ClTY SECRETARY SP�CIFICATIONS
D.O.E. FII.E AND
CONTRACTOR'S BONDINC� ��NTRACT DOCUMENTS
CONSTRUCTION'S COP� FOR
CLI�fVT 7��Ar�? 3v1E9��
,
�ON R CT NO Y �.�C�'��
N1AIN C 1 C4B DRAINAGE AREA
SAI�TITARY SEWER SYSTEM REHr1BILITATION AND IMPROVEMENTS
(GROUP 6, CONTRACT 2), PART 7
�
LTNIT 3 D.O.E. NO. 2 1
SEWER PROJECT NO, PS46-070460410230
IN THE
�
�
� K�nneth Barr
Mayor
� Bob Terretl
City Manager
l�
CITY OF F()RT WORTH
A. Douglas Rademaker, P.E.
Director, Engineering Departnzent
1999
Lee C. Bradley, Jr., P.E.
Director, Water Department
Hugo A. Malanga, P.E.
Director, Transp�riation and
Public Works Department
TC&B Project No. 47-99680-990
�' Turner Collie & Braden Inc.
Engineers • Planners • Project Managers
�
,
Yr
�
1200 Summit Ave., Suite 600
Forth Worth, Texas 76102
��f�a�0l�� �[�C�� °?�
��� s���GG��G��
�e �G'�b, ���,
.� �
City of Fo�t Worth, Texas
Mayor and Council.
Communication
DATE
, 2/1 /00
REFERENCE NUMBER LOG NAME
**C-17841
30PRU
PAGE
1 of 2
SUBJECT AWARD OF CONTRACT TO M. E. BURNS CONSTRUCTION, INC. FOR MAIN C1C4B
DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 7, UNIT 3 �
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a contract with M. E.
Burns Construction, Inc. in the amount of $339,284.50 for Main C1 C4B Drainage Area Sanitary Sewer
System Rehabilitation and Improvements (Group 6, Contract 2) Part 7, Unit 3.
DISCUSSION:
On March 11, 1999 (M&C C-17310), the City Council authorized the City Manager to execute an
engineering agreement with Turner Collie & Braden, Inc. to prepare plans and specifications for the
reduction of inflow/infiltration in Sanitary Sewer Main C1 C4B drainage area.
The project is part of the City's Integrated Wet Weather Wastewater Management Program to comply
with an administrative order from the U.S. Environmental Protection Agency to eliminate sewer
overflows from the City's wastewater collection system.
The project consists of the replacement of the following sanitary sewer laterals:
• L-217
• L-404
• L-440
Located in the alley between Pruitt Street and Cooper Street from 7th Street westerly
550 feet;
Beginning from the Pulaski Street/7th Street intersection, northerly 800 feet along
Pulaski Street; and
Beginning from the Rosedale Street/5th Street intersection, northerly 700 feet along 5th
Street.
The proposed improvements consist of the replacement of approximately 2,700 linear feet of 8-inch
sewer pipe. The project is located in COUNCIL DISTRICT 9, Mapsco 76 G, L and M.
The project was advertised for bid on October 28 and November 4, 1999. On December 2, 1999, the
following bids were received:
BIDDER
M. E. Burns Construction. Inc.
Conatser Construction, Inc.
B&H Utilities, Inc.
Cleburne Utility Construction, Inc.
Davila Construction, Inc.
AMOUNT
$339.284.50
347,339.80
362,914.00
370,695.50
388,594.50
TIME OF COMPLETION
100 Calendar Days
� ,„
�
,
�
City of Fo�t Worth, Texas
Mayor and Council
Communication
DATE REFERENCE NUMBER LOG NAME PAGE
2/1/QO **C-i 784i � 3QPRU ! 2 of 2
SUBJECT AWARD OF CONTRACT TO M. E. BURNS CONSTRUCTION, INC. FOR MAIN C1C4B
' DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATiON AND
IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 7, UNIT 3
Bur(eson Utilities, Inc. 411,141.00
Whizcon Utifities, (nc. 470,807.00
In addition to the contract cost, $17,000.00 is required for inspection and survey and $24,000.00 is
provided for praject contingencies.
M. E. Burns Construction, Inc. is in compliance with the City's M/WBE Ordinance by committing to 16%
M/WBE participation. The City's goal on this project is 16%.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the State Revolving Fund - Sewer.
MG:k
�
�
�
,
. r.
�
Submitted for City Manager's
Office by:
Mike Groomer 6140
Originating Department Head:
FiJND I ACCOUNT
(to)
�
�
CENTER � AMOUNT CITY SECRETARY
i �}
City of Fort Worth, Texas
� Mayor and C,ounci 1 , .
Communication
IDATE REFERENCE NUMBER LOG NAME PAGE
2/1 /00 **C-'17841 I 30PRU 3 of 2
SUBJECT AWARD OF CONTRACT TO M. E. BURNS CONSTRUCTION, INC. FOR MAIN C1C4B
DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 7, UNIT 3
I A. Douglas Rademaker 6157 (from) � APPROVED 2/1/00
PE42 541200 070420417720 $339,284.50 1
Additional Information Contact: � '
� �
A. Douglas Rademaker 6157 � �
r
�
Date Issued: Novem6er 15, 1999
CITY OF FORT WORTH
DEPARTMENT OF ENGINEERING
�
ADDENDUM NO. 1
TO THE SPECIFICATIONS AND CONTRACT DOCUMENTS
I�C�� 7
C
�
�
�
�
�
�
MAIN C 1 C4B DRAINAGE AREA SANITARY SEWER
SYSTEM REHABILITATION AND IMPROVEMENTS
(GROUP 6, CONTRACT 2), PART 7
UNIT 1 D.O.E. NO. 2113
LTNIT 2 D.O.E. NO. 2710
UNIT 3 D.O.E. NO. 2711
LJNIT 4 D.O.E. NO. 2712
SEWER PROJECT NO. PS46-070460410230
Bid Receipt Date — December 2, 1999
1. Specifications and Contract Documents: Part B— Proposal Unit 2
��:- � :.�o
!•. ;. i
•�����n�������e������•
GRADY H. E3EAC,-IUM
............a.........
�9 ; 64125 � ;�;
����AAF 9Fc� E �°'�� �
�1 ss/��S'���G�
�l��w �NAL � ss.
��=is •?9
Delete Bid Proposal Sheet No. B2-7 and replace with the attached, revised Bid Proposal Sheet
No. B2-7.
'The revised Bid Proposal Sheet will be mailed to each contractor who has already picked up
plans. Additional copies can be obtained at D.O.E. front desk.
No other parts of the plans or contract documents aze hereby changed.
Please acknowledge receipt of the addendum by placing a signed copy of same into your
proposal at the time of bidding. Failure to return a signed copy of the addendum with the
proposal shall be grounds for rendering the bid non-responsive.
RECEIPT ACKNOWLEDGED:
B ��� �.�--
Department of Engineering
Rick Trice, P.E.
Manager, Consultant S�-v� �� � r, �,�,;�, �i�y��,��
�,�,� L�Ua� G<��,�u��
'' _� Q R U�J��v Us151��1 e��
By: /o n S � � � � �N , .�,r� _, � r�
���'-::�� E��
c� ���fc ((i� ,�
Addendum No. 1(1 of 2)
�
�.
�
�
�
�
MAIN C1C46 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2), PART 7
UNIT 2 CONSTRUCTION
Item Approximate Description of Item With Unit
No. Quantity Bid Price Written In Words Price
36 36 SY 6" Topsoil
a(� Dollars $
and Cents
Per Square Yard
37 51 LF Bermuda Grass Solid Sod Replacement
C� Dollars $
and Cents
Per Linear Foot
38 169 LF "**8-inch San. Sewer Rehab by CIPP
or FAFP
a(� Dollars
and Cents $
Per Linear Foot
TOTAL AMOUNT OF BID - UNIT 2 $
(TRANSFER TOTAL TO PAGE B-SUMMARY)
$
$
$
Amount
Bid
""" Contractor must complete City Approved Product
and Approved Method Form on Page 62-8 B2-7
�����f����GO�� �'C���G? o, � €
. , ^ , �ti� � ��: G�C��G�1�
'li. �i� �i�Jr�i��\^� ir���� � ���'a .
� �
Addendum No. 1(2 of 2)
6r
SPECIAL CONTRACT DOCUMENTS
FOR
MA1N C 1 C4B DRAINAGE AREA
SAIVITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS
(GROUP 6, CONTRACT 2), PART 7
LTNIT 1 D.O.E. NO. 2113
LJNIT 2 D.O.E. NO. 2710
LTNIT 3 D.O.E. NO. 2711
LTNIT 4 D.O.E. NO. 2712
SEWER PROJECT NO. PS46-070460410230
IN
THE CITY OF FORT WORTH, TEXAS
1999
LJ�
r�
I hereby state that these Contract Documents were prepared under
my direct supervision and that I am a duly Registered Professional
Engineer under the laws of the State of Texas.
............«...«:«
GRADY H. BEACHUM
......................
�9; 64125 :�
Q� 49F 9�e � s T Ea`:°'����,
��S��NAL��EMO
� ��
/�-/��i`�%
TURNER COLLIE & BRADEN INC.
ENGINEERS • PLANNERS � PROJECT MANAGERS
1200 Summit Ave., Suite 600
Fort Worth, Texas 76102
�
u�f�0����,� �_'�'��°�D
�����r ����,���I��,��}i�
��,'"-r,����i�P� -??y�
, ,;i i� ,: ���o
�
�
�
�
�
�
�'
�
TABLE OF CONTENTS
PART A
17\�I 1i:3
PART C
'.:_ I
PART E
Notice to Bidders
Detailed Notice to Bidders
Special Instructions to Bidders
M/WBE Specifications - Unit 1 (Pink)
Proposal - Unit 1
M/WBE Specifications - Unit 2 (Pink)
Proposal - Unit 2
M/WBE Specifications - Unit 3 (Pink)
Proposal - Unit 3
General Conditions (Canary Yellow)
Supplementary Conditions (Canary Yellow)
Special Conditions (Green)
Additional Special Conditions (Green)
Details (Green)
General Specifications for Water Department Projects
(Not bound herein)
PART F
Certificate of Insurance
Contractor Compliance With Worker's Compensation Laws
�" Performance Bond
Payment Bond
�i Maintenance Bond
PART G
� Contract
APPENDIX A
Permits/Easements
�
�
t
0
�
APPENDIX B
SRF Funding
����D�G�C�.�� �����G1D
���'uf c"�.� r,��U �i�
�� Vt`.�... .•.?'�lir �I�f/�o
'�
�
1
i
1
1
[�
1
L
�
PART A
�
�
Notice to Bidders
Detailed Notz'ce to Bidders
Special Instructions to Bidders
�
��
�
�
�
�
�
�
u���CUI�� ��[���G�� �
� ��'tir �"�':: G���G�1�
�c U'�/.>�Il�,�l'�F V��o
�
�
�
�
Sealed proposals for the following:
DETAILED NOTICE TO BIDDERS
Main C1C4B Drainage Area Sanitary
Sewer System Rehabilitation and Improvements
(Group 6, Contract 2), Part 7
Unit 1 D.O.E. No. 2113
Unit 2 D.O.E. No. 2710
Unit 3 D.O.E. No. 2711
Unit 4 D.O.E. No. 2712
addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office
until 1:30 n.m. on Thursdav, December 2, 1999 and then publicly opened and read aloud at 2:00 p.m. in the City
Council Chambers.
Plans, specifications and contract documents for this project may be obtained at the office of the Department of
Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. A fifty (50.00) dollaz deposit is
�„ required for the first set of documents and additional sets may be purchased on a non-refundable basis for fifty (50.00)
dollars for each set. These documents contain additional information for prospective bidders.
�
�
�
All bidders will be required to comply with provision 5159 of "Vernon's Civil Statutes" of the State of Texas with respect
to payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth
City Code Sections 13-A-21 through 10-A-29), prohibiting discrimination in employment practices.
Bid security is required in accordance with Pazagraph 2 of the Special Instructions to Bidders.
The major work on this project shall consist of:
UNIT 1 8 EA Manholes
(DOE 2113) 676 LF 8-inch PVC Sanitary Sewer by Open Cut
619 LF 8-inch DIP Sanitary Sewer by Open Cut
662 LF 6 to 8-inch Sanitary Sewer by Pipe Enlargement
255 LF 8 to 8-inch Sanitary Sewer by Pipe Enlargement
15 LF 8-inch PVC Sanitary Sewer by Short Bore
�
LJNIT 2
r, (DOE 2710)
�'
�„
�
r
�
11
3
557
88
25
129
1,737
787
EA
EA
LF
LF
LF
LF
LF
LF
Manholes
Wastewater Access Device
6-inch Sanitary Sewer Rehab by CIPP or FAFP
8-inch PVC Sanitary Sewer by Open Cut
8-inch HDPE Sanitary Sewer by Open Cut
6 to 6-inch Sanitary Sewer by Pipe Enlargement
6 to 8-inch Sanitary Sewer by Pipe Enlazgement
8 to 8-inch Sanitary Sewer by Pipe Enlazgement
LJNIT 3 12 EA Manholes
(DOE 2711) 2,265 LF 8-inch PVC Sanitary Sewer by Open Cut
105 LF 8-inch DIP Sanitary Sewer by Open Cut
324 LF 6 to 8-inch Sanitary Sewer by Pipe Enlargement
UNIT 4 20 EA Manholes
(DOE 2712) 2,448 LF 8-inch PVC Sanitary Sewer by Open Cut
478 LF 8-inch DiP Sanitary Sewer by Open Cut
118 LF 8-inch PVC Sanitary Sewer by Short Bore
65 LF 8-inch DIP Sanitary Sewer by Other than Open Cut
482 LF 6 to 8-inch Sanitary Sewer by Pipe Enlargement
������1��:� ��C����,,�;�;�;
DNB-1 �'� `
���' �C���G���aG��
f�� ��u�r'�MA ���o
�
��
11 LF 12-inch PVC Sanitary Sewer by Open Cut
and all necessary appurtenances and incidental work to provide a complete and serviceable project. Included in the above
will be all other miscellaneous items of construction as outlined in the Specifications and Contract Documents.
A pre-bid conference will not be held for this project.
The City reserves the right to reject any and/or all bids and waive any and/or all formalities. Bidders shall not separate,
detach or remove any portion, segment, or sheets from the contract documents at any time. Bidders must complete the
proposal sections and submit the complete specifications book or face rejection of the bid as non-responsive.
�
..d
AWARD OF CONTRACT: No bid may be withdrawn until the expiration of ninety (90) days from the date bids are
� opened. The Award of Contract, if made, will be within ninety (90) days after the opening of bids, but in no case will the
awazd be made until all the necessary investigations aze made as to the responsibility of the bidder to whom it is proposed
to awazd the Contract.
�"1 SUBMISSION OF BID(S) AND AWARD OF CONTRACT(S): This document is designed as four (4) separate
contract documents and shall not be construed as being a single contract. The proposal sections are provided as
four (4) individual proposals with four (4) individual M/WBE specifications and are arranged in units to allow
prospective bidders to submit bids on one unit, or all units. Award of contract(s), if made, shall be to the
responsive low bidder for each individual unit. If a contractor is the responsive low bidder on multiple units, then
� a single set of contract documents consisting of all applicable units will be created and one single award of contract
shall be made. The Contractor shall comply with the City's M/WBE Ordinance on each individual unit.
,.-,
Construction time on all units will run concurreatly. For situations involving approved contracts with multiple
units, the total allowable construction completion time period for all the units shall be the same as the unit with the
longest construction time period within such coutracts.
r,,, Any contract or contracts awarded under this Detailed Notice to Bidders are expected to be funded in part by a loan from
the Texas Water Development Board. This contract is contingent upon release of funds from the Texas Water
� Development Board. Neither the State of Texas nor any of its departments, agencies, or employees is or will be a party to
this Detailed notice to Bidders or any resulting contract. The contract or contracts are subject to regulations contained in
31 TAC, Chapter 363, in effect on the date this contract is executed.
�'" In accordance with City of Fort Worth Ordinance No. 13471, as amended by Ordnance No. 13781 the City of Fort Worth
. has goals for the participation of Disadvantaged Enterprise in City contracts. A copy of the Ordinance can be obtained
from the Office of the City Secretary. The bidder shall submit the M/WBE UTILIZATION FORM, PRIME
, CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM ("Documentation"), as appropriate. The
Documentation must be received by the contracting department no later than 5:00 p.m., five (5) City business days after
�' the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the contracting department to
whom delivery was made. Such receipt shatl be evidence that the Documentation was received by the City.
The Contracting Department for this project is the Engineering Depaztment. For additional information concerning this
project, please contact John Boyer, Project Manager, at 332-5474 (ext.37) or Stephen James, P.E. at 332-8977.
r BOB TERRELL
� CITY MANAGER
` ' GLORIA PEARSON By:
� CITY SECRETARY
� ADVERTISING DATES:
October 28, 1999
� , November 4, 1999
�.Y
�
f
e.y
Department of Engineering
A. Douglas Rademaker, P.E , irector
-� S� � �
�sy:- lo n y � J�
Rick Trice, P.E.,
Manager, Consultant Services,
'��(��8��1�� �'[�Gr,J���,
DNB-2 ��? �(1 �r �'1�
�� c � ti� � ���G��a� ��
U lo V�+1 i�i'UUU4 �L7L�o
�
�
r- Sealed bids for the following:
NOTICE TO BIDDERS
Main C1C4B Drainage Area Sanitary
Sewer System Rehabilitation and Improvements
� (Group 6, Contract 2), Part 7
Unit 1 D.O.E. No. 2113
Unit 2 D.O.E. No. 2710
� Unit 3 D.O.E. No. 2711
Unit 4 D.O.E. No. 2712
�
�
R"
iJNIT 1 8 EA Manholes
(DOE 2113) 676 LF 8-inch PVC Sanitary Sewer by Open Cut
619 LF 8-inch DIP Sanitary Sewer by Open Cut
662 LF 6 to 8-inch Sanitary Sewer by Pipe Enlargement
255 LF 8 to 8-inch Sanitary Sewer by Pipe Enlargement
15 LF 8-inch PVC Sanitary Sewer by Short Bore
UNIT 2 I 1
(DOE 2710) 3
557
88
25
129
1,737
787
EA
EA
LF
LF
LF
LF
LF
LF
Manholes
Wastewater Access Device
6-inch Sanitary Sewer Rehab by CIPP or FAFP
8-inch PVC Sanitary Sewer by Open Cut
8-inch HDPE Sanitary Sewer by Open Cut
6 to 6-inch Sanitary Sewer by Pipe Enlargement
6 to 8-inch Sanitary Sewer by Pipe Enlargement
8 to 8-inch Sanitary Sewer by Pipe Enlargement
iJNIT 3 12 EA Manholes
(DOE 2711) 2,265 LF 8-inch PVC Sanitary Sewer by Open Cut
105 LF 8-inch DIP Sanitary Sewer by Open Cut
324 LF 6 to 8-inch Sanitary Sewer by Pipe Enlargement
UMT 4 20
(DOE 2712) 2,448
478
118
65
482
11
EA
LF
LF
LF
LF
LF
LF
Manholes
8-inch PVC Sanitary Sewer by Open Cut
8-inch DIP Sanitary Sewer by Open Cut
8-inch PVC Sanitary Sewer by Short Bore
8-inch DIP Sanitary Sewer by Other than Open Cut
6 to 8-inch Sanitary Sewer by Pipe Enlargement
12-inch PVC Sanitary Sewer by Open Cut
i`"' addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing
Office until 1:30 a.m. on Thursday. December 2. 1999 and then publicly opened and read aloud at 2:00 p.m. in the
� City Council Chambers. Plans, specifications and contract documents for this project may be obtained at the offices
of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. One
set of documents will be provided to prospective bidders for a deposit of Fifiy Dollars ($50.00).
� A pre-bid conference will not be held for this project.
�
�
�����-G���G01�� �'����G}@
A-t �-2��'ti� �L���G�� ° °���
i� l� �M+� ; ���y �� Zo
L�J
Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time.
oBidders must submit the complete specifications book or risk rejection of bid.
For additional information, please contact Mr. John Boyer at 332-5474 (ext. 37) or Mr. Stephen James, P.E. at 332-
Q 8977.
ADVERTISING DATES:
a October 28,1999
November 4,1999
�
�
�
�
�
�
L�J
�
LJ
l�J
L�J
LJ
�
L�!
A-2
a
t'�
SPECIAL INSTRUCTION TO BIDDERS
(WATER DEPARTh�.NT�
� 1. PREOUALIFTCATI(�N REQUIRF1ViENT; All oontra,ctQrs submitting bids are nequired
to be prequalified by the Fort Worth Water Department prior to submitting bids. This
� prequalification process will establish a bid limit based on a technical evaluation and
financial analysis of the contra,ctor. It is the bidder's responsibility to submit the following
documentation: a ourrent financial statement, an acceptable experience record, an
� acceptable equipment schedule and any other documents the Depa.rtment may deem
, necessary, to the Director of the Water Department at least seven ("7) calendar days prior
�; to the date of the opening of bids.
�' . (a) The financial statement required shall have been prepared by an independent certified
public accountant or an independent public accountant holding a valid pemut issued
by an appropri,ate State lioensing agency and shall have been so prepared as to reflect
�•.� . the financial status of the submitting company. This st�tement must be curi�ent and not
more than one (1) year o1d. In the case that a bidding date falls within the time a new
� statement is being . prepared, the previous statement shall be updated by proper
verification. �
�
(b) For an e�perience record to be considerad to be a�ccept�ble for a give� project, it must
reflect the experience of the fum seelang quali.fic�tion in work of both the same nature
and technicai level as that of the project for which bids are to be received.
(c) liie Director of the Water Department shall be the sole judge as to �the acceptability
for financial qualification to bid on any Fort Worth Water Department project.
� (d) Bids rac;eived in caccess of the bid limit shall be oonsidered non-responsive and will be
rejected as such.
(e) The City, in it's sole discretion, may reject any bid for failure to demonstr�te
experience and/or expertise.
( fl Any proposals submitted by a non�r�equalified bidder shall be retumed unopened, and
� if inadvertently opened, shall not be considered.
(g) The City will a�tempt to notify prospective bidders whose qualifications (financial or
experience) are not deemed to be appropriat�e to the nature and/or magnitude of the
pmject on which bids are to be received. Failure to notify shall not be a waiver of any
necessary prequalification. -1-
�
�
I "^ n
'v� s��'� C�';:�� 6`_'�'�;U��U
�� s�.r �, �;^- r�,�� � e ti''
�-�! � �'� �rU,:���V
U �a ``n,r`�. ;: � �� � 1
y� :: r.:i. �i �ry0a
�' 2. �ID SE;(,URITY: A cashier's check or a,cceptable bidder's bond payable to the City of
�,,, . Fort Worth in an amount of not less than five pet�cent (5 4b) of the largest possible total of
1,, the bid submitted must accompany the bid, and is subject to forfeiture in the event the
successful bidder fails to ezecute the Contract Documents vtrithin (10) days after the
� contract has been awarded. To be an�acceptable surety on the bond, (1) the name of the
surety shall be included on the current U.S. 7�rasury, or ('2) the surety must have capital
and surplus equal to ten times the limit of the bond. The surety must be"'licensed to do
� business in the State of Tezas. The amount of the bond shall not ezceed the amount shown
on the Treasury list or one-tenth (1/10) the total capit�al and surplus.
3. �nNDS: A perfornlance bond, a payment�bond and a maintenance bond each for one
hundred (10096) perc�t of the contract price will be required; Reference C 3-3.7.
4. WArE RATE.S: Not less than the prevailing wage rates established by the City of fort
Worth, Tezas and as set forth in the contract documents must be paid on this pmject.
� 5. A1Vj$�IGLTITY: In the case of ambiguity or lack of clearness in stating prices in the
Proposal the City reserves the right to adopt the most advantageous constn�ction thereof
j"'� to the City or to reject the Proposal. .
i�
�� � 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas.
1.�'� .•
�
7. NONRESIDIIVT BIDDER�S: Pursuant to Article 601g, Te�zas Revised Civi1 Statutes, the
City of Fort Worth will not award this � contract to a nonresident bidder unless the
� nonresident's bid is lower than the lowest bid submitted by a responsible Tea�as resident
bidder by the same. amount that a Texas resident bidder would be required to underbid a
� � nonresident bidder to obtain a oomparaUle contract in the St� in which the nonresident's
, principal place of busin�ss is located.
� , .
� "Nonresident bidder" means a bidder whose principal plaae of business is not in the State
� of Te�s, but ezcludes a contractor whose ultimate parent company or majority owner has
its principal place of business in the State of Teuas. �
«. This provfision does not apply if t�is contxact involves Federal funds.
� .
�
�
-�
'� '�'� � P �"� fl �.;r�a��r;. �.�;�r
�U�11 Il ���."'.uU'S� ��L:I�II��:���
� ��`'u� ��'C�C��G�'�
i� V. �����'��'��J� 1��%io
,:.
s�
�,, The appropriate blanks of the Proposal must be filled out by all nonresident bidders in
order for the bid to meet specafications. The failure of a normesident contractor to do so
�. will automatically disqualify that bidder.
8. �'AYMF.NT: If the contract amount is �25,000 or less, the contra:ct amount shall be paid
within foriy-five (45� calendar days after completion and acceptance by the City.
9. AGE: In accordance with the policy ("Policy") of the F.xecutive Branch of the Federal
Government, Contcac�or covenar►ts that neither it, nor any of its officers, members, agents,
employees, Program participants or subcontractors while engaged in performing this
contra�ct, shall, in connection with the employment; advancement or discharge of
employees in connection with the terms, conditions or privileges of their employment,
discriminate against persons because of their age except on ttie basis of a bona fide
occupational qualification, retirement plan, or statutory requirement.
Contractor fiuther oovenants that neither it nor its officers, membexs, agents, employees,
subcontractors, program participants, or persons acting on their behalf, shall specify, in
solicitations or advertisements for employees to work on this contract, a ma�cimum age
limit for such employment unless the specif ed maaimum age limit is based upon a bona
fide. occupational qualif cation, retiremetit plan or statutory requirements.
� Conha�ctor warrants it will�fully comply with the policy and will defend, indemnify and
hold City harmiess against any claims or allegations asserted by third parties or
*"' subcontractors and/or its subcontractors' alleged failure to comply with the above
referenc�d Policy concerning age discrimination in the perfomtance of this agreemen�
�„ 10. DLSABILTTY; In accordance wiih the provisions of the Americans With Disabilities Act
of 1990 ("ADA"), Contr�tor warrants that� it and any and all of its su6conha�ctArs will not
� unlawfully discriminate on; the basis of disability in the provision of services to the
� general public, nor in the availability, terms and/or conditions of employment for
r"'" applicants for employment with or employces of Contra�ctor or any of its subcontractors.
Contractor wanants it will fully comply with the ADFA's provisions and any other
applicable Federal, State and locallaws conoerning disability and will defend, indemnify
� and hold City harmless against any claims or allegations asserted by third parties or
sulicontractors against City arising out of contractor's and/or its subcontra,ctors' alleged
� failure to comply with the above referenced Policy concerning age discrimination in the
perforniance of this �greement.
-3-
�
�
�����'�u'�0�„� r���'�'�'U���
�� ��V ���� G���G��
���. �r:.������o ����. ,
11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with the
�'" City of Fort Worth Ordinance No. 13471, as amended by Ordinance No. 13781 the
� City of Fort Worth has goals for the participation of minority business enterprises
and women business enterprises in City contracts. A copy of the Ordinance can be
obtained from the Office of the City Secretary. The bidder shall submit the
� MBE/'WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FROM
andlor the GOOD FAITH EFFORT FORM ("Documentation") as appropriate. The
documentation must be received no later than 5:00 PM, five (5) City business days
after the bid opening date. The bidder shall obtain a receipt from the appropriate
�„ employee of the managing department to whom delivery was made. Such receipt
shall be evidence that the documentation was received by the City. Failure to
�" comply shall render the bid nonresponsive.
#r�Y
Upon request, Contractor agrees to provide the Owner complete and accurate
� information regarding actual work performed by a Minority Business Enterprise
(MBE) and/or a Women Business Enterprise (WBE) on the contract and payment
thereof. Contractor further agrees to permit any audit and/or examination of any
books, records or files in its possession that will substantiate the actual work
" performed by an MBE andJor WBE. The misrepresentation of facts (other than a
� negligent misrepresentation) and/or the commission of fraud by the Contractor will
be grounds for termination of the contract andlor initiating action under
appropriate federal state or local laws or ordinances relating to false statements.
� Further, any such misrepresentation (other than a negligent misrepresentation)
andJor commission of fraud will result in the Contractor being determined to be
irresponsible and barred from participating in City work for a period of time of not
�'"? less than three (3) years.
'
'
1
'
�
�
'
-4-
'�)I�i��L�G�',L �`�`�'�'Ju'�'
�: U�U c�����Uul51Ui111te�,U
G-l+u �J!�=��Ully IIL4Wo
� Page 1 of 2
MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM
� fiZEHABILITATION AND IMPROVEMENTS (GROUP 6, CONTRACT 2), PART 7(UNIT 3)
� .
� c�t� of Fort wo�n
, Minority and Women usiness Enterprise Specifications
' �MBEIWBE UTILIZATION
� � � ��.�, r h 5 %o r� s-fr4. c ��s„ � : �,,, � � a _ �- q �l
�Rl E COM A Y NAME BID DATE
�AIN C1C48 REHAB. AND IMPROV.. PART T(UNIT 31 PS46-070460410230
ROJECT NAME PROJECT NIfMBER
' � CTTY'S M/WBE PROJECT GOAL: � � M/WBE PERCEIVTAGE ACFIIEVEA: �
ailure to complete this form, in its entirety with supporting documentation, and received by the Managing Department �
�, �rt or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid
_ eing considered non-responsive to bid specifications. -
'� i tf�e u�dersigned bidder agrees to enter into a formal agreement with the MBE andlor WBE firms for work listed in this
schedule, conditloned upon execution of a contract with the City of Fort Worth. The intentional andior knowing
�srepresentation of facts is grounds for consideration of disqualification and wiil result in the bid bemg considered
� on-responsive to speci�cations.
�Company Name, Contact Name, Certified
Address, and Telephone No.
� I U
, �
� �
z
' L C�.rr,, 'i�� L, �
��'OI A1�,Sov�
�' , �No r-i'�_y,�`] lo I � v �
r �,�
�» - � S ) �t��i'�9
� C. �'� c,6. Q Q �. �(' nn s}crz�{��
� ( �0 )( �$� A ._...
���uc�i�-� ,Tx 7� u� 3 ✓
{� n�n ✓1 �� -�c�. vn In �!
� 1- �i I '7 � � �, �, - ,�i Co'7
� ,. -
i
>
00
��
Specify All Contracting
Scope of Work (*)
�i�r v� , s ►� �4-
� Q,� I
�q �e�n�-1�� S�C�ew��l�,
Gthci �rivrwa�
�� 4� i r
Specify All Items to be
Supplied(*) �..,
m �
rn �
�Ic�.--�e�r- � a I 5 �--
1 �I� s
Doliar Amount �
� ou
l6l DU U —
�
39� �o�
�
' MNVBEs must be tocated in t�e 9(nine) county martcetplace or currently doin� business in the marketplace at the time of bid.
� �
� Specify ali areas in which MWBE's are to be utilized and/or items to be supplied:
Cl A compiete IisUng of items to be supplied is required in order to recetve credit toward i�e MMIBE poal.
�C� Identify each Tter tevel. Tte� Means the level of subcontracting below the prima contractor/consultant, i.e., a dlrect payment
from the prime corrtractor to a subcorttractor is considered 1" tier, a payment by a subcontractor to
its suppller is considered 2"° der.
MAIN C1C4B DRAfNAGE AREA SANITARY SEWER SYSTEM
� THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FNE (5} CI7Y BllSINESS DAYS AFTER BID
OPENING, EXCLUSIVE OF THE BID OPENING DATE
^. ; ,,, , - � .;
�� ��.� ,, �,��r �, ,� �,��� �� �� � Re�. sn�ss
� Pages 1 and 2 of Attachment 1A must be received by the Managirg�ar�� '"`�`�
,i��,' �` �('';' �'��� �'�
_.-';!'U '�'��::. '.L:�c,•u'i1,i�
�� . � Ua ��� p t��'�U UQ �U1rUo
- - - "�. A 1 I�AVf9mtIV 1
Page 2 �
REHABILlTATiON AND IMPROVEMENTS (GROUP 6, CONTRACT 2), PART 7(UNIT 3)
city of Fort wortn
Minority and Women Business Enterprise Specifications
MBENVBE UTILIZATION
Company Name, Contaci Name. � Cert fted
Address, and Telephone No. � r�
� Q 0
V X �Z ~
Specify AII Contracting
Scope of Wo�4c ('}
Specify All Items to he Dolla� Amount
Supplied(*) ,Z�
� L
y h
ihe bidder fu�ther agrees to provide, directly to the City upon request, complete and accu�ate information regardir.
actual work perFormed by aH subcontractors, incfuding MBE(s) andior WBE{s) arrangements submitted with this bi�
The bidder also agrees to allow an audit and/oc examination of any books, records and fifes field by their company th:
wiil substantiate the actual work perFormed by the MBE(s) andlor WBE(s) on this contract, by an authorized officer c
empioyee of the City. Any intentionaf and/or knowing misrepresentation of facts will be grounds for terminating th
contract or debarment from City work ior a period of not less than three (3) years and for initiating action under Federa
State or Local laws conceming false statements. Any failure to comply with this ordinance and creates a materi:
breach of contract may resuft in a determination of an irresponsible offeror and barred from participating in City wor
for a period of time not less than one (1) year.
ALL MBEs and WBEs MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD
���1 �.�--- ►�Ia,� � �,� E , ,✓-��rh S
Autho ied Signature
�1rt 5 ► ( l `� h -�
Title
V"i C� (�1 u, � n s
Company Name
'�� D (�,�x � /
Address
�����
City/State2ip Cod�
�—i� r� 5 �'u-(��� , l�Y� c—
(� � �3
��e�1v
Printed Signature
Contact Name and Titie (if different)
�17' ��1�-va�i �
Telephone Number (s)
���-���-�a��7
Fax Number
/� ��- � �
[Sate
TH1S FORM MUST BE RECENED BY THE MANAGING DEPARTMENT BY S:QO p.m.. FIVE 5) CITY BUS�ti�� � AFTER BID
OPENING, EXCLUSIVE OF THE BID OPEMNG DATE - �:;��
'�,_!�ir � �" � �� ���° Rev. 61219t
Pages 1 and 2 of Attachment 1A must be received by the Mana; �in�,�Qepartment
,
�
�rllu . ...,,�y � -" _
�
�
r�
PART B - PROPOSAL
UNIT 3 CONSTRUCTION
(This proposal must not be removed from this book of Contract Documents).
TO: Bob Terrell
� City Manager
Fort Worth, Texas
PROPOSAL FOR: The furnishing of all materials, except materials specified to be furnished by the
City, equipment and labor for:
� Main C1C4B Drainage Area Sanitary
Sewer System Rehabilitation and Improvements
(Group 6, Contract 2), Part 7
Sewer Project No. PS46-070460410230
� D.O.E. No. 2711
� The major work on this project shall consist of:
LJNIT 3 12 EA Manholes
(DOE 2711) 2,265 LF 8-inch PVC Sanitary Sewer by Open Cut
� 105 LF 8-inch DIP Sanitary Sewer by Open Cut
324 LF 6 to 8-inch Sanitary Sewer by Pipe Enlargement
and all necessary appurtenances and incidental work to provide a complete and serviceable project.
Pursuant to the foregoing "Notice to Bidders," the undersigned Bidder, having thoroughly examined the
Contract Documents, including plans, special contract documents, and the General Contract Documents
and General Specifications for Water Department Projects, the site of the project and understanding the
amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all
labor, equipment and material except as specified to be furnished by the City, which is necessary to fully
cornplete the work as provided in the plans and Contract Documents and subject to the inspection and
approval of the Director of the Deparhnent of Engineering of the City of Fort Worth, Texas; and binds
himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance
Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the
Contract Documents for the performing and completing of the said work. Contractor proposes to do the
work within the time stated and for the following sums:
(Furnish and install, including all appurtenant work, complete in place, the following items) ("D-No."
refers to the related items in Part D- Special Conditions):
� NOTE: A BID MAY BE SUBMITTED ON iJNIT 1, iINIT 2, LTNIT 3, iJNIT 4 OR ALL, AT THE
CONTR.ACTOR'S OPTION.
�
,
�
�
B3-1 �',J�U���G�l�'.fl U:i���f�%V�L'
;. r- il r,�, �
��0�' �C�"��"r�:,�Vr.'u
� �'�'1 �. '��"�
r�. M����� � ���,`o -
MAIN C1C46 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2), PART 7
UNIT 3 CONSTRUCTION
Item Approximate Description of Item With Unit
No. Quantity Bid Price Written In Words Price
1 2,265 LF '8-inch PVC San. Sewer Pipe
(All depths)
(�a i h,�-iy --�� r pollars c� �
and v� :h -I� Cents $ 3 �
Per Linear Foot
F�
3
Amount
Bid
$�9,v��s�
�
105 LF 8-inch DIP San. Sewer Pipe
(All depths)
Ccr� f-� � o �: e Dollars � p �, a S c�
and � n ; n-�., Cents $ � � — $ `� .3 1 /
Per Linear Foot
324 LF '"'6" to 8" Sewer Rehab By
Pipe Enlargement
an E � � h �u
and �-h ;
Per Linear Foot
Dollars V U� bu
Cents $ O �— $ a� , 9 a c-
4 11 EA Standard 4-Foot Dia. SSMH
to 6-Foot Depth
C�a n�,e-+-�„�,5�,„�. �.,�,k4„M�aDollars � // o�.
and z--e-,v Cents $ �-U $ l -�/ '7�UU �—
Per Each
5
10 VF Extra Depth Over 6-Feet for
Standard 4-Foot Dia. SSMH
Cu� �h� l�uv,drec� Dollars �� ��;
and -r?�'�v Cents $ �L'C) — $ I � C��d —
Per Vertical Foot
6 1 EA Standard 4-Foot Dia. Shallow Cone
SSMH
na O�,e -t���,�,,�,�c ���-�,c���dDollars �o
�, ;�
and �,,, Cents $ �, 5 UD - $ , 5�:(� —
Per Each � �
7 12 EA Vacuum Test SSMH
@ OKP hu r�l � P�,� �-�`�, Dollars /� U�� c o
and �� ,-�; Cents $ � �v $ � , �d�
Per Each
'J��U'GO�� �'�C'`�'�?,�'
��!J�Ur Nrt���'U11SUfrUU�RlIn
',** Contractor must complete City Approved Product �� h�� J�l�:.�M 5�j���
and Approved Method Form on Page B3-7 B3-2 � n.� JUp �L5,/bo
�
�"
�
MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2), PART 7
UNIT 3 CONSTRUCTION
Item Approximate Description of Item With Unit
No. Quantity Bid Price Written In Words Price
8 10 EA Concrete Collar for SSMH
aC� �,� ,� h u �. c� rPc� Dotlars
and �> Cents $ a �%Ocv
Per Each
�
10
11
12
13
14
12 EA Watertight Insert for SSMH
(� S , X� Dollars I ��;
and �-„ , Cents $ l0 i� '
Per Each
Amount
Bid
$ �� C�(�0° �
$'7�C7�=
16 VF SSMH Corrosion Resistant Coating
@�wo ln k h c � ve�+ -fw e,-.,�y �r��e Dollars
and �u , Cents $ v�� � � �� $ �� �c�(� J
Per Vertical Foot
2 EA 4-inch Service Tap (Open Cut)
la�7k�� �,kkc�rYd ��t� Dollars ��, ��
and z?�, Cents $ 35 � — $ ��U ^
Per Each
20 LF "'4-inch Diameter PVC Sanitary Sewer
Service Line
(a? Twe v,-i� -- �iw �� Dollars �" ''/'/ ou
and � �„ Cents $ �� — $ 7 `1�� —
Per Linear Foot
20 LF *4-inch Diameter PVC Sanitary Sewer
Service Line - Reroute on Private Property
(a� �-, �� Dollars � p,_; c�
and ��-, Cents $ -�O — $ �J �� _�
Per Linear Foot
33 EA 6-inch Service Tap (Open Cut)
no I�o u� 1�,� � r� rr cP Dollars , / �k� �, �;
and ��, Cents $ `7 � $ � .� � � UU �—"
PerEach
15 8 EA Service Reinstatement for
Pipe Enlargement
Un ��ve�� 4,uh.lr.r.� ���+�� D0118fS �� pQ
and ��v ' Cents $ %�b — $ �v� ��
Per Each
,
" Contractor must complete City Approved ��r��"`I"r�"��
�� ��[��C�G�� ����..,�,_L
Product Form on Pa e B3-7 63-3 ^ ^ e t,'�;�`;�
g ���� ���rG�[��V�
���o ���G��ao ��� zo
MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2), PART 7
UNIT 3 CONSTRUCTION
Item Approximate Description of Item With Unit
No. Quantity Bid Price Written In Words Price
16 515 LF '6-inch Diameter PVC Sanitary Sewer
Service Line
aC� 1 nie����h� �e Dollars ��,
and �z-�, Cents $ � � '
Per Linear Foot
17
18
Amount
Bid
$ / /. ��5 0�
750 LF '6-inch Diameter PVC Sanitary Sewer
Service Line - Reroute on Private Property
an �, � -i'�.ti � Dollars
and � �-�.,� Cents $ �o� vv $ 3� �ju � cv
Per Linear Foot
18 LF 8-inch DIP Water Line Adjustment
na �� v e u�-1�-c� Dollars ��;
and ��-,u Cents $ �� —
Per Linear Foot
$ �� � ��od
19 1,307 LF Trench Safery System
(> 5 FT. Depths)
(c� D� �- Dollars �v 5'v
and -F'� -�-4� Cents $ � $ � , � �U
Per Linear Foot �
20 2,026 LF Pre-Construction TV Inspection
for Sanitary Sewers
a(� 1-u�r pollars /I �� ,/ �,;
and �� Cents $ �7 $ �, � �'7"
Per Linear Foot �
21 2,694 LF Post-Construction N
Inspection of Sanitary Sewers
aC� � N P Dollars J � / 'I
and -�i -� -{-t � Cents $ � 5— $ `f"J D '7' � `' ��
Per Linear Foot ��
22 1 EA Repair 4-ft x 3-ft Concrete Pipe Arch
Storm Drain Crossing
(o� i ���r h U r�l ��� Dollars '/r�,/� ,/
and ��"U Cents $ `�WC " $ '7 �a G �
Per Each
' Contractor must complete City Approved
Product Form on Page B3-7 83-4
,
�^ ��D�c��� �����c����d .
���'ti� ���:;G?C °�G?°�
G��o ��'��� �� �o
MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2), PART 7
UNIT 3 CONSTRUCTION
item Approximate Description of Item With Unit
No. Quantity Bid Price Written In Words Price
23 16 LF Remove and Replace 18-inch RCP
Storm Dr in
(c� ��-�. �� Dollars 5 a � v
and �� h ; Cents $
Per Linear Foot
24
f'�7
��.^
27
f��:]
Amount
Bid
$
�3���=
16 LF Remove and Replace 24-inch RCP
Storm Drain
pn 1-,-��j e.i J�� Dollars �� n ��,
and `�-,� ; Cents $ � � " $ % � � �
Per Linear Foot
30 LF Curb and Gutter Re lacement
(a� � �ven� -�ti4 Dollars �� ��
and �-n , Cents $ a 5 -- $� 5 U�
Per Linear Foot
44 SY Concrete Driveway Replacement
(a� �u,r �;V;�t�" Dollars / I ��
and ��„ Cents $ �-t � $ � . � � � v �
Per Square Yard �
53 SY Concrete Sidewalk Replacement
(a� )—�%��—�i��f' Dollars �(\� c�
and z't-� Cents $ / Z� —
Per Square Yard
$ a, ���-��
8 EA Pre-Construction D-Hole cJ o�
(cr� J�o•�r 1.��� re cf� Dollars $ ��U � $ �, �t�G
and ����� Cents
PerEach
29 10 EA Cut, Plug & Abandon Exist.
Sewer Lines
an%l,r�� hkh,a�r��-��., Dollars Z �� o0
and �s-,�, -� Cents $ .JSO '— $ 3 , �C� �
Per Each
B3-5
'����C�Q� �'C��Gu�u�n
�c���'1� ��'GG���GaG'u�
���}� �� ,���� ���.
�!��Gu �Illv�,_ g ✓`10
MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2), PART 7
UNIT 3 CONSTRUCTION
Item Approximate Description of Item With Unit Amount
No. Quantity Bid Price Written In Words Price Bid
30 13 EA Remove Existing SSMH
�ix.„h��.�,r1rr�� �ri��1`1 Dollefs U� 5 O�-
and �n, Cents $ �5 U — $ � , a � '
Per Each �
�
�
�
�
�
31
100 LF Concrete Encasement, per GCD Fig. 113
aC� � 1� , f'� Dollars p��
and -�?�-,-, , Cents $ .3 l� —
Per Linear Foot
�J l/
$ 3 . O�C� --
32 1.5 TON Cast Iron Fittings
(c� ��; ��,o�� 5 a hd Dollars
and ��; Cents $ � , OC�� � $ 3 : �� �b �
- .
Per Ton
33 1,830 LF HMAC Pavement Repair per Fig. 4
Ca� Th�r � -- -}�wo Dollars $ 3� �J $ � �� J�� °o
and -�-w Cents
Per Linear Foot
34
35
�
660 LF Concrete Pavement Repair per Fig. 1 I'
Ca� �n'r �z.+ �- h� e� Dollars $'i 9 vU $ 3� I� t/� pD
T
and � c�-v Cents �
Per Linear Foot
88 SY 6" Topsoil //-� b�
Ca� l �v� Dollars $ / V
and �.� Cents
Per Square Yard
150 LF Bermuda Grass Solid Sod Replacement '''7 p �
(c� S� Jev� Dollars $ /
and -�-�u Cents
Per Linear Foot
$ � �o�o
$ �, O5p ��
TOTAL AMOUNT OF BID - UNIT 3 ��� f� g� SO
(TRANSFER TOTAL TO PAGE B-SUMMARY)
B3-6
��G��C01�� �'�G�G'�
, �-: �� � ���G?[�G��
a-: .,,tf,�,�,���J4 �C�'�
��
1. t, L.;`1:_ L1.o
CITY APPROVED PRODUCT AND APPROVED METHOD FOR *
* CONTRACTOR SHAI.L SELECT TYPE OF PIPE TO
BE USED
STANDARD SPEC NO. SIZE
� E1-31 4" thru 30"
�E1-25 4" thru 15"
E1-27 4"thru 15"
E1-28 18" thru 27"
E100-2 18" thru 48"
Consult the "City of Fort Worth, Texas, Texas Standard Product List" to obtain the Generic/Trade Name and the Manufachuer for the
pipes listed above.
�
�
�
�
r
'
,
'
1
�
�
w
�
** CONTRACTOR TO INDICATE PIPE ENLARGEMENT METHOD BEING
USED AND PROVIDE NAME OF CONTRACTOR FOR INSTALLATION:
i� PIM Method ��r �� �� h� w�—
Name of Subcontractor if Applicable
T.R.S. System
Name of Subcontractor if Applicable
McConnell Method
Name of Subcontractor if Applicable
Expanded System
Name of Subcontractor if Applicable
Note: Only tee service connecrions will be allowed
Failure to provide the information required above may result in rejection of bid as non-responsive.
Only products listed above will be allowed for use in this project. Any substitution shall result in rejection of bid
As non-responsive.
,
';�)U�If� ��� �'�i��'�,!Ll
B3-7 � CO�� G��'�.�
���� ��'CG��°?�1�
�, ���'��I, ��.
�
Within ten (10) days after notification by the City, the undersigned will execute the formal contract and
� will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for
the faithful performance of the Contract. The attached bid security in the amount of �'l� ,(;. Ga�l�
�, is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds
are not executed and delivered within the time above set forth, as liquidated damages for the delay and
' additional work caused thereby.
L*J
The undersigned bidder certified that he has been furnished at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978, including
latest revisions, and that he has read and thoroughly understands all the requirements and conditions of
those General Documents and the specific Contract Documents and appurtenant plans.
T'he undersigned assures that its employees and applicants for employment and those of any labor
�'" organization, subcontractors, or employment agency in either furnishing or referring employee applicants
to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278
as amended by City Ordinance No. 7400.
�
The Bidder agrees to begin construction within ten (10) calendar days after issue of the work order, and
to complete the contract (iINIT 3) within one hundred (100) calendar days after beginning construction
as set forth in the written work order to be furnished by the Owner.
(Complete A or B below, as applicable)
❑ A. The principal place of business of our company is in the State of
� B
�
'
'
t
1
�
��
�
Nonresident bidders in the State of , our principal place of business, are
required to be percent lower than resident bidders by state law. A copy of the
statute is attached.
Nonresident bidders in the State of , our principal place of business, are not
required to underbid resident bidders.
The principal place of business of our company or our parent company or majority
owner is in the State of Texas.
����C�l�� �'[�C�JG?@ �
B3-8 �`: � � ll���GUSISI(fn1US U
�`� l� U'��'�'�bo ��o
Receipt is acknowledged of the following addenda:
�
�
�"
�
�
�
�
�
�
'
'
�
'
�
.�
i�
�
Addendum No. 1
Addendum No. 2
Addendum No. 3
Respectfully submitted,
%��/� �ur� is/y � �� , .�/� c.
By:� . � ,�--
�L�y .. �yr s„L �
Title
���. //�%�' �'/Cv�n�-� %��-y Jl//o -6�1�'
Address r
�'r,? � ��7- � z � z-
Telephone
(SEAL)
If Bidder is Corporation
Date: ,�r� � - /y sy
u��O�G��1� ����GuG�D
��� ' ����G1� ° G��
B3-9 ��� � V�:��Wp ��ir�,
r.
�
,
1
i
i
1
1
1
�
i
�
�
�
�
�
�
�
�
�
PART C
General Condit�'ons
Supplementary Conditions
u�f���G01�� �?�C��G��
r � �� ����GG����
U l'u U'J�`�')r'�UU9 �Lyl/�{a `
■
C2-2.7 Delivery of Proposal
C2-2.8 Withdrawing Proposals
C2-2.9 Telegraphic Modification of Rroposals
C2-2.10 Public Opening of Proposal
C2-2.11 Irregular Proposals
C2-2.12 Disqualification of Bidders
C3-3
C3-3.1
C3-3.2
C3-3.3
C3-3.4
C3-3.5
C3-3.6
C3-3.7
C3-3.8
C3-3.9
C3-3.10
C3-3.11
C3-3.12
C3-3.13
C3-3.14
C3-3.15
C4-4
C4-4.1
C4-4.2
C4-4.3
C4-4.4
C4-4.5
C4-4.6
C4-4.7
C5-5
C5-5.1
C5-5.2
CS-5.3
C5-5.4
CS-5.5
CS-5.6
CS-5.7
CS-5.8
C5-5.9
C5-5.10
CS-5.11
C5-5.12
CS-5.13
C5-5.14
CS-5.15
C5-5.16
C5-5.17
C5-5.18
AWARD AND EXECUTION OF DOCUMENT5
Consideration of Proposals
Minority Business Enterpise
Women-Owned Business Enterprise
compliance
Equal Employment Provisions
Withdrawal of Proposals
Award of Contract �
Return of P�oposal Securities
Bonds
Exec�ztion of Contract
Failure to Execute Contract
Beginning Work
Insurance
Contractor's Obligations
Weekly Payroll
Contractor's Contract Administration
Venue
SCOPE OF WORK
Intent of Contract Documents
Special Provisions
Increased or Decreased Quantities
Alteration of Contract Documents
Extra Work
Schedule of Operations
Progress Schedules for Water and
Sewer Plant Facilities
CONTROL OF WORR AND MATERIALS
_ Authority of Engineer
Conformity with Plans �
Coordination of Contract Documents
Cooperation of Contractor
Emergency and/oz Rectification Work
Field OfFice
Construction Stakes
Authority and Duties of Inspectors
Inspection
Removal of Defective and Unauthorized
Substitute Materials or Equipment
Samples and Tests of Materials
Storage of Materials
Existing Structures and Utilities
Interruption of Service
Mutual Responsibility of Contractors
Cleanup
Final Inspection
, ���J����� 6���Cu���l
�, �,- ,
�� V U ti� ����� e� � c U
�, 'll; ����� u �o
�� .
(2>
C2-2 (4)
C2-2 (4)
C2-2 (4)
C2-2 (4)
C2-2 (4)
C2-2 (5)
C3-3 (1)
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
(1>
(1)
(2)
(2)
(2)
(2)
(4>
(4)
(4)
(4)
(7)
(7)
(7)
(8)
C4-4 (1)
C4-4 (1)
C4-4 (1)
C4-4 (2)
C4-4 t2)
C4-4 (3)
C4-4 (4)
C5-5
C5-5
C5-5
C5-5
C5-5
C5-5
C5-5
C5-5
CS-5
Work C5-5
C5-5
CS-5
C5-5
C5-5
C5-5
C5-5
C5-5
C5-5
(1)
(1)
(2)
(2)
(3>
(3)
(3)
(4)
(5)
(5)
(5)
(6)
(6)
(7)
(7)
(8)
(8)
(9)
*.,
�
W
�
�
�
�i
�
i
�
�
t
�
�
1
�
1
�
1
C1-1
C1-1.1
C1-1.2
C1-1.3
C1-1.4
C1-1.5
C1-1.6
C1-1.7
C1-1.8
C1-1.9
C1-1.10
C1-1.11
ci=.i, ia
Cl�l .13
C1��.14
C1=1.15�
C1=1.16
C1-I..17
C1-1.18
C1-1.19
C1-1.20
C1-1.21
C1-1.22
C1-1.23
C1-1.24
C1-1.25
C1-1.26
C1-1.27
C1-1.28
C1-1.29
C1-1.30
C1-1.31
C1-1.32
C2-2
C2-2.1
C2-2.2
C2-2.3
C2-2.4
C2-2.5
C2-2.6
PART C - GENERAL
TABLE OF CONTENTS
NOVEMBER, 1, 1987
TABLE OF CONTENTS ,
DEFINITIONS
De£inition of Terms
Contract Documents
Notice to Bidders
Proposal
Bidder ,
General Conditions
Special Conditions
Specifications
Bond
Contract
Plans,
City
City Council
: Ma�or'`
City �.�Ianager �
Ci.ty. P;�torney �
Director of� P�utiiic Works
bire�tor, City Water Department
-Engineer � ,
Contractor �
Sureti�es
The Work or Project
Working Day
Calendar Day
Legal Holiday
Abbreviations
Change Order
Paved Streets and Alleys
Unpaved Streets and Alleys
City Streets
Roadway
Gravel Street
INTERPRETATION
OF PROPOSAL
Proposal Form
Interpretation
Examination of
and Site
�
AND PREPARATION
of Quantities
Contract Documents
Submitting of Proposal
Rejection of Proposals
Bid Security
CONDITIONS
C1-1
Cl-1
C1-1
C1-1
C1-1
C1-1
C1-1
Cl-1
C1-1
C1-1
C1-1
�l_1
C1-1
C1-1
C1-1
Cl-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
Cl-1
C1-1
Cl-1
Cl-1
C1-1
C1-1
(1)
(1>
(2)
(2)
(2)
(2)
(2>
(2)
(2)
(3)
(3)
(3)
(3>
t3)
(3)
(3)
(4)
(4)
(4)
(4)
(4)
(4)
(4)
(4)
(4)
(5)
(6)
(6)
(6)
(6)
(6)
(6)
C2-2 (1)
C2-2 (1)
C2-2 (2)
C2-2 (3)
C2-2 (3)
C2-2 (3)
(1) �� �i�I���O�� �����)r',i��
'�^: ���� ��'rG����^�
�� , � ��r���, ���so
��: ;��; �
C8-8.3
C8-8.4
CS-8.5
C8-8.6
C8-8.7
C8-8.8
C8-8.9
C8-8.10
C8-8.11
C8-8.12
C8-8.13
Lump Sum
Scope of Payment
Partial Estimates and Retainage
Withholding Payment
Final Acceptance
Final Payment
Adquacy of Design '
General Guaranty
Subsidiary Work
Miscellaneous Placement of Material
Record Documents
�
�:�����'G�Qd G���J�?�
' �;:��'1�' �[�'�. G�C� ° °'��
�: �� �VY.YYY� �l�(!��
}
�
� . � 4w
(4)
C8-8 (1>
C8-8 (1)
C8-8 (2)
C8-8 (3)
C8=8 (3)
C8-8 (3)
C8-8 (4)
C8-6 (4)
C8-8 (S)
C8-8 (5)
C8-8 (5)
�
�
�
�
��
�
�
,
C
�
�
�
�
�
�
�
�
�
�
'
�
C6-6
C6-6.1
C6-6.2
C6-6.3
C6-6.4
C6-6.5
C6-6.6
C6-6.7
C6-6.8
C6-6.9
C6-6.10
C6-6.11
C6-6.12
C6-6.13
C6-6.14
C6-6.15
C6-6.16
C6-6.17
C6-6.18
�C6-6.19
C6-6.20
C6-6.21
C7-7
C7-7.1
C7-7.2
C7-7.3
C7-7.4
C7-7.5
C7-7.6
C7-7.7
C7-7.8
C7-7.9
C7-7.10
C7-7.11
C7-7.12
C7-7.13
C7-7.14
C7-7.15
C7-7.16
C7-7.17
C8-8
CS-8.1
C8-8.2
LEGAL RELATIONS AND PUBLIC RESPONSIBILITY
Laws to be Observed
Permits and Licenses
Patented Devices, Materials and Processes
Sanitary Provisions .
Public Safety and Convenience
Privileges of Contractor in Streets,
Alleys, and Right-of-Way
Railway Crossings
Barricades, Warnings and Watchmen
Use of Explosives, Drop Weight, etc.
Work Within Easements
Independent Contractor
Contractor's Responsibflity for
Damage Claims
Contractor's� Claim for Damages
Adjustment of Relocation of Public
Utilities, etc.
Temporary Sewer Drain Connections
Arrangement and Charges of Water
Furnished by City
Use of a Section of Portion of the Work
Contractor's Responsibility for Work
No Waiver of Legal Rights
Personal Liability of Public Officials
State Sales Tax
PROSECUTION AND PROGRESS
Subletting
Assignment of Contract
Prosecution of the Work
Limitations of Operations
Character of Workman and Equipment
Work Schedule
Time of Commencement and Completion
Extension of time of Completion.
Delays
Time of Completion
Suspension by Court Order
Temporary Suspension
Termination of Contract due to
National Emergency
Suspension of Abandonment of the
Work and Annulment of Contract
Fulfillment of Contract
Termination for Convenience of the Onwer
Safety Methods and Practices
MEASUREMENT AND PAYMENT
Measurement ot Quantities
Unit Prices
C6-6 (1)
C6-6 (1)
C6-6 (1)
C6-6 (2)
C6-6 (2)
C6-6 (3)
C6-6 (4)
C6-6 (4)
C6-6.(5)
C6-6 (6)
C6-6 (8)
C6-6 (8)
C6-6 (10)
C6-6 (10)
C6-6 (10)
C6-6 (11)
C6-6 (11)
C6-6 (11)
C6-6 (12)
C6-6 (12)
C6-6 (12)
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
(1)
(1)
(1)
(2)
(2>
(3)
(4)
(4)
(4)
(5)
(6)
(6)
C7-7 (7)
C7-7 (7)
C7-7 (9)
C7-7 (10)
C7-7 t13)
C8-8 (1>
C8-8 (1)
������� 8�� G'�C���D
����r� �C����[����
(3) -
=�'-',.�.J�:'��o �{e
�
C1-1.3 NOTICE TO BIDDERS: All of the legal publications
either actually published in public advertising mediums or
furnished direct to interested parties pertaining to the work
contemplated under the Contract Documents� constitu�es the
notice to bidders.
^�
C1-1.4 PROPOSAL: The completed written and signed offer or
tender of a bidder to perform the work which the Owner desires ''
�o have done, together with the bid security, constitutes the
Proposal, which becomes binding upon the Bidder when it is �
officially received by the Owner, has been publicly opened and
read and not rejected'by the Owner. -
�
C1-1.5 BIDDER: Any.person, persons, firm, partnership,
company, association, corporation, acting directly or through
a duly authorized representative, submitting a proposal for�
performing the work contemplated under the Contract Documents,
constitutes a bidder. �
C1-1.6 GENERAL CONDITIONS: The General Conditions are the ��
usual construc�ion and contract requirement.s which govern the
performance of the work so that it will be carried on in
accordance with the customary procedure, the local statutes,
and requirements of the City of Fort Worth's charter and �
promulgated ordinances.
Wherever there may be a conflict between the General
Conditio.ns and Special Conditions, the latter shall take
precedence and shall govern.
C1-1.7 SPECIAL CONDITIONS: Special conditions are the
specific requirements which are necessary for the particular
project covered by the Contract Documents and not specifically
covered in the General Conditions. When considered with the
General Conditions and o�her elements of the Contract
Documents they provide the information which the Contractor
and Owner should have in order to gain a thorough knowledge of
the project.
C1-1.8 S ECIFI ATIO�IS: The Specifications is that section or
part of ��e Con�ract Documents which sets forth in detail the
requirements which must be met by all materials, construction,
workmanship, equipment and services in order to render a
completed and useful project. Whenever reference is made to
standard specifications, requlations, requirements, statutes,
etc., such referred to docume•nts shall become a part of the
Contract Documents just as though they.were embodied therein.
C1-1.9 BOND: The bond or bonds are the written guarantee or
security furnished by the Contractor for the prompt and
1 �. � t, ��el�j� C1-1 ( 2)
;�a!�I;����;Gfr.� �'��
.^ \r l� u,.��� ° °�U
�,�lli �'�•�'
� �����ti'��� ��•
�,., �
�
�
�
.1
�
�
.�,
�
C�
0
PART C - GENERAL CONDITIONS
C1-1 DEFINITIONS
�
�
C
�
,
�
�
�
'
SECTION C1-1 DEFINITIONS
C1-1.1 DEFINITIONS OF TERMS: Whenever in these Contract
Documents the following terms or pronouns in place oF them are
used, the intent and meaning shall be understood and
interpreted as £ollows; .
C1-1.2 �ONTRACT DOCUMENTS: The Contract Documents are all of
the wri �en and drawn documents, such as specitications,
bonds, addenda, plans, etc., which govern the terms and
performance oF the contract. These are con�ained in the
General Contract Documents and the Special Contract Documents.
a. GENERAL CONTRACT DOCUMENTS; The General Contract
Documents govern all Water Department Projects and
include the following items:
PART A- NOTICE TO BIDDERS (Sample�
PART B - PROPOSAL (Sample)
PART C - GENERAL CONDITIONS (CITY)
(Developer)
PART D - SPECIAL CONDITIONS
PART E - SPECIFICATIONS
PERMITS/EASEMENTS
PART F - BONDS .
PART G - CONTRACT
(Sample)
(Sample)
White
White
Canary Yellow
Brown
Green
E1-White
E2-Golden Rod
E2A-White
Blue
White
White
b. SPECIAL CONTRACT OOCUMENTS: The Special Contract
Documents are prepared for each specific project as
a supplement to the General Contract Documents and
include the following items:
P ART A- NOTICE TO BIDDERS (Advertisement) Same as
above
PART B - PROPOSAL (Bid)
PART C - GENERAL CONDITIONS
PART D - SPECIAL CONDITIONS
PART E - SPECIFICATIONS �
PERMITS/EASEM�NTS � �
P�T F - BONDS
PART G - CONTRACT
PART H- PLANS (Usually bound separately)
ci—i ci,
�`;���0 GU �,� �>�� �G�D
�; G�'U ����G�C�G,1��7
�a - �"tr'�r�` ��.
J
C1-1.17 DIRECTOR OF PUBLIC WORKS: The duly appointed,official
of the City of Fort Worth, referred to in the Charter as the
City Engineer, or his duly authorized representative.
�
C1-1.18 DIRECTOR CITY WATER DEPARTMENT: The duly appoin�ed
Director of the �ity Water Department of the City of Fort �
Worth, Texas, or his duly authorized representative, -..
assistant, or agents.
C1-1.19 ENGINEER: The Director of Public Works, the Director +
of the Fort Worth,City Water Department, or their duly �`
authorized assistants, agents, engineers, inspectors, or
superintendents, acting within the scope of the particular �
duties entrusted to them.
C1-1.20 CONTRACTOR: The person, persons, partnership,
company, firm, association, or corporation, entering into a
contract with the Owner for the execution of the work, acting
directly or through a duly authorized representative. A
sub-contractor is a person, firm, corporation, or others under
contract with the principal contractor, supplying labor and
materials or only labor, for work at the site of the project.
C1-1.21 SURETIES: The Corporate bodies which are bound by ,.�
such bonds are required with and for the Contractor. The
sureties engaged are to be fully responsible for the entire
and satisfactory fulfillment of the Contract and for any and �
all requirements as set forth in the Contract Documents and
approved changes therein.
C1-1.22 THE WORK OR PROJECT:
in and covered by the Contr�ct
limited to the furnishing of
equipment, and incidentals nec
and serviceable project. ,
The completed work contemplated
Documents, including but not
all labor, materials, tools,
�ssary to produce a completed
C1-1.23 WORRIN� DAY: A working day is defined as a calendar
day, not including S�turdays, Sundays, and legal holidays, in
which the weather or other conditions not under the control of
the Contractor permit the performance of the principal unit of
work for a period of not less than seven (7) hours between
7:00 a.m. and 6:00 p.m., with exceptions as permitted in
paragraph C7-7.6.
C1-1.24 CALENDAR DAYS: A calendar day is any day of the week
or month, no days being� excepted.
C1-1.25 LEGAL HOLIDAYS: Legal holidays shall be observed as
prescribed by the City Council of the Citg of Fort Worth for
observance by City employees as Follows:
"._., _ ,. _
�,u�l���� �t�_� u�'[�� � °�D
�� ll U�!l`�i�, C,LS 1�'1S� tl
� ���l�y ��� _
, . ..�. , , �
C1-1 (4)
�
�
.�
,
...
�
l _�
�
�
�
�
I 'i
�
�
i
faithful performance of the contract and incl�de the
following:
a. Performance
b. Payment Bond
c. Maintenance
d. Proposal or
to Bidders,
Bond (see paragraph C3-3.7)
(see paragraph C3-3.7)
Bond (see paragraph C3-3.7)
Bid Security (see Special Instructions
Part A and C2-2.6)
C1-1.10 CONTRACT: The Contract is the formal signed agreement
between the Owner aqd the Contractor covering the mutual
understanding of the two contracting parties about the project
to be completed under the Contract Documents.
C1-1.11 PLANS: The plans are the drawings or reproductions,
therefrom made by the Owner's representative showing in detail
the location, dimension and position of the various elements
of the project, including such profiles, typical
cross-sections, layout diagrams, working drawings, preliminary
drawinqs and such supplemental drawings as the Owner may issue
to clarify other drawinqs or for the purpose of showing
ch�anges in the work hereinafter authorized by the Owner. The
plans are usually bound separately from other parts of the
Contract Documents, but they are a part of the Contract
�Documents just as though they were bound therein.
C1-1.12 CITY: The City of Fort Worth, Texas, a municipal
corporation, authorized and chartered under the Texas State
Statutes, acting by and through its governing body or its City
Manger, each of which is required by charter to perform
specific duties. Responsibility tor tinal enforcement of
Contracts involving the City of Fort Worth is by Charter
vested in the City Manager. The terms City and Owner are
synonyinous . .
C1-1.13 CITY COUNCIL: The duly elected and qualified
governing body of the City of Fort Worth, Texas.
C1-1.14 MAYOR: The officially elected Mayor, or in his
absence, the Mayor Pro tem.of the City of Fort Worth, Texas.
.., C1-1.15 CITY MANAGER: The officially appointed and authorized
� City Manager of the City of Fort Worth, Texas, or his duly
authorized representative.
� C1-1.16 CITY ATTORNEY: The officially appointed City Attorney
of the City of Fort Worth, Texas, or his duly authorized
representative.
�
�
'
��—� c 3 � �(��dC�O�d��[�����
'�: �� e���C� a ��
. �.. ���'f"��o ��
0
C1-1.27 CHANGE ORDER: A"Change Order" is a written
supplemental agreement between the Owner and the Contractor
covering some added or deducted item or feature which may be
found necessary and which was not s.peciEically included in the
scope of the project on which bids were submitted. Increase
in unit quantities stated in the proposal are not the subject
matter of a Change Order unless the increase or decrease is
more than 25$ of the amount of the particular item or items in
the original proposal.
All "Change Orders" shall be prepared by the City from
information as necessary furnished by the Contractor.
C1-1.28 PAVED STREETS AND ALLEYS: A paved street or alley
shall be defined as a street or alley having one of the,
following types of wearing surfaces applied over the natural
unimproved surface:
1. Any type of asphaltic concrete with or without
separate base material.
2. Any type of asphalt surface treatment, not
including an oiled surface, with or without
separate base material.
3. Brick, with or without separate base material.
4. Concrete, with or without separate base material.
5. Any combination of the above.
C1-1.29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley,
roadway or other surface is any area except those defined
above for "Paved Streets and Alleys."
C1-1.30 CITY STREETS: A city street is detined as that area
between the right-of-way lines as the street is dedicated.
. C1-1.31 ROADWAY:_ T.he roadway is defined as the area between
parallel lines two (2') feet back of the curb lines or four
(4' ): feet back of the average edge oF pavement where no curb
exis�s.
C1-1.32 GRAVEL STREET: A gravel street is any unpaved street
to which has been addea one or more applications of gravel or
similar material other than the natural material found on the
street surface before any improvement was made.
�`�"'PI�����lr�l� .65��� � C 1-1 ( 6 )
: �4^
��4� 4 ������QU
1 � �._ ��.�� ��""'
.�
�
�
'
�
1.
2.
3.
5.
6.
7.
8.
9.
New Year's Day
M. L. Ring, Jr. Birthday
January 1
Third Monday in January
Last Monday in May
July 4
First Monday in September
Fourth Thursday in November
Fourth Friday in November
December 25
�
�
Memorial Day
Independence Day
Labor Day
Thanksgiving Day
Thanksgiving Friday
Christmas Day
Such other days in lieu of
holidays as the�City Council
may determine .
When one of the above named holidays or a special holiday is
� declared by the City Council, falls on Saturday, the holiday
shall be observed on the preceding Friday or if it talls on
Sunday, it shall be observed on the following Monday, by �hose
� employees working on working day operations. Employees
working calendar day operations will consider the calendar
holiday as the holiday.
�
�
�
�
�
�J
�
C1-1.26 ABBREYIATIONS: Wherever the abbreviations defined
herein appear in Contr�act Documents, the intent and meaning
shall be as follows;
AASHTO - American Association of MGD
State Highway Transportation
Officials
ASCE - American Society of Civil
Engineers
LAW - In Accordance With
ASTM - American Society of
Testing Materials
AWWA - American Water Works
Association
ASA - American Standards Association
HI - Hydraulic Institute
Asph.
Ave.
Blvd.
CI
CL
GI
Lin.
lb.
MH
Max.
- Asphalt
- Avenue
- Boulevard
- Cast Iron
- Center Line
- Galvanized Iron
- Linear or Lineal
- Pound
- Manhole
- Maximum
Cl-1 (5)
'
- Million Gallons Per
Day
CFS - Cubic Foot per
Second
Min. - Minimum
Mono.- Monolithic
$ - Percentum
R - Radius
I.D. - Inside Diameter
O.D. - Outside
Diam�ter
Elev.- Elevation
F - Fahrenheit
C - Centigrade
In• - Inch
Ft. - Foot
St. - Street
CY - Cubic Yard
Yd. - Yard
SY - Square Yard
L.F. - Linear Foot
�.I. - Ductile Iron
�L��1i���� U��. ������1D
�`"l• �Br � tS��IAIL� IIWQ 1(
4 ' ���': �Ur :; ^„1:-:��jlf� �j(�'Nj,
. ;- - ., .� !r1lp u 15l��
`r"�'--�-_--
�
�
forms or other parts of the Contract Documents �rill be
considered as approximate only and will be used for
purpose of comparing bids on a uniform basi$. Payment will�be
made to the Contractor for only the actual quantities of
performed or materials furnished in strict accordance with the
Contract Documents and Plans. The quantities of work to be
performed and materials to be furnished may be increased or
decreased as hereinafter provided, without in any Way
invalidating the unit prices bid or any other requirements of
the Contract Documents.
C2-2.3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT;
Bidders are advised that the C:ontract Documents on tile wit�h
�he Owner shall constitute all of the information which the
Owner will furnish. All additional information and data which
the owner will supply after promulgation of the formal
contract documents shall be issued in the form of written
addenda and shall become part of the Contract Documents just
as though such addenda were actually written into the original
Contract Documents.
Bidders are required, prior to the filing of proposal, to read
and become familiar with the Contract Documents, to vis�t the
site ot the project and examine carefully all local
conditions, to inform themselves by their own independent
research and investigations, tests, boring, and by such other
means as may be necessary to gain a complete knowledge of �he
conditions which will be encountered during the construction
of the project. They must judge for themselves the
difficulties of the work and all attending circumstances
affecting the cost of doing the work or the time requi�ed for
its completion, and�obtain all information required to make an
intelligent proposal. No information given by the Owner or
any representat�ive of�the Owner other than that contained in
the Contract Documents.and officially promulgated- addenda
thereto, shall be binding upon the Owner. Bidders shall.rely
exclusive.ly and solely upon their� o•wn estimates,
investigation, research, tests, explorations, and other data
which are necessary far full and complete information upon
which the proposal is to be based. It is mutually agreed that
the submission of a proposal is prima-facie evidence that the
bidder has made the investigations, examinations and tests
herein required. Claims for additional compensation due to
variations between conditions actually e.ncounter.ed in
constructio.n and as indicated in the Contract Documents will
not be allawed.
The logs of Soil Borings, if any, showing on the plans are for
general inEormation only and may not be correct. Neither the
�ic�=°'.::1�l;_• � r�,2(^r'r1�
.;'�� U�';�:,-��-.� �<:��G���,.�;
I( �C L 1U ����� �st5 uw c1 7.
�� ���^ �r,5?�L1�9 Ul5(n10 `
�y" i!•; �
o U'�''�.. .. S O 1
c2�2c2�
�
�
�
7
J
�
�
.. �
'
II
�,
SECTION C - GENERAL CONDITIONS
C2-2 INTERPRETATION AND
PREPARATION OF PROPOSAL
SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL
� C2-2.1 PROPOSAL FORM: The Owner will furnish bidders with
proposal form, which�will contain an itemized list of the
items of work to be done or materials to be furnished and upon
� which bid prices are reques�ed. The Proposal torni will state
the Bidder's general understanding of the project to be
completed, provide a space for furnishing the an�ount of bid
security, and state the basis for entering into a formal
� contract. The Owner will furnish forms for the Bidder's
"Experienc e Record," "Equipment Schedule," and "Financial
Statement," all of which must be properly executed and filed
� with the Director of the City Water Department one week prior
to the hour for openinq of.bids.
The financial statement required shall have been prepared by
an independent certified public accountant or an independent
public ac countant holding a valid permit issued by an
appropriate state licensing agency, and shall have been so
� prepared as to reflect the current financial status. This
statement must be current and not more than one (1) year old.
In the case that a bidding date :Ealls within the time a new
� statement is being prepared, the previous statement shall be
� updated by proper verification. Liquid assets in the amount
of ten (10$) percent of the estimated project cost will be
� required.
- For ,an experience _record to be considered to be acceptable for
a given project, it must reflect the experience of the firm
� seeking qualiEication in work of bo.th the same nature and
magnitude as that of the project for which bids are�to be
received, and such experience must have been on projects
� completed not more than five (5) years prior to the date on
which are to be received. The Director of the Water
�' department�shall be sole judge as to the acceptability of
experience tor qualification to bid on any Fort Worth Water
"' Department project.
�
The prospective�bidder shall schedule the equipment.he has
� available for�the project and state that he will rent�such
additional equipment as may be required to complete the
project on which he submits a bid.
, C2-2.2 INTERPRETATION OF QUANTITIE : The quantities of work
and materials to be turnished as may �e listed in the proposal
� - ��� . . � �-, �:��_^(:��� �r����l ��'��� � � .
z � � � �>(. �, ���:��� ��, G_����G
. �. . . ' ����II u^ r�15���i� ° cU
� . . . . �'� * '�����:�'G�: � ti �"�.
�
. _ ....�.�
�
�
C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered
unless it is delivered, accompanied by its proper gid
Security, to the City Manager or his representative in the
official place of business as set forth in the "NoticE to
Bidders." It is the Bidder's sole responsibility to deliver
the proposal at the proper time to the proper place. The mere
fact that a proposal was dispatched will not be considered.
The Bidd�r must have the proposal actually delivered. Each
proposal shall be in a sealed envelope plainly marked with the
word "PROPOSAL," and the name or description of the project as
designated in the "Notice to Bidders." The envelope shall be
addressed to the City Manager, City Hall, Fort Worth, Texas.
C2-2.8 WITfiDRAWING PROPOSALS: Proposals actually filed with
the City Manager cannot be withdrawn prior to the time set For,
opening proposals. A request for non-consideration of a
prop.osal must be made in writing, addressed to the City
Manager, and filed with him prior to the time set for the
opening of proposals. After all proposals not requested for
non-consideration are opened and publicly read aloud, the
proposals for which non-consideration requests have been
properly filed may, at the option of the Owner, be returned
unopened.
C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may
modify his proposal by telegraphic communica�ion at any time
prior to the time set For opening proposals, provided such
telegraphic communication is received by the City Manager
prior to the said proposal opening time, and provided further,
that the City Manager is satisfied that a written and duly
authenticated confirmation of such telegraphic communication
over the signature of the bidder was mailed prior to the
proposal opening time. If such conf irmation is not received
within.forty-eight (48) hours after the proposal opening time,
no further consideration will be given to the proposal.
C2-2..10 PUBLIC OPENING OF PROPOSAL: Proposals which have been
properly filed and for which no "Non-consideration Request"
has been received will be publicly opened and read aloud by
the City Manager or his authorized representative at the time
and place indicated in the "Notiee to Bidders." All proposals
which have been opened and read will remain on file with the
Owner until the contract has been awarded. Bidders or their
authorized representatives are invited to be present for the
opening of bids.
C2-2.11 IRRE ULAR RQPOSALS: Proposals shall be considered as
being "Irregu�ar'� i� they show any omi.ssions, alterakions of
form, �dditions, or conditions not called Eor, unauthorized
alternate bids, or irregularities.of any kind. However, the
�;;��ir������`� U�,����,�.
�u�,�� �����.G,S ° ��
� ��� •h���r:���?"?� �o
C2-2(4)
�
�
�
�
�
�,
s
�
,;�
�
r
�
Owner nor the Engineer guarantee that the data shown is
representative of conditions which actually exist.
C2-2.4 SUBMITTING OF PROPOSAL: The Bidder shall submit his
� Proposal on the torm furnished by the Owner. All blank spaces
applicable to the project contained in the form shall be
correctly filled in and the Bidder shall state the prices,
� written in ink in both words and numerals, for which he
proposes to do the work contemplated or furnishe the materials
required. All such prices shall be written legibly.
� of discrepancy between the price written in words and the
; price written in numerals, the price most advantageous t th
-s
City shall govern.
�
�
l�
'
i
�
L_��
o e
If a propo.sal is submitted by an individual, his or her name�
must be signed by him (her) or his (her) duly authorized agent.
If a proposal is s�tbmitted by a firm, association, or
partnership, the name and address of each member must be
given, and the proposal must be signed by a member of the
firm, association, or partnership, or by a person duly
authorized. If a proposal is submitted by a company or
corporation, the company or corporate name and business
address must be given, and the proposal signed by an official
or duly authorized agent. The corporate seal must be atfixed.
Power of Attorney authorizing agents or others to sign
proposal must be properly certified and must be in writing and
submitted with the proposal.
C2-2.5 REJECTION OF PROPOSALS: Proposals may be rejected if
they show any aiteration of wards or figures, additions not
called for, conditional or uncalled for alternate bids,
incomplete.bids, erasures, or irregularities of any kind, or
contain unbalance value of any items. Proposal tendered or
delivered af ter the official time designated for receipt of
proposal shall be returned to the Bidder unopened.
C2-2.6 BID SECORITX: No proposal will be considered unless it
is accompanied by a�"Proposal Security" of the character and
in the amount indicated in the "Notice to Bidders" and the
"Proposal�." The Bid Security is required by the Owner a�s
evidence of good faith�on the part of the Bidder, and by way
of a guaranty that if awarded the contract, the Bidder will
within the required time execute a.formal contract and Furnish
the required perfozmance and other bonds. The bid se.curity of
ttie thr�ee lowest bidders will be retained until the contract
is awarded or other disposition is made thereof. The bid
security of all other bfdders may be returned promptly after
the canvass oE bids.
C2-2(3)
e�����G��:.� G'����D .
��IIT/r C���^�� d W U
`:.'.'.� i' II C
�r ll+�;�, f,,���1��
I��' U�"'' ' � ?�� .
� � �::-��, ir � ,
_ �,_......._�
n
�
�
�
L
�
,
1
�
�
�
Owner reserves the right to waive any and all irregularities
and to make the award of the contract to the best interest of
the City. Tendering a proposal a£ter the�closing hour is an
irregularity which cannot be waived.
C2-2.12 DISQUALIFICATION OF BIDDERS: Bidders may be
disqualified.and their proposals not con�idered for any of,
but not limited to, the following reason:
a. Reasons for believing that collusion exists among
bidders. . -
b. Reasonable grounds f or believing that any bidder is
interested in more than one proposal for work
contemplated.
c. The bidder being interested in any litigation�
against the Owner or where the Owner may have a
claim against or be engaged in litigation against
the bidder.
d. The bidder being in arrears on any existing contract
e.
f.
9•
h.
o lowing:
or having defaulted on a previous contract.
The bidder having performed a prior contract in an
unsatisfactory manner.
Lack of competency as revealed by the financial
statement, experience record, equipment schedule,
and such inquiries as the Owner may see fit to make.
Uncompleted work which, in the judgment of the
Owner, will prevent or hinder the promp� completion
of additional work if awarded.
The bidder not filing with the Owner, one week in
advance of the hour of the opening of proposals the
f 1
1. Financial Statement showing the financial
condition of the bidder as specified in Part
"A" - Special Instructions.
2. A current experience record showing especially
the projects of a nature s.imilar to the one
under consideration, which have been
successfully completed by the Bidder.
3. An equipment schedule s howing the equipment
the bidder has available for use on the
project.
The Bid Proposal of a bidder who, in the judgment of the
� Engineer, is disqualified under the requirements stated
herein, shall be set aside and not opened.
�
�
ca—acs>
�
f 'J����O�� G�[�C�G�
�
� '� ��' �L���=`G�L��� ,
�� r,� ;.
� G� '�'�, `_ :'''c �?,M . i7 ��
(.�,._._ _ �� :;. , �G�.o
__ . _!
rr �
The Contractor shall post the required notice to that effect
on the project site, and, at his request, wiTl be provided
assistance by the City of Fort Wor�h's, Equal Employment
Officer who will refer any qualified applicant he may have on
file in his office to the Contractor. Appropriate notices may
be acquired from the Equal Employment Officer.
C3-3.4 WITHDRAWAL OF PROPOSALS,: After a proposal has been
read by the Owner it cannot be withdrawn by the Bidder within
forty-five (45) days after the date on which the proposals
were opened.
C3-3.5 AWARD OF CONTRACT: The Owner reserves the right to
withholdfinal action on the proposals f or a reasonable time,
not to exceed forty-five (45) days after the date of opening
proposals, and in no event will an award be made until after
investigations have been made as to the responsibility of the
proposed awardee...
The award of the contract, if an award is made, will be to the
lowest and best responsible bidder.
The award of the contract shall not become effective until the
Owner has notified the Contractor in writing of such award.
C3-3.6 RETURN OF PROPOSAL SECURITIES: As soon as proposed
price totals have been determined for comparison of bids, the
Owner may, at its discretion, return the proposal security
which accompanied the proposals which, in its judgment, would
not be considered for the award. All other proposal
securities, usually those of the three lowest bidders, will be
retained by the Owner until the required contract has been
executed and bond furnished or the Owner has otherwise
diaposed of �he bids, after which they will be returned by the
City Secretary.
C3-3.7 BONDS: With the execution and delivery of the Contract
Documents, the Contractor shall furnish to, and file with the
Owner in the amounts herein required, the following bonds:
a• PERFORMANCE BOND: A good and sufficient
performance bond in�an amount not less than 100
percent of the amount of the contract, as evidenced
bY the proposal tabulation or otherwise,
guaranteeing the full and faithEul execution of the
work and performance of the contract, and for the
protection of the Owner and all other persons
against damage by reason of negligence of the
Contractor, or improper execution of the work or
the use of inferior materials. This performance
� ,-. ' � �.,���C� !'
�� t������< <. � �- ° r
��„����� ���''� G' ° e� U
� �
'�� ����`u'�� ��°
_ _ _.._.._. .. -
C3-3 (2)
�
��.
�
a.�
�
�
�
..,
��
�
�,
�
'
PART C - GENERAL CONpITIONS
C3-3 AWARD AND EXECUTION OF
DOCUMENTS
�
�
�
�
,
1,
SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS:
C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been
opened and read aloud, the proposal5 will be tabulated on the
basis of the quoted prices, the quantities shown in the
proposal, and the application of such formulas or other
methods of bringing items to a common basis as may be
established in the Contract Documents.
The total obtained by taking the sum of the products of unit'
prices quoted and the estimated quantities plus any lump sum
items and such other quoted amounts as may enter into the cost
of the completed project will be consi.dered as the amount of
the bid.
Until the award of the contract is made by the Owner, the
right will be reserved to reject any or all proposals and
waive technicalities, to re-advertise for new proposals, or to
proceed with the work in any manner as maybe considered for
the best interest of the Owner.
C3-3.2 MINORITY BQSINESS ENTERPRISE/WOMEN-OWNED BUSINESS
' ENTERPRISE Cd�iPLIANGE: Contractor agrees to provide �o dwner,�
upon request, complete and accurate information regarding
actual work performed by a Minority Business Enterprise (MBE)
' and or a a Woman-owned Business Enterprise (WBE) on the
contract and the paycaent therefor. Contractor further agrees,
upon request by Owner, to allow and audit and/or an
examination of any books, records, or files in the possession
� of Contrac tor that will substantiate the actual work performed
by the MBE or WBE. Any material misrepresentation of any
nature will be grounds for termination of the contract and for
� initiating any action under appropriate federal, state or
,� local laws and ordinances relatfnq to Ealse statements;
further, any such misrepresentation may be qrounds for
� dfsqualification of Contractor at Owner's discretion for
bidding on future Contracts with the Owner for a period of
time of not less than six (6) months.
� comply3wit�h Curre tLC�ty Ordina cespro��ibitinc�discrimination
in employment practices. g
, �
�
�
; - •--...,�
� ��'� ��4' �J`��" �'�'���D
C3-3 (1) �^�!i,�%C��S"i;�,c���U
. . � c �_ . ,.�
651� �`�;v�v_?�6 �1���
new surety satisfactory to the Owner. No payment will�be made
under the contract until the new surety or sureties, as
required, have qualified and have been accepted by the Owner.
The contract shall not be operative nor will any paymen�s be
due or paid until approval of the bonds by the Owner.
C3-3.8 EXECUTION OF CONTRACT: Within ten (10) days after the
Owner has by appropriate resol�ution, or.otherwise, awarded the
contract, the Contractor shall execute and file with the Owner
the Contract and such bonds as may be required in the Contract
Documents.
No contract shall be binding upon the owner until it
attested by the City Secretary, approved as to
legality by the City Attorney, and executed for the
either the Mayor or City Manager.
� � -,
C3-3.9 FAILURE TO EXECUTE CONTRACT: The tailure of the
Awardee to execute the required bond or bonds or to sign the
required contract within ten (10) days after the contract is
awarded shall be considered by the Owner as an abandonment of
his proposal, and the Owner may annul the Award. By reason of
the uncertainty of the market prices of material and labor,
and it being impracticable and difficult to accurately
determine the amount of damages occuring to the Owner by
reason of said awardee's failure to execute said bonds and
contract within ten (10) days, the proposal security
accompanying the proposal shall be the agreed amount of
damages which Owner will suffer by reason of such failure on
the part of the Awardee and shall thereupon immediately be
forteited to the Owner.
The filing of a proposal will be considered as an acceptance
of this provision by the Bidder.
C3-3.10 BEGINNING WORR: The Contractor shall not commence
work until authorized�in writing to do so by the Owner.
Should the Contractor fail to commence work at the site of the
project within the time stipulated in the written
authorization usually termed the "Work Order" or "Proceed
Order", it is agreed that the Surety Company will, within ten
(10) days after the commencement date set forth in such
written authorization, commence the physical execution of the
contract.
C3-3.11 YNSUR NCE: The Contractor shall not commence work
under this con� ract until he has obtained all the insurance
required under the Contract Documents, and such insurance has
been approved by the Owner. The prime Contractor shall be
responsible for delivering to the Owner the sub-contractors'
';�-_ .,-:.,�,,:,,;� �?�L(�')�'�''��)
'';1'Ir''��� u� �- u -
�'�"'��'% �^r�i'`�C � r1�1�
'::1�� u �!s.: ���1n� u
�'. �"'i1j�',�� ��,
��• � ��p,
__ , __`_� .
C3-3 (4)
has been
form and
Owner by
;
,�
, �
,..
�
, .
bond shall guarantee the payment for all•labor,
� materials, equipment, supplies, and services used
-' in the construction o� the work, and shall remain
in full force and effect until provisions as above
'" stipulated are accomplished and final payment is
j�; made on the project by the City.
I
�
�
�
�
�
,
b. MAINTENANCE � BOND : A good and suf f icient
maintenance bond, in the amount of not less than
100 percent of the amount of the contract, as
evidenced by the proposal tabulation or otherwise,
guarante,eing the prompt, full and faithful
performance of the general guaranty which is set
forth in paragraph C8-8.10.
c. PAYMENT BOND: A good and sufficient payment bond,
in an amount not less than 100 percent of the
a mount of the contract, as evidenced by the
proposal tabulat'ion or otherwise, g�uaranteeing the
prompt; full and faithful paymen� of ..all claimants
as defined in Article 5160, Revised Civil Statutes
of Texas, 1925, as amended by House Bill 344 Acts
56th �Legislature, Regular Session; 1959, ef tective
April 27, 1959, and/or the latest version thereof,
supplying labor and materials in the prosecution of
the work provided for in the contract being
constructed under these specifications. Payment
Bond shall remain in force.until all payments as
above stipulated are made.
d. OTHER BONDS: Such other bonds. as may be required
by these Contract Documents shall be furnished by
the Contractor.
' No sureties will be accepted by the Owner which are at the
time in default or delinquent on any bonds or which are
interested in any litigation against the owner. Al1 bonds
shall be made on the forms furnished by the Owner and shall be
� executed by an approved surety company doing business in the
i City of Fort Worth, Texas, and which is acceptable to the
owner. In order to be ac.ceptable, the name of the surety
�+ shall be included on the current U.S. Treasury list of
� acceptable sureties, and the amount of bond.written by any one
acceptable company shall not exceed the amount shown on the
� Treasury list for that�company. Each bond shall be properly
executed by both the Contractor and Surety Company.
Should any surety on th
at any time by the Owner,
to that effect and the
�
e contract be determined unsatisfactory
notice will be gipen the Contractor
Contractor shall immediately prouide a
C3-3 (3)
�
M__.�
� . ;� �
� II � I S -.
,. �
�"1 � J��U��4 f,(�L /�IJ 1��1i
u " �� � �.'. �
�.: u� I �� ��",, �'�����;U(%'�%
��i�� f�;���`�:��o �'�o
5.
s.
Buil�er's risk (where above-qround stTr_tures
are involved).
Contractual Liability (covers all
indemnification requirements of Contract>,
d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY
DAMAGE: The Contractor shall procuze and maintain,
during the life o.E this Contract, Com�rehensive
Automobile Liability insurance in an amount not
less tha.n $250,000 for injuries including
accidental death to any one person and subject to
the same �limit for each pe�son an amount not les�
than $500,000 on account oF one accident, and
automobile property damage insurance in an amount
not less than $100,000.
e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The
insurancz required under the above�paragraph5 shall
provide adequate protection for the Contractor and
his sub-contractors, respectively, against damage
claims which may arise from operatio.ns under this
contract, whether such operations be by the insured
or by anyone directly or indirectly employed by
him, an3 also against any oF the following special
hazards which may be encountered in the performance
of the Contract.
f. PROOF OF CARRIAGE OF INSURANCE: The Contractor
shall furnish the Owner with sati�sfactory proof of
coverage by insurance required in these Contract
Documents in amounts and by c�rriers satisfactory
to the Owner. (Sample attached.) Al1 insurance
requirements made upon the Contractor shall apply
to the sub-contractor, should the Prime
Contractor's insurance not cover the
sub-contractor's work operations.
9. LOCAL AGENT FOR INSURANCE AND B(�NDING: The
insurance and bonding companies with whom the
C ontractor's insurance and performance, nayment,
maintenance and all such other bonds are written
shall be represented by an agent or agents having
an oEfice Located wi�hin the city limits of the
�[�����I�� G?�C�u?��
��� �������c��
(�; ��`���w,�����
C3-3 (6)
..
�
'
certificate of insurance for approval. The prime contractor
� shall indicate on the certificate of insurance inCludecl in the
, documents for execution whether or not his insurance covers
sub-contractors. It is the intention of �he Owner that the
�, insurance coverage required herein shall include the coverage
� of all sub-contractors.
�
�
�
� .
�
,
[�
�
IJ
�
�
a. COMPEN�SATION INSURANCE: The Contractor shall
maintain, during the life of this contract,
Workers' Compensation Insurance on all of his
employees,to be engaged in work on the project
under this contract, and for all sub-contractors.
In case any class of employees engaged in hazardous
work on the project under this contract is not
protected under the Workers' Compensation Statute,
the Contractor shall provide ad�quate employer's'
general liability insurance for the protection of
such of his employees not so protected.
b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The
Contractor shall procure and sh�ll maintain �during
the life of this contract Contractor's
Comprehensive General Liability Insurance (Public
Liability and Property Damage Insurance) in an
amount not less than .$500,000 covering each
occurrence on account of bodily injury, including
death, and in an amount not less than $500,000
covering each occurrence on account of property
damage with $2,000,000 umbrella policy coverage.
c. ADDITIONAL LIABILITY: The Contractor shall
furnish insurance as separate policies or by
additional endorsement to one of the
b
a ove-mentioned polfcies, and in the amount as set
forth for public liability and property damage, the
following insurance: �
1.
2.
3.
4.
Contingent Liability (covers General
Contractor's Liability £or acts of
sub-contractors).
Blasting, prior to any blasting being done.
Collapse of buildings or structures adjacent
to excavation (if excav ti�ns ara to be
performed adiacent to same�. � - '
Damage to underground utilities Eor $500,000.
C3-3 (5)
�_J
�
'':''i;-����r���a,if �����I�@
� r��� J�a��
�� �} . 4 ���
' U �i ��C�.,:�`� �� c
,;;
� . ,:�� `:"'�Jy 6?LSG�o
I. �, L.u<�W �,
J
-w
matter associated such as maintaining adequate and appropriate
insurance or security coverage tor the project. Such local
authority for administration of the work•under the Contract
shall be araintained until all business transactions executed
as part of the Contract are complete.
Should the Contr�ctor's.principal base of operations be other ^�
than in the Fort Wo.rth-t�allas metropolitan area, notiEication
of the Contractor's assignment oE local authority shall be �
mad� in writing to the Engineer in ad vance of any.work on the ,r
project, all appropriately signed and sealPd, as applicable,�
by the Contractor.'s responsible officers with the
understanding that this written assignment oE authority to a �
local repreaentative shall become part of the project Contract
as though �bound directly into the project documents. The �
intent of these requirements is that all matters associated
with tl�e Contractor's administration, whether it be oriented
in furthering the work, or other, be governed direct hy local �
autliority. This samP r.�quireinent is imposed on insurance an3 °��
surety coverage. Should the Contractor's local representative
fail to pP rform to the satisfaction of Engineer, the Engineer, "�
at his sole discretion, inay deinand that �such local
represeatative be r�placed and the Fngineer may, at his sole �
discretion, stop all work until a.new local authority
satisfactory to the Engineer is assigned. No credit of
working time will be for periods in which work stoppages are "'�
in effect For this reason.
C3-3.15 VENUE: Venue of any action hereinunder shall be
exclusively in Tarrant County, Texas. �
�
�
�
'
�
�
�
���(��G�C�,�, ��3��r}U`��`�;' C3-3 ( 8 )
Iu�7,�(p u"` (e'1 � ° �
1 V �i�.�U„�
�91���'C�'��9�° �
J
�❑
.A
�
�
City of Fort Worth, Tarrant County, Texas: Each
�' such agent shall be a duly qualified, one upon whom
�+ service of process may be had, and must have
authority and power to act on behalf ot the
� insurance and/or bonding company to negotiate and
settle with the City of Fort Worth, or any other
claimant, any claims that the City of Fort Worth or
� other claimant or any property owner who has been
damaged, may have against the Contractor,
insurance, and/or bonding company. If the local
insurance-representative is not so empowered by the
� insurance.or bonding companies, then such authority
� must be vested in a local agent or claims officer
residing in the Metroplex, the Fort Worth-Dallas
�* area. The name of the agent or agents shall be set�
� forth on all of such bonds and certificates of
insurance.
' C3-3.12 CONTRACTOR'S OBLIGATIONS,: Under the Contract, the
Contractor shall pay for all materials, labor and services
when due.
, C3-3.13 WEEKLY PAYROLL: A certified copy of each payroll
covering payment of wages to all person engaged in work on the
-� project at the site of the project shall be furnished to the
� Owner's representative within seven (7) days after the close
of each payroll period. A copy or copies of the applicable
minimum wage rates as set forth in the Contract Documents
1 shall be kept posted in a conspicuous place at the site of the
project at all times during the course of the Contract.
Copies of the wage rates will be furnished the Contractor, by
1 the Owner; however, posting and protection of the wage rates
shall be the responsibility of the Contractor.
� C3-3.14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor,
whether a person, persons, partnership, company, firm,
association, corporation or other who is approved to do
business with and enters into a contract with the City for
� construction of water and/or sanitary sewer facilities, will
. have or shall establish a fully operational business office
within the Fort Worth-Dallas metropolitan area. The
�^ Contractor shall charge, delegate, or assign this office (or
� he may delegate his Project Superintendent) with full
authority to transact all business actions required in the
' performance of the Contract. This local authority sh�all be
made responsible to act for the Contractor in all matters
pertaining to the work governed by the Contract whether it be
administrative or otherwise and as such shall be empowered,
W thus delegated and directed, to settle all material, labor or
, other expenditures, all claims against the work or any other
��
i
c3-3 c �� �!�����V�f G`_'l��'��D
!���' ��C��G�C����1�
��o �c��_���9 �-
waiving or invalidating any conditions or provisions oF the
Contract Docurnents.
Variations in quantitiPs of sanitary sewer pi es in
categories, shatl b� interpr�ted herein as a i d�p�h
overall quantitiPs or sanitar sewer PP Ying to the
hut not to the various depth ca egories,Pipe in each pipe size,
C4-4.4 ALTERATION OF CONTRACT DOCUMENTS; By Change Order, the
Owner reserves the right to make such changes in the Contract
Documents and in the- character or quantities of the work as
may be necessary or desirable to insure completion in the most
satisfactory manner, prvvided such changes do not materially
alter the original Contract Documents or change the general
nature oF the project as a whole. Such changes shall not be
considere3 as waiving or invalid.�ting any condition or
provision of the Contract Documents.
C4-4.5 EXTRA WORK: Additional work made necessary by clianges
and altPrations oE the Contract Documents or oE quantities or
for other reasons far which no prices ar� provided in the
Contract Documents, shall be defined as "Extra Wor.k" and shall
be performed by the Coatractor in accordance with these
�ontract Oocuments or approved additions thereto; provided,
however, that beEore any extra work is begun a"Change Order"
shall be �xecuted or written order issued by the Owner to do
the work f or payments or credits as shall be determined by one
or more combination of the Following m�thods:
a.
L�
Unit bid price previously approved.
An agreed lump sum,
c. The ac tual reasonable cost of (1) labor, (2) rental
of equipment used on the extra work for the time so
u�szd a.t :Associated General Contractors of� America
current eq�iipment rental rates; (3) materials
entering permanently into the project, and (4)
actual cost of insurance, bonds, and social
security as det�rmined by the Owner, plus a fixed
fee to be aqreed upon but not to exceed 10� of the
actual cost of such extra work. The Fixed fee is
not to include any additional profit to the
Contractor for rental of equipment owned tiy him and
used for the extra work. The fe:e shal,l be full and
compl�e"te compensation to cover the cosC of
superintendence, overhead, other profit, general
and.all othe.r expense not included.in (1), (2��
t3). and (4) above. The Contractor shall keep
ac�urate cost records on the form and in the method
��,f ,���f i�U� ;�"11 �G,�rG��Glj�� .
,�; i LSUc V✓ � ,
�\���,�� ����W ��� ,,��,-,�;
�o �a►;-��,19 �```;o ,
C4-4 (2)
�
�
�J
PART C - GENERAL CONDITIONS
C4-4 SCOPE OF WORK �
�
�
SECTION C4-4 SCOPE OF WORK
C4-4.1 INTENT OF CONTRACT DOCUMENTS: It is the detinite
� intention of these Contract Documents to provide �or a
complete, useful project which the Contractor undertakes to
construct.or furnish, all in full com.pliance with the
requirements and intent of the Contract�Documents. It is
definitely understood•that the Contractor shall do all work as
provided for in the Contract Documents,�shall do all extra or
special work as may be considered by the Osvner as necessary to
complete the project in a satisfactory and acceptable manner.
The Contractor shall, unless otherwise specifically stated in
these Contract Documents, furnish all labor, tools, materials,
machinery, equipment,�special services, and incidentals
necessary to the prosecution and completion ot the project.
�
r :
�
,
�
�
�
�
�
'
�
,
�
C4-4.2 SPEC I AL P ROVISIONS: Should any work or conditions
which are not thoroughly and satistactorily stipulated or
covered by General or Special Conditions of these Contract
Documents be anticipated, or should there be any additional
proposed work which is not covered by these Con�ract
Documents, then "Special Provisions" covering all such work
will be prepared by the Owner previous to the time of
receiving bids or proposals for such work and furnished to the
Bidder in the f orm of Addenda. All such "Special Provisions"
shall be considered to be a part of the Contract Documents
just as though they were originally written therein.
C4-4.3 IN�REASED OR DECREASED QUANTITIES: The Owner reserves
the right o alter the quantities of the work to be performed
or to extend_ or shorten the improvements�at any time when and
as Eound to be necess.ary, and�the Con.tractor shall perf orm the
work as altered, increased or decreased at the unit prices.
Such increased or decreased quantity shall not be more than 25
percent of the contemplated quantity of such item or items.
When such changes increase or decrease the original quantity
of any item or items of work to be done or materials to be
furnished by the 25 percent or more, then either party to the
contract s�hall upon written request to the other party be
entitled to a r,evised co.nsideration. upon that� portion at . the
wo�rk above or below the 25 p�ercent of the original quantity
stated in the proposal; such revised consideration to be
determined by special agreement or as hereinafter provided for
"Extra Work." No allowance will be made for any changes in
anticipated profits nor shall such changes be considered as
� ; '����'G���L� �'� �!�'rc'''! ��
c4—a c i � �� �� ���C�[��''-�G���� .
� �,
. �l�c VU�:/ DJ�UIIP U17��:0
shall be presented also a composite graph showing the
anticipated progr�ss of construction with the time being
plotted horizontally and the percentage oF completion plotted
vertically. The progress charts shall be prepared on 8-1/2n X
11" sheets and at least Five black or blue line prints shall
be furnished to the Owner. �
C4-4.7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT
FACILITIES: �ithin ten (10) aays prior to suamission of
first monthly progress payment, the Contractor shall
prepare and submit to the Owner For approval six copies of
the schedule in which the Contractor proposes to carry on
the work, the 3ate of�which he will start the several major
activities (including procurement of materials, nlans, and
equipment) and the contemplated dates for completing the
same. The schedule shall be in the form of a time schedule
Critical Path Method (CPM) n�twork diagram. As the work
progresses, the Contractor shall enter on the diagram the
actual progress at the end of each pa.rtial payment period
or at such intervals as directed by the Engineer. The
Contractor shall also revise the schedule to reElec� any
adjustments in contract time approved by the.Engineer.
Three copies of the updated schedule shall be delivered at
such intervals as dir�cted by the Owner.
As a minimum, the construction schedulp shall incorporate
all work elements and activities indicated in the proposal
and in the technical speciFications.
Prior to the final draFting oP the detailed construction
schedulP, the Contractor shall review the draft schedule
with the Engineer to ensure the Contractor's understanding
of the contract requirements.
The following guidelines shall be adhered to in preparing
the construction schedule:
3. Milestone dates and final project completion
dates shall be developed to conP�rm to time
constraiats, sequencing requirements and
completion time.
b. The construction process shall be divided into
activities with time durations of approximately
f ourteen (14) days and construction values not to
exceed $50,000. Fabrication, delivery and
submittal activities are exceptions to this
guideline.
' !�!���'�Gt4:� G��'G'JG'��;
�w V q. �� �15�� �� uv�+ e1 �l
(�o � � ���, 4[��0 __,
C4-4 (4)
�
�
'
suggested by the Owner and shall give the Owner
�q access to all accounts, bills, vouchers, and
� records relatfng to the Extra Work. .
No "Change Order" shall become effective until it has been
approved and signed by each of the Contracting parties.
No claim for Extra Work of any kind will be allowed unless
, ordered in writing by the Owner. In case any orders or
instructions, either oral or written, appear to the Contractor
to involve Extra Work for which he should receive
� compensation, he shall make written request to the Engineer
for written orders authorizin.g such Extra Work, prior to
' beginning such work.
.�
Should a difference arise as to what does or does not'
� constitute Extra Work, or as to the payment thereof, and the
Engineer insists upon its performance, the Contractor shall
� proceed with the work after making wr�itten request f or wri�ten
orders and shall keep an accurate account of the actual
reasonable, cost thereof as provided under method (Item C).
Claims for extra work will not be paid unless the Contractor
� shall file his claim with the Owner within five (5) days
before the time for making the first estimate after such work
is done and unless the claim is supported by satisfactory
� vouchers and certified payrolls covering all labor and
�+ � materials expended upon the said Extra Work.
� The Contractor shall furnish the Owner such installation
records of all deviations from the original Contract Documents
as may be necessary to enab.le the Owner to prepare for
� permanent record a corrected set of plans showing the actual
installation.
� The compensation agreed upon�for 'extra work' whether or not
' iniitiated by a'change order' shall be a full, complete and
final payment for all costs Contractor incurs as a result or
relating to the change or extra work, whether said costs are
� known, unknown, foreseen or unforeseen at that time, including
without limitation, any costs for delay, extended overhead,
� ripple or impact cost, or any other effect on changed or
,� unchanged work as a result or the change or extra work.
� C4-4.6 SCHEDU � OF OPER TIONS: Before commencing any work
under this con�ract, the �ontractor shall submit to the�Owner
' and receive the Owner's approval thereof, a"Schedule of
Operations," showing by a straight line methQd the date of
commencing arid finishing each of the major elements of the
contract. There shall be also shown.the estimated monthly
� cost of work for which estimates are to be expected. There
�
�
�
��
C4-4 ( 3) c� r�� e� �
U��OL��� �.�L �l�C .
�� D� ���; ���a��,i�
[� ���G��I�� ��%Z�
�
�
.�
9. Operata.onal testing.
10. Final fnspection.
0
If, in the opinion of the Owner, work accomplished falls �
behind that scheduled, the Contractor shall take such .,
action as necessary to improve his progress. In addition,
the Owner may require the Contractor to submit a revised �•,
schedule demonstrating his program and proposed plan to '
make up lag in scheduled progress and to insure completion "�
of the work within the contract time. If the Owner finds
the proposed plan ciot acceptable, he may require the �
Contractor to increase the work force, the construction �.-:
plant and equipment, the number of work shifts or the
over:time operations without additional cost to the Owner. ' -
Failure of the Contractor to comply with these requirements �
shall be considered grounds for determination by the Owner
that the Contractor is failing to prosecute the work with �
such diligence as will insure its completion within the
time specified.
�
��
�
��
�
'
�
�
_ ; , . -.
=���:i�:�� �. �.� U:'���C�G'���
'': � . � C4-4 ( 6 )
�� 4�Ur ���k� u� � c u!
I C��: C������� l� ���Q ���
,..,i
�
�p
a.,
�
�
..
�
�
�
��
�
�
CJ
'
'
�
�
�
�
c. Durations shall be in calenda�r days and normal
holidays and weather conditions over the duration
of the contract shall be accounted for within the
duration of each activity.
e. Float time is defined as the amount of time
between the earliest start date and the latest
start date' of a chain of activities of the CPM
construction schedule. Float time is not for the
exclusive use or benefit of either the Contractor
or the Owner.
d. One critical path shall be shown on the
construction schedule.
f. Thirty days shall be used for submittal review
unless otherwise specified.
The construction schedule shall as a minimum be divided
into general categories as indicated in the Proposal and
Technical Specif'ications and each general category shall be
broken down into activities in enough detail to achieve
activities of approximately fourteen (14) days duration.
For each general category, the construction schedule shall
identify all trades or subcontracts.whose work is
represented by activities that follow'the guidelines of
this Section.
For each of the trades or subcontracts, the construction
schedule shall indicate the following procurements,
construction and preacceptance activities and events in
their logical sequence for equipment and materials.
1.
2.
3.
4.
5.
6.
7.
8.
Preparation and transmittal of submittals.
Submittal review periods.
Shop fabrication and delivery.
Erection or installation.
Transmittal of manufacturer's operation and
maintenance instructions.
Installed equipment and materials testing.
Owner�s operator instruction (if applicable).
Final inspection.
C4-4 (5)
1
� � ��D� ��4�_�� G�� ���D ,
'G��'�S��G°�s "G`�1�
; _ (�e o °���a 1��,
,
. � � r •
r`�` ����� `tSeJ
�tit
� � ,,:A�������� ���p ��
,1'r �'�,",�;��� 1�'��:�������i
� `;�' :'. �:.- ,. a .: ' '
C5-5.3 COORDINATION OF CONTRACT DOCUMENTS: -fine �ontract "
Documents are made up of several sections, which, taken
together, are intended to describe and provide tor a comPlete
� and useful project, and any requirements appearing in one oF
the sections is as binding as though it occurred in all
sections. In case of discrepancies, figured dimension shall
�. govern over scaled dimensions, plans shall govern over
specifications, special conditions shall govern over general
conditions and standard specifications, and quantities shown
on the plans shall govern over those shown in the proposal.
The Contractor shall not take advantage of any apparent error
ir.. or omission�in the Contract Documents, and the Owner shall be
permitted to make such corrections or interpretations as may
be deemed necessary for the fulfillment of the intent of the
� Contract Documents. In the event the Contractor discovers an
apparent error or discrepancy, he shall immediately call this �
� cond�ition to the attention of the Engineer. In the event of a
conflict in the drawings, specifications, or other portions of
the Contract Documents which were not reported prior to the
award of Contract, the Contractor shall be deemed to have
�"` quoted the most expensive resolution of the conflict.
C5-5.4 COOPERATION OF CONTRACTOR: The Contractor will be
furnished with three sets of the Contract Documents and shall
� have available on the site of the project at all times one set
of such Contract Documents.
�
��
.w
The Contract shall give to the work the constant attention
necessary to facilitate the progress thereof and shall
cooperate with the Engineer, his inspector, and other
Contractors in every possible way.
The Contractor shall at all times have competent personnel
available to the project site for proper performance of the
work. The Contractor shall provide and maintain $t all times
at the site of the project a competent, English-speaking
superintendent and an assistant who are fully authorized to
act�as the Contractor's agent on the work. Such
superintendent and his assistant shall be capable of reading
and understanding the Contract Documents and shall receive and
fulfill instructions from the Owner, the Engineer, or his
authorized representatives. Pursuant to this responsibility
of the Contractor, the Contractor shall designate in writing
to the project superintendent, to act as the Contractor's
agent on the work. Such assistant project superintendent
shall be a resident of Tarrant County, Texas and shall be
subject to call, as is the project Superintendent, at any time
of the day or night on any day ot the week on which the
Engineer determines that circumstances requfre the presence on
the project site of a represen�ative of the Contractor to
C5-5 (2)
�
,
a N� � ,�'�I ` _ _\;iPil sl�r'I .
�IL�.'Yi.:,. � I
%4% r'.J�
__ . ��j(�V�S�JU,'2JJ � �i����i
,:��.,
0���,�,� ��4�;r �.; �, �
�
�
PART C - GENERAL COND�ITIONS
C5-5 CONTROL OF WORR AND '
MATE1tIALS
SECTION C5-5 CONTROL OF WORR AND MATERIALS
C5-5.1 AUTHORITY OF ENGINEER: The work shall be performed to
the satisfac�ion of the Engineer and in strict oompliance with
the Contract Do.cuments. He shall decide all questions which
arise as to the qaality and acceptability of materials
furnished, work�performed, rate of progress of the work,
overall sequence of the construction, interpretation of the
Contract Documents, acceptable fulfillment of the contract,
compensation, mutual rights between Contractor and Owner under
these Contract Documents, supervision oF the work, resumption
of operations, and all other questions or disputes which may
arise. Engineer will not be responsible for Contractor's
means, methods, techniques, sequences or procedures of
construction, or the safety precaution and prog�ams incident
thereto, and he Will not be responsible Eor Contractor's
failure to perform the work in accordance with the contract
documents. �
He shall determine the amount and quality of the work
completed and materials turnished, and his decisions and
estimates shall be fina'. His estimates in such event shall
be a condition to the right of the Contractor to receive money
due him under the Contract. The Owner shall have executive
authority to enforce and make effective such necessary
decisions and orders as the Contractor fails to carry out
promptly. �
In the event of any dispute between the Engineer and
Contractor over the decfsion of the Engineer on any such
matters, the Engineer must, within a reasonable time, upon
written request of the Contractor, render and deliver to both
the Owner and Contractor, a written decision on the matter in
controversy.
C5-5.2 CO �FORMITY WITH PLANS: The finished project in all
cases shall confor.m with li�nes, grades, cross-sections,
finish, and dimensions shown on the plans or any other
requirements otherwise �described in the Contract Documents.
Any deviation from �he approved Contract Documents required by
the Engineer during construction will in all cases be
determined by the Engineer and authorized by the Owner by
Change Order.
C5-5 (1)
�
�
s
�
�'"'
Th
.. � ' ,�� � U U���� ��/u u�' e� �
%�a a���;;�� J �� �-�'
������±����,q ��B��G�S�'^�i .
ese stakes or markings shall be set sufficiently in advance
of conatruction operations to avoid delay. Such stakes or
markings as may be established For the Co�ntractor's use or
guidance shall be preserved by the Contractor until he is
authorized by the Engineer to remove them. Whenever, in the
opinion of the Engineer, any stakes or markings have been
carelessly or willfully destroyed, disturbed, or removed by
the Contractor or any of his employees, �he full cost of
replacing such stakes or marks plus 25� will be charged
against the Contractor, and the full amount will.be deduc�ed
from payment due the Contractor.
�
CS-5.8 AUTHORITY AND DUTIES OF CITY INSPECTORS: City
� Inspectors will be authorized to inspect all work done and to
be done and all materials furnished. Such inspection may
extend to all or any part of the work, and the preparation or
� manufacturing of the ma�erials to be used or equipment to be
installed. A City Inspector may be stationed on the work to
report to the Engineer as to the progress of the work and the
manner in which it is being perFormed, to report any evidence
� that the materials being furnished or the work being performed
by the Contractor fails to fulfill the requirements of the
. Contract Documents, and to call the attention of the
�-, Contractor to any such failure or other inf�ingements. Such
inspection or lack of inspection will not relieve �he
Contractor from any obligation to perform the work in
accordance with the requirements of the Contract Documents.
In case of any dispute arising between the Contractor and the
� City Inspector as to the materials or equipment furnished or
the manner of performing the work, the City Inspector will
have authority to reject materials or equipment to suspend
� work until the question at issue can be referred to and be
decided by the Engineer.. The City Inspector will not,
�, however, be authorized to revoke, alter, enlarge, or release
at�y requirement of.these Contract.Documents, nor to approve or
accept any portion or section of the work, nor to issue any
instruc�ions contrary to the requirements of the Contract
Documents. He will in no case act as superintendent or
�,,,, f oreman or perform any other duties for the Contractor, or
intertere with the management or operation of the work. He
�, will not accept from the Contractor any compensation in any
form for performing any duties. The Contractor shall regard
and obey the directions and instructions of the City Inspector
or Engineer when the same are consistent with the obligations
�' of the Contract Documents, provided, however, should the
Contractor object to any orders or instructions of the City
Inspector, the Contractor may within six days make written
appeal to the Engineer for his decision on the matter in
controversy.
r.
C5-5 (4)
u
�
'
���� aC��:. .,=v��� �.� _
��a:��1�1..�� �'�1.,
;+ �a � (a -„�i r�� � I -J�
I(��� ri"�ij�151?� j�i��;1;' ����i
. _ _ �. .: �i � . �. _ . �
adequately provide for the safety or convenience-of the
traveling public or the owners of property across which the
project extends or the safety of property.contiguous to the
project routing.
The Contrac tor shl�ll provide alI facilities to enable the
Engineer and his linspector to examine and inspec� the
workmanship and mate�rials entering into the work.
C5-5.5 EMERGENC Y AND/OR RECTIFICATION WORR: When, in the
opinion of the Own r. or Engineer, a condition oE emergency
exists related to a�y part of the work, the Contractor, or the
Contractor throughlhis designated representative, shall
respond with dis t h t
�
,
L�
�
�
�
,
pa � o a verbal request made by the Owner or
Engineer to alleviate the emergency condition. Such a� �
response shall occur day or night, whether the projec� is �„
scheduled on a calendar-day or on a working-day basis.
Should the Contractor fail to respond to a request fro�n the
Engineer to recti y any discrepancies, omissions, or
corrections necessa�ry to conform with the requirements of the
project specificatio�hs or plans, the Engineer shall .give the
Contractor written notice that such work or changes are to be
performed. The written notice shall direct attention to the
discrepant conditian and request the Contractor to take
remedial action to correct the condition. In the.event the
Contractor does ncit take positive steps to fulFill this
written request, orldoes not show just cause f or not taking
the proper action, within 24 hours, the City may take such
remedial action wit�h City forces or by contract. The City
shall then deduct ar� amount equal to the entire costs for such
remedial action, plus 25$, from any funds due the Contractor
on the project. I
C5-5.6 FIELD OFFICI: The Contractor shall provide, at no
extra compensation, �n adequate field office for use of the
Engineer, if specifically called For. The field office shall
be not less than 10 by 14 feet in floor area, substantially
constructed, well �heated, air conditioned, lighted, and
weather-proof, so that documents will not be damaged by the
elements.
C5-5.7 CONSTRy TIONISTAKE : The City, through its Engineer,
will furnish t�e Colntrac��or with all � lines, grades., and
measurements necess�ry to the proper prosecution and control
of the work contracted for under these Contract Documents, and
lines, grades and measurements will be established by means of
stakes or other customary method of marking as may be found
consistent with good practice.
C5-5 (3)
iri
�
CS-5.9 INSPECTION: The Contr3ctor shall furnish the Engine�r
� with every reasonable f�cility For ascertaining whether or not
the work as performed is in accor3ance with �he requirements
oF the Contract Documents. If the Engineer so reque�te, the
Contractor shall, at any time beEorz acceQ�ance oE the work,
resnove or uncovzr. such portion of th� finishPd work as may bP
� 3irected. After �xamination, the Contractor shall restore
said portions of the work to the standard required by �he
r` Contr.act �ocumpnts.
Should the wor�c exposed or exa►nined prove acc�eptahle, the
� uncovPring or rexnoving an3 replacing of the cov�ring or making
good of the par+�s remov�d shall be paid for as �xtra work, hut
sl�o�ild be w�rk so expo�ed or �xamined prove to be
u:�acceptable, the unc�vering or removing and the replacing oE,
all adjacent defective or damage3 parts shall.be a� thP
� Contrac tor's expense. No wozk shalt be.done or mat.erials used
without suit�ble supervisi�n or inspection
�
�
�
�
�
�
'
C5-5.10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work,
materials, or equipment which has beea rejectcd 5ha11 be
r�medied or r�rnoved and rzplaced i� an accept3ble manner by
the �ontractor at his own expense. W�rk donz beyond the lines
and grades given or as shown �n the plans, Pxcent as herein
speciFically provided, or any Extra �Iork_ done without written
authority, wi.11 be considere3 as unautho�ized and done at the
expense o£ the Contractor and will not bP paid For by the
Owner. Work so done may be ordered removed at the
Contractor's expense, U�on thP failure on �he part o� the
Contractoc to comply with any or3er oF the Fngineer mad� under
the provisions of this paragraph, the Engineer will have the
authority t� cause defective work to be r�medied or reinoved
an3 re�laced and unauth�rized work to be removed, and th'e cost
tllP ceof may be deducted Erom any anoney due or to become ,due to
the�Contractor. Failure to require the removal qf any
def��ctive or unauthorized work shall not constitute acc�ptance
of such works. �
C5-5.11 SUBSTITUTE MATERIALS OR EQUIPMENT: I�f the
Specifications, law, ordinaneP, r.odes or regulations permit
Contractor to Eurnish or use a substitute that is equal to any
material or equipment specified, anc� if Cont�actor wishes to
f urnish or us� a proposed substitute, he shall, prior to the
preconstruction conFerence, make written apptication to
ENGINEER f or approval of such substitute certifying in writing
th�t the proposed substitute will perEorm adequately the
functions called f�r by the general design, be similar and of
equal substance to that speciFied and be suited to the same
use and capable of per�orming the same fur�ction as that
specifie�3; and identifying all vari�tions oE the proposed
J
� r'J � 5 � CJ � �v���U���/!',S ���� V��
�� �
'V �� �1�,'� G'�'���
u uo r�/'�'(_L�J� ���n
substitute Erom that speciEied and indicating ay.ailable
maintenance service. No substitute shall be ordered or
instaltpd without the written approval of Engineer who will be
the judge of the equality and may require ConL-ractor to
F.urnish such other data about the proposed substitute as h�
considers pertinent. No substitute shall be ordered
install?d without such performance guarantee and bonds or
Owner. may require which shall be turnished at Contrac�oras
expense. Contractor shall ind�mniFy and hold harmless Owner
and Engineer and anyone directly or indirec�ly employed b
either oF them from and ag�inst t�e claims, dama �� y
and expenses (including attorneys fees> arising out QE the Sus�
of substituted mat�rials or equipment,
C5-5.12 SAMPLES AND TESTS OR MATERIALS: Where, in the opinion
of the Engineer, or as called for in the Contract Documents,
tests of materials or equipment are necessary, such tests will
be made at the expense of and paid for direct to the testing
agency by the Owner unless otherwise specifically Provid2d.
The failure oF ttie Owner to make any tests �f materials shalt
be in no way relieve the Contractor oF his responsibility of
furnishing materials and eqsipment fully conforming to the
requirements of the Contract Docume.nts. Tests and sampling of
materials; unl�s5 otherwise spe�.i.Eied, will be made in
accordance with the latest methods prescribed by the American
Society Por Tes�ing Mat?rials or speciFic requirements ot the
Owner. The Contractor shall provide such facilities as the
Engineer may require for colle�ting and forwarding samples and
shall not, without s�ecific written permission of the
Engineer, use the cnaterials represented by the samples until
tests hav� been made and the materials approved for use. The
Contractor will furnish adequat� samples without charge to the
Owner.
In case ot concrete, the aggregates, design--minimum, and the
mixing and transporting equipment shall be approved by the
Fngineer before any concrete is placed, and the Contactor
shall be responsible for re�lacing any concrete which does not
mzet the requirements of the Contract Oocuments. Tests shall
be made at least 9 days prior to the placing of concrete,
using s�mples from the same aggregate, cement, and mortar
which are to be usPd later in �he concrPte. Should the source
of supply �hange, new tests shall be madP prior to �he use oF
the new materials.
CS-5.13 STORAGE OF MATERIALS: All materials which are to be
used in the construction operation shall be stored so as to
insure the preservation of the quality and fitness oP the work.
When directed by the Engineer, they shall b� placed on wooden
platforms or other hard, clean durable surfaces and not on the
u���'G��� 6?�C��G� c;
� �� c����.�� � °( J
�a ���1�� °� �b!/�a .
C5-5 (6)
Z• Not i Ey each cus tome r personally throuqh
responsible personnel as to time and schedule
�f the interruption o£ their service, or
3• In the event that personal Rotification of a
customer cannot be made, a prepared tag form
shall be attached to the customer's entzance
door knob. The tag sha11 be durable in
composition, and in large bold tyQe sha11 say•
"NOTICE"
Due to Utility Iinprovem�nt in
your neighborhood, your (water)
(sew�r> service will be inter-
rupted on between
the hours of and
This inconvenience will be as
short as possible.
Thank you,.
Contractor
Address Phone
�
Emerqenc�; In the event that an unf�reseen service
interruption occurs, notice shall be as above,but
immed.i�te.
C5-5.16 MUTUAL RESPONSIBILITY OF CONTRACTORS: If, through
acts or neglect on the part of the Contractor, any other
Contractor or any sub-contr�ctor shall suffer loss or damage
on the work, the Contractor agrees to settle with such othe.r
Con�.r�ctor or sub-contractor by agreement or arbitration.. If
such other Contractor or�sub-contractor shall assert any claim
against the Owner on account of any damage alleged to have
been sustained, the Owner will notify the Cont.ractor, who
shall indemnif y and save harmless the Owner against any such
claim.
CS-5.17 CLEAN-UP: Clean-up of surplus and%or waste materials
accumulated on th� job site during the prosecution of the work
under these Contract Documents shall be accomplished in
keeping with a da.ily rout�ine establisheci. to the t�he �
satisfaction of the Engineer. Twenty-fours fours after
written notice i� given to the Contractor �hat the clean-up on
the job sit�� is proceeding in a manner unsatisEactory to the
Engineer, if the Contractor fails to correct the
C5-5 (8)
- �„�� � � i�,}(��r�JG��
. � � � i���i��U'���;Q�;i�� u���5.� � � . . � � �
. �����li ������ ° ��� � � . .
. � �a:�G��b4 ���: � � �
�
'
� ground, and shall
materials shall b
'~' prompt inspection.
be placed under cover when directed.� Stored
e placed and located so as to facilitate
�� C5-5.14 EXISTING STRUCTURES AND UTILITIES: The location and
dimensions shown on the P�ans relative to existing utilities
are based on the best information available. Omission from, or
1 the inclusion of utility loca�ions on the Plans is not to be
considered as the nonexistenc-e of, or a definite location of,
existing uncierground utilities. The location of many qas
� mains, water mains,•conduits, sewer lines and service lines
for all utilities, etc., is unknown to the Owner, and the
�' Owner assumes no respons-ibility for failure to show any or all
such structures and utilities on the plans or to show them in
`� their exac t location. It is mutually agreed that such failure,
� will not be considered sufficient basis for claims for
additional compensation for Extra Work or for increasing the
� pay quantities in any manner whatsoever, unless an obstruction
encountered is such as to necessitate changes in the lines and
grades of considerable magnitude or requires the building of
' special works, provision for which is not made in the Contract
Documents, in which case the provision in these Contract
Documents for Extra Work sha11 apPly.
� It shall be the Contractors responsibility to verify locations
of adjacent and/or conflicting utilities sufficiently in
advance of construction in order that he may negotiate such
local adjustments as necessary in the construction process to
' provide adequate clearances. The Contractor shall take all
necessary precautions in order to protect all existing
utilities, structures and service lin�es. Verification of
' �existing utilities, stru�tures and service lines shall include
notiEication of all utility companies �t least forty eight
(48) hours in advance of�construction including exploratory
' excavatiion� if nec�essary. All verifi�cati:on of existing
utilities and their adjustment shall be considered as
subsidiary work.
� �5-5.15 INTERRUPTION OF SERVICE:
.
a. Normal Prosecution: In the normal
�� work where the interruption of service
�the Contractor, at leas t 24 hours in
be required to: .
,
1
1
prosectuion of
is necessary,
advance, shall
1. Notify the Water Department's Distribution
Division as to location, time, and schedule of
service interrup�ion.
C5-5 (�7 )
1 .
,r�����Of��Q� ���� CJ �'�
���: ���'�' �L���G°?��1� .
��; �`'^'��:`��� �f�
.,�� �
�
�
'
unsatisfactory procedure, the City may take such direct action
� as the Engineer deems appropriate to correct the clean-up
�• deficiencies cited to the Contractor in the Written notice,
and the costs of such direct action, plus 25� of such costs,
� shall be deducted from monies due or to become due to the
Contractor.
, Upon the completion of the project as a whole as covered by
these Contract Documents, and before final acceptance and
final payment will be made, the Contractor shall clean and
remove from the site of the project all surplus and discarded
� materials, temporary�structures, and debris of every kind. He
. shall leave the si�e of all work in a neat and orderly
condition equal to that which originally existed. Surplus and
� waste materials removed from the site of the work shall be
� disposed of at locations satisf actory to the Engineer. The
Contractor shall thoroughly clean all equipment and materials
installed by him and shall deliver over such materials and
' equipment in a bright, clean, polished and new appearing
condition. No extra compensation will be made to the
Contractor for any clean-up required on the project.
,, C5-5.18 FINAL INSPECTION: Whenever the work provided for in
and contemplated under the Contract Documents has been
� satisfactorily completed and final cleanup performed, the
�, Engineer will noti£y the proper officials of the Owner and
request that the Final inspection be made. Such inspection
will be made within 10 days after such notification. After
� such final inspection, if the work and materials and equipment
are found satisfactory, the Contractor will be notified in
writing of the acceptance of the same after the proper
' resolution has been passed by the City Council. No time
charge will be made agai�st the Contractor between said date
of notification of the Engineer and the date of final
, inspection of the work.
'
1
,
��
�
�
C5-5 (9) . �
������G�i�G ���C��D ,
�D�r ��� ��'��aG��
I� a� ���,��� R�?�
�
C6-6.4 SANITARY PROVISIQNS: The Contractor shall establish �
and enforce among his employees such regulations in regard to �
cleanliness and disposal of garbage an3 waste as will tend �o
prevent the inception and spread of infectious or contagious
diseases and to effectively prevent the creation ot a nuisance
about the work on any property either public or pri,vate, and
such regulations as are required by Law shall be put into �
immediate force and ePfect�by the Contractor. The necessary
sanitary conveniences for use of laborers on �he work, �
properly secluded from public observation, shall be
constructed and maintained by the Contractor and their use
shall be strictly enforced by the�Contractor. All such �
Eacilities shall be kept in a clean and sanitary condition,
free from objectionable odors so as not to cause a nuisance. , ��
All sanitary laws and regulations of the State ot Texas and
the �'ity shall be strictly complied with. F
C6-6.5 PUBLIC SAFETY AND CONVENIENCE: Materials or equipment
stored about the work shall be so placed and used, and the
work shall at all times be so conducted, as to cause no
greater obstruction or inconvenience to the public than is
considered to be absolutely necessary by the Engineer. The
Contractor is required to maintain at all times all phases of
his work in such a manner as not to impair the safety or
convenience of the public, including, but �ot limited to, safe
and convenient ingress and egress to property contiguous to
the work area. The Contractor shall make adequate provisions
to render reasonable ingress and egress for normal vehicular
traffic, except during actual trenching or pipe installation
operations, at all driveway crossings. Such provisions may
include bridging, placement oF crushed stone or gravel or such
other means of providing.proper ingress and egress for the
property served by the driveway as the Engineer may approve as
appr.opriate. Such other means.may include the diversion oF ��
driveway traffic, with specific approval by the Engineer. If
diversion of traffic is approved by the Engineer at any
locat'ion, the Contractor shall make arrangements satisfactory
to the Engineer at any location, the Contractor shall make
arrangements satisfactory to the Engineer for the diversion of
traffic, and shall, at his own expense, provide al1 materials
and perform all work �ecessary For the construction and
maintenance of roadways and bridges for such diversion of
trafFic. Sidewalks must not be obstructed except by special
permission of the Engineer.
�
�
-,
�
The materials excavated and the construction materials such as
pipe used in the constructfon of the work shall be placed so �
as not to endanger the work or prevent free access to all fire
hydrants, fire alarm boxes, police call boxes, water valves,
�
C6-6 (2)
r-,, ; �,;�,.�,�;s;�� �����°��
v��; �� U ���':;G?� ' °�
� p Uo UU`/�'�Uily tll7�V. —��,
�
'
,..
�
'
PART C - GENERAL CONDITIODiS
C6-6 LEGAL RELATIONS AND PUBLIC
RESPONSIBILITY
� SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY
C6-6.1 LAWS TO BE OBSERVED: The Contractor shall at �all times
� observe and comply with�all Federal and State Laws and City
ordinances and regulations which in any way affect the conduct
of the work or his o�erations, and shall observe and comply
� with all orders, laws, ordinances and regulations which exist
or which may be enacted later by bodies having jurisdiction or
"� authority for such enactment. No plea of misunderstanding or
ignorance thereof will be considered. The Contractor and his
� Sureties shall indemnify and save harmless the City and all of
�i its officers, agents, and employees against any and all claims
or liability arising from or based on the violation of any
� such law, ordinance, regulation, or order, whether it be by
himself or his employees.
C6-6.2 PERMITS AND LICENSES: The Contractor shall procure aIl
permits and licenses, pay�all charges, costs and fees, and
give all notices necessary and incident to the due and lawful
prosecution of the work.
�I C6-6.3 PATENTED DEVICES MATERIALS AND PRO�ES�SES: If the
Contractor is required or c�esires to use any esign, device,
, material, or process covered by letter, patent, or copyright,
he shall provide for such use by suitable legal agreement with
the patentee or owner of such patent, letter, or copyrighted
, design. It is mutually.agreed and understood that without
exception the contract prices shall include all royalties or
cost arising from patents, trade-marks, and copy rights in any
way involved in the work. The Contractor and his sureties
' shall indemnify and save harmless the Owner from any and all
claims for infringement by reason of the use of any such
patented design, device, material or process, or any
� trade-mark or copy right in connection with the work agreed to
� be performed under these Contract Documents, and shall
indemniEy the Owner for any cost, expense, or damage which it
may be obliged to pay by reason of such inFringement at any
�' time during the prosecution of the work or a£ter completion of
�l the work, provided, however, that the Owner will assume the
responsibility to defend any and all suits brought for the
� infringement of any patent claimed to be infringed upon by the
design, typ e of construction or material or equipment
specified in the Contract Documents furnished the Contractor
� by the Owner, and to hold the Contractor harmless on account
of such suits.
�
�
�
'.,;,?���I��C�� ��C�'G0 n° D
C6-6 (1 ) .. . � �, � �,UI�� f
� � ��r r
�� � ����.��[�qQ�
������
� �, )��
��, , ��,;a�±� �j;�M
�Li�vblfU� . �SiNo
carried on in such manner as no� to interfere with the
operation oE trains, loading or unloading oE cars, e�c. Other
contractors of the Owner may, for all purposes required by the
contract, enter upon the work and premises used by the
Contractor and shall be provided all reasonable facilities and
assistance for the completion of adjoining work. An
additiona 1 grounds desired by the Contractor for his use shall
be provided by him at his own cost and expense. '
C6-6.7 RAILWAY CROSSINGS,: When the work encroaches upon any
right-of-way of any railway, the City will secure the
necessary easement for the work. Where the railway tracks are
to be crossed, tne Contractor shall observe all the
regulations and instructions o£ the railway company as to the
methods of performing the work and take all precautions for
safety of p rop erty and the public. Negotiations with the
railway companies for permits shall be done by and through the
City. The Contractor shall give the City notice not less than
five days prior to the time of his intentions to begin work on
that portion of the project which is related to the railway
properties. The Contractor will not be given extra or
additional compensation for such railway crossings unless
specifically set forth in the Contract Documents.
C6-6.8 BARRICADES, WARNINGS AND WATCHMEN: Where the work is
carried on in or adjacent to any street, alley, or public
place, the Contractor shall at his own expense furnish, erect,
and maintain such barricades, fences, lights and danger
signals, shall provide such watchmen, and shall take all such
other precautionary measures for the protection of persons or
property and of the work as are necessary. Barricades and
fences shall be painted in a color that will be visible at
night. From sunset to sunrise the Contractor shall furnish
and maintain at least one easily visible burning light at each
barricade. A sufficient numbery.of barricades shall be erected
and unaintained to keep pedestrians away from, and vehicles
tro�i being driven on or into, any work under construction or
being maintained. The Contractor shall furnish watchmen and
keep them at their respective assignments in sufficient
numbers to protect the work and prevent accident or damage.
All installations and procedures shall be consistent with the
provisions set forth in the "1980 Texas Manual on Uniform
Traffic Con trol Devices for Streets and Highways" issued under
the authority of the "State of Texas Uniform Act Regulating
Traffic on Hig hways", codified as Article 6701d Veron's Civil
Statutes, pertinent sections being Section Nos. 27, 29, 30�and
31.
^ ^ } � � c�� C6-6 ( 4 )
��C�[�4�cdC�� �C��.� �
Cn ti� �������ti
�a � °�N�o�f�� _
�.,
�
'
gas valves, or manholes in the vicinity. The Owner reserves
� the right to remedy any neglect on the part of the Contractor
�+ as regards to public convenience and safety whicli may come to
its attention, after twenty-four hours notice in wri�fng to
the Contractor, save in cases oE emergency when it shall have
the right to remedy any neglect without notice, and in either
case, the cost of such work done or materials furnished by the
� Owner or by the City shall be deducted from monies due or to
become due to the Contractor.
�, The Contractor, after approval o� the Engineer, shall notify
, the Fire Department Headquarters, Traffic Engineer, and Police
�' Department, when any street or a�ley is requested to be closed
or obstructed or any fire hydrant is to be made inaccessible,
"� and, when so directed by the Engineer, shall keep any street,
� streets, or highways in condition for unobstructed use by fire
apparatus. The Contractor shall promptly no�ify the Fire
' Department Headquarters when all such obstructed streets,
alleys, or hydrants are again placed ba�ck in service.
,
�
,
'
�
�
'
Where the Contractor is required to construct temporary
bridges�or make other arrangements f or crossing over ditches
or streams, his responsibility for accidents in connection
with such crossings shall include the roadway approaches as
well as the structures of such crossings.
The Contractor shall at all times conduct his operation and
the use of construction machinery so as t�ot to damage or
destroy trees and shrubs located in close proximity to or on
the site of the work. Wherever any such damage may be done,
the Contractor shall immediately satisfy all claims of
property owners, and no payment will be made by the Owner in
settlement of such claims.. The Contractor shall file with the
Engineer a written statement showing all such claims adjusted.
C6-6.6 PRIj�ILEGES OF CONTRACTOR IN STREETS. AT.�,,EYS, AND
RIGHT-O�-injAY: For the performance of �he���co�ntract, the
Contractor will be permitted to use and occupy such portions
of the public streets and alleys, or.other public places or
other rights-of-way as provided for in the ordinances of the
City, as shown in the Contract Documents, or as may be
specifically authorized in writing by the Engineer. A
reasonable amount of tools, materials, and equipment Eor
construction purposes may be stored in such space, but no more
than is necessary to avoid delay in the construction
operations. Excavated and waste materials shall be piled or
stacked in such a way as not to interfere with the use of
spaces that may be designated to be left free and unobstructed
and so as not to inconvenience occupants of adjacent property.
If the stree t is occupied by railway tracks, the work shall be
C 6- 6 ( 3) ���,L�U;��� 0%� �i2��1 c�D
6 15 U
�;' ��� y% C� �,v �C���17
,-: � �.C�
� ��i(«S�M 7rsM
advance oF the use of any activity which might damag� or
endanger their or his property along or adjacent to the work.
Where the use of explosives is to be permitted on the project,
as specified in the Special Contract Documents, or the use of
explosives is requested, the Con�ractor shall submit no�ice �o
the Engineer in writing twenty-Eour hours prior to' commencing
and shall f urnish evidence that he has insurance coverage �o
protect against any damages and/or injuries arising out oE
such us� of explosives.
All claims arising out oE the use oE explosives shall be
investigated and a written report made by the Contractor's
insurers to the Engineer within ten (10) days after receipt of
writ�en notice oP the claim to the Contractor from eitner the,
City or the clai�ant. The City shall proceed to give notice
to the Contractor of any such claim. The use of explosives
may be suspended by the Engineer if any complaiRt is received
and such use shall not be resumed until the cause of the
complaint has been addressed. '
Whenever explosives are stored or kept, they shall be stored
in a safe and secure manner and all st�rage places shall be
plainly marked "DANGEROUS EXPLOSIVES" and.shall be under the
care of a competent watchman at all times. All vehicles in
which explosives are being transported shall be plainly marked
as mentioned above and shall, insofar as possible, not use
heavy traPfic routes.
C6-6.10 WORK WITHIN EASEMENTS: Where the work passes over,
through, or into private proper�y, the Owner will provide such
right-oF-way or easement privileges as the City may dePcn
necessary for the prosecution of the work. .Any additional
rights-of-way or work area considered necessary by the
Contractor shall be provided by him at his own expense. Such
+additional rights-of-way or work area shall be acquired for
the benefit of the City. The City shall be notified in
wri-ting as to the rights so acquired before work begins in the
affected area. The Contractor shall not enter upon private
property for any purpose without having previously obtained
permission from the owner of such property. The Contractor
will not be allowed to store equipment or material on private
property unless and until the specified approval oE the
property owne.r `�as been secured in writing by the Contractor
and a copy furnished to the Engineer. Unless specifically
provided otherwise, the Contractor �hall clear all
rights-of-way or easements oE obstructions which must be
removed to make possible proper prosecution of the v�ork. as a
part of the project construction operations. The Contractor
shall be responsible for the preservation oE and shall use
��"n.�t�S I� ;������ �''�C����� C6-6 ( 6 )
v���j �l J�u
�� ��'ti ��C��G1 ° �°1�
�C �j�,�Y UQ �L�/v,/ '` .
���
'
�
� The Contractor will not remove any regulatory�sign,
instructional sign, street name sign, or other sign which has
' been erected by the City. If it is determined that a sign
must be removed to permft required construction, the
�' Contractor shall contact the Transportation and Public Works
� depa=tment, Signs and Markings Division (phone number
8780-8075), to remove the sign. In the case of r•egulatory
� signs, the Contractor must replace the permanent sign wi.th a
temporary sign meeting the requirements of the above
referenced manual and such temporary sign must be installed
� prior to the removal' of the permanent sign. If the temporary
sign is not installed correctly or if it does not meet the
�' � required specif ications, the permanent sign shall be left in
place until the temporary sign requirements are met. When
"'' construction work is completed to the extent that the
� permanent sign can be re-installed, ttie Contractor shall again
contact the Signs and Markings Division to re-install the
, permanent sign and shall leave his temporary sign fn place
until such re-installation is completed.
� The Contractor will be held responsible for all damage to the
work or the public due to failure of barricades, signs,
fences, lights, or watchmen to protect them. Whenever
evidence is found of such damage to the work the Engi:neer may
1 order the damaged portion immediately removed and replaced by
the Contractor at the Contractor's own expense. The
Contractor's responsibility for the maintenance of barricades,
' signs, fences and lights, and for providing watchmen shall not
cease until the project shall have been completed and accepted
by the Owner.
INo compensation, except as specifically provided in these
Contract Documents, will�be paid to the Contractor for the
� work and materials involved in the constructing, providing,
, and maintaining o£ barricades, signs, fences, and lights or
f or salaries of watchmen, for the subsequent removal and
disposal ot such barricades, signs, or for any other
� incidentals necessary for the proper protection, safety, and
convenience of the public during the contract period, as this
� work is considered to be subsidiary to the several items for
��
which unit or lump sum prices are requested in the Proposal.
� C6-6.9 USE OF EXPLOSIVE , DROP WEIGHT� ETC.: Should the
Contractor elect to use exp�dsives, arop weight, etc., in the
' prosecution of the work, the utmost care shall be exercised at
all times so as not to endanger life or property. The
Contractor shall notiEy the proper representative of any
public service corporatfon, any company, individual, or
� utility, and the Owner, not less than twenty-four hours in
�
.,�
�
'
�::��C�����@� ����u�D .
C6-6 (5)
'^�t' r l\���.su`J��Y
v � C
C �;/15 n
G� ��a : = � ��.� �
n _. , .���o
�
proposal. ThereFore, no separate payment shalt be all�owed '�
for any service associated with this wor�.
In case of Eailure on the part of the Contractor to restore
such property to make good 5uch damage or injury, the Owner
may, upon 48 hour written notice under ordinary circumstances,
and without notice when a nuisance or hazardous condition
results, groceed to repair, rebuild, �r otherwise restore such
pronerty as may be dete.rmined by the Owner to be necessary,
and the cos t thPraby wi 1.t be deduci�ed from any monies due or
to become due to the Contractor under this Contract.
C6-6.11 INDEPENDENT CONTRACTOR: It is understood and agr�ed �
by the �a.rties ti�reto that Contractor shall perform all work
and services hereuader as an independent con�ractor, and n�t� J
as an afEicer, agent, servant or employee of the Owner.
Coatr.�ctor shall have exclusiv� control of and the exclusive
right to control the details of all the work and services ''
performed hereunder, and all persons performing same, �nd
shall be solely responsible Eor the acts and omissions of its �
oPficers, agents, servants, employees, contrac�ors,
subcontractors, license�s and invitees. The�doctrine of
respondeat superior shall not apply as between Owner and
�ontracto.r, its officers, agents, emnloyees, contractors and �
subcontractors, and not'ning her�in shall be construed as
creating a partnership or joint en�erprise between Owner and
Contractor. �
C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: �
Contrac�or covenants and agrees to, and does hereby indemnify, T*
hold harmless and defend Owner, its oEficers, agents,
servants, and employees from and against any an all claims or
suits for property damag� or loss and/or personal i�njury,
including death, to any and all persons, of whatsoever kind or
character, whe ther real or asserted, arising out of or in �
conne�ction with,.directly.or indirectly, the work and services
to be perf or med�hereunder by Contractor, fts officers, agen�s,
employees, contractors, subcont.ractors, licensees or invitees, �
whether or not caused, in whole or in part, by alleged
negligence on the part of officers, agents, servants, ,,,,
e�nployees, c ontractors, subcontractors, licensees and invitees
of the Owner; and said Contractor does hereby covenant and
agree to assume all liability and responsibility of Owner, its
ofFicers agents, servants and employ�es for property damage�or `
loss, and/or personal injuries, including death, to any and �
all p.ersons of whatsoever° kind or ctiaracter, wtiether real or
asserted, �rising out of or.in coanection with, directly or
indirectly, the work and services to be perPormed.hereunder bY �
Contractor, its officers, agents employees, contractors,
subcontractors, licensees and invitees, whether or no� caused,
_ ^� _
�;',,�(�i}�:;��:i.��U'���UU1� . C6-6 (�81 . . ... .
..' fC�`u �"�"�C'�`�`'� ' � �
'��. �U �� G���ln 4�. -
. �
.,
r
'
every precaution to prevent damage to all trees, shrabbery,
�! plants, lawns, fences, culverts, curbing, and all other types
�, of structures or improvements, to all water, sewer, and gas
lines, to all conduits, overhead pole lines, or appurtenances
•, thereoF, including the construction of temporary fences, and
� to all other public or private property along adjacent to the
work.
� The Contractor shall notify the proper representatives of
own�rs or occupants of public or private lands or interest in
lands which might be� affected by the work. Such notice shall
�q be made at least 48 hours in advance oF the beginning of the
� work. Notices shall be a��licable to both public and private
utility companies or any corporation, company, individual, or
�. other, either as owners or occupants, whose land or interest
� in land might affected by the work. The Contractor shall be
responsible for all damage or injury to property o£ any
character resulting from any act, omission, neglect, or
' misconduct in the manner or method or execution of �he work,
or at any time due to defective work, material, or equipment.
,
,
�
When and where any direct or indirect or injury is done to
public or private property�on account oF any act, omission,
neglect, or misconduct in the execution of the work, or in
consequence of the non-execution thereof on the part of the
Contractor, he shall restore or have restored at his own cost
and expense such property to a condition at least equal to
that existing be£ore such damage or injury was done, by
repairing, rebuilding, or otherwise replacing and restoring as
may be directed by the Owner, or he shall make good such
damages or injury in a manner acceptable to the owner of the
property and the Engineer.
All fences encountered and removed during construction of
this project shall be restored to the original or a better
than original condition upon completion of this_project.
When wire fencing, either wire mesh or barbed wire is to be
c rossed, the Contractor shall set cross braced posts on
either side of permanent easement bef ore the fence is cut.
Should additional fence cuts be necessary, the Contractor
shall provide cross braceci posts at poi,nt oE the proposed
cut in addition to the cross braced posts p.rovided a� the
permanent easements limits, before the fence is cuti�.
Temporary f encing shall be erected in place of th
' removed whenever the work is not in progress and
site is vacated overnight, and/or.at all times t
livestock £rom entering �he construction area. The
1 fence removal, temporary closures and replacement
subsidiary to the various it ems bid in the
'
'
C6-6 ( 7 )
: fencing
when the
� prevent
cos t f or
shall be
project
0 -- ^ n . ^
:: �(�������� �`��U��
., �
�'� ;�j Ur r r d�,�/
� r,����.`„�1�US U
rt^ : �
�rt; ��,;� �,�: �iTG� � ��
� u�,;i. u. i c' ,
�
expiration of the six month period the Dirzctor may recommend
that final payment be made if a11 other work has been
performed and all other obliga�ions of the Contractor have �
been met to �he satisfaction o� the Oirector.
The Dir�c tor may, if he de�m� it appropriate, rePuse to accept
bids on other Water Department Con�ract work Erom a�ontractor
against whom a claim for damages is outstanding as a result of
work p�rformed under a City contract.
C6-6.13 CONTRACTOR'S CLAIM FOR DAMAGES: Should the �ontractor
claim compensation for any alleged damage by reason of the
acts or omissions of the Owner, he shall within �hree days
after the actual sustaining of such alleged da►nagP, make a
written statement to the Engineer, setting out in detail the�
nature of t.he alleged damage, and on or beFore the 25th day oF
the month succeeding that in which any such damage is claimed
to have been sustainPd, the Contractor shall file with the
Engineer an itemized statement oE the details and amount oP
such alleged damage and, upon request, shall give the Engineer
access to all books oE account, receipts, vouchprs, bills of
lading, and other books or papPrs containing any� evidence as
to th.e amount of such all?ged damag�. Unless such statemen�s
shall be filed as hereinabove required, the Contractor's claim
f or compensation shall be waived, and he shall not be entitled
to payment on account of such dacnages.
C6-6.14 ADJUSTMENT OR RELOCATION OF PUBLIC UTILITIES� ETC.:
In case it is necessary to change, move, or altsr in any
manner the property of a public utility or others, the said
p.roperty shall not be moved or interfer_ed with until orders
thereupon have been issued by the Engineer. The right is
reserved to the owners oE public utilities to enter the
geographical limits of the Contract for the purpose of making
such.changes or repairs to their property th�t may be
necessary by the performance of .this contract.
C6-6.15 TEMPORARY SEWER AND DRAIN CONNECTIONS: When existing
sewer lines have to be taken up or removed, the Contractor
shall, at his own expense and cost, provide and maintain
�e�nporary outlets and connect�ions For all private or public
3rains and sewers. The Contractor shall also take care of a11
sewage and drainage which will be received from these drains
and sewers, and F.or this purnose he sha11 provide and
maintain, a� his own cost and expensP, adequate p,umping
facilities and�temporary outlets�or diversions.
The Contractor, at his own cost and expense, shall construct
such troughs, pipes, or other structures necessary, and be
prepared at all times to dispose of drainage and sewage
_ ,, � �,�,.
�. �,.`'; n O� .��� I�
�,�,i����d�`��Ol�:r�� �?[��C�'��.�,
u
'.> ����f �� ��`�� 6 ����
.. ,�o �'uG'��q ��� :
C6-6 (10)
�.
r
�
in whole or in part, by alleged negligence of ofFicers,
� agents, servants, employees, contractors, subcontractors,
� licensees or invitees of the Owner. Co�ntractor likewise
covenants and agrees to, and does hereby, indemnify and hold
,,,,� harmless Owner from and against any and all injuries,loss or
� damages to property of the Owner during the performance of any
of the terms and conditions of this Contract, whether arising
out of or in connection with or resul.ting from, in whole or in
� part, any and all alleged acts or omissions of o£ficers,
agents, servants, employees, contractors, subcontractors,
licenses, or invitees .of the Owner.
�
�
�
,
1
�
In the event a written claim for damages against the
contractor or its subcontractors remains unsettled at the time
all work on the project has been completed to the satistaction
of the Director of the Water Department, as evidenced by a
f inal inspection, final payment to the Contractor sl�all not be
recommended by the Director of the Wa�er�Department tor a
period of 30 days after the date ot such Final inspection,
unless the Contractor shall submit written evidence
satisfactory to the Director that the claim has been set�led
and a release has been obtained from the claimant involved.
If the claim concerned remains unsettled as of the expiration
of the above 30-day period, the Contractor may be deemed to be
entitl.ed to a semi-tinal payment for work completed, such
semi-final payment to be in an amount equal to the total
dollar amount then due less the dollar value of any written
claims pending against the Contractor arising out of the
perFormance of such work, and such semi-final payment may then
be recommended by the Director.
The Director shall not recommend final payment to a Contraetor
against whom such a claini Eor damages is outstanding for a
period of six months following the date of the acceptance oE
the work performed unless the Contractor submits e.vidence in
writing satisfactory to the Director that:
1.
2.
The claim has been settled and a release has been
obtained from the claimant involved, or
Good faith efforts have been made to settle such
outstanding claims, and such good faith e.fforts
have tailed.
� If condition (1) above is met at any time with,in the six month
period, the Director shall recommend that the Final payment to
the Contractor be made. If condi�tion (2) above is met a� any
� time within the six month period, the Director may recommend
that the final payment to the Contractor be made. At the
'
,
C6-6 (9)
- -�, ^ � ��O.G'D
!""U�irU'L��'�' U`_'��0 D
������� �- ����-� c�c����
�o � V`_'���a i���
thereoF by action of the elements or from any cause
whatsoever, whether arising from the execution or nonexecution
ot the work. The Contractor shall rebuild, repair, restore,
and make good at his own expense all injuries or damage to any
portion of the work occasioned by any of the hereinabove
causes.
C6-6.19 NO WAIVER OF LEGAL RIGHTS: Inspection by the Engineer
or any order by the Owner by paym�nt of money or any payment
for or acceptance of any work, or any extension of time, or
any possession taken by the Ci�y shall not operate as a waiver
of any provision of the Contract Documents. Any waiver ot any
breach or Contract shall not be held to.be a waiver of any
other or subsequent breach.
The Owner reserves the right to correct any error that may be
discovered in any estima�e that may have been paid and to
adjust the same to meet the requirements of th�e Contract
Documents.
C6-6.20 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In carrying
out the provisions of these Contract Documen�s or in
exercising any power of authority granted thereunder, there
shall be no liability upon the authorized representatives of
the Owner, either personally or otherwise as they are agents
and representatives of the City.
C6-6.21 STATE SALES TAX; On a contract awarded by the City ot
Fort Worth, an organization which qualifies for exemption
pursuant the provisions of Article 20.04 (H) of the Texas
Limited Sales, excise, and Use Tax Act, the Contractor may
purchase, rent or lease all materials, supplies and equipment
used or consumed in the_performance of this contract by
issuing to his supplier an exemption certificate in lieu of
the tax, said exemption certificate to comply with State
Comptroller's Ruling .007. Any such exemption c�rtificate
issued by the Contractor in� lieu of. tiie tax shall� be subject
to and shall comply with the provisions of State Comptroller's
Ruling .011, and any other applicable State Comptroller
rulings pertaining to the Texas Limited Sales, Excise, and Use
Tax Act.
On a contrac t awarded by a developer for the construction of a
publicly-owned imp.rovement in a street right-of-way or other
easement wh�ich has been dedieated to the public and the City
of Fort Wor�h, an organization.which qualiF�ies for.exemption
pursuant to the provisions of Article 20.04 (H) of the Texas
limited Sales, Excise, and Use Tax Act, the Contractor can
probabTy be exempted in the same manner s�ated above.
_ �����������:d G?�C��G�D .
� ;'�,��v ����u °�C��G�^� ,
��'�lo U�1v�'UWo u�. �
C6-6 (12)
�
�
�
�
�
■�
'
received from these temporary connections until such times as
the permanent connections are built and are in service. The
existing sewers and connections shall be kept in service and
maintained under the Contract, except when specified or
ordered to be abandoned by the Engineer. All water, sewage,
and other waste shall be disposed of in a satisf actory manner
so that no nuisance is created and so that the work under
construction will be adequately protected.
C6-6.16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE
CZTY: Wh�n the Contrac�or desires to use City water in
connection with any.construction work, he shall make complete
and satisfactory arrangements with the Fort Worth City Wa�er
Department for so doing.
City water Eurnished to the Contractor shall be delivered to
the Contractor from a connection on an existing City main.
Al1 piping required beyond the point oE delivery shall be
installed by the Contractor at his own expense.
The Contractor's responsibility in the use of all existing
� fire hydrant and/or valves is detailed in Section E2-1.2 USE
,� OF FIRE HYDRANTS AND VALVES in these General Contract
Documents.
,
,
When meters are used �o measure the water, the charges, if
any, for water will be at the regular established rates. When
meters are not used, the charges, if any, will be as
prescribed by the City Ordinance, or where no ordinance
applies, payment shall be made on estimates and rates
established by the Director of the Fort Worth Water
Department.
C6-6.17 IISE OF A SECTION OR PORTION OF THE WORK: Whenever, in
' the opinion of the Engineer, any section or portion of the
work or any structure is in suitable condit�ion, it may be put
into use upon the written order of the Engineer, and such
usage shall not be held to be in any way an acceptance of said
� work or structure or any part thereof or as a waiver of any of
. the provisions of these Contract Documents. AIl necessary
repairs and removals of any section of the work so put into
� use, due to def ective materials or workmanship, equipment, or
� to deficient operations on the part of the Contractor, shall
be performed by the Contractor at his own expense.
� C6-6.18 CONTRACTOR'S RESPONSIBILITY FOR THE WORR: Until
written acceptance by the Owner as provided For f.n t.hese
Contract Documents, the work�shall be under the charge and
� care oE the Contractor, and he shall take every necessary
precaution to prevent injur.y or damage to the�work or any part
�
�
C6-6 (11)
i"�''��'''U'� i y i j'i�r�� ''If �'I,, Ir'.'
�'' I�� V �: LL'.!� L�_L:����,''v'�U��)
�
� '� ° �'u' ��''"G����1� . .
n��-;,,.::,��;� �[��a
��. �� .. ,
.�......,:�_ .
�
1
,a
�
�
�
�
�
'
,
,
'
'
�
,
1
1
'
L.r
L
Limited Sale, Excise and Use Tax permits and information can
be obtained from:
Comptroller oE Public Accounts
Sale Tax Division
Capitol Sta�ion
Austin, TX
C6-6 (13)
r"i�"��1�',����, r'J�i�(J�� ,
_�v
';T.q (N�(� ^-fp��
U
1,'� ,I'�1�J'} fP��Uf
c �
,.� C'L<✓U�u:�'UUsU
�
;=i;' I����..����i ��
�� �', u�: L 6`U, �� '.
�
PART C - GENERAL CONDIT•IONS
C7-7 PROSECUTION AND PROGRESS
SECTION C7-7 PROSECUTION AND PROGRESS:
�.�
�
C7-7.1 SUBLETTING: The Contractor shall perform with his own m
organization, and with the assistance of workman under his
immediate superintendance, work of a value of not less than "'"'
fifty (50$) percent of the value embraced in the contract. If
the Contractor sublets any part of the work to be done under �
these Contract Documents, he will not under any circumstances
be relieved of the responsibility and obligation assumed under
these Contract Documents. Al1 transactions oE the Engineer, "�
will be with the Contractor. Subcontractors will be a,,i
considered only in the capacity ot employees or workmen ot the
Contractor and shall be subject to the same requirements as to
character and competency. The Owner will not recognise any ��
subcontractor on the work. The Contractor shall at all times,
when the work is in operation, be represented either in person
or by a superintendent or other designated representatives. '�'
C7-7.2 ASSIGNMENT OF CONTRACT: The Contractor shall not
assign, transfer, sublet, convey, or otherwise dispose of the
contract or his rights, title, or interest in or to the same
or any part thereof without the previous consent ot the Owner
expressed by resolution of the City Council and concurred in
by the Sureties.
If the Contractor does, without such previous consent, assign,
transfer, sublet, convey, br otherwise dispose of the contract "'1
or his right, title, or interest therein or any part thereof, ;�,
to any person or persons; partnership, company, firm, or
corporation, or does by bankruptcy, voluntary or involuntary, �
or by assignment under the insolvency laws of any state,
attempt to dispose of the contract may, at the option of the `�
Owner be revoked and annulled, unless the Sureties shall
successfully complete said contract, and in the event of any �
such revocation or annulment, any monies due or to become due
under or by virtue of said contract shall be retained by the
Owner as liquidated damages f or the reason that it wvuld be �
impracticable and extremely difficult to fix the actual
damages.
C7-7.3 PROSECUTION OF THE WORK: Prior to beginning any �
construction operation, the Contractor shall submit to the �
Engineer in five or more copies, if requested by the Engineer,
a progress schedule preferably in chart or diagram form, or a �
brief outlining in detail and step by step the manner of
c�—� ci� j�\
��y����U� G�G� � G�C��G��,� �C� � i
.sl�l I!! C�L��'U?�tl��U��U
��i!a �'JG'��lo l�l�0 1
�
'
,
�
�
'
�
�
1
�rosecuting the work and ordering materials and equipment �,.
which he expects to follow in order to complet� �he pro;ject in �
the scheduled time. There shall also be submitted a table oF
estimated amounts to be earned by the Contractor during each
monthly estimat� period.
�
The Contractor shall commeace the work to be performed under.
this contract within the time limit stated in these Contract
Documents and sliall conduct the work in a continuous manner
and with su.fficient equipment, ma�erials, and labor as is
necessary to insure its compl�tion within the time limit.
The sequence requested of all construction operations shall be
at all times as specified in the Special Contract O�cuments,
Any:deviation from scuh sequencing shall be submitted to �ne
Engineer for his approval. Contracto.r shall not
any:,deviation until he has raceived written a �roceed with
Engineer. Such specification or a PProval from the
shall not relieve the Con�ractor fromrthe f 11 r sp nsib lity
of the complete performance of the Conrract.
The contract time may be
C7-7.8 "Extension of Time
and a progress schedule
contract time.
changed only as set fortli in Section
of Completion" of this Agreement,
shall not constitute a change in the
C7-7.4 LIMITATIONS OF OPERATIONS: The working operations
' shall at a11 times be conducted by the Contractor so as �o
create a minimum amount of inconvenience to the public: At
any time when, in the judgment of the Engineer, the Contractor
has obstructed or closed or is carrying on operations in a
� portion of a street or public way greater than is necessary
Eor the proper execution of the work, the Engineer may require
the Contractor to finish the section on which operations are
� in progress beEore the work is commenced on any additional
� section or street.
..
�
�
�
L.�
'
C7-7.:5 CHARACTER OF WORKMEN AND EQ UIPMENT: Local labor shall
be used by the Contractor is available. The Contractor may
bring in f rom outside the City oF Fort Worth his key men and
his superintendent. A11 otlier workmen, i.ncluding equipment
operators, may be importeci only after the loc�l supply is
exh�usted. The Contractor shall employ only such
supPrintenden�s, foremen, and workmen who are careful,
competent, and fully quali�ied to pertor�n the duties or tasks
assigned to them, and the Engine�r may demand and secure the
summary dismissal oP any person or persons employed by the
Contractor in or about or on the work who, in the opinion oE
the Owner, shall misconduct himself or be Eound to be
incompetent, disrespectful, intemperate, dishones�, or
C7-7 ( 2 ) �������lr�l� ���l�V�;�
� ��V �[�'� �[�G��
� ��o �"��r���r ��.
�
�
*
�
�
�
'
�
�
�
�
�_
�
�
C7-7.7 TIME OF COMMENCEMENT AND COMPLETION: The Contractor
shall commence the working operations within the
speci f ied in the Contract Documents and set forth in the � 1 me
Order. Failure to do so shall be considered by �he Owner �as
abandonment of the Contract by the Contractor and the Owner
may proceed as he sees fit.
The Contractor shall main�ain a rate of progress such as will
insure that the whole work will be perFormed and the premises
cleaned up in accordance with the Contract Documents and
within the time establishPd in such documents and such
extension of time as may be properly authorized by the Owner.
C7-7.8 EXTENSION OF TIME COMPLETION: The Contractor's request
for an extension of time of completion shall be considered
only when the request for such extension is submitted in
writing to the Engineer within seven days from and after the
time alleged cause oE delay shall have occurred. Should an
extension of the time of completion be requested such request
will be forwarded to the City Council for approval .
In adjusting the contract time tor completion ot work,
consideration will be given to untorseeable causes $eyond the
control of and without the fault or negligence of the
Contractor, including but limited to acts of the public enemy,
acts of the Owner, fire, flood, tornadoes, epidemics,
quarantine restrictions, strikes, freight embargoes, or delays
of sub-contractors due to such causes.
When the date oF completion is based on a calendar day bid, a
request for extension of time because of inclement weather
will not be considered. A request for extension of time due
to inability to obtain supplies and materials will be
considered only when a review of the Contractor's purchase
order dates and other pertinent data as requested by the
Engi�eer indicates that the Contractor has made a bonafide
attempt to secure delivery on schedule: This shall include
effor�s to obtain the supplies and materials from alternate
sources in case the first source cannot make delivery.
If satisfactory execution and completion of the contract
should require work and materials in grea�er amounts or
quantities than those set forth in the approved Contract
Documents, then the contract time may be increased by Change
Order.
C7-7.9 DELAYS: T�he Contractor shall receive no compensation
for delays or �hindrances to the work, except when direct and
unavoidable extra cost to the Contractor is caused by the
failure of the City to provide intormation or material, if
C7-7 (4)
_ _:,
U����O�� ����NJ�`�'
�0'� ��'�G?��QG?��
�0 11YI77l�JV'��Wy U�W
.�
otherwise objectionable or neglect�ul in the proper
performance of his or their duties, or who neglects or refuses
to comply with or carry out the directions o� the Owner, and
s�ich person or persons shatl not be employed again �hereon
without written consent oP the Engineer.
All workme.n shall have sufficient skill, abi�.ity, and
experience to properly perform the work assigned to them and
opera�? any ?quipment necessary to properly carry out the
perCormancP oF the assigned duties.
The Contrac tor shall.furnish and maintain on the work a11 sucli
equipcaent as is considered to be necessary for prosecu�ion of
the work in an acceptablP manner and at a satisfactory rate of
progress. All equipment, tools, and machinery used Por
handlfng matArials and executing any part ot the work shall be
subject to the approval �F the Engineer and shall bF
maintained in a satisfactory, safe and efficient working
condition. Equi�ment on any portion oF the work shall be such
that no injury to the work, workmen or adjacent property will
result from its use.
C7-7.6 WORK SCHEDULE: Elapse3 working days shall be computed
starting with the fi�st day of work complated as defiaed in
C1-1.23 "�vVORKING DAY" or the date stipulated in the "WORK
OR�ER" Por beginning work, whichever comes Eirst.
Nothing in these Contract Aocu�nents shall be construed as
prohibiting the Contractor from working on Saturday, Sunday o.r
Legal Holidays, providing that the Fotlowing requirements are
met:
a. A request to work on a specific
Legal Holiday must be madP to the
than the proceeding Thursday.
Saturday, Sunday or �
Engineer no later
b• Any work to be done �n the project on such a
speciEic 8aturday, Sunday or Legal Holiday must be,
in the opinion o.E the Engineer, essential to the
timely completion of the project.
The Engineer's decision shall be final in response to such a
request for approval �o work on a specific Saturday, Sunday or
Legal Holiday, and no extra compensation shall be allowed to
the.Contractor Por any work per�ormed on such a specific
Saturday, Sunday or Legal Holiday.
Calendar Days shall be deFined in C1-1.24 and the Contractor
may work as he so desires.
. ^'�� �Q .
,i. ,, ,, ��� p
c�—� � 3 � � '� ��'�(����r��;.�s �� .��G�D �.
� ,�.����r �r����.G� �s G1� �
�.�� C � �
. � �� ���� �� �_��N�q �[� �
0
�
'
�
r.
�
,
1
,
�.
0
b. Substanti�t evidence that progress of the work
� operations by Contractor is insufPicienE �o
complete the work within the speciFied time.
c. Failure of the Contractor to �rovide and maintain
sufEicient labor and equipment to properly execute
the working operations.
d. Substantial evidence that the Contractor has
abandoned the work.
e. Substantial evidence that the Contractor has become
insolvent or bankrupt, or otherwise financially
unab.le to carry on the work satisfactorily.
� f• FailurP on the part oF the Contractor to observe�
any requirertents of the Contract Documents or �o
R comply with any orders given by the Engineer or
, Owner provided for in these Contract Documents.
�, g. Failare of the Contractor promptly to make good any
defect in materials or w�rkmanship, or. any defects
�' o.E any nature the correction of which has been
directed in writing by the Engineer or the Owner.
�
h. Substantial evidence of collusion for the purpose
of illegally procuring a contract or perpetrating
�raud on the City in the construction of work under
contract.
i• A substantial indic3tion that the Contr.�ct�r has
made an unauthorized assignment o� the contract or
any f unds due theref rom f or the benef it of any
credit�r or for any other purpose.
�^
0
]• If the Contractor shall for any cause whatsoever
.. not carry on the working operation in an acceptable
manner.
� k- If the Cont.ractor commences legal action against
� the Owner.
� A copy of the suspension order or action of the �:ity Council
shall be served on the Contractor's Sureties. When work is
suspended Eor any cause or causes, or when the contract is
� cancelled,.the Contractor shall discontinue the work or such
. p�rt thereof as the Owner shall designate, whereupon the
Sureties may, at their option, assume the contract or that
portion ther�oF which the Owner has ordere.d �he Contractor to
� discontinue, and may perEorm the same or may, with the written
' �7-7 (8)
. . �� U�����G�� ����VU��
� � �� ° ' Q�
� .,�� ���.G?�
_ .. . . . ` (��io �� �;��C�➢ �f��o
� � � �
that construction may be resumed. Such reimbursement shall be
based on actual cost to the Contractor of moving the equipment
and no protit will be allowed. .
No reimbursement shalt be allow�d if_ the equipment is mov�d to
another construction Qroject for the City of Fort �orth.
The Contractor shall not suspend work without written notice
fr_om the Engineer and shall proceed with �he work operations
prornptly when notified by the Engineer to so resume
operations. � �
�7-7.13 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY:
�lhenever, because of National Ftnergency, so declared by the
President oE the United States or other lawful authority, it
becomes impossible for the Contractor to obtain all oP the
necessary labor, materials, and equipment for the �rosecution
oF the work with reasonable continuity Eor a pariod of two
months, the Contractor shall within seven days notify the City
in writing, giving a detailed statement oE the efforts which
have been mad� and listing all necessary items o� labor,
materials, anci equipment not obtainable. . If, after
investigations, the Owner finds that such conditions existing
and that the inability oE the Contractor to proceed is not
attributable in whole or in part to the fault or neglect of
the Contract, then i� the Owner cannot af ter reasonable effort
assist �he Contractor in procuring and making available the
nec�ssary labor, materials and equipment withi�; thirty days,
the Contrac tor may request the Owner to terminatp the contract
and the Ownzr may comply witlz the request, and the termination
shall be conditioned and based ��pon a Einal settlement
mutually acceptable to both thz Owner and the Contractor and
final payment shall be made in accordance with the �erms of
the agr�ed settlement, which shatl include, but not be limited
l:o, the p3yment for all work executed but no anticipated
pro�fits on work which has not been performed. ..
C7-7.14 SUSPENSION OR ABANDOj� MENT OF THE WORK AND ANNT1[�MENT OF
CONTRACT; The work operations�on all or any portion or
section of the work under Contract shall be suspended
immediately on written order oE the Engineer or the Co�ntract
may be d�cl�red cancelled by the City Council for any good and
sufficient cause. The following, by way of example, but not
oE limitation, may be considered g.r�unds for suspe,nsion o.c
cancellatioa:
a. .F�ilure of the Contractor to commence work
operations within the time �specified in the Work
Order issued by the Owner.
� ��: ������ Ol�� G'��'�'���
��—� c � � . �; ��`tif ���'�G?C�GiG?"�
L �a UV ��}IC��UU9 �Uu�e
�
�
$ 500,001 to
$1,000,001 to
$2,000,001 and over
$1,000,000
$2,000,000
inclusive $ 315.00
inclu�ive $ 420.00
' $ 630.00
fi
The par�ies hereto understand and agree that any harm �o the
City caused by the Contractor's delay in compl.eting �$e Work
hereunder in the time specified by the Contract•Documents
would be incapable or very di�Eicult oP accurate estimation,
and that the "Amount of Liquidated Damages Per Day", as �ot
out above, i5 a reasonable forecast of just compe.n5ation due
the City for harm caused by any delay.
C7-7.11 SUSPENSION BY COURT ORDER: The Contractor sha11
� suspend operations on such part or parts o.f the work ordered
by a.ny court, and will not be entitled to additional
li
compensation by vlrtue oP such court order. Neither will he
be liable to the City in the even�t the work is suspended by a
Court Order. Neither will the Owner bA liable to the
Contractor by virtue of any Court �rder or action for which
ttie Owne.r is not solely responsible.
C7-7.12 TEMPORARY SUSPENSION: The Qwner shall h�ave the right
to suspend the work operatian wholly �r in part for such
period or periods of time as he may deem necessary due to
unsuitable weather conditions or any other unfavorable
conditions which in the opinion of the Owner or Engi�eer caus�
further prosecution of the work to be unsatisfactory or
detrimental to the interest of the project. During temporary
suspension of work covered by this contract, for any reason,
the Owner will make no extra payment for stand-by time of
construction equipment and/or construct.ion crews.
If it should become necessary to suspend work for an
r� indefinite period, the Contractor shall store all materials in
such..:manner that they will not obstruct or impede the public
unnecessarily ,nor become damaged in any way, and he shall take
every precauti�n to prevent damage or deteriorati�n of the
work:�erformzd; he shall provide suitable drainage about the
� work, and erect temporary structures where necessary.
�
�
�
Shoutd the Contractor not be abla to complete a portion of the
project due to causes beyond �he control of and without the
fault or negligence of the Contractor as set Eorth in
Paragraph C7-7,8 EXTENSION OF THE TIME OF COMPLETION, and
should it be determined by mutual cons�nt of the Contractor
and the Engineer that a solution to allow construction to
proceed is not available within a reasonable period of time,
then the Contractor may be reimbursed for the cost of moving
his squipment off the job and returning the necessary
equipment to the job when it is determined by the Engineer
C7-7 (6)
, ���Q��,�� G?[�C�CJG°�� .
� C���'� ����G�i` °1Q� �
' �� � l�'��I, �C�.
any, which is to be furnished by the City. When suc� extra
compensation is claimed a written s�atement thereof shall be
presented by the Co�tractor to the Engin�er an.d if by him
found correct shall be approved and reFerred by him to the
Council for final approval or disapproval; and the action
thereon by the Council shall be final and binding. It delay
is caused by specific or,ders given by the Engineers to stop
work, or by the performance of extra work, or by the failure
of the City to provide material or necessary instructions for
carrying on the work, then such delay will entitle the
Contractor to an equivalent extension of time, his application
for which shall, however, be subject to the approval of the
City Council; and no such extension of time shall release the
Contractor or the surety on his performance bond fr�om all his
obligations hereunder which shall remain in full force until
the discharge of the contract.
C7-7.10 TIME OF COMPLETION: The time of completion is an
essential element of the contract. Each bidder shall indicate
in the appropriate place on the last page of the Proposal the
number of working days or calendar days that he will require
to fully complete this contract or the time o.f completion will
be specified by the City in the Proposal section of the
contract documents.
The number of days indicated shall be a realistic estimate of
the time required to complete the work covered by the specific
contract being bid upon. The amount of time so stated by the
successful bidder or the City will become the time of
completion specified in the Contract Documents.
For each calendar day that any work shall remain uncompleted
after the time specified_in the Contract Documents, or the
increased time granted by the Owner, or as automatically
increased by additional work or materials ordered after the
contract is signed, the sum per day given in the following
schedule, unless otherwise specified in other pa�rts oF the
Contract Documents, will be deducted from monies due the
Contractor, not as a penalty, but as liquidated damages
suffered by the Owner. '
AMOUNT OF CONTRACT
$
$
$
$
Less than $ 5,000
5,001 to $ 15,000
15,001 to . $ 25,000
25,001 to $ 50,000
50,001 to $ 100,000
100,001 to $ 500,000
C7-7 (5)
inclusive $
inclusive $
inclusive $
inclusive $
inclusive $
inclusive $
35.00
45.00
63.00
105.00
154.00
210.00
u����c0�� �'����GiD
,
,� 1'� ti� c�����- �,�G�U
� ,; � � �
;.�;� n�i7 �,r,
,..,, ���,�:�N�n ��.
�
or emnlovees..
In the event Owner receives a written claim for damages against the Contractor or its
subcontractors prior to final payment, final payment shall not be made until Contractor
either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a
release from the claimant involved, or (b) provides Owner with a letter from Contractor's
liability insurance carrier that the claim has been referred to the insurance carrier.
The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort
Worth public work from a Contractor against whom a claim for damages is outstanding
as a result of work performed under a City Contract.
Revised Pg. 3
6/04/99
,
' �^''�������:� �'�'�''�'��
i;l I',�j�p ����`� �`��'�ae}��
�-^ "��,: (�� y��v/
i, °�„�..���� 9LSW.
� . _ �
�.... ,_.�_�
�
�
�
�
�
E.
�'
G
part thereof, but which at the time of the pay estimate have not been so installed. If such
materials are included within a pay estimate, payment shall be based upon 85% of the net
voice value thereof. The Contractor will furnish the Engineer such information as may be
reasonably requested to aid in the verification or the preparation of the pay estimate.
For contracts of less than $400,000 at the time of execution, retainage shall be ten per
cent (10%). For contracts of $400,000 or more at the time of execution, retainage shall
be five percent (5%).
Contractor shall pay subcontractors in accord with the subcontract agreement within five
(5) business days after receipt by Contractor of the payment by City. Contractor's failure
to make the required payments to subcontractors will authorize the City to withhold
future payments from the Contractor until compliance with this paragraph is
accomplished.
It is understood that the partial pay estimates will be approximate only, and all partial pay
estimates and payment of same will be subject to correction in the estimate rendered
following the discovery of the mistake in any previous estimate. Partial payment by
Owner for the amount of work done or of its quality or sufficiency or acceptance of the
work done; shall not release the Contractor of any of its responsibilities under the
Contract Documents.
The City reserves the right to withhold the payment of any partial estimate if the
Contractor fails to perform the work in strict accordance with the specifications or other
provisions of this contract.
C3-3.11 INSURANCE: Page C3-3 (5): Delete subparagraph "a. COMPENSATION
INSUR.ANCE"
C3-3.11 INSURANCE: Page C3-3 (6): Delete subparagraph "g. LOCAL AGENT FOR
INSURANCE AND BONDING"
�
�
�
�
C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DAMAGE CLAIMS: Page C6-6
(8), should be deleted in its entirety and replaced with the following:
Contractor covenants and agrees to indemnify City's engineer and architect, and their
personnel at the project site for Contractor's sole negligence. In addition, Contractor
covenants and agrees to indemnify, hold hannless and defend, at its own expense, the
Owner, its officers, servants and employees, from and against any and all claims or suits
for property loss, property damage, personal injury, including death, arising out of, or
alleged to arise out of, the work and services to be performed hereunder by Contractor, its
officers, agents, employees, subcontractors, licensees or invitees, whether or not anv
such iniurv, damage or death is caused, in whole or in part, bv the negligence or
alleged neQligence of Owner, its officers, servants, or emnlovees. Contractor likewise
covenants and agrees to indemnify and hold harmless the Owner from and against any
and all injuries to Owner's officers, servants and employees and any damage, loss or
destruction to property of the Owner arising from the performance of any of the terms and
conditions of this Contract, whether or not anv such iniury or damage is caused in
whole or in part bv the negligence or alleged net�liQence of Owner, its officers, servants
Revised Pg. � ^
6/04/99 �,� ��������0 ��� �;�����°��
'��, � � 1,' ���': ���b
� � �� ,����. �(��.
�
...�
,�
��
�
SECTION C1: �
SUPPLEMENTARY CONDITIONS TO PART C- GENERAL CONDITIONS
A. General
These Supplementary Conditions amend or supplement the General Conditions of the
Contract and other provisions of the Contract Documents as indicated below. Provisions
which are not so amended or supplemented remain in full force and affect.
B. C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS -
ENTERPRISE COMPLIANCE: Page C3-3 (1), should be deleted in its entirety and ;,�
replaced with the following:
Upon request, Contractor agrees to provide to Owner complete and accurate information �
regarding actual work performed by a Minority Business Enterprise (MBE) and/or a
Woman Business Enterprise (WBE) on the contract and payment therefore. Contractor ,�„�
further agrees to permit an audit and/or examination of any books, records or files in its j�
possession that will substantiate the actual work performed by an MBE and/or WBE.
The misrepresentation of facts (other than a negligent misrepresentation) and/or the ��
commission of fraud by the Contractor will be grounds for termination of the contract ;,,�
and/or initiating action under appropriate federal, state or local laws or ordinances
relating to false statements; further, any such misrepresentation (other than a negligent �
misrepresentation) and/or commission of fraud will result in the Contractar being �
determined to be irresponsible and barred from participating in City work for a period of
time of not less than three (3) years. '"�
C. C3-3.7 BONDS: Page C3-3 (3), the paragraph after subparagraph d. Change the
paragraph to read as follows:
"No sureties will be accepted by the owner which are at the time in default or delinquent
on any bonds or which axe interested in any litigation against the Owner. All bonds shall
be made on the forms furnished by the Owner and the surety shall be acceptable to the
owner. In order for a surety to be acceptable to the City, (1) the name of the surety shall
be included on the current U.S. Treasury List of Acceptable Sureties {Circular 870}, or
(2) the surety must have capital and surplus equal to ten times the amount of the bond.
The surety must be licensed to business in the state of Texas. The amount of the bond
shall not exceed the amount shown on the Treasury list or one-tenth (1/10) of the total
capital and surplus. If reinsurance is required, the company writing the reinsurance must
be authorized, accredited or trusteed to do business in Texas."
D. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Page C8-8 (2), should be deleted in �
its entirety and replaced with the following: '
Partial pay estimates shall be submitted by the Contractor or prepared by the City on the
Sth day and 20th day of each month that the work is in progress. The estimate shall be
proceeded by the City on the lOth day and 25th day respectively. Estimates will be paid
within 25 days following the end of the estimate period, less the appropriate retainage as
set out below. Partial pay estimates may include acceptable nonperishable materials
delivered to the work place which are to be incorporated into the work as a permanent
Revised Pg• 1 (�^���tS�UIGU�;�- D'.�CUG��
6/04/99
�u��`u ��'� °, �' ��
�`
« 0���;-��ao 4�'.
�
�
�
�
SECTION Cl
�Ur't•�L�rARY CONDITIOI�S
- TO SECZ`ION C
�����a���l�� G��c���D ,
� r .;: � ,
�Ci'1�rJ �fjfi �I �i � r
�� ��1, �.�"'.
��,-: ;,�,� � �
,` r � �
--� -- -- _ _ .,
pay for any damage to other work resulting therefrom whi.ch �
shall appear within a period of one year from the date of
final acceptance of the work unless a longer period is �
specified andshall furnish a good and sufficient maintenance
bond in the amount of 100 percent of the amount of the
contract which shall assure the perFormance of �he general �
guaranty as above outline. The Owner will give noticP ot �
observed defects with reasonable promp�ness. -
C8-8.11 SUBSIDIARY WORK: Any and all work specifically �
governed by documentary requirements f or the project, such as
conditions imposed by the Plans, the General Contract
Documents or these Special Contract Documents, in which no �
specific itAm for bid has been provided for in the Proposal,
shall be considered as a subsidiary item of work, the cost o.f
which shall be included in the price bid in the Proposal, for � �
each bid item. Surface restoration, rock excavation and
cleanup are general items of work which fall in the ca�egory s
of subsidiary work. ,
C8-8.12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be �
allocated under v�rious bid items in the Proposal to establish
unit prices for miscellaneous placement of material. These �
materials shall be used only when directed by the Engineer,
depending on field conditions. Payment for miscellaneous
placement of mat?rial will be made for only that amount of �
material used, measured to the nearest one-tenth unit.
Payment for miscellaneous placement oF inatzrial shall be in
accordance with the General Contract Dacuments regardless of ^�
the actual amount used for the project. �
C8-8.13 RECORD DOCUMENTS: Contractor shall keep on record a
copy of all s ecifications ""'
P , plans, addenda, modifications,
shop drawings and samples at the site, in good order and �
annotated to show all changes made during the construction
process. These shall be delivered to Engineer upon completion
of the work.
�
�
1
�
c 8— 8 c 5� ���C�[��� U�d �'[�C�G °�@
�: G�' �"��'�-�'�� ° �'�' ,
� a,�,r �; f�.,�Ni P �� � ° „
�� r r� �
__,_, w
him as a guide in the veriEication or the preparation of
partial estimates.
It is understood that the partial estima�e from month to mon�h
will be approximate only, and all partial monthly estima�es
and paymen� will be subject to correc�ion in the estimate
rendered following the discovery of an error in any. previous
estimats,and sucti estimate shall not, in any respec�, be tiak�n
as an admission of the Owner aE tize amount oE w�rk done or of
its quality of sufEiciency, or as an acceptance of the work
done or the release of the Contractor of any oE his
responsibilities under the Contract Documents.
The City reserves �he right to withhold the p�yment oE any
monthly estimate i£ the contractor .fails to p�rForm the raork
strictly in accordance with the specifications or provisions
of this contract.
C8-8.6 WITHHOLDING PAYMENT: Payment on any estimate or
estimates may be heLd in abeyance if the perf��rmance oE the
construction operations is not in accordance with the
requirements of the Contract Docume.�ts.
C8-8.7 FINAL ACCEPTANCE: Whenev�r the improvements.provided
For by the Contract Documents sh�ll have been completed and
all requir�snents oF the Contr�ct Documents shall have been
fulfilled on the par� of the Contractor, the Contractor shall
notify the Engineer in writing that the improvements are ready
for the final inspection. The Engineer shall noti�y the
appropriate officials of the Owner, will within a reasonable
time make such final inspection, and if the work is
satisfactory, in an acceptable condition, an�d has been
complet�d in accordance with the terms of the Contract
Documents and all approved modi�ications thereoP, the Engineer
will initiate the processing oE the final estimate and
recommend final acceptance of the project and final payment
thereEor as outlined in C8-8.8 below.
C8-8.8 FINAL PAYMENT: Whenev�r all the improvements provided
for by the Contract Documents and all approved modifications
thereoE shall have been com�leted and all requir�meats of the
Contract Documents have been fulfilled on the part of the
Contractor, a final estimate showing the value of the work
will be prepared by the Engineer as soon as the necessary
measurements, computations, and checks can be made.
All prior estimatzs upon which payment has been madP are
subject to necessary corrections or revisions in the Final
payment. �
C8-8 (3)
��
'~�''��'`'�''''.: �:-!' ';�''�iriQ) �D
��V<<�tiR �c��������ac��
..0 �f
51� �fl��; J����9 �,��/�.
�, �
�
�
�
�
,
�
�
�
'rhe acnount oF the final estimate, less previous payments and
any sum that have been deducted or retained under the
provisions of the Contract Documents, will be paid to the
�ontractor within 60 days after final acceptance by the Owner
on a proper resolution of the City Council, provided the
Contractor has furnished �o the Owner satisfactory evidence of
payment as follows: Prior to submission ot the final estimate
for payment, the Contractor shall execute an aff'idavit, as
turnished by the City, certiFying that all persons, Eirms,
associ�tions, corporations, or otiier organizations f urnishing
labo.r and/or materials have been paid in full, that the wage
scale established by the City Council in the City of Fort
Worth has been paid, and that there are no claims pending for
personal injury and/or property damages.
The acceptance.by the Contractor of the last or final payment
as a:foresaid shall operate as and shall release the Owner from
all claims or liabilities under the Contract �or anything done
or furnished or relating to the work under Contract Documents
or any act or negle�t oE said City relating to or connected
with the Contract.
� The making of the final payment by the Owne.r shall not relieve
1 the Contractor oF�any guarantees or other requir�ments of the
Contract Documents which s�eciEically continue thereafter.
'
'
�
r
,
�
�
�
�
,
C8-8.9 ADEQUACY OF DESIGN: It is understood that the Owner
believes it has employed competent Engineers and designers to
prepare the Contract Documents and all modifications of the
approved Contract Documents. It is, theretore, agreed that
the Owner shall be respon.sible for the adequacy of its own
design features, sufficiency of the Contract Documents, the
saFety o� the structure, and the practicability of the
oper�tions of the completed project, provided the Contractor
has complied with the requirements of the said Contract
Documents, all app�oved modifications thereof, and additions
and alterations thereto approved in writing by the Owner. The
burden of proof of such complianc� shall be upon the
Contractor to show that he has complied with the said
requirements of the Contract Documents, approved modifications
thereoF, and all approved additic�ns and alterations thereto.
C8-8.10 GENERAL GUARANTY: Neither the final certificate of
payment nor any provision in the Contract Documents nor
partial or entire occupancy or use of the premises by the
Owner shall constitute an acceptance of work not done in
accordance with the Contract Documents or relipve the
Contractor of liability in respect to any express warrantie.s
or responsibility for Faulty materials or workmanship. The
Contractor shall remedy any defects or damages in the work and
C8-8 (4)
u����a�� �����JG�G�
Ca�1l ���'��?��'ti1
�a UVl/ ``�uu! U!5��.
�
PART C - GENERAL CONDITIONS
C8-8 MEASUREMENT AND PAY�NT
SECTION C8-8 MEASUREMENT AND PAYMENT
C8-8.1 MEASUREMENT OF QUANTITIES: The determination of
quantities of work perEormed by the Contractor and authorized
by the Contract Documents acceptably completed under the terms
of the Contract Oocuments shall be made by the Engineer, based
on measurements made by the Engineer. These measurements will
be made according to the United States Standard Measurements
used in common prac tice, and will be the actual length, area,
solid contents, numbers, and weights of the materials and
items installed.
C8-8.2 UNIT PRICES: When in the Proposal a"Unit Price" is
set forth, the said�"Unit Price" shall include �he furnishing
by the Contractor of all labor, tools, materials, machinery,
equipment, appliances and appurtenances necessary for the
construction of and the completion in a manner acceptable to
the Engineer of all work to be done under these Contract
Documents.
The "Unit Frice" shall include all permanent and temporary
protection oE overhead, surface, and underground structures,
cleanup, .finished, overhead expense, bond, insurance, patent
fees, royalties, risk due to the elements and other causes,
delays, profits, injuries, damages claims, taxes, and all
other items not specifically mentioned that may be required to
fully construct each item of the work complete in place and in
a satisfactory condition for operatioa.
C8-8.3 LUMP SUM: When in the Proposal a"Lump Sum" is set
forth, the said "Lump Sum" shall reQresent the total cost for
the Contractor to furnish all labor, tools, materials,
machinery, equipment, appurtenances, and all subsidary work
necessary f or the construction and completion of all the work
to provide a compl�te and functional item as detailed in the
Special Contract Documents and/or Plans.
C8-8.4 SCOPE OF PAYMENT: The Contractor shall receive and
accept the compensation, �as herein provided, in full payment
For furnishing all labor, tools, materials, and incidentals
for performing all work contemplated and embraced under these
Contract Documents, for all loss and damage arising out oi the
nature of the work or from �he action of the elements, for any
unforeseen defects or obstructions which may arise or be
encountered during the prosecuttion of the work at any time
cs—a ci�
�����i�VS��cG���� V�-�C��°�D .
i =;!l ;r ��� K�� ti�;���aG°��
�j�;' 1r�''. � 1�i�7. 1.
i, �� ; l��"�.{,
'_. - �-
"„�
�
�
'"1
�
�
�
�'�
�
1
O
, before its final acceptance by the Owner, (except as p.rovided
in paragraph C5-5.14) for all risks of whatever description
connec�ed with the prosecution of the work, for all expense
' �incurred by or in consequence oP suspension or discontinuance
of such pros�cution oF the working operations as herein
specified, or any and all infringements oF paten�s
trademarks, copyrights, or o�her legal reservations, 3nd Eor
� compteteing the work in an accep�aAle manner according �o �he
� � terms of the Contract Documents.
•. The payment of any current or partial estimatP prior to final
� acceptance of the work by the Owner shall in no way constitute
an acknowledgment of the acceptance of the work, ma�erials, �r
equipment, nor in any way prejudice or aEtect the obligations
' of t'he Contractor to repair, correct, renew, or replace a� his
own .and proper expense any dePects or imperPections in the
cons'truction or in the strength or quality of the mat?rial
� used or equipment or machinery furnished in or about th�
construction of the work under contract and its ap�urtenances,
or any damage due or attributed to such defects, which
� defects, imperfection, or damage shall hav2 been discovered on
or before the final inspection and acceptance of work or
during the one year guaranty period after final accep�ance.
The Owner shall be the sole judge oE such defects,
' imperfections, or damage, and the Contractor shall be liable
to the OwnPr Eor failure to correct th� same as provided
herein.
l_J
�
'
'
'
1
'
1
C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Between the lst and
5th day of eac1� month the Contractor shall submit to the
Engineer a statement showing an estima�e of the value of the
work done during the previous month, or estimate pa_riod under
the Contract Documents. Not later than the lOtll day of the
month the Engineer shall verify such estimate, and if it is
found �o be acceptable and the value of work performed since
the 1.ast partial payment was made exceeds one hundred dollars
($lOD.00) in amount, 90� of such estimated sum will be paid to
the Contractor if the total contract amount is less than
$400,000, or 95$ of such estimated sum will be paid to the
Contractor if the total contract amount is $400,000 or greater
within twenty-five (25> days aFt�r the regular estimafie period.
The City will have the option ot pr�paring e�timates on Forms
furnished by the City. The partial estimate may include
acceptable nonperishable matprials delivered to tihe work which
are to be incorporated into the work•as a permanent part
thereof, but which at the the time of the e�timate have not
been installed. (such payment will be allowed on a basis of
85$ oP the net invoice value thereo.f.)..The Contractor shall
furnish the Engineer such information as he may request to aid
C8-8 (2)
�!����Ol�d ���� °'� i
� o� ���� G���a����
c�o ��.�����Q �����
�
equitable adjustment of the price or prices
specffied in the contract relating to the continued �
portion of the �ontract (the portion not terminated
by the notice of termination), such equitable
adjustment as may be agreed upon shall be made in �
such price or prices; nothing contained herein,
however, shall limit the right of the Owner and the
Contractor to agree upon the amount or amounts to
be paid to the Contractor for the completion of the
continued portion of the contract when said �
contract does not contain an established contract
price for such continued portion. �
H. NO LIMITATION OF RIGHTS: Nothing contained in this �
section shall limit or alter the rights which the �
Owner may have for termination of this contract �
under C7-7.14 hereof entitled "Suspension of
Abandonment of the work and Amendment ot Contract"
or any other right which Owner may have tor def ault �
or breach of contract by Contractor.
C7-7.17 SAFETY METHODS AND PRACTICES: The Contractor shall be
responsible for initiating, maintaining, and supervising all
saf ety precautions and programs in connection with the work at
all times and shall assume all responsibilities £or their
enforcement.
The Contractor shall comply with federal, state, and local
laws, ordinances, and regulations so as to protect person and
property f rom injury, including death, or damage in connection
with the work.
�
�
1
- � 1
�`�L����GU�� G_'�C���� -
�;:p ,�� c�G���G���L?1�
C7-7 (13 ) � �'n';�:'�j�y ���1. '
, � ����; �,
,,
'
�
r�
5.
a. the fabricated or unEabricated parts,
work in process, completed work,
supplies and other ma�erial produced as
a part of, or acquired in connection
with the performance of, the work
terminated by the notice of
termination; and .
b, the completed, or partially completed
plans, drawings, information and other
property which, if the contract had
�been completed, would have been
required to be fnrnished to the Owner.
complete
as shall
notice of
performance of such part of the work
not have been terminated by the �
termination; and
6. take such action as may be necessary, or as
the Engineer may direct, for the protection
and preservation of the property related to
its contract which is in the possession of
the Contractor and in which the Owner has or
may acquire the rest.
At a time not later than 30 days after the
termination date specified in the notice of
termination, the Contractor may submit to the
Engineer a list, certified as to quantity and
guality, of any or all items of termination
inventory not previously disposed of, exclusive of
items the disposition of which has been directed or
authorized by the Engineer. Not later than 15 days
thereafter, the Owner shall accept title to such
items provided, that the list submitted shall be
subject to verification by the Engineer upon
removal of the items or, if the items are stored,
within 45 days from the date of submission of the
list, and any necessary adjustments to correct the
list as submitted, shall be made prior to final
settlement.
C. TERMINATION CLAIM: Within 60 days after notice of
termination, the Contractor shall submit his
termination claim to the Engineer in the £orm and
with the certification prescribed by the Engineer.
Unless one or more extensions in writing are
granted.by the.Owner upon request of the
Contractor, made in writing within such 60-day
period or authorized extension thereof, any and all
such claims shall be conclusively deemed waived.
' �' ; �,`);��iiG
� �. .. � ��_�. � � b,.
�"'�(;": � C�j Df(;���,%s� �C')M
C%—% � 1.1 ) .:' :' � vt�C .��'��,"�1W U
';i!' 'C:;i, u
, � .. ._c��� � •
�
,�
-,
��
��
�
J
�
�
�
'
1
�..
�
'
i
,
1
�
�
�
�
�
1
'
D. AMOUNTS: Subject to the p.rovisions oE Item
C7-7.16(C), the Contractor and Owner may agree upon
the whole or any part oF the amount or amounts to
be paid to the Contractor by reason of_ the total or
partial termination of work pursuant hereto;
provided, that such agreed amount or amounts shall
never exceed the to�al contract price as reduced by
the amount of payments otherwise made and as
further reduced by the contract price of w�rk not
terminated. The contract shall be amended
accordingly, and the Contractor shall be paid the
agreed amount�. No amount shall be due For lost or
anti�ipated profits. Nothing in C7-7.16(E>
hereaFter, prescribing the amount to be naid to the
Contractor in the event ot Eailure o� the
Contractor by reason of the termination of work
pursuant to this section, shall be de�med to Limit,
restrict or otherwise determine or affect the
amount or amounts which may be agreed upon to be
paid to the iontractor pursuant to this paragra�h.
E. FAILURE TO AGREE: In the event oF the failure oF
the Contractor and the Owner to agree as provided
in C7-7.16 (D) upon the whole amount to be paid to
the Contractor by r�ason of the termination of work
pursuant to this section the Owner shall determine,
on the basis of information available to it, the
amount, if any, due to the Contractor by reason of
the termination and shall pay to the Contractor the
amounts determined. No amount shall be due for
lost or anticipated profits.
F. DEDUCTIONS: In arriving at the amount due the
contractor under this section, there shall be
deducted (a) all unliquidated advance or other
payments on account �heretoFore made to the
Contractor, applicable to the terminated portion oF
this contract; (b) any claim which the Owner may
have against the Contractor in connection with this
contract; and (c) the agr�ed price Eor, or the
proceeds of sale of, any materials, supplies or
other things kept by the Contractor or sold,
pursuant to the provisions of this clause, and not
otherwise recover�d by or credited �o the Owner.
G. ADJUSTMENT: If the termination hereunder be
partial, prior to the settlement of the terminated
portion of �his contract, the Contractor may file
with the Engineer a request in writing for an
C7-7 (12)
: ����C�UI�� ���'cuG�D
C0�`'V' ���:�G��c�� .
C�o 17�IV C`��Ully U �ti� `
,�
consent of the Owner, sublet the work or that portion oE the
work as taken over, provided however, that the Sureties shall
exercise their option, if at all, within tiwo weeks after the
written notice to discontinue the work has been served upon
the Contractor and upon the Sureties or their authorized
agents. The Sureties, in such event shall assume the
Contractor's place in all respects, and shall be paid by the
Owner for all work performed by them in accordance wi�h �he
terms of the Contract Documents. All monies remaining due �he
Contractor at the time of this default shall thereupon become
due and payable to the Sureties as the work progresses,
subject to all of the terms oF the Contract Documents.
In case the Sureties do not, within the hereinabove specified
time, exercise their right and option to assume the contract
responsibilities, or that portion thereof which the Owner has
ordered by the Contractor to discontinue, then the Owner shall
have the power to complete, by contract or otherwise, as it
may determine, the work herein described or such part thereof
as it may deem necessary, and the Contractor hereto agrees
that the Owner shall have the right to take possession ot and
use any materials, plants, tools, equipment, supplies, and
property of any kind provided by the Contrac�or tor the
purpose of. carrying on the work and to procure o�her tools,
equipment, materials, labor and property for the completion of
the work, and to charge to the account ot the Contractor . of
said contract expense for labor, materials, tools, equipment,
and all expenses incidental thereto. The expense so charged
shall be deducted by the Owner from such monies as may be due
or may become due at any time thereafter to the Contractor
under and by virtue ot the Contract or any part thereof. The
Owner shall not be required to obtain the lowest bid for the
work completing the contract, but the expense to be deducted
shall be the actual cost of the owner of such work.
In case such expenses shall exceed the amount which would have
been payable under the Contract if the same had been completed
by the Contrac tor, then the Contractor and his Sureties shall
pay the amount of such excess to the City on notice from the
Owner of the excess due. When any particular part of the work
is being carried on by the Owner by contract or otherwise
under the provis�ions of this section, the Contractor shall
continue the remainder of the work in conformity with the
terms of the Contract Documents and in such a manner as to not
h.inder or interfere with performance of the�work by the Owner.
C7-7.15 FULFILLMENT OF CQNTRACT: The Contract will be
considered as having been fulfiiled, save as provided in any
bond or bonds or by law, when all the work and all sections or
parts of the project covered by the Contract Documents� have
C7-7 (9)
�'• i�� I � � �� SII�,`lU1D
��(,��;� , � G�� ,I� V.Is.. �R
L J �Y
_:1`'�,,,� u N"'��r��� �E c
_ ,'.';`^'r' u� ���
. ;k•",' ;i��,� � L 0
�
�
�
�
�
�
�
�
�
��
1
7
�
�
�
,�
� been finished and com�leted, the final inspection made by the
Engineer, and the �inal acceptance and final payment made by
the Owner.
�
�
�
�,
�
LJ
�
�
�
�
'
'
�
'
�
�
�
'
�
C7-7.16 TERMINATION FOR CONVENIENCE OF THE OWNER:
A. NOTICE OF TERMINATION: The performance of the work
under this contract may be termiaated by the Owner
in whole, or �rom time to tiine in par�, in
acco�dance with this section, whenever th� Owner
shall determine that such termination is in the
best int�rest of the Owner. Any suc'n termination
shall be effected by mailing a notire oF
termination to the Contractor specifying the extent
to which performance of work under the contrac� is
terminated, an3 the date upon which such
termination becomes effective. �teceipt of the
notice shall be deemed cox�clusively presumPd and
established when the l�tter is placed in the United
Sta�es Hail by the Owner. Further, it shall be
deemed conclusively presumed and established that
such termination is made with just cause as therein
stated; and no prooF in any claim, demand or suit
shall be required of the Owner regarding such
discretionary action.
B• CONTRACTOR ACTION: After receip� of a notice of
termination, and except as otherwise directed by
the Engineer, the Contractor shall:
1• Stop work under ttie contract on the date and
to the ex�tent speci.fied in the notice of
�ermina�ion;
2• place no further orders or subcontracts Eor
materials, services or facilities except as
- may be necessary for completion of such
portion oE the work undPr the contract as is
not terminated;
3• terminate all orders and subcontracts to the
extent that they relate to the performance of
work terminated by the no�ice oF termina�ion;
4• transfer title to the Owner and deliver in
the manner, at thA times, and to the extent,
iF any, dir�cted by the Engineer:
C7-7 (10)
� '�����1�� ���OQ�
� :;��`'1� ����rG?(���(
�' UUo U'JUI�'�uJUy �151n1. ,
;�
C�j
�
0
�
�
�
C��
0
�
�
���
��
���
�
i�
��
��
�
PART D
Special Conditions
Details
uf���� 0�� �?�C�G�D
� �� �C��� G�����
[��a WuG���i� ���o
.��
i�
;�
�
�
�
�
I��
�1
��
�
�
�
�
L'
�
L�J
�
L�J
�
D-1
D-2
D-3'
D-4
D-5
D-6
D-7
D-8
D-9
D-10
D-11
D-12
D-13
D-14
D-15
D-16
D-17
D-18
D-19
D-20
D-21
D-22
D-23
D-24
D-25
D-26
D-27
D-28
D-29
D-30
D-31
D-32
D-33
D-34
D-35
D-36
D-37
D-38
D-39
D-40�
D-41
D-42
D-43
D-44
D-45
D-46
D-47
D-48
D-49
D-50
D-51
PART Q - SPEClAL �ON�ITIC�NS
AWARDOF CONTRACT ....................................................................................... SC-3
SUBMISSION OF CONTRACT DOCUMENTS ...................................................... SC-3
GENERAL.............................................................................................................. SC-4
TAXEXEMPTIONS ................................................................................................. SC-5
PROJECTDESIGNATION ..................................................................................... SC-6
EQUAL EMPLOYMENT PROVISIONS .................................................................. SC-6
PRE-CONSTRUCTION CONFERENCE ..................................:............................. SC-6
COORDINATION MEETINGS ................................................................................ SC-6
PROJECTABANDONMENT .................................................................................. SC-6
BREAKDOWN OF BID PROPOSAL ....................................................................... SC-6
OMIT...................................................................................................................... SC-6
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW ......... SC-6
MINORITY AND WOMENS BUSINESS ENTERPRISE (M/WBE)COMPLIANCE... SC-9
CALENDARDAY ................................................................................................. SC-10
SUBSIDIARYWORK ............................................................................................ SC-10
WAGERATES ..................................................................................................... SC-11
EASEMENTSAND PERMITS .............................................................................. SC-12
COORDINATION WITH FORT WORTH WATER DEPARTMENT ....................... SC-13
DAMAGE TO PRIVATE PROPERTY ................................................................... SC-13
SHOPDRAWINGS .............................................................................................. SC-13
CROSSING OF EXISTING UTILITIES ................................................................. SC-14
EXISTING UTILITIES AND IMPROVEMENTS ..................................................... SC-14
CONSTRUCTION TRAFFIC OVER PIPELINES .................................................. SC-15
TRAFFICCONTROL ............................................................................................ SC-15
PAYMENT............................................................................................................ SC-16
DELAYS............................................................................................................... SC-16
DETOURS............................................................................................................ SC-16
BARRICADES AND WARNING SiGNS ............................................................... SC-16
EXAMINATIONOF SITE ...................................................................................... SC-16
ZONINGCOMPLIANCE ....................................................................................... SC-16
WATER FOR CONSTRUCTION .......................................................................... SC-17
WASTE MATERIAL ...............................................:.............................................. SC-17
CLEANUP FOR FINAL ACCEPTANCE ................................................................ SC-17
PROPERTYACCESS .......................................................................................... SC-17
CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK ......................... SC-17
SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES .................... SC-17
CONTRACTOR'S �ESPONSIBILITY FOR DAMAGE CLAIMS ............................ SC-18
SANITARY FACILITIES FOR WORKERS ............................................................. SC-19
LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC ....................... SC-19
RIGHTTO AUDIT ................................................................................................ SC-19
INCREASE OR DECREASE IN QUANTITIES ..................................................... SC-19
CUTTINGOF CONCRETE .................................................................................. SC-20
PROJECT DESIGNATION SIGN ......................................................................... SC-20
CONCRETE SIDEWALK AND `DRIVEWAY REPLACEMENT .............................. SG20
MISCELLANEOUS PLACEMENT OF MATERIAL ................................................ SC-21
TYPE"C" BACKFILL ............................................................................................ SG21
CRUSHED LIMESTONE BACKFILL .................................................................... SC-21
2:27 CONCRETE ................................................................................................. SC-21
TRENCH EXCAVATION, BACKFILL AND COMPACTION .................................. SC-22
PAVEMENT REPAIR (E2-19) ............................................................................... SC-23
TRENG�H SAFETY SYSTEM FOR WATER DEPARTMENT PROJECTS ONLY .. SC-24
�oi�tiss SC-1
� �
Q , ���Uy����� u�����G1D
�c0� ���� G°?��Qi�
t!J
�
ls.'�
L�J
�
�
L�J
�
�J
�
�
�
�
J
�
�
J
D-52
D-53
D-54
D-55
D-56
D-57
D-58
D-59
D-60
D-61
D-62
D-63
D-64
D-65
D-66
D-67
D-68
D-69
D-70
D-71
D-72
D-73
D-74
D-75
D-76
D-77
D-78
D-79
D-80
80.1
80.2
80.3
80.4
80.5
80.6
80.7
80.8
80.9
80.10
80.11
80.12
80.13
80.14
D-81
D-82
D-83
D-84
D-85
D-86
�
�a�yss
J.
PART D - SPE�I�L GC�NQITI�INS
SANITARY SEWER MAf�1�HOLES ......................................................................... SC-24
SANITARY SEWER SER.V�CES ........................................................................... SC-27
NOTUSED ........................................................................................................... SC-28
REMOVAL, SALVAGE AND ABANDONMENT OF EXISTING FACILITIES......... SC-28
DETECTABLE WARNING TAPES ....................................................................... SC-30
PIPECLEANING .................................................................................................. SC-30
BARRICADES, WARNINGS AND FLAGMEN ...................................................... SC-30
DISPOSAL OF SPOIUFILL MATERIAL ............................................................... SC-31
MECHANICS AND MATERIALMEN'S LIEN ......................................................... SC-31
SUBSTITUTIONS................................................................................................. SC-31
PRECONSTRUCTION TELEVISION INSPECTION/SANITARY SEWER LINES . SC-31
VACUUM TESTING OF SANITARY SEWER MANHOLES .................................. SC-34
BYPASSPUMPING ............................................................................................. SC-35
POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS SC-36
SAMPLES AND QUALITY CONTROL TESTING ................................................. SC-37
TEMPORARY EROSION SEDIMENTS AND WATER POLLUTION CONTROL .. SC-38
INGRESS AND EGRESS/ ACCESS TO DRIVES ................................................ SC-39
PROTECTION OF TREES, PLANTS AND SOIL .................................................. SC-39
SITE RESTORATION ...............�............................................................................ SC-39
STANDARD PRODUCT LIST ............................................................................... SC-39
STATE REVO�VING FUND (SRF) REQUIREMENTS ......................................... SC-39
TOPSOIL, SODDING AND SEEDING .................................................................. SC-40
CONFINED SPACE ENTRY PROGRAM ............................................................. SC-45
SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION ................... SC-45
EXCAVATION NEAR TREES .............................................................................. SC-46
CONCRETE ENCASEMENT OF SEWER PIPE .................................................. SC-46
CLAYDAM ........................................................................................................... SC-46
EXPLORATORY EXCAVATION (D-HOLE) .......................................................... SC-47
INSTALLATION OF WANTER FACILITIES ............................................................ SC-47
POLYVINYAL (CHLORIDE PVC) WATER PIPE .................................................. SC-47
BLOCKING........................................................................................................... SC-47
TYPE OF CASING PIPE ...................................................................................... SC-47
TIE-INS ................................................................................................................ SC-48
CONNECTION OF EXISTING MAINS .................................................................. SC-48
VALVE CUT-INS .................................................................................................. SC-48
WATER SERVICES ............................................................................................. SC-49
2-INCH TEMPORARY SERVICE LINE ................................................................ SC-51
ADJUST MANHOLES AND VAULTS (UTILITY CUT) .......................................... SC-51
ADJUST WATER VAL�E BOXES ........................................................................ SC-51
PURGING AND STERILIZATION OF WATER LINES .......................................... SC-52
WORK NEAR PRESSURE PLANE BOUNDARIES .............................................. SC-52
WATER SAMPLE STATION ................................................................................. SC-52
DUCTILE IRON AND GRAY IRON FITTINGS ...................................................... SC-53
SPRINKLING FOR DUST CONTROL .................................................................. SC-53
DEWATERING..................................................................................................... SC-53
TRENCH EXCAVATION FOR DEEP TRENCHES ............................................... SC-53
TREEPRUNING .................................................................................................. SC-54
TREEREMOVAL ................................................................................................. SC-55
TESTHOLES ...................................................................................................... SC-55
�C-2
PART Q - SPE�IAL �O�iDITIQNS
Contractors Work Plan and Schedule
Disposal Site for Waste Material Information
Sub-Contractor ldentification
Trench Safety Design (if required)
Confined Space Entry Program
Name and number of a responsible person for off hour emergencies
Project schedule which must reflect a p�oject completion date to be
completion time period stipulated in the proposal section. �
�
�
�
determined by the
�
The pre-construction conference is intended as a forum befinreen the contractor and the
appropriate City staff to go over th� project in detail and to afford the contractor the opportunity to
submit all the required documents listed above.
If the contractor fails to submit any of the required documents, the contractor will not be allowed
to begin work and time on the project will start to accumulate.
f����I�►L�'714�
The order or precedence in case of conflicts or discrepancies between various parts of the
Contract Documents subject to the ruling of the �ngineer shall generally, but not necessarily,
follow the guidelines listed below: �
1. Plans
2. Contract Documents
3. Special Conditions
The following Special Conditions shall be applicable to this project and shall govem over any
conflicts with the General Contract Documents under �he provisions stated above. The
Contractor shall be responsible for defects in this p oject due to faulty materials and
workmanship, or both, .for a period" of one (1) year from dat of final acceptance of this project by
the City Council of the City of Fort Worth and will be requir d to replace at his expense any part
or all of this project which becomes defective due to these uses.
The City reserves the right to° abandon, without obligatioh to the Contractor, any part of the
project, or the entire project, at any time before the Con�ractor begins any construction work
authorized by the City. Contract, if awarded, shall be as de�cribed in "Award of Contract" above.
�
Subject �to modifications as herein contained, the Fort �Worth Water Department's General
Contract Documents and General Specifications, with lat st revisions, are made a part of the
General Contract Documents for this project. The Plans, t ese Special Contract Documents and
the rules, regulations, requirements, instructions, drawings r details referred to by manufacturers
name, or identification include therein as specifying, r�ferring or implying product control,
performance, quality, or other shall be binding upon th� contractor. The specifications and
drawings shall be considered cooperative; therefore, work or material called for by one and not
shown or mentioned in the other shall be accomplished � or fumished in a faithful manner as
though required by all. �
I
Any Contractor performing any work on Fort Worth water a�r sanitary sewer facilities must be pre-
qualified with the Water Department to perForm such ork in accordance with procedures
described in the current Fort Wo�th Water Department �eneral Specifications, which general
specifications shall govem performance of all such work. �
,�,�9
� o�f��Q:� �,f �? �� ° �
sc-� � �: 0�' ��[����[��G�(
i ��o �G'��ls �(�{o
C
L�J
�
�
PART Q - SPEGlAL CONDITIONS
FOR: MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM
(GROUP 6, CONTRACT 2), PART 7
FORT WORTH, TEXAS
UNIT 1 DOE PROJECT NO. 2113
UNIT 2 DOE PROJECT NO. 2710
UNIT 3 DOE PROJECT NO. 2711
UNIT 4 DOE PROJECT NO. 2712
SEWER PROJECT NO. PS46-070460410230 � �� •- � �
D-1 AWARD OF CONTRACT: The City reserves the right to abandon without obligation to the
� contractor, any part of the project, or the entire project, at any time before the contractor begins
any construction work authorized by the City. Award, if made, shall be to the responsive low
bidder.
�
L�J
�
�
�
The following shall apply for contract documents with multiple units of work. Each unit represents
a separate project, each with an individual MNIIBE specification and pr.oposal section. The
proposal sections are arranged to allow prospective bidders to submit bids on one unit, some of
the units, or all of the units. Award of contract(s), if made, shall be to the responsive low bidder
for each individual unit. If a contractor is the responsive low bidder on two units or more, a single
set of contract documents consisting of all applicable units will be created and one single award
of contract shall be made. The Contractor shall comply with the City's M/WBE Ordinance on
each unit. Bidders shall submit individual and separate monthly M/WBE reports for each Unit
included in the Contract.
Construction time on all units will run concurrently. For situations involving approved contracts
with multiple units, the total allowable construction completion time period for all the units shall be
the same as the unit with the longest construction time period.
D-2 SUBMISSION OF CONTRACT DOCUMENTS, CONSTRUCTION START TIME AND
� PRE-CONSTRUCTION SUBMITTALS: The contractor(s) shall execute and return the contract
documents to the Department of Engineering within ten (10) working days after notification by the
City.
�
�
a
�
�
a
�
�
A Pre-Construction meeting date will be established and noted in the Letter to Contractor. The
effective work order date will be set at the pre-construction conference.
The contractor(s) shall be required to start construction on the project no later than ten (10)
calendar working days after the pre-construction meeting date. The City shall begin to charge
time on the project to the contractor eleven days after the pre-construction meeting date.
Per City ordinance 13471, as amended by Ordinance No. 13781, the contractor(s) shall submit
the letters of intent or a copy of the agreements with the approved M/WBE subcontractor(s) at or
before the pre-construction conference. To expedite M/WBE compliance contractors are strongly
encouraged ta submit the executed letters of intent (with M/WBE subcontractors) at the time of
submittal of the UTILIZATION FORM or GOOD FAITH EFFORT FORM. The letter(s) must be
signed by both parties. If the contractor(s) fails to submit the letter(s) or agreement(s), the
contractor(s) will not be allowed to begin work. Time on the project will start to accumulate at the
end of the ten (10) days as stipulated above.
Additional submittals at time of pre-construction meeting shall include (but not limited to):
�oit�ss
SC-3
������ ��:d G��C���D
����'u' ����G?����1
` �R ��u� ,r�S�M �?I�M
PART Q - SPECIAL C�NQITIONS
Use Tax Act. All equipment and materials not consumed by or incorporated into the project
construction, are subject to State sales tax under House Bill 11, enacteci August 15, 1991. All
such taxes shall be included in the various amounts on the Proposal Form. The successful
Bidder shall be required to submit a breakdown between labor and material costs prior to
execution of the contract.
D-5 PROJECT. DESIGNATION: Construction under these Special Documents shall be
performed under the• Project Designation: Project No. PS46-07046410260
D-6 EQUAL EMPLOYMENT PROVISIONS: Contracto� shall comply with City O.rdinance
Number 7278 as amended by City Ordinance Number 7400 (Fort Worth City Code Sections 13-
A-21 through 12-A-29) prohibiting discrimination in employment practices.
The Contractor shall post the required notice to that effect on the project site, and at his request,
will be provided assistance by the City of Fort Worth's Equal Employment Officer who will refer
any qualified applicant he may have on file in his o.ffice. to the Contractor. Appropriate notices
may be acquired from the Equal Employment Officer.
D-7 PRE-CONSTRUCTION CONFERENCE: Before the project work order is issued, a pre-
construction conference shall be held with representatives of the following agencies present: City
Engineering Department, City Water Department, City Public Works Department, other interested
City Departments (such as Traffic), interested utility companies (such as gas, telephone, and
electric), Design Engineer and the successful Contractor. Contractor shall submit a schedule of
operations at the pre-construction conference.
D-8 COORDINATION MEETINGS: For coordination purposes, weekly meetings at the job
site may be required ta maintain the project on the desired schedule. The Contractor shall be �
present at all meetings.
D-9 PROJECT ABANDONMENT: The City reserves the right to abandon, without obligation
to the Contractor, any part of the project, or the entire project, at any time before the Contractor
begins any construction work authorized by the City.
D-10 BREAKDOWN OF BID PROPOSAL: When requested by the Engineer, the Contractor
shall furnish a cost breakdown of those bid items shown in the Proposal as lump sum items. This
information is for use in the prepa►-ation of a recommendation to the City for award of contract.
D-11 OMIT:
� D-12 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW:
A. Definitions:
1. Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of
authority to self-insure issued by the commission, or a coverage agreement (TWCC-81,
TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance
coverage for the person's or entity's employees providing services on a project, for the
duration of the project.
2. Duration of the project - includes the time from the beginning of the work �n the project
until the contractor's/person's work on the project has been completed and accepted by
the governmental entity. ,
�a��iss
������D�L�I�:�. G��C��G°�D
sc-s �:���V' c��<<�ti��`�iG��
��o �UC���a ���o
�
L�J
�
�
PART Q - SPECIAL CONQITIQNS
This contract and project, where applicable, may also be governed by the two following published
specifications, except as modified by these Special Provisions: .
1. STANDARD SPECIFICATI4NS FOR STREET AND STORM DRAIN CONSTRUCTION -
CITY OF FORT WORTH
2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH
CENTRAL TEXAS . . . .. . .
A copy of either of these specifications may be purchased at the office of the Transportation and
p Public Works Di�ector, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth,
Texas 76102. The specifications applicable to each pay item are indicated by the call-out for the
pay item by the designer. If not shown; then applicable published specifications in either of these
� documents may be followed at the discretion of the Contractor. General Provisions shall be
those of the Fort Worth document rather than Division 1, of the North Central Texas document.
�
�
L�J
�J
��l
�
' �J
l�l
�
�
u
C
��.
Bidders shall not separate, detach or remove any portion, segment or sheets from the
contract document at any time. Failure to bid or fuily execute co�tract without retaining
contract documents intact may be grounds for designating bids as "non-responsive" and
rejecting bids or voiding contract as appropriate as determined by the City Engineer.
INTERPRETATION AND PREPARATION OF PROPOSAL:
A. DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered,
accompanied by its proper Bid Security, to the Purchasing Manager or his representative at
the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole
responsibility to deliver the proposal at the proper time to the proper place. The mere fact
that a proposal was dispatched will not be considered. The Bidders must have the proposal
actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word
"PROPOSAL", and the name or description of the project as designated in the "Notice to
Bidders". The envelope shall be addressed to the Purchasing 11llanager, City of Fort Worth
Purchasing Division, PO Box 17027, Fort Worth, Texas 76102.
B. WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot
be withdrawn prior to the time set for opening proposals. A request for non-consideration of a
proposal must be made in writing, addressed to the City Manager, and filed with him prior to
the time set for the opening of proposals. After all proposals not requested for non-
consideration are opened and publicly read aloud, the proposals for which non-consideration
requests have been properly filed mav, at the option of the Owner be returned unopened.
C. TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by
telegraphic communication at any time prior to the time set for opening proposals, provided
such telegraphic communication is received by the Purchasing Manager prior to the said
proposal opening time, and provided further, that the City Manager is satisfied that a written
and duly authenticated confirmation of such telegraphic communication over the signature of
the bidder w�s mailed prior to the proposal opening time. If such confirmation is not received
within forty-eight (48) hours after the proposal opening time, no further consideration will be
given to the proposal.
D-4 TAX EXEMPTIONS: This contract is issued by an organization which qualifies for
exemption pur�uant .of the provisions of Article 20.04(F) of the Texas Limited Sales, Excise and
. , � .,
�oi�2iss � ,. �
sc-s �[��� G�l�� ° [�C�O�D �
��� ���������
��� G,�uG���� ���o
PART D - SPECIAL CONDITIONS
1. Provide coverage, based on proper reporting on dassification codes and payroll amounts
and filing of any coverage agreements, which meets the statutory requirements of Texas
Labor Code, Section 401.011(44) for all of its employees providing services on the project,
for the duration of the project;
2. Provide to the Contractor, prior to that person beginning work on the project, a certificate
of coverage showing that eoverage is being provided for all employees of the person
providing services��on the project, for the duration of the project;
3. Provide the Contractor, prior to the end of the coverage period, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the current
certificate of cove�age ends during the duration of the project;
4. Obtain from each other person with whom it contracts, and provide to the Contractor:
a.) A certificate of coverage, prior to the other person beginning work on the project; and
b.) A new certificate of coverage showing extension of coverage, prior to the end of the
coverage period, if the coverage period shown on the current certificate of coverage
ends during the duration of the project.
5. Retain all required certificates of coverage on fiie for the duration of the project and for
one year thereafter.
6. Notify the govemmental entity in writing by certfied mail or personal delivery, within ten
(10) days after the person knew or should have known, of any change that materially
affects the provision of coverage of any..person providing services on the project; and
7. Contractually require each person with whom it contracts, to perForm as required by
paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom
they are providing services.
8. By signing this contract or providing or causing to be provided a certificate of coverage,
the contractor is representing to the governmental entify that all employees of the
contractor who will provide services on the project will be covered by worker's
compensation coverage fo� the duration of the project, that the coverage will be based on
proper reporting of classification codes �and payroll amounts, and that all coverage
agreements will be filed with the appropriate insurance carrier or, in the case of a self-
insured, with the commission's Division of Self-Insurance Regulation. Providing false or
misleading information may subject the contractor to administrative, criminal, civil
penalties or othe� civil actions.
9. The contractor's'failure to comply with any of these provisions is a breach of contract by
the contractor which entitles the governmental entiiy to declare the contract void if the
contractor does not remedy the breach within ten days after receipt of notice of breach
from the governmental entity.
J. The contractor shall post a notice on each project site informing all persons providing services
on the project that ,xhey are required to be covered, and stating how a person may derify
current coverage a�d report failure to provide coverage. This notice does not satisfy other
,���9
m
sc-s - ���I��U�UG,��� �:� ��'D
�p`� �[���G���a�
��n �G�'��� q��o
��l
0
��
CII
�
l�J
�
�
PART D - SPECIAL CONQITIONS
3. Persons providing services on the project ("subcontractor" in §406.096)- includes all
persons or entities performing all or part of the services the contractor has undertaken to
perform on the project, regardless of whether that person contracted directly with the
contractor and regardless of whether that person has employees. This includes, without
limitation, independent contractors, subcontractors, leasing companies, motor carriers,
owner operators, employees of an� such entity, or employees of any entity which
furnishes persons to provide services on the project. "Services" include, without limitation,
providing, hauling, or delivering equipment or materials, or providing labor, transportation,
or othe� services related to a project. 'Services" does not include activities unrelated to
the project, such as food/beverage vendors, office supply deliveries, and delivery of
portable toilets.
B. The Contractor shall provide coverage, based on proper reporting of classification codes and
payroll amounts and filing of any coverage agreements, which meets the statutory
requirements of Texas Labor Code, Section 401.011(44) or 211 employees of the Contractor
providing services on the project, for the duration of the project.
C. The Contractor must provide a certificate of coverage to the governmental entity prior to being
awarded the contract.
D. If the coverage period sho,wn on the contractor's current certificate of coverage ends during
Q the duration of the project, the contractor must, prior to the end of the coverage period, file a
new certificate of coverage with the govemmental entity showing that coverage has been
extended.
�
u
�
�'
�
'J
LJ
i-
i�
�
E. The Contractor shall obtain from each person providing services on a project, and provide the
governmental entity:
1. A certificate of coverage, prior to that person beginning work on the project, so the
governmental entity will have on file certificates of coverage showing coverage for all
p"ersons providing services on the p�oject; and
2. No later than seven days after receipt by the contractor, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of
coverage ends during the duration of the project.
F. The contractor shall retain all required certificates of coverage for the duration of the project
and for one year thereafter.
G. The contractor shall notify th� governmental entity in writing by certified mail or personal
delivery, within ten (10) days after the contractor knew or should have known„ of any change
that materially affects the provision of coverage of any person providing services on the
project.
H. The contractor shall post on each project site a notice, in the text, form and manner
prescribed by the Texas Worker's Compensation Commission, informing all persons providing
services on the project that they are required to be covered, and stating how a person may
verify coverage and report lack of coverage. �
The contractor shall .contractually
services on �a project; ,tc�s � •�� ,:,�, , ;
� ,�,�, k „���y .:.„s Y
a�. w� � eA.+�. n'. �`ryA ,.'� �, i e• i
10/12/99 ' " ;� '' �, �
0 a. >. �
require each person with whom it contracts to provide
SC-7 � I���� 4i�d ��� G'��
. �0�1"( ������°���Q�
� �a-���� r���➢ ���o
PART D - SPECIAL CONQITI4NS
meeting the goals must be certified prior to the award of the Contract. The M/WBE contractor(s)
must be certified by either the No�t�i Central Texas Regional Certification Agency (NCTRCA) or
Texas Department of Transportation (TxDOT), Highway Division and must be located in the nine
(9) county marketplace at time pf bid. The Contractor shall contact all such M/WBE
subcontractors or suppliers prior to listing them on the M/WBE utilization or good faith effort forms
as applicable. Failure to contact the listed M/VVBE subcontractor or supplier prior to bid .opening
may result in the rejection of bid as non-responsive. �
Whenever a change order a�Fects� the work of an M/WBE subcontractor or supplier, the M/WBE
shall be given an opportunity to perform the work. Whenever a change order exceeds 10°/a of the
original contract, the M/WBE coordinator shall determine the goals applicable to the work to be
performed under the change order.
During the term of the contract the contract shall:
1. Make no unjustified changes or deletions in it's M/WBE participation commitments
submitted with or subsequerit to the bid, and,
2. If substantial subcontractin� and/or substantial supplier opportunities arise during the term
of the contract which the coratractor had represented he would perForm with his forces, the
contractor shall notify the City before subcontracts or purchase orders are let, and shall be
required to comply with modifications to goals as determined by the City, and ,
3. Submit a REQUEST FOR APPROVAL OF CHANGE FORM, if the contractor desires to
change or delete any of the M/WBE subcontra�tors or suppliers. Justification for change
may be granted for the following:
a. Failure of Subcontractor to provide evidence of coverage by Worker's Compensation
Insurance.
b. Failure of Subcontracto � to provide required general liability of other insurance.
c. Failure of Subcontractor to execute a standard subcontract form in the amount of the
proposal used by the Contractor in preparing his MN11BE Participation plan.
d. Default by #he M/WBE s�ibcontractor or supplier in the performance of the
'subcontractor.
Within ten (10) days after final payment from the City, the contractor shall provide the
M/WBE Office with documentation to reflect final participatior� of each subcontractor and
supplier used on the project, inclusive of M/V1IBEs.
D-14 CALENDAR DAY: Delete paragraph C1-1.24, in Part C-General Conditions, in its entirety
and substitute the following new paragraph:
C1-1.24 Calendar Dav: A Calendar day is any day of the week or month. The Contractor
will not be allowed to work on Sundays or any holidays observed by the City of Fort
Worth.
D-15 SUBSIDIARY WORK: Any and all work specifically govemed by documentary
requirements for the project, such as conditions imposed by the Plans, the General Contract
_. __-:� ��„.
�a�2iss "
SC-10
_.._. ,
�
� ��0����� E'�C���.GzD
�G�`� �C���G���Q�
��n �����.�� ���o �
�
�
�'
�
l�J
�
PART D - SPECIAL �ONQITIQNS
posting requirements imposed by the Texas Worker's Compensation Act or other Texas
Worker's Compensation ��ommission rules. This notice must be printed with a title in at least
30 point bold type and text in at least 19 point normai type, and shall be in both English and
Spanish and any other language common to the worker population. The text for the notices
shall be the following text, without any additional words or changes:
"REQUIRED WORKER'S COMPENSATION COVERAGE
The law requires that each person working on this site or providing services related to this
construction project must be covered by workers' compensation insurance. This includes
persons providing, hauling, or delivering equipment or materials, or providing labor or
transportation or other service related to the project, regardless of the �identity of their
employer or status as an employee."
D Call the Texas Worker's Compensation Commission at (512)440-3789 to receive information
on the legal requirement for coverage, to verify whether your employe� has provided the
required coverage, or to report an employer's failure to provide coverage".
�
L�J
�J
�
D-13 MINORITY AND WOMENS BUSINESS ENTERPRISE (M/WBE) COMPLIANCE: In
accordance with City of Fort Worth Ordinance No. 11923, the City of Fort Worth has goals for the
participation of minority business enterprises and women business enterprises in City contracts.
The Ordinance is incorporated in these specifications by reference. A copy of the Ordinance may
be obtained from the Office of the City Secretary. Failure to comply with the ordinance shall be a
material breach of contract.
The M/WBE UTIL•IZATION FORM, flll/WBE GOALS WAIVER FORM AND GOOD FAITH
EFFORT FORM, as applicable, must be submitted within five (5) city business days after bid
opening. Failure to comply shall render the bid non-responsive.
Upon request, contractor agrees to provide the City complete and accurate information regarding
�"�' actual work performed by a Minority or Women Business Enterprise (M/WBE) on the contract and
L1 payment thereof. Contractor further, agrees to permit an audit and/or examination of any books,
records or files in its possession that will substantiate the actual work performed by an MBE
� and/or WBE. The misrepresentation of acts (other than a negligent misrepresentation) and/or the
commission of fraud by the Contractor will be grounds for termination of the contract and/or
initiating action under appropriate federal, state, or local laws or ordinances relating to false
D statement. Further, any such misrepresentation (other than a neglig�nt misrepresentation)
and/or commission of fraud will result in the Contractor being determined to be irresponsible and
barred from participating in City work fof a period of time of not less than three years.
The City will consider the contractor's perFormance regarding its M/WBE program in the
aevaluation of bids. Failure to comply with the City's M/WBE Ordinance, or to demonstrate "good
faith effort", shall result in a bid being rendered non-responsive to specifications.
��l
l�J
�'1
LJI
��
Contractor shall provide copies of subcontracts or co-signed letters of„ intent with approved
M/VVBE subcontractors prior to issuance of the Notice to Proceed. Contractor shall also provide
monthly reports on utilization of the subcontractors to the City's M/WBE office.
The Contractor may count first and second tier subcontractors and/or suppliers toward meeting
the goals. The Contractor may count toward its goal a po�tion of the total dollar amount of the
contract with a joint venture equal to the percentage of the M/WBE participation in the joint
venture for a clearly defined portion of the work to be performed. All M/WBE contractors used in
Toi�vss .._.,,.�:�� :.:. .. ::......_,.._,o-. , -::
.. . ::�.. .
��t��� .� , a., �
.r � , . :.
.: i.
,
..x,.v e4.t^,rw,..��r»aL.n�..�.�..�`
sc-s u����� 4,� ��C�C��G°1D
co� ���G���a�r
�Uo OVG��UVIIO ��Wm
�
PART D - SPECiAL CONDITIQNS
CLASSIFICATION RATE
CLASSIFiCATION
POW�R EQUIPMENT OPERATORS
Asphalt Distributor $8.404
Asphalt Paving Machine • $9.053
Broom or Sweeper Operator $7.908
Bulidozer, 160 HP or Less -��$8.703-
Bulldozer, Over 150 HP $9.160
Concrete Paving Curing Mach.$8.213
Concrete Pav Finishing Mach. $9.453
Concrete Paving Form Grader$8.500
Concrete Paving Joint Mach. $9.042
Concrete Paving Joint Sealer $7.350
Concrete Paving Float $7.875
Concrete Paving Saw $9.29Q
Concrete Paving Spreader $9.750
Slipform Machine $9.000
Crane, Clamshell, Backhoe,
Derrick, Dragline, Shovel
(Less than 1 %z cy) $9.513
Crane, Clamshell, Backhoe,
Derrick, Dragline, Shovel
("1 '/z cy & Over) $10.517
Crushing or Scrng Plt Opr. $9.50p
Elevating Grader Foundation
Drill Oper. (Crawler Mounted) $10.000
Foundation Drill Operator
(Truck Mounted) $11.138
Foundation Drill Opr Hel�er
Front Ent Loader
(2 %Z CY or Less) $8.823
Front Ent Loader
(Over 2 %2 CY) $9.311
Hoist (Double Drum & Less) $8.917
Milling Machine Operator $6.650
Mixer (Over 16 CF) $9.000
Mixer �16 CF & Less) $7.913
Mixer - Concrete Paving $9.500
Motor Grader Operator
(Fine Grade) $10.346
Motor Grader Operator $9.891
Pavement Marking Machine $6.402
Posthole Driller Operator
Roller, Steel Wheel
(Plant-Mix Pavements)
Roller, Steel Wheel
(Flatwheel or Tamping)
Roller, Pneumatic Self-Pro
Scraper - 17 CY & Less
Scraper - Over 17 CY
Side Boom
Tractor - Crawler Type
(150 HP & Less)
Tractor - Crawler Type
(Over 150 HP)
Tractor - Pneumatic
Traveling Mixer
Trenching Machine - Light
Trenching Machine - Heavy
Wagon-Drill, Boring Machin
Reinforcing Steel Setter
(Paving)
Reinforcing Steel Setter
(Structural)
Steel Worker - Structural
Sign Erector
Spreader Box Operator
Barricade Servicer Zone Wk,
Mounted Sign Installer
(Permanent Ground)
Truck Driver - Single Axle
(Light)
Truck Driver - Single Axle
(Heavy)
Truck Driver - Tandem Axle
(Semi-Trailer)
Truck Driver - Lowboy/Float
Truck Driver - Transit Mix
Truck Driver - Winch
Vibrator Operator
Welder
RATE
$9.000
$8.339
$7.963
$7,403
$8.138
$8.205
$7.793
$8.448
$8.873
$7.735
$7.615
$8.188
$12.498
e $9.000
$9.218
$11.548
$16.300
$11.436
$6.988
$6.402
$6.402
$7.465
$8.067
$7.816
$9.653
$7.507
$8.200
$7.000
$10.459
D-17 EASEMENTS AND PERMITS: The performance of this contract requires certain
temporary construction, right-of-e`ntry agreements, and/or permits to perform work on private
. . properiy.
,a,�9
sc-� 2 �� ��C���Q�� �'�C�Ul�U
� ��� c���v����
�o �U`cUUllq U���
0
l�J
�
u
�
PART D - SPECIAL CC�NQITIC�NS
Documents or these Special Contract Documents, in which no specific item for bid has been
provided for in the Proposal, shall be considered as a subsidiary item of work, the cost of which
shall be included in the price bid in the Proposal for each bid item. Surface restoration, removal
and replacement of fencing, and cfeanup are general items of work which fall in the category of
subsidiary work.
D-16 WAGE RATES: The labor classifications and minimum wage rates set forth herein have
been predetermined by the City Council of the City of Fort Worth, Texas, in accordance with
statutory requirements, as being the prevailing classific�tions and rates that shall govern on all
work perFormed by the Contractor or any Subcontractor on the site of the project covered by
these Contract Documents. In no event shall less than the following ,rates of wages be paid.
(Attached)
CITY OF FORT WORTH
j1 HIGHWAY CONSTRUCTION
� PREVAILING WAGE RATE FOR 1995
�
�
CLASSIFlCATION
Air Tool Operator
Asphalt Raker
Asphalt Shoveler
Batching Plant Weigher
Batterboard Setter
Carpenter
Concrete Finisher (PAV)
Concrete Finisher (STRS)
Concrete Rubber
Electrician
Flagger
Form Builder (STRS)
RATE
CLASSIFICATION
RATE
'R]
LJ
�J
I�
ul
�'
�
��I
U
C'
�I
I�I
�
�a�vss .�.�.,_�.s ,.
Y . yi,_} .
�
$7.55�
$8.565
$8.255
$9.371
$8.920
$9.447
$9.345
$9.058
$7.733
$12.761
$5.598
$8.717
N
.. .. _ .. . ,..„ . 'S
Form Liner
Form Setter (Pav & Curb)
Form Setter (Structures)
Laborer, Common
Laborer, Utility
Mechanic
Oiler
Servicer
Piledriver
Pipelayer
Blaster
$8.913
$8.686
$8.427
$6.402
$7.461
$10.658
$8.698
$8.104
$7.500
$8:509
$11.333
sc-� � GI��OC��d G��C� �
, CD�II ���cQ��IQI1�
I�
�Uo ��e�Ulfllp U�lNn
PART.Q - SPECIAL eQNDITION�
processed, the design drawings and specifications shall govern. The Contractor shall be
responsible for all dimensions which are to be confirmed and correlated at the job site, fabrication
processes and techniques of construction, coordination of his work with that of other trades and
satisfactory performance of his work. The Contractor shall check and verify all measurements
arid review submittals prior to being submitted, and sign or initial a statement included with the
submittal, which signifies compliance with the plans and specifications and dimensions suitable
for the application. Any deviation from the specified. criteria shall be expressly stated in writing in
the submittal. .
Shop drawings shall be submitted for the following items prior to installation:
1. All pipe
2. Reinforced steel fabrication for structures
3. Cast Iron structural appurtenances
Shop drawings must be approved b,y the Engineer prior to the start of work.
D-21 CROSSING OF EXISTING UTILITIES: Where a proposed water line crosses over a
sanitary sewer or sanitary sewer service line and/or proposed sewer line crosses over a water
line and the clear vertical distance is less than 9 feet barrel to barrel, the sanitary sewer or
sanitary sewer service line shall be made water tight or be constructed of ductile iron pipe. The
required length of replacement shall be determined by the Engineer. The material for sanitary
sewer mains and sanitary sewer laterals shall be Class 51 Ductile Iron Pipe with polyethylene
wrapping. The material for sanitary sewer service lines shall be extra strength cast iron soil pipe
with polyethylene wrapping. Adapter fittings shall be a urethane or neoprene coupling ASTM
C-425 with series 300 stainless steel compression straps.
Payment for work such as backfill, fittings, tie-ins and all other associated appurtenances
required, shall be included in the linear foot price of the appropriate bid item.
D-22 EXISTING UTILITIES AND IMPROVEMENTS: The plans show the locations of all known
surface and subsurface structures. However, the Owner assumes no responsibility for failure to
show any or all of these structures on the Plans, or to show them in their exact location. It is
mutually agreed that such failure shall not be considered sufficient basis for claims for additional
compensation for extra work or for increasing the pay quantities in any manner whatsoever.
The Contractor shall be responsible for verifying the locations of and protecting all existing
utilities, service lines, or other property exposed by his construction operations. Contractor shall
make all necessary provisions for the support, protection, relocation, and/or temporary relocation
of all utility poles, gas lines, telephone cables, utility services, water mains, sanitary sewer lines,
electrical cables, drainage pipes� and all other utilities and structures both above and below
ground during construction. The Contractor is liable for all damages done to such existing
facilities as a result of his operations and any and all cost incurred for the protection and/or
temporary relocation of such facilities shall be included in the cost bid per linear foot of pipe
installed. NO ADDITIONAL COMPENSATION WILL BE ALLOWED.
Where existing utilities d'r service lines are cut, broken or damaged the Contractor shall replace or
repair the utilities or service lines with the same type of original material and construction, or
better, unless otherwise shown or noted on the plans, at his own cost and expense. The
Contractor shall immediately notify the Owner of the damaged utility or service line. He shall
cooperate with the Owners of all �utilities to locate existing underground facilities and notify the
Engineer of any conflicts in grades and alignment.
�oi�2iss
�_
SC-14 -
���d���G�d �?���G�D
C�� ����Q��Q�
C��� �C?�b� q��. ,
�
PART D - SPECIAL C4NDITIQNS
D The City has attempted to obtain the temporary construction and/or right-of-entry agreements for
properties where construction activi.ty is necessary on City owned facilities, such as sewer lines or
manholes. For locations where the City was unable to obtain the easement or right-ef-entry, it
D shall be the Contractor's responsibility to obtain the agreement prior to beginning work on subject
property. This shall be subsidiary to the contract. The agreements which the City has obtained
are available to the Contractor for review by contacting the plans desk at the Department of
Q Engineering, City of Fort Worth. Also, it shall be the responsibility of the Contractor to obtain
written permission from property-�owners to perform such work as cleanout repair and sewer
service replacement on private property. Contractor shall adhere to all requirements of
Paragraph C6-6.10 of the General �ontract Documents. The Contractor's attention is directed to
a the agreement terms along with any special conditions that may have been imposed on these
agreements, by the property owners.
C
L�J
The easements and/or private property shall be cleaned up after use and restored to its original
condition or better. In event additional work room is required by the Contractor,,it shall be the
Contractor's responsibility to obtain written permission from the property �wners involved for the
use of additional property required. No additional payment will be allowed for this item.
The City has obtained the necessary documentation for railroad and/or highway permits required
o for construction of this project. The Contractor shall be responsible for complying with all
provisions of such permits and shall pay any and all costs associated with the permit(s). It is the
Contractor's responsibility to provide the required flagmen and/or provide payment to the
� approp�iate railroad/agency for all flagmen during construction in railroad/agency right-of-way.
Any and all costs associated with compliance with permits(s) including payment for flagmen shall
be subsidiary to the project price. No additional payment will be allowed for this item.
�
l!J
D-18 COORDINATION WITH FORT WORTH WATER DEPARTMENT: During the
construction of this project, it will be necessary to deactivate, for a period of time, existing lines.
The Contractor shall be required to coordinate with the Water Department to determine the best
times for deactivating and activating those lines.
D-19 DAMAGE TO PRIVATE PROPERTY: The Contractor shall immediately repair or replace
� any damage to private property, including but not limited to fences, walls, pavement and water
and sewer services, at no cost to the Owner. This shall be subsidiary to the contract and not a
separate pay item.
�
l�'J
�
L�J
�
I�i
�
�—' i
D-20 SHOP DRAWINGS: Shop drawings shall be submitted by the Contractor to the
Construction Engineer, for all equipment and materials for this project. Contractor shall submit
seven (7)� copies of shop drawings, layouts, manufacturer's data and material schedules as may
be required by the Engineer for his review. Such review by the Engineer shall include checking
for general conformance with the design concept of the project and general compliance with
information given in the General Contract Documents. Indicated action by the Engineer, which
may result from his review, shall not constitute concurrence with any deviation from the plans and
specifications unless such deviations are specifically identified by the method� described below,
and further shall not relieve the Contractor of responsibility for errors or omissions in the
submitted data. Processed shop drawing submittal are not change orders. The purpose of
submittals, by the Contractor, is to demonstrate that the Contractor understands the design
concept, and that he demonstrates his understanding by indicating which equipment and
materials he intends to furnish and install, and by detailing the fabrication and installation
methods he intends to use. If deviations, discrepancies or conflicts between submittals and the
design drawings and/or specifications are discovered, either prior to or after submittals are
���` , . _x,_.._ ,,
�oi�tiss " ' � ..> �. yx . �
�
.�� . �.'�� _ �, : ',: y`.
.�. ' .. e � ��
. ���.,.:.�:.. � .
SC-13 �.. . ,. ,
uf��OG01�� G����G�D .
� 0�'� ���'v G?[�1G��
rao nnr �, r,on n �r��n
PART D- SPECIAL CONL ITIQNS
2. The cost of the traffic control shall be included in the price bid for pipe compiete in place
as bid in the Proposal, and no other compensation will be allowed.
3. The Contractor shall furnish a traffic control pfan to �the City at the pre-construction
meeting. The cost for traffic control shall be subsidiary to the unit prices for this project.
�
�
�
D-25 PAYMENT: Payment for all work and material irnolved in salvaging, abandoning, and/or
removing of existing facilities shall be included in the tinear foot bid price of the pipe except as �
follows: �
1. Separate payment will be made for removal of all fire hydrants, gate valves 16-inch and
larger, and sanitary sewer manholes regardless of location.
2. Payment will be made for salvaging, abandoning, and/or removing of all other existing
facilities when said facility is not being replaced in the same trench, i.e., when removal
requires a separate trenching operation.
�
D-26 DELAYS: The Contractor shall receive no compensation for delays or hindrances to the
work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of
the City to provide information or material, if any, which is to be furnished by the City. When such
extra compensation is claimed, a written statement thereof shall be presented by the Contractor
to the Engineer, and if by him found correct, shall be approved and referred by him to the Council
for final approval or disapproval; and the action thereon by the Council shall be final and binding.
If delay is caused by specific orders given by the Engineers to stop work, or by the performance
of extra work, or by the failure of the City to provide material or necessary instructions for carrying
on the work, then such delay will entitle the Contractor fo an equivalent extension of time, his
application for which shall, however, be subject to the approval of the City Council; and no such
extension of time shall release the Contractor or the surefy on his performance bond from all his
obligations hereunder which shall remain in full force until the discharge of the contract.
D-27 DETOURS: TheY Contractor shall prosecute his work in such a manner as to create a
minimum of interruption� to traffic and pedestrian facilfies and to the flow of vehicular and
pedestrian traffic within the project area.
D-28 BARRICADES AND WARNING SiGNS: Barricades, waming and detour signs shall
conform to the Standard Specifications "Barriers and Waming and/or Detour Signs," Item 524,
and/or as shown on the plans. Construction signing and barricades shall conform with "1980
Texas Manual on Uniform T�affic Control Devices, Vol. No. 1" or latest edition there of.
D-29 EXAMINATION OF SITE: It shall be the responsibility of the prospective bidder to visit
the project site and make such examinations and explorations as may be necessary to determine
all conditions which may affect construction of this projed. Particular attention should be given to
methods of providing ingress and egress to adjacent private and public properties, procedures for
protecting existing improvements and disposition of all materials to be removed. Proper
consideration should be given to these details during the preparation of the Proposal and all
uni�sual conditions which may give rise to later contingencies should be brought to the attention
of the Owner prior to the submission of the Proposal.
D-30 ZONING COMPLIANCE: During the construction of this project, the Contractor shall
comply with present zoning requirements of the City of Fo�t Worth in the use of vacant property
for storage purposes. ._.. .
,0„�9
SC-16 �� �a���d ��Q��G'D
� �� � ��������
��o �G'��, ���o ,
�
LJ
��l
�
�
PART D - SPECIAL �QN�ITiQNS
Any and all permanent structures such as parking lot surface, fencing, and like structures shall be
replaced at no cost to the City by material of equal value and quality as that damaged.
In case it is necessary to change or move the property of any Owner of a public utility, such
property shall not be moved or interfered with until ordered to do so by the Engineer. The right is
re,served to the owner of public utilities to enter upon the limits of the project for the purpose of
making such changes or repairs of their property that may be made necessary by performance of
this contract.
The utility lines and conduits shown on the plans are for information only and are not guaranteed
o by the City of the Engineer to be accurate as to extent, location, and depth; they are shown on
the plans as the best information available at the time of design, from the owners of the utilities
involved and from evidences found on the ground.
�
�
�
�
�
L�J
LJ
iJ
L�'!
D-23 CONSTRUCTION TRAF�IC OVER PIPELINES: It is apparent that certain construction
vehicles could exceed the load bearing capacity of the pipe under shallow �b,ury conditions. It will
be the responsibility of the Contractor to protect .both the new line and the existing lines from
these possibly excessive loads. The Contractor shall not, at any time, cross the existing or new
pipe with a truck delivering new pipe to the site. Anv dama4e to the existing or new pipe will be
repaired or replaced by the Contractor, at the Contractor's expense, to the satisfaction of the City.
In locations where it is not permissible to cross the existing or proposed pipes without additional
protection the Contractor may elect to provide additional protection of the pipes so that more
frequent crossings of the pipes are allowed. It still is, however, the responsibility of the
Contractor to repair any damage to the existing or proposed lines, if the damage results from any
phase of his construction operation.
D-24 TRAFFIC CONTROL: The Contractor shall be responsible for providing traffic control
during the construction of this project consistent with the provision set forth in the "1980 Texas
Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority
of the "State of Texas Uniform Act Regulating Traffic on Highwa�rs," codified as Article 6701d
Vernon's Civil Statutes, pertinent sections being Section Nos. 27, 29, 30 and 31. In addition, the
Contractor shall comply with City of Fort Worth, Texas, February 1979, Traffic Control Handbook
for Construction and Maintenance Work Areas.
Q The Contractor will not remove any regulatory sign, instructional sign, street name sign or other
sign which has been erected by the City. If it is determined that a sign must be removed to
permit required construction, the Contractor shall contact the Transportation/Public Works
Department, Signs and Markings Division, (Phone Number 871-8100) to remove the sign., In the
a case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign
meeting the requirements of the above-referenced manual and such temporary sign must be
installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly
Q or �if it does not meet the required specifications, the permanent sign shall be left in place until the
temporary sign requirements are me�. When construction work is completed to the extent that
the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings
� Division to reinstall the permanent sign and shall leave his temporary sign in place until such
reinstallation is completed.
C+�J
u
0
1. The Contractor shall fumish barricades, flares, etc., for the protection of the public and the
work.
10/12/99 ,
. � �.�t�.:.
•� ,. .. '-
SC-15
G����O a'[� G?���D
C�II Il N1��v��WI�4W� ,
nn nnn�nnnn nnen
PART D — SPECIAL CONDITIQNS
5. No person shall work within six feet of a high voltage line without protection having besn
taken as outlined in Paragraph (3).
D-37 CONTRACTOR'S RESPONSIBILlTY FOR DAMAGE CLAIMS: The Contractor
covenants and agrees to indemnify, hold harmless and defend the City, and their officers, agents
servants or employees, and/or owners of the units and lot abutting the units in this contract from
and against any and all cfaims for damages or injuries, including death, to any and all persons or
property, of whatsoever-kind: of �character, whether real or asserted, arising out of or incident to
the services relating to the project to be performed� by said Contractor, its officers, agents,
servants or employees, under the terms and conditions of this Contract, whether or not caused by
negligence on the part of the City, or their officers, agents, servants or employees; and said
Contractor does hereby covenant and agree to assume all liability and responsibility of City for
injuries, claims or suits for damages to, any and all persons or property, of whatsoever kind or
character, occurring during the term of this agreement and arising out of or by reason of service,
covenants or agreements performed by said Contractor, its officers, agents, servants or
employees. Contractor likewise covenants and agrees to, and does hereby, indemnify and hold
harmless fhe City from a�d against any and all injuries or damages to property of City during the
performance of any of the terms and conditions of this Contract, whether arising out of or in
connection with or resulting from any and all acts or omissions of the City, their officers, agents,
servants, or employees, or caused by negligence on the part of City, or their officers, agents,
servants employees and/or owners of the units and lots abutting the units in this contract.
In the event a written claim for damages against the Contractor remains unsettled at the time all
work on the project has been completed to the satisfaction of the Director for the Department of
Engineering, as evidenced by a final inspection, final payment to the Contractor shall not be
recommended by the Director of Department of Engineering for a period of 30 days after the date
of such final inspection, „unless the Contractor shall submit written evidence satisfactory to the
Director that the claim has besn �settled and a release has been •obtained from the claimant
involved.
Although the claim concerned remains unsettle'd as of the expiration of the above 30-day period,
the Contractor may be deemed to be entitled to a semi-final payment for work completed, such
semi-final payment to be in an amount equal to the total dollar amount then due less the dollar
value of any written claims pending against the Contractor arising out of the performance of such
work, and such semi-final payment may then be recommended by the Director.
The Director shall not recommendr final payment to a Contractor against whom such a claim for
damages is outstanding for a period of six months following the date of the acceptance for the
work performed unless the Contractor submits evidence in writing satisfactory to the Director that:
1. The claim has been settled and a release has been obtained from the claimant involved,
or
2. Good faith efforts have been made to settle such outstanding class, and such good faith
efforts have failed.
If condition (1). above is met at any time within the six-month period, the Director shall
recommend that the final payment to the Contractor be made. If condition (2) above is met at
any time within the six-month period, the Director may recommend that the final payment to the
Coritractor be made. At the expiration of the six-month period, the Director may recommend that
final payment be made if all other work has been performed and all other obligation of the
Contractor have been rnet to the satisfaction of the Director.
�oi�tiss
V'
i£.
�------�—
sc-� s � --��: � �. �QD
'��(�ir����-u���s �?��J°
����U' ��[����G���1Q�1
�o �uG���o �C��{a
�
,��
�
��I
C�
"�
J
J
.�.
�
�
,.,
�
LJ
LJ
�
L�J
�
PART Q - SPECIAL CC�NQITIONS
D-31 WATER FOR CONSTRUCTION: Water for construction will be furnished by the
Contractor at his own expense. .
D-32 WASTE MATERIAL: All waste material shall become the properly of the Contractor and
shall be disposed of by the Contractor at locations approved by the Engineer. All materiai shall
be disposed of in such a manner as to present a neat appearance and to not obstruct proper
drainage or to cause injury to street improvements or to abutting property.
D-33 CLEANUP FOR FINAL ACCEPTANCE: Final cleanup work shall be done for this project
as soon as all construction has been completed. No more .than seven days shall elapse after
completion of construction before the roadway, right-of-way, or easement is cleaned up to the
satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work
before acceptance by the City of Fort Worth or its representative. This cleanup shall include
removal of all objectionable rocks, pieces of asphaft or concrete and other construction materials,
and in general preparing the site of the work in an orderiy manner arid appearance. Final
acceptance of the completed project work shall be given by the City of Fort Worth Department of
Engineering.
D-34 PROPERTY ACCESS: �Access to adjacent property shall be maintained at all times
unless otherwise directed by the Engineer.
D-35 CONSTRUCTION SCHEDULE AND SEQUENCING OF UVORK: Prior to executing the
Contract, it shall be the responsibility of the Contractor to fumish a schedule outlining the
anticipated time for each phase of construction with starting and completion dates, including`
sufficient time being allowed for cleanup.
D-36 SAFETY RESTRICTIONS : WORK NEAR HIGH VOLTAGE LINES: The following
procedures will be followed regarding the subject item on this contract:.
1. A warning sign not less than five inches by seven incl�es, painted yellow with black letters
that are legible at twelve feet shall be placed inside and outside vehicles such as cranes,
derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus.
The war•ning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS
EQUIPMENT.WITHIN SIX FEET OF HIGH VOLTAGE LINES." �
2. Equipment that may be operated within ten feet of high voltage lines shall have insulating
cage-type of guard about the boom or arm, except back hoes or dippers, and insulator
links on the lift hook connections.
3. When necessary to work within six feet of high voltage electric lines, notifcation shall be
given the power company (Texas Utility Electric) who will erect temporary mechanical
barriers, de-energize the lines, or raise or lower the lines. The work done by the power
company shall not be at the expense of the City of Fort Worth. The notifying department
shall maintain an accurate log of all such calls to Texas Utility Electric, and shall record
action taken �n each case.
4. The Contractor is required to make arrangements with the Texas Electric Service
company for the temporary relocation or raising of high voltage lines at the Contractor's
sole cost and expense.
o...... . .. .... .� . :.., . ..
10/12/99 *�4"
0 � _.. � . 4�:'
sc-� 7 U�(�0�0�� G��C��G�@
co� �������aQ�
�o VUIJ�j�Ulla �L�!/�:o
PART D - SPECIAL �QNQITI4NS
When the quantity of the work to be done or materials to be furnished under any pay item of the
contract is less than 75% of the quantity stated in the contract, whether stated by Owner or by
Contractor, then either party to the contract, upon demand, shall be entitled to negotiate for
revised consideration on the portio� of work below 75% of the quantity stated in the contract.
This paragraph shall not apply in the event Owner deletes a pay item in its entirety from this
contract.
In the event Owner and �ontractor are unable to agree on a negotiated price, Owner and
Contractor agree that the consideration will be the actual field cost of the work plus 15% as
described herein below, agreed up�n in writing by the Contractor and Director of Department of
Engineering and Contractor and Director of Department of Engineering and approved by the City
Council after said work is completed, subject to all other conditions of the contract. As used
herein, field cost of the work will include the cost of all workmen, foremen, time keepers,
mechanics and laborers; all materials, supplies, trucks, equipment rental for such time as actually
used on such work only, plus all power, fuel, lubricants, water and similar operating expenses;
and a ratable portion� of premiums �n performance and payment bonds, public liability, Workers
Compensation and all other insurance required by law or by ordinance. The Director of
Department of Engineering will direct the form in which the accounts of actual field cost will be
kept and will recommend in writing the method of doing the work and the type and kind of
equipment to be used, but such work will be performed by the Contractor as an independent
Contractor and not as an agent or employee of the City. The 15% of the actual field cost to be
paid to the Contractor shall cover and compensate him for profit, overhead, general supervision
and field office expense, and all other elements of cost and expense not embraced within the
actual field cost as herein specified. Upon request, the Contractor shall provide the� Director of
Department of Engineering access to all accounts, bills and vouchers relating thereto.
D-42 CUTTING OF CONCRETE: When existing concrete is cut, such cuts shall be made with
a concrete saw. All sawing shall be subsidiary to the unit cost of the respective item.
D-43 PROJECT DESIGNATION SIGN: Project signs are required at all locations. It shall be in
accordance with the attached Figure 30 (dated 9-18-96). Th� signs may be mounted on skids or
posts. The exact locations and methods of mounting shall be approveci by the Engineer. In
addition to the 4' x 8' project signs, project signs shall be attached to barricades used where
manhole rehabilitation or replacement is being conducted. Signs suspended from barricading
shall be placed in such a way that signs do not interfere with reflective paint o� coloring on the
barricades. Barricade signs shall be in accord� nce with Figure 30, excepti" that they shall be 1'-0"
by 2'-0" in size. The information box shall have the following information:
For Questions on this Projecf Call:
(817)871-8306 M-F 7:30 am to 4:30 p.m.
or
(817)871-8300 Nights and Weekends
Any and all cost for the required �materials, laF.or, and equipment necessary for the furnishing of
Project Signs shall be considered as a s�ibsidiary cost of the project and no additional
compensation will be allowed.
D-44 CONCRETE SIDEWALK AND DRIVEINAY REPLACEMENT: At locations in the project
where mains are required to be placed ui�der existing � sidewalks and/or driveways, such
sidewalks and/or driv��vays shall be completely replaced fior the full existing width, between
existing construction or expansion joints with 3000 psi concrete with reinforcing steel 'on a sand
�0/1tis9 SC-20 i J�������� Gy��iJ°�D
���U c�L��r�?� ° G��(
�Un UVVGSU� ���n —
L�'J
0
C��
PART Q - �PECIAL CONQITIONS
The Director may, if he deems it appropriate, refuse to accept bids on other Department of
Engineering contract work from a Contractor against whom a claim for damages is outstanding as
a result of work performed under a City contract or under a developer-let contract for City of Fort
Worth street and/or storm drainage facilities.
Q D-38 SANITARY FAClLITIES FOR WORKERS: The Contractor shall provide all necessary
sanitary conveniences for the use of workers at the project site. Specific attention is directed to
this requirement.
L�J
[��
I�
C
'RJ
�
�
�
�
L�J
D-39 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor's
particular attention is directed to the requirements of Item C-6-6, °Legal Relations and
Responsibilities to the Public" of the Fort Worth General Cbnditions.
D-40 RIGHT TO AUDIT:
A. Contractor agrees that the City shall, until the expiration of three (3) �years after final payment
under this contract have access to and the right to examine and photocopy any directly
pertinent books, document's, papers and records of the Contractor involving transactions
relating to this contract. Contractor agrees that the City shall have access during normal
working hours to all necessary Contractor facilities and shall be provided adequate and
appropriate work space in order to conduct audits in compliance with the provisions of this
section. The City shall give Contractor reasonable advance notice of intended audits.
B. Gontractor further agrees to include in all its subcontracts hereunder a provision to the effect
that the subcontractor agrees that the City shall, under the expiration of three (3) years after
final payment under the subcontract, have access to and the right to examine and photocopy
any directly pertinent books, documents, papers,and records of such subcontractor, involving
transactions to the subcontract, and further, that City shall have access during normal working
hours to all subcontractor facilities, and shall be provided adequate and appropriate work
space, in order to conduct audits in compliance with the provisions of this article together with
subsection (c) hereof. City shall give subcontractor reasonable advance notice of intended
audits.
C. Contractor and subcontractor agree to photocopy such documents as° may be requested by
the City. The City agrees to reimburse Contractor for the cost of copies as follows:
1. copies and under - 10 cents per page
2. more than 50 copies - 85 cents for the first page plus fifteen cents for each pa�e
thereafter
D-41 INCREASE OR DECREASE �IN QUANTITIES: The quantities shown in the proposal are
� approximate. It is the Contractor's sole responsibility to verify all pay item quantities prior to
submitting a bid.
�
��J
When the quantity of the work to be done or materials to be furnished under any pay item of the
contract is more than 125% of the quantity stated in the contract, whether stated by Owner or by
Contractor, then either party to the contract, upon demand, shall, be entitled to negotiate for
revised consideration on the portion of work above 125% of the quantity in the contract.
Q_ � -� ..a..,..
�oi�zss � '. ' . , ,. _ x
�
� . ,� ,a, .. �
SC-19 G ���� ��� ����UQ�
���`'V' ���Q� ° Q�
f�R IWlln�rS�M S�f�m
PART D - SPECIAL �QNQITIQNS
D-49 TRENCH EXCAVATiON, BACKFILL, AND COMPACTION: Trench excavation and
backfill under parking lots, driveways, gravel surfaced roads, within easements, and within
existing or future R.O.W: shall be in accordance with Section E1-2 Backfill and E2-2 Excavation
and Backfill of the General Contract Documents and Specifications except as specified herein.
A. TRENCH EXCAVATION: !n accordance with Section E2-2 Excavation and Backfill, if the
stated maximum.tr.ench widths are exceeded,.either through accident or otherwise, and if the
� Engineer determines that the design loading of the pipe will be exceeded, the Contractor will
be required to support the pipe with an improved trench bottom. The expense of such
remedial measures shall be entirely the Contractors own. All trenching operations shall be
confined to the width, of permanent rights-of-way, permanent easements, and any temporary
construction easements. All excavation shall be in strict compliance with the Trench Safety
Systems Special Condition of this document. ,
B. TRENCH BACKFILL: Trenches which lie outside of exis ing or future pavement shall be
backfilled above the top of the embedment material ith Type "C" backfill material.
Excavated material used fo� T�ype "C" backfill must be me�chanically compacted unless the
Contractor can fumish the Engineer with satisfactory evide ce that the P.I. of the excavated
material is less than 8. Such evidence shall be a test re ort from an independent testing
laboratory and must include.representative samples of soils in all involved areas, with a map
showing the location and depth of the various test holes. �f excavated material is obviously
granular in nature, c;ontaining little or no plastic material, �he Engineer may waive the test
report requiremerit. See E1-2.3, Type "C"' or "D" Backfill, and E2-2.11 Trench Backfill for
additional requirements. When,Type "C" backfill material is not suitable, at the direction of the
Engineer, Type "B" bac�ll material shall be used. In general, all backfill material for trenches
in existing paved streets shall be in accordance with Figure(s) A, B, C, or D. Sand material
specified in Figure(s) A-D shall be obtained from an approved source and shall consist of
durable particles free of thin or elongated pieces, lumps of clay, soil, Ioam or vegetable matter
and shall meet the following gradation:
Size Sieve % Reiained
#4 � 0-5
#16 0-20
#50 0=50
#100 60-95
#200 90-100
(P.I. = 8 or less)
C. TRENCH COMPACTION: All trench backfill shall be placed in lifts per E2-2.9 Backfill.
Trenches which lie outside existing or future pavements shall be compacted to a minimum of
90% Standard Proctor Density (A.S.T.M. D698) by means of tamping only.
Trenches which lie under existing or future pavement shall be baclifilled per Figure A with
95°/a Standard Proctor Density by jetting, mechanical tamping, or a combination of inethods.
Backfill material to be mechanically tamped must be within +-4% of its optimum moisture
�a�zis�` ."
SC-22
C�f�I��C�Oad G'C�C���D
� C��� ���r�f��Q�
�Ua VU�JUi,�UUg �li`Wo
�
�
C��
l��
L�J
�
C�
C'J
�
�'
PART D - SPECIAL CONDITIUNS
cushion in accordance with City of `Fort Worth Transportation/Public Works Department Standard
Specifications for Construction, Item 504.
At locations where mains are required to be placed under existing curb and gutter, such curb and
gutter shall be replaced to match type and geometry of the removed curb and gutter shall be
installed in accordance with City of Fort Worth Public Works Department Standard Specification
for Construction, Item 502. .
Payment for cutting,� backfill, concrete, forming materials and all other associated appurtenances
required, shall be included in the square yard price of the bid itein for concrete sidewalk or
driveway repair.
D-45 MISCELLANEOUS PLACEMENT OF MATERIAL: Material has been allocated under
various bid items in the Proposal to establish unit prices for miscellaneous placement of material.
These materials shall be used only when directed by the Engineer, depending on field conditions.
Payment for miscellaneous placement of mat2rial will �e made for only that amount of material
used, measured to the nearest one=tenth unit. Payment for miscellaneous placement of material
shall be in accordance with the General Contract Documents regardless of the actual amount
used for the project.
D-46 TYPE "C" ' BACKFILL: Excavated material used for Type "C" backfill must be
mechanically compacted unless �the Contractor can furnish the Engineer with satisfactory
evidence the P.I. of the excavated material is less then 8.* Such evidence shall be a test report
from an independen� testing laboratory and must include representative samples of soils in all
involved areas, with a map showing the location and depth of the various test holes.
If excavated material is obviously granular in nature, containing little or no plastic material, the
Engineer may waive the test report requirement.
See E-1.24, Type "C" Backfill, and E2.11 Trench Backfill.**
� * Revised 3/20/81
*" Revised 4/20/81
a D-47 CRUSHED LIMESTONE BACKFILL: Where specified on the plans or directed by the
Engineer, Crushed Limestone shall be used for trench .backfill on this project. The mater'ial shall
conform to Public Works Standard Specifications for Street and Storm Drain Construction
a Division 2 Item 208.2 - Materials and Division 2 Item 208.3 - Materials Sources. Trench bacicfill
and compaction shall meet the requirements of E2-2 Excavation and Backfill, Construction
Specifications, General Contract Documents.
�II
��i
M�
�
D
�
i
I�
Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal
multiplied by the quantity of material used measured in accordance with E2-2.16 Measurement of
Backfill Materials, Construction Specifications, General Contract Documents.
D-48 2:27 CONCRETE: Transportation and Public Works Department typical sections for
P�avement and Trench Repair for Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as
base repair. Since this call-out includes the word "concrete", the consistent interp�etation of the
Transportation and Public Works Department is that this ratio specifies two (2) sacks of cement
per cubic yard of concrete.
,o„�9F - .. a.�., _. ��.�: --:,....
.. � � �� F ;. °' ��a;„'i'w°;
, -_ ,��. �..
� 'A�`�4�r .�. $`� ,
.��._ . , � � .
sc-2� �f�f���� 4,d °'�C�C��D
r�� ��'�������
(��o �G��I� �f��
PART Q - SPECIAL �QNDITIONS
D-51 TRENCH SAFETY SYSTEM FOR WATER DEPARTMENT PROJECTS ONLY:
A. GENERAL: This specification covers the trench safety requirements for all trench
excavations exceeding depth of five (5) fest in order to protect workers from cave-ins. The
requirements of this item govem all trenches for mains, manholes, vaults, service lines, and
all other appurtenances. The design for the trench safety shall be signed and sealed by a
Registered Professional Engineer licensed in Texas.
B. STANDARDS: The latest version of the U.S. Depa�tment of Labor, Occupational Safety and
Health Administration Standards, 29 CFR Part 1926, Sub-Part P- Excavations, are hereby
made a part of this specificatio� and shall be the minimum goveming requirements for trench
safety.
C. DEFINITIONS:
1. TRENCHES - A`trench is referred to as a narrow excavation made below the surface of
the ground in which the depth is greater than the width, where the width measured at the
bottom is not greater than ffteen (15) fest.
2. BENCHING SYS�TEM - Benching means excavating the sides of a trencti to form one or a
series of horizontal level o� steps, usually with vertical or near-vertical surfaces between
levels.
3. SLOPING SYSTEM - Sloping means excavating to form sides of a trench that are inclined
away from the excavationN
4. SHIELD SYSTEM - Shields used in trenches are generally referred to as "trench boxes" or
°trench shields". Shield means a structure that is able to withstand the forces imposed on
it by a cave-in and protect worlcers within the structure. Shields can be permanent
structures or can be designed to be portable and move along as the work progresses.
Shields can be either pre-manufactured or job-built in accordance with OSHA standards.
5. SHORING SYSTEM - Sh�ring means a structure such as a metal hydraulic, mechanical
or timer system that supports the sides of a trench and which is designed to prevent cave-
ins. Shoring s�stems are generally comprised of cross-braces, vertical rails, (uprights),
horizontal rails (wales) and/or sheeting.
D. MEASUREMENT - Trench depth is the vertical measurement from the top of the existing
ground to the bottorii of the pipe or structures. The quantity of trench safety systems shall be
based on the linear foot amount of trench depth greater than five (5) feet.
E. PAYMENT - Payment shall be full compensation for safety system design, labor, tools,
materials, equipment and incidentals necessary for the installation and removal of trench
safety systems.
D-52 SANITARY SEWER MANHOLES:
A. GENERAL: The installation, replacement, and/or rehabilitation of sanitary sewer manholes
will be required a,s shown on the plans, and/or as described in these .Special Contract
Documents in ad�ition to those located in the field and identified by the Engineer. All
manholes shall be �in accordance with sections E1-14 Materials for Sanitary Sewer Manholes,
r`����
�oi�tiss - SC-24 j ��� ��������
V Uo VUGU`,UIlU9 ��o
�
�
I�J
�
�
�
Ls'
lR'
Li'
�
C�
�
�
�
�
�
�,
�
�
C
i
PART D - SPECIAL CONQITI4NS
� content. The top finro (2) feet of sewer line trenches and the top eighteen (18) inch�s of water
line may be rolled in with heavy equipment tires, provided it is placed in lifts appropriate to the
material being used and the operation can be performed without damage to the installed pipe.
C�
�
�
��J
�
�
`�J
f�
�
�
J
L'1
L�
�
�
�
��
The City, at its own expense, will perform�trench compaction tests per A.S.T.M. standards on
all trench bacfcfill. Any retesting required as a result of failure to compact the backfill material
to meet the standards will be at the expense of the Contr�actor and will be billed at the
commercial rates as determined by the City. .These soil density tests shall be performed at
two (2) foot vertical intervals beginning at a level two (2) feet above the top of the installed
pipe and continuing to the top of the completed bacicfill at intervals along the trench not to
exceed 300 linear feet. The Contractor will be responsible for providing access and trench
safety system to the level of trench backfill to be tested. No extra compensation will be
allowed for exposing the backfill layer to be tested or providing trench safety system for tests
conducted by the City.
D. MEASUREMENT AND PAYMENT: All material, including• any and all Type "B" backfill, and
labor costs of excavation and backfill will be inciuded in tFie price bid per linear foot of water
and sewer pipe.
D-50 PAVEMENT REPAIR (E2-19�: The unit price bid under the appropriate bid item of the
proposal shall cover all cost for providing pavem�nt repair equal to or superior in composition,
thickness, etc., to existing pavement as detailed in the Public Works Department typical sections
for Pavement and Trench Repair for Utility Cuts, Figures 1 through 5.
All required paving cuts shall be made with a concrete saw in a true and straight line on both
sides of the trench, a minimum of finrelve (12) inches outside the trench walls. The trench shall be
backfilled and the top nine (9) inches shall be filled with required materials as shown on paving
details, compacted and level with the finished street surface. This finished grade shall be
maintained in a serviceable condition until the paving has been replaced. All residential
driveways shall be accessible at night and over weekends.
It has been determined by the Transportation and Public Works Department that the strip of
existing HMAC pavement between the existing gutter and the edge of the trench pavement repair
will not hold up if such strip of existing pavement is two (2) feet or less in width.
Therefore, at the locations in the project where the trench wall is three (3) feet or less from the lip
of the existing gutter, the Contractor shall be required to remove the existing paving to such
gutter. The pavement repair shall then be made from a minimum distance of finrelve (12) inches
outside the trench wall nearest the center of the strest to the gutter line.
The pavement shall be replaced within a maximum of five (5) working days, providing job
placement conditions will permit repaving. If paving conditions are not suitable for repaving, in
the opinion of the Owner, the repaving shall be done at the earliest possible date.
A permit must be obtained from the Department of Engineering Construction Services Section by
the Contractor in conformance with Ordinance No. 3449 and/or Ordinance No. 792 to make utility
cuts in the strest. The Department of Engineering•will inspect the paving repair after construction.
This permit requirement may be waived if work is being done under a Performance Bond and
inspected by the Department of Engineering.
�
�oi�2iss
� ; `� � .
� '.,It'.
SC-23 �
�(��0��/z� G-������D
�� '� �SC���G�� �° G��
r�s� ��� 7n�M ��r�M
�'ART D - SPECIAL CONDITiC�NS
joints using a trapped type performed O-ring rubber gasket shall require Bitumastic joint
sealants as per Figure M.
This sealant shall be pre-formed and trowelable Bitumastic as manufactured by Kent=
Seal, Ram-Nek, E-Z Stick, or equal. The joint sealer shall be supplied in either extruded
pipe form or suitable cross-sectional area or flat-tape and shall be sized as recommended
by the manufacturer and approved by the Engineer. The joint sealer shall be protected by
a suitable removable.wrapper and shall not in any way depend on oxidation, evaporation,
or any other chemical action for either its adhesive properties or cohesive strength. The
Joint sealer shall remain totally flexible without shrinking, hardening, or oxidizing
regardless of the Iength A of"'time it is exposed to the elements. The manufacturer shall
fumish an affidavit attesting to the successful use of the product as a pre-formed flexible
joint sealant on concrete�pipe and manhole sections for a period of at least five years.
B. EXECUTION:
1. INSTALLATION OF JOINT SEALANT: Each grade adjustment ring and manhole frame
shall be sealed with the above 'specified materials. All surtaces to be in contact with the
joint sealant shall be thoraughly cleaned of dirt, sand, mud, or other foreign matter. A
primer shall be applied to a�l surfaces prior to installing the joint sealant in accordance with
the r�commendations by the manufacturer. The protective wrapper shall remain on the
joint sealant until immediately prior to the placement of the pipe in the trench. After
removal of the protective wrapper, the joint sealant shall be kept clean. Install frames and
cover over manhole openir�'g with the bottom of the rings resting on Bitumastic joint sealer.
Frames and grade rings shall rest on two (2) rows (inside and outside) of Bitumastic joint
sealer.
2. SEALING AND/OR ADJUSTING EXISTING MANHOLES: Excavate (rectangular full
depth saw cut i#� in pavement) adjacent to the manhole to expose the entire manhole
frame and a mirlimum of 6 inches of the manhole wall keeping the sides of the trench
nearly vertical.
Remove manhole frame from the manhole structure and observe the condition of the
frame and grade rings. Any frame or grade ring that is not suitable for use as determined
by the Engineer' shall be replaced. Grade rings that are constructed of brick, block
materials other than pre-cast concrete rings, or where necessary and approved by the
Engineer, shall be replaced with a pre-cast flattop section. Pre-cast concrete rings, or a
pre-cast concrete flattopg section will be the only adjustments allowed.
In brick or block manholes; replace the upper portion of the manhole to a point 24 inches
below the frame. If the walls or cone section below this level are structurally unsound,
notify the Engineer prior to replacement of the grade rings and manhole frame. Existing
brickwork, if damaged by the Contractor, shall be replaced at the Contracto�'s expense.
Wire brush manhole frame and exposed manhole surfaces to remove dirt and loose
debris. Coat exposed manhole surfaces with an approved bonding agent followed by an
application of a quick setting hydraulic cement to provide a smooth working surface.
If the inside diameter of the manhole is too large to safely support new adjustment rings or
frames, a flat top section shall be installed.
�a�2iss
a
i
9
�
sc-2s G���C��Q� �`�I�� � u`l�
C�O�(1 ���Q� ° Q�
f�o �GG���9 �f[��o
il "
�J
CI
�
PART Q - S�PECIAL �ONDITIQNS
Valve Vaults, Etc., and E2-14 Vault and Manhole Construction of the General Contract
Documents and Specifications, unless amended or superseded by requirements of this
Special Condition.
a1. CONCRETE COLLARS
per Figure 121.
�
u
�
�
�
L�J
LJ
u
�
�
�
�
Concrete collars will be required on all manholes specified as
2. WATERTIGHT MANHOLE INSERTS: Watertight gasketed� manhole inserts shall be
install�d in all sanitary sewer manholes. Inserts shall be constructed in accordance with
Fort Worth Water Department Standard E100-4 and shall be fitted and installed according
to the manufacturer's recommendations. Stainless Steel manhole inserts shall be
required for all pipe diameters 18" and greater.
3. LIFT HOLES: All lift holes shall be plugged with a pre-cast concrete plug. The lift hole
shall be sealed on the outside of the manhole with Ram-Nek or an approved equal
sealant. The lift hole shall be sealed on the inside of the manhole with quick setting
cement grout.
4. F1NAL RIM ELEVATIONS: Manhole rims in parkways, lawns and other improved lands
shall be at an elevation not more than one (1) nor less than one-half (1/2) inch above the
surrounding ground. Backfill shall provide a uniform slope from the top of manhole
casting for not less than three (3) feet each direcction to existing finish grade of the ground.
The grade of all surFaces shall be checked for proper slope and grade by string lining the
entire area regarded near the manhole.
Manholes in open fields, unimproved land, or drainage courses shall be at an elevation
shown on the drawings or minimum of 6 inches above grade.
5. .MANHOLE COVERS: All lids shall have pick slots in lieu of pick holes. Manhole frames
and covers shall be McKinley, Type N, with indented top design, or equal, with pick slots.
Covers shall set flush with the rim of the frame and shall have no larger fhan 1/8 inch gap
between the frame and cover. Bearing surfaces shall be machine finished. Locking
manhole lids and frames will be restricted to locations within the 100-year�floodplain and
areas specifically designated on the plans. Certainteed Ductile Iron Manhole Lids and
Frames are acceptable for use where locking lids are specified.
6. SHALLOW CONE MANHOLES: Shallow manhole construction will be used when
manhole depth is four (4) feet or less. All shallow cone manholes shall be built in
accordance with Figure 105. All shallow cone manholes shall have a cast iron lid and
frame with pick slots. NOTE: MANHOLES PER FIGURE 106 WILL NOT BE ALLOWED.
7. MANHOLE STEPS: No manhole steps are to be installed on any sanitary sewer
manhole.
8. EXTERIOR SURFACE COATING: Exterior surfaces of all manholes shall be coated with
� two mop coats of coal tar epoxy, Koppers "Bitumastic Super Service Black" Tnemec "46-
450 Heavy Tnemecol," or equal to, a minimum or 14 mils dry film thickness.
Q 9. MANHOLE JOINT SEALING: All interior and/or exterior joints on concrete manhole
sections constructed for the City of Fort Worth Wat�r Department, excluding only the
� .. „ � . ....� ._.. ,� �9�. .., . {„ _
,0„�9 � � .. , � , � ,, sc-25 UU�I�UCDQ� ��G�C��G�D
� � . � ,,. . � ..e C���I ���G°�[��G?�l
•• � �a UUV S`�Ifll. �IC/n\ _
PART Q - SPECIAL CONDITIONS
A. SEWER SERVICE RECONNECTION: When sewer service reconnection is called for the
Contractor shall ve�tically adjust the existing sewer service line as required for reconnection
and fumish a new tap. The fittings used for vertical adjustment shall consist of a maximum
bend of 45 degrees. The tap shall be located so as to line up with the service line and avoid
any horizontal adjustment. For open cut applications, all sanitary sewer service lines shall be
replaced to the property or easement line, or as directed by the Engineer. Sanitary sewer
services on sewers be,jng rehabilitated using pipe enlargement methods shall be replaced to
the property or easement line or as directed by the Engineer. Procedures listed below for
Sewer Service Replacement sha(I be adhered to for the installation of any sewer service line
including the incidental four (4) feet of service line which is included in the price bid for
Sanitary Sewer Taps. Payment°for work such as backfill, saddles, tees, fittings incidental four
(4) feet of service line and all other associated appurtenances required shall be included in
the price bid for Sanitary Sewer Taps.
B. SEWER SERVICE REPLACEMENT: All building sewer services encountered during
� construction shall be adjusted and/ot replaced by the Contractor as directed by the Engineer
as required for the connection Qf the sewer service line. If the sewer service line is in such
condition or adjustment necessitates the replacement of the sewer service line, all work shall
be perFormed by a licensed plumber. The length of the replacement shall be determined by
the Engineer. All sewer services shall be installed at a minimum of finro (2) percent slope or
as approved by the Engineer. Connection to the existing sewer service line shall be made
with appropriate adapter fitting. The fitting shall be a urethane or neoprene coupling A.S.T.M.
C-425 with series 300 stainless steel compression straps.
Payment for work and materials such as backfill, pipe fittings, surface restoration on private
property (to match existin�), and all other associated work for service replacements in excess
of four (4) linear feet shall be included in the linear foot price bid for sanitary sewer service
line replacement. Payment for all work and material involving the "tap" shall be included in
the price bid for sanitary sewer service taps.
D-54 NOT USED
D-55 REMOVAL, SAL"VAGE, AND ABANDONMENT OF EXISTING FACILITIES: Any
removal, salvaging and/or abandonment of existing facilities will necessarily be required as shown
on the plans, and/or described in these Special Contract Documents in addition to those Iocated
in the field and identified by the Engineer. This work shall be done in accordance with Section
E2-1.5 Salvaging of Material and E2-2.7 Removing Pipe, of the General Contract Documents and
Specifications, unless amended or superseded by requirements� of this Special Condition.
A. SALVAGE OF EXISTING WATER METER AND METER BOX: Existing water meter and
meter box shall be removed and returned to the Water Department warehouse by the
Cor�tractor in accordance with "Section E2-1.5 Salvaging of Materials.
B. SALVAGE OF EXISTING WATER METER AND CONCRETE VAULT LID: Existing water
meter and concrete vault lid shall be removed and returned to the Water Department
warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The
concrete vault shall be demblished in place to a point not less than 18 inches below final
grade. The concrete vault shall then be backfilled and compacted in accordance with backfill
method as specified in Sectien E2-2.9 Backfill. Backfill material shall be suitable excavated
material approved by the Engineer. Surface restoration shall be compatible with existing
surrounding surface and grade.
,0„�9
F
� ..
sc-Zs �j����a�� G}f�C��V°?U
C�D�1 ���Qf��G?ti
� (�o �IC�G?�N�9 �L��
0
PART D - SPECfAL CONQITIONS
Joint surfaces between the frames, adjustment rings, and cone section shall be� free of
� dirt, stones, debris and voids to ensure a watertight seal. Place flexible gasket joint
material along the inside and outside edge of each joint, or use trowelable material in lieu
of pre-formed gasket material. Position the butt joint of each length of joint material on
� opposite sides of the manhole. No steel shims, wood, stones, or any material not
specifically accepted by the Engineer may be used to obtain final surface elevation of the
manhole frame.
�
�
'sl
LJ
L�J
In paved areas or future paved areas, castings shall be installed by using a straight edge
not less than ten (10) feet long so that the top of the casting will conform to the slope and
finish elevation of the paved surFace. The top of the casting shall be 1/8 inch below the
finished elevation. Allowances for the compression of the joint material shall be made to
assure a proper final grade elevation.
3. EXPOSED EXTERIOR SURFACES: All exposed exterior surfaces shall be coated with
finro mop coats of coal tar epoxy. Kopper "Bitumastic Super Service Black"; Tnemec "46-
450 Heavq Tnemecol", or equal, �to a minimum of 14 mils dry film thickness.
4. The exterior surface of all pre-cast section joints shall be thoroughly cleaned with a wire
brush and then waterproofed with a 1/2-inch thick coat of trowelable bitumastic joint
sealant from 6-inches below to 6-inches above the joint. The coated joint shall then be
wrapped with 6 mil plastic to protect the sealant from damage during backfilling.
a C. MEASUREMENT AND PAYMENT: The price bid for new manhole installations shall include
all labor, equipment, and materials necessary for construction of the manhole including, but
not limited to, joint sealing, lift hole sealing and exterior surface coating and pavement repair.
�
�
The price bid for reconstruction of existing manholes shall include all labor equipment and
materials necessary for construction of new manhole, including, but not limited to, excavation,
backfill, disposal of materials, joint sealing, lift hole sealing, exterior surFace coating and
pavement repair.
The price bid for adjusting and/or sealing of existing manholes shall include all labor,
�'j equipment and materials necessary for adjusting and/or sealing the manhole, including but
U not limited to, joint sealing, lifthole sealing, and exterior surface coating.
�
�
l*1
l�J
�
�
�I
Payment for concrete collars will be made per each. Payment for manhole inserts will be
made per each.
D-53 SANITARY SEWER SERVICES: Any reconnection, relocation, re-routes, replacement, or
new sanitary sewer service shall be required as shown on the plans, and/or as described in these
Special Contact Documents in addition to those located in the field and identified by the Engineer
as active sewer taps. The service connections shall be constructed by the Contractor utilizing
standard factory manufactured tees. City approved factory manufactured saddle taps may be
used, but only as directed by the Engineer. The decision to use saddle taps as opposed to tees
shall be made on a case by case basis. The Contractor shall be responsible for coordinating the
scheduling of tapping crews with building owners and the Engineer ih order that. the work be
performed in an expeditious manner. A minimum of 24 hours advance notice shall be given when
taps will be required. Severed service connections shall be maintained as specified in section
C6-6.15.
10/12/99 `' ..'. ""�h, .
I �,} 3�• • . '
r a
� 4 , • �'^�f! 'A. ,e. W.0 rf r�.rnu_ _.
SG27 DO�������� �'�����
V O Y Y��f����Y4.� Y
�o UV�JU�:t�UUy U�Wa
�PART Q - SPECIAL CONQITIQNS
J. REMOVAL OF EXISTING PIPE: Where removal of the existing pipe is required, it shall be
the Contractor's responsibility to properly dispose of all removed pipe. All removed valves,
fire hydrants and meter boxes shall be delivered to Water Department Field Operation,
Storage Yard.
K. PAYMENT: Payment.for all work and material involved in salvaging, abandoning and/or
removing existing facilities shall be included in the linear foot bid price of the pipe, except as
follows: separate payment will be made for removal of all fire hydrants, gate valves, 16 inch
and larger, and sanitary sewer manholes, regardless of location.
Payment will be made for salvaging, abandoning and/or removing all other existing facilities
when said facility is not being replaced in the same trench (i.e., when removal requires a
separate trench).
D-56 DETECTABLE WARNING TAPES: Detectable underground utility war.ning tapes which
can be Iocated from the surface by a pipe detector shall be installed directly above non-metallic
water and sanitary sewer pipe. The detectable tape shall be "Detect Tape" manufactured by Allen
Systems, Inc. or approved equal, and shall consist of a minimum thickness 0.35 mils solid
aluminum foil encased in a protective inert plastic jacket that is impervious to all known alkalis,
acids, chemical reagents and solvents found in the soil. The minimum overall thickness of the
tape shall be 5.5 mils, and the width shall not be less than two inches with a minimum unit weight
of 2%z pounds/1 inch/1 QO'. The tape shall be color coded and imprinted with the message as
follows: �
Tvpe of Utilitv
Col"or Code
LeQends
Water
Sewer
Safety Blue
Safety Green
Caution! Buried Water Line Below
Caution! Buried Sewer Line Below
Installation of detectable tapes shall be per manufacturer's recommendations and shall be as
close to the grade as is practical for optimum protection and detectability. Allow a minimum of 18
inches between the tape and the pipe. Payment for work such as backfill, bedding, blocking,
detectable tapes, and all other associated appurtenances required shall be included in the unit
price bid for the appropriate bid item(s).
D-57 PIPE CLEANING: Joints`shall be wiped and then inspected for proper installation by the
inspectors. Each joint shall be swept daily and kept clean during installation. A temporary night
plug shall be installed on all exposed pipe ends during any period of work stoppage.
D-58 BARRICADES, WARNINGS, AND FLAGMEN: Reference Part C- General
Conditions, Section C6-6.8 BaKricades, Warnings, and Watchmen:
A. Wherever the word Watchmen appears in this paragraph, it shall be changed to the word
Flagmen.
B. In the first paragraph, lineso five (5) and six (6), change the phrase "take all such other
precautionary measures" to "take all reasonable necessary measure�" ,
,0�,�9 . sc-3o
0�1�6C�81�� �?�C�O�D
C�O� �E��rG��`�G��
�� �����M, �(��{.
�
��-J
�
�
l�l
�
�'�l
,�
��
l�l
�
��
�
LrJ
�
O
�
r'�
��.
��
PART Q - SPECfAL CQNDITIONS
C. SALVAGE OF EXISTING FIRE HYDRANTS: Existing fire hydrants shali be removed and
returned to the Water Department warehouse by the Contractor in accordance with Section
E2-1.5 Salvaging of Materials. The void shall be backfilled and compacted in accordance with
backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable
excavated material approved by the Engineer. Surface restoration shall be compatible with
existing surrounding surface and grade.
D. SALVAGE OF EXISTING GATE VALVE: Existing gate valve and valve box and lid shall be
removed and returned to the Water Department warehouse by the Contractor in accordance
with Section E2-1.5 Salvaging of Materials. The void area caused by the valve removal
shall be backfilled and compacted in accordance with backfill method as specified in Section
E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the
Engineer. Surface restoration shall be compatible with existing surrounding surtace and
grade. If the valve is in a concrete vault, the vault shall be demolished in place to a point no
less than 18" below final grade.
E. ABANDONMENT OF EXISTING GATE VALVE: Existing gate valve ,and box lid shall be
abandoned by first closing the valve to the fully closed position and demolishing the valve box
in place to a point not less than 18 inches below final grade. �oncrete shall then be used as
backfill material to match existing grade.
F. ABANDONMENT OF EXISTING VAULTS: Vaults to be demolished in place shall have top
slab and lid removed and vault walls demolished to a point not less than 18" below final
grade. The void area caused shall then be bacicfilled and compacted in accordance with
backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable
excavated material approved by the Engineer. Surface restoration shall be compatible with
the existing surrounding grade.
G. ABANDONMENT OF MANHOLES: Manholes to be abandoned in pla�e shall have all pipes
entering or exiting the structure plugged with lean concrete. Manhole top or cone section
shall be removed to the top of the full barrel diameter section, or to point not less than 18
inches below final grade. The structure shall then be backfilled and compacted in accordance
with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be either
clean washed sand of clean, suitable excavated material approved by the Engineer. Surface
restoration shall be compatible with surrounding service surface. Payment for work involved
in backfilling, plugging of pipe(s) and all other appurtenances required, shall be included in the
appropriate bid item - Abandon Existing Sewer Manhole.
H. REMOVAL OF MANHOLES: Manholes to be removed shall have all pipes entering or exiting
the structure disconnected. The complete manhole, including top or cone section, all full
barrel diameter section, and base section shall be removed. The excavation shall then be
backfilled and compacted in accordance with backfill method as specified in Section E2-2.9
Backfill. Backfill material may be with Type C Backfill or Type B Backfill, as approved by the
Engineer. Surface restoration shall be compatible with surrounding surface.
I. CUTTING AND PLUGGING EXISTING MAINS: At various locations on this project, it may be
required to cut, plug, and block existing water mains/services or sanitary sewer
mains/services in order to abandon these lines. Cutting and plugging existing mains and/or
services shall be considered as incidental and all costs incurred will be considered to be
included in the linear foot bid price of the pipe, unless separate trenching is required.
�oi�2�ss �.. , � .. . ,. _ ;..�. .k
. � � ..; . .
S C-29
._�
GC�f�BC���d G�[�C���D
C���1 ����[��Ql�
r� �r��M ��M
PART D - SPECIAL G(�NQITIONS
capable of producing a scouring action from 15 to 45 degrees in all size lines designated
to be cleaned. Equipment shall also. include a high-velocity gun for washing and scouring
manhole walls and floor. The gun shall be capable of producing flows from a fine spray to
a solid stream. The equipment shall carry its own water tank, auxiliary engines, pumps,
and hydraulically driven hose reel.
Hy.draulically Propelled Equipment shall. be of a movable dam type and be constructed in such
a way that a portion of the dam may be collapsed at any time during the cleaning
operation to protect againsf flooding of the sewer. The movable dam shall be equal in
diameter around the outer periphery to ensure removal of grease. If sewer cleaning balls
or other equipment which cannot �e collapsed is used, special precautions to prevent
flooding of the sewers and public or+ private property shall be taken. The flow of sewage
present in the sev�er lines shall be u�ilized to provide necessary fluid for hydraulic cleaning
devices whenever possible. �
2. CLEANING PROCEDURES: The �designated sewer manholes shall be cleaned using
high-velocity jet equipment. The �quipment shall be capable of removing dirt, grease,
rocks, sand, and other materials an,d obstructions from the sewer lines and manholes. If
cleaning of an entire section cannot be successfully performed from one manhole, the
equipment shall be set up on the other manhole and cleaning again attempted. If, again,
successful cleaning cannot be performed or equipment fails to traverse the entire manhole
section, it will be assumed that a major blockage exists, and the cleaning effort shall be
abandoned. Wh�n additional quantities of water from fire hydrants is necessary to avoid
delay in normal working procedures, the water shall be conserved and not used
unnecessarily. No fire hydrant shall be obstructed in case of a fire in the area served by
the hydrant. Before using any water from the City Water Distribution System, the
Contractor shall °apply for and receive permission from the Water Department. The
Contractor shall be responsible for the water meter and related charges for the setup,
including the water usage bill. All expenses shall be considered incidental to cleaning.
3. DEBRIS REMOVAL AND �ISPOSAL: All sludge, dirt, sand, rock, grease, and other solid
or semisolid material resulting from the cleaning operation shall be removed at the
downstream manhole of the section being cleaned. Passing material from manhole
section to manhole section, which could cause line stoppages, accumulations of sand in
wet wells, or damage pumping equipment, shall not be permitted.
4. All solids or semisolid resulting from the cfeaning operafions shall be removed from the
site and disposed of at a site designated by the Engineer. All materials shall be removed
from the site no less often than at the end of each workday and disposed of at no
additional cost to the City.
5. UNDER NO CIRCUMSTANCE SHALL SEWAGE OR SOLIDS REMOVED THEREFROM
BE DUMPED ONTO STR�EETS OR INTO DITCHES, CATCH BASINS, STORM DRAINS
OR SANITARY SEWER MANHOLES.
6. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection
shall be one specifically designed and constructed for such inspection. Lighting for the
camera shall be suitable to allow a clear picture'of the entire periphery of the pipe. The
camera shall be operative in 100% humidity conditions. The camera, television monito�,
and other components of the video system shall be capable of producing picture quality to
the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no
payment will be made for an unsatisfactory inspection. ,
,0�,�9
_ _� ���OC���� �?[��G�D
sc-s2 CU`�l�( �I�'���j��/J—
�o UV\/��t�UU9 �L7U�o i
�
��
u
C'
C
L�JI
�•l
�
�J
�
��
��
[�J
!J
L�J
�
PART D - SPECIAL CONDITIQNS
D-59 DISPOSAL OF SPOIUFILL MATERIAL: Prior to the disposing of any spoil/fill material,
the Contractor shall advise the Director of Engineering Department, acting as the City of Fort
Worth's Flood Plain Administrator ("Administrator"), of the location of all sites where the
Contractor intends to dispose of such material. Contractor shall not dispose of such material until
the proposed sites have been determined by the Administrator to meet the requirements of the
Flood Plain Ordinances of the City of Fort Worth (Ordinance No. 10056). All disposal sites must .
be approved by the Administrator to ensure that filling is not occurring within a flobdplain without
a permit. A floodplain permit can be. issued upon approval of necessary Er�gineering studies. No
fill permit is required if disposal sites are not in a floodplain. Approval of the Contractor's disposal
sites shall be evidenced by a letter signed by the Administrator stating that the site is r�ot in a
known flood plain, or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any
expenses associated with obtaining the fill permit, including any necessary Engineering studies,
shall be at the Contractor's expense. In the event that the Contractor disposes of spoil/fill
material at a site without a fill permit ar a fetter from the administrator approving the disposal site,
upon notification by the Director of Engineering DepartmeM, Contractor shall remove the spoil/fill
material at its expense and dispose of such materials in accordance with the Ordinances of ttie
City and this section.
D-60 MECHANICS AND MATERIALMEN'S LIEN: The Contractor shall be required to execute
a release of inechanics and materialmen's liens upon receipt of payment.
D-61 SUBSTITUTIONS: The specifications for materiats set out the minimum standard of
quality which the City believes necessary to procure a satisfactory proje�t. No substitutions will
be permitted until the Contractor has received written permission of the Engineer to make a
substitution for the material which has been specified. Where the term "or equal", or "or approved
equal° is used, it is understood that if a material, product, or piece of equipment bearing the name
so used is furnished, it will be approvable, as the particular trade name was used for the purpose
of establishing a standard of quality acceptable to the City. If a product of any other name is
proposed for use, the Engineer's approval thereof must be obtained before the proposed
substitute is procured by the Contractor. Where the term `or equal", or "or approved equal" is not
used in the specifications, this does not necessarily exdude alternative items or material or
equipment which may accomplish the intended purpose. However, the Contractor shall have the
full responsibility of proving that the proposed substitution is, in fact, equal, and the Engineer, as
the representative of the City, shall be the sole judge of the acceptability of substitutions. The
provisions of this sub-section as related to "substitutions' shall be applicable to all sections of
these specifications.
D-62 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER
A. GENERAL: Prior to the reconstruction, ALL sections of existing sanitary sewer lines to be
abandoned, ,removed (except where being replaced in the same location), or rehabilitated
(pipe enlargement, cured-in-place pipe, fold and form pipe, slip-line, etc.), shall be cleaned,
and a television inspection performed to identify any active' sewer service taps, other sewer
laterals and their location. Work shall consist of fumishing all labor, material, and equipment
necessary for the cleaning and inspection of the sewer lines by means of closed circuit
television. Satisfactory precautions shall be taken to protect the sewer lines from damage
that might be inflicted by the improper use of cleaning equipment.
a 1. HIGH VELOCITY JET (HYDROCLEANING) EQUIPMENT: The high-velocity sewer line
cleanin'g equipment shall be cons�ructed for easy and safe operation. The equipment
shall•.also, have a 5election of finro or more high-velocity nozzles. The nozzles shall be
� °� � '� � �" � - ,
�I
�oi�vss
SC-31 U����O��� �`(���'�'�°�
��u If ����U`��IlWb�,�u�
1� �0 1%1'I1v��l�l(71 II Ir i.l
PART Q - SPECIAL CONQITIDNS
If the tapes are of such poor quality that the Engineer is unable to evaluate the condition
of the sewer line or to locate service connections, the Contractor shall be required to re-
televise and provide a good tape of the line at no additional cost to the City. If a good
tape cannot be provided of such quality that can be reviewed by the Engineer, no
payment for televising this portion shall be made. Also, no payment shall be made for
portions of lines not televised or portions where manholes cannot be negotiated with the
television camera. .
i
THE TAPES SHAI.L BE SUBMITTED TO THE ENGINEER PRIOR TO COf�?STRUCTION
FOR REVIEW AND DETERMINATION OF SAGS. Upon completion of review of the
tapes by the Engineer, the �ontractor will be notified as to which sections of the sanitary
sewer are to be corrected. Tapes will be retumed to the Contractor upon completion of
review by the Engineer.
All costs associated with this work shall be.. incidental to unit prices bid for items under
Television Inspection of the �Proposal.
C. PAYMENT OF CLEANING AND PRE-CONSTRUCTION TELEVISION � INSPECTION OF
SANITARY SEWERS: The cost for Pre-Construction Cleaning and Television Inspection of
sanitary sewers shall be per linear foot of sewer actually televised. The Contractor shall
provide the Engineer with tapes of a quality that the particular piece of sewer can be readily
� evaluated as to existing sewer:conditiQns and for providing appropriate means for review of
the tapes by the Engineer including cbllection and removal, transpo�tation and disposal of
sand and debris from the sewers to a I�gal dump site.
Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to
provide video image required for line analysis.
The primary purpose of cleaning is for television inspection and rehabilitation; when a portion
of a line is not or cannot be televised or rehabilitated, the cleaning of that portion of line shall
be incidental and no payment shall be made.
The City makes no guarantee that all of the sanitary sewers to be entered are clear for the
passage of a camera. The methods u�ed for securing passage of the camera are to be at the
option of the Contractor, and the costs must be included in the bid price for N Inspections.
The cost of retrieving the .N Camera, under all circumstances, when it becomes lodged
during inspection, shall be incidental to Tl/ Inspection.
The item shall also include all costs of installing and maintaining any bypass pumping
required to provide reliable, regular sewer service to the area residents. All bypass pumping
shall be incidental to the project.
D-63 VACUUM TESTING OF SANITARY SEWER MANHOLES
A. GENERAL: This item shall govern the vacuum testing of all newly constructed sanitary sewer
manholes.
B. EXECUTION:
.;�, .. .. �, .. .
�oilvss ;
SC-34 ��p�LOG�� �i�'� �� ���
C�� �[���G�C��G���
�o UUVII�i�Ullg ���a �
���
L
C�
�
PART D - SPECIAL CONQITIQNS
B. EXECUTION:
1. TELEVISION INSPECTION: The camera shall be moved through the line in either
direction at a moderate rate, stopping when necessary to :permit proper documentation of
any sewer service taps. In no case will the television camera be pulled at a speed greater
than 30 feet per minute. Manual winches, power winches, N cable, and powered
rewinds or other devices that do not obstruct the camera view or interfere with p�oper
documentation shall be used to move the camera through the sewer line.
,
When manually operated winches are used to pull the television camera through the line,
a telephones or other suitable means of communications shall be set up befinreen the two
manholes of the section being inspected to ensure good communications between
members of the crew.
I�
�i�
�
L�J
�
I AJ�
L�'.',
The importance of accurate distance measurements is emohasized. All television
inspection video tapes shall have a footage counter. Measurement for location of sewer
service taps shall be above ground by means of ineter device. Marking on the cable, or
the like, which would require interpolation for depth of manhole, will not be allowed.
Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or
other suitable devic�, and the accuracy shall be satisfactory to the Engineer.
The City makes no guarantee that all of the sanitary sewers to be entered are clear for the
passage of a camera. i he methods used for securing passage of the camera are to be at
the option of the Contractor. The cost of retrieving the Television camera, under all
circumstances, when it becomes lodged during inspection, shall be incidental to Television
inspection.
2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept
by the Contractor and will clearly shbw the loc�tion in relation to an adjacent manhole of
each sewer service taps observed during inspection. In addition, other points of
significance such as locations of unusual conditions, roots, storm sewer connections,
broken pipe, presence of scale and corrosion, and other discemible features will be
recorded, and a copy of such records will be supplied to the City.
3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the
� television picture of problems shall be taken by the Contractor upon request of the
Engineer, as long as such photographing does not interfere with the Contractor's
operations.•
C��
�'
4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual
and audio record of problem areas of the lines that may be replayed.. Video tape
recording playback shall be at the same speed that it was recorded. The television tapes
shall be furnished to the City for review immediately upon completion �of the television
inspection and may be retained a maxirr�um of 30 calendar days.
� Equipment shall be provided to the City by the Contractor for review of the tapes. Tapes
will be returned to the Contractor upon completion of review by the Engineer. Tapes shall
not be erased without the permission of the Engineer.
�
� �oi�vss�
�
..;.. . ca.tia ' °.ri -. ,' � SC-33 ���8���� �����)���
.. . C�0�1 ��C�': ���`��G��U�
(�o � G��G�e ���o
PART D - SPECIAL CONDITIONS
connected to the sewer. Provisions shall be made at drivew,ays and street crossings to permit
safe vehicular travel without interr�ipting flow. in the bypass system. Under no circumstances will
the Contractor be permitted to discharge sewage into the trenches. Payment shall be incidental
to rehabilitation or replac�ment of the sewer line.
D-65 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER:
� si
A. GENERAL: After construction, ALL sections of sanitary sewer lines shall have a television
inspection performed. Work shall consist of, fumishing all labor, material, and equipment
necessary for inspection of the sewer lines by means of closed circuit television. Satisfactory
precautions shall be taken to protect the sewer lines from damage that might be inflicted by
the improper use of cleaning equipment.
B. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection
shall be one specifically designed and constructed for such inspection. Lighting for the
camera shall be operative in 100% humidity conditions. The camera, television monitor, and
other components of the vide8 system shall be capable of producing picture quality to the
satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no
payment will be made for an unsatisfactory inspection.
C. EXECUTION:
1. TELEVISION INSPECTION: The camera shall be moved through the line in either
direction at a moderate rate, stopping when necessary to permit proper documentation of
any sewer service taps. In no case will the television camera be pulled at a speed greater
than 30 feet per minute. Manual winches, power winches, TV cable, and powered
rewinds or other devices that do not obstruct the camera view or interfere with proper
documentation sl�all bey used to move the camera through the sewer line.
When manually operated winches are used to pull the television camera through the line,
telephones or other suitable ineans of communications shall be set up between the two
manholes of the section being inspected to ensure good communications between
members of the crew.
The imqortance of accurate distance measurements is emphasized. All television
inspection video tapes shall have a footage counter. Measurement for location of sewer
service taps shall be above ground by means of ineter device. Marking on the cable, or
the like, which would require interpolation for depth of manhole, will not be allowed.
Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or
other suitable device, and the accuracy shall be satisfactory to the Engineer.
The City makes no guatantee that all of the sanitary sewers to be entered are clear for the
passage of a camera. The methods used for securing passage of the camera are to be at
the option of the. Contractor. The cost or retrieving the Television camera, under all
circumstances, when it becomes lodged during inspection, shall be incidental to Television
inspection.
Sanitary sewer mains must be laced with enough water to fill all low pints. The television
inspection must be done immediately following the lacing of the main with no water flow.
If sewer is active, flow must be restricted to provide a clear image of sewer being
inspected.
,0„�9
;
SC-36 ���� �`�
C���1 ���CG�[��V��
[�o �G���a �[��.
0
PART D - SPECIAL C�NQITiQNS
a 1. TEST PROCEDURE: Manholes shall be tested with all connections in place. Lift holes
shall be plugged, and all drop-connections and gas sealing connections shall be installed
prior to testing. .
�
LJ
�
The sewer lines entering the manhole shall be plugged and braced to prevent the plugs
from being drawn into the manhole. The plugs shall be installed in the lines beyond the
drop-connections, gas sealing connections, etc. The test head shall be placed inside the
frame at the top of the manhole and inflated in accordance with the manufacturer's
recommendations. A vacuum of ten inches of inercury (10"Hg) shall be drawn and the
vacuum pump will be tumed off. With the valve closed, the level of vacuum shall be read
after the required test time. The required test time shall be determined from the Table I
below in accordance with ASTM C1244-93:
a � Table I
MINIMUM TIME REQUIRED FOR VACUUM DROP
OF 1" Hg (10"Hg - 9"Hg) (SEC)
" Depfh of MH. 48-Inch Dia. 60-Inch Dia.
o(FT.) Manhole Manhole
0 to 16' 40 sec. 52 sec.
�I
�
�I
�
u
�
u
18'
20'
22'
24'
26'
28'
30'
For Each
Additional 2'
45 sec.
50 sec.
55 sec.
59 sec.
64 sec.
69 sec.
74 sec.
5 sec.
59 sec.
65 sec.
72 sec.
78 sec.
85 sec.
91 sec.
98 sec. ..
6 sec.
2. ACCEPTANCE: The manhole shall be considered acceptable, if the drop in the leve! of
vacuum is less than one-inch of inercury (1" Hg) after the required test time. Any
manhole which fails to pass the initial test must be repaired with a suitable material which
conforms to the constr�action material of the manhole. The manhole shall be retested as
described above until it has successfully passed the test.
Following completion of a successful test, the manhole shall be restored to its normal
condition, all temporary plugs shall be removed, all braces, equipment, and debris shall be
removed and disposed of in a manrrer satisfactory to the Engineer.
C. PAYMENT: Payment for vacuum testing of sanitary sewer manholes shall be paid at the
0 contract price per each vacuum test. This price shall include all material, labor, equipment,
and all incidentals, including all bypass pumping, required to complete the test as specified
herein.
��
�
I�
��
D-64 BYPASS PUMPING: The Contractor shall bypass the sewage around the section or
sections of sewer to be rehabilita�ed and/or replaced. The bypass shall be made by plugging
existing upstream manhole and pumping the sewage into a downstream manhole or adjacent
system or other method as may be approved by the Engineer. The pump and bypass lines shall
be of adequate capacity and size to handle the flow without sewage backup occurring to facilities
�oi�tiss ° . �. .� � �.
. ..,z :- � ��, .
° +` r , " „ i:' � ,,,
SC-35 -�
���0���:� E�C�C�G�D
C�0�1 ����G'� �E �`�
�o VUVU:�Illlllp ��Wo
PART D - SPECIAL CaNQITiC�NS
shall provide manufacturer's certifications for all manufactured items to be used in the project
and will bear any experase related thereto.
B. Tests of the design concrete mix shall be made by the contractor's labo�atory at least nine
days prior to the placing of concrete using the same aggregate, cement, and mortar which are
to be used later in the concrete. The Contractor shall provide a certified copy of the test
results to the City,
C. Quality control testin�, of in-plac� material on this project will be performed by the city at its
own expense. Any r�testing required as a result of failure oi the material to meet project
specifications will be ai the expense of the contractor and will be billed at commercial rates as
determined by the City. The failure of the City to make any tests of materials shall in no way
relieve the contractor bf its responsibility to furnish materials and equipment conforming to the
requirements of the contract. �
D. Not less than 24 hours notice shall be provided to the City by the Contractor for operations
requiring testing. The Contractor shall provide access and trench safety system (if required)
for the site to be tested, and any work effort involved is deemed to be included in the unit
price for the item being tested.
E. The Contractor shall provide� a copy of the trip ticicet for each load of fill material delivered to
the job site. The ticket shall sp�cify the name of the pit supplying the fill material.
D-67 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL:
A. DESCRIPTION: This °item shall consist of temporary soil erosion sediment and water
pollution control measures deemed necessary by the Engineer �fior the duration of the
contract. These control measures shall at no time be used as a substitute for the permanent
control measures unless otherwise directed by the Engineer and they shall not include
measures taken by the CONTRACTOR to control conditions created by his construction
operations. The temporary measures shall include dikes, dams, berms, sediment basins,
fiber mats, jute netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble
liners, baled-hay retards, dikes, slope drains and other devices.
B. CONSTRUCTION REQUIREMENTS: The Engineer has the authority to define erodible earth
and the authority to limit the surFace area of erodible-earth material exposed by preparing
right-of-way, clearing and gru�bing, the surface area of erodible-earth material exposed by
excavation, borrow and to direct the CONTRACTOR to provide temporary pollution-control
measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or
other, areas of watelr impoundment. Such work may involve the construction of temporary
berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats,
seeding, or other control devices or methods directed by the Engineer as necessary to control
soil erosion. Temporary pollution-control measures shall be used to prevent or correct
erosion that may develop during construction prior to installation of permanent pollution
control features, but are not associated with permanent control features on the prOject. The
Engineer will limit the area of preparing right-of-way, clearing and grubbing, excavation and
borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the
finish grading, mulching, seeding, and other such permanent pollution-control measures
current in accordan�e with the accepted schedule. Should seasonal conditions make such
limitations unrealistic, temporary soil-erosion-control measures shall be performed as directed
by the Engineer.
�oi�a�s
t
SC-38 ����'���� ���tn� � D
C�D�V ���� `�1����
�o UV�JU'��uup ��0
� ,..... .. .
�
��-J
�
�
l�l
�
�Rl
C�
�
�J
PART D - SPECIAL CQNQITIC�N�
2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept
by the Contractor and will clearly show the loration in relation to an adjacent manhole of
each sewer service tap observed during inspection. All television logs shall be referenced
to stationing as shown on the plans. A copy of these television logs will be supplied to the
City.
3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the
television picture of problems shall be taken by the Contractor upon request of the
Engineer, as long as such photographing does not interfere with the Contractor's
operations.
4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual
and audio record of problem areas of the I'u�es that may be replayed. Video tape
recording playback shall t�e at the same speed that it was recorded. The television tapes
shall be furnished to the City for review immediately upon .completion of the television
inspection and may be retained a maximum of 30 calendar days. Equipment shall be
provided to the City by the Contractor for review of the tapes. Tapes will be returned to
the Contractor upon completion of review by the Engineer. Tapes shall not be erased
without the permission of the Engineer.
If the tapes are of such qoor aualitv that the Encmneer is unable to evaluate the condition
of the sewer line or to locate service connections. the Contractor shall be reauired to re-
televise and provide a 400d tape of the line at no additional cost to the Citv. If a good
tape cannot be provided of such quality that can be reviewed by the Engineer, no
payment for televising this portion shall be made. Also, no payment shall be made for
portions of lines not televised or portions where manholes cannot be negotiated with the
television camera.
D D. PAYMENT OF POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY
SEWERS: The cost for post-construction Television Inspection of sanitary sewers shall be
per linear foot of sewer televised. The Contractor shall provide the Engineer with tapes of a
a quality that the particular piece of sewer can be readily evaluated as to sewer conditions and
for providing app�opriate means for review of the tapes by the Engineer.
�
�
L�J
u
��I
lRl
�
Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to
provide video image required for line analysis. The quantity of N inspection shall be
measured as the total length of new pipe installed. All costs associated with this work shall be
included in the appropriate bid item - Post-Construction Television Inspection.
The item shall also include all costs of installing and maintaining any bypass pumping
required to provide reliable, regular sewer service ta the area residents. All bypass pumping
shall be incidental to the project.
D-66 SAMPLES AND QUALITY CONTROL TESTING:
A. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all
materials proposed to be used on the project, includ'mg a mix design for any asphaltic and/or
Portland cement concrete to be used, and gradation analysis for sand and crushed stone to
be used along with the name of the pit from which the material was taken. The contractor
° . :.�. - ' ',:, �
,0�,�9 ��� .
:i, ;, ..
1.+A' � ..
.,...�..,.. ...'�'';" ..., �� »-. �.��
sc-37 Q'��'����J�—
C�O� ����� ��`�G?1�
U !lo U'J�:/ S+�IIUD U�!!Uo
PART D - SPECIAL �ONDITIONS
1. At the Time of Contract Document Execution
• ED-103-Contractors Act of Assurance
• ED-104-Resolution
Work required to conform to these requirements shail be considered subsidiary and no extra
payment will be made.. ..
The SRF requirements are included in Appendix A
D-73 TOPSOIL, SODDING AND SEEDING: This item shall be performed in accordance with the
City of Fort Worth Parks and Community Services Department Specifications for Topsoil, Sodding
and Seeding.
1. TOPSOIL
DESCRIPTION: This item will consist of fumishing and placing a minimum of six (6) inches of
topsoil, free from rock and foreign material, in all parkways and medians to the lines and
grades as established by the Engineer.
CONSTRUCTION METHODS: Topsoil will be secured from borrow sources as required to
supplement material secured from street excavation. All excavated materials from streets
which is suitable for topsoil will be used in the parkways and medians before any topsoil is
obtained from a borrow source. Topsoil material secured from street excavation shall be
stockpiled at locations approved by the Engineer, and at completion of grading and paving
operations, topsoil staall be placed on parkway areas so as to provide a minimum six (6)
inches of compacted depth of topsoil parkways.
2. SODDING
DESCRIPTION: Sodding will consist of fumishing and planting Bermuda, Buffalo or St.
Augustine grass in the areas between the curbs and walks, on terraces, in median strips, on
embankments or cut slopes,, or in such areas as designated on the Drawings and in
accordance with the requi�etaients of this Specification. Recommended Buffalo grass
varieties for sodding are Prairie and 609.
MATERIALS: Sod shall consist of live and growing Bermuda, Buffalo or St. Augustine grass
secured from sources where the soil is fefile. Sod to be placed during the dormant state of
these grasses shall be alive and acceptable. Bermuda and Buffalo grass sod shall have a
healthy, virile root system of dense, thickly matted roots throughout a finro (2) inch minimum
thickness of native soil attached to the roots. St. Augustine grass sod shall have a healthy,
virile root system of dense, thickly matted roots throughout a one (1) inch minimum thickness
of native soil attached to the roots.
The sod shall be free from obnoxious weeds or other grasses and shall not contain any
matter deleterious to its growth or which might affect its subsistence or hardiness when
transplanted. Sod to be placed between curb and walk and on terraces shall be the same
type grass as adjacent grass or existing lawn.
Care shall be taken at all times to retain native soil on the roots of the sod during the process
of excavating, hauling, and planting. Sod material shall be kept moist from the time it is dug
i �D
,0�,�9 � . sc-�o UI������
� �
C���U ��'�QC�`�Q
� f�o �IOG'�N�9 �L'�•
�
�
'J
I�I
�
PART a - SPECIAL CONQITI4NS
1. Waste or disposal areas and construction roads shali be located and constructed in a
manner that will minimize the amount of sediment entering streams.
2. When work areas or material sources are located in or adjacent to live streams, such
areas shall be separated from the stream by a dike or other ba�rier to keep sediment from
entering a flowing stream. Care �hall be taken during the construction and removal of
such barriers to minimize the muddying of a stream. � � ,
3. All waterways shall be cleared as soon as practicable of false work, piling, debris or other
obstructions placed during construction operations that are not a part of the finished work.
4. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and
Q reservoirs with fuels, oils, bitumens, calcium chloride or other harmful materials. He shall
conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes
and reservoirs and to avoid� interference with movement of migratory fish.
0
I'I
C
I�
u
L�!
I�
�
�
�
L�'f
CI'
�
C. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide
temporary erosion control shall be considered subsidiary to the contract and no extra pay will
be given for this work.
D-68 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES: The Contractor
shall provide ingress and egress to the property being crossed by this construction and adjacent
property when construction is not in progress and at night. Drives shall be left accessible at
night, on weekends, and during holidays. The Contractor shall conduct his activities to minimize
obstruction of access to drives and property during the progress of construction. Notification shall
be made to an owner prior to his driveway being removed and/or rebuilt.
D-69 PROTECTION OF TREES, PLANTS AND SOIL: All property along and adjacent to the
Contractors' operations including lawns, yards, shrubs, trees, etc., shall be preserved or restored
after completion of the work, to a condition equal to or better than existed prior to start of work.
Any t�ees or other landscape features scarred or damaged by the Contractor's operations shall
be restored or replaced at the Contractor's expense. Trimming or pruning to facilitate the work
will be permitted only by experienced workmen in an approved manner (No trimming or pruning
without the property owners' consent). Pruned limbs of 1" diameter or larger shall be thoroughly
treated as soon as possible with a tree wound dressing.
D-70 SITE RESTORATION: The contractor shall be responsible for restoring the site to
original grade and condition after completion of .,his operations subject to approval of the
Engineer. The basis for approval by the Engineer will be grade restoration to pius minus one-
tenth (0.1) of a foot.
D-71 CITY OF FORT WORTH STANDARD PRODUCT LIST: Proposed products submitted in
the bid documents must appear in the latest "City of Fort Worth Standard Product List, for the bid
to be considered responsive. Products and processes listed in the "City of Fort Worth Standard
Product List, shall be considered to meet City of Fort Worth minimum technical requirements.
D-72 STATE REVOLVING FUND (SRF) REQUIREMENTS: This project, in addition to standard
City of Fort Worth requirements, may involve certain State requirements. These requirements, if
applicable, are provided . in the following documents and should thoroughly be reviewed and
completed by the contractor. They include:
. ,.. ., ,.
1 ��7 U A.7 �" , � � .F . .. �•S 4 . i .. ,...
+ ` ° M;:, � �;,':;r ' .,,,� � ;�
�.4 *� � �'� ....i. � '�:! .
.�._.,. .9, ..,.:' ... ». �
�'��6��0��1:�. �'�C'��
SC-39 ���i ��''��i?���° `��i�
��n� ��r 7�� �'%
o UUVU;�,��(`Jy ��L�o
PART D - SPECfAL CONQITIONS
a. General. All seed used must carry a Texas Testin,g Seed label showing purity and
germination, name, type of seed, and that the seed meets ail requirements of the Texas
Seed Law. Seed fumished shall be of the previous season's crop and the date of analysis
shown on each tag shall be within nine (9) months of time of delivery to the project. Each
variety of seed shall be fumished and delivered in separate.bags or containers. A sample
of each variety of seed shall be furnished for analysis and testing when directed by the
Enginesr. . . .. , .
The specifieci seed shall equal or exceed the following percentages of Purity and
germination:
Common Name
Puri
Germination
Common Bermuda Grass
Annual Rye Grass
Tall Fescue
Western Wheatgrass
Buffalo Grass Varieties
Top Gun
Cody
95%
95%
95%
95%
95%
95%
90%
95%
90%
90%
90%
90%
Table 120.2.(2)a.
URBAN AREA WARM-SEASON SEEDIMG RATE (Ibs.); Pure Live Seed (PLS)
Dates Mixture for Clav or Tiaht Soils
Feb 1 (Eastern Sectionsl
To Bei�mudagrass 40
May 1 Buffalograss 60
(Westem Sections)
Buffatograss 80
Bermudagrass 20
Mixture for Sandv
Soils
(All Sections)
Bermudagrass 60
Buffalograss 40
Total: 100 Totaf: 100 Total: 100
Table,120.2.(2)b
TEMPORARY COOL-SEASON SEEDING RATE; (Ib.) Pure Live Seed (PLS)
Dates (All Sections�
Aug 15 Tall Fescue
To Westem UVheatgrass
May 1 Annual Rye
,
Total:
50
50
50
100
CONSTRUCTION METHODS: After the designated areas have been completed to the lines,
grades, and cross-sections shown on the Drawings and as provided for in other items of this
Contract, seeding of the type specified shait be performed in accordance with the
requirements hereinafter described.
a. � Watering. �eeded areas shall be watered as directed by the Engineer so as to prevent
�washing of the slopes or dislodgment of the seed.
�
i g � � eJ I^� °
� q����,��.�1�,� G��G�G�D
�o��2rss' �� SC-42 ��� c��!C°���i°����
�o UU\/G,Uuup ��o
�RJ
��J
�
L
��1
LRJ
�
�
L�
�
�
�
E�J
'!J
�
PART D , SPECIAL �ONQITI4NS
until planted. When so directed by the Engineer, the sod existing at the source shall ,be
watered to the extent required prior to excavating. Sod material shall be planted within three
days after it is excavated.
CONSTRUCTION METHODS: After the designated areas have been completed to the lines,
grade�, and c�oss-sections shown on the Drawings and as provided fo� in other items of the
contract, � sodding of the .type ..specified. shall be performed in accordance with the
requirements hereinafter described. Sodding shall be either "spot" or "block' ; either
Bermuda, Buffalo or St. Augustine grass. �
a. Spot Sodding
Furrows parallel to the curb line or sidewalk lines, twelve (12) inches on centers or to the
dimensions shown on the Drawings, shall be opened on areas to be sodded. In all
furrows, sod approximately three (3) inches square shall be placed on finrelve (12) inch
centers at proper depth so that the top of the sod shall not be more than one-half (1/2)
inch below the finished grade. Holes of equivalent depth and spacing may be used
instead of furrows. The soil shall be firm around each block and then the entire sodded
area shall be carefully rolled with a heavy, hand roller developing fifteen (15) to twenty-five
(25) pounds per square inch compression. Hand tamping may be required on terraces.
b. Block Sodding.
At locations on the Drawings or where directed, sod blocks shall be carefully placed on
the prepared areas. The sod shall be so placed that the entire designated area shall be
covered, and any voids left in the block sodding shall be filled with additional sod and
tamped. The entire sodded area shall be rolled and tamped to form a thoroughly compact
solid mass. Surfaces of block sod, which, in the opinion of the Engineer,•may slide due to
the height or slope of the surface or nature of the soil, shall,. upon direction of the
Engineer, be pegged with wooden pegs driven through the sod block to the firm earth,
sufficiently close to hold the block sod firmly in place.
When necessary, the sodded areas shall be smoothed• after planting has been completed
and shaped to conform to the cross-section previously provided and existing at the time
sodding operations were begun. Any excess dirt from planting operations shall be spread
uniformly over the adjacent areas or disposed of as directed by the Engineer so that the
completed surface will,.,present a sightly appearance.
The sodded areas shall be thoroughly watered immediately after they are planted and
shall be subsequently watered at such times and in a manner and quantity directed by the
Engineer until completion and final acceptance of the project by the City of Fort Worth.
3. SE�DING
D DESCRIPTION: "Seeding" will consist of preparing ground, p�oviding and��planting seed or a
mixture of seed of the kind specified along and across such areas as may be designated on
the Drawings and in accordance with these Specifications.
�
�
MATERIALS:
10/12/99 ' �,� ' . ' �. �
.,.,• ,,�,. ,
SC-41
�
���aC�9l�� �[�C��G�D
�0�1 ���Q s °�
�� �� ��'.'!r�� I� rn : ll l�lnlo
�
>.
� M;�:
,. ,.. . . ...�.µ.. �.��;,� r.� .
PART D - SPECIAL �ONDITIQ�NS
RE-SEEDING OF AREAS PLANTED WITH COOL SEA�ONS SPECIES: Areas where
temporary cool season species have been planted may be replanted beginning February 1
with warm season species as listed in Table 120.2(2)a. The re-seeding,will be achieved in the
following manner. The cool season species shall be mowed down to a height of one (1) inch
to insure that slit-seeding equipment will be able to cut through the turf and achieve adequate
soil penetration. .. . .. . . . .
* Slit-seeding, is acliieved through the use of an implement which cuts a furrow (slit) in the
soil and places the seed in the slit which is then pressed close with a cultipacker wheel.
CONSTRUCTION WITHIN PARK AREAS
TURF RESTORATION OF PA�tK AREAS: FERTILIZER
DESCRIPTION: "Fertilizer" will consist of providing and distributing fertilizer over.such areas
as are designated on the Drawings and in accordance with these Specifications.
MATERIALS: All fertilizer used shall be delivered in bags or containers clearly labeled
showing the analysis. The fe�tilizer is subject to testing by the City ofi Fort Wo�th in
accordance with the Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used with
an analysis of 16-20-0 or 16-5-8 or having the analysis shown on the Drawings. The figures
in the analysis represent the percent of nitrogen, phosphoric acid, and potash nutrients
respectively as determined by the methods of the Association of Official Agricultural
Chemists.
In the event it is necessary to substitute a fertilizer of a different analysis, it shall be a pelleted
or granulated fertilizer with a lower concentration. Total amount of nutrients furnished and
applied per acre shall equal or exceed that spec�ed for each nutrient.
CONSTRUCTION METHODS: When an item for fertilizer is included in the Drawings and
proposal, pelleted or granulated fertiliz,er shall be applied uniformly over the area specified to
be fertilized and in the manner directed for the particular item of work. Fe�tilizer shall be dry
and in good physical condition. Fertilizer that is powdered to caked will be rejected.
Distribution of fertilizer as a particular item of wo�lc shall meet the approval of the Engineer.
Unless otherwise indicated on the Drawings, fertilizer
average rate of three hundred (300) pounds per acre
hundred (400) pounds per acre for all types of "Seeding".
shall be applied uniformly at the �
for all types of "Sodding" and four
MEASUREMENT: Topsoil secured from boRow sources will be measured by the square yard
in place on the project site. Measurement will be made only on topsoils secured.from borrow
sources.
Acceptable material for "Seeding" will be measured by the linear foot, complete in place.
Acceptable material for "Sodding" will be measured by the linear foot, complete in place.
Acceptable material for "Fertilizer" shall be subsidiary to the price of sodding or seeding.
,0�,�9
�
sc-�4 U��� Gul�[� G�� G��'��
. C���1 �L��cQ[�G��(
�o VUGU`,�UU9 ��a
��I
�
I�
�
�
i�l
PART Q - SPECIAL CONDITIQ�NS
b. Finishing. Wher� applicable, the shoulders, slopes, and ditches shall be smoothed after
� seed bed preparation has been completed and shaped to conform to the cross-section
previously provided and existing at the time planting operations were begun.
CI
��
�
u
�
L�J
�
�
�
�
��
LJ
"�"J
�
C'
BROA�`CAST SEEDING: The seed or seed mixture in the quantity specified shall be
uniformly distributed over the areas shown on the Drawings and where directed. If the sowing
of seed is by hand, rather than by mechanical methods, the seed shall be sown in two
directions at right angles to each other. Seed and fertilizer shall be distributed at the same
time provided the specified uniform rate of application for both is obtained. "Finishing" as
specified in Section D-46, Construction Methods, is not applicable since no seed bed
preparation is required. �
DISCED SEEDING: Soil over the area shown on the Drawings as directed to be seeded shall
be loosened to a minimum depth of three (3) inches and all particles in the seed bed shall be
reduced to less than one (1) inch in diameter or they shall be removed. The area shall then
be finished to line and grade as specified under "Finishing" in Section D-46, Construction
Methods. • �
The sesd, or seed mixture, specified shall then be planted at the rate required and the
application shall be made uniformly. If the sowing of seed is by hand rather than by
mechanical methods, seed shall be raked or harrowed into the soil to a depth of
approximately one-eight (1/8) inch. The planted area shall be rolled with a corrugated roller of
the "Cultipacker" type. All rolling of the slope areas shall be on the contour.
ASPHALT MULCH SEEDING: The soil over the area shown on the Drawings, or as directed
to be seeded, shall be loosened to the minimum depth of three (3) inches and all particles in
the seed bed shall be reduced to�less than one (1) inch in diameter, or they shall be removed.
The area shall then be finished to line and grade as specified under "Finishing" in Section D-
46, Construction Methods.
Water shall then be applied to the cultivated area of the sesd bed until a minimum depth of six
(6) inches is thoroughly moistened.
After the watering, when the ground has become sufficiently dry to bealoose and pliable, the
seed, or seed mixture specified, shall then be planted at the rate required and the application
shall be made uniformly. If the sowing of seed is by hand, rather than mechanical methods,
the seed shall be sown in two directions at right angles to each other. Seed and fertilizer may
be distributed at the same time, provided the specified uniform rate of application for both is
obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of
approximately one-quarter (1/4) inch. The planted surface area and giving a smooth surFace
without ruts or tracks. In between the time compacting is completed and the asphalt is
applied, the planted area shall be watered sufficiently to assure uniform moisture from the
surface to a minimum of six (6) inches in depth.
The application of asphalt shall follow the last watering as rapidly as possible. Asphalt shall
be of the type and grade as shown on the Drawings and shall conform to the requirements of
the item 300, "Asphalts, Oils and Emulsions". If the type of asphalt to be used is not shown
on the Drawings, or if Drawings are not included, then MS-2 shall be used. Applications of
the asphalt shall be at a rate of three-tenths (0.3) gallons per square yard. It shall be applied
to the area in such a manner so that a complete film is obtained and the finished surface shall
be comparatively smooth.
a�a�zss .� .:; r : ,. � „ , _ . . ., _
. , `��.:,w�r� , �
Q.. . -�.�..� � � ��.. � .
sc-�3 Of���C�l�� �'����D
C�'0�1 ����: `�� ° G?��
� �o �1GG'�G�B ���o
PART Q - SPECIAL CONQITIQNS
5. Final inspection shall be in conformance with general condition item "C5-5.18 Final
Inspection" of PART C- G'ENERAL CONDITIONS.
D-76 .EXCAVATION NEAR TREES:
1. The Contractor shall be responsible for taking measures to minimize damage to tree
limbs, tree trunks,, •and tree roots at each wor{c site. All such measures shall be
considered as incidental work included in the Contract Unit Price bid for applicable pipe or
structure installation except for short tunneling/tree augering.
2. Any and all trees located within the equipment operating area at each work site shall, at
� the direction of thee Engineer, be protected by erecting a"snow fence" along the drip line
t�r edge of the tree root system beiween tree and the construction area.
3. Contractor shall inspect each work site in advance and �arrange to have any tree limbs
pruned that might be damaged by equipment operations. The Engineer shall be notified
at least 24 hours prior to any tree trimming work. No trimming work will be permitted
within private property without written permission of the Owner.
4. Nothing shall be stored over the tree root system within the drip line area of any tree.
5. Before excavation (off the roadway) within the drip line area of any tree, the earth shall be
sawcut for a minimum depth of 2 feet.
6. At designated locations shown on the drawings, the "short tunnel" method using Class 51
D.I. pipe shall be utilized.
7. Except irt areas where clearing is allowed, all trees up to 8" in diameter damaged during
construction shall be removed and replaced with the same type and diameter tree at the
contractors expense.
8. Contractor shall employ a qualified landscaper for all the work required for tree care to
ensure utilization of the best agricultural practices and procedures.
9. Short tunneling shall consist of power augering or hand excavation. The tunnel diameter
shall not be larger than 1-1/2 times the outside pipe diameter. Voids remaining after pipe
installation shall be pressure grouted.
D-77 CONCRETE ENt;ASEMENT OF SEWER PIPE: Concrete encasement of sewers shall be
paid for at the Contract Unit Price per linear foot of concrete encasement as measured in place
along the centerline of the pipe for each pipe diameter indicated. The Contract Unit Price shall
include all costs associated with installation and reinforcement of the concrete encasement.
D-T8 CLAY DAM: Clay dam construction shall be performed in accordance with the
Wastewater Clay Dam Construction, figure in the Drawings in these Specifications, at locations
indicated on the Drawings or as directed by the City. Clay dams sha�l be keyed into undisturbed
soil to make an impervious barrier to reduce groundwater percolation through the pipeline trench.
Construction material shall consist of compacted bentonite clay or 2:27 concrete. Payment for
work such as forming, placing and finishing shall be subsidiary to the price bid for pipe
installation.
� . ...
,0„�9
;
sc-�s ��f�0��1�� �'�C�'JG�'D
C���1 ���Q����l �
If H. 1'll'1\�//��Illln III`�We
�
PART D — SPECIAL CONDITIQNS
PAYMENT: All work performed as ordered and measured as provided under "Measurement"
� shall be paid for at the unit price bid for each item of work. Its price shall be full compensation
for excavating (except as. noted below), loading, hauling, placing and furnishing all labor,
equipment, tools, supplies, and incidentals necessary to complete work.
�
LJ
�
L��
�
�
�
�
�
�J
All labor, equipment, tools and incidentals necessary to supply, transport; stockpile and place
topsoil or salvage topsoii as specified shall be included in "Seeding" or "Sodding" bid items
and will not be paid for directly. :� . . .
"Spot sodding" or "block sodding" as the case may' be, will be paid for at the contract unit
price per square yard, complete in place,, as provided in the proposal and contract. The
contract unit price shall be the total compensation for fumishing and placing all sod; for all
rolling and tamping; for all watering; for disposal of all surplus materials; and for all materials,
labor, equipment, tools and incidentals necessary to complete the work, all in accordance with
the Drawings and these Specifications.
The work performed and materials fumished and measured as provided under
"Measurement" shall be paid for at the unit price for "Seeding", or "Sodding", of the type
specified, as the case may, be, which price shall each be full compensation for furnishing all
materials and for performing all operations necessary to complete the work accepted as
follows:
Fertilizer material and application will not be measured or paid for directly, but is considered
subsidiary to Sodding and Seedirag. .
D-74 CONFINED SPACE ENTRY PROGRAM: It shall be the responsibility of the contractor to
implement and maintain a variable "CONFINED SPACE ENTRY PROGRAM" which must meet
OSHA requirements for all its employees and subcontractors at all times during construction. All
active sewer manholes, regardless of depth, are defined by OSHA as "permit required confined
spaces". Contractors shall submit an acceptable "CONFINED SPACE ENTRY PROGRAM" for
all applicable manholes and maintain an active file for these manholes. The cost of complying
with this program shall be subsidiary to the pay items involving work in confined spaces.
D-75 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION:
1. Prior to the final inspection being conducted for the project, the contractor shall contact
� the city inspector in writing when the entire project or a designated portion of the project is
substantially complete.
a 2. The inspector along with appropriate City staff and the City's consultant shall make an
inspection of the substantially completed work and prepare and submit to the contractor a
list of items needing to be completed or coRected.
�
�
�
3. The contractor shall take immediate steps to rectify the listed deficiencies and notify the
owner in writing when all the items have been completed or corrected.
4. Payment for substantial completion inspection as well as final inspection shall be
subsidiary to the project price. Contractor shall still be required to address all other
deficiencies which are discovered at the time of final inspection.
� '
� �oi�z�ss „ _ •
�w s . �Fk ..,..�
�
' J p, , �
t
sc-a.5 ��f�OC�0/�d ��C�GQD
���i'bf ���'�� " °�
U �u U���'�'i2;���i'r! !1 �'JUo
PART Q - SPECIAL �ONQITIQNS
Stainless Steel Casing Spacers (centering style) such a5 manufactured by Cascade
Waterworks Manufacturing Company or an approved equal shail �be used on all non-
concrete pipes when installed in casing. Installation shall be as recommended by the
manufacturer.
�
I�
I�
2. SEWER:
Boring used on this project shall be in accordance with the material standard E1-1 � and �
Construction standard E2-15 as per Fig: 110 of the General Contract Documents.
� • 3. PAYMENT:
Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and
incidental work shall be included in the unit price bid per foot.
80.4 Tie-Ins: 'The Contractor shall be responsible for making tie-ins to the existing
water mains. It shall be the responsibility of the Contractor to verify the exact location and
°elevation of the existing line° tie-ins. And any differences in locations and elevation of
existing line tie-ins befinreen the contract drawings and what may be encountered in the
field shall be considered as incidental to construction. The cost of making tie-ins to
existing water or sanitary sewer mains shall be included in the linear foot bid price of the
pipe.
80.5 Connection of Existing Mains: The Contractor shall determine the exact
location, elevation, configuration and angulation of existing water or sanitary sewer lines
prior to manufac�uring of the connecting piece. Any differences in locations, elevatiori,
configuration, and or angulation of existing lines between the contract drawings and what
may be encountered in the said work shall be considered as incidental to construction.
Where it is required to shut down existing mains in order to make proposed connections,
such down time shall be coordinated, with the Engineer, and all efforts shall be made to
keep this down time to a minimum. In case of shutting down an existing main, the
Contractor shall notify the Manager, Construction Services, Phone 871-7813, at least 48-
hours prior to the required shut down time. The Contractor's attention is directed to
Paragraph C5-5.15 INTERRUPTION OF SERVICE, Page C5-5(5), PART C- GENERAL
CONDITIONS OF THE 1IVATER DEPARTMENT GENERAL CONTRACT DOCUMENTS
AND GENERAL SPECIFICATIONS. The Contractor shall notify the customer both
personally and in writing as to the location, time, and schedule of the service interruption.
The cost of removing any existing concrete blocking shall be included in the cost of
connection. Unless bid separately all cost incurred shall be included in the linear foot
price bid for the appropriate pipe size.
80.6 Valve Cut-Ins: It may be necessary to cut-in gate valves to isolate the water main
from which the extension and/or replacement is to be connected. This may require closing
valves in other lines and putting consumers out of service for that period of time
necessary to cut in the new valve; the work must be expedited to the utmost and all such
cut-ins must be coordinated with the engineer in charge of inspection. All consumers shall
be individually advised prior to the shut out and advised of the approximate length of time
they may be without service.
Paymen.t for work such as backfill, bedding, fittings, blocking and all other associated
appu�tenants required, shall be included in the price of the appropriate bid items.
�oi�ti�s � SC-48 U���(G��1d E?I�� U��1
�
� C�D�I �S��CG���Q�l
i ��. M�o�G���lo ���a
�
L��
l�J
�
LJ
i�i
PART D - SPECfAL CONQITIUNS
D-79 EXPLORATORY EXCAVATION (D-HOLE): The Contractor shall be responsible for
verifying the locations of alf existing utilities prior to construction, in accordance with item D-22.
At locations identified on the drawings, contractor shail conduct an exploratory excavation (D-
Hole), to locate and verify the location and elevation of the existing underground utility where it
may be in potential conflict with a proposed facility alignment. The exploratory excavation shall
be conducted prior to construction of the entire project only at locations denoted on the plans
or as directed by the engineer. Contractor shall submit a report of findings (including surveyed
elevations of existing conflicting utilities) to the City prior to the start of construction of the entire
project. 1f the contractor determines an existing utility is in conflict with the proposed facility, the
contractor shall contact the engineer immediately for appropriate design modifications.
The contractor shall make the necessary repairs at the exploratory excavation (D-Hole) to obtain
a safe and proper driving surface to ensure the safety of the general public and to meet the
approval of the City inspector. The contractor shall be liable for any and all damages incurred
due to the exploratory excavation (D-Hole).
� Payment shall not be made for verification of existing utilities per item D-22. Payment for
exploratory excavation (D-Hole), at locations identified on the plans or as directed by the
Engineer, shall include full compensation for all materials, excavation, surface restoration, fie!d
� surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No
payment shall be made for exploratory excavation(s) conducted after construction has begun.
u
�
��
�
�
D-80 INSTALLATION OF WATER FACILITIES
80.1 Polyvinyl Chloride (PVC) Water Pipe: POLYVINYL Chloride Plastic Water Pipe
and fittings on this Project shall be in accordance with the material standard contained in the
General Contract Documents. Payment for work such as backfill, bedding, blocking,
detectable tapes and all other associated appurtenant required, shall be included in the
linear foot price bid of the appropriate BID ITEM(S).
80.2 Blocking: Concrete blocking on this Project will necessarily be required as shown
on the Plans and shall be installed in accordance with,the General Contract Documents. All
valves shall have concrete blocking provided for supporting. No separate payment will be
made for any of the work involved for the item and all costs incurred will be considered to be
included in the linear foot bid price of the pipe or the bid price of the valve.
80.3 Type of Casing Pipe:
� 1. WATER:
The casing pipe for open cut and bored or tunneled section shall be AVW1/A C-200
� Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of
� E1-15, E1-5 and E1-9 in Material Specifications of General Contract Documents and
Specifications for Water Department Projects. The steel casing pipe shall be supplied as
follows:
�
�
�
�
For the inside and outside of casing pipe, coal-tar protective coating in accordance with
the requirements of Sec. 2.2 and related sections in AWWA C-203.
Touch-up after field welds shall provide coating equal to those specified above.
C. Minimum thickness for casing pipe used shall be 0.375 inch.
10/12/99 '� • � � .
SC-47 J����OU�� ����-
V O�!' c"�''✓ ° ° °�%
��� �:; ��n� ;���u
��o Vu'�:�'�� •.
a
PART D- SPECIAL C4NL ITlONS
one (1) Service Tap to Main for each service reconnected plus for any copper service line
used in excess of five (5) feet from Main to five (5) feet behinc�the Meter. �
3. WATER SERVICE METER AND METER BOX RELOCATIONS: When the replacement
and relocation of a water service and meter box is required and the location of the meter
and meter box is moved more than iwelve (12) inches, as measured from the center line
of the existing meter to Iocation to the center line of the proposed meter location, separate
payment will be allowed foe the relocation of service meter and meter box. Centerline is
defined by a line extended from the service tap through the meter. Only relocations made
perpendicular to this centerline will be paid for separately. Relocations made along the
centerline will be paid of in feet of copper service line.
When relocation of service meter and meter box is required, payment for all work and
materials such as backfill, fittings, five (5) feet of type K copper service and all materials,
labor, and equipment used by. and for the licensed plumber shall be included in-the price
bid for the service meter r�location. All other costs will be included in other appropriate
bid item(s).
This item will also be used to pay for all service meter and meter box relocations as
required by the Engineer when the service line is not being replaced. Adjustment of only
the meter box and customer service line within 5 feet distance behind the meter will not
justify separate payment at any time. Locations with multiple service branches will be
paid for as one service meter and meter box relocation.
4. NEW SERVICE:
(when required),
and meter box.
When new services are required the contractor shall install tap saddle
corporation stop, type K copper service line, curb stop with lock wings, �
Payment for all work and materials such as backfill, fitt�ngs, type K copper tubing, and
curb stop with lock wings shall be inciuded in the Linear Foot price bid for Service Line
from Main to Meter five (5) feet behind the meter.
Payment for all work and materials such as tap saddle, corporation stops, and fittings shall
be included in the price bid for Service Taps to Mains.
Payment for all work and materials such as fumishing and setting new meter box shall be
included in the price bid for furnish and set meter box. '
5. MULTIPLE SERVICE BRANCHES: When multiple service branc�ies are required the
contractor shall fumish approved factory manufactured branches.
Payment for multiple service branches will include fumishing and installing the multiple
service branch only and�all other costwill be included in other'appropriate bid item(s).
6. MULTIPLE STREET SERVICE LINES TO SINGLE SERVICE METER: Any multiple
service lines with taps servicing a single service meter encountered during construction
shall be replaced with on� service line that is applicable for the size of the existing service
meter and approved by the Engineer.
Payment shall be made at the unit bid price in the appropriate bid item(s).
,0�,�9
�
�
@
t
sc-5o U��n�V��G ����� L
C�e�i �S��GG��� °�y�
0 �o VUVUIIUUYO ��7YUY
0
PART D - SPECIAL CONDITI4NS
80.7 Water Services: The relocation, replacement, or reconnection of water services•
� will be required as shown on the plans, and/or as described in these Special Contract
Documents in addition to those located in the field and identified by the Engineer.
�
LJ
�
L�J
All service's shall be constructed by the contractor utilizing approved factory manufactured
tap saddles (when required) and corporation stops, type K copper water tubing, curb stops
with lock wings,. meter boxes, and if required approved manufactured
service branches. All materials used shall be as specified in the Material Standards (E1-
17 & E1-18) contained in the General Contract Documents.
All water services to be replaced shall be installed at a minimum depth of 36 inches
below final grade.
All existing 3/4inch water service lines which are to be �eplaced shall be replaced witf� 1-
inch Type K copper, 1-inch diameter tap saddle when required, and 1-inch corporation
from the main line to the meter box.
� All services which are to be replaced or relocated shall be installed with the service main
tap and service line being in line with the service meter unless othenivise directed by the
' Engineer.
L��
�
Ll
'�
LJ
A minimum of 24 hours advance notice shall be given when service interruption will be
required as specified in Section C5-5.15 INTERRUPTION OF SERVICE.
All water service meters shal� be removed, tagged; and collected by the contractor for
pickup by the Water Department for reconditioning or replacement. After installation of the
water service in the proposed location and receipt of a meter from the project inspector
the contractor shall install the �meter. The meter box shall be reset as necessary to be
flush with existing ground or as otherwise directed by the Engineer. All such work
on the outlet side of the service meter shall be pertormed by a licensed plumber.
1. WATER SERVICE REPLACEMENTS: Water service replacement or relocation is
required when the existing service is lead or is too shallow to avoid breakage during street
reconstruction. The contractor shall replace the existing service line with Type K copper
from the main to the meter, curb stop with lock wings, and corporation stop.
D Payment for all work and materials such as backfill, fittings, type K copper tubing, curb
stop with locfc wings, service line adjustment, and any relocation of up to 12-inches from
center line existing meter locatio� to center line proposed meter location shall be included
� in the Linear Foot price bid for Copper Service Line from Main to five (5) feet behind
Meter., Any vertical adjustment of customer service line within the 5 foot area shall be
subsidiary .to the service installation.
lrJ
�
LRJ
l��
0
Payment for all work and materials such as tap saddle (if required), corporation stops, and
fittings shall be included in the price bid for Service Taps to Main.
2. WATER SERVICE RECONNECTION: Water service reconnection is required when the
. existing service is copper and at adequate depth to avoid breakage during street
reconstruction. The contractor shall adjust the existing water service line as required for
reconnection and furnish a new tap with corporation stop. The contractor will be paid for
�oirtiss SC-49
G����O�� ������
co��� ��,�a d ��
p�]R r1F-^•, �f;�l�t'•� �!"W
U Uo ���i�:'�'t.cri:!.' : , a
PART D - SPECIAL CONQITIQNS
The unit price bid per each will be full compensation for all labor, materials, equipment,
tools, and incidentals necessary to complete the work.
80.11 Purging and Steritization of Water Lines: Before being placed into service all
newly constructed water lines shall be purged and sterilized in accordance with E2-24 of
the General Contract Documents and Specifications except as modified herein. The
Contractor will furnish all water for INITIAL cleaning and sterilization of water lines. All
materials for construction of the project, including appropriately sized "pipe cleaning pigs",
chlorine gas or chlorinated lime (HTH) shall be fumished by the Contractor. Chlorinated
lime (HTH) shall be used in sufficien� quantities to provide a chlorine residual of fifty (50)
PPM. The residual of free chlorine sHall be measured after 24 hours and shall not be less
than 10 parts per million of free chl�rine. Chlorinated water shall be disposed of in the
sanitary sewer system. Should a sarlitary sewer not be available, chlorinated water shall
be "de-chlorinated" prior to disposal. The line may not be placed in seryice until two
successive sets of samples, taken �4 hours apart, have met the established standards of
purity.
�
Purging and sterilization of'�the water lines shall be considered as incidental to the project
and all costs incurred will, be considered to be included in the linear foot bid price of the
PiPe•
80.12 Work Near Pressure Plane Boundaries: Contractor shall take note that the
water line to be replaced under this contract may cross or may be in close proximity to an
existing pressure. plane boundary. Care shall be taken to ensure all "pressure plane"
valves installed are installed closed and no cross connections are made between pressure
planes .
80.13 Water Sample Station:
GENERAL:
All water sampling station installations will be per attached Figu�e 34 or as required in
large water meter vaults asnper Figure 33 unless otherwise directed by the Engineer.
The appropri�te water sampling station will be furnished to the Contractor free of charge;
however, the Contractor will be required to pick up this item at the Field Operations
Warehouse.
PAYMENT FOR FIGURE 34 INSTALLATIONS: Payment for all work and materials
necessary for the insfallation of the 3/4inch type K copper service line will be shall be
included in the price bid for copper Service Line from Main to Meter.
Payment for all work and materials necessary for the installation tap saddle (if required),
corporation stops, and fittings shall be included in the price bid for Service Taps to Main.
Payment for all work and materials necessary for the installation of the sampling station,
concrete support block, curb stop, fittings, and an incidental 5-feet of type K copper
service line which are required to provide a complete and functional water sampling
station shall be included in the price bid for Water Sample Stations.
PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work and materials
necessary for the installation tap saddle, gate valve, and fittings shall be included in the
price bid for Service Taps to Main.
���8���� G����,"�,;p.
�oi�ziss SC-52 �,� o ���Y
�o� c���� c;���ac�v
.. (�o �G�u �:���� ���.o
C'''
PART D - SPECIAL �ONL�ITIQNS
80.8 2-Inch Temporary' Service Line: The 2-inch temporary service main and 3/4-inch
� service lines shall be installed to provide temporary water service to all buildings that will
necessarily be required to have severed water service during said work. The contractor
shall be responsible for coordinating the schedule of the temporary service connections
a and permanent service reconnections with the building owners and the•Engineer in order
that the work be performed in an expeditious mann�r. Severed water service must be
reconnected within 2 hours of discontinuance of service.
�
�
�
��
�
,
�I
�
L!
A 2=inch tapping saddle and 2-inch corporation stop or 2-inch gate valve with an
appropriate fire hydrant adapter fitting shall be required at the temporary service point of
connection to the City water supply. The 2-inch temporary service main and 3/4-inch
service lines shall be installed in accordance to the attached figures 1, 2 and 3. 2"
temporary service line shall be cfeaned and sterilized by using chlorine gas or chlorinated
lime (HTH) prior to installation.
A finro-inch meter will be furnished by the Water Department Meter Shop and installed by
the Contractor at its point of connection to the City water supply fQr record keeping
purposes only. The out-of-service meters shall be removed, tagged and collected by the
Contractor for delivery to the Water Department Meter Shop for reconditioning or
replacement. Upon restoring permanent service, the Contractor shall re-install the meters
at the correct location. The meter box shall be reset as necessary to be flush with the
existing ground or as otherwise directed by the Engineer.
The temporary service layout shall have a minimum available flow rate of 5 GPM at a
dynamic pressure of 35 PSI per service tap. This criteria shall be used by the Contractor
to determine the length of temporary service allowed, number of service taps and number
of feed points.
When the temporary service is required for more than one location the 2-inch temporary
service pipes, 3/4-inch service lines and the 2-inch meter shall be moved to the next
successive project location.
Payment for work such as fittings, 3/4-inch service lines, asphalt, barricades, all service
D connections, removal of temporary services and all other associated appurtenants
required, shall be included in the appropriate bid item.
�
l�
�
�
�
� 10/12/99
,J
80.9 Adjust Manholes, and Vaults (Utility Cut): Contractor will be responsible for
adjusting water valve boxes, manholes and vaults to match new pavement grade. The
unit p�ice bid will be full payment for materials including all labor, equipment, tools and
incidentals necessary to complete the work.
80.10 Adjust Water Valve Boxes: Contractor will be responsible for adjusting water
valve boxes to match new pavement grade. The water valves themselves will be
adjusted, if necessary, by City of Fort Worth Water Department forces.
Prior to the beginning of work, the Contractor shall make an inventory of the condition of
existing water valve boxes. The Construction Engineer will field verify this inventory and
provide the Contractor replacements for broken valve boxes. The contractor shall replace
the valve boxes which are damaged during construction at no cost to the City.
.-,.!crtK�: ur:J.. � . ,....�n .- �
sc-5, 0�(�a���� G'�����D
�0�`(1 ��� °��� °�"�
��� � o G'��a ���o :.
-----..... �
PART D - SPE�[AL C4N�ITIONS
D-84 TREE PRUNING:
A. REFERENCES: National Arbbrist Association's "Pruning Standards for Shade Trees".
B. ROOT PRUNING EQUIPMENT
1. Vibratory Knife
2. Vermeer V-1550RC Root Pruner'
C. NATURAL RESOURCES PROTECTION FENCE
1. Steel "T" = Bar stakes, 6 f�et long.
2. Smooth Horse-Wire: 1�4-1/2 gauge (medium gauge) or 12 gauge (heavy gauge).
3. Surveyor's Plastic Flagging: "Tundr�a" weight, International fluorescent orange or red
colo�.
4. Combination Fence: Commercially manufactured combination soil separator fabric on
wire mesh backing as shown on the Drawings.
D. ROOT PRUNING
1. Survey and stake location of root pruning trenches as shown on drawings.
2. Using the approved specified equipment, make a cut a minimum of 36 inches deep in
order to minimize damage to the undisturbed root zone.
3. Backfill and compact the trench immediately after trenching.
4. Place a 3-foot wide by 4-inch deep cover of mulch over the trench as required by the
Engineer.
5. Within 24 hours, prune flush with ground and backfill any exposed roots due to
construction activity. Cover with wood chips of mulch in order to equalize soil
temperature and minimize water loss due to evaporation.
6. Limit any grading work within conservation areas to 3-inch maximum cut or fill, with no
roots over 1-inch diameter being cut unless cut by hand or cut by specified methods,
equipment and protection.
E. MULCHING: Apply 2-inches to 4-inches of wood chips from trimming or clearing
operation on areas designated by the Engineer.
F. Tree Pruning shall be considered subsidiary to the project contract price.
� ���� ��d ��C�C�G°�D
� ��' ����� Q����(
' �Vn UV��CcUUU9 Y�//Um
�oi�tiss � SC-54
�
L��
l�,
�
`.,
�
PART D - �PECfAL CC�NQITICIN�
Payment for all work and materials necessary for the installation of the sampling station,
modification to the vault, fittings, and all type K copper service line which are required to
provide a complete and functional water sampling station shall be included in the price bid
for Water Sample Stations.
80.14 Ductile Iron and Gray Iron Fittings:
Reference Part E2 Constr�ction Specifications, Section E2-7 Installing Cast Iron Pipe,
fittings, and Specials, Sub section E2-7.11 Cast Iron Fittings: the first Paragraph shall be
revised to read as follows: .
Q E2-7.11 DUCTILE-IRON AND GRAY-IRON FITTINGS: All ductile-iron and gray-iron
fittings shall be furnished with cement mortar lining as stated in Section E1-7. The price
bid per ton of fittings shall be payment in full for all fttings, joint accessories, polyethylene
D w�apping, horizontal concrete blocking, vertical tie-down concrete blocking, and concrete
cradle necessary for construction as designed.
o All ductile-iron and gray-iron fittings, valves and specials shall b� wrapped with
polyethylene wrapping conforming to Material Specification E1-13 and Construction
Specification E2-13. Wrapping shall precede horizontal concrete blocking, vertical tie-
down concrete blocking, and concrete cradle. Payment for the polyethylene wrapping,
Q horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle shall
be included it� bid items for vales and fittings and no other payments will be allowed.
L�J
LJ
�
�
l�l
�
D-81 SPRINKLING FOR DUST CONTROL:
All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall
apply. However, no direct payment will be made for this item and it shall be considered to this
contract.
D-82 DEWATERING:
The Contractor shall be responsible for determining the method of dewatering operation for the
water or sewage flows from the existing mains and ground water. The Contractor shall be
responsible for damage of any nature resulting from the dewatering operations.
The DISCHARGE from any dewatering operation shall be conducted as approved by the
Engineer. Ground water shall not be discharged into sanitary sewers.
Dewatering shall be considered as incidental to a cdnstruction and all costs incurred will be
considered to be included in the project price.
D-83 TRENCH EXCAVATION ON DEEP TRENCHES:
� Contractor to prevent any water flowing into open trench during construction. Contractor shall not
leave excavated trench open overnight. Contractor shall fill any trench the same day of
excavation. rN,�, extra payment shall be allowed for this special conditio�.
L�"'1
�
�f��OC�O�d �?��'�G?��
���(1 ����� °?� �° G`��7
�U ��!uU`�.;��'4�n
� ,.
�oi�zss SC-53
�
'!J
PART D - �PECIAL �ONQITIQNS
� D-85 TREE.,REMOVAL:
Trees to be removed shall be removed using applicable methods, including stump and root ball
� removal, loading, hauling and dumping. Extra caution shall be taken to not disrupt existing
utilities both overhead and buried. The Contractor shall immediately repair or replace- any
damage to utilities and private property including, but not limited to, water and sewer services,
� pavement, fences, walls, sprinkler system piping, etc., at no cost to the Owner. All costs for tree
removal, including temporary service costs, shall be considered subsidiary to the project contract
price and no additional payment will be allowed. .
aD-86 TEST HOLES:
The matter of subsurface exploration to ascertain the nature of the soils, including the amount of
� rock, if any, through which this pipeline installation is to be made is the responsibility of any and
all prospective bidders, and any bidder on 'this project shall submit his bid under this condition.
Whether prospective bidders perform this subsurface exploration jointly or independently, and
Q whether they make such determination by the use of test hol�s or other means, shall be left to the
discretion of such prospective biddeirs.
�
L�J
�
LJ
If test borings have been made and are provided for bidder's information, at the locations shown
on the logs of borings in the appendix of this specification, it is expressly declared that neither the
City nor the Engineer guarantees the accuracy for the information or that the material
encountered in excavations is the same, either in character, location, or elevation, as shown on
the boring logs. It shall be the responsibility�of the bidder to make such subsurface investigations
as he deems necessary to determine the nature of the material to be excavated. The Contractor
assumes all responsibility for interpretation of these records and for making and maintaining the
required excavation and of doing other work affected by the geology of the site.
The cost of all rock removal and other associated appurtenances, if required, shall be included in
the linear foot bid price of the pipe.
�
�
�
�
0
0
0
10/12/99
Q
,,
�__...� . ...__�._::°`._.. �_____.�.
SG55
��� �G��� �?��O�D
� 6 � ���GG���1Q�1
��. ��'�o�<<��ao �C��o
u� � �
�
F'
�
�
l�J
�
��
�
�
L1
�
C
LJ
C
��J
CI
Ci
�
C'�
L�J
PART DA - ADDITIONAL SPECIAL CONDITIONS
DA-1 PIPELINE REHABILITATION CURED—IN—PLACE PIPE ...................................................ASC-3
DA-2 PIPELINE REHABILITATIOf� PIPE ENLARGEMENT SYSTEM ......................................ASC-8
DA-3 PIPELINE REHABILITATION FOLD AND FORM PIPE ................................................ ASC-15
DA-4 SLIPLINING ............................................................................................................. (OMITTED)
DA-5 PIPE INSTALLED BY OTHER THAN OPEN CUT ......................................................... ASC-19
DA-6 SERVICE LINE POINT REPAIR / CLEANOUT REPAIR ......................................... (OMITTED)
DA-7 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION ..................... ASC-22
DA-8 MANHOLE REHABILITATION ITEMS .................................................................... (OMITTED)
DA-9 SURFACE PREPARATION FOR MANHOLE REHABILITATION ............................ (OMITTED)
DA-10 INTERIOR MANHOLE COATING — MICROSILICATE MORTAR SYSTEM .............. (OMITT�D�
DA-11 INTERIOR MANHOLE COATING — QUADEX SYSTEM .......................................... (OMITTED)
DA-12 INTERIOR MANHOLE COATING — SPRAYINALL SYSTEM ......................................... ASC-24
DA-13 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM ..................................... ASC-27
DA-14 INTERIOR MANHOLE COATING — PERMACAST SYSTEM WITH EPDXY LINER. (OMITTED)
DA-15 INTERIOR MANHOLE COATING—STRONG—SEAL SYSTEM ...................................(OMITf'ED)
DA-16 RIGID FIBERGLASS MANHOLE LINERS ............................................................... (OMITTED)
DA-17 PVC LINED CONCRETE WALL RECONSTRUCTION ............................................ (OMITTED)
DA-18 PRESSURE GROUTING ......................................................................................... (OMITTED)
DA-19 VACUUM TESTING OF REHABILITATED MANHOLES .......................................... (OMIT,TED)
DA-20 FIBERGLASS MANHOLES ...................................................................................... (OMITTED)
DA-21 LOCATION AND EXPOSURE OF M�4NHOLES AND WATER VALVES .................. (OMITfED)
DA-22 REPLAGEMENT OF CONCRETE CURB AND GUTTER ............................................... ASC-29
DP�-23 REPLACEMENT OF 6" CONCRETE DRIVEWAYS ....................................................... ASC-30
DA-24 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE .......................................... (OMITfED)
DA-25 GRADED CRUSHED STONES ....................................................................�:..........�(OMITTED)
DA-26 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE ........................................................ (OMITTED)
04/16/99
�
�
ASC-1 . ��,����1_�•I�r������:� �'��UG°�U
� J U L �
���:�71yr ����v'��'��.�G?�(
I��a '�1J,�E�,''��W� �� ��
�o
� � PART DA - ADDITIONAL SPECIAL CONDITIONS
� DA-27 BUTT JOINTS - MILLED .......................................................................................... (OMITTED)
JDA-28 2" H.M.A.C. SURFP�CE COURSE (TYPE "D" MIX) ................................................. (OMITTED)
DA-29 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER ......................................... (OMITTED)
� DA-30 NEW 7" CONCRETE VALLEY GUTTER .................................................................. (OMITTED)
DA-31 NEW 4" STANDARD WHEELCHAIR RAMP ............................................................ (OMITTED)
J DA-32 8" PAVEMENT�PULVERIZATION ............................................................................ (OMITTED)
JDA-33 REINFORCED CONCRET,E PAVEMENT OR BASE (UTILITY CUT) ............................ ASC-30
DA-34 RAISED PAVEMENT MARKERS ............................................................:...:............ (OMITTED)
� DA-35 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING ............... (OMITTED)
� DA-36 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL ..... (OMITTED)
DA-37 ROCK RIPRAP — GROUT — FILTER FABRIC ............................................................ (OMITTED)
JDA-38 CONCRETE PIPE�FITINGS AND SPECIALS ..........................................................(OMITTED)
DA-39 PIPE INSTALLED BY SHORT BORE ............................................................................ ASC-31
�
�
�
D
�
0
0
0
�
04/16/99
�
ASC-2
�
u��O�G�d G'�C�G�D
�D�V' ���GG���G��
�R.: ii 0 e,��y ���o
PART DA - ADDITIONAL SPECIAL CONDITIONS
Unless otherwise° specified; the Contractor shall furnish a general purpose unsaturated
polyester resin and catalyst system that meets ASTM standards and the finished cured
physical strengths specified. �
C. REQUIRED THICKNESS OF CURED-IN-PLACE PIPE: The thickness of the pipe will be
determined from information supplied or manufacture's recommendation for the condition of
the existing pipe. Should pre-installation inspections reveal the sewers to be in substantially
different conditions than those in the design considerations, the Contractor can request such
changes in pipe thickness, supporting such request with design data in accordance with the
pipe manufacturer's standard design criteria as follows:
Sewer
Diameter
6"
8"
10"
12"
15"
18"
21"
24"
30"
36"
42"
48"
54"
60"
4.5mm
6.Omm
6.Omm
6.Omm
7.5mm
9,Omm
1 Q.Smm
12.Omm
15.Omm
16.5mm
19.5mm
22.5mm
25.5mm
28.5mm
4.5mm
6.Omm
6.Omm
7.5mm
9.Omrri
12.Omm
13.5mm
15.Omm
18.Omm
21.Omm
24.Omm
28.5mm
30.Omm
34.5mm
0
Pipe Invert
Depth Over 15'
4.5mm
6.Omm
7.5mm
9.Omm
10.5mm
13.5mm
15.Omm
16.5mm
21.Omm
24.Omm
28.5mm
33.Omm
36.Omm
39.Omm
D. PREPARATORY WORK: The installation procedures shall be as follows unless otherwise
approved by the City.
1. Safety - The contr�ctor shall carry out his operations in strict accordance with all
safety requirements. Particular attention is drawn to those safety requirements
that involve working with scaffolding and entering confined spaces.
w
2. All easements shall be cleaned up after use and restored to. their original
conditions or better. In the event additional work room or access is required by the
Contractor, it shall be the Contractor's responsibility to obtain written permission
from the Property Owners involved for the use of additional property required. No
additional payment will be allowed for this item. If a street must be closed to traffic
04/16/99
- .� o
9 •
.E . .'i�3e `if i:'.1,
a �, ,;� , �'y,. r„ -
, , �,�� I � . �.t tirpl ,
LINER THICKNESS
Pipe Invert Pipe Invert
Depth� up to 10' Depth �10'-15'
(also the minimum)
asc-� � �; ; �i ���.�� G�[�CC��D
���J� � �
. ��l' Ilr CC'l��v�1�UW�U
r�o �uc���9 ���o �
�
�
�
L�l
�
L�J
�
LJ
�
�
u
L�J
u
��
!J
�
�
�
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
DA-1 PIPELINE REHi4BILlTATION'CURED-IN-PLACE PIPE:
A. WORK TO BE DONE: The work to be done under this contract consists of rehabilitation
of existing sewer lines by the Cure-in-Place Pipe Method or approved equal. Cured-in-
place pipe consists of a resin impregnated flexible tube, coated with an elastomeric
coating, when inverted into an existing sewer pipe through existing access manholes, and
which, under proper hydrostatic and thermal conditions, is cured-in-place, becoming a
structurally sound cured-in-place pipe. The thickness of the pipe will be dictated by the
structural requirements of the sewer pipe with no loss of cross sectional area other than
the thickness of the resin-impregnated tube. The pipe will be impermeable to water,
provide corrosion resistance, and an optimum friction factor for the sewer flow. Branch
connections shall be reinstated by a remote controlled cutting device.
The work consists of providing all labor, equipment, transportation, materials, and
supervision necessary to :
1. Thoroughly clean sewers as required for the installation of the resin-impregnated
tube.
2. Inspect sewers by closed circuit color television (CCN), including identifying and
marking the location of each service connection. Cost subsidiary to Pre-
Construction TV Inspection.
3.
4.
5.
6.
7.
Notify residents at least 48 hours prior to service interruption.
Install the resin-impregnated tube of the correct thickness as specified.
Cut out all service connections by remote cutters and restore service within
18 hours.
Reinspect by CCTV to verify satisfactory completion of work at time of lateral
reinstatement. Cost subsidiary to Post-Construction N Inspection.
Pump around all dry and wet weather flows to accommodate the process at each
separate installation, as required.
8. Comply with all appropriate governmental agencies' regulations regarding traffic,
safety procedures and permits, the cost of which is the responsibility of the
Contractor.
B. MATERIALS: The fiber. felt tube shall be fabricated to a size that when installed will tightly
fit the internal circumference of the conduit specified by ,the Owner. Allowance for
circumferential stretching during inversion shall be made and shall mest ASTM-1216.
The minimum length shall be that deemed necessary by the Contractor to effectively span
the distance from the inlet to the outlet of the respective manholes, unless otherwise
'specified. The Contractor shall verify the lengths in the field before impregnation.
Individual inversion may Mbe made over one or more manhole sections, as determined in
the field by the Contractor.
04/16/99 ASC-3 '
� ������c��� G?��OQD
�V i}�ti� 5���; G� ��G?1�
�R �1�,�,�,-^- =:,�tf 1� ^I?ti7
Uo UU�:.�tG,ellk��g i'`�t•'�+o
PART DA - ADDITIONAL SPECIAL CONDITIONS
uniformly raise the water temperature above the temperature required to effect a
cure of the resin. This temperature shall be determined by the resin/catalyst
system employed and shall be per manufacturer's standards. �
4. The heat source shall be fitted with suitable monitors to gauge the temperature of
the incoming and outgoing water or steam supply. Another such gauge shall be
placed at the remote manholes to determine the temperatures during cure. Initial
cure shall be deemed to be completed when inspection of the exposed portions of
the cured-in-plac�, pipe appear to be hard and sound. The cure period shall be of
a duration recomme�ded by the resin manufacturer, as modified for the inversion
process, during which time the recirculation of the water and/or steam and cycfing
of the heat exchanger to maintain the temperature continues.
5. Cool-down: The Contractor shall cool the hardened cured-in-place pipe to a
temperature below 100 F before relieving the static head in the inversion
standpipe. Cool-down. may be accomplished by introducing cool water into the
, inversion standpipe io replace water or steam being drained from a small hole
made in the downstream end. Care shall be taken in the release of the static head
so that a vacuum will not be developed that could damage the newly installed
cured-in-place pipe.
F. SERVICE CONNECTIONS: After the pipe has been installed, the Contractor shall
reconnect the active service connections. This shall generally be done without
excavation, and, in the case of non-man entry pipes, from the interior of the pipeline by
means of a television camera and a cutting device that re-est�blished them to not less
than 90 percent capacity. Existing services shall be �reinstated within 18 hours of
installation. Should intemal � reinstatement not be possible, the services must be
reconnected externally by excavation immediately. Service saddles acceptable to the
Engineer shall be utilized. Backfill at service connections shall be cement stabilized
(2 sacks per cubic yard) to a point 12 inches above the service lateral to trench
intersection and shall be in accordance wi'th these specifications. Each reconnection shall
be paid for separately. Six inch sewer lines shall have service' connections completed by
external means. Contractor may re-connect the 6" sewer line connections by internal
means in special cases with the approval of the Engineer.
G. ACCEPTANCE: The finished cure-in-place pipe shall be continuous over'the entire length
of an inversion r�n between manholes and be smooth and free from substantial wrinkles,
as well as defects, and improper house connections. Should any of tfiese defects occur,
the line shall be excavated, repaired and/or replaced and complete restoration made to
the satisfaction of the City at no additional cost.
H.
I.
J.
04/1 fi/99
The watertightness of the pipe shall be tested for leaks under a positive head during cure
with allowances being made for end leakage and temperature effects. -
CLEAN-UP: Upon acceptance of the installation work and testing, the Contractor shall
restore the project area affected by his operations to original or better conditions.
PATENTS: The Contractor shall warrant and save harmless the City and all of its officers,
agents, and employees against all claims for patent infringement and any loss thereof.
SPECtAL NCOTES: The Contractor shall be liable for damages to the homes or
basements from backups which may result during the installation of new pipe.
� '�,
ASC-6 U��OL��� ,i�°����Q�
C�� 4 VL`7f�4'�YUt7WlY�II
II UO DU�.;/GiODUa YL�(/�D ,
L�'J
�
�
L�J
�.�
�
�
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
because of the orientation of $he sewer, the Department of Engineering shall
institute the actions necessary to do this for the mutually �greed upon time period.
3. Before using any water from the City of Fort Worth, the Contractor shall be
responsible for the water meter and related charges for the set up, including the
water usage bill. All expenses shall be considered incidental to cleaning.
4. Cleaning of Sewer Line - It shall be the responsibility of the ,�ontractor to remove
all internal debris out of the sewer lines and flush the sewer lines clean, disposing
of debris off-site. Debris is not to be washed downstream into other sewers. All
solids or semisolids resulting from the cieaning operations shall be removed from
the site and disposed af at no additional cost to the City. It is the responsibility of
the Contractor to secure a legal dump site for the disposal of this material. All
materials shall be removed from the site no less often than at the end of each work
day. All cost for the above-described work shall be paid for by the price bid per
linear foo4 for Cleaning and Television Inspection. �
5. Inspection of Pipelines - Inspection of pipelines shall be performed by experienced
personnel trained in locating breaks, obstacles, and service connections by closed
circuit color television. Television inspection shall be in accordance with the
specifications contained herewith for "Pre- and Post-Construction Television
Inspection of Sanitary Sewer Lines".
� E. INSTALLATION OF THE RESIN IMPREGNATED TUBE:
1. The Contractor shall designate a location where the uncured resin in the original
� , containers and the unimpregnated fiber-felt tube will be vacuum impregnated prior
to installation. The Contractor shall allow the Owner to inspect the materials and
"wet-out" procedure. A resin and catalyst system compatible with requirements of
� this method shall be used. The quantities of the liquid thermosetting materials
shall be per manufacturer's standards to provide the wall thickness specified. All
felt shall be impregnated under vacuum.
L�J
I�
L�l
C�I
�
�
L�J
I�J
2. The wet-out fiber felt tube shall be installed through an existing manhole or other
approved access by means of an inversion p�ocess and the application of a
hydrostatic head sufficient to fully extend it to the next designated manhole. The
impregnated tube shall generally be inserted into the vertical inversion standpipe
with the impermeable plastic membrane side out. At the lower end of the inversion
standpipe, the felt tube shall be turned inside out and attached to the standpipe so
that a leak-proof seal is created. The inversion head will be adjusted to be of
sufficient height to cause the impregnated tube to invert from manhole to manhole
and hold the tube tight to the pipe wall and produce dimples at the side
connections. A lubricant, if used, shall be as approved by manufacturer's
standards. Manufacturer's standards shall be closely followed during the elevated
temperature curing so as not to over-stress the felt fiber and cause damage or
failure prior to cure. In certain cases, the Contractor may elect to use a top
inversion.
3. Curing: After inversion is complete, the Contractor shall supply a suitable heat
source and water or steam recirculation equipment. The equipment shall be
capable of delivering, hot water or steam throughout the section by means of a pre-
_._..strun,g, hose, which has been perforated per manufacturer's recommendations, to
04/16/99 ' „ { `s,� '' ` r � ASC-5
.. ':�t;.� •r�w; ,:�,c . .
;t , .
; . . ^ ; ti.°sj;. i
:.. e ,.na.a o �.�.,.. .e� �.... .s.V.G.et„t
li �U'����I� ff��l�iVUe��I ..,
�r:�ul"l �"�'�G°���G��
� l�o `U�;.r:;:;'�������� : 1' �I�o
PART DA - ADDITIONAL SPECIAL CONDITIONS
DA-2 PIPE ENLARGEMENT SYSTEM:
A. GENERAL:
Description: °' This specification includes requirements to rehabilitate existing
sanitary sewers by th� pipe enlargement system, herein called Pipe Bursting or
Pipe Crushing (Pipe Bursting/Crushing). This system includes splitting or bursting
the existing pipe to install a new polyethylene pipe and reconnect existing sewer
service connections.
2. Methods: This section specifies the approved system method or process to
include all labor, materials, tools, equipment and incidentals necessary to provide
for the complete rehabilitation of deteriorated gravity sewer lines by the Pipe
. Bursting/Crushing systems. Approved methods include: the PIM Corporation
(PIM System), Piscata Way, New Jersey; McLat Construction (McConnell System
for Pipe Crushing), Houston, Texas; and Trenchless Replacement Systems, (TRS
System), Calgary, Canada. Refer to Part D- SPECIAL CONDITIONS D-61
SIBSTITUTIONS for information regarding pre-approval procedures for alternative
processes.
3. Definition: The Pipe�rBursting/Crushing system is defined as the reconstruction of
gravity sewer pipe by installing an approved pipe material, by means of one of the
pre-approved methods set forth in Section A.2 of this specification. The process
involves the use of'� a static, hydraulic or pneumatic hammer "moling" device,
suitably sized to break out the old pipe or using modified boring "knife" with a
flared plug that implodes and crushes the existing sewer pipe. Forward progress
of the "mole" or the "knife" may be aided by the use of hydraulic equipment or
other apparatus, as specified in the approved methods. The replacement pipe is
either pulled or pushed into the bore. The method allows for replacement of pipe
sizes from 8" through 21" and/or upsizing in varying increments up to 21 ". This
specification is based on the precedent that the Pipe Bursting/Crushing system
used has been pre-approved by the City of Fort Worth Department of Engineering,
and Fort Worth Water Department.
4. Quality Assurance:
The Contractor shall be certified by the particular Pipe Bursting/Crushing system
manufacturer that such firm is a licensed installer of their system. No other Pipe
Bursting/Crushing system other than those listed in Section A.2. of these
specifications is acceptable.
a. Personnel directly involved with installing the new pipe shall receive
training in the proper methods for joint fusing, handling, and installing the
polyethylene pip,e. Training shall be performed by a qualified
representative as determined by the pipe manufacturer.
b. Personnel directly involved with installing the new pipe shall receive
training in the proper methods for joint fusing, handling, and installing the
polyethyiene pipe. Training shall be performed by a qualified
representative as determined by the pipe manufacturer.
�4�,6/99
� .
. a�� , , � �
ASC-8 -
u�����UQd G��C��QD
C�� ����G�����1
- �. �u�s�a, ��a .
�
� K.
�
L�1
�,
�
L�J
PART DA - ADDITIONAL SPECIAL CONDITIONS
MEASUREMENT AND PAYMENT:
Cured-in-Place Pipe (CIPP) Installation: CIPP instaliation will be measured for
payment by the linear foot of CIPP actually installed in the various diameters of
sewers measured along the centerline of the sewer from centerline to centerfine of
manholes. Payment will be made for the quantities measured at the unit price per
linear foot for the various sewer diameters listed.
2. Service Reconnection: Payment will be made for the quantities measured at the
unit price per each listed in the bid proposal. Payment shall incfude all labor,
materials, and the lateral connection, including all necessary pipe and fittings to
� connect the existing service line. Payment shall not include pavement
replacement, which if required, shall be paid separately.
3. Television Inspectioh and Cleaning: Special Condition for Post-Construction
Television Inspection applies. �
4. Sewer Cleaning by Bucket Machine: Heavy cleaning requiring more than hydraulic
D jet cleaning shall be performed by bucket machines. The payment for such
cleaning shall be included in the bid item for Pre-Construction Television
Inspection of Sanitar�r° Sewer.
l�
�
��J
�
',�!
��
�
[�'
'J
Q ����9
�M,
�,
5. By-Pass Pumping: The Contractor shall provide diversion for the flow of sewage
around the section or sections of pipe designated for the inversion of the resin-
impregnated tube. The pumps and by-pass lines shall be of adequate capacity
and size to handle all flows. All costs for by-pass pumping required during
installation of the pipe shall be subsidiary to the pipe reconstruction item.
6. Point Repairs: Point`repairs shall be made before or after a cured-in-place pipe
installation at the Contractor's option. Point repairs shall be conducted only if
mutually agreed to by the Department of Engineering and the Contractor prior to
accep�ance of the line for reconstruction. Before any excavation is done for any
purpose, it will be the responsibility of the Contractor to check with various utility
companies and determine the location of their facilities. Point repairs shall be
measured and paid for by the linear foot for the appropriate depth of cut. Payment
shall include all labor, material and equipment for pipe replacement according to
standards.
7. Subsidiary Work: Any damage resulting to utilities and property, resulting repairs,
tempora�c service costs, etc., shall be borne by Contractor. Repair and/or
replacement of fences, sprinkler system piping and other such restoration work
resulting from �ontractor activities shall be considered subsidiary to the cost of the
project and no additional payment will be allowed.
.._. ,. .. „.:..ro�- , �t,..y..,., ..F ..
. . �: �' ASG7
P,
....w.,�,�� �
GI����G��;�,� U��'����G°�D
C ��`U'' C ��u G�� �° �'��
f�R M�^n�r�M �r�r��
PART DA - ADDITIONAL SPECIAL CONDITIONS
C.
a. The interior o� the pipe shall be a light reflective color to facilitate closed
� circuit television inspection.
b. The pipe material shall be listed by the Plastic Pipe Institute (PPI) in PPI
TR-4. The pipe material shall have as hydrostatic design basis of 1600 psi
at 73 F and 800 psi at 140 F.
c. The manufacturer's certification shall state that the pipe was manufactured
from one specific resin and shall state the resin used and its source. All
pipe shall be made of virgin material. No rework, except that obtained from
the manufacturer's own production of the same formulation, shall be used.
d. Pipe supplied under this specification shall have a nominal IPS (Iron Pipe
Size) outsid� diameter. The Standard Dimension Ratio (SDR) and
minimum oressure ratina of the qiae shall be SDR 17 - 100 �si. Pipe with a
lower SDR ratio and higher pressure rating may be used in lieu of the
minimum specified.
Tests: The Contractor shall be required to send submittals to the City of Fort
Worth on the production material.
2.
a. The pipe manufacturer shall provide certification that samples of the
production product meets these specifications. The certification will state
that production product has been tested in accordance with ASTM D2837,
and validated in accordance with the latest revision of PPI TR-3.
b. The pipe• manufacturer shall provide certification that stress regression
testing has been performed on the specific product. Certification shall
include a stress life curve per ASTM D2837 and testing shall have been
performed in accordance with ASTM D2837.
c. Rejection: Polyethylene plastic pipe and fittings may be rejected for failure �
to meet any of the requirements of this specification.
SEWER SERVICE CONNECTIONS:
Sewer Service Connections: Sewer service connections shall be connected to the
new pipe by mechanical or fusion methods. Once the saddle is secured, a hole
shall be drilled in the pipe the full inside diameter of saddle outlet.
2. Pipe Saddles: Mechanical saddles shall be made of polyethytene pipe compound
� that meets the requirements of ASTM D1248, Class C, have stainless steel straps
and fasteners, neoprene gasket and backup plate. Mechanical saddles shall be
Strap-on-Saddle Type as manufactured by Driscopipe or Tapping Saddle
manufactured by DuPont, or approved equal. Fusion saddles shall be
electrofusion branch saddles as manufactured � by Central Plastics Company, or
approved.equal.
3. Connection to Exi`sting Service: Connections to the existing sewer service
connectiohs pipe shall be made using flexible couplings. All flexible couplings
shall conform to ASTM C425 and shall be as manufactured by Fernco Joint Sealer
Co., DFW Plastics, Inc. or approved equal. Backfill at service connections shall be
cement stabilized sand (2 sacks per cubic yard) to a point 12 inches above the
oai�c,�ss ' ' ASC-10
� ,,. ,� .
.,
u��O�cdE;,� G?�C��G°�D
r��' ���u °�����
�o �G��N�, ���, �
0
��
0
0
a
6
�
�
D
�
�d
�
a
�
aB
a
Q
LJ
04/16/99
5.
�
PART DA - ADD�TIONAL SPECIAL CONDITIONS
Submittals: Submit for review and acceptance, the following Contractor's Work
Plan and Drawings to the Department of Engineering (DOE):
a. Shop drawings, catalog data, 'and manufacturer's technical data showing
complete information on material composition, physical properties, and
dimensions of new pipe and fittings. Include manufacturer's
recommendation for handling, storage, and repair of pipe and fittings if
damaged.
L7
�.
Location and number of insertion or access pits shall be planned by
Contractor and submitted in writing prior to excavation for approval by
DOE.
Method of "construction and restoration of existing sewer service
connections. This shall incfude:
1) Detail drawings and written description of the entire construction
procedure to install pipe, bypass sewage flow and reconnection of
sewer service connections.
2) Working drawings for information only showing sewage flow
bypass, and maintenance of traffic. Contractor shall provide for
continuous sewerage flow. Dewatering shall be the Contractors
responsibility.
3) Certification of workmen training for installing pipe.
4) Television inspection reports and video tapes made after new pipe
installation.
Delivery, Storage, and Handling:
a. Transport, handle, and store pipe and fittings as recommended by
manufacturer.
b. If new pipe and fitfings become damaged before or during installation, it
shall be repaired as recommended by the manufacturer or replaced as
required by the Project Manager at the Contractor's expense, before
proceeding further.
c. Deliver, store and handle other materials as required to prevent damage.
MATERIALS:
1. Polyethylene Piping Material: The pipe and fitting material shall be high density,
extra molecular weight (EHMW) polyethylene pipe material conforming to ASTM
D1248, Type III, Class C, Category 5, Grade P34, and have a PPI (Plastic Pipe .
Institute) recommended designation of PE3408 and cell classification 345434C per
ASTM D3350. The molecular weight category shall be extra high (250,000 to
1,500,000) as per the Gel Permeation Chromatography determination procedure
with a typical value of 330,000.
w.����.,,�
k, .
� � . . �:4.'� ., � ..�. ,. � ., ^
.� ASC-9
u��G��OI�� ��C�GQD
�G�; ��';` ?t��,�G°��(
�+ �� ,;,,��t�; ',v,'�'
ir�� �li`��:u'��� u�ir m
PART DA - ADDITIONAL SPECIAL CONDITIONS
inspection shall be performed in accordance with television inspection of
sanitary sewer lines. Video tapes shall be submitted to the Department of
Engineering for review,
b. Correction of Sags: Sags shall be corrected by open cut and by adding
additional bedding material to bring the sag back to grade where access is
available. For pipe enlargemenf inethods, all sags identified on the pre-
construction vid�o tapes shall be corrected prior to commencing with pipe
enlargement.
In instances where sags are located under existing structures, the existing
sewer line r�ay be relocated using open cut or boring methods. The
De�artment of Engineering shall specifically review potential relocation's
and evaluate the constructability, economics and engineering feasibility
prior to construction w6rk.
c. Measurement and Payment: Measurement and payment to correct sags
shall be per linear foot of pipe construction to correct the sag. For pipe
bursting methods, open-cut or bore construction, the applicable bid prices
in the proposal section shall apply.
L
04/16/�J9
4. Television Inspection: Inspection of the pipelines shall be perfo�med by
experienced personnel trained in locating breaks, obstacles and service
connections by closed circuit color television. Television inspection shall be in
accordance with the specifications contained herewith for "Pre- and Post-
Construction Television Inspection of Sanitary Sewer Lines".
PIPE ENLARGEMENT SYSTEM AND PIPE INSTALLATION:
1. Site Organization:
a. Inse�tion or access pits shall
be minimized and the length
shall be maximized.
be located such that their total number shall !.J
of replacement pipe installed in a single pull
b. Existing manholes shall be utilized wherever practical. Manhole inverts
and bottoms may be removed to permit access for installation equipment.
c. Equipment �used to perform the work shall be located away from buildings
so as not to create a noise impact. Provide silencers or other devises to
reduce machine noise as needed to meet requirements.
2. Finished Pipe: The installed replacement pipe shall be continuous over the entire
length of each pipe segment from manhole to manhole and shall be free from
visual defects such as foreign inclusions, concentrated ridges, discoloration,
pitting, varyirtig� wall thickness, pipe separation, other deformities. Replacement
pipe with gashes, nicks, abrasions, or any such physical damage which may have
occurred during storage and/oc handling, which are larger/deepe� than 10% of the
wall thickness shall not be used and shall be removed from the construction site.
The replacement pipe passing through or terminating in a manhole shall be
carefully cut out in a shape and manner approved by the Engineer. The invert and
-:?.� . .. . , .
ASC-12 -
u����0�a G������D
C0�' ���'uQ��Q�
�Uo UU�/U;i�ItUg-U�IN�
�
�
�
�
�
�
�
�❑
�
�
D
�
D °.
�
�
�
D
�
�
�
Q
�
�
0
Q
PART DA - ADDITIONAL SPECIAL CONDITIONS
service lateral to trench intersection and shall be in accordance with these
specifications. .
The Contractor shall, upon request, permit the Er�gineer to take elevations on both the
existing and new portions of the service connection pole to determine final grade
and invert elevations. Elevation changes greater than 0.10 feet from the house
lateral piping and shall be reconnected as directed by the Engineer.
4. Service Interruptions: Service interruptions to homes shall not exceed 18 hours.
PREPARATION:
If sewage backup occurs and enters buildings, the Contractor shall be
responsible for clean-up, repair, property damage costs and claims.
2. Line Obstructions: If pre-installation (N) inspection reveals an obstruction in the
existing s�wer (heavy solids, dropped joints, protruding service taps or collapsed
pipe) which will prevent completion � of the pipe bursting/crushing process, and
cannot be removed by conventional sewer cleaning equipment, then an
obstruction removal shall be made by the Contractor, with the approval of the
Engineer.
3. Sags in Se�iver Line: ALL SAGS AND GRADE PROBLEMS IN EXISTING SEWER
LINES SHALL BE CORRECTED AS PART OF THIS CONTRACT. If the pre-
construction television inspection re�eals a sag in the sewer line, the Contractor
shall be responsible for bringing the proposed sewer pipe to an acceptable grade
without a sag. A sag is defined as any sewer line segment more than 3 feet in
length which ponds water in the absence of sewage flow. The contractor shall
take the necessary measures to eliminate tfie sag by the method of: pipe
replacement, digging a sag elimina�ion pit and bringing the bottom of the pipe
trench to a uniform grade in line with the existing pipe invert or by other measures
that shall be acceptable to the Engineer and the City.
� oai�siss
�
Bypassing Sewage:
a. The Contractor shall bypass the sewage around the section or sections of
sewer to be rehabilitated. The bypass shall be made by plugging existing
upstream manhole 'and pumping the sewage into a downstream manhole
or adjacent system or other method as may be approved by the Engineer.
The pump and bypass lines shall be of adequate capacjty and size to
handle the flow without sewage backup occurring to facilities connected to
the sewer.
b. The Contractor shall be responsible for continuity of sanitary sewer service
to each facility connected to the section of sewer during the execution of
the work.
a. Identification of Sags: Sags shall be identified by television inspection in
the absence of sewage flow. If available, the Contractor shall be furnished
television tapes from the City identifying the sag location. Flow shall be
blocked at an upstream manhole and diverted to another sewer line or
downstream manhole below the segment of pipe to be inspected. N
�
�
ASC-11 � ,..,..._.:,r,.� • (�QQ�
tl If j`v �• �j � io- li t����
�.r��c��ul;_�,.. f.��
{r r'�" ` �' `-��� �G��
��[ u ���,; i =
�o � uC'�(�o �[��o
PART DA - ADDITIONAL SPECIAL CONDITIONS
�
c. Restore manhole bottom and invert.
Fieid Testing:
�
a. Low Pressure Air Test of Replacement Pipe: After a manhole-to-manhole
section of sanitary sewer main has been pipe burst/crushed and prior to
any service lines being connected to the replacement pipe, the pipe shall
be plugged at each manhole with pneumatic plugs. The design of the
plugs shall be such that they will hold against the test pressure without
requiring external blocking or bracing. One of the plugs shall have three air
hose connections; one for the inflation of the plug, one for reading the air
pressure in the sealed line, and one for introducing air into the sealed line.
Low pressure° air shall then be introduced into the sealed line until the
inte�nal air pi�essure reaches 4.0 psig greater than the average back
pressure resulting from any ground water -that may be over the pipe. At
least two minutes shall elapse to allow the pre'ssure to stabilize. The time
required for the internal pressure to decrease from 3.5 to 2.5 psig greater
tha� the average back pressure resulting from any ground water that may
be over the pipe, shall not be less than the time shown for a given pipe
diameter in the following table:
Carrier Pipe Minimum Elapsed
Diameter (inches) Time (minutes)
' 8 4
10 5
12 6
15 7
F.
oa��siss
b. Post-Construction Television Inspection of New Pipe: Refer to Special �
Condition for Post-Construction Television Inspection of Sanitary Sewer.
MEASUREMENT AND PAYMENT:
1. Pipe Installation: Pipe installation will be measured for payment by the linear foot
of pipe actually installed in the various diameters of sewers measured along the
centerline of the sewer from centerline to centerline of manholes. Payment will be
made for the quantities measured at the unit price per linear foot for the various
sewer diameters listed.
2. Service Reconnections: Installation of sewer service connections will be
measured for payment by each actually reconnected to the installed pipe.
Payment will be made for the quantities measured at the unit price per each listed.
Payment shall include required excavation. and bacicfill, saddles, flexible
connectibns, and all other incidentals necessary to successfully reconnect sewer
service lines to th,e rehabilitated sewer. Payment shall not include pavement
replacement, which if required, shall be paid separately.
3. Sewer Cleaning by Bucket Machine: Heavy cleaning requiring more than hydraulic
jet cleaning shall be performed by bucket machines. The payment for such
cleaning; shall be included in the bid item for Pre-Construction Television
Inspection of Sanitary Sewer Lines. ,
,, .
ASC-14 ' U(�[���G���,� � I�-���
. C4� ��rQ���b
��o �G���,, ����
�
L�J
�
LJ
'�J
'iJ
L�
I''�
u
L�1
�
�
L�"J
�
�
�
�
L�
�
.�
3.
4.
PART DA - ADDITIONAL SPECIAL CONDITIONS
benches shall be streamlined and improved for smooth flow. The installed pipe
shall meet the leakage requirements of the �ressure test specified later.
Pipe Jointing:
a. Sections of polyethylene replacement pipe �shall be assembled and joined
on the job site above the ground. Jointing shall be accomplished by the
heating and butt-fusion system in strict conformance with the
manufacturer's printed ins,tructions.
b. The butt-fusion system for pipe jointing shall be carried out in the field by
operators with prior experience in ,fusing polyethylene pipe with similar
equipment using proper jigs and tools per standard procedures outlined by
the pipe manufacturer. These joints shall have a smooth, uniform, double
rolled back bead �made while applying the proper melt, pressure, and
alignment. It shall be the sore responsibility of the Contractor to provide an
acceptable butt-fusion joint. All joints shall be made available for inspection
by the Engineer before insertion. . The replacement pipe shall be joined on
the site in appropriate working lengths near the insertion pit. The maximum
(ength of continuous replacement pipe which shall be assembled above
ground and pulled on the job site at any one time shall be 600 linear feet.
c. For situations where the replacement pipe is not pulled all the way to the
manhole or if it is impossible° to pull the missle all the way through, the
following shall apply: At the direction of the Engineer, a 12"-18" full circle�
steel clamp shall be utilized to connect segments of the HDPE pipe.
New Pipe Installation:
a. Thread winch cable or chain and associated lines `through sewer section to
be rehabilitated. Keep lines away from pedestrian and vehicular traffic.
b. Existing manholes may be used for launch and receiving access. Remove
manhole invert and bottom as required. Pull winch chain through sewer
section and attach to cutter and machine head. Lower into launching
manhole, apply winch tension pulling the cutter and head into the sewer
until the rear of the machine is flush with the manhole wall. Attach steel
starter pipe and advance assembly until the rear of the steel starter pipe is
flush with the manhole wall. Lower hydraulic jack into the manhole and
align. Insert new pipe by simultaneous operation of the jack and winching
the cutter and head forward. .
04/16/99 �
5. Anchoring New Pipe and Sealing Manholes:
a. After the new pipe has been� installed in the entire length of the sewer
section, anchor the pipe at manholes. The new pipe shall protrude in the
manholes for enough distance to allow sea7ing and trimming.
b. Sealing the new pipe at manholes shall not begin for a minimum of ten (10)
hours after installation. Provide a flexible gasket connector in tlie manhole
wall at the end of the new pipe, centered in the existing manhole wall.
Grout flexible connector in the manhole, filling all voids the full thickness of
� .., . ., fhe manhole wall.
ASC-13
, �:,;
-� ?
* H. �,.. �.,..'... .�. 4',�a ,„ r`.. y'�
���y���C� 4'.� �'�(���Q�
r�; ��`or ����� ����Q�
�, � � R,. �... - --- - �
PART DA - ADDITIONAL SPECIAL CONDITIONS
b. The length of liner shall be that deemed necessary bjr the Contractor to
� effectively carry out the insertion and seal the liner at the inlet and outlet
points. When reformed, the hardened liner should extend from end to end
of ttie sewer segment being lined in a continuous tight fitting watertight
pipe-within-a-pipe.
c. The wall thickness of the folded pipe liner shall conform to the design
criteria of the manufacturer or the licensee; however, the minimum wall
thickness shall conform to the following table:
Existing Pipe I.D.
(inches)
6
8
10
12
C. EXECUTION:
Minimum Wall
Thickness (inches)
0.236
0.265
0.331
0.392
� 1. General: Liner installation shall be accomplished by pulling the liner through the
existing sanitary sewer pipeline utilizing a power winch and stee! cable�with an
appropriate pulling head at the end of the liner. Rounding of the liner shall be
. accomplished by utilizing a heat source such as water or steam with a rounding
device to reform the folded pipe into a hard, impermeable round pipe.
2.
3.
4.
04/16/99
Preliminary Cleaning and Inspection:
a. Prior to any lining of designated sanitary sewer line segments, the
Contractor shall remove internal deposits as necessary to assure proper
liner installation. .
b. Inspection af pipelines shall be performed by experienced personnel
Yrained in locating breaks, obstacles, and service connections by closed
circuit television. The interior of the pipeline shall be carefully inspected to
determine the location and extent of any structural failures, which may
prevent proper installation of lining materials into the pipelines and location
of°service laterals.
c. It shall be the responsibility of the Contractor to clear the line of
obstruction� such as solids, roots, dropped joints, protruding branch
connections or broken pipe that will prevent the insertion of the liner. If
inspection reveals an obstruction not indicated in these specifications that
cannot be removed by conventional cleaning equipment, then the
Contractor shall notify the Engineer. The Engineer may authorize an
excavation in order to remove such obstruction.
Documentation: Special Conditions for Pre- and Post-Construction Television
inspection apply.
Flow Bypassing: The Contractor, when required, si�all provide for the transfer of
flow around the section or sections of pipe that are to be lined. The bypass shall
ASC-16
' ., � . .
u f�����1�� �C�C�C�QD
�p� ������`�Q�I
��a �BaBU4� �4hf�a --,
�
�
�
�
�
�
�
�
�
�
�
I
�
�
�
�
�
�
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
4. By-pass Pumping: The Contractor shall provide diversion for the flow of sewage
around the section or sections of pipe designated for rehabilitation. The pumps
and`by-pass lines shall be of adequate capacity and size to handle all flows. All
costs for by-pass pumping required during installation of the pipe shall be
subsidiary to pipe enlargement.
5. Subsidiary Work: Any damage to utilities and property, resulting repairs,
temporary service costs, etc. shall be borne by Contractor. Repair and/or
replacement of fences, sprinkler system piping and other such restoration work
resulting from Contractor activities shall be considered subsidiary to the cost of the
project and no additional payment will be allowed.
6. Testing: All cost for testing the replacement pipe by a pressure method will be
incidental to pipe installation. '
DA-3 FOL' D AND FORM PIPE:
A. GENERAL:
Description: The Contractor shall utilize the installation of polyethylene or PVC
sewer lines to restore, the watertight condition of sanitary sewer lines.
B. MATERIALS:
Polyethylene Liner Material: The polyethylene liner material shall be a high density
polyethylene pipe compound which conforms to ASTM D-1248. The polyethylene
pipe liner shall meet manufacturer's standards. The lining shall be a hard
impermeable pipe which shall conform to the minimum structural standards
applicable; including ASTM D-368 for 3,300 psi tensile stress, ASTM D-638 for
4,500 psi for flexural stress, and ASTM D-790 for 145,000 psi for modules of
elasticity. The finished liner shall incorporate materials which will withstand the
corrosive effects of normal sewage. The Contractor shall provide a written
guarantes of his compliance with these standards. The liner shall be light in color
to facilitate closed circuit television inspection.
2. Polyvinyl Chloride (PVC) Liner Material: Polyvinyl pipe shall conform to ASTM
D3034. The PVC compound used for the folded pipe shall conform to ASTM
D1784 classification 12334-B, 123448 or 12454B or C. Compounds that have
different cell classifications which are superior to those of the specified compounds
are also acceptable.. The lining shall conform to the minimum structural standards
applicable including ASTM D-790 for 6,000 psi flexural stress and 350,000 psi
modulus of elasticity. �
3. Sizing of the Liner. The liner diameter, length and wall thickness shall be
appropriate for each designated location. The Contractor shall verify the actual
sewer lengths and diameters in the field prior to cutting the liner to length and
sizing the diameter.
a. The liner shall be fabricated to a size that when installed will neatly fit the
internal circumference of the sewer to be lined. Allowance for
.... circumferential stretching of the liner during insertion shall be made as per
�� - � ti, ��--� ; -� :manufacturer's standards. ��
oai�siss ;� �� .. y . „ ;, ASC-15 U�I��r��� �l��OQa :
, ,r .
,F ,''' � `
m , '•�'z. .,,;-. C��'r ��"rl��Q�
u C� `s �.!t:;c�
^ : ... pr. �. �
� � u !.�,s�r+� '"L�1�
o � u�i��f�n u o
PART DA - ADDITIONAL SPECIAL CONDITIONS
,:�
esta,blishes their operability or by excavation. Any bypass pumping that is
required shall'be provided at no additional cost for sewer lines where lining
is being performed. Service interruptions to any homes tributary to this
sewer line sh�ll not exceed 18 hours. Connection of the service lateral by
excavation shall be rnade with a Neoprene Gasket Saddle which inse�ts
into the lined pipe for a watertight fit. Backfill at service connections shall
be cement stabilized �sand (2 sacks per cubic yard) to a point 12 inches
above the service lat�ral to trench intersection and shall be in accordance
with these specificatio,ns.
Excavation pits for e ternally reinstated service laterals shall remain open
for 24 hours after rei statement of the service. The Contractor shall be
responsible for verifyij�g that shrinkage of the polyethylene sewer liner has
not occurred. I
i
c. The water tightness of the liner shall be gauged while the liner is curing,
and under a positive head. After tfie work is completed, the Contractor will
provide the Qwner with a video tape showing both the before lined and
after lined conditions, including the restored connections. Upon completion
of the installation work after required testing indicates the lining is
acceptable, the Contractor shall reinstate the project area affected by his
operations and perForm any surface restoration in accordance with these
Specifications.
�
8. Special Notes: The;anstaller shall be liable for damages to the homes or basement
from backups which, may result during the installation Of the liner. Installer will be
allowed to open clean outs.
MEASUREMENT AND PAYMENT:
Liner Installation: Liner installation �will be measured for payment by the linear foot
of liner actually installed in the various diameters of sewers measured along the
centerline �of the sewer from centerline to centerline of manholes. Payment will be
made for the quantities measured at the unit price per linear foot for the various
sewer diameters listed.
04/16/99
2. Service Reconnection: Payment will be made for the quanttties measured at the
unit price per each listed in the bid proposal. Payment shall include all labor,
materials, and the lateral connection, including all necessary pipe and fittings to
connect the existing service line. Payment shall not include pavement
replacement, which if required, shall be paid separately.
3. Television Inspection and Cleaning: Special Conditions for Pre- and Post-
�Construction Television Inspection apply. �
4. Sewer Cleaning by;�Bucket Machine: Heavy cleaning requiring more than hydraulic
jet cleaning shall be performed by bucket machines. The payment for such �
cleaning �hall be included in the bid item for Cleaning and Television Inspection of
Sanitary Sewer Lines.
5. By-Pass Pumping: The Contractor shall provide diversion for the flow of sewage �
around the section or sections of pipe designated for rehabilitation. The pumps
ASC-18
u�f�OC��l�� ��C�C��QD
C�0�1 �����G��
(��o �G��o ���{o
�
�
�
5. Notification of the Public: The Contractor shall notify all Property Owners affected
by the liner installation work at least 48 hours prior to commencement of the work
which will temporarily plug the sanitary services of the Property Owners connected
to the sewer line segment being lined. Notification shall be by written notice and,
when possible, shall be verbal, also. Customer complaints during installation shall
be resolved by the Contractor.
� � be made by diversion of the flow �at an existing upstream access point and
pumping the flow Into a downstream access point or �djacent system. The pump
and bypass lines shall be of adequate capacity and size to handle the flow. The
D proposed bypassing system shall be approved in advance by the Owner. All costs
of flow bypassing shall be considered incidental to cost of rehabilitating the pipe.
�I
�
�
L�
�rJ
��l
6. Liner Installation:
PART DA - ADDITIONAL SPECIAL CONDITIONS
a. The liner shall be inserted into the �existing sewer line with a power winch
and steel cable connected to the end of the liner by use of an appropriate
pulling head. A second pulling head may be attached to the other end of
the liner for attachment of a tag line to pull the liner back out of the sewer
line, if necessary. Precautions should be taken during insertion to protect
the liner pipes to prevent scoring the outside of the liner as it is being pulled
into the sewer.
b. Pr=ior to reforming the liner, "O" Ring gaskets shall be installed on the liner
at each manhole connection.
Q c. After insertion is completed, the installer shall supply a suitable
, heat/pressure source and water recirculation equipment. The equipment
shall be capable of delivering water/pressure throughouY the section to
� uniformly raise the water temperature above the temperature required to
reform the liner.
L�`:
I�
L�J
�
7.
II ��
'J
�
d. The heat source shall be fitted with suitable monitors to gauge the
temperature of the incoming and outgoing water supply.
e. The installer shall cool the liner to a temperature below 100 F before
relieving the reforming pressure. Cool down may be accomplished by the
introduction of cool water or other approved method into the recirculation
network.
f. The finished lining shall be continuous over the entire length of an insertion
run and be free from visual defects such as foreign inclusions and pinholes.
The lining shall be impervious and free of any leakage from the pipe to the
surrounding ground or from the ground to the inside of the lined pipe. Any
defects which will affect, in the foreseeable future, or warranty period, the
integrity or strength of the linings, shall be repaired at the Contractor's
expense, in a manner mutually agreed by the Owner and the Contractor.
Completion of Lining:
a. After the liner has been reformed, the Contractor shall reconnect the
existing active service connections. This shall be done from the interior of
the pipeline by means of a television camera and a cutting device that re-
04/16/99 �� r " .
..w
r ...
, ,.
, ,, :� .
,. , ASC-17
^,,.
u����c0�!�.� G���OQ�
�G��' �1�������°JQI�
� ���r,�M ��M
PART D/� - ADDITIONAL SPECIAL �CONDITIONS
C.
04/16/99
4. Grout: Grout shall be Portland Cement grout of min. 2000 psi compressive
strength at n28 days. Proportioned not less than 1 cu. ft. of cement to 3 cu. ft. of
fine sand with sufficient water added to provide a free flowing thick slurry.
EXECUTION
Where sewer pipe is required to be installed under railroad embankments or under
highways, streets or other facilities in other than open cut, construction shall be
performed in such a manner so as to not interfere with the ope�ation of the
railroad, street, highway, or other facility, and so as not to weaken or damage any
embankment or stru�ture. During construction operations, barricades and lights to
safeguard traffic and pedestrians shall be furnished and maintained, until such
time as the backfill has been completed and then shall be removed from the site.
Pits and Trenches:
�
a. If the grade of the pipe at the end is below the ground surface, suitable pits
or trenches shall be excavated for the purpose of conducting the jacking or
tunneling operations and for placing end joints of the pipe. Wherever end
trenches are cut in the sides of the embankment or beyond it, such work
shall be sheeted securely and braced in a manner to prevent earth from
caving in.
b. Tfie location of the pit shall meet the approval of the Engineer.
c. The pits of trenches excavated to facilitate these operations shall be
backfilled immediately after the casing and carrier pipe installation has
been completed.
Boring and Jacking Steel Casing Pipe: Steel casing pipe shall be installed by
boring hole with the earth auger and simultaneously jacking pipe into place.
3.
a. The boring shall proceed from a pit provided for the boring equipment and
workmen. The holes are to be bored mechanically. The boring shall be
dane using a pilot hole. By this method an approximate 2-inch hole shall
be bored the entire length of the crossing and shall be checked for line and
gr,ade on the opposite end of the bore from the work pit. This pilot hole
shall serve as the centerline of the larger diameter hole to be bored. Other
methods of maintaining line and grade on the casing may be app"roved if
acceptable to the Engineer. Excavated material shall be placed near the
top of the working pit and disposed of as required. The use of water or
other fluids in connection with the boring operation will be permitted only to
the extent required to lubricate cuttings. Jetting or sluicing will not be
permitted.
b. In unconsolidated soil formations, a gel-forming colloidal drilling fluid
consisting of at least 10 percent of high grade carefully processed
bentonite may be used to consolidate cuttings of the bit, seal the walls of
the hole, and furnish lubricatibn for subsequent removal of cuttings and
installation of the pipe immediately #hereafter.
�
asc-2o v ��� Cp/�� 6���(�GQD
� �11�U' � �'rQ��Q�i
U Ilo IlllU�'UUII➢ �L�Wo
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
D and by-pass lines shall be of adequate capacity and size to handle ail flows. All
costs for by-pass pumping required during installation of the pipe shall be
subsidiary to the pipe reconstruction item.
�
[�l
�
�
L�'J
[�.
CI
L�"J
L
L�J
��,
t�l
[�.
�
�
�
�
6. Point Repai�s: Point repairs shall be made before or after liner installation at the
Contractor's option. Point repairs are available for payment only if mutually agreed
by the Department of Engineering and the Contractor prior to acceptance of the
line for reconstruction. Before any excavation is done for any purpose, it will be
the responsibility of othe Contractor to check with various utility companies and
determine the location of their facilities. Point repairs shall be measured and paid
for by the linear foot for the appropriate depth of cut. Payment shall includ.e all
labor, materials, and equipment for pipe replacement according to FW1ND
standards.
7. Subsidiary Work: Any damage resulting to utilities and property, resulting repairs,
temporary service costs, etc., shall be borne by Contractor. Repair and/or�
replacement of fences, sprinkler system piping and other such restoration work
resulting from Contractor activities shall be considered subsidiary to the cost of the
project and no additional payment will be allowed.
DA-5 PIPE INSTALLED BY OTHER THAN OPEN CUT:
A. GENERAL:
1. � Furnish materials and necessary �accessories, with strengths, thickness, coatings,
and fittings indicated, specified and/or necessary to complete the work.
2. All excavation shall provide an open area conforming to the outside diameter of
the casing and/or ca�`rier conduit. The excavation shall be to an alignment and
grade which will allow the carrier conduit to be installed to proper line and grade as
shown on the Plans and as established in the Specifications.
3. Work shall be performed in accordance with the requirements of the City of Fort
Worth Water Department, the Texas Department of Transportation, or railroad
company, as applicable.
B. MATERIALS:
1. Casing Pipe: Casing pipe shall be steel conforming to ANSI B36.10 and the
following:
a.
b.
c.
d.
2.
3.
04/16/99
Field Strength: 35,000 psi minimum.
Wall thickness: 0.312 in. minimum (0.5 for railroad crossings).
Diameter: As shown on the drawings (minimum size requirements).
Joints: Continuous circumferential weld in accordance with AWS D1.1.
Carrier Pipe in Casing: Carrier pipe shall be as shown on drawings and as
specified in the General Contract Documents.
Sewer Pipe without Casing Pipe: Shall be minimum Class 51 ductile iron pipe, or
as �esignated on the plans.
��•�„„; .�....,e����,
, ASC-19
r�� '
j����s�u!�,���,? G�'��OQ�
,.
.. '� ��V' ��1�'� �'����G�1�
.j ��o �u���; ���M_ ��s�
PART DA - ADDITIONAL SPECIAL CONDITIONS
design shall bear the seal of a licensed professional engineer in the State
of Texas. Approval by the Engineer shall not relieve the Contractor of the
responsibility for the adequacy of the liner method. -
L�
c.
The space befinreen the tunnel liner and the limits of excavation shall be
pressure grouted or mud jacked.
Access holes for placing concrete shall be space at maximum intervals of
10 feet.
D. MEASUREMENT AND PAYMENT: Installation of pipe by other than open cut will be
measured by the linear foot of pipe, complete� in place. Such measurement will be made
befinreen the ends of the pipe along the central axis as installed. The work performed and
materials furnished as prescribed by this item will,be� paid for at the Contract Unit Price bid
per linear foot for Pipe Installed by Other Than. Open Cut of the type, size, and class of
pipe specified� as shown on plan,�. The furnishing of all materials, pipe, liner materials
required for installation, for all preparation, hauling and installing of same, and for all labor,
tools, equipment and incidentals necessary to complete the work, including excavation,
bacicfilling and disposal of s�rplus material shall be included in the Contract Unit Price as
shown in the Bid Proposal.
DA-7 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION:
A. GENERAL:
1. Scope: This section governs all work, materials and testing required for the
application of interio� protective coating. Structures designated to received interior
coating are listed on the construction drawings. The structures are to be coated,
including interior wall, top and bench surfaces. Protective coating for corrosion
protection shall meet the requirements of this Specification (and items DA-12 and
DA-13) and the Manufacturers recommendations and specifications.
2. Description: The Contractor shall be responsible for the furnishing of all labor,
supervision, materials, equipment, and testing required for the completion of
protectivea coating of structures in accordance with manufacturer's
recommendations.
3.
4.
Manufacturer's Recommendations: Materials and procedures utilized for the lining
process shall be in strict accordance with manufacturer's recommendations.
Corrosion Protection: Corrosion protection may be required on all structures
where high turbulence or high H2S content is expected.
B. MATERIALS:
04/1 fi/99
�
�
t
t
1. Scope: This section governs the materials required for completion of p�otective
coating of designated structures. a
2. Protective Coating: The protective coatin� shall be a proprietary finro component,
100 percent solids, rigid polyurethane system designated as Spray Wall as
manufactured by Sprayroq, Inc. or a two-part epoxy resin s�rstem using 100% solids
asc-22 �j����U�� �[��OQD
,. � ���i1 ��'G� � ° Q�
�o �����p ��. ,
�
�
�❑
CrJ
�
l�J
�
l�'J
u
L+�'
��
L!
�
L�J
�
�
�I
L.
C�
�
a a4„�9
F
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
c. Allowable variation from the line and grade shall be as specified under
paragraph 1#.2. All voids between bore and outside 'of casing shall be
pressure grouted.
Installation of Carrier Pipe in Casing:
4.
a. Sanitary sewer�pipe located within the encasement pipe shall be supported
by "skids" or "bands" to prevent the pipe and bells from snagging on the
inside of the casing, and to keep the installed line from resting on the bells.
b. All skids shall be treated with a wood preservative. Skids should extend for
the full length of�the pipe with the exception of the bell area and spigot area
' necessary for assembly unless otherwise specified.
c. The Contractor shall prevent over-belling the pipe while installing it through
the casing. A method of restricting the movement between the assembled
bell and spigot where applicable shall be provided.
d. At all bored, jacked, or tunneled installations, the annular space between
the carrier pipe and casing shall be filled with grout. Care must be taken
that not too much water is forced into the casing so as not to float the pipe.
The b�ckfill material will not be required unless specified on the plans and
specified by the Engineer.
e. Closure of the casing after the pipe has been installed shall be plugged at
the ends of the casing as shown on the drawings or as required by the
Engineer.
Boring and Jacking Ductile Iron Pipe without Casing Pipe:
5.
a. As indicated on drawings and as required and directed by the Engineer
sewer shall be constructed of bore' and jacked ductile iron pipe.
b. When a casing pipe is not designated on the drawings, the contractor shall
provide a casing pipe if necessary to achieve line and grade. Casing pipe
shall be provided at no additional cost and shall be subsidiary to the cost
bid for installation By Other than Open Cut.
c. Bore and jack in accordance with paragraph C.3. above.
d. Short length of sewer consisting of a single pipe section may be installed
by jacking without a bore hole if permitted by the Engineer and in soft soil
layer. All voids outside of installed pipe shall be pressure grouted.
6. Tunneling: Where the characteristics of the soil, the size of the proposed pipe, or
the use of monolithic sewer would make the use of tunneling more satisfactory
than jacking or boring, or when shown on the plans, a tunneling method may be
used, with the approval of the Engineer or railroad/highway officials.
a. When tunneling is permitted, the lining of the tunnel shall be of sufficient
strength of support the overburden. The Contractor shall submit the
prqposed liner method to the Engineer for approval. The tunnel liner
' r� � ' ASG21
�� '.
+.
���BC�OI�d ��C��GC�
�=n�����Q a ��
�� i���.� �����; r� �r�r
PART DA - ADDITIONAL SPECIAL CONDITIONS
1)
2)
3)
The su "rface shall be thoroughly cleaned of all foreign materials and
matter. '
Place covers over the invert to prevent extraneous material from
entering the sewers.
If required for filling or leveling, apply specialty cement product to
provide a smooth surface for the coasting material.
4) Spray the urethane or epoxy onto the structure wall and
bench/trough to a minimum uniform thickness of 125 mils (0.125
inches). Thickness to be verifiable through the use of inethods
acceptable to the Engineer. After the walls are coated, the wooden
bench covers shall be removed.
5) The final appli'cation shall have a minimum of three (3) hours cure
time or be set hard to the touch, before being subjected to active
flow.
6) No applications shall be made to frozen surfaces or if freezing is
expected to occur inside the structure within 24 hours after
application. •
4. Testing of Rehabilitated Manfaoles: Testing of rehabilitated manholes for
watertightness shall be performed by the Contractor after operations are
complete in accordance with .the Section D-63 - VACUUM TESTING OF
SANITARY SEWER MANHOLES.
D. MEASUREMENT AND PAYMENT: Payment shall be based on the Contract Unit Price
Bid per vertical foot, measured from the bottom of the frame to the top of the bench. The
Contract Unit Price shall be payment in full for perfo�ming the work and for furnis�hing all
labor, supervision, materials, equipment and material testing required to complete the
work. Pressure grouting, if necessary to stop active infiltration prior to application of the
protective coating, shall be included in the above unit price. Grouting of the pipe seals,
bench and trough, and lower portion of a particular structure, if required by the •Engineer,
shall be paid for separately, as specified in Section DA-8, MANHOLE REHABILITATION.
DA-12 INTERIOR MANHOLE COATING - SPRAY WALL SYSTEM:
A. GENERAL
1. Scope
This section govems all work, materials and testing required for the application of
interior manhole coating. Manholes designated for interior coating are listed on the
Manhole Rehabilitation Schedule. Interior manhole coating shall meet the
requirements of this Section or of Section DA-10, DA-11, DA-13, or DA-14.
2. Description
04/16/99
�
�
ASG24 � �����G�� ��� �U�� .
r��`'U' �[�':;G�� ° G��
�o " �1�t1 U9 �L�lNo
L]
�
�
�
D
�
�
D
0
C.
Q
�
0
�
a
Q
�
lrl
04/16/99
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
based epoxy binder with fibrous and flake fillers, is manufactured by Raven Lining
systems and designated as Raven 4.05.
3. Specialty Cement (If required for leveling or filling): The specialty cement-based
coating material shall be either Quadex QM-1 s as manufactured by Quadex, Inc. or
Reliner MSP as manufactured by Standard Cement Materials.
4. Material Identification: The protective coating material sprayed onto the surface of
the structure shall be a urethane or epoxy resin system formulated for the
application to a sanitary sewer environment. The spray system shall exhibit the
minimum physical properties as follows:
Property
Tensile Strength
Flexural Stress
Flexural Modulus
Standard Lon� Term Value
ASTM D-638 5,000 psi
ASTM D-790 10,000 psi
ASTM D-790 550,000 psi
5. Mixing and Handling: Mixing and Handling of specialty cement material and
protective coating material, which may be toxic under certain conditions shall be in
accordance with the recommendations of the manufacturer and in such a manner
as to minimize hazard to personnel. It is the responsibility of the Contractor to
provide appropriate pro�ective measures to ensure that materials are under control
at all times and are not available to unauthorized personnel or animals. All
equipment shall be subjec� to the approval of the Engineer. Only personnel
thoroughly familiar with.the handling of the coating material shall perform the spray
coating operations and coating installations.
EXECUTION:
1
2.
General: Protective coating shall not be installed until the structure is complete
and in place.
Preliminary Repairs:
a. All foreign materials shall be removed from the interior of the structure
using high press�re water spray (3500 psi to 4000 psi at spray tip).
b. All unsealed lifting holes, unsealed step holes, and voids larger than
approximately one-half (1/2) inch in thickness shall be filled with patching
compound as recommended by the material supplier for this application.
c. After all repairs `have been completed, remove all loose �naterial.
3
Protective Coating:
a.
b.
.,af�"� , ..
',��', ,�. ,.
� � .��� _ �.... �
The protective coating shall be applied "to the structure from the bottom of
the frame to the bench, down to the top of the trough. The top of the
structure shall also be coated.
The- protective coating shall be installed in accordance with the
manufacturer's recommendations and the following procedure.
ASC-23
�(�(�8���� ���OQD f
���'v'.���:��5 ° Q�
�e IYI'�Li,l�'l�l�. nf�:rl
PART DA - ADDITIONAL SPECIAL CONDITIONS
protective measures to ensure that materials are under control at ail times and are
not available to unauthorized personnei or animals. All equipment shall be subject to
the approval.of the Engineer. Only personnel thoroughly familiar with the handling of
the coating material shall perform the spray coating operations and coating
installations.
C. EXECUTION
1. General
2.
�
Manhole coating shall 'not be installed until sealing of manhole frame and grade
adjustments, or partial manhole replacement when required for the manhole per the
Manhole Rehabilitation Schedule, is complete.
Temperature
Normal interior coating operation shall be perFormed at temperatures of 40°F or
greater. No application shall be made when freezing is expected within 24 hours.
Interior Manhole Coating
a. The interior coating shall be applied to the manhole from the bottom of the
frame to the bench, down to the top of the trough.
b. The interior coating shall be installed in accordance with the manufacturer's D
recommendations and the following procedure.
1) The surface shall be thoroughly cleaned of all foreign materials and
matter. Cleaning shall be accomplished by using high pressur.e water
spray (minimum 3500 psi at spray tip), cleaning with muriatic acid,
degreaser, or other solvents as needed in order to remove any film or
residue on the surface.
2)
�
�t�
Place covers over the invert to prevent extraneous material from 0
entering the sewers.
3) Apply a minimum of one-half (1/2) inch specialty cement product
(Quadex QM-1 s or Reliner MSP) smooth surface for the urethane
coating material. �
4) Spray the urethane onto the manhole wall and bench/trough with a
minimum thickness of 125 mils (0.125 inches). Thickness to be
verifiable through the use of inethods acceptable to the Engineer.
5) Coat trough area with specialty cement product (Quadex QM-1 s or
Reliner MSR).
1.
04/16/99
Testing of Rehabilitated Manholes
ASG26 U����I��
V �� U ll ����I�L51�i�U1 if
�o UU V U,t�U U9 �ISWo
�
�
�
�
�
�
��
�
3.
The Contractor shall be responsible for the furnishing of all labor, supervision,
omaterials, equipment, and testing required for the completion of interior coating of
manholes in accordance with the Cbntract Documents.
�
[�.
trJ
C�J
u
�
�
�
L�J
L��
1
F�
3
C'�
Scope
This section govems the materials required for completion of interior coating of
manholes. �
Interior Coating
The interior coating shall be a proprietary two component, 100 percent solids, rigid
polyurethane system designated as Spray Wall as manufactured by Sprayroq, Inc.
Specialty Cement
The specialty cement-based coating material shall be either Quadex QM-1 s as
manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard
Cement Materials.
Material Identification
� The interior manhole coating material sprayed onto the surface of the manhole shall
be a urethane resin system formulated for the application to a sanitary sewer
environment. The spray system shall exhibit the physical properties as follows:
u
�
L:
L!
� OM16/99
�
4.
PART DA - ADDITIONAL SPECIAL CONDITIONS
Manufacturer's Recommendations
Materials, mixture ratios, and procedures utilized for the coating process shall be in
accordance with manufacturer's recommendations.
Manholes
Manholes to be coated are of brick, block, or concrete construction. All manholes
shall have a minimum of one-half (1/2) inch specialty cement-based coating material
(Quadex QM-1 s or Reliner MSP) sprayed or trowelled on coating over the original
interior surFace.
B. MATERIALS
5.
� Property
Tensile Strength
Flexural Stress
Flexural Modulus
Mixing and Handling
Standard Lonq Term Value
ASTM D-638 ""5,000 psi
ASTM D-790 10,000 psi
ASTM D-790 550,000 psi
Mixing and handling of specialty cement material and interior coating material, which
may be toxic under certain conditions shall be in accordance with the
recommer�dations of the manufacti�rer and in such a manner as to minimize hazard
,. `Zo, Re�sgnnel,.,_._,It is the responsibility of the Contractor to provide appropriate
. ,, ,
: _ � � , ASG25 `
�. .. : �.::� G�[�OC�O�� �s��C��D
� .. . � � � ,' ,. C�0�1 �S��rG°�C�"�IG�1�
- �o VVVII1)Ullllp ��Wo
PART DA - ADDITIONAL SPECIAL CONDITIONS
3.
4.
E
Raven Ultra„ High-Build epoxy Coating, a finro-part epoxy resin system using 100%
solids based epoxy binder with fibrous and flake fillers, is manufactured by Raven
Lining systems and designated as Raven 405.
Specialty Cement
The specialty cement-based coating material shall be either Quadex QM-1 s as
manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard
Cement Materials.
Material I d�ntification
Contractors will completely identify the types of grout, mortar, sealant, and/or root
control chemicals proposed and provide case histories of successful use or defend
the choice of grouting materials based on chemical and physical properties, ease of
application, and expected perFormance. These gr'outing materials shall be
compatible with Raven 405 interior coating. The contractor shall be responsible for
getting approval from Raven Lining systems and/or the grout manufacturers for the
use of these grouting materials.
Mixing and Handling�
Mixing and handling of interior coating, which may be toxic under certain conditions
shall be in accordance with the recommendations of the manufacturer.and in such a
manner as to minimize hazard to personnel. It is the responsibility of the Contractor
to provide appropriate protective measures to ensure that materials are under
control at all times and are not .available to unauthorized personnel or animals. All
equipment shall be subject to the approval of the Engineer. Coating shall be
performed only by certified applicators approved by the manufacturers.
C. EXECUTION
1. General
Manhole coating shall not be performed until sealing of manhole from frame and
grade adjustments, partial manhole replacement, manhole grouting or sewer
replacement/repair� are complete.
2. Tempera�ures
3
04/16/99. �. ~..
Normal interior coating operation shall be performed at temperatures' of 40°F or
greater. No application shall be made when freezing is expected within 24 hours.
Interior Manhole Coating �
a. Manholes scheduled for interior coating are shown on the Manhole
Rehabilitation Schedule. The interior coating shall be applied to the manhole
from the bottom of the manhole frame to the bench/trough, including the
bench/trough.
b. The interior coating shall be installed in accordance with the manufacturer's �
recommendations and the following procedure.
- ,..�
ASC-28 ������Qd �°���dQ�
C�� �'l5f(�Gf e ° 1(
�o I�GG1��� �[�{o
�
�❑
LJ
�J
A. GENERAL
Testing of rehabilitated manholes for watertightness shall be performed by,
the Contractor after operations are complete in accordance with Section DA-
18.
DD. MEASUREMENT AND PAYMENT
Payment shall be based on the Contract Unit Price per vertical foot, measured from the
� bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in
full for performing the work and for fumishing all labor, supervision, materials, equipment
and material testing required to complete the work. Grouting, if necessary, shall be
� included in the above unit price. Grouting of the pipe seals, bench and trough, and lower
portion of a particular manhole, if required by Manhole Rehabilitation Work Schedule o�
required to be done by the Engineer, shall be paid for separately at the Contract Unit Price.
� DA-13 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM:
�
C�
�
�
[�?
L!J
�
�
1
2.
3
4.
Manholes to be coated are of brick, block, or concrete construction. All manholes
� shall have a minimum of one-half (1/2) specialty cement-based coating material
(Quadex QM-1 s or Reliner MSP) sprayed or trowelled on coating over the original
interior surface.
aB. MATERIALS
L�J
LJ
�
�� I
1. Scope
PART DA - ADDITIONAL SPECIAL CONDITIONS
=a
Scope
This section govems all work, materials and testing required for the application of
interior manhole coating. Manholes designated for interior coating are listed of the
Manhole Rehabilitation Schedule, listed in Section I. Interior manhole coating shall
meet the requirements of this Section, or of Section DA-10, DA-11, DA-12, or DA-14.
Description
The Contractor shall be responsible for the furnishing of all labor, supervision,
materials, equipment, and testing required for the completion of interior coating of
manholes in accordance with the Contract Documents.
Manufacturer's Recommendations
Materials, mixture ratios, and p�ocedures utilized for the coating process shall be in
accordance with manufacturer's recommendations.
Manholes
This section governs the materials required for completion of interior coating of
manholes.
2. Interior Coatir��g '
,'_ � ;:�, �.�. .: ��,•. �
oai�siss .� y : . ,, . . . �
a,,
L .p
F �
i
0
ASC-27
O�f�aC�O/�� ���C�u�D
��� ��r�� "Q�
�o UUVV`S�UUe ��Wa
PART DA - ADDITIONAL SPECIAL CONDITIONS
as shown in Drawing No. �-S5 of the Star�dard Specifications. Included, and figured subsidiary to
this unit price, will be the required excavation into the street to aid in the construction of the curb
and gutter. The pay limit will be 9" out from the gutter lip, with same day haul-off of the removed
material to a suitable dump site. The street void shall be filled with H.M.A.C. "Type D" mix and
compacted to standard City densities and top soil, if needed, shall be added and leveled to grade
behind the curb. Existing improve"ments within the parkway such as water meters, sprinkler
system, etc. �amaged during construction shall be replaced with same or better at no cost to the
City.
Backfill'for curb and gutter shall be completed within fourteen (14) calendar days f�om the day of
demolition to date of completion. if"the contractor fails to complete the work within fourteen (147
calendar days, a$100 dollar liquidated damage will be assessed per block per day.
The unit price bid per linear foot shall be full compensation for all materials, labor, equipment and
incidentals necessary to complete the work.
DA-23 REPLACEMENT OF 6" CONCRETE DRIVEWAYS:
This item shall include the removal and replacement of existing concrete driveways, due to
deterioration or in situations where curb and gutter is replaced to adjust grades to eliminate
ponding water with same day haul-off of the removed material to a suitable dump site. For
specifications governing'°this item see Item No. 104 "Removing Old Concrete", Item No. 504"
Concrete Sidewalk and Driveways". Pay limits for concrete driveway are as shown in Drawing
No. S-S5 of the Standard Specifications. . �
The unit price bid per square yard shall be full compensation for all labor, material, equipment,
supplies, and incidentals necessary to complete the work.
DA-33 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CU�
The following specifications are for the fumishing and placing of reinforced concrete pavement or
base as shown on detail and as directed by the Engineer.
A. GENERAL:
Reinforced concrete pavement or base shall conform to Specification Item No. 314 herein
except for finishing and curing:
B. FINISHING:
The reinforced concrete shall° be brought to a uniform surface by working with a wooden float.
The surface shall be flush anrith the adjacent pavement and shall have a finish similar to the
surrounding pavement. The surface shall be even and shall provide a smooth ride.
C. CURING:
The reinforced concrete pavement surFaces shall be sprayed uniformly with a membrane curing
compound Conforming to the requirements of ASTM C-309, Type 2, white-pigmented
compound, which shall not.produce permanent discoloration of the concrete. Concrete shall be
allowed to cure for seven days or test cylinders reach 3000 psi before removal of barricades.
04/f 6/99
�
Asc-so � G��D�pQ� G�[�C�OQD
���1 ��rQ ° °�
�o VVUU,�IIUy ��� �
�
�
.�J
I
I!J
�
�
�
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
1) The surface preparation shall comply with the requirements of
Section DA-9, SURFACE PREPARATION FOR MANHOLE
RESTORATION.
2) Apply a minimum of one-half (1/2) inch
product (Quadex QM-1s or Reliner MSP;
urethane coating material.
3) The su►fiace prior to application may be
noticeable free water droplets seeping or
shall be spray applied per manufacturer's
minimum thickness of 125 mils (0.125 inch)
specialty cement-based
smooth surface for the
damp but shall not have
running water. Material
recommendations with a
4) After the walls are coated, the'� wooden bench covers shall be
removed and the bench sprayed to the same average and minimum
thickness as required for the walls.
5) The final application shall have a minimum of three (3) hours cure
time or be set hard to the touch, before being subjected to active flow.
6) No applications shall be made to frozen surFaces or if freezing is
expected to occur in side the manhole within 24 hours after
application.
�J
�
�
�
D.
�
�
C��
4.
Testing of Rehabilitated Manholes
;a. After the epoxy liner has set (hard to touch), all visible pinholes shall be
repaired. Repairs shall be made by fightly abrading the surface and brushing
the lining material over the area. All blisters and evidence of uneven cover
shall be repaired according to the manufacturer's recommendations. Spot
check of coating thickness may be made by Owner's Representative, and the
contractor shall repair these areas as required, at no additional cost to the
Owner. �
b. Testing of rehabilitated manholes for watertightness shall be performed by
the Contractor after operations are complete in accordance'with Section DA-
18 — VACUUM TESTING OF REHABILITATED MANHOLES.
MEASUREMENT AND PAYMENT
Payment shall be based on the Contract Unit Price per vertical foot, measured from the
bottom of the frame to the top �of the bench. The Contract Unit Price shall be payment in full
for performing the work and .�for furnishing all labor, supervision, materials, equipment all
testing necessary to complete the woric. Payment for grouting of pipe seals, bench and
trough and manhole walls shall be based on the Contract Unit Price for each manhole
actually grouted.
DA-22 REPLACEMENT OF CONCRETE CURB AND GUTTER:
a Contractor shall replace all damaged existing� curb and gutter, as designated by the Constructioh
Engineer, and replace with standard concrete curb and gutter, laydown curb and gutter, or in like
kind, as governed by--t#�e�wstandard•��ity Specifications. Pay limits for laydown curb and gutter are
0 04„�9 � � , -F . . :��:. 7. . asc-Zs ��f�BC���� ���C���D
,�.. ��
. `,�� .:'�:� . .. � � C0�1 �(���G�[��1��
Q� w ... „ _ . �.w�.�. ,:,.� � ��,. � . ... f�o r��6"�G�p �(�30
PART DA - ADDITIONAL SPECIAL CONDITIONS
B. MATERIALS:
1. Carrier Pipe: Carrier pipe shall be as shown on drawings and as specified in the
General Contract Documents. Approved carrier pipe materials include SDR 35 PVC,
150 psi water grade PVC, HDPE, and CL 51 DIP. The pipe material of the carrier pipe
installed by short bore will be consistent with the pipe material installed immediately
upstream and downstream of the short bore section.
2. Grout: Grout shall be Portland Cement grout of min. 2000 psi compressive strength at
28 days. Proportioned ns�t less than 1 cu. ft. of cement to 3 cu. ft. of fine sand with
sufficient water added to provide a free flowing thick slurry.
C. EXECUTION
Where sewer pipe is required to be installed across the root system of a tree (drip line)
by short bore, construction shall be performed in such a manner so as to minimize
damage to the tree. During cons,truction operations, barricades to safeguard
pedestrians shall be furnished and maintained, until such time as the backfill has been
completed and then shall be removed from the site.
2. The minimum length of'pipe to be replaced by short bore shall� be finrenty (20) feet.
Additional lengths of sewer line installed by short bore beyond "minimum length"
criteria will be determined by the Contractor and extended to the appropriate limits.
This extension must be approved by the City prior to proceeding with construction.
3.
4.
Pits and Trenches:
.i
a. Suitable pits or trenches shall�be excavated for the purpose of conducting the
short bore operations and for placing end joints of the pipe. �Wherever end
trencties are cut in the sides of the embankment or beyond it, such work shall
be sheeted securely and braced in a manner to prevent earth from caving in.
�
c.
The location of the pit shall meet the approval of the Engineer.
The pits of trenches excavated to facilitate these operations shall be backfilled
immediately after the carrier pipe installation has been completed.
Carrier Pipe Installation: The carrier pipe shall be installed by boring/excavating a
hole with the earth auger and simultaneously jacking pipe into place.
a. The short bore process shaf! proceed from a pit provided for the auger and
jacking equipment and workmen. The Contractor must minimize excessive
over-excavation during augering operations and mafitain proper sewer
alignment and grade. Excavated material shall be placed near the top of the
working.pit anii disposed of as required. The use of water or other fluids in
connection with the boring operation will be permitted only to the extent
required to lubricate cuttings. Jetting or sluicing will not be permitted.
Q
All voids betweeri the carrier pipe and the limits of excavation shall be pressure
grouted or mud jacked.
oai�siss ,_ ASC-32
�
C�(�f�BC�O�d ��[�C��QD
C0�1 ��Gf°���G��
�o ��1��9 ��{.
�
�
LJ
�I
ts!
l�J
L�J
�J
�
�
L�J
LJ
�
�
PARI' DA -.ADDITIONAL SPECIAL CONDITIONS
D. EXECUTION:
Included in this item wiil be the removal of the existing reinforced concrete pavement. The
existing pavement shall be sawed so as to maintain an even, straight pavement cut. The
existing reinforcing steel at sawed line and construction joints shall be lapped 18 inches with the
new reinforced concrete pavement. The existing steel shall be thoroughly cleaned before
lapping.
The following work method will �e performed on each utility cut:
1. Place safety signs, barricades and/or other waming devices where necessary and as
required.
2. Replace pavement to nearest joint.
3. Mark out the damaged area with keel, chalk line or paint being sure to include all areas
requiring repair.
4. Saw cut along marked lines a minimum of two (2) in�hes deep.
5. Remove existing concrete.
6. Form joints and place reinforcing steel and Dowel Bars (as required) according to standard
specifications.
7. Place and finish concrete.
8. Clean up job site, removing all debris.
9. Maintain traffic control devices to protect the area until the concrete has cured seven days
or concrete reaches 3000 psi compressive strength.
E. PAYMENT:
Payment shall be made at the unit price per linear foot as shown on the proposal and shall be
full compensation for furnishing all labor, materials, equipment tools and incidentals necessary
to complete the work.
DA-39 PIPE INSTALLED BY SHORT BORE:
A. GENERAL:
a 1. Furnish materials and necessary accessories, with strengths, thickness, coatings, and
fittings indicated, specified and/or necessary to complete the work.
�
�J
�i
2. All excavation shall provide an open area conforming to the outside diameter of the
carrier conduit. The excavation shall be to an alignment and grade which will allow the
carrier conduit to be installed to proper line and grade as shown on the Plans and as
established in the Specifications. �
3. Work shall be performed in accordance with the requirements of the City of Fort Worth
�/Vater Department, as applicable. ,
...�::, t ..,,:.., <<, ., � ASC-31 i( n ( _
04/16/99 . � . . . VIfIfO�OG�L� �'115'�JG�.�IJ
>..
� _ � : �� '� - 1�:0� If ����US�I�i11�S�
,. �, .„� . , �ypo t 1 Di�M� �lSl/Uo
u n �� I�U
� . PART DA - ADDITIONAL SPECIAL CONDITIONS
� D. MEASUREMENT AND PAYMENT: Installation of pipe by short bore will be measured by the
linear foot of pipe, complete in place. Such measurement will be made between the ends of
the pipe along the central axis as installed. The work perFormed and materials furnished as
prescribed by this item will' be paid for at the Contract Unit Price bid per linear foot for� Pipe
� Installed by Short Bore of the size and material specified on plans. The fumishing of all
materials, pipe, liner �materials required for installation, for all preparation, hauling and
installing of same, and for all labor, tools, equipment and incidentals necessary to complete
� the work, including excavation, bacicfilling and disposal of surplus material shall be included in
the Contract Unit Price as shown in the Bid Proposal.
�I
�
�
�
�
�l
�
C
C
�
��
�
�
a�4„G/�9
0
�
�
A — C�(�f�DC�OI���E�C��CGQD
C���1 ���Q�°JQ1�
f�o �G��o �[��{o
�
�J
��
�
L�'
�c��itm E100 - MATERIAL SPECIFIC�TIONS
MATERIAL STIINDARO E100-4
3AHUARY 1, 197e (IlD0E0 5/13/90)
.
�.�J� . a . � r i► � � ► �
F100-,�.1 6ENERAL; This standard cov�rs the furnishing ind installation af
Ksterti9ht qasketed manhole inse�ts in the Fort Worth sanitiry sewer tolltction
system. �
[��.+ � : : . � � �
a. The manhale insert shatl be of corroston-proaf high density
polyethelene that meets or exceeds the requi�rements of ASTM D1248,
Category 5. Type III.
b. The minimum thickness of the manhole irtsert sha11 be 1/6".
� c. The manhole inse�t sha11 have a gasket that provides positive seal ta
wet or dry conditions.- 7he gasket, shall bt made of closed cell
neo�prene rubber end meet the requi�ement of ASTM D1056, or equal.
�
�I
�
�
d. The manhole insert shall have a strap for removi�g the insert. The
strap shatl be made of minimum 1" wide waven polypropalene o� nylon
webbing, rrith �the ends treated to prevent unravelling. Stainless
steel hardrrare sha11 be used to securely attach strap to the tnsert.
e. Th� manhole insert sha11 have one or more vent holes or valves to
reZease gasses and altow Kater inflow at a rate na greater than 10
qallons pt� 24 hours.
i �l� • ► � ►
�
�
�
a
0
D
0 �.�
a.
�
a. The manhole frame shall be clean,ed of alt dirt and debris hefare
placi�g the manhote ii�sert on the �im.
b. The manhole insert shall ,be fully seated around the manhole frame rim
to retard water from seeping between the cover and the manhol� f�ame
�im.
�ioo c �,
�f���C�O °��� ����OG°�D ,
C0�1 ��� ����G'�
U Do vUl�l t}�UU9 ��o
0
�
�
�
��
l'�'
�
l�
1—,
�
L�l
0
�
�
EXCAVATI�N, BACKF�ILL AND PAVEMENT
REPAIR UNDER EXISTING STREETS
MIN, 2' H�T ❑R C�LD MIX ASPHALT —TEMP�RARY PAVING REPAIR SHOWN —
EXIST, STREET PAVEMENT FOR PERMANENT PAVING REPAIR DETAILS
J SEE FIGURES 1-5 ❑R AS SPECIFIED IN
/ THE PLANS ❑R SPECIFICATIONS.
0
: : .. '�, f• •. a• �
1� .d S • .
•. ••; d . .
� ,.
'.
� •• • �� ~• • a.
EXIST. BASE
� SAND MATERIAL�
EMBEDMENT
SEE SPEC, El-2
�� 1> SEWER — MINIMUM 12'—�
SAND EMBEDMENT CCIVER
2> WATER — MINIMt•7M 6'
SAND EMBEDMENT C�VER
MINIMUM 6` EMBEDMENT
r 6� �C�(��fE�" �' /i %/��%���//
:X—BASE MA7ERIAL�%��/��������� � ' • '• ,' ,
�, �% /,/:�;.' ,J ,/ /_• ,% �/.�f � ;% �� / �� i / � .*' � . : + .� , � 'a, .
.d�
B�TTUM OF TEMP�RARY OR� ' .'�.. •�!'' •. 'd ���
PERMANENT PAVEMENT REPAIR • , , ..' . ! : , •
•• ` . `',� � ' �TYPE C BACKFILL
''" ' �'~ .•, � • :•�'' '. SEE SPEC, El-2
�� `�'' '�,� �;:,. s•: 1'-6' MAXIMUM
.. .. '�;� :..;�.
��..,;•::.
• :, , ,•. -:; :
; �` � ti.
••-+' • • • :y.
.iicilE'.A �; .•
'� � � ..r : '..
.� � ��= :• � �+, �: CRUSHED ST�NE
', :: :. - Q� : ••„ � SEE SPEC, El-3
.� f = ''�, Q .� .:r �
•+ � :; : -•,. • _ • y ti � f;�.M j .
� '� �i tf ..'. • r.�
� '��.� •• } �_�
�� S �•A� • . .� .:l.�'.. • • t�
J�...�i, :. ; a � •':t .
a "� �'�r:,
V
� INCLUDED oIN LINEAR F��T BID PRICE ❑F PIPE
F�IGURE B
CSEWER� ALL SIZES)
CWATER SIZES 16" & LARGER)
NTS
�
�
REV� MARCH 25, 1999
��i�(�fl�dl�d ���G�D
,� ��'�.; �r�,� �I51�1�5 U
�' � lN�r� .• � �', !1
c•,
c �7 , ' i 1:.-?=+�'3�
_ ��...n�+.�cr
�
�
��.
D
� '
O ,
�J
L
L
�
�
0
�
�
l�J
L�J
� w • y 'I • �•
` �:! f�ti�•
� � ,•
. ;. --•-- , ,:_.,
-cWn �' . � ..i �
w� , ,•.
�Q ;:..�• '..
.:
, ,.
ZN '':s ''''
. �,.
� r . : : :.. :
.:. .
.
• ' �: Z
w- •,. . .� � „ �
• '� • . • •
, �.. t��: .
wE0 JOINT FIiCE
` OIA. CLOSEO CELL EXPIiNDED
LYETHYLENE FOAM 6ACKER R01
FtRST POUR ' : ; ;' SECONO P4UR
:
� 'COID` JOINT CONSTRUCTION
JOtNT OETAIL H0.2
SE�4L. FOR LpNGiTiJOtNAL AKO
� � � TRANSYERSE�CONSTRUCTiON
`gUTT JOINT
' N.T.S. .
JOiNT DEPTH
PaYEMENT � JO(NT �DEPTN
THlCKhiFSS i T!4 �
T=5' 1�/{`
T=6� ���2�
Z=7' t��'
T=8' 2` .
��4. � StLICOHE� .lOINT SEA�aNT
� �a~ �
� � �
,�.. ,� .,. ..
:t ,/; :
=�' � '� � f' t� �� SaWEO J4(NT FQCE
�;�., . . ' : :
Q"' � � ' .'� f:;' �.� '•� �•
� :: j O •. •..• : : :
' � � f� i �� �•
�, -: = •::
.� .. •:
... y •
, .� �� : , ,� ,� .� � i
. ,
..•
. . .�� � �:i� .
. � .
�� .
•i •
� �lOiHi' QETh1L N0.3
SEAL �OR SaWED QUNtt�Y
N.T.S.
�6�SMOOTH
�
.� . j..�
M �
,�. . . ' �.�.,,..�
ly • !' : ;;:• ::;
, � �::�::
. � - .,
,:t �
�_�,..r
• •.
..
: s��'3� \�
_�_ .
3/$` OIQ.'CLOSED CELL EXPANOEd
POLYETNYLENE FOAM BA�CKER ROC
JOINT
` .
,, .,.
:: _.s
s: ;. .: :
.
��� s e
.
1.
��
. •, .
:� .
A �
��� : :
SILICONE JOIN7 SEAIAt�IT
POI.YETHYLEPIE 80ND
BREAKER TAPE
REOWOnO EXPQNStON
JOINT FILLER � �
DOIKEI. SUPPORT BASKET
� �ot�+r oEra��. No. t
s�a� FOR �a�siort ,�occ�
. . t1.T.S. �
SUPPLEMENT TO T8c�W FIGURE t:
��`'- iNHEN EXlSTING CONCRETE tS CUT� SUCH GUTS SHAIL BE MaOE VUCCH A CONCRETE SaW.
�� ALl SAWING SHALL 8E SUBSIOIQRY TO THE UiVfT COST OF THE ITEM FOR WH1CN SAWtNG
lS REQUIREO. JOINT DETI4iL5 NOS. 1; 2& 3 OF THE T&PW P�` L 6E�
� apt�.�cae��. . . . � C�f��Q���:�, G.'�C�OQ�
Cfl�'ti� ��C���t�G°?"�
Q (�o ��}u:��Q ��°� o
r—� iT '
_„�; c�? `�
I__ � _
� �� r-r�>
�
�>> a� u=.
� �� '� �
� � �.
��
�� � o
��� �
e ��
.l'.: �'��A••
'SLv
�� �� �� �� � �� �
• r �? ..
' , �;,�
�No.3 BARS ON 24' CENTERS BOTN VYAYS 4�ITH
� MM.2 BARS LONGITUOINAL fN DITCN.
�ST�R 8 EXIST. CONC. CLASS 'A' REINFORCED CONCRETE �(ST. CONC. EXIST. CURB �
PAVEMENT , PAVEMENT REPL'ACEMENT PAVEFAENT � GUTTER
SAw cUT SAW CUT � �,
� . . .
.
. • - •
. .
. � .
� . .
i� •��1�� �i, •��Ir���•�: f• • .
' /,�l • ��i 1 ����• �1 ���� � \ \������`
�._._ : :, : 6� MIN. : . � . • ; -�� . .
�r . .' �. : • • • • •' �2�
. ,��....s. :. .
EXiST. BASE � �' ��� . . �•. • . � . . • . . `—' 2:2i CONCRETE EXfST: BASE pF At�
� A� � ''�: �' � '� •��•• ALL TRENCH BACKFILL SHdLL MEET REQU�REMENTS FOR
•• •. ' � �. .. GRADAT(ON AND COMPACTiON AS SPEC(F(ED (N ITEM �02 (Jf
.. '�.. THE STANDARD SPECIFlCATIONS FOR CONSTRUCTiON, PUHLIC
•� YfORKS OEPT., C1TY OF FORT YfORTH 7EXAS OR BACKFILL
CRUSFtEO LfMESTONE BEOOtNG TO EXTENO�_ �; •• AS SPECiFIED IN SECTIONS Et-2 &, .�2-2 OF THE
fROM 6' BELOW PIPE TO SPRfNGLfNE• � . •• SPECIFICATIONS FOR WATER DEPT. PROJECTS, fORT 170R'fH
',, 0 � �� 1 Y A T E R � O E P T.. q T Y O F FOR T WOR T N, T EXAS.
NOTES:
00
� �oO
p �o�� �o
� �
��! �""� �'_ � �1 r� �� �'� �
. : _;1
PROPOSED PIPE
/� � � OITCN WALL
0
1� � 1 1
6' CRUSHED LIMESTONE BEDOfNG
Q REINFORCEO CONCRETE PAVEMENT SHALL BE REPLACED TO ORIGINAL OEPTH
OR TO A MfMMUM OEPTN OF 5'. WMCHEVER IS GREATER. �
Q IF STEEL • EXISTS IN CONCRETE BASE • TO BE CUT. TNE STEEL SNALL BE Cl1T
AND SALVAGED AS POSSIBLE. A MIMMUM .LAP SFLICE DiSTANCE OF 12' SNALL BE
PROV(DED. .
��
�
r��
u
REMFORCED CONCRETE PA1/.EMENT 1YILL BE REPLACED AS SHOWN OYER TRENCH
IN THE EVENT NON-REINF'ORCED CONCRETE PAYEMENT IS REMOYEO. .
BEOOING OF PfP� TO MATCN ADJACENT SECTIONS OR SPECIFICATiON 402. WNiCHEYER
IS GREATER. ' '
2s27 CONCRETE MAY BE DELETED IF NALF THE SPECIFIEO TMCKNESS OF 2:27 IS
ADDED TO THE CLASS 'A• CONCRETE.
CONCRETE
FIGURE
PAVEMENT
NOT TO SCALE
� .
REPAIR DETAIL
�77 CI C� G� C� �7 G� t� C�7 CJ �1 C_� C� G� C� � f� � C.�7
�-- MO 7 ���t Oh !1'CtMfill{ •OTM ���5 R11M
• Y1q 2•��S lOMi1TY�lll�l M OITCN
et1iT. CtA�
•MRT�� [ltt�t A�MY�1 /�tIM4LT iYR/�Ci �[IlAC�11tMT [stST •{�It�LT tt1iT�11�
' fYR/�Ct il�/�� 111M 1 {YR/�C� C CUR� • W/i�A
+I' fA/ OJT C`��CM CO�� (�f�IM CYT `•
�
� � •
.. ,,: :!; ' �:� � � .� ��' �:' :�' ;�•� �� ` 1 •
. , �. , . •:� • � �' � .,' : �. • . � / • •
.��• � � � � ' • - ••
! • �S .fa► -� ` . � I
: .• . �., •. - - i + ' 9•�e^ �O � �. «/+ � `,�.��'^c� � �� 0
Q (y
• f�►' /�ti�i,� C► i,r1.S���� Of-��J, �: ��[nti
v• "D�� '` wi
�:' :;:.::::;� i;:'� . . . � � • ;; :, ;. �:•
•� : � .� �::
� t���t. c�c ��K • �' , • ' �.•, •, �
� : •.;�� �--t=n coNaKn
;, '. ' , � ,,,-: ...
[snr wt��w c«ss �'Rtwra�u• ' • � � • . � ' �—��� *•rrcN •.cRr�u :N�u rt[r �rsT w• ws
RiOY��tr(NTi �OR •��TWII MM
1 N�11'tt) C011CIKTL Mf[ � �:. .�.., .� �p�/rCT�DN At •��C�1�� M 11(Y I t1 •�t �
• , •,�. �O! o/ tNt f1�MAM MtC�:KA•
� ��'•1 T�OI�Rf Oi�T C1T• N' IOAr �p1�TM
' • " T[f4s OA ��CR+iLI M fr[OM+�O IN
� � �[CTIOM! ��•t MI! [!-t M TK
NTCM MLL • �• �• f►[�I/�C�T10M• I�� KT[• KH►�T-
fi�T 1�0�[CT�. IMT M�tw w�TtR
� • • • R�T � C�T � o► ►MT �Mtw, ttRN.
. .'
.: ,. • .
. •.
.�;.. �
.;
• �. ��IwOlr�t� /IrGIITt �T�iL�TIM
. ' •
.�•!... � � �, ' �I�i
,� �
..� � ': : • ��
. �i�1•••���� '���,.�. ��'. �� �'�•; �!� • ::'
� � ) Ttt � .
1�1[�Mi� CMCMTi N�i R1Ll Nl!•M �T![l [XI�?• M�MC�fT� M.1'll�w/OACt� CACR[Tt •A�[ 11��' Kl tiN1 ��►�tALT CNr1i� �Mbll
��j) M Rt�LAq� Y� MNIMI •{/TN �A�t TO K tYt. TM[ �tttl �IIL �[ 11[/L�C�� M sNow�. N�R�IUC!• ta TM� oR�a�al
C>? � �� M 1� A�1�w �i�TM M i�� lM�iL M CY1 �M� :KM�K� w• OKA tA[IICM IA T1i tYtMT M011 • KtTM. rN111111U 1av[I�[IIT A�l� I
.�I�tMf�M » tR N�AT��. IO��t��� A�IMIIIYII t�► N1.R� �[��/ORCt� CNC/[T[ ��/t �t M���T tTw[tTi f++��l �[ � y
� CS �'? � •��TAIK[ N 1!� wK� �t M�vot� �t1iN�rt�. M riN s�ait� WM�Ct CMM�.
��"-' t- K��IIN OR hK T� 11ATd1 �OJ�C[11T '
a KCTIOR� rR lKNIlCATNA Mt �,,, �, NO.s- 2d1 CONCRETE MA� fIE DELETEO tF
��� ... (� �� �f�«� MAIf TME l�EGlfl[0 T� 'KN[�SOf 2�t7 1!
,`� � O A00[0 TO TME CLAS!'A COMCRETE. ,
�� a. TYPICAL � SECTiON TR E N C H REPAIR
ASPHALT SI�RFACE � R�INFORCEO � GONCRETE �ASE,
cirr of foRr �ro�rN �r_ �_,_n REv �•��
,•'�"' TRANl�ORTATION/PUSL�C 1NORKS OE�T. �:�-��-�-�
•»•: vss fIM�1MffRM►i .....'--- �cv-�r-�s-�e ._, .
�""i/OM . Rrv-�-so-�t f/i. I.
. .. .. . _ . .T':.-.•-. s� R. �;c;:. - . . ..-. .. _ . . .
f""1 �'! f"'i E""'� �""r3 �� . C"�� !"""'7 �_'! �""7 , '� t""_I P"� �-""� !"'""! �'1 �� tr""�
�
SEE NOTE 4O BELOK
EXIST. CURB EXIST. N.M.A.C.
& GUTTER '� r SURFACE
NOTES:
�
0
O
PROPOSED H.M.A.C. REPLACEMENT
�2� MIN'� EXIST. N.M.A.C.
SAW. CUT �URFACE
EXIST. CURB
� & GUTTER
� -� � J
. ., . ,., .: . ,.,,. 1_ .,,.!���
��� /J ��� /, •��� �II r�1 ��I +�I I
� }�i�� �.�I�� B� �N. •�•�i �•\•�i
� -.�. r. . . -./.�l
�
� � ~ • " ' ' • � � ' • ' � � EXISTING GRAVEL BASE
, t�. �. . • . • . • . . .. 12' '�
F�' . • ' � • • • ' � ' • • • ' �-�i
• • • '� . �• ' ' � _ � � • EXISTfNG BASE qF ANl7
. :.• ; '.'� ': ` ' � •'
. • • . ; . • " • � . ' PR1ME COAT '
•' •• � " 2�27 CONCRETE
.
CRUSHED LIMESTONE BEODtfVG TO EXTEND -� ;; �' �' �- ALL TRENCH BACKFILL SNAII MEET' REQU(REMENTS FOR
FROM 6' BELOW PiPE TO SPRINGLINE � �: . GRADATION AND COMPACTION AS SPECIFIED IN ITEM 402 OF
PROPOSED PIPE �
00
OITCH WALL �' 0� o �`
c2
�'�
-- ��
~ ��-,�,
�
)).2_� ;�.,
_ =� ,� ;;�;
� a �`�'v ��
�
; 'c-=_
��-;� �%
` `` `'. � �J
�' . ,,, �
SAW CUT---�
iii.:
� THE STANOARD SPECIFICATIONS FOR CONSTRUCTION. PUBLIC
O � WORKS OEPT.. qTY OF FORT IYORTN. TEXAS OR BACKFlLL
� p o AS SPECIFlED M SECTIONS Et-2 � E2-2 OF iHE
1 SPECiFICATIONS FOR WATER DEPT. PROJECi'S, fORT WORTN
o � WATER OEPT., qTY OF FORT WORTN, TEXAS.
�� o
10�14 �1 1 .
� '6' CRUSHED Lliu(F�SiONE BEODING , , . .
2:27 CONCRETE SHALL 8E INSTALLED A MIN. OF 8' BELOW BOTTOM OF EXIST(�!G
H.M.A.C. PAVEMEN?. �
PAVEMENT REP ACEMENT SHALL BE 2 OF FlNE G ADED RS RFACEECOUR E��
BEOOIN� Of PIPE TO MATCH AOJACENT SECTION OR SPECIFICATION q02. NMCHEVER
IS MORE STRINGENT.
�� ON MAJOR� PROJECTS..'p�E PRAJECT ENGINEER OR DESIGNER MUST EVALUATE•THE FULL.
WfOTH OF EXISTING H.M.A.G PAYEMENT AS TO TMCKNESS. COND1T(ONS AND ABiL(TY TO' �"
WITNSTAND CONSTRUCTION LOADING. IF APPROPORIATE. TNE FLILL WtOTH OF SURFACE
SHALL BE REMOVEO AND REPLACEO IYITH APPROPRIATE 7REATMENT TO EXISTiNG BASE
OR SUBGRADE MA'fERIAL.
FIGURE 4
ASPHALT � PAVEMENT REPAIR DETAIL
NOT TO SCALE
C�
�
NOTE: Bearing Areas shown are based on
150 P.S.1.G test pressure and 3000
�`� P.S.F. soil bearing value.
Q , Plug
..,, '' �
:�.•� �
� `.t.V .p3, r`�7
!t~ ��:?�• �•�
� �� 'a.'i
� Tee
1500� Concrete
n
� :+ii.i':�.L��=; /`��r�;���V�+��^,�t •
''�; ! ':. .r
:�?: :� •�• `f 1.,, - • �• �� �,
� ;• S�" �i •i S : . y I� j : ;
.:•' � � ' ; ::� �:«��� ` ,'' � _
1 �•'�� ,.t •iir f'�►�: X
� _ � � V � � ' i �; � - + : : � � � i � l ; �� �
/� • � `
�♦��r� •������4,
O"E" � 1500� Concrete
�
� .
..�- .
a��: ! P i pe
�s.� ` S i ze
0
�
D
Q
D
�
� � .,
a
4��
6"
8��
10"
12"
16"
20"
24�'
3p��
36"
42��
48"
r ��,..
NOTES;
Bend
��7
HORIZONTAL 6LOCKING TA6LE
-'�Dimension "X" May�Va°ry if Necessary To Provide Bearing
Against Undisturbed Trench Wall
X--;
Dim.
Ft.
1�.
1.5
1.5
1:5
1.5
2
2
2•5
2.5
3
4.0
��
���
6���� e
�? �, �5..
O, �
�
6��a ys
s
11°�- 15' 22° - 30' 45° 90° Tee � Plug
„�� r►i �n. r�►++x �� " r� i n. � Max. „�„ ArPa Vcail . "Di' Area Vol . "�" aMPa� V�l
A Ar Vnl R Area V�1
.90 .8 .05- •95 •90 .OS •95 •�0 .05 .gl .82 .OS 1.16 .5 .OS
•90 :8 .OS, .95 •90 .OS 1.05 1.10 .OS 1.�3 1.99 .OS 1.19 1.41 .05�
.90 .8 .�5 .95 .90 .05 �1.41 2.00 .OS 1. 6 3.47 .l� 1.57 2.4 .1
•90 .8 .05. 1.26 1.60 .OS 1.79 3.20 .1 2.18 5.62 .2 1.99 3•9� •15
1.10 1.2 .OS 1.48 2.30 .1 2.14 4.50 .2 2.83 $.00 .3 2•38 5•b5 •2
�.4� 2.0°. .� 2.00 4.nn ,,,� Z��R3 R,,,�� .4 �.�s 14.�0 .6s 3.�6 ro.oa .5
1• 77 3• 10 . 2 2. 54 6. 20 . 3 3. 52 l2. �+0 . 6 4. 70 1. 00 1.15 3.9415 • 55 • 75
2. 14 4. 50 . 25 3. 00 9. 00 . 5 4. 25 1 1 Q . 95 5. 65 32. 00 1.8S 4.76 22 . 6Q 1. OS
2. 66 7.10 . 55 3• 78 14. 20 1. 0 5. 30 �20 1. 75 7• OS 4.�80 3.�+ S. g l 35 • 33 2. 1
3. 33 to . f1n . 75 4. So za4o 1; 4 �,. 36 4a8o 2. 65 8• 50 �2Ao 5. 1 .�ZOSt . 0 2.95
3.72 13.$Q1.2 S.2S 27.60 2.2 7.41 �5.�0 4.1 �1.90 �7.SO 7.9 8.30 .0 4
4. 38 18. 0 l. 6 6. 00 ,� 00 2.� 8.48 7�00 5;, 4 1 1,14 1Z6. to. 4 . 0 .0 6.1
4. 00 �2.�� .00 6. 70 • 4�00 7.00 _ 9.40 88A0 ' 0. 00 1,3 . 00 6�.n t F„n 10. 7 115 D0 12 .0
Mlnimum areas shown are in square feet. Volumes shown a�e In cubic yards.
Vertical dimensions of all� block bearing areas shall be fdentical to the
horizontal dimension shown. .
HORI ZQ'NTAL
u����c�l�a �?L���QD
����� �}���.G-I��Q�(
��o�1�:.-.,,;:.., � =:���
�•,. �,,1�,: � �� o
6LOCK IN � ���
C`�
.���`90�, �`
;�•;�':�.8
� ;
�•;.: ::.
�• �=Q `�. ,��
'��� � : • �� �if�
�•
o�
�� \
�
e� . °�s
;� .. : ;�; ,i� �� f e
\'�. �."�
F I G U R E 9 E��- 2� Material
D 1-1-]$ E-2-20 Construction
�
�
D �
i�
�
� 500# Con�
D
Be
D
Trench width:
1. Pipe 24" i.d. and smaller = 24" or
o.d. + 12" whichever is greater. �
2. Pipe larger than 24" = o.d, of Pipe t,
+ 18". ��.,•
3. Cradle shall extend a min. of 6'' beyond
each side of pipe.
�� � ��� �
Typ, �
D RU88ER GaSKET JOINT �
M. J. - M. J. Bend
� c. ��
o,
� _�a
Q �la
..�y� '�jj��'�;�r,S.;�� _ • '
� ' Q ;, .�. �. �
p `'� 9�r,='§.� : gt .:t ..� .�Y ;� �-
.�
�`�fi��� `�`�' � r 1'-0��
{ �
j ~'���'�'=``'�� � �
f��� �',� � ..�/ � TYP•
Bell-Bell
Bend -!
1500# Concrete
Keep a mi n. of 1'-0'�'
clearance between
conc. and joints or
bolts on C.I. Pipe.
or in excess of 1'-0"
as detailed.
i" •
0
O
-;a
i
�� ��.s
� � �. 4i;�i�
;•,�.��r.
i:�.' �. �
. ��,.:::�=: -:�
:If . .'Y
-= ''" r'��S>"
' �;; •r��.`����.
t,��'•�yf r J'�t,i�
�� �;o�C• 6,��
. � _Main
1500� Concrete
,''�`:�
MECHANICAL JOINT
, Ma i n
- - ..- ..ti, - ., ..:,
.:;'= :.`'��:� �
2'-0"
_ TYP•
6ELL ANO SPIGOT JOINT
CRADLE DETAIL
Note: When crqdle is
shown or specifie
for installation
on concre�e pipe
the full joint
.�1 e`ngtfi�� of the p i p
or f i tt i ng shal,�•.-
cradled. :�
.�
FIGUR�g �
�_�_�$ �����p�d ���OQD E�-20 Mater i a i s
. ��� ����n s o� E 2-20 Const ruct i on
US
�Ilo UUI�/e1 9 '
C� C�'.� C� �� C� �"� �7 C� �J C� .� G� L� C� C�] � C� C� C_._.�7
,; _ _
. � �, PMS 167 (Copper) ,—, PMS 288 (Blue) ,�. PMS 288 (Blue)
. • . 8� 0�� ; ;
.
,1. ;/ � ,:% �� .
3" �,, 3'-1.5" ; .3�� ��. ; 4'-�5��
� .
�� � . , � 4 ,
, , , �
,
. ; .
,
2.25'� _ ` � ' ' '
,
� ; ,
,
' ' Wate�
� ' T o TH ou�;
� ,
1 � \
i
� /� • • �
r � ` � . � .�'� IZC�s ,TZ :c�Ctl01l- =
, u .�.
f�- � ' .
2.25
c
c
4.5"
�—
�
-�,
: �' �'
�;r/i� :��.
r•�.�i .
-� * r.--
_ - �, -
~ v-r.� �
-,- �
.���
_` �
.�
�
/
/
�-
�
.---��
; �
,
.
,
,
,
',_ White
,
�
1
N
0
—•—
4.5"
� � � :
'� �3" Radius
. /
: / .
;_ PMS 288 (Btue) /
. �
�-•—� +
PROJECT SIGN
Figure 30
3.75"
. _.-
3"
3.75" ,
.�
Scale 1 " =1'
AA/J A/AA F7_i C`nnctr� ��tinn
Whe�e M.H.'s a�e tn st�eet
install two or more courses of�
`•rick .o� conc�ete grade rings
�• :tween casti�g and top of brick
,one. or co�crete slab.
�i�tt=lu��7u�
-Use standard
McKi�ley, �
No. A24 AM. or
�Equal M.H. F�ame
��ad Cover
Set in Mortar
Use Cast fron Ptpe to
First Joint Behind•
Limit of Excavation
1)
(F�� �. �
�
�+��- :-" y•,:� � � c�
� �u
Co�c. Col l ar (��
M.J. Cas�
Iron��ee
.. � �
� %
� , /' L
� �
�a�i � ��
o ��
� / :
.a °'
�o � � �
•L �
� R /
� �.
� �
��
� = �..J. I �
�•.. • • •� ..' •• �•.�; � . r•• .
Grouted
w.:�.• a (ll
, ..� . �
a ,�,
timit of --
Excava t i on �«�
ilt �
�i
tti
�1
ll� t
llll
Th�ust Block to
Extend 6" tn All
Di�ections f�om
Outside Diameter
of PJpe
STANDARD
I
�
install M.H. SteE
Same as in Stan�
M.H.
�. �
/
"'` ��" Push-on Pl ug
�
` �� . �
� . ~1�. '�'� .
o j �Install Nuts
O � Away from M.H.�
Wall on M.J.
4'-0" � Fttting COR-TEH
� � � � 6olts
If Required �ovide � �oncrete _
�tub Extension At �� See
n of P.E. in M.H.
�a�1� � Standard 4' Oia.
. � M. H. Detail
/ Figure 103 .
� Slope 1"/1'� /
� • "� � Ve�tical to 3/�+
L �
�ti'� � $�t Point of Pipe
� '�•�.'` ..� .'�••� .;��. .i'•
Inver.t� Use 4000{# Concrete
�. 4' dfa. for sewe�
TYPICAL SECTION
F4U�R FOOT
� pipe up to 21"
dia. 5' dia. for
sewer pipe 21" tc
39" dia.
,
D R 0 ���04GG�� ��C��G��
� A�C ES�� MAN H��L E C��i �f����Q�
Ft G UR� I 0? '� M.�G��� ���
.. .
1-1-78
E 1-1'4 Material
E 2-14 Construction
Where M.N.'s a�e built
in st�eets to be paved�
M.H. �im to be set to
p�oposed paving grade 7
� �
D `
.
�
Existing surface
LJ
� ^1
tti
� f.
0 � ,l
f�'• ;j .\
• •�i�'y
t..J '
O /
Q -
� =.
a
D
O �� j .
� � �-�-,$
O
Backf i i l as spec i f ied
. • . ��i'����'��r�r,c�—�?"�•.
� � . � • , � !'
� �� . , • ' f •
� ' � • � �
• I � � �
• �
� � � � � t • � � �
� �
• �
• � � • � � :�
� . � • � � { •
� , � • • , � � •
� �
1 � , � � •
�� � � � .�-+� � � y .
�. '���� �'�� /�+1'Y �' � •� • � � �
v, �
.• `f•• • ' �• If�I `; f:` r•�,I '�.•'�,�. � •� , • ' � �•SL`�� � O
'•.f ::...��.;, ••• �i.• .:.-: ..:�:::a�:�'i 1
' • :`•,r,::: � �• � • �
.. . `;:�_. ., : ' : � •: • ;:a�:` ', ;�r m
��r��,;•'1;.�. .,ttii �.:; �,
+f ►.s • �ji. •� -
, � ' '•, �
�t�� � C'• •�Q ' • ' .
�• •
4a' �t '. .O�Q �,; .•. _
�'E..J � f O� -' -�.��, � - -
;• ��... • •. •. �
� .:� • � ,: ��': � � � • ';'T�-A�
, �•:;:.�:, ., �:� -
, av-,_ � . � �
:;,':�p. : ;,...,' .,�' •. '. .�
� ���. ' • �.; •.i,J . • • .
J : � • :\ � ���� • �. . � -.
�� •�• .;%1,nj i��� •. w"•i�il•\�'..r� �. `
�. • �G� � ;
. � •�'(� �� •� • r�yiT. f�. • i
.. y?i: � O
t' :� � :: ' • . : '`• :: .�'%�b:�� �
: ;`�j�., � ` ... ; r� �. ' _' ; . : .' . ;^�=r:; a i
\ "`J p��y ti
` �I • '=�:�� �/Ifil=/; • � 1:�( G�r:�!'�(//16�=y/(f ll� :�
!�
' O 6" min. dimension. 6" max. for pay purposes when
bid per cubic yard.
Q6" m'in�. dimension. Max. for pay pu�poses shall be 6"
o�� mains 24" and smaller, 9" on mains 30" and larger,
when bid per cubic yard.
O3 4" min. dimension. 4" max. far pay purpases whe�
bid per cubic� yard. r�20��np ����r��D
Q Class "E" 15�0�# concrete. �) �r ����r' �)
�0� ���������
C O � V �Uo UUV �_'�� ���o ,
RETE ENCASEMEN ��`'A'�t�..
FIGURE 113 E �-� Material
E 2- 7 Const ruct i on
� � � � � � � � � � � 1� � � � � � ! �
w
�
-�
�
a
a.
(D
..�i
a
�
�
w
�._�.
— �� ---- �•_�•
1
_.I �
, . �I�� . . .1
:
�
:�
� '\
� O
1 � .
-r ^ i ,
� '
t
i
:
I
� —
�
��NS T
Sl�AS �T ��EACM M�Y
MOpfED EACN ENO
9-�1t0=��DOwEIS MIOUND RiN6
i0 �OND ���CK TO TO► SL�L.�
CITt lTAIQAIO f11�11E �MO COVE11 I � ►�VINO �Ul1i�CE �J
1�2 MORt111 � ,
ON( dt YORf COURXS ' �
2 4� vIT111fICD �11�CK 'x"'+""�' ,
' ZS DI11.
���5 T,Dl��S
•T �"E�CH w�r
MM /�i ��M �T Ir �a�� C�� �AI13 rtT U'
II[IpR �I�STIC vE�iit+�� l��5
C.t.y�N�E STEK fT(►1 YA� K � Hp5 �i ��"
AT �2 � Y11EAD USED (1� �MLL I��f"
STAG6EIIED — �S OVCA {� U3C
TO► OF ►V[7 fT[[L RE�AI1
�s►r►uRs� .
W �y� � • !��
V � y w � �
� V f �•
t 4 � �
� O
� t W � ,` �
� o �� SLO►E i` TO DRAtN
� �S lTEEI TIIONEL
1��� REY— .. � /IMIlM / H �
\ / . -
c'' \
� V+�r!i.. 4� . . � =
�S �ARS �T ��C- EACM MAY
SECTION B-8
OR •� �►1!f AT �" C—C Mi LI[U
OF R[TIrM�
RtVIfED 10/01/ST J.A.N./W.R.M.
ws,
ws �+��s �r �' e�cN +�r
NOOKEO E�CN END
i•
•�Rs E ��RS c
•1 ��RS AT 1�� �� Y�3 �T 1��
OUT3IDE FAC[ IN�IOE F�CE
�A1U D
•1��11! �T li� ��RS �
OUTlIOE fAC( •� RI�RS RT ��
IM31DE FAtE
/ _-- - -- '_ t .. `�-1 .._ '_ ��
�` I � — � �. ��— �
�
� �
NOTE� D£PTH �� D�� SNALL BE � � - �
—�• — �}- �
SHOWN ON STORM ORA/N ;�_�= r_� —�7 --__' G
�� PLAN ond PROF/LE SHEETS �- -�- � .
_ � •
::.-..
�S t�111 �T �"f� w�r 12 � .� � ��'-� ��1 DOMEL! �T I��ALL
SECTION A-A �z ���� �kCER IN
w4► OF ►i►E
1-0� NOTE:�LO►EIMVlRT OI
� �� - M�NN0.E �S IMDK�TfD
ON ►LAN-M10F4E OMEET.
, �.. ,... .. " ' '.'ti!'+�• i .':
(/�,� •"��� " ?
ry
TYPICAL CORNE I
- DETAIL _ �
PLAN VIEW ` r� I - �
-� �+- 2 �/= TYPICAL
NO/ !O SCO/t
]
U����IQi� ����u c�L'
�����,r�r�G�� STANDARD 5' SQUARE MANHOLE
f2Rq oA����C,g�!4 �(��,�9 CITY of FORT WORTH, TEXAS -CONSTRUCTION STANDARO
U0 WV
` ORAWtNG N0. S-SO 8 � DATE� JAN. 1969
�cv�s�o� ��N, i���
� PLAN
iJ
U
�
�
D
�
D
�
Q�
�
�
�
Q
�
�
�
Q
0
�
Q
PART F
Insu�an ce
and
.Bond Forms
u��a�fl�a ���C�C��D
C ��' ��C�tG���G��
'� �G'��lp ���a
y
�
,
l�
,
'
NOTICE
� The following blank spaces in the Certificate of Insurance,
Performance, Payment and Maintenance Bonds, and Contract are
� not to be filled in by the Bidder at the time of submitting his
Proposal.
These forms are included herein to familiarize the Bidder with such
forms which the successful Bidder will be required to execute.
'
1
1
1
1
1
'
t
�
�
u►��0� ��:L� ��_����Q�
����� �"C���G��QG��
[�, ���'�:`1!�l0 ��% o
�I
�
Blasting
Co111pse of Building or
structures adjacent to
excavations
Damage to Underground
Utilities
Builder's Risk
Comprehensive
Automobile Liability
TO: CTI'Y OF FORT WORTH Date:
� NAME OF PROJECT:
� PROJECT NUMBER:
IS TO CERTIFY THAT :
� is, at the date of this certificate, Insured by this Company with respect to the business operations hereinafter described, for
the type of insurance and accordance with provisions of the standard policies used by this Company, and further
hereinafter described. Exceptions to standard policy noted on reverse side hereof.
� TYPE OF INSURANCE
Policy Effective Expires Limits of Liability
� Worker's Compensation
Comprehensive General
Liability Insurance (Public
Liability)
�
�r
�
�
�
�
1
�
Contractual Liability
Other
CERTIFTCATE OF INSURt1NCE
Bodily Injury:
Ea.Occurrence: $
Property Damage:
Ea.Occunence: $
Ea.Occunence: $
Ea.Occurrence: $
Ea.Occurrence: $
Bodily Injury:
Ea. Person: $
Ea. Occurrence: $
Property Damage:
Ea. Occurrence: $
Bodily Injury:
Ea.Occurrence: $
Property Damage:
Ea.Occurrence: $
Locations covered:
Description of operations covered:
The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or
canceled by the insurer in less than five (5) days after the insured has received written notice of such change/or
cancellation.
Where applicable local laws or regulations require more than five (5) days actual notice of change or cancellation to be
assured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement
thereto attached.
A�encv
Port Worth A�ent Bv
Address Title
,������'� 0�'�_�+. b`'�CJQ�
����ti` �"���G'- ° °��
I�'; a l��'J{C:%i'''�y U �(Ne
1
�
CONTRACTOR COMPLIANCE WITH
WORKERS' COMPENSATION LAW
Pursuant to V.T.C.A Labor Code Section 406.096, Contractor certifies that it provides workers'
co�npensation insurance coverage for all its employees employed on city of Fort Worth Project Number PS46-
070460410230
�
�
a
�
�..
STATE OF TEXAS �
COUNTY OF TARRANT �
ME BURNS CONSTRUCTION, INC,
CONTRACTOR
By: �. • ?�-z----�
� �� � ���
Title
� - �-�/ - � d
Date
BEFORE ME, the undersigned authority, on this day personally appeared � � �.����'��-�
� known to me be the person whose name is subs ribef� to the for oing instr ent, and acknowledged to me that he
executed the same as the act and deed of %�il � I�U,�entv �'�rt..�, � for the purpose and consideration
therein expressed and in the capacity therein stated.
� GIVEN UNDER MY HAND AND SEAL OF OFFICE this �� day of
� .�1 D� .
� �
C 7l ,fi�YJ�,�1
� Notary Public in an or
the State of Texas
L
R",
�
�
�
�.�*� PAINlEU J ATCHISON�
�aran rt��c
�, � * sa�. a T.w.
'� � � oornm. bip. 0�16-2003
h�q�� �_; ; ���� �,; �;,, ���� (e�I Q
u J'U'J':s lne: IY:�S�, �W
��,:IJ�`U CrL���u'o� � p�
l�l�� U'�r�V�II��IIUUy �L�W�
1
�
�
PERFORMANCE BOND
BOND NO. 33-74989
THE STATE OF TEXAS
COUNTY OF TARRANT
� KNOW ALL MEN BY THESE PRESENTS: That we (1) ME BURNS CONSTRUCTION, INC. a(2)
CORPORATION of TEXAS, hereinafter call Principal, and (3)$a „ k P,- G T..sis u r a n c e ���=r.-r a
corporation organized and existing under the laws of the State and fully authorized to transact business in the State of
� Texas, as Surety, are held and �rmly bound unto the City of Fort Worth, a municipal corporation organized and
existing under the laws of the State of Texas, hereinafter called Owner, in the penal sum of:
THREE HUNDRED THIRTY NINE THODSAND TWO HUNDRED EIGHTY FOUR AND 50/100 .............
�ii ($339,284.50) Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for
�„ thc payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators and
successors, jointly and severally, firmly by these presents.
�
' THE CONDITION OF THIS of: OBLIGATION is such that Whereas, the Principal entered into a certain
contract with the City of Fort Worth, the Owner, dated the of a copy of which is hereto attached and
made a part hereof, for the construction of: FEB O 1 ZOOO
MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
_ IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 7, UNIT 3
clesignated as Project No. (s) PS46-070460410230, a copy of which contract is hereby attached, referred to, and
made a part hereof as fully and to the same extent as if copied at length herein, such project and construction being
hereinafter referred to as the "work".
NOW THEREFORE, if the Principal shall well, truly, and faithfully perform the work in accordance with
1"'' the plans, specific�tions, and contract documents during the original term thereof, and any extensions thereof which
may be granted by the Owner, with or without notice to the Surety, and if he shall satisfy all claims and demands
incurred under such contract, and shall fully indemnify and save harmless the Owner from all costs and damages
which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense
which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in full
�"' force and effect.
�
�
�
�u�
r
1
�
'�-l�Ir �'� �G{�� a<���Q�
''����.i1 c��'u� ° cl�
F1 ;�,.r 11��+.�)I�:�i�UIIM ��.
'
R*
PROVIDED FURTHER, that if any legal action filed upon this bond, venue shall lie in Tarrant County,
� State of Texas.
AND PROVIDED FLTRTHER, that the said Surety, for value received, hereby stipulates and agrees that no
� change, extension of time, alteration or addition to the terms of the contract or to the work to be performed
thereunder or the specifications accompanying the same shall in any wise affect its obligations on this bond, and it
does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or
� to the work or to the specifications.
IN WITNESS WHEREOF, this instrument is executed in 10 counterparts each one of which shall be
� deemed an original, this the ��e� 0 1 2od�
ATTEST:
(Principal) Secretary
(SEAL)
Witness as to Principal
� Address
ATTEST:
'
� (SEAL)
�
�
(Surety) Secretary
ME BURNS CONSTRUCTION, INC.
PRINCIPAL (4)
BY: �1! � µ
Tide: �� -, , �, �. %
PO BOX 11678
FORT WORTH, TX 76110
(Address)
Bankers Insurance Com�an�
w rV" . C�\,T v�N `►�A1
BY: C\��
(Attorney-in-fact) (5) L i n d a w.
2425 N. Central Expwy #458
Richardson, TX 75080
(Address)
NOTE: Date of Bond must not be
prior to date of Contract
(1)
i2)
� i,;�' �i1�'1'�'
V��
Witness as to Surety Dawn Freeman
1600 W. 7th St. Ft. Worth, TX 76102
�; (Address)
�
� F2
(3)
(4)
(5)
Correct Name of Contractar
A Corporation, a Partnership or an
Individual, as case may be
Correct name of Surety
If contractor is Partnership all
Partners should execute Bond
A true copy of Power of Attorney
shall be attached to Bond by
Attorney-in-Fact..
�������'_� ��_���V��
';:��' ��C'�G� ` °�(
��`''' �'��� ;"� :'??�F �C��.
Sinku
'
�
PAYMENT BOND
�
f�
THE STATE OF TEXAS
COUNTY OF TARRANT
BOND NO. 33-74989
KNOW ALL MEN BY THESE PRESENTS: That we (1) ME BURNS CONSTRUCTION, INC. a(2)
Corporation of Texas, hereinafter call Principal, and (3)g,��j�� �� I:,� a lu :�.. �e-��,n�`, corporation
organized and existing under the laws of the State and fully authorized to transact business in the State of Texas, as
�+ Surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation organized and existing under
the laws of the State of Texas, hereinafter called Owner, and unto all person, firms, and corporations who may
�furnish materials, for or perform labor upon the building or improvements hereinafter referred to in the penal sum of
�
THREE HUNDRED THIRTY NINE THOUSAND TWO HUNDRED EIGHTY FOUR AND 50/100............,
L
�
�
�
—•,
L
�
($339,284.501 Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the
payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators and
successors, jointly and severally, firmly to these presents.
THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain
contract with the City of Fort Worth, the Owner, dated the d qf A.D. , 1999, a copy of which is hereto
attiched and made a part thereof, for the construction of:: �� 1' ��
MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 7, UNIT 3
Project No. (s) PS46-070460410230 a copy of which is hereto attached, referred to and made a part hereof
as fully and to the same extent as if copied at length herein, such project and construction beina hereinafter referred
to as the "work".
NOW THEREFORE, the condition of this obligation is such that, if the Principal shall promptly make
payment to all claimants as defined in Article 5160, Revised Civil Statutes of Texas, supplying labor and materials in
the prosecution of the work provided for in said Contract, then this obligation shall be null and void, otherwise it
shall remain in full force and effect.
F10
�����f�0��.p�;:; , 6�������D
'�= '�`u` ���'� �� ' ° �
� �^��' �
�o E� v .:��I, � ,
L'
�
THE BOND IS MADE AND ENTERED into solely for the protection of all claimants supplying labor and
material in the prosecution of the work provided for i❑ said Contract, as claimants are defined in said Article 5160,
and all such claimants shall have a direct right of action under the bond as provided in Article 5160 of the Revised
Civil Statutes.
� PROVIDED FURTHER, that if any legal action be filed upon this bond, venue shall lie in Tarrant County,
State of Texas, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of
time, alteration of addition to the terms of the contract or to the work to be performed thereunder or the specification
�"' s accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any
such change, extension of time, alteration or addition to the terms of the contract or to the work to the specifications.
�
�
PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the
right of any beneficiary hereunder whose claim may be unsatisfied.
IN WITNESS WHEREOF, this instrument is executed in 10 counterparts each one of which shall be
deemed an original, this the �y Qf �(, .D., 1999.
l9
ATTEST:
4�..
I��
C
�
(Principal) Secretary
ME BURNS CONSTRUCTION, INC.
PRINCIPAL (4)
BY: �� �% ��—_
1 �
Title: /�iL-� s � � »
PO BOX 11678
FORT WORTH, TX 76110 (SEAL)
(Address)
Bankers Insura ce Company
Wi[ness as to Principal \ �,\ �
B ure�U., Vv •
�
(Attorney-in-fact) (5) L i n d a W. S i n k u
Address
�^
ATTEST:
(Surety) Secretary
ir
(SEAL)
�
�
I',I
�1
�
b..
���� �/' ► / � F
Witness as to Surety
Dawn Freeman
1600 W. 7th St. Ft.
(Address)
2425 N. Central Expwy #458
Richardsq��}dr�� 75080
(Address)
NOTE: Date of Bond must not be prior to date
of contract
Worth, TX 76102
(1) Correct Name of Contractor
(2) A Corporation, a Partnership or an
Individual, as case may be
(3) Correct name of Surety
(4) If contractor is Partnership all
Partners should execute Bond
(5) A true copy of Power of Attorney
shall be attached to Bond by
Attorney-in-Fact..
�,,,�����;=���::�t�.��. u'<�����G�D
��: � U,u � l�5"� U:.� ° e U
�'r ��j��� �r, M
� Ir(�� �_'�L'r�IIU�, � o
,
�
MAINTENANCE BOND
�+ THE STATE OF TEXAS § B 0 ND N 0. 3 3— 7 4 9 8 9
COUNTY OF TARRANT �
KNOW ALL MEN BY THESE PRESENTS: That (1) ME BURNS CONSTRUCTION. INC. as
Principal, acting herein by and through (2) its duly authorized
and (3�,g,� k P Y G T n G u r a n n P C' mm � a n� a corporation organized under the
laws of the State of TEXAS, as surety, do hereby acknowledge themselves to be held and bound to pay unto the
City of Fort Worth, A Municipal Corporation, chartered by virtue of Constitution and laws of the State of Texas, at
Fort Worth, in Tarrant County, Texas the sum of
THREE HUNDRED THIRTY NINE THOUSAND TWO HUNDRED EIGHTY FOUR AND 50/100............
($339.284.501 in lawful money of the United States, for the payment of which sum well and truly be made unto said
City of Fort Worth and its successors, said Contractor and surety do hereby bind themselves, their heirs, executors,
administrators, assigns and s�ccessors, jointly and severally.
This obligation is conditioned, however; that,
WHEREAS, the Principal has entered into a certain contract with the City of Fort �o�.t� ��o
� performance of the following described public work and the construction of the following described public
improvements:
MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
� IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 7, UNIT 3
� of same being referred to herein and in said contract as the Work and being designated as project PS46-
' 070460410230 and said contract, including all of the specifications, conditions and written instruments referred to
therein as contract documents being hereby incorporated herein by reference for all purposes and made a part hereof,
the same as if set out verbatim herein; and ,
�
WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work that
� it will remain in good repair and condition for and during the period One (1) Year after the date of the final
� acceptance of the work by the City; and
,
� WHEREAS, said Conuactor binds itself to maintain said work in good repair and condition for said term of
One (1) Year; and,
WHEREAS, said Contractor binds itself to repair or reconstruct the work in whole or in part at any time
within said period, if in the opinion of the Director of the Water Department of the City of Fort Worth, it be
necessary; and,
WHEREAS, said Contractor binds itseif, upon receiving notice of the need therefor to repair or reconstruct
said work as herein provided. "
� '� rf= ^� � 4 � .
���-������ ��,.� ����GG�D
�p %��(2� �o~ p�
, ��: I;�u ��l���ll�� ° e N
fr `�1���� � M j��
L l v..:h:C: ���:r�U Up U �
1
�
.
�._, NOW THEREFORE, if said Contrac[or shall keep and perform its said agreement to maintain, repair or
reconstruct said work in accordance with all the terms and conditions of said Contract, these presents shall be null
� and void, and have no force or effect. Otherwise this Bond shall be and remain in full force and effect, and said City
shall have and recover from the said Contractor and its surety damages in the premises prescribed by said Contract.
This obligation shall be continuing one and successive recoveries may be had hereon for successive breaches until
the full amoun[ hereof is exhausted.
. WHEREAS, all parties covenant and agree that if any legal action be filed upon this bond, venue shall lie in
Tarrant County, Texas; and,
IN WITNESS WHEREOF, this instrument is executed in 10 counterparts, each one of which shall be
deemed an oriainai, dated � Q� 20QO
ATTEST:
(Principal) Secretary
P
(Seal)
PRINCIPAL (4)
,-
�
�
q
� Witness as to Principal
� (Address)
ATTEST:
� (Surety) Secretary
��. (SEA.L)
R"
Witness as to Surety
� Dawn Freeman
1600 W. 7th St, Ft. Worth, TX 76102
�
�
F6
ME BURNS CONSTRUCTION, INC.
BY: /%� � �
Title: �ic� s , � -; �
PO BOX 11678
FORT WORTH. TX 76110
(Address)
Banke n�P c� ar,�
i �
� uret��
BY:
2 4 2 5 N. C e n t�Attirne�?'-in-fact) (5� L� n d a [�T . S i n k u
�� �k'���'y # 5
Richardson, �Address)
NOTE: Date of Bond must not be prior to
date of Contract
(1) Correct Name of Contractor
(2) A Corporation, a partnership or ar.
Individual, as case may be
(3) Correct name of Surety
(4) If Contractor is Partnership all
Partners should execute Bond
(5) A true copy of Power of Attorney
shall be attached to Bond by
Attorney-in-Faci.
��;�f�D������ �}C�C��G��
':'���ur ���v��°,Q�
r�o ����'��o ��n
•�,
� Power o Attorne 33- 74989
y
� KNOW ALL MEN BY THESE PRESENTS: That Bankers Insurance Company, a corporation created by and existing under the laws of
.,,,� the State of Florida having its principal office in the City of St. Petersburg, Pinellas County, State of Florida, does hereby nominate, constitute
and appoint:
Gary B. McElroy, Connie S. McMullen, Michael F. Washmon, and/or Linda W. Sinku
�
of the City of Fort Worth , Tarrant Caunty, State of Texas , each its true and
lawful, Attorney-in-Fact, with full power and authority conferred upon him to sign, execute, acknowledge and deliver for and on its behalf as
Surety as its act and deed, any bond, undertaking, consent or agreement, not exceeding Two Million and XXI100 Dollars (52,000,000.00) which
this Company may be authorized to write.
The Bankers Insurance Company further certifies that the following is a true and correct copy af Article IV, Section 6 af the By-Laws
duly adopted and now in force, to wit:
SECTION 6, PRESIDENT. The President shall in the absence ar disability of the Chairman preside over all meetings of the
Oirectors and Shareholders and shall have generai supervision of the affairs of the Corporation, shall sign or countersign
certificates, contracts, and other instruments of the Corporatian as authorized by the Board of Directors, shall make reports
to the Board of �irectors and Stackholders, and shall perform all such other duties as are incident to his affice or are
properly required af him by the Board of Directors.
IN WITNESS WHEREOF, the Bankers Insurance Company has caused these presents to 6e signed by its President and,its`Carpor�t�,.
. � .� 9 �i • r.
Seal to he affixed by its Secretary this 17th day of May , 19 94 . ;�`�, �. ..' '_ '=
�' ; .� :
ATTEST: , BANKERS I S RANCE COMP - '�` ,.� �'.��: -
G� : _ : o. .,. -- -- _
�° ` - � � � - �-.�.� .y �- " ti -
� hT
" G. nstin Delano, Secretary David . eehan, Pr i en : �--' "
� This Power of Attorney is signed and sealed 6y facsimile under and by the authority af the foilowing Resolutian adopted 5y tNe Board:��`� �
�,,, of Directors of the Bankers Insurance Company at its monthly meeting held in August 1981. �
rr RESOLVED, that the signatures of such Officers and the Seal af the Corporation may be affixed to any such Power of
� Attorney or any certified copy thereof or any certification relating thereto, by facsimile and any such Power af Attorney or
Yi.r
any certified copy thereof, ar any certification relating thereto 6earing such facsimile signatures or facsimile seal shall be
�, valid and binding upon the Corporation in the future with respec2 ta any bonds, undertakings, recognizance or contracts of
indemnity to which it is attached.
STATE OF FLORIDA )
"1 1 SS.
�,,,; COUNTY OF PINELLAS )
�
r�.
..'
BEFORE ME, the undersigned authority, personally appeared DAUID K. MEEHAN and G. KRISTIN DELANO who acknowledged themselves
to be the President and Secretary of Bankers Insurance Company, a Florida corporation, and they as such President and Secretary 6eing authorized
to do so, executed the foregoing instrument for the purposes therein contained by signing the name of the corporation by themselves as President
and Secretary, and that said secretary affixed thereto the seal of the corparation and attested to the execution of the foregoing instrument.
IN WITNESS WHEREOF, I hereunto set my hand and seal this 17th day of May , 19 94 .
����� 'OFFlCIAL SEAL'
My Commission Expires: ����*�tiy��� gS �� n /L-�
�'�: a�� 1NIyC0��y�tlSSipt �es2j1J97 Notary ublic Caro n(,�. Thames
�''o'�o� �.°�•`' COITxTli,SsiOn �fC�2�.�i465
��.r,.. . .a.
I, the undersigned, Secretary of Bankers Insurance Company, do hereby certify that the original Power of Attorney, of which the
foregoing is a full, true and correct copy, is in full force and effect.
IN WITNESS WHEREOF, I have hereunto subscribed my name as
� day of , 19
L.�
(SEAL)
�
Secretar� arid aifix the corporate seal of the Corporation this
. Kristin Deiano, Secret�ry u `� • = �UW�
'` � u' �"�'��� ° °�
(�_ P�u�(��►7Pn�_ �i(�:�_
�
�
PART G - CONTRACT
THE STATE OF TEXAS
� COUNTY OF TARRANT
F^ n
THIS CONTRACT, made and entered into �Eg D�y �r��tween the City of Fort Worth, a
home-rule municipal corporation located in Tarrant County, Texas, acting through its City Manager
thereunto duly authorized so to do, Party of the First Part, hereinafter termed "OWNER", and ME
� BURNS CONSTRUCTION, INC. of the City of FORT WORTH County of TARRANT and State of
TEXAS, Party of the Second Part, hereinafter termed "CONTRACTOR".
�, WITNESSETH: That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the Party of the First Part (Owner), said Party of the Second
� Part (Contractor) hereby agrees with the said party of the First Part (Owner) to commence and complete
�- certain improvements described as follows:
�r MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 7, UNIT 3
��j And all extra work connected therewith, under the terms as stated in the Contract Documents, and at his
�� (their) own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools,
superintendent, labor, bonds, insurance, and other accessories and services necessary to complete the said
r construction, in accordance with all the requirements of the Contract Documents, which include all maps,
plats, blueprints and other drawings and printed or written explanatory matter thereof, and the
specifications thereof, as prepared by the Engineers employed by the Owner, each of which has been
� identified by the endorsement of the Contractor and the Engineers thereon, together with the Contractor's
Written Proposal and the other parts of the Contract Documents hereto attached, including the Fort
Worth Water Department General Contractor pocuments and General Specifications, all of which are
� inade a part hereof and collectively and constitute the entire contract.
G1
'
,
'
�
�
^ .�r�• 1 ^ /'�
�;�;��UV�G�G�:i� 6����Go��D
�� c�� c�G��� G�(�,1G�ti
�o u �' `'l�o ��Lt�o
t
�
�
The Contractor hereby agrees to commence work within ten (10) days after the date written
notice to do so shall have been given to him, and to substantially complete same within the time stated in
the proposal.
�
�i The Owner agrees to pay the contractor in current funds for the performance of the contract in
accordance with the Proposal submitted therefor, subject to additions and deductions, as provided in the
Contract Documents and all approved modifications thereof, and to make payment on account thereof as
�' provided therein.
l''�
IN WITNESS WHEREOF, the Parties to these presents have executed this Contract in 10
counterparts in the year and say first above written.
Citv of Fort Worth, Texas (Owner)
� Party o the First part �'`���
� .
1i BY: � "�--^--
�� ASST. City Manager CW
ATTEST:
�� �� �
LJ/l�t .t41� ' °' �
Cit�ecretary a _ � � � ��
e
(Seal)
WITNESSES:
� ME BURNS CONSTRUCTION, INC.
PO BOX 11678
� FORT WORTH, TX 76110
Contractor
R"
�
By: %��---- �/%-�`-_
Title: � � s � �7` ��—
APPROVED:
Ty����-�� S /° �p�,
' `"—�"e"-°�i.A L$'�3"`� a�''�'�°`,��,,��':' �',�'�`°s--V'°'-._.""'
A. Douglas Rademaker, P.E. Director
�` Department of Engineering
�W
1
�
Ap roved as to Form and Legality:
Gary Steinberger, Asst. City Attorney
C- ����1
�;dntract Authorization
� - j �- �1 �
flate
,���i�U�GO��:�� ������D
�:; Q� � C��° : US� ° c U
���f;�i�9 ��o
1�
�
�
u
�
l�'
�
���
�
�
�
���
0
�
�
�
�
AI'p�-N��. A
�e
rmiis/Ease'rrzents
����C�O�� G?��C��D
rQ�1 ��'GG°� ° °�
��o �G���I� ��o
�
L�J
�
EASEMENT DOCUMENTS
Six copies (in 3-ring binders) of all the right-of-entry forms and all easements (temporary
construction and permanent) obtained for this project are available for examination at the
� Department of Engineering plans desk. Bidders shall be provided with copies of any right-of
entry or easements upon request. The terms of a11 Special Provisions or Conditions for
Qeasements shall be applicable. The responsive low bidder(s) will be furnished with a copy of
Appendix B after awazd of contract. Bidders shall not remove any of the six copies from the
O� plans desk.
�
�
�
�
�
���
L�
C�
0
�
��
�
Appendia A-1
a
�
C
��J
�
�
L�'J
�
0
0
APPENDIX B
0 S'tate Revolving Fund (SRF) Requirements
�
0
�
���
0
�
r
�
�
TWDB CONTRACT CONDITIONS
PRIVITY OF CONTRACT.
This contract is expected to be funded in part with funds from the Texas Water
�, Development Board. Neither the State of Texas nor any of its departments, agencies or
employees is, or will be, a party to this contract or any lower tier contract. This contract
is subject to regulations contained in 31 TAC Chapter 363 in effect on the date this
�� contract is executed.
� DEFINITION.
�
�
�,
The term "TWDB" means the Executive Administrator of the Texas Water Development
Board, or other person who may be at the time acting in the capacity or authorized to
perform the functions of such Administrator, or the authorized representative thereof.
FINAL PAYMENT.
The retainage and its interest earnings, if any, shall not be paid to the Contractor until
the TWDB has authorized a reduction in, or release of, retainage on the contract work.
REVIEW BY OWNER AND TWDB.
(a) The Owner, authorized representatives and agents of the Owner, and the TWDB
shall, at all times have access to and be permitted to observe and review all work,
materials, equipment, payrolls, personnel records, employment conditions, material
invoices, and other relevant data and records pertaining to this Contract, provided,
however that all instructions and approval with respect to the work will be given to
the Contractor only by the Owner through authorized representatives or agents.
(b) Any such inspection or review by the TWDB shall not subject the state of Texas to
any action for damages.
FLOOD HAZARD INSURANCE
� This provision applies to any contract which will construct structures that are insurable
under the National Flood Insurance Program of the Federal Emergency Management
�* Agency. The Contractor shall apply for flood insurance on all insurable structures that
will be built under this contract. A copy of the completed application must be provided to
the owner before commencing construction of the project. The Contractor shall obtain
the flood hazard insurance as soon as possible and submit a copy of the policy to the
� Owner.
� ARCHEOLOGICAL DISCOVERIES.
No activity which may affect a State Archeological Landmark is authorized until the
Owner has complied with the provisions of the Antiquities Code of Texas. The Owner
� has previously coordinated with the appropriate agencies and impacts to known cultural
or archeological deposits have been avoided or mitigated. However, the Contractor
may encounter unanticipated cultural or archeological deposits during construction.
�
�..
A1-1 { ;';;-i�i1',•���=_� �'�(G�JU,��
i`, !�}�''�r ��CI�Ci d D�'%
��'�` I �w�''"�': :''l��o ��l�o
�� .�
r
�I If archeolo ical sites or historic structures are discovered after construction o erations
9 P
�, are begun, the Contractor shall immediately cease operations in that particular area and
notify the Owner, the TWDB, and the Texas Historical Commission, (512-463-6096).
The Contractor shall take reasonable steps to protect and preserve the discoveries until
they have been inspected by the Owner's representative and the TWDB. The Owner
� will promptly coordinate with the Texas Historical Commission and any other appropriate
agencies to obtain any necessary approvals or permits to enable the work to continue.
The Contractor shall not resume work in the area of the discovery until authorized to do
� so by the Owner.
�
ENDANGERED SPECIES.
No activity is authorized that is likely to jeopardize the continued existence of a
threatened or endangered species as listed or proposed for listing under the Federal
Endangered Species Act (ESA), and/or the State of Texas Parks and Wildlife Code on
� Endangered Species, or to destroy or adversely modify the habitat of such species.
� If a threatened or endangered species is encountered during construction, the
Contractor shall immediately cease work in the area of the encounter and notify the
Owner, who will immediately implement actions in accordance with the ESA and
� applicable State statutes. These actions shall include reporting the encounter to the
TWDB, the U.S. Fish and Wifdlife Service, and the Texas Parks and Wildlife
Dspartment, obtaining any necessary approvals or permits to enable the work to
continue, or implement other mitigative actions. The Contractor shall not resume
' construction in the area of the encounter until authorized to do so by the Owner.
LAWS TO BE OBSERVED.
In the execution of the Contract, the Contractor must comply with all applicable Local,
State and Federal laws, including but not limited to laws concerned with labor, safety,
minimum wages, and the environment. The Contractor shall make himself familiar with
� and at all times shall observe and comply with all Federal, State and Local laws,
ordinances and regulations which in any manner affect the conduct of the work, and
� shall indemnify and save harmless the Owner, the TWDB, and their representatives
against any claim arising from violation of any such law, ordinance or regulation by
himself or by his subcontractor or his employees.
HAZARDOUS MATERIALS.
Materials utilized in the project shall be free of any hazardous materials, except as may
be specifically provided for in the specifications.
�
If the Contractor encounters existing material on sites owned or controlled by the Owner
�'^ or in material sources that are suspected by visual observation or smell to contain
�,.; hazardous materials, the Contractor shall immediately notify the Engineer and the
Owner. The Owner will be responsible for the testing for and removal or disposition of
� hazardous materials on sites owned or controlled by the Owner. The Owner may
suspend the work, wholly or in part during the testing, removal or disposition of
hazardous materials on sites owned or controlled by the Owner.
�
�'
"'r;� :ri;;. ;����I�JUi�
A1-2 , � . :; �.-.:, �_
��` ,' � U� Cr�' �Uc� d e U
� ;>�, `�;;;','=';��� ��o
�
'
� EQUAL EMPLOYMENT OPPORTUNITY
During the performance of this contract, the Contractor agrees as follows:
�„ (1) The Contractor will not discriminate against any employee or applicant for
employment because of race, color, religion, sex, age, handicap, or national origin.
� The Contractor will take affirmative action to ensure that applicants are employed,
and that employees are treated during employment without regard to their race,
color, religion, sex, age, handicap, or national origin. Such action shall include, but
� not be limited to the following: Employment, upgrading, demotion, or transfer;
recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. The
Contractor agrees to post in conspicuous places, available to employees and
� applicants for employment, notices to be provided setting forth the provisions of this
nondiscrimination clause.
� (2) The Contractor will, in all solicitations or advertisements for employees placed by or
on behalf of the Contractor, state that all qualified applicants will receive
considerations for employment without regard to race, color, religion, sex, age,
� handicap, or national origin.
(3) The Contractor will send to each labor union or representative of workers with which
� he has a collective bargaining agreement or other contract or understanding, a
notice to be provided advising the said labor union or workers' representatives of the
Contractor's commitments under this section, and shall post copies of the notice in
'� conspicuous places available to employees and applicants for employees.
(4) The Contractor will comply with all provisions of Executive Order 11246 of
September 24, 1965, the Age Discrimination in Employment Act of 1967,29 U.S.
�+ C.A. 621 (1985), Executive Order 12250 of November 2, 1980, the Rehabilitation Act
of 1973, 29 U:S.C.A. 701 et seq. (1985), and of the rules, regulations, and relevant
�, orders of the Secretary of Labor.
L
(5) The Contractor will furnish all information and reports required by Executive Order
�''" 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary
of Labor, or pursuant thereto, and will permit access to his books, records, and
accounts by the administering agency and the Secretary of Labor for purposes of
investigation to ascertain compliance with such rules, regulations, and orders.
�
(6) In the event of the Contractor's noncompliance with the nondiscrimination clauses of
� this contract or with any of the said rules, regulations, or orders, this contract may be
canceled, terminated, or suspended in whole or in part and the Contractor may be
declared ineligible for further Government contracts or federally assisted
� construction contracts in accordance with procedures authorized in Executive Order
11246 of September 24, 1965, and such other sanctions may be imposed and
remedies invested as provided in Executive Order 11246 of September 24, 1965, or
L
�
J
�.�. _.�
A1-3 i �:;i;:i�V;;.^:.r�r:.y� G�i�l�;luJU,��
y ',J J l .'�. �J '��]
(± '�1�;�' �r�li�'�' s ��
<, 'u a J C �;
r,^.^. '}�
�
��: l`yu�'i���� �y� o 0
�
�' by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by
Law.
n
(7) The Contractor will include the portion of the sentence immediately preceding
paragraph 1, and the provisions of paragraph 1 through 7, in every subcontract or
purchase order unless exempted by rules, regulations, or orders of the Secretary of
� Labor issued pursuant to section 204 of Executive Order 11246 of September 24,
1965, so that such provisions will be binding upon each subcontractor or vendor.
The Contractor will take such action with respect to any subcontract or purchase
order as the administering agency may direct as a means of enforcing such
provisions, including sanctions for noncompliance. PROVIDED, HOWEVER, That in
the event a Contractor becomes involved in, or is threatened with, litigation with a
� subcontractor or vendor as a result of such direction by the administering agency the
� Contractor may request the United States to enter into such litigation to protect the
interest of the United States.
� (8) The Contractor will comply with Executive Order 11246 based on its implementation
of the Equal Opportunity Clause, specific affirmative action obligations required by
� the Standard Federal Equal Employment Opportunity Construction Contract
Specifications, as set forth in 41 CFR Part 60-4 and its efforts to meet the goals
established for the geographical area where the Contract is to be performed. The
r"! hours of minority and female employment and training must be substantially uniform
�Y throughout the length of the Contract, and in each trade, and the Contractor shall
make a good faith effort to employ minorities and women evenly on each of its
projects. The transfer of minority or female employees or trainees from Contractor
to Contractor or from project to project for the sole purpose of ineeting the
Contractor's goals shall be a violation of the Contract, the Executive Order, and the
''" regulations in 41 CFR Part 60-4. The goals are expressed as percentages of the
total hours of employment and training of minority and female utilization the
Contractor should reasonably be able to achieve in each construction trade in which
it has employees in the covered area. Goals are published periodically in the
4,,; Federal Reqister in notice form, and such notices may be obtained from any office of
federal contract compliance's programs office or from federal procurement
� contracting officers (512) 229-5835. The Contractor is expected to make
substantially uniform progress toward its goal in each craft during the period
specified.
r
Whenever the Contractor, or any subcontractor at any tier, subcontracts a portion of the
work involving any construction trade, it shall physically include in each subcontract in
excess of $10,000 the provisions of these specifications and the notice which contains
� the applicable goals set for minority and female participation and which is set forth in the
solicitations from which this contract resulted.
�
'
L�
�
�;�`,.:ui;r'� UcLS��Je1�
A1-4 ,;�=il�� �r�n G! ° ��
.. t� � B C� �''��' �
�� ua �'�r�'V�9 ��e
r
�
�.�:��
� 1. The Contractor shall complete the two attached Texas Water Development Board
forms at time of contract execution.
�
C
1
1
1
1
1
1
1
1
1
1
1
1
���
i
2. The Contractor shall submit along with the by-monthly payroll certification the
attached form SRF-74, Certification By Contractor for Labor Standard Compliance.
; � � �. . ���:-_`' ,���C���@
���� -� ���� �'��� \ ��:1� �'f'jM
c:' U t,Li. . li
� r•� ,,, V,,,,, _ ;.: ,
, '
�� ,�.. . �� � �✓�o
�
�
CONTRACTOR'S ACT OF ASSURANCE
�^ STATE OF TEXAS
� COUNTY OF �_.�:AU�i7C�� °
� BEFORE ME�H,L�'fLE.{'� 7-C7(:L'�-fX--, a Notary Public duly commissioned
and qualified in and for the County of �,���(�P2( � in the State of Texas
� ..y� � �y (`'
came and appeared /�f �� . sl��%U7/1� ���C. as represented by /�� ro .
�
�GL�L�� , the corporation's (,�i�_z_,�-- , who
, � / �I
declares he/she is authorized to represent��� •� ./c�)L�/i£,�L �X�L�Gu('�.���"/C .
�" pursuant to provisions of a resolution adopted by said corporation on the
7 ,� �
� day of (�C�C�-- ..;��t�Li (a duly certified copy of such resolution is attached to and
�
�"
�
is hereby made a part of this document).
�i' � / � � . ���� . as the representative of �1� �� . �G��D �� • �C •
declares that%�'1 •� .�U��� Ux�assures the Texas Water Development Board that
it will construct�I�.%�fiK C l�'�� `�'•?,C�pro ct at �7y -����`'L. Texas, in
accordance with sound construction practice, all laws of the State of Texas, and the
rules of the Texas Water Development Board.
GIVEN UNDER MY HAND and seal of o�ce this '-7 � day of ���" -
�.p�0 AD
►AY ��/r�?��2XLlI /l..
� P�/1 J ATCHISON /YK.e.�C�
� � �� ��
*� a�. a T.w. '
'� �'I'�tP�Q --� � � 501��..
'� � � C�ornm. 6�p. 0�16-2000
� .,. ,. � _
Printed Name
My Commission expires
�
�
F,,, A3-1
L.
% ��(P -o`'c.� �—
�
������c0�!� �'t�C �G?D
,v_L,�, c���y� � ��,
��'1?� n+n�jr��IlUy ��Wo
CONTRACTOR'S ACT OF ASSURANCE RESOLUTION
�'�'1 • �'. ��',��i Ci�o�-t.u-c=���- ��- •
Name
�
�
�
�
�
�
.,
�
�
'
,
'
'
�
�
I hereby certify that it was RESOLVED by a quorum of the directors of the
/ i i • � . �1,,�(�`I/1%�- l�`�'�1�� ��t �%3`""Zc� K- ��l'i1 C .
Name of Corporation
meeting on the day of L% ��� ,��Da , that `�� •� . �C,JL���
be, and hereby is authorized to act on behalf of�� .�.��� ��.'!�2�'��t '<'�"�- ����- •
,
Name of Corporation
as its representative, in all business transactions conducted in the State of Texas, and;
That all above resolution was unanimously ratified by the Board of Directors at
said meeting and that the resolution has not been rescinded or amended and is now in
full forces and effect; and;
In authentication of the adoption of this resolution, I subscribe my name and affix
the seal of the corporation this � day of 7`(�� ,�8� C> .
�� � �� k �
Secretary
(seal)
A4-1
����L�i,'c��:'� �'I�C� °�D
I� C�` ��C�+ P�� d �l�
'r'i; �,��'��I~-���'J �L�W
. . ' 1��:� L . li � a
r
�
�
�
�
�
CERTIFICATION BY CONTRACTOR
of
LABOR STANDARDS COMPLIANCE
In accordance with Title 29, Subtitle A, Part 5, Section 5.6(A)(1), each monthly
engineering estimate must be accompanied by the following certificate executed by
each prime contractor employing mechanics and laborers at the work site in which the
federal government is to participate:
Date
Estimate Number: for period to
Name of Project Location
Contract Number Date of Contract Awarded
State Revolving Fund Loan Number
I hereby certify that all of the contract requirements as specified under the labor
standards have been complied with by:
as principal contractor and by each subcontractor
(Name of Contractor)
employing mechanics or laborers at the site of the work, or there is a substantial dispute
with respect to the required provisions.
Name of Contractor/Subcontractor
Signature and Title
Notes:
1. This certification may be placed on the estimate or on a separate sheet
attached to the estimate.
2. The Texas Water Development Board shall, prior to approving a voucher,
satisfy itself that copies of these certificates are on file with the owner.
A5-1
�
�v'����:;�u��� �:'l�'C'J°�� `!
�^� r (r�i~�) s °n !I
�-�,�`� ��� �G��G�� ,
��,
n � r.,�S.�M u �!/�a
�l��io �hf�.:��'' UUup �
r
� City of Fort Worth, Texas
�1►�aya� And Caunc�il .a�rt�nun�cAt�an
C
DATE REFERENCE NUMBER LOG NAME • PAGE
2/1/00 **C-17841 30PRU I 2 of 2
" SUBJECT AWARD 'OF CONTRAC�' TO M. E. BURNS CONSTRUCTION, INC. FOR MAIN C1 C4B
- DRAINAGE AREA SANITARY SEWER 'SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 7, UNIT �3
In addition to the contract cost, $17,000.00 is required for inspection and survey and $24,000:00 is
provided for project contingencies.
M. E. Burns Construction, Inc. is in compliance with the City's M/WBE Ordinance by committing to 16°/a
M/WBE participation. The City's goal on this proje�t is 16%.
FISCAL INFORMATION/CERTIFICATION:
,
The Finance Director certifies that funds ,are available in the current capital budget, as appropriated, of
the State Revolving Fund - Sewer. , '
MG:k
0
Submitted for City Manager's
Office by:
'Mike Groomer
Originating Department Head:
A. Douglas Rademaker
Additional Information Contact:
7
FUND I ACCOUNT I
(to)
�
6140
�
6157 I (from)
I PE42
�
A. Douglas Rademaker 6157 �
CENTER I AMOUNT
541200 070420417720 $339,284.50
CITY SECRETARY
APPROVED
CITY COUNCIL
�Ee 1 z000
�� ��
City Secretary of the
City oE Fort Worth, Toxas
1
City of Fort Worth, Texas
�1►�A�a� And Caunc�l Co�n�nun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
2/1/00 **C-17841 30PRU � 1 of 2
SUBJECT AWARD OF CONTRACT TO NI. �. f3URNS CONSTRUCTION, INC. FOR MAIN C1 C4B
DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 7, UNIT 3
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a contract with M. E.
Burns Construction, Inc. in the amount of $339,284.50 for Main C1 C4B Drainage Area Sanitary Sewer
System Rehabilitation and Improvements (Group 6, Contract 2) Part 7, Unit 3.
DISCUSSION:
On 1lilarch 11, 1999 (M&C C-17310), the City Council authorized the City Manager to execute an
engineering agreement with Turner Collie & Braden, Inc. to prepare plans and specifications for the
reduction of inflow/infittration in Sanitary Sewer Main C1 C4B drainage area.
The project is part of the City's Integrated Wet Weather Wastewater Management Program to comply
with an administrative order from the U.S. Environmental Protection Agency to eliminate sewer
overflows from the City's wastewater collection system.
The project consists of the replacement of the following sanitary sewer laterals:
• L-217 Located in the alley between Pruitt Street and Cooper Street from 7th Street westerly
550 feet;
• L-404 Beginning from the Pulaski Street/7th Street intersection, northerly 800 feet along
Pulaski Street; and
• L-440 Beginning from the Rosedale Street/5th Street intersection, northerly 700 feet along 5th
Street.
The proposed improvements consist of the replacement of approximately 2,700 linear feet of 8-inch
sewer pipe. The project is located in COUNCIL DISTRICT 9, Mapsco 76 G, L and M.
The project was advertised for bid on October 28 and November 4, 1999. On December 2, 1999, the
following bids were received:
BIDDER
M. E. Burns Construction. Inc.
Conatser Construction, Inc.
B&H Utilities, Inc.
Cleburne Utility Construction, Inc.
Davila Construction, Inc.
Burleson Utilities, Inc.
Whizcon Utilities, Inc.
AMOUNT
$339.284.50
347, 339.80
362,914.00
370,695.50
388,594.50
411,141.00
470,807.00
TIME OF COMPLETION
100 Calendar Days