HomeMy WebLinkAbout025606 - Construction-Related - Contract - Brown, Hampton & Brown, Inc.AL�NDI�NT NO. 3
STATE OF TERAS
$ CITY SECRETARY CONTRACT NO.� ✓ CQQ�CQ
(No M&C Needed)
COLJN'PY OF TARRANT $
WHSREAS, the City of Fort Worth (City) and Broarn, Hampton &
Broam, Inc., (Engineer) made and entered into City Secretary
Contract No. 23630, (the Contract) which was authorized by the City.
Council by M�C C-16611 on the 17th day of February, 1998; and
subsequently renised by tvro previous amendments; and -
WSEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Main 39� Drainage Area
Sanitary Se�ver System Rehabilitation and Improvements (Group
6, Contract 1), Part 7.
WHLREAS,
said Contract
m87t��+++�*� fee;
it has become necessary to execute Amendment No. 3 to
to include an increased scope of ovork and revised
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
aqreement which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated S�ptember
10, 1999, a copy of �hich is attached hereto and incorporated
herein. The cost to City for the additional design services to be
performed by Engineer total $10,670.00.
2.
Article II of the Contract is amended to provide for an
increase in the maxi.mum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and sernices shall not
exceed the sum of $229,895.00.
'If�1L��ai� ���C�����'��
�: �`�' ��'�G?L�G°a���
U Uo UJ �' ���U Up �LSlNo
�
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
�� EXECUTED on this the /��, day of �.Q ,�{�'(,(.r�.
'9, in Fort Worth, Tarrant County, Texas, v, d � ,
. .
ATT ��`�. �� l.0 I l�. �.�
��ti���Ct Authorization
�� .� � � � ����
G oria Pearson, City Secretary _.._..,,. _. ,
��'ID--DD ����
APPROVAL
APPROVED:
Mike Groomer d
Assistant City Manager
���:C� c.� `�-�`�,.��c�
A. Douglas Rademaker, P.E. �
Director, Department of
Engineering
BAIRD, HAMPTON & BROWN, INC.
ENGINEER
By: �� � �-�
Name: KONSTANTINE BAKINTAS, P.E.
Vice President
01C 1���::� a.�Jaa J L��� L, �`31 l.� �tr� 30� w. �l !h S'�, , S� S��
Fort Worth, TX 76102
APPROVED AS TO FORM AND LEGALITY:
Gary Stei erger
Assistant City Attorney
23630-3
-2-
U�����''fl F,II ��%Lc'(� � � `�I�l
v bl'eu �; \il�:lJ'
C`^'� U U ��1�'u � ° ° U
�o �'�"!`'���, �C��o
� � �
Baird, Hampton & Browri, Inc. � 0� Engineering & Surveying
September 10, 1999
City of Fort Worth
Department of Engineering
Integrated Wet Weather Program
811 Lamar Street, Suite 310
Fort Worth, Texas 76102
Tel 332-5474, Fax 332-5478
Attn.: Mr. Mike Domenech, Project Manager
Re: SANITARY SEWER MAIN M-390, DRAINAGE AREA SANITARY SEWER
SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 6, CONTRACT 1),
PART 7, UNIT 4, SEWER PROJECT PS46-070460410280, DOE No 2450
BHB No 9799.00
Mr. Domenech:
As you know, to accommodate future improvements and expansion of Fort Worth Independent School
District facilities, Unit 4 of the referenced project requires numerous revisions. This Unit, of the overall
project, was designed by our M/WBE subconsultant, Wendy Lopez & Associates (WLA); we have
therefore requested WLA to prepare the enclosed scope of services for your consideration.
These additional efforts are considered outside our original scope of work, and we therefore request a
contract amendment to increase the not-to-exceed fee amount by Ten Thousand Six Hundred and
Seventy ($9,700 + 10% _ $10,670) Dollars.
Original Not to Exceed Amount: $211,725
Amendment No 1: $ 3,000
Amendment No 2: $ 4.500
Not to Exceed Amount: $219,225
- Approved 12/11 /98
- Approved 7/21/99
Amendment No 3: $ 10.670
Revised Not to Exceed Amount: $229,895
- Requested Herein
- Requested Herein
In an effort to expedite the revisions and not delay the contractor, WLA has already started surveying and
revising the previously approved plans; we therefore request processing of the professional services
contract modification as soon as possible.
Sincerely,
BAIRD, HAMPTON 8� BROWN, INC.
"_ 1 !-` ��,� �
� ; ���; �
Konstantine Bakintas, P.E.
Vice President
Enclosure: WLA Proposal
CC: Peter Fu, PE - Water Department, Tony Sholola, PE - Program Manager
Paul R. Holmes, PE, RPLS, WLA Fort Wo�th Office Manager
c�',G�����G�G�,� �"�'GJ��'@
�:; C�'V �����r��G?�
ir, C(!n�,r:�r,p .��q,�
�f�u 1L��'j�i,��.�.'.i�JJF ,li:�iv
G:\CIVIL\9799�.4DD 3.DOC
309 W. 7th Street Suite 500 Fart Worth, Texas 76102 Tel: B17-338•1277 Fax: 817-338-9245 E-Mail: mail@bhbinc.com
FF'0�•I :- IJ�NUY L�'EZ �. H�'.�C. PHOfJE NO. : E17�=3��b3C Sep. 1�1 1999 �: 29Ph1 P2
Wendy Lopez & Associates, Inc.
engrnaering • environmental - surveyrng • construction services
Sep�emb�r 10, 1999
Mr. Konsuntine Bakintas, P.E.
Baird, Hampton and Browr�, Iiic.
309 Wesc 7ch Street Suite �00
Fort Worch, TX 76102
RE: ReVised Proposal
Additional Work on M-390 Dtaioage Ar�a
Sanirary Scwer System Rehabiliratioi� and Improvements
(Group 6, Contract 1) Part ?, Unic 4, D_O.E. Number 2450
WLA Project No. 98015
Dear Mr. Bakintas:
Wendy Lopez & Associates, lnc_ (V+iLA) very much appreciates [he opportunity to provide
addi�iona} surveyinD and engineering services associaced witli the above-referenced projccr.
Ic is our undentas�ding that the additional work includes the foliowing scoQe of services:
A. Surveying Services
+ Provide design topographic survey for approxima[eIy 650 LF of new
sanitary sewer litte in Vickery Boulevard and Conner Avenue.
� Provide design topographic survey for approximately 100 LF of ne�v
sauitary sewer line on thc south end of L-$527A in Nashviile Ave�iue:
• Loca.te manhole in L-4362B in che easeme�it bctween Parkdale and
Conner.
• Verify that facilities on Lots 1. 2, and 3 on soutli side of Vickery just west
of Coiuizr can be served by che new lateral.
� Verify thac facilities on Lots 2, 3, 4, 5, ai�d 6 an east side of Nashville
south of Avenue A can tie inro L-5527A.
* Provide Letters of Entry Agreements and Teraporary Conscruction
Easements for reconneccing house service lines ta new lateral.
'<�'I�I�rI'���-.' ``'1���;�=���;��;'��l
,
�, •� �_ ��_a�:��� :�
38�0 Sandshell Drive - Suite 175 • Fort Worth, Texas 7fi137 •(8i7) 232-0244 • F/bC +�SPj'�� ��?4�,�'Ru�
I�� ; -�, ;,,,-,- -
�(, �r�;���lil�'�L��U� ��i;L^�:a
rFor� : i.�erivr �oPE� � �ssoc.
h'(r. Iio�utancine Bakinca.s, P.E.
Baird, Hnmpto� and Brawn, Inc.
S�ptember I0, �999
Yabe Two
B. Design Services
PHOPJE PID. : E17''_32=ib3E Sep. 1�3 1999 ��^- : 3�Pt9 P3
Provide design atid draiting for new lateral.
Provide d�sign and drafting for addi[ion to L-5�27-A_
• Revise existing conscructio►� contract drawinas to reflecc chaiiges includin;
deieting two proposed Iincs, leaving �ome existing Iines in servie;e which
were scheduled to be abandoned and abandoning portions of three exiscing
lines.
In response to your conce�n for providing tliese services in a timely manner, we have srdxted
the surveying wurk today. The field surveying worJc wit[ be eompl�r.e wicl�in two days. The
consrruccion drawinos wi�l be available for review by September 20, � 999.
We are proceedin� wich this work as expeditiousIy as possible in order not to delay the
constructiuj� coiicractor who is currently warking in the azea.
We propose to provide th� se�vices for the following:
Surveying including Right ot Encry
Letzers and ?emporary Construction
Easemznts for the lun�p sum of
Engineering and Drafting for rhe lump sum of
Tota] Lump Sum Price
If you have any quesr.ions or i��d additional information, please call me.
Sincerely,
$ 3,200.00
. i� ��
. • /1 11`
WENDY LOPEZ & ASSOCIATES, INC.
Paul R. Holtnes, P.E. ,
Manaaer, Fort Worth Office � �� �i��� =� ��1���i��,�
�� ��'ti� ����G�� ° ��
�o ���;'��,���;�o l�C�"zo
►
FOT OTH
R R
_
� =
-�-
MEMORANDUM
�
FROM
DATE:
A. Douglas Rademaker, Director DOE and
Mike Groomer, Assistant City Manager
Mike Domenech, P.E. '�/
January 28, 2000
RE: DESIGN FEE AMENDMENT NO. 3 TO MAIN 390 DRAINAGE
AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 1), PART 7, SEWER
PROJECT NO. PS46-070460410280, DOE NO. 1827
The proposed amendment will reimburse Baird Hampton & Brown, Inc.(BHB), for the
additional engineering services to be provided on the project as requested by the City.
In order to relocate all public sewer lines from property scheduled for development by the
Fort Worth Independent School District staff directed BHB to prepare plans and specifi-
cations for the removal of all the sewer lines from the proposed site and develop new
alignments for the affected lines.
Baird Hampton & Brown, Inc., is requesting reimbursement in the amount of $10,670.00
for the additional services thereby increasing the contract fee from $219,225.00 to
$229,895.00. I believe this fee is fair and reasonable for the additional services that were
provided.
Please authorize the additional design fee by your signature on the attached contract
amendment form.
Attachment
cc: Tony Sholola, P.E., Program Manager
Berdena Hamilton, Water Department
Dan Pepon, Water Department
'J��B��l�� �?���' °��
��l �1r ���� c ' It;U
Ivi8Mo1927 la�ln IM1��jli`I��Q ��U�a
UV
� ENGINEERING DEPARTMENT `"�`"`y'"`"'""
THE CITY OF FORT WORTH * IOOO THROCKMORTON STREET * FORT WORTH, Texns 76102-6311
(817) 871-7941 * Fax (81'� 871-7854
� Pdnted on recycled paper