HomeMy WebLinkAbout061218-A2 - Construction-Related - Contract - Kimley-Horn and Associates, Inc.CSC No. 61218-A2 OFFICIAL RECORD AMENDMENT No . 2 CITY SECRETARY FT. WORTH, TX TO CITY SECRETARY CONTRACT No. 61218 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 61218, (the CONTRACT) which was authorized by M&C 24-0258 on the 26th day of March, 2024 in the amount of $ 950,280.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $168,070.00 which was authorized by M&C 25-0729 on August 12, 2025; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Contract Replacement 2023 WSM-L, CPN 105107; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $72,260.00.(Water: $44,079.00 ; Sewer:$28,181.00) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,190,610.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas WGSS Repl Contract 2023 WSM-L Prof Services Agreement Amendment Template 105107 Revision Date: June 13, 2025 Page 1 of 2 EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth A KOM Dianna Giordano (Jul 28, 2026 09:21:05 CDT) Jesica McEachern Assistant City Manager DATE: 07/28/2026 44v opu FORE 0 ATTEST: /1C�(JZQiLLiLf[ �� daII� nEx 45640 Jannette Goodall City Secretary APPROVAL RECOMMENDED: chnstonhei- f4w(ey Christopher Ha er (Jul 23, 2026 09:58:00 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: of the date subscribed by the City's ENGINEER Kimley-Horn and Associates, Inc. P. E. Chris Igo, P.E. Associate DATE: 07/01 /2026 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Reason: I am approving thidocument Date: 2026.07.01 08:52:23-05,00, J a i kso n Jaikson Jacob Project Manager APPROVED AS TO FORM AND LEGALITY: M&C No.#: N/A M&C Date: N/A Douglas Black (Jul 23, 2026 16:26:54 CDT) Douglas W. Black OFFICIAL RECORD Sr. Assistant City Attorney CITY SECRETARY City of Frt Prof Servicesworth, Texs AgreementaAmendment Template FT. WORTH, TX i'ILSS Repl Contract 2023105107 Revision Date: June 13, 2025 Page 2 of 2 Kimley>»Horn June 16, 2026 Mr. Jaikson Jacob Project Manager City of Fort Worth Water Department 200 Texas Street Fort Worth, TX 76102 Re: 2023 WSM-L: Water and Sanitary Sewer Cast Iron Replacements Amendment No. 2 — WSM-L Part 1 CCA KHA No. 061018468 City Project No. 105107-1 / City Secretary No. 61218 Dear Jaikson: The City of Fort Worth ("City") requested that Kimley-Horn and Associates, Inc. ("Engineer" or "Kimley-Horn") perform a revised scope of services associated with the Original Contract dated 07- 20-2023 and herein referred to as "Contract", and amendments made thereto, for the 2023 WSM-L: Water and Sanitary Sewer Cast Iron Replacements project. These services include construction phase services and preparation of record drawings upon completion of construction phase services for Part 1 of the 2023 WSM-L Water and Sanitary Sewer Cast Iron Replacements project. The revisions to the scope of services associated with each task is shown below followed by a summary of the proposed budget modifications. TASK 1.0 — DESIGN MANAGEMENT: (WATER $3,538, SEWER $2,262) ENGINEER will complete Design Management in accordance with the Original Contract for the following: • Coordination with other agencies, engineering firms, and contractors as necessary for the construction of proposed infrastructure. TASK 6.OA — CONSTRUCTION PHASE SERVICES — PART 1: (WATER $40,541, SEWER $25,919) 6.1A ENGINEER will complete the following additional tasks in accordance with the Original Contract: • The ENGINEER shall assist the City with project communications and documentation as required by tasks below on the City's E-Builder Site, including meeting notes, site observation notes, shop drawing submittals and responses, RFIs and RFI responses. • The ENGINEER shall attend the preconstruction conference. • After the pre -construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. Kimley>>> Horn Page 2 Prepare and distribute Meeting Notes. • On -site Observation o Make up to twenty (20) monthly site visits to coincide with monthly construction progress meetings in order to observe the progress of the work. Such visits and observations by ENGINEER are not intended to be exhaustive or to extend to every aspect of Contractor's work in progress. Observations are to be limited to spot checking, selective measurement, and similar methods of general observation of the Work based on ENGINEER'S exercise of professional judgment. Based on information obtained during such visits and such observations, ENGINEER will evaluate whether Contractor's work is generally proceeding in accordance with the Contract Documents, and ENGINEER will keep CITY informed of the general progress of the Work. The purpose of ENGINEER'S site visits will be to enable ENGINEER to better carry out the duties and responsibilities specifically assigned in this Agreement to ENGINEER, and to provide CITY a greater degree of confidence that the completed Work will conform in general to the Contract Documents. ENGINEER shall not, during such visits or as a result of such observations of Contractor's work in progress, supervise, direct, or have control over Contractor's work, nor shall ENGINEER have authority over or responsibility for the means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and regulations applicable to Contractor's furnishing and performing the Work. Accordingly, ENGINEER neither guarantees the performance of any Contractor nor assumes responsibility for any Contractor's failure to furnish and perform its work in accordance with the Contract Documents. • Progress Meetings o Attend monthly progress meetings (up to 20). • Shop drawing, samples and other submittals Review o Review up to twenty (20) shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. o Such review, approvals or other action will not extend to means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction or to related safety precautions and programs and shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. o Log all shop drawings, samples and other submittals. • Substitutions o Evaluate and determine the acceptability of up to ten (10) substitute or "or -equal" materials proposed by Contractor in accordance with the Contract Documents, but subject to the provisions of applicable standards of the state or the CITY. • Request for information (RFI): Kimley>»Horn Page 3 o Provide necessary interpretations and clarifications of contract documents, and make recommendations as to the acceptability of the work for up to three (3) RFI's. ENGINEER will respond to reasonable and appropriate Contractor requests for information and issue necessary clarifications and interpretations of the Contract Documents to CITY as appropriate to the orderly completion of Contractor's work. Any orders authorizing variations from the Contract Documents will be made by CITY. • Change Orders o Provide support for up to one (1) Change Order as requested by the CITY. Change Order support may include review and recommendations to the CITY for the execution of change orders. • Final PROJECT Walk Through o Attend the "Final" PROJECT walk through and assist with preparation of final punch list. Attend one (1) final site visit to determine if the completed Work of Contractor is generally in accordance with the Contract Documents. • ENGINEER shall not be responsible for the acts or omissions of any Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing or furnishing the Work. ENGINEER shall not have the authority or responsibility to stop the work of any Contractor. 6.2A Record Drawings Preparation ENGINEER will complete the following additional tasks in accordance with the Original Contract: • The ENGINEER shall prepare Record Drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. The following information shall be provided by the CITY: o As -Built Survey o Red -Line Markups from Contractor o Red -Line Markups from City Inspector o Copies of Approved Change Orders o Approved Substitutions The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. Kimley»>Horn Page 4 We recommend that the CITY increase the budget by $82,510 for these additional services. The following tables summarize our recommended budget revisions, water and sanitary sewer design fees, and revised contract amount: Task Name Water Sewer Total Task 1 - Design Management $3,538 $2,262 $5,800 Task 6A - Construction Phase Services - Part 1 $40,541 $25,919 $66,460 Total $44,079 $28,181 $72,260 The following breakdown for water and sewer services is recommended: Water Fee Sewer Fee Total Original Contract $779,230 $171,050 $950,280 Amendment No. 1 $151,263 $ 16,807 $168,070 Amendment No. 2 $44,079 $28,181 $72,260 Total $974,572 $216,038 $1,190,610 The following table summarizes our recommended budget revisions and shows the revised contract amount: Task Name Original Contract Amend. 1 Amend. 2 Revised Contract Task 1 - Design Management $ 39,800 $ - $ 5,800 $ 46,600 Task 2 - Conceptual Design $ 73,100 $ - $ - $ 73,100 Task 3 - Preliminary Design $ 202,220 $ - $ - $ 202,220 Task 4 - Final Design $ 173,800 $ 82,100 $ - $ 255,900 Task 4A - Construction Contract Document Prep. $ 18,700 $ 16,200 $ - $ 34,900 Task 4B - Construction Contract Document Prep. $ 18,700 $ - $ - $ 18,700 Task 5A - Bid Phase Services $ 23,400 $ 6,000 $ - $ 29,400 Task 5B - Bid Phase Services $ 23,400 $ - $ - $ 23,400 Task 6 - Construction Phase Services $ - $ 33,100 $ 66,460 $ 99,560 Task 7 - Survey and SUE $ 294,060 $ 24,870 $ - $ 318,930 Task 8 - Permitting $ 53,100 $ 5,800 $ - $ 58,900 Task 9 - Additional Services $ 30,000 $ - $ - $ 30,000 Total Project $ 950,280 $ 168,070 $ 72,260 $1,190,610 *Task 6 includes the total of tasks 6A and 6B outlined above. Kimley»>Horn Page 5 We appreciate the opportunity to be of continued service to the CITY. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Chris Igo, P.E. Associate Lr� P. E. CPI/nlc 4 Attachments: - Level of Effort Spreadsheet KAFTW_Utilities\061018468-WSM_L-Water-and-Sewer-Replacements\PPP\POST_NTP\Amendment-No-2_South CCA\2026-04-01_Amend2_WSM-L South CCA.doc C NC Z C 69 t 0 L c N N 0 p r O <C Y y d O C (n cn Z co w N = d W O O E �o Q cn O Y cn O O O O O 61i O t0 O IO M M C O 0 0 EA 01 0 10 r 0 0 vi t0 0 0 r to O t0 N O O It N M7c0 � N p uY N tU 7 N 7 M N W Ef) tD vi fA va N ER EA va EA va fA r to 7 M Y VI t0 F y @ C o O H K' U W C O _ U E J o ti a N � a0i LL cL Y [0 f6 m Voa bO9 EOA N C O C O � Z W m 0 4 0 0 W 0 0 0 ova O) O) 0 o co a O 10 M M M N_ 0 o_ejrn 0 o M 0 N rvatnrva 7 a0 o 0 — 0 0 0a 0 m N N 4'1 N N t0 N M r N J Oy V Efa v3 w EA M C14 lv�EA fA va t6 EPr m U o C O O � M O N N N Q 00 O ul u� h M oO N.to -�t c) lMD � N w � 'o L O o O t0 N W r N N O v N V LL7 V O o0 w O L W m N J W O C lA O m w A O O N r N N O t0 M m m N C O O O M O a` d @ o C = C N O N N C O � C O M N O N zz y J N U LL W O L U N L O O. C O O y > y J -aLo y C Lu V d -WO U y y O d�' j L m m�L Amo La. c 3 aaa -o u�v—ytn -o °o -o rN F m tc c .0 u � O. y3 O. ` rn 0 C O 0 0 C C O N N in 0 0 N W O O C d CddO_ oFUU to u)E U N O G U O U O O U N p 7 N M V t[)tor to W Z s y � N (t1 to tC to (t) co to co c0 N tD Q O O N P O O O � O tD r O FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Kimley-Horn and Associates, Inc. Subject of the Agreement: Water and Sanitary Sewer Contract Replacement 2023 WSM-L M&C Approved by the Council? * Yes ❑ No M If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 0 No ❑ 61218-A2 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see backpage for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: 7/1 /2026 If different from the approval date. Expiration Date: N/A If applicable. Is a 1295 Form required? * Yes ❑ No 21 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 105107 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 0 No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.