Loading...
HomeMy WebLinkAbout025606 - Construction-Related - Contract - Brown, Hampton & Brown, Inc.AL�NDI�NT NO. 3 STATE OF TERAS $ CITY SECRETARY CONTRACT NO.� ✓ CQQ�CQ (No M&C Needed) COLJN'PY OF TARRANT $ WHSREAS, the City of Fort Worth (City) and Broarn, Hampton & Broam, Inc., (Engineer) made and entered into City Secretary Contract No. 23630, (the Contract) which was authorized by the City. Council by M�C C-16611 on the 17th day of February, 1998; and subsequently renised by tvro previous amendments; and - WSEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Main 39� Drainage Area Sanitary Se�ver System Rehabilitation and Improvements (Group 6, Contract 1), Part 7. WHLREAS, said Contract m87t��+++�*� fee; it has become necessary to execute Amendment No. 3 to to include an increased scope of ovork and revised NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following aqreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated S�ptember 10, 1999, a copy of �hich is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $10,670.00. 2. Article II of the Contract is amended to provide for an increase in the maxi.mum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and sernices shall not exceed the sum of $229,895.00. 'If�1L��ai� ���C�����'�� �: �`�' ��'�G?L�G°a��� U Uo UJ �' ���U Up �LSlNo � All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. �� EXECUTED on this the /��, day of �.Q ,�{�'(,(.r�. '9, in Fort Worth, Tarrant County, Texas, v, d � , . . ATT ��`�. �� l.0 I l�. �.� ��ti���Ct Authorization �� .� � � � ���� G oria Pearson, City Secretary _.._..,,. _. , ��'ID--DD ���� APPROVAL APPROVED: Mike Groomer d Assistant City Manager ���:C� c.� `�-�`�,.��c� A. Douglas Rademaker, P.E. � Director, Department of Engineering BAIRD, HAMPTON & BROWN, INC. ENGINEER By: �� � �-� Name: KONSTANTINE BAKINTAS, P.E. Vice President 01C 1���::� a.�Jaa J L��� L, �`31 l.� �tr� 30� w. �l !h S'�, , S� S�� Fort Worth, TX 76102 APPROVED AS TO FORM AND LEGALITY: Gary Stei erger Assistant City Attorney 23630-3 -2- U�����''fl F,II ��%Lc'(� � � `�I�l v bl'eu �; \il�:lJ' C`^'� U U ��1�'u � ° ° U �o �'�"!`'���, �C��o � � � Baird, Hampton & Browri, Inc. � 0� Engineering & Surveying September 10, 1999 City of Fort Worth Department of Engineering Integrated Wet Weather Program 811 Lamar Street, Suite 310 Fort Worth, Texas 76102 Tel 332-5474, Fax 332-5478 Attn.: Mr. Mike Domenech, Project Manager Re: SANITARY SEWER MAIN M-390, DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 6, CONTRACT 1), PART 7, UNIT 4, SEWER PROJECT PS46-070460410280, DOE No 2450 BHB No 9799.00 Mr. Domenech: As you know, to accommodate future improvements and expansion of Fort Worth Independent School District facilities, Unit 4 of the referenced project requires numerous revisions. This Unit, of the overall project, was designed by our M/WBE subconsultant, Wendy Lopez & Associates (WLA); we have therefore requested WLA to prepare the enclosed scope of services for your consideration. These additional efforts are considered outside our original scope of work, and we therefore request a contract amendment to increase the not-to-exceed fee amount by Ten Thousand Six Hundred and Seventy ($9,700 + 10% _ $10,670) Dollars. Original Not to Exceed Amount: $211,725 Amendment No 1: $ 3,000 Amendment No 2: $ 4.500 Not to Exceed Amount: $219,225 - Approved 12/11 /98 - Approved 7/21/99 Amendment No 3: $ 10.670 Revised Not to Exceed Amount: $229,895 - Requested Herein - Requested Herein In an effort to expedite the revisions and not delay the contractor, WLA has already started surveying and revising the previously approved plans; we therefore request processing of the professional services contract modification as soon as possible. Sincerely, BAIRD, HAMPTON 8� BROWN, INC. "_ 1 !-` ��,� � � ; ���; � Konstantine Bakintas, P.E. Vice President Enclosure: WLA Proposal CC: Peter Fu, PE - Water Department, Tony Sholola, PE - Program Manager Paul R. Holmes, PE, RPLS, WLA Fort Wo�th Office Manager c�',G�����G�G�,� �"�'GJ��'@ �:; C�'V �����r��G?� ir, C(!n�,r:�r,p .��q,� �f�u 1L��'j�i,��.�.'.i�JJF ,li:�iv G:\CIVIL\9799�.4DD 3.DOC 309 W. 7th Street Suite 500 Fart Worth, Texas 76102 Tel: B17-338•1277 Fax: 817-338-9245 E-Mail: mail@bhbinc.com FF'0�•I :- IJ�NUY L�'EZ �. H�'.�C. PHOfJE NO. : E17�=3��b3C Sep. 1�1 1999 �: 29Ph1 P2 Wendy Lopez & Associates, Inc. engrnaering • environmental - surveyrng • construction services Sep�emb�r 10, 1999 Mr. Konsuntine Bakintas, P.E. Baird, Hampton and Browr�, Iiic. 309 Wesc 7ch Street Suite �00 Fort Worch, TX 76102 RE: ReVised Proposal Additional Work on M-390 Dtaioage Ar�a Sanirary Scwer System Rehabiliratioi� and Improvements (Group 6, Contract 1) Part ?, Unic 4, D_O.E. Number 2450 WLA Project No. 98015 Dear Mr. Bakintas: Wendy Lopez & Associates, lnc_ (V+iLA) very much appreciates [he opportunity to provide addi�iona} surveyinD and engineering services associaced witli the above-referenced projccr. Ic is our undentas�ding that the additional work includes the foliowing scoQe of services: A. Surveying Services + Provide design topographic survey for approxima[eIy 650 LF of new sanitary sewer litte in Vickery Boulevard and Conner Avenue. � Provide design topographic survey for approximately 100 LF of ne�v sauitary sewer line on thc south end of L-$527A in Nashviile Ave�iue: • Loca.te manhole in L-4362B in che easeme�it bctween Parkdale and Conner. • Verify that facilities on Lots 1. 2, and 3 on soutli side of Vickery just west of Coiuizr can be served by che new lateral. � Verify thac facilities on Lots 2, 3, 4, 5, ai�d 6 an east side of Nashville south of Avenue A can tie inro L-5527A. * Provide Letters of Entry Agreements and Teraporary Conscruction Easements for reconneccing house service lines ta new lateral. '<�'I�I�rI'���-.' ``'1���;�=���;��;'��l , �, •� �_ ��_a�:��� :� 38�0 Sandshell Drive - Suite 175 • Fort Worth, Texas 7fi137 •(8i7) 232-0244 • F/bC +�SPj'�� ��?4�,�'Ru� I�� ; -�, ;,,,-,- - �(, �r�;���lil�'�L��U� ��i;L^�:a rFor� : i.�erivr �oPE� � �ssoc. h'(r. Iio�utancine Bakinca.s, P.E. Baird, Hnmpto� and Brawn, Inc. S�ptember I0, �999 Yabe Two B. Design Services PHOPJE PID. : E17''_32=ib3E Sep. 1�3 1999 ��^- : 3�Pt9 P3 Provide design atid draiting for new lateral. Provide d�sign and drafting for addi[ion to L-5�27-A_ • Revise existing conscructio►� contract drawinas to reflecc chaiiges includin; deieting two proposed Iincs, leaving �ome existing Iines in servie;e which were scheduled to be abandoned and abandoning portions of three exiscing lines. In response to your conce�n for providing tliese services in a timely manner, we have srdxted the surveying wurk today. The field surveying worJc wit[ be eompl�r.e wicl�in two days. The consrruccion drawinos wi�l be available for review by September 20, � 999. We are proceedin� wich this work as expeditiousIy as possible in order not to delay the constructiuj� coiicractor who is currently warking in the azea. We propose to provide th� se�vices for the following: Surveying including Right ot Encry Letzers and ?emporary Construction Easemznts for the lun�p sum of Engineering and Drafting for rhe lump sum of Tota] Lump Sum Price If you have any quesr.ions or i��d additional information, please call me. Sincerely, $ 3,200.00 . i� �� . • /1 11` WENDY LOPEZ & ASSOCIATES, INC. Paul R. Holtnes, P.E. , Manaaer, Fort Worth Office � �� �i��� =� ��1���i��,� �� ��'ti� ����G�� ° �� �o ���;'��,���;�o l�C�"zo ► FOT OTH R R _ � = -�- MEMORANDUM � FROM DATE: A. Douglas Rademaker, Director DOE and Mike Groomer, Assistant City Manager Mike Domenech, P.E. '�/ January 28, 2000 RE: DESIGN FEE AMENDMENT NO. 3 TO MAIN 390 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 6, CONTRACT 1), PART 7, SEWER PROJECT NO. PS46-070460410280, DOE NO. 1827 The proposed amendment will reimburse Baird Hampton & Brown, Inc.(BHB), for the additional engineering services to be provided on the project as requested by the City. In order to relocate all public sewer lines from property scheduled for development by the Fort Worth Independent School District staff directed BHB to prepare plans and specifi- cations for the removal of all the sewer lines from the proposed site and develop new alignments for the affected lines. Baird Hampton & Brown, Inc., is requesting reimbursement in the amount of $10,670.00 for the additional services thereby increasing the contract fee from $219,225.00 to $229,895.00. I believe this fee is fair and reasonable for the additional services that were provided. Please authorize the additional design fee by your signature on the attached contract amendment form. Attachment cc: Tony Sholola, P.E., Program Manager Berdena Hamilton, Water Department Dan Pepon, Water Department 'J��B��l�� �?���' °�� ��l �1r ���� c ' It;U Ivi8Mo1927 la�ln IM1��jli`I��Q ��U�a UV � ENGINEERING DEPARTMENT `"�`"`y'"`"'"" THE CITY OF FORT WORTH * IOOO THROCKMORTON STREET * FORT WORTH, Texns 76102-6311 (817) 871-7941 * Fax (81'� 871-7854 � Pdnted on recycled paper