign a written acceptance of the final estimate as payment in full for the work done. All prior partial estimates shall be �" subject to correction in the final estimate and payment. SECTION 01300 - SUBMITTALS � Prior to construction, the contractor shall furnish the Parks and Community Services Department a schedule outlining the anticipated time each phase of construction will begin and be completed, � including sufficient time for clean-up. The Contractor shall submit to the Project Manager shop drawings, product data and samples ►'" required in specification sections. SECTION 01400 - QUALITY CONTROL � The contractor will receive all instructions and approvals from the Director of Engineering and/or his assigned inspectors. The inspector will be introduced to the contractor prior to � beginning work. Any work done at the direction of any other authority will not be accepted or paid for. Final approval for the finished project shall be given by the Director of Engineering, � City of Fort Worth. Q �'" GENERAL REQUIREMENTS -5- r � The contractor or a com etent and reliable su erintendent shall oversee the work at all times. P P � The superintendent shall represent the contractor in his absence and all directions given to him sha11 be binding as if given to the contractor. SECTION 01410 - TESTING All tests made by the testing laboratory selected by the City will be paid for by the City. In the event manufacturing certificates aze requested, they shall be paid for by the Contractor. SECTION 01500 - TEMPORARY FACILITIES AND CONTROLS The contractor shall take all precautions necessary to protect all existing trees, shrubbery, sidewalks, buildings, vehicles, utilities, etc., in the area where the work is being done. The contractor shall rebuild, restore, and make good at his own expense all injury and damage to same which may result from work being carried out under this contract. � T'he utility lines and conduits shown on the plans are for information only and are not guaranteed by the Owner to be accurate as to location and depth; they are shown on the plans as the best mformation available from the owners of the utilrties mvolved and from evidences found on the � ground. The contractor shall determine the exact location of all existing utilities and conduct his work to prevent interruption of service or damages. SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES A warning sign not less than five inches by seven inches, painted yellow with black letters that � are legible at twelve feet, shall be placed inside and outside vehicles such as cranes, derricks, , power shovel, drilling rigs, pile drivers, hoisting equipment or similar machinery. The warning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." L,. Equipment that may be operated within six feet of high voltage lines shall have an insulating cage-type guard about the boom or arm, except backhoes or dippers, and insulator links on the �" lift hood connections. When necessary to work within six feet of high voltage electric lines, the Contractor shall notify power company (TUElectric) to erect temporary mechanical barriers, de-energize the line, or � raise or lower the line. The contractor shall maintain a log of all such correspondence. The Contractor is responsible for all costs incurred. � '� � � GENERAL REQUIREMENTS � _6_ SECTION 01640 - SUBSTITUTIONS AND PRODUCT OPTIONS 1.01 GENERAL Send submittals for substitutions to: Betty B. Presnall, Landscape Architect (817)871-5750 Parks and Community Services Department 4200 S. Freeway Suite 2200 Fort Worth, Texas 76115-1499 1.02 PRODUCTS LIST A. Within ten (10) days after date of Contract, submit to Landscape Architect two (2) copies of complete list of all products which are proposed for installation. B. Tabulate list by each specification section. C. For products specified under reference standards, include with listing of each product: 1. Name and address of manufacturer 2. Trade name 3. Model or catalog designation 4. Manufacturer's data a. Performance and test data b. Reference standards 1.03 CONTRACTOR'S OPTIONS A. For products specified only by reference standards, select any product meeting standards, by any manufacturer. B. For products specified by naming several products or manufacturers, select any product and manufacturer named. C. For products specified by naming one or more products, Contractor must submit request, as required for substitution, for any product not specifically named. 1.04 SUBSTITUTIONS A. During bidding, Landscape Architect will consider written requests from prime bidders for substitutions, received at least ten (10) days prior to bid date; requests received after that time will not be considered. GENERAL REQUIREMENTS -7- rJ ' B. Within thi (30 da s after date of Contract Landsca e Architect will consider rtY ) Y , p � formal requests from Contractor for substitution of products in place of those specified. � � C. Submit two (2) copies of request for substitution. Include in request: 1. Complete data substantiating compliance of proposed substitution with Contract Documents. 2. For products: a. Product identification, including manufacturer's name and address. b. Manufacturer's literature: (1) Product description (2) Performance and test data (3) Reference standards c. Samples, if required. d. Name and address of similar projects on which product was used, and date of installation. r,. D. In making request for substitution, Bidder/Contractor represents: ' 1. He has personally investigated proposed product or method, and determined that it is equal or superior in all respects to that specified. � 2. He will provide the same guarantee (or better) for substituted product or method specified. 3. He will coordinate installation of accepted substitution into work, making such ��. changes as may be required for work to be complete in all respects. 4. He waives all claims for additional costs related to substitution which � consequently become apparent. E. Substitutions will not be considered if: � 1. They are indicated or implied on shop drawings or project data submittals without formal request submitted in accord with Paragraph 1.04. �2. Acceptance will require substantial revision of Contract Documents. � SECTION 01700 - PROJECT CLOSEOUT � �,,, 1.01 CLEANING The Contractor shall make final clean-up of the construction area, to the satisfaction of � the Parks and Community Services Department, as soon as construction in that area is completed. Clean-up shall include removal of all construction materials, pieces of �"i concrete, equipment and/or other rubbish. No more than five (5) days shall elapse after � the completion of construction before the area is cleaned. Surplus materials shall be disposed of by the Contractor, at this own expense, and as directed by the Parks and , Community Services Department. Cleaning of equipment by Contractor or Subcontractor, such equipment as cement mixers, ready-mix trucks, tools, etc., shall take place in an area designated by the Parks and Community Services Department. � � C++ GENERAL REQUIREMENTS -8- � � 1.02 GUARANTEE J The Contractor shall be responsible for defects in this project due to faulty workmanship or materials, or both, for a period of one (1) yeaz from the date of final acceptance of this � project by the Parks and Community Services Department. The Contractor will be required to replace, at his own expense, any part, or all, of this project which becomes ,�. defective due to these causes. SECTION 01800 - CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not anv such iniurv. damaQe or death is caused. in whole or in part. by the ne,�liQence or allesed neQliQence of Owner, its officers. servants, or emn[ovees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not anv such iniury or damaQe is caused in whole or in part bv the neQlisence or alle�ed ne�liPence oiOwner, its of�cers. servants or emnlovees.. r� In the event Owner receives a written claim for damages against the Contractor or its , subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance �,,,; carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth � public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. � END OF DIVISION 1 � � �'. GENERAL REQUIREMENTS -9- � i� SECTION 02100 - SITE PREPARATION PART 1 - GENERAL 1.01 SCOPE: Work in this section includes furnishing all labor, materials, equipment and services required for clearing and grubbing, demolition, and removal and disposal of items as specified herein and on the plans. 1.02 RELATED WORK SPECIFIED ELSEWHERE: A. Section 02200 - Earthwork �j'�` B. Existing Conditions, Removal and Demolition Items. � PART 2 — PRODUCTS 2.01 No products are required to execute this work, except as the Contractor may deem necessary. PART 3 — EXECUTION 3.01 CLEARING AND GRUBBING: A. Clearing and grubbing shall consist of removing all natural and artificial objectionable materials from the project site or from limited areas of construction specified within the site. B. In general, clearing and grubbing shall be performed in advance of grading and earthwork operations and shall be performed over the entire area of earthwork operations. C. Unless otherwise specified on the plans, all trees and shrubs of three inches caliper and r`"'� less (caliper is the diameter as measured 12 inches above the ground) and all scrub growth, such as cactus, yucca, vines, and shrub thickets, shall be cleared. All dead rtrees, logs, stumps, rubbish of any nature, and other surface debris shall also be cleared. D. Buried material such as logs, stumps, roots of downed trees that are greater than one and 1-1/2') inches in diameters, matted roots, rubbish, and foreign debris shall be grubbed and removed to a minimum depth of 24 inches below proposed finished grades. E. Ground covers of weeds, grass, and other herbaceous vegetation shall be removed prior to stripping and stockpiling topsoil from areas of earthwork operations. Such removal shall be accomplished by "blading" off the uppermost layers of sod or root-matted soil for removal. � �1i 3.02 PAVEMENT REMOVAL: A. Bituminous and concrete pavements shall be removed to neatly sawed edges. Saw cuts shall be full depth. If a saw cut in concrete pavement falls within 3 feet of an existing SITE PREPARATION 02100 -1- � � score joint, construction joint, saw joint, cold joint, expansion joint, or edge, the concrete shall be removed to that joint or edge. All saw cuts shall be parallel and/or perpendicular to the line of existing pavement. If an edge of a cut is damaged �"' subsequent to saw cutting, the concrete shall again be sawed to a neat, straight line for � the purpose of removing the damaged area. B. Concrete curb and gutter shall be removed as specified above. No section to be replaced � shall be smaller than 30 inches in length or width. �;I 3.03 UTILITIES REMOVAL: In general, those utilities on the site that aze to be removed and that belong to the Owner shall be removed by the Contractor. The Owner is responsible for arranging the relocation or removal of other utilities owned by utility companies or other r" parties. 3.04 MINOR DEMOLITION: There may be certain items on the site such as old building foundations, fences, and other undetermined structures and improvements that must be removed before construction can commence. Unless otherwise specified, such items become the property of the Contractor for subsequent disposal. 3.05 USE OF EXPLOSIVES: The use of explosives will not be permitted in site preparation operations. 3.06 BACKFILLING: All holes, cavities, and depressions in the ground caused by site preparation operations will be backf lled and tamped to normal compaction and will be graded to prevent ponding of water and to promote drainage. In areas that are to be immediately excavated, the Architect/Engineer may permit hoies, etc., to remain open. � 3.07 DISPOSAL OF WASTE MATERIALS: , A. Unless otherwise stated, materials generated by clearing, grubbing, removal, and � demolition shall be known as "waste" or "spoils" and shall be removed from the site and disposed of by the Contractor. Sirnilar materials may be unearthed or generated by earthwork operations or by subgrade preparation. Unless otherwise specified any ' merchantable items become the property of the Contractor. END OF SECTION � I� l �! �J SITE PREPARATION 02100 -2- J � SECTION 02140 - SITE UNDERDRAINS PART I - GENERAL � 1.01 SCOPE: Work in this section includes furnishing all labor, materials, equipment, and services '^� required to construct underdrains to the required lines, grades, and cross sections as specified �,; herein and on the plans. 1.02 RELATED WORK SPECIFIED ELSEWHERE: A. Section 02200 - Earthwork. B. Section 03300 - Cast-in-Place Concrete PART 2 - PRODUCTS 2.01 UNDERDRAIN PIPE: Pipe and fittings shall be flexible, corrugated tubing manufactured of high-density polyethylene resins and conforming to ASTM Product Specifications F-405 and F-667. Drainage tubing shall be as manufactured by Advanced Drainage Systems (ADS), Inc., of Columbus, Ohio. The local manufacturing plant which will provide a list of suppliers is in Ennis, Texas - telephone (214) 875-6591. A. Perforated Pipe: Perforations shall be linear slots cut radially into the tubing wall between corrugations. Perforated pipe will be furnished complete with the Cerex nylon ' "Drain Guard" screen. The screen will completely surround the pipe and will have a lapped, welded longitudinal joint. r- B. Non-Perforated Pipe: Non-perforated pipe shall be used for collector lines which convey the water from perforated pipe to the concrete inlet or outfall. � C. Fittings: All couplings, reducers, tees, ells, plugs, caps, and other fittings shall be non- perforated and shall be of the same manufacturer as the drainage tubing. A fitting shall �; be used at each pipe junction/termination, as appropriate. 2.02 FILTER MATERIAL: Filter material for use in backfilling trenches over and around � underdrains shall consist of 1 1/2" to 2" gravel washed free of organic or other deleterious ' matter. 2.03 FILTER FABRIC: Filter fabric to line and lap over gravel filled subdrain trench shall be �`' Mirafi 140N drainage fabric as manufactured by Celanese Corporation, (800) 223-9811, or approved equal. � PART 3 - EXECUTION 3.01 VERTICAL AND HORIZONTAL CONTROLS: � A. The Contractor shall establish or shall employ a licensed surveyor to establish all lines and grades necessary for each stage of the work described herein. �,., SITE UNDERDRAINS 02140 -1- � �+I B. Provide blue tops for reference in dressing trench bottoms at intervals not to exceed 30 feet along the centerline of each trench. R" , 3.02 LTNDERDRAINS: Trenches for underdrains shall be dug after the subgrade is prepared. The excavation of each trench shall begin at its outlet and proceed toward its upper end. The trench "' must not be excavated below the proposed grade line. Trenches will be cleaned of all loose � material and their bottoms will be dressed and fine graded to blue tops set as previously described. Trenches shall be lined with filter fabric and underdrain pipe shall be set on the trench bottom. All fittings shall be securely coupled and all open ends will be capped. The � pipe shall be carefully covered with the gravel filter material and the filter fabric shall be lapped over the trench. � Care shall be taken not to damage the pipe or its fabric filter screen. Underdrain pipe shall be connected to solid pipe joints and to outfall at the concrete structure/collar as indicated in the � plans. Care shall be taken not to loosen or cave-in the trench walls. Any such damage will be excavated and will be backfilled in mechanically tamped lifts not to exceed eight inches and will be re-constructed. 3.03 SETTLEMENT: After the trench has been backfilled it shall be thoroughly soaked. This process shall be repeated two times allowing the backfill material to dry twenty-four hours before wetting again. END OF SECTION CJ 1 � 1 � !� � SITE iJNDERDRAINS 02140 -2- � � � PART1-GENERAL SECTION 02200 - EARTHWORK 1.01 SCOPE: Work in this section includes furnishing all labor, materials, equipment, and services � required to construct, shape, and finish earthwork to the required lines, grades, and cross � sections as specified herein and on the plans. 1.02 RELATED WORK SPECIFIED ELSEWHERE A. Section 02100 - Site Preparation. B. Grading Plan: Refer to plan sheets. �1.03 METHOD OF PAYMENT: Earthwork is a necessary and incidental part of the work. The ` total cost will be included in the Bid Proposal. Payment will not be made on a unit price basis. PART 2 - PRODUCTS 2.01 LJNCLASSIFIED EXCAVATION: Unclassified excavation shall consist of all excavation, unless separately designated, within the limits of the work. Unclassified excavation includes all material encountered regardless of its nature or the manner in which it is to be excavated. 2.02 LJNCLASSIFIED FILL A. Unclassified fill shall consist of all fill within the limits of the work. All suitable native r"' materials removed in unclassified excavation, or similaz imported materials, shall be , used insofar as practicable as unclassified fill. Properly deposited, conditioned, and compacted fill is hereinafter referred to as "earth embankment." � B. Rock: Minor quantities of rock not greater than four inches in greatest dimension are permissible in fill materials used to construct earth embankment. Minor quantities of �"" rock of greater dimensions may be placed in the deeper fills in accordance with the ��y State Department of Highways and Public Transportation requirements for construction of rock embankinents, provided such placement of rock is not immediately adjacent to � structures or piers. Also, rock may be placed in the portions of embankments outside � the limits of the completed graded width where the size of the rock prohibits their incorporation in the normal embankment layers. "'"' 2.03 TOPSOIL On-Site Topsoil: Topsoil shall consist of an average depth of six inches of native surface soil �' left in place after the ground cover of herbaceous vegetation and other objectionable matter has been cleared by "blading," as specified in Section 02100, "Site Preparation." Topsoil may be greater or less, than the upper six inches. in depth. ' � � EARTH WORK 02200 -1- �� ,� 2.04 IMPORTED FILL A. Imported fill materials shall be used for the construction of earth embankment in the � event that (1) the volume of unclassified excavation is less than the volume of fill required for earth embankment and/or (2) the condition of materials removed in unclassified excavation makes them unsuitable for use in the construction of earth embankment. � � �'. 2.05 �r � � � 2.06 � �, B. The Contractor shall haul and place imported fill obtained from off-site sources as necessary to construct the embankment and various other details of the construction plans. All costs related to such imported fill will be included in the contract price, and no additional or separate payment for imported fill will be due the Contractor. C. A sample of the proposed imported fill must be provided by the Contractor and be approved by the Owner. In general, imported material must be equal to or better than native material in quality and engineering characteristics. The Architect/ Engineer may also require the Contractor to provided a material analysis test of the proposed fill. SELECT MATERIALS Select materials shall be imported from offsite sources, unless they are available from specifically designated areas on the site as marked on the plans. A. Cushion Sand: Clean fine sand, free from clay clumps, rocks, or other deleterious material. : Playground Gravel: Gravel backfill for playground areas shall be washed "pea gravel", clean and free of all foreign materials. Particle size of the gravel shall be 1/8" — 5/8". C. Playground Sand: Sand backfill for sand dig areas shall be fine white sand graded with the following sieve analysis limits: I� Size Percent No. 16 No. 30 No. 50 No. 100 No. 200 UNSUITABLE MATERIALS Percent Passing 100 98 62 17 0 -1 A. Topsoil, select material, imported fill, or unclassified fill will be declared as "'unsuitable" by the Owner if, in his opinion, any of the following conditions or matter and particles are present to a degree that is judged detrimental to the proposed use of the material. l. Moisture 2. Decayed or undecayed vegetation 3. Hardpan clay, heavy clay, or clay balls EARTHWORK 02200 -2- � �I � 4. Rubbish 5. Construction rubble 6. Sand or gravel 7. Rocks, cobbles, or boulders 8. Cementious matter 9. Foreign matter of any kind �"'� B. Unsuitable materials will be disposed of as "waste" as specified in Section 02100. C. Wet Material: If fill material is unsatisfactory for use as embankment solely because of high moisture content, the Architect/Engineer may grant the Contractor permission to process the material to reduce the moisture content to a usable optimum condition. PART 3 - EXECUTION 3.01 SITE PREPARATION: In general, "site preparation," as specified in Section 02100, shall be performed in advance of grading and earthwork operations and shall be completed over the entire area of earthwork operations. 3.02 TOPSOIL � A. The removal and storage of topsoil shall occur after site preparation is complete and before excavation and embankment construction begin. Likewise, topsoil will be �., replaced after excavation and embankment construction are complete. B. Removal: Topsoil shall be stripped to an average depth of six inches from areas where excavation and embankment construction are planned. Topsoil may be obtained from greater depths if it is uncontaminated by the substratum and it is of good quality, in the opinion of the Architect/Engineer. C. Storage: Topsoil shall be stored in stockpiles conveniently located to areas that will later receive the topsoil. Stockpiles shall be out of the way of earthwork operations in locations approved by the Owner or Architect/Engineer. Stored topsoil shall be kept separate from other excavated materials and shall be protected from contamination by objectionable materials that would render it unsuitable. � D. Timing: Topsoil will not be replaced (deposited) until construction activities are complete that would create undesirable conditions in the topsoil, such as overcompaction or contamination. Trenching for items such as electrical conduit and i.,, irrigation pressure lines must be complete before topsoil replacement may begin. � E. Replacement: Topsoil will be deposited in a single layer or lift. It will be placed, processed, compacted, and graded to leave a finished layer of topsoil not less than five inches in depth. Unless otherwise indicated, topsoil will be replaced over all areas of R"" earthwork (including slopes), except where pavement is planned. � �"" � EARTH WORK 02200 -3- � � F. Grading: Topsoil will be final graded to the elevations shown on the plans. Fine grading will be accomplished with a weighted spike ha.rrow, weighted drag, tractor box �,, blade, light maintainer, or other acceptable machinery. All particles of the finish grade shall be reduced to less than one inch in diameter or they shall be removed. All rocks of one inch or greater shall also be removed. Grading operations and equipment will be such that topsoil does not become overcompacted. Bulldozer blades and front-end loader buckets are not acceptable devices for topsoil grading operations. Final grading �'` within five feet of constructed or installed elements shall be hand raked. G. Acceptability: Finished areas of topsoil aze satisfactory if they are true to grade, true in plane, even in gradient (slope), uniform in surface texture, and of normal compaction. Areas of loose granular pockets or of overcompacted soils are not acceptable and will be reworked. Finished areas will promote surface drainage and will be ready for turfgrass planting. � ,� 3.03 UNCLASSIFIED EXCAVATION A. All excavated areas shall be maintained in a condition to assure proper drainage at all times, and ditches and sumps shall be constructed and maintained to avoid damage to the areas under construction. � B. C� Surplus Material: 1. Surplus excavation is that quantity of material that may be left over after the grading plan is executed, and all earthwork operations, including excavation, embankment construction, topsoil replacement, and final grading, are completed. Any other surplus material shall be disposed of as "waste" as specified in Section 02100. 2. At this Park, the Architect/Engineer shall permit the Contractor to "waste" the surplus by constructing additional embankment in an approved location. No additional payment for such work would be due that Contractor. � C. Excavation in Rock: The use of explosives will not be permitted. Unless otherwise � indicated on the plans, excavation in solid rock shall extend six inches below required subgrade elevation for the entire width of the area under construction and shall be backfilled with suitable materials as indicated on the plans. r 3.04 EARTH EMBANKMENT A. Earth embankment is defined as embankment composed of suitable materials removed ►.. in unclassified excavation and/or imported fill. The construction of embankment includes preparing the area on which fill is to be placed and the depositing, r'" conditioning, and compaction of fill material. L,.+ B. General: Except as otherwise required by the plans, all embankment shall be � constructed in layers approximately parallel to the finished grade of the graded area, and • each layer shall be so constructed as to provide a uniform slope as shown on the grading plan. Embankments shall be constructed to correspond to the general shape of the typical sections shown on the plans, and each section of the.embankment shall � � EARTH WORK 02200 -4- ,: W correspond to the detailed section or slopes established by the drawings. After completion of the graded area, embankment shall be continuously maintained to its ►'� finished section and grade until the project is accepted. C. Preparation: Prior to placing any embankment, all preparatory operations will have been completed on the excavation sources and areas over which the embankment is to be placed. The subgrade shall be proof rolled to detect soft spots, which if exist, should be reworked. Proof rolling shall be performed using a heavy pneumatc tired roller, loaded dump truck, or similar piece of equipment weighing approximately 25 tons except as otherwise specified for tree protection and areas inaccessible to vehicular compactors. Stump holes or other small excavations in the limits of the embankments shall be backfilled with suitable material and thoroughly tamped by approved methods before commencing embankment construction. The surface of the ground, including plowed, loosened ground, or surfaces roughened by small washes or otherwise, shall be restored to approximately its original slope by blading or other methods, and, where indicated on the plans or required by the Owner, the ground surface, thus prepared, shall be compacted by sprinkling and rolling. � D. Scarification: The surface of all areas and slopes over which fill is to be placed, other than rock, shall be scarified to a depth of approximately six inches to provide a bond � between the existing surface and the proposed embankment. Scarification shall be accomplished by plowing, discing, or other approved means. Prior to fill placement, the loosened material shall be adjusted to the proper moisture content and recompacted to r" the density specified herein for fill. E. Benching: Scarification is normally adequate for sloping surfaces. However, in certain "� cases where fill is to be placed against hillsides or existing embankment with slopes greater than 4:1, the Owner may direct the Contractor to key the fill material to the existing slopes by benching. A minimum of two feet normal to the slope shall be removed and recompacted to insure that the new work is constructed on a firm � foundation free of loose or disturbed material. � F. Depositing: Fill material shall be placed in horizontal layers or lifts, evenly spread, not to exceed eight inches in loose depth before conditioning and compaction. Unless �„ otherwise permitted, each layer of fill material sha11 cover the length and width of the area to be filled and shall be conditioned and compacted before the next higher layer of fill is placed. Adequate drainage shall be maintained at all times. � G. Watering: At the time of compaction, the moisture content of fill material shall be such that the specified compaction will be obtained, and the fill will be firm, hard, and unyielding. Fill material which contains excessive moisture shall not be compacted �� until it is dry enough to obtain the specified compaction. �,,. H. Compacting: Each layer of earth fill shall be compacted by approved tamping or sheepsfoot rollers, pneumatic tire rollers, or other mechanical means acceptable to the Owner. Hand-directed compaction equipment shall be used in areas inaccessible to vehicular compactors. � ►-� EARTH WORK 02200 -5- � � I. Grading: Embankments shall be constructed in proper sequence and at proper densities for their respective functions. All embankment serves in one capacity or another as subgrade (e.g., under topsoil, under concrete and asphalt pavement, � under structures, etc.). Accordingly, the upper layer of embankment shall be graded to within plus or minus 0.10 foot of proper subgrade elevation prior to depositing topsoil, and prior to the construction of pavements, slabs, etc. � 3.05 DENSITY CONTROL A. Earth Embankment in General: Earth embankment shall be compacted in lifts at a minimum of 90 percent of Standard Density ASTM D698 with plus 4 percent or minus 2 percentage points of optimum moisture content. B. Earth Embankment Under Structures and Pavement: The top 6 inches of natural earth comprising the subgrade for structural slabs or for areas of pavement shall be 95 percent to 98 percent of Standard Density ASTM D698 with the moisture content at minus 2 percent to plus 4 percent of optimum. � 3.06 MOISTURE MAINTENANCE: The specified moisture content shall be maintained in all embankments that aze to function as subgrade for structures, areas of pavement, or for select � embankment. After completion of the embankment, the Contractor shall prevent excessive loss of moisture in the embankment by sprinkling as required. Loss of moisture in excess of 2 percent below optimum in the top 12 inches of the fill will require that the top 12 inches of the � embankment be scarified, wetted, and recompacted prior to placement of the structure, select fill or pavement. If desired, the Contractor may place an asphalt membrane of emulsified or cutback asphalt over the completed embankment and thus eliminate the sprinkling requirement. � �. � � � � � i" � � 3.08 TOPSOIL REPLACEMENT: Topsoil shall be carefully placed to avoid any displacement or damage to the subgrade. If any of the subgrade is rutted, damaged or displaced it shall be restored prior to placing topsoil. Topsoil shall be replaced as specified herein per Item 3.02. END OF SECTION EARTHWORK 02200 -6- f� SECTION 02537 -WOOD FIBER PLAYGROUND SURFACING PARTI— GENERAL 1.01 SCOPE Surfacing tasks for shredded wood fiber surfacing with drainage matrix system include all �„ labor, materials and equipment necessary for, and pertinent to, the work to be done. Work will be accomplished in a thorough and workmanlike manner. The specified �'' products will be applied strictly in accordance with the manufacturer's recommendations. 1.02 DESCRIPTION OF SYSTEM � A. Shredded Wood Fiber Surfacing System with Drainage Matrix (Base Bid): Shall be Fibar System 300 as patented and licensed for production by Robert Godfrey, � Ltd., Woodcarpet with Duraliner fabric as manufactured and warranted by Zeager �' Bros., Inc. with TerraFlow 100 Drainage System by Contech, or approved equals. B. Shredded Wood Fiber Surfacing System with Gravel and Subdrain (Alternate Bid, � per Plan Detail No. 6): Sha11 be Fibar System 200, Woodcarpet system with Duraliner and gravel layer, or approved equal. C. Fibar Systems, FibarMat, and FibarGard are available from Modlin Recreation � Equipment, Inc., P. 0. Box 50048, Denton, Texas 76026-0048, 1-800-433-5347 (local Exclusive Representative) or Robert Godfrey, Ltd., 141 Halstead Avenue, Mamaroneck, NY 10543-2650. Ca11800-Fibar-21 or 914-835-151. Fax 914-835- � 6975. D. Woodcarpet Systems, Woodcarpet Mat, and TerraFlow System are available from �► Hunter Knepshield, P.O. Box 260677, Plano, Texas 75026-0677, 1-800-451-4138 (local representative) or Zeager Hardwood Co., 340 Butt Road, Franklin, Kentucky, 42134, 1-502-586-4491. �„ PART 2 — PRODUCTS [4�Ij � � /•r � �l :� / � 1�.`] A. WOOD FIBRE SURFACING � B. � 1. Surfacing shall be a mix of random-sized hardwood fibres. Standard wood chips or bark mulch will not be acceptable. 2. To allow for compaction, the following formulas must be used to �"' determine the conect number of cubic yards: 8" deep: Sq. ft. of playground x 0.0375. Twelve inches deep: Sq. ft. of playground x 0.05. � 3. Bidder will guarantee sieve analysis of wood fibre as follows: Greater than 85 percent passing 3/8" sieve. Less than 50 percent passing #60 � sieve. 4. Wood fibre shall have no recycled wood from pallets or waste wood and � no twigs, bark, leaf debris or other organic material incorporated within. � r" WOOD FIBER PLAYGROUND SURFACMG 02537 -1- � � B. DRAINAGE FABRIC �, I. Product used shall be FibarFelt, DuraLiner, or aproved equal polyester nonwoven engineering geotextile fabric. 2. Bidder will provide enough material to allow for 12" overlap on all seams. � C. DRAINAGE MATRIX I. Product used shall be FibazDrain, TenaFlow 100, or aproved equal geotextile encapsulated drainage core. � D. WEAR MATS I. Product used shall be FibarMat, WoodCarpet Mat, or approved equal a rubber matting, meeting ASTM F1292-91 playground surfacing standazd for a drop height not to exceed 3.5 feet. Must be installed under all swings and slides to preserve warranty. Method of anchorage must be approved r" by Owner. PART 3 - SPECIAL REQUIREMENTS 3.01 QUALITY CONTROL A. The Bidder will provide the engineered wood fiber system to be constructed exactly according to manufacturer's installation instructions. B. The Bidder will provide the owner or its designated contractor with all necessary licenses prior to start of construction in accordance with U. S. Patents. C. Supplier must provide test results for impact attenuation in accordance with ASTM F1292-93; Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment. Results must be provided for new material and for 5-year-old material. D. Testing must show "g" ratings of not more than 155g for the 8" thick system, or 120g for the 12" system at 12' fall heights, and HIC values of less than 1,000 for both new and 8-year-old material. � E. Product must be wheelchair accessible and meet the requirements of the 1990 _ Americaris with Disabilities Act (ADA) in accordance with ASTM PS83-97. � F. The Bidder will provide copies of flammability testing procedures and results using (i) Section 1500.44 of the Federal Hazardous Substance Act, Title 16, � Chapter II, Subchapter C, for rigid and pliable solids, and (ii) 16 CFR Part 1630 Standard for the Surface Flammability of Carpets and Rugs (FF 1-70), Modified Procedure. Testing should be performed by an independent testing laboratory. � � WOOD FIBER PLAYGROUND SURFACING �"' 02537 -2- i�+r G. The Bidder will provide copies of testing procedures and results of (i) new shredded wood fibre, and (ii) shredded wood fibre not less than five years old taken from an existing site, performed by an independent testing source using the � ASTM F 1292-91 playground safety surfacing standazd. _�� H. The Bidder will provide at least three references of handicapped-accessib�e � playgrounds that have been installed with said surface. 3.02 WARRANTY All materials and labor under this Section shall be installed by a contractor authorized by the manufacturer. Safety surface shall be warranted for labor and materials for a period of no less than two years. Written warranty must be submitted by the manufacturer and the authorized installer. PART 4 — EXECUTION A. PREPARATION Installer shall thoroughly examine the site and specifications, carefully checking the dimensions before starting work. B. SUBGRADE 1. The subgrade shall be graded a minimum of 1 percent. It is not recommended that the surfacing system be installed on a grade greater than 10 percent. All roots, stones, and vegetation shall be removed. 2. The drainage matrix must be connected to the drainage system. � 3. The first 6" of subgrade shall be compacted to at least 95 percent of the dry density, as determined by the provisions of AASHTO or T 205, as � modified in 203.24. C. APPLICATION: 1. SHREDDED WOOD FIBER SURFACING SYSTEM WITH � � �I � � DRAINAGE MATRIX: Install per plans and specifications and in accordance with cross-sectional drawings and detailed installation instructions available from approved manufacturers. a. Drainage Fabric 1. Subgrade shall be covered with drainage fabric as specified, overlapping all seams at least 12". 2. In areas where equipment exists, it is necessary to cut the fabric to fit. Once fitted, any cuts should be overlapped with fabric wherever possible. WOOD FIBER PLAYGROUND SURFACING 02537 -3- � � � � � � � Q c. Drainage Matrix 1. Drainage matrix shall be cut from edge-to-edge of the playground and must be placed on 6' centers in the direction of the grade. 2. Drainage matrix must extend beneath and beyond border system. Drainage matrix must connect to a drain. Wear Mat 1. A wear mat must be installed under every swing and slide, to preserve warranty. 2. Install the wear mat over surfacing and anchored to the subsoil in an approved method. d. Shredded wood fiber 1 2. The shredded wood fiber surface shall be spread to a uniform depth. All material supplied by the manufacturer must be installed to allow for settling and natural compaction. Machinery shall not disturb or travel on the drainage fabic. Contractor shall be responsible for applying additional material as required to maintain design grades and anticipated settling for a period of sixty (60) days following project acceptance. WOOD FIBER PLAYGROUND SURFACING 02537 -4- � � SECTION 02860 - PLAYGROUND EQUIPMENT � PART 1- GENERAL 1.01 DESCRIPTION A. This section shall include all materials, labor, tools, equipment, transportation and supervision required for the installation of new playground equipment. 1.02 RELATED WORK A. Section 02870 - Site Furnishings B. Section 03300 - Cast-In-Place Concrete 1.03 QUALITY ASSURANCE A. Codes and Standards: All equipment and materials shall meet the standards and requirements of the latest editions of the U. S. Consumer Product Safety Commission's (CPSC) Handbook for Public Playground Safety and of ASTM Designation F 1487: Standard Consumer Safety Performance Specification for Playground Equipment for Public Use. B. Submittals: 1. Submittals Prior to Construction - Submit manufacturers' documentation of product compliance with CPSC and ASTM F1487 Standards including: a. All paints and other similar finishes must meet the current CPSC regulation for lead in paint (0.06 percent maximum lead by dry weight). b. Regardless of the material or the treatment process, the manufacturer shall ensure that the users of the playground equipment cannot ingest, inhale, or absorb any potentially hazardous amounts of substances through body surfaces as a result of contact with the equipment. c. Submittals must be received and approved by the Landscape Architect prior to ordering equipment. PLAYGROUND EQUIPMENT 02860 1 � � � � 2. Submittals Prior to Project Acceptance — Contractor shall submit all manufacturer's literature to the Landscape Architect prior to acceptance of the �,. project. PART 2 — PRODUCTS � 2.01 MULTI - PURPOSE METAL PLAY STRUCTURE: Play structure units shall be � constructed of aluminum or galvanized posts and beams and vinyl clad steel decks connected to the posts and beams by a system of stamped steel or cast aluminum collar devices. 1. Material Reauirements: a. All aluminum or galvanized posts and beams shall be 3.5" and 5" O. D. round tubing with a minimum wall thickness of .125". Tensile strength shall be 39,900 P.S.I. Yield point sha11 be 32,000- � 39,000 P.S.I. b. Exposed ends of all posts and beams shall be fitted with domed end caps, permanently affixed. These end caps will be stamped or � cast from aluminum or galvanized steel only. c. Static posts shall be fabricated to allow embedding 3'-0" below finished grade in a concrete footing (or larger as required by ;j' prevailing site conditions). Dynamic posts shall be embedded 5'-9" below finished grade in a concrete footing (or larger as required by �.,, prevailing site conditions). Post bottoms shall include two (2) holes � for acceptance of horizontal #4 reinforcing bars supplied by installing Contractor. �, d. Pipe used for safety rails, ladder rungs, turning bars, etc. sha11 be 1- �, " 5/16 " O.D. with a minimum wall thickness of .120". e. All metal parts, other than those galvanized or of stainless or nonferrous composition, shall be free of excess welds, carefully �'� cleaned, and finished with a lead- free electrostatically applied powder coating; which has been oven cured to render the coated *"' metal resistant to abrasion, impact, chipping, weathering, and , rusting. f. Cast aluminum collazs or stamped steel shall be smoothly finished and coated as per specification C.S. (this section) Connecting � hardware shall be tamper-proof. Collars shall be fabricated with minimum protrusions. All collars shall be permanently �xed after final assembly to preclude displacement. g. Steel decks shall be expanded metal or vinyl-clad perforated steel �, plate (minimum 3/16" thickness), or approved equal. �' PLAYGROUND EQUIPMENT 02860 2 � � �'I h. All structural plastic parts shall be fabricated of polyethylene with ultra-violet light stabilizers and color molded in. Polyethylene shall � comply with ASTM D1693-66, environmental stress cracking resistance test. Clear bubbles shall be 1/4" thick Lexan. � i. Additional hardware necessary for complete field assembly sha11 be -� provided in sufficient quantity, sizes, and quality to assure safety � and suitability for intended use. Hardware shall be color coated per specification or otherwise finished to provide corrosion resistance. � j. Materials of play accessories shall be compatible with and designed as an integral part of the basic play structure. k. Detailed erection drawings and a bill of materials shall be furnished with each model. Drawings shall include all data � necessary for assembly, including the recommended erection sequence. To facilitate assembly, each manufactured member shall �?� be easily identifiable by its shape or dimensions or by a piece � marked or number keyed to the erection drawing. 1. All decks installed higher than 42 inches above the finished ground �"'�, level shall have enclosing panels or guazd railings at least 38 � inches high completely surrounding the deck surface, except for necessary entrance and exit openings. To prevent climbing over the � guard rails, open rails must be vertical with no openings greater than 4 inches. No horizontal intermediate rails shall be acceptable. m. No horizontal surface intended for play shall be higher than 84 ^ � inches above finished ground level. n. Slides: � � 1.) All sliding surfaces of equipment shall have sides or other protective devices on both sides to guide descent and prevent lateral discharge of the user during normal use. 2.) The exit region should be essentially horizontal and parallel to the ground and have a minimum length of 11 inches. 3.) For slides that are no more than 4 feet in height, the height of the exit region should be no more than 11 inches from the protective surface. 4.) For slides that aze over 4 feet in height the exit region should be at least 7 inches but not more than 15 inches above the protective surface. 5.) Slide exit edges should be rounded or curved, to prevent lacerations or other injuries which could result from impact r» � with sharp or straight edges. o. Handrails shall be used at all openings where access ladders are located. PLAYGROUND EQUIPMENT 02860 3 � � � p. Approved Products: � � � r� � �, ' �. !�. ' �. � UNIT ONE — CANDLERIDGE PARK : GameTime- Plav Structure, Model OT # 9951792. or approved equal. k:._ �,.-. . UNIT TWO — FIRE STATION PARK: Little Tikes-Plav Builders, Model # PB 4 Modified. or ` approved equal. Little Tikes-See Saw Snake Model # 200007469 UNIT THREE — FOREST/TILLERY PARK: Little Tikes -Plav Builders, Model # PB 5 Modified, or approved equal. UNIT FOUR — HIGHLAND HILLS: Little Tikes — Plav Builders, Model # PB 5 Modified, or approved equal. UNIT FIVE — OVERTON PARK: GameTime — Tire Swin�, Model # 10777. or approved equal. UNIT SIX — SOUTHWEST PARK: GameTime — Plav Structure. Model # 11557, or approved equal. UNIT SEVEN — WESTCREEK PARK: GameTime — Hill & Dale Slide. Model #11514. or approved equal. GameTime — Steerin� Wheel, Model # 3358, or approved equal. GameTime — Animal Panel. Model # 4824. or approved equal. GameTime — Tic-Tac-Toe Panel, Model # 4800. or approved equal. GameTime — End Panel Unri�ht. Model # 4811. or approved equal. GameTime — Unri�ht 180 De�rees. Model # 4813. or approved equal. 'f UNIT EIGHT — WORTH HEIGHTS PARK: Little Tikes-See Saw Snake Model # 200007469 PLAYGROUND EQUIPMENT 02860 4 � r � .W UNIT NINE — WRIGHT TARELTON PARK: GameTime — Steering Wheel. Model # 3358. or approved equal. GameTime — Animal Panel, Model # 4824. or approved equal. GameTime — End Panel Unri�ht. Model # 4811, or approved equal. ALL UNITS : Plavworld Youth Si�n, Model #0170, or approved equal. Plavworld Tot Si�*n, Model # 0160, or approved equal. q. Suppliers: Plavworld available from: The Playwell Group (817) 335-1666 GameTime available from: Modlin Recreation Equipment, Inc. (800) 433-5347 Little Tikes available from: Jim Lea Associates (800) 237-4739 2.02 SWINGS: � �� / � i - � � � � � ' Material Reauirements: a. Heavy duty swing shall be two legged and three legged type end support frame, with two swings per bay maximum. Height as specified on drawings/ equipment schedule. b. Components shall be cleaned in a five bath system, including a rust- inhibitive iron phosphate wash prior to painting. c. Steel beams and legs shall be fabricated of 3 1/2" outer diameter, schedule 40, hot dipped galvanized steel pipe, coated with a baked on electrostatically applied polyester dry powder coating. d. Swing yoke clamps shall be 2 7/8" outside diameter, 8 guage steel with a baked on electrostatically applied polyester dry powder coating. e. Swing hangers shall be hot dipped galvanized malleable iron with oil impregnated bushings pressed in. f. Swing chains shall be 4/0 straight link hod dipped galvanized steel utilizing double clevis and bolt link chain connections. g. Seats to be slash-proof belt type of a high-grade, durable rubber compound with steel cable reinforcing and blunt molded edges. PLAYGROUND EQUIPMENT 02860 5 �� C h. If specified, tot seats shall be of a high-grade, durable rubber compound, fully enclosed bucket seats with back support and leg cutouts. i. Approved products: UNIT FOUR — HIGHLAND HILLS PARK: Recreation � Creations Sinsle Bav Swin� with Full Bucket Swin�s, Model # 90-1002, or approved equal. � � � L � L �� UNIT NINE — WRIGHT TARELTON PARK: Plavworld SinEle Bav with Belt Seats, Model # 0270, or approved equal. j. Suppliers: 2.03 Other Eauipment Plavworld available from: The Playwell Group (817) 335-1666 Recreation Creations, Inc. available from: Hunter - Knepshield Company �- (800) 451-4138 1. Whirl a. Approved Product: Recreation Creations Junior Whirl, Model # 650, or approved equal. b. Supplier: Recreation Creations. Inc. available from: � Hunter - Knepshield Company , (800) 451-4138 2. Buck - A — Bout a. Approved Product: GameTime. Buck — A— Bout Model # 200. Duck Aluminum Seat, Model # 388, & FroE Aluminum Seat. Model # 359, or approved equal. b. Supplier: GameTime available from: Modlin Recreation Equipment, Inc. (800) 433-5347 3. Dome Climber a. Approved Product: GameTime — Dome Climber. Model # 655, or approved equal. b. Supplier: GameTime available from: Modlin Recreation Equipment, Inc. (800) 433-5347 PLAYGROUND EQUIPMENT 02860 6 � � ' 4. Volleyball Standazds & Net a. Approved Products: GameTime, Model #'s 137 and 739 � b. Supplier: GameTime available from: Modlin Recreation Equipment, Inc. � (800) 433-5347 � PART 3 - EXECUTION 3.01 GENERAL: All items shall be supplied and installed by Contractor as shown on the plans and as recommended by the manufacturer. 3.02 FALL ZONES: Contractor shall verify all fall zone clearances onsite prior to installing the equipment. Notify the Landscape Architect of any conflicts or discrepancies. 3.03 CONCRETE FOOTINGS: The finished grade of all concrete footings shall be set twelve inches below the finish grade of surfacing material. 3.04 FASTENERS: All nuts and bolts shall be upset and tack welded to prevent disassembly. 3.05 PROTECTION: Contractor shall be responsible for protection of unfinished work and � shall erect temporary signage and barriers as necessary to prevent park users from utilizing unfinished equipment. 3.06 HEIGHTS OF SWING SEATS: Install tot/bucket seats at 24" from top of safety surface and youth/belt seats at 18" from top of safety surface. � END OF SECTION �' � � � PLAYGROUND EQUIPMENT 02860 7 � � SECTION 02870 - SITE FURNISHINGS PART I - GENERAL 1.01 DESCRIPTION Furnish and supply all labor, equipment, materials and incidentals necessary to assemble, install and otherwise construct park equipment as listed under products. 1.02 RELATED WORK A. Section 03300 - Cast-in-Place Concrete. B. Section 07920 - Caulking and Sealants 1.03 QUALITY ASSURANCE A. All equipment shall be free of sharp edges and corners, or extremely rough surfaces. B. All materials shall be new and conform to all standazds as specified. C. The bidder shall be responsible for defects in equipment due to faulty materials or manufacturing, damage or loss. D. Metal shall be straight or at design radii or bends, without kinks, and shall be true to shape. E. Codes and Standards: All "accessible" site furnishings shall comply with the current Texas Accessibilitv Standards (TAS) of the Architectural Barriers Act, Article 9102, Texas Civil Statutes (512) 453-3211. 1.04 PRODUCT DELIVERY, STORAGE AND HANDLING A. Protect from inclement weather: wet, damp, extreme heat or cold. B. Store in a manner to prevent warpage and/or bowing. 1.05 JOB CONDITIONS The contractor shall be responsible for protection of unfinished work and shall be responsible for the safety of park users utilizing unfinished equipment. SITE FURNISHINGS � 02870 -1- PART2-PRODUCTS � � � �. � � � � � � ' � � 2.01 ACCESSIBLE PICNIC TABLE (8') ..-�`"-_. , Diversified Metal Fabricators, Model #'s ET 8150, or approved equal. Modlin Recreation Equipment, Inc. (800) 433-5347 2.02 EXPANDED METAL BENCH (6') Plavworld. Model # 1410, or approved equal. The Playwell Group (817) 335-1666 PART 3 - EXECUTION 3.01 INSTALLATION A. Fasteners: All nuts and bolts shall be upset and tack welded to prevent disassembly. B. Manufacturer's Installation Instructions: The Contractor shall follow the manufacturer's installation instructions and give the Landscape Architect the instructions for filing, unless otherwise stated. Set benches and picnic tables level. END OF SECTION 0 SIT'E FURNISHINGS 02870 -2- � � � � � � � SECTION 02930 - SEEDING PART 1 - GENERAL 1.01 DESCRIPTION A. Work Included: Seeding of grass seed or wildflower seed, as specified on the plans. B. Related Work Specified Elsewhere: Section 02220, Earthwork. 1.02 REFERENCE STANDARDS A. Standardized Plant Names 1. For exotic plant materials: American Joint Committee of Horticultural Nomenclature, Second Edition, 1942. 2. For native materials a. Manual of the Vascular Plants of Texas by Correll and Johnston b. Check List of Vascular Plants of Texas by Hatch c. Flora of North Central Texas by Shinners and Moller �y B. Texas Highway Department: Standard Specifications for Construction, Item 164, �.� "Seeding for Erosion Control" and Item 180, "Wildflower Seeding". � r� .� � � � � 1.03 SUBMITTALS A. Seed 1. Vendors' certification that seeds meet Texas State seed law including: a. Testing and labeling for pure live seed (PLS) b. Name and type of seed 2. If using native grass or wildflower seed, seed must have been harvested within 100 miles of the construction site. 3. All seed shall be tested in a laboratory with certified results presented to the Project Manager, in writing, prior to planting. 4. All seed to be of the previous season's crop and the date on the container shall be within twelve months of the seeding date. 5. Each species of seed shall be supplied in a separate, labeled container for acceptance by the Project Manager. B. Fertilizer 1. Unopened bags labeled with the analysis 2. Conform to Texas fertilizer law 1.04 JOB CONDITIONS A. Planting Season: The season varies according to species (see Part 2- Products). Do not seed when soil is excessively wet or dry or when wind exceeds 10 miles per hour. B. Schedule After All Other Construction and Planting Is Complete. SECTION 02930 - SEEDING -1- � �� �! C. Protect and Maintain Seeded Areas 1. From erosion 2. From traffic and all other use 3. Until seeding is complete and accepted 1.05 QUALITY CONTROL The contractor who plants the seeds, whether the general contractor or a subcontractor, is responsible for daily supervision of his crew, while planting the seed and maintaining the seedlings until the project is accepted by the City. PART 2 - PRODUCTS 2.01 MATERIALS A. Seed All seed shall be planted at rates based on pure live seed (PLS = purity x germination) per acre. � � � r� Substitution of individual seed types due to lack of availability shall be made only by the Project Manager at the time of planting. The Contractor shall notify the Project Manager, prior to bidding, of difficulties locating certain species. Only those areas indicated on the plans and areas disturbed by construction shall be seeded. Prior to seeding, each azea sha11 be marked in the field and approved by the Project Manager. Any adjustment of area location by the Project Manager shall be considered incidental and shall not entitle the Contractor to additional compensation. Weed seed shall not exceed 10 percent by weight of the total of pure live seed (PLS) and other material in the mixture. Johnsongrass and nutgrass seed shall not be allowed. � � �.., � R" � � The seed shall be clean, dry and harvested within one year of planting. 1. Non-native �rass seed sha11 consist of: If planted between Apri115 and September 10: Lbs./Acre Common Name Scientific Name Puri 25 Bermuda (unhulled) Cynodon dacrylon 85% 75 Bermuda (hulled) Cynodon dacrylon 95% Substitute the following if planted between September 10 and April 15: 220 Rye Grass Lolium multiflorum 82% 40 Bermuda (unhulled) Cynodon dacrylon 84% SECTION 02930 - SEEDING -2- Germination 90% 90% 80% 85% �w ;' � � 2 Native �rass seed - The seed shall be planted between February 1 and October 1 and shall consist of: Lbs. PLS/Acre Common Name Botanical Name 16 Green Sprangletop Leptochloa dubia 40 Sideoats Grama* Bouteloua curtipendula 64 Little Bluestem* Schizachyrium scoparium 200 Buffalograss Buchloe dacryloides 40 Indian Grass* Sorghastrum avenaceum 16 Big Top Lovegrass* Eragrostis hirsuta 16 Weeping Lovegrass Eragrostis curvula 80 Canada Wild Rye* Elymus canadensis var. canadensis *These grasses are not to be planted within ten feet of a road or parking lot or within three feet of a walkway. 3 Wildflower seed - All wildflower seeds are to be hand broadcast, (see 3.02,A). The seed sha11 be planted between March 5 and May 31 or between September 1 and December 1 and shall consist of: � L Lbs. PLS/Acre 10 20 50 10 10 20 10 3 10 10 Common Name Foxglove* Lanceleaf Coreopsis Bluebonnet Pink Evening Primrose Purple Coneflower* Indian Blanket Mexican Hat Maximillian Sunflower* Winecup Lemon Mint* , Botanical Name Penstemon cobaea Coreopsis lanceolata Lupinus texensis Oenothera speciosa Echinacea purpurea Gaillardia pulchella Ratibida columnaris Helianthus maximiliana Callirhoe involucrata Monarda citriodora *These wildflowers are not to be planted within ten feet of a road or parking lot or within three feet of a walkway. r � � L � 4. Temnorary erosion control seed When specified on the plans, temporary control measures shall be performed. These measures shall consist of the sowing of cool season plant seeds and the work and materials as required in this section. B. Mulch 1. Mulch should be designed for use with conventional mechanical or hydraulic planting of seed, either alone or with fertilizer. 2. Mulch should be wood cellulose fiber produced from virgin wood or recycled paper-by-products (waste products from paper mills or recycled newspaper). 3. Mulch should contain no growth or germination inhibiting factors. 4. Mulch should contain no more than 10 percent moisture, air dry weight basis. 5. Additives shall include a binder in powder form. SECTION 02930 - SEEDING -3- � � 6. Material sha11 form a strong moisture retaining mat. C. Fertilizer � 1. All fertilizer shall be delivered in bags or containers clearly labeled showing the - analysis. 2. All fertilizer shall be in acceptable condition for distribution and shall be applied uniformly over the planted area. � 3. Analysis of 16-20-0, 16-8-8, or as designated on the plans. Fertilizer rate: a. No fertilizer is required for wildflower seeding. b. Where applying fertilizer on newly established seeding areas - 100 pounds of Nitrogen per acre. c. Where applying fertilizer on established seeding areas - 150 pounds of �� Nitrogen per acre. i D. Water: Shall be furnished by the Contractor and shall be clean and free of industrial wastes or other substances harmful to the germination of the seed or to the growth of the vegetation. The amount of water will vary according to the weather variables. Generally, an amount of water that is equal to the average amount of rainfall plus 1/2" per week should be applied for approximately three weeks or until project is accepted by the Project Manager. E. Erosion Control Measures 1. For seeding application in areas up to 3:1 slope, use cellulose, fiber or recycled paper mulch, (see 2.01, B. Mulch and 3.03). 2. For seeding application in areas 3:1 slope or greater, use the following soil retention blanket (Follow the manufacturer's directions): r.r . "Curlex I" from American Excelsior, 900 Ave. H East, Post Office Box 5624, Arlington, Texas 76001, 1-800-777-SOIL. r 2.02 MIXING � Seed, mulch, fertilizer and water may be mixed provided that: 1. Mixture is uniformly suspended to form a homogenous slurry. �" 2. Mixture forms a blotter-like ground cover impregnated uniformly with grass seed. ��' 3. Mixture is applied within 30 minutes after placed in the equipment. � � � � "`' SECTION 02930 - SEEDING -4- C�1 � PART 3 — EXECUTION 3.01 SEEDED PREPARATION A. Clear Surface of All Materials, Such As: l. Stumps, stones, and other objects lazger than one inch. 2. Roots, brush, wire, stakes, etc. 3. Any objects that may interfere with seeding or maintenance. B. Tilling 1. In all compacted areas till one inch deep. 2. If area is sloped greater than 3:1, run a tractor pazallel to slope to provide less seedlwater run-off. 3. In areas near trees: Do not till deeper than 1/2 inch inside "drip line" of trees. C. Watering: Soil should be watered to a minimum depth of four inches within 48 hours of seeding. 3.02 SEEDING A. If Sowing Seed By Hand 1. Broadcast seed in two directions at right angles to each other. 2. Harrow or rake lightly to cover seed. 3. Never cover seed with more soil than twice its diameter. 4. For wildflower plantings, scalp existing grasses to one inch, remove grass clippings, so seed can make contact with the soil. r� B. Mechanically Seeding (Drilling): If inechanically seeding (drilling) the seed or seed mixture, the quantity specified shall be uniformly distributed over the areas shown on the plans or where directed. All varieties � of seed, as well as fertilizer, may be distributed at the same time provided that each component is uniformly applied at the specified rate. Seed shall be drilled at a depth of � from 1/4 inch to 3/8 inch utilizing a pasture or rangeland type drill. All drilling is to be on the contour. After planting, the area shall be rolled with a roller integral to the seed � drill, or a corrugated roller of the "Cultipacker" type. All rolling of slope areas shall be on the contour. ..._ 3.03 MULCHING A. Apply uniformly after completion of seeding in areas up to 3:1 slope. Mulch may be applied concurrently with fertilizer and seed, if desired. B. Apply at the following rates unless otherwise shown on plans: �� 1. Sandy soils, flat surfaces - minimum 1,SOO lbs./acre. ; 2. Sandy soils, sloping surfaces - minimum 1,8001bs./acre. 3. Clay soils, flat surfaces - minimum 2,5001bs./acre. � 4. Clay soils, sloping surfaces - minimum 3,000 lbs./acre. 5. "Flat" and "sloping" surfaces will be shown on the plans if not visually obvious. t"^ SECTION 02930 - SEEDING -5- � �� C. Apply within 30 minutes after placement in equipment. Keep mulch moist, by daily water application, if necessary: R'" 1. For approximately twenty-one days, or 2. Until seeds have germinated and have rooted in soil, (see 3.04, B) and project has been accepted by the Project Manager. 3.04 MAINTENANCE AND MANAGEMENT A. Includes protection, replanting, maintaining grades and immediate repair of erosion damage until the project receives final acceptance. � B. Replanting 1. Replant areas where a stand of grass or wildflowers are not present in a reasonable � length of time, as determined by the Project Manager. 2. A"stand" shall be defined as: a. Bermuda/Rye grasses: Fourteen growing plants per square inch established within two weeks of seeding date on a smooth bed free of ' foreign material and rocks or clods lazger than one inch diameter. b. Native grass and wildflowers: 80% percent coverage of growing plants within seeded area within twenty-one days of seeding date on a smooth � bed free of foreign material and rocks or clods larger than one inch diameter. �►; c. Having no bare spots greater than six inch square. END OF SECTION r � � ' � � � SECTION 02930 - SEEDMG , . _6_ � �' � SECTION 03300 — CAST-IN-PLACE CONCRETE PART1-GENERAL 1.01 SCOPE OF WORK A. Concrete Sidewalk B. Concrete Handicap Ramps C. Picnic Table Slabs �- � D. Playground Edging E. Concrete Walls and Footings 1.02 QUALITY ASSURANCE Reference Specifications: The work under this division of the Specifications shall conform generally to the requirements of Item 314 -"Concrete Pavement", Item 406 - "Concrete for Structures", and Item 410 —"Concrete Structures" of the City of Fort Worth's Standard Snecifications for Street and Storm Drain Construction. PART 2 - MATERIALS 2.01 FORMS Forms shall be of ample strength, adequately braced, joined neatly and tightly and set exactly to established line and grade. � 2.02 REINFORCING MATERIALS � Reinforcing Bars: Reinforcing bars shall be round deformed bars meeting the requirements of the cunent standard Specifications for Intermediate Grade Billet Steel ° Concrete Reinforcing Bars of the A.S.T.M. Designation A-615. Reinforcing bars at the time the concrete is placed shall be free from rust, scale or other coatings that will destroy or reduce the bond. General reinforcing bars shall be number three bars spaced 18 inches �``" on center in walks and 12 inches in slabs as shown on Plans. 2.03 CONCRETE MATERIALS A. Cement: Portland cement shall meet the requirements of A.S.T.M. Specifications Designation C-150 and shall be Type 1. B. Aggregates: Concrete aggregates shall consist of gravel or crushed stone and shall be free from any excess amount of salt, alkali, vegetative matter or other objectionable materials. The aggregate shall be well graded from fine to course and the maximum size shall be one inch . Fine aggregate shall consist of sand C. Water: Water used in mixing concrete shall be clean and free from deleterious amounts of acids, alkalies, vegetative matter or organic material. The concrete shall be mixed in an approved batch mixer. The mixing time shall not be less than one minute after all the batch materials are in the mixer. Cement content � � CAST-IN-PLACE CONCRETE 03300 -1- i� �shall be not less than five sacks per cubic yard of concrete and shall have a �"' minimum 28 day compressive strength of 3,000 psi. D. Mixing: Transit mixed concrete shall meet all the requirements for concrete as specified above. Sufficient transit mix equipment shall be assigned exclusively to the project as required for continuous pours at regular intervals without sfopping or interrupting. Concrete shall not be placed on the job after a period of 1 1/2 hours after the cement has been placed in the mixer. 2.04 RELATED MATERIAL A. Expansion Joint Filler: Expansion joint material shall be one inch clear heart redwood with cap or 3/4 inch pre-molded fiber to the thickness of the concrete paved cross section as shown on the plans B. Dowels: Dowels for expansion joints shall be number four smooth round steel bars with expansion tubes as shown on Plans. Dowels shall be placed eighteen inches on center or as shown on Plans. C. Curing Compound: The membranous curing compound shall comply with the requirements of A.S.T.M., Designation C-309, Type 2, white pigmented. D. PVC Sleeves: The Contractor shall furnish and install four inch class 200 PVC pipe sleeves under concrete walk as shown on plans and details. 2.05 CONCRETE MIX DESIGN AND CONTROL ' A. Mix Design: The concrete shall contain not less than five sacks of cement per . cubic yard. Total water shall not exceed seven gallons per sack of cement. The mix shall be uniform and workable. The amount of course aggregate (dry-loose �"' volume) shall not be more than 85 percent per cubic yard of concrete. The net amount of water will be the amount added at the mixer plus the free water in the aggregate or minus the amount of water needed to compensate for absorption by the aggregates. Free water or absorption determinations will be based on the condition of the aggregates at the time used. The absorption test will be based on a thirty minute absorption period. No water allowance will be made for evaporation after batching. � l�J B. Slump: When gauged by the standard slump test, the settlement of the concrete shall not be less than 3 inches nor more than 5 inches, unless otherwise indicated. C. Quality: The concrete shall be designed for a minimum compressive strength of 3,000 pounds per square inch at the age of twenty-eight days using a 5 sack mix. CAST-IN-PLACE CONCRETE 03300 �' _2_ � �D. Control-Submittal: Within a period of not less than ten days prior to the start of concrete operations, the Contractor shall submit to the Engineer a design of the �" concrete mix proposed to be used together with samples of all materials to be incorporated into the mix and a full description of the source of supply of each material component. The design of the concrete mix shall conform with the provisions and limitation requirements of these specifications. All material � samples submitted to the Engineer shall be sufficiently large to permit laboratory batching for the construction of test beams to check the adequacy of the design. � When the design mix has been approved by the Engineer, there shall be no change or deviation from the proportions thereof or sources of supply except as hereinafter provided. No concrete mav be nlaced on the iob site until the mix � desi�n has been apnroved bv the En�ineer in writin� to the Contractor. PART 3 - EXECUTION 3.01 REINFORCING Metal reinforcing shall be accurately placed in accordance with the Plans and shall be adequately secured in position by concrete, metal, or plastic chairs and spacers. Bar splices shall overlap at least twelve inches. The re-bars shall be bent cold. 3.02 JOINTS A. Expansion Joints: Expansion joint materials shall be installed perpendiculaz to � the surface. The bottom edge of the material shall extend to or slightly below the bottom edge of the slab and the top edge shall be held approximately 1/2 inch r,,, below the surface of the slab. The edge of joints shall be tooled with an edging tool having a 1/2 inch radius. B. Contraction Joints: Contraction joints shall be 1/4 inch wide by 3/4 inch deep, � tooled joints placed on six foot centers, unless otherwise indicated. Contraction joints will not be required to be sealed. Sawed joints may be allowed only if specifically approved by the Engineer. Joints will be sawed as soon as sawing � can be performed without stripping aggregate from the concrete, generally within twelve to twenty-four hours after placement, and they shall be completed before �,., uncontrolled cracking of the pavement takes place. C. Construction Joints: Construction joints shall be installed in all concrete work at the locations shown on the Plans. Construction joints formed at the close of each day's work shall be located at any of the control joints designated on the Plans. Joints may be constructed by use of wood or preformed metal bulkheads set true to the section of the finished concrete and cleaned and oiled. Surplus concrete on the subgrade shall be removed before resuming concreting operations. � � 3.03 PLACING CONCRETE Placement of Concrete: The concrete shall be rapidly deposited on the subgrade immediately after mixing is completed. Subgrade and forms shall be dampened prior to placement of the concrete. The concrete shall be transported, placed and spread in such a CAST-IN-PLACE CONCRETE 03300 -3- i� ' manner as to prevent segregation of the aggregate or an excess amount of water and fine materials to be brought to the surface. No concrete shall be placed when the air � temperature is less than forty degrees Fahrenheit nor when the temperature of the � concrete is eighty-five degrees Fahrenheit or higher, without approval of Construction Inspector. � Placement shall be carried on at such a rate that the concrete is at all times plastic and flows readily into the space between the bazs. No concrete that has partially hardened or � that has been contaminated by foreign material shall be deposited in the work nor shall retempered concrete be used. Each section of pavement between expansion and � construction joints shall be placed monolithically. All concrete shall be thoroughly compacted by suitable means during the operation of placing and shall be thoroughly worked around reinforcement and embedded fixtures and into the corners of the forms. Special care shall be taken to prevent voids and honeycombing. The concrete shall then be struck off and bull-floated to the grade shown on the Plans before bleed water has an opportunity to collect on the surface. �' 3.04 FINISHING All concrete shall be finished by experienced, qualified concrete finishers. All concrete � shall have a neat, rounded edge. Edging and jointing (radius described on Plans) shall be ° accomplished with care so as not to leave deep impressions in the concrete surface adjacent to edges and joints. After the concrete has been floated and has set sufficiently to support the weight of cement finishers, a smooth steel trowel will be used to produce `" hard surface. The entire surface will then be brushed with a stiff bristle broom to produce r,,, a uniform textured finish. All edges and sides of concrete exposed to view shall be free of warp and blemishes with a uniform texture and smoothness as described in Plans. 3.05 CURING � Curing Compound: Immediately after the finishing operations, the concrete shall be completely covered with a curing compound. The concrete surface shall be kept moist between finishing operations and the application of the curing compound. The curing � compound shall be applied under pressure by means of a spray nozzle at a rate not to exceed 200 square feet per gallon. A minimum of 72 hours curing time will be required. r 3.06 CONCRETE WALLS A. Placing Concrete � 1. Where tremies are used, or where the free drop is 5'-O" or more, and through reinforcement, use a dumping box or board, moving the concrete � therefrom by shovels or hoes. 2. Deposit concrete so that the surface is kept level throughout, a minimum being permitted to flow from one position to another, and place as rapidly F' as practicable after mixing. 3. Do not use in this Work any concrete not placed within 30 minutes after leaving the mixer. � � `.. CAST-IN-PLACE CONCRETE 03300 -4- i� � 4. Thoroughly work concrete around reinforcernent and embedded fixtures, � and into corners of forms, during placing operations. 5. Completely compact with tamping poles and by tapping forms until the ' concrete is thoroughly compact and without voids. Determine the number . of tampers needed by the amount and method of placing concrete. 6. Exercise care to tamp concrete vigorously and thoroughly to obtain �""' maximum density. 7. Use manual tampers as well as mechanical vibrators. � a. Exercise care to direct the quick handling of vibrators from one position to another. b. Do not over-vibrate concrete. !? c. Do not move concrete by use of vibrator. � B. Finishing 1. All formed surfaces exposed to view shall have a smooth form finish. 2. After concrete has been properly placed and cured, sandblast finish if ,,,, indicated on the plans and per specification Section 03350. 3.07 PROTECTION After concrete is placed, finished and cured as required, permit no traffic thereon for three days thereafter and further protect the surface from damage due to other causes. END OF SECTION � 1 Cl 1 i 1 � � CAST-M-PLACE CONCRETE 03300 -5- � � � SECTION 07920 - CAULKING AND SEALANTS � � -N. � PART I - GENERAL 1.01 DEFINITIONS: A. The term "sealant" or "sealing" shall refer to exterior joints exposed to weather or interior joints exposed to moisture. When "sealant" is used in an outside joint in aluminum or steel frames, "sealant" shall be required on the inside joint also. B. The term "caulk" or'caulking' (calking) shall refer to interior joints not normally exposed to weather or moisture conditions. 1.02 SUBMITTAL: A. Submit to Owner's representative manufacturer's literature, specification data, and. color chart for all materials proposed for this project. B. Identify their use and location. � 1.03 GUARANTEE: The Contractor shall provide the Inspector a manufacturer's written guarantee on all joint sealing materials. The manufacturer shall agree to provide any replacement material free of charge to the City. Also, the Contractor shall provide the Engineer a written warranty on all sealed joints. The Contractor shall agree to replace any failed joints at no cost to the City. Both warranties shall be for one yeaz after final acceptance of the completed work by the Engineer. �- PART 2-PRODUCTS �' 2.01 SEALANTS: As manufactured by Pecora or approved equal. � A. Concrete-to-Concrete (Horizontal Joint): NR-201 with primer. ' B. Masonry-to-Masonry or Concrete-to-Concrete (Vertical): Dynatrol II 2.02 PRIMERS: Type as manufactured by manufacturer of sealing or caulking material and completely compatible with compound. � 2.03 JOINT BACKING: Rods or tape in sizes and types as recommended by manufacturer of sealing or caulking material, and completely compatible with compound. CAULKING AND SEALANTS 07920 � 1 ' � � I* PART 3 - EXECUTION 3.01 GENERAL: A. Work shall be performed by experienced mechanics skilled in execution of type r,,,, of work required and in application of specified materials. B. Deliver materials to job site in original containers with manufacturer's name and brand cleazly marked thereon. � C. When perimeter joints around frames that are to be caulked do not have built-in � stops or other means to prevent depth of compound from exceeding 1/2 inch, pack joint with back-up materials of correct type and to the depth as necessary to provide minimum 3/8" and maximum 1/2" depth of compound. � D. Materials and methods shall be as specified herein, unless they are contrary to � approved manufacturer's directions or to approved trade practice; or unless Contractor believes they will not produce a watertight job which he will �,,,, guarantee as required. Where any part of these conditions occur, Contractor shall notify Architect in writing. Deviation from procedure specified will be permitted only upon Architect's approval and providing that work is guaranteed by Contractor as specified. " E. If, prior to beginning work, Contractor does not notify Architect in writing of any proposed changes, it will be assumed that he agrees that materials and � methods specified will produce results desired, and that he will furnish required guarantee. 3.02 PREPARATORY WORK: A. Where weather molds, staff beads, etc., do not form integral part of frames to be caulked, but are removable, remove same prior to caulking, execute caulking, replace molds, etc., and point. B. Clean a11 joints, etc., that are to be caulked or sealed, prior to executing work. , 3.03 PRIMING: When conditions of joints so require, or when types of materials used `"' adjacent to joints so require, or when compound manufacturer's recommendations so require, clean and prime joints before starting caulking. Execute priming operations in_ � strict accordance with manufacturer's directions. �., 3.04 JOINT BACKING: Joint backing shall be installed in all joints to receive sealants. Backing shall be sized to require 20% to 50% compression upon insertion, and shall be CAULKING AND SEALANTS 07920 -2- �� ' � � placed so that sealant depth is approximately 1/2 joint width. In joints not of sufficient � depth to allow backing, install bond breaking tape at back of joint. 3.05 APPLICATION: Apply sealant and caulking material under pressure to fill joint completely, allowing no air pockets or voids. Tool the joint surface to compress the �,,, compound into the joint. 3.06 THRESHOLDS: Place all exterior door thresholds in a fill bed of sealant during setting �j procedures. R"° 3.07 CLEANING: Clean adjacent surfaces free of caulking and sealant and clean all work of . other trades that has in any way been soiled by these operations. Finished work shall be left in a neat and clean condition. ' ' ' , 1 ' ' , ' � _ , END OF SECTION CAULKING AND SEALANTS 07920 -3- - � � BIDDER'S STATEMENT OF QUALIFICATIONS � Firtn Name: Date Organized: ❑ PARTNERSHIP ❑ CORPOR.ATION aAddress: � City: State: Zip: � Telephone Number: Fax Number: Number of yeazs in business under present name: `"' Former name s of or anization: ' �) g � � CLASSIFICATION: ❑ General ❑ Building ❑ Electrical ❑ Plumbing ❑ HVAC � a❑ Utilities ❑ Earthwork ❑ Paving ❑ Other : 1. LIST OF SIMILAR COMPLETED PROJECTS � AMOUNT TYPE OF DATE NAME and TELEPHONE NUMBER OF aOF CONTR.ACT WORK COMPLETED OWNER � . . � :.. a2. LIST OF SIMILAR PROJECTS UNDER CONSTRUCTION OR UNDER CONTRACT AMOUNT TYPE OF DATE NAME and PHONE NUMBER OF OWNER � pOF CONTR.ACT WORK COMPLETED � - � a �� o . . BIDDER'S STATEMENT OF QUALIFICATIONS -1- a � � � � a � � � � U � D D � � � � a a 3. LIST SURETY BONDS IN FORCE ON ABOVE INCOMPLETE WORK (LIST 2): DATE OF TYPE OF AMOUNT OF NAME AND TELEPHONE NUMBER OF CONTR.ACT BOND BOND SURETY 4. LIST CONSTRUCTION SUPERINTENDENT'S NAME AND CONSTRUCTION EXPERIENCE: � BIDDER'S STATEMENT OF QUALIFICATIONS -2- � � Q � O � a � D U D � D D � U D � O CERTIFTCATE OF INSURANCE TO: CTTY OF FORT WORTH Date_ NAME OF PRO7ECT: PROJECT NUMBER: IS TO CERTIFY THAT : is, at the date of this certificate, Insured by this Company with respect to the business operations hereinafter described, for tlie type of insurance and accordance with provisions of the standard policies used by this Company, and further hereinafter described. Exceptions to standard policy noted on reverse side hereof. TYPE OF INSURANCE Policy Effective Expires Limits of Liability Worker's Compensation Comprehensive General Liability Insurance (Public Liabi lity) Blasting Coll�►pse of Building or structures adjacent to excavltions Damage to Underground Utilities Builder's Risk Comprehensive Automobile Liability Contractual Liability Other Bodily Injury: Ea.Occurrence: $ Property Damage: Ea.Occurrence: $ Ea.Occurrence: $ Ea.Occurrence: $ Ea.Occurrence: $ Bodily Injury: Ea. Person: $ Ea. Occurrence: $ Property Damage: Ea. Occurrence: $ Bodily Injury: Ea.Occurrence: $ Property Damage: Ea.Occurrence: $ Locations covered: Description of operations covered: The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or canceled by the insurer in ]ess than five (5) days after the insured has received written notice of such change/or cancellation. Where applicable local laws or regulations require more than �ve (5) days actuaI notice of change or cancellation to be lssured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement thereto attached. Aeencv Fort Worth Aeent By Address Title � J L�l � � � lJ L�J '�J u � �� L�J CONTRACTOR COMPLIANCE WTTH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A Labor Code Section 406.096, Contractor certifies that it provides workers' compensation insurance coverage for all its employees employed on city of Fort Worth Project Number C181/08018048150, C181/08018048190. C181/080181048200, C181/08Q18104823Q. C181/0801804827Q. C181/Q8018048300, C181108018Q48320, C181/080181048330, C181/08018048340 STATE OF TEXAS COUNTY OF TARRANT 0 0 CREATIVE 4 CONSTRUCTION AND MANAGEMENT COMPANY. INC CONTRACTOR By: ������2� � Title l� � n o21��� Date BEFORE ME, the undersigned authority, on this day personally appeared !�`�� ��, /� known to me be the person whose name is subscribed to the foregoing instrument, and acknowledged to zne that he executed the same as the act and deed of for the purpose and consideration therein expressed and in the capacity therein•stated. �.Q��. 0 . GIVEN UNDER MY HAND AND SEAL OF OFFICE this ��� day of .i9�c,00 . ti�s+ P SHANNON LEA GONZALEZ o * � * N07ARY PUBLIC ,,� State of Texas a'� Comm. Exp.11/13/2001 � � � �-� � !� Notary Public in and for the State of Texas � � � � � THE STATE OF TEXAS COUNTY OFTARRANT PERFORMANCE BOND Bond # 757300 KNOW ALL MEN BY THESE PRESENTS: That we (1) CR�ATIV� 4 CONSTRUCTION AND � MANAGEMENT COMPANY� INC. a(2) CORPORATION of TEXAS, hereinafter call Principal, and �3 �1tAl 1r�Hmity Co7_'porat7cxl a corporation organized and cxisting under the laws of the State and fully authorized lo transact business in the State of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation organizcd and existing under the laws of the State of Texas, hereinafter called Owncr, in the pcnal sum of: �� TWO HUNDR�D SEVENTY THREE THOUSAND THREE HUNDRED NIN�TY FIVE AND 90/100......... ($273,395.90) Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for � the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators and successors, jointly and sevcrally, firmly by these presents. -� TH� CONllITION OF THIS oP: OBLIGATION is such that Whercas, the Principal entcred into a certain contract wi[h the City of Fort Worth, the Owner, dated the �qf ���opy of which is hercto allached and �" made a part hcreof, for the construction of: Ji�N �-� PLAYGROUND RL+'NOVATIONS AT NINE PARK SITES � dcsignated as Project No. (s) C181/080181048150, C181/0808181048190, C181/080181048200, C181/080181048230, C181/080181048270, C181/080181048300, C181/080181048320, C181/080181048330, �'- C181/080181048340, a copy of which contract is hereby attached, rcferred to, and madc a part hereof as fully and to the same extent as if copied at Iength herein, such project and construction being hcrcinafter rcferred to as the ..work". r NOW THEREFORE, iP lhe Principal shall well, truly, and faithfully perform the work in accordance with thc plans, specifications, and contract documencs during the original term thereof, and any extensions thereof which �"' may bc granted by the Owner, with or without notice to the Surety, and if he shall satisfy all claims and demands incin-rcd under such contract, and shall fully indemnify and save harmless the Owner 1'rom all costs and damages which it may suffcr by rcason of fai(urc to do so, and shall rcimburse and repay lhc Owner all outlay and expcnsc which thc Owncr may incur in making good any dcfault, then this obligation shall bc void; othcrwisc to rcmain in full f��rcc and cffect. ... � FI � � � �.., � C � � PROVIDED PURTHER, tha[ if any legal action 61ed upon this bond, vcnuc shnll lic in Tarrant Counly, Statc of Texas. AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, exlension of time, alteration or addition lo the tcrms of the contracc or to the work co be performed thereundcr or the spccil'icalions accompanying the same shall in any wise affect ils obligations on this bond, and it cli�cs hcrchy waivc noticc of any such changc, cxtcnsion oP timc, altcration or addition to thc tcrms of thc conU�act or ��� thc work or lu lhc s��ccificalions. IN WITNESS WHEREOF, this inslrument is executed in 6 counterparts each one of which shall be deemed an original, this the of � l�T�sT: J AN 0 4 2000 (Principal) Secretary � � �, (SEAL) �r..� ! �' eL ��iu ttness as to Prin pal � !1 �3 �. ��. 2 D �.?.-_1���--�' � Address %b ,3 fi"�' ATT�ST: (SEAL) r L � � (Surcty) Secrctary ��-���•���'l Witness as to Sur� v 701 Lamar, Wic ita Falls, TX 76301 (AcJd►-css) CR�ATIVE 4 CONSTRUCTION AND MANAGEMENT, INC. BY��i�NCIP� Title: � 3320 MAIN STREET VERNON, TX 76384 (AJdress) �a�ital ����n�-��,� -.��r���cn Surety BY• �, ,(l� c� � � , �i:i- �'.�-_i / StaCi s (Attorney-in-fact) (5) 701 Lamar, Wichita Falls, TX 76301 (Address) NOTE: Datc of Bond must not be prior to date of Contract (1) Correct Name of Contractor (2) A Corporation, a Partnership or an Individual, as case may be (3) Corrcct namc of Surcty (4) If contractor is Partncrship all Partners should execute Bond (5) A truc copy of Powcr of Attorncy shall bc altached lo Bond by Attorncy-in-Fact.. r2 Bond # 757300 i�. PAYMENT BOND �. 1'H� STATE OF TEXAS " COUNTY OF TARRANT � �... �y KNOW ALL MEN BY THESE PRESENTS: That we (1) CREATIVE 4 CONSTRUCTION AND MANAGEMENT� INC a (2) Cornoration of Texas, hereinafter call Principal, and (3) (:2q�itAl lyd�ml.ty Cc��oratioll , a corporation organized and existing under the laws of the State and fully authorizcd to transact husincss in lhc Stale of Tcxas, as Surcty, arc hcld and I�irmly bound unto tlic City of Fort Worth, a municipal corporation organizcd and cxisting undcr thc laws ol' thc Statc of Tcxas, hcrcinaftcr cal(cd Owner, and unto all person, firms, and corporations who may furnish materials, for or perform labor upon the building or improvcments hereinafter referred to in thc penal sum of : TWO HUNDRED S�VENTY THRE� THOUSAND THREE HUNDRED NINETY FIV� AND 90/100.......... r ($273,395.90) Dollars in lawful inoney of the United States, to be paid in Fort Worlh, Tarrant County, Texas, for the ;, , �ayment of which sum well and truly be made, we hercby bind ourselves, our heirs, executors, adminislrators and �uccessors, jointly and severally, firmly to thcse presen[s. . THE CONDITION OP THIS OBLIGATION is such that Whereas, the Principal entcred into a certain contracl with the City of Port Wor[h, thc Owner, dated the day of A.D. , , a copy of which is hereto auached and made a part thereof, for the construction of:: �JAN O 4 ZOOO YLAYGROUND IMPROV�M�NTS AT NIN� PARK SIT�S � Project No. (s) C181/080181048150, C181/080181048190, C181/080181048200, C181/080181045230, C181/080181048270, C1S1/080181048300, C181/080181048320, C181/080181048330, C181/080181048340 a copy of' which is hereto attached, referred to and made a part hereof as fully and to the samc extent as if copied at Icngth herein, such project aud construction being hereinafter referred to as the "work". �_ j` NOW THER�FORE, the condition of this obligation is such that, if the Principal shall promptly make � ��ayment to all claimants as defined in Article 5160, Reviscd Civil Statutes of Texas, supplying labor and materials in the prosecution ol' the work provided for in said Contrac[, then this obliga[ion shall be null and void, otherwise it � shall remain in full force and effect. � i 1 rio 1 L.. � THE BOND IS MADE AND ENTERED into solely for thc protection of all claimants supplying labor and ma�crial in the prosecution of the work provided for in said Contract, as claimants arc defined in said Article 516Q `'' and all such claimants shall have a direct right of action under the bond as provided in Article 5160 of thc Revised r Civil Statutcs. � PROVIDED FURTHER, that if any legal action be filed upon this bond, vcnuc shall lie in Tarrant County, State of Tcxas, that the said Surety,for value received, hereby stipulates and agrecs that no change, extension of �ime, alteration of addition to the terms of the contract or to the work to be performed thereunder or the specification s accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any such cl�ange, extcnsion of time, alteration or addition �o the tenns of the contract or to thc work to lhe specif'ications. PROVID�D PURTHER, that no iinal settlement between the Owncr and the Contractor shall abridge the ' right of any bcnei�iciary hereunder whose claim may be unsatistied. IN WITNESS WHEREOF, this instrument is executed in 6 counterparts each one of which shall be deemed � an original, this thc day of A.D., JAN q 4 2000 . � I �. r A'1,TLST: (Principal) Sccrclary ,r � �C�. -�_1�,.,.aJ �� Witncss as to Principa� � � i�3/ l k, ��l . � U 7�3 `,�c�,..�,� �4..� Address f L3 Yf� �" ATTEST: w, � �� (SLAL) � � (Surety) Secretary �' „� � Witness as to Surety �_ � 701 Lamar, Wichita Falls, TX 76301 (Address) CR�ATIVE 4 CONSTRUCTION AND MANAGEMENT COMPANY. INC. BY:��PRIN I AL (4 /l�i � E�i� Titic: 3320 MAIN STREET VERNON, TX 76384 (SEAL) (Address) Capitol �i�tlity Carporatian �� Surety � ,( BY. � n n �: �� L4_�S�I % S�3C1 «s (Altorney-in-fact) (5) 701 Lamar, Wichita Falls, TX 76301 (Address) 701 I,amar� Wichita Falls� TX 76�01 (Address) NOTE: Datc of Bond must not bc prior to datc of contract (1) Correcl Name of Con[ractor (2) A Corporation, a Partnership or an Individual, as case may be (3) Correct name of Surety (4) If contractor is Partnership all Pariners should execute Bond (5) A true copy of Power of Attorney shall be attached to Bond by Attorney-in-Fact.. Bond #757300 �., MAINTENANCE BOND T1-1� STATE OF T�XAS § COUNTY OF TARRANT § KNOW ALL MEN BY THESE PRESENTS: That (1) CREATIVE 4 CONSTRUCTION AND MANAGEMENT COMPANY, INC.as Principal, acting herein by and through (21� its duly authorized and (3)C�Pitol Irr.]�mity Ca�oraticxt a corporation organized undcr the laws of the State of TEXAS, as surety, do hereby acknowledge themselves to be held and r bound to pay unto thc City ol' Fort Worth, A Municipal Corporation, chartered by virtue oi' Constitution and laws of thc Statc of Tcxas, a� Fort Worth, in Tarrant County, Texas the sum of TWO HUNDRED S�VENTY THREE THOUSAND THR�E HUNDRED NINETY FNE AND 90/100.......... L.W ($273,395.90) in lawful money of [he United States, for [he payment of which sum wcll and lruly be tnade unto said City of Fort Worth and its successors, said Contractor and surety do hereby bind themselves, their heirs, executors, �" administrarors, assigns and successors, jointly and sevcrally. This obligation is condi�ioned, however; [hat, ' JAN 0 4 2000 . WHEREAS, ll�e Principal has entered in[o a certain contract with thc City of Fort Worth, the ��crfonnance of the following described public work and the construction of thc following described public ' improvements: `� PA12K RENOVATIONS AT NINE PARK SITES � ol� same being rel�en-ed to herein and in said contract as the Work and being designated as project y-- C181/080181048150, C181/080181048190, C181/080181048200, C181/080181048230, C181/080181048270, C181/080181048300, C181/OSO1F31048320, C181/080181048330, C181/080181048340and said contract, including � all of the specifications, conditions and written instruments referrcd to therein as contract documents being hereby , incorpora�cd hcrcin hy rc(crcncc for all purposcs and madc a part hercof, thc samc as if sct out vcrbatim hcrcin; and , WHEREAS, in said Conlract, Contractor binds itself to use such materials and to so construct the work that '� it will rcmain in good repair and condition for and during the period One (1) Year after the da[e of the final _ acceptance of the work by the City; and WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of Onc (1) Year; and, � WHEREAS, said Conlractor binds i[self to repair or rcconstruct the work in whole or in part at any [ime within said period, if in thc opinion of the Director of the Water Department of thc City of Fort Worth, it bc ncccssary; and, WHEREAS, said Contractor binds itself, upon receiving notice of the need therefor to repair or reconstruct said work as herein provided. ' � � � � � � � �, . NOW THEREFORE, if said Contractor shall kcep and perform its said agrccmen[ to main[ain, repair or reconstruct said work in accordancc with all the terms and conditions of said Contract, thcse presents shall be null and void, and have no force or cffect. Otherwise this Bond shall bc and remain in full foree and effect, and said City shall have and recovcr from the said Contractor and its surety damages in the premiscs prescribed by said Conlract. This obligation shall bc continuing one and successive recoveries may bc had hereon for successive breaches until thc 1'ull amount hcreof is cxhausted. WHEREAS, all parties covenant and agree that if any legal action be filed upon this bond, venue shall lie in Tarrant County, Texas; and, IN WITNESS WHEREOF, this instrument is executed in 6 counterparts, each one of which shall be dccmed an original, datcd �AN 0 4 2��0 ATTEST: (Principal) Secretary (Seal) CREATIVE 4 CONSTRUCTION AND MANAGEMENT COMPANY, INC PRINCIPAL (4) BY: �� � l �-�'l�.�I���.G�. Title: ��!% �� Ci=�'vr ..,, /C�;�1�oJ Witness as to Principal � � //��/ �,,�� n f (Address) �G3 � ATTEST: (Surety) Secretary � �, (S�AL) � � �-ll- �'L � Witt� s as to Surety �_ 701 Lamar, Wichita Falls, TX 76301 � 3320 MAIN STR�rT V�RNON, TX 7C834 (Address) Cap',tol Indemnitv Cornoration Surety ,� BY:A. �(l �'� � a�4 ��a / StaC1. S (Attorney-in-fact) (5) 701 Lamar, Wichita Falls, TX 76301 (Address) NOTE: Date of Bond must not be prior to date of Contract (1) Correct Name of Contractor (2) A Corporation, a parmership or an Individual, as case may be (3) Corrcct name of Surcty (4) If Contractor is Partnership all Partners should execute Bond (5) A true copy of Power of Attorney shall be at[ached to Bond by A[torney-in-Fac[. �� F6 G, � � • . INDEMNITY CORPORATION 4610 UNIVERSITYAVENUE, SUITE 1400, MADISON, WISCONSIN 53705-0900 PLEASE ADDRESS REPLY TO P.O. BOX 5900, MADISON, WI 53705-0900 PHONE (608) 231-4450 • FAX (608) 231-2029 � POWER OF ATTORNEY No: �� 1. S 3 6 Know ail men by these Presents, That the CAPITOL INDEMNITY CORPORATION, a �CO'I`pOPat1011 G '���, �E � :_i'�+, f:) t ��il, �1���� .iy ����� �„iC�C,lF�dl ��i�i � ; �i�lt r'��)� J' 11/�cl�'i:�U�l. �iIS�'ii_�� � riOPS ITiBi(@, COI'1StI�Ut@ " ancl appoini , -------------- STACI J. GROSS, LAURA A. ESPII�iOZA, STEVE DEAL OR DONAL BOLEY ------------------ � its tr�ue and lawful Attorney(s)-in-fact, to make, executE, seaf and deliv�r i ��i �drrf �r�� its behalf, as surety, and as its act and �� deed, any and all bonds, undertakings and contracts of suretyship, prr��.��c���;� ,'r�at no bond or undertaking or contract of suretyship ex�cuted urcl�r this autharity shall exceed in amount the sum ui � ------------------------------------------------ NOT TO EXCEED $4,000,000.00 -------------------------------------------------- ��Thi� Power ofi �t[orney is gra��it�d ar�d i:�, ���o�.e�' ti���a sf � ���c? i�a� ���,�.�sirr�ile ��nc��r and by the authority of the fpllowing Resolution,adopted k�y the Board af C)irectors of ��F'I"r�L l�If�E�Ui�lf'➢`� G�FiP�RATION at a meeting duly called anci held on the 5th day of May 1960: , , "RESOLVED, that Xhe President, and Vice-President; the Secretary or Treasurer, acting individually or otherwise; be and th�y hereby are granted the power and authorization to appoint by a Power of Attarney for the purposes only of executing and attesting bonds and undertakings, and other writings obligatory in the nature thereof, one or more Yesident vice-presidents, assistant secretaries and attorney(s)-in-fact, each appointee to have the powers and duties usual to such offices to the business of this company; the signature of such officers and seal of the Company may be affixed to any such power of attorney or to any certificate relating thereto by facsimile, and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be valid and binding upon the Company, and any such power so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company in the future with respect to any horid or undertaking or other writing obligatoiy in the nature thereof to which it is attached. Any such appointment may be revoked, for cause, or without cause, by any of said officers; at any time." IN WITNESS WHEREOF, tlie CAPITOL INDEMNITY CORPORATION has caused these preser�ts to be signed by its offic�r undersigned and its corporate seal to be'hereto affixed duly attested �y its Secretary, ttiis `1st day of June, 1999. CAPITOL INDEMNITY CORPORATION � Attest: - _ -� . II������� . . . � . .. '� �• ��������QAN�NII1111/(/b���� ';., I ' """� _�. �'^""! . ��i ii il � :;i �iP �� �' I�� �• l ' � .. . � ' VlYgllllle iN. SChU�t2, S2Cf2tdty ..� ,,.,',. �� CO S�FILATE q�. ,,_' Cicor�:� �.. Fai't; T�rc,ldCnt'. 1� .���i� �� I�� �����.� -��� j', � � � o' � � II i � �I � � i L.. �� �` Ilii i.�,�I i i ��i�il, �� �. CO NT�Y O �bAO� SIN � �� `� iii',� ��i� ��.. �� �rii � + �� � �r �� � ���,� i , � �� � � �,�,� � � < . � � ' ��, '•, �, �� •�`� � � �� � � �� � � '; �,�,. ij�� sr,r�Ns �0� iii ���� � i i' ,� i�llil il �' ' � � s� �. i i'iip 'i� �,. // 11111111111�� ��i il iil�l il9�l i� �. � � On the 1 st day of June, A.D., 1999, ,before me p�rsonally came George /� Fait, tp me known; who being by me duly `� CAPITOL INDEMNITY CORPORATFON, the cr�rporation described in and which executed the at he is the President of sworn, did depose and say: that he resides in the County of Dane, State of Wisconsin; t s the seal of the said cor oration� that the seal affixetf to said instrument is such cor orat above instrument; that he � know p , p e seal; that it was so affixed by order of the Board of Directors of said corporation and that he signed his name thereta by like order. - `, STATE OF WISCONSIN \\\�������tiuu�iurniie����� L.T, C�Ci�� '� �\ OF WI5 , �// \ P . S� � �„/�� �� � : ` 5 � � y = , COUNTY OF [7ANE � `��`�� �� � �� ��* �AF E � *_ � � ,1ane F. Endres � � � ,. 1 � � lENDRES\ � - � ��� _ : �, , y, � Notary Public, Dane Co., WL o�` M Commission Ex ires March 23, 2003 � i i I �,��: . ��� _, , i � ii �� .,,� ��/9j r"�av c�i�`' ��A��� � ,� _ . � �r ,�,.. . i` �.�. �.,� : ` . . ////U/1111111111\ . ,� .�, �,��� _ � � ,, , � � �:����� CEI�TIFICATE � CORPORATION�arWiscons�`�nUCo p�ratiant a thor'�ed to mak� th si�ertifi � e,t DC��HEREBY�C�F�TiFY that the foregoTY APITOL INDEMNI F ing attached Power of Attorney remains in full farce and has not been revoked; and furthermore that the Resolution of the Board of Directors, set forth in the Power of Attamey is now in force. � Signed �nc� sealed at,the City of Madison: Dated the day of .. ; ` ����uuWatuiiii � ' i� �p � �',il' \�\�1 �N,Ni I y � ///���i , . . :. � � ' � \\ �- (i�I/ I II �`�1 � . . � � � I I I � �I �I i ��I I i ii���l�i�� '.�tl ��� :S� ill���� �� lil ���� ,��i��li� �I���q� .11�i� . . �o . ..�.a� .. ..., . . �, .�... . � ���u \ .I�i�i � � � �, a , , ` I� �il' � a .i, q � � � i '� �,�I � i ,� ��° _ � CORPORATE � � � Raui .�. Sr�i � � r, Treasurer � � ,��� u � � � � �` � �,�i�� ���i �� �i,' �� r I�I i I . il�� i i i i i II� � i ��II��� . �cy SEI�L�� z �� . '. �A �� � . ,: �_ ��� ������.� �. �.�: i I �. . ��. � I t � � ;i'1'� i � � � � //�������/////IIIIIIIIU\0�\\`\`� � � This power is valid oniy if the power of attorney number printed in the upper right hand corner apears in red. Photocopies, carbon copies w�her, reproductions are not binding on the com(�any. Inquiries concerning this power of attorney may be directed ta the Bond Manager at the e bffice of the Caaitol fndemnitv Cornoration. ' � CITY OF FORT WORTH, TEXAS CONTRACT THE STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS COUNTY OF TARRANT ' JAN Q 4 2000 That this agreement, made and entered into this day of . A.D. 19 by and between the CITY OF FORT WORTH, a municipal corporation of Tarran[ County, Texas, organized and existing under and by lii,. virtue of a special charter adopted by the qualified voters within said City of the 11`� day of December, A.D. 1924, under the authority of the Constitution of Texas, and in accordance with a resolution duly passed at a regular ' meeting of the City Council of said City of Fort Worth being hereafter termed Owner, and CREATIVE 4 CONSTRUCTION AND MANAGEMENT COMPANY, INC.hereinafter called Contractor. � � 1. That for and in consideration of the payments and agreemeqts hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby aarees with the said Owner to commence and complete the construction of certain improvements dcscribed as follows: PLAYGROUND RENOVATIONS AT NINE PARK SITES, 2. That the work herein contemplated shall consist of furnishing all labor, tools, appliances and materials � necessary for the construction and completion of said project in accordance with the Plans and Speciiications heretofore prepared by the Parks and Community Services Depart of the City of Fort Worth and adopted by [he City Council of said City, as an independent contractor, and which plans and specifications are incorporated herein by reference. i.� The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Depazt of Engineering Director of the City of Fort Worth and the City Council of the City of Fort Worth within a period of 240 workin� d1yS from the time of commencing said work; that said Contractor shall be entitled to an extension of said time for doing said work for such time as he may necessarily lose or be delayed by unavoidable accidents caused by unforeseen matters over which said Contractor has no control, such as inclemency in the weather, acts of Providence, labor strikes and delivery of materials, in all of which cases the negligence or carelessness of the Contractor is not contributing to such delay. 5. �'! Should the Contractor fail to begin the work herein provided for within the time herein iixed or to carry on and complete the same according to the true meaning of the intent and terms of said specifications, then the City shall have the right to take charge of and complete the work in such a manner as it may deem proper, and if, in the , completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and speciiications made a part hereof, the Contractor shall pay said City on demand in writing, setting forth and � specifying an itemized statement of the total cost thereof, said excess cost. , 6. CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor covenants and agrees to, and does hereby indemnify, hold harmless and defend Owner, its officers, agents, servants and employees from and � against any and all claims or suits for property damage or loss and/or personal injury, including death, to any and all persons, of whatsoever kind or character, whether real or asserted, arising out of or in connection with, directly or � � indirectly, the work and services to be performed hereunder by Contractor, its officers, agents, employees, D contractors, subcontractors, licensees or invitees, whether or not caused in whole or in part, by alleged negligence on the part of officers, agents, servants, employees, contractors, subcontractors, licensees and invitees of the Owner; and said Contractor does hereby covenant and agree to assume all liability and responsibility of Owner, its officers, agents, servants and employees for property damage or loss, and/or personal injuries, including death, to any and all a persons of whatsoever kind or character, whether real or asserted, azising out of or in connection with, directly or indirectly, the work and services to be performed hereunder by Contractor, its officers, agents employees, contractors, subcontractors, licensees and invitees, whether or not caused, in whole or in part, by alleged negligence � of officers, agents, servants, employees, contractors, subcontractors, licensees or invitees of the Owner. Contractor likewise covenants and agrees to, and does hereby, indemnify and hold harmless Owner from and against any and all injuries, loss or damages to property of the Owner during the performance of any of the terms and conditions of this Contract, whether arising out of or in connection with or resulting from, in whole or in part, any and all alleged � acts or omissions of officers, agents, servants, employees, contractors, subcon[ractors, licensees, or invitees of the O wner. a In the event a written claim for damages against the Contractor or its subcontractors remains unsettled at the time 111 work on the project has been completed to the satisfaction of the Director of the Department of Engineering, as evidenced by a final inspection, iinal payment to the Contractor shall not be recommended by the Director of the Department of Engineering for a period of 30 days after the date of such final inspection, unless the � Contractor shall submit written evidence satisfactory to the Director that the claim has been settled and a release has been obtained from the claimant involved. o Although the claim concerned remains unsettled at the expiration of the above 30 day period, the Contractor may be deemed to be entitled to a semi-iinal payment for work completed, such semi-final payment to be in an amount equal to the total dollar amount thert due less the dollar value of any written claims pending against the Contractor arising out of the performance of sucti work, and such semi-final payment may then be recommended by � the Director. The Director shall not recommended final payment to a Contractor against whom such a claim for damages n is outstanding for a period of six month follovang the date of the acceptance of the work performed unless the �; Contractor submits evidence in writing satisfacto ry to the Director that: 1. The claim has been settled and a re'�ease has been obtained from the claimant involved; or a2. Good faith effor[s have been made ro settle such outstanding claims, and such good faith efforts have failed. � If condition 1 above is met at any time within the six month period, the Director shall recommend that the final payment to the Contractor be made. If co��dition 2 above is met at any time within the six month period, the Director may recommend that the final payme�it to the Contractor be made. At the expiration of the six month Q period, the Director may recommend that fnal F ayment be made if all other work has been performed and all other obligations of the Contractor have been met to t1-e satisfaction of the Director. � The Director may, if he deems it appropriate, refuse to accept bid on other Department of Engineering contract work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. C�' C' �I 7. The Contractor agrees, on the execut6.on of the Contract, and before beginning work , to make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful performance of the terms and stipulations of the contract, including the exhibil attached hereto and made a pazt hereof and such bonds shall be 100 percent of the total contract price, and the said surety shall be a surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City Council of the City of Fort Worth. 8. �I' � �� r i.� � P� � � f"� Said City agrees and hinds irself to pay, and the said Contractor agrees to receive, for all the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on the proposal submitted by the successfvl bidder hereto attached and made a part hereof. 9. It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or nssigned to anyone else by said Contracior without the written consent of the Department of Engineering Director of said City of Fort Worth. 10. The Contractor agrees to pay at least minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth, Tezas, a copy of which is attached hereto and made a part hereof thc samc as if it were copicd verbatim herein. 11. It is mutua[ly agreed and understood that this agreement is made and entered into by [he parties hereto with reference to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with reference to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of the same. IN WITNESS WHEREOF, the City of Fort Worth has caused this instrument to be signed in triplicate in its name and on its behalf by the City Manager and attested by its Secretary, with the coiporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in 6 counterparts with it corporate seal attached. ��N o 4 ZQQ� Done in Fort Worth, Texas, this the RECOMMENDED BY day of . A.D. 19 APPROVED B • ' � ' P�RKS AND CO SERVICES � DIRECTOR A � � SECRETARY � �-�--� . �OF � DEP�,A� 7�v ENT OF GINEE G � DIRECTOR C� F RT �,VO � � BY: ���i�%�`"o` �,�- CITY MANA�R � Creative 4 Construction & Management Co., Inc. corrrxAcro���i $y. �� . President TITI.E � 3320 Main St. Vernon, Texas 76384 ADDRESS �,,,� November 296(? Revised November 1982 , Revised May 1986 Revised October 1989 �.. SEAL APP OVED �RM AND LEGALITY CITY ATTORNEY � � — / '� .� % � Contract Authorization �— "� —� Date � ��F'�°Wc.''^'=_e City of Fort Worth, Texas �1�Ayar And Caunc�l Ca�n�nun�cAt�on DATE REFERENCE NUMBER LOG NAME PAGE 1/4/00 C-17813 80PLAY 1 of 3 SUBJECT AWARD OF CONTRACT TO CREATIVE 4 CONSTRUCTION AND MANAGEMENT COMPANY, INC. FOR THE CONSTRUCTION OF PLAYGROUND RENOVATIONS AT NINE PARK SITES RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contact with Creative 4 Construction and Management Company, Inc. in the amount of $273,395.90 for construction of playground renovations at nine park sites. DISCUSSION: The 1998 Capital Improvement Program allocated $863,576.00 for playground renovation at twenty park sites identified in the 1995 Parks and Community Services Department (PACSD) Play Area Renovation Plan. Of this amount, $386,080.00 had been allocated for playground renovation at nine park sites in the PACSD Southwest Region. These sites are: Candleridge, Fire Station, Forest/Tillery, Highland Hills, Overton, Southwest, Westcreek, Worth Heights, and Wright Tarleton parks. On February 2, 1999 (M&C C-17255), the City Council approved the award of a contract for design services to Kellogg Landscape Architecture in the amount of $64,320.00 for the design of playground renovations at all nine sites. This project was advertised for bid on August 19 and 26, 1999. On September 16, 1999, the following bids were received: Bidders Northstar Construction Creative 4 Construction and Manaqement Company, Inc. Eagleton Construction Botanical Tech. Corporate Construction AUI Pittman Construction I:�a:IC $222,563.70 $248,095.90 $258,679.00 $284,487.75 $350,630.72 $365,344.00 $919,572.45 Add Alternates $28,616.00 $38,740.00 $32,500.00 $39,650.00 $44,134.90 $48,220.00 $31,232.00 Total (Base + Alt� $251,179.70 $286, 835.90 $291,179.00 $324,137.75 $394,765.32 $413, 564.00 $950,802.45 The base bid includes demolition and replacement of deteriorating or hazardous equipment, and the installation of concrete flatwork and accessible safety surfacing. The add alternates provide for the installation of age appropriate signage for all the park areas (add alternate No. 2 for each unit) and other site specific equipment modifications or additions (add alternate Nos. 3-6). The apparent low bidder, Northstar Construction, Inc., is not recommended because they failed to comply with the M/WBE Ordinance. It is recommended that the base bid and selected add alternates listed below totaling $273,395.90, as submitted by Creative 4 Construction and Management Company, Inc., be approved for award of the contract. The contract time is sixty working days. � ',� City of Fort Worth, Tiexas �1►�A�ae� And Coue��ll �01�11�:u1��fcA#latt DATE REFERENCE NUMBER LOG NAME � /�ioo � C-17813 80PLAY PAGE 2of3 �su��ECT � AWARD OF CONTRACT TO �REATIVE .4 GONSTRU�TION AND � MANAGEMENT COMPANY, INC. F`OR THE CONSTRUCTION OF PLAYGROUND RENOVATIONS AT , NINE PARK SITES , Unit One Unit Two Unit Three 'Unif Four Unit Five Unit Six Unit Sev2en Unit Eight Unit Nine Candleridge Park Fire Station Park Forest/Tillery Park Highland Hills Park Overton Park Southwest Park Westcreek Park Worth Heights Park Wright Tarleton Park Base bid + add alternates 2, 3, and. 4 Base bid + add alternates 2, 3, and 4 Base bid + add alternates 2 and 3 Base bid�+ add,alternate 2 Base bid + add alternates 2 and 3 Base bid + add alternates 2 and 3 Base bid + add alternate 2 Base bid + add alterr�ate 2 Base bid + add alternate 2 Greative 4 Construction and Management Company, Inc. "is in compliance with the City's M/WBE ordinance by committing to 23% M/WBE participation on the base bid. The City's goal for this project is 18%. This project budg�t is as follows: Construction Contract Gontingencies: ��"`'" DOE Inspection (7%) PACSD Administration (4%) Change�Orders (5°/a) Total Construction Budget $273,395.90 19,138.00 10,936.00 13;670.00 $317,139.90 The annual operating impac't on the General Fund budget beginning Fiscal Year 2000-2001 will amount to: Candleridge Park Fire Station �Park Forest/Tillery Park Highland Hills Park Overton Pa�k Southwest Park Westcreek Park Worth Heigfits Park Wright Tarleton Park Total Impact no impact no impact $ 900 $ 900 $ 800 $ 750 $ 750 $ 700 625 $5,425 These increases in the General Fund are the result of maintaining the wood fiber playground surfacing. • � � �. City of Fort Worth, Texas �1►�A�ar �nd C,�unc�! ��a�n�nun�cAt�an DATE REFERENCE NUMBER LOG NAME PAGE 1/4/00 C-17$~13 •° 80PLAY 3 of 3 SUBJECT AWARD OF CONTRACT TO CREATIVE 4 CONSTRUCTION AND MANAGEMENT COMPANY, INC. FOR THE CON�TRUCTION OF PLAYGROUND RENOVATIONS AT NINE PARK SITES These nine parks are located in COUNCIL DISTRICTS 6, 7, 8, and 9. FISCAL INFORMATION/CERTIFICATION: w The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Parks and Community Services Improvement Fund. LW:k � Submitted for City Manager's Office by: Libby Watson Originating Department Head: Richard Zavala Additional Information Contact: � FUND � ACCOUNT � CENTER � AMOUNT � (to) � � 6M183 � 5704 I (from) C181 C181 � C181 i �,8� � C181 � C181 � C181 � C181 I C181 541200 541200 541200° 541200 541200 541200s �541200�� 541200 541200 080181048150 080181048190 080181048200 080181048230 08018104827Q 080181048300 080181048320 080181048330 080181048340 $18,553.00 $16,760.00 $29,668.20 $31,258.70 $25,790.00 $43,530.00 $49,987.00 $26,005.00 $31,844.00 Richard Zavala 5704 CITY SECRETARY A�PROVED CiTY COUI��I�. JAN 4 2000 �� �� Citq Secr�taip at t�� Citp of Fort �Jortt�, T�ax�e�